- s gc 1 GENERAL NUCLEAR SYSTEMS,INC.'
l A ChenNuclear Company
[
j September 23, 1993 RA-0664-93
- j i
Docket'Nos. 71-0231, 72-1000 j
Charles.J. Haughney, Chief Storage and. Transport Systems Branch i
and Acting. Chief Source Containment and Devices' Branch Division of-Industrial and j
Medical Nuclear Safety Office of Nuclear. Material Safety and Safeguards Mail Stop 6-H-3 U.S.
Nuclear Regulatory Commission Washington, DC 20555-0001 i
Dear'Mr. Haughney:
l By letter dated July 14, 1993, you requested additional information relative to Revision 4 of the General Nuclear Systems, Inc., Quality Assurance Plan (Docket Nos. 71-0231 and 72-1000).
As committed in GNSI's August 9, 1993 letter to you, detailed written responses to each of your questions and comments were included in our letter RA-0631-93.of September 13, 1993.
j Inadvertently, a second copy of page 6 of the attachment was-
.i included-and page 7 was not included.
Please replace the duplicate page 6 with the page 7 enclosed with this letter.
We apologize for the inconvenience.
If you have any questions or would like additional' clarification, please contact me at (803) 758-1851.
Sincerely, f
- I
]
David L.
Langan Director, Quality Assurance j
General Nuclear Systems, Inc.-
DLL/nhs l
cc:'
R.
Weh
)
P.L.
Paquin 1
9000,10 9309300138 930923 g
~3 1
h[~
U C
't 220 Storendge Dnve
- Columba South Carchna 29210 * (603) 2564450
- Telex. 216947
~
Docket Nos. 71-0231, 72-1000 will be made and documented of the validity of previous inspection or test results using the devise in question.
30.
Comment: The term " construction" is no longer in the Glossary of the GNS/GNB QA Plan but the term is still in Section 5.1.1 of the plan.
Also, it would be nice if the Glossary in the plan were in alphabetical order.
Response: Section 5.1;l will be revised to delete the words "to be used in construction" so that the sentence reads "This section describes the manner in which instructions, procedures, and drawings are prepared, reviewed, and I
accepted or approved by GNS/GNB and external bodies."
The glossary will be put in alphabetical order.
31.
Comment: The matrix of procedures versus requirements in the GNS QA Handbook is not in the GNS/GNB QA Plan.
Shouldn't the GNS/GNB QA Plan (and the CNSI QA Program) include a matrix of procedures versus requirements?
Fesponse: Both CNSI and GNS/GNB use procedures, instructions, drawings, and other controlled documents to control work activities.
Due to the volume of such documents, and the fact that these types of documents are frequently added or deleted, listing them in a QA Plan or Program would be inappropriate and would subject the Plan or Program to unnecessary and frequent revisions.
32.
Comment: The date of NQA-1 committed to in the Introduction of the GNS/GNB QA Plan does not agree with the date of NQA-1 committed to in Section 3.2.1 of the GNSI QA Plan.
Shouldn't the commitments be to the same edition of the standard?
Response: The date for the edition of NQA-1 included in the GNS/GNB QA Plan introduction will be revised to reflect the 1989 edition, as stated in the GNSI QA Plan.
4 6
-t manawre n
.