ML051030161: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 61: Line 61:
SBLC JPM.doc                                                                            Page 3 of 6
SBLC JPM.doc                                                                            Page 3 of 6


B. TOOLS AND EQUIPMENT None
B. TOOLS AND EQUIPMENT None C. REFERENCES RRC 11.1-2, Rev. 0, Standby iquid Syslam Initiation During a Plant Event D. TASK STANDARD
-
C. REFERENCES RRC 11.1-2, Rev. 0, Standby iquid Syslam Initiation During a Plant Event D. TASK STANDARD
: 1. Satisfactory task completion is indicated when Standby Liquid Control is injecting into the RPV at adequate discharge pressure using the B SBLC Pump.
: 1. Satisfactory task completion is indicated when Standby Liquid Control is injecting into the RPV at adequate discharge pressure using the B SBLC Pump.
: 2.      Estimated time to complete: 12 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, inject SBLC into the RPV using the  A SBLC Pump using RRC 11.I-2, Standby Liquid System Initiation during a Plant Event. Iwill describe initial plant conditions and provide you access to the materials required to complete this task.
: 2.      Estimated time to complete: 12 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, inject SBLC into the RPV using the  A SBLC Pump using RRC 11.I-2, Standby Liquid System Initiation during a Plant Event. Iwill describe initial plant conditions and provide you access to the materials required to complete this task.
Line 75: Line 73:


H.      PERFORMANCE CHECKLIST
H.      PERFORMANCE CHECKLIST
-
--    NO I STEP    I                    STEP I I ACT STANDARD I    1      Obtain a copy of procedure RRC 11-1-2.
--    NO I STEP    I                    STEP I I ACT STANDARD I    1      Obtain a copy of procedure RRC 11-1-2.
Verify CLOSED the AO-39 AND AO-40,              P P    A copy of procedure RRC I1.1-2 is obtained.
Verify CLOSED the AO-39 AND AO-40,              P P    A copy of procedure RRC I1.1-2 is obtained.
Line 101: Line 98:
SBLC JPM.doc                                                                            Page 6 of 6
SBLC JPM.doc                                                                            Page 6 of 6


TASK CONDITIONS/PREREQUISITES
TASK CONDITIONS/PREREQUISITES I. An attempt has been made to scram the reactor.
-
I. An attempt has been made to scram the reactor.
: 2. A n Electric ATWS has resulted and SBLC injection is required.
: 2. A n Electric ATWS has resulted and SBLC injection is required.
: 3. Reactor Pressure is 1000 psig with the Turbine EHC system in control.
: 3. Reactor Pressure is 1000 psig with the Turbine EHC system in control.
Line 129: Line 124:
7.
7.
8.
8.
                                                                  .. .
9.
9.
IO.
IO.
Line 147: Line 141:
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
: 3. JPM Performance
: 3. JPM Performance
: a. *  "Control Room" JPMs are designed to be performed in the simulator. If a
: a. *  "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
          ..
                    "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
: b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
: b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
: 4. Satisfactory performanceof this JPM is accomplished if:
: 4. Satisfactory performanceof this JPM is accomplished if:
Line 188: Line 180:
   *7    Jerify MO-2-13-132, RClC Cooling Water    P  MO-2-13-132 red light discovered to be ralve, is open.                                3FF at panel 20C004C.
   *7    Jerify MO-2-13-132, RClC Cooling Water    P  MO-2-13-132 red light discovered to be ralve, is open.                                3FF at panel 20C004C.
Cue: MO-132 green light is on, red light s off.)
Cue: MO-132 green light is on, red light s off.)
-                                                -
RClC JPM Rev000.doc                                                                Page 5 of 7
RClC JPM Rev000.doc                                                                Page 5 of 7


                                                    -
I                    STEP                    ACT                  STANDARD
I                    STEP                    ACT                  STANDARD
   *8    Place the switch for MO-2-13-132, RClC          The control switch for MO-2-13-132 is Cooling Water valve, to the OPEN                placed in the OPEN position until the valve position.                                      begins stroking open.
   *8    Place the switch for MO-2-13-132, RClC          The control switch for MO-2-13-132 is Cooling Water valve, to the OPEN                placed in the OPEN position until the valve position.                                      begins stroking open.
Line 251: Line 241:
PLOR023C RevOO6.doc                                  Page 2 of 7
PLOR023C RevOO6.doc                                  Page 2 of 7


