| | S:pt:mb:r 11,1998 EN 98-060 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACT:ON licensea: United States Enrichment Corporation EA 98-239 Bethesda, Maryland Docket No. 70-7001 |
| | |
| | ==Subject:== |
| | EXERCISE OF ENFORCEMENT DISCRETlON This is to inform the Commission that the staff intends to exercise enforcement discretion pursuant to Section Vll.B.6 of the Enforcement Policy and not issue a Notice of Violation or propose a civil penalty for a Severity Level Ill problem involving a nonconservative assumption in the Safety Analysis Report (SAR) updated accident analysis. The issue involved a seismic accident analysis which assumed no liquid uranium hexafluoride (UFe)in the accumulators. This assumption underestimated the potential source term for the seismic accident scenario. USEC operates with liquid UF6 in the accumulators. |
| | The staff proposes to exercise enforcement discretion because of: (1) the difference between current requirements and previous (old) design practices which appeared to allow the seismic design and accident analysis assumptions used by USEC; (2) USEC's prompt compensatory measures and comprehensive design changes to resolve the seismic weakness, as detailed in a Confirmatory Order issued to USEC on April 22,1998 (EA 98-156); and (3) USEC's corrective actions to improve the rigor and documentation of safety evaluations for as-found conditions. |
| | It should be noted that the licensee has not been specifically informed of the enforcement decision. The schedule ofissuance is: |
| | Mailing ofletter detailing exercise of enforcement discretion September 18,1998 Telephone notification oflicensee September 18,1998 |
| | , The State of Kentucky will be notified |
| | ; No response is required to this letter detailing exercise of enforcement discretion l Contacts: J. DelMedico, OE, 415-2739 J. Lieberman, OE, 415-2741 l |
| | Distribution O'NFN OWFN TWFN Regional Offices r |
| | . Chairman Jackson EDO OC RI RIV Comm. Diaz DEDE AEOD Ril WCFO Comm. McGaffigan OE OP CTR Rlli Comm. OGC NMSS SECY NP.R IRM Mall OCA 01 OlG NUDOCS l PA SP RES PUBLIC IP ACRS 1 |
| | PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTil VERIFICATION THAT LICENSEE HAS RECEIVED ACTION <D 9811170191 900911 PDR I&E |
| | \u\\U EN-98-060 PDR}} |
Latest revision as of 20:32, 16 December 2020
|
---|
Category:ENFORCEMENT ACTION NOTIFICATIONS
MONTHYEARML20203B7561998-11-17017 November 1998 EN-98-066:informs Commission That Staff Intends to Exercise Enforcement Discretion by Refraining from Issuance of Proposed Civil Penalty to Us Enrichment Corp for Violation Involving Failure to Limit Discharge Below Pressure ML20195D4511998-10-16016 October 1998 EN-98-060B:staff Advised Commission of Intent to Exercise Enforcement Discretion Per Section VII.B.6 of Enforcement Policy & Not Issue Nov.Decision Is Based On,Among Other Reasons,Certificate Holder Corrective Action ML20195D2531998-09-23023 September 1998 EN-98-060A:staff Advised Commission of Intent to Exercise Enforcement Discretion Per Section VII.B.6 of Enforcement Policy & Not Issue Nov.Staff Decided to Defer Issuing Action Until Action Verified ML20195C6631998-09-11011 September 1998 EN-98-060:informing That on 980918 NRC Intends to Exercise Enforcement Discretion Per Section VII.B.6 of Enforcement Policy & Not Issue NOV or Propose CP for Severity Level III Problem Re Nonconservative Assumption in SAR ML20197F6471997-12-0303 December 1997 EN-97-110:on 971208,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Violation Involving Five Examples of Failure to Maintain Control of Classified Matter 1998-09-23
