ML080160211: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML080160211
| number = ML080160211
| issue date = 01/30/2008
| issue date = 01/30/2008
| title = Oconee Nuclear Station, Units 2 and 3 - Closure of Confirmatory Action Letter NRR-07-022 (TAC Nos. MD4166 and MD4167)
| title = Closure of Confirmatory Action Letter NRR-07-022
| author name = Haney C
| author name = Haney C
| author affiliation = NRC/NRR/ADRO/DORL
| author affiliation = NRC/NRR/ADRO/DORL
| addressee name = Hamilton B H
| addressee name = Hamilton B
| addressee affiliation = Duke Power Co
| addressee affiliation = Duke Power Co
| docket = 05000270, 05000287
| docket = 05000270, 05000287
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:January 30, 2008  
{{#Wiki_filter:January 30, 2008 Mr. Bruce H. Hamilton Vice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672
 
Mr. Bruce H. Hamilton Vice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672


==SUBJECT:==
==SUBJECT:==
OCONEE NUCLEAR STATION, UNITS 2 AND 3 - CLOSURE OF CONFIRMATORY ACTION LETTER NRR-07-022 (TAC NOS. MD4166 AND MD4167)
OCONEE NUCLEAR STATION, UNITS 2 AND 3 - CLOSURE OF CONFIRMATORY ACTION LETTER NRR-07-022 (TAC NOS. MD4166 AND MD4167)


==Dear Mr. Hamilton:==
==Dear Mr. Hamilton:==


On March 27, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070790113) regarding dissimilar metal welds in the pressurizers at Oconee Nuclear Station, Units 2 and 3. This letter acknowledges receipt of your letter dated December 13, 2007 (ADAMS Accession No. ML073532226) informing the NRC of actions taken in response to this CAL at Oconee Unit 3. The NRC has previously acknowledged actions taken at Oconee Unit 2 by letter dated September 12, 2007 (ADAMS Accession No. ML072130497).  
On March 27, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070790113) regarding dissimilar metal welds in the pressurizers at Oconee Nuclear Station, Units 2 and 3. This letter acknowledges receipt of your letter dated December 13, 2007 (ADAMS Accession No. ML073532226) informing the NRC of actions taken in response to this CAL at Oconee Unit 3. The NRC has previously acknowledged actions taken at Oconee Unit 2 by letter dated September 12, 2007 (ADAMS Accession No. ML072130497).
 
In your letter, you informed us of the mitigative actions taken at Oconee Unit 3, which consisted of the application of full structural weld overlays to the Alloy 82/182 welds of the pressurizer surge, spray, and safety/relief nozzle and safe end welds. The results of the ultrasonic examinations were included in the letter.
In your letter, you informed us of the mitigative actions taken at Oconee Unit 3, which consisted of the application of full structural weld overlays to the Alloy 82/182 welds of the pressurizer surge, spray, and safety/relief nozzle and safe end welds. The results of the ultrasonic examinations were included in the letter.  
 
Based on your letter, the NRC has found that all the commitments listed in the CAL and supporting commitment letters (ADAMS Accession Nos. ML070390049 and ML070600169) have been met for Oconee Units 2 and 3. No further response is required regarding the CAL.
Based on your letter, the NRC has found that all the commitments listed in the CAL and supporting commitment letters (ADAMS Accession Nos. ML070390049 and ML070600169) have been met for Oconee Units 2 and 3. No further response is required regarding the CAL.
We consider the CAL closed. As such, it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system. Based on these actions, TAC No. MD4167 will be closed. TAC No. MD4166 was closed previously.  
We consider the CAL closed. As such, it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system. Based on these actions, TAC No. MD4167 will be closed. TAC No. MD4166 was closed previously.
 
Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.
Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.  
Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).
 
Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).  
 
B. Hamilton
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and your response will be made available electronically for public inspection in t he NRC Public Document Room or from the NRC
=s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.
Sincerely, 
  /RA/ Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
 
Docket Nos. 50-270 and 50-287
 
cc:  See next page 
 
ML080160211      NRR-106 OFFICE  DCI/CPNB  DCI/CPNB  LPL2-1/PM LPL2-1/LA LPL2-1/BC  (A)
 
NAME  TLupold  TChan  LOlshan  MO'Brien  JStang DATE    1/17/08 1/17/08 1/16/08 01/16/08    1/18/08
 
OFFICE  DCI/D  DRS/D RII DORL/D NAME  MEvans  HChristensen for JShea CHaney DATE    1/17/08 By email 1/30/08    1/30/08 Oconee Nuclear Station, Units 1, 2, and 3 January 31, 2008
 
cc:
 
