ML20205C040: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:, . _ _ . _ _ . . . _ . . _ . _ _ . . . _ . _ . _ _ . . . . . . _ . - . .    ......._-.._m  . _ . _ . _ . _ . _ _ . _ . _ _ ..
I I      .
!                                                                                                                                                                      l l                                                                                                                                                                      l
[:*
GEORGIA POWER COMPANY i
EDWIN 1. HATCH NUCLEAR PLANT I                                '
ANNUAL ENVIRONMENTAL SURVEILLANCE REPORT                                                                      i CALENDAR YEAR 1986                                                                    !
r I
I i
l 1                                                                                                                                                                    t 4                                                                                                                                                                    r i                                                                                                                                                                    !
i
: v.                                                                                                                                                                    '
]                                                                                                                                                                    t I
4                      '
!                                                                                                                                                                    f 1
l.
t i
4                                                                                                                                                                    !
l k
e i-t
,I                                                                                                                                                                  s i
i
)
4 i
['
1-h 5F yis                          -
t-i                                      8703300096g500 PDR R
ADOCK
                                                                    /        TDR 21                                                    p. gh g,4 ho&
i leg        /        f I                ,
 
EDWIN I. HATCH NUCLEAR PLANT ANNUAL ENVIRONMENTAL
('j                            SURVEILLANCE REPORT
  'v SPECIFICATION In accordance with Section 5.6.1 of the Edwin I. Hatch Nuclear Plant, Units 1 and 2, Environmental Technical Specifications, the Annual ~ Environmental Surveillance Report will provide a summary and interpretation of the results of any environmental monitoring activities required and an assessment of any observed impacts of plant operation on the environment. Also, the report will include a summary of all instances of Environmental Technical Specifications (ETS) noncompliances and corrective action taken, changes to federal and state permits and certificates, changes to the Environmental Program Description Document (EPDD), changes in station design or operation which could involve an environmental impact, changes made to the ETS, and copies of all reports regarding station discharges made in accordance with NPDES Permit No. GA-0004120.
DISCUSSION In 1986, there were no non-radiological environmental monitoring activities performed at the Hatch Nuclear Plant (except those
{'/)
s_
required by the NPDES permit), nor wers there any changes in station design or operation which could involve an environmental impact. There were no known ETS noncompliances or changes,-and no changes were made to federal and state permits and certificates or the EPDD.
Georgia Power Company was issued on July 21, 1986 a United States Army Corps of Engineers permit (No. 074-OYN-006086) to construct a temporary weir across the Altamaha River in order to maintain adequate water levels for intake of cooling water during periods of extreme droughts. Such conditions existed in 1986, and a temporary weir was constructed, utilized and removed under the stipulations of the permit. There was no known environmental impact caused by this activity. The expiration date of the permit is September 30, 1991.
Copies of all reports regarding station discharges made in accordance with NPDES permit No. GA-0004120 are included in Appendix A.
l
 
l O            .
EDWIN I. HATCH NUCLEAR PLANT ANNUAL ENVIRONMENTAL SURVEILLANCE REPORT APPENDIX A
O    NPDES Operation Monitoring Reports Edwin I. Hatch Nuclear Plant                                  .
1986 O
D wem_          -n n------r_--.---v----e----    w-,-w--n -,--,
 
i    .    .
Page 1 of 9 QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company                                                  From: 01-01-86 Plant Hatch                                                              To: 03-31-86 P. O. Box 439 Baxley, Georgia 31513                                        Permit Number: GA0004120 Discharge Location: 001A1 - Low Volume Waste
                                                      -(Neutralizaton Tank)
Type of Sample: Grab Frequency of Analysis:    2/mo Parameter:                    Suspended Solids              Oil & Grease            pH mg/l                        ag/l Limits:                          Avg. 30                  Avg. 15            Min. 6.0 Max. 100                      Max. 20            Max. 9.0 Date                                                                                          '
.        01-06-86                            2.3                        0.4                7,0 i
* _                            _                _
02-15-86                            20.0                        5.0                8.3      -
03-05-86                            1.3                        5.2                7.5 03-17-86                            1.3                        2.4                8.3 Number of Samples:                      4                            4                4 Average Value:                      6.2                        3.25              7.8 Maximum Value:                    20.0                          5.2              8.3 Minimum Value:                      1.3                      -
0.4      -
7.0      '
Limits Exceeded:                        0                            0                0    -
* Tank was not discharged for the remainder of the month.                                  '
l l
l I
l l
O e
 
Pegs 2 of 9 QUARTERLY OPER!.TIONAL MONI~0 KING REPOR'~
Geoigia Power Company From: 01- 1-86
,        Plant Hatch                                                              To: 03-31-86 P. O. Box 439 Baxley, Georgia 31513 Permit Number: CA0004120            ..
Discharge Location: 001A2 - Low Volume Waste                  ,
(Pressure Filters)
Type of Sample: Grab Frequency of Analysis:  1/qtr                                  .
Parameter:            Suspended Solids              Oil & Grease                pH mg/l                          ag/l Limits:                    Avg. 30                Avg. 15                Min. 6.0 Max. 100                    Max. 20                Max. 9.0 4
Date 2-3-86    (A)              7.9                          (5                      8.0 2-3-86    (B)              5.9                          <5                      7.9 2-3-86    (c)              8.0                          (.5                    8.0 2-3-86    (D)              8.8                          <5                    7.9 Number of Samples:              4                          4                        4 Average Value:              7.6                          /5                      7.95 Maximum Value:              8.8                          45                      8.0 Minimum Value:              5.9                          (-5                    7.9 Limits Exceeded:              0                        . 0            .          0 l
i 4
l 4
l l
l l
l 4
i  *                          -
 
Pcg3 3 of 9 QUARTERLY OPERATIONAL MONITORING REPORT
  !")
V    Georgia Power Company                                              From: 01-01-86 Plant Hatch                                                          To: 03-31-86 P. O. Box 439 Baxley, Georgia 31513                                  Permit Number: GA0004120            .
Discharge Location: 001B - Cooling Tower Blowdown Location:        Intake      Mixing Zone      pH            Zn                Cr Type Sample:    In Situ        In Situ        Grab          Grab              Grab Frequency:          1/wk          1/wk          2/mo          1/qtr              1/qtr Parameter:      Temp. Deg. F Temp. Deg. F.
Limits:          T of 5 Deg. T of 5 Deg.      Min. 6.0 Max. 90 Deg. Max. 90 Deg. Max. 9.0        Max. 1.0          Max. 0.2 Unit 1 Unit 2 Unit 1 Unit 2 Unit 1 Unit 2 Date 1-03-86            50            50 1-06-86                                    7.8      7.6  (0.1      .16    (0.1    (0.1 1-08-86            46            46 1-15-86            45            45 1-20-86                                    *
* 1-23-86            54            54 1-30-86            46.4          46.4 2-03-86
* 6.8
(  2-07-86 2-14-86 52 50 52 50 2-17-86
* 7.5 2-19-86            54            54 2-26-86            57            57 3-03-86
* 7.0                -
3-05-86            52            52    ,
NOTE:
3-12-86            63            63
* Unit in cold shutdown 3-17-86
* 7.5 3-19-86            68            68                  -
3-26-86            59            59' Nucher of Sa:nple: 13            13        1        5      1        1        1        1 Average Value:    54            54        7.8      7.3  40.1      .16    40.1      (0.1 Maximum Value:    68            68        7.8      7.5  40.1      .16    40.1      eD.1 Minimum Value:    45            45        7.8      6.8  40.1      .16    40.1      40.1 Limits Exceeded:    0            0        0      0      0          0      0        0 0
O h
 
Paga 4 of 9                                                                                            -
QUARTERLY OPERATIONAL MONITORING REPORT
  \  Georgia Power Company                                                                                                          From: 01-01-86 Plant Hatch                                                                                                                      To: 03-31-86 P. O. Box 439 4
baxley, Georgia 31513                                                                                          Permit Number: CA0004120 Discharge Location: 001C - Sewage Treatment Plant Type of Sample: Grab Frequency of Analysis:                            2/yr.
Parameter:                                                                        BOD 5                          FAC                                TSS mg/l                            mg/l                                ag/l l  Limits:                                          PLANT #                  Avg. 30                                -
Avg. 30 l                                                                              Max. 45                                -
Max. 45 Date 1-08-86                                              1                          72.4                              1.0                        102.5
. 2-27-86                                              1                          13.7                              0.8                  -
19.0 Number of Samples:                                                            2                                  2                              2 i
Average Value:                                          ,                    43.0                              0.9                            60.8 Maximum Value:                                                                72.4                              1.0                        102.5 Minimum Value:                                                                13.7                              0.8                            19.0 Limits Exceeded:                                                              1                                  0                              1
                                                                                                                                        =
}
l i
i i
i
                                    ~
O O
y      - --
                              -o,e-w.m--m,.g.---,w--,              ---w m,mw-,,,,e_-w      . - _ , - , , - - , , ,      ,+n        _            --~~-,,---,.--.w- . - ~ - + - - ~ , - = - ,
 
Page 5 of 9 l
QUARTERLY OPERATIONAL MONITORING REPORT
!    b  Georgia Power Company
  '                                                                                From:      01-01-86 Plant Hatch                                                                To:      03-31-86 4
P. O. Box 439 Baxley, Georgia 31513                                          Permit Number:        CA0004120      '
i                                                                  e Discharge Location: 001D - Liquid Radwaste System Unit 1 Type of Sample: Grab Frequency of Analysis: 2/mo.
4 Parameter:                      Suspended Solids            Oil & Grease                    pH l                                                mg/l                    ag/l                      pH Units 4
Limits:                                Avg. 30                Avg. 15                    Min. 6.0 i                                                Max. 100                Max. 20                    Max. 9.0 4
Date 1-06-86                                12.0  -
8.2                        6.1 1-20-86                                    1.8                    1.6                        6.7 2-03-86                                    0.0                    0.0                        6.4
!      *2-14-86                                  38                        NA                        6.7 2-17-86                                  15                        0.6                        7.0
',      3-03-86                                    1.4 5.6                        6.9 l        3-17-86                                    1.0                    0.4                        6.1
!O.                                                        -
,        Number of Samples                        7                        6                          7
.        Average Value:                          10                        2.7                        6.6      >
Maximum Value:                          38                        8.2                        7.0 Minimum Value:                          0                  -
0        -
6.1 Limits Exceeded:                        0                        0                          0
* Procedure calls for TSS to be done if Turbidity)50 NTi!.              ,
4 i
)                    .
I l                                                                                                              <
t o
d                                                                              E i
i
 
i Page 6 of 9 g                        QUARTERLY OPERATIONAL MONITORING RFPORT Georgia Power Company                                              From: 01-01-86 Plant Hatch                                                          To: 03-31-86 P. O. Box 439 Baxley, Georgia 31513                                  Permit Number: GA0004120        ,
Discharge Location: 001D - Liquid Radwaste System Unit 2 Type of Fample: Grab Frequency of Analysis: 2/mo.
Parameter:                      Suspended Solids      Oil & Grease                pH mg/l                  ag/l                pH Units Limits:                          Avg. 30              Avg. 15                Min. 6.0 Max. 100              Max. 20                Max. 9.0 Date 1-05-86                          0.40                  0.50                    7.0 1-20-86                          0.0                  0.80                    6.4 2-02-86                          1.1                  0.0                    6.2 2-16-86                          0.0                  2.8                    6.4 3-02-86                          0.0                  0.01                    8.9 O Number of Samples:                5                    5                      5 Average Value:                    0.6                  0.8                    7.0 Maximum Value:                    1.1                  2.8                    8.9 Minimum Value:                    0.0                  0.0                    6.2 Limits Exceeded:                  0                    0 0
      *No tanks discharged to river from 3-13 to 3-31-86.
J b
O 4
9 h
 
Page 7 of 9 QUARTERLY OPERATIONAL MONITORING REPORT                                    !
O5    Georgia Power Company                                                  From:      01-01-86 Plant Hatch                                                              To:      03-31-86 P. O. Box 439 Baxley, Georgia 31513                                      Permit Number:          GA0004120 ,
;                                  Discharge Location: 001E - Combined Plant Waste Unit 1 Frequency of Analysis: 1/wk.
Type of Sample:            In Situ        Grab          Grab              Grab Parameter:              Temperature        TRC            FAC                  pH Limits:                        Deg. F      N/A      ,    N/A          Min. 6.0
;                                                                                    Max. 9.0 4
Date 1-03-86                        50        40.1        40.1                    7.3 1-08-86                        50        40.1      40.1                      7.9 i            1-15-86                        47        40.1        40.1                  7.5 1-23-86                        55        (0.1        40.1                  6.8 1-30-86                        47        40.1      40.1                    6.7 4
2-07-86                        69        z0.1        c0.1                  6.8 2-14-86                        55        40.1      40.1                    7.1 l          2-19-86                        59        40.1        40.1                  7.0 2-26-86 0    3-05-86 3-12-86 53 5.7 66 4.0.1 40.1 c 0.1 40.1 40.1 40.1 7.5 7.6 7.2 3-19-86                        68        (0.1      c0.1                  6.9 3-26-86                        63        40.1      40.1                  7.4
,            Number of Samples:            13          13          13                13 Average Value:                56.8    40.1        40.1                  7.2 Maximum Value:                69        40.1      (0.1                  7.9 Minimum Value:                47        40.1      40.1                  6.7 Limits Exceeded:              0          0            0
                                                                                  ~
0 I
?
O l.
l                      .
I
* i  .
 
Prg3 8 of 9
                            -QUARTERLY OPERATIONAL MONITORING REPORT
- (3 Q/ Georgia Power Company                                            From: 01-01-86 Plant Hatch                                                          To: 03-31-86 P. O. Box 439 Baxley, Georgia 31513                                    Permit Number: GA0004120 ,
Discharge Location: 001E -Combined Plant Waste Unit 2 Frequency of Analysis: 1/wk.
Type of Sample:              In Situ        Grab      Grab            Grab Parameter:                Temperature        TRC      FAC              pH Limits:                    Deg. F*
N/A        N/A          Min. 6.0 Max. 9.0 Date 1-03-86        -
56            (0.1      40.1              7.0 1-08-86                    55          '40.1      40.1            8.0 1-15-86                    52            40.1      40.1              7.4 1-23-86                    57            40.1      40.1            6.9 1-30-86                    57            20.1      40.1            7.1 2-07-86                    79            40.1      40.1              7.4 2-14-86                    68            40.1      40.1            7.2 2-19-86                    80            40.1-      40.1            7.1 2-26-86 0  3-05-86 3-12-86 69 71 80 40.1 40.1 40.1 40.1 40.1 40.1 7.6 8.8 7.6 3-19-86                    83            40.1      40.1            7.0 3-26-86                    77            z0.1      &O.1              7.4 Number of Samples:        13      ,      13        13              13 Average Value:            68            40.1      40.1              7.4 Maximum Value:            83            40.1      40.1              8.8 Minimum Value:            52            20.1      40.1              6.9 Licits Exceeded:          0                0        0 0
O O
I
 
Pcg3 9 cf 9 QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company                                                                                      From: 01-01-86 Plant Hatch      j                                                                                            To:        03-31-86 P. O. Box 439 Baxley, Georgia 31513                                                                    Permit Number                  CA0004120 i
                                                                                                                  ,~
I certify under penalty of law that this document and all attachments were prepared under the direction of supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based en my inquiry of the person or persons who manage the system or those persons
,      directly responsible for gathering the informatiori the information submitted is to the best of my knowledge and belief true, accurate and complete.                                                    I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations.
i H. C. Nix
!                                                                                General Manager
/
i l
i i
l l
l l
O l
1 I
e
                            - - - ,_ -, - - -              , , - - . . _ _ _ . - _                    - - . . . ~              -- -_- ,-.- - --- - - - - - - -
 
t QUARTERLY OPERATIONAL MONITORING REPORT
    -OV Georgia Power Company ADDITIONAL MONITORING l
From: 01-01-86 Plant Hatch                                                                                      To:  03-31-86 P. O. Box 439 Baxley, Georgia 31513                                                              Permit Number:    CA0004120    .
s Discharge Location: 001D - Liquid Radwaste System Unit 1 Type of Sample: Grab Frequency of Analysis: Each Batch Parameter:                                      pH                      Parameter:              pH pH Units                                            pH Units Limits:                                  Min. 6.0                        Limits              Min. 6.0 Max. 9.0                                            Max. 9.0 Date                                                                    Date 1-1                              6.8,      6.0                          1-16            7.2,    6.1, 6.7 1-2                              6.8,      6.3,      7.4, 6.7            1-17            7.6,    6.0, 7.5, 6.6, 6.6 1-3                              6.6,      6.0,      7.5                1-18            6.8,    6.6, 6.8 1-4                              6.3,      6.1,      6.4. 6.3, 6.9      1-19            6.2,    6.5 1-5                              6.6,      6.5,      6.2                1-21            6.1. 7.0 1-6                              6.9,      6.0                          1-22            6.2,    6.3 1-7                              6.0,      6.1,      6.3, 6.2            1-23
* 6.3 1-8                              6.8,      6.0,      6.1, 6.2, 6.3,      1-24            6.0, 6.2, 6.7 (V                                  8.7,      6.3 1-9                            8.3,      6.0,      6.7,      6.7. 6.1  1-25            6.1, 6.5, 6.1, 6.2, 6.1 1-10                            6.6,      6.0,      8.5,      6.0      1-26            6.3, 6.3, 6.2, 6.7 1-11                            6.6,      6.7.      6.5,      6.1, 6.5  1-27            6.0                            ,.
1-12                            6.1,      6.8.      6.9,      6.2, 6.0  1-28            7.4,    6.4, 6.6 1-13                            6.9,      6.0                          1-29            6.0,    6.9, 7.4 1-14                            6.0,      6.0,      6.1                1-30            6.0,    7.0, 6.9, 6.3 1-15                            7.0,      6.1                          1-31            6.4. 7.3, 6.9, 6.9 No Limits Exceeded                                                                          .
4 b
G i
1
_    .. __~___-.___..._....__,.____..___._._.___.____--___m,-_______.____.._                                              _-
 
QUARTERLY OPERATIONAL MONITORING REPORT f
ADDITIONAL MONITORING
( Cao'rgia Power Company From: 01-01-86 Plant Hatch                                                          To:  03-31-86 P. O. Box 439 Baxley, Cecrgia 31513                                    Permit Number:  GA0004120 Discharge Location: 001D - Liquid Radwaste System Unit 1 Type of Sample: Grab Frequency of Analysis: Each Batch Parameter:            pH                      Parameter:          pH pH Units                                      pH Units Limits:          Min. 6.0                    Limits:          Min. 6.0 Max. 9.0                                      Max. 9.0 Date                                          Date 2-1            6.6                            2-14          6.0 2-2            7.3, 7.9. 7.4. 7.0            2-15          6.3, 6.0 2-3            7.0, 6,.2                      2-16          6.3, 7.1 2-4            6.4, 7.0, 6.2, 6.1, 6.6,      2-17          7.1 8.0                                                                    '
2-5            6.6, 6.6. 6.3, 8.4            2-18          6.0, 7.0 2-6            6.6, 6.4, 7.7. 6.4            2-19          7.0 2-7            6.1, 6.6. 6.3, 8.0, 6.2,      2-20          7.0, 6.8, 6.8 2-8            6.1. 6.4, 7.5                2-23          6.6 2-9            6.3                          2-24          6.5, 8.3 2-10            6.7. 6.3                      2-25          8.6, 7.6, 6.2
,    2-11            6.7. 6.1, 6.0, 6.5, 6.3      2-26          6.1
!    2-12            6.0                          2-27          6.6, 6.0, 6.0 2-13            7.5, 6.0                      2-28          7.5, 6.4 No Limits Exceeded 1
l 1
I 4
e I
A
 
i QUARTERLY OPERATIONAL MONITORING REPORT q                                  ADDITIONAL MONITORING Q  Georgia Power Company Plant Hatch                                                        From: 01-01-86 P. O. Box 439                                                        To: 03-31-86 Baxley, Georgia 31513 Permit Number: CA0004120    ,
Discharge Location: 001D - Liquid Radwaste System Unit 1 Type of Sample: Grab Frequency of Analysis: Each Batch Parameter:            pH                      Parameter:              pH pH Units                                          pH Units Limits:            Min. 6.0                    Limits:                Min. 6.0 Max. 9.0                                          Max. 9.0 Date                                          Date 3-1            6.4                            3-16              6.5, 6.5 3-2            6.7. 6.9                      3-17              8.4, 6.5 3-3            8.4                          3-18              6.8 3-4            6.4                          3-19              6.7, 6.8 3-5            6.6, 6.3                      3-20              6.1 3-6            6.3                          3-21              6.2, 6.4, 6.3 3-7            7.0,  8.3,  7.0              3-22              6.8 3-8            8.3,  6.3                    3-23              6.2, 6.0 3-10 C) 3-11 6.0, 6.1, 6.3, 6.0 7.8              3-24 3-26 6.2, 6.4 6.4, 6.2 3-12            6.3,  7.2                    3-27              6.3 3-13            6.1,  6.1,  6.1, 6.6          3-28              7.1 3-14            6.3,  6.1,  6.1, 6.5          3-29              6.6, 6.1 3-15            6.0, 6.9                      3-31              8.4 No Limits Exceeded 4
0
 
QUARTERLY OPERATIONAL MONITORING REPORT O'  Georgia Power Company Plant Hatch ADDITIONAL MONITORING From:  01-01-86 To:  03-31-86 P. O. Box 439 Baxley, Georgia 31513                                    Permit Number:    CA0004120    ,
Discharge Location: 001D- Liquid Radwaste System Unit 2 Type of Sample: Grab Frequency of Analysis: Each Batch Parameter:              pH                  Parameter:              pH pH Units                                      pH Units Limits:            Min. 6.0                Limits:              Min. 6.0 Max. 9.0                                      Max. 9.0 Date                                        Date 1-1              6.0,  6.4, 6.4, 6.4, 6.2  1-14            6.0, 6.0, 6.0, 6.8 1-2              6.0, 6.5,  7.0, 6.1, 6.0  1-15            6.0, 6.2 1-3              6.9, 6.0,  7.0, 6.2        1-16            6.0, 7.9, 6.0 1-4              6.3,  6.6,  6.6. 6.4, 7.1,  1-17            6.1,'6.4, 6.0, 6.0 6.2                                                                  ,,
1-5              6.6,  6.0,  6.0, 7.0 '      1-18            6.0, 6.0, 6.8, 6.7 1-6              6.0,  6.0,  6.2, 6.1, 6.7  1-19            6.8 1-7              6.1,  6.0,  6.0, 6.1, 7.2  1-21            6.2 Q() 1-8              7.0,  6.1,  7.0            1-22            6.0 1-9              6.2,  7.6,  6.8, 6.0, 6.2  1-24            6.7 1-10            6.0,  6.8,  6.0, 6.8        1-25            6.8, 6.1, 6.2, 6.2, 6.5, 6.2 1-11            6.2,  7.8,  6.2, 7.0        1-26            6.7, 6.9, 6.4, 7.0, 6.2, 6.9 1-12            6.0,  6.1,  6.0, 7.6        1-27            6.1, 6.8, 8.1 1-13            6.2,  8.7                  1-30            6.0 No Limits Exceeded O                    .
 
QUARTERLY OPERATIONAL MONITORING REPORT ADDITIONAL MONITORING Q  Georgia Power Company                                            From:
01-01-86 Plant Match                                                        To:  03-31-86 P. O. Box 439 Baxley, Georgia 31513                                  Permit Number:    GA0004120      .
Discharge Location: 001D - Liquid Radwaste System Unit 2 Type of Sample: Grab Frequency of Analysis: Each Batch Parameter:              pH                  Parameter:            pH pH Units                                  pH Units Limits:              Min. 6.0                Limits:            Min. 6.0 Max. 9.0                                  Max. 9.0 Date                                        Date 2-1            6.6                          2-13          6.5, 6.1 2-2            6.2                          2-14          9.0, 6.7 2-4            6.5                          2-15          8.1 2-5            6.5, 8.8,  6.7              2-16          6.3, 6.5. 6.2              4 2-6            6.5, 6.0,  6.5,  6.0        2-17          6.0                          .
2-7            8.5, 6.3,  6.3,  8.3        2-18          6.8, 6.8, 8.5, 6.5 2-8            6.3, 6.1,  6.1              2-19          6.4 O  2-9 2-10 2-11 6.1, 6.1, 6.1, 6.3, 6.1, 6.0 7.9, 7.3, 6.3 6.3 2-20 2-21 6.0, 6.2, 8.3, 6.2 8.6. 6.0, 6.2 2-23          6.2, 6.1, 6.0, 6.5 2-12          7.8, 6.5 No Limits Exceeded 4
0
 
                                                                                ~.                          .    .        . - . . . .        . - - -                    - . .
QUARTERLY OPERATIONAL MONITORING REPORT j
ADDITIONAL MONITORING                                                    -
* g                    Ge6rgia Power Company                                                                                                          ,
Plant Hatch                                                                                                                            From: 01-01-86 P. O. Box 439                                                                                                                                    To: 03-31-86 Baxley, Georgia 31513 Permit Number: GA0004120 Discharge Location: 001D - Liquid Radwaste System Unit 2 Type of Sample: Grab                                                                                                                        ,
Frequency of Analysis: Each Batch Parameter:                                                              pH                              Parameter:                                  pH j                                                                                    pH Units                                                                    pH Units Limits:                                                      Min. 6.0                                    Limits:                          Min. 6.0 Max. 9.0                                                                      Max. 9.0 Date                                                                                                    Date t                    3-1                                            8.2                                                      3-8                  6.2,        6.2,                6.0, 7.2, 6.4
:                      3-2                                            7.2                                                      3-9                    6.1,        7.6,                6.6 i                      3-3                                          6.0                                                        3-10                  6.9.        6.0,                6.7, 6.1
}                      3-4                                          6.6, 7.1                                                  3-11                  8.5,        6.4,                6.2 3-5                                          6.3, 6.1, 6.0                                            3-12                  7.1,        6.3 3-6                                          6.7                                                      3-13                  6.3
;                      3-7                                          6.0, 6.4, 7.4                                      ,
i I \
j                      No Limits Exceeded l
1 I
s
)
1 I
,g
    - - - , . _ . . _        _ - , . . . , , , . _ - _ _ . _ . _ . - . _ _ - . _ _ _ . . . . , - , , _ _ _ _ _                                              _ . . , _ . - _ - - , - - - . - ~ . . , . . , . _ - - _ . , _ - --
 
I 1
CIRC WATER CHLORINATION DATA                                                                    l DATA PACKAGE 1                                                                    ,
(DATA SHEET 1)
O)(
\
v                                                                                                                                                          i WEEKLY ,                                                                UNIT NO:                /
CHLORINATORS                          C1
          ._--_.... _.-_-.--_. .__-_.---_-----____-_                                              __-_--_--_4_-_    -        _---__.
DATL FREQUENCY CL S INJECT                              NO. 1          NO. 2        FREE mg/l* DISCHARGE INITIALS CYCLE / DAY MIN / CYCLE                    f/24 HR f/24 HR                AVG. MAX            HOUR / DAY 1        .
L.a __c w-_-__- ..___-____..__---___                                ______.      .___.    .-____      _ _ _ _ _ - _ _ _ ' -__x_%__
y          n cos.
J u. _r, .-----_---..______-__--__
____.- _ _ _ . . _                      ...-_..__---._. _-_-___                _.2w_ - _ _ _ _
    -s    jg.i_t. p_n ___- .--_-_-__--._ _-__---___ ..
_            --                                                                .-__-  ._-___      ~.___-__-__.__4_ 4__if_>g  -
    .c .y3 . . .iyu . _ . . . ._
                                                  .__ ---_.--_.____.- - _ _ _ . _ ..___.                  ... --      . . _ _ _ _ _ _ _ _ " ._ z.u g                                        %.                                                                                      7 L22.C _ _.n_ _u _k _
_ _sw    ,
            .y ,.. .g_ _y.
z ., ____
                                                                                      - a c,
                                                                                                                        . _ _ _ _ _ _ _ _ + _-...__
_ .__,?r4 t.
_ _ _ . - _ _ ...--_---___            ..-.___---._ _ . - _3 . . .-___
LIMIT        0.20 0.50            2 HR/ DAY
(                                                                                  ______-.____.--___.____-__--__________
* MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE 4 'U//it' x . ds.ldYW'm..
            ;) *,ts, f*            'Q.wbo- fu u r O '$''&w t:t Au ll//",- F'Jt*)s., ,4f =od*4f Page 2 of 2 62EV-SAM-002-0                R00
 
CIRC WATER CHLORINATION DATA DATA PACKAGE 1 (DATA SHEET 1) m                ,
QA WEEKLY.                                                                UNIT NO:              me CHLORINATORS                          C1                                                .
          ._____________..._________________..... ___                                      ..._______4___________.
DATE FREQUENCY CL t INJECT NO. 1                                      HO. 2 FREE mg/1* DISCHARGE INITIALS CYCLE / DAY MIN / CYCLE                  9/24 HR 6/24 HR AVG. MAX                            HOUR / DAY a_.i;t_
              ._    ._x_______.. .______          ___        . _ Q_C_.s_ _ ________
_          _____      ._____.-.._______                    _72__4_'  ___  b_,
__ &_____                                          ..._______3_],_'/__,                  A L.k.A- . _c_ _ _ _ _...___.____    __.                                  ______    .__....___._                                  .    - _____
                                                                                            ^
                                                              ._ Q_b_._-__~_____                                  .________4        _- s$__h___h___
2,J/ .h,!-.:*. . _ _ _ _ _ _ .  .______.___                                      .____      ._____
w.y. _ _ _ _ _ _ _ _ _...________ .                _ _w_ ___________
y_y___8___
        .___.      .N_ _ _ _ _ _ _ _ _ .                    ________________            _____      __________________________
        .._____________.._______________ ..._______                                        .____      N_____
r                                                                              LIMIT        0.20 0.50            2 HR/DA
(                                                                            . _____,.____. _______________________
* MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE t                                                              -
l l
1 l
1 I
i i
I Page 2 of 2 62EV-SAM-002-0                    R00
 
ww
      .;'ys..
y' CIRC WATER CHLORINATION DATA
      ~f.'
r s
c'                                                        DATA PACKAGE 1
('Ty                                                          (DATA SHEET 1)
  ,v m4                                  -
                                          ,                                                                                              s WEEKLYi                                                              UNIT NO:            /
CHLORINATORS                          Clg,                                  -
DATE FREQUENCY CLg. INJECT NO. 1                                  NO. 2 FREE mg/1* DISCHARGE                      INITIALS CYCLE / DAY MIN / CYCLE                9/24 HR 6/24 HR AVG. MAX                            HOUR / DAY
                                                        ..._-G[j)_ _ _ _
3$ . .- . . . _ . . .._________.                                                                _ _ _ _ . . _ _ . . ~ .._(_,J_U. - _f%
                                                                    ~-
        .]_ln..                                                          ____      .-___      ._____
Q f,S* LE._<  _ _ _ _ _ _ _ _ .. _____  _.. _ .__ _- _- -_ _ _._g3_______  __.._      __-___-_-.._____..
                                                                                                                  .            . _-____k_
                      ,:                                '--                                                                      4 j
                  . . _ _ _ . . . . . .. _-____.__.--____ }.7&...____                ..___      . .___    _ . . . . _ _ _ _.Z_._//___h.
          *>      ._s__....._. .._____.___              . _ _ _ _ - _ Ja r_&..__..    .__..      .____.    . _ . . _ _ _ _ _ .u_ - > _--
        ._-__.__..____                W                .____....
N N            :: :n.,                                _. -_____
        .__ .._ __...__..___ __.__...__ ____..-_____                                _____      ._-_..    ...____....        h.
LIMIT 0.20 0.50 2 HR/ DAY o      MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE J
1 C
Page 2 Of 2 62EV-SAM.002 0            R00 h
 
CIRC WATER CHLORINATION DATA
(,                ,
DATA PACKAGE 1 (DATA SHEET 1)                                                                                          {
: v.                                                                                                          .
WEEKLY                                                              UNIT NO:                      A CHLORINATORS
                                                                                                  ._______.g    Cl
                . ___._          _ ____..._____ .___ . _ .....__ __                                                ... _______.                                                  I DATE FREQUENCY CL t INJECT NO. 1                                NO. 2 FREE mg/l* DISCHARGE INITIAL                                                            (,
                ..... . .._____.            ._ _-_____..___.___. .______ .......____.. ________. ._______S                                                              _
CYCLE / DAY MIN / CYCLE              $/24 HR f/24 HR AVG. MAX                                                                                        ,
HOUR        /  DAY I
                                                                                                                      ..._______.._______.                                        F y jg.                                      -                -                                                                        -
yM      ------
                                                                                                                                                                                  -F F      Jkilt      _ _ _c_rj. _.. . .
                                            .._-_______. _......... ___                        .____  _____.      . _ _ _ _ _ _ _ - . " ._ .,7_%. . . .                        W 8                            -                                                                                                                                ;
1                              c/
J      g
                      . . u._..          ._..._.._....._. ._._._....                        ...._  ......      ..____...';.              .
                                                                                                                                                                .._*._.          .1
              .D%.      _ [LS. .. _ . . .....
                                                                .            ~
_. _. ____.... ...__                                          . . . . . . . . - _ ' . ,.Z:.,b,:. - _.
c f
              , .p
                                                                                    <. ,v. 3
                                                                                                                              - - - . .. ,          ,p.                      [,,
___ . . _ _ _ _ _ . _ _ .. .___..... ._ ~                                          ..___ . _....._ ... . .__ .. ...                                            r- -
4 i
j      ._____. ...__...____. ....._____..._____. . . . .__.._ ____ . .... ___==                                                                                  _.
j LIMIT 0.20 0.50 2 HR/ DAY i.
MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE 1
            +                                                                                                                            'N
{                  _4:t- lbe' J/bu%6s tes dl l.wwdm N"'hk7/*M*Nb V a
J i
i J,
1 i
t i                                                                                                            62EV-SAM-002-0                            R00 j  e      ,
 
V                                                                                                          g.
CIRC WATER CHLORINATION DATA DATA PACKAGE 1
    /                              *
(DATA SHEET 1)
A J..
                                          }                                                                                    -
                                                                                                                                              ~  .
WEEKLY 2.                                                          UNIT NO:            r, ao            .
CHLORINATORS                      Cl
    .____....._____.__________________..._____                                      __________4_______, _ _ _ _ . . .
DATE FREQUENCY CLgINJECT NO. 1                                        NO. 2 FREE mg/l* DISCHARGE INITIALS CYCLE / DAY MIN / CYCLE                  6/24 HR 4/24 HR AVG. MAX                        HOUR / DAY          I'''
    ..___ .____ __ _, . _ - _ _ _ _ . _ _ __--__.-_-____ __                        ..._.....__.......__._.                      u:.____.
2b. ,.p.      i
              ..________            ..___.._-__        _ J_.'o_S _ . . .._____.  .____  ..__...__.....__.                f_:/) _' &_
2A. ..g;  . . . _ _ _ _ _ _ ..__.... --_            -_ g__._. ....___          .____  ..__._      . _ . . . _ _ _ _ . " .. g ___h.
  .1 Lm._..._____                  ._________.        . .dM_ _ _ _ _______        _____  ._____      ___-_-___4      ___
_ _ _ A_ _ _.
QTh
            . ~ _ - _ _ . . _ _ _ , ..__....___        ._ W.__-.. .___-__          ...__  ... __      . _ ... ___._
_  _ _ . ..Z;_,v.,5(i__n_.
  .__..    .N_ _ . _ - _ _ _ _ .                      ._______.....___            ... .  ..........___.__...______.
  ...__ _ _ . _ _ _ _ _ _ ..._________                  N______
  ......_________..__ _______________________ ...__ h                                                          _______      ________.
(                                                                        LIMIT    0.20 0.50            2 HR
                                                                        .______.._____________ .______ h MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE Page 2 of 2 62Ev. SAM 002 0                R00 o
 
l
              .s. "'
Mi        -
CIRC WATER CHLORINATION DATA
        ..                                                            DATA PACKAGE 1 (DATA SHEET 1)
    .7nr[                                      .
s vg-                            WEEKLY 4 4
UNIT NO:
s o2 s
CHLORINATORS                              Clg DATE FREQUENCY CL 2. INJECT                              NO. 1            NO. 2        FREE mg/l* DISCHARGE INITIALS CYCLE / DAY MIN / CYCLE                    f/24 HR #/24 HR                AVG. MAX              HOUR */ DAY S
          ._k_    l{f._________          .__________          - _ _ _ _~_ _{Jh3_.____          .____      ._____    . _ _ _ _ _ _ _ _ _ ' .~_ _u i_
_ _ ~ _ _ _ _ .__________
____.                ________z      p,,g.
                                                                                                                                                      .g,
_ _ _ _ _ __ _ __ -_-_____ _ .A 4 s
          /8 3 _A u 4_________. .__________                        _ _ _ _ _ _ _ faW  _______      _____      ______    . _ _ _ _ _ _ _ _ _ >____  _      ___fv'_k_'
                                                                                                                                                                \    '
4                                                                                                                -        7
                    . _ _ _ _ _ _ _ _ _ . ._________- _______Jtp
_                    _______      .____        ______    __________f.                  _____
        ._____ _ _ _ _ _ _ _ _ _ .        A                    ._______._______                _____        __________________________
N_
______ _ _ _ _ _ _ _ _ _ ..__________                  .--_____________                h                      ___________          _________
_______________..__________                                _______________              _____      ______      ._________.          h
(                                                                            LIMIT        0.20 0.50              2 HR/ DAY V
0        MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE 9                                                .
Page 2 of 2 62EV-SAM-002 0                  R00
 
i SERVICE WATER CHLORINATION DATA DATA PACKAGE 2 (v)                                                      (DATA SHEET 2)
WIEKLY                                                          UNIT NO:              88I CHLORINATORS                                      Clx DATE FREQUENCY              CL; INJECT          NO. 1          NO. 2          NO. 3        FREE mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE            f/24 HR f/24 HR f/24 HR                      AVG.        MAX      HOUR / DAY
    .....      ..........      ...........        ........        .........        ....s..      .....      ......    ..... .....
                          ^
f./.A. .....V.0.6.. ...........
                                                    ........        __.......        .....__      .....    ......      ..........3
    .M..n ...D.O...S.. ...........
    .f sd . . . 0. .o. .f. .
    .l .fifd.../.).Q$...
        ...                    ...........      ..............___                __.....      ..... _.....      . . . . . . .?. .". .
    .....      ..........      ...........      .......s        ....      s__.  ...__..      ...........          ...........
    .....      ..........      ...........      __......        __.......      .......      ..... 7T r            ......__.
LIMIT                                      0.20 0.50              2 HR/ DAY MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE
    ** MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME Page 2 of 2 62EV-SAM-002-0                  R00 e
 
SERVICE WATER CHLORINATION DATA e
* DATA PACKAGE 2 (DATA SHEET 2)
WIERLT,                                                                  UNIT NO:
                                                                                                                                          /)E CHLORINATORS                                            Clx                                            .
DATE FREQUENCY            CL2. INJECT                NO. 1          NO. 2          NO. 3          FREE mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE                  9/24 HR 9/24 HR t/24 HR AVG.                                    MAX        HOUR / DAY
                    .L                                                                                                      . . .'. . ..........%
a t
8 g.gf.
                ..    .........    ..........f.} Q. . .%.    .    . . .-. .. . . . . . . ~ ." . " . . . . . .....
Q
          ?-PJ-ff
          .....    .C.........    ...........
Q ...            .........        .......        ...........              .......3                    ...
C.
          .v.x.t.6 ..L k
                        ........    ...........              . C9G    ....  .........        .......        ...........              ...........
.1 i
          ........................... ........................                                                  .....      . ~ . ....
LIMIT                                          0.20 0.50                  2 HR/ DAY 1
i
          * ' MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE i
          ** MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME l
I I
f i
1 l
l i
l l                                                                      .
I 62EV. SAM.002-0                        R00 l
1
 
1
      *!jfkEQ Jdesdh"p69?
SERVICE WATER CHLORINATI6N DATA-
      .~rco 4s gpfD'                                                        DATA PACKAGE 2,.
fr                                                            (DATA SHEET 2)j    _
NNI        .                      1                                                                                1                -
WEEKLY                                                        UNIT NO:
CHLORINATORS                                      Cla, DATE FREQUENCY                CLg INJECT          NO. 1        NO. 2      'NO. 3          FREE mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE              f/24 HR f/24 HR f/24 HR                  AVG.        MAX        HOUR / DAY I
3.-4 6. ..~........ ...........                  ........  .Q.01....    .......        .....    ......        .........m M    ..
i i
31h2e.    ..$.......          ....____...        ........  .003.....    .......        .....    ......        ... ...... c_.
JHs as.A,1.&  ..m-~........      ...........      ........    . ype/
                                                                                                                                              -- a    y 3
: 2.        ..__......        .__..__....        ........ __F......    .......        ...........            .........._s      .
___..      ..........        A                  ........
N
            ...__ ..........              ........... __......          . N_____... :                ..___...... . . . . . . . . . . .
N
            .......................... ___ .................... ..... ......                                                    h
/"'d                                                            LIMIT                                    0.20 0.50                2 HR/ DAY
(_,1.w                                                        ........................................_____.
MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME CT U
Page 2 of 2 62EV-SAM-002-O                    R00 e
 
s SERVICE WATER CHLORINATION DATA i
DATA PACKAGE 2 (DATA SHEET 2)                  .
WIEKLY                                                                              UNIT NO:                          We                                      '
?
i                                                                                                              CHLORINATORS Clx ...........
                        ...............r..........
DATE FREQUENCY                              CLg INJECT                    NO. 1            NO. 2            NO. 3        FREE mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE                            4/24 HR t/24 HR f/24 HR AVG.                                                MAX    HOUR / DAY x
F./4....r....... ....S. u. s..                  .          ..  ........
                                                                                                    ~/ /          f. . . . . . s. .[.......
l-8.% .. ,.......
                                                                    . . .x. . . . . . .s. . . . . . ./. .. .J....tiv. ..,          . ..
                                                                                                                                      )' 14... l  .....              ......      ........e                    ...
l IS5. /......... .. A......
                        .....                                      .                      1U/ bR
                                                                                          ...... .              ..t.......        ... ...      .....              ......      ...........
                                                                                                                                                                                                                ?
l l415 .s........ . . . 4%. x d
                                                                                          ......f.. .. f.......r-W                . .......      ...........                    .......2                    ...
i                    ...............
I i
LIMIT 0.20 0.50                        2 HR/ DAY                      N.a f
* MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE
                        *
* MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME A
1 i
i i
4                                                                                                                                                                                                                          ,
.i 4
i 1
J i
i
!                                                                                                            Page 2 of 2 t,                                                                                                                                                62EV-SAM-002-0                              R00 h
    - - - -  --.e.,      , - - , - , - - , , - - - , , , -                                ___,,n,_w                                            _        ,_n,.,,,-n--,-                  --n,_n-,-,,,,
 
SERVICE WATER CHLORINATION DATA DATA PACKAGE 2 (DATA SHEET 2)
(
[',            .
WIEKLi                                                                                                                      UNIT NO:              IMJ CHLORINATORS                                                              Clx DATE FREQUENCY                        CLg INJECT                    NO. 1                                                          NO. 2      NO. 3        FREE      mg/1* DISCHARGE CYCLE / DAY MIN / CYCLE                                  f/24 ER f/24 HR f/24 HR                                                                  AVG.        MAX    HOUR / DAY g..u .c ..
                            ....... . . . . . . 2 C a.
                                                                              . . w. .:.t. (. 6..e.k... .d. .a. t.                                                      .....    ......
f                                ^
          ?.G. .H
          .        . ..........              ......M. . . .G.u.(. .f..h...W... J. j.b.:#                                                                            L. .....    ......    . . . . . . . .D
          .....      ..c........ .......,y.x. . Ap. ...g.r.....c.k..sv                                                          .                                      ...........
                                                                                                                                                                                              ...........g 26.s. ..c........ ..... m... .. ., day. . .y...At. . . A. .br...                                                                                                        ......    ..  .. ....>...
                                              . . . . . n.r . .
                                                                  -a
: a. -
n                ?                                      /          A, An-w e ...... .......                        ...........          ...........
        ........................... ........................ ..... ......                                                                                                                    N..........
LIMIT                                                                                    0.20 0.50              2 HR/ DAY O(                                                                          . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....~..............
MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE
        ** MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME i
l O
Page 2 of 2 6 2 EV -S AM-0 0 2 -0          R00
 
                ~
SERVICE WATER CHLORINATION DATA DATA PACKAGE 2 (DATA SHEET 2) l_[                                                    .
t WIEKLM                                                                                    UNIT NO:                  5b-
                                                              . .                                                                                                                                        i CHLORINATORS                                                  Cla, DATE FREQUENCY CL. INJECT                                                      NO. 1      NO. 2                  NO. 3              FRE'E    mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE                                            t/24 HR t/24 HR t/24 HR                                AVG.        MAX        HOUR / DAY 3.y.J h. .m.........                      ...........                      ........        .f.o.&....            .......        .....        ......      ..........m.%
Af 3%L 6. ::........                        ...........                      ........        . 09:L...            .......        ...........                ..........n x-''
                                                                                                                                                                                  ..... mn Q,4..      ..........                    ...........                      ........          . P_ . . . . .        .......        ...........                            .....
K% (
3MB.T. . . . . .=                                                          ._......          . M 4.._. .~......                    ...........                ...........
                  .....      ..........                    ...........                      N.......
                  ........................... ....... ................                                                                                .....        ......      h y                                                                                              LIMIT                                              0.20 0.50                  2 HR/ DAY
* MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE
                  ** MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME i
L i
1 i
Page 2 of 2 62EV-SAM-002-0                      R00
  ,n.  .. -,,...:                  - , , _ ~ . . , _ _ _ -        - , ~ _ , , ,    , . . - - _ _ . _ .                    .. ,    ,,_.      . -  -  - - _ .
 