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARML20217B3271999-10-0606 October 1999 Insp Rept 70-7001/99-203 on 990921-23.No Violations Noted. Major Areas Inspected:Paducah Gaseous Diffusion Plant Y2K Program,Including Mgt Planning,Implementation,Qa,Regulatory Considerations & Documentation,Per GL 98-03 ML20212K9301999-10-0404 October 1999 Insp Rept 70-7001/99-10 on 990720-0907.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20212K9161999-10-0404 October 1999 Notice of Violation from Insp on 990720-0907.Violation Noted:Between 990720 & 0907,plant Staff Granted Personnel Unescorted Access to Controlled Access Area That Had Not Received General Employee or site-specific Training ML20212F1181999-09-22022 September 1999 Insp Rept 70-7001/99-12 on 990830-0902.No Violations Noted. Major Areas Inspected:Security Insp Including Physical, Storage & Control of Classified Matter,Classification, Communications Security & Computer Security ML20212B6681999-09-15015 September 1999 Insp Rept 70-7001/99-202 on 990816-20.No Violations Noted. Major Areas Inspected:Engineered Fire Protection Sys, Implementation of Administrative Fire Prevention Controls & Manual Fire Suppression Response Capabilities ML20211L8981999-09-0202 September 1999 Insp Rept 70-7001/99-11 on 990802-06.No Violations Noted. Major Areas Inspected:Selective Exam of Procedures & Representative Records,Interviews with Personnel & Observations of Activities in Progress ML20210P7521999-08-10010 August 1999 Notice of Violation from Insp on 990529-0719.Violation Noted:Between 990510 & 0601,plant Staff Did Not Promptly Notify Plant Shift Superintendent of Identified Problems & Conditions Associated with Process Bldg Fire Protection Sys ML20210P7671999-08-10010 August 1999 Insp Rept 70-7001/99-08 on 990529-0719.Violations Noted. Major Areas Inspected:Plant Operations,Engineering & Plant Support ML20209F0741999-07-0909 July 1999 Insp Rept 70-7001/99-09 on 990621-25.No Violations Noted. Major Areas Inspected:Insp Noted That Operators Response to Small UF6 Release in Building C-337A Was Effective & Consistent with Guidance Provided in Alarm Response ML20196K1051999-07-0101 July 1999 Insp Rept 70-7001/99-07 on 990413-0528.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support ML20196K5851999-05-10010 May 1999 Notice of Violation from Insp on 990413-0528.Violation Noted:Corporation Did Not Report to NRC Operations Ctr, within 24 Hours After Discovery of Event in Which Process Gas Leak Detection Sys Failed to Function as Designed ML20206E6591999-04-29029 April 1999 Insp Rept 70-7001/99-04 on 990224-0412.No Violations Noted. Major Areas Inspected:Plant Staff Took Appropriate Actions to Trip Process Motors for Cell Involved with Motor Fire Due to Failed motor-to speed-increaser Coupling ML20205R8141999-04-20020 April 1999 Partially Withheld Insp Rept 70-7001/99-201 on 990322-26. Details Withheld ML20205J3091999-04-0202 April 1999 Insp Rept 70-7001/99-05 on 990322-25.No Violations Noted. Major Areas Inspected:Compliance with Certificate Holder Approved Physical Security Plan for Protection of Special Nuclear Matl of Low Strategic Significance ML20207K3091999-03-11011 March 1999 Insp Rept 70-7001/99-01 on 990113-0223.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support ML20207G2711999-03-0505 March 1999 Notice of Violation from Insp on 981201-990112.Violation Noted:Certificatee Permitted Individuals to Have Access to Document Revealing Confidential Restricted Data Without Having Q or L Access Authorization ML20203G4231999-02-0909 February 1999 Insp Rept 70-7001/99-02 on 990125-29.No Violations Noted. Major Areas Inspected:Plant Support ML20198K9661998-12-28028 December 1998 Notice of Violation from Insp on 981015-1130.Violation Noted:Discharge Bellows Pressure for Number 1 Normetex Withdrawal Pump in Bldg C-315 Exceeded 45 Psia as Pump Transitioned from Mode 2 to Mode 3 ML20198H8891998-12-21021 December 1998 Insp Rept 70-7001/98-17 on 981015-1130.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support ML20196C2311998-11-24024 November 1998 Notice of Violation from Insp on 980721-0901.Violation Noted:Discharge Bellows Pressure for 2 Normetex Withdrawal Pump in Bldg C-315 Exceeded 45 Psia as Pump Transitioned from Mode 2 Withdrawal to Mode 3 Standby ML20203B7561998-11-17017 November 1998 EN-98-066:informs Commission That Staff Intends to Exercise Enforcement Discretion by Refraining from Issuance of Proposed Civil Penalty to Us Enrichment Corp for Violation Involving Failure to Limit Discharge Below Pressure ML20154R1421998-10-22022 October 1998 Partially Withheld Insp Rept 70-7001/98-206 on 980928-1002. Details Withheld,Per 10CFR2.790 ML20155A4341998-10-22022 October 1998 Insp Rept 70-7001/98-205 on 980915-18.No Violations Noted. Major Areas Inspected:Paducah Gaseous Diffusion Plant High Risk Chemical Release Possibilities That May Occur as Result of Seismic Initiating Event ML20154R8351998-10-21021 October 1998 Insp Rept 70-7001/98-16 on 980902-1014.