Mr. Bruce H. Hamilton Vice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC  29672
 
Ms. Lisa F. Vaughn Associate General Counsel and Managing Attorney Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, North Carolina  28202
 
Manager, LIS NUS Corporation 2650 McCormick Dr., 3rd Floor Clearwater, FL  34619-1035
 
Senior Resident Inspector U.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, SC  29672
 
Mr. Henry Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Dept. of Health and Env. Control 2600 Bull St.
Columbia, SC  29201-1708
 
Mr. Michael A. Schoppman Framatome ANP 1911 North Ft. Myer Dr.
Suite 705 Rosslyn, VA  22209
 
Mr. B. G. Davenport Regulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation
 
ON03RC 7800 Rochester Highway Seneca, SC  29672
 
Mr. Leonard G. Green Assistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC  27602
 
Mr. R. L. Gill, Jr.
Manager - Nuclear Regulatory Issues and Industry Affairs Duke Power Company LLC 526 S. Church St.
Mail Stop EC05P Charlotte, NC  28202
 
Division of Radiation Protection NC Dept of Environment, Health, & Natural Resources 3825 Barrett Dr.
Raleigh, NC  27609-7721
 
Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, NC  28210
 
Mr. Henry Barron Group Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC  28201-1006


Mr. Charles Brinkman Director, Washington Operations Westinghouse Electric Company 12300 Twinbrook Parkway, Suite 330 Rockville, MD  20852
B. Hamilton                              In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and your response will be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.
Sincerely,
                                                    /RA/
Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-270 and 50-287 cc: See next page


Ms. Kathryn B. Nolan Senior Counsel Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, NC 28202}}
ML080160211                                                    NRR-106 OFFICE        DCI/CPNB        DCI/CPNB        LPL2-1/PM        LPL2-1/LA      LPL2-1/BC (A)
NAME          TLupold        TChan            LOlshan          MOBrien      JStang DATE              1/17/08        1/17/08          1/16/08      01/16/08          1/18/08 OFFICE      DCI/D          DRS/D RII          DORL/D NAME        MEvans          HChristensen      CHaney for JShea By email DATE            1/17/08                            1/30/08 1/30/08 Oconee Nuclear Station, Units 1, 2, and 3 January 31, 2008 cc:
Mr. Bruce H. Hamilton Vice President, Oconee Site              Mr. Leonard G. Green Duke Power Company LLC                    Assistant Attorney General 7800 Rochester Highway                    NC Department of Justice Seneca, SC 29672                          P.O. Box 629 Raleigh, NC 27602 Ms. Lisa F. Vaughn Associate General Counsel and Managing    Mr. R. L. Gill, Jr.
Attorney                                  Manager - Nuclear Regulatory Duke Energy Carolinas, LLC                  Issues and Industry Affairs 526 South Church Street - EC07H          Duke Power Company LLC Charlotte, North Carolina 28202          526 S. Church St.
Mail Stop EC05P Manager, LIS                              Charlotte, NC 28202 NUS Corporation 2650 McCormick Dr., 3rd Floor            Division of Radiation Protection Clearwater, FL 34619-1035                NC Dept of Environment, Health, & Natural Resources Senior Resident Inspector                3825 Barrett Dr.
U.S. Nuclear Regulatory Commission        Raleigh, NC 27609-7721 7812B Rochester Highway Seneca, SC 29672                          Mr. Peter R. Harden, IV VP-Customer Relations and Sales Mr. Henry Porter, Director                Westinghouse Electric Company Division of Radioactive Waste Management  6000 Fairview Road Bureau of Land and Waste Management      12th Floor Dept. of Health and Env. Control          Charlotte, NC 28210 2600 Bull St.
Columbia, SC 29201-1708                  Mr. Henry Barron Group Vice President, Nuclear Generation Mr. Michael A. Schoppman                    and Chief Nuclear Officer Framatome ANP                            P.O. Box 1006-EC07H 1911 North Ft. Myer Dr.                  Charlotte, NC 28201-1006 Suite 705 Rosslyn, VA 22209                        Mr. Charles Brinkman Director, Washington Operations Mr. B. G. Davenport                      Westinghouse Electric Company Regulatory Compliance Manager            12300 Twinbrook Parkway, Suite 330 Oconee Nuclear Site                      Rockville, MD 20852 Duke Energy Corporation ON03RC                                    Ms. Kathryn B. Nolan 7800 Rochester Highway                    Senior Counsel Seneca, SC 29672                          Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, NC 28202}}