Page      !  .f 8      .
i OUARTERLY OPERATIONAL MONITORING REPORT Georgia Pouer Con pany                                                                      From: 04-01-86 Plant Hat c h                                                                                  To: 06-30-86 O      P.O. Box 4545 Atlanta, Georgia 30302                                              Permit Number: GR004120 Discharge Location:001A1 - Low Vo l u nie Waste (Neut ral i zat i on Tank )
Type of Sample:          Grab Frequency of Analysis:          2/Mo Code:                          (530)                  (550)                            (400)
Parameter:                Suspended Solids        Oil & Grease                            pH mg/l                    ag/l Limits:                      Avg. 30                  Avg. 15                        Min. 6.0 Max. 100                Max. 20                        Max. 9.0 Date 04-07-86                        0.1                    3.6                              8.0 04-22-86                        0.2                    0.0                              7.1 05-06-86                        0.2                    0.0                              7.7 05-19-86                        0.2                    0.0                              7.5 06-02-86.                        2.0                    2.9                              7.5 06-16-86                        5.3                    2.5                              6.6 Humber of Samples:                6                      6                                6 Average Value:                  1.33                    1.50                              7.40 C'' )g Maximum Value:                  5.30                    3.60                              8.00 M i n i niu m Value:              .10                    0.00                              6.60 Liniits Exceeded:                0                      0                                0 e
 
Pcg    2 of 8                                                                                                          1 I
QURRTERLY OPERATIONRL MONITORING REPORT Georgia Pouer Company                                                                                    From: 04-01-86
/"D    Pl ant. Hat c h                                                                                            To: 06-30-86 l (s )  P.O. Box 4545                                                                                                          l Atlanta, Georgia 30302                                                          Permit Number: GR004120 Discharge Loc at ion:001R2 Lou Volume Wast e (Pressure Filters)
Type of Sample:      Grab Frequency of Analysis:          1/qtr Code:                        (530)                (550)                              (400)
Parameter:              Suspended Solids      Oil & Grease                                            pH mg/l                      mg/l Limits:                      Avg. 30              Aug. 15                            Min. 6.0 Max. 100            Max. 20                            Max. 9.0 Date 05-05-86          (R)          54                            10.0                                    7.6 05-05-86          (B)          106.8                          12.1                                  7.8 05-05-86          (C)          71.6                          10.6                                  7.9-05-05-86          (D)          63.2                          16.4                                  7.9 05-24-86          (R)          3.4                          *
* 05-24-86          (B)          34                            *
* 05-24-86          (C)          2.6                          *
* 05-24-86          (D)          1.8                          *
* 05-31-86          (R)          1.1                          *                                      *
\'-]  05-31-86 05-31-86 C.B )
(C) 1.3 1.7 e
05-31-86          (D)          2.2                          *
* Humber of Samples:              12                                  4                                    4 Average Value:                25.92                      12.28                                        7.80 Maximum Value:              106.80                      16.40                                        7.90 Minimum Value:                  1.10                    10.00                                        7.60 Limits Exceeded:                1                                  0                                    0
 
I Pcge    3 og g OUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company                                                                        From: 04-01-86
(-
Plant ' Hat c h P.O. Box 4545 To: 06-30-86 Atlanta, Georgia 30302                                                            Permit Number: GA004120 Discharge Locat ion:001B - Cooling Tower Blowdown Loc at i on:                  Intake      Mixing Zone          pH                  Zn                  Cr Type Sample: In Sisu                        In Situ        Grab                  Grab                Grab Frequency:                      1/wk.          1/wk.        2/mo                1/qtr                1/otr Parameter: Temp. Deg. F                    Temp. Deg. F Limits:                                    T of 5 Deg. Min. 6.0 Max. 90 Deg. Max. 9.0            Max. 1.0                  Max. 0.2 Unit 1 Unit 2    Unit 1 Unit 2 Unit 1 Unit 2 Code:                          (11)          (11)          (400)                (1992)                (1934)
Date 04-02-86                        70            70                      **                          **
04-07-86                                                                <0.1              0.10    <0.1      <0.1 04-07-86
* 8.1 04-09-86                        71            71 04-16-86                        68            68 04-21-86
* 7.8 04-23-86                        66            66 04-30-86                        66            66 05-05-86                                                  7.4      8.3 05-07-86                        77            77 O        05-14-86 05-19-86 79            79 8.2      8.7 05-23-86                        75            75 05-28-86                        79            79 06-02-86                                                  8.4      8.6 06-06-86                        82            82 06-11-86                        84            84 06-18-86                                                  8.4      8.7 06-18-86                        83            83 06-27-86                        84            84 No. of Sample:                  13            13        4        6            1    ,1            1        1 Average Yalue:                  76            76      8.10      8.37  4 10            .10        4 10      g.10 Maximum Value:                  84            84      8.40      8.70  4 10            .10        g.10      (.10 Minimum Value:                  66            66      7.4      7.80  4.10            .10        (.10      4.10 Over Limits:                      0              0        0        0    0              0          0        0
* Unit 1 in Shutdown
                  ** Unit 1 SAMPLED on 5-20-86 b
v
 
Page      4 of 8 QUARTERLY OPERATIONRL MONITORING REPORT Georgia Pouer Company                                                                                                                                          From: 04-01-86 O    P l ant- Hatch P.O. Box 4545 Atlanta, Georgia 30302 To: 06-30-86 Perniit Number: GR004120 Discharge Loc at ion: 001D - Liqui d Raduaste Systen Unis One Type of Sample:                          Grab Frequency of Analysis:                                    2/Mo Code:                                              (530)                                                          (550)                                      (400)
Parameter:                                Suspended Solids                                                    Oil & Greate                                    pH mg/l                                                        mg/l Limits:                                            Avg. 30                                                        Aug. 15                                    Min. 6.0 Max. 100                                                        Max. 20                                    Max. 9.0 Date 04-07-86                                                  6.0                                                      0.6                                        6.7 04-21-86                                                    13.6                                                    0.0                                        6.4 05-05-86                                                  42.0                                                    16.0                                      6.3 05-19-86                                                    1.8                                                    2.5                                        6.5 06-03-86                                                    1.2                                                    0.0                                  ,    6.1 06-16-86                                                  22.0                                                    7.2                                        6.5 Number of Samples:
O    Average Value:
Maximum Value:
14.43 42.00 6                                                    6 4.38 16.00 6
6.42 6.70 Minimum Value:                                              1.20                                                    0.00                                      6.10 Limits Exceeded:                                                0                                                    0                                          0 o
9
* Pcge 3 or 8 QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company                                                                                                                      From: 84-01-86
[''''
s Plant . Hatch P.O. Box 4545 To: 06-30-66 At l ant a, Georgi a 30302                                                                            P e r nii t Number: GR004120 Discharge Loc at ion: 001D - Liquid Radwaste System Unit Tuo Type of Sample:                            Grab Frequency of Analysis:                                                2/Mo Code:                                                              (530)                  (550)                                        (400)
Parameter:                                        Suspended Solids                Oil & Grease                                            pH mg/l                  mg/l Limits:                                                            Avg. 30                Avg. 15                                      Min. 6.0 Max. 100              Max. 20                                      Max. 9.0 Date 04-01-86                                                              1.0                    0.4                                          6.5 04-22-86                                                              0.66                  0.38                                          6.2 05-05-86                                                              2.0                    0.4                                          6.3 05-19-86                                                              2.0                    0.0                                          6.6 06-03-86                                                              .31                    1.41                                          6.1 06-17-86                                                              0.7                    2.42                                          6.1 Humber of Samples:                                                    6                      6                                            6 Rserage Value:                                                        1.11                    .84                                          6.30 Maximum Value:                                                        2.00                  2.42                                          6.60 Minimum Value:                                                          .31                  0.00                                          6.10 Limits Exceeded:                                                      0                      0                                            0 e
f I
i 1
0
 
4        .  -
Pcge                        6 of 8 QUARTERLY OPERATIONRL MONITORING REPORT
    -      Georgia Pouer Company                                                                                        From: 84-01-86 Plant Hatch                                                                                                      To: 06-30-86 P.O. Box 4545 At l ant a, Georgi a 30302                                                                      Permit Number: GR004120 Discharge Loc at ion: 001E - Combine d Plant Waste Unit One Frequency of Analysis:                          1/uk.
Type of Sample:                                    In Situ                    Grab            Grab                Grab Parameter:                                        Temperature                T.R.C.          F.R.C.                  pH Limits:                                              Deg. F                    N/A                N/A            Min. 6.0
."                                                                                                                            Max. 9.0
:          Code:                                                  (11)                  (50060)        (50064)                (400) i Date 04-02-86                                                  68                    <.1                <.1                7.3 04-09-86                                                  71                    <.1                <.1                7.1 04-16-86                                                  69                    <.1                <.1                7.2 04-23-86                                                  70                    <.1                <.1                7.2 04-30-86                                                  77                    <.1                <.1                7.4 05-07-86                                                  80                    <.1                <.1                7.4 05-14-86                                                  82                    <.1                <.1                7.7 05-23-06                                                  82                    <.1                <.1'              8.2 05-28-66                                                  89                    <.1                <.1                8.2 06-06-86                                                  86                    <.1                <.1                7.8 06-11-86                                                  90                    <.1                <.1                8.0 06-18-86                                                  89                    <.1                <.1                8.3 06-27-86                                                  87                    <.1                <.1                8.5 Humber of Samples:                                        13                    13                    13              13 Rverage Value:                                        80.00                    4 10                4,.10            7.72 Maximum Value:                                        90.00                    4 10                4,.10            8.50 Minimum Value:                                        68.00                    g.10                  g.10            7.10 Limits Exceeded:                                              0                      0                    0              0 4
I v
1 1
 
Page        7 of 8 QURRTERLY OPERRTIONRL MONITORING REPORT Georgia Power Company                                                                                              From: 04-01-86
  .O          Plant. Hatch                                                                                                                To: 06-30-86 V            P.O. Box 4545 Atlanta, Georgia 30302                                                                                  Permit Humber: GR004120 Discharge Location:001E - Combined Plant Waste Unit Tuo Frequency of Rnalysis:                              1euk.
Type of Sample:                                        In Situ                            Grab          Grab                  Grab Parameter:                                            Temperature                        T.R.C.        F.R.C.                  pH Limits:                                                  Deg. F                            N/A            N/A                Min. 6.0 Max. 9.0 Code:                                                          (11)                      (50060)        (50064)                (400) 04-02-86                                                          74                      <.1            <.1                  7.1 04-09-86                                                          76                      <.1            <.1                  7.2 04-16-86                                                          77                      <.1            <.1                  7.3 04-23-86                                                          64                      <.1            <.1                  7.1 04-30-86                                                          81                      <.1            <.1                  7.1 05-07-86                                                          86                      <.1            <.1                  8.2 05-14-86                                                          86                      <.1            <.1                  7.8 05-23-86                                                          84                      <.1            <.1                  7.4 05-28-86                                                          91                      <.1            <.1                  8.3 06-06-86                                                          89                      <.1            <.1                  7.7 06-11-86                                                          91                      <.1            <.1                  8.0 i
06-18-86                                                          89                      <.1            <.1                  8.5 06-27-86                                                            92                      <.1            <.1                  8.5
;              Number of Samples:                                                  13                        13                13              13 Average Value:                                                83.08                          4 10            g.10                7.71 Maximum Value:                                                92.00                          c.10            (.10              8.50 Minimum Value:                                                64.00                          4 10            4 10              7.10 Linitts Exceeded:                                                        0                      0                  0              0 l
l l                                                                                                                                ~
                            . . _ _ _ _ _ , _ . ~ . .            _      _ . . _ _ _ _ _ _ _ _ . . _ _ ,      _.___-,__  _ _ _. _ , , ,        - _ _ _ _ .
 
Pcge    8 of 8 QUARTERLY OPERATIONAL MONITORING REPORT Ceorgia Power Company                                                    From: 04-01-86 f''N P l ant Hatch                                                              To: 06-30-86
()  P.O. Box 4545 At l ant a, Georgi a 30302                                      Permit Number: GR004120 Date: July 18, 1986 I certify under the penalty of law that this document and all attachments uere prepared under the direction of supervision in accordance uith a system designed to assure that qualified personnel properly gather and evaluate the i nf ormat i on submitted. Based on my inquiry of the person or persons uho manage the system or those persons directly responsible for gathering the information the inf ormat ion submitted is to the best of my knouledge and belief true, accurate and complete.      I am aware that there are significant penalties for submitting false i nf ormat i on including the possibility of fine and imprisonment for knouing violations.
                                                    ?
p                                          W
    ~-                                      H. C. Hix
                                          )  General Manager l
W. R. Woodall, Jr.
Manager of Environmental Affiirs e
i
 
QUARTERLY OPERATIONAL MONITORING REPORT ADDITIONAL MONITORING-
  ~
s    Georgia Power Co=pany                                                                                              From: 04-01-86 Plant Hatch              ,
To: 06-30-86              A P. O. Box 4545          t Atlanta, Georgia 30302                                                                                  Permit Number: GA0004120                          _
Discharge Lo' cation: 001D - Liquid Radvante System Unit 2 Type of Sample: Grab                                                                        '
Frequency of Analysis: Each Batch Parameter:                  pH                                                    Parameter:                                              pH pH Units                                                                                              pH Units Limits:                Min. 6.0                                                Limits:                                      Min. 6.0 Max. 9.0                                                                                              Max. 9.0 DATE                                                                              DATE 4-01        6.5, 8.8                                                            4-14        6.2 4-02        7.1, 7.3                                                            4-15        7.8,          7.3,  7.8, 6.2 4-03        7.3                                                                  4-16        6.2,          6.9,  6.0, 6.0 4-04        7.0                                                                  4-17        6.0,          6.0 4-05        6.1                                                                  4-18        6.0,          6.1,  6.1, 6.7 4-06        6.0                                                                  4-19        6.6,          6.0,  6.7 4-07        6.3                                                                  4-20        6.3,            6.1,  6.1, 6.3, 6.1 4-08        6.0                                                                  4-21        7.2,            7.0
(''N)
(,      4-09        6.1                                                                  4-22        6.2,            6.7. 6.2 4-10        7.8                                                                  4-23        6.0 4-13        6.0, 6.0                                                            4-24        62 4-25        6.3 4-30        6.0 U
_ _ _ _ . .__ ._,                . . _ _ . , .e-..__..  . _ . , . . . . _ , , _ .      . _ _ - _ _ . _ , _ _        . _ _ . , _ _ _ _ _ . . - ,  . _ . _ , _ - _ _ . _ _ , _
 
QUARTERLY OPERATIONAL MONHORING REPORT ADDITIONAL MONITORING 4
Georgia Power Company                                              From: 04-01-86 Plant Hatch          .
To: 06-30-86 P. O. Box 4545        t Atlanta, Georgia 30302                                    Permit Number: GA0004120    .
Discharge Lo' cation: 001D - Liquid Radwaste System Unit 2 Type of Sample: Grab                        -
Frequency of Analysis: Each Batch Parameter:              pH                      Parameter:                  pH pH Units                                            pH Units Limits:              Min. 6.0                    Limits:                  Min. 6.0 Max. 9.0                                            Max. 9.0    ,
DATE                                            DATE 5-01  6.3, 6.0,  6.1                          5-15    6.6 5-02  8.7, 7.0,  6.2                          5-16    6.7 5-03  6.2, 6.2,  6.3                          5-17    6.3, 6.6 5-04  6.2, 6.0,  6.2, 6.3                    5-18    6.3, 6.2, 6.3 5-05  8.3                                      5-19    6.6 5-06  6.0                                      5-21    6.5 5-07  6.5                                      5-22    6.5 f- g      5-08  7.3, 6.0                                5-26    6.2
( ,)      5-09 5-10 6.3                                      5-27    6.1, 7.0, 6.2 6.0, 6.2                                5-28    6.2, 6.3, 7.1, 7.2, 6.3 5-11  6.2, 6.1, 6.4, 6.1, 6.4 5-12  6.2 5-13  6.6, 6.2, 6.1 5-14  6.1 o
V D
g                                                            I
 
QUARTERLY OPERATIONAL MONITORING REPORT ADDITIONAL MONITORING Georgia Power Company                                                                                                                                      From: 04-01-86 Plant Hatch                                                              .,
To: 06-30-86                                  C P. O. Box 4545                                                          ',
Atlanta, Georgia 30302                                                                                                                        Permit Number: GA0004120                                          .
i                                                                                                                                                                                    '
Discharge Location: 001D - Liquid Radwaste System Unit 2 Type of Sample: Grab Frequency of Analysis: Each Batch Parameter:                                                                          pH                                  Parameter:                                    pH pH Units                                                                                      pH Units Limits:                                                              Min. 6.0                                          Limits:                                      Min. 6.0 Max. 9.0                                                                                      Max. 9.0 DATE                                                                                                                    DATE 6-03            6.1                                                                                                  6-17            6.1,        6.4, 6.0 6-04            6.1, 6.3, 6.1                                                                                        6-18            6.1,        8.5, 6.0 6-05            6.2                                                                                                  6-19            6.0,        6.1 6-07            6.9                                                                                                  6-20            6.0,        6.0                                                                  '
6-08            6.9                                                                                                  6-21            6.1,        6.3, 6.1 6-09            7.8, 6.0                                                                                              6-22            6.2 6-10            7.2, 7.4                                                                                              6-23            6.0 l
              .6-11              6.0,.6.6                                                                                              6-25            6.0 6-13              6.0, 7.2                                                                                              6-26            7.0 6-14              6.1, 6.2                                                                                              6-27            6.'0, 6.0 6-15              6.3                                                                                                  6-28            6.1 6-30            6.0, 6.4 i
e p
i
                                                                            ~
l O
 
QUARTERLY OPERATIONAL MONITORING REPORT ADDITIONAL MONITORING-f-s    Georgia Power Company                                                                                                                                            From: 04-01-86
( j)
Plant Hatch                                                    .?                                                                                                              To: 06-30-8.6 P. O. Box 4545                                                  ,                                                                                                                                                    ,
Atlanta, Georgia 30302                                                                                                                  Permit Number: CA0004120                                                      .
Discharge Lo'ation:    c          001D - Liquid Radwaste System Unit 1 Type of Sample: Grab                                                                                  '
Frequency of Analysis: Each Batch Parameter:                                                        pH                                                          Parameter:                                                            pH pH Units                                                                                                                pH Units Limits:                                                      Min. 6.0                                                          Limits:                                                Min. 6.0 Max 9.0                                                                                                                  Max. 9.0 DATE                                                                                                                          DATE 4-01                            6.0,              6.9,  8,8                                                                  4-17  6.2, 6.5, 6.6, 6.5 4-02                            6.4,              6.0,  6.4                                                                  4-18  6.8 4-03                            6.1,              6.3,  7.2, 6.2                                                            4-19  6.6, 6.4, 6.6, 7.2, 6.3 4-04                            6.0,              6.8,  6.5, 6.1, 6.5                                                        4-20  6.0, 6.7 4-05                            8.1,              6.5,  6.9                                                                  4-21  6.4, 6.3 4-06                              6.7,              6.5,  6.0                                                                  4-22  7.4, 6.2 4-07                              6.7                                                                                          4-23  6.2, 6.2, 6.5, 7.1 4-08                              8.5                                                                                          4-24  6.0, 6.6,~6.8
('
  'd
        )  4-09 4-10 6.6, 6.4, 6.6 6.8 4-25 4-26 6.3, 7.0 6.4 4-11                              6.0, 6.8                                                                                      4-27  6.5, 6.2 4-12                              6.0                                                                                          4-28  6.1, 6.1, 8.9 4-15                              6.7, 6.0                                                                                      4-29  9.1, 6.8, 6.0, 6.2, 8.3 4-16                              6.4, 6.2, 6.9, 6.0                                                                          4-30  6.2, 6.3, 6.5, 6.5 i
l I                                                                  +                                                    .,
i f
 
              . - .                                  - -      . _ = _ _ ~ . .- _ _ - .-                                                    .        ~-          __        . _  . _    . _ - -
QUARTERLY OPERATIONAL MONITORING REPORT ADDITIONAL MONITORING s  Georgia Power Company                                                                                                                                  From: 04-01-86          ,
Plant P.atch                                      -                                                                                                            To: 06-30-86      +
C~'s  P. O. Box 4545                                    >
Atlanta, Georgia 30302                                                                                                                      Permit Number: GA0004120              .
Discharge Location: 001D - Liquid Radwaste System Unit 1 Type of Sample: Grab                                                                                  '
Frequency of Analysis: Each Batch                                                                                                              .
Parameter:                                            pH                                                                          Parameters                      pH pH Units                                                                                                        PH Units Limits:                                          Min. 6.0                                                                        Limits:                        Min. 6.0 Max. 9.0                                                                                                        Max. 9.0
!        DATE                                                                                                                              DATE 5-01            6.2                                                                                                              5-16    6.5,  6.3 5-02            6.7, 6.6                                                                                                          5-17    6.7. 6.3, 6.5 5-03            6.3                                                                                                              5-18    6.4,  6.1 5-04            6.3                                                                                                              5-19    6.5,  6.4, 6.3
;        5-05            6.6                                                                                                              5-20  6.1,    6.2
,        5-06            6.2, 6.2                                                                                                          5-21  6.4 i
5-07            6.2                                                                                                              5-22  6.2,    6.'1, 6.1
!  f- s 5-08            6.3,    6.2                                                                                                      5-23  6.2, 6.0
,  (    5-09            6.4,    7.2                                                                                                      5-24  6.3 1        5-10            6.2,    6.1                                                                                                      5-25  6.2 5-11            6.0,    0.3                                                                                                      5-26  6.2 5-12            6.6,    6.2                                                                                                      5-27  6.1,    6.1, 6.4, 6.7 5-13            6.1,    6.4                                                                                                      5-29  6.1,    6.0, 6.6, 6.7 5-14            6.5,    6.0                                                                                                      5-30  6.8,    6.8, 6.0 5-15            6.6,    6.4, 6.4, 6.2                                                                                            5-31  6.0,    6.4 i
e I                                                                                                                                                                                .
4 i
a 9
y                                          .        A
        ,4.__.___., __.      ___,_,---m___.___x-_,mm__._                                  .__,. _ , , _ _ , . _ _ _ _ _ , _ _ - _ . , . .
 
_  -                  -      .- - _ = _ _ _ _ . - . .            . - _ - - .        ._
QUARTERLY OPERATIONAL MONITORING REPORT ADDITIONAL MONITORING Georgia Power Company                                                                    From: 04-01-86
_(''T                                                                                                To: 06-30-86 '
    \ -)  Plant Hatch P. O. Box 4545      .
Atlanta, Georgia 30302                                                      Permit Number: CA0004120      _
Discharge Location: 001D - Liquid Radwaste System Unit 1 Type of Sample: Grab                                            '
Frequency of Analysis: Each Batch Parameter:            pH                                          Parameter:                      pH pH Units                                                                    pH Units Limits:            Min. 6.0                                        Limits:                      Min. 6.0 Max. 9.0                                                                    Max. 9.0 DATE                                                              DATE a
6-01    6.4, 7.6                                                    6-17  6.7 6-03    6.1, 7.2, 7.4                                              6-18    6.4 6-04    6.5, 7.5, 6.5                                              6-19    6.5,    6.4, 6.3 6-05    7.3, 7.3, 7.0, 7.3, 6.5                                    6-20    6.2,    8.4, 6.4, 6.0, 6.3 6-06    6.6                                                        6-21    6.4,    6.2    ,
6-07    6.3                                                        6-22    6.6,    6.2 6-08    6.1                                                        6-23    6.4
    /~'s  6-09    6.6, 6.9                                                  6-24    6.4, 6.7
(,,)
6.10    6.6, 6.3, 6.8, 6.3                                        6-25    6.6 6-11    6.6. 6.3                                                  6-26    6.5 6-13    7.8, 6.2, 6.4                                              6-27    6.2,    6.4, 6.7, 7.8 6-14    6.1                                                        6-28    6.8,    6.7 6-16    6.5                                                        6-29    6.7,    6.7, 6.5 6-30    6.7,    6.6 l
t 1
l l
lO
\
l l
l    ,
 
CIRC WATER CHLORINATION DATA'
                  ~
c''                                                  DATA PACKAGE 1
    ~-
(DATA SHEET 1) s''                                ..
ao (v                        WEEKLY UNIT NO:
                                              ~
                                          .                  CHLORINATORS                              Clg DATE FREQUENCY CL 2. INJECT                  NO. 1            NO. 2 FREE mg/l* DISCHARGE INITIALS CYCLE / DAY MIN / CYCLE            f/24 HR 9/24 HR                AVG. MAX                HOUR / DAY f_5f_,_____I_____ .__f_0__-___ _4_0_D_0__3.po_o_                _.      -  ._._5_ _. _. _6_ _ _____0________2_f_6_ _'              ___
L<)2 $..__.l'_____..__]O______,A_ .S_o_o_ _ __gsp_o__ . _. A_ _ _ ..- _. Y_ ____p________ _g_?d_ _ _ _ _
l2}}E____.l_____ .__}__D___-__ _ _9_m_ _ o_ _            _    _______        _ls_ _    . _. _A_ _ _____O_______. ..8_ _/> _ _      __
lA*9._ _ t:, ,_s_/_ _ _ .._=_________ ________________                    .____      ._____      __________}_ .E_h_____      ?_
_____    _h                                __---___________                _____      __________________________
______ _ _ _ _ _ _ _ _ _ ..__________      _ N______                      _____      __________________________
______________-___________________________                                  _____      N_____
f                                                                LIMIT        0.20 0.50              2 HR/DA              %                  ,
o                                                                    _______..____________________________--
(s
* MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE t
s t
1 1
l I
i
[\
                            '                                    Page 2 og 2 62Ey_ GAM-002_O                  ggg e
 
                                                                                                                                  ~
CIR;        ATER CHLORINATION DATA                                                        l DATA PACKAGE 1 (DATA SHEET 1)
I' 0                                  WEEKLY          -
                                                    ,''                                                  UNIT NO:              /              '  '
CHLORINATORS                          Clg DATE FREQUENCY CL 2. INJECT                          NO. 1          NO. 2      FREE mg/l* DISCHARGE INITIALS CYCLE / DAY MIN / CYCLE                f/24 HR f/24 HR            AVG. MAX              HOUR / DAY S.7-p _92 _ _ _ _ _ _ _ .
                                            .___________________                _______  .___        ._____    ______c____ _________
            .t&. ..z. __________            .__________-__ m_______              _______  .____      ._____
__________:__yQg    ________
            $_'lY"
___          _ _ _ _ _ _ _ _ _ _ .._____________.,____________                _____      _________________            __V_______
72_f.L& .      '_________.      .___-_--_--        - _tw 9
L&_______
qMP.___L_____.. _ _3.0-- _ _ _ __3_000                                3000      J_5_ .__4______0________ 4_ _____
w
______ _ _ _ _ _ _ _ _ _ .      .h_ _ _ _ _ _ _ _ , _ _______                  _____      ._____    ____________________
N N
_____ _ _ _ _ _ _ _ _ _ _ ..__________                ________________          .h                    ____________________
_______________..__________________________                                      _____ ______ ___________                h f                                                                          LIMIT 0.20 0.50            2 HR/ DAY
        \
MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE 4
                                                                                      ~
l 62EV-SAM-002-0            R00 6                                                                  9 e
e
 
CIRC WATER CHLORINATION DATA DATA PACKAGE 1
              .                                                    (DATA SHEET 1) m  y                                _.
V                              WEEKLY:.e                                                                UNIT NO:                    (de/
                                                        ~
CHLORINATORS                                  Clg, DATE FREQUENCY                    CL 2. INJECT    NO. 1        NO. 2            FREE mg/l* DISCHARGE INITIALS CYCLE / DAY ~ MIN / CYCLE              f/24 HR f/24 HR                  AVG. MAX                HOUR / DAY N U
            . f_v.. _ M_ _ u_ _ _ _ _ _ .__________________.
                                                .                            _______          .____        ._____      ._________I h_ _ _ _/_ _ _ _
d.41$.. .cs* . . _ _ _ . ._________________________.
            .J.H 1:_-. _ Pb_ _ _ _ _ .._'_________ ________________
_                                                              .____      ._____      ._________& _J_h______
0
__%__i_b      W kb
                                                                                                                                              .      s 4' s
            .d N
4_ J.o.- _n_ _d_ _ _.__________.________
_                            __.                        _______            .____      ._____      . _ _ _ _ _ _ _ _ _ _ '_7_?_u_.____
m
          . ____ _ _ _ _ _ _ _ _ _ ..__________              .:=-=      -_ ___ _ _ _ _ _ ..____          ._____.___________________
__________________________._______________                                          _____      ______      .__________              :::=        ___
,                                                                              LIMIT              0.20        0.50        2 HR/ DAY pa
* MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE i
l r
O Page 2 of 2 62EV-SAM *002-0                    R00 i
t
 
CIRC WATER CHLORINATION DATA DATA PACKAGE 1 (DATA SHEET 1)
                                                                                                                          ~
:                                                                                              r 6                                                                                      '
WEEKLY
* UNIT NO:
I CHLORINATORS                              C14 DATE FREQUENCY CLgINJECT NO. 1                                        NO. 2        FREE mg/l* DISCHARGE INITIALS CYCLE / DAY MIN / CYCLE                  t/24 HR t/24 HR              AVG. MAX * ' HOUR / DAY
      &_G_ _ _ _ _ ]_ _ ..___S_0_______
_                                  __                        _3_ _0_0_0_
_3_o_c_o _  _ __ _. a_ _ _._4_ _____Q_______2_9_9__
                                                                                                                                                    '3 _ _
      .L25__ _ _ _1_ _ _ _ _ ..___&ct_____ _Sa.e_                                          .. a__
_          ._&______.a_______Ab_____
_ __3a.e.a_
                                                                                              /_T_ .J_ ___.L______ ___b_____
4f-LV. ___/_____.. _ _ _6_ _0_ _ _ _ __ _Fn_e_ _ _ _                  _______        .
i
                  ..' . M u_ __ __. ._______________                                      .____        .________________      _Y/_h_____
4_2_&_9_          -
e
_ _ _ -      W. _ _ _ _.__________    ___.          ______________                  . , _ _ _ . /____ ___________        ________
LIMIT 0.20 0.50 2 HR/ DAY
* MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE I
I 62EV-SAM-p02-0        R00
 
SERVICE WATER CH: .RINATION DATA                                                    -
DATA PACKAGE 2 (DATA SHEET 2) 3                                                                                                  '
i-
                                                                                                                                  /
WIEKLi                                                                      UNIT NO:
x CHLORINATORS                                          Clx DATE FREQUENCY                      CLg INJECT            NO. 1        NO, 2      NO. 3              FRdE m /l* DISCHARGE
                                                                                                                        ..g
                                                                ........      .__......    .......            .t y. .      ....  ...........
CYCLE / DAY MIN / CYCLE                        f/24 HR f/24 HR t/24 HR                      AVG.        MAX HOUR / DAY
                                            . . . .N. /_c . . . . .Ro. o. . . . . . . ~ ~ . ... .-. . -. . . . ..g. . . . 0. . .    ...0.......
                                                                                        ~
4.6.&..  . ........
Y'J'd-[_.
                    ........              ....l$A_... . . E Q .o. .        .........    .~....              )5. . . .O. . . .._f}......r
        .t, n%.
a    .!.a.h.    . .m. .0...A..l1.%.... ...2.f.C_ _........
                                        ..                                                .......            .sLS... . .a _ _ ...        0.......
W      __A_ _ _ _ _ _ _v.        ....E8.... . 2 0...              ...__....    ...~__.. ..}.5... . P. . . ...D.......
N                        w ,...              ............__...          .....__            ...........          ...........
                                                                        ~
        .....    ..........                ...........        ........      ....... . h                            ......    ...........
N
        ......................_...                              ........_ . ............                      .....    ...... M. _ .
E                                                            LIMIT                                        0.20 0.50              2 HR/ DAY
* MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE
        **      MEASURED AT SERVICE WATER. DISCHARGE TO CIRC WATER FLUME t
l l
l l
l l
                        ''s                                                                                    62Ev. SAM-002-0                R00 l
* SERVICE WATER CHLORINATION DATA V                                                        DATA PACKAGE 2 (DATA SHEET 2)
(q r
P
                                          ?
          '                                7-L/                              .
WEEKLYF                                                                    UNIT NO:                  /
CHLORINATORS                                            . C1x
                                                            ........................                            ... 7.................
DATE FREQUENCY            CLg INJECT              NO. 1                NO. 2            NO. 3      FREE      m/ l*
                                                                                                                            ..g            DISCHARGE
                      ..........      ...........          ........      .........                ....... etf..            ....    ...........
CYCLE / DAY MIN / CYCLE                t/24 HR t/24 HR t/24 HR .....                      AVG.
                                                                                                                                ,Mi'X HOUR / DAY y n.. . <......... .____......                  . .o.w. . . ..........
pf.li.
            .        . <.........    ...........          .. w._.... .... ....                    .......    ...........              ..........~.
[.x.(,_ .g.n.A...~.... . . .HA . . . . . .a o. .s. . ..En....  .                        ..H.A... .vy'...<. .t. . . ....o.......                ,
                                                                                                      . . g. _ _ ..j.s. .. o ). . ....a.......
              .e])s. . .i n. . %. . .. .. ...A.. ./A. . . .. ..a. . .o. . . 9....
            .....    ..........                            ..a..............                        .......
            .....    ..........        ...........          ........      . . . _h LIMIT                                            0.20 0.50                  2 HR/ DAY
* MEAf tRED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE
            *
* MEA 141 RED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME l
l t
I l
i L
i l
a.
                                '                                    Page 2 of 2                                        .
ROO 6 2 EV-S AM -00 2 -0 O                                                              _
                                                                              -,.n-,      - - . - -
 
SERVICE WATER CHLORINATION DATA DATA PACKAGE 2
      %                                  ._                          (DATA SHEET 2)
        )      .
1 WsEKLY
                                                ~
UNIT NO:              cN8                          .
CHLORINATOR 5                      ,
Cl g DATE FREQUENCY                  CLa INJECT          NO. 1            NO. 2      NO. 3      FREE      mg/1* DISCHARGE CYCLE / DAY MIN / CYCLE                f/24 HR t/24 HR I/24 HR                AVG.          MAX      HOUR / DAY J/,
          . .'.3.R. . . ./.3.W. . . . .    ...........        ........        .........    .......  .....      ......d. .h. .b.'. . . . . .
49-/f.r ...t.w......
                .                          ...........        ........        .........    .......  .....      . . . . .&.  .  .J'.......
                                                                                                                            ^
d),f. b*. . . p., .b. . . . . ...........          .................            .......  .....      ......-      .h. .b. . . . . . . .
          /.p:.%.
          . .        . ... m....... ...........              ........        .........    .......  ...........            . f5.!.J. . . . . . .
                                                                                                                                % 9+1
          }),..e.                                                                                                              .V v,......
r<s, .,,                                          .........    .......  ...........                    .
                  .a ..........            ...........        ........
                                                                                                                              . . .w .
p      ..........................                          ........................                .....      ......
0.20 0.50                2 HR/ DAY
(
w)?                                                          LIMIT
* MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE
          **      MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME i
i l
(mv>\
Page 2 of 2 62EV-SAM.002 0                    ROO
 
SERVICE WATER CHLORINATION SATA DATA PACKAGE 2 (DATA SHEET 2)
(  )            .                          t                                                                                                              .-
V WsEKLY                                                                    UNIT NO:                  e7                .
CHLORINATORS                                            C1 g DATE FREQUENCY                  CLg INJECT                NO. 1          NO. 2            NO. 3      IREE m      ..g/l*        DISCHARGE
        .....          ..........        ...........              ........        .........          .......      72. .            ....    .....__....
CYCLE / DAY MIN / CYCLE                    f/24-HR f/24 HR f/24 HR                        AVG.          MAX        HOUR / DAY
[d_ib. ..........                ....          d.... . . A00. . .        ._.......          .. ~___..  [4          . . .O. . . ....O.......
                                                    ''                                      ~~~                            *
                    . .      ...    .m......H.          ...    . . 2 E.e. . .........            .......    . ., /.D. . . .O. . . ..__O_......
        .&AJ.b. 6.. . .%. . .n.e.....E..R.... . . Ja r . .                      ......._.          .......    ..      '. ..a.. ...O.......
                .!,B
                  .  . ././.*$. .m. .e. .... R" "0.... . 2.0.0. . .....~....                      .......    . N. ... 0... 0.......  ...
        .....        ........_.        h                                      .........          .......    ...........              ...........
N
                                                                                                                  ~~
N LIMIT                                        0.20 0.50                  2 HR/ DAY HEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE
        ** MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME N                                                                      .
Page 2 of 2 R00 N                                                                                6 2 EV'-S AM -0 0 2 -0
 
                                                                                                                              ~
SERVICE WATER CHLORINATION DATA
"                                                            DATA PACKAGE 2 m                                                          (DATA SHEET 2) g U
lV WsEKL6                                                            UNIT NO:                A              '
CHLORINATORS                                        Clx DATE FREQUENCY                  CLg INJECT        NO. 1          NO. 2          NO. 3        FREE mg/l* DISCHARGE
                                                        ........      .........        .......      .( t. .  ......      ...........
CYCLE / DAY MIN / CYCLE            t/24 HR t/24 HR f/24 HR                      AVG.        MAX HOUR / DAY
                                                                          /y#&.....,.......
la. .'s-m A                                                                                                                        <
f./. y. {,.l. ..........        ...........      ........        .f.pv.....
S-vi& CL....
5).lsM..(./.A.$.. &.            ...N..h....
                                              ..        . 2 M ... . . R.t*c . . . ..)y.k...  .        n'3JY. . .d...... l    .. 0..*.....
d- E}.l. ia. .t o. .; s. .o. ....b..M..... . EJ.W. . ....U.A.... . 80'. .
                                                                                                        . .,lb'.. .<. s. l . ...R......
        .....        ..........        =
N
        .....        ..........        ...................            A                e ..... .....          ......      ...........
2 '-----------------------~~~                                                                          0.20 0.50                2 HR/ DAY W                                                        LIMIT g                                                        . . . . . . . . . . . . . . . . . . . . . . . .. . . . . ..................
MEASURED AT POI.NT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE
        **      MEASURED AT SERVICE WATER. DISCHARGE TO CIRC WATER FLUME                                                    .
                                                                                                                          \*
                                                                          '                                                                ~
d                                                                Page 2 of 2 62EV.S,AM-002 0                R00 M
 
SERVICE WATER CHLORINATION DATA P                                                        DATA PACKAGE 2 (DATA SHEET 2) 7- g      s      .
e
  'J' ~-
wtEKLY                                                      UNIT NO:          4>              -
CHLORINATORS                                  C1x DATE FREQUENCY          CLg INJECT        NO. 1            NO. 2      NO. 3    FREE mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE          f/24 HR f/24 HR f/24 HR                  AVG.        MAX      HOUR / DAY gy. . . W.s
                                                                                                            - - . >      A
                ...g..
                                  .....  ...........    .................              .......  .....    ......      . F. .]./. . . . . .
4.t.2/5 ..itz.,.....
                .                        ...........    ........        .........    .......  .....    ......      . .b.h. . . . . . . .
Y2fl$. .. 4Gt.... ...........            .................              .......  .....    .....: ...........
                .J1. r1. ...p.. v..... ...........        ........        .........    .......  ...........            . .f.?th. . . . . . .
                .43.o.%.....rf.o.....
s          .
                                          ...........    .................              .......  .....    .....' .$.w......
A
                                          ...........    .....-=                =..... .......  ...........            ...........
t                                                  LIMIT                                  0.20 0.50              2 HR/ DAY g                                                      ..............................................
* MEASURED AT POINT OF DISCHARGE TO RI'VER DURING CHLORINATION CYCLE
                **    MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME 1
(
4 Page 2 of 2 62EV.. SAM-002 0                ROO O
 
CIRC WATER CHLORINATION DATA DATA PACKAGE 1                                              .
(DATA SHEET 1)
WEEKLY UNIT NO:              ,7                ,-
                                  . I.            _______________________________________________.
CHLORINATORS                            Clg DATE FREQUENCY            CL t INJECT            NO. 1          NO. 2      FREE mg/l* DISCHARGE INITIALS CYCLE / DAY MIN / CYCLE              f/24 HR I/24 HR              AVG. MAX                HOUR / DAY S-7 % _IN_ _ _ _ _ _ _ .
p____ __________            ___________
_ pp_____        _______    _____..______ _ _ _ _ _ _ _ _ _ . .          3_b______
__,._h_____
_[-_/_((_ _ _ _ _ _ _ _ _ _ _ ..__________ _ _/_3_4_/_ _ _ ________          _____      _________________
ga_ir_,__ &_
w
__o_______      _______    _____      .________________
_-fjd_
  .&. LWe _. _ _ _ ]_ _ _ _ _ ..___4_0_______      .-T f f_o_ _ _3_M_ _e_ _ _/_S__ _ _. fA_ _____Q_______f_]&_____
_____    _______ ~___N N N
______ _ _ _ _ _ _ _ _ _ ..__________________________                        w                      ____________________
_______________..__________________________                                  _ _ , . _ _ ______      ___________        h LIMIT      0.20 0.50              2 HR/ DAY
* MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE 62EV-SAM-002-0                ROO 9
h
                                                                  =
 
