05000440/FIN-2009003-02: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 13: | Line 13: | ||
| identified by = Self-Revealing | | identified by = Self-Revealing | ||
| Inspection procedure = IP 71111.15 | | Inspection procedure = IP 71111.15 | ||
| Inspector = M Wilk, M Marshfield, M Phalen, D Jones, M Franke, J Bashore, R Leidy, J Cameron, R Murray, C Tilton, J Coroju | | Inspector = M Wilk, M Marshfield, M Phalen, D Jones, M Franke, J Bashore, R Leidy, J Cameron, R Murray, C Tilton, J Coroju-Sandin | ||
| CCA = H.5 | | CCA = H.5 | ||
| INPO aspect = WP.1 | | INPO aspect = WP.1 |
Latest revision as of 19:37, 20 February 2018
Site: | Perry |
---|---|
Report | IR 05000440/2009003 Section 1R15 |
Date counted | Jun 30, 2009 (2009Q2) |
Type: | Finding: Green |
cornerstone | Barrier Integrity |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71111.15 |
Inspectors (proximate) | M Wilk M Marshfield M Phalen D Jones M Franke J Bashore R Leidy J Cameron R Murray C Tilton J Coroju-Sandin |
CCA | H.5, Work Management |
INPO aspect | WP.1 |
' | |