Rev 17 to QAT-95-4062, Northeast Utils QA Program Topical Rept Change Request Form
ML20078P692
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/09/1995
From: Paliuca R
NORTHEAST NUCLEAR ENERGY CO.
To:
References
QAT-95-4062, NUDOCS 9502170184
Download: ML20078P692 (43)


Text

a S '

  • NDS DOCLMENT PISTRIBUTION n>" NUQAP TOPICAL REPORT REVISION Dit t<!BUTION < u DATE: 02/10/95 TO: DOCUMENT CONTROL DESK 1RAN5MITTAL# QAT-95-4062 USNRC WASHINGTON DC 20553 FROM: N'JCLEAR DOCUMENT SERVICES MP BLDG 475 (203)447-1791

SUBJECT:

N'JOAP TOPICAL REPORT REVISION THE ATTACHED NUGAP TOPICAL REPORT REVISION.

15 BEING DISTRIBUTED TO YOU FOR INCORPORATION INTO YOUR CONTROLLED DOCUME NT . PLEASE SIGN bel 0W TO ACKNOWLEDGE RECEIPT OF THIS REVISION AND TO VERIFY THAT YOU WILL INCORPORATE THIS REVISION INTO YOUR CONTROL LEC DOCUMLNT A5 500N A5 POSSIBLE. RETURN THIS FORM TO BETH MEI! d2443). NDS. MP B475. FL3. AS 500N AS RECEIVfD RECElP15 RECEIVED AFTER

  • 03/10/95
  • ARE CONSIDERED L ATE.
      • PLEASE RETURN RECEIPTS BEFORE THIS DATE. *** THANK YOU.

l 5IONATUEf Clif l

\

COPY NUMatR: 34 TRACKING NUMBER: QAIR0006 l l

9502170184 950209 PDR ADOCK 05000336 0\\

l P PDR

N:rthrst

.. Utilities System O ..

Memo February 9,1995 QAS-95-4062 TO: NUQAP Topical Report Copyholders FROM: Rick Paliuca, QAS (Extension 6767 MP)

SUBJECT:

Update to NUQAP Topical Report, Revision 17 O

Enclosed are approved changes to the Topical Report from the third quarter of 1994. Please keep these with your controlled copy.

These changes will be included in Revision 18 which will be submitted to the NRC by June 10,1995 for acceptance.

Call me if you have questions.

Transmittal No. QAT-95-4062

)

O

OCT-C5-94 WED 213C4 P.02

, DCI- 5-94.W.E.D...9.:5.8 Q .. '. .. . . .

. . AS .FA[H0.2034375815 P.01 ELGURE 7.2 NORTHEAST UTILITIES QUALITY ASSURANCE PROGRAM TOPICAL REPORT

- ~~

CHANGE REQUEST FORM SAMPLE Request No._ '! _ Date 1of Tl94 Requestor MAC 4. (kw

1. PROPOSED AEVISION
1. GENERAL DESCRIPTION OF CHANGE IW Section/ Appendix F Paragraph No. Rev.No., M / 7 ##

5tsKh.hsadexet%s.t%sh mev m sg  % w e4aa.4 J,m,;a e.<w.6 4df/ e.raire.e y..

2. PURPOSE OF CHANGE b t. %a u nsabA h 40i1 W4 A -\%-% xV%,.%. -A4.dh. M c@9 s%

Laun a 4.2k?.9 %. MV? % r 4 T**A.4o bG s c.etth. %Ro

3. NEO PROCEDURES AFFECTED D New Q Revised B No (see NEO 1.04)

O Concurrence _ bw e N:LvN inactor ~

[if NEO Procedure (s) areht affected, the completion of Section ll.A is not required.)

l!.A PRINCIPAL PRB MEMBER /NEO RESPONSIBLE INDIVIDUAL REVIEWS .

1. PRINCIPAL PRB MEMBER COMMENTS: O Approval A O otsapprovat Signature Date 1
2. NEO R1 COMMENTS: O Approval l

4 O Disapprovai Signature Date NEO 3.08 Rev.7 w .t. we Page 7.2-1 of 2

CCT-G5-C4 WED 21:U4 p.es DCT- 5-84 WED B:57 ,

QAS .. _. . J6X. H0. 2034375915 P.02

11. 8 QAS REVIEW. i
1. ARE THERE OTHER SECTIONS OF THE TOPICAL REPORT AFFECTED?

NO YES (LIST) -

2. DOES THE PROPOSED CHANGE REDUCE COMMITMENTS OF THE QA i PROGRAM?  ;

K NO YES (SPECIFY)

3. THE PROPOSED CHANGE AFFECTS: '

CONNECTICUT YANKEE x MILLSTONE UNITS & ? o.A

_ ALL UNITS .

D '

OTHER COMMENTS: 5 AAA 4 4 \

M /* Id Approved QAS Reviewer Date / /

O oisapproved M o-ca.4 /0 Y Approved

/

( DirecF-QJI B Date O Disapproved I

l NEO 3.08 Rev.7 m . . .. .

Page 7.2 2 of 2

ocT-ss-94 wen 2s:s7 e.o4

'- 'OCT- 5-94 WED $ 57 -

QAS . . ,

,_ ,,,JAX NO. 2034375815 P.03 O NUQUAT TOPICAL REPORT CHANGE REQUEST

~

l Attachment to NEO 3.08 Form Page 1 of 1 i l

e we recognize that our commitment was to an earlier ANSI standard which did not identify any alternate method to the ,

Operations Manager holding an operating license on the Unit. '

e The later revision of ANSI /ANS 3.1 does allow for an alternative, which we now would invoke.

  • Therefore, this is a change in our commitment, but it does not reduce our commitment from a quality perspective.
8. ANSI N18.1-1971, paragraph 4.2.2, states in part, "The operations Manager shall hold a Senior Reactor Operator's Li cense .

NU has developed an alternative to this requirement for the Millstone Unit No. 2 Licence which allows the Assistant Operations Manager to held the SRO License if the Operations Manager has been certified in accordance with section 4.2.2 of ANSI /ANS 3.1-1987.

O V This alternate would only be available for the next three years. This assumes the Operations Manager gets a license or is replaced with a Manager who has the license, before the three year limitation expires.

i O

l

r l

l Millstone Organization e MU Sr. Vice Preeldent- 80RC Milletone Station i

l l

Achinistrative Steff -

1 I I I I I I Nclear Wclear Wclear Meintenance Unit Site ie.or.

i thit 3 -

PGC Unit i thit 2 Services Services Services

, Director Director Director Director Director Director g%$j*

g g3

  • Control Reporting g,,, 8ME GENGZATIG4 A8 (MIT 3 I I I I o.oreueno see IOC Meneger

,,ioten,,ce Meneger O yut 3 him Nim M Co , uter service.

W g 3 Program Servicae l l I Huolth Physics se Meneger Stift oc Staff eer Staff Staff steff themistry Manager g Security Munoger a g ing == -,

t oretore k.a.

Generation Construction Supervisere LO - 1.icensed Operstor l L80 - Liconeed Senior (%mretor Generation Cenetruction Omneration T p Menegerintendent terrock)

Control e - Overell Site Responalbility for Fire Protection

%'P[ es - Either of these too positione constitute the Radiation Protection Manager requirement es I see Technical Socifications Plant ese - lmit 3.0seretione Muneger Equipeont

" le % en LSD FIGURE 1.5.8 .ted ua44 Rev: i Date: August 10, ige 4

l

. ~

, FIGURE 7.2 NORTHEAST UTILITIES OUALITY ASSURANCE PROGRAM TOPICAL REPORT CHANGE REQUEST FORM Request No. 'D Date Octobe 12. 1994 Requestor D. n Mccnry .
1. PROPOSED REVISION '
1. GENERAL DESCPIPTION OF CHANGE Section/ Appendix Paragraph No. Rev.No.  !

See Attached Pages.  !

2. PURPOSE OF CHANGE 1. Pelocation of Procurement Quality Services to the Nuclear Production Materials Department. 2. To remove QAS from line responsibility of ,

reviewing contractor certifications prior to the start of work, and putting the responsi-bility on the user department. This is a corrective action for a finding identified in audit A60539.

