ML21229A019: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Catawba Nuclear Station UFSAR Appendix 8B. Figures Appendix 8B. Figures
 
Catawba Nuclear Station        UFSAR Figure 8-1 (Page 1 of 1)
Figure 8-1. Onsite Power System (09 OCT 2019)
 
Catawba Nuclear Station              UFSAR Figure 8-2 (Page 1 of 1)
Figure 8-2. Duke Transmission System (22 OCT 2001)
 
Catawba Nuclear Station            UFSAR Figure 8-3 (Page 1 of 1)
Figure 8-3. Deleted Per 2010 Update (21 OCT 2010)
 
SeSeSecurity-Related Information Withhold under 10 CFR 2.390 Catawba Nuclear Station                                                        UFSAR Figure 8-5 (Page 1 of 1)
Figure 8-5. Newport Transmission Line Plan This figure is currently unavailable in an electronic format. It can be located in a hardcopy version of the FSAR.
(22 OCT 2001)
 
Catawba Nuclear Station                          UFSAR Figure 8-6 (Page 1 of 1)
Figure 8-6. Allison Creek Transmission Line Plan (22 OCT 2001)
 
Catawba Nuclear Station                  UFSAR Figure 8-7 (Page 1 of 1)
Figure 8-7. Roddey Transmission Line Plan (22 OCT 2001)
 
Catawba Nuclear Station                      UFSAR Figure 8-8 (Page 1 of 1)
Figure 8-8. Clay Hill Transmission Line Plan (22 OCT 2001)
 
Catawba Nuclear Station                  UFSAR Figure 8-9 (Page 1 of 1)
Figure 8-9. Moser Transmission Line Plan (22 OCT 2001)
 
Catawba Nuclear Station                          UFSAR Figure 8-10 (Page 1 of 1)
Figure 8-10. 230KV Switchyard General Arrangement (22 OCT 2001)
 
Catawba Nuclear Station                                    UFSAR Figure 8-11 (Page 1 of 1)
Figure 8-11. 230KV Switchyard 125VDC Auxiliary Power System (22 OCT 2001)
 
Catawba Nuclear Station                                    UFSAR Figure 8-12 (Page 1 of 1)
Figure 8-12. 230KV Switchyard and Station Interconnections (22 OCT 2001)
 
Catawba Nuclear Station                                    UFSAR Figure 8-13 (Page 1 of 1)
Figure 8-13. Offsite Power System Protective Relaying Zones (17 APR 2012)
 
Catawba Nuclear Station                                        UFSAR Figure 8-14 (Page 1 of 1)
Figure 8-14. Stability Analysis Diagram Revised Per CNCE-10888 (22 OCT 2001)
 
Catawba Nuclear Station                UFSAR Figure 8 Figure 8-18(Page 1 of 1)
Figure 8-15. Deleted Per 2000 Revision Figure 8-16. Deleted Per 2000 Revision Figure 8-17. Deleted Per 2000 Revision Figure 8-18. Deleted Per 2000 Revision (22 OCT 2001)
 
Catawba Nuclear Station                    UFSAR Figure 8-19 (Page 1 of 2)
Figure 8-19. Non-Class 1E AC Power Systems (09 OCT 2019)
 
Catawba Nuclear Station UFSAR Figure 8-19 (Page 2 of 2)
(09 OCT 2019)
 
Catawba Nuclear Station                                        UFSAR Figure 8-20 (Page 1 of 1)
Figure 8-20. 13.8KV Normal Auxiliary Power System and 600 VAC Cooling Tower Auxiliary Power System (22 OCT 2001)
 
Catawba Nuclear Station                                    UFSAR Figure 8-21 (Page 1 of 1)
Figure 8-21. Essential and Blackout Auxiliary Power Systems (24 OCT 2004)
 
Catawba Nuclear Station                                        UFSAR Figure 8-22 (Page 1 of 2)
Figure 8-22. 125 VDC and 240/120 VAC Auxiliary Control Power Systems (17 OCT 2013)
 
Catawba Nuclear Station UFSAR Figure 8-22 (Page 2 of 2)
(17 OCT 2013)
 
Catawba Nuclear Station                    UFSAR Figure 8-23 (Page 1 of 1)
Figure 8-23. 250 VDC Auxiliary Power System (22 OCT 2001)
 
Catawba Nuclear Station                                        UFSAR Figure 8-24 (Page 1 of 1)
Figure 8-24. 125 VDC and 120 VAC Vital Instrumentation and Control Power System (24 OCT 2004)
 
Catawba Nuclear Station                                          UFSAR Figure 8-25 (Page 1 of 1)
Figure 8-25. 125 VDC Vital Instrumentation and Control Battery Duty Cycle (24 APR 2006)
 
Catawba Nuclear Station                                      UFSAR Figure 8-26 (Page 1 of 1)
Figure 8-26. 125 VDC Diesel Essential Auxiliary Power System (17 APR 2012)
 
Catawba Nuclear Station                                        UFSAR Figure 8-27 (Page 1 of 1)
Figure 8-27. 125 VDC Diesel Auxiliary Power Battery Duty Cycle (24 APR 2006)
 
Catawba Nuclear Station                    UFSAR Figure 8-28 (Page 1 of 1)
Figure 8-28. Peacock Transmission Line Plan (22 OCT 2001)}}

Latest revision as of 18:21, 18 January 2022

1 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures NRC (Redacted)
ML21229A019
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 10/09/2019
From:
Duke Energy Carolinas
To:
Division of Operating Reactor Licensing
Stone Z
Shared Package
ML21228A237 List:
References
Download: ML21229A019 (28)


Text

Catawba Nuclear Station UFSAR Appendix 8B. Figures Appendix 8B. Figures

Catawba Nuclear Station UFSAR Figure 8-1 (Page 1 of 1)

Figure 8-1. Onsite Power System (09 OCT 2019)

Catawba Nuclear Station UFSAR Figure 8-2 (Page 1 of 1)

Figure 8-2. Duke Transmission System (22 OCT 2001)

Catawba Nuclear Station UFSAR Figure 8-3 (Page 1 of 1)

Figure 8-3. Deleted Per 2010 Update (21 OCT 2010)

SeSeSecurity-Related Information Withhold under 10 CFR 2.390 Catawba Nuclear Station UFSAR Figure 8-5 (Page 1 of 1)

Figure 8-5. Newport Transmission Line Plan This figure is currently unavailable in an electronic format. It can be located in a hardcopy version of the FSAR.

(22 OCT 2001)

Catawba Nuclear Station UFSAR Figure 8-6 (Page 1 of 1)

Figure 8-6. Allison Creek Transmission Line Plan (22 OCT 2001)

Catawba Nuclear Station UFSAR Figure 8-7 (Page 1 of 1)

Figure 8-7. Roddey Transmission Line Plan (22 OCT 2001)

Catawba Nuclear Station UFSAR Figure 8-8 (Page 1 of 1)

Figure 8-8. Clay Hill Transmission Line Plan (22 OCT 2001)

Catawba Nuclear Station UFSAR Figure 8-9 (Page 1 of 1)

Figure 8-9. Moser Transmission Line Plan (22 OCT 2001)

Catawba Nuclear Station UFSAR Figure 8-10 (Page 1 of 1)

Figure 8-10. 230KV Switchyard General Arrangement (22 OCT 2001)

Catawba Nuclear Station UFSAR Figure 8-11 (Page 1 of 1)

Figure 8-11. 230KV Switchyard 125VDC Auxiliary Power System (22 OCT 2001)

Catawba Nuclear Station UFSAR Figure 8-12 (Page 1 of 1)

Figure 8-12. 230KV Switchyard and Station Interconnections (22 OCT 2001)

Catawba Nuclear Station UFSAR Figure 8-13 (Page 1 of 1)

Figure 8-13. Offsite Power System Protective Relaying Zones (17 APR 2012)

Catawba Nuclear Station UFSAR Figure 8-14 (Page 1 of 1)

Figure 8-14. Stability Analysis Diagram Revised Per CNCE-10888 (22 OCT 2001)

Catawba Nuclear Station UFSAR Figure 8 Figure 8-18(Page 1 of 1)

Figure 8-15. Deleted Per 2000 Revision Figure 8-16. Deleted Per 2000 Revision Figure 8-17. Deleted Per 2000 Revision Figure 8-18. Deleted Per 2000 Revision (22 OCT 2001)

Catawba Nuclear Station UFSAR Figure 8-19 (Page 1 of 2)

Figure 8-19. Non-Class 1E AC Power Systems (09 OCT 2019)

Catawba Nuclear Station UFSAR Figure 8-19 (Page 2 of 2)

(09 OCT 2019)

Catawba Nuclear Station UFSAR Figure 8-20 (Page 1 of 1)

Figure 8-20. 13.8KV Normal Auxiliary Power System and 600 VAC Cooling Tower Auxiliary Power System (22 OCT 2001)

Catawba Nuclear Station UFSAR Figure 8-21 (Page 1 of 1)

Figure 8-21. Essential and Blackout Auxiliary Power Systems (24 OCT 2004)

Catawba Nuclear Station UFSAR Figure 8-22 (Page 1 of 2)

Figure 8-22. 125 VDC and 240/120 VAC Auxiliary Control Power Systems (17 OCT 2013)

Catawba Nuclear Station UFSAR Figure 8-22 (Page 2 of 2)

(17 OCT 2013)

Catawba Nuclear Station UFSAR Figure 8-23 (Page 1 of 1)

Figure 8-23. 250 VDC Auxiliary Power System (22 OCT 2001)

Catawba Nuclear Station UFSAR Figure 8-24 (Page 1 of 1)

Figure 8-24. 125 VDC and 120 VAC Vital Instrumentation and Control Power System (24 OCT 2004)

Catawba Nuclear Station UFSAR Figure 8-25 (Page 1 of 1)

Figure 8-25. 125 VDC Vital Instrumentation and Control Battery Duty Cycle (24 APR 2006)

Catawba Nuclear Station UFSAR Figure 8-26 (Page 1 of 1)

Figure 8-26. 125 VDC Diesel Essential Auxiliary Power System (17 APR 2012)

Catawba Nuclear Station UFSAR Figure 8-27 (Page 1 of 1)

Figure 8-27. 125 VDC Diesel Auxiliary Power Battery Duty Cycle (24 APR 2006)

Catawba Nuclear Station UFSAR Figure 8-28 (Page 1 of 1)

Figure 8-28. Peacock Transmission Line Plan (22 OCT 2001)