MONTHYEARML23289A2302023-10-16016 October 2023 Discrimination Allegations Received Sept - 2023 ML23289A2292023-10-16016 October 2023 Allegations Substantiated with Regulatory Response - Sept 2023 ML23289A2272023-10-16016 October 2023 Allegations Substantiated - September 2023 ML23289A2232023-10-16016 October 2023 Allegations Received from All Sources External to the NRC - Sept 2023 ML23289A2212023-07-28028 July 2023 Allegations Open - Sept 2023 ML22348A0872023-07-25025 July 2023 Enclosure - VEGP Unit 4 - 103g - Final Memorandum Table ML23184A0472023-07-0303 July 2023 Dashboard Report 7-3-2023 ML23121A0392023-05-0101 May 2023 Dashboard Report 5-1-2023 ML23093A0862023-04-0303 April 2023 Dashboard Report 4-3-2023 ML22214B4932023-02-0808 February 2023 Enclosure 2 - Licensing Actions Status Table ML22214B4902023-02-0808 February 2023 Enclosure 1 - Operational Program Inspection Status Table ML23038A0082023-02-0707 February 2023 Construction Reactor Oversight Process Resources Report February 7, 2023 ML23033A0232023-02-0202 February 2023 Dashboard Report 2-2-2023 ML22278A0382022-10-0505 October 2022 Dashboard Report 10-5-2022 ML22230C5162022-08-18018 August 2022 Dashboard Report 8-18-2022 ML22208A0242022-08-0101 August 2022 103g - Final Memorandum - Enclosure ML22206A1682022-07-25025 July 2022 Dashboard Report 7-25-2022 ML22206A1712022-07-25025 July 2022 Dashboard Report 7-25-2022 ML22201A0442022-07-20020 July 2022 Voices Dashboard Report for Vogtle Unit 3 as of July 20, 2022 ML22186A0332022-07-0505 July 2022 Dashboard Report 7-5-2022 ML22186A0342022-07-0505 July 2022 Dashboard Report 7-5-2022 ML22173A0122022-06-22022 June 2022 Dashboard Report 6-22-2022 ML22144A0492022-05-24024 May 2022 Dashboard Report 5-24-2022 ML22144A0502022-05-24024 May 2022 Dashboard Report 5-24-2022 ND-22-0242, Request for Alternative: Alternative Requirements for Main Turbine System Valve Testing (VEGP 3&4-IST-ALT-02)2022-04-0808 April 2022 Request for Alternative: Alternative Requirements for Main Turbine System Valve Testing (VEGP 3&4-IST-ALT-02) ML22091A3162022-04-0101 April 2022 NRC Initial Test Program and Operational Programs Inspection Reports 05200025/2022002, 05200026/2022002 ML22087A0962022-03-28028 March 2022 Dashboard Report 3-28-2022 ML21277A0762021-10-0404 October 2021 Vog 4 Dashboard 10-4-2021 ML21215A0072021-08-0303 August 2021 Dashboard Report 8-2-2021 ML21215A0062021-08-0303 August 2021 Dashboard Report 8-2-2021 ML21160A0382021-06-0909 June 2021 Construction Reactor Oversight Process Resources Report June 2021 ML21132A0482021-05-12012 May 2021 Construction Reactor Oversight Process Resources Report May 2021 ML21090A2092021-03-31031 March 2021 Construction Reactor Oversight Process Resources Report March 2021 ML21008A0042021-01-0404 January 2021 Dashboard Report 1-4-2021 ML20343A0742020-12-0202 December 2020 Dashboard Report 12-2-2020 ML20281A3872020-10-0101 October 2020 Dashboard Report 10-1-2020 ML20281A4002020-10-0101 October 2020 Dashboard Report 10-1-2020 ML20183A0902020-09-24024 September 2020 Initial Commission Memo Regarding Status of ITAAC Closure, Inspection, and Licensing Activities for Vogtle Electric Generating Plant, Unit 3 ML20191A3982020-08-14014 August 2020 Table 2 - Vogtle, Units 3 and 4, Resident Inspector Inspection Samples and Hours ND-20-0907, Revision to Proposed Alternative Requirements for Preservice Inspection Acceptance of Volumetric Examinations, in Accordance with 10 CFR 50.551(z)(1),(VEGP 3&4-PSI/ISI-ALT-14R1)2020-07-28028 July 2020 Revision to Proposed Alternative Requirements for Preservice Inspection Acceptance of Volumetric Examinations, in Accordance with 10 CFR 50.551(z)(1),(VEGP 3&4-PSI/ISI-ALT-14R1) ML20121A2902020-04-30030 April 2020 Construction Reactor Oversight Process Resources 1st Quarter CY2020 ML20038A3072020-02-0707 February 2020 Construction Reactor Oversight Process Resources. Quarterly Update. 