3. NEO PROCEDURES AFFECTED D New Revised O No (see NEO 1.04) Nuclear Group Roles and Responsibilities. NGP 3.14 and most 600 Series NGPs. (These changes will be minor and are mainly associated with which organization will be responsi e fpr a unction, that is most references to QAS will have to be revised o PR . I i

i i

Concurrence .

kM' Ne ireltor [

(if NEO Procedure (s) are not affected, the completion of Section ll.A is not required.)

ll.A PRINCIPAL PRB MEMBER /NEO RESPONSIBLE INDIVIDUAL REVIEWS *

1. PRINCIPAL PRB MEMBER  !

1 CCMMENTS: O Approval O Disapprovai Signature Date

2. NEO RI COMMENTS: O Approval i O Disapproval Signature Date O '

NEO 3.08 Rev.7

m. .m Page 7.2-1 of 2 i

l t

FIGURE 7.2 SUPPLEMENT TO TOPICAL REPORT ORANGE REOUEST FORM October 12, 1994 Requestor: D. D. McCory

1. PROPOSED REVISION GENERAL DESCRIPTION OF CRANGE See attached pages, revisions marked in red.'

Section/ Appendix 1.0 Paragraph No. 1.4.2.1 Figure 1.4 Figure 1.5 2.0 2.2.4 2.2.5 3.0 3.2 4.0 4.2.1 4.2.3

\- 5.0 5.2 6.0 6.2.1 6.2.2 6.2.3 6.2.4 7.0 7.2.1 7.2.2 7.2.3 7.2.4 7.2.5 8.0 8.2 9.0 9.2 l 9.2.2 10.0 10.2.1 11.0 11.2.1  :

11.2.4 12.0 12.2.1 13.0 13.2.1

FIGURE 7.2 SUPPLEMENT TO TOPICAL REPORT CHANGE REOUEST FORM October 12, 1994 Requestor: D. D. McCory

1. PROPOSED REVISION GENERAL DESCRIPTION OF CHANGE See attached pages, revisions marked in red.

Section/ Appendix 14.0 Paragraph No. 14.2.1 15.0 15.2.2 17.0 17.2 18.0 18.2.1 C

O O

() 1.4.2 The Vice President-Nuclear, Operations Services is responsible for Nuclear Production Materials, Quality Services, Emergency. Preparedness, Nuclear Maintenance Programs, and Nuclear Training. The following department Directors report to the Vice President-Nuclear, Operations Services (see Figure 1.4):

  1. vendor o.epe.vd ud ven@4, rece.yd impec.ho g 1.4.2.1 The Director-Nuclear Production Materials is r4sponsible for pans, materials,)n(records support services,gnd procure-ment of equipment and material as required for NUSCOI NUPOC Departments during the design, modification, mainte-nance, construction, and operation of nticlear power plants.

1.4.2.2 The Director-Quality Services is responsible for the preparation and issuance of the NUQAP Topical Report, and verification of the implementation of its requirements by the applicable NUSCO/NUPOC Depanments. Verification is performed by a planned program of audits, surveillance, and inspections by the Quality Services Sections. He provides management with objective evidence of the performance of activities affecting quality, independent of the individual or group directly responsible for performing the specific activity.

m lv) He has the authority and organizational freedom to verify all activities affecting quality. This is performed independent of I undue influences and respcnsibilities for schedules and costs. I He has the responsit;ilig and authority, delineated in writing, to stop unsatisfactory work and control further processing, delivery, or installation of nonconforming materials. He also has the responsibility and authority to identify quality prob-lems, to recommend or provide solutions, and to verify their implementation.

The responsibilities and duties of all NUSCO Quality Services I personnel are described in NUSCO/NUPOC implementing procedures.

1.4.2.3 The Director-Emergency Preparedness is responsible for the on-site Emergency Preparedness Program, the off-site Emer-gency Preparedness Program, and the Technical Support Programs.

O V QAP - 1.0 Rev.- 16 Date: October 7,1993 Page 6 of 9

O O O ) ()

NORTEAST UTILITIES -

Vice President, Organizational Relationships Nuclear, Operations .

of Personnel having Quality Services Functions I I I I I I .

Director * " knager, Nuclear Director. Director. Director. Director, clear cuality Emergency Nuclear Nuclear aterials Services Neparedness M ntenance Training Nuclear Onsite Maintenance General Procurement -

Safety _

Emergency -

Engineering -

Nuclear Engineering Engineering Preparedness Services Training Programs

- i .

Wclear u k#i/

Ducument / el y / Offsite Generation SinnJ1stor Services rv ce ,/ __

Emergency -

Test -

Technical ss Services Support

& clear Plant Production -

Gjelity Meterials thrwices TWM

- Support Technical W ams Training f,. esm.4 l gay _

Assessment Services

% v w.%

Assess

[ d ,n,t nh Services GAP 1.0 m Administrative Fhrporting Only FIGlFE 1.4 Rev: 16 Date: October 7, 1993

~

NORTHEAST UTILITIES Organizational Relationships Executive Vice President, Between NUSCO G NUPOC Nuclear - - - - - - - - - Nuclear Review Wsco s upoc) B **

Personnel having Quality Functions J

l Vice President, RJclear Operations f Services E I Plant M MJclear Stetton M Site W Nuclear Station M

Director. Operatione ---

Vice Freeldent Oper,a,t,ione --

Vice President QJelity Servicoe Review g g, 00sunittee U Consmittee Milletene Manager.

Nxloor Sofety Engineering < "

MJclear thit " - d MJclear thit #

Director - -

Director ---- Plant etione -

" Millstone i Review ittee N111 stone il 9

/g 7 I lf

- , , MJclear " s"-e to M> clear thit M "

Services -

Director - - - -

Plant Re g tione _

Director

-h Milletone 2 i latone to Plant BJality Services Maclear thit M

  • Indicates On Site Organizational Elements -

Director ---- Plant etione -

Supervisor, lhder the Quality Assurance Program Milletone 3 Review ittee Assesseent N111 stone 3)

Services Functional C Administrative Reporting thit #

gy, _ _ _ _ _ , Communications / Advisory Reporting gges

~

S N Q {c", ,

- Functional Reporting

_ Administrative Reporting Site M Services Director FIGUFE 1.5 Rev: 16 Date: October 7, 1993

.. l For systems, components, and structures, Regulatory Commitments and NUSCO/NUPOC procedures describe the measures taken to assure that the quality assurance requirements are met. ,

The degree of control over activities affecting quality systems, structures, and l components is consistent with their importance to safety. Such controls  !

include use of appropriate equipment, establishment of suitable environmental  ;

conditions, and assurance that all prerequisites for a given activity have been i satisfied. This NUQAP Topical Report provides controls over special

[

processes and skills necessary to attain the required quality, and the need for  ;

verification of quality by inspection and test.

Quality Services Department and applicable NUSCO/NUPOC technical organizations jointly determine and identify the extent quality assurance controls are to be applied to quality structures, systems, and components.

The quality assurance controls are in conformance with this NUQAP Topical  :

Report, which complies with the 18 criteria set forth in Appendix B, to  !

10 CFR Part 50.

2.2.4 PARTICIPATING ORGANIZATIONS .

The NU orgamzations with responsibilities for activities affecting quality i systems, structures, and components are identified in QAP 1.0, which also O briefly describes their assigned responsibilities.

Quality Services Department is responsible for: a) the development,  ;

coordination, and control of the NUQAP including coordination of NUSCO  !

Quality Services Department Procedure review and approval; b) control and i

issuance of the NUQAP Topical Report as a controlled document (as  !

described in QAP 6.0) and; c) review and concurrence with quality assurance procedures and revisions written by other departments. Procedure reviews will be performed in accordance with QAP 5.0.

