| | number = ML101160471 | | | number = ML101160471 |
| | issue date = 04/26/2010 | | | issue date = 04/26/2010 |
| | title = Draft Request for Additional Information TS Changes on Minimum RWT Volume Setpoints(Tac Nos. ME2842, ME2843, and ME2842) | | | title = Draft Request for Additional Information TS Changes on Minimum RWT Volume Setpoints |
| | author name = | | | author name = |
| | author affiliation = NRC/NRR/DORL/LPLIV | | | author affiliation = NRC/NRR/DORL/LPLIV |
Latest revision as of 17:22, 21 March 2020
Letter Sequence Draft RAI |
---|
|
|
MONTHYEARML0934504852009-11-30030 November 2009 Request for Amendment to TS Table 3.3.5-1,Engineered Safety Features Actuation System Instrumentation, and Figure 3.5.5-1, Minimum Required Refueling Water Tank (RWT) Volume & Supporting Changes Project stage: Request ML1011604712010-04-26026 April 2010 Draft Request for Additional Information TS Changes on Minimum RWT Volume Setpoints Project stage: Draft RAI ML1011604562010-04-26026 April 2010 E-mail, Request for Additional Information TS Changes on Minimum RWT Volume Setpoints Project stage: RAI ML1021500362010-07-22022 July 2010 Response to Request for Additional Information Relating to License Amendment Request to Change the Technical Specifications to Support Crediting an Existing Manual Operator Action to Isolate the Refueling Water Tank Project stage: Response to RAI ML1021500372010-07-22022 July 2010 Engineering Study 13-MS-B094, Revision 0 Project stage: Other ML1027103012010-11-24024 November 2010 Issuance of Amendment Nos. 182, 182, and 182, Revise TS Table 3.3.5-1, Engineered Safety Features Actuation System, and Figure 3.5-1, Minimum Refueling Water Tank Volume Project stage: Approval 2010-11-24
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML24297A6212024-10-22022 October 2024 Request for Additional Information Relief Request (RR) No. 72: Re-Submittal of RR-39/ASME Code X1 IWC-3420, IWA-3300 ML24257A1012024-09-11011 September 2024 Request for Additional Information License Renewal Commitment for AMP of Alloy 600 Components ML24143A1112024-05-20020 May 2024 Draft 2nd Round Request for RAIs Concerning LAR to Modify LCO for TS 3.5.2, LCO for TS 3.6.5, and Surveillance Requirements 3.5.1.2 and 3.5.2.2 for TS 3.5.1 and TS 3.5.2 ML24123A2002024-05-0101 May 2024 (E-Mail) Draft 2nd Round Request for Additional Information Concerning License Amendment Request to Modify Limiting Condition for Operation (LCO) for Technical Specification (TS) 3.5.2, LCO for TS 3.6.5, 3.5.1.2 and 3.5.2.2 for TS 3.5.1, a ML24114A2812024-04-19019 April 2024 Request for Additional Information (RAI-10150-R1) ML24011A1002024-01-10010 January 2024 March 2024 Emergency Preparedness Program Inspection - Request for Information ML23334A1612023-11-30030 November 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - RAIs Associated with License Renewal Commitment for Pressurizer Surge Line Welds Inspection Program to Manage Environmentally Assisted Fatigue ML23334A0072023-11-29029 November 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for LAR That Revises TSs 3.5.1, SITs - Operating; 3.5.2, SIT Shutdown; 3.6.5, Containment Air Temperature; and SRs for TS 3.5.1, SITs Operating ML23298A1232023-10-25025 October 2023 NRR E-mail Capture - Palo Verde, Unit 1 - RAIs for Relief Request 70, Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle ML23031A3392023-01-31031 January 2023 In-service Inspection Request for Information ML23013A0632023-01-13013 January 2023 NRR E-mail Capture - Palo Verde Unit 1 -Request for Additional Information - U1R23 Inspection Summary Report for Steam Generator Tubing ML22348A1672022-12-14014 December 2022 March 2023 Emergency Preparedness Exercise Inspection - Request for Information ML22339A2372022-12-0505 December 2022 NRR E-mail Capture - Palo Verde Unit 1 – Request for Additional Information - U1R23 Inspection Summary Report for Steam Generator Tubing ML22272A3252022-09-29029 September 2022 Licensed Operator Positive Fitness-For-Duty Test Request for Additional Information ML22209A1752022-07-28028 July 2022 Inservice Inspection Request for Information ML22187A2632022-07-0606 July 2022 Notification of Inspection (NRC IR 05000528/2022004, 05000529/2022004 and 05000530/2022004) and Request for Information ML22067A2292022-03-0202 March 2022 Inservice Inspection Inspection PWR Request for Information ML22055A5842022-02-24024 February 2022 NRR E-mail Capture - Palo Verde, Unit 3 - Final RAIs for 22nd Refueling Outage (Spring 2021) Steam Generator Tube Inservice Inspection Report ML22035A3302022-02-10010 February 2022 Requests for Confirmation of Information for Exemption to Delete Diverse Auxiliary Feedwater Actuation System Based on Risk-Informed Process for Evaluations ML22025A4012022-01-0303 January 2022 March 2022 Emergency Preparedness Program Inspection - Request for Information ML21245A2222021-09-0101 September 2021 Request for Information ML21200A2392021-07-20020 July 2021 Docs Request AC - AA August 2021 ML21154A0082021-05-26026 May 2021 NRR E-mail Capture - Palo Verde 1, 2 and 3 - Official RAIs for LAR Associated with