ML20217Q612: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 14: Line 14:
| page count = 1
| page count = 1
}}
}}
See also: [[see also::IR 07100231/1998201]]


=Text=
=Text=
Line 19: Line 20:
   ~
   ~
     .- Mr. Richrrd E. Crmpbell
     .- Mr. Richrrd E. Crmpbell
:        G:m;r:l Mrnrg:r, Qu lity Assurance                                      April 3, 1998 Chem-Nuclear Systems I        140 Storieridge Drive                                                                                )
    '
:        G:m;r:l Mrnrg:r, Qu lity Assurance                                      April 3, 1998
        Chem-Nuclear Systems
I        140 Storieridge Drive                                                                                )
l        Columbia, SC 20210                                                                                    l
l        Columbia, SC 20210                                                                                    l
 
!
==SUBJECT:==
!
NRC INSPECTION REPORT NO. 710231/98-201 AND NOTICE OF NONCONFORMANCE
        SUBJECT:       NRC INSPECTION REPORT NO. 710231/98-201 AND NOTICE OF
 
                        NONCONFORMANCE
==Dear Mr. Campbell:==
!        Dear Mr. Campbell:
 
        This letter refers to your response, dated March 2,1998, concerning the Notice of
This letter refers to your response, dated March 2,1998, concerning the Notice of Nonconformance issued with the U.S. Nuclear Regulatory Commission inspection Report 1
        Nonconformance issued with the U.S. Nuclear Regulatory Commission inspection Report
No. 71-0231/98-201, dated February 4,1998.
1
Conceming Nonconformances A, B, C.1, C.2, D, E, F, G, and H, the corrective actions which l        have been, or will be, taken appear acceptable, and no additionalinformation is required at this time.
        No. 71-0231/98-201, dated February 4,1998.
,        However, the staff requests further clarification of your response to Nonconformance C.3, l        regarding Chem-Nuclear Systems' (CNS's) failure to present a nonconformance report (NCR) to the CNS Safety Review Board (SRB). The staff acknowledges that the nonconformance                    {
        Conceming Nonconformances A, B, C.1, C.2, D, E, F, G, and H, the corrective actions which
identified in the NCR did not meet your criteria for "10 CFR 21 applicable," requiring subsequent submittal to the SRB. Nonetheless, the staff remains concemed that an NCR identified (albeit incorrectly) as meeting the criteria for an SRB review did not appear on the agenda for the next SRB meeting. Please clarify the process of how an NCR identified as "10 CFR applicable" is transferred to the SRB from the individual who first completes the NCR form.
l        have been, or will be, taken appear acceptable, and no additionalinformation is required at
The information requested should be provided within 30 days from the date of this letter.
!
Sincerely, Original /s/ by:
        this time.
Susan F. Shankman, Acting Deputy Director Transportation Safety and Inspection Branch Spent Fuel Project Office Docket No. 71-0231 cc:      R. E. Voit, President Chem-Nuclear Systems l
,        However, the staff requests further clarification of your response to Nonconformance C.3,
Distribution:                                                                                  g NRC F/C                SFPO r/f              NMSS r/f              PUBLIC                  g\
l        regarding Chem-Nuclear Systems' (CNS's) failure to present a nonconformance report (NCR)
CHaughney, SFPO GJackson, OCFO                JLieberman, OE        WReamer, OGC l
        to the CNS Safety Review Board (SRB). The staff acknowledges that the nonconformance                    {
ELeeds, SFPO          FSturz, SFPO          RChappell, SFPO      FCostel;o, RI                      ;
                                                                                                                '
JMadera, Rill l
        identified in the NCR did not meet your criteria for "10 CFR 21 applicable," requiring
CHosey, Ril TSIS Route              Document: g:\710231.ltr BSpitzberg, RIV      HStromberg, INEEL 0
        subsequent submittal to the SRB. Nonetheless, the staff remains concemed that an NCR
g  !
        identified (albeit incorrectly) as meeting the criteria for an SRB review did not appear on the
OFC          SFPO        E      SFJO        E        SFPO      E      SFROa ,    E NAME          SMcDuke            N'Connor      $hfn~g'                S    nkman DATE            04k298            04/2/98            04/2/98          04N98                        ,
        agenda for the next SRB meeting. Please clarify the process of how an NCR identified as
C = COVER              E = COVER & ENCLOSURE                      N = NO COPY l      9004130047 900303                                                  CI O O r* n~r ~.,,
        "10 CFR applicable" is transferred to the SRB from the individual who first completes the
PR      ADOCK 0710          1                                      I w a L mZ g L ,              h,JQ}f j}}
        NCR form.
        The information requested should be provided within 30 days from the date of this letter.
                                                        Sincerely,
                                                      Original /s/ by:
                                                        Susan F. Shankman, Acting Deputy Director
                                                        Transportation Safety and Inspection Branch
                                                        Spent Fuel Project Office
          Docket No. 71-0231
        cc:      R. E. Voit, President
                  Chem-Nuclear Systems
l
                                                                                                              ,
          Distribution:                                                                                  g
          NRC F/C                SFPO r/f              NMSS r/f              PUBLIC                  g\
        CHaughney, SFPO GJackson, OCFO                JLieberman, OE        WReamer, OGC
l
          ELeeds, SFPO          FSturz, SFPO          RChappell, SFPO      FCostel;o, RI                      ;
                                JMadera, Rill
l
'
          CHosey, Ril
        TSIS Route              Document: g:\710231.ltr
                                                        BSpitzberg, RIV      HStromberg, INEEL
                                                                                                            0
                                                                                                            g  !
          OFC          SFPO        E      SFJO        E        SFPO      E      SFROa ,    E
            NAME          SMcDuke            N'Connor      $hfn~g'                S    nkman
          DATE            04k298            04/2/98            04/2/98          04N98                        ,
                  C = COVER              E = COVER & ENCLOSURE                      N = NO COPY
l      9004130047 900303                                                  CI O O r* n~r ~.,,
        PR      ADOCK 0710          1                                      I w a L mZ g L ,              h,JQ}f
                                                                                                                j
}}