. NU requires that their engineer-constructors, contractors, suppliers,  !

engineering service organizations invoke upon their subcontractors, via k procurement documents, requirements for a quality assurance program to meet the applicable criteria of Appendix B to 10 CFR, Part 50, including the i applicable elements of the Regulatory Guides and their endorsed Standards i identified in Appendix D of the Topical Report. However, NU retains overall l

responsibility for the QA Program. The specific quality activities rformed by these organizations are specified in the procurement documents.g a itf g

Services reviews and approves these organizations quality assurance programs i QAP - 2.0 Rev.: 16 Date: October 7,1993  !

Page 4 of 7

l prior to initiation of contracted activities, and performs audits, surveillances, and inspections on subsequent activities for compliance to their procedures.

(J) w The object of the review is to verify that the enjineering-constructors, i contractors, suppliers, and engineering service organizations have an adequate  !

quality assurance program to meet applicable requirements of Appendix B, to 10 CFR, Part 50.

l In addition to the initial review, the engineer-constructor, contractors, suppliers, and engineering service orgamzations' quality assurance programs shall be periodically audited by uality Services to assure continued implementation of quality requiremen . g%g Contractors may be delegated the execution of quality assurance functions by contract. These contracts are reviewed and approved in accordance with NUQAP requirements.

2.2.5 INDOCTRINATION AND TRAINING A program is established and maintained for quality assurance indoctrination and training which provides confidence that the required level of personnel competence and skill is achieved and maintained in the performance of quality p activities. Quality procedures delineate the requirements for an indoctrination Q program to assure that personnel responsible for performing quality activities are instructed in the purpose, scope, and implementation of quality procedures and instructions and that compliance to these documents is mandatory. The Director-Quality Services is responsible for the indoctrination of personnel wit'ain his department who perform quality activities.

Naclear training programs shall be developed and implemented to provide tnining for all individuals attached to or associated with NU nuclear facilities.

Additional guidance is established in NUSCO/NUPOC Procedures.

Implementing NUSCO/NUPOC Procedures describe the nuclear training program requirements which assure that:

a. Documentation of formal training and qualification programs includes the objective, content of the program, attendees, and date of atten-dance; QAP - 2.0 Rev. 16 Date: October 7,1993 Page 5 of 7

. ., i The quality assurance programs of the engineer-constructor, NUSCO  !

contractors, suppliers, and engineering service organizations that perform  !

quality activities are reviewed by Quality Services to assure that their management regularly reviews the status and adequacy of their part of the NUQAP.

fro c.wre.mt.d j l

f i

t O  :

i t

s l

i i

i O QAP - 2.0 Rev.: 16 i Date: October 7,1993 Page 7 of 7

which adversely affect quality systems, structures and components in design process are documented, and appropriate corrective action is taken. These design errors and denciencies are documented in accordance with design change procedures or as

~

denned in QAP 15.0.

3.2 IMPLEMENTATION NUSCO Project Services Department is responsible for the design, design review, engineerin'g approval of design changes, design evaluation and design control of nuclear power plants. The function may be delegated to other organizations to perform the design activity, or any part thereof, but the responsibility for overall design remains with the PSD. In all cases, final engineering <!ecisions and ultimate design control of systems, structures and components related to nuclear power plants is the responsibility of the PSD.

NUSCO Quality Services performs audits, surveillances, and inspections, to verify that $: engin ci; cer!~cterr, coe'r2cters, mpp!! err, engineering remice

-ws,w#er 2nd NU departments are effectively complying with the NUQAP and procedural requirements for design control.

p= L .m s .wh h, sm-,- % u.s., fv.cuee.ms.d Qwad3 Ss r v $ ". 5

%J .cfd . o, , b v e s h tbf 3.2.1 DESIGN PROCESS Ac eay- d --c-m c_wa,s,

%4., a. , , '

wrrh*v$ *2 s . 3 av v ice. orp w A as . e.,

p Design control measures are appiied to design analyses, such as, reactor

() physics, stress, thermal, hydraulic, nuclear radiation, accident and seismic analyses; compatibility of materials; accessibility for in-service inspection, maintenance, and repair; and delineation of acceptance criteria for inspections and test. Measures established to control design documents are described in QAP 6.0.

Program procedures and instructions define the method of implementing design control measures. These measures require that applicable design requirements, such as, design bases, regulatory requirements, codes and standards, are translated into specifications, drawings, procedures or instmetions. Instructions funher require that appropriate quality standards are specified and included in design documents. All materials, equipment, parts and processes, including standard "off the shelf" commercial or previously approved items essential to the quality functions, are selected and reviewed ,'

for suitability of application. The basis for selection may include industry !

standards, material and prototype hardware testing programs, and design review.

feMediv s\

3 c._ t f g .m % .a v ger f=

%4 re s.h,..A c*p e s~ *~b De desir e.f..)

O Q QAP - 3.0 Rev.: 16 Date: October 7,1993 Page 2 of 6 1

I l

4.0 PROCUREMENT DOCUMENT CONTROL O ~

4.1 GENERAL REOUIREMENTS The procurement of materials, equipments, parts and/or services required during the design, construction, testing, operation and maintenance of quality systems, structures and components in nuclear power plants is performed in a controlled manner which assures compliance with applicable regulatory requirements, procedures, quality assurance standards and regulations affecting procurement documents. Changes to procurement documents are subject to the same degree of control as utilized in the preparation of the original documents.

4.2 IMPLEMENTATION 4.2.1 PROGRAM A Project Engineer / Plant Engineer is selected for each modification to an in-service nuclear power plant. The project engineer coordinates the preparation, review and approval of procurement documents for quality material, equipment, parts or services, and ensures the technical adequacy and inclusion of quality assurance requirements.

NUSCO/NUPOC Pumhase Requisitions are reviewed for technical adequacy and verification of the quality designation. The appropriate NUSCO Project Engineer /NUPOC Nuclear Unit Director revigs and apgrges NUSCO/  ;

NUPOC Purchase Requisitions, when applicable. uiEY3ervices personnel then review the purchase requisition, s for the inclu[ ion an assurance requirements, prior to the issuance of the purchase order. i Any engineer-constructors, contractors, suppliers and engineering service organizations utilized by NUSCO/NUPOC in the design, construction, testing, operation, maintenance, and modifications to nuclear power plants are responsible to implement measures for control of procurement documents associated with quality material, equipment, parts and services to ensure applicable requirements including quality assurance requirements are specified. Quali Sgrvices sity" eff i audits, surveillances, and inspections3 o Tn,suTe*gerforms orgafl5tio op"nIntilized by NUSCO/NUPO effectively complying with their requirements for the control of procurement documents. h fr*wneed Qw.Jh Seevic e 5 rd~ s ES-s de. ,

awa as , se v e N c.u. , _ J m p b. ,, s .4 h <- 5 *-t e cymph=['

Changes to procurement documents, whether initiated by NUSCO/NUPOC or their representative, are subjected to the same degree of control as that utilized in the preparation of the original document. The procurement of O

V QAP - 4.0 Rev.: 16 Date: October 7,1993 Page 1 of 3

spare or replacement parts for quality systems, structures, or components is g subject to the controls of the .iatest NU QA Program and NUSCO/NUPOC procedure requirements. The spare or replacement parts are subject to controls equivalent to original or subsequent codes and standards. The use of subsequent codes and standards are controlled in accordance with the Design Change Control Requirements in QAP 3.0.

fr. car em ed Procurement documents are reviewed by3 Quality Services personnel to determine that:

a. The quality assurance requirements are correctly stated, auditable and controllable; -
b. There are adequate acceptance and rejection criteria.
c. The - procurement document has been prepared, reviewed, and approved in accordance with the NU QA program requirements.

