ML061000645: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(One intermediate revision by the same user not shown) | |||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:[ Ja-m'e'sNo-gg)e- | {{#Wiki_filter:[ Ja-m'e'sNo-gg)e- - FW:- M-ONITROING WELL STATUS DECEMBER-20,2005 Page 1 1 I .ames NoglWELL JMOIRON -= FWSTTU DEEME 20=...... | ||
-FW:- M-ONITROING WELL STATUS DECEMBER-20,2005 Page 1 1 I | ,20 Pa..e 1..,= | ||
,20 Pa..e 1 | From: "Croulet, Donald" <dcroule©entergy.com> | ||
To: "Conroy, Pat" <PConroy~entergy.com>, "Co ark R" <mcox9O@entergy.com>,"Janicki, John" <JJanick~entergy.com>, "'James Noggle"' <J @nrc.gov>, "'Timothy Rice"'<tbrice l gw.dec.state.ny.us> | To: "Conroy, Pat" <PConroy~entergy.com>, "Co ark R" <mcox9O@entergy.com>, | ||
Date: 12/21/05 6:26AM | "Janicki, John" <JJanick~entergy.com>, "'James Noggle"' <J @nrc.gov>, "'Timothy Rice"' | ||
<tbrice l gw.dec.state.ny.us> | |||
Date: 12/21/05 6:26AM | |||
==Subject:== | ==Subject:== | ||
FW: MONITROING WELL STATUS DECEMBER 20,2005 fyi From: Axelson, William L Sent: Tuesday, December 20, 2005 5:41 PM To: Rutkoske, Michael; Jones, T. R.; Wilson, Daniel; Sandike, Steven; McMullin, Kathy; Skonieczny, John;Drake, Richard; Nuta, Dragos A; Lavera, Ron; Deeds, Paul; Bode, Paul M.; English, Christopher; Petors, James; Leach, Don; Kulaga, Joe; Morin, Kenneth; Croulet, Donald; Durfee, Michael; Hinrichs, Gary;Thiery, Al; Evers, Bob; Colville, Howard J.; Colville, Richard; Burns, Thomas Cc: Mayer, Don; Axelson, William L; Sachatello, Ronald | FW: MONITROING WELL STATUS DECEMBER 20,2005 fyi From: Axelson, William L Sent: Tuesday, December 20, 2005 5:41 PM To: Rutkoske, Michael; Jones, T. R.; Wilson, Daniel; Sandike, Steven; McMullin, Kathy; Skonieczny, John; Drake, Richard; Nuta, Dragos A; Lavera, Ron; Deeds, Paul; Bode, Paul M.; English, Christopher; Petors, James; Leach, Don; Kulaga, Joe; Morin, Kenneth; Croulet, Donald; Durfee, Michael; Hinrichs, Gary; Thiery, Al; Evers, Bob; Colville, Howard J.; Colville, Richard; Burns, Thomas Cc: Mayer, Don; Axelson, William L; Sachatello, Ronald | ||
==Subject:== | ==Subject:== | ||
MONITROING WELL STATUS DECEMBER 20,2005<<MONITORING WELL STATUS.doc>> | MONITROING WELL STATUS DECEMBER 20,2005 | ||
Todays Progress: MW-31 Finished drilling well and "developing well" for a sample tomorrow MW-32 | <<MONITORING WELL STATUS.doc>> | ||
Todays Progress: | |||
MW- | MW-31 Finished drilling well and "developing well" for a sample tomorrow MW-32 Vacuumed down to about 8.5', and still have metal indication Engineering will decide next step Storm Drains: I lave sampled all storm drains with exception of 1 and 4A, which will be done tomorrow State Split Sample results: The State split samples done with IPEC on December 6 and 8 on on site and offsite locations are in good agreement with IPEC | ||