Page  1 of 9 j
QUARTERLY OPERATIONAL MONITOPIi1C REPORT                                      I Georgia Power Company O
Plant Hatch P.O. Box 4545 From: 07-01-86 To: 09-30-86 AtIanta, Georgia 30302 Permit Number: GA004120 Discharge Location:001A1 - Lou Volume Waste (Heutralization Tank)
Type of Sample:    Grab Frequency of Analysis:            2/Mo Code:                          (530)              (550)                  (400)
Parameter:          Suspended Solids          Oil & Grease                  pH              .
mg/l              mg/l Limits:                        Avg. 30              Avg. 15              Min. 6.0 Max. 100            Max. 20              Max. 9.0 Date i
07-08-86                          16.0 07-20-86                                              0.82                  8.0 47.25              0.96                  7.1 08-05-86                            1.0                0.70 08-18-86                                                                      6.7 18.0              0.4                    6.4 09-01-86                            30.5              2.0 09-15-86                                                                      8.2 1.67              0.47                  7.4 Number of SaJnples:                  6                  6 s      Average value:                                                                  6 19.07                .89                  7.30 Maximum Value:                    47.25              2.00 Minimum Value:                                                                8.20 1.00                .40                  6.40 Limits Exceeded:'                    8                  0                      0 i
1 e
i g
ty 5
a L. 'J                                                                                                                    .
t            @                I w - e de e.-.          s    +. .
_(                                                    ...                            .
 
i-Page 2 of 9 i
QUARTERLY OPERATIONAL MONITORING REPORT U                Georgia Pouer Company Froni: 07-01-86 Plant Hat c h P.O. Box 4545                                                                    To: 09-30-86 Atlanta, Georgia 30302 Permit Humber: GA004120 Discharge Location:001A2 Lou Volume Waste (Pressure Filters)
Type of Sample:    Grab Frequency of Analysis:        1/qtr Code:      '"ss        (530)                (550)                  (400)
Parameter:            Suspended Solids      Oil & Grease                    pH mg/l                mg/l Limits:                  Avg. 30              Avg. 15              Min. 6.0 Max. 100              Max. 20              Max. 9.0 Date
      ,            88-04-86          (R)          1.1                <5 08-04-86                                                                    7.6 (B)        0.7                .<5 08-04-86                                                                    7.6 (C)          1.1                <5                      7.6 08-04-86            (D)      ' . 0. 6                <5                      7.6 Humber of Samples:                4                  4      -
4 y            Rverage Value:                    .88              (5.00        ,
7.60 Maximum Value:                  1.10              45.00 Minimum Value:
7.60
                                                    .60              45.00 Limits Exceeded:                                                              7.60 0                  0                      0 i
e LO
* t L_      . . _ _ . _ _    - , _
g, g .      ea            *b "'
 
Page  3 of 9 q                                QUARTERLY OPERATIONAL MONITORING REPORT
      -l Georgia Power Company Plant Hatch                                                                      From: 07-01-86 P.O. Box 4545                                                                      To: 09-30-86 Atlanta,Ceorgia 30302 Permit Number: GA004120 Discharge Location:001B - Cooling Touer Bloudoun Location:      Intake      Mixing Zone        pH Type Sample:'In Situ                                                    Zn                  Cr In Situ          Grab                  Grab                  Grab Frequency:      1/uk.          1/uk.          2/mo              1/qtr                    1/qte Parameter: Temp. Deg. F      Temp. Deg. F Limits:                      T of 5 Deg. Min. 6.0 Max. 90 Deg. Max. 9.0          Max. 1.0                  Max. 0.2 Code:            <11)            (11)
Unit 1 Unit 2 (400)
Unit 1 Unit 2 Unit 1 Unit 2 (1092)                  (1034)
Date 07-02-86          86              84 07-07-86                                    8.3        7.8 07-09-86          89              89 07-16-86          88              88 07-21-86                                    8.5        8.5 07-23-86          87              88 07-30-86          86              86 0      08-04-86 08-06-86 08-13-86 86 84 86 84 8.2        8.0 08-18-86                                    8.1        7.8                  -
08-20-86          86              86 08-21-86 08-28-86                                                      <0.1              <0.1    (0.1    <0.1 88              88 09-01-86                                    8.0        7.6 09-05-86          8~1            81 09-12-86          80              80 09-15-06                                    8.2        7'9 09-18-86          81              81 09-24-86          80              80                                    -
Ho. of Saaple:    12              12        6          6        1            1          1 Average Value:    85              85      8.22 1
7.93    4.10          4 10        <.10 Maximum Value:    89              89      8.50    8.50 4 10 Minimum Value:    80 4 10 g.10                  4 10 4 10 80      8.0      7.60    4 10 4 10 Over Limits:        0                0      0          0      0 4 10 4 10 0            0        0 l
l e                              .
L
 
Page  4 of 9 QUARTERLY OPERATIONAL MONITORING REPORT Ci Georgia Power Company Plant Hatch                                                          From: 07-01-86 P.O. Box 4545                                                          To: 09-30-86 Atlanta, Georgia 30302 Permit Number: GA004120 Discharge Locat ion:001C - Sewage Treatment Plant Type of Sample:      Grab Frequency of Analysis:      2/Yr Code:                    (310)                (50064)  (400)    (530)
Parameter:                B.O.D.5                F.A.C. pH    T.S.S.
mg/l                  mg/l            ag/l Limits:      PLANT #      Avg. 30                  -
Avg. 30 Max. 45                  -
Max. 45 Date
  , 07-08-86        1          5.4                  0.7    6.5    10.4 Humber of Samples:              1                  1 Average Value:                                            1          1 5.40                  .70 Maximum Yalue:                5.40 6.5    10.40
                                                        .70    65      10.40 Minimum Value:                5.40
%)  Limits Exceeded:              0
                                                        .70 0
6l5    10.40 0
0
                                    .        4M
* O p
 
4 Page            5 of 9 QUARTERLY OPERATIONAL HONITORING REPORT Georgia Power Company Plant Hatch                                                                                                                                  From: 07-01-86 P.O. Box 4545                                                                                                                                        To: 09-30-86 Atlanta. Georgia 30302 i                                                                                                                                                                Permit Number: GA004120 Discharge Loc at ion: 001D - Liquid Raduast e Syst em Uni t One Type of Sample: Grab Frequency of Analysis:                2/Mo 4
Code:                              (530)                                                      (550)                              (400)
Parameter:                      Suspended Solids                                            Oil & Grease i                                                                                                                                                                        pH mg/l                                                        mg/l Limits:                            Avg. 30                                                    Avg. 15                            Min. 6.0 e
Max. 100                                                    Max. 20                            Max. 9.0 i
Date 07-07-86                                12.0                                                        2.7 07-21-86                                                                                                                                6.5 9.0                                                        3.52                                6.9 08-03-86                                3.82                                                        0.9 08-18-86                                                                                                                                6.0 0.63                                                        0.00                              6.2 09-01-8C                                8.8                                                        2.0 69-16-86                                                                                                                                6.8 O                                                                    59.5                                                        12.6                              7. 4 i                              Number df Samples:                        6                                                          6 i                              Average Value:                                                                                                                              6 14.12                                                        3.62                                6.6 Maximum Value:                        50.50                                                        12.60                                7.4 Minimum Value:                            .63                                                      0.00                                6.0 Limits Exceeded:                          0                                                          0                                    A i
I                                                                                                                                                      ,
i
^
6 I
h i
r i
O
_...---_.._...,.,_,_.._,._.,_.._,.__,.__,...,__c            _
 
Page 6 of 9 OUARTERLY OPERATIONAL M014ITORIl1G REPORT Georgia Power Corup any Plant Hatch                                                                                                                                    From: 07-01-86 P.O. Box 4545                                                                                                                                          To: 09-30-86 Atlanta, Georgia 30302 Permit Number: GA004120 Discharge Location:001D - Liquid Radwaste System Unit Two Type of Sample: Grab 1
Frequency of Analysis: 2/Mo Code:                                                          (530)                                    (550)                (400)
Parameter:                                                  Suspended Solids                          Oil & Grease                      pH
,                                                                                          mg/l                                    mg/l Limits:                                                          Avg. 30                                  Avg. 15            Min. 6.0 Max. 100                                Max. 20          Max. 9.0 Date
              '          07-07-86                                                            0.3                                      2.53 07-21-86                                                                                                                                6.3 i
1.00                                    0.00                      6.0 08-04-86                                                            1.00 08-18-86                                                                                                    0.00                      8.1 0.6                                      0.94                      6.1 09-01-86                                                            0.52 09-16-86                                                                                                      1.80                      6.1 0.667                                    2.00                      6.3 O
Number of Samples:                                                    6                                        6 Average Value:                                                                                                                                6 1
                                                                                              .68                                    1.21                    6.48 Maximum Value:                                                        1.00                                    2.53 Minimum Value:                                                                                                                          8.10
                                                                                              .30                                    0.00 Limits Exceeded:                                                                                                                        6.00 0                                        0 1                                                                                                                                                                    0 l
1 i
t l
t I  b e
      - - - - . . _ . . . . , . . _ , . _ . . . . , . - _ _ _ _ _ _ _ _ _ , _ _ , _ .              . _ _ . . . _ _ , - _ . _ ,            _m      _ . _ _ _ _ _ _ _ _ _ _ _ _              _ _ , _ _ _ . - - _ _
 
                                                                                                                                                                                                                        .w
.4 Page          7 of 9 QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company                                                                                                                                                From: 07-01-86 Plant Hat c h                                                                                                                                                          To: 09-30-86 P.O. Box 4545 At lant a, Georgia 30302                                                                                                                                    Permit Humber: CA004120 Discharge Location:001E - Combined Plant Waste Unit One Frequency of Analysis:                                    1/wk.
Type of Sample:                                                  In Sisu                                      Grab                                          Grab            Grab Parameter:                                                  Temperature                                      T.R.C.                                          F.A.C.            pH Limits:                                                                Deg. F                                        N/A                                        N/A        Min. 6.0 4
Max. 9.0 Code:                                                                        (11)                            (50060)                                        (50064)          (400)
Date 07-02-86                                                                        96                                  <.1                                        <.1            8.7 07-09-86                                                                        91                                  <.1                                        <.1            8.5 07-16-86                                                                        91                                  (.1                                        <.1            8.2 07-23                                                                      88                                  <.1                                        <.1            8.4 07-30-86                                                                        91                                  <.1                                        <.1            8.1 08-06-86                                                                        87                                  < .1                                        <.1            7.8 08-13-86                                                                        90                                  < .1                                        <.1            8.2 08-20-86                                                                        91                                  <.1                                        <.1            7.9 4
08-28-86                                                                        89                                  < .1                                        <.1            8.2
    \                    09-03-86                                                                        87                                  < .1                                        <.1            6.0 89-12-86                                                                        89                                  < .1                                        <.1            7.9
: j.                        09-19-86                                                                        86                                  < .1                                        <.1            7.8 09-24-86                                                                        87                                  <.1                                        <.1            8.5 Humber of Samples:                                                                13                                      13                                        13            13 Average Value:                                                              89.46                                      4.10                                      g .10          8.17 Maximum Value:                                                              96.00                                      4.10                                      4 10            8.70 Minimum Value:                                                              86.00                                      4 10                                      4.10          7.80 Limits Exceeded:                                                                    0                                        0                                      0            0
'I O
h
        -        , - . _ . ,      - . - . _        , . . . . ~ - . . . - . _ _ _ .
                                                                                        - - . _ _ _ _ -          . . . . . _ - , _ ..__.,_-_,._. _ r _ _ . , . - . , . . . _ . _ _ . , _              -.,--.__,--_.I,--
 
                      , . . . . . . . _ , .            >,..  . . ,      .  ..    .                  ..    ,, .m Page    8 of 9
  /                                      QUARTERLY OPERATIOilAL MONITORING REPORT Georgia Power Corupany                                                              From: 07-01-86 Plant Hatch                                                                            To: 09-30-86 P.O. Box 4545 At l ant a, Georgi a 30302                                                Permit Number: GA004120 Discharge Locat ion:001E - Combined Plant Waste Unit Tuo Frequency of Analysis:            1/wk.
Type of Sample:                      In Situ                Grab          Grab          Grab Parameter:                        Temperature            T.R.C.      F.A.C.              pH Limits:                              Deg. F                N/A            N/A        Min. 6.0 Max. 9.0 Code:                                  (11)              (50060)      (50064)          (400)
Date 07-02-86                                  97                  <.1            <.1            8.3 07-09-86                                  89                  <.1            <.1            8.3  .
97-16-86                                  93                  <.1            <.1            8.3 07-23-86                                  88                  <.1            <.1            7.7 87-30-86                                  87                  <.1            <.1            8.2 08-06-86                                  89                  <.1            <.1            8.3 l      98-13-86                                  87                  (.1            <.1            7.8 08-20-86                                  87                  <.1            <.1            8.1 08-28-86                                  87                  <.1            (.1            8.0 09-03-86                                  73                  <.1            <.1            7.9 09-12-86                                  91                  <.1            <.1            7.9 09-19-86                                  69                  <.1            <.1 09-24-86                                                                                    7.8 86                  <.1            (.1            8.2 Humber of Samples:                        13                  13              13          13 Rverage Value:                          86.38 t.10          4.10          8.06 Maximum Value:                          97.00                <.10            <.10          8.30 Minimum Value:                          69.00 Limits Exceeded:                                              <.10            4 10        7.70 0                    0              0            0 i
}
I
 
                                                                                            . s3pt. I f
                                                                                                  'xp l
Pcgt 9 of 9                                                                                  ;
QU 6 P T E F.L Y OPERATIONAL MONITORING PEPORT                          )
  %      Georgia Power Company                                                  From: 07-08-86 v
1 Plant Hatch                                                              To: 09-30-86 P.O. Box 4545 Atlanta, Georgia 36302                                          Permit Number: GA004120 I certify under the penalty of law that this document and all at tachment s were prepared under the direction of supervision in accordance with a system designed to assure'that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information the information submitted is to the best of my knowledge and belief true, accurate and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations.
      .1 AM p)
L                                                H. C. Hix
                                                            ?
General Manager
  )              .
.                                                                                              au
 
QUARTERLY OPERATIONAL MONITORING REPORT
(''
v ADDITIONAL MONITORING Ccorgia Power Company Plant Hatch                                                          From: 07-01-86 To: 09-30-86 P. O. Box 4545 Atlanta Georgia 30302 Permit Number: CA0004120 s
Discharge Location: 001D - Liquid Radwaste System Unit 1 Type of Sample: Grab Frequency of Analysis: Each Batch Code:                  (400)                      Code:                  (400)
Parameter:              pH                        Parameter:              pH pH Units                                            pH Units Limits:              Min. 6.0                      Limits:              Min. 6.0 Max. 9.0                                            Max. 9.0 DATE                                                DATE 7-01    6.5;  6.4                                7-17  6.5; 7.2 7-02. 6.3;  6.3                                7-18  6.5;  6.1; 6.7
{
s      7-03    6.4;  6.0; 6.2; 6.2                      7-19  6.5;  6.4; 6.6 7-04    6.4;  6.0; 6.2; 6.7                      7-20  6.6; 6.7 7-05    6.2;  6.3                                7-21    6.9 7-07    6.5                                      7-22  6.8; 6.3; 6.9 7-08    6.4                                      7-23  6.7; 6.2 7-09    6.6                                      7-24  8.4; 6.9; 6.5; 6.1; 6.9 7-10    6.3; 6.6                                  7-26  7.9 7-11    6.4                                      7-27  8.3; 8.5; 8.1 7-12    6.3; 6.1; 6.4; 6.2                        7-28  6.1; 8.3; 8.2; 6.0; 8.3 7-13    6.4; 6.1                                  7-29  7.7; 7.4 7-14    6.6; 6.2                                  7-30  7.0; 6.8; 6.7, 7-15    6.6                                      7-31  6.5; 7.5; 7.6; 6.8; 6.6 7-16    6.0; 6.4; 6.9 i
O
 
l l
QUARTERLY OPERATIONAL MONITORING REPORT
                                                  .                      ADDITIONAL MONITORING
,    '% )
Georgia Power Company Plant Hatch                                                                                                                      From: 07-01-86 P. O. Box 4545                                                                                                                      To: 09-30-86 Atlanta, Georgia 30302                                                                                              Permit Number: CA0004120 Discharge Location: 001D - Liquid Radwaste System Unit 1 Type of Sample: Grab Frequency of Analysis: Each Batch Code:                                          (400)                                                Code:                                (400)
Parameter:                                      pH                                                  Parameter:                            pH pH Units                                                                                  pH Units Limits:                                    Min. 6.0                                                Limits:                          Min. 6.0 Max. 9.0                                                                                  Max. 9.0 DATE                                                                                                DATE 8-01                    6.8;          6.8; 6.4; 6.5; 6.4                                            8-17  6.2;        6.0;  6.2 p        8-02 8-03 6.8; 6.3; 6.1; 6.0; 6.3; 6.8 6.7; 6.5 8-18 8-19 6.2; 6.2; 6.6; 6.2; 6.4; 7.0 6.4
('/
8-04                    6.3;          6.2                                                          8-20  6.0;        6.0;  6.1;    6.3 8-05                    6.5;          6.3                                                          8-21  6.6;        6.0;  6.3;    6.5 8-06                    6.2;          6.4; 6.0                                                      8-22  6.2;        6.4;  6.6;    6.2; 6.4 8-07                    6.0;          6.1; 6.0; 6.2; 6.5; 6.1                                      8-23  6.9;        6.1;  6.6;    6.5; 6.2 8-09                    6.0                                                                        8-24  6.2;        6.6;  6.4;    6.5 8-10                    6.4;          6.1                                                          8-25  6.0 8-11                    6.0;          6.2; 6.4;  6.2; 6.0                                          8-27 7.8; 6.0 8-12                    6.5;          6.0; 6.2;  6.4; 6.7; 6.4                                      8-28 6.8 8-13                    8.4;          6.6; 8.5;  6.2                                                8-29 7.9; 6.6
.            8-14                    6.2;          6.3; 6.3;  7.0; 6.0                                          8-30 7.7; 6.7; 6.7,; 7.2 8-15                    7.3;          6.1; 6.4;  6.7                                                8-31 6.7; 6.8; 6.8; 6.5; 6.8 8-16                    6.5;          6.4; 6.4;  6.1 9
l-l s
t
            *    , _ _ _ . _. ,..,_- _ .._,.._. .                  ,, ,      . , _ _ _ . _ , _ . - _ - _ , _ . _        . - _ . -    ..,,._..,..,_,___-_____g, _
 
l QUARTERLY OPERATIONAL MONITORING REPORT f*'              .
ADDITIONAL MONITORING
  \
s                                                                                                I Georgia Power Company Plant Hatch                                                          From: 07-01-86 P. O. Box 4545                                                        To: 09-30-86 Atlanta, Georgia 30302 Permit Number: CA0004120 Discharge Location: 001D - Liquid Radwaste System Unit 1 Type of Sample: Grab Frequency of Analysis: Each Batch Code:                  (400)                    Code:                    (400)
Parameter:              pH                      Parameter:                pH pH Units                                          pH Units Limits:              Min. 6.0                    Limits:                Min. 6.0 Max. 9.0                                            Max. 9.0 DATE                                              DATE 4
9-01      6.5; 6.8; 6.5                          9-18  6.3;  6.1 9-02      6.2; 6.8; 6.3                          9-19  6.7; 6.0;  7.7;  6.6 I)''
9-03 9-04 6.0; 6.2; 6.5; 8.2; 6.9; 6.0 6.1 9-20  7.9; 6.6;  6.0 9-21  6.3; 6.6;  7.8;  6.9 9-05      6.2; 6.6                              9-22  6.0; 6.7;  6.6 9-06 6.3; 6.7; 6.4                          9-23  7.2; 6.7;  6.3;  6.5 9-07      6.5                                    9-24  6.3; 7.1;  6.5;  6.2 9-08      6.0; 6.6; 6.8                          9-25  6.2; 6.1;  6.9;  6.4 9-09      6.7; 8.5; 8.4                          9-26  6.2; 6.5; 6.6;  7.0; 6.8 9-10      8.7; 8.4; 7.4                          9-27  6.2; 6.2;  6.6 9-11      7.9; 6.6                              9-28  6.5; 6.3; 8.7;  6.8; 6.7 9-12      6.9; 6.0; 6.6; 6.1                    9-29  6.4; 6.6; 6.6;  6.7; 7.2 9-13      7.0; 6.2                              9-30  6.6; 7.5; 6.9;  6.6 9-16      6.0; 7.7; 7.2
* 9-17      6.1; 6.4; 6.2; 7.4 I
l i
(
O l
 
QUARTERLY OPERATIONAL MONITORING REPORT ADDITIONAL MONITORING l
V Georgia Power Company Plant Hatch                                                                                          From: 07-01-86 P. O. Box 4545                                                                                          To: 09-30-86 Atlanta, Georgia .30302 Permit Number: CA0004120 Discharge Location: 001D - Liquid Radwaste System Unit 2 Type of Sample: Grab Frequency of Analysis: Each Batch Parameter:                  pH                                Parameter:                                  pH pH Units pH Units Limits:                  Min. 6.0                            Limits:                                    Min. 6.0 Max. 9.0                                                                        Max. 9.0 DATE DATE
~
        ,          7-01    6.4                                                  8-01    6.2; 6.1;          6.2; 6.0 7-02    7.9; 6.0                                              8-02  8.3; 6.0;          6.4; 6.3 7-03    6.3                                                  8-03    6.0; 6.0 4
7-04    6.2                                                  8-04    8.1; 6.2;          6.0 7-05    6.0; 6.3                                            8-05    6.0; 6.0;          6.1 f]                7-06    6.1; 7.9                                            8-06    6.1; 6.8
; N m _/            7-07    6.3; 6.1                                            8-07    8.8; 6.2;          8.2; 8.8 7-08    6.1                                                  8-08    6.0; 6.0;          6.5; 7.3 7-09    6.2;  6.4; 6.6; 6.0                                8-09    _8.7; 6.1 7-10    6.0;  6.3                                          8-10    6.1; 6.1 7-12    6.0;  6.2                                          8-11    6.6; 8.1 7-13    6.1;  6.1                                          8-12 6.8 7-14    6.0;  7.4                                          8-13 6.0; 6.1 7-15    6.2                                                  8-14 6.0; 6.0; 6.1; 8.4 7-16    6.1                                                  8-15 8.5; 6.6; 6.3 7-17    6.3                                                  8-16 6.5; 6.5; 6.4; 6.0; 6.1; 6.1 7-18    8.8                                                  8-17 6.0                            ~
7-19    6.2; 6.1                                            8-18 6.1 7-20    6.0                                                  8-19 6.2; 6.0 7-21    6.0                                                  8-20    6.1; 6.1;          6.2                                              ,
7-22    6.0                                                  8-21    6.0; 6.1;          6.0;            6.0 7-23    6.2; 6.6                                            8-22    6.2; 6.5;          6.0;            6.0 7-24    6.6                                                  8-23    6.0; 8.2;          6.0;            6.0 7-25    6.1;  6.9                                          8-24    8.1; 6.0;          6.0;            6.1 7-26    6.2;  6.2; 6.6                                      8-25    6.0; 6.3;          9.0 7-27    6.3;  6.5                                          8-26    6.0;  6.4 7-28    6.3;  6.5                                          8-27    6.4;  6.1;          7.0 7-29    6.2                                                  8-28    6.2; 6.1;          6.1; 6.1 7-30    6.6                                                  8-29    6.0; 6.0;          6.3 7-31    6.2; 6.4; 6.4; 6.6                                  8-31    6.4;  6.1
;O 9
h
          . . , . .        _      _        --            ,    ,  _    ,. ,._ -..~.- ..        , - _ - - . . - - _ _ , . -    - _ _ . - - - - . - - -  , ,
 
                                                      '                                    .                            T.  . . . .y
  ~~                                                          QUARTERLY OPERATIONAL MONITORING REPORT ADDITIONAL MONITORING
  ~Q Ceorgia - Power Company Plant Hatch                                                                          From: 07-01-86 P. O. Box 4545                                                                          To: 09-30-86 Atlanta, Georgia 30302                                                                                  .
Permit Number: CA0004120 Discharge Location: 001D - Liquid Radwaste System Unit 2 Type of Sample: Crab Frequency of Analysis: Each Batch Parameter:                                pH pH Units Parameter:            pH pH Units Limits:                                Min. 6.0                    Limits:              Min. 6.0 Max. 9.0 Max. 9.0 DATE DATE 9-01        6.1 9-02          6.0; 6.0; 7.1; 6.1 9-03        6.1 9-05        9.0;                6.5; 6.5 9-06        8.6;                6.0; 8.9; 6.4 9-07        6.0;                6.1;  6.1; 7.2; 6.0 O*'        9-08        8.9;                  8.9
            '9-09        6.1;                  6.0; 6.2 9-10        6.0;                  7.6
            .9-11        8.8;                  6.1; 7.2 9-12        6.7;                  8.3; 7.1; 8.2; 6.8 9-13        6.0;                  8.6 9-14        6.0;                  6.5 9-16        6.0;                  6.3; 6.1 9-17        6.1;                  6.2; 6.4; 6.3 9-18      6.2 9-19      9.0                                                                          -
9-20      6.4; 6.0 9-21      6.0 9-22      6.5; 6.3; 6.7; 7.3 9-23      6.2; 6.2; 6.3; 6.0; 7.9                                                                        ,
l            9-24      6.3; 6.3 i
9-25      6.1; 6.0; 6.0; 6.2; 6.0; 6.8; 6.0 9-26      6.0; 6.9; 8.0; 6.0; 6.0; 6.4
,          9-27      7.6; 6.3;6.5; 6.1; 6.1 9-28      6.8; 6.3; 6.9; 6.2; 6.0 9-29      8.4; 6.0; 6.1; 6.1; 6.1; 6.1; 6.2
;          9-30      8.6; 6.3; 7.2; 6.3; I
e 4
 
                            "f.;?u 3                            . CIRC WATER CHLORINATION DATA
: e. ane&W          --
I e.cE'?~fg      ' -
                        ~~                                          DATA PACKAGE 1 j                            (DATA SHEET 1)                                                                    -
h                                          i WEEKLY                                                                                                    i z  ,          .  .                      .
UNIT NO:                !                    ,
            ..._______4.'____.___.,,______                      __,_ CHLORINATORS                      Cl
____.______ __________4_
DATE FREQUENCY CL t INJECT tlO. 1
_____ _ ___,.____ _____________--____                                    2    FREE      mg/l*    DISCHARGE
___NO._____                                                INI CYCLE / DAY MIN / CYCLE          f/24 HR                                                                    .TIALS
_____ ____.._____ . _ _ _ _ _ _ _ _ , . __________                                      MAX        H
_f/24
______ HR      AVG.______
                                                                                          .____                _,,_'JUR/D AY J2~f(- __ D_o_o___.
_7_ t%_ __._ W___..._______-___________
9
_ _g.p.            y                                                                              __________lf__b______
___________..              .__________    _________    _______      _____      ______      ________=y_-______
fiul.
_1_4_%_ __ __ __ __t_w                -
_n__a__              W W
                                                                                                                                            ~ _ _ __k_
                                                                                                      .      __________5_
1 LIMIT 0.20 0.50 2 HR/ DAY 4__(.                                                                  _______,.____._____________ .._________
0 MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE a-1 1
(O-.;
        )                                                                                                .
1 Page 2 of 2
  ,                                                                                                62EV-SAM-002-0                  R00              .
 
CIRC WATER CHLORINATION DATA DATA PACKAGE I (DATA SHEET 1)
WEEKLY UNIT NO:                                              /
                                                                                                        --__CHLORINATORS
____Cl__4_________...
DATE FREQUENCY CL A INJECT NO. 1                                                                    N                2          FREE mg/l* DISCHARGE INITI A L.9
                      ----- --..--____ .----__...--_-__--_ ..._O.                                                              ___.
CYCLE / DAY MIN / CYCLE                                        p/24 HR
                      .____ _________. ._..____....                                                                                                                    MAX                                        HOUR / DAY
                                                                                                            ......        .f/24
                                                                                                                            ...__. HR .____            AVG..___                                          .    ._______...
g,, I                                      , ..                  . . . _ . . .  - - - - - - .    .    - - - -                                                                                            '
                      ._ Us.. .__w..___                                                                                                                . - . -        . . . .                                  .      -
                                                                          ... ........__.__... .                            ._-__                  .__..        ._-__.                                      .....___...              _}_Q..._..
                    -Sbb,, L .      ....l...... ...b.l..._... . _il/[. . . .. W......                                                              . _. 2_ .0 50
                                                                                                                                                                                                              . f__.... l.&.....
                    .,h.mV...../......
W                                                                                                                                                                                                                  '
                                                                        .__6.0...... . . .A.'li. _.S.t.\M.. .            _.                      .. .a_u ..  .            . 50..... O.f ._.. 'h..).._..            ..            .
t .
1 ,fz.e                      l
                          .'                                            ._ f_c___ _.. _4./d_ _ _ _9tt                      .
                                                                                                                          .___..                  ...J.a
                                                                                                                                                        ..    .          .      .T._o.._ E ..... . . . .A !
                                                                                                                        .___... ...__                          ..____ ...........                                                      .(./...._..
O _M__
      >                                                                                                              .. ____._...___... ..___...... w. . . _ _ _ _' ,
VM                                                                                                                  LIMIT 0.20 0.50 2 HR/ DAY MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE d                                                                                                                                                                                                                                      .
                                          ,                                                                Page 2 of 2
          .                                                                                                                                                      62EV. SAM-002 0                                                        R00
 
                #  ~--g-n      ._
d' ''RELMdW" '
k L Wy+PWV                                              c:ac wx..R C
                                                                        't H L O R i u a. . r O N,
                                                                                              ..        0474 5
DATA PACKAGE 1 g                                                      (DATA SHEET 1)
WEEKLY UNIT yo.            ,
7....g.................... ..... CHLORINATORS                                  r-~~~---~~~~~~-~~~~~~~~~~~~----
Cl DATE FREQUENC Y CL                                      ..........        ...........g T    NO. 1                                        ............
              .....      _......... ....z ...... INJEC .........            NO.
CYCLE / DAY MIN
                                                                              ......2          FREE ng/l* DISCHARGE 1
INITIALS
            .....        ..........          ..../ CYCLE        #/24 HR f/24                AVC.f1 MAX i                                    .......  ........    .......HR. .....          .....
HOUR / DAY f1.h. .. . .l.i.hb
                                          ~
            -                                                                  ~
g.... ....gby _                                                    .......      ............        . . . . . . . . ,........A}
                                                                                                                                      . .~.
1I J.n' Ln. . .....f.....            ....{p0.........N......
                                                                              .......      ...........          ...... d Qc/
D,
                                                                                            . 0.D ......0*V                              iN
            ~~~~. ....4.
J.                        . . . .
                                                                                                                  ....W.......
                                                                                                                  . -s                  .......
                                                                                                                                      ./s
                                                                                                                  ......... ./.W.            . .; . . . .
_........~~.~~.....h
                                      ..............)..........                ......
LIMIT      0.20 0.50              2HR/DAY Wn.
o                                                                  i. . . . . . .<. . . . .!. . . . . .(.
MEASURED AT TOWER OVERFLOW DURING CHLORINATION l
t m
N      j m
Page 2 og g
                                                                                                    '''" cs"        an~  ~    ...                        t
 
h a f;=l&                                                                                                                            .
      , [aggg47
* 6
                                      -''&b-    ~-
d'                              CIRC WATER CHLORINATION DATA
: w. 'rsi n W- ,,> s; s ;m
              ' W 5Q y y .'u.a,oa..  ~;*,..*
DATA PACKAGE 1 SN.W.. E' .' u .'.
                                . T.
(DATA SHEET 1)
                  ..r.
                                                                                                                            )
F.e*
WEEKLY                                                      UNIT NO:          -
                                                                                                                                  ~
1                        ----_____-__-________-__-_----------_--________
                                          ,                ,,            CHLORINATORS                      Cl
_______________..__________________________                                      __________4_______ ____
DATE FREQUENCY CL t INJECT                              'NO .- 1      NO. 2 FREE mg/1* DISCHARGE INITIALS CYCLE /DAE MIN /CYCCE                  t/24 HR f/24 HR          AVG. MAX'
_  ' _ HOUR / DAY:
            .7).. .k ___t e____ .___________________                              _______  _____    ._____    ___________=_8A______
2.,_                                                                            .
m s
_7_-/W4_
19
___3%_____W            _ _ _ _ _ _ _ ..__________________________ _ _ _ _ ._            _________________~ ,.______
v tp p,                CV                      -
_ c __________                          .__________    ________________        _____    ______    _ _ _ _ _ _ _ _ _ _ ~ _______
___.__ _          _ _ _ _ _ _ _ _ _ .  . W_______      m_____________          _____    .________________              _________
n _______________..___________________ _______ _____                                              ________________ _________
( -
l-                                                                      ' LIMIT 0.20 0.50 2 HR/ DAY tw V
0 MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE t
t l
l 1
l l
l I
l                                                                        Page 2 of 2
* 62EV_ SAM-002-0              R00 l
l
 
              -mp-  W      '
z -
CIRC WATER CHLORINATION DATA n
(        ')                                                    DATA PACKAGE I
(/                                                            (DATA SHEET 1) h WEEKLY UNIT NO:            2 CHLORINATORS                          Cl
_______________.__________                  ________._______            __________g        ____________
DATE FREQUENCY CL t INJECT NO. 1                            NO. 2 FREE mg/l* DISCHARGE INITIAL
            .____ __________..__________________. _______ ______________________                                              ________S    _
CYCLE / DAY MIN / CYCLE        #/24 HR #/24 HR AVG. MAX                          HOUR / DAY 9 -blib_    -___ _____      .___b_O_________$_h___.. _20    ______
_5000
                                                                                                  . 50 pf          _ _ _L_)____
1ll21L.      _____I____ .___(2_0______ _ _N_ _b_ .__?_o                    _ __5000
                                                                                                . _. _5_0_ ____ B!_____
______          __                                  _    d_____
shijn                              &D.        DA          sw            .u        .n              x                  i
            .tb_,7/GL            ]_ _ _ _ .._ _ b_0      44          S'""            ''        s~            !              E
____        _~____>_        __.
                                                                  ~-    ~
____ _ _ _ _ _ _ _ _ _ _ ..__________ _________ ___~____                      .!_C.h.                    ___ _________
                                                                                                                      ~    ~
r/s                                                            LIMIT ' 0.20 0.50 2 HR/ DAY V                                                            _______.______________________________
MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE Page 2 of 2 62EV-SAM _002-0              R00                _
 
CIRC WATER CHLORINATION DATA DATA PACKAGE 1 (DATA SHEET 1) lI WEEKLY UNIT NO.
CHLORI                                      ...___........_-___.______
          .___,..._...____....____.                      _-_.......NATOR ..__._-___g, S                    Cl DATE      FREQUENCY CLg INJECT                                                                          ___ ___. ___
NO. 1                    2      FREE mg/l* DISCHARGE INITIALS
                                        .___.__.___      _____.__        . . _NO___.. .
CYCLE / DAY MIN / CYCLE                #/24 HR
_ __    .--....._.                                                          HR AVG. MAX                  HOUR / DAY
                                        ._.__._ __.      . _.__...          .f/24 O/n_.._ _-.__-_
        ._                _bcw ......__...              ___...._.                                                                        d
__..____=
6__h..      .___ n__ u____.      .___.______.        ..____. _-___._                                                        I ' __._
l                                                                  #**                                                ___  __.__.__.
      '_7f6_. . _ _ ). . . _ . .. .. .b_ _C.). . . . _ _D_ .0L
                                                              .....        _ __.      h_20. 3____
C. S'
                                                                                                        .__...    ..__[..__..$. h,.tl
: n.        . . _ _ . . _ _ _ .  ..__.._____    _.__..__.
                ...__-___. :.=== ---.__ ..._.....  ~
y....__
t      ...__ ______...._..._____..____ ....____                                      ____.__.____ ___._._. _%_ N_______
LIMIT          0.20 0.50 2 HR/ DAY MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE 4
Page 2 of 2 e
62EV-SAM-002-0              R00          ,
 
                      ,u-A w -svy+: a.
                              *c,,.,...                          SERVICE WATER CHLORINATION DATA
                                          -p-
                          .w
              ,      ET.9                                                        DATA PACKAGE 2 "M,",'n
      ~
                    .p.    .                                                      (DATA SHEET 2)
    &-                                  W5EKLY UNIT NO:
A                !
e CHLORINATORS                                Cl
          ...............y........
DATE FREQUENCY CLg INJECT 3...____.....        ... _.....      ..___.....x....__......
NO. 1        NO. 2      NO. 3 FREE                    DISCHARGE
    -      ..... .......... ........... ...__... ......... ....___ ..... .mg/l*                                                .....  ..__.......
CYCLE / DAY MIN /CYC'LE                          #/24 HR #/24 HR f/24 HR AVG.
          .....          ..........                . . . . . . . '. . . . ........                                                    HOUR / DAY
                                                                                          ......... ....... ..... ._ _...        MAX ........__.          .
14n %__        /sshaae. ...E.4.... ..P..o.e... ......... .. __..
                                                                                                                  ..JZ. . . .o_ _ _._J2.......
18b . . .& . . .                        ...........              ........ __ .____.    .... __    ..... __ ...    .....___
s
          .M..s...... n_..... __....._...                                    ..______    ____ ....    .......    ..._.    ......    ......... .
          .7/3){        ..    .00y-
                                                                                                                                      ...__. N 7p g,                W                          -
w                                                    .-                                      ....._. .....        ...... ________~
___.. .......... ......__... .w _ _                                                        --
                                                                                                                  ..... .......      h ...
(                                                                        LIMIT                                0.20 0.50            2 HR/ DAY MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE
        ** MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME l
l t                                                                                                                                                              i 8
i f
i                                                                                                                                                              i i
i Q
V r
l Page 2 of 2
  ,                                                                                                            62EV-SAM-002-0              R00
 
i_                                _
M M-f
          ..li gg  A P
SERVICE WATER CHLORINATION DATA DATA PACKAGE 2 (DATA SHEET 2) h            .
WEEKLY                                                                                  ?
UNIT NO:                -
CHLORINATOR 5                                        Cl
                  ...............,.......... ..................._- ..                                      --..----- x            .-- -...----
DATE FREQUENCY CLg INJECT                    NO. 1          NO. 2          NO. 3        FREE m
                  ..... .......... .....___...                ........ ..-_.-... ......- ---.-                        - g/1*
DISCHARGE CYCLE / DAY MIN / CYCLE        f/24 HR f/24 HR f/24 HR                      AVG.          MAX        HOUR
                .....        ..........      .....__....    ..__....        .__...... . ___..            .....      ......        ....../ DAY......
                -      R_
a    .@f. .* tov.... fJ...... 5      .J.D.O... . . .d.i
                                                                    .                ....    .A.W..... . .d.o. ..    .    .D.o. . ...    .......
9bg 3.lh.6      .....        ..  .. k. ...... ..A..U  ....    . . .A.S.I. . . . . .t.vd_ . . . . J.o. . . . .....
                ?.P f' .......4.                b
                                            ...........    .2.0o.... . J.V.S. . . . . .A..l'.f... .. d.o. . . D.o
                  .M.b.v'.  ... W....... .. &. ...... .. W....... . f.'A. . . . . . .#.}f. . . .W. . . ... &.... /..........
        ' . ~....          ..._......      ........      -              ......._.        ....... .....          ......        ........._.
N
              ..__. .......... ........... .... __.......... N........w                                                            ...........
f3            .................................................. .....
!    N                                                        LIMIT 0.20 0.50                  2 HR/ DAY s
    'O                                                      ..............................................
MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE
            ** MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME Page 2 of 2 62EV. SAM.002-0                        ROO
 
b --                  -
      =      "Y,                                          SERVICE WATER CHLORINATION DATA DATA PACKAGE 2 (DATA SHEET 2i
()
WEEKLY UNIT NO:
CHLORINATORS
                      ...............r.......... ........................                                ........C1,    ..~...........      .
DATE FREQUENCY CLg INJECT NO. 1                          NO. 2      NO    3      FREE mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE            1/24  HR  f/24  HR
                    ..... .......... ........... ........                                        HR AVG. MAX HOUR / DAY
                                                                              .........    .#/24
                    .YIb6. . . $.(.r:1) -
                          ...          . ...      ...........    ........  .........    .......      .....    ......  . . . . . . . .Y
                      .}4$ .'. ... W)    ....    ...........    ........  .........    \.......      .....    ......    ...........
9
                    . ./. . &. . . .O.lw                                                                                                ~_.
1 .M..I/O. ...d.p2.....
                    .d.                          ...........    ........ ....... ..
N                _
N          '
c,
(      -
LIMIT 0.20 0.50          2 HR/ DAY t........................ ..... ................
v MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CY
                  ** MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME 1
/        \
s_
4 Page 2 of 2 62EV-SAH-002-0              R00            .
 