Permanent Extension of Containment ILRT Frequency to 15 Years (Type a) and CIV Leak Rate Test Frequency to 75 Months (Type C) ML21064A2372021-03-0303 March 2021 ISI Request for Information Rls ML21042B9692021-02-18018 February 2021 Notification of NRC Design Bases Assurance Inspection and Initial Request for Information ML21043A1462021-02-11011 February 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAI for an Order Associated with Indirect License Transfer from Public Service Company of New Mexico to Avangrid, Inc ML21023A0212021-01-13013 January 2021 PVNGS PI&R Request for Information RA ML21011A1972021-01-12012 January 2021 Unit 2, and Unit 3 - Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000528/2021012, 05000529/2021012 and 05000530/2021012) and Request for Information ML20227A0992020-08-14014 August 2020 Licensed Operator Positive Fitness-For-Duty Test Request for Additional Information ML20118D1362020-04-28028 April 2020 Licensed Operator Positive Fitness-For-Duty Test Request for Additional Information ML20049A0992020-02-14014 February 2020 Notification of Cyber Security Inspection (NRC Inspection Report 05000528/2020401; 05000529/2020401; and 05000530/2020401) and Request for Information ML20049A0252020-02-12012 February 2020 NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 1 - Official RAIs for License Amendment Request Associated with Changes to Emergency Plan Staffing Requirements ML20021A3172020-01-21021 January 2020 NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 1 - Official RAIs for Relief Request 64, Impractical Examinations for the Third 10-Year ISI Interval ML19317D0782019-11-13013 November 2019 NRR E-mail Capture - Palo Verde 1 - Requests for Additional Information on Unit 1 21st Refueling Outage Steam Generator Tube Inspection Report ML19234A3202019-08-29029 August 2019 Redacted - Request for Additional Information for Amendment and Exemption Request to Support the Implementation of Framatome High Thermal Performance Fuel (EPID L-2018-LLA-0194; EPID L-2018-LLE-0010) ML19155A1842019-05-30030 May 2019 NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 3 - Mvib Official RAIs for RR-63, Impractical Examinations for the Third 10-Year ISI Interval ML19095A6552019-04-0404 April 2019 NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 3 - Mphb Official RAIs for RR-63, Impractical Examinations for the Third 10-Year ISI Interval ML19044A7342019-02-13013 February 2019 NRR E-mail Capture - Palo Verde1, 2, and 3 - Official Requests for Additional Information for RR 62, Third and Fourth 10-Year ISI Intervals, Proposed Alternative - Pressurizer Heat Sleeve Repairs ML19008A3612019-01-0808 January 2019 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for LAR Associated with Response Time Testing of Pressure Transmitters ML18341A0252018-12-0303 December 2018 Notification of NRC Design Bases Assurance Inspection (Teams)(05000528/2019011, 05000529/2019011, and 05000530/2019011) and Initial Request for Information ML18271A0392018-10-0202 October 2018 Non Proprietary - Supplemental Information Needed for Acceptance of Requested License Amendments and Exemptions Implementation of Framatome High Thermal Performance Fuel (Epids L-2018-LLA-0194 and L-2018-LLE-0010) ML18221A5102018-08-23023 August 2018 Request for Additional Information License Amendment Request to Adopt Risk-Informed Completion Times (CAC Nos. MF6576, MF6577, and MF6578; EPID: L-2015-LLA-0001) ML18229A3132018-08-17017 August 2018 NRR E-mail Capture - Request for Additional Information Relief Request 58: Impractical Examinations for the Third 10-Year Inservice Inspection Interval Arizona Public Service Company Palo Verde Nuclear Generation Station, Unit 2 - Second Se ML18227A8672018-08-15015 August 2018 NRR E-mail Capture - Request for Additional Information Relief Request 58: Impractical Examinations for the Third 10-Year Inservice Inspection Interval Arizona Public Service Company Palo Verde Nuclear Generation Station, Unit 2 ML18124A0112018-05-0303 May 2018 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official Eeob RAIs for TSTF-505 (4b) LAR (CAC Nos. MF6576, MF6577, and MF6578; EPID L-2015-LLA-0001) ML18099A0072018-04-0606 April 2018 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for 10 CFR 50.69 LAR (CAC Nos. MF9971, MF9972, and MF9973; EPID L-2017-LLA-0276) ML18094B1122018-04-0404 April 2018 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Final RAIs for TSTF-505 (Initiative 4b) LAR (CAC Nos. MF6576, MF6577, and MF6578: EPID L-2015-LLA-0001) ML18066A7032018-03-0707 March 2018 Notification of Nrc Design Bases Assurance Inspection (Programs) 05000528/2018011, 05000529/2018011, and 05000530/2018011 Initial Request for Information ML17248A0162017-08-31031 August 2017 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Final RAI for RRs PRR-03, PRR-04 and PRR-05, Pump Testing ML17107A0052017-04-14014 April 2017 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Ngf LAR and Exemption RAIs (CAC Nos. MF8076 to MF8081) 2024-09-11
[Table view] |
Text
DRAFT REQUEST FOR ADDITIONAL INFORMATION ARIZONA PUBLIC SERVICE COMPANY, ET. AL.