4.2.2 PROCUREMENT DOCUMENT PROVISIONS Procurement documents are prepared, reviewed and approved in accordance with approved procedures of the issuing orgamzation or department and are

( available for verification. These procedures require that procurement documents consist of the following, as necessary:

l 1

a. The scope of work to be performed;
b. Technical requirements (specified or referenced) including the I

applicable components and materials identification requirements, drawings, specifications, procedures, instructions, codes and regula-tions, and the identification of applicable test, mspection and  :

acceptance requirements, or special process instructions; '

c. Quality Assurance Program requirements to be imposed on contractors which include the applicable requirements of 10 CFR 50, Appendix B, and the NRC regulatory position contained in the Regulatory Guides and their endorsed ANSI Standards listed in Appendix D of this Topical Report;
d. Right of access which provides, as appropriate, for access to contractor facilities and records for inspection or audit by NUSCO or its designated representative; and provides access for events such as those requiring notification of hold points; QAP - 4.0 Rev.: 16 Date: October 7,1993 Page 2 of 3 i

h a

e. The documentation required to be prepared, maintained, and / or submitted to NUSCO/NUPOC or its representative for review, cpproval or historical record. The time of submittal of this docunentation and the retention and disposition of quality assurance records which are not submitted to NUSCO/NUPOC is prescribed, as applicable, for NUSCO/NUPOC-Nuclear Grade procurements.

4.2.3 SELECTION OF PROCUREMENT SOURCES

. If the engineer-constmetor, contractor, or supplier is not delegated the  :

function of procurement source selection, the NUSCO Purchasing Department verifies that the procurement document has been reviewed and approved, and i that the supplier has been approved for procurer. lent prior to issuing the purchase order for the material, equipment, parts md services.

Procurement documents may be issued to organizations with unapproved quality assurance programs. These procurement documents to unapproved organizations contain detailed supplementary quality assurance requirements and/or witness / hold point to meet NUSCO requirements.

(reem sm.&

Procurement documents are reviewed by 3 Quality Services to ensure i appropriate quality assurance requirements are specified. These requirements, included in the procurement document as necessary, include acceptance s crueria, audits and/or inspections at the suppliers facilities with scheduled witness / hold points during the fabrication process and/or prior to shipment of i the procured item. Acceptance inspections and tests determined by NU shall i be performed after receipt at NU but prior to operation.

i QAP - 4.0 1 Rev.: 16 Date: October 7,1993 Page 3 of 3

- 5.0 PROCEDURES. INSTRUCTIONS. AND DRAWINGS

~

5.1 GENERAL REOUIREMENTS The NUQAP provides measures for the preparation, review, approval, control and distribution of procedures, instructions and drawings of activities affecting quality systems, structures and components during design, construction, testing, maintenance, modifications, and operation of nuclear power plants. The documents include appropriate quantitative and qualitative acceptance criteria which specify the activity to be performed, the methods of ccastruction and testing to be employed, material, equipment or parts to be used, a sequence of operation and the required documentation.

5.2 - IMPLEMENTATION

' Quality Procedures provide direction for personnel performing quality functions. The Quality Services Department reviews and concurs with Quality Procedures such as those listed in Appendix C. Comments concerning compliance with the NUQAP Topical Report and regulatory requirements are resolved prior to issuance of the

- procedure. NUSCO Quality Services receives controlled copies of Quality Procedures that are listed in Appendix C. Any engineer-constructors, contractors, n suppliers, and engineering service orgamzations utilized by NUSCO/NUPOC in the t ) design, construction, testing, operation, maintenance and modifications to nuclear power plants may be delegated respon.cibility for preparing, maintaining, issuing and verifying the implementation of apprcpriate program documents which are se.lectively reviewed / approved by the appropriate NUPOC Nuclear Unit Director, NUSCO Superintegpgene - ionfo.pjo,n, or Prgetgngingr, as apgropriate. p In this case, Qualitygervic rIormAon-site nd If-nteaudit3/surveilIances/ inspections /of 9

the quality assurance programr7e(nNnP the engineer-constmetor, contractor suppliers and engineering service organizations are effectively complying with their requirements for compliance with their requirements for procedures and instructions.

Contractor programs are required to clearly delineate the actions to be accomplished in the preparation, review and control of procedures, instmetions and drawings and the methods for complying with 10 CFR 50, Appendix B.

5.2.1 PROCEDURES AND INSTRUCTIONS Procedures and instructions for activities affecting quality are prepared, reviewed, and approved in accordance with written procedures and l instmetions.

The NUSCO Superintendent, Generation Constmetion, or NUSCO/NUPOC Project / Plant Engineer, ensures that any engineer-constmetors, contractors, QAP - 5.0 l Rev. - 16 Date: October 7,1993 Page 1 of 2 1

7

g. Final Safety Analysis Report;

(  !

'd h. Procurement Documents;

i. Design Change Requests;
j. Topical Report;
k. Nonconformance Report;
1. Computer Codes.

NUSCO/NUPOC Procedures describe the measures taken by Quality Services or individuals other than the person who generated the document but qualified in quality assurance, for the control of documents to assure review and

?

concurrence, as necessary, for such documents listed above with regards to g quality assurance aspects.

{

v The requirements for control of procurement documents are contained in QAP

  • 4.0. During all phases of plant life, it is the responsibility of each f organization issuing controlled documents to employ document control i procedures. The issuing organization is additionally responsible for 5 m distribution of the documents to appropriate locations. There shall be O

(] provisions to assure that approved changes are included in instructions, procedures, drawings and other documents prior to implementation of the 3 changes.

[

Any engineer-constmetors, contractors, suppliers and engineering service organizations utilized by NUSCO/NUPOC in the design, construction, testing, c.f operation, maintenance, and modifications to nuclear power plants are responsible for implementing measures for review, approval, control and 1 8

distribution with the requirements of for controlled documents, to ensure they are document control.

periodic on-site and off-site audits, surveillances, and inspections 01 me engineer-constmetors, contractors, suppliers and engineering service organizationsyto verify compliance with their approved quality assurance programs. N'hd'1 )

6.2.2 DISTRIBUTION OF CONTROLLED DOCUMENTS NUSCO/NUPOC Procedures, specify in what manner controlled documents and revisions thereof, are distributed to appropriate locations, prior to commencing the work. Holders of controlled copies of documents complete acknowledgement of receipt forms and return them to the distributor in order O

V QAP - 6.0 Rev.- 16 Date: October 7,1993 Page 2 of 3

, ad tr.< e<,

s.J Q ~~h% wv v.s

- to assure that obsolete or superse,dgd docurgents are removed from the work (m) ~

areas in a timely manner. Quafty3SeEde'sperformpperiodic on-site and off-site audits, surveillances, and inspections j Ao verity compliance with the requirements of procedures for documen' control.1 ~

re,pa.v oly 6.2.3 DRAWING CONTROL The NU Nuclear Document Services Orgamzation is responsible to implement a program, as per approved proacdures, for the retention and retrieval of drawings and records submitted by the cogmzant NUSCO/NUPOC project personnel. The NU Nuclear Docuiment Services Organization maintains a drawing status file for in-service unit!. which includes drawings newly issued or revised with latest revision and cuaent status.

The engineer-constructor, contractors, suppliers and engineering service organizations utilized by NUSCO/NUPOC during the design, construction and modification to nuclear power plants may be delegated the function of drawing control and must furnish periodic status reports listing the revisions of applicable drawings which they issue.

.a sh .. .,4 c.wA Pr- -* w & G O brv***5 The Quality 3 Services Department 3 perform)( on-site and off-site audits, surveillances, and inspections of suppliersyto verig they are effectively p complying with their programs for document c7Ilfr'oi oYYrhings.

b 6.2.4 INSTRUCTION AND PROCEDURE CONTROL ad %sasa,4 .a A w q. t,% Sew , e e ,

The Quality 3 Services Department 3 performs audits, surveillanccs, and inspections of NU departments and any engir:eer-canstyctors, coi:.:tactors, suppliers and engineering service organizations}Yt$ life'd t,fHUSCO/NUPOC in the design, construction, testing, operation, maintenance, and modification to ensure they are effectively complying with their QA program for control of procedures and instmetions.

The originating department is responsible for establishing adequate control over quality procedures and instructions issued by them. The responsible organization also issues status reports or revised indices listing the latest revision of applicable controlled documents issued by them.