      -x'      :n
                    ~
Y.
      '          ~
SERVICE WATER y    . ~ .i                                                                CHLORINATION DATA
        ,+%.      7 .
        ,+
DATA PACKAGE 2 lDATA SHEET 2)-
D
                                                . I                                                                                  ,
WEEKLY s
                                                      .                    .                      UNIT NO:        _ /1
* g..............r........r....... CHLORINATORS                                                    x
                      'DATE FREQUENCY CLg INJECT NO 1................. ......p,..Cl                                .............
NO. 2 .NO. 3 F                                          .
                                                                          ........... ........ ..REE            mg/1* DISCHARGE CYCLE / DAY MIN / CYCLE                                              .........          ..........      .
                    ..... .......... ..... .....                ..t/24  HR.........
                                                                    ......      f/24 HR f/24    HR AVG.                    HOUR / DAY
                                                                                            .......  .....    .. MAX
                    .7).f. d/ .l.m. .u.2 . . . _/f}. . . . .
                                                                  . .~4. 2. ..... ~..... ....... . .).5. . . 0. . . ...p.......
                    .7Af). .        114.... ........... ........                .........  .......  .....    ......      .......    . . [.
7.-l.W. .L. . .C. V. ..~.........
7
                  ./23. .fL. . ......  ,
                                          .%s
                                                                                                                      ~~ ........
5'.
                                                  ....~........ .......
7 k.li.c. ... W.......
                                                                                          ....... ..... ......          ....... N  ....
w            ........ ...........
  ,,            t........................... .......'....
< ('
LIMIT
                                                                                    ............. .....      . . .m: nnn.......
0.50
                                                              '.........................0.20 .................
2 HR/ DAY MEASURED AT POINT OF DISCHARGE TO RIVER DURING
                ** MEASURED AT SERVICE WATER DISCHARCI TO CIRC WATE Page 2 of 2 O                                                                                              62EV. SAM -002 -0            R00            g
 
      ;~
      .y ww av g.3
      %E                                                  SERVICE WATER CHLORItJ ATION D ATA DATA PACKAGE 2 (DATA SHEET 2) l w/
WEEKLY UtlIT tJO:                [
CHLORINATORS                                        Cl
                      .......................... ........................                                      ..........x        ........... .
DATE FREQUENCY CLg INJECT NO. I                          14 0 . 2        tJO . 3 FREE mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE
                                                                  #/24 HR f/24 HR f/24 HR                      AVG.        MAX      HOUR / DAY
                    .Ay ..f(s. .  .Co. .Y."l1.w.
                                              . . . /.% .''l.
                                                      .......  ..At*t" . . ./.fW
                                                                                                .gf.Y.... . $J ...=20 .../........
ft$.ca. .(h....w... . . ./. .'A. . . . . . .ds'o
                          ,                                        ......  . . st' y1. . . . . . A. .'d. . .. Jo. . . J. .o. . .../........
                    .&,..s&...cCf' .wew ....A..M......
                                                                . n....... . . .s w ..n..... x... ... u... .. x........
yOb7k's. . . $. W. . . .... .A..'A  ......  .. &..... . . . A. 'A. . . .. .A. './1. .
                                                                                    .                .        4."V.. ..
                                                                                                                .          W....    . /.........
                  . ....      .h            ........... ........
N
                  ..... .......... ....... ...                .h.                          . ....... ..... ...... ...........
vg              .......................... ........................ ..... ...... ........ m c,                                                        LIMIT                                        0.20 0.50              2 HR/ DAY t      i s                                                    ..............................................
MEASURED AT POIllT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE
* MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME 7~
s
  \
t/
62CV-SAM-002-0                  R00        j
 
_.,.m    .-
f          r.      'sc '
I.
* pe'
      . .; f ,i* }
4.*                                                    SERVICE WATER CHLORINATION DATA DATA PACKAGE 2 (DATA SHEET 2) t lgr                            WEEKLY UNIT NO:
CHLORINATORS                                Cl 4 7...............          .
                          'DATE FREQUENCY CLg INJECT NO. 1                        NO. 2    NO. 3 . FREE mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE        8/24 HR f/24 HR 1/24 H              AVG.        MAX
                                    .......... ...........          ........  .........  ......R .....
HOUR / DAY q.g/,9 ggi=
                                                        =
Ehn.. ...Of.W..... ...........
                                                                    ........    ......... .......      .....      ......      ........N  ...
                            ./7 /.4 .. 2. ./ ... _
                                                                                                              ^                      %_~
y fl ...Y..~.3 I-
                                                      ........... ........ .........    .......      .....      ......      ........N  . ..
    ---                . ..... ......... ........... ........ .........                  N....... --.            w.....      ...........
              . c .......................... ........................ .... ....... ..........
LIMIT                            o.20 o.50                2 HR/ DAY
        ,rh                                                      ..............................................
1          1
      \.
              )
MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCL C*
MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME m
xx        !
8 62Ev SAM.oo2.o                  Roo          I
 
Pcg2    1 of 9                                    ~
QUARTERLY OPERATIONAL N0HITORING REPORT Ceorgia Power Company O    Plant Hat c h P.O. Box 4545 At l ant a, Georgi a 30302 From: 10-01-86 To: 12-31-06 Permit Humber: GR004120 Discharge Location:001 A1 - Lou Volume Waste (Heutralizat ion Tank)
Type of Sample:      Grab                                                              '
Frequency of Analysis:          2/Mo Code:                      (530)                (550)            (408)
* Parameter:              Suspended Solids    Oil & Grease            pH mg/l                ag/l Limits:                    Avg. 30              Avg. 15          Min. 6.0 Max. 100            Max. 20          Max. 9.0 Date 10-06-06                      2.0                2.51            0.2 10-20-06                      1.4                1.0              0.5 11-03-06                      2.0                0                6.0 11-16-06                      15.5                0                7.1
* 12-01-06                        0                  3.41            0.6 12-14-06                        35.9                0.9              7.2            ,
O  Number of Samples:
Average Value:
Maximum Value:
6 9.47 35.90 6
1.30 3.41 6
7.73 0.60 Minimum Value:                0.00                0.00              6.00 Limits Exceeded:                0                    0                0 t
i 1
a 1
i f
r iO i
1 ,
 
                                                                                                          .g..    .-          ..
4 Page    2 of 9                                        i QUARTERLY OPERRT10HHLJ MONITORINO REPORT Georgia Power Company                                                                          From: 10-01-86 Plant Hatch                                                                                          To: 12-31-06 P.O. Box 4545 At lant a, Georgi a 30302                                                            Permit !! umber: GR004120 Discharge Locationh001M2 Low Volume Waste-(Pressure Filters)
Type of Sample: ' Grab Frequency of Analysis:              1/qte                                                                                          -
Code:                            (530)                          (556F                    <400)
Parameter:              Suspended Solids                  Oil & Grease                      pH mg/l                            ag/l i
Limits:                          Avg. 30                        Rug. 15                  Min.' 6.0 max. 188                        Max.'20                  Max. 9.O Date                                '
11-03-06            (R)            1.3                            (5                        7.0 11-03-06            (3)            5.2                            (5                        7.4 11-03-06            (C) .          3.4                            (5                        U.4 11-03-06            (D)            4.0                            <5                        0.6 Number of Samples:                    4                              4  '
4 t,
Average Yalue:                      3.60                        < 5. 00      -
7.93 Maximum Yalue:                      5.20                        a.a.t.                      0.00                                      j Minimum Value:                      1.30                        '5.00
                                                                      .                          7.00 Limits Exceeded:                      0                              0                        0 s
t e          e
                                                                        +
l i                                                                                                    4
                                                                                                          \
r
                                                                                      ' I O
m
 
O                                                                                          .
Pcge' 3 of 9 QUARTERLY OPERATIONAL MONITORING REPORT I
Gecqola Pouer Company Plant Hat c h .                                                                                                                                      From: 10-01-86 P.O. Box 4545                                                                                                                                              To: 12-31-86 Rtlanta, Georgia 3B302 Permit Number: CR004120 Discharge Locatlon:001B - Cooling Tower Blowdown Locasion:                                                                Intake          Mixing Zone Type Sample:                                                                                                                                    Delta T In Situ            In Situ Frequency:                                                                1/wk.                                                                Calculated 1/wk.
Parameter:                                                                                                                                          1/wk.
Temp. Deg. F            Temp. Deg. F                                      Temp. Deg. F Limits:                                                  Max of 90 Deg. F Code:                                                                      (11)
Max of 90 Deg. F                                    Delta T of 5 Deg. F (11)                                              (18)
:  .                        Date
.i 1-19-03-96                                                                    84                  84 10-09-0G 0
'                                                                                                        79                  79 10-15-86                                                                                                                                                e 73                  73 c                10-23-96                                                                                                                                                0 64                  64 18 .9,9-86                                                                                                                                            0 60                  68 11-07-86                                                                                                                                                e 78                  70
                            !!-12-86                                                                                                                                                e
                        ,                                                                              72                  72 11-19-06                                                                                                                                                0 64                  64 11-26-86                                                                                                                                                0 64                  64 12-05-06                                                                                                                                                0 55                  55 12-11-06'                                                                                                                                                9 57                  57 12-17-06                                                                                                                                                9 54                  54 12-24-65                                                                                                                                                8 52                  52                                                    8 Ho. of Savole:                                                              13                  13                                                  13 Average Vatue:                                                              66                  66 Maximum Yalue:                                                                                                                                        9.90 84                  84 Minimum Value:                                                                                                                                        0.00 52                  52
, s
                        'Duer Limits:                                                                                                                                            8.00
          ,                                                                                              8                  9                                                  e I
.      :/          ,
i      s 4
l 1
                              /
l 1
i I
e I
i 9
_  _-._-._.]      .__. ___. ____.. _ -.__,__. ,._,__._._. .__. _ _ - . _ _ . _ _ _ _                  .                - , . _ . _ _ _ _ _ _ _ _ - - _
                                                                                                                                                                                      ..__..._.__..____.v
 
Page    4 of 9                                                                                                &*
OURRTERLY OPERATIONAL NONITORING REPORT j    Georgia Power Company                                                                      From: 10 01-86 Plant Hatch                                                                                  To: 12-31-86 P.O. Box 4545 N            At l ant a, Georgi a 30302                                                  Permit Number: GR004120 Discharge Location:001B - Cooling Tower Blowdown Type Sample:              pH Grab                          2n Grab                            Cr Grab Frequency:                  2/Mo.                            1/qtr                              1/qtr            ,
Limits:                  Min. 6.0 Max. 9.0                          Max. 1.0                              Max 0.2 N  Unit 1    Unit 2            Unit 1          Unit 2                Unit 1      Unit 2 Code:                        (408)                            (1992)                              (1934)
Date 10-06-86                                              <0.1            +                    (0.1
* 10-06-86                8.1      7.7 10-20-86                7.4      7.5                                              t 11-03-8G                8.6      8.2 11-17-86                7.5      7.5 12-01-86                6.9      7.5
          . 12-15-86                7.2      7.2 s
No. of Samples:          6        6                    1              1                    1            1 g  Average Value :          7.62      7.60              < .10              0.00                <.10          0.00 Maxizum Value :          8.60      8.20              <;. 1 0            8.90              < .10          8.90 Maximum Value :          6.90      7.20            .< .10      g      0.00              < .10          0.00 Over Limits :            0        0                    e          s    0                    0            0 N
* Unit 2 Shutdown m
e
  \
                                                                                                            \
s O-                                                                                                                    .
h
 
Pege    5 of 9                                                                    y' QUARTERLY OPERATIONAL MONITORING REPORT
  /~'    Georgia Power Company                                            From: 10-01-86 Plant Hat c h                                                        To: 12-31-86 P.O. Box 4545                      -
Atlanta, Georgia 30302                                    Permit Number: GR004120 Discharge Location:001D - Liquid Radwaste System Unit One Type of Sample:    Grab Frequency of Analysis:    2/Mo Code:                    (530)                (550)            (400)
Parameter:            Suspended Solids      Oil & Grease          pH mg/l                mg/l Limits:                  Aug. 30              Avg. 15          Min. 6.0 Max. 100            Max. 20          Max. 9.0 Date 10-06-86                    3.0                    0.0            6.6 10-19-86                    1.0                    0.56          6.1
      . 11-03-86                    0.75                  9.0            6.4 11-17-86                    2.0                  0.38            6.0 11-30-86                    1.6                  0.6            9.0 12-15-86                    21                    0.0            6.4 Humber of Samples:          6                      6              6 l        Average Value:              4.89                  1.76            6.75 I
Maximum Value:            21.00                  9.00            9.00 i
Minimum Value:              .75                  0.00            6.00 Limits Exceeded:              0                      0              0 l-t                                                                      .
l t
a
 
Pc.ge 6 of 9                                                                        .
QUARTERLY OPERATIONAL MONITORING REPORT
    \      Geopgia Pouer Company d        P1 ant Hatch                                                          From: 10-01-86 P.O. Box 4545                                                          To: 12-31-86 AtIansa, Georgia 30302 Permit Number: GR004120 Discharge Location:001D - Liquid Raduaste System Unit      Tuo Type of Sample:    Grab Frequency of Analysis:      2/Mo Code:                    (530)                (550)            (400)
Parameter:          Suspended Solids      Oil & Grease            pH mg/l                  ag/l Limits:                  Aug. 30              Avg. 15          Min. 6.0 Max. 100            Max. 20          Max. 9.0 Date 10-08-86                    2.4 10-20-86                                          0.0              6.1 0.2                  1.02 11-03-86                    1.5                                    6.4 11-17-86                                          6.6              6.6 2.0                  0.0 12-01-86                    2.4 7.8 12-15-86                                          0.2              6.0 2.0                    0.0              6.5 O      Humber of' Samples:
Average Value:
6 1.75 6                6 Maximum Value:.                                  1.30              6.57 2.40                  6.60 Minimum Value:                .20                                  7.80 0.00 Limits Exceeded:              0                      0 6.00 0
V i
O h
 
6 Page      7 of 9 QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company                                                From: 10-01-86 Plant Hat c h                                                          To: 12-31-86 P.O. Box 4545 At l ant a, Georgi a 30302                                  Permit Number: GA004120 Discharge Location:001E - Combined Plant Waste Unit One Frequency cf Analysis:        1/wk.
                    ~
Type of Sample:                  In Situ        Grab        Grab          Grab Parameter:                    Temperature    T.R.C.      F.A.C.          pH Limits:~                          Deg. F          N/A          N/A      Min. 6.0 Max. 9.0 Code:                              (11)      (50060)      (50064)        (408)
Date 10-01-86                            *          <.1          <.1          7.7 10-03-86                            89          *            *
* 10-08-86                            *          <.1          <.1          8.3 10-09-86                            87          *            *
* 10-15-86                            80          <.1          <.1          8.5 10-22-86                            *          (.1          <.1          8.0 10-23-86                            67          *            *
* 10-29-86                            82          <.1          <.1          7.9
    '11-05-86                            *          <.1          <.1          8.2 11-07-86                            87          *            *
* g    11-12-86                            87          <.1          <.1          7.9 11-19-86                              80          <.1          <.1          7.7 11-26-86                            88          <.1          <.1          7.4 12-03-86                            78          <.1          <.1          7.6 12-10-06                              *          (.1          <.1          7.1 12-11-06                              89          <.1          <.1          7.5 12-17-86                            80          *            *
* 12-24-86                            79          (.1          <.1          6.7 Humber of Samples:                  13            13          13          13 Average Value:                      82.54        <.10        <.10          7.73 Maximum Value:                      89.00        < .10        c.10          8.50 Minimum Value:                      67.80        <. 10          4.le        6.70 Limits Exceeded:                      0            0            0          0
        *No data required O
 
Page          8 of 9 1
QUARTERLY OPERATIONAL MONITORING REPORT
()
n Georgia Pouer Company Plant Hat c h                                                                                                              From: 10-01-86 To: 12-31-86 P.O. Box 4545 At lanta, Georgia 30302 Permit Humber: GA004120 Discharge Locat ion:001E - Combined Plant Waste Unit Tuo Frequency of Analysis:                                              1/uk.
Type of Sample:                                                        In Situ            Grab            Grab Parameter:                                                                                                                        Grab Temperat ure        T.R.C.          F.R.C.                  pH Limits:                                                                  Deg. F              H/R              N/A              Min. 6.0 Code:                                                                                                                          Max. 9.0 (11)          (50060)          (50064)                (400)
Date 10-01-86                                                                    *                <.1              <.1                  7.5 10-03-86                                                                    85              *                *
* 10-08-86                                                                    *                (.1              <.1 10-09-86                                                                                                                            7.7 81              *                *
* 10-15-86                                                                    78              <.1 10-22-86
                                                                                                                              <.1
* 8. 0
                                                                                            *                <.1            <.1                  7.8 10-23-86                                                                    82              *                *
* 10-29-86                                                                    69              <.1              (.1 11-02-86                                                                                                                            8.0 71              *                *
* 11-05-86                                                                    *                (.1              <.1                  8.0 i    11-12-86                                                                    75              <.1              <.1                  7.7 11-19-86 66              <.1              <.1                  7.5 11-26-86                                                                    68              <.1              <.1                  7.3 12-03-86                                                                    75              <.1              <.1                  7.3 12-19-86                                                                    *                <.1              <.1 12-11-86                                                                                                                          6.9 68              *                *
* 12-17-86                                                                    69              <.1              <.1 12-24-86                                                                                                                            7.2 78              <.1              <.1                  6.8 Number of Samples:                                                          13                13              13                13 Rverage Value:                                                            74.23              <c.10            .c.10                7.52 Maximum Value:                                                            85.00              < .10          at.10                8.00 Minimum Value:                                                            66.00              ac.10          <t .10                6.80 Limits Exceeded:                                                              0                  0  ,
0                0
                      *No data required O
 
Pcge c9 of 9                                                                                                  E
                                              -QUARTERLY OPERATIONRL MONITORING REPORT
/'')
w,/
Georgia Power Company Plant Hatch                                                                                    From: 10-01-86 P.O. Box 4545                                                                                    To: 12-31-86
  ;        RtIanta Georgia 30302 Permit Number: GA004120 I certify under the penalty of law that this document and all attachments were prepared to    assure under  that      the direction of supervision in accordance with a system designed submitted.                    qualified personnel properly gather and evaluate the information or those persons        Based on my inquiry of the person or persons who manage the system information                      directly is toresponsible  the best offor  gathering the information the and      complete.submitted  I am aware that there are significant    my  knowledge and belief true, accurate false violations. information including the possibility of fine and imprisonmentpenalties for submitting for knowing t
O H. C. Nix General Manager
      ,,,me,_.***F.            * " ' "
O
 
l i
QUARTERLY' OPERATIONAL MONITORING, REPORT ADDITIONAL MONITORING O            Georgia Power Company
* From:                  '10-01-86 Plant Hatch                                                                            ,
To:        12-31-86 P. O. Box 4545                                                                          '-                                                                                                -
Atlanta, Georgia                                30302                                                          Permit Number
* GA0004120            '
Discharge Location:                                    001D - Liquid Radwaste System Unit 1 Type of Sample:                        Grab Frequency of Analysis:                                      Each B.atch                                                                                          ,
Code:                                    (400)                                                Code:                                                                                (400)
Param'e t er : .                            pH                                                Parameter:                                                                              pH
                                        . pH Units                                                                                                                                              - pH Units Limits:                      Min. 6.0                                                          Limits:                                                                            Min. 6.0 Max. 9.0                                                                                                                                              Max. 9.0 Date                                                                                            Date I
l0-01      6.5,        6.4, 6.7, 7.1                                                          -
10-17      6.5,        6.4,        6.8,                        6.3 10-02      6.5, 6.2, 6.3                                                                          10-18      6.4,        6.2,        6.2,                        6.7, 7.6 10-03      6.4, 7.2, 6.4, 6.8, 6.4                                                                10-19      6.8,        6.6,        6.6,                        6.1 i              10-04      6.5, 6.7, 6.3, 7.3                                                                    10-20      6.9,        7.0,        6.2 t>. 6. 6. 6, e.3, 6. 7                                                                10-21      6.7,        7.0,        6.5,                        7.9 i              10-05 10-06      6.7,      6.6,              6.4,      6.7 6.4                                        10-22      7.4,        6.6,        6.6,                        6.8, 6.7 10-07      6.2,      6.8,              7.0,      6.7                                            10-23      6.5,        6.4,        6.4,                        6.4, 6.7 10-08      6.0,      6.8,              6.6,      6.9                                            10-24      6.4,        6.6,        6.7,                        6.6                -
10-09      8.1,      7.6,              6.6,      6.4, 6.8, 6.7                                  10-25      6.1,        6.3 10-10      6.2,      6.6,              6.4,      6.1, 7.2, 6.6                                  10-26      6.4,        6.0,        6.5,                        6.6,          6.9 10-11    6.1,      6.0,              6.3,    6.8                                            10-27      6.7,        6.5,        6.4,                        6.6,          6.2, 6.7
,                10-12    6.0,      6.6,              6.6,      6.1, 6.6, 6.7                                  10-28      7.1,        6.5,        6.0,                        6.8,          6.2, 6.7 10-13      6.0,      6.6,              6.7,      7.3                                            10-29      6.5,        6.7,        6.1,                        6.0,          6.4, 6.6 10-14    7.2,      6.6,            7.2                                                      10-30      6.2,        6.7,        6.3 10-15    6.6,      6.1                                                                        10-31      6.2,        6.4,        6.6,                        6.4 10-16    6.8,      6.1,            6.0 6.5, 6.2 l
l i
O j                                                                                                                                                                                                          -
  , - _ . . , .---,L.
 
                                                                      -                              .      =.        . . =                  _ = _.                                                                      .
QUARTERLY OPERATION L MONITORING REPORT                                                                                            -
ADDITIONAL MONITORINO T      Georgia Power Company                                                                                                                                                        From:            10-01-86 Plant Hatch ~                                                                                                        .                                                          To:            12-31-86              '
P. O. Box 4545                                                                                                      '-
A t l a,n t a , Georgia. 30302                                                                                                                                  Permit Number: ,GA0004120 Dis, charge Location:                                  001D - Liquid Radwaste System Unit 1 Type of Sample:                Grab                                        '
Frequency of Analysis:                                                  Each Batch Code:                                                                (400)                                                              Code:                                                  (400)
Parameter:                                                                pH                                                            Parameter:                                                      pH pH Units                                                                                                                      pH Units                    .
Limits:                                                  Min. 6.0                                                                        Limits:                                        Min. 6.0 Max. 9.0                                                                                                                      Max. 90 Date                                                                                                                                  Date Il-01              6.6,                    6.5,                    6.5                                                                  11-16              6.4 11-02              6.6,                    6.4,                    6.3, 6.2, 6.4                                                        11-17              6.0,  6.2 11-03              6.4,                    6.5,                    6.4, 8.1                                                            11-18              6.2,  6.0,  6.1 s        11-04              6.3,                    6.5,                    6.4, 6.5, 7.4                                                        11-19              7.1,  6.0,  6.3 11-05              6.9,                    6.6                                                                                          11-20              6.1,  6.3,  6.1 11-06              6.0,                    6.5,                    6.3,      6.4                                                      11-21              6.0,  6.1 11-07              6.0,                    6.3,                    6.8.      6.7, 7.1                                                  11-22              6.0,  6.0,  6.1, 6.0, 7.5, 6.0 11-08              7.1,                    6.8,                    7.0,      6.3                                                      11-23              6.0,  6.0
,              11-09              6.2,                    6.3,                    6.2                                                                  11-24              6.0 11-10              6.8,                    6.4,                    6.5,      6.8, 6.4, 6.2                                            11-25              6.1 11-11              6.2,                    6.3                                                                                          11-26              7.9,  6.5,  6.1, 6.2, 6.5 11-12              6.5,                    6.5,                    7.0                                                                  11-27              8.4,  6.2 11-13              6.2,                    6.8,                    6.6                                                                  11-28              6.7,  7.4,  6.0 11-14              7.0,                    6.3                                                                                          11-29              8.5,  6.1,  6.2                                .
11-15              6.7,                    6.3,                    6.4                                                                11-30                6.9,  8.2,  6.4, 9.0 l
3 O
 
QUARTERLY OPERATIONAL MONITORINO REPORT ADDITIONAL MONITORINO pm      .
I    i Georgia Power Company                                                                          -
From:        10-01-86 Plant Hatch *                                                                            .
To:        12-31-86 P. O. Box 4545                                                                            '-
Atlanta, Georgia                        30302                                                                            Permit Number:                  OA0004120 Discharge Location:                        001D - Liquid Radwaste System Unit.1
* Type of Sample:                      Grab Frequency of Analysis:                          Each Batch
* Code:                      (400)                                                                    Code:                                              (400)
Parameter:                  pH                                                                      Parameter:                                            pH
                                  .pH Units                                                                                                                    pH Units Limits:                  Min. 6.0                                                                    Limits:                                        Min. 6.0 Max. 90                                                                                                                      Max. 9.0 Date                                                                                                Date 15-01    6.5,        6.6, 6.3                                                                      12-17          6.4, 6.6 12-02    6.0,        6.8,  7.9                                                                    12-18          6.1
      . 12-03    6.0,        6.2                                                                          12-19          6.1
.        12-04    6.2,        6.5,  6.4, 7.3, 6.7                                                          12-20          6.3 12-05    6.9,        6.2,  6.3, 6.2                                                                12-21          6.3 12-06    6.3,        6.3,  6.1                                                                    12-22          7.1, 6.1 12-07    6.2,        6.8,  6.0                                                                    12-23          6.7, 6.9 c12-08    -                                                                                          12-24          6.1, 6.9 12-09      7.1, 6.1                                                                                  12-25        6.0 12-10  6.6                                                                                          12-26        6.1 12-11    7.0, 6.3                                                                                *12-27          -
12-12      6.4, 6.2                                                                                  12-28        7.2 12-13  6.2                                                                                          12-29        6.7, 6.5 12-14      6.0                                                                                      12-30        6.3, 6.1 12-15      6.4, 7.0                                                                                *12-31          -              ,
12-16  6.7
          *No discharge made on this day.
3 O
            =_ --. __ . - _ _          . . _ _ , - . . . - _ , - . - - .  . _ . . , _ , - - , _        .      - . . .    -- -    - - _ . - - , _      .,    ,r  -  , - . _ _ - - - - - - - -
 
QUARTERLY OPERATIONAL MONITORING REPORT                                                                ,
ADDITIONAL MONITORING                                                                          .-
      -Georgia,. Power Company                                                                              From:  10-01-86 12-31-86 Plant Hatch                                                                                          To:
P. O. Box 4545                                                        l.
Atlanta, Georgia        30302~                                                      Permit Number:        GA00.04120 l
Discharge Location:    001D - Liquid Radwaste System Unit 2  '
Type of Sample:    Grab Frequency of Analysis:    Each Batch                      .
Code:              (400)                                              Code:          .
(400)
Parameter:          pH                                                Parameter:                            pH pH Units                                                                                pH Units Limits:          Min. 6.0                                            Limits:                            Min. 6.0 Max. 9.0                                                                                Max. 9.0 Date                                                              Date 10-01  6.0, 6.1, 6.2                                                10-17          6.4, 6.1 10-02  7.6                                                    *10-18            -
10-03  6.3, 6.3, 6.7                                          *10-19            -
10-04  -                                                            10-20        6.4
    $)10-05 010-06 6.7 10-21 10-22 6.0 7.3, 6.2, 6.3
    *10-07  -                                                            10-23          6.4, 6.1 10-08  6.1                                                    *10-24              -
10-09  6.2                                                          10-25 6.5 10-10  6.1                                                    *10-26              -
10-11  6.2, 6.9                                                    10-27          7.5, 6.4 10-12  6.6, 6.2                                                    10-28          6.3, 6.7 10-13  6.4                                                    *10-29              -
10-14  6.0, 7.3                                                *10-30              -                                                .-
10-15    6.4, 6.5                                                    10-31          6.5, 6.5 10-16    6.2                                                                                .
      *No discharge made on this day.
O e
 
QUARTERLY OPERATIONAL MONITORING REPORT ADDITIONAL MONITORING                                        ,
Georgia Power Company              -
From:    10-01-86 Plant Hatch      -
                                                        ,                                      To:    12-31-86 V '.        O. Box 4545                              '-
Atlanta, Georgia      30302                                        Permit Number:          GA0004120 Discharge Location:    001D,- Liquid Radwaste System Unit 2. -
Type of Sample:    Grab Frequency of Analysis:    Each Batch Code:              (400)                            Code::                                  (400)
Parameter:          pH                              Parameter:                                        pH pH Units                                                                    pH Units Limits:        Min. 6.0                              Limits:                              Min. 6.0 Max. 90                                                                    Max. 9.0 Dnte                                                Date 11-01  6.2                                            11-16    6.1,    6.7,  6.0 011-02  -                              -
11-17    7.8,    7.5,  6.2, 7.2 11-03  6.6, 6.4                                      11-18    7.0,    6.2, 6.1 11-04  6.6                                            11-19    7.3,    7.2 11-05  7.0                                          11-20    7.3,    7.3,  7.3, 7.7 hl-06 w;ll-07 6.4, 6.4, 6.2 6.1, 7.3, 6.2 11-21 11-22 7.6 6.4 11-08 6.3                                            11-23    7.3, 7.4
      *11-09  -
11-24    7.0
      *11-10  -
11-25    8.2, 6.1 11-11  6.0                                          11-26    7.6 11-12  6.1, 8.9                                      11-27    7.9 11-13  5.9, 6.1, 7.3                                11-28    6.8 11-14  6.6                                          11-29    7.4 11-15  6.5, 6.7                                    *11-30    -
        *No discharge made on this day.
I e
O
 
QUARTERLY OPERATIONAL MONITORING REPORT                                                                                        -
ADDITIONAL MONITORING 1
Georgia, Power Company                                                                                                          From:        10-01-86
  ~ Q Plant            Hatch
                                                                                                                                                                        ~
To:      12-31-86 P. O.      Box 4545                                                            .
Atlanta, Georgia                      30302                                                                    Permit Number:                GA0004120 Discharge Location:                    001D - Liquid Radwaste System Unit 2.
Type of Sample:                  Grab Frequency of Analysis:                            Each Batgh Code:                          (400)                                                                Code::                                    (400)
Parameter:                      pH                                                                  Parameter:                                    pH p.H Units                                                                                                    pH Units Limits:                      Min. 6.0                                                                Limits:                              Min. 6.0                          ,
Max. 9.0                                                                                                      Max. 90 Date                                                                                                  Date 12-D1 6.0                                                                                              12-17      6.0, 6.1 12-02            6.0,        6.7,  6.5,  6.4                                                        12-18      6.0,  6.5 12-03            6.1,        6.1,  6.5                                                              12-19      6.1,  7.2 8.9,        6.6,  6.5                                                                12-20      6.0,  6.3 C12-04 32-05 12-06 6.6.
6.1, 7.5, 6.0, 6.6, 6.5, 6.3 6.8 12-21 12-22 7.2, 6.1, 7.2, 7.4, 7.2 6.0, 7.0 12-07            8.2,        6.8,  6.9,  7.0, 6.9,, 6.4, 6.1                                        12-23 7.5 12-08            6.1,        7.3                                                                  *12-24          -
12-09            6.0,        6.8,  7.6                                                          *12-25          -
12-10            6.9,        8.7,  6.7, 6.1                                                    *12-26          -
12-11            6.2,        7.3                                                                      12-27      6.0 12-12          6.6,        6.0,  6.3, 8.6                                                    *12-28          -
12-13          6.0                                                                              *12-29          -
12-14          6.5, 6.6, 7.9, 7.1, 6.5                                                          *12-30          -
12-15          6.5, 8.4, 6.5                                                                        12-31 8.1 12-16          6.5, 8.5, 6.0                                                                                                  ~
              *No discharge made on this day.
3 g
 
h ,-          f=*
g
          , MEl*n
          ;NIV                                                      CIRC WATER CHLORINATION DATA
          .T''.t
        .'v.
DATA PACKAGE 1 (DATA SHEET 1)
WEEKLY                                                                        UNIT NO:                    [
CHLORINATORS                              Clg DATE FREQUENCY CL 1 INJECT                                  NO. 1          NO. 2            FREE mg/1* DISCHARGE INITIALS                                      -
CYCLE / DAY MIN / CYCLE                      #/24 HR f/24 HR AVG. MAX                                HOUR / DAY g.g _ _ _(--_ _(q ) .____      _    . . . _ -    _.. _ . . . - -
_ _ o_ T _ _ _
s
_fo-ps_ _ _ _ _l h
______0______        _ ______________
_ _J_o  __
ao W            _ ,.h$
(        ____
_ic_u _im__ _ _ _ _ _l    _ _ _ _ .  .___6__0_____      _________        _Q_c_o___ . _. po_ _. _. _f_o_ __ _ ______
_                                  _f_ _f _
V' N  ______
_ _._-n_ _              /
_ _ _ _ _ _ _ _ _ _ . .__A'O_____ _ _ - _ _ _ _ _ _ __ T_O_(p_ .t_
_ _6_2 _ __.22______O________W_______
edO______[____ ._ _.6.0
                                                                                              @ 0 12          ellt        .2A            0                  W
                \          _s
                                                      ..,_________      _________        _s_ _            .____      . _ _ _. _ _ _ _ _ _ _ _ _ N_ _ ,    _________
p, ,
_N________
    '/                                                                                      LIMIT            0.20      0.50        2 HR/ DAY e
            '      )
            'd MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE 1
1 I
l l
l l
l I
l l
l 1
t i {}
l r        4 V                            '
s 1
    ,                                                                                                                      62EV-SAM-002-0                    R00
 
                                                                                                                                                                                \
w e q,-4Et.M '-                                                                                                                                                    -~1 xW G7;-.*
ea            %-  ,                                                                                                                                              I
        -e                  -
    &#'* e* *g          E 1%;,t., _'A . .
i I
CIRC WATER CHLOR 1tJ ATION DATA
    ,-r?M, einge # *%                                                                                                                                                                l DATA PACKAGE 1                                                                                  i (DATA SHEET 1)                                                    -
WEEKLY                                                                          UNIT NO:                f CHLORINATORS
__________g        Cl DATE FREQUENCY CL t INJECT                        NO. 1            NO. 2            FREE mg/l* DISCHARGE INITIALS CYCLE / DAY MIN / CYCLE              f/24 HR f/24 HR                    AVG. MAX                  HOUR / DAY
_l.4.12____L_____ .___.5_0_____                  _________          _4_ _&n_ __J_d
_ _ ._,l0__ _ _ _ _ l _ _ _ _ ,__ _7/_.,_f_                g. _
1I./M,.        w,-                          -
                                                                                                                                                                ,s      i
                  //.;ag          (p)      <
                                                                                                                                                                  ' x.
kmi_ _ _ _ .I_ _ _ _ _ _ ..____60______ _ " _yocca__ _a20_ . _._yo_ _____l________ H.______
l                                                                                                                                          _________
s                                                                          LIMIT            0.20        0.50          2 HR/ DAY MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE h 0{ f                  020k &$                  '
                                                                                  .PY b5 Mb h N Ql ch.
: g.                                                                          .
I 1
\
l l
l l
t(
Page 2 of 2 62EV-SAM-002-0                R00
 
nv.:4. :.                                                                                            .
i.n.          , tW.h,.t)        *
: y. e                                                                                                                                    .
  /3.Sht/,<
CIRC WATER CHLORINATION DATA
  %r:a
  ''~
        .- v:                                                                                                                    .
DATA PACKAGE 1 (DATA SHEET 1)                                            '
ss
('v        /
WEEKLY                                                                UNIT NO:
CHLORINATORS                        Cl
              -_-_--___-__-_.                -__---_-__---___--___----_                        _--_----- 4        -----__-_ -_
DATE FREQUENCY CL t INJECT                              NO. 1        NO. 2        FREE mg/l* DISCHARGE INITIALS                                ,
CYCLE / DAY MIN / CYCLE                  #/24 HR f/24 HR AVG. MAX                          HOUR / DAY W4_C- ---_]_-___                __ hf)      -__-_____-____            _4.3.0_0_ _2_
                                                                                          -      - _6____'_ --?_O --_.0._-_--_ _Q'_C,.l_'i_lt '_        -
par'                                fn
_l
                                                                                    %Gn        .dD        . :3 0          .O          L',.U---___
_12_-K1_      _  - _ - .]_ _ _ - _ .._-6.Q--__-_    _ ~___-___ y]_00__ _1_2A __ _> _20- ____Q__-_-
                                                                                        -                                          _  _ Z_^.6" - - _ _
p_qg-_ _ - - }- _ _ _ _ ..              h  C) 4 --_.
_-_2co          ,                          O            d I
                                                ---__--_        ______--_                    . _2 0_ . ._.----
                                                                                                    -          2o    __-__ _----      - ,-___
                          . _ _ _ , _ ~      _ _ . . . _ .
LIMIT      0.20      0.50        2 HR/ DAY o
MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE Page 2 of 2 62EV-SAM-002-0              R00
 
                                                                                                                                                                                                            .N 01 lY;@_k^
7                                                                                                                                                                      -
CIPC WATER CHLORINATION DATA                                                                                                              .
DATA PACKAGE 1 I                                                      (DATA SHEET 1) h                      WEEKLY                                                                  UNIT NO:                    --b CHLORINATORS
                                                                  ----------------          ---------Cl g              ------------
DATE FREQUENCY CL 3. INJECT                        NO. 1        NO. 2        FREE mg/l* DISCHARGE INITIA
              ---_- ----------              --_----------------- -------                    - - - - - - - - - - - - - - - - - - - - - -                      ------LS                    --
CYCLE / DAY MIN / CYCLE              t/24 HR f/24 HR            AVG. MAX                      HOUR / DAY
_IA' .p
_&.=[ fG_    _-----          , Cg , y D    -x w  ,_'h1g.u.,au. _-_--_-          - - ~ _ ~. ~
_ * ' _ - - ~ . - - - _ -- _-.
              -f_/] /g ---_ --[u L.{.w--<~_&Q-i z                  gu                                                                          '                          4;
            /_vn&. ....--
                --              6l5_k_5,,-__i 9- _f-epszt___-
jQ..og --
                            -----  g. .. -_. 4-- ..A.. .f:.1.9. . _          .--....      ........ ..
                                                                                                                        ..........?%
e yL{og,. . . . . . .c+.f.5 t--o J... 3.%. .*pq ..      .......      . .........                  ...... 7      ..._
N
            - - \-j- - - _'- -- / ...-- ._ \--                                '
                                                                                                        \--..__-        ... ----..... - -----
                                                                                                                                                          ---\
    %          (
s LIMIT        0.20 0.50                    2 HR/ DAY MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE Q
i
'                                '                                    Page 2 of 2 e                                                                                                      62EV-SAM-002-0                                    R00
 
w-                  .      .    .
                                                                                                                                                              . ~l p.w?,;H;.m.;m
          -. .                    b
                                                                                              .-                                                                M
      ;t.a,._.:._. s%        r.,
d.7,-ATL  .,v s-, . - .. , .+:,s, n,
y w.tS ' .c-)        -
CIRC WATER Ci!LORINATION DATA T<fcFig * ''
    '''WV                                                      DATA FACKAGE 1 (DATA SHEET 1)
                                                                                                                              ~~)
WEEKLY                                                            UNIT NO:              t__
CHLORINATORS
__________g        Cl DATE FREQUENCY CL E INJECT NO. 1                          NO. 2 FREE mg/l* DISCHARGE INITIALS                                              -
CYCLE / DAY MIN / CYCLE      #/24 HR f/24 HR AVG. MAX                                  HOUR / DAY
_lt_-7_9z_Q(5- _ _%__. _!  _ _ _ _of_ _ _)__L_ _ _s_tc,/ u_rP_fk?_
                                                                      -          -_    -            ._____- _c"%_    _ __,.c_ _ ___/__C_____
                                                                                                                                      '2_ _ _ ~          . >
st_o_ns      .      Jeos w~ .R                  '    ie.z_C.%_
                                                                            /                  I _..___-__-____-____
                                                                                                                            -+      __-_'      ____
                                                                                                                                                        'V
            -ll_E/_) $$,                                                                            ~ ~ ~        ~
_-      _ _h_L _/_ _ _ _' _. _                                                                                    _ _ _'_(
                                          .$__1_3'.___Cb____
g              ,
_ _Q
__    .",Ut  c_~_4 0__i <f._
y_%_ _pp_1___J__..M_ _ _ - _ _q. __^fs_f __    _          _  ._ _r_D
                                                                                  %a_w_
_  .~p_ _ _    ._____      _ _ _ _ _ _ _ _ _7__  'lt e l
LIMIT        0.20        0.50        2 HR/ DAY O
MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE s
                                                                                                  ~          .
                                                                                                                                                                  \
9 l
Page 2 of 2 62EV-SAM-002-0                R00
 
n ,n . ..- :.
:=-%.W.      E . . s. s.,                                                                                                        .
5 ry. -
F.h;yr                                                                  CIRC WATER CHLORINATION DATA                                                                                                      '
: :.e. - -1 i
DATA PACKAGE-1 (DATA SHEET 1)                                                                    -
Gn O                                    WEEKLY                                                                                          UNIT NO:                      ")
v--
CHLORINATORS                                    Clg DATE FREQUENCY                          CLgINJECT                      NO. 1                  NO ._ 2        FREE mg/l* DISCHARGE INITIALS CYCLE / DAY MIN / CYCLE                                f/24 HR f/24 HR                        AVG. MAX                      HOUR / DAY
                                                                                                                                                                                                      ,c , c.
y .0f.
                            .      -        . 0 0-----      --------------------                                -------        -----          .-----          ------------------_-
kn$l ---QO'i----
                                                              ---------------------_-----                                        -----          -----------------                        - - 'l' C_ _ - -
                                                                                                                                                                  --- ~ ~~
Qf.t<j_ -- Owl----        r            -----------                ---------------.
                                                                                                            ^
                                                                                                                                  .----        .............----                          -2T    -------
12W4
                                              /                    --.(Q------- - ------- W@--                                      ,20 .a 2d-- - - - d- - - - - -- W-------
b..-
                          .\. __ -                    .-                                                                                                                      -
  /
i          )                                                                                                      LIMIT          0.20 0.50                      2 HR/ DAY H, g    \, )
_                                                                                                                                                                                            g
                                                                                                                                      ~
* MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLP T
l t
e l
              \
l            1 iw/
Page 2 of 2 62EV-SAM-002-0                          R00 e
 
          -.eF : .7
              ~-          *
      .a. -2g      >,.d.a
                . x-
        . uvw.:
1.*<y?C. .i'
          . .si c
      .a,s w -
            .p.
SERVICE WATER CHLORINATION DATA T
        '                                                              DATA PACKAGE 2 (DATA SHEET 2)
WEEKLY UNIT NO:              f CHLORINATORS                                        Cl
                                                                  ..___...._....__......._                      _____.....x........__..
DATE FREQUENCY CLg INJECT NO. 1                            NO. 2          NO. 3 FREE m
                                                                                                                          ..g/1* ...........
DISCHARGE CYCLE / DAY MIN / CYCLE            #/24 HR #/24 HR #/24 HR                      AVG.        MAX      HOU
_____ ..________ ______...__                ..__..._    __....... .......                ..... .____.          .___R/      DAY
_Iw-n_______.cat    Q____
20D                            .if        :O c<.fim___...  ..._____    ________. ___ ...                ... _    _ . . ' ..  . . ..'......
                                                                                                                                          . s i_o.-i.m_ .. . . _E. n. . _.....-_...
                                                                                                                                                  /
e_ _-a_x_  _ _ C4.G. b, . a_d_ m-: r._ _ _              . . .p..oc                          ./!
_ _ _i_2_..__._.>        .....
w
                  .w. J.h _S.....        .. . .__.~.... ......_.
_ _ C .o.V'_' . ........
                                                                                              .              . _F.7.. .., .Ie            n L. ..._V__-...
le_is. .. %..__ ... .. &........ __ "_..... .282...                        ..__...            W
_L ..... J.T_.. ...a..___.
7              --.._ __..__.... .. _______. ......__ _______..                            ......_        _.... ...... .________..
I      s i,v/
(      ._-_ ----__................                    ................___....                    ..... ...... ...........
LIMIT                                      0.20 0.50              2 HR/ DAY f,/)
        ~.
MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME 1
l l
l i
1
  /D
! \v) l l
    .                                                                Page 2 of 2 t                                                                                                        l'@li3L_%V:L.MC2 2
_                    FUBLO
 
