Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Clinton 2022 Initial License Exam Outline Review Comments | | {{#Wiki_filter:Clinton 2022 Initial License Exam Outline Review Comments Simulator Scenario Outline Comments NRC: For EOP entered identify expected EOP significant actions to be taken by each crew member. Simply stating to perform EOP actions as directed is not sufficient. |
| | |
| Simulator Scenario Outline Comments | |
| * NRC: For EOP entered identify expected EOP significant actions to be taken by each crew member. Simply stating to perform EOP actions as directed is not sufficient.
| |
| | |
| Facility: Additional detail was added to the SRO portion for the applicable EOPs. | | Facility: Additional detail was added to the SRO portion for the applicable EOPs. |
| * NRC: For scenario 2 the scenario guide identifies the blowdown as Critical Task
| | NRC: For scenario 2 the scenario guide identifies the blowdown as Critical Task |
| -3 when it should be Critical Task-2.
| | -3 when it should be Critical Task-2. |
| | | Facility: Blowdown changed to CT-2 NRC: Does the manual initiation of SBGT and manual isolation of VF critical meet the definition of a critical task? These are mitigation strategies necessary to prevent/minimize onsite exposures and offsite releases and affect the mitigating strategy. If radiation levels are high enough to warrant these actions, then they are a critical task to be completed. |
| Facility: Blowdown changed to CT-2 | |
| * NRC: Does the manual initiation of SBGT and manual isolation of VF critical meet the definition of a critical task? These are mitigation strategies necessary to prevent/minimize onsite exposures and offsite releases and affect the mitigating strategy. If radiation levels are high enough to warrant these actions, then they are a critical task to be completed.
| |
| | |
| Facility: The RPV instrument line leak is large enough to result in the necessary actuation but not large enough to meet the definition of a critical task. No change is needed. | | Facility: The RPV instrument line leak is large enough to result in the necessary actuation but not large enough to meet the definition of a critical task. No change is needed. |
| * NRC: Add an examiner note that the ATC returns and controls hotwell level to between 36 and 55 inches as the low level alarm does not annunciate until 23 inches and will be outside of the normal level.
| | NRC: Add an examiner note that the ATC returns and controls hotwell level to between 36 and 55 inches as the low level alarm does not annunciate until 23 inches and will be outside of the normal level. |
| | | Facility: Examiner note was added. |
| Facility: Examin er note was added. | | NRC: For scenario 3 event 4, consider modifying malfunction setup to activate the malfunction a few seconds after the Drive Out push-button is depressed. The stuck detector may be identified by either observing the IRM channel responses and/or when the detector Out light does not illuminate. |
| * NRC: For scenario 3 event 4, consider modifying malfunction setup to activate the malfunction a few seconds after the Drive Out push-button is depressed. The stuck detector may be identified by either observing the IRM channel responses and/or when the detector Out light does not illuminate.
| | Facility: During OV it was determined that the stuck detector was identified by the operators without the need for the detector Out light to fail. No changes made. |
| | NRC: Op-CL-108-107-1002, Degraded Grid Actions requires that the load reduction be completed within 15 minutes. The info could be read that the load |
|
| |
|
| Facility: During OV it was determined that the stuck detector was identified by the operators without the need for the detector Out light to fail. No changes made.
| | reduction either be started within 15 minutes or completed within 15 minutes. |
| * NRC: Op-CL-108-107-1002, Degraded Grid Actions requires that the load reduction be completed within 15 minutes. The info could be read that the load reduction either be started within 15 minutes or completed wi thin 15 minutes.
| |
| Add the completion requirements to the SRO notes. | | Add the completion requirements to the SRO notes. |
| * Facility: Note added.
| | Facility: Note added. |
| | | JPM Outline Comments NRC: Reminder that JPM task standards must clearly indicate how the critical steps were dentified. For instance generally stating do something in accordance with a procedure is not adequate as it can be construed that any verifiable actions steps done when performing that procedure would be critical. |
| JPM Outline Comments | | Facility: No comments NRC: All JPM cover sheets will need approval signatures and dates for final submittal. Repeat comment from the previous exam. |
| * NRC: Reminder that JPM task standards must clearly indicate how the critical steps were dentified. For instance generally stating do something in accordance with a procedure is not adequate as it can be construed that any verifiable actions steps done when performing that procedure would be critical.