O b QAP - 6.0 Rev. 16 Date: October 7,1993 Page 3 of 3

t

,q 7.0 CONTROL OF PURCHASED MATERIAL. EOUTPMENT AND SERVICES U

~

7.1 GENERAL REOUIREMENTS Measures for the control of procured material, equipment, parts and services by or for NU related to the safety of nuclear power plants are established and imposed by the NUQA.P during design, construction, testing, operation, maintenance and modification, to ensure conformance to procurement documents. These measures include provisions for source evaluation and selection, submission of objective evidence by the contractor or subcontractor, inspection at the supplier source and examination of items upon delivery. Control of quality by contractors and subcontractors is assessed for effectiveness at intervals consistent with the importance, complexity and quantity of the product or service.

7.2 IMPLEMENTATION The word supplier is used in this section to designate what is otherwise described as the engineer-constructor, contractor, supplier or engineering service organization.

The evaluation and selection of suppliers is performed in accordance with procedures, which specify that procurement source evaluation and selection measures are O performed to determine supplier capability and delineate responsibilities of qualified V personnel involved in the evaluation and selection process.

from< e m,#

7.2.1 3Quality Services utilizes one or more of the following methods in evaluating the qualifications of a potential supplier:

a. Audits and/or coordinated review of a potential supplier utilizing one -

or more departments (i.e., Engineering, Construction, Operations and/or Purchasing);

b. Other utility supplier audits and evaluations;
c. Nuclear Procurement Issues Committee (NUPIC) audits.
d. ASME N, NA, NPT, NV, or MM/ MS Cenificate of Authorization.
e. Commercial grade surveys and/or coordinated review of a potential supplier utilizing one or more departments, (i.e., Engineering, Construction, Operations and/or Purchasing).
f. Source inspection / surveillance t

( QAP - 7.0 Rev.. 16 Date: October 7,1993 Page 1 of 4

i Evaluations ensure that NU suppliers employ a quality assurance program that ,

conforms to applicable portions of the NUQAP Topical Report. *

~ Pr. - c ~ t i nQuality Services maintains documented evidence Bf the evaluation and acceptance of the supplier's quality assurance program. The determination of i supplier approval is based on such factors as prior performance, quality performance data, audits, commercial grade surveys, surveillances and evalu-  :

ations of the supplier's quality assurance program. i Suppliers' Certificates of Conformance are periodically evaluated by audits, j commercial grade surveys, surveillances, independent inspections and tests,  ;

to assure they are valid. This verification of Certificates of Conformance is {

documented.

t 7.2.2 SOURCE INSPECTION P p e em*d-  !

, Quality Services is responsible for the performance of source inspections at l' suppliers' facilities to ensure that the requirements of a Purchase Order

  • Contract have been met.

t Source inspections are perforrnred in accordance with written procedures which provide for the method of inspection, the extent of documentation required and those responsible for implementing those instructions.

O l

Inspection of items occurs either when verifications of procurement  ;

requirements cannot be determined upon receipt or the supplier's QA  !

program has not been accepted by Quality Services.

7.2.3 RECEIPT INSPECTION Receipt inspection for procured items is performed "q- - di=:cr. cf i-fv .m _4 ,

NUSCO Quality Services &-* in accordance with quality procedures l which delineate requirements and responsibilities necessary to perform ,

inspection functions. Contractual obligation fulfilhnent and specified requirements are verified during receipt inspections.

't Receiving inspection of supplier-furnished material and equipment is

  • performed to assure that material, components, equipment and acceptance  ;

records are examined in accordance with predetermined inspection ,

instructions prior to acceptance, installation and operation. Receipt  !

inspections include, as appropriate.  ;

l O QAP - 7.0 Rev.: 16 Date: October 7,1993 Page 2 of 4 l,

e . - . . . . - . , _ . . . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _

a J/e< %-g fwee-en The responsible @lity Services & personnel shall review for acceptability those O, documents which pertain to the requirements in the procurement document, in accordance with the NUQAP Topical Report and its, applicable procedures.

M hb f - m e._gk s I 7.2.5 NUSCO/NUPOC Procedures address the measures taken to assure that for commercial grade items, where specific quality assurance controls for nuclear applications cannot be imposed in a practicable manner, that special dedication requirements are established and implemented.

These measures follow the guidance in Regulatory Guide 1.144, paragraph C.3.b (1) and Regulatory Guide 1.123 and applicable paragraphs of Section 10 of ANSI N45.2.13.

These measures include appropriate requirements for special categorization and identification within the procurement document, receiving inspection, and additional controls during the installation and testing process to be performed ,

by.she Quality Services , - -- ^t, NUPOC and/or other appropriate groups.

Y frec.sfem* b O \

n.be esy.os.b) m~ E.,

m As

,, m. m ,

tsv i e . J

._.s. .

u. Ab d . % .f

. _ . . ~,

vew.l . ,.

ce<b4 c. b.ns pra , k, % 54 A- .4 w. <k. .

ps<s.nns t / ep ,mt g p, .4 Assus-tJ 5=,v.s., bywvbw4 -.h (v=#' k

,ys,,,,,p .4 As c.bv.b=s v i =- awh4, sw< v s M a a , *"

m . ,,,k .ws e, v .b w s . ,

O QAP - 7.0 Rev.: 16 Date: October 7,1993 Page 4 of 4

. t

.- 7 r

implementation of the identification and control program to any engineer- .

constructors, contractors, suppliers and engineering service orgamzations utilized by l

NUSCO/NUPOC in the design, construction, testing, operation, maintenance and ~

modification to nuclear power plants, as appropriate. If delegated, contracts require that the contractor establish an identification and control prgghgh meets the q NUQAP Topical Report requirement. In this case QualEyfServicesgogng and off-site audits, surveillances, and m, spections of the engmeen,ng-constructor, con-g ,, ;  ;

tractor, supplier, engineering service organization's quality assurance programjo ensure they are effectively complying with these requirements for identificatidn a'iG h' ';

control of material, equipment and components.

Receipt inspections are performed to verify that materials, equipment and components I are properly identified in accordance with procurement requirements. Quality i Services is responsible for assigning and applying permanent identification to the  !

items in accordance with approved procedures. If the application of a serial number -

is not practical, other means of identification are implemented to assure proper identification and traceability.

j, i

In the event that the equipment, material or component is nonconforming or the identification becomes lost or illegible, the items are considered nonconforming and are identified and controlled in accordance with QAP 15.0. j O  :

i i

t, QAP - 8.0 Rev.: 16 i Date: October 7,1993 [

Page 2 of 2

/

m

\

9.0 CONTROL OF SPECIAL PROCESSES V

9.1 GENERAL REOUIREMENTS The NUQAP provides measures to assure control of special processes associated with quality systems, structures and components by the use of qualified, approved procedures, equipment and personnel during design, construction, testing, operation, maintenance and modifications to nuclear power plants.

Special processes are performed under controlled conditions in accordance with special requirements and may include, but are not limited to: welding, cleaning, heat treating, and nondestructive examination and/or testing.

9.2 - IMPLEMENTATION During design, construction testing, operation, maintenance, and modification of nuclear power plants, the NUSCO/NUPOC Project / Plant Engineer is responsible for ensuring that special process data and documentation is reviewed, and that contractors, engineer-constructors, suppliers, and/or engineering service organizations special process procedures utilized at nuclear power plants are qualified and approved, and that personnel and equigr3egilizingyecialjrocg l c qualified prior to start of work. Qualitygervices personnelperform site and oft-ongegerg g_m site audits, surveillances, and inspectionsg engge engineering-constructors, r"'d contractors, suppliers, and engineering seNice orga'hizations are effectively complying with their quality assurance program requirements for control of special processes.

NUSCO/NUPOC special process procedures utilized during testing, operation, maintenance, modification and refueling of the in-service nuclear power plant are prepared, reviewed and approved in accordance with procedures as specified in QAP 5.0.

9.2.1 PROCEDURE OUALIFICATION AND CONTROL NUSCO / NUPOC Procedures specify that written process control documents are utilized and qualified, as required, in accordance the applicable specification, codes or standards.