A?.;. D.w m g                                                                          .
                                                                                                                                                                        ~
            ~ . . n. ?
            .r                                                                                                                                                ,
SERVICE WATER CHLOR: NATION DATA he[x(nh.f
    ,o -
Af
        "                                                            DATA PACKAGE 2
          /                                                            (DATA SHEET 2)
(
f                                      W sE?.LY                                                            UNIT NO:                  [
CHLORINATORS                                              C1,
_______.._..... -________. .________.._____________                                          _____..___~_ ___....__.
DATE FREQUENCY CL2 INJECT                    NO. 1          NO. 2              NO. 3          FREE mg/l* DISCHARGE                          .
CYCLE / DAY MIN / CYCLE            #/24 HR #/24 HR #/24 HR AVG.                                      MAX        HOUR / DAY fi.f.%.. .U__b__b_{%_.
                  .                                    _ _    . ~ . _ ._ ~
                                                . (_m_ _ i_th_.<s_s.      _      _ ~ _l0_
_ _2_        ~ _ __ _ _ .
                                                                                                  .......        _ _a t_o____<j.f. .        . 0Yw______.
_h-1_2f.. fC.&_ _ _.(r_n_k_
_                            _ _ _ _ _ _ _.._~._____
_ _ _ _2_0_ _(I _ _ _
_        _______        _2_10___    _ _s J T. .. . .m_ _m_ _ _ _ _ .
_lH1.4 _ i_n_ _k_ wo____        _ _ .u. w_ __
_(r.&.      _  _.:.'______
_ . _ _?_R_ _. _ _        _ __. ' ' _ ~
_    . .~
                                                                                                                    . I.b._. ~    _ _ ..e .. <c___...
                                                                                                                              ..sif___
                  .I9y.4_ .c.c    %._ .._ _k_ _ . k. . .+.,. . _..-
_    .  .... . ,9. g_g . . .    ...__..
                                                                                                                . jy. . ..,.f0... ..T.,1                .._.
LIMIT                                          0.20 0.50                    2 HR/ DAY MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME I
I l
lt l
l l
l Page 2 of 2 i
i  e                                                                                                          62EV-SAM-002-0                      R00
 
j k.
    " Q + Q: ^g y" - '
cx-m e ,-                                                                                                                                                      1 Q.7,i-M '                                              SERVICE WATER CHLORINATION DATA                                                                    .    :
g"                                _                                                                                                                              l DATA PACKAGE 2 (DATA SHEET 2) y                          l WEEKLY                                                              UNIT NO:                  1 CHLORINATORS                                        Cl x DATE FREQUENCY CLg INJECT                                NO. 1            NO. 2        NO. 3      FREE mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE                    8/24 HR 8/24 HR f/24 HR AVG.                              MAX      HOUR / DAY
                                                                                                                  .]n -.?.n . ...0--....
                                                                                                          ~
Lu. t- <m_ .tw.c. . ..6.0-__---
                      -. ._        --..                            ........        . 7.0. 0. . . .                                a
            .i 2]y. . . u_s_M_ _u.m. . .
_                  ...bo.. --.          ........    .
                                                                                      . 79.)- - - - . ......-      < z.o.. . .?p- - ....o..----.
p_g_ s .le.d..s..m.- _.40_-....
                            -                                        ........        . 2.00--..      .......    . a. .o.. ..a. 0. .      ... 0.---...
            ]227$- _ _(e.%_ . ~- .-_ff_-....
                -.                            -.                  .. ~...... . 2_0. 0. . . . .    .......    . ~2.0 . . 20. . ..0
(
            . .: .  ._n__..._.              . . . - _ . . . _ _ - . ._ . = _ -  _  ___... ..
N
,\
(x      S                                                                LIMIT                                    0.20 0.50                  2 HR/ DAY v
* MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE
            ** MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME Page 2 of 2 62EV-SAM-002-0                      R00
 
e'7.,,.,g,nze M .p                                                                                        .
          & L"14 W
        ;d M W                                                  SERVICE WATER CHLORINATION DATA
        .:.::q ::
agl a
          %~                                                                        DATA PACKAGE 2 (DATA SHEET 2)
WEEKLY                                                                            UNIT NO:                      '
CHLORINATORS                                                  Cl 4 DATE FREQUENCY                CL2 " INJECT                NO. 1          NO. 2                NO. 3            FREE mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE                      f/24 HR f/24 HR 1/24 HR                                  AVG.          MAX        HOUR / DAY l0-I-b      les$ser          Ch$rm                            ~~~
c200                                .ti          .?o
                                                                                                                                                                                    \
IV.i.o1!4
                    .          . _ _hM. .        ...........              ..............._.                      .....__          _____      ......      ....... /..
                    /_
                    .c./71_6  . . .E@.__....    ...........              ........        __....__.              ...__..          ..... ..__ .            ...........
                                                                                                                                                                                            ~
                              .._Y(D..}... .__ ~. __...
p_h_7a            _                        _            ........        ____.__ -
                                                                                                                    ....... ...-_ _.. __                      .___.....h..
1 _N. . ...          6..~..  ...__.___.. ._____..                      .....___.              _...........                ..__..        ...____....
                    -- \%. . . . _ _ _ . . . < ./". .~_,s_ _ . . v y .-                                      %                                      -
[m)              ......_____....._____..... ..._____................                                                              .....      .___.. ...........
    '-4                                                                        LIMIT                                                  0.20 0.50                  2 HR/ DAY 7~
U MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE
                  ** MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME f Q2 h & W                                                                h .Is 00$ & Q $ nfue g,
l 9)
    .o]
    \v i
Page 2 of 2 62EV-SAM-002-0                        R00 e
: w. . ._ . y,.w. .. .:n-                                                                .
n-
        ;2@qw
        . .g:. : . df
                    '                                      SERVICE WATER CHLORINATION DATA t+Mr
            ^*'
DATA PACKAGE 2 (DATA SHEET 2) b WsEKLY                                                          UNIT ::0:
2 CHLORINATORS                                      Cl
                        ............... ..........                    ........................                    ..........x      ...........    .
DATE FREQUENCY CL., INJECT                      NO. 1        NO. 2          NO. 3          FREE mg/1* DISCHARGE              -
CYCLE / DAY MIN / CYCLE          4/24 HR f/24 HR f/24 HR AVG. MAX                                HOUR / DAY ll                                                              '
                      ..~]R      . .D. .Q . .E. .%..M. .W. . .O?.?. ,,g.h. f.t.b(
z                  .          Q.d.f.w.p..e... " . . . ~. .' . . ~ . . ' . ~.~..........
                      .I{_ .l'.lf. h.(.k. . .k.((.u.1.2.[6.,.. k$e. .A.ch..
y        $...r. h...p,.....
7                        .....    ......      .~..........
I
                      .H.  .e .%.._M.._...i..u.us
: u. . . . d. . J.. .i. .7 .n a..t%..y..r..&.  ......      .....    ... '... .~..........
                                                                                                                                            ~~
                    ..l@fsS ..R. h_.. )..C. 6.'4.L. .cf. .-.$. .t. .&. ;,.h. p,,. M...D............                /c, . .- . .      .".."....'....
f--,
s
            )      .................................................. ..... ...... ...........
7,/                            s LIMIT                                      0.20 0.50            2 HR/ DAY v                                                        . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..................
MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE
                  ** MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME O
g                                                                                                                                          -
Page 2 of 2 e                                                                                                          62EV-SAM.002-0                R00
* me Y&? Y.-                                                                                              .
SERVICE WATER CHLORINATION DATA                                                                                '
u.
7 DATA PACKAGE 2                                    -
(DATA SHEET 2)
}
WEEKLY                                                                        UNIT NO:                    $2 CHLORINATORS                                            Cl g DATE FREQUENCY                  CLg INJECT                  NO. 1            NO. 2            NO. 3        FREE mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE                      f/24 HR 8/24 HR f/24 HR                          AVG.        MAX          HOUR / DAY
              .L%...y    _ _ _0.(.n t.... - __.........                ........          .........          ....... ____.      . . . . .~.-.~..........          h s
                          ....).....
1.4.                          ...........              ........          .........          .......      .....    ......          ...........
              ..YDL
                          ._        }.....  ..... .__.. __....__                        .........
                                                                                                                                                            ---}
gjyu. s ..( .. w..... .__.6_...__                        ........          ..2.0_0_...        .......
_ <_2p_ _  _L.29..        ..      0........
                                                        . . . . . . . ......a.          .__-_....          ..__...    .....      ......          ...........
LIhIT                                          0.20 0.50                    2 HR/ DAY
                . MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE
            ** MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME t
/'
!      )                                                                                                                                                        -
\      ;>
kJ Page 2 of 2 62EV-SAM-002-0                      R00 e
 
I~
Georgia Powcr Company 333 Piedmont Avenu3 At:anta, Geore!) 30308 Telephon) 404 526-6526 Ma.hng Address Post Offce Box 4545 Atlanta. Georgia 30302 Georgia Power L. T. Gucwa                                                      7,3,    ;,,*wrn 6+rrrm'em Manager Nuclear Safety and Licens;ng 1211C March 20, 1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 ANNUAL ENVIRONMENTAL SURVEILLANCE REPORT Gentlemen:
Pursuant      to  section 5.6 of the E. I. Hatch Nuclear Plant Environmental Technical Specifications, please find enclosed the Annual Environmental Surveillance Report for 1986.
If you have any questions in this regard, please contact this office at any time.
Sincerely, L. T. Gucwa MJB/lc Enclosure c: Georgia Power Company Mr . s  . P. O'Reilly (w/o enclosure)
Mr. J. T. Beckham, Jr. (w/o enclosure)
Mr. H. C. Nix, Jr. (w/o enclosures)
G0-NORMS U. S. Nuclear Regulatory Connission Dr. J. N. Grace, Regional Administrator (w/2 enclosures)
Mr. P. Holmes-Ray, Senior Resident Inspector - Hatch (w/o enclosure)
Mr. G. Rivenbark, Licensing Project Manager - Hatch (w/o enclosure)
D
                                                                          . 6 3}}

Latest revision as of 05:22, 30 December 2020

Annual Environ Surveillance Rept for 1986. Ltr
ML20205C040
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/31/1986
From: Gucwa L
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
SL-2162, NUDOCS 8703300096
Download: ML20205C040 (109)


Text

, . _ _ . _ _ . . . _ . . _ . _ _ . . . _ . _ . _ _ . . . . . . _ . - . . ......._-.._m . _ . _ . _ . _ . _ _ . _ . _ _ ..

I I .

! l l l

[:*

GEORGIA POWER COMPANY i

EDWIN 1. HATCH NUCLEAR PLANT I '

ANNUAL ENVIRONMENTAL SURVEILLANCE REPORT i CALENDAR YEAR 1986  !

r I

I i

l 1 t 4 r i  !

i

v. '

] t I

4 '

! f 1

l.

t i

4  !

l k

e i-t

,I s i

i

)

4 i

['

1-h 5F yis -

t-i 8703300096g500 PDR R

ADOCK

/ TDR 21 p. gh g,4 ho&

i leg / f I ,

EDWIN I. HATCH NUCLEAR PLANT ANNUAL ENVIRONMENTAL

('j SURVEILLANCE REPORT

'v SPECIFICATION In accordance with Section 5.6.1 of the Edwin I. Hatch Nuclear Plant, Units 1 and 2, Environmental Technical Specifications, the Annual ~ Environmental Surveillance Report will provide a summary and interpretation of the results of any environmental monitoring activities required and an assessment of any observed impacts of plant operation on the environment. Also, the report will include a summary of all instances of Environmental Technical Specifications (ETS) noncompliances and corrective action taken, changes to federal and state permits and certificates, changes to the Environmental Program Description Document (EPDD), changes in station design or operation which could involve an environmental impact, changes made to the ETS, and copies of all reports regarding station discharges made in accordance with NPDES Permit No. GA-0004120.

DISCUSSION In 1986, there were no non-radiological environmental monitoring activities performed at the Hatch Nuclear Plant (except those

{'/)

s_

required by the NPDES permit), nor wers there any changes in station design or operation which could involve an environmental impact. There were no known ETS noncompliances or changes,-and no changes were made to federal and state permits and certificates or the EPDD.

Georgia Power Company was issued on July 21, 1986 a United States Army Corps of Engineers permit (No. 074-OYN-006086) to construct a temporary weir across the Altamaha River in order to maintain adequate water levels for intake of cooling water during periods of extreme droughts. Such conditions existed in 1986, and a temporary weir was constructed, utilized and removed under the stipulations of the permit. There was no known environmental impact caused by this activity. The expiration date of the permit is September 30, 1991.

Copies of all reports regarding station discharges made in accordance with NPDES permit No. GA-0004120 are included in Appendix A.

l

l O .

EDWIN I. HATCH NUCLEAR PLANT ANNUAL ENVIRONMENTAL SURVEILLANCE REPORT APPENDIX A

O NPDES Operation Monitoring Reports Edwin I. Hatch Nuclear Plant .

1986 O

D wem_ -n n------r_--.---v----e---- w-,-w--n -,--,

i . .

Page 1 of 9 QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 01-01-86 Plant Hatch To: 03-31-86 P. O. Box 439 Baxley, Georgia 31513 Permit Number: GA0004120 Discharge Location: 001A1 - Low Volume Waste

-(Neutralizaton Tank)

Type of Sample: Grab Frequency of Analysis: 2/mo Parameter: Suspended Solids Oil & Grease pH mg/l ag/l Limits: Avg. 30 Avg. 15 Min. 6.0 Max. 100 Max. 20 Max. 9.0 Date '

. 01-06-86 2.3 0.4 7,0 i

  • _ _ _

02-15-86 20.0 5.0 8.3 -

03-05-86 1.3 5.2 7.5 03-17-86 1.3 2.4 8.3 Number of Samples: 4 4 4 Average Value: 6.2 3.25 7.8 Maximum Value: 20.0 5.2 8.3 Minimum Value: 1.3 -

0.4 -

7.0 '

Limits Exceeded: 0 0 0 -

  • Tank was not discharged for the remainder of the month. '

l l

l I

l l

O e

Pegs 2 of 9 QUARTERLY OPER!.TIONAL MONI~0 KING REPOR'~

Geoigia Power Company From: 01- 1-86

, Plant Hatch To: 03-31-86 P. O. Box 439 Baxley, Georgia 31513 Permit Number: CA0004120 ..

Discharge Location: 001A2 - Low Volume Waste ,

(Pressure Filters)

Type of Sample: Grab Frequency of Analysis: 1/qtr .

Parameter: Suspended Solids Oil & Grease pH mg/l ag/l Limits: Avg. 30 Avg. 15 Min. 6.0 Max. 100 Max. 20 Max. 9.0 4

Date 2-3-86 (A) 7.9 (5 8.0 2-3-86 (B) 5.9 <5 7.9 2-3-86 (c) 8.0 (.5 8.0 2-3-86 (D) 8.8 <5 7.9 Number of Samples: 4 4 4 Average Value: 7.6 /5 7.95 Maximum Value: 8.8 45 8.0 Minimum Value: 5.9 (-5 7.9 Limits Exceeded: 0 . 0 . 0 l

i 4

l 4

l l

l l

l 4

i * -

Pcg3 3 of 9 QUARTERLY OPERATIONAL MONITORING REPORT

!")

V Georgia Power Company From: 01-01-86 Plant Hatch To: 03-31-86 P. O. Box 439 Baxley, Georgia 31513 Permit Number: GA0004120 .

Discharge Location: 001B - Cooling Tower Blowdown Location: Intake Mixing Zone pH Zn Cr Type Sample: In Situ In Situ Grab Grab Grab Frequency: 1/wk 1/wk 2/mo 1/qtr 1/qtr Parameter: Temp. Deg. F Temp. Deg. F.

Limits: T of 5 Deg. T of 5 Deg. Min. 6.0 Max. 90 Deg. Max. 90 Deg. Max. 9.0 Max. 1.0 Max. 0.2 Unit 1 Unit 2 Unit 1 Unit 2 Unit 1 Unit 2 Date 1-03-86 50 50 1-06-86 7.8 7.6 (0.1 .16 (0.1 (0.1 1-08-86 46 46 1-15-86 45 45 1-20-86 *

  • 1-23-86 54 54 1-30-86 46.4 46.4 2-03-86
  • 6.8

( 2-07-86 2-14-86 52 50 52 50 2-17-86

  • 7.5 2-19-86 54 54 2-26-86 57 57 3-03-86
  • 7.0 -

3-05-86 52 52 ,

NOTE:

3-12-86 63 63

  • Unit in cold shutdown 3-17-86
  • 7.5 3-19-86 68 68 -

3-26-86 59 59' Nucher of Sa:nple: 13 13 1 5 1 1 1 1 Average Value: 54 54 7.8 7.3 40.1 .16 40.1 (0.1 Maximum Value: 68 68 7.8 7.5 40.1 .16 40.1 eD.1 Minimum Value: 45 45 7.8 6.8 40.1 .16 40.1 40.1 Limits Exceeded: 0 0 0 0 0 0 0 0 0

O h

Paga 4 of 9 -

QUARTERLY OPERATIONAL MONITORING REPORT

\ Georgia Power Company From: 01-01-86 Plant Hatch To: 03-31-86 P. O. Box 439 4

baxley, Georgia 31513 Permit Number: CA0004120 Discharge Location: 001C - Sewage Treatment Plant Type of Sample: Grab Frequency of Analysis: 2/yr.

Parameter: BOD 5 FAC TSS mg/l mg/l ag/l l Limits: PLANT # Avg. 30 -

Avg. 30 l Max. 45 -

Max. 45 Date 1-08-86 1 72.4 1.0 102.5

. 2-27-86 1 13.7 0.8 -

19.0 Number of Samples: 2 2 2 i

Average Value: , 43.0 0.9 60.8 Maximum Value: 72.4 1.0 102.5 Minimum Value: 13.7 0.8 19.0 Limits Exceeded: 1 0 1

=

}

l i

i i

i

~

O O

y - --

-o,e-w.m--m,.g.---,w--, ---w m,mw-,,,,e_-w . - _ , - , , - - , , , ,+n _ --~~-,,---,.--.w- . - ~ - + - - ~ , - = - ,

Page 5 of 9 l

QUARTERLY OPERATIONAL MONITORING REPORT

! b Georgia Power Company

' From: 01-01-86 Plant Hatch To: 03-31-86 4

P. O. Box 439 Baxley, Georgia 31513 Permit Number: CA0004120 '

i e Discharge Location: 001D - Liquid Radwaste System Unit 1 Type of Sample: Grab Frequency of Analysis: 2/mo.

4 Parameter: Suspended Solids Oil & Grease pH l mg/l ag/l pH Units 4

Limits: Avg. 30 Avg. 15 Min. 6.0 i Max. 100 Max. 20 Max. 9.0 4

Date 1-06-86 12.0 -

8.2 6.1 1-20-86 1.8 1.6 6.7 2-03-86 0.0 0.0 6.4

! *2-14-86 38 NA 6.7 2-17-86 15 0.6 7.0

', 3-03-86 1.4 5.6 6.9 l 3-17-86 1.0 0.4 6.1

!O. -

, Number of Samples 7 6 7

. Average Value: 10 2.7 6.6 >

Maximum Value: 38 8.2 7.0 Minimum Value: 0 -

0 -

6.1 Limits Exceeded: 0 0 0

  • Procedure calls for TSS to be done if Turbidity)50 NTi!. ,

4 i

) .

I l <

t o

d E i

i

i Page 6 of 9 g QUARTERLY OPERATIONAL MONITORING RFPORT Georgia Power Company From: 01-01-86 Plant Hatch To: 03-31-86 P. O. Box 439 Baxley, Georgia 31513 Permit Number: GA0004120 ,

Discharge Location: 001D - Liquid Radwaste System Unit 2 Type of Fample: Grab Frequency of Analysis: 2/mo.

Parameter: Suspended Solids Oil & Grease pH mg/l ag/l pH Units Limits: Avg. 30 Avg. 15 Min. 6.0 Max. 100 Max. 20 Max. 9.0 Date 1-05-86 0.40 0.50 7.0 1-20-86 0.0 0.80 6.4 2-02-86 1.1 0.0 6.2 2-16-86 0.0 2.8 6.4 3-02-86 0.0 0.01 8.9 O Number of Samples: 5 5 5 Average Value: 0.6 0.8 7.0 Maximum Value: 1.1 2.8 8.9 Minimum Value: 0.0 0.0 6.2 Limits Exceeded: 0 0 0

  • No tanks discharged to river from 3-13 to 3-31-86.

J b

O 4

9 h

Page 7 of 9 QUARTERLY OPERATIONAL MONITORING REPORT  !

O5 Georgia Power Company From: 01-01-86 Plant Hatch To: 03-31-86 P. O. Box 439 Baxley, Georgia 31513 Permit Number: GA0004120 ,

Discharge Location
001E - Combined Plant Waste Unit 1 Frequency of Analysis: 1/wk.

Type of Sample: In Situ Grab Grab Grab Parameter: Temperature TRC FAC pH Limits: Deg. F N/A , N/A Min. 6.0

Max. 9.0 4

Date 1-03-86 50 40.1 40.1 7.3 1-08-86 50 40.1 40.1 7.9 i 1-15-86 47 40.1 40.1 7.5 1-23-86 55 (0.1 40.1 6.8 1-30-86 47 40.1 40.1 6.7 4

2-07-86 69 z0.1 c0.1 6.8 2-14-86 55 40.1 40.1 7.1 l 2-19-86 59 40.1 40.1 7.0 2-26-86 0 3-05-86 3-12-86 53 5.7 66 4.0.1 40.1 c 0.1 40.1 40.1 40.1 7.5 7.6 7.2 3-19-86 68 (0.1 c0.1 6.9 3-26-86 63 40.1 40.1 7.4

, Number of Samples: 13 13 13 13 Average Value: 56.8 40.1 40.1 7.2 Maximum Value: 69 40.1 (0.1 7.9 Minimum Value: 47 40.1 40.1 6.7 Limits Exceeded: 0 0 0

~

0 I

?

O l.

l .

I

  • i .

Prg3 8 of 9

-QUARTERLY OPERATIONAL MONITORING REPORT

- (3 Q/ Georgia Power Company From: 01-01-86 Plant Hatch To: 03-31-86 P. O. Box 439 Baxley, Georgia 31513 Permit Number: GA0004120 ,

Discharge Location: 001E -Combined Plant Waste Unit 2 Frequency of Analysis: 1/wk.

Type of Sample: In Situ Grab Grab Grab Parameter: Temperature TRC FAC pH Limits: Deg. F*

N/A N/A Min. 6.0 Max. 9.0 Date 1-03-86 -

56 (0.1 40.1 7.0 1-08-86 55 '40.1 40.1 8.0 1-15-86 52 40.1 40.1 7.4 1-23-86 57 40.1 40.1 6.9 1-30-86 57 20.1 40.1 7.1 2-07-86 79 40.1 40.1 7.4 2-14-86 68 40.1 40.1 7.2 2-19-86 80 40.1- 40.1 7.1 2-26-86 0 3-05-86 3-12-86 69 71 80 40.1 40.1 40.1 40.1 40.1 40.1 7.6 8.8 7.6 3-19-86 83 40.1 40.1 7.0 3-26-86 77 z0.1 &O.1 7.4 Number of Samples: 13 , 13 13 13 Average Value: 68 40.1 40.1 7.4 Maximum Value: 83 40.1 40.1 8.8 Minimum Value: 52 20.1 40.1 6.9 Licits Exceeded: 0 0 0 0

O O

I

Pcg3 9 cf 9 QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 01-01-86 Plant Hatch j To: 03-31-86 P. O. Box 439 Baxley, Georgia 31513 Permit Number CA0004120 i

,~

I certify under penalty of law that this document and all attachments were prepared under the direction of supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.

Based en my inquiry of the person or persons who manage the system or those persons

, directly responsible for gathering the informatiori the information submitted is to the best of my knowledge and belief true, accurate and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations.

i H. C. Nix

! General Manager

/

i l

i i

l l

l l

O l

1 I

e

- - - ,_ -, - - - , , - - . . _ _ _ . - _ - - . . . ~ -- -_- ,-.- - --- - - - - - - -

t QUARTERLY OPERATIONAL MONITORING REPORT

-OV Georgia Power Company ADDITIONAL MONITORING l

From: 01-01-86 Plant Hatch To: 03-31-86 P. O. Box 439 Baxley, Georgia 31513 Permit Number: CA0004120 .

s Discharge Location: 001D - Liquid Radwaste System Unit 1 Type of Sample: Grab Frequency of Analysis: Each Batch Parameter: pH Parameter: pH pH Units pH Units Limits: Min. 6.0 Limits Min. 6.0 Max. 9.0 Max. 9.0 Date Date 1-1 6.8, 6.0 1-16 7.2, 6.1, 6.7 1-2 6.8, 6.3, 7.4, 6.7 1-17 7.6, 6.0, 7.5, 6.6, 6.6 1-3 6.6, 6.0, 7.5 1-18 6.8, 6.6, 6.8 1-4 6.3, 6.1, 6.4. 6.3, 6.9 1-19 6.2, 6.5 1-5 6.6, 6.5, 6.2 1-21 6.1. 7.0 1-6 6.9, 6.0 1-22 6.2, 6.3 1-7 6.0, 6.1, 6.3, 6.2 1-23

  • 6.3 1-8 6.8, 6.0, 6.1, 6.2, 6.3, 1-24 6.0, 6.2, 6.7 (V 8.7, 6.3 1-9 8.3, 6.0, 6.7, 6.7. 6.1 1-25 6.1, 6.5, 6.1, 6.2, 6.1 1-10 6.6, 6.0, 8.5, 6.0 1-26 6.3, 6.3, 6.2, 6.7 1-11 6.6, 6.7. 6.5, 6.1, 6.5 1-27 6.0 ,.

1-12 6.1, 6.8. 6.9, 6.2, 6.0 1-28 7.4, 6.4, 6.6 1-13 6.9, 6.0 1-29 6.0, 6.9, 7.4 1-14 6.0, 6.0, 6.1 1-30 6.0, 7.0, 6.9, 6.3 1-15 7.0, 6.1 1-31 6.4. 7.3, 6.9, 6.9 No Limits Exceeded .

4 b

G i

1

_ .. __~___-.___..._....__,.____..___._._.___.____--___m,-_______.____.._ _-

QUARTERLY OPERATIONAL MONITORING REPORT f

ADDITIONAL MONITORING

( Cao'rgia Power Company From: 01-01-86 Plant Hatch To: 03-31-86 P. O. Box 439 Baxley, Cecrgia 31513 Permit Number: GA0004120 Discharge Location: 001D - Liquid Radwaste System Unit 1 Type of Sample: Grab Frequency of Analysis: Each Batch Parameter: pH Parameter: pH pH Units pH Units Limits: Min. 6.0 Limits: Min. 6.0 Max. 9.0 Max. 9.0 Date Date 2-1 6.6 2-14 6.0 2-2 7.3, 7.9. 7.4. 7.0 2-15 6.3, 6.0 2-3 7.0, 6,.2 2-16 6.3, 7.1 2-4 6.4, 7.0, 6.2, 6.1, 6.6, 2-17 7.1 8.0 '

2-5 6.6, 6.6. 6.3, 8.4 2-18 6.0, 7.0 2-6 6.6, 6.4, 7.7. 6.4 2-19 7.0 2-7 6.1, 6.6. 6.3, 8.0, 6.2, 2-20 7.0, 6.8, 6.8 2-8 6.1. 6.4, 7.5 2-23 6.6 2-9 6.3 2-24 6.5, 8.3 2-10 6.7. 6.3 2-25 8.6, 7.6, 6.2

, 2-11 6.7. 6.1, 6.0, 6.5, 6.3 2-26 6.1

! 2-12 6.0 2-27 6.6, 6.0, 6.0 2-13 7.5, 6.0 2-28 7.5, 6.4 No Limits Exceeded 1

l 1

I 4

e I

A

i QUARTERLY OPERATIONAL MONITORING REPORT q ADDITIONAL MONITORING Q Georgia Power Company Plant Hatch From: 01-01-86 P. O. Box 439 To: 03-31-86 Baxley, Georgia 31513 Permit Number: CA0004120 ,

Discharge Location: 001D - Liquid Radwaste System Unit 1 Type of Sample: Grab Frequency of Analysis: Each Batch Parameter: pH Parameter: pH pH Units pH Units Limits: Min. 6.0 Limits: Min. 6.0 Max. 9.0 Max. 9.0 Date Date 3-1 6.4 3-16 6.5, 6.5 3-2 6.7. 6.9 3-17 8.4, 6.5 3-3 8.4 3-18 6.8 3-4 6.4 3-19 6.7, 6.8 3-5 6.6, 6.3 3-20 6.1 3-6 6.3 3-21 6.2, 6.4, 6.3 3-7 7.0, 8.3, 7.0 3-22 6.8 3-8 8.3, 6.3 3-23 6.2, 6.0 3-10 C) 3-11 6.0, 6.1, 6.3, 6.0 7.8 3-24 3-26 6.2, 6.4 6.4, 6.2 3-12 6.3, 7.2 3-27 6.3 3-13 6.1, 6.1, 6.1, 6.6 3-28 7.1 3-14 6.3, 6.1, 6.1, 6.5 3-29 6.6, 6.1 3-15 6.0, 6.9 3-31 8.4 No Limits Exceeded 4

0

QUARTERLY OPERATIONAL MONITORING REPORT O' Georgia Power Company Plant Hatch ADDITIONAL MONITORING From: 01-01-86 To: 03-31-86 P. O. Box 439 Baxley, Georgia 31513 Permit Number: CA0004120 ,

Discharge Location: 001D- Liquid Radwaste System Unit 2 Type of Sample: Grab Frequency of Analysis: Each Batch Parameter: pH Parameter: pH pH Units pH Units Limits: Min. 6.0 Limits: Min. 6.0 Max. 9.0 Max. 9.0 Date Date 1-1 6.0, 6.4, 6.4, 6.4, 6.2 1-14 6.0, 6.0, 6.0, 6.8 1-2 6.0, 6.5, 7.0, 6.1, 6.0 1-15 6.0, 6.2 1-3 6.9, 6.0, 7.0, 6.2 1-16 6.0, 7.9, 6.0 1-4 6.3, 6.6, 6.6. 6.4, 7.1, 1-17 6.1,'6.4, 6.0, 6.0 6.2 ,,

1-5 6.6, 6.0, 6.0, 7.0 ' 1-18 6.0, 6.0, 6.8, 6.7 1-6 6.0, 6.0, 6.2, 6.1, 6.7 1-19 6.8 1-7 6.1, 6.0, 6.0, 6.1, 7.2 1-21 6.2 Q() 1-8 7.0, 6.1, 7.0 1-22 6.0 1-9 6.2, 7.6, 6.8, 6.0, 6.2 1-24 6.7 1-10 6.0, 6.8, 6.0, 6.8 1-25 6.8, 6.1, 6.2, 6.2, 6.5, 6.2 1-11 6.2, 7.8, 6.2, 7.0 1-26 6.7, 6.9, 6.4, 7.0, 6.2, 6.9 1-12 6.0, 6.1, 6.0, 7.6 1-27 6.1, 6.8, 8.1 1-13 6.2, 8.7 1-30 6.0 No Limits Exceeded O .

QUARTERLY OPERATIONAL MONITORING REPORT ADDITIONAL MONITORING Q Georgia Power Company From:

01-01-86 Plant Match To: 03-31-86 P. O. Box 439 Baxley, Georgia 31513 Permit Number: GA0004120 .

Discharge Location: 001D - Liquid Radwaste System Unit 2 Type of Sample: Grab Frequency of Analysis: Each Batch Parameter: pH Parameter: pH pH Units pH Units Limits: Min. 6.0 Limits: Min. 6.0 Max. 9.0 Max. 9.0 Date Date 2-1 6.6 2-13 6.5, 6.1 2-2 6.2 2-14 9.0, 6.7 2-4 6.5 2-15 8.1 2-5 6.5, 8.8, 6.7 2-16 6.3, 6.5. 6.2 4 2-6 6.5, 6.0, 6.5, 6.0 2-17 6.0 .

2-7 8.5, 6.3, 6.3, 8.3 2-18 6.8, 6.8, 8.5, 6.5 2-8 6.3, 6.1, 6.1 2-19 6.4 O 2-9 2-10 2-11 6.1, 6.1, 6.1, 6.3, 6.1, 6.0 7.9, 7.3, 6.3 6.3 2-20 2-21 6.0, 6.2, 8.3, 6.2 8.6. 6.0, 6.2 2-23 6.2, 6.1, 6.0, 6.5 2-12 7.8, 6.5 No Limits Exceeded 4

0

~. . . . - . . . . . - - - - . .

QUARTERLY OPERATIONAL MONITORING REPORT j

ADDITIONAL MONITORING -

  • g Ge6rgia Power Company ,

Plant Hatch From: 01-01-86 P. O. Box 439 To: 03-31-86 Baxley, Georgia 31513 Permit Number: GA0004120 Discharge Location: 001D - Liquid Radwaste System Unit 2 Type of Sample: Grab ,

Frequency of Analysis: Each Batch Parameter: pH Parameter: pH j pH Units pH Units Limits: Min. 6.0 Limits: Min. 6.0 Max. 9.0 Max. 9.0 Date Date t 3-1 8.2 3-8 6.2, 6.2, 6.0, 7.2, 6.4

3-2 7.2 3-9 6.1, 7.6, 6.6 i 3-3 6.0 3-10 6.9. 6.0, 6.7, 6.1

} 3-4 6.6, 7.1 3-11 8.5, 6.4, 6.2 3-5 6.3, 6.1, 6.0 3-12 7.1, 6.3 3-6 6.7 3-13 6.3

3-7 6.0, 6.4, 7.4 ,

i I \

j No Limits Exceeded l

1 I

s

)

1 I

,g

- - - , . _ . . _ _ - , . . . , , , . _ - _ _ . _ . _ . - . _ _ - . _ _ _ . . . . , - , , _ _ _ _ _ _ . . , _ . - _ - - , - - - . - ~ . . , . . , . _ - - _ . , _ - --

I 1

CIRC WATER CHLORINATION DATA l DATA PACKAGE 1 ,

(DATA SHEET 1)

O)(

\

v i WEEKLY , UNIT NO: /

CHLORINATORS C1

._--_.... _.-_-.--_. .__-_.---_-----____-_ __-_--_--_4_-_ - _---__.

DATL FREQUENCY CL S INJECT NO. 1 NO. 2 FREE mg/l* DISCHARGE INITIALS CYCLE / DAY MIN / CYCLE f/24 HR f/24 HR AVG. MAX HOUR / DAY 1 .

L.a __c w-_-__- ..___-____..__---___ ______. .___. .-____ _ _ _ _ _ - _ _ _ ' -__x_%__

y n cos.

J u. _r, .-----_---..______-__--__

____.- _ _ _ . . _ ...-_..__---._. _-_-___ _.2w_ - _ _ _ _

-s jg.i_t. p_n ___- .--_-_-__--._ _-__---___ ..

_ -- .-__- ._-___ ~.___-__-__.__4_ 4__if_>g -

.c .y3 . . .iyu . _ . . . ._

.__ ---_.--_.____.- - _ _ _ . _ ..___. ... -- . . _ _ _ _ _ _ _ _ " ._ z.u g  %. 7 L22.C _ _.n_ _u _k _

_ _sw ,

.y ,.. .g_ _y.

z ., ____

- a c,

. _ _ _ _ _ _ _ _ + _-...__

_ .__,?r4 t.

_ _ _ . - _ _ ...--_---___ ..-.___---._ _ . - _3 . . .-___

LIMIT 0.20 0.50 2 HR/ DAY

( ______-.____.--___.____-__--__________

  • MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE 4 'U//it' x . ds.ldYW'm..
) *,ts, f* 'Q.wbo- fu u r O '$&w t:t Au ll//",- F'Jt*)s., ,4f =od*4f Page 2 of 2 62EV-SAM-002-0 R00

CIRC WATER CHLORINATION DATA DATA PACKAGE 1 (DATA SHEET 1) m ,

QA WEEKLY. UNIT NO: me CHLORINATORS C1 .

._____________..._________________..... ___ ..._______4___________.

DATE FREQUENCY CL t INJECT NO. 1 HO. 2 FREE mg/1* DISCHARGE INITIALS CYCLE / DAY MIN / CYCLE 9/24 HR 6/24 HR AVG. MAX HOUR / DAY a_.i;t_

._ ._x_______.. .______ ___ . _ Q_C_.s_ _ ________

_ _____ ._____.-.._______ _72__4_' ___ b_,

__ &_____ ..._______3_],_'/__, A L.k.A- . _c_ _ _ _ _...___.____ __. ______ .__....___._ . - _____

^

._ Q_b_._-__~_____ .________4 _- s$__h___h___

2,J/ .h,!-.:*. . _ _ _ _ _ _ . .______.___ .____ ._____

w.y. _ _ _ _ _ _ _ _ _...________ . _ _w_ ___________

y_y___8___

.___. .N_ _ _ _ _ _ _ _ _ . ________________ _____ __________________________

.._____________.._______________ ..._______ .____ N_____

r LIMIT 0.20 0.50 2 HR/DA

( . _____,.____. _______________________

  • MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE t -

l l

1 l

1 I

i i

I Page 2 of 2 62EV-SAM-002-0 R00

ww

.;'ys..

y' CIRC WATER CHLORINATION DATA

~f.'

r s

c' DATA PACKAGE 1

('Ty (DATA SHEET 1)

,v m4 -

, s WEEKLYi UNIT NO: /

CHLORINATORS Clg, -

DATE FREQUENCY CLg. INJECT NO. 1 NO. 2 FREE mg/1* DISCHARGE INITIALS CYCLE / DAY MIN / CYCLE 9/24 HR 6/24 HR AVG. MAX HOUR / DAY

..._-G[j)_ _ _ _

3$ . .- . . . _ . . .._________. _ _ _ _ . . _ _ . . ~ .._(_,J_U. - _f%

~-

.]_ln.. ____ .-___ ._____

Q f,S* LE._< _ _ _ _ _ _ _ _ .. _____ _.. _ .__ _- _- -_ _ _._g3_______ __.._ __-___-_-.._____..

. . _-____k_

,: '-- 4 j

. . _ _ _ . . . . . .. _-____.__.--____ }.7&...____ ..___ . .___ _ . . . . _ _ _ _.Z_._//___h.

  • > ._s__....._. .._____.___ . _ _ _ _ - _ Ja r_&..__.. .__.. .____. . _ . . _ _ _ _ _ .u_ - > _--

._-__.__..____ W .____....

N N  :: :n., _. -_____

.__ .._ __...__..___ __.__...__ ____..-_____ _____ ._-_.. ...____.... h.

LIMIT 0.20 0.50 2 HR/ DAY o MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE J

1 C

Page 2 Of 2 62EV-SAM.002 0 R00 h

CIRC WATER CHLORINATION DATA

(, ,

DATA PACKAGE 1 (DATA SHEET 1) {

v. .

WEEKLY UNIT NO: A CHLORINATORS

._______.g Cl

. ___._ _ ____..._____ .___ . _ .....__ __ ... _______. I DATE FREQUENCY CL t INJECT NO. 1 NO. 2 FREE mg/l* DISCHARGE INITIAL (,

..... . .._____. ._ _-_____..___.___. .______ .......____.. ________. ._______S _

CYCLE / DAY MIN / CYCLE $/24 HR f/24 HR AVG. MAX ,

HOUR / DAY I

..._______.._______. F y jg. - - -

yM ------

-F F Jkilt _ _ _c_rj. _.. . .

.._-_______. _......... ___ .____ _____. . _ _ _ _ _ _ _ - . " ._ .,7_%. . . . W 8 -  ;

1 c/

J g

. . u._.. ._..._.._....._. ._._._.... ...._ ...... ..____...';. .

.._*._. .1

.D%. _ [LS. .. _ . . .....

. ~

_. _. ____.... ...__ . . . . . . . . - _ ' . ,.Z:.,b,:. - _.

c f

, .p

<. ,v. 3

- - - . .. , ,p. [,,

___ . . _ _ _ _ _ . _ _ .. .___..... ._ ~ ..___ . _....._ ... . .__ .. ... r- -

4 i

j ._____. ...__...____. ....._____..._____. . . . .__.._ ____ . .... ___== _.

j LIMIT 0.20 0.50 2 HR/ DAY i.

MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE 1

+ 'N

{ _4:t- lbe' J/bu%6s tes dl l.wwdm N"'hk7/*M*Nb V a

J i

i J,

1 i

t i 62EV-SAM-002-0 R00 j e ,

V g.

CIRC WATER CHLORINATION DATA DATA PACKAGE 1

/ *

(DATA SHEET 1)

A J..

} -

~ .

WEEKLY 2. UNIT NO: r, ao .

CHLORINATORS Cl

.____....._____.__________________..._____ __________4_______, _ _ _ _ . . .

DATE FREQUENCY CLgINJECT NO. 1 NO. 2 FREE mg/l* DISCHARGE INITIALS CYCLE / DAY MIN / CYCLE 6/24 HR 4/24 HR AVG. MAX HOUR / DAY I

..___ .____ __ _, . _ - _ _ _ _ . _ _ __--__.-_-____ __ ..._.....__.......__._. u:.____.

2b. ,.p. i

..________ ..___.._-__ _ J_.'o_S _ . . .._____. .____ ..__...__.....__. f_:/) _' &_

2A. ..g; . . . _ _ _ _ _ _ ..__.... --_ -_ g__._. ....___ .____ ..__._ . _ . . . _ _ _ _ . " .. g ___h.

.1 Lm._..._____ ._________. . .dM_ _ _ _ _______ _____ ._____ ___-_-___4 ___

_ _ _ A_ _ _.

QTh

. ~ _ - _ _ . . _ _ _ , ..__....___ ._ W.__-.. .___-__ ...__ ... __ . _ ... ___._

_ _ _ . ..Z;_,v.,5(i__n_.

.__.. .N_ _ . _ - _ _ _ _ . ._______.....___ ... . ..........___.__...______.

...__ _ _ . _ _ _ _ _ _ ..._________ N______

......_________..__ _______________________ ...__ h _______ ________.

( LIMIT 0.20 0.50 2 HR

.______.._____________ .______ h MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE Page 2 of 2 62Ev. SAM 002 0 R00 o

l

.s. "'

Mi -

CIRC WATER CHLORINATION DATA

.. DATA PACKAGE 1 (DATA SHEET 1)

.7nr[ .

s vg- WEEKLY 4 4

UNIT NO:

s o2 s

CHLORINATORS Clg DATE FREQUENCY CL 2. INJECT NO. 1 NO. 2 FREE mg/l* DISCHARGE INITIALS CYCLE / DAY MIN / CYCLE f/24 HR #/24 HR AVG. MAX HOUR */ DAY S

._k_ l{f._________ .__________ - _ _ _ _~_ _{Jh3_.____ .____ ._____ . _ _ _ _ _ _ _ _ _ ' .~_ _u i_

_ _ ~ _ _ _ _ .__________

____. ________z p,,g.

.g,

_ _ _ _ _ __ _ __ -_-_____ _ .A 4 s

/8 3 _A u 4_________. .__________ _ _ _ _ _ _ _ faW _______ _____ ______ . _ _ _ _ _ _ _ _ _ >____ _ ___fv'_k_'

\ '

4 - 7

. _ _ _ _ _ _ _ _ _ . ._________- _______Jtp

_ _______ .____ ______ __________f. _____

._____ _ _ _ _ _ _ _ _ _ . A ._______._______ _____ __________________________

N_

______ _ _ _ _ _ _ _ _ _ ..__________ .--_____________ h ___________ _________

_______________..__________ _______________ _____ ______ ._________. h

( LIMIT 0.20 0.50 2 HR/ DAY V

0 MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE 9 .

Page 2 of 2 62EV-SAM-002 0 R00

i SERVICE WATER CHLORINATION DATA DATA PACKAGE 2 (v) (DATA SHEET 2)

WIEKLY UNIT NO: 88I CHLORINATORS Clx DATE FREQUENCY CL; INJECT NO. 1 NO. 2 NO. 3 FREE mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE f/24 HR f/24 HR f/24 HR AVG. MAX HOUR / DAY

..... .......... ........... ........ ......... ....s.. ..... ...... ..... .....