1st Quarter 2020 ML20035C5542020-02-0404 February 2020 Attachment 1 - Targeted ITAAC Listing for Vogtle Electric Generating Plant Units 3 and 4 ML20035C5612020-02-0404 February 2020 Attachment 2 - Targeted ITAAC Family Listing for Vogtle Electric Generating Plant Units 3 and 4 ML20035C5702020-02-0404 February 2020 Attachment 3 - Targeted ITAAC Changes for Vogtle Electric Generating Plant Units 3 and 4 ML20007D9042020-01-0808 January 2020 Table of Proposed ROP Baseline Samples for Vogtle Site ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML15106A3612015-04-17017 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Example Vogtle 1 and 2, Change Justification Matrix ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T ML14078A6202014-04-0101 April 2014 Enclosure 2 - SAMG Entry Flowcharts 2023-07-03
[Table view] |
Text
TRANSITION TO REACTOR OVERSIGHT PROCESS FOR VOGTLE ELECTRIC GENERATING PLANT UNITS 3 AND 4 MEMORANDUM (ML20191A378)
Table 2 - Vogtle Unit 3 and Vogtle Units 3&4 Resident Inspector Inspection Samples and Hours Inspection Inspection Manual Chapter (IMC) or Inspection Minimum Sample Hours Sample Hours Activity Procedure (IP) Title Samples Range Range Range Range Vogtle 3 Vogtle 3 Vogtle 3 Vogtle 3&41 Vogtle 3&4 IP 71111.01 Adverse Weather Protection 1 1-4 18-24 1-3-42 18-24 IP 71111.04 Equipment Alignment (Partial) 1 1-2 2-4 2-3-4 4-8 IP 71111.04 Equipment Alignment (Complete) 03 0-13 0-6 0-1-23 0-12 IP 71111.05 Fire Protection (Annual) 1 1-1 5 1-1-1 5 IP 71111.05 Fire Protection (Quarterly) 3 3-4 4-6 6-7-8 9-12 IP 71111.06 Flood Protection 1 1-1 8-12 1-1-2 8-12 IP 71111.07 Heat Sink Performance (Annual) 1 1-1 6-8 1-1-1 6-8 IP 71111.11 Licensed Operator Requalification Program and 8 8-8 32 8-8-8 32 Licensed Operator Performance (Quarterly)
IP 71111.12 Maintenance Effectiveness 1 1-2 10-20 3-4-5 30-50 IP 71111.13 Maintenance Risk Assessments and Emergent Work 4 4-5 20-25 7-8-9 35-45 Control IP 71111.15 Operability Determinations and Functionality 5 5-6 28-33 9-10-11 50-60 Assessments IP 71111.18 Plant Modifications 1 1-2 9-18 2-2-3 18-27 IP 71111.19 Post Maintenance Testing 5 5-6 18-21 9-10-11 31-39 IP 71111.20 Refueling and Other Outage Activities 1 1-1 62-92 1-1-1 62-92 IP 71111.22 Surveillance Testing 4 4-5 25-35 6-7-8 45 IP 71114.01 Exercise Evaluation 1 1-1 11-15 1-1-12 11-15 IP 71114.06 Drill Evaluation 3 3-3 9-20 3-3-32 9-20 IP 71130.11 Material Control & Accounting (MC&A) 1 1-1 8-24 1-1-1 8-24 IP 71151 Performance Indicator Verification 12 12-12 13-18 12-12-12 37-45 IP 71152 Problem Identification and Resolution (Annual) 4 4-8 61-81 4-6-8 64-84 IP 71152 Problem Identification and Resolution (Semiannual) 2 2-2 16-24 2-2-2 16-24 IP 71152 Problem Identification and Resolution - Daily Review of N/A N/A 129 N/A 178 Corrective Action Items
IP 71153 Follow-Up of Events Notices of Enforcement Discretion 1 1-1 32 1-1-1 40 IMC 2515 Plant Status N/A N/A 641 N/A 699 Appendix D Note 1: The Vogtle 3&4 Sample Range identified in this column is formatted as Minimum-Nominal-Maximum as identified in SECY-20-0050 and/or the subject IP.
Note 2: Indicates Sample Ranges to be performed for Vogtle 3&4 until NRC starts performing Site-Wide Implementation and Maximum Samples as identified in SECY-20-0050.