9.2.2 PERSONNEL OUALIFICATION AND CERTIFICATION Codes, standards and NUSCO/NUPOC procedures specify personnel qualification / certification requirements. Personnel responsible for the performance and verification of special processes are trained, tested, and n

d QAP - 9.0 Rev. 16 Date: October 7,1993 Page 1 of 2

g certified as required by applicable specifications, codes and standards.

V Requirements for the period of cenification, retesting, and recertification of personnel are also specified. Contractors qualify p,ersonnel and maintain records of qualified personnel in accordance with applicable codes, standards g w.k. a specifications, and contractor procurement document requirements. QSN'f"

c. ,4,..h,)la Services " , _ _. x: is responsible for the review of records of qualified personnel, equipment and procedures associated with special processes. M The.

J A w n,-...a se,v. m eu ,~.n r,.v A . . m . 3 ve

,y% .mvs .a , +. sev.s .u ,u . w - A. cw evJb.-,

e btrector, Quality S6rvices is responsible for the trammg, testmg, and certification of all NUSCO/NUPOC NDE personnel in accordance with the requirements of Regulatory Guide 1.58 (Rev. 1, 9/80) and ASNT Recommended Practice No. SNT-TC-1A.

9.2.3 SPECIAL PROCESS RFCORDS Records provide objective evidence that special processes were performed in accordance with approved procedures, by qualified personnel, and that when ,

required by procedures, specifications, and codes, such performance was  !

verified. Results of nondestructive examinations are recorded in accordance i with applicable specifications, codes and standards. These records are retained by the supplier or supplied to NUSCO/NUPOC as required by contract or purchase orders. If records are to be retained by the supplier, the

/ contract or purchase order specifies the retention period and instruction for final disposition of records.

Special process documentation such as special process procedures, qualifying data, and personnel and equipment qualification records associated with the performance of special processes at nuclear power plants, are kept current and maintained in appropriate NUSCO/NUPOC files, with final disposition to the appropriate NU Nuclear Document Services Facility.

l i

O QAP - 9.0 Rev.: 16 i Date: October 7,1993 Page 2 of 2 i

l

. , , . , 1 l

10.0 INSPECTION 10.1 GENERAL REOUIREMENTS Inspection of activities to verify the quality of systems, structures and components, which are performed by or for Northeast Utilities (NU), are executed in accordance with the Quality Assurance Program (NUQAP) and appropriate procedures, instructions and drawings by qualified personnel independent from the individual or group performing the activity being inspected. If inspection is impossible or disadvantageous, indirect controls by monitoring processing methods, equipment and penomel are provided. Inspection notification and hold points are identified, as required, in the applicable documents.

10.2 IMPLEMENTATION 10.2.1 INSPECTION RESPONSIBILITIES During construction, testing, maintenance, modification, and operation, procedures shall define the need for inspections (e.g.,

receipt inspections, installation, system turnover, and product acceptance).

Quality Services personnel will ensure procedural requirements are met by means of audits and surveillances as defined in Quality Services procedures.

When inspections are required, Quality Services' involvement is as follows:

a. Identification of inspection personnel;
b. Review of work procedures and work documents;
c. Preparation and approval of inspection plans ensuring that the necessary inspection requirements, methods, and acceptance criteria have been identified;
d. Documentation of inspection results.

%emmk 3 Quality Services performs audits, surveillances, and mspections to verify that any engineer-constructors, contractors, suppliers, and engineering service orgamzations utilized by NUSCO/NUPOC in the design, construction, testing, operation, maintenance, and modification to nuclear power plants are effectively complying with their quality QAP - 10.0 Rev. - 16 Date: October 7,1993 Page 1 of 4

,, 11.0 TEST CONTROL i )

v

~

11.1 GENERAL REOUIREMENTS A ' documented test control program is established by the NUQAP for systems, structures and components to ensure that they will perform satisfactorily in service and that test results are documented in accordance with 10 CFR 50, Appendix B and other peninent regulatory and/or technical requirements.

The test control program identiDes the systems, structures and components to be tested, method of conducting tests, evaluation of tests and documentation of tests by qualified personnel to assure requirements have been satisfied.

The test control program is systematic and inchides proof tests prior to installation, construction tests, operational tests, surveillance tests, and retest following repairs, replacements, preventative maintenance or modifications.

11.2 IMPLEMENTATION 11.2.1 TEST PROGRAM Test requirements to determine or to verify the capability of an item to meet specified requirements in accordance with engineering / design documents, Safety Analysis Reports (SAR), technical specifications, procedures or procurement documents, as appropriate, are accomplished by subjecting the item to a set of physical, chemical, environmental or operating conditions. Retest following repair, replacement or modification is performed in accordance with the original design requirements or acceptable alternatives and is performed when original test results are invalidated.

NUSCO/NUPOC procedures are written and approved to delineate the methods and responsibilities for controlling, accomplishing and documenting testing during construction, maintenance, operation and modification of nuclear power plants.

Any engineer-constructors, contractors, suppliers, and engineering service organizations utilized by NUSCO/NUPOC in the design, construction, testing, operation, maintenance and modification to nuclear power plants are responsible for implementing measures for the control of tests to ensure,thjt ,atgalsgquipments and parts will perform satisfactorily. Quality ervicespormW on-site and off-site audits, surveillances, and inspections of selicted proof tests Nrnewhen i *bb ' QAP - 11.0 )

Rev. - 16 Date: October 7,1993 ,

Page 1 of 3 '

i

.,4 . .

l

. l i

points have been identified in Purchase Order / Contracts of the engineer-constmetors, contractors, suppliers and engineering service organizations to verify they are complying with their quality assurance l program requirements for test control. Documentation associated with these observations are maintained by Quality Service./fm-cM bih sum < > ,

Proof tests, product acceptance tests, retests, and periodic surveillance tests are conducted by qualified personnel in accordance with approved procedures. Personnel performing tests ensure that calibrated equipment and instrumentation utilized are within the calibration interval specified. Documentation including test procedures and approved data sheets are maintained in appropriate files.

11.2.2 TEST PROCEDURE PREPARATION AND TEST PERFORM ANCE Testing is accomplished in accordance with approved test procedures which incorporate or reference the requirements and acceptance ,

criteria in the applicable design and procurement documents. The test procedure or test program documents include the following as a minimum:

a. Instmctions for the testing method used;  ;
b. Required test equipment and instrumentation; i
c. Test requirements, such as acceptance and rejection criteria;
d. Hold, notification, inspection and data collection points;
e. Test prerequisites such as: calibrated instrumentation; trained, qualified, and licensed or certified personnel; preparation, condition and completeness of item to be tested; suitable and controlled environmental conditions;
f. Methods for documenting or recording test data and results; '
g. Provisions for data collection and storage.

11.2.3 TEST EOUIPMENT ,

NUSCO/NUPOC Procedures provide the criteria for determining when a test is required and the accuracy requirements of test equipment.

i QAP - 11.0 ,

Rev.: 16 Date: October 7,1993 i Page 2 of 3

l I

c During the operations phase of a nuclear plant, the following steps are  !

taken:

a. To ensure accuracy, test instrumeniation is checked and l

calibrated in accordance with NUSCO/NUPOC procedures.

b. Plant instrumentation used in testing is calibrated. It is maintained in calibration at regular intervals in accordance with established surveillance and / or preventative maintenance procedures.
c. Where special instrumentation is required for testing, the requirements are stated in the procedures. Instrument characteristics, including accuracy requirements, are equivalent to or better than those specified by the vendor.

11.2.4 EVALUATION OF TEST RESULTS The documented test results are evaluated against the predetermined acceptance criteria by an individual or group having appropriate qualifications. The acceptance status of the test is documented.

Deficiencies noted during the evaluation are documented and dispositioned in accordance with approved procedures.

The evaluation of test results may also be delegated to other organizations. The evaluating organization is required to assure the use of qualified personnel, evaluate the data against predetemtined criteria and document the results o the evaluati status of the test. Quality Service Erm,iMs,gp and acc{p,tance3uiYeiIG inspections to verify that these organizations are effectively complying ,

with their quality assurance program requirements for test control.

t) QAP - 11.0 Rev. - 16 Date: October 7,1993 Page 3 of 3

~ 12.0 CONTROL OF MEASURING AND TESTING EOUIPMENT

~

12.1 GENERAL REOUIREMENTS The NUQAP provides measures for the control of measuring and testing equipment (M&TE) used as the basis for acceptance in activities affecting quality during inspection, testing and measurement of materials, equipments and parts.

