* January 29, 1999 l
MEMORANDUM TO: Docket File FROM:                    Jacob 1. Zimmerrnan, Project Manager Original signed by:                        )
Project Directorate 11-2 Division of Reactor Projects - 1/11 i
Office of Nuclear Reactor Regulation
 
==SUBJECT:==
FARLEY UNITS 1 AND 2 - PLACEMENT OF A DOCUMENT IN THE PUBLIC DOCUMENT ROOM Please make the attached Request for Additional Information (RAl) available in the NRC's Public Document Room. The attached RAI was faxed, today, to Wes Sparkman of the Southern Nuclear Operating Company, Inc. This document neither constitutes a formal request i
for information nor does it represent a formal NRC staff position.
l Docket Nos. 50-348 and 50-364
 
==Attachment:==
As stated I
l i
Distribution Docket File l
PUBLIC                                                                                            f H. Berkow
;      J. Luehman                                                                                        p\
l      C. Schulten
                          ,.                              \
OFFICE    PWPf@2            l    LA:PDil-2 l ,j P D:f@          N NAME      JfitRm'erman:cn        LBerry ,d 6b      HBerkbW '
DATE      //4f/99                / Sf699 ' I        / /)d99 DOCUMENT NAME: G:\FARLEY\A1364RAI.WPD OFFICIAL RECORD COPY m    3
(\1@3 9902020272 990129 PDR    ADOCK 05000348 p                        PDR                                                  em en  Fpm  : ;e
{3f ([h$2 O a C' ~
 
gp ittu I      O              t.                            UNITED STATES L
l j
2 NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20066 0001
      \ . .. . . p/                              January 29, 1999 l
1 l          ' MEMORANDUM TO: Docket File                                                      _
FROM:                  Jacob 1. Zimmerman, Project Manager Project Directorate ll 2 Division of Reactor Projects - t/II Office of Nuclear Reactor Regulation                                            ,
l
 
==SUBJECT:==
FARLEY UNITS 1 AND 2 - PLACEMENT OF A DOCUMENT IN THE                          ;
PUBLIC DOCUMENT ROOM                                                            i i
l Please make the attached Request for Additional Information (RAI) available in the NRC's Public Document Room. The attached RAI was faxed, today, to Wes Sparkman of the Southem Nuclear Operating Company, Inc. This document neither constitutes a formal request for information nor does it represent a formal NRC staff position.
Docket Nos. 50-348 and 50-364
 
==Attachment:==
As stated
 
l
'                                  FARLEY IMPROVED TS REVIEW COMMENTS SECTION 3.7 - PLANT SYSTEMS (By ITS Section) 3.7.1.1 ITS LCO 3.7.1 DOC 4L and 4aL Comment: In the licensee's submittal, these changes are identified as a beyond-scope change. The licensee should review approved TSTF-235 Rev.1 and revise, as appropriate, the ITS and the Bases before review of this issue is pursued as a beyond-scope change.
Southern Company Response:
i
          . 3.7.5-1 ITS SR 3.7.5.2 DOC 16 L Comment: The STS contains the same allowed outage time for a single pump as the proposed ITS (72 hours). However, the proposed ITS has a 72-hour limit on testing the turbine driven pump while the STS has a 24-hour limit for testing. While waiting up to 72 hours may be acceptable, what plant-specific reason necessitates waiting 48 hours longer than the STS    '
before testing?
Southern Company Response:
Attachment l
    . _ .}}

Latest revision as of 23:32, 1 January 2021

Requests That Encl RAI Be Made Available in NRC Pdr.Subj Document Neither Constitutes Formal Request for Info Nor Represent Formal NRC Position.Encl RAI Faxed on 990129 to W Sparkman of Snoc
ML20202E162
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/29/1999
From: Jacob Zimmerman
NRC (Affiliation Not Assigned)
To:
NRC
References
NUDOCS 9902020272
Download: ML20202E162 (3)


Text

.. ._ - . _ - . . - .. . __

  • January 29, 1999 l

MEMORANDUM TO: Docket File FROM: Jacob 1. Zimmerrnan, Project Manager Original signed by: )

Project Directorate 11-2 Division of Reactor Projects - 1/11 i

Office of Nuclear Reactor Regulation

SUBJECT:

FARLEY UNITS 1 AND 2 - PLACEMENT OF A DOCUMENT IN THE PUBLIC DOCUMENT ROOM Please make the attached Request for Additional Information (RAl) available in the NRC's Public Document Room. The attached RAI was faxed, today, to Wes Sparkman of the Southern Nuclear Operating Company, Inc. This document neither constitutes a formal request i

for information nor does it represent a formal NRC staff position.

l Docket Nos. 50-348 and 50-364

Attachment:

As stated I

l i

Distribution Docket File l

PUBLIC f H. Berkow

J. Luehman p\

l C. Schulten

,. \

OFFICE PWPf@2 l LA:PDil-2 l ,j P D:f@ N NAME JfitRm'erman:cn LBerry ,d 6b HBerkbW '

DATE //4f/99 / Sf699 ' I / /)d99 DOCUMENT NAME: G:\FARLEY\A1364RAI.WPD OFFICIAL RECORD COPY m 3

(\1@3 9902020272 990129 PDR ADOCK 05000348 p PDR em en Fpm  : ;e

{3f ([h$2 O a C' ~

gp ittu I O t. UNITED STATES L

l j

2 NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20066 0001

\ . .. . . p/ January 29, 1999 l

1 l ' MEMORANDUM TO: Docket File _

FROM: Jacob 1. Zimmerman, Project Manager Project Directorate ll 2 Division of Reactor Projects - t/II Office of Nuclear Reactor Regulation ,

l

SUBJECT:

FARLEY UNITS 1 AND 2 - PLACEMENT OF A DOCUMENT IN THE  ;

PUBLIC DOCUMENT ROOM i i

l Please make the attached Request for Additional Information (RAI) available in the NRC's Public Document Room. The attached RAI was faxed, today, to Wes Sparkman of the Southem Nuclear Operating Company, Inc. This document neither constitutes a formal request for information nor does it represent a formal NRC staff position.

Docket Nos. 50-348 and 50-364

Attachment:

As stated

l

' FARLEY IMPROVED TS REVIEW COMMENTS SECTION 3.7 - PLANT SYSTEMS (By ITS Section) 3.7.1.1 ITS LCO 3.7.1 DOC 4L and 4aL Comment: In the licensee's submittal, these changes are identified as a beyond-scope change. The licensee should review approved TSTF-235 Rev.1 and revise, as appropriate, the ITS and the Bases before review of this issue is pursued as a beyond-scope change.

Southern Company Response:

i

. 3.7.5-1 ITS SR 3.7.5.2 DOC 16 L Comment: The STS contains the same allowed outage time for a single pump as the proposed ITS (72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />). However, the proposed ITS has a 72-hour limit on testing the turbine driven pump while the STS has a 24-hour limit for testing. While waiting up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> may be acceptable, what plant-specific reason necessitates waiting 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> longer than the STS '

before testing?

Southern Company Response:

Attachment l