| | Facility: Signatures and dates added NRC: Ensure that the examinee cue sheets reflect any changes made to the initial conditions and/or iniating cues. |
| | | Facility: Done NRC: JPM 417 - Step 7 has the applicant place handswitch 1HS-VR101 in the neutral position in accordance with step 8.1.3.1.1 but des not ensure that the applicant verify the various dampers and fans go closed or stop as applicable. |
| Facility: No comments | |
| * NRC: All JPM cover sheets will need approval signatures and dates for final submittal. Repeat comment from the previous exam.
| |
| | |
| Facility: Signatures and dates added | |
| * NRC: Ensure that the examinee cue sheets reflect any changes made to the initial conditions and/or iniating cues.
| |
| | |
| Facility: Done | |
| * NRC: JPM 417 - Step 7 has the applicant place handswitch 1HS-VR101 in the neutral position in accordance with step 8.1.3.1.1 but des not ensure that the applicant verify the various dampers and fans go closed or stop as applicable.
| |
| | |
| Facility: Information was added. | | Facility: Information was added. |
| * NRC: JPM 417 - Step 8.1.3.1.5 of procedure CPS 3408.01 needs to be added to the JPM.
| | NRC: JPM 417 - Step 8.1.3.1.5 of procedure CPS 3408.01 needs to be added to the JPM. |
| | | Facility: Step added NRC: JPM 065 - Procedure references wrong. Step 6 of JPM is supposed to reference procedure 3503.01, step 8.2.3.6 but instead references step 8.2.1.5.6 which does not exist. |
| Facility: Step added | | Facility: Corrected |
| * NRC: JPM 065 - Procedure references wrong. Step 6 of JPM is supposed to reference procedure 3503.01, step 8.2.3.6 but instead references step 8.2.1.5.6 which does not exist.
| | *}} |
| | |
| Facility: Corrected | |
| | |
| *}}
| |
|
---|
Category:License-Operator
MONTHYEARML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 ML23258A0212023-09-15015 September 2023 Form 5.1-1 Post-Examination Check Sheet (Clinton 2023) IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 ML23258A0132023-08-24024 August 2023 Form 1.3-1 Examination Security Agreement (Clinton 2023) ML23258A0162023-08-24024 August 2023 Form 2.1-1 Examination Prep Checklist (Clinton 2023) ML23258A0232023-08-0101 August 2023 Post-Exam Comments (None, Clinton 2023) ML23258A0222023-08-0101 August 2023 Licensee Post-Exam Submittal Letter (Clinton 2023) ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23258A0522023-07-0808 July 2023 Form 3.4-1 Events and Evolutions Checklist (Clinton 2023) ML23258A0502023-07-0808 July 2023 Form 2.3-1 Examination Outline Quality Checklist (Clinton 2023) ML23258A0942023-07-0606 July 2023 Form 2.3-4 Written Examination Quality Checklist (Clinton 2023) ML23258A0932023-07-0606 July 2023 Form 2.3-2 Operating Test Quality Checklist (Clinton 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23258A0952023-04-0606 April 2023 Licensee Exam Submittal Letter (Clinton 2023) ML23258A0562023-02-0606 February 2023 Licensee Outline Submission Letter (Clinton 2023) ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22153A5202022-01-28028 January 2022 ES-201-2 Clinton ML22157A3782022-01-28028 January 2022 ES-201-3 Pre Exam ML22153A4902022-01-28028 January 2022 Scenarios ML22157A0722022-01-28028 January 2022 Administered Scenarios ML22153A5142022-01-28028 January 2022 Inplant JPM ML22153A5102022-01-28028 January 2022 ES-401-6 Clinton 2022 ML22153A4882022-01-28028 January 2022 RO Admin JPM ML22153A4942022-01-28028 January 2022 Sim JPM ML22157A0762022-01-28028 January 2022 Administered Sim JPM ML22157A3752022-01-28028 January 2022 ES-201-1 Exam Prep Checklist ML22157A3772022-01-28028 January 2022 ES-201-3 Post Exam Security Agreement ML22157A4102022-01-28028 January 2022 ES-401-4 Record of Rejected KAs Jan 22 Clinton Written Exam ML22153A5292022-01-28028 January 2022 ES-D-1 Clinton Jan 2022 