ML20203A335: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(One intermediate revision by the same user not shown) | |||
Line 16: | Line 16: | ||
| page count = 2 | | page count = 2 | ||
}} | }} | ||
See also: [[see also::IR 07100231/1998201]] | |||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:_ . - _ _ _ _ __ _. _ _ _ _ _ _ ._ _ _ _ _ _ _ _ _ _ _ _ _ _ | ||
, | |||
., | |||
* | |||
p e cue y | |||
p' t UNITED 8TATES | |||
g .j NUCLEAR REGULATORY COMMISSION | |||
g e WASHINGTON, D.C. Sous coot | |||
S | |||
U,. . . . . ,o | |||
February 4. 1998 | |||
Chem-Nuclear Systems | |||
ATTN: Mr. R. E. Voit | |||
President | |||
140 Stoneridge Drive | |||
Columbla, SC 29210 | |||
SUBJECT: NRC INSPECTION REPORT NO. 710231/98 201 | |||
AND NOTICE OF NONCONFORMANCE | |||
Dear Mr. Voit: | |||
On January 5-9,1998, the U.S. Nuclear Regulatory Commission performed an announced | |||
inspection of Chem Nuclear Systems (CNS) at its offices in Columbia and Barnwell, S.C. The | |||
enclosed inspection report presents the details of that inspection. | |||
The team inspected CNS's activities associated with the transportation of radioactive material to | |||
; determine if they were executed in accordance with the requirements of Parts 21 and 71 of | |||
' | |||
Title 10 of the Code of Federal Regulations (10 CFR), certificates of compliance, safety analysis | |||
' | |||
reports, and the NRC approved quality assurance program. The team inspected CNS's | |||
management and maintenance controls. | |||
The team concluded that CNS's management and maintenance controls were generally | |||
acceptable. However, the inspectors found that CNS failed to meet certain NRC requirements. | |||
The team found a total of eight nonconformances occurcing in the areas of nonconformance | |||
control, documentation control, and maintenance activities. All of the nonconformances identified | |||
were of moderate to low safety significance. The nonconformances of special concern to the | |||
NRC are CNS's inadequate training in 10 CFR Part 21 requirements, failure to implement | |||
corrective actions resulting from a previous NRC inspection, and failure to translate cafety | |||
analysis report requirements into instructions, procedures, or drawings. | |||
The team did not find any issues that affected the capability of packagings to perform their | |||
intended safety function. Furthermore, the inspectors found CNS personnel to be knowledgeable , | |||
and prom::tive in resolving problemc and other issues. In idition, the team found that most of /, | |||
CNS's procedures reviewed were of good quality. | |||
Please provide us, within 30 days of the date of this letter, a written statement in accordance with | |||
the instructions specified in the enclosed Notice of Nonconformance. Wo will consHer extending | |||
the response time if you can show good cause for us to do so. | |||
ATih 3 | |||
, . _ | |||
,k ; a - | |||
v- | |||
-C -m. . | |||
,M bdm yI | |||
- t | |||
9002240004 900204 | |||
PDR ADOCK 07100231 | |||
C PDR | |||
l.l; ll l.lll.!B. i.ll:l.l .I | |||
. | |||
:, . | |||
* | |||
,. | |||
Mr. R. E. Volt 2 | |||
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its | |||
enclosures, and your response will be placed in the NRC Public Document Room. | |||
. | |||
Sincerely, | |||
Susan F. Shankman, ChW | |||
Transportation Safety and Inspection Branch | |||
Spent Fuel Project Office, NMSS | |||
Enclosures: | |||
1. NRC Inspection Report No. 71 0231/98 201 | |||
2. Notice of Nonconformance | |||
Docket No. 710231 | |||
_ =_ | |||
}} |
Latest revision as of 02:27, 8 September 2023
ML20203A335 | |
Person / Time | |
---|---|
Site: | 07100231 |
Issue date: | 02/04/1998 |
From: | Shankman S NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
To: | Voit R CHEM-NUCLEAR SYSTEMS, INC. |
Shared Package | |
ML20203A339 | List: |
References | |
REF-PT21-98 71-0231-98-201, 71-231-98-201, NUDOCS 9802240004 | |
Download: ML20203A335 (2) | |
See also: IR 07100231/1998201
Text
_ . - _ _ _ _ __ _. _ _ _ _ _ _ ._ _ _ _ _ _ _ _ _ _ _ _ _ _
,
.,
p e cue y
p' t UNITED 8TATES
g .j NUCLEAR REGULATORY COMMISSION
g e WASHINGTON, D.C. Sous coot
S
U,. . . . . ,o
February 4. 1998
Chem-Nuclear Systems
ATTN: Mr. R. E. Voit
President
140 Stoneridge Drive
Columbla, SC 29210
SUBJECT: NRC INSPECTION REPORT NO. 710231/98 201
AND NOTICE OF NONCONFORMANCE
Dear Mr. Voit:
On January 5-9,1998, the U.S. Nuclear Regulatory Commission performed an announced
inspection of Chem Nuclear Systems (CNS) at its offices in Columbia and Barnwell, S.C. The
enclosed inspection report presents the details of that inspection.
The team inspected CNS's activities associated with the transportation of radioactive material to
- determine if they were executed in accordance with the requirements of Parts 21 and 71 of
'
Title 10 of the Code of Federal Regulations (10 CFR), certificates of compliance, safety analysis
'
reports, and the NRC approved quality assurance program. The team inspected CNS's
management and maintenance controls.
The team concluded that CNS's management and maintenance controls were generally
acceptable. However, the inspectors found that CNS failed to meet certain NRC requirements.
The team found a total of eight nonconformances occurcing in the areas of nonconformance
control, documentation control, and maintenance activities. All of the nonconformances identified
were of moderate to low safety significance. The nonconformances of special concern to the
NRC are CNS's inadequate training in 10 CFR Part 21 requirements, failure to implement
corrective actions resulting from a previous NRC inspection, and failure to translate cafety
analysis report requirements into instructions, procedures, or drawings.
The team did not find any issues that affected the capability of packagings to perform their
intended safety function. Furthermore, the inspectors found CNS personnel to be knowledgeable ,
and prom::tive in resolving problemc and other issues. In idition, the team found that most of /,
CNS's procedures reviewed were of good quality.
Please provide us, within 30 days of the date of this letter, a written statement in accordance with
the instructions specified in the enclosed Notice of Nonconformance. Wo will consHer extending
the response time if you can show good cause for us to do so.
ATih 3
, . _
,k ; a -
v-
-C -m. .
,M bdm yI
- t
9002240004 900204
PDR ADOCK 07100231
C PDR
l.l; ll l.lll.!B. i.ll:l.l .I
.
- , .
,.
Mr. R. E. Volt 2
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, and your response will be placed in the NRC Public Document Room.
.
Sincerely,
Susan F. Shankman, ChW
Transportation Safety and Inspection Branch
Spent Fuel Project Office, NMSS
Enclosures:
1. NRC Inspection Report No. 71 0231/98 201
2. Notice of Nonconformance
Docket No. 710231
_ =_