Latest revision as of 14:37, 22 March 2020

Closure of Confirmatory Action Letter NRR-07-022
ML080160211
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/30/2008
From: Catherine Haney
Plant Licensing Branch III-2
To: Brandi Hamilton
Duke Power Co
Olshan L N, NRR/DORL, 415-1419
References
TAC MD4166, TAC MD4167, NRR-07-022
Download: ML080160211 (4)


Text

January 30, 2008 Mr. Bruce H. Hamilton Vice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672

SUBJECT:

OCONEE NUCLEAR STATION, UNITS 2 AND 3 - CLOSURE OF CONFIRMATORY ACTION LETTER NRR-07-022 (TAC NOS. MD4166 AND MD4167)

Dear Mr. Hamilton:

On March 27, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070790113) regarding dissimilar metal welds in the pressurizers at Oconee Nuclear Station, Units 2 and 3. This letter acknowledges receipt of your letter dated December 13, 2007 (ADAMS Accession No. ML073532226) informing the NRC of actions taken in response to this CAL at Oconee Unit 3. The NRC has previously acknowledged actions taken at Oconee Unit 2 by letter dated September 12, 2007 (ADAMS Accession No. ML072130497).

In your letter, you informed us of the mitigative actions taken at Oconee Unit 3, which consisted of the application of full structural weld overlays to the Alloy 82/182 welds of the pressurizer surge, spray, and safety/relief nozzle and safe end welds. The results of the ultrasonic examinations were included in the letter.

Based on your letter, the NRC has found that all the commitments listed in the CAL and supporting commitment letters (ADAMS Accession Nos. ML070390049 and ML070600169) have been met for Oconee Units 2 and 3. No further response is required regarding the CAL.

We consider the CAL closed. As such, it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system. Based on these actions, TAC No. MD4167 will be closed. TAC No. MD4166 was closed previously.

Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.

Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).

B. Hamilton In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and your response will be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.

Sincerely,

/RA/

Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-270 and 50-287 cc: See next page

ML080160211 NRR-106 OFFICE DCI/CPNB DCI/CPNB LPL2-1/PM LPL2-1/LA LPL2-1/BC (A)

NAME TLupold TChan LOlshan MOBrien JStang DATE 1/17/08 1/17/08 1/16/08 01/16/08 1/18/08 OFFICE DCI/D DRS/D RII DORL/D NAME MEvans HChristensen CHaney for JShea By email DATE 1/17/08 1/30/08 1/30/08 Oconee Nuclear Station, Units 1, 2, and 3 January 31, 2008 cc:

Mr. Bruce H. Hamilton Vice President, Oconee Site Mr. Leonard G. Green Duke Power Company LLC Assistant Attorney General 7800 Rochester Highway NC Department of Justice Seneca, SC 29672 P.O. Box 629 Raleigh, NC 27602 Ms. Lisa F. Vaughn Associate General Counsel and Managing Mr. R. L. Gill, Jr.

Attorney Manager - Nuclear Regulatory Duke Energy Carolinas, LLC Issues and Industry Affairs 526 South Church Street - EC07H Duke Power Company LLC Charlotte, North Carolina 28202 526 S. Church St.

Mail Stop EC05P Manager, LIS Charlotte, NC 28202 NUS Corporation 2650 McCormick Dr., 3rd Floor Division of Radiation Protection Clearwater, FL 34619-1035 NC Dept of Environment, Health, & Natural Resources Senior Resident Inspector 3825 Barrett Dr.

U.S. Nuclear Regulatory Commission Raleigh, NC 27609-7721 7812B Rochester Highway Seneca, SC 29672 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Mr. Henry Porter, Director Westinghouse Electric Company Division of Radioactive Waste Management 6000 Fairview Road Bureau of Land and Waste Management 12th Floor Dept. of Health and Env. Control Charlotte, NC 28210 2600 Bull St.

Columbia, SC 29201-1708 Mr. Henry Barron Group Vice President, Nuclear Generation Mr. Michael A. Schoppman and Chief Nuclear Officer Framatome ANP P.O. Box 1006-EC07H 1911 North Ft. Myer Dr. Charlotte, NC 28201-1006 Suite 705 Rosslyn, VA 22209 Mr. Charles Brinkman Director, Washington Operations Mr. B. G. Davenport Westinghouse Electric Company Regulatory Compliance Manager 12300 Twinbrook Parkway, Suite 330 Oconee Nuclear Site Rockville, MD 20852 Duke Energy Corporation ON03RC Ms. Kathryn B. Nolan 7800 Rochester Highway Senior Counsel Seneca, SC 29672 Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, NC 28202