IR 05000259/2021010: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML21207A006
| number = ML21047A473
| issue date = 07/26/2021
| issue date = 02/16/2021
| title = Design Basis Assurance Inspection (Teams) Inspection Report 05000259/2021010 and 05000260/2021010 and 05000296/2021010
| title = Notification of Browns Ferry Nuclear Power Plant Design Bases Assurance Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000259/2021010, 05000260/2021010, and 05000296/2021010
| author name = Baptist J
| author name = Baptist J
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS/EB1
| addressee name = Barstow J
| addressee name = Barstow J
| addressee affiliation = Tennessee Valley Authority
| addressee affiliation = Tennessee Valley Authority
Line 10: Line 10:
| license number = DPR-033, DPR-052, DPR-068
| license number = DPR-033, DPR-052, DPR-068
| contact person =  
| contact person =  
| case reference number = EPID I-2021-010-0038
| document report number = IR 2021010
| document report number = IR 2021010
| document type = Inspection Report
| document type = Inspection Plan, Letter
| page count = 17
| page count = 5
}}
}}


Line 19: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:February 16, 2021
 
==SUBJECT:==
NOTIFICATION OF BROWNS FERRY NUCLEAR POWER PLANT DESIGN BASES ASSURANCE INSPECTION - U.S. NUCLEAR REGULATORY COMMISSION INSPECTION REPORT 05000259/2021010, 05000260/2021010, AND 05000296/2021010
 
==Dear Mr. Barstow:==
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II staff will conduct a Design Bases Assurance Inspection (DBAI) at your Browns Ferry Nuclear Power Plant during the weeks of May 17 - 21, and June 7 - 11, 2021.
 
Mr. Marcus Riley, a reactor inspector from the NRCs Region II office, will lead the inspection team. The inspection will be conducted in accordance with Inspection Procedure 71111.21M, Design Bases Assurance Inspection (Teams), dated December 8, 2016 (ADAMS ML16238A320).
 
The inspection will evaluate the capability of components that have been modified and risk-significant/low-margin components to function as designed and to support proper system operation. The inspection will also include a review of selected operator actions, operating experience, and modifications.
 
During a telephone conversation on February 11, 2021, with Mr. Denzel Housley, we confirmed arrangements for an information-gathering site visit and the two-week onsite inspection. The schedule is as follows:
* Information-gathering visit: Week of April 26 - 30, 2021
*
Onsite weeks: Weeks of May 17 - 21, and June 7 - 11, 2021
 
The purpose of the information-gathering visit is to meet with members of your staff to identify components that have been modified, risk-significant components, and operator actions.
 
Information and documentation needed to support the inspection will also be identified.
 
Mr. Andy Rosebrook, a Region II Senior Risk Analyst, will support Mr. Riley during the information-gathering visit to review probabilistic risk assessment data and identify components to be examined during the inspection. Additionally, during the onsite weeks, time will be needed on the plant-referenced simulator in order to facilitate the development of operator action-based scenarios. The enclosure lists documents that will be needed prior to the information-gathering visit.
 
Please provide the referenced information to the Region II Office by Friday, April 16, 2021.
 
Additional documents will be requested following the information-gathering visit. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation. The additional information will be needed in the Region II office by Friday, May 7, 2021, to support the inspection teams preparation week. During the information-gathering trip, Mr. Riley will also discuss the following inspection support administrative details, as applicable: (1) availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; (2) method of tracking inspector requests during the inspection; (3) licensee computer access; (4) working space; (5)
arrangements for site access; and (6) other applicable information.
 
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
Thank you for your cooperation in this matter. If you have any questions, regarding the information requested or the inspection, please contact Mr. Riley at 404-997-4888 or contact me at 404-997-4506.
 
Sincerely,
/RA/
 
James Baptist, Chief
 
Engineering Branch 1
 
Division of Reactor Safety
 
Docket Nos.: 50-259, 50-260, 50-296 License Nos.: DPR-33, DPR-52, DPR-68
 
Enclosure:
Notification of Browns Ferry Nuclear Power Plant, Design Bases Assurance Inspection (Teams)
 
cc: Distribution via Listserv
 
ML21047A473 X
SUNSI Review
 
X Non-Sensitive
 
Sensitive
 
X Publicly Available
 
Non-Publicly Available
 
OFFICE RII/DRS RII/DRS
 
NAME M. Riley J. Baptist
 
DATE 02/12/2021 02/12/2021
 
Enclosure INFORMATION REQUEST FOR BROWNS FERRY NUCLEAR POWER PLANT DESIGN BASES ASSURANCE INSPECTION (TEAMS)
 
Please provide the information electronically in.pdf files, Excel, or other searchable format on CDROM (or FTP site, SharePoint, etc.). The CDROM (or website) should be indexed and hyperlinked to facilitate ease of use. The requested items below, identified with an asterisk (*),
should have a date range from January 1, 2018, until present.
 