< 1000 pCi/l (MDA)Using IPEC counting system (see note 2. below)Storm Drain # 6 Transformer Yard 84' from MW-Ill Sample all Storm Drains 11/10/05 (51,300 pCi/l 12/08/05 )37,100 pCi/l Note 1: Will attempt to samnle MT-Ii and MI-4A tomorrow to complete all storm driins, andl samnle MTW-31 for the first time.Note 2: Received results from the State of New York on split samples IPEC took with them and NRC on 12/6/05 and 12/08/05 for tritium on MW-38, 101,105,107, Lefarge Plant Well # 1 and 3 (#2 well not sampled because pump was broke). The results of the State testing was in *good agreement to IPEC. The State reported MW-38 at 701 +-117 pCi/l (we counted it as 985 pCi/l). The State counted MW-107 as 96+-86 pCi/I, we reported MDA (same relative value). We are still awaiting the NRC's count results.}} | |||
t MONITORING WELL STATUS (Tues, Dec 20, 2005-1730 hrs) | |||
Well Location Status Ne xt Samples Sample Result Number StEen Taken (Highest Historical Value) | |||
MW-111 Transformer Yard Baseline Sample PT Sampled 12/19/05-(still counting) 302,000 pCi/l (11/04/05) | |||
MW-30 U-2 SFB Developed well Raw Water: 399,000 pCi/l (11/23/05) | |||
Adding casings to reach 80'el Packer test Water: 600,000 pCi/l (11/24/05) | |||
MW-31 MOB side walk Completed Finish flushing, (take 1 st sample 12/21/05) | |||
MW-32 U-2 SFB Alley Way Metal magnotometer Vacuumed to 8.5 ', still a metal indication. | |||
indication still present in hole Engineering to decide next step tomorrow MW-33 Transformer Yard Well installed Sampled water 12/19/05, counting now. 42,300 pCi/l (12/15/05) | |||
MW-34 Transformer Yard Well installed Sampled water 12/19/05, counting now. 63,900 pCi/l (12/14/05) | |||
MW-35 Transformer Yard Well installed Sampled water 12/19/05, counting now. 142,000 pCi/l (12/14/05) | |||
MW-36 U-2 Turbine Bldg Re-locating drill location Get engineering package out and walkdown MW-37 U-2 Turbine Bldg Re-locating drill location Get engineering piackage out and walkdown MW-38 South U-3 Boundary Well in service Continue periodic sampling < 1000 pCi/l (MDA) | |||
Using IPEC counting system (see note 2. below) | |||
Storm Drain # 6 Transformer Yard 84' from MW-Ill Sample all Storm Drains 11/10/05 (51,300 pCi/l 12/08/05 )37,100 pCi/l Note 1: Will attempt to samnle MT-Ii and MI-4A tomorrow to complete all storm driins, andl samnle MTW-31 for the first time. | |||
Note 2: Received results from the State of New York on split samples IPEC took with them and NRC on 12/6/05 and 12/08/05 for tritium on MW-38, 101,105,107, Lefarge Plant Well # 1 and 3 (#2 well not sampled because pump was broke). The results of the State testing was in *good agreement to IPEC. The State reported MW-38 at 701 +-117 pCi/l (we counted it as 985 pCi/l). The State counted MW-107 as 96+-86 pCi/I, we reported MDA (same relative value). We are still awaiting the NRC's count results.}} |
Latest revision as of 07:14, 23 March 2020
ML061000645 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 12/21/2005 |
From: | Croulet D Entergy Nuclear Operations |
To: | Noggle J Division of Reactor Safety I |
References | |
FOIA/PA-2006-0081 | |
Download: ML061000645 (2) | |
Text
[ Ja-m'e'sNo-gg)e- - FW:- M-ONITROING WELL STATUS DECEMBER-20,2005 Page 1 1 I .ames NoglWELL JMOIRON -= FWSTTU DEEME 20=......
