ML20069A448: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:,
Str.tlen Support Espirtmint
                  .                                                                                      10 CFR 50.90
    ,    .    ~      #
PECO ENERGY                                                                =3c="L,,
965 Chesterbrook Boulevard Wayne, PA 19087-5691 May 13,1994 Docket Nos. 50 352 50-353 License Nos. NPF-39 NPF-85 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
 
==Subject:==
Limerick Generating Station, Units 1 and 2 Technical Specifications Change Request No. 93-21-0 Gentlemen:
PECO Energy Company is submitting Technical Specifications (TS) Change Request No. 93-21-0 in accordance with 10 CFR 50.90, requesting an amendment to the TS (i.e., Appendix A) of Operating Ucense Nos. NPF-39 and NPF-85 for Umerick Generating Station, Units 1 and 2, respectively. This proposed TS Change revises TS Surveillance Requirement 4.8.1.1.20.8, which requires that a diesel generator be retested within 5 minutes after completing a 24 hour endurance run. Information supporting this TS Change Request is contained in Attachment 1 to this letter, and the proposed replacement pages for the LGS, Units 1 and 2, TS are contained in Attachment 2. This information is being submitted under affirmation, and the required affidavit is enclosed.
We request that, if approved, the amendments to the LGS, Units 1 and 2, TS be effective immediately upon issuance.
If you have any questions, please do not hesitate to contact us.
Very truly yours,
                      .O.              ga V.
G. A. Hunger, Jr., Director Licensing Section Attachments Enclosure i
ec:      T. T. Martin, Administrator, Region 1. USNRC (w/ attachments, enclosure)
N. S. Perry, USNRC Senior Resident inspector, LGS (w/ attachments, enclosure)
R. R. Janati, Director, PA Bureau of Radiation Protection, (w/ attachments, enclosure)
                    ^                                                                                                          l Cj''"9405250204940513
        "'                                                                                                                  '{
PDR      ADDCK 05000352  PDR
                                                                                                                        ,          1
                  -p                                                                                                      j L-(
 
  ., =    ,
Page 2 bec:    D. M. Smith - 63C-3                w/o attachment, enclosure D. R. Helwig - LGS, SMB1 1                                    ,
W. H. Smith, Ill, - 62C-3                  -
J..B. Cotton - 51 A-1 J. Doering - 63C-5 R. W. Boyce - LGS, GML5-1 J. G. Hufnagel - LGS, SMB3-2                  -                ''
J. L Kantner - LGS, SMB3-1        w/ attachment, enclosure D. P. Heiker - 62A-1 Commitment Coordinator - 62A-1 PA DER BRP inspector - LGS, SMB3-1                            2 Correspondence Control Desk DAC 0:\lic\clw\wp51\tscr9414.sub
                                                                                        'r
(.
 
COMMONWEALTH OF PENNSYLVANIA COUNTY OF CHESTER                                    :
W. H. Smith,111, being first duly sworn, deposes and says:
That he is Vice President of PECO Energy Company; the Applicant herein; that he has read the foregoing Technical Specifications Change Request No. 93-21-0 for Limerick Generating Station, Units 1 and 2, to revise the requirement to retest a diesel generator within five minutes after completing a 24 hour endurance run, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, Information, and belief.
                                                                                            ~
Vice Pre::! dent v
Subscribed and sworn to before me this            ay of            ;    1994.
L              ,/
                            ^'
                                          ~%
y / ;. y  _
Notary Public tuanaismi P utic Erica A.Santert Notar/
Tra W,nTwp.,ChtAY MycomrtussonEx;*mJuly10. 995 L::}}

Latest revision as of 18:18, 28 August 2020

Application for Amends to Licenses NPF-39 & NPF-85, Requesting TS Change That Requires Diesel Generator Be Retested within 5 Minutes After Completing 24 Hour Endurance Run
ML20069A448
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 05/13/1994
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20069A451 List:
References
NUDOCS 9405250204
Download: ML20069A448 (3)


Text

,

Str.tlen Support Espirtmint

. 10 CFR 50.90

, . ~ #

PECO ENERGY =3c="L,,

965 Chesterbrook Boulevard Wayne, PA 19087-5691 May 13,1994 Docket Nos. 50 352 50-353 License Nos. NPF-39 NPF-85 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Limerick Generating Station, Units 1 and 2 Technical Specifications Change Request No. 93-21-0 Gentlemen:

PECO Energy Company is submitting Technical Specifications (TS) Change Request No. 93-21-0 in accordance with 10 CFR 50.90, requesting an amendment to the TS (i.e., Appendix A) of Operating Ucense Nos. NPF-39 and NPF-85 for Umerick Generating Station, Units 1 and 2, respectively. This proposed TS Change revises TS Surveillance Requirement 4.8.1.1.20.8, which requires that a diesel generator be retested within 5 minutes after completing a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> endurance run. Information supporting this TS Change Request is contained in Attachment 1 to this letter, and the proposed replacement pages for the LGS, Units 1 and 2, TS are contained in Attachment 2. This information is being submitted under affirmation, and the required affidavit is enclosed.

We request that, if approved, the amendments to the LGS, Units 1 and 2, TS be effective immediately upon issuance.

If you have any questions, please do not hesitate to contact us.

Very truly yours,

.O. ga V.

G. A. Hunger, Jr., Director Licensing Section Attachments Enclosure i

ec: T. T. Martin, Administrator, Region 1. USNRC (w/ attachments, enclosure)

N. S. Perry, USNRC Senior Resident inspector, LGS (w/ attachments, enclosure)

R. R. Janati, Director, PA Bureau of Radiation Protection, (w/ attachments, enclosure)

^ l Cj"9405250204940513

"' '{

PDR ADDCK 05000352 PDR

, 1

-p j L-(

., = ,

Page 2 bec: D. M. Smith - 63C-3 w/o attachment, enclosure D. R. Helwig - LGS, SMB1 1 ,

W. H. Smith, Ill, - 62C-3 -

J..B. Cotton - 51 A-1 J. Doering - 63C-5 R. W. Boyce - LGS, GML5-1 J. G. Hufnagel - LGS, SMB3-2 -

J. L Kantner - LGS, SMB3-1 w/ attachment, enclosure D. P. Heiker - 62A-1 Commitment Coordinator - 62A-1 PA DER BRP inspector - LGS, SMB3-1 2 Correspondence Control Desk DAC 0:\lic\clw\wp51\tscr9414.sub

'r

(.

COMMONWEALTH OF PENNSYLVANIA COUNTY OF CHESTER  :

W. H. Smith,111, being first duly sworn, deposes and says:

That he is Vice President of PECO Energy Company; the Applicant herein; that he has read the foregoing Technical Specifications Change Request No. 93-21-0 for Limerick Generating Station, Units 1 and 2, to revise the requirement to retest a diesel generator within five minutes after completing a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> endurance run, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, Information, and belief.

~

Vice Pre::! dent v

Subscribed and sworn to before me this ay of  ; 1994.

L ,/

^'

~%

y / ;. y _

Notary Public tuanaismi P utic Erica A.Santert Notar/

Tra W,nTwp.,ChtAY MycomrtussonEx;*mJuly10. 995 L::