1.
* List and brief description of permanent and field work completed plant modifications including permanent plant changes, design changes, set point changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications. Include an index of systems (system numbers/designators and corresponding names), the safety classification for each modification, and type of modification.
 
2.
 
From your most recent probabilistic safety analysis (PSA) excluding external events and fires:
 
a. Two risk rankings of components from your site-specific PSA: one sorted by Risk Achievement Worth (RAW), and the other sorted by Birnbaum Importance
 
b. A list of the top 500 cut-sets
 
c. A list of the top 500 LERF contributors
 
3.
 
From your most recent PSA including external events and fires:
 
a. Two risk rankings of components from your site-specific PSA: one sorted by RAW, and the other sorted by Birnbaum Importance
 
b. A list of the top 500 cut-sets
 
4.
 
Risk ranking of operator actions from your site-specific PSA sorted by RAW and human reliability worksheets for these items
 
5.
 
List of time-critical operator actions with a brief description of each action
 
6.
* List of components with low-design margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design-required output, heat exchangers close to rated design heat removal, and motor-operated valve risk-margin rankings, etc.) and associated evaluations or calculations
 
7.
* List and brief description of Root Cause Evaluations performed 8.
* List and brief description of common-cause component failures that have occurred
 
9.
* List and brief description of Operability Determinations and Functionality Assessments
 
10. *List and reason for equipment that has been classified in maintenance rule (a)(1) status
 
11. *List of equipment on the sites Station Equipment Reliability Issues List, including a description of the reason(s) why each component is on that list, and summaries (if available) of your plans to address the issue(s) along with dates added or removed from the issues list
 
12. List of current operator work arounds/burdens
 
13. Copy of Updated Final Safety Analysis Report
 
14. Copy of Technical Specification(s)
 
15. Copy of Technical Specifications Bases
 
16. Copy of Technical Requirements Manual(s)
 
17. Copy of the Quality Assurance Program Manual
 
18. Copy of Corrective Action Program Procedure(s)
 
19. Copy of Operability Determination Procedure(s)
 
20. List of motor operated valves and air operated valves in the valve program, and their associated design margin and risk ranking
 
21. Primary AC and DC calculations for safety-related buses
 
22. One-line diagram of electrical plant (Electronic only)
 
23. Index and legend for electrical plant one-line diagrams
 
24. Piping and instrumentation diagrams (P&IDs) for safety-related systems (Electronic)
 
25. Index and legend for P&IDs
 
26. Index (procedure number, title, and current revision) of station Emergency Operating Procedures, Abnormal Operating Procedures, and Annunciator Response Procedures
 
27. Copies of corrective action documents generated from previous CDBI
 
28. Copy of any self-assessments performed, and corrective action documents generated, in preparation for current DBAI
 
29. Contact information for a person to discuss PSA information prior to and during the information-gathering trip (Name, title, phone number, and e-mail address)
}}
}}

Latest revision as of 11:03, 29 November 2024

Notification of Browns Ferry Nuclear Power Plant Design Bases Assurance Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000259/2021010, 05000260/2021010, and 05000296/2021010
ML21047A473
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 02/16/2021
From: James Baptist
NRC/RGN-II/DRS/EB1
To: Jim Barstow
Tennessee Valley Authority
References
IR 2021010
Download: ML21047A473 (5)


Text

February 16, 2021

SUBJECT:

NOTIFICATION OF BROWNS FERRY NUCLEAR POWER PLANT DESIGN BASES ASSURANCE INSPECTION - U.S. NUCLEAR REGULATORY COMMISSION INSPECTION REPORT 05000259/2021010, 05000260/2021010, AND 05000296/2021010

Dear Mr. Barstow:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a Design Bases Assurance Inspection (DBAI) at your Browns Ferry Nuclear Power Plant during the weeks of May 17 - 21, and June 7 - 11, 2021.

Mr. Marcus Riley, a reactor inspector from the NRCs Region II office, will lead the inspection team. The inspection will be conducted in accordance with Inspection Procedure 71111.21M, Design Bases Assurance Inspection (Teams), dated December 8, 2016 (ADAMS ML16238A320).

The inspection will evaluate the capability of components that have been modified and risk-significant/low-margin components to function as designed and to support proper system operation. The inspection will also include a review of selected operator actions, operating experience, and modifications.

During a telephone conversation on February 11, 2021, with Mr. Denzel Housley, we confirmed arrangements for an information-gathering site visit and the two-week onsite inspection. The schedule is as follows:

  • Information-gathering visit: Week of April 26 - 30, 2021

Onsite weeks: Weeks of May 17 - 21, and June 7 - 11, 2021

The purpose of the information-gathering visit is to meet with members of your staff to identify components that have been modified, risk-significant components, and operator actions.