ML22157A3952022-01-28028 January 2022 ES-301-7 Op Test Review Wksht Clinton 22 ML22153A5282022-01-28028 January 2022 ES-401-3 Clinton Jan 2022 ML22153A5222022-01-28028 January 2022 ES-301-5 Clinton 2022 ML22157A1192022-01-28028 January 2022 Administered SRO Written Exam ML22157A0862022-01-28028 January 2022 Administered SRO Admin JPM ML22157A1452022-01-28028 January 2022 Administered in Plant JPM U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22153A5072022-01-28028 January 2022 ILT 20-1 NRC RO and SRO Submittal ML22153A5272022-01-28028 January 2022 ES-401-1 Clinton Jan 2022 ML22153A5172022-01-28028 January 2022 ES-201-2 Clinton 2022 NRC Written Outline Only ML22153A4782022-01-28028 January 2022 ES-301-3 ML22153A4762022-01-28028 January 2022 U-604644 - CPS Submittal of Integrated Initial License Training Examination Materials - 75-Day ML22153A5302022-01-28028 January 2022 ES-301-1 Clinton Jan 22 ML22157A1982022-01-28028 January 2022 Administered RO Admin JPM ML22153A4982022-01-28028 January 2022 SRO Admin JPM ML22157A4162022-01-28028 January 2022 Outline Review Comments Clinton 2022 ML22153A4682022-01-28028 January 2022 ES-301-4 2024-06-27
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 ML23258A0212023-09-15015 September 2023 Form 5.1-1 Post-Examination Check Sheet (Clinton 2023) IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 ML23258A0132023-08-24024 August 2023 Form 1.3-1 Examination Security Agreement (Clinton 2023) ML23258A0162023-08-24024 August 2023 Form 2.1-1 Examination Prep Checklist (Clinton 2023) ML23258A0222023-08-0101 August 2023 Licensee Post-Exam Submittal Letter (Clinton 2023) ML23258A0232023-08-0101 August 2023 Post-Exam Comments (None, Clinton 2023) ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23258A0502023-07-0808 July 2023 Form 2.3-1 Examination Outline Quality Checklist (Clinton 2023) ML23258A0522023-07-0808 July 2023 Form 3.4-1 Events and Evolutions Checklist (Clinton 2023) ML23258A0932023-07-0606 July 2023 Form 2.3-2 Operating Test Quality Checklist (Clinton 2023) ML23258A0942023-07-0606 July 2023 Form 2.3-4 Written Examination Quality Checklist (Clinton 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23258A0952023-04-0606 April 2023 Licensee Exam Submittal Letter (Clinton 2023) ML23258A0562023-02-0606 February 2023 Licensee Outline Submission Letter (Clinton 2023) ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22153A5282022-01-28028 January 2022 ES-401-3 Clinton Jan 2022 ML22153A5102022-01-28028 January 2022 ES-401-6 Clinton 2022 ML22157A1192022-01-28028 January 2022 Administered SRO Written Exam ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22157A0762022-01-28028 January 2022 Administered Sim JPM ML22153A4762022-01-28028 January 2022 U-604644 - CPS Submittal of Integrated Initial License Training Examination Materials - 75-Day ML22153A4722022-01-28028 January 2022 ES-301-6 ML22157A3772022-01-28028 January 2022 ES-201-3 Post Exam Security Agreement ML22153A4782022-01-28028 January 2022 ES-301-3 ML22157A3782022-01-28028 January 2022 ES-201-3 Pre Exam ML22153A5202022-01-28028 January 2022 ES-201-2 Clinton ML22157A4142022-01-28028 January 2022 ES-401-9 Written Exam Review Wksht Clinton 22 U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 ML22153A5172022-01-28028 January 2022 ES-201-2 Clinton 2022 NRC Written Outline Only ML22153A5292022-01-28028 January 2022 ES-D-1 Clinton Jan 2022 ML22153A5222022-01-28028 January 2022 ES-301-5 Clinton 2022 ML22157A4162022-01-28028 January 2022 Outline Review Comments Clinton 2022 ML22157A3952022-01-28028 January 2022 ES-301-7 Op Test Review Wksht Clinton 22 ML22153A5272022-01-28028 January 2022 ES-401-1 Clinton Jan 2022 ML22157A1452022-01-28028 January 2022 Administered in Plant JPM ML22153A4942022-01-28028 January 2022 Sim JPM ML22157A3752022-01-28028 January 2022 ES-201-1 