^

f./.A. .....V.0.6.. ...........

........ __....... .....__ ..... ...... ..........3

.M..n ...D.O...S.. ...........

.f sd . . . 0. .o. .f. .

.l .fifd.../.).Q$...

... ........... ..............___ __..... ..... _..... . . . . . . .?. .". .

..... .......... ........... .......s .... s__. ...__.. ........... ...........

..... .......... ........... __...... __....... ....... ..... 7T r ......__.

LIMIT 0.20 0.50 2 HR/ DAY MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE

SERVICE WATER CHLORINATION DATA e

  • DATA PACKAGE 2 (DATA SHEET 2)

WIERLT, UNIT NO:

/)E CHLORINATORS Clx .

DATE FREQUENCY CL2. INJECT NO. 1 NO. 2 NO. 3 FREE mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE 9/24 HR 9/24 HR t/24 HR AVG. MAX HOUR / DAY

.L . . .'. . ..........%

a t

8 g.gf.

.. ......... ..........f.} Q. . .%. . . . .-. .. . . . . . . ~ ." . " . . . . . .....

Q

?-PJ-ff

..... .C......... ...........

Q ... ......... ....... ........... .......3 ...

C.

.v.x.t.6 ..L k

........ ........... . C9G .... ......... ....... ........... ...........

.1 i

........................... ........................ ..... . ~ . ....

LIMIT 0.20 0.50 2 HR/ DAY 1

i

  • ' MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE i

I I

f i

1 l

l i

l l .

I 62EV. SAM.002-0 R00 l

1

1

  • !jfkEQ Jdesdh"p69?

SERVICE WATER CHLORINATI6N DATA-

.~rco 4s gpfD' DATA PACKAGE 2,.

fr (DATA SHEET 2)j _

NNI . 1 1 -

WEEKLY UNIT NO:

CHLORINATORS Cla, DATE FREQUENCY CLg INJECT NO. 1 NO. 2 'NO. 3 FREE mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE f/24 HR f/24 HR f/24 HR AVG. MAX HOUR / DAY I

3.-4 6. ..~........ ........... ........ .Q.01.... ....... ..... ...... .........m M ..

i i

31h2e. ..$....... ....____... ........ .003..... ....... ..... ...... ... ...... c_.

JHs as.A,1.& ..m-~........ ........... ........ . ype/

-- a y 3

2. ..__...... .__..__.... ........ __F...... ....... ........... .........._s .

___.. .......... A ........

N

...__ .......... ........... __...... . N_____... : ..___...... . . . . . . . . . . .

N

.......................... ___ .................... ..... ...... h

/"'d LIMIT 0.20 0.50 2 HR/ DAY

(_,1.w ........................................_____.

MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME CT U

Page 2 of 2 62EV-SAM-002-O R00 e

s SERVICE WATER CHLORINATION DATA i

DATA PACKAGE 2 (DATA SHEET 2) .

WIEKLY UNIT NO: We '

?

i CHLORINATORS Clx ...........

...............r..........

DATE FREQUENCY CLg INJECT NO. 1 NO. 2 NO. 3 FREE mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE 4/24 HR t/24 HR f/24 HR AVG. MAX HOUR / DAY x

F./4....r....... ....S. u. s.. . .. ........

~/ / f. . . . . . s. .[.......

l-8.% .. ,.......

. . .x. . . . . . .s. . . . . . ./. .. .J....tiv. .., . ..

)' 14... l ..... ...... ........e ...

l IS5. /......... .. A......

..... . 1U/ bR

...... . ..t....... ... ... ..... ...... ...........

?

l l415 .s........ . . . 4%. x d

......f.. .. f.......r-W . ....... ........... .......2 ...

i ...............

I i

LIMIT 0.20 0.50 2 HR/ DAY N.a f

  • MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE

1 i

i i

4 ,

.i 4

i 1

J i

i

! Page 2 of 2 t, 62EV-SAM-002-0 R00 h

- - - - --.e., , - - , - , - - , , - - - , , , - ___,,n,_w _ ,_n,.,,,-n--,- --n,_n-,-,,,,

SERVICE WATER CHLORINATION DATA DATA PACKAGE 2 (DATA SHEET 2)

(

[', .

WIEKLi UNIT NO: IMJ CHLORINATORS Clx DATE FREQUENCY CLg INJECT NO. 1 NO. 2 NO. 3 FREE mg/1* DISCHARGE CYCLE / DAY MIN / CYCLE f/24 ER f/24 HR f/24 HR AVG. MAX HOUR / DAY g..u .c ..

....... . . . . . . 2 C a.

. . w. .:.t. (. 6..e.k... .d. .a. t. ..... ......

f ^

?.G. .H

. . .......... ......M. . . .G.u.(. .f..h...W... J. j.b.:# L. ..... ...... . . . . . . . .D

..... ..c........ .......,y.x. . Ap. ...g.r.....c.k..sv . ...........

...........g 26.s. ..c........ ..... m... .. ., day. . .y...At. . . A. .br... ...... .. .. ....>...

. . . . . n.r . .

-a

a. -

n  ? / A, An-w e ...... ....... ........... ...........

........................... ........................ ..... ...... N..........

LIMIT 0.20 0.50 2 HR/ DAY O( . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....~..............

MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE

l O

Page 2 of 2 6 2 EV -S AM-0 0 2 -0 R00

~

SERVICE WATER CHLORINATION DATA DATA PACKAGE 2 (DATA SHEET 2) l_[ .

t WIEKLM UNIT NO: 5b-

. . i CHLORINATORS Cla, DATE FREQUENCY CL. INJECT NO. 1 NO. 2 NO. 3 FRE'E mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE t/24 HR t/24 HR t/24 HR AVG. MAX HOUR / DAY 3.y.J h. .m......... ........... ........ .f.o.&.... ....... ..... ...... ..........m.%

Af 3%L 6. ::........ ........... ........ . 09:L... ....... ........... ..........n x-

..... mn Q,4.. .......... ........... ........ . P_ . . . . . ....... ........... .....

K% (

3MB.T. . . . . .= ._...... . M 4.._. .~...... ........... ...........

..... .......... ........... N.......

........................... ....... ................ ..... ...... h y LIMIT 0.20 0.50 2 HR/ DAY

  • MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE

L i

1 i

Page 2 of 2 62EV-SAM-002-0 R00

,n. .. -,,...: - , , _ ~ . . , _ _ _ - - , ~ _ , , , , . . - - _ _ . _ . .. , ,,_. . - - - - _ .

Page  ! .f 8 .

i OUARTERLY OPERATIONAL MONITORING REPORT Georgia Pouer Con pany From: 04-01-86 Plant Hat c h To: 06-30-86 O P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GR004120 Discharge Location:001A1 - Low Vo l u nie Waste (Neut ral i zat i on Tank )

Type of Sample: Grab Frequency of Analysis: 2/Mo Code: (530) (550) (400)

Parameter: Suspended Solids Oil & Grease pH mg/l ag/l Limits: Avg. 30 Avg. 15 Min. 6.0 Max. 100 Max. 20 Max. 9.0 Date 04-07-86 0.1 3.6 8.0 04-22-86 0.2 0.0 7.1 05-06-86 0.2 0.0 7.7 05-19-86 0.2 0.0 7.5 06-02-86. 2.0 2.9 7.5 06-16-86 5.3 2.5 6.6 Humber of Samples: 6 6 6 Average Value: 1.33 1.50 7.40 C )g Maximum Value: 5.30 3.60 8.00 M i n i niu m Value: .10 0.00 6.60 Liniits Exceeded: 0 0 0 e

Pcg 2 of 8 1 I

QURRTERLY OPERATIONRL MONITORING REPORT Georgia Pouer Company From: 04-01-86

/"D Pl ant. Hat c h To: 06-30-86 l (s ) P.O. Box 4545 l Atlanta, Georgia 30302 Permit Number: GR004120 Discharge Loc at ion:001R2 Lou Volume Wast e (Pressure Filters)

Type of Sample: Grab Frequency of Analysis: 1/qtr Code: (530) (550) (400)

Parameter: Suspended Solids Oil & Grease pH mg/l mg/l Limits: Avg. 30 Aug. 15 Min. 6.0 Max. 100 Max. 20 Max. 9.0 Date 05-05-86 (R) 54 10.0 7.6 05-05-86 (B) 106.8 12.1 7.8 05-05-86 (C) 71.6 10.6 7.9-05-05-86 (D) 63.2 16.4 7.9 05-24-86 (R) 3.4 *

  • 05-24-86 (B) 34 *
  • 05-24-86 (C) 2.6 *
  • 05-24-86 (D) 1.8 *
  • 05-31-86 (R) 1.1 * *

\'-] 05-31-86 05-31-86 C.B )

(C) 1.3 1.7 e

05-31-86 (D) 2.2 *

  • Humber of Samples: 12 4 4 Average Value: 25.92 12.28 7.80 Maximum Value: 106.80 16.40 7.90 Minimum Value: 1.10 10.00 7.60 Limits Exceeded: 1 0 0

I Pcge 3 og g OUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 04-01-86

(-

Plant ' Hat c h P.O. Box 4545 To: 06-30-86 Atlanta, Georgia 30302 Permit Number: GA004120 Discharge Locat ion:001B - Cooling Tower Blowdown Loc at i on: Intake Mixing Zone pH Zn Cr Type Sample: In Sisu In Situ Grab Grab Grab Frequency: 1/wk. 1/wk. 2/mo 1/qtr 1/otr Parameter: Temp. Deg. F Temp. Deg. F Limits: T of 5 Deg. Min. 6.0 Max. 90 Deg. Max. 9.0 Max. 1.0 Max. 0.2 Unit 1 Unit 2 Unit 1 Unit 2 Unit 1 Unit 2 Code: (11) (11) (400) (1992) (1934)

Date 04-02-86 70 70 ** **

04-07-86 <0.1 0.10 <0.1 <0.1 04-07-86

  • 8.1 04-09-86 71 71 04-16-86 68 68 04-21-86
  • 7.8 04-23-86 66 66 04-30-86 66 66 05-05-86 7.4 8.3 05-07-86 77 77 O 05-14-86 05-19-86 79 79 8.2 8.7 05-23-86 75 75 05-28-86 79 79 06-02-86 8.4 8.6 06-06-86 82 82 06-11-86 84 84 06-18-86 8.4 8.7 06-18-86 83 83 06-27-86 84 84 No. of Sample: 13 13 4 6 1 ,1 1 1 Average Yalue: 76 76 8.10 8.37 4 10 .10 4 10 g.10 Maximum Value: 84 84 8.40 8.70 4 10 .10 g.10 (.10 Minimum Value: 66 66 7.4 7.80 4.10 .10 (.10 4.10 Over Limits: 0 0 0 0 0 0 0 0
  • Unit 1 in Shutdown
    • Unit 1 SAMPLED on 5-20-86 b

v

Page 4 of 8 QUARTERLY OPERATIONRL MONITORING REPORT Georgia Pouer Company From: 04-01-86 O P l ant- Hatch P.O. Box 4545 Atlanta, Georgia 30302 To: 06-30-86 Perniit Number: GR004120 Discharge Loc at ion: 001D - Liqui d Raduaste Systen Unis One Type of Sample: Grab Frequency of Analysis: 2/Mo Code: (530) (550) (400)

Parameter: Suspended Solids Oil & Greate pH mg/l mg/l Limits: Avg. 30 Aug. 15 Min. 6.0 Max. 100 Max. 20 Max. 9.0 Date 04-07-86 6.0 0.6 6.7 04-21-86 13.6 0.0 6.4 05-05-86 42.0 16.0 6.3 05-19-86 1.8 2.5 6.5 06-03-86 1.2 0.0 , 6.1 06-16-86 22.0 7.2 6.5 Number of Samples:

O Average Value:

Maximum Value:

14.43 42.00 6 6 4.38 16.00 6

6.42 6.70 Minimum Value: 1.20 0.00 6.10 Limits Exceeded: 0 0 0 o

9

  • Pcge 3 or 8 QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 84-01-86

['

s Plant . Hatch P.O. Box 4545 To: 06-30-66 At l ant a, Georgi a 30302 P e r nii t Number: GR004120 Discharge Loc at ion: 001D - Liquid Radwaste System Unit Tuo Type of Sample: Grab Frequency of Analysis: 2/Mo Code: (530) (550) (400)

Parameter: Suspended Solids Oil & Grease pH mg/l mg/l Limits: Avg. 30 Avg. 15 Min. 6.0 Max. 100 Max. 20 Max. 9.0 Date 04-01-86 1.0 0.4 6.5 04-22-86 0.66 0.38 6.2 05-05-86 2.0 0.4 6.3 05-19-86 2.0 0.0 6.6 06-03-86 .31 1.41 6.1 06-17-86 0.7 2.42 6.1 Humber of Samples: 6 6 6 Rserage Value: 1.11 .84 6.30 Maximum Value: 2.00 2.42 6.60 Minimum Value: .31 0.00 6.10 Limits Exceeded: 0 0 0 e

f I

i 1

0

4 . -

Pcge 6 of 8 QUARTERLY OPERATIONRL MONITORING REPORT

- Georgia Pouer Company From: 84-01-86 Plant Hatch To: 06-30-86 P.O. Box 4545 At l ant a, Georgi a 30302 Permit Number: GR004120 Discharge Loc at ion: 001E - Combine d Plant Waste Unit One Frequency of Analysis: 1/uk.

Type of Sample: In Situ Grab Grab Grab Parameter: Temperature T.R.C. F.R.C. pH Limits: Deg. F N/A N/A Min. 6.0

." Max. 9.0

Code: (11) (50060) (50064) (400) i Date 04-02-86 68 <.1 <.1 7.3 04-09-86 71 <.1 <.1 7.1 04-16-86 69 <.1 <.1 7.2 04-23-86 70 <.1 <.1 7.2 04-30-86 77 <.1 <.1 7.4 05-07-86 80 <.1 <.1 7.4 05-14-86 82 <.1 <.1 7.7 05-23-06 82 <.1 <.1' 8.2 05-28-66 89 <.1 <.1 8.2 06-06-86 86 <.1 <.1 7.8 06-11-86 90 <.1 <.1 8.0 06-18-86 89 <.1 <.1 8.3 06-27-86 87 <.1 <.1 8.5 Humber of Samples: 13 13 13 13 Rverage Value: 80.00 4 10 4,.10 7.72 Maximum Value: 90.00 4 10 4,.10 8.50 Minimum Value: 68.00 g.10 g.10 7.10 Limits Exceeded: 0 0 0 0 4

I v

1 1

Page 7 of 8 QURRTERLY OPERRTIONRL MONITORING REPORT Georgia Power Company From: 04-01-86

.O Plant. Hatch To: 06-30-86 V P.O. Box 4545 Atlanta, Georgia 30302 Permit Humber: GR004120 Discharge Location:001E - Combined Plant Waste Unit Tuo Frequency of Rnalysis: 1euk.

Type of Sample: In Situ Grab Grab Grab Parameter: Temperature T.R.C. F.R.C. pH Limits: Deg. F N/A N/A Min. 6.0 Max. 9.0 Code: (11) (50060) (50064) (400) 04-02-86 74 <.1 <.1 7.1 04-09-86 76 <.1 <.1 7.2 04-16-86 77 <.1 <.1 7.3 04-23-86 64 <.1 <.1 7.1 04-30-86 81 <.1 <.1 7.1 05-07-86 86 <.1 <.1 8.2 05-14-86 86 <.1 <.1 7.8 05-23-86 84 <.1 <.1 7.4 05-28-86 91 <.1 <.1 8.3 06-06-86 89 <.1 <.1 7.7 06-11-86 91 <.1 <.1 8.0 i

06-18-86 89 <.1 <.1 8.5 06-27-86 92 <.1 <.1 8.5

Number of Samples
13 13 13 13 Average Value: 83.08 4 10 g.10 7.71 Maximum Value: 92.00 c.10 (.10 8.50 Minimum Value: 64.00 4 10 4 10 7.10 Linitts Exceeded: 0 0 0 0 l

l l ~

. . _ _ _ _ _ , _ . ~ . . _ _ . . _ _ _ _ _ _ _ _ . . _ _ , _.___-,__ _ _ _. _ , , , - _ _ _ _ .

Pcge 8 of 8 QUARTERLY OPERATIONAL MONITORING REPORT Ceorgia Power Company From: 04-01-86 fN P l ant Hatch To: 06-30-86

() P.O. Box 4545 At l ant a, Georgi a 30302 Permit Number: GR004120 Date: July 18, 1986 I certify under the penalty of law that this document and all attachments uere prepared under the direction of supervision in accordance uith a system designed to assure that qualified personnel properly gather and evaluate the i nf ormat i on submitted. Based on my inquiry of the person or persons uho manage the system or those persons directly responsible for gathering the information the inf ormat ion submitted is to the best of my knouledge and belief true, accurate and complete. I am aware that there are significant penalties for submitting false i nf ormat i on including the possibility of fine and imprisonment for knouing violations.

?

p W

~- H. C. Hix

) General Manager l

W. R. Woodall, Jr.

Manager of Environmental Affiirs e

i

QUARTERLY OPERATIONAL MONITORING REPORT ADDITIONAL MONITORING-

~

s Georgia Power Co=pany From: 04-01-86 Plant Hatch ,

To: 06-30-86 A P. O. Box 4545 t Atlanta, Georgia 30302 Permit Number: GA0004120 _

Discharge Lo' cation: 001D - Liquid Radvante System Unit 2 Type of Sample: Grab '

Frequency of Analysis: Each Batch Parameter: pH Parameter: pH pH Units pH Units Limits: Min. 6.0 Limits: Min. 6.0 Max. 9.0 Max. 9.0 DATE DATE 4-01 6.5, 8.8 4-14 6.2 4-02 7.1, 7.3 4-15 7.8, 7.3, 7.8, 6.2 4-03 7.3 4-16 6.2, 6.9, 6.0, 6.0 4-04 7.0 4-17 6.0, 6.0 4-05 6.1 4-18 6.0, 6.1, 6.1, 6.7 4-06 6.0 4-19 6.6, 6.0, 6.7 4-07 6.3 4-20 6.3, 6.1, 6.1, 6.3, 6.1 4-08 6.0 4-21 7.2, 7.0

(N)

(, 4-09 6.1 4-22 6.2, 6.7. 6.2 4-10 7.8 4-23 6.0 4-13 6.0, 6.0 4-24 62 4-25 6.3 4-30 6.0 U

_ _ _ _ . .__ ._, . . _ _ . , .e-..__.. . _ . , . . . . _ , , _ . . _ _ - _ _ . _ , _ _ . _ _ . , _ _ _ _ _ . . - , . _ . _ , _ - _ _ . _ _ , _

QUARTERLY OPERATIONAL MONHORING REPORT ADDITIONAL MONITORING 4

Georgia Power Company From: 04-01-86 Plant Hatch .

To: 06-30-86 P. O. Box 4545 t Atlanta, Georgia 30302 Permit Number: GA0004120 .

Discharge Lo' cation: 001D - Liquid Radwaste System Unit 2 Type of Sample: Grab -

Frequency of Analysis: Each Batch Parameter: pH Parameter: pH pH Units pH Units Limits: Min. 6.0 Limits: Min. 6.0 Max. 9.0 Max. 9.0 ,

DATE DATE 5-01 6.3, 6.0, 6.1 5-15 6.6 5-02 8.7, 7.0, 6.2 5-16 6.7 5-03 6.2, 6.2, 6.3 5-17 6.3, 6.6 5-04 6.2, 6.0, 6.2, 6.3 5-18 6.3, 6.2, 6.3 5-05 8.3 5-19 6.6 5-06 6.0 5-21 6.5 5-07 6.5 5-22 6.5 f- g 5-08 7.3, 6.0 5-26 6.2

( ,) 5-09 5-10 6.3 5-27 6.1, 7.0, 6.2 6.0, 6.2 5-28 6.2, 6.3, 7.1, 7.2, 6.3 5-11 6.2, 6.1, 6.4, 6.1, 6.4 5-12 6.2 5-13 6.6, 6.2, 6.1 5-14 6.1 o

V D

g I

QUARTERLY OPERATIONAL MONITORING REPORT ADDITIONAL MONITORING Georgia Power Company From: 04-01-86 Plant Hatch .,

To: 06-30-86 C P. O. Box 4545 ',

Atlanta, Georgia 30302 Permit Number: GA0004120 .

i '

Discharge Location: 001D - Liquid Radwaste System Unit 2 Type of Sample: Grab Frequency of Analysis: Each Batch Parameter: pH Parameter: pH pH Units pH Units Limits: Min. 6.0 Limits: Min. 6.0 Max. 9.0 Max. 9.0 DATE DATE 6-03 6.1 6-17 6.1, 6.4, 6.0 6-04 6.1, 6.3, 6.1 6-18 6.1, 8.5, 6.0 6-05 6.2 6-19 6.0, 6.1 6-07 6.9 6-20 6.0, 6.0 '

6-08 6.9 6-21 6.1, 6.3, 6.1 6-09 7.8, 6.0 6-22 6.2 6-10 7.2, 7.4 6-23 6.0 l

.6-11 6.0,.6.6 6-25 6.0 6-13 6.0, 7.2 6-26 7.0 6-14 6.1, 6.2 6-27 6.'0, 6.0 6-15 6.3 6-28 6.1 6-30 6.0, 6.4 i

e p

i

~

l O

QUARTERLY OPERATIONAL MONITORING REPORT ADDITIONAL MONITORING-f-s Georgia Power Company From: 04-01-86

( j)

Plant Hatch .? To: 06-30-8.6 P. O. Box 4545 , ,

Atlanta, Georgia 30302 Permit Number: CA0004120 .

Discharge Lo'ation: c 001D - Liquid Radwaste System Unit 1 Type of Sample: Grab '

Frequency of Analysis: Each Batch Parameter: pH Parameter: pH pH Units pH Units Limits: Min. 6.0 Limits: Min. 6.0 Max 9.0 Max. 9.0 DATE DATE 4-01 6.0, 6.9, 8,8 4-17 6.2, 6.5, 6.6, 6.5 4-02 6.4, 6.0, 6.4 4-18 6.8 4-03 6.1, 6.3, 7.2, 6.2 4-19 6.6, 6.4, 6.6, 7.2, 6.3 4-04 6.0, 6.8, 6.5, 6.1, 6.5 4-20 6.0, 6.7 4-05 8.1, 6.5, 6.9 4-21 6.4, 6.3 4-06 6.7, 6.5, 6.0 4-22 7.4, 6.2 4-07 6.7 4-23 6.2, 6.2, 6.5, 7.1 4-08 8.5 4-24 6.0, 6.6,~6.8

('

'd

) 4-09 4-10 6.6, 6.4, 6.6 6.8 4-25 4-26 6.3, 7.0 6.4 4-11 6.0, 6.8 4-27 6.5, 6.2 4-12 6.0 4-28 6.1, 6.1, 8.9 4-15 6.7, 6.0 4-29 9.1, 6.8, 6.0, 6.2, 8.3 4-16 6.4, 6.2, 6.9, 6.0 4-30 6.2, 6.3, 6.5, 6.5 i

l I + .,

i f

. - . - - . _ = _ _ ~ . .- _ _ - .- . ~- __ . _ . _ . _ - -

QUARTERLY OPERATIONAL MONITORING REPORT ADDITIONAL MONITORING s Georgia Power Company From: 04-01-86 ,

Plant P.atch - To: 06-30-86 +

C~'s P. O. Box 4545 >

Atlanta, Georgia 30302 Permit Number: GA0004120 .

Discharge Location: 001D - Liquid Radwaste System Unit 1 Type of Sample: Grab '

Frequency of Analysis: Each Batch .

Parameter: pH Parameters pH pH Units PH Units Limits: Min. 6.0 Limits: Min. 6.0 Max. 9.0 Max. 9.0

! DATE DATE 5-01 6.2 5-16 6.5, 6.3 5-02 6.7, 6.6 5-17 6.7. 6.3, 6.5 5-03 6.3 5-18 6.4, 6.1 5-04 6.3 5-19 6.5, 6.4, 6.3

5-05 6.6 5-20 6.1, 6.2

, 5-06 6.2, 6.2 5-21 6.4 i

5-07 6.2 5-22 6.2, 6.'1, 6.1

! f- s 5-08 6.3, 6.2 5-23 6.2, 6.0

, ( 5-09 6.4, 7.2 5-24 6.3 1 5-10 6.2, 6.1 5-25 6.2 5-11 6.0, 0.3 5-26 6.2 5-12 6.6, 6.2 5-27 6.1, 6.1, 6.4, 6.7 5-13 6.1, 6.4 5-29 6.1, 6.0, 6.6, 6.7 5-14 6.5, 6.0 5-30 6.8, 6.8, 6.0 5-15 6.6, 6.4, 6.4, 6.2 5-31 6.0, 6.4 i

e I .

4 i

a 9

y . A

,4.__.___., __. ___,_,---m___.___x-_,mm__._ .__,. _ , , _ _ , . _ _ _ _ _ , _ _ - _ . , . .

_ - - .- - _ = _ _ _ _ . - . . . - _ - - . ._

QUARTERLY OPERATIONAL MONITORING REPORT ADDITIONAL MONITORING Georgia Power Company From: 04-01-86

_(T To: 06-30-86 '

\ -) Plant Hatch P. O. Box 4545 .

Atlanta, Georgia 30302 Permit Number: CA0004120 _

Discharge Location: 001D - Liquid Radwaste System Unit 1 Type of Sample: Grab '

Frequency of Analysis: Each Batch Parameter: pH Parameter: pH pH Units pH Units Limits: Min. 6.0 Limits: Min. 6.0 Max. 9.0 Max. 9.0 DATE DATE a

6-01 6.4, 7.6 6-17 6.7 6-03 6.1, 7.2, 7.4 6-18 6.4 6-04 6.5, 7.5, 6.5 6-19 6.5, 6.4, 6.3 6-05 7.3, 7.3, 7.0, 7.3, 6.5 6-20 6.2, 8.4, 6.4, 6.0, 6.3 6-06 6.6 6-21 6.4, 6.2 ,

6-07 6.3 6-22 6.6, 6.2 6-08 6.1 6-23 6.4

/~'s 6-09 6.6, 6.9 6-24 6.4, 6.7

(,,)

6.10 6.6, 6.3, 6.8, 6.3 6-25 6.6 6-11 6.6. 6.3 6-26 6.5 6-13 7.8, 6.2, 6.4 6-27 6.2, 6.4, 6.7, 7.8 6-14 6.1 6-28 6.8, 6.7 6-16 6.5 6-29 6.7, 6.7, 6.5 6-30 6.7, 6.6 l

t 1

l l

lO

\

l l

l ,

CIRC WATER CHLORINATION DATA'

~

c DATA PACKAGE 1

~-

(DATA SHEET 1) s ..

ao (v WEEKLY UNIT NO:

~

. CHLORINATORS Clg DATE FREQUENCY CL 2. INJECT NO. 1 NO. 2 FREE mg/l* DISCHARGE INITIALS CYCLE / DAY MIN / CYCLE f/24 HR 9/24 HR AVG. MAX HOUR / DAY f_5f_,_____I_____ .__f_0__-___ _4_0_D_0__3.po_o_ _. - ._._5_ _. _. _6_ _ _____0________2_f_6_ _' ___

L<)2 $..__.l'_____..__]O______,A_ .S_o_o_ _ __gsp_o__ . _. A_ _ _ ..- _. Y_ ____p________ _g_?d_ _ _ _ _

l2E____.l_____ .__}__D___-__ _ _9_m_ _ o_ _ _ _______ _ls_ _ . _. _A_ _ _____O_______. ..8_ _/> _ _ __ lA*9._ _ t:, ,_s_/_ _ _ .._=_________ ________________ .____ ._____ __________}_ .E_h_____ ?_ _____ _h __---___________ _____ __________________________ ______ _ _ _ _ _ _ _ _ _ ..__________ _ N______ _____ __________________________ ______________-___________________________ _____ N_____ f LIMIT 0.20 0.50 2 HR/DA  % , o _______..____________________________-- (s

  • MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE t

s t 1 1 l I i [\

                           '                                     Page 2 og 2 62Ey_ GAM-002_O                  ggg e
                                                                                                                                  ~

CIR; ATER CHLORINATION DATA l DATA PACKAGE 1 (DATA SHEET 1) I' 0 WEEKLY -

                                                    ,                                                  UNIT NO:              /              '   '

CHLORINATORS Clg DATE FREQUENCY CL 2. INJECT NO. 1 NO. 2 FREE mg/l* DISCHARGE INITIALS CYCLE / DAY MIN / CYCLE f/24 HR f/24 HR AVG. MAX HOUR / DAY S.7-p _92 _ _ _ _ _ _ _ .

                                            .___________________                 _______   .___        ._____     ______c____ _________
            .t&. ..z. __________            .__________-__ m_______              _______   .____      ._____

__________:__yQg ________

           $_'lY"

___ _ _ _ _ _ _ _ _ _ _ .._____________.,____________ _____ _________________ __V_______ 72_f.L& . '_________. .___-_--_-- - _tw 9 L&_______ qMP.___L_____.. _ _3.0-- _ _ _ __3_000 3000 J_5_ .__4______0________ 4_ _____ w ______ _ _ _ _ _ _ _ _ _ . .h_ _ _ _ _ _ _ _ , _ _______ _____ ._____ ____________________ N N _____ _ _ _ _ _ _ _ _ _ _ ..__________ ________________ .h ____________________ _______________..__________________________ _____ ______ ___________ h f LIMIT 0.20 0.50 2 HR/ DAY

        \

MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE 4

                                                                                     ~

l 62EV-SAM-002-0 R00 6 9 e e

CIRC WATER CHLORINATION DATA DATA PACKAGE 1

              .                                                     (DATA SHEET 1) m  y                                 _.

V WEEKLY:.e UNIT NO: (de/

                                                       ~

CHLORINATORS Clg, DATE FREQUENCY CL 2. INJECT NO. 1 NO. 2 FREE mg/l* DISCHARGE INITIALS CYCLE / DAY ~ MIN / CYCLE f/24 HR f/24 HR AVG. MAX HOUR / DAY N U

           . f_v.. _ M_ _ u_ _ _ _ _ _ .__________________.
                                               .                             _______           .____        ._____       ._________I h_ _ _ _/_ _ _ _

d.41$.. .cs* . . _ _ _ . ._________________________.

           .J.H 1:_-. _ Pb_ _ _ _ _ .._'_________ ________________

_ .____ ._____ ._________& _J_h______ 0 __%__i_b W kb

                                                                                                                                             .       s 4' s
           .d N

4_ J.o.- _n_ _d_ _ _.__________.________ _ __. _______ .____ ._____ . _ _ _ _ _ _ _ _ _ _ '_7_?_u_.____ m

          . ____ _ _ _ _ _ _ _ _ _ ..__________               .:=-=       -_ ___ _ _ _ _ _ ..____          ._____.___________________

__________________________._______________ _____ ______ .__________  :::= ___ , LIMIT 0.20 0.50 2 HR/ DAY pa

  • MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE i

l r O Page 2 of 2 62EV-SAM *002-0 R00 i t

CIRC WATER CHLORINATION DATA DATA PACKAGE 1 (DATA SHEET 1)

                                                                                                                          ~
r 6 '

WEEKLY

  • UNIT NO:

I CHLORINATORS C14 DATE FREQUENCY CLgINJECT NO. 1 NO. 2 FREE mg/l* DISCHARGE INITIALS CYCLE / DAY MIN / CYCLE t/24 HR t/24 HR AVG. MAX * ' HOUR / DAY

     &_G_ _ _ _ _ ]_ _ ..___S_0_______

_ __ _3_ _0_0_0_ _3_o_c_o _ _ __ _. a_ _ _._4_ _____Q_______2_9_9__

                                                                                                                                                    '3 _ _
     .L25__ _ _ _1_ _ _ _ _ ..___&ct_____ _Sa.e_                                          .. a__

_ ._&______.a_______Ab_____ _ __3a.e.a_

                                                                                              /_T_ .J_ ___.L______ ___b_____

4f-LV. ___/_____.. _ _ _6_ _0_ _ _ _ __ _Fn_e_ _ _ _ _______ . i

                  ..' . M u_ __ __. ._______________                                      .____        .________________       _Y/_h_____

4_2_&_9_ - e _ _ _ - W. _ _ _ _.__________ ___. ______________ . , _ _ _ . /____ ___________ ________ LIMIT 0.20 0.50 2 HR/ DAY

  • MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE I

I 62EV-SAM-p02-0 R00

SERVICE WATER CH: .RINATION DATA - DATA PACKAGE 2 (DATA SHEET 2) 3 ' i-

                                                                                                                                  /

WIEKLi UNIT NO: x CHLORINATORS Clx DATE FREQUENCY CLg INJECT NO. 1 NO, 2 NO. 3 FRdE m /l* DISCHARGE

                                                                                                                        ..g
                                                               ........      .__......     .......            .t y. .       ....   ...........

CYCLE / DAY MIN / CYCLE f/24 HR f/24 HR t/24 HR AVG. MAX HOUR / DAY

                                           . . . .N. /_c . . . . .Ro. o. . . . . . . ~ ~ . ... .-. . -. . . . ..g. . . . 0. . .    ...0.......
                                                                                       ~

4.6.&.. . ........ Y'J'd-[_.

                    ........               ....l$A_... . . E Q .o. .         .........     .~....               )5. . . .O. . . .._f}......r
       .t, n%.

a .!.a.h. . .m. .0...A..l1.%.... ...2.f.C_ _........

                                        ..                                                 .......            .sLS... . .a _ _ ...        0.......

W __A_ _ _ _ _ _ _v. ....E8.... . 2 0... ...__.... ...~__.. ..}.5... . P. . . ...D....... N w ,... ............__... .....__ ........... ...........

                                                                       ~
       .....     ..........                ...........         ........      ....... . h                             ......     ...........

N

       ......................_...                              ........_ . ............                       .....     ...... M. _ .

E LIMIT 0.20 0.50 2 HR/ DAY

  • MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE
       **      MEASURED AT SERVICE WATER. DISCHARGE TO CIRC WATER FLUME t

l l l l l l

                       s                                                                                     62Ev. SAM-002-0                 R00 l
  • SERVICE WATER CHLORINATION DATA V DATA PACKAGE 2 (DATA SHEET 2)

(q r P

                                         ?
         '                                7-L/                               .

WEEKLYF UNIT NO: / CHLORINATORS . C1x

                                                            ........................                            ... 7.................

DATE FREQUENCY CLg INJECT NO. 1 NO. 2 NO. 3 FREE m/ l*

                                                                                                                           ..g            DISCHARGE
                     ..........       ...........           ........       .........                 ....... etf..            ....    ...........

CYCLE / DAY MIN / CYCLE t/24 HR t/24 HR t/24 HR ..... AVG.

                                                                                                                                ,Mi'X HOUR / DAY y n.. . <......... .____......                  . .o.w. . . ..........

pf.li.

            .        . <.........     ...........           .. w._.... .... ....                     .......    ...........              ..........~.

[.x.(,_ .g.n.A...~.... . . .HA . . . . . .a o. .s. . ..En.... . ..H.A... .vy'...<. .t. . . ....o....... ,

                                                                                                     . . g. _ _ ..j.s. .. o ). . ....a.......
              .e])s. . .i n. . %. . .. .. ...A.. ./A. . . .. ..a. . .o. . . 9....
            .....    ..........                             ..a..............                        .......
            .....    ..........        ...........          ........       . . . _h LIMIT                                             0.20 0.50                  2 HR/ DAY
  • MEAf tRED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE
            *
  • MEA 141 RED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME l

l t I l i L i l a.

                               '                                     Page 2 of 2                                         .

ROO 6 2 EV-S AM -00 2 -0 O _

                                                                              -,.n-,       - - . - -

SERVICE WATER CHLORINATION DATA DATA PACKAGE 2

     %                                  ._                          (DATA SHEET 2)
       )       .

1 WsEKLY

                                               ~

UNIT NO: cN8 . CHLORINATOR 5 , Cl g DATE FREQUENCY CLa INJECT NO. 1 NO. 2 NO. 3 FREE mg/1* DISCHARGE CYCLE / DAY MIN / CYCLE f/24 HR t/24 HR I/24 HR AVG. MAX HOUR / DAY J/,

          . .'.3.R. . . ./.3.W. . . . .    ...........        ........         .........    .......   .....      ......d. .h. .b.'. . . . . .

49-/f.r ...t.w......

                .                          ...........        ........         .........    .......   .....      . . . . .&.  .  .J'.......
                                                                                                                            ^

d),f. b*. . . p., .b. . . . . ........... ................. ....... ..... ......- .h. .b. . . . . . . .

          /.p:.%.
          . .        . ... m....... ...........               ........         .........    .......   ...........             . f5.!.J. . . . . . .
                                                                                                                                % 9+1
         }),..e.                                                                                                              .V v,......

r<s, .,, ......... ....... ........... .

                  .a ..........            ...........        ........
                                                                                                                              . . .w .

p .......................... ........................ ..... ...... 0.20 0.50 2 HR/ DAY ( w)? LIMIT

  • MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE
         **       MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME i

i l (mv>\ Page 2 of 2 62EV-SAM.002 0 ROO

SERVICE WATER CHLORINATION SATA DATA PACKAGE 2 (DATA SHEET 2) ( ) . t .- V WsEKLY UNIT NO: e7 . CHLORINATORS C1 g DATE FREQUENCY CLg INJECT NO. 1 NO. 2 NO. 3 IREE m ..g/l* DISCHARGE

        .....          ..........        ...........              ........        .........          .......      72. .            ....    .....__....

CYCLE / DAY MIN / CYCLE f/24-HR f/24 HR f/24 HR AVG. MAX HOUR / DAY [d_ib. .......... .... d.... . . A00. . . ._....... .. ~___.. [4 . . .O. . . ....O.......

                                                                                         ~~~                            *
                    . .      ...     .m......H.           ...     . . 2 E.e. . .........             .......     . ., /.D. . . .O. . . ..__O_......
        .&AJ.b. 6.. . .%. . .n.e.....E..R.... . . Ja r . .                       ......._.           .......     ..       '. ..a.. ...O.......
               .!,B
                  .   . ././.*$. .m. .e. .... R" "0.... . 2.0.0. . .....~....                      .......     . N. ... 0... 0.......   ...
        .....         ........_.         h                                       .........           .......     ...........              ...........

N

                                                                                                                 ~~

N LIMIT 0.20 0.50 2 HR/ DAY HEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE

       ** MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME N                                                                      .

Page 2 of 2 R00 N 6 2 EV'-S AM -0 0 2 -0

                                                                                                                              ~

SERVICE WATER CHLORINATION DATA

"                                                            DATA PACKAGE 2 m                                                          (DATA SHEET 2) g U

lV WsEKL6 UNIT NO: A ' CHLORINATORS Clx DATE FREQUENCY CLg INJECT NO. 1 NO. 2 NO. 3 FREE mg/l* DISCHARGE

                                                        ........       .........         .......       .( t. .   ......       ...........

CYCLE / DAY MIN / CYCLE t/24 HR t/24 HR f/24 HR AVG. MAX HOUR / DAY

                                                                          /y#&.....,.......

la. .'s-m A < f./. y. {,.l. .......... ........... ........ .f.pv..... S-vi& CL.... 5).lsM..(./.A.$.. &. ...N..h....

                                             ..         . 2 M ... . . R.t*c . . . ..)y.k...  .         n'3JY. . .d...... l    .. 0..*.....

d- E}.l. ia. .t o. .; s. .o. ....b..M..... . EJ.W. . ....U.A.... . 80'. .

                                                                                                       . .,lb'.. .<. s. l . ...R......
       .....         ..........         =

N

       .....         ..........         ...................             A                e ..... .....           ......       ...........

2 '-----------------------~~~ 0.20 0.50 2 HR/ DAY W LIMIT g . . . . . . . . . . . . . . . . . . . . . . . .. . . . . .................. MEASURED AT POI.NT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE

       **      MEASURED AT SERVICE WATER. DISCHARGE TO CIRC WATER FLUME                                                     .
                                                                                                                         \*
                                                                          '                                                                 ~

d Page 2 of 2 62EV.S,AM-002 0 R00 M

SERVICE WATER CHLORINATION DATA P DATA PACKAGE 2 (DATA SHEET 2) 7- g s . e

 'J' ~-

wtEKLY UNIT NO: 4> - CHLORINATORS C1x DATE FREQUENCY CLg INJECT NO. 1 NO. 2 NO. 3 FREE mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE f/24 HR f/24 HR f/24 HR AVG. MAX HOUR / DAY gy. . . W.s

                                                                                                            - - . >       A
               ...g..
                                  .....  ...........     .................              .......   .....     ......       . F. .]./. . . . . .

4.t.2/5 ..itz.,.....

               .                         ...........     ........         .........     .......   .....     ......       . .b.h. . . . . . . .

Y2fl$. .. 4Gt.... ........... ................. ....... ..... .....: ...........

               .J1. r1. ...p.. v..... ...........        ........         .........     .......   ...........            . .f.?th. . . . . . .
               .43.o.%.....rf.o.....

s .

                                         ...........     .................              .......   .....     .....' .$.w......

A

                                         ...........     .....-=                 =..... .......   ...........            ...........

t LIMIT 0.20 0.50 2 HR/ DAY g ..............................................

  • MEASURED AT POINT OF DISCHARGE TO RI'VER DURING CHLORINATION CYCLE
               **    MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME 1

( 4 Page 2 of 2 62EV.. SAM-002 0 ROO O

CIRC WATER CHLORINATION DATA DATA PACKAGE 1 . (DATA SHEET 1) WEEKLY UNIT NO: ,7 ,-

                                  . I.            _______________________________________________.