PECO NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE
PECO NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE:                Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2180040101 / PLOR-023C                        WA:    218000A4.03 RO: 4.2  SRO: 4.2 TASK DESCRIPTION:            ADS RESET FOLLOWING BLOWDOWN A. NOTES TO EVALUATOR:
-.-
POSITION TITLE:                Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2180040101 / PLOR-023C                        WA:    218000A4.03 RO: 4.2  SRO: 4.2 TASK DESCRIPTION:            ADS RESET FOLLOWING BLOWDOWN A. NOTES TO EVALUATOR:
: 1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
: 1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
Line 268: Line 256:
PLOR023C RevOO6.doc                                                                      Page 3 of 7
PLOR023C RevOO6.doc                                                                      Page 3 of 7


B. TOOLS AND EQUIPMENT None
B. TOOLS AND EQUIPMENT None C. REFERENCES Procedure SO 1G.7.C-2, Rev. 8, "Automatic Depressurization System Reset Following Blowdown" (R)
-
C. REFERENCES Procedure SO 1G.7.C-2, Rev. 8, "Automatic Depressurization System Reset Following Blowdown" (R)
D. TASK STANDARD
D. TASK STANDARD
: 1.      Satisfactory task completion is indicated when ADS logic reset, Vacuum breaker position indication reset, and ADS relief valve position indication reset.
: 1.      Satisfactory task completion is indicated when ADS logic reset, Vacuum breaker position indication reset, and ADS relief valve position indication reset.
Line 334: Line 320:
~                      S - must simulate
~                      S - must simulate
: 1. TERMINATING CUE When the ADS logic has been reset, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
: 1. TERMINATING CUE When the ADS logic has been reset, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
  -
PLOR023C RevOO6.doc                                                              Page 7 of 7
PLOR023C RevOO6.doc                                                              Page 7 of 7


Line 382: Line 367:
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
: 2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
: 3. JPM Performance
: 3. JPM Performance
-
: a.    "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
: a.    "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
: b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
: b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
Line 391: Line 375:
: 2)    For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
: 2)    For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
~. 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
~. 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
                                                                                                  -
PLOR323CA Rev000.doc                                                                    Page 3 of 6
PLOR323CA Rev000.doc                                                                    Page 3 of 6


Line 407: Line 390:
PLOR323CA Rev000.doc                                                                    Page 4 of 6
PLOR323CA Rev000.doc                                                                    Page 4 of 6


___
H. PERFORMANCE CHECKLIST
H. PERFORMANCE CHECKLIST
     ---  NO 1
     ---  NO 1
Line 426: Line 408:
Verify HPCl has been declared                  S  Control Room Supervisor is informed that inoperable.                                        HPCl is inoperable.
Verify HPCl has been declared                  S  Control Room Supervisor is informed that inoperable.                                        HPCl is inoperable.
PLOR323CA Rev000.doc
PLOR323CA Rev000.doc
                                                              -


STEP                                          STANDARD 8    Inform Control Room Supervisor of task        P    Task completion reported.
STEP                                          STANDARD 8    Inform Control Room Supervisor of task        P    Task completion reported.
Line 561: Line 542:
PLOR322CA Rev001.doc                                                                    Page 3 of 10
PLOR322CA Rev001.doc                                                                    Page 3 of 10


B. TOOLS AND EQUIPMENT Synchronizing Switch Removable Handle
B. TOOLS AND EQUIPMENT Synchronizing Switch Removable Handle C. REFERENCES Procedure SO 52A.1.B, Rev. 32, "Diesel Generator Operations" (R)
-
C. REFERENCES Procedure SO 52A.1.B, Rev. 32, "Diesel Generator Operations" (R)
D. TASK STANDARD
D. TASK STANDARD
: 1.      Satisfactory task completion is indicated when the E 4 3 breaker has been opened -  OR the E 4 Diesel Generator tripped by the examinee (due to E 4 Diesel Generator load cont rot diffkuI ty).
: 1.      Satisfactory task completion is indicated when the E 4 3 breaker has been opened -  OR the E 4 Diesel Generator tripped by the examinee (due to E 4 Diesel Generator load cont rot diffkuI ty).
Line 573: Line 552:
: 4.      The ESW system is supplying Diesel Generator cooling water.
: 4.      The ESW system is supplying Diesel Generator cooling water.
G. INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to synchronize the E 4 Diesel Generator to the E 4 3 Bus and pick up 2600 KW and 1000 KVAR in accordance with Section 4.2 of SO 52A.1 .B, "Diesel Generator Operations."
G. INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to synchronize the E 4 Diesel Generator to the E 4 3 Bus and pick up 2600 KW and 1000 KVAR in accordance with Section 4.2 of SO 52A.1 .B, "Diesel Generator Operations."
PLOR322CA Rev001 .doc
PLOR322CA Rev001 .doc Page 4 of 10
                                                                                                    -
Page 4 of 10


