{{#Wiki_filter:Vogtle Unit 4 4Q/2021 Performance Summary | {{#Wiki_filter:Vogtle Unit 4 4Q /2021 Performance Summary | ||
Design Engineering Back to Top Procurement/Fabrication Back to Top Construction/Installation Identified By: NRC Identification Date: 11/29/2021 Significance: Green Item Type: Construction Finding Report: Vogtle Electric Generating Plant, Units 3 And 4 - NRC Initial Test Program and Operational Programs Integrated Inspection Reports 05200025/2021008, 05200026/2021008 Item Number: 05200026/2021008-02 Note: Open in Report (NCV) | Construction Action Matrix Column: | ||
Failure to Follow Procedure CNSITPP-502 NRC inspectors identified a construction finding of very low safety significance and an associated NCV of 10 CFR, Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the licensees failure to accomplish activities associated with local leak rate testing of electrical penetration 4-IDSC-EY-P29Y in accordance with procedure 4-CNS-ITPP-502, Containment Penetration Leak Rate (Type B) | |||
Licensee Response | |||
Construction Safeguards Operational Reactor Safety Programs Readiness | |||
Design/ Procurement/ Construction/ Inspection/ Security Operational Engineering Fabrication Installation Testing Programs Programs | |||
Most Significant Inspection Findings | |||
4Q/202 1 No findings No findings G No findings No findings No findings this quarter this quarter this quarter this quarter this quarter | |||
3Q/2021 No findings No findings No findings No findings No findings No findings this quarter this quarter this quarter this quarter this quarter this quarter | |||
2Q/2021 No findings No findings No findings No findings No findings No findings this quarter this quarter this quarter this quarter this quarter this quarter | |||
1Q/202 1 No findings No findings No findings No findings No findings No findings this quarter this quarter this quarter this quarter this quarter this quarter | |||
Additional Inspection and Assessment Information | |||
List of Construction Inspection Reports | |||
' List of Construction Assessment Reports/Inspection Plans | |||
Vogtle Unit 4 Findings Archive | |||
Design Engineering | |||
Back to Top Procurement/Fabrication | |||
Back to Top Construction/Installation | |||
Identified By: NRC Identification Date: 11/29/2021 Significance: Green Item Type: Construction Finding Report: Vogtle Electric Generating Plant, Units 3 And 4 - NRC Initial Test Program and Operational Programs Integrated Inspection Reports 05200025/2021008, 05200026/2021008 Item Number: 05200026/2021008- 02 Note: Open in Report (NCV) | |||
Failure to Follow Procedure CNSITPP-502 | |||
NRC inspectors identified a construction finding of very low safety significance and an associated NCV of 10 CFR, Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the licensees failure to accomplish activities associated with local leak rate testing of electrical penetration 4-IDSC-EY-P29Y in accordance with procedure 4-CNS-ITPP-502, Containment Penetration Leak Rate (Type B) | |||
Preoperational Test, Version 1.0. Specifically, the licensee failed to wait for flowmeter readings to stabilize prior to recording the leak rate data and inappropriately declaring the test acceptance criteria met. The licensee entered this issue into its CAP as CR 50116481. | Preoperational Test, Version 1.0. Specifically, the licensee failed to wait for flowmeter readings to stabilize prior to recording the leak rate data and inappropriately declaring the test acceptance criteria met. The licensee entered this issue into its CAP as CR 50116481. | ||
The performance deficiency was determined to be of more than minor safety significance and thus a finding because it rendered the quality of a structure, system, or component (SSC) unacceptable or indeterminate and required substantial corrective action. The inspectors determined the finding was associated with the containment and was of very low safety significance (Green) because the issue did not affect a design function. The inspectors determined the finding had a cross-cutting aspect of training, in the area of Human Performance. Specifically, the organization failed to ensure that test personnel were trained to perform tests in a consistent manner. | The performance deficiency was determined to be of more than minor safety significance and thus a finding because it rendered the quality of a structure, system, or component (SSC) unacceptable or indeterminate and required substantial corrective action. The inspectors determined the finding was associated with the containment and was of very low safety significance (Green) because the issue did not affect a design function. The inspectors determined the finding had a cross-cutting aspect of training, in the area of Human Performance. Specifically, the organization failed to ensure that test personnel were trained to perform tests in a consistent manner. | ||
Back to Top Inspection/Testing Back to Top Security Programs Back to Top Operational Programs Back to Top}} | |||
Back to Top Inspection/Testing | |||
Back to Top Security Programs | |||
Back to Top | |||
Operational Programs | |||
Back to Top}} |
Latest revision as of 14:48, 18 November 2024
ML22060A007 | |
Person / Time | |
---|---|
Issue date: | 02/28/2022 |
From: | NRC/NRR/VPOB |
To: | |
Armstrong G | |
References | |
Download: ML22060A007 (2) | |
Text
Vogtle Unit 4 4Q /2021 Performance Summary
Construction Action Matrix Column:
Licensee Response
Construction Safeguards Operational Reactor Safety Programs Readiness
Design/ Procurement/ Construction/ Inspection/ Security Operational Engineering Fabrication Installation Testing Programs Programs
Most Significant Inspection Findings
4Q/202 1 No findings No findings G No findings No findings No findings this quarter this quarter this quarter this quarter this quarter
3Q/2021 No findings No findings No findings No findings No findings No findings this quarter this quarter this quarter this quarter this quarter this quarter
2Q/2021 No findings No findings No findings No findings No findings No findings this quarter this quarter this quarter this quarter this quarter this quarter
1Q/202 1 No findings No findings No findings No findings No findings No findings this quarter this quarter this quarter this quarter this quarter this quarter
Additional Inspection and Assessment Information
List of Construction Inspection Reports
' List of Construction Assessment Reports/Inspection Plans
Vogtle Unit 4 Findings Archive
Design Engineering
Back to Top Procurement/Fabrication
Back to Top Construction/Installation
Identified By: NRC Identification Date: 11/29/2021 Significance: Green Item Type: Construction Finding Report: Vogtle Electric Generating Plant, Units 3 And 4 - NRC Initial Test Program and Operational Programs Integrated Inspection Reports 05200025/2021008, 05200026/2021008 Item Number: 05200026/2021008- 02 Note: Open in Report (NCV)
Failure to Follow Procedure CNSITPP-502
NRC inspectors identified a construction finding of very low safety significance and an associated NCV of 10 CFR, Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the licensees failure to accomplish activities associated with local leak rate testing of electrical penetration 4-IDSC-EY-P29Y in accordance with procedure 4-CNS-ITPP-502, Containment Penetration Leak Rate (Type B)
Preoperational Test, Version 1.0. Specifically, the licensee failed to wait for flowmeter readings to stabilize prior to recording the leak rate data and inappropriately declaring the test acceptance criteria met. The licensee entered this issue into its CAP as CR 50116481.
The performance deficiency was determined to be of more than minor safety significance and thus a finding because it rendered the quality of a structure, system, or component (SSC) unacceptable or indeterminate and required substantial corrective action. The inspectors determined the finding was associated with the containment and was of very low safety significance (Green) because the issue did not affect a design function. The inspectors determined the finding had a cross-cutting aspect of training, in the area of Human Performance. Specifically, the organization failed to ensure that test personnel were trained to perform tests in a consistent manner.