ML20214H017: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 14: Line 14:
| document type = DKT 30 MTL BYPRODUCT, INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
| document type = DKT 30 MTL BYPRODUCT, INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
| page count = 1
| page count = 1
| project = TAC:55361, TAC:55362
| stage = Approval
}}
}}


Line 22: Line 24:
==SUBJECT:==
==SUBJECT:==
EICSB (PWR-A) INPUT FOR MCGUIRE UNITS 1 AND 2 TECHNICAL SPECIFICATION CHANGES, MPA B-90 Plant Name:          McGuire Nuclear Station, Units 1 and 2 Utility:              Duke Power Company                                                        l Docket Nos.:          50-369, 50-370 TAC Nos.:              55361, 55362 Licensing Status:      OR Resp. Directorate:    PD4/DPA Project Manager:      Darl Hood Review Branch:        EICSB/DPA                                                                .
EICSB (PWR-A) INPUT FOR MCGUIRE UNITS 1 AND 2 TECHNICAL SPECIFICATION CHANGES, MPA B-90 Plant Name:          McGuire Nuclear Station, Units 1 and 2 Utility:              Duke Power Company                                                        l Docket Nos.:          50-369, 50-370 TAC Nos.:              55361, 55362 Licensing Status:      OR Resp. Directorate:    PD4/DPA Project Manager:      Darl Hood Review Branch:        EICSB/DPA                                                                .
Review Status:        Incomplete                                                                l By letter dated December 7,1985, Duke Power Company submitted proposed technical specification changes for the McGuire Nuclear Station, Units 1 and 2, in response to Generic Letter 85-09.      EICSB finds the proposed changes acceptable except for the following:
Review Status:        Incomplete                                                                l By {{letter dated|date=December 7, 1985|text=letter dated December 7,1985}}, Duke Power Company submitted proposed technical specification changes for the McGuire Nuclear Station, Units 1 and 2, in response to Generic Letter 85-09.      EICSB finds the proposed changes acceptable except for the following:
: 1. The licencee should provide a proposed technical specification for testing the Reactor Trip Bypass Breaker prior, to each time it is put into service consistent with Generic Letter 85-09.
: 1. The licencee should provide a proposed technical specification for testing the Reactor Trip Bypass Breaker prior, to each time it is put into service consistent with Generic Letter 85-09.
: 2. The licensee should provide proposed technical specifications for verifying the operability of the Bypass Breaker Trip circuit (s) each refueling outage consistent with Generic Letter 85-09.
: 2. The licensee should provide proposed technical specifications for verifying the operability of the Bypass Breaker Trip circuit (s) each refueling outage consistent with Generic Letter 85-09.

Latest revision as of 17:12, 4 May 2021

Forwards SER Supporting Licensee 851207 Proposed Tech Spec Changes in Response to Generic Ltr 85-09 Except for Two Listed Exceptions Re Testing Reactor Trip Bypass Breaker & Bypass Breaker Trip Circuits.Salp Input Also Encl
ML20214H017
Person / Time
Site: Mcguire, Vogtle, McGuire, 05000000
Issue date: 05/22/1986
From: Rossi C
Office of Nuclear Reactor Regulation
To: Hood D
Office of Nuclear Reactor Regulation
Shared Package
ML20213E629 List:
References
GL-85-09, GL-85-9, TAC-55361, TAC-55362, NUDOCS 8605300008
Download: ML20214H017 (1)


Text

4

, Docket No.: 50-369/370 IRAY 221986 MEMORANDUM FOR: Darl Hood, Project Manager, Project Directorate #4 Division of PWR Licensing-A FROM: Charles E. Rossi, Assistant Director for Technical Support Division of PWR Licensing-A

SUBJECT:

EICSB (PWR-A) INPUT FOR MCGUIRE UNITS 1 AND 2 TECHNICAL SPECIFICATION CHANGES, MPA B-90 Plant Name: McGuire Nuclear Station, Units 1 and 2 Utility: Duke Power Company l Docket Nos.: 50-369, 50-370 TAC Nos.: 55361, 55362 Licensing Status: OR Resp. Directorate: PD4/DPA Project Manager: Darl Hood Review Branch: EICSB/DPA .

Review Status: Incomplete l By letter dated December 7,1985, Duke Power Company submitted proposed technical specification changes for the McGuire Nuclear Station, Units 1 and 2, in response to Generic Letter 85-09. EICSB finds the proposed changes acceptable except for the following:

1. The licencee should provide a proposed technical specification for testing the Reactor Trip Bypass Breaker prior, to each time it is put into service consistent with Generic Letter 85-09.
2. The licensee should provide proposed technical specifications for verifying the operability of the Bypass Breaker Trip circuit (s) each refueling outage consistent with Generic Letter 85-09.

Enclosure 2 is the SALP input for this review.

Cri;2 :I v i57, Charles E. Rossi, Assistant Director for Technical Support Division of PWR Licensing-A l

Enclosure:

Distribution:

As stated Docket File 50-369/370 C. E. Rossi EICSB Rdg. V. Benaroya cc: T. Novak A. Toalston (PF)(2) McGuire S/F .

B. J. Youngblood D. Lasher -

J. E. Knight

Contact:

p'A F. Rosa A. Toals. ton, EICSB/DPA ' y b

X27243(r(ogg3ppy Q pp -

EICSB/DPA- CIES87DPA SL/EICSB/DPA BC/EICSB/DPA F0B/DPA / .

AT@g:ct er JEKnightf/L FRosa VBen roya l

5/ O /86 5/ /J /86 5/ $ /86 5//f/86 5/I'/86 5/Jg/8