                                         ~
                                         ~
Line 593: Line 570:
it "Bottom Dead Center" and both lights OFF" when sync scope at "Top Dead
it "Bottom Dead Center" and both lights OFF" when sync scope at "Top Dead
         ;enter".)
         ;enter".)
PLOR322CA Rev001.doc
PLOR322CA Rev001.doc Page 5 of 10
                                                                                        -
Page 5 of 10
                                                                                                     .a
                                                                                                     .a


Line 692: Line 667:
PLOR322CA Rev001 .doc                                                                      Page 10 of 10
PLOR322CA Rev001 .doc                                                                      Page 10 of 10


TASK CONDITIONS/PREREQUISITES
TASK CONDITIONS/PREREQUISITES I. The E 4 Diesel Generator has been SLOW started and is running in accordance with Section 4.1 of SO 52A.I.B, Diesel Generator Operations?
.--
I. The E 4 Diesel Generator has been SLOW started and is running in accordance with Section 4.1 of SO 52A.I.B, Diesel Generator Operations?
: 2. The E 4 Diesel Generator is running at rated frequency and voltage.
: 2. The E 4 Diesel Generator is running at rated frequency and voltage.
: 3. The E 4 3 Bus is being supplied by ZSUE.
: 3. The E 4 3 Bus is being supplied by ZSUE.
Line 716: Line 689:
4.
4.
5.
5.
-
6.
6.
7.
7.
Line 741: Line 713:
-          given to the examinee.
-          given to the examinee.
DWCW-RBCCW JPM.doc                                                                    Page 3 of 6
DWCW-RBCCW JPM.doc                                                                    Page 3 of 6
: 6. TOOLS AND EQUIPMENT None
: 6. TOOLS AND EQUIPMENT None C. REFERENCES GP-8.B, Rev. 17, PCIS Isolation - Groups 1    I and 111 (R)
-
C. REFERENCES GP-8.B, Rev. 17, PCIS Isolation - Groups 1    I and 111 (R)
D. TASK STANDARD
D. TASK STANDARD
: 1. Satisfactory task completion is indicated when the Drywell Chilled Water isolation valves, M0-2200A 8, B and MO-2201A & B are closed, The Drywell Chillers are tripped, and the DWCW Pump control switches are in PULL TO LOCK.
: 1. Satisfactory task completion is indicated when the Drywell Chilled Water isolation valves, M0-2200A 8, B and MO-2201A & B are closed, The Drywell Chillers are tripped, and the DWCW Pump control switches are in PULL TO LOCK.
Line 753: Line 723:
: 4. Drywell pressure is approximately 24 psig.
: 4. Drywell pressure is approximately 24 psig.
G. INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to perform step 3.5 of GP-8.B, PCIS Isolation - Groups II and 111.
G. INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to perform step 3.5 of GP-8.B, PCIS Isolation - Groups II and 111.
.
DWCW-RBCCW JPM.dOC                                                                        Page 4 of 6
DWCW-RBCCW JPM.dOC                                                                        Page 4 of 6


Line 772: Line 741:
   "6    Close MO-2373. RBCCW Isolation valve. P    MO-2373 control switch is momentarily placed in the "CLOSE" position at panel (Cue: Acknowledge control switch            2ocOl2.
   "6    Close MO-2373. RBCCW Isolation valve. P    MO-2373 control switch is momentarily placed in the "CLOSE" position at panel (Cue: Acknowledge control switch            2ocOl2.
operation.)
operation.)
DWCW-RBCCW JPM.dX
DWCW-RBCCW JPM.dX Page 5 of 6
                                                                                        -
Page 5 of 6


STEP                    ACT                      STANDARD Verify the M0-2373, the RBCCW Isolation        P    MO-2373 green light is verified ON and valve is closed.                                    red light is verified OFF at panel 20C012.
STEP                    ACT                      STANDARD Verify the M0-2373, the RBCCW Isolation        P    MO-2373 green light is verified ON and valve is closed.                                    red light is verified OFF at panel 20C012.
Line 790: Line 757:


TASK CONDITIONS/PREREQUISlTES
TASK CONDITIONS/PREREQUISlTES
-_-
: 1. The Reactor has just been scrammed.
: 1. The Reactor has just been scrammed.
: 2. DWCW Return Header pressure as read on PI-2-0262