ML22354A258: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:RB-2022, Written Exam Analysis The class consisted of 12 students (8 ROs, 2 Upgrade SROs and 2 Instant SROs).
{{#Wiki_filter:RB-2022, Written Exam Analysis
 
The class consisted of 12 students (8 ROs, 2 Upgrade SROs and 2 Instant SROs ).
Question 67 6/12 missed RBS has reviewed the question and believes it to be valid and has only one correct answer. This K/A was presented during the training program.
Question 67 6/12 missed RBS has reviewed the question and believes it to be valid and has only one correct answer. This K/A was presented during the training program.
High missed question due to students attention to detail and level of knowledge.
High missed question due to students attention to detail and level of knowledge.
Students were weak on maximum amount of time before the Change Notice (CN) should be incorporated in accordance with RBNP-001. Most students confused the 180 day requirement with 14 days which is the time required to receive all reviews for approval on the Change Notice (CN). The requirement for incorporating is 180 days from the final approval.}}
Students were weak on maximum amount of time before the Change Notice (CN) should be incorporated in accordance with RBNP -001. Most students confused the 180 day requirement with 14 days which is the time required to receive all reviews for approval on the Change Notice (CN). The requirement for incorporating is 180 days from the final approval.}}

Latest revision as of 13:40, 15 November 2024

10_RBS-2022-12 Post-Exam Comments
ML22354A258
Person / Time
Site: River Bend Entergy icon.png
Issue date: 12/15/2022
From: Heather Gepford
NRC/RGN-IV/DORS/OB
To:
Entergy Operations
References
Download: ML22354A258 (1)


Text

RB-2022, Written Exam Analysis

The class consisted of 12 students (8 ROs, 2 Upgrade SROs and 2 Instant SROs ).

Question 67 6/12 missed RBS has reviewed the question and believes it to be valid and has only one correct answer. This K/A was presented during the training program.

High missed question due to students attention to detail and level of knowledge.

Students were weak on maximum amount of time before the Change Notice (CN) should be incorporated in accordance with RBNP -001. Most students confused the 180 day requirement with 14 days which is the time required to receive all reviews for approval on the Change Notice (CN). The requirement for incorporating is 180 days from the final approval.