Latest revision as of 01:23, 6 September 2023

Requests Further Clarification of Response to Nonconformance C.3 Re Licensee Failure to Present Nonconformance Rept to Chem-Nuclear Sys Srb in Ref to Insp Rept 71-0231/98-201,dtd 980204
ML20217Q612
Person / Time
Site: 07100231
Issue date: 04/03/1998
From: Shankman S
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Campbell R
CHEM-NUCLEAR SYSTEMS, INC.
References
71-0231-98-201, 71-231-98-201, NUDOCS 9804130047
Download: ML20217Q612 (1)


See also: IR 07100231/1998201

Text

i 1

~

.- Mr. Richrrd E. Crmpbell

'

G:m;r:l Mrnrg:r, Qu lity Assurance April 3, 1998

Chem-Nuclear Systems

I 140 Storieridge Drive )

l Columbia, SC 20210 l

!

!

SUBJECT: NRC INSPECTION REPORT NO. 710231/98-201 AND NOTICE OF

NONCONFORMANCE

! Dear Mr. Campbell:

This letter refers to your response, dated March 2,1998, concerning the Notice of

Nonconformance issued with the U.S. Nuclear Regulatory Commission inspection Report

1

No. 71-0231/98-201, dated February 4,1998.

Conceming Nonconformances A, B, C.1, C.2, D, E, F, G, and H, the corrective actions which

l have been, or will be, taken appear acceptable, and no additionalinformation is required at

!

this time.

, However, the staff requests further clarification of your response to Nonconformance C.3,

l regarding Chem-Nuclear Systems' (CNS's) failure to present a nonconformance report (NCR)

to the CNS Safety Review Board (SRB). The staff acknowledges that the nonconformance {

'

identified in the NCR did not meet your criteria for "10 CFR 21 applicable," requiring

subsequent submittal to the SRB. Nonetheless, the staff remains concemed that an NCR

identified (albeit incorrectly) as meeting the criteria for an SRB review did not appear on the

agenda for the next SRB meeting. Please clarify the process of how an NCR identified as

"10 CFR applicable" is transferred to the SRB from the individual who first completes the

NCR form.

The information requested should be provided within 30 days from the date of this letter.

Sincerely,

Original /s/ by:

Susan F. Shankman, Acting Deputy Director

Transportation Safety and Inspection Branch

Spent Fuel Project Office

Docket No. 71-0231

cc: R. E. Voit, President

Chem-Nuclear Systems

l

,

Distribution: g

NRC F/C SFPO r/f NMSS r/f PUBLIC g\

CHaughney, SFPO GJackson, OCFO JLieberman, OE WReamer, OGC

l

ELeeds, SFPO FSturz, SFPO RChappell, SFPO FCostel;o, RI  ;

JMadera, Rill

l

'

CHosey, Ril

TSIS Route Document: g:\710231.ltr

BSpitzberg, RIV HStromberg, INEEL

0

g  !

OFC SFPO E SFJO E SFPO E SFROa , E

NAME SMcDuke N'Connor $hfn~g' S nkman

DATE 04k298 04/2/98 04/2/98 04N98 ,

C = COVER E = COVER & ENCLOSURE N = NO COPY

l 9004130047 900303 CI O O r* n~r ~.,,

PR ADOCK 0710 1 I w a L mZ g L , h,JQ}f

j