ML20217Q612

From kanterella
Jump to navigation Jump to search
Requests Further Clarification of Response to Nonconformance C.3 Re Licensee Failure to Present Nonconformance Rept to Chem-Nuclear Sys Srb in Ref to Insp Rept 71-0231/98-201,dtd 980204
ML20217Q612
Person / Time
Site: 07100231
Issue date: 04/03/1998
From: Shankman S
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Campbell R
CHEM-NUCLEAR SYSTEMS, INC.
References
71-0231-98-201, 71-231-98-201, NUDOCS 9804130047
Download: ML20217Q612 (1)


See also: IR 07100231/1998201

Text

i 1

~

.- Mr. Richrrd E. Crmpbell

'

G:m;r:l Mrnrg:r, Qu lity Assurance April 3, 1998

Chem-Nuclear Systems

I 140 Storieridge Drive )

l Columbia, SC 20210 l

!

!

SUBJECT: NRC INSPECTION REPORT NO. 710231/98-201 AND NOTICE OF

NONCONFORMANCE

! Dear Mr. Campbell:

This letter refers to your response, dated March 2,1998, concerning the Notice of

Nonconformance issued with the U.S. Nuclear Regulatory Commission inspection Report

1

No. 71-0231/98-201, dated February 4,1998.

Conceming Nonconformances A, B, C.1, C.2, D, E, F, G, and H, the corrective actions which

l have been, or will be, taken appear acceptable, and no additionalinformation is required at

!

this time.

, However, the staff requests further clarification of your response to Nonconformance C.3,

l regarding Chem-Nuclear Systems' (CNS's) failure to present a nonconformance report (NCR)

to the CNS Safety Review Board (SRB). The staff acknowledges that the nonconformance {

'

identified in the NCR did not meet your criteria for "10 CFR 21 applicable," requiring

subsequent submittal to the SRB. Nonetheless, the staff remains concemed that an NCR

identified (albeit incorrectly) as meeting the criteria for an SRB review did not appear on the

agenda for the next SRB meeting. Please clarify the process of how an NCR identified as

"10 CFR applicable" is transferred to the SRB from the individual who first completes the

NCR form.

The information requested should be provided within 30 days from the date of this letter.

Sincerely,

Original /s/ by:

Susan F. Shankman, Acting Deputy Director

Transportation Safety and Inspection Branch

Spent Fuel Project Office

Docket No. 71-0231

cc: R. E. Voit, President

Chem-Nuclear Systems

l

,

Distribution: g

NRC F/C SFPO r/f NMSS r/f PUBLIC g\

CHaughney, SFPO GJackson, OCFO JLieberman, OE WReamer, OGC

l

ELeeds, SFPO FSturz, SFPO RChappell, SFPO FCostel;o, RI  ;

JMadera, Rill

l

'

CHosey, Ril

TSIS Route Document: g:\710231.ltr

BSpitzberg, RIV HStromberg, INEEL

0

g  !

OFC SFPO E SFJO E SFPO E SFROa , E

NAME SMcDuke N'Connor $hfn~g' S nkman

DATE 04k298 04/2/98 04/2/98 04N98 ,

C = COVER E = COVER & ENCLOSURE N = NO COPY

l 9004130047 900303 CI O O r* n~r ~.,,

PR ADOCK 0710 1 I w a L mZ g L , h,JQ}f

j