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20154P5181998-10-16016 October 1998 Insp Rept 70-7001/98-13 on 980721-0901.Violations Noted. Major Areas Inspected:Plant Operations,Main Surveillance, Engineering & Plant Support ML20154P5141998-10-16016 October 1998 Notice of Violations from Insp on 980721-0901.Violations Noted:Corporation Failed to Incorporate ASME NQA-1-1989 Supplemental Requirements Associated with Design Control & Measuring & Test Equipment Into QAP ML20195D4511998-10-16016 October 1998 EN-98-060B:staff Advised Commission of Intent to Exercise Enforcement Discretion Per Section VII.B.6 of Enforcement Policy & Not Issue Nov.Decision Is Based On,Among Other Reasons,Certificate Holder Corrective Action ML20154J7571998-10-0909 October 1998 Insp Rept 70-7001/98-15 on 980908-11.No Violations Noted. Major Areas Inspected:Maint & Surveillance & Plant Support ML20195D2531998-09-23023 September 1998 EN-98-060A:staff Advised Commission of Intent to Exercise Enforcement Discretion Per Section VII.B.6 of Enforcement Policy & Not Issue Nov.Staff Decided to Defer Issuing Action Until Action Verified ML20153B3451998-09-16016 September 1998 Insp Rept 70-7001/98-204 on 980831-0903.No Violations Noted. Major Areas Inspected:Ncs Related Open Items,Corrective Actions & Corrective Action Tracking,Criticality Safety & Plant Operations ML20195C6631998-09-11011 September 1998 EN-98-060:informing That on 980918 NRC Intends to Exercise Enforcement Discretion Per Section VII.B.6 of Enforcement Policy & Not Issue NOV or Propose CP for Severity Level III Problem Re Nonconservative Assumption in SAR ML20237E6031998-08-27027 August 1998 Insp Rept 70-7001/98-14 on 980803-07.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Engineering ML20236Y1151998-08-0505 August 1998 Insp Rept 70-7001/98-11 on 980609-0720.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20236Y1101998-08-0505 August 1998 Notice of Violation from Insp on 980609-0720.Violation Noted:As of 980627,Corporation Failed to Identify,Review & Translate Design Requirements,Associated W/Installation of Bldg C-710 Criticality Accident Alarm Sys ML20236R2261998-07-14014 July 1998 Insp Rept 70-7001/98-12 on 980622-26.No Violations Noted. Major Areas Inspected:Operation,Maint & Surveillance & Plant Support ML20236F8241998-06-30030 June 1998 Insp Rept 70-7001/98-09 on 980420-0608.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance & Surveillance,Engineering & Plant Support ML20236F8221998-06-30030 June 1998 Notice of Violation from Insp on 980420-0608.Violation Noted:Between 980414 & 0513,Corporation Failed to Implement, as Soon as Practical,Interim Nuclear Criticality Safety Spacing Controls for Bldg C-333 Wet Air Pump Piping Elbows ML20249B0671998-06-15015 June 1998 Notice of Violation from Insp on 980518-22.Violation Noted: Design Analysis & Calculations Rept DAC-815-19938-0001,dtd 980120 Documented Existing Rail Stops on Levelator Would Not Prevent Rolling Scale Cart & Carried Cylinder Off End ML20249B0681998-06-15015 June 1998 Insp Rept 70-7001/98-10 on 980518-22.Violation Noted. Major Areas Inspected:Maint & Plant Support ML20216B9231998-05-0707 May 1998 Insp Rept 70-7001/98-06 on 980310-0420.Violation Noted.Major Areas Inspected:Operations,Maint & Surveillance,Engineering & Plant Support PNO-III-98-029, on 980428,empty UF6 Cylinder Arrived from Starmet of Sc with Radioactive Contamination on Surface of Cylinder.Certificatee Decontaminated Cylinder1998-04-30030 April 1998 PNO-III-98-029:on 980428,empty UF6 Cylinder Arrived from Starmet of Sc with Radioactive Contamination on Surface of Cylinder.Certificatee Decontaminated Cylinder ML20217L8551998-04-28028 