Exam Prep Checklist ML22153A5072022-01-28028 January 2022 ILT 20-1 NRC RO and SRO Submittal ML22153A5142022-01-28028 January 2022 Inplant JPM ML22157A0702022-01-28028 January 2022 Administered RO Written Exam ML22153A4682022-01-28028 January 2022 ES-301-4 ML22157A0862022-01-28028 January 2022 Administered SRO Admin JPM ML22153A5252022-01-28028 January 2022 ES-301-2 Clinton Jan 22 ML22157A4102022-01-28028 January 2022 ES-401-4 Record of Rejected KAs Jan 22 Clinton Written Exam ML22157A3822022-01-28028 January 2022 ES-403-1 Clinton 2022 ML22153A4902022-01-28028 January 2022 Scenarios 2024-06-27
[Table view] |
Text
Clinton 2022 Initial License Exam Outline Review Comments Simulator Scenario Outline Comments NRC: For EOP entered identify expected EOP significant actions to be taken by each crew member. Simply stating to perform EOP actions as directed is not sufficient.
Facility: Additional detail was added to the SRO portion for the applicable EOPs.
NRC: For scenario 2 the scenario guide identifies the blowdown as Critical Task
-3 when it should be Critical Task-2.
Facility: Blowdown changed to CT-2 NRC: Does the manual initiation of SBGT and manual isolation of VF critical meet the definition of a critical task? These are mitigation strategies necessary to prevent/minimize onsite exposures and offsite releases and affect the mitigating strategy. If radiation levels are high enough to warrant these actions, then they are a critical task to be completed.
Facility: The RPV instrument line leak is large enough to result in the necessary actuation but not large enough to meet the definition of a critical task. No change is needed.
NRC: Add an examiner note that the ATC returns and controls hotwell level to between 36 and 55 inches as the low level alarm does not annunciate until 23 inches and will be outside of the normal level.
Facility: Examiner note was added.
NRC: For scenario 3 event 4, consider modifying malfunction setup to activate the malfunction a few seconds after the Drive Out push-button is depressed. The stuck detector may be identified by either observing the IRM channel responses and/or when the detector Out light does not illuminate.
Facility: During OV it was determined that the stuck detector was identified by the operators without the need for the detector Out light to fail. No changes made.
NRC: Op-CL-108-107-1002, Degraded Grid Actions requires that the load reduction be completed within 15 minutes. The info could be read that the load
reduction either be started within 15 minutes or completed within 15 minutes.
Add the completion requirements to the SRO notes.
Facility: Note added.
JPM Outline Comments NRC: Reminder that JPM task standards must clearly indicate how the critical steps were dentified. For instance generally stating do something in accordance with a procedure is not adequate as it can be construed that any verifiable actions steps done when performing that procedure would be critical.
Facility: No comments NRC: All JPM cover sheets will need approval signatures and dates for final submittal. Repeat comment from the previous exam.
Facility: Signatures and dates added NRC: Ensure that the examinee cue sheets reflect any changes made to the initial conditions and/or iniating cues.
Facility: Done NRC: JPM 417 - Step 7 has the applicant place handswitch 1HS-VR101 in the neutral position in accordance with step 8.1.3.1.1 but des not ensure that the applicant verify the various dampers and fans go closed or stop as applicable.
Facility: Information was added.
NRC: JPM 417 - Step 8.1.3.1.5 of procedure CPS 3408.01 needs to be added to the JPM.
Facility: Step added NRC: JPM 065 - Procedure references wrong. Step 6 of JPM is supposed to reference procedure 3503.01, step 8.2.3.6 but instead references step 8.2.1.5.6 which does not exist.
Facility: Corrected