CHLORINATORS Clg DATE FREQUENCY CL t INJECT NO. 1 NO. 2 FREE mg/l* DISCHARGE INITIALS CYCLE / DAY MIN / CYCLE f/24 HR I/24 HR AVG. MAX HOUR / DAY S-7 % _IN_ _ _ _ _ _ _ . p____ __________ ___________ _ pp_____ _______ _____..______ _ _ _ _ _ _ _ _ _ . . 3_b______ __,._h_____ _[-_/_((_ _ _ _ _ _ _ _ _ _ _ ..__________ _ _/_3_4_/_ _ _ ________ _____ _________________ ga_ir_,__ &_ w __o_______ _______ _____ .________________ _-fjd_

  .&. LWe _. _ _ _ ]_ _ _ _ _ ..___4_0_______       .-T f f_o_ _ _3_M_ _e_ _ _/_S__ _ _. fA_ _____Q_______f_]&_____

_____ _______ ~___N N N ______ _ _ _ _ _ _ _ _ _ ..__________________________ w ____________________ _______________..__________________________ _ _ , . _ _ ______ ___________ h LIMIT 0.20 0.50 2 HR/ DAY

  • MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE 62EV-SAM-002-0 ROO 9

h

                                                                 =

Page 1 of 9 j QUARTERLY OPERATIONAL MONITOPIi1C REPORT I Georgia Power Company O Plant Hatch P.O. Box 4545 From: 07-01-86 To: 09-30-86 AtIanta, Georgia 30302 Permit Number: GA004120 Discharge Location:001A1 - Lou Volume Waste (Heutralization Tank) Type of Sample: Grab Frequency of Analysis: 2/Mo Code: (530) (550) (400) Parameter: Suspended Solids Oil & Grease pH . mg/l mg/l Limits: Avg. 30 Avg. 15 Min. 6.0 Max. 100 Max. 20 Max. 9.0 Date i 07-08-86 16.0 07-20-86 0.82 8.0 47.25 0.96 7.1 08-05-86 1.0 0.70 08-18-86 6.7 18.0 0.4 6.4 09-01-86 30.5 2.0 09-15-86 8.2 1.67 0.47 7.4 Number of SaJnples: 6 6 s Average value: 6 19.07 .89 7.30 Maximum Value: 47.25 2.00 Minimum Value: 8.20 1.00 .40 6.40 Limits Exceeded:' 8 0 0 i 1 e i g ty 5 a L. 'J . t @ I w - e de e.-. s +. . _( ... .

i-Page 2 of 9 i QUARTERLY OPERATIONAL MONITORING REPORT U Georgia Pouer Company Froni: 07-01-86 Plant Hat c h P.O. Box 4545 To: 09-30-86 Atlanta, Georgia 30302 Permit Humber: GA004120 Discharge Location:001A2 Lou Volume Waste (Pressure Filters) Type of Sample: Grab Frequency of Analysis: 1/qtr Code: '"ss (530) (550) (400) Parameter: Suspended Solids Oil & Grease pH mg/l mg/l Limits: Avg. 30 Avg. 15 Min. 6.0 Max. 100 Max. 20 Max. 9.0 Date

     ,             88-04-86           (R)          1.1                 <5 08-04-86                                                                    7.6 (B)         0.7                 .<5 08-04-86                                                                     7.6 (C)          1.1                 <5                      7.6 08-04-86            (D)      ' . 0. 6                <5                      7.6 Humber of Samples:                4                   4       -

4 y Rverage Value: .88 (5.00 , 7.60 Maximum Value: 1.10 45.00 Minimum Value: 7.60

                                                    .60              45.00 Limits Exceeded:                                                              7.60 0                   0                       0 i

e LO

  • t L_ . . _ _ . _ _ - , _

g, g . ea *b "'

Page 3 of 9 q QUARTERLY OPERATIONAL MONITORING REPORT

     -l Georgia Power Company Plant Hatch                                                                      From: 07-01-86 P.O. Box 4545                                                                      To: 09-30-86 Atlanta,Ceorgia 30302 Permit Number: GA004120 Discharge Location:001B - Cooling Touer Bloudoun Location:       Intake       Mixing Zone         pH Type Sample:'In Situ                                                     Zn                  Cr In Situ          Grab                  Grab                  Grab Frequency:       1/uk.           1/uk.          2/mo              1/qtr                    1/qte Parameter: Temp. Deg. F       Temp. Deg. F Limits:                      T of 5 Deg. Min. 6.0 Max. 90 Deg. Max. 9.0          Max. 1.0                   Max. 0.2 Code:            <11)            (11)

Unit 1 Unit 2 (400) Unit 1 Unit 2 Unit 1 Unit 2 (1092) (1034) Date 07-02-86 86 84 07-07-86 8.3 7.8 07-09-86 89 89 07-16-86 88 88 07-21-86 8.5 8.5 07-23-86 87 88 07-30-86 86 86 0 08-04-86 08-06-86 08-13-86 86 84 86 84 8.2 8.0 08-18-86 8.1 7.8 - 08-20-86 86 86 08-21-86 08-28-86 <0.1 <0.1 (0.1 <0.1 88 88 09-01-86 8.0 7.6 09-05-86 8~1 81 09-12-86 80 80 09-15-06 8.2 7'9 09-18-86 81 81 09-24-86 80 80 - Ho. of Saaple: 12 12 6 6 1 1 1 Average Value: 85 85 8.22 1 7.93 4.10 4 10 <.10 Maximum Value: 89 89 8.50 8.50 4 10 Minimum Value: 80 4 10 g.10 4 10 4 10 80 8.0 7.60 4 10 4 10 Over Limits: 0 0 0 0 0 4 10 4 10 0 0 0 l l e . L

Page 4 of 9 QUARTERLY OPERATIONAL MONITORING REPORT Ci Georgia Power Company Plant Hatch From: 07-01-86 P.O. Box 4545 To: 09-30-86 Atlanta, Georgia 30302 Permit Number: GA004120 Discharge Locat ion:001C - Sewage Treatment Plant Type of Sample: Grab Frequency of Analysis: 2/Yr Code: (310) (50064) (400) (530) Parameter: B.O.D.5 F.A.C. pH T.S.S. mg/l mg/l ag/l Limits: PLANT # Avg. 30 - Avg. 30 Max. 45 - Max. 45 Date

  , 07-08-86         1           5.4                   0.7     6.5     10.4 Humber of Samples:               1                  1 Average Value:                                             1          1 5.40                  .70 Maximum Yalue:                5.40 6.5     10.40
                                                        .70    65      10.40 Minimum Value:                5.40

%) Limits Exceeded: 0

                                                        .70 0

6l5 10.40 0 0

                                   .         4M
  • O p

4 Page 5 of 9 QUARTERLY OPERATIONAL HONITORING REPORT Georgia Power Company Plant Hatch From: 07-01-86 P.O. Box 4545 To: 09-30-86 Atlanta. Georgia 30302 i Permit Number: GA004120 Discharge Loc at ion: 001D - Liquid Raduast e Syst em Uni t One Type of Sample: Grab Frequency of Analysis: 2/Mo 4 Code: (530) (550) (400) Parameter: Suspended Solids Oil & Grease i pH mg/l mg/l Limits: Avg. 30 Avg. 15 Min. 6.0 e Max. 100 Max. 20 Max. 9.0 i Date 07-07-86 12.0 2.7 07-21-86 6.5 9.0 3.52 6.9 08-03-86 3.82 0.9 08-18-86 6.0 0.63 0.00 6.2 09-01-8C 8.8 2.0 69-16-86 6.8 O 59.5 12.6 7. 4 i Number df Samples: 6 6 i Average Value: 6 14.12 3.62 6.6 Maximum Value: 50.50 12.60 7.4 Minimum Value: .63 0.00 6.0 Limits Exceeded: 0 0 A i I , i

^

6 I h i r i O _...---_.._...,.,_,_.._,._.,_.._,.__,.__,...,__c _

Page 6 of 9 OUARTERLY OPERATIONAL M014ITORIl1G REPORT Georgia Power Corup any Plant Hatch From: 07-01-86 P.O. Box 4545 To: 09-30-86 Atlanta, Georgia 30302 Permit Number: GA004120 Discharge Location:001D - Liquid Radwaste System Unit Two Type of Sample: Grab 1 Frequency of Analysis: 2/Mo Code: (530) (550) (400) Parameter: Suspended Solids Oil & Grease pH

,                                                                                           mg/l                                     mg/l Limits:                                                          Avg. 30                                  Avg. 15            Min. 6.0 Max. 100                                 Max. 20           Max. 9.0 Date
             '           07-07-86                                                            0.3                                      2.53 07-21-86                                                                                                                                 6.3 i

1.00 0.00 6.0 08-04-86 1.00 08-18-86 0.00 8.1 0.6 0.94 6.1 09-01-86 0.52 09-16-86 1.80 6.1 0.667 2.00 6.3 O Number of Samples: 6 6 Average Value: 6 1

                                                                                              .68                                     1.21                     6.48 Maximum Value:                                                        1.00                                    2.53 Minimum Value:                                                                                                                          8.10
                                                                                              .30                                    0.00 Limits Exceeded:                                                                                                                        6.00 0                                        0 1                                                                                                                                                                     0 l

1 i t l t I b e

      - - - - . . _ . . . . , . . _ , . _ . . . . , . - _ _ _ _ _ _ _ _ _ , _ _ , _ .               . _ _ . . . _ _ , - _ . _ ,             _m       _ . _ _ _ _ _ _ _ _ _ _ _ _              _ _ , _ _ _ . - - _ _
                                                                                                                                                                                                                        .w

.4 Page 7 of 9 QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 07-01-86 Plant Hat c h To: 09-30-86 P.O. Box 4545 At lant a, Georgia 30302 Permit Humber: CA004120 Discharge Location:001E - Combined Plant Waste Unit One Frequency of Analysis: 1/wk. Type of Sample: In Sisu Grab Grab Grab Parameter: Temperature T.R.C. F.A.C. pH Limits: Deg. F N/A N/A Min. 6.0 4 Max. 9.0 Code: (11) (50060) (50064) (400) Date 07-02-86 96 <.1 <.1 8.7 07-09-86 91 <.1 <.1 8.5 07-16-86 91 (.1 <.1 8.2 07-23 88 <.1 <.1 8.4 07-30-86 91 <.1 <.1 8.1 08-06-86 87 < .1 <.1 7.8 08-13-86 90 < .1 <.1 8.2 08-20-86 91 <.1 <.1 7.9 4 08-28-86 89 < .1 <.1 8.2

   \                     09-03-86                                                                         87                                  < .1                                        <.1             6.0 89-12-86                                                                         89                                  < .1                                        <.1             7.9
j. 09-19-86 86 < .1 <.1 7.8 09-24-86 87 <.1 <.1 8.5 Humber of Samples: 13 13 13 13 Average Value: 89.46 4.10 g .10 8.17 Maximum Value: 96.00 4.10 4 10 8.70 Minimum Value: 86.00 4 10 4.10 7.80 Limits Exceeded: 0 0 0 0

'I O h

       -        , - . _ . ,      - . - . _        , . . . . ~ - . . . - . _ _ _ .
                                                                                       - - . _ _ _ _ -          . . . . . _ - , _ ..__.,_-_,._. _ r _ _ . , . - . , . . . _ . _ _ . , _               -.,--.__,--_.I,--
                     , . . . . . . . _ , .             >,..   . . ,       .   ..    .                  ..    ,, .m Page     8 of 9
  /                                      QUARTERLY OPERATIOilAL MONITORING REPORT Georgia Power Corupany                                                               From: 07-01-86 Plant Hatch                                                                            To: 09-30-86 P.O. Box 4545 At l ant a, Georgi a 30302                                                 Permit Number: GA004120 Discharge Locat ion:001E - Combined Plant Waste Unit Tuo Frequency of Analysis:            1/wk.

Type of Sample: In Situ Grab Grab Grab Parameter: Temperature T.R.C. F.A.C. pH Limits: Deg. F N/A N/A Min. 6.0 Max. 9.0 Code: (11) (50060) (50064) (400) Date 07-02-86 97 <.1 <.1 8.3 07-09-86 89 <.1 <.1 8.3 . 97-16-86 93 <.1 <.1 8.3 07-23-86 88 <.1 <.1 7.7 87-30-86 87 <.1 <.1 8.2 08-06-86 89 <.1 <.1 8.3 l 98-13-86 87 (.1 <.1 7.8 08-20-86 87 <.1 <.1 8.1 08-28-86 87 <.1 (.1 8.0 09-03-86 73 <.1 <.1 7.9 09-12-86 91 <.1 <.1 7.9 09-19-86 69 <.1 <.1 09-24-86 7.8 86 <.1 (.1 8.2 Humber of Samples: 13 13 13 13 Rverage Value: 86.38 t.10 4.10 8.06 Maximum Value: 97.00 <.10 <.10 8.30 Minimum Value: 69.00 Limits Exceeded: <.10 4 10 7.70 0 0 0 0 i } I

                                                                                           . s3pt. I f
                                                                                                  'xp l

Pcgt 9 of 9  ; QU 6 P T E F.L Y OPERATIONAL MONITORING PEPORT )

  %      Georgia Power Company                                                  From: 07-08-86 v

1 Plant Hatch To: 09-30-86 P.O. Box 4545 Atlanta, Georgia 36302 Permit Number: GA004120 I certify under the penalty of law that this document and all at tachment s were prepared under the direction of supervision in accordance with a system designed to assure'that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information the information submitted is to the best of my knowledge and belief true, accurate and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations.

     .1 AM p)

L H. C. Hix

                                                           ?

General Manager

  )              .
.                                                                                              au

QUARTERLY OPERATIONAL MONITORING REPORT ( v ADDITIONAL MONITORING Ccorgia Power Company Plant Hatch From: 07-01-86 To: 09-30-86 P. O. Box 4545 Atlanta Georgia 30302 Permit Number: CA0004120 s Discharge Location: 001D - Liquid Radwaste System Unit 1 Type of Sample: Grab Frequency of Analysis: Each Batch Code: (400) Code: (400) Parameter: pH Parameter: pH pH Units pH Units Limits: Min. 6.0 Limits: Min. 6.0 Max. 9.0 Max. 9.0 DATE DATE 7-01 6.5; 6.4 7-17 6.5; 7.2 7-02. 6.3; 6.3 7-18 6.5; 6.1; 6.7 { s 7-03 6.4; 6.0; 6.2; 6.2 7-19 6.5; 6.4; 6.6 7-04 6.4; 6.0; 6.2; 6.7 7-20 6.6; 6.7 7-05 6.2; 6.3 7-21 6.9 7-07 6.5 7-22 6.8; 6.3; 6.9 7-08 6.4 7-23 6.7; 6.2 7-09 6.6 7-24 8.4; 6.9; 6.5; 6.1; 6.9 7-10 6.3; 6.6 7-26 7.9 7-11 6.4 7-27 8.3; 8.5; 8.1 7-12 6.3; 6.1; 6.4; 6.2 7-28 6.1; 8.3; 8.2; 6.0; 8.3 7-13 6.4; 6.1 7-29 7.7; 7.4 7-14 6.6; 6.2 7-30 7.0; 6.8; 6.7, 7-15 6.6 7-31 6.5; 7.5; 7.6; 6.8; 6.6 7-16 6.0; 6.4; 6.9 i O

l l QUARTERLY OPERATIONAL MONITORING REPORT

                                                 .                       ADDITIONAL MONITORING

, '% ) Georgia Power Company Plant Hatch From: 07-01-86 P. O. Box 4545 To: 09-30-86 Atlanta, Georgia 30302 Permit Number: CA0004120 Discharge Location: 001D - Liquid Radwaste System Unit 1 Type of Sample: Grab Frequency of Analysis: Each Batch Code: (400) Code: (400) Parameter: pH Parameter: pH pH Units pH Units Limits: Min. 6.0 Limits: Min. 6.0 Max. 9.0 Max. 9.0 DATE DATE 8-01 6.8; 6.8; 6.4; 6.5; 6.4 8-17 6.2; 6.0; 6.2 p 8-02 8-03 6.8; 6.3; 6.1; 6.0; 6.3; 6.8 6.7; 6.5 8-18 8-19 6.2; 6.2; 6.6; 6.2; 6.4; 7.0 6.4 ('/ 8-04 6.3; 6.2 8-20 6.0; 6.0; 6.1; 6.3 8-05 6.5; 6.3 8-21 6.6; 6.0; 6.3; 6.5 8-06 6.2; 6.4; 6.0 8-22 6.2; 6.4; 6.6; 6.2; 6.4 8-07 6.0; 6.1; 6.0; 6.2; 6.5; 6.1 8-23 6.9; 6.1; 6.6; 6.5; 6.2 8-09 6.0 8-24 6.2; 6.6; 6.4; 6.5 8-10 6.4; 6.1 8-25 6.0 8-11 6.0; 6.2; 6.4; 6.2; 6.0 8-27 7.8; 6.0 8-12 6.5; 6.0; 6.2; 6.4; 6.7; 6.4 8-28 6.8 8-13 8.4; 6.6; 8.5; 6.2 8-29 7.9; 6.6 . 8-14 6.2; 6.3; 6.3; 7.0; 6.0 8-30 7.7; 6.7; 6.7,; 7.2 8-15 7.3; 6.1; 6.4; 6.7 8-31 6.7; 6.8; 6.8; 6.5; 6.8 8-16 6.5; 6.4; 6.4; 6.1 9 l-l s t

           *    , _ _ _ . _. ,..,_- _ .._,.._. .                  ,, ,       . , _ _ _ . _ , _ . - _ - _ , _ . _         . - _ . -    ..,,._..,..,_,___-_____g, _

l QUARTERLY OPERATIONAL MONITORING REPORT f*' . ADDITIONAL MONITORING

 \

s I Georgia Power Company Plant Hatch From: 07-01-86 P. O. Box 4545 To: 09-30-86 Atlanta, Georgia 30302 Permit Number: CA0004120 Discharge Location: 001D - Liquid Radwaste System Unit 1 Type of Sample: Grab Frequency of Analysis: Each Batch Code: (400) Code: (400) Parameter: pH Parameter: pH pH Units pH Units Limits: Min. 6.0 Limits: Min. 6.0 Max. 9.0 Max. 9.0 DATE DATE 4 9-01 6.5; 6.8; 6.5 9-18 6.3; 6.1 9-02 6.2; 6.8; 6.3 9-19 6.7; 6.0; 7.7; 6.6 I) 9-03 9-04 6.0; 6.2; 6.5; 8.2; 6.9; 6.0 6.1 9-20 7.9; 6.6; 6.0 9-21 6.3; 6.6; 7.8; 6.9 9-05 6.2; 6.6 9-22 6.0; 6.7; 6.6 9-06 6.3; 6.7; 6.4 9-23 7.2; 6.7; 6.3; 6.5 9-07 6.5 9-24 6.3; 7.1; 6.5; 6.2 9-08 6.0; 6.6; 6.8 9-25 6.2; 6.1; 6.9; 6.4 9-09 6.7; 8.5; 8.4 9-26 6.2; 6.5; 6.6; 7.0; 6.8 9-10 8.7; 8.4; 7.4 9-27 6.2; 6.2; 6.6 9-11 7.9; 6.6 9-28 6.5; 6.3; 8.7; 6.8; 6.7 9-12 6.9; 6.0; 6.6; 6.1 9-29 6.4; 6.6; 6.6; 6.7; 7.2 9-13 7.0; 6.2 9-30 6.6; 7.5; 6.9; 6.6 9-16 6.0; 7.7; 7.2

  • 9-17 6.1; 6.4; 6.2; 7.4 I

l i ( O l

QUARTERLY OPERATIONAL MONITORING REPORT ADDITIONAL MONITORING l V Georgia Power Company Plant Hatch From: 07-01-86 P. O. Box 4545 To: 09-30-86 Atlanta, Georgia .30302 Permit Number: CA0004120 Discharge Location: 001D - Liquid Radwaste System Unit 2 Type of Sample: Grab Frequency of Analysis: Each Batch Parameter: pH Parameter: pH pH Units pH Units Limits: Min. 6.0 Limits: Min. 6.0 Max. 9.0 Max. 9.0 DATE DATE ~

        ,           7-01     6.4                                                  8-01    6.2; 6.1;          6.2; 6.0 7-02     7.9; 6.0                                              8-02   8.3; 6.0;          6.4; 6.3 7-03     6.3                                                  8-03    6.0; 6.0 4

7-04 6.2 8-04 8.1; 6.2; 6.0 7-05 6.0; 6.3 8-05 6.0; 6.0; 6.1 f] 7-06 6.1; 7.9 8-06 6.1; 6.8

N m _/ 7-07 6.3; 6.1 8-07 8.8; 6.2; 8.2; 8.8 7-08 6.1 8-08 6.0; 6.0; 6.5; 7.3 7-09 6.2; 6.4; 6.6; 6.0 8-09 _8.7; 6.1 7-10 6.0; 6.3 8-10 6.1; 6.1 7-12 6.0; 6.2 8-11 6.6; 8.1 7-13 6.1; 6.1 8-12 6.8 7-14 6.0; 7.4 8-13 6.0; 6.1 7-15 6.2 8-14 6.0; 6.0; 6.1; 8.4 7-16 6.1 8-15 8.5; 6.6; 6.3 7-17 6.3 8-16 6.5; 6.5; 6.4; 6.0; 6.1; 6.1 7-18 8.8 8-17 6.0 ~

7-19 6.2; 6.1 8-18 6.1 7-20 6.0 8-19 6.2; 6.0 7-21 6.0 8-20 6.1; 6.1; 6.2 , 7-22 6.0 8-21 6.0; 6.1; 6.0; 6.0 7-23 6.2; 6.6 8-22 6.2; 6.5; 6.0; 6.0 7-24 6.6 8-23 6.0; 8.2; 6.0; 6.0 7-25 6.1; 6.9 8-24 8.1; 6.0; 6.0; 6.1 7-26 6.2; 6.2; 6.6 8-25 6.0; 6.3; 9.0 7-27 6.3; 6.5 8-26 6.0; 6.4 7-28 6.3; 6.5 8-27 6.4; 6.1; 7.0 7-29 6.2 8-28 6.2; 6.1; 6.1; 6.1 7-30 6.6 8-29 6.0; 6.0; 6.3 7-31 6.2; 6.4; 6.4; 6.6 8-31 6.4; 6.1

O 9

h

          . . , . .        _      _         --             ,    ,  _     ,. ,._ -..~.- ..         , - _ - - . . - - _ _ , . -    - _ _ . - - - - . - - -   , ,
                                                     '                                     .                            T.  . . . .y
  ~~                                                           QUARTERLY OPERATIONAL MONITORING REPORT ADDITIONAL MONITORING
 ~Q Ceorgia - Power Company Plant Hatch                                                                           From: 07-01-86 P. O. Box 4545                                                                          To: 09-30-86 Atlanta, Georgia 30302                                                                                   .

Permit Number: CA0004120 Discharge Location: 001D - Liquid Radwaste System Unit 2 Type of Sample: Crab Frequency of Analysis: Each Batch Parameter: pH pH Units Parameter: pH pH Units Limits: Min. 6.0 Limits: Min. 6.0 Max. 9.0 Max. 9.0 DATE DATE 9-01 6.1 9-02 6.0; 6.0; 7.1; 6.1 9-03 6.1 9-05 9.0; 6.5; 6.5 9-06 8.6; 6.0; 8.9; 6.4 9-07 6.0; 6.1; 6.1; 7.2; 6.0 O*' 9-08 8.9; 8.9

            '9-09        6.1;                  6.0; 6.2 9-10        6.0;                  7.6
           .9-11         8.8;                  6.1; 7.2 9-12        6.7;                  8.3; 7.1; 8.2; 6.8 9-13        6.0;                   8.6 9-14        6.0;                   6.5 9-16        6.0;                   6.3; 6.1 9-17        6.1;                   6.2; 6.4; 6.3 9-18       6.2 9-19       9.0                                                                           -

9-20 6.4; 6.0 9-21 6.0 9-22 6.5; 6.3; 6.7; 7.3 9-23 6.2; 6.2; 6.3; 6.0; 7.9 , l 9-24 6.3; 6.3 i 9-25 6.1; 6.0; 6.0; 6.2; 6.0; 6.8; 6.0 9-26 6.0; 6.9; 8.0; 6.0; 6.0; 6.4 , 9-27 7.6; 6.3;6.5; 6.1; 6.1 9-28 6.8; 6.3; 6.9; 6.2; 6.0 9-29 8.4; 6.0; 6.1; 6.1; 6.1; 6.1; 6.2

9-30 8.6; 6.3; 7.2; 6.3; I

e 4

                            "f.;?u 3                             . CIRC WATER CHLORINATION DATA
e. ane&W --

I e.cE'?~fg ' -

                       ~~                                           DATA PACKAGE 1 j                             (DATA SHEET 1)                                                                     -

h i WEEKLY i z , . . . UNIT NO:  ! ,

            ..._______4.'____.___.,,______                       __,_ CHLORINATORS                       Cl

____.______ __________4_ DATE FREQUENCY CL t INJECT tlO. 1 _____ _ ___,.____ _____________--____ 2 FREE mg/l* DISCHARGE ___NO._____ INI CYCLE / DAY MIN / CYCLE f/24 HR .TIALS _____ ____.._____ . _ _ _ _ _ _ _ _ , . __________ MAX H _f/24 ______ HR AVG.______

                                                                                         .____                _,,_'JUR/D AY J2~f(- __ D_o_o___.

_7_ t%_ __._ W___..._______-___________ 9 _ _g.p. y __________lf__b______ ___________.. .__________ _________ _______ _____ ______ ________=y_-______ fiul. _1_4_%_ __ __ __ __t_w - _n__a__ W W

                                                                                                                                            ~ _ _ __k_
                                                                                                     .       __________5_

1 LIMIT 0.20 0.50 2 HR/ DAY 4__(. _______,.____._____________ .._________ 0 MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE a-1 1 (O-.;

        )                                                                                                 .

1 Page 2 of 2

  ,                                                                                                62EV-SAM-002-0                   R00              .

CIRC WATER CHLORINATION DATA DATA PACKAGE I (DATA SHEET 1) WEEKLY UNIT NO: /

                                                                                                       --__CHLORINATORS

____Cl__4_________... DATE FREQUENCY CL A INJECT NO. 1 N 2 FREE mg/l* DISCHARGE INITI A L.9

                      ----- --..--____ .----__...--_-__--_ ..._O.                                                               ___.

CYCLE / DAY MIN / CYCLE p/24 HR

                     .____ _________. ._..____....                                                                                                                    MAX                                         HOUR / DAY
                                                                                                           ......        .f/24
                                                                                                                           ...__. HR .____            AVG..___                                           .     ._______...

g,, I , .. . . . _ . . . - - - - - - . . - - - - '

                     ._ Us.. .__w..___                                                                                                                . - . -         . . . .                                   .       -
                                                                         ... ........__.__... .                             ._-__                   .__..        ._-__.                                       .....___...               _}_Q..._..
                    -Sbb,, L .       ....l...... ...b.l..._... . _il/[. . . .. W......                                                              . _. 2_ .0 50
                                                                                                                                                                                                              . f__.... l.&.....
                   .,h.mV...../......

W '

                                                                        .__6.0...... . . .A.'li. _.S.t.\M.. .             _.                      .. .a_u ..   .            . 50..... O.f ._.. 'h..).._..             ..            .

t . 1 ,fz.e l

                         .'                                            ._ f_c___ _.. _4./d_ _ _ _9tt                       .
                                                                                                                          .___..                   ...J.a
                                                                                                                                                        ..     .           .      .T._o.._ E ..... . . . .A !
                                                                                                                       .___... ...__                           ..____ ...........                                                      .(./...._..

O _M__

     >                                                                                                               .. ____._...___... ..___...... w. . . _ _ _ _' ,

VM LIMIT 0.20 0.50 2 HR/ DAY MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE d .

                                         ,                                                                Page 2 of 2
          .                                                                                                                                                      62EV. SAM-002 0                                                        R00
                #  ~--g-n      ._

d' RELMdW" ' k L Wy+PWV c:ac wx..R C

                                                                       't H L O R i u a. . r O N,
                                                                                              ..        0474 5

DATA PACKAGE 1 g (DATA SHEET 1) WEEKLY UNIT yo. , 7....g.................... ..... CHLORINATORS r-~~~---~~~~~~-~~~~~~~~~~~~---- Cl DATE FREQUENC Y CL .......... ...........g T NO. 1 ............

              .....       _......... ....z ...... INJEC .........             NO.

CYCLE / DAY MIN

                                                                             ......2          FREE ng/l* DISCHARGE 1

INITIALS

            .....        ..........           ..../ CYCLE         #/24 HR f/24                AVC.f1 MAX i                                     .......   ........     .......HR. .....          .....

HOUR / DAY f1.h. .. . .l.i.hb

                                          ~
            -                                                                   ~

g.... ....gby _ ....... ............ . . . . . . . . ,........A}

                                                                                                                                      . .~.

1I J.n' Ln. . .....f..... ....{p0.........N......

                                                                              .......      ...........           ...... d Qc/

D,

                                                                                           . 0.D ......0*V                              iN
           ~~~~. ....4.

J. . . . .

                                                                                                                 ....W.......
                                                                                                                  . -s                  .......
                                                                                                                                      ./s
                                                                                                                  ......... ./.W.            . .; . . . .

_........~~.~~.....h

                                     ..............)..........                ......

LIMIT 0.20 0.50 2HR/DAY Wn. o i. . . . . . .<. . . . .!. . . . . .(. MEASURED AT TOWER OVERFLOW DURING CHLORINATION l t m N j m Page 2 og g

                                                                                                    " cs"        an~  ~     ...                        t

h a f;=l& .

     , [aggg47
  • 6
                                     -&b-    ~-

d' CIRC WATER CHLORINATION DATA

w. 'rsi n W- ,,> s; s ;m
             ' W 5Q y y .'u.a,oa..  ~;*,..*

DATA PACKAGE 1 SN.W.. E' .' u .'.

                               . T.

(DATA SHEET 1)

                  ..r.
                                                                                                                           )

F.e* WEEKLY UNIT NO: -

                                                                                                                                  ~

1 ----_____-__-________-__-_----------_--________

                                          ,                ,,            CHLORINATORS                      Cl

_______________..__________________________ __________4_______ ____ DATE FREQUENCY CL t INJECT 'NO .- 1 NO. 2 FREE mg/1* DISCHARGE INITIALS CYCLE /DAE MIN /CYCCE t/24 HR f/24 HR AVG. MAX' _ ' _ HOUR / DAY:

           .7).. .k ___t e____ .___________________                              _______   _____    ._____    ___________=_8A______

2.,_ . m s _7_-/W4_ 19 ___3%_____W _ _ _ _ _ _ _ ..__________________________ _ _ _ _ ._ _________________~ ,.______ v tp p, CV - _ c __________ .__________ ________________ _____ ______ _ _ _ _ _ _ _ _ _ _ ~ _______ ___.__ _ _ _ _ _ _ _ _ _ _ . . W_______ m_____________ _____ .________________ _________ n _______________..___________________ _______ _____ ________________ _________ ( - l- ' LIMIT 0.20 0.50 2 HR/ DAY tw V 0 MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE t t l l 1 l l l I l Page 2 of 2

  • 62EV_ SAM-002-0 R00 l

l

              -mp-   W      '

z - CIRC WATER CHLORINATION DATA n ( ') DATA PACKAGE I (/ (DATA SHEET 1) h WEEKLY UNIT NO: 2 CHLORINATORS Cl _______________.__________ ________._______ __________g ____________ DATE FREQUENCY CL t INJECT NO. 1 NO. 2 FREE mg/l* DISCHARGE INITIAL

            .____ __________..__________________. _______ ______________________                                               ________S    _

CYCLE / DAY MIN / CYCLE #/24 HR #/24 HR AVG. MAX HOUR / DAY 9 -blib_ -___ _____ .___b_O_________$_h___.. _20 ______ _5000

                                                                                                 . 50 pf          _ _ _L_)____

1ll21L. _____I____ .___(2_0______ _ _N_ _b_ .__?_o _ __5000

                                                                                               . _. _5_0_ ____ B!_____

______ __ _ d_____ shijn &D. DA sw .u .n x i

           .tb_,7/GL             ]_ _ _ _ .._ _ b_0       44           S'""                     s~             !               E

____ _~____>_ __.

                                                                 ~-    ~

____ _ _ _ _ _ _ _ _ _ _ ..__________ _________ ___~____ .!_C.h. ___ _________

                                                                                                                     ~     ~

r/s LIMIT ' 0.20 0.50 2 HR/ DAY V _______.______________________________ MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE Page 2 of 2 62EV-SAM _002-0 R00 _

CIRC WATER CHLORINATION DATA DATA PACKAGE 1 (DATA SHEET 1) lI WEEKLY UNIT NO. CHLORI ...___........_-___.______

          .___,..._...____....____.                       _-_.......NATOR ..__._-___g, S                     Cl DATE       FREQUENCY CLg INJECT                                                                          ___ ___. ___

NO. 1 2 FREE mg/l* DISCHARGE INITIALS

                                        .___.__.___      _____.__         . . _NO___.. .

CYCLE / DAY MIN / CYCLE #/24 HR _ __ .--....._. HR AVG. MAX HOUR / DAY

                                        ._.__._ __.      . _.__...          .f/24 O/n_.._ _-.__-_
        ._                 _bcw ......__...              ___...._.                                                                         d

__..____= 6__h.. .___ n__ u____. .___.______. ..____. _-___._ I ' __._ l #** ___ __.__.__.

      '_7f6_. . _ _ ). . . _ . .. .. .b_ _C.). . . . _ _D_ .0L
                                                              .....        _ __.      h_20. 3____

C. S'

                                                                                                       .__...     ..__[..__..$. h,.tl
n. . . _ _ . . _ _ _ . ..__.._____ _.__..__.
                ...__-___. :.=== ---.__ ..._.....  ~

y....__ t ...__ ______...._..._____..____ ....____ ____.__.____ ___._._. _%_ N_______ LIMIT 0.20 0.50 2 HR/ DAY MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE 4 Page 2 of 2 e 62EV-SAM-002-0 R00 ,

                     ,u-A w -svy+: a.
                              *c,,.,...                          SERVICE WATER CHLORINATION DATA
                                         -p-
                         .w
              ,      ET.9                                                         DATA PACKAGE 2 "M,",'n
     ~
                   .p.    .                                                       (DATA SHEET 2)
   &-                                   W5EKLY UNIT NO:

A  ! e CHLORINATORS Cl

          ...............y........

DATE FREQUENCY CLg INJECT 3...____..... ... _..... ..___.....x....__...... NO. 1 NO. 2 NO. 3 FREE DISCHARGE

   -      ..... .......... ........... ...__... ......... ....___ ..... .mg/l*                                                .....   ..__.......

CYCLE / DAY MIN /CYC'LE #/24 HR #/24 HR f/24 HR AVG.

          .....          ..........                 . . . . . . . '. . . . ........                                                    HOUR / DAY
                                                                                         ......... ....... ..... ._ _...        MAX ........__.           .

14n %__ /sshaae. ...E.4.... ..P..o.e... ......... .. __..

                                                                                                                  ..JZ. . . .o_ _ _._J2.......

18b . . .& . . . ........... ........ __ .____. .... __ ..... __ ... .....___ s

         .M..s...... n_..... __....._...                                    ..______    ____ ....     .......     ..._.    ......    ......... .
         .7/3){         ..     .00y-
                                                                                                                                     ...__. N 7p g,                 W                           -

w .- ....._. ..... ...... ________~ ___.. .......... ......__... .w _ _ --

                                                                                                                 ..... .......       h ...

( LIMIT 0.20 0.50 2 HR/ DAY MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE

       ** MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME l

l t i 8 i f i i i i Q V r l Page 2 of 2

 ,                                                                                                             62EV-SAM-002-0              R00

i_ _ M M-f

         ..li gg   A P

SERVICE WATER CHLORINATION DATA DATA PACKAGE 2 (DATA SHEET 2) h . WEEKLY  ? UNIT NO: - CHLORINATOR 5 Cl

                 ...............,.......... ..................._- ..                                       --..----- x            .-- -...----

DATE FREQUENCY CLg INJECT NO. 1 NO. 2 NO. 3 FREE m

                 ..... .......... .....___...                ........ ..-_.-... ......- ---.-                         - g/1*

DISCHARGE CYCLE / DAY MIN / CYCLE f/24 HR f/24 HR f/24 HR AVG. MAX HOUR

                .....        ..........      .....__....    ..__....        .__...... . ___..             .....       ......        ....../ DAY......
               -       R_

a .@f. .* tov.... fJ...... 5 .J.D.O... . . .d.i

                                                                   .                 ....    .A.W..... . .d.o. ..    .    .D.o. . ...    .......

9bg 3.lh.6 ..... .. .. k. ...... ..A..U .... . . .A.S.I. . . . . .t.vd_ . . . . J.o. . . . .....

               ?.P f' .......4.                 b
                                            ...........     .2.0o.... . J.V.S. . . . . .A..l'.f... .. d.o. . . D.o
                 .M.b.v'.  ... W....... .. &. ...... .. W....... . f.'A. . . . . . .#.}f. . . .W. . . ... &.... /..........
        ' . ~....          ..._......       ........       -               ......._.        ....... .....           ......         ........._.

N

             ..__. .......... ........... .... __.......... N........w                                                             ...........

f3 .................................................. ..... ! N LIMIT 0.20 0.50 2 HR/ DAY s

   'O                                                      ..............................................

MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE

            ** MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME Page 2 of 2 62EV. SAM.002-0                        ROO

b -- -

     =       "Y,                                           SERVICE WATER CHLORINATION DATA DATA PACKAGE 2 (DATA SHEET 2i

() WEEKLY UNIT NO: CHLORINATORS

                     ...............r.......... ........................                                ........C1,    ..~...........       .

DATE FREQUENCY CLg INJECT NO. 1 NO. 2 NO 3 FREE mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE 1/24 HR f/24 HR

                    ..... .......... ........... ........                                         HR AVG. MAX HOUR / DAY
                                                                             .........    .#/24
                    .YIb6. . . $.(.r:1) -
                         ...           . ...      ...........    ........   .........     .......      .....     ......   . . . . . . . .Y
                      .}4$ .'. ... W)    ....    ...........     ........   .........    \.......      .....    ......    ...........

9

                   . ./. . &. . . .O.lw                                                                                                ~_.

1 .M..I/O. ...d.p2.....

                   .d.                          ...........     ........ ....... ..

N _ N ' c, ( - LIMIT 0.20 0.50 2 HR/ DAY t........................ ..... ................ v MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CY

                 ** MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME 1

/ \ s_ 4 Page 2 of 2 62EV-SAH-002-0 R00 .

     -x'       :n
                    ~

Y.

     '          ~

SERVICE WATER y . ~ .i CHLORINATION DATA

       ,+%.       7 .
       ,+

DATA PACKAGE 2 lDATA SHEET 2)- D

                                                . I                                                                                   ,

WEEKLY s

                                                      .                     .                      UNIT NO:         _ /1
  • g..............r........r....... CHLORINATORS x
                      'DATE FREQUENCY CLg INJECT NO 1................. ......p,..Cl                                 .............

NO. 2 .NO. 3 F .

                                                                         ........... ........ ..REE             mg/1* DISCHARGE CYCLE / DAY MIN / CYCLE                                               .........          ..........      .
                    ..... .......... ..... .....                 ..t/24  HR.........
                                                                    ......       f/24 HR f/24    HR AVG.                     HOUR / DAY
                                                                                            .......  .....     .. MAX
                    .7).f. d/ .l.m. .u.2 . . . _/f}. . . . .
                                                                 . .~4. 2. ..... ~..... ....... . .).5. . . 0. . . ...p.......
                   .7Af). .        114.... ........... ........                 .........  .......  .....     ......      .......    . . [.

7.-l.W. .L. . .C. V. ..~......... 7

                  ./23. .fL. . ......  ,
                                         .%s
                                                                                                                     ~~ ........

5'.

                                                  ....~........ .......

7 k.li.c. ... W.......

                                                                                          ....... ..... ......          ....... N   ....

w ........ ...........

 ,,             t........................... .......'....
< ('

LIMIT

                                                                                    ............. .....       . . .m: nnn.......

0.50

                                                              '.........................0.20 .................

2 HR/ DAY MEASURED AT POINT OF DISCHARGE TO RIVER DURING

               ** MEASURED AT SERVICE WATER DISCHARCI TO CIRC WATE Page 2 of 2 O                                                                                              62EV. SAM -002 -0            R00             g
     ;~
      .y ww av g.3
     %E                                                  SERVICE WATER CHLORItJ ATION D ATA DATA PACKAGE 2 (DATA SHEET 2) l w/

WEEKLY UtlIT tJO: [ CHLORINATORS Cl

                     .......................... ........................                                       ..........x        ........... .

DATE FREQUENCY CLg INJECT NO. I 14 0 . 2 tJO . 3 FREE mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE

                                                                  #/24 HR f/24 HR f/24 HR                       AVG.        MAX      HOUR / DAY
                    .Ay ..f(s. .  .Co. .Y."l1.w.
                                              . . . /.% .l.
                                                      .......  ..At*t" . . ./.fW
                                                                                               .gf.Y.... . $J ...=20 .../........

ft$.ca. .(h....w... . . ./. .'A. . . . . . .ds'o

                         ,                                         ......   . . st' y1. . . . . . A. .'d. . .. Jo. . . J. .o. . .../........
                    .&,..s&...cCf' .wew ....A..M......
                                                               . n....... . . .s w ..n..... x... ... u... .. x........

yOb7k's. . . $. W. . . .... .A..'A ...... .. &..... . . . A. 'A. . . .. .A. './1. .

                                                                                    .                 .        4."V.. ..
                                                                                                               .          W....    . /.........
                  . ....       .h            ........... ........

N

                  ..... .......... ....... ...                .h.                          . ....... ..... ...... ...........

vg .......................... ........................ ..... ...... ........ m c, LIMIT 0.20 0.50 2 HR/ DAY t i s .............................................. MEASURED AT POIllT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE

  • MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME 7~

s

 \

t/ 62CV-SAM-002-0 R00 j

_.,.m .- f r. 'sc ' I.

  • pe'
      . .; f ,i* }

4.* SERVICE WATER CHLORINATION DATA DATA PACKAGE 2 (DATA SHEET 2) t lgr WEEKLY UNIT NO: CHLORINATORS Cl 4 7............... .

                          'DATE FREQUENCY CLg INJECT NO. 1                        NO. 2     NO. 3 . FREE mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE         8/24 HR f/24 HR 1/24 H              AVG.         MAX
                                    .......... ...........          ........   .........  ......R .....

HOUR / DAY q.g/,9 ggi=

                                                       =

Ehn.. ...Of.W..... ...........

                                                                   ........    ......... .......       .....       ......      ........N  ...
                           ./7 /.4 .. 2. ./ ... _
                                                                                                              ^                       %_~

y fl ...Y..~.3 I-

                                                      ........... ........ .........     .......       .....      ......      ........N   . ..
    ---                . ..... ......... ........... ........ .........                  N....... --.             w.....      ...........
             . c .......................... ........................ .... ....... ..........

LIMIT o.20 o.50 2 HR/ DAY

        ,rh                                                       ..............................................

1 1

      \.
             )

MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCL C* MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME m xx  ! 8 62Ev SAM.oo2.o Roo I

Pcg2 1 of 9 ~ QUARTERLY OPERATIONAL N0HITORING REPORT Ceorgia Power Company O Plant Hat c h P.O. Box 4545 At l ant a, Georgi a 30302 From: 10-01-86 To: 12-31-06 Permit Humber: GR004120 Discharge Location:001 A1 - Lou Volume Waste (Heutralizat ion Tank) Type of Sample: Grab ' Frequency of Analysis: 2/Mo Code: (530) (550) (408)

  • Parameter: Suspended Solids Oil & Grease pH mg/l ag/l Limits: Avg. 30 Avg. 15 Min. 6.0 Max. 100 Max. 20 Max. 9.0 Date 10-06-06 2.0 2.51 0.2 10-20-06 1.4 1.0 0.5 11-03-06 2.0 0 6.0 11-16-06 15.5 0 7.1
  • 12-01-06 0 3.41 0.6 12-14-06 35.9 0.9 7.2 ,

O Number of Samples: Average Value: Maximum Value: 6 9.47 35.90 6 1.30 3.41 6 7.73 0.60 Minimum Value: 0.00 0.00 6.00 Limits Exceeded: 0 0 0 t i 1 a 1 i f r iO i 1 ,

                                                                                                         .g..     .-           ..