,20 Pa..e 1..,=
From: "Croulet, Donald" <dcroule©entergy.com>
To: "Conroy, Pat" <PConroy~entergy.com>, "Co ark R" <mcox9O@entergy.com>,
"Janicki, John" <JJanick~entergy.com>, "'James Noggle"' <J @nrc.gov>, "'Timothy Rice"'
<tbrice l gw.dec.state.ny.us>
Date: 12/21/05 6:26AM
Subject:
FW: MONITROING WELL STATUS DECEMBER 20,2005 fyi From: Axelson, William L Sent: Tuesday, December 20, 2005 5:41 PM To: Rutkoske, Michael; Jones, T. R.; Wilson, Daniel; Sandike, Steven; McMullin, Kathy; Skonieczny, John; Drake, Richard; Nuta, Dragos A; Lavera, Ron; Deeds, Paul; Bode, Paul M.; English, Christopher; Petors, James; Leach, Don; Kulaga, Joe; Morin, Kenneth; Croulet, Donald; Durfee, Michael; Hinrichs, Gary; Thiery, Al; Evers, Bob; Colville, Howard J.; Colville, Richard; Burns, Thomas Cc: Mayer, Don; Axelson, William L; Sachatello, Ronald
Subject:
MONITROING WELL STATUS DECEMBER 20,2005
<<MONITORING WELL STATUS.doc>>
Todays Progress:
MW-31 Finished drilling well and "developing well" for a sample tomorrow MW-32 Vacuumed down to about 8.5', and still have metal indication Engineering will decide next step Storm Drains: I lave sampled all storm drains with exception of 1 and 4A, which will be done tomorrow State Split Sample results: The State split samples done with IPEC on December 6 and 8 on on site and offsite locations are in good agreement with IPEC
t MONITORING WELL STATUS (Tues, Dec 20, 2005-1730 hrs)
Well Location Status Ne xt Samples Sample Result Number StEen Taken (Highest Historical Value)
MW-111 Transformer Yard Baseline Sample PT Sampled 12/19/05-(still counting) 302,000 pCi/l (11/04/05)
MW-30 U-2 SFB Developed well Raw Water: 399,000 pCi/l (11/23/05)
Adding casings to reach 80'el Packer test Water: 600,000 pCi/l (11/24/05)
MW-31 MOB side walk Completed Finish flushing, (take 1 st sample 12/21/05)
MW-32 U-2 SFB Alley Way Metal magnotometer Vacuumed to 8.5 ', still a metal indication.
indication still present in hole Engineering to decide next step tomorrow MW-33 Transformer Yard Well installed Sampled water 12/19/05, counting now. 42,300 pCi/l (12/15/05)
MW-34 Transformer Yard Well installed Sampled water 12/19/05, counting now. 63,900 pCi/l (12/14/05)
MW-35 Transformer Yard Well installed Sampled water 12/19/05, counting now. 142,000 pCi/l (12/14/05)
MW-36 U-2 Turbine Bldg Re-locating drill location Get engineering package out and walkdown MW-37 U-2 Turbine Bldg Re-locating drill location Get engineering piackage out and walkdown MW-38 South U-3 Boundary Well in service Continue periodic sampling < 1000 pCi/l (MDA)
Using IPEC counting system (see note 2. below)
Storm Drain # 6 Transformer Yard 84' from MW-Ill Sample all Storm Drains 11/10/05 (51,300 pCi/l 12/08/05 )37,100 pCi/l Note 1: Will attempt to samnle MT-Ii and MI-4A tomorrow to complete all storm driins, andl samnle MTW-31 for the first time.
Note 2: Received results from the State of New York on split samples IPEC took with them and NRC on 12/6/05 and 12/08/05 for tritium on MW-38, 101,105,107, Lefarge Plant Well # 1 and 3 (#2 well not sampled because pump was broke). The results of the State testing was in *good agreement to IPEC. The State reported MW-38 at 701 +-117 pCi/l (we counted it as 985 pCi/l). The State counted MW-107 as 96+-86 pCi/I, we reported MDA (same relative value). We are still awaiting the NRC's count results.