Incident reports concerning the capture of four endangered sea turtles were submitted to the NRC on June 21, 1994 and July 26, 1994.
Incident reports concerning the capture of four endangered sea turtles were submitted to the NRC on June 21, 1994 and July 26, 1994.
Consistent with Section 7 of the Endangered Species 'Act, GPUN provided the NRC and the National Marine Fisheries Service (NMFS)'with an " Assessment of the Impacts of the Oyster Creek Nuclear Generating Station on Kemp's Ridley and Loggerhead Sea Turtles" dated December 1994. The purpose of the assessment was to examine the potential impacts associated with the continued operation of the plant. By letter dated January 19, 1995 the NRC agreed with GPUN's conclusion that the continued operation of the plant will not jeopardize the continued existence of. endangered or threatened sea turtles. The assessment is currently being reviewed by NMFS.
Consistent with Section 7 of the Endangered Species 'Act, GPUN provided the NRC and the National Marine Fisheries Service (NMFS)'with an " Assessment of the Impacts of the Oyster Creek Nuclear Generating Station on Kemp's Ridley and Loggerhead Sea Turtles" dated December 1994. The purpose of the assessment was to examine the potential impacts associated with the continued operation of the plant. By {{letter dated|date=January 19, 1995|text=letter dated January 19, 1995}} the NRC agreed with GPUN's conclusion that the continued operation of the plant will not jeopardize the continued existence of. endangered or threatened sea turtles. The assessment is currently being reviewed by NMFS.
                 --.                                                                                                          I
                 --.                                                                                                          I



Latest revision as of 14:13, 26 September 2022

1994 Annual Environ Operating Rept Oyster Creek Nuclear Generating Station
ML20081F044
Person / Time
Site: Oyster Creek
Issue date: 12/31/1994
From: J. J. Barton
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
6550-952-104, NUDOCS 9503210513
Download: ML20081F044 (4)


Text

.

I l

GPU Nuclear Corporation Nuclear i

"::far 88 Forked River.New Jersey 08731-0388 609 971-4000 l Writer's Direct Dial Number:

\

March 13, 1995  ;

6550-952-104 '

I U. S. Nuclear Regulatory Commission  !

Attention: Document Control Desk Washington, D.C. 20555

Dear Sir:

Subject:

Oyster Creek Nuclear Generating Station (0CNGS)  !

Docket No. 50-219 Annual Environmental Operating Report Enclosed are two (2) copies of the 1994 Annual Environmental Operating Report (AEOR) for the OCNGS. The AE0R is submitted in accordance with Section 3.5.1(A) of the Oyster Creek Environmental Technical Specifications (OCETS).

If you have any questions concerning this submittal, please contact Mr. Joseph D. Lachenmayer of our Environmental Affairs staff at '

(201) 316-7971.

Very tru y yours,

/

4 J.Q.Barton ce President and Director '

Oyster Creek Nuclear Generating Station JJB/JDL/ame Enclosure cc: W. Russel (NRC) )

NRC Resident inspector, OC l A. Dromerick, Jr. (NRC)  !

R. Stern (NJDEP) l EICCC7 9503210513 941231 nunar 0500 9 3

GPU Nuclear Corporation is a subsidiary of General Pubhc Utikties Corporation }

p. -q

, i l

1994 ANNUAL ENVIRONNENTAL.0PERATING REPORT OYSTER CREEK NUCLEAR GENERATING STATION '

LICENSE NO. DPR-16  ;

DOCKET NO. 50-219 PREPARED BY:

GPU NUCLEAR CORPORATION NARCH, 1995 l

4 unen

. 2 >; -

,F et:1,0= : Introduction

~ This ' document is the Oyster: Creek ~ Nuclear Generating i Station (OCNGS)

~

Annual Environmental Operating Report (AEOR) for 1994.. This. report:is-

  • required by Oyster Creek: Environmental Technical Specification (OCETS)

Section 3.5.1(A).

.The 0CNGS is a single. cycle, forced circulation, boiling water reactor of 620MWsmaximum(summer)dependablenetcapacity,ownedbyJerseyCentral

' Power & Light Company and operated by GPU Nuclear Corporation. . The OCNGS is located -in Lacey Township, Ocean County, New. Jersey. 'The plantiis 'j subject to . Operating License No. DPR-16. The= date of initial . reactor criticality was May 3,1969 and the commercial generation of. power began on-December 23, 1969. _

This AEOR covers the period from January 1,1994 through December 31,

~1994. The. report is organized in the'following format:

Section 1.0 - Introduction .

Section 2.0 - Environmental Monitoring Section 3.0 - Special Monitoring and Study Activities Section 4.0 - Additional Information 2.0 Environmental Monitorina This section is intended' to address the results of environmental l monitoring required to be implemented by Section 1.1 of the OCETS during .

the report period.- The Fish Kill Monitoring Program is the only environmental monitoring required by Section 1.1 There were no fish kills during the reporting period and therefore this monitoring program was not implemented.

3.0 Special Monitorina and Study Activities l

Incident reports concerning the capture of four endangered sea turtles were submitted to the NRC on June 21, 1994 and July 26, 1994.

Consistent with Section 7 of the Endangered Species 'Act, GPUN provided the NRC and the National Marine Fisheries Service (NMFS)'with an " Assessment of the Impacts of the Oyster Creek Nuclear Generating Station on Kemp's Ridley and Loggerhead Sea Turtles" dated December 1994. The purpose of the assessment was to examine the potential impacts associated with the continued operation of the plant. By letter dated January 19, 1995 the NRC agreed with GPUN's conclusion that the continued operation of the plant will not jeopardize the continued existence of. endangered or threatened sea turtles. The assessment is currently being reviewed by NMFS.

--. I

W t

i; . . .,

b .'*. ,
4.0 ' Additional ~ Information - -l
  • This 'section reports' any additional information that.?is required by

~ Section 3.5.1 of the OCETS which includes a sumary of:

-a) ~ All OCETS Non-Routine Environmental Operating Reports (NE0R) and the- -)

corrective action:taken to remedy them.-

b) Changes - made to State and. Federal Permits land . certificates' which q pertain to the requirements of the OCETS.-  ;

. . -l c) Changes in station design which could involve an environmental impact. J d) Changes-to the OCETS. .;

-4.1 Sumary of OCETS NE0R.

There were no NE0Rs during the report period.

Summary of Chanaes Made to Federal and State Permits and Certificates )

which Pertain to the Reauirements of OCETS .j NJPDES Permit No. NJ0005550, which authorizes discharges to.the waters of ]

the State of New Jersey from the Oyster Creek facility, was reissued with - '

an effective date of December 1, .1994 and an expiration date of November.' -;

30, 1999. As part of this process, the NJDEP terminated the Forked River ll site's NJPDES permit and consolidated.its requirements into the reissuance i' of the Oyster Creek NJPDES permit.

Sumary of Chanaes in Station Desian Which Could Involve an Environmental 1

Imoact l

There were no changes in, or modifications of, station design during the.

reporting period which could involve an environmental . impact. l 1

4.2 Summary of Chanaes to the OCETS-  ;

There were no changes to the OCETS during the reporting' period.  ;