ML20203C164: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:-. . . - . . - . - . - _ - - . - . . . -.-.-...~....__. .- ...- - -..- -..- . . _ . . . | ||
d Docket Nos. 50-245 4 | |||
50-336 50-423 B16957 i. | |||
i i | |||
t Attachment 1 Millstone Nuclear Power Stat!on, Unit Nos.1,2, and 3 | |||
: Change to Appendix E, Page 4 of 5 for Revision 19 to the | |||
; Northeast Utilities Quality Assurance Program (NUQAP) Topical Report 4 | |||
1 i | |||
t 4 | |||
January 1998 | |||
; 9002250102 900129 PDR i | |||
P ADOCK 05000245 pg | |||
U.S. hel::r Rsgul: tory Commission | |||
, B16957\ Attachment 1\Page 1 | |||
: 12. ANSI N45.2.31973, Subsection 2.1 requires the establishment of five hcusekeeping zones. NU has developed an alternative to this requirement which establishes for the Millstone Station nuclearpowerplants, as a minimum, a two zone program to which ANSIZones I through V requirements shall be appfled as indicated below: | |||
MIIIstone Station nuclear power plant foreign material exclusion (FME) procedures include provisions for implementing controls and countermeasures that meet or exceed the ANSI Zone I, li, lit, IV, and V requirements with ther exception that work planning and theJob supervisor shall determine when the ANSI Zones I, ll and ill logging requirements for material and personnel accountability and clothing (i.e., gloves, shoe and head covc:mg) are appIled based upon retrievability and final inspection of the work performed. | |||
i | |||
1 1 | |||
i | |||
: Docket No. 50-245 I 50-336 50-423 | |||
! B16957. | |||
t 4 | |||
1 E | |||
4 5 | |||
9 l Attachment 2 Millstone Nuclear Power Station, Unit Nos.1,2, and 3 1 | |||
Regulatory Commitments d | |||
i i | |||
i I i l i | |||
i l l | |||
I s | |||
i January 1998 1 1 - | |||
U.S. Nucistr Rrguletory Commission | |||
, B_16957%ttachment 2\Page 1 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. | |||
Any other actions discussed in the submittal represent intended or planned actions by j NNECO. They are described to the NRC for the NRC's information and are not regulatory commitments. The Director - Regulatory Affairs should be notified of any questions regarding this document or any associated regulatory commitments. | |||
1 Regulatory Commitment Committed Date or | |||
; Outage B16957 Exception 12 to proposed Revision 19 to the Complete NUQAP Topical Report will be revised to implement ANSI Zone 1 requirements within the Foreign Material Exclusion Procedures. | |||
v-----}} |
Latest revision as of 02:50, 1 January 2021
ML20203C164 | |
Person / Time | |
---|---|
Site: | Millstone |
Issue date: | 01/31/1998 |
From: | NORTHEAST NUCLEAR ENERGY CO. |
To: | |
Shared Package | |
ML20203C157 | List: |
References | |
NUDOCS 9802250102 | |
Download: ML20203C164 (4) | |
Text
-. . . - . . - . - . - _ - - . - . . . -.-.-...~....__. .- ...- - -..- -..- . . _ . . .
d Docket Nos. 50-245 4
50-336 50-423 B16957 i.
i i
t Attachment 1 Millstone Nuclear Power Stat!on, Unit Nos.1,2, and 3
- Change to Appendix E, Page 4 of 5 for Revision 19 to the
- Northeast Utilities Quality Assurance Program (NUQAP) Topical Report 4
1 i
t 4
January 1998
- 9002250102 900129 PDR i
P ADOCK 05000245 pg
U.S. hel::r Rsgul: tory Commission
, B16957\ Attachment 1\Page 1
- 12. ANSI N45.2.31973, Subsection 2.1 requires the establishment of five hcusekeeping zones. NU has developed an alternative to this requirement which establishes for the Millstone Station nuclearpowerplants, as a minimum, a two zone program to which ANSIZones I through V requirements shall be appfled as indicated below:
MIIIstone Station nuclear power plant foreign material exclusion (FME) procedures include provisions for implementing controls and countermeasures that meet or exceed the ANSI Zone I, li, lit, IV, and V requirements with ther exception that work planning and theJob supervisor shall determine when the ANSI Zones I, ll and ill logging requirements for material and personnel accountability and clothing (i.e., gloves, shoe and head covc:mg) are appIled based upon retrievability and final inspection of the work performed.
i
1 1
i
- Docket No. 50-245 I 50-336 50-423
! B16957.
t 4
1 E
4 5
9 l Attachment 2 Millstone Nuclear Power Station, Unit Nos.1,2, and 3 1
Regulatory Commitments d
i i
i I i l i
i l l
I s
i January 1998 1 1 -
U.S. Nucistr Rrguletory Commission
, B_16957%ttachment 2\Page 1 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.
Any other actions discussed in the submittal represent intended or planned actions by j NNECO. They are described to the NRC for the NRC's information and are not regulatory commitments. The Director - Regulatory Affairs should be notified of any questions regarding this document or any associated regulatory commitments.
1 Regulatory Commitment Committed Date or
- Outage B16957 Exception 12 to proposed Revision 19 to the Complete NUQAP Topical Report will be revised to implement ANSI Zone 1 requirements within the Foreign Material Exclusion Procedures.
v-----