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 DOCKET NOS. STN 50-528, 50-529, AND 50-530 LICENSE AMENDMENT REQUEST TO CHANGE THE TECHNICAL SPECIFICATIONS TO SUPPORT CREDITING AN EXISTING MANUAL OPERATOR ACTION TO ISOLATE THE REFUELING WATER TANK (RWT)
TAC NOS. ME2842, ME2843, AND ME2844 By letter dated November 30, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML093450485), Arizona Public Service Company (APS) submitted a license amendment request for the Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2, and 3.
The proposed amendment would revise Technical Specification (TS) Table 3.3.5-1, Engineered Safety Features Actuation System Instrumentation, to increase the RWT low-level setpoint for the Recirculation Actuation Signal (RAS); and TS Figure 3.5.5-1, Minimum Required RWT Volume, to increase the minimum volume in the RWT; and would also change the plant licensing basis to allow credit for an existing manual operator action to isolate the RWT in order to preclude the potential for air entrainment from the RWT following an RAS.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the information provided and determined that the additional information specified below is needed for the staff to complete its evaluation of the license amendment request (LAR).
- 1. Because PVNGS is a three-unit facility that shares common TS pages and implementation of the TS changes for each of these units will be completed over time as the associated modifications are completed, care must be taken to clearly identify the applicable revision of TS for each plant. The stated format of this change will be to add additional TS pages in support of the proposed amendment. The additional pages for the After RWT TS setpoint change will be applicable for the Units that have implemented the proposed changes contained in the APS submittal. The current TS pages will be revised to indicate that they are the Pre-RWT TS setpoint changes and will continue to be applicable for Units with the existing RWT setpoints. TS Bases pages will also be changed to reflect the Pre-RWT and After RWT setpoint changes. When the three units have implemented the proposed changes contained in this submittal, APS plans to submit a license amendment request to remove the pages related to the Pre-RWT TS setpoint changes that no longer apply. From the submittal, it appears that there will not be any cues provided on the Pre-RWT pages or the After RWT pages to allow easy determination of whether the pages are applicable or not. The proposed page footers do not help in determining applicability and may just add confusion. Also, there is no confirmatory action to determine whether the RWT setpoint changes have been implemented and Operations accepted, i.e. whether the Pre-RWT or the After RWT pages are applicable. How will the applicability of the Pre-RWT pages versus the After RWT pages be clearly communicated to plant personnel?
- 2. In the LAR, the licensee stated that the impacts of the increased RAS setpoint and associated Allowable Values and minimum RWT water volume on RWT design functions were evaluated. a) Were any changes to the operator interface identified, e.g.,
display banding, range expansion, control type, annunciator setpoints, or other control or display characteristics? b) Are any Safety Parameter Display System (SPDS) displays affected? c) Please list all identified changes to the control room, emergency operating procedures (EOPs), and SPDS not previously identified in your submittal.
- 3. Will any changes to the simulator be required to support the proposed TS changes? If so, how will the sequencing of the proposed changes to the simulator vis--vis training for all three plants be addressed?
- 4. The licensee stated that the emergency operating procedures (EOP) are an integral part of the licensed operator qualification and requalification training programs. The action to close these valves after a RAS already exists in the EOPs, but the proposed change credits this task as time-critical. To ensure completion of the task within the allotted time, the EOPs will be modified to: (a) include a note that the action to close valves CH-530 and CH-531 after RAS is a time-critical step; and (b) re-sequence the actions after RAS to isolate the RWT sooner. Changes to the EOPs will be communicated to PVNGS plant operators and appropriate training will be provided.
Given that each unit will implement this TS change at a different time in plant life, how will the EOP revisions and supporting training be sequenced to assure that each/all plant staff has adequate, timely training?
- 5. Please provide a copy of the Note that has been proposed to be added to the EOPs to cue the operators that the isolation of the RWT is a time-critical task.
Preferably, this should be in the form of a marked-up page, or a page from the clean final draft.
- 6. Please provide a copy of PVNGS Engineering Study 13-MS-B094, Revision 0, "Operator Action Time for RWT Isolation After RAS," dated October 9, 2009.