4 Page 2 of 9 i QUARTERLY OPERRT10HHLJ MONITORINO REPORT Georgia Power Company From: 10-01-86 Plant Hatch To: 12-31-06 P.O. Box 4545 At lant a, Georgi a 30302 Permit !! umber: GR004120 Discharge Locationh001M2 Low Volume Waste-(Pressure Filters) Type of Sample: ' Grab Frequency of Analysis: 1/qte - Code: (530) (556F <400) Parameter: Suspended Solids Oil & Grease pH mg/l ag/l i Limits: Avg. 30 Rug. 15 Min.' 6.0 max. 188 Max.'20 Max. 9.O Date ' 11-03-06 (R) 1.3 (5 7.0 11-03-06 (3) 5.2 (5 7.4 11-03-06 (C) . 3.4 (5 U.4 11-03-06 (D) 4.0 <5 0.6 Number of Samples: 4 4 ' 4 t, Average Yalue: 3.60 < 5. 00 - 7.93 Maximum Yalue: 5.20 a.a.t. 0.00 j Minimum Value: 1.30 '5.00

                                                                     .                           7.00 Limits Exceeded:                       0                              0                         0 s

t e e

                                                                        +

l i 4

                                                                                                          \

r

                                                                                     ' I O

m

O . Pcge' 3 of 9 QUARTERLY OPERATIONAL MONITORING REPORT I Gecqola Pouer Company Plant Hat c h . From: 10-01-86 P.O. Box 4545 To: 12-31-86 Rtlanta, Georgia 3B302 Permit Number: CR004120 Discharge Locatlon:001B - Cooling Tower Blowdown Locasion: Intake Mixing Zone Type Sample: Delta T In Situ In Situ Frequency: 1/wk. Calculated 1/wk. Parameter: 1/wk. Temp. Deg. F Temp. Deg. F Temp. Deg. F Limits: Max of 90 Deg. F Code: (11) Max of 90 Deg. F Delta T of 5 Deg. F (11) (18)

. Date

.i 1-19-03-96 84 84 10-09-0G 0 ' 79 79 10-15-86 e 73 73 c 10-23-96 0 64 64 18 .9,9-86 0 60 68 11-07-86 e 78 70

                           !!-12-86                                                                                                                                                e
                        ,                                                                               72                   72 11-19-06                                                                                                                                                0 64                  64 11-26-86                                                                                                                                                0 64                  64 12-05-06                                                                                                                                                0 55                   55 12-11-06'                                                                                                                                                9 57                   57 12-17-06                                                                                                                                                 9 54                   54 12-24-65                                                                                                                                                 8 52                   52                                                     8 Ho. of Savole:                                                               13                   13                                                   13 Average Vatue:                                                               66                   66 Maximum Yalue:                                                                                                                                         9.90 84                   84 Minimum Value:                                                                                                                                         0.00 52                   52
, s
                        'Duer Limits:                                                                                                                                            8.00
         ,                                                                                               8                   9                                                   e I

.  :/ , i s 4 l 1

                              /

l 1 i I e I i 9 _ _-._-._.] .__. ___. ____.. _ -.__,__. ,._,__._._. .__. _ _ - . _ _ . _ _ _ _ . - , . _ . _ _ _ _ _ _ _ _ - - _

                                                                                                                                                                                      ..__..._.__..____.v

Page 4 of 9 &* OURRTERLY OPERATIONAL NONITORING REPORT j Georgia Power Company From: 10 01-86 Plant Hatch To: 12-31-86 P.O. Box 4545 N At l ant a, Georgi a 30302 Permit Number: GR004120 Discharge Location:001B - Cooling Tower Blowdown Type Sample: pH Grab 2n Grab Cr Grab Frequency: 2/Mo. 1/qtr 1/qtr , Limits: Min. 6.0 Max. 9.0 Max. 1.0 Max 0.2 N Unit 1 Unit 2 Unit 1 Unit 2 Unit 1 Unit 2 Code: (408) (1992) (1934) Date 10-06-86 <0.1 + (0.1

  • 10-06-86 8.1 7.7 10-20-86 7.4 7.5 t 11-03-8G 8.6 8.2 11-17-86 7.5 7.5 12-01-86 6.9 7.5
         . 12-15-86                 7.2       7.2 s

No. of Samples: 6 6 1 1 1 1 g Average Value : 7.62 7.60 < .10 0.00 <.10 0.00 Maxizum Value : 8.60 8.20 <;. 1 0 8.90 < .10 8.90 Maximum Value : 6.90 7.20 .< .10 g 0.00 < .10 0.00 Over Limits : 0 0 e s 0 0 0 N

  • Unit 2 Shutdown m

e

 \
                                                                                                           \

s O- . h

Pege 5 of 9 y' QUARTERLY OPERATIONAL MONITORING REPORT

  /~'    Georgia Power Company                                             From: 10-01-86 Plant Hat c h                                                        To: 12-31-86 P.O. Box 4545                      -

Atlanta, Georgia 30302 Permit Number: GR004120 Discharge Location:001D - Liquid Radwaste System Unit One Type of Sample: Grab Frequency of Analysis: 2/Mo Code: (530) (550) (400) Parameter: Suspended Solids Oil & Grease pH mg/l mg/l Limits: Aug. 30 Avg. 15 Min. 6.0 Max. 100 Max. 20 Max. 9.0 Date 10-06-86 3.0 0.0 6.6 10-19-86 1.0 0.56 6.1

      . 11-03-86                    0.75                  9.0             6.4 11-17-86                    2.0                   0.38            6.0 11-30-86                    1.6                   0.6             9.0 12-15-86                    21                    0.0             6.4 Humber of Samples:           6                      6              6 l        Average Value:              4.89                  1.76            6.75 I

Maximum Value: 21.00 9.00 9.00 i Minimum Value: .75 0.00 6.00 Limits Exceeded: 0 0 0 l-t . l t a

Pc.ge 6 of 9 . QUARTERLY OPERATIONAL MONITORING REPORT

   \      Geopgia Pouer Company d        P1 ant Hatch                                                          From: 10-01-86 P.O. Box 4545                                                           To: 12-31-86 AtIansa, Georgia 30302 Permit Number: GR004120 Discharge Location:001D - Liquid Raduaste System Unit       Tuo Type of Sample:     Grab Frequency of Analysis:      2/Mo Code:                    (530)                 (550)            (400)

Parameter: Suspended Solids Oil & Grease pH mg/l ag/l Limits: Aug. 30 Avg. 15 Min. 6.0 Max. 100 Max. 20 Max. 9.0 Date 10-08-86 2.4 10-20-86 0.0 6.1 0.2 1.02 11-03-86 1.5 6.4 11-17-86 6.6 6.6 2.0 0.0 12-01-86 2.4 7.8 12-15-86 0.2 6.0 2.0 0.0 6.5 O Humber of' Samples: Average Value: 6 1.75 6 6 Maximum Value:. 1.30 6.57 2.40 6.60 Minimum Value: .20 7.80 0.00 Limits Exceeded: 0 0 6.00 0 V i O h

6 Page 7 of 9 QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 10-01-86 Plant Hat c h To: 12-31-86 P.O. Box 4545 At l ant a, Georgi a 30302 Permit Number: GA004120 Discharge Location:001E - Combined Plant Waste Unit One Frequency cf Analysis: 1/wk.

                   ~

Type of Sample: In Situ Grab Grab Grab Parameter: Temperature T.R.C. F.A.C. pH Limits:~ Deg. F N/A N/A Min. 6.0 Max. 9.0 Code: (11) (50060) (50064) (408) Date 10-01-86 * <.1 <.1 7.7 10-03-86 89 * *

  • 10-08-86 * <.1 <.1 8.3 10-09-86 87 * *
  • 10-15-86 80 <.1 <.1 8.5 10-22-86 * (.1 <.1 8.0 10-23-86 67 * *
  • 10-29-86 82 <.1 <.1 7.9
    '11-05-86                             *           <.1          <.1           8.2 11-07-86                             87          *            *
  • g 11-12-86 87 <.1 <.1 7.9 11-19-86 80 <.1 <.1 7.7 11-26-86 88 <.1 <.1 7.4 12-03-86 78 <.1 <.1 7.6 12-10-06 * (.1 <.1 7.1 12-11-06 89 <.1 <.1 7.5 12-17-86 80 * *
  • 12-24-86 79 (.1 <.1 6.7 Humber of Samples: 13 13 13 13 Average Value: 82.54 <.10 <.10 7.73 Maximum Value: 89.00 < .10 c.10 8.50 Minimum Value: 67.80 <. 10 4.le 6.70 Limits Exceeded: 0 0 0 0
        *No data required O

Page 8 of 9 1 QUARTERLY OPERATIONAL MONITORING REPORT () n Georgia Pouer Company Plant Hat c h From: 10-01-86 To: 12-31-86 P.O. Box 4545 At lanta, Georgia 30302 Permit Humber: GA004120 Discharge Locat ion:001E - Combined Plant Waste Unit Tuo Frequency of Analysis: 1/uk. Type of Sample: In Situ Grab Grab Parameter: Grab Temperat ure T.R.C. F.R.C. pH Limits: Deg. F H/R N/A Min. 6.0 Code: Max. 9.0 (11) (50060) (50064) (400) Date 10-01-86 * <.1 <.1 7.5 10-03-86 85 * *

  • 10-08-86 * (.1 <.1 10-09-86 7.7 81 * *
  • 10-15-86 78 <.1 10-22-86
                                                                                                                             <.1
  • 8. 0
                                                                                           *                <.1             <.1                   7.8 10-23-86                                                                     82              *                *
  • 10-29-86 69 <.1 (.1 11-02-86 8.0 71 * *
  • 11-05-86 * (.1 <.1 8.0 i 11-12-86 75 <.1 <.1 7.7 11-19-86 66 <.1 <.1 7.5 11-26-86 68 <.1 <.1 7.3 12-03-86 75 <.1 <.1 7.3 12-19-86 * <.1 <.1 12-11-86 6.9 68 * *
  • 12-17-86 69 <.1 <.1 12-24-86 7.2 78 <.1 <.1 6.8 Number of Samples: 13 13 13 13 Rverage Value: 74.23 <c.10 .c.10 7.52 Maximum Value: 85.00 < .10 at.10 8.00 Minimum Value: 66.00 ac.10 <t .10 6.80 Limits Exceeded: 0 0 ,

0 0

                     *No data required O

Pcge c9 of 9 E

                                             -QUARTERLY OPERATIONRL MONITORING REPORT

/) w,/ Georgia Power Company Plant Hatch From: 10-01-86 P.O. Box 4545 To: 12-31-86

  ;        RtIanta Georgia 30302 Permit Number: GA004120 I certify under the penalty of law that this document and all attachments were prepared to     assure under  that      the direction of supervision in accordance with a system designed submitted.                    qualified personnel properly gather and evaluate the information or those persons        Based on my inquiry of the person or persons who manage the system information                      directly is toresponsible  the best offor  gathering the information the and      complete.submitted   I am aware that there are significant    my  knowledge and belief true, accurate false violations. information including the possibility of fine and imprisonmentpenalties for submitting for knowing t

O H. C. Nix General Manager

     ,,,me,_.***F.             * " ' "

O

l i QUARTERLY' OPERATIONAL MONITORING, REPORT ADDITIONAL MONITORING O Georgia Power Company

  • From: '10-01-86 Plant Hatch ,

To: 12-31-86 P. O. Box 4545 '- - Atlanta, Georgia 30302 Permit Number

  • GA0004120 '

Discharge Location: 001D - Liquid Radwaste System Unit 1 Type of Sample: Grab Frequency of Analysis: Each B.atch , Code: (400) Code: (400) Param'e t er : . pH Parameter: pH

                                       . pH Units                                                                                                                                               - pH Units Limits:                      Min. 6.0                                                           Limits:                                                                            Min. 6.0 Max. 9.0                                                                                                                                              Max. 9.0 Date                                                                                            Date I

l0-01 6.5, 6.4, 6.7, 7.1 - 10-17 6.5, 6.4, 6.8, 6.3 10-02 6.5, 6.2, 6.3 10-18 6.4, 6.2, 6.2, 6.7, 7.6 10-03 6.4, 7.2, 6.4, 6.8, 6.4 10-19 6.8, 6.6, 6.6, 6.1 i 10-04 6.5, 6.7, 6.3, 7.3 10-20 6.9, 7.0, 6.2 t>. 6. 6. 6, e.3, 6. 7 10-21 6.7, 7.0, 6.5, 7.9 i 10-05 10-06 6.7, 6.6, 6.4, 6.7 6.4 10-22 7.4, 6.6, 6.6, 6.8, 6.7 10-07 6.2, 6.8, 7.0, 6.7 10-23 6.5, 6.4, 6.4, 6.4, 6.7 10-08 6.0, 6.8, 6.6, 6.9 10-24 6.4, 6.6, 6.7, 6.6 - 10-09 8.1, 7.6, 6.6, 6.4, 6.8, 6.7 10-25 6.1, 6.3 10-10 6.2, 6.6, 6.4, 6.1, 7.2, 6.6 10-26 6.4, 6.0, 6.5, 6.6, 6.9 10-11 6.1, 6.0, 6.3, 6.8 10-27 6.7, 6.5, 6.4, 6.6, 6.2, 6.7 , 10-12 6.0, 6.6, 6.6, 6.1, 6.6, 6.7 10-28 7.1, 6.5, 6.0, 6.8, 6.2, 6.7 10-13 6.0, 6.6, 6.7, 7.3 10-29 6.5, 6.7, 6.1, 6.0, 6.4, 6.6 10-14 7.2, 6.6, 7.2 10-30 6.2, 6.7, 6.3 10-15 6.6, 6.1 10-31 6.2, 6.4, 6.6, 6.4 10-16 6.8, 6.1, 6.0 6.5, 6.2 l l i O j -

 , - _ . . , .---,L.
                                                                      -                              .      =.        . . =                   _ = _.                                                                       .

QUARTERLY OPERATION L MONITORING REPORT - ADDITIONAL MONITORINO T Georgia Power Company From: 10-01-86 Plant Hatch ~ . To: 12-31-86 ' P. O. Box 4545 '- A t l a,n t a , Georgia. 30302 Permit Number: ,GA0004120 Dis, charge Location: 001D - Liquid Radwaste System Unit 1 Type of Sample: Grab ' Frequency of Analysis: Each Batch Code: (400) Code: (400) Parameter: pH Parameter: pH pH Units pH Units . Limits: Min. 6.0 Limits: Min. 6.0 Max. 9.0 Max. 90 Date Date Il-01 6.6, 6.5, 6.5 11-16 6.4 11-02 6.6, 6.4, 6.3, 6.2, 6.4 11-17 6.0, 6.2 11-03 6.4, 6.5, 6.4, 8.1 11-18 6.2, 6.0, 6.1 s 11-04 6.3, 6.5, 6.4, 6.5, 7.4 11-19 7.1, 6.0, 6.3 11-05 6.9, 6.6 11-20 6.1, 6.3, 6.1 11-06 6.0, 6.5, 6.3, 6.4 11-21 6.0, 6.1 11-07 6.0, 6.3, 6.8. 6.7, 7.1 11-22 6.0, 6.0, 6.1, 6.0, 7.5, 6.0 11-08 7.1, 6.8, 7.0, 6.3 11-23 6.0, 6.0 , 11-09 6.2, 6.3, 6.2 11-24 6.0 11-10 6.8, 6.4, 6.5, 6.8, 6.4, 6.2 11-25 6.1 11-11 6.2, 6.3 11-26 7.9, 6.5, 6.1, 6.2, 6.5 11-12 6.5, 6.5, 7.0 11-27 8.4, 6.2 11-13 6.2, 6.8, 6.6 11-28 6.7, 7.4, 6.0 11-14 7.0, 6.3 11-29 8.5, 6.1, 6.2 . 11-15 6.7, 6.3, 6.4 11-30 6.9, 8.2, 6.4, 9.0 l 3 O

QUARTERLY OPERATIONAL MONITORINO REPORT ADDITIONAL MONITORINO pm . I i Georgia Power Company - From: 10-01-86 Plant Hatch * . To: 12-31-86 P. O. Box 4545 '- Atlanta, Georgia 30302 Permit Number: OA0004120 Discharge Location: 001D - Liquid Radwaste System Unit.1

  • Type of Sample: Grab Frequency of Analysis: Each Batch
  • Code: (400) Code: (400)

Parameter: pH Parameter: pH

                                  .pH Units                                                                                                                    pH Units Limits:                  Min. 6.0                                                                     Limits:                                         Min. 6.0 Max. 90                                                                                                                      Max. 9.0 Date                                                                                                Date 15-01     6.5,        6.6, 6.3                                                                      12-17          6.4, 6.6 12-02     6.0,        6.8,  7.9                                                                     12-18          6.1
     . 12-03     6.0,        6.2                                                                           12-19          6.1

. 12-04 6.2, 6.5, 6.4, 7.3, 6.7 12-20 6.3 12-05 6.9, 6.2, 6.3, 6.2 12-21 6.3 12-06 6.3, 6.3, 6.1 12-22 7.1, 6.1 12-07 6.2, 6.8, 6.0 12-23 6.7, 6.9 c12-08 - 12-24 6.1, 6.9 12-09 7.1, 6.1 12-25 6.0 12-10 6.6 12-26 6.1 12-11 7.0, 6.3 *12-27 - 12-12 6.4, 6.2 12-28 7.2 12-13 6.2 12-29 6.7, 6.5 12-14 6.0 12-30 6.3, 6.1 12-15 6.4, 7.0 *12-31 - , 12-16 6.7

         *No discharge made on this day.

3 O

            =_ --. __ . - _ _           . . _ _ , - . . . - _ , - . - - .   . _ . . , _ , - - , _        .       - . . .     -- -    - - _ . - - , _      .,    ,r  -   , - . _ _ - - - - - - - -

QUARTERLY OPERATIONAL MONITORING REPORT , ADDITIONAL MONITORING .-

     -Georgia,. Power Company                                                                              From:  10-01-86 12-31-86 Plant Hatch                                                                                           To:

P. O. Box 4545 l. Atlanta, Georgia 30302~ Permit Number: GA00.04120 l Discharge Location: 001D - Liquid Radwaste System Unit 2 ' Type of Sample: Grab Frequency of Analysis: Each Batch . Code: (400) Code: . (400) Parameter: pH Parameter: pH pH Units pH Units Limits: Min. 6.0 Limits: Min. 6.0 Max. 9.0 Max. 9.0 Date Date 10-01 6.0, 6.1, 6.2 10-17 6.4, 6.1 10-02 7.6 *10-18 - 10-03 6.3, 6.3, 6.7 *10-19 - 10-04 - 10-20 6.4

   $)10-05 010-06 6.7 10-21 10-22 6.0 7.3, 6.2, 6.3
   *10-07   -                                                            10-23          6.4, 6.1 10-08   6.1                                                     *10-24              -

10-09 6.2 10-25 6.5 10-10 6.1 *10-26 - 10-11 6.2, 6.9 10-27 7.5, 6.4 10-12 6.6, 6.2 10-28 6.3, 6.7 10-13 6.4 *10-29 - 10-14 6.0, 7.3 *10-30 - .- 10-15 6.4, 6.5 10-31 6.5, 6.5 10-16 6.2 .

      *No discharge made on this day.

O e

QUARTERLY OPERATIONAL MONITORING REPORT ADDITIONAL MONITORING , Georgia Power Company - From: 10-01-86 Plant Hatch -

                                                       ,                                       To:    12-31-86 V '.        O. Box 4545                               '-

Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 001D,- Liquid Radwaste System Unit 2. - Type of Sample: Grab Frequency of Analysis: Each Batch Code: (400) Code:: (400) Parameter: pH Parameter: pH pH Units pH Units Limits: Min. 6.0 Limits: Min. 6.0 Max. 90 Max. 9.0 Dnte Date 11-01 6.2 11-16 6.1, 6.7, 6.0 011-02 - - 11-17 7.8, 7.5, 6.2, 7.2 11-03 6.6, 6.4 11-18 7.0, 6.2, 6.1 11-04 6.6 11-19 7.3, 7.2 11-05 7.0 11-20 7.3, 7.3, 7.3, 7.7 hl-06 w;ll-07 6.4, 6.4, 6.2 6.1, 7.3, 6.2 11-21 11-22 7.6 6.4 11-08 6.3 11-23 7.3, 7.4

     *11-09  -

11-24 7.0

     *11-10   -

11-25 8.2, 6.1 11-11 6.0 11-26 7.6 11-12 6.1, 8.9 11-27 7.9 11-13 5.9, 6.1, 7.3 11-28 6.8 11-14 6.6 11-29 7.4 11-15 6.5, 6.7 *11-30 -

       *No discharge made on this day.

I e O

QUARTERLY OPERATIONAL MONITORING REPORT - ADDITIONAL MONITORING 1 Georgia, Power Company From: 10-01-86

  ~ Q Plant             Hatch
                                                                                                                                                                       ~

To: 12-31-86 P. O. Box 4545 . Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 001D - Liquid Radwaste System Unit 2. Type of Sample: Grab Frequency of Analysis: Each Batgh Code: (400) Code:: (400) Parameter: pH Parameter: pH p.H Units pH Units Limits: Min. 6.0 Limits: Min. 6.0 , Max. 9.0 Max. 90 Date Date 12-D1 6.0 12-17 6.0, 6.1 12-02 6.0, 6.7, 6.5, 6.4 12-18 6.0, 6.5 12-03 6.1, 6.1, 6.5 12-19 6.1, 7.2 8.9, 6.6, 6.5 12-20 6.0, 6.3 C12-04 32-05 12-06 6.6. 6.1, 7.5, 6.0, 6.6, 6.5, 6.3 6.8 12-21 12-22 7.2, 6.1, 7.2, 7.4, 7.2 6.0, 7.0 12-07 8.2, 6.8, 6.9, 7.0, 6.9,, 6.4, 6.1 12-23 7.5 12-08 6.1, 7.3 *12-24 - 12-09 6.0, 6.8, 7.6 *12-25 - 12-10 6.9, 8.7, 6.7, 6.1 *12-26 - 12-11 6.2, 7.3 12-27 6.0 12-12 6.6, 6.0, 6.3, 8.6 *12-28 - 12-13 6.0 *12-29 - 12-14 6.5, 6.6, 7.9, 7.1, 6.5 *12-30 - 12-15 6.5, 8.4, 6.5 12-31 8.1 12-16 6.5, 8.5, 6.0 ~

             *No discharge made on this day.

3 g

h ,- f=* g

         , MEl*n
          ;NIV                                                      CIRC WATER CHLORINATION DATA
          .T.t
        .'v.

DATA PACKAGE 1 (DATA SHEET 1) WEEKLY UNIT NO: [ CHLORINATORS Clg DATE FREQUENCY CL 1 INJECT NO. 1 NO. 2 FREE mg/1* DISCHARGE INITIALS - CYCLE / DAY MIN / CYCLE #/24 HR f/24 HR AVG. MAX HOUR / DAY g.g _ _ _(--_ _(q ) .____ _ . . . _ - _.. _ . . . - - _ _ o_ T _ _ _ s _fo-ps_ _ _ _ _l h ______0______ _ ______________ _ _J_o __ ao W _ ,.h$ ( ____ _ic_u _im__ _ _ _ _ _l _ _ _ _ . .___6__0_____ _________ _Q_c_o___ . _. po_ _. _. _f_o_ __ _ ______ _ _f_ _f _ V' N ______ _ _._-n_ _ / _ _ _ _ _ _ _ _ _ _ . .__A'O_____ _ _ - _ _ _ _ _ _ __ T_O_(p_ .t_ _ _6_2 _ __.22______O________W_______ edO______[____ ._ _.6.0

                                                                                             @ 0 12           ellt         .2A             0                  W
               \           _s
                                                     ..,_________       _________        _s_ _            .____       . _ _ _. _ _ _ _ _ _ _ _ _ N_ _ ,    _________

p, , _N________

   '/                                                                                       LIMIT            0.20       0.50        2 HR/ DAY e
           '      )
            'd MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE 1

1 I l l l l l I l l l 1 t i {} l r 4 V ' s 1

    ,                                                                                                                      62EV-SAM-002-0                     R00
                                                                                                                                                                               \

w e q,-4Et.M '- -~1 xW G7;-.* ea  %- , I

       -e                  -
    &#'* e* *g          E 1%;,t., _'A . .

i I CIRC WATER CHLOR 1tJ ATION DATA

    ,-r?M, einge # *%                                                                                                                                                                 l DATA PACKAGE 1                                                                                  i (DATA SHEET 1)                                                     -

WEEKLY UNIT NO: f CHLORINATORS __________g Cl DATE FREQUENCY CL t INJECT NO. 1 NO. 2 FREE mg/l* DISCHARGE INITIALS CYCLE / DAY MIN / CYCLE f/24 HR f/24 HR AVG. MAX HOUR / DAY _l.4.12____L_____ .___.5_0_____ _________ _4_ _&n_ __J_d _ _ ._,l0__ _ _ _ _ l _ _ _ _ ,__ _7/_.,_f_ g. _ 1I./M,. w,- -

                                                                                                                                                               ,s       i
                  //.;ag          (p)       <
                                                                                                                                                                  ' x.

kmi_ _ _ _ .I_ _ _ _ _ _ ..____60______ _ " _yocca__ _a20_ . _._yo_ _____l________ H.______ l _________ s LIMIT 0.20 0.50 2 HR/ DAY MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE h 0{ f 020k &$ '

                                                                                 .PY b5 Mb h N Ql ch.
g. .

I 1 \ l l l l t( Page 2 of 2 62EV-SAM-002-0 R00

nv.:4. :. . i.n. , tW.h,.t) *

y. e .
 /3.Sht/,<

CIRC WATER CHLORINATION DATA

 %r:a
 ~
       .- v:                                                                                                                     .

DATA PACKAGE 1 (DATA SHEET 1) ' ss ('v / WEEKLY UNIT NO: CHLORINATORS Cl

             -_-_--___-__-_.                 -__---_-__---___--___----_                        _--_----- 4         -----__-_ -_

DATE FREQUENCY CL t INJECT NO. 1 NO. 2 FREE mg/l* DISCHARGE INITIALS , CYCLE / DAY MIN / CYCLE #/24 HR f/24 HR AVG. MAX HOUR / DAY W4_C- ---_]_-___ __ hf) -__-_____-____ _4.3.0_0_ _2_

                                                                                         -      - _6____'_ --?_O --_.0._-_--_ _Q'_C,.l_'i_lt '_         -

par' fn _l

                                                                                    %Gn         .dD         . :3 0           .O           L',.U---___

_12_-K1_ _ - _ - .]_ _ _ - _ .._-6.Q--__-_ _ ~___-___ y]_00__ _1_2A __ _> _20- ____Q__-_-

                                                                                        -                                          _   _ Z_^.6" - - _ _

p_qg-_ _ - - }- _ _ _ _ .. h C) 4 --_. _-_2co , O d I

                                                ---__--_         ______--_                    . _2 0_ . ._.----
                                                                                                    -          2o    __-__ _----       - ,-___
                         . _ _ _ , _ ~      _ _ . . . _ .

LIMIT 0.20 0.50 2 HR/ DAY o MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE Page 2 of 2 62EV-SAM-002-0 R00

                                                                                                                                                                                                           .N 01 lY;@_k^

7 - CIPC WATER CHLORINATION DATA . DATA PACKAGE 1 I (DATA SHEET 1) h WEEKLY UNIT NO: --b CHLORINATORS

                                                                 ----------------           ---------Cl g              ------------

DATE FREQUENCY CL 3. INJECT NO. 1 NO. 2 FREE mg/l* DISCHARGE INITIA

              ---_- ----------              --_----------------- -------                    - - - - - - - - - - - - - - - - - - - - - -                      ------LS                     --

CYCLE / DAY MIN / CYCLE t/24 HR f/24 HR AVG. MAX HOUR / DAY _IA' .p _&.=[ fG_ _----- , Cg , y D -x w ,_'h1g.u.,au. _-_--_- - - ~ _ ~. ~ _ * ' _ - - ~ . - - - _ -- _-.

             -f_/] /g ---_ --[u L.{.w--<~_&Q-i z                   gu                                                                          '                           4;
            /_vn&. ....--
                --              6l5_k_5,,-__i 9- _f-epszt___-

jQ..og --

                           -----   g. .. -_. 4-- ..A.. .f:.1.9. . _           .--....      ........ ..
                                                                                                                        ..........?%

e yL{og,. . . . . . .c+.f.5 t--o J... 3.%. .*pq .. ....... . ......... ...... 7 ..._ N

           - - \-j- - - _'- -- / ...-- ._ \--                                '
                                                                                                       \--..__-         ... ----..... - -----
                                                                                                                                                          ---\
   %          (

s LIMIT 0.20 0.50 2 HR/ DAY MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE Q i ' ' Page 2 of 2 e 62EV-SAM-002-0 R00

w- . . .

                                                                                                                                                              . ~l p.w?,;H;.m.;m
         -. .                    b
                                                                                              .-                                                                M
     ;t.a,._.:._. s%         r.,

d.7,-ATL .,v s-, . - .. , .+:,s, n, y w.tS ' .c-) - CIRC WATER Ci!LORINATION DATA T<fcFig *

    WV                                                      DATA FACKAGE 1 (DATA SHEET 1)
                                                                                                                              ~~)

WEEKLY UNIT NO: t__ CHLORINATORS __________g Cl DATE FREQUENCY CL E INJECT NO. 1 NO. 2 FREE mg/l* DISCHARGE INITIALS - CYCLE / DAY MIN / CYCLE #/24 HR f/24 HR AVG. MAX HOUR / DAY _lt_-7_9z_Q(5- _ _%__. _! _ _ _ _of_ _ _)__L_ _ _s_tc,/ u_rP_fk?_

                                                                      -          -_    -             ._____- _c"%_    _ __,.c_ _ ___/__C_____
                                                                                                                                      '2_ _ _ ~          . >

st_o_ns . Jeos w~ .R ' ie.z_C.%_

                                                                            /                  I _..___-__-____-____
                                                                                                                            -+       __-_'       ____
                                                                                                                                                        'V
            -ll_E/_) $$,                                                                             ~ ~ ~         ~

_- _ _h_L _/_ _ _ _' _. _ _ _ _'_(

                                         .$__1_3'.___Cb____

g , _ _Q __ .",Ut c_~_4 0__i <f._ y_%_ _pp_1___J__..M_ _ _ - _ _q. __^fs_f __ _ _ ._ _r_D

                                                                                 %a_w_

_ .~p_ _ _ ._____ _ _ _ _ _ _ _ _ _7__ 'lt e l LIMIT 0.20 0.50 2 HR/ DAY O MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLE s

                                                                                                 ~           .
                                                                                                                                                                 \

9 l Page 2 of 2 62EV-SAM-002-0 R00

n ,n . ..- :.

=-%.W. E . . s. s., .

5 ry. - F.h;yr CIRC WATER CHLORINATION DATA '

:.e. - -1 i

DATA PACKAGE-1 (DATA SHEET 1) - Gn O WEEKLY UNIT NO: ") v-- CHLORINATORS Clg DATE FREQUENCY CLgINJECT NO. 1 NO ._ 2 FREE mg/l* DISCHARGE INITIALS CYCLE / DAY MIN / CYCLE f/24 HR f/24 HR AVG. MAX HOUR / DAY

                                                                                                                                                                                                     ,c , c.

y .0f.

                            .       -        . 0 0-----       --------------------                                 -------        -----          .-----           ------------------_-

kn$l ---QO'i----

                                                              ---------------------_-----                                         -----          -----------------                         - - 'l' C_ _ - -
                                                                                                                                                                  --- ~ ~~

Qf.t<j_ -- Owl---- r ----------- ---------------.

                                                                                                            ^
                                                                                                                                  .----         .............----                          -2T    -------

12W4

                                              /                    --.(Q------- - ------- W@--                                       ,20 .a 2d-- - - - d- - - - - -- W-------

b..-

                         .\. __ -                     .-                                                                                                                       -
  /

i ) LIMIT 0.20 0.50 2 HR/ DAY H, g \, ) _ g

                                                                                                                                      ~
  • MEASURED AT TOWER OVERFLOW DURING CHLORINATION CYCLP T

l t e l

             \

l 1 iw/ Page 2 of 2 62EV-SAM-002-0 R00 e

          -.eF : .7
             ~-           *
      .a. -2g      >,.d.a
                . x-
       . uvw.:

1.*<y?C. .i'

         . .si c
     .a,s w -
           .p.

SERVICE WATER CHLORINATION DATA T

        '                                                              DATA PACKAGE 2 (DATA SHEET 2)

WEEKLY UNIT NO: f CHLORINATORS Cl

                                                                 ..___...._....__......._                      _____.....x........__..

DATE FREQUENCY CLg INJECT NO. 1 NO. 2 NO. 3 FREE m

                                                                                                                         ..g/1* ...........

DISCHARGE CYCLE / DAY MIN / CYCLE #/24 HR #/24 HR #/24 HR AVG. MAX HOU _____ ..________ ______...__ ..__..._ __....... ....... ..... .____. .___R/ DAY _Iw-n_______.cat Q____ 20D .if :O c<.fim___... ..._____ ________. ___ ... ... _ _ . . ' .. . . ..'......

                                                                                                                                          . s i_o.-i.m_ .. . . _E. n. . _.....-_...
                                                                                                                                                 /

e_ _-a_x_ _ _ C4.G. b, . a_d_ m-: r._ _ _ . . .p..oc ./! _ _ _i_2_..__._.> ..... w

                  .w. J.h _S.....        .. . .__.~.... ......_.

_ _ C .o.V'_' . ........

                                                                                              .              . _F.7.. .., .Ie             n L. ..._V__-...

le_is. .. %..__ ... .. &........ __ "_..... .282... ..__... W _L ..... J.T_.. ...a..___. 7 --.._ __..__.... .. _______. ......__ _______.. ......_ _.... ...... .________.. I s i,v/ ( ._-_ ----__................ ................___.... ..... ...... ........... LIMIT 0.20 0.50 2 HR/ DAY f,/)

       ~.

MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME 1 l l l i 1

 /D

! \v) l l

   .                                                                Page 2 of 2 t                                                                                                         l'@li3L_%V:L.MC2 2

_ FUBLO

A?.;. D.w m g .

                                                                                                                                                                       ~
            ~ . . n. ?
           .r                                                                                                                                                 ,

SERVICE WATER CHLOR: NATION DATA he[x(nh.f

    ,o -

Af

        "                                                            DATA PACKAGE 2
         /                                                            (DATA SHEET 2)

( f W sE?.LY UNIT NO: [ CHLORINATORS C1, _______.._..... -________. .________.._____________ _____..___~_ ___....__. DATE FREQUENCY CL2 INJECT NO. 1 NO. 2 NO. 3 FREE mg/l* DISCHARGE . CYCLE / DAY MIN / CYCLE #/24 HR #/24 HR #/24 HR AVG. MAX HOUR / DAY fi.f.%.. .U__b__b_{%_.

                  .                                     _ _    . ~ . _ ._ ~
                                               . (_m_ _ i_th_.<s_s.      _       _ ~ _l0_

_ _2_ ~ _ __ _ _ .

                                                                                                  .......        _ _a t_o____<j.f. .        . 0Yw______.

_h-1_2f.. fC.&_ _ _.(r_n_k_ _ _ _ _ _ _ _ _.._~._____ _ _ _ _2_0_ _(I _ _ _ _ _______ _2_10___ _ _s J T. .. . .m_ _m_ _ _ _ _ . _lH1.4 _ i_n_ _k_ wo____ _ _ .u. w_ __ _(r.&. _ _.:.'______ _ . _ _?_R_ _. _ _ _ __. ' ' _ ~ _ . .~

                                                                                                                   . I.b._. ~    _ _ ..e .. <c___...
                                                                                                                             ..sif___
                 .I9y.4_ .c.c     %._ .._ _k_ _ . k. . .+.,. . _..-

_ . .... . ,9. g_g . . . ...__..

                                                                                                                . jy. . ..,.f0... ..T.,1                 .._.

LIMIT 0.20 0.50 2 HR/ DAY MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME I I l lt l l l l Page 2 of 2 i i e 62EV-SAM-002-0 R00

j k.

   " Q + Q: ^g y" - '

cx-m e ,- 1 Q.7,i-M ' SERVICE WATER CHLORINATION DATA .  : g" _ l DATA PACKAGE 2 (DATA SHEET 2) y l WEEKLY UNIT NO: 1 CHLORINATORS Cl x DATE FREQUENCY CLg INJECT NO. 1 NO. 2 NO. 3 FREE mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE 8/24 HR 8/24 HR f/24 HR AVG. MAX HOUR / DAY

                                                                                                                  .]n -.?.n . ...0--....
                                                                                                          ~

Lu. t- <m_ .tw.c. . ..6.0-__---

                     -. ._         --..                             ........         . 7.0. 0. . . .                                a
            .i 2]y. . . u_s_M_ _u.m. . .

_ ...bo.. --. ........ .

                                                                                     . 79.)- - - - . ......-      < z.o.. . .?p- - ....o..----.

p_g_ s .le.d..s..m.- _.40_-....

                           -                                        ........         . 2.00--..      .......    . a. .o.. ..a. 0. .      ... 0.---...
            ]227$- _ _(e.%_ . ~- .-_ff_-....
                -.                             -.                   .. ~...... . 2_0. 0. . . . .     .......    . ~2.0 . . 20. . ..0

(

            . .: .   ._n__..._.               . . . - _ . . . _ _ - . ._ . = _ -  _   ___... ..

N

,\

(x S LIMIT 0.20 0.50 2 HR/ DAY v

  • MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE
           ** MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME Page 2 of 2 62EV-SAM-002-0                       R00

e'7.,,.,g,nze M .p .

         & L"14 W
       ;d M W                                                   SERVICE WATER CHLORINATION DATA
        .:.::q ::

agl a

         %~                                                                         DATA PACKAGE 2 (DATA SHEET 2)

WEEKLY UNIT NO: ' CHLORINATORS Cl 4 DATE FREQUENCY CL2 " INJECT NO. 1 NO. 2 NO. 3 FREE mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE f/24 HR f/24 HR 1/24 HR AVG. MAX HOUR / DAY l0-I-b les$ser Ch$rm ~~~ c200 .ti .?o

                                                                                                                                                                                   \

IV.i.o1!4

                   .           . _ _hM. .        ...........               ..............._.                       .....__          _____       ......       ....... /..
                   /_
                   .c./71_6   . . .E@.__....     ...........               ........        __....__.               ...__..          ..... ..__ .             ...........
                                                                                                                                                                                           ~
                              .._Y(D..}... .__ ~. __...

p_h_7a _ _ ........ ____.__ -

                                                                                                                   ....... ...-_ _.. __                      .___.....h..

1 _N. . ... 6..~.. ...__.___.. ._____.. .....___. _........... ..__.. ...____....

                   -- \%. . . . _ _ _ . . . < ./". .~_,s_ _ . . v y .-                                      %                                      -

[m) ......_____....._____..... ..._____................ ..... .___.. ...........

   '-4                                                                         LIMIT                                                  0.20 0.50                   2 HR/ DAY 7~

U MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE

                 ** MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME f Q2 h & W                                                                h .Is 00$ & Q $ nfue g,

l 9)

   .o]
   \v i

Page 2 of 2 62EV-SAM-002-0 R00 e

w. . ._ . y,.w. .. .:n- .

n-

        ;2@qw
        . .g:. : . df
                    '                                       SERVICE WATER CHLORINATION DATA t+Mr
           ^*'

DATA PACKAGE 2 (DATA SHEET 2) b WsEKLY UNIT ::0: 2 CHLORINATORS Cl

                       ............... ..........                     ........................                     ..........x       ...........     .

DATE FREQUENCY CL., INJECT NO. 1 NO. 2 NO. 3 FREE mg/1* DISCHARGE - CYCLE / DAY MIN / CYCLE 4/24 HR f/24 HR f/24 HR AVG. MAX HOUR / DAY ll '

                      ..~]R      . .D. .Q . .E. .%..M. .W. . .O?.?. ,,g.h. f.t.b(

z . Q.d.f.w.p..e... " . . . ~. .' . . ~ . . ' . ~.~..........

                     .I{_ .l'.lf. h.(.k. . .k.((.u.1.2.[6.,.. k$e. .A.ch..

y $...r. h...p,..... 7 ..... ...... .~.......... I

                     .H.   .e .%.._M.._...i..u.us
u. . . . d. . J.. .i. .7 .n a..t%..y..r..&. ...... ..... ... '... .~..........
                                                                                                                                           ~~
                    ..l@fsS ..R. h_.. )..C. 6.'4.L. .cf. .-.$. .t. .&. ;,.h. p,,. M...D............                /c, . .- . .       .".."....'....

f--, s

           )       .................................................. ..... ...... ...........

7,/ s LIMIT 0.20 0.50 2 HR/ DAY v . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .................. MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE

                  ** MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME O

g - Page 2 of 2 e 62EV-SAM.002-0 R00

  • me Y&? Y.- .

SERVICE WATER CHLORINATION DATA ' u. 7 DATA PACKAGE 2 - (DATA SHEET 2) } WEEKLY UNIT NO: $2 CHLORINATORS Cl g DATE FREQUENCY CLg INJECT NO. 1 NO. 2 NO. 3 FREE mg/l* DISCHARGE CYCLE / DAY MIN / CYCLE f/24 HR 8/24 HR f/24 HR AVG. MAX HOUR / DAY

              .L%...y     _ _ _0.(.n t.... - __.........                ........          .........          ....... ____.      . . . . .~.-.~..........          h s
                         ....).....

1.4. ........... ........ ......... ....... ..... ...... ...........

              ..YDL
                         ._         }.....   ..... .__.. __....__                        .........
                                                                                                                                                           ---}

gjyu. s ..( .. w..... .__.6_...__ ........ ..2.0_0_... ....... _ <_2p_ _ _L.29.. .. 0........

                                                        . . . . . . . ......a.           .__-_....          ..__...     .....      ......          ...........

LIhIT 0.20 0.50 2 HR/ DAY

                . MEASURED AT POINT OF DISCHARGE TO RIVER DURING CHLORINATION CYCLE
            ** MEASURED AT SERVICE WATER DISCHARGE TO CIRC WATER FLUME t
/'

! ) - \  ;> kJ Page 2 of 2 62EV-SAM-002-0 R00 e

I~ Georgia Powcr Company 333 Piedmont Avenu3 At:anta, Geore!) 30308 Telephon) 404 526-6526 Ma.hng Address Post Offce Box 4545 Atlanta. Georgia 30302 Georgia Power L. T. Gucwa 7,3,  ;,,*wrn 6+rrrm'em Manager Nuclear Safety and Licens;ng 1211C March 20, 1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 ANNUAL ENVIRONMENTAL SURVEILLANCE REPORT Gentlemen: Pursuant to section 5.6 of the E. I. Hatch Nuclear Plant Environmental Technical Specifications, please find enclosed the Annual Environmental Surveillance Report for 1986. If you have any questions in this regard, please contact this office at any time. Sincerely, L. T. Gucwa MJB/lc Enclosure c: Georgia Power Company Mr . s . P. O'Reilly (w/o enclosure) Mr. J. T. Beckham, Jr. (w/o enclosure) Mr. H. C. Nix, Jr. (w/o enclosures) G0-NORMS U. S. Nuclear Regulatory Connission Dr. J. N. Grace, Regional Administrator (w/2 enclosures) Mr. P. Holmes-Ray, Senior Resident Inspector - Hatch (w/o enclosure) Mr. G. Rivenbark, Licensing Project Manager - Hatch (w/o enclosure) D

                                                                         . 6 3}}