Information and documentation needed to support the inspection will also be identified.

Mr. Andy Rosebrook, a Region II Senior Risk Analyst, will support Mr. Riley during the information-gathering visit to review probabilistic risk assessment data and identify components to be examined during the inspection. Additionally, during the onsite weeks, time will be needed on the plant-referenced simulator in order to facilitate the development of operator action-based scenarios. The enclosure lists documents that will be needed prior to the information-gathering visit.

Please provide the referenced information to the Region II Office by Friday, April 16, 2021.

Additional documents will be requested following the information-gathering visit. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation. The additional information will be needed in the Region II office by Friday, May 7, 2021, to support the inspection teams preparation week. During the information-gathering trip, Mr. Riley will also discuss the following inspection support administrative details, as applicable: (1) availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; (2) method of tracking inspector requests during the inspection; (3) licensee computer access; (4) working space; (5)

arrangements for site access; and (6) other applicable information.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Thank you for your cooperation in this matter. If you have any questions, regarding the information requested or the inspection, please contact Mr. Riley at 404-997-4888 or contact me at 404-997-4506.

Sincerely,

/RA/

James Baptist, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos.: 50-259, 50-260, 50-296 License Nos.: DPR-33, DPR-52, DPR-68

Enclosure:

Notification of Browns Ferry Nuclear Power Plant, Design Bases Assurance Inspection (Teams)

cc: Distribution via Listserv

ML21047A473 X

SUNSI Review

X Non-Sensitive

Sensitive

X Publicly Available

Non-Publicly Available

OFFICE RII/DRS RII/DRS

NAME M. Riley J. Baptist

DATE 02/12/2021 02/12/2021

Enclosure INFORMATION REQUEST FOR BROWNS FERRY NUCLEAR POWER PLANT DESIGN BASES ASSURANCE INSPECTION (TEAMS)

Please provide the information electronically in.pdf files, Excel, or other searchable format on CDROM (or FTP site, SharePoint, etc.). The CDROM (or website) should be indexed and hyperlinked to facilitate ease of use. The requested items below, identified with an asterisk (*),

should have a date range from January 1, 2018, until present.

1.

  • List and brief description of permanent and field work completed plant modifications including permanent plant changes, design changes, set point changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications. Include an index of systems (system numbers/designators and corresponding names), the safety classification for each modification, and type of modification.

2.

From your most recent probabilistic safety analysis (PSA) excluding external events and fires:

a. Two risk rankings of components from your site-specific PSA: one sorted by Risk Achievement Worth (RAW), and the other sorted by Birnbaum Importance

b. A list of the top 500 cut-sets

c. A list of the top 500 LERF contributors

3.

From your most recent PSA including external events and fires:

a. Two risk rankings of components from your site-specific PSA: one sorted by RAW, and the other sorted by Birnbaum Importance

b. A list of the top 500 cut-sets

4.

Risk ranking of operator actions from your site-specific PSA sorted by RAW and human reliability worksheets for these items

5.

List of time-critical operator actions with a brief description of each action

6.

  • List of components with low-design margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design-required output, heat exchangers close to rated design heat removal, and motor-operated valve risk-margin rankings, etc.) and associated evaluations or calculations

7.

  • List and brief description of Root Cause Evaluations performed 8.
  • List and brief description of common-cause component failures that have occurred

9.

10. *List and reason for equipment that has been classified in maintenance rule (a)(1) status

11. *List of equipment on the sites Station Equipment Reliability Issues List, including a description of the reason(s) why each component is on that list, and summaries (if available) of your plans to address the issue(s) along with dates added or removed from the issues list

12. List of current operator work arounds/burdens

13. Copy of Updated Final Safety Analysis Report 14. Copy of Technical Specification(s)

15. Copy of Technical Specifications Bases

16. Copy of Technical Requirements Manual(s)

17. Copy of the Quality Assurance Program Manual

18. Copy of Corrective Action Program Procedure(s)

19. Copy of Operability Determination Procedure(s)

20. List of motor operated valves and air operated valves in the valve program, and their associated design margin and risk ranking

21. Primary AC and DC calculations for safety-related buses

22. One-line diagram of electrical plant (Electronic only)

23. Index and legend for electrical plant one-line diagrams

24. Piping and instrumentation diagrams (P&IDs) for safety-related systems (Electronic)

25. Index and legend for P&IDs

26. Index (procedure number, title, and current revision) of station Emergency Operating Procedures, Abnormal Operating Procedures, and Annunciator Response Procedures

27. Copies of corrective action documents generated from previous CDBI

28. Copy of any self-assessments performed, and corrective action documents generated, in preparation for current DBAI

29. Contact information for a person to discuss PSA information prior to and during the information-gathering trip (Name, title, phone number, and e-mail address)