Periodic calibration and adjustment of measuring and test equipment is performed and controlled to assure accuracy is maintained within limits necessary to verify that design and operating condition requirements have been met. Documentation is retained such that all items of M&TE are traceable to their calibration records.

4 12.2 IMPLEMENTATION 12.2.1 Approved procedures delineate the methods and responsibilities for the control, maintenance and calibration of M&TE including portable and installed instmments, tools, gages, fixtures, reference and transfer standards, and nondestructive test equipment.

All documentation associated with M&TE is maintained in appropriate files, with eventual incorporation into the NU Nuclear Records Program.

During NUSCO-directed activities on a nuclear plant, with the exception of Generation Construction's directed activities, the calibration program is implemented in accordance with the require-ments defm' ed in NUSCO Procedures. NUSCO functional groups are responsible for implementing these procedures which comply with the requirements contained in specifications and drawings.

frw.-e < d5he Quality Services D 7- . is responsible for verifying that receipt of calibrated equipment is in conformance with the require-ments of procurement documents, and to control calibrated M&TE used during their inspections.

During NUPOC/ Generation Constmetion/ Generation Test-directed activities, the calibration program is implemented in accordance with the requirements defined in NUPOC Procedures. The Site / Plant Operations Review Committee (SORC/PORC) reviews and approves procedures related to the calibration program.

Depamnent heads / Job Supervisors are responsible to ensure that O

V QAP - 12.0 Rev.: 16 Date: October 7,1993 Page 1 of 3

l

, . , . 1 M&TE equipment is calibrated, issued, and controlled in accor-3 (b dance with the requirements of the procedures. During Generation Construction-directed activities, the Job Supervisor shall ensure that the users of the M&TE are properly instructed in the use and control of the M&TE. Department Heads are responsible for calibrating M&TE within the required frequency and for reviewing calibration data associated with M&TE calibration by outside vendors in accordance with the procedures.

Quality Services performs audits, surveillances, and inspections and to verify implementation of the calibration program.

Any engineer-constructors, contractors, suppliers and engineering service orgaruzations utilized by NUSCO/NUPOC in the design, construction, testing, operation, maintenance and modification to nuclear power plants are responsible for implementing measures for the control of M&TE to ensure they are properly calibrated, adjusted and maintained at specified intervals in or *d l accuracy within required limits. NUSCO QualiE$pego m on-site and off-site audits, surveillances, and inspections f the Q*JD quality assurance programs of the engineer-constructdr?,p"h*h

'f

  • 5 5 " v ""

contractors, suppliers and engineering service organizations to verify they are effectively complying with their requirements for

v; control of M&TE.

12.2.2 CALIBRATION STANDARDS Measuring and test equipment is calibrated at specified intervals based on the required accuracy, purpose, degree of usage, stability characteristics, and other conditions affecting the measurement.

Measuring and test equipment shall be labeled or tagged to indicate the date calibrated and next calibration date.

NUSCO/NUPOC Procedures describe the measures taken to assure that reference and transfer standards are traceable to nationally recognized standards and that, where national standards do not exist, provisions are established to document the basis for calibration.

(O"y QAP - 12.0 Rev.: 16 Date: October 7,1993 l Page 2 of 3 l

T' 13.0 HANDLING. STORAGE AND SHIPPING V}

13.1 GENERAL REOUIREMENTS Measures are established by the NUQAP using approved procedures, instructions and procurement documents to ensure proper handling, storage, shipping, cleaning and preservation of material, equipment and parts. These measures are imposed during the design, procurement, construction, testing and operation of nuclear power plants and modifications thereto, in order to preclude damage, loss or deterioration of materials, equipments and pans.

13.2 IMPLEMENTATION 13.2.1 GENERAL Procedures, instructions and procurement documents define the requirements and responsibilities for the handling, storage, shipment, cleaning and preservation of material, equipment, and parts required for implementation of established design and specification require-ments.

I OV Ifandling, storage, cleaning and preservation requirements of material, equipment and parts is conducted in accordance with written procedures and procurement documents. Any engineer-constnictors, suppliers, and engineering service orgamzations utilized by NUSCO/

NUPOC in the design, construction, testing, operation, maintenance and modifications to nuclear power plants are responsible for implementing measures for handling, storage, shipping, cleaning and preserving materia,ls g eguigt grgtogrgelgej,agaggog*or, deterioration. QualitynService per:orms audits, surverhances, arid inspe;tions to verify that NUS O/NUPOC, contractors, suppliers and engineering service organizations are effectively implementing and complying with the approved procedures and instmetions for handling, storage, shipping, cleaning and preservation of materials, equipments and parts.

13.2.2 ESTABLISHMENT OF SPECIAL HANDLING. STORAGE.

SHIPPING. CLEANING AND PRESERVATION REOUIREMENTS Special or additional handling, storage, shipping, cleaning and preservation requirements are to be identified and implemented as specified in procurement documents and approved procedures. These established requirements are consistent with the regulatory positions

' QAP - 13.0 Rev.: 16 Date: October 7,1993 Page 1 of 2

14.0 INSPECTION. TEST AND OPERATING STATUS O

14.1 GENERAL REOUIREMENTS The NUQAP provides measures for indication, by the use of marking such as stamps, tags, labels or other suitable means, the status of tests and inspections of material, equipment and parts throughout design, construction, testing, operation, maintenance and modification of nuclear power plants, to preclude the inadvertent bypassing of inspection and test requirements. These measures provide for the identification of items which have satisfactorily passed required inspections and tests. Measures are also established for indicating the operating status of systems, structures and components to prevent inadvertent operation.

14.2 IMPLEMENTATION 14.2.1 GENERAL

- Any engineer-constructors, contractors, suppliers and engineering service organizations utilized by NUSCO/NUPOC in the design, construction, testing, operation, maintenance and modification to nuclear power plants are responsible for implementing approved O measures for the identification ofinspection and test status of material, equijngt gays to preclude the bypassing of requirements.

QuabtyASErvices, opnkon-site and o{f-sitegudits,* surveillances, and inspectionspf en engineering 'sWUce or$a%eI~coEs*tnIYbH,%ntract'o htions, as appropriate, to verify that they are effectively complying with their requirements for identification of inspection and test status, in compliance with approved procedures and instructions. Elements of this system require that suppliers and contractors have a controlled manufacturing and test operation, in order to preclude the inadvertent bypassing of process inspections or tests, and to provide a positive identification of component status throughout all phases of manufacturing, testing, and inspection by means of tagging, routing cards, stamping, manufacturing or test reports, labeling or other appropriate methods.

When Receipt Insppetions areprformed at the NU Nuclear Generating Facilities,%ahtyTervices ensures that traceability is maintained for acceptable materials, equipments and parts, to indicate conformance to Purchase Order / Contract requirements.

Nonconforming materials, equipment and parts are identified in accordance with QAP 15.0.

O QAP - 14.0 Rev.: 16 ,

Date: October 7,1993 Page 1 of 2

p 15.0 NONCONFORMING MATERIALS. PARTS. COMP.gBjFL3 OR SERVICES U/

15.1 GENERAL REOUIREMENTS The NUQAP requires that documentation and control of nonconforming materials, pans, components, or services utilized in systems, structures and components during design, constniction, testing, operation and maintenance of nuclear power plants and modifications tnereto, be performed in accordance with approved procedures in order to prevent inadvertent use or installation. These procedures include appropriate requirements for identification, documentation, segregation and disposition of nonconforming items, and notification to affected organizations.