April 1998 Insp Rept 70-7001/98-203 on 980330-0403.No Violations Noted. Major Areas Inspected:Chemical Process Safety Insp of Paducah Gaseous Diffusion Plant,In Paducah,Ky on 980330-0403 ML20217D9071998-04-22022 April 1998 Insp Rept 70-7001/98-08 on 980331-0402.No Violations Noted. Major Areas Inspected:Evaluation of Certificatee Performance During Plant Biennial Exercise of Emergency Plan ML20216B0491998-04-0808 April 1998 Insp Rept 70-7001/98-07 on 980316-20.No Violations Noted. Major Areas Inspected:Operations & Training ML20216B6591998-04-0606 April 1998 Notice of Violation from Insp on 980120-0309.Violation Noted:Plant Shift Superintendent Did Not Implement Requirements of Procedure UE2-TO NS1032 for Inoperable UF6 Detection Sys in Building C-333A W/Autoclaves ML20216B6671998-04-0606 April 1998 Insp Rept 70-7001/98-03 on 980120-0309.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Surveillance & Engineering ML20217G7901998-03-27027 March 1998 Insp Rept 70-7001/98-04 on 980223-27.No Violations Noted. Major Areas Inspected:Provided follow-up on 970505-09 Security Insp Findings at Paducah Plant That Resulted in Escalated Enforcement & Review of Physical Security Plan ML20217G7331998-03-27027 March 1998 Insp Rept 70-7001/97-10 on 970919-980216.No Violations Noted.Major Areas Inspected:Operational Controls,Maint Programs,Engineering Design,Event Root Cause Evaluation & Classification & Reporting of Event ML20217F2261998-03-26026 March 1998 Partially Withheld Insp Rept 70-7001/98-202 (Ref 10CFR2.790) on 980302-06.No Violations Noted.Details Withheld ML20217C0841998-03-24024 March 1998 Notice of Violation from NRC Review of Pgdp Certificate Amend Request - Update to Application SAR Dtd 970818. Violation Noted:On 970817,USEC Did Not Submit Amend to Certification Application Which Includes Listed Info 1999-09-22
[Table view] |
Text
, _ ._ _ _ . ._- __
S:pt:mb:r 11,1998 EN 98-060 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACT:ON licensea: United States Enrichment Corporation EA 98-239 Bethesda, Maryland Docket No. 70-7001
Subject:
EXERCISE OF ENFORCEMENT DISCRETlON This is to inform the Commission that the staff intends to exercise enforcement discretion pursuant to Section Vll.B.6 of the Enforcement Policy and not issue a Notice of Violation or propose a civil penalty for a Severity Level Ill problem involving a nonconservative assumption in the Safety Analysis Report (SAR) updated accident analysis. The issue involved a seismic accident analysis which assumed no liquid uranium hexafluoride (UFe)in the accumulators. This assumption underestimated the potential source term for the seismic accident scenario. USEC operates with liquid UF6 in the accumulators.
The staff proposes to exercise enforcement discretion because of: (1) the difference between current requirements and previous (old) design practices which appeared to allow the seismic design and accident analysis assumptions used by USEC; (2) USEC's prompt compensatory measures and comprehensive design changes to resolve the seismic weakness, as detailed in a Confirmatory Order issued to USEC on April 22,1998 (EA 98-156); and (3) USEC's corrective actions to improve the rigor and documentation of safety evaluations for as-found conditions.
It should be noted that the licensee has not been specifically informed of the enforcement decision. The schedule ofissuance is:
Mailing ofletter detailing exercise of enforcement discretion September 18,1998 Telephone notification oflicensee September 18,1998
, The State of Kentucky will be notified
- No response is required to this letter detailing exercise of enforcement discretion l Contacts
- J. DelMedico, OE, 415-2739 J. Lieberman, OE, 415-2741 l
Distribution O'NFN OWFN TWFN Regional Offices r
. Chairman Jackson EDO OC RI RIV Comm. Diaz DEDE AEOD Ril WCFO Comm. McGaffigan OE OP CTR Rlli Comm. OGC NMSS SECY NP.R IRM Mall OCA 01 OlG NUDOCS l PA SP RES PUBLIC IP ACRS 1
PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTil VERIFICATION THAT LICENSEE HAS RECEIVED ACTION <D 9811170191 900911 PDR I&E
\u\\U EN-98-060 PDR