7590-01 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMISSION In the Matter of CONNECTICUT YANKEE ATOMIC Docket No. 50-213 POWER COMPANY (HaddamNeckPlant) a; CORRECTION TO ORDER CONFIRMING LICENSEE COMITMENTS ON EMERGENCY RESPONSE CAPABILITY I. | |||
Connecticut Yankee Atomic Power Company (CY APCO) holds Facility Op-erating License No. DPR-61 which authorizes the operation of the Haddam Neck at steady-state power levels not in excess of 1825 megawatts thermal. | |||
The facility is a pressurized water reactor (PWR) located in Middlesex Coun-ty, Connecticut. | |||
II. | |||
O n July 2, 1986, the Commission issued an Order, published in the Federal Register at 51 FR 24766 (July 8,1986), confirming the Licensee's additional commitments to comply with post-TMI requirements proposed in Sup-plement I to NUREG-0737, "Clarffication of TMI Action Plan Requirements." | |||
Subsequent to the issuance of the Order, it has come to the Staff's attention that the Order had described the Licensee's commitments erroneously in two instances in the table attached to the Order. | |||
8608190199 860812 j PDR ADOCK 05000213 F PDR | |||
First, the Order required under Item Ib in the attached table that the Licensee make the safety parameter display system (SPDS) fully operational and have operators trained on the SPDS by March 25, 1988. The required completion date should have read " March 25, 1988 or within 6 months of the Start of Cycle 15" to reflect more accurately the Licensee's commitments in this area and to allow some flexibiHty for delaying completion if the current outage schedule should slip. | |||
Second, the status of Item 3b pertaining to implementation of require-ments proposed in Supplement I to NUREG-0737 regarding Regulatory Guide , | |||
1.97 was described as complete as of July 17, 1984, in the table attached to - | |||
the July 2,1986 Order. This item, which was the subject of an earlier order should have indicated only that the Licensee was required to submit and had submitted an implementation schedule by July 17, 1984. The item was not a new requirement under the July 2,1986 Order and was included on the table only to provide a convenient reference to all of the Licensee's commitments to , | |||
Supplement I to NUREG-0737. | |||
~ | |||
III. | |||
t Accordingly. Attachment I of the July 2 Order is revised to reflect a l | |||
completion date for Item Ib of " March 25,1988, or 6 months from the Start of Cycle 15" and to reflect under Item 3b that the Licensee had completed the requirement to submit a schedule for implementation by July 17, 1984. A copy of the corrected table is attached. | |||
l- . - - _ - - _ _ _ _ _ _ _ _ . _ - _ _ _ - - _ _ _ - . . _ - - . _ - - _ _ _ _ . _ . - . . - _ - - - - _ - . - - _ . _ _ . | |||
r , | |||
The Order of July 2,1986, as corrected herein, remains in effect in accordance with its terms. | |||
FOR THE NUCLEAR REGULATORY COMMISSION Frank J. MO@ glia, (ector | |||
:. DivisionofPWRLic@ensing-B Office of Nuclear Reactor Regulation Dated at Bethesda, Maryland this 12th day of August 1986. | |||
==Attachment:== | |||
CYAPC0 Commitments on Requirements Specified in Supplement I to NUREG-0737 5 | |||
+. | |||
, - n. ,, ,; | |||
l> *. | |||
w. | |||
l .' | |||
l HADDAM NECX PLANT | |||
! LICENSEE'S COMMITMENTS ON SUPPLEMENT 1 TO NUREG-0737 TITLE LICENSEE'S COMPLETION REQUIREMENT | |||
! 1. SCHEDULE (0R STATUS) | |||
Safety Parameter Display , la. Submit a safety analysis and an i System (SPDS) Complete 5/13/86 implementation plan to the NRC. | |||
i l | |||
lb. SPDS fully operational and March 25,1988 or 6 months operators trained. | |||
from start of Cycle 15 i | |||
: 2. Detailed Control Room Design 2a. Submit a program plan to the Complete 2/28/86 Review (DCRDR) NRC. | |||
i 4 | |||
i 2b. Submit a summary report to the February 25, 1988 | |||
; NRC including a proposed i | |||
schedule for implementation. | |||
~ | |||
! 3. Regulatory Guide 1.97 - | |||
Application to Emergency 3a. Submit a report to the NRC Complete 02/29/84 Response Facilities - describing how the requirements | |||
! '' of Supplement 1 to NUREG-0737 j have been or will be met. Schedule submitted by 7/17/84 i Complete 3b. Implement (installationor upgrade) requirements. | |||
i 1 | |||
1 e | |||
l | |||
.- .e >^ | |||
,. ..s - ..u | |||
\ .' | |||
! HADDAM NECK PLANT | |||
: LICENSEE'S COMITWDIT!RF3UPPIEERT 1 TO NUREG-0737 | |||
! LICENSEE'S COMPLETION | |||
:- TITLE REQUIREMENT SCHEDULE (OR STATUS) | |||
: 4. 4a. Submit a Procedures . Complete 09/01/83 Upgrade Procedures Emergency) | |||
(EOPs Operating Generation Package to the NRC. | |||
, 4b. Implement the upgraded E0Ps. September 1, 1986 i 5. Emergency Response Facilities Sa. Technical Support Center Complete | |||
* i | |||
.I fully functional. ' | |||
Sb. Operational Support Center Complete | |||
* fully functional. | |||
l Sc. Emergency Operations Facility ** Complete | |||
* fully functional. | |||
j . | |||
r I | |||
i i | |||
* Except for any additional changes that may be required as a result of other items in this Order. | |||
** Relief for backup E0F granted by letter from D. Eisenhet to W. Counsil. dated June 4, 1984 i | |||
i | |||
;}} |
Latest revision as of 20:39, 29 December 2020
ML20205F418 | |
Person / Time | |
---|---|
Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
Issue date: | 08/12/1986 |
From: | Miraglia F Office of Nuclear Reactor Regulation |
To: | CONNECTICUT YANKEE ATOMIC POWER CO. |
Shared Package | |
ML20205F403 | List: |
References | |
NUDOCS 8608190199 | |
Download: ML20205F418 (5) | |
Text
. .
7590-01 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMISSION In the Matter of CONNECTICUT YANKEE ATOMIC Docket No. 50-213 POWER COMPANY (HaddamNeckPlant) a; CORRECTION TO ORDER CONFIRMING LICENSEE COMITMENTS ON EMERGENCY RESPONSE CAPABILITY I.
Connecticut Yankee Atomic Power Company (CY APCO) holds Facility Op-erating License No. DPR-61 which authorizes the operation of the Haddam Neck at steady-state power levels not in excess of 1825 megawatts thermal.
The facility is a pressurized water reactor (PWR) located in Middlesex Coun-ty, Connecticut.
II.
O n July 2, 1986, the Commission issued an Order, published in the Federal Register at 51 FR 24766 (July 8,1986), confirming the Licensee's additional commitments to comply with post-TMI requirements proposed in Sup-plement I to NUREG-0737, "Clarffication of TMI Action Plan Requirements."
Subsequent to the issuance of the Order, it has come to the Staff's attention that the Order had described the Licensee's commitments erroneously in two instances in the table attached to the Order.
8608190199 860812 j PDR ADOCK 05000213 F PDR
First, the Order required under Item Ib in the attached table that the Licensee make the safety parameter display system (SPDS) fully operational and have operators trained on the SPDS by March 25, 1988. The required completion date should have read " March 25, 1988 or within 6 months of the Start of Cycle 15" to reflect more accurately the Licensee's commitments in this area and to allow some flexibiHty for delaying completion if the current outage schedule should slip.
Second, the status of Item 3b pertaining to implementation of require-ments proposed in Supplement I to NUREG-0737 regarding Regulatory Guide ,
1.97 was described as complete as of July 17, 1984, in the table attached to -
the July 2,1986 Order. This item, which was the subject of an earlier order should have indicated only that the Licensee was required to submit and had submitted an implementation schedule by July 17, 1984. The item was not a new requirement under the July 2,1986 Order and was included on the table only to provide a convenient reference to all of the Licensee's commitments to ,
Supplement I to NUREG-0737.
~
III.
t Accordingly. Attachment I of the July 2 Order is revised to reflect a l
completion date for Item Ib of " March 25,1988, or 6 months from the Start of Cycle 15" and to reflect under Item 3b that the Licensee had completed the requirement to submit a schedule for implementation by July 17, 1984. A copy of the corrected table is attached.
l- . - - _ - - _ _ _ _ _ _ _ _ . _ - _ _ _ - - _ _ _ - . . _ - - . _ - - _ _ _ _ . _ . - . . - _ - - - - _ - . - - _ . _ _ .
r ,
The Order of July 2,1986, as corrected herein, remains in effect in accordance with its terms.
FOR THE NUCLEAR REGULATORY COMMISSION Frank J. MO@ glia, (ector
- . DivisionofPWRLic@ensing-B Office of Nuclear Reactor Regulation Dated at Bethesda, Maryland this 12th day of August 1986.
Attachment:
CYAPC0 Commitments on Requirements Specified in Supplement I to NUREG-0737 5
+.
, - n. ,, ,;
l> *.
w.
l .'
l HADDAM NECX PLANT
! LICENSEE'S COMMITMENTS ON SUPPLEMENT 1 TO NUREG-0737 TITLE LICENSEE'S COMPLETION REQUIREMENT
! 1. SCHEDULE (0R STATUS)
Safety Parameter Display , la. Submit a safety analysis and an i System (SPDS) Complete 5/13/86 implementation plan to the NRC.
i l
lb. SPDS fully operational and March 25,1988 or 6 months operators trained.
from start of Cycle 15 i
- 2. Detailed Control Room Design 2a. Submit a program plan to the Complete 2/28/86 Review (DCRDR) NRC.
i 4
i 2b. Submit a summary report to the February 25, 1988
- NRC including a proposed i
schedule for implementation.
~
! 3. Regulatory Guide 1.97 -
Application to Emergency 3a. Submit a report to the NRC Complete 02/29/84 Response Facilities - describing how the requirements
! of Supplement 1 to NUREG-0737 j have been or will be met. Schedule submitted by 7/17/84 i Complete 3b. Implement (installationor upgrade) requirements.
i 1
1 e
l
.- .e >^
,. ..s - ..u
\ .'
! HADDAM NECK PLANT
- LICENSEE'S COMITWDIT!RF3UPPIEERT 1 TO NUREG-0737
! LICENSEE'S COMPLETION
- - TITLE REQUIREMENT SCHEDULE (OR STATUS)
- 4. 4a. Submit a Procedures . Complete 09/01/83 Upgrade Procedures Emergency)
(EOPs Operating Generation Package to the NRC.
, 4b. Implement the upgraded E0Ps. September 1, 1986 i 5. Emergency Response Facilities Sa. Technical Support Center Complete
- i
.I fully functional. '
Sb. Operational Support Center Complete
- fully functional.
l Sc. Emergency Operations Facility ** Complete
- fully functional.
j .
r I
i i
- Except for any additional changes that may be required as a result of other items in this Order.
- Relief for backup E0F granted by letter from D. Eisenhet to W. Counsil. dated June 4, 1984 i
i