15.2 IMPLEMENTATION 15.2.1 PROGRAM Approved procedures define personnel responsibilities and establish various measures for identification, documentation, segregation, review and disposition of nonconforming item repons. Report mechanisms are available to all NU personnel and utilized based on the scope of their departmental responsibilities and procedural O guidance.

b 15.2.2 DOCUMENTATION Documentation of nonconforming items requires identification of the items, description of the nonconformance, disposition of the nonconformance, inspection requirements and signature approval of the disposition. A trend analysis of nonconformances documenting program / procedural problems is performed by NU in accordance with approved procedures. The trend analysis results are periodically reponed to upper management, including the Executive Vice President, Nuclear and Director, Quality Services Depanment, for review and assessment.

Tagging systems are utilized pahvs,ic,all4 identify nonconforming items prior to installation. @e3Quahty Services "c,--- -- - utilizes tags for received material, pans and components.

An engineering evaluation is performed, if necessary, prior to the resolution of nonconformances.

15.2.3 EVALUATION AND DISPOSITION U

QAP - 15.0 Rev.. 16 Date: October 7,1993 Page 1 of 2

P 17.0 OUALITY ASSURANCE RECORDS 17.1 GENERAL REOUIREMENTS The NUQAP provides for the maintenance, identincation, retention and retrieval of records to furnish evidence of activities affecting quality during design, construction, testing, operations, maintenance and modification of nuclear power plants. The records include but are not limited to: operating logs and the results of reviews, inspections, tests, audits, monitoring of work performance aril material analyses. l The records also include closely related data such as qualifications of personnel,  ;

procedures and equipments. Inspection and test records con ain as a minimum but ,

are not limited to: identification of inspector or data recc.rder and the acceptability <

and the action taken in connection with any deficiencies and Reportable Occurrences noted. Approved procedures establish requirements concerning record retention such as duration, location and assigned responsibility.

17.2 IMPLEMENTATION NUSCO/NUPOC Procedures and Instructions establish the responsibilities and requirements for the maintenance, identification, retention and retrievability of records pertaining to materials, equipments, parts, processes or operations relating

(' to systems, stmetures and components which when founded on observations, measu ements or tests can be fully verified, and documented by cognizant personnel.

Any engineer-constructors, contractors, suppliers and engineering service r organizations utilized by NUSCO/NUPOC in the design, construction, testing,  !

operation, mainterance and modification to nuclear power pluts are responsible to  !

implement measures for identification, maintenance, retention, retdeval and turnover  ;

to the NUSCO/NUPOC personnel of documented and approved records which  ;

g ob egve vitence of qu lity as ,cified in Purchase Order / Contracts.

co g Q ity ices rfo$ENsIite d!Tls atidtE, surveillances, and inspections,rupdwelp ;

of the engineer-constmetors, contractors, suppliers and engineering service l orgamzations, as appropriate, to verify they are effectively complying with their program for quality asst)rance records.

NUSCO/NUPOC record i are identified, controlled and maintained in appropriate files i and are identifiable to specific systems, structures and components within the nuclear power plant. When identification to a specific system, stmeture or component is not practical, records are filed by category (e.g. specification, nonconformance reports,  !

audits, etc). I 17.3 RETENTION O QAP - 17.0 Rev.: 16 Date: October 7,1993 Page 1 of 2

f s -

C 18.0 AUDITS  :

O 1 18.1 GENERAL REOUIREMENTS '

d The NUQAP requires that a comprehensive system of planned and periodic audits shall be carried out to verify compliance with the NUQAP Topical Report during the fg design, construction, modification, testing, maintenance, and operation of nuclear >

power plants. $

n Aud'its are conducted in accordance with written procedures and checklists by appropriately trained personnel not having direct responsibilities in the areas being

[ ,

audited.

]mo Audit results are documented and reviewed by management having responsibility in ,

the area audited and the responsible management takes the necessary action to address any audit findings revealed by the audit.

f l

5 18.2 IMPLEMENTATION g 18.2.1 PROGRAM u

(

c The Audit program requires ~ audits of corporate and plant quality activities. Audits are performed on activities where the requirements ,

of 10 CFR 50 and respective Technical Specifications are being ]e ,

implemented. In addition to those activities, audits are performed on areas associated with indoctrination and traming programs, at J interface control among tne licensee and contractors [ Audits are regularly scheduled on the basis of the status and safety importance of the activities being performed. Regularly scheduled audits are ,

supplemented by audits for one or more of the following conditions: '

a. When significant changes are made.in functioral areas of the quality assurance program, such as significat reorganization or procedure revisions.
b. When it is suspected that the quality of the item is in jeopardy due to deficiencies in the quality assurance program
c. When a systematic, independent assessment of program effectiveness is considered necessary.
d. When necessary to verify implementation of required corrective action.

O QAP - 18.0 Rev.: 17 Date: August 10,1994 Page: 1 of 3

.. #= .

l

  • I D

[d Schedules are originated and maintained by the Quality Services Department.

Audits are performed as specified in procedures by qualified person- j nel, using a preestablished written audit plan prepared by the auditing  !

organization. Auditors evaluate the work areas, activities, processes, ,

items, and review documents and records to determine the effective- l ness of implementation and conformance to the NUQAP.

Approved contractors, suppliers, and engineering service organizations utilized by NUSCO/NUPOC in the design, .constmetion, testing, operation, maintenance, and modification to nuclear power plants are responsible for developing and implementing a system of planned and periodic audits to verify compliance with the effectige v ss of ay aspects of their quality assurance programs. Quainy *YEicYshe"'A e

personnel perform audits to ensure these organizations are e,ffectively QJh complying with their quality assurance requirements. Sew W In addition to the audits, other methods, such as surveillances, and inspections are used to ensure that quality activities are in compliance with the NUQAP Topical Report.

18.2.2 REPORTING OF AUDIT RESULTS Audit results are reviewed and approved by the Quality Services Depanment in accordance with approved procedures. The audit reports are issued to the appropriate management of the area audited to ensure appropriate and/or timely corrective action is taken to address any audit findings. In addition, audit data and repons are accumulated as pan of the review for quality trends and assessed to ensure the effectiveness of the quality assurance program.

18.2.3 REVIEW OF AUDIT FINDINGS Audit results are documented, reviewed, and analyzed with manage-ment having responsibility in the area audited. The responsible management is required to take the necessary action to address any findings identified by the audit.

18.2.4 RESOLUTION OF AUDIT FINDINGS Appropriate action to resolve fimdings identified during audits is to be taken by the cognizant NUSCO/NUPOC organization before scheduled

,. resolution dates. The audited organization reviews thefindings, and l i}

\

QAP - 18.0 Rev.- 16 l Date: October 7,1993 Page 2 of 3 l

. . <

  • e I

C PROCUREMENT QUALITY SERVICES BRANCH

\w PROCEDURES ..

10 CFR 50, APP. B CRITERIA PRQS - PROCEDURES IV. Procurement Document PROS-3.01 Procurement Document Control Revie.w PRQS-3.04 Performance of Commercial Grade Surveys VII. Control of Purchased PRQS-3.02 Supplier Evaluations Material, Equipment,  ;

and Services PROS-3.03 Evaluation and Approval of Nuclear Supplier Quality Assurance Programs PROS-3.05 Control of the Approved Suppliers O>- List, ASME Suppliers List, and Commercial Suppliers List PROS-3.10 Periodic Oversight Program X. Inspection PRQS-3.07 Preparation, Performance, and Reporting of Source Inspections

]

PROS-3.08 Performance of i Receipt Inspection Activities PROS-3.09 Inspection Status ,

(Tagging) )

QAP - Appendix C Rev.: 17 Date:

O Page

aa r. o -

PROCUREMENT QUALITY SERVICES BRANCH (G'] PROCEDURES ..

10 CFR 50, APP. B CRITERIA PROS - PROCEDURES XV. Nonconforming Materials, PROS-3.11 Critique of Parts, or Components, or Potentially Services Significant Quality Problems Related to NUSCO Suppliers XVIII. Audits PROS-2.10 Joint Vendor Audits PRQS-2.12 Performing, Reporting, and Follow-up of Procurement Quality

()

Services Audits QAP - Appendix C Rev.: 17 Date:

(Q)

, Page