{{#Wiki_filter:From:            Venkataraman, Booma To:              Steinman, Rebecca L:(Exelon Nuclear)
{{#Wiki_filter:}}
Cc:              Salgado, Nancy
 
==Subject:==
ACCEPTANCE REVIEW: Quad Cities Units 1 and 2- License Amendment Request Re: New Fuel Vault Storage and Spent Fuel Pool Criticality Methodologies (EPID: L-2021-LLA-0196)
Date:            Thursday, November 18, 2021 10:51:00 AM
 
==Dear Ms. Steinman:==
 
By application dated October 25, 2021, (Agencywide Document Access and Management System (ADAMS) Accession No. ML21298A168), Exelon Generation Company, LLC (the licensee) submitted a license amendment request with a proposed change to the criticality safety analysis (CSA) methodology for performing the criticality safety evaluation for legacy fuel types in addition to the GNF3 reload fuel in the spent fuel pool at Quad Cities Nuclear Power Station, Units 1 and 2. The proposed change includes revising the Technical Specifications 4.3.1, "Criticality." Additionally the licensee also proposes to change the new fuel vault (NFV) CSA to utilize GESTAR II methodology for validating the criticality safety for GNF3 fuel in the General Electric designed NFV racks.
The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an application for an amendment to a license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and the supplement and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 400 hours to complete. The NRC staff expects to complete this review by November, 2022. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could
 
change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
If you have any questions, please contact me at (301) 415-2934, or booma.venkataraman@nrc.gov.
Sincerely, Booma Venkataraman Project Manager, NRR/DORL/LPL3 Office of Nuclear Reactor Regulation Booma.Venkataraman@nrc.gov 301.415.2934 cc: Distribution via Listserv}}

Revision as of 16:12, 16 January 2022

Acceptance Review: Quad Cities Units 1 and 2 - License Amendment Request New Fuel Vault Storage and Spent Fuel Pool Criticality Methodologies
ML21322A311
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 11/18/2021
From: Booma Venkataraman
Plant Licensing Branch III
To: Steinman R
Exelon Generation Co
Venkataraman, B.
References
EPID L-2021-LLA-0196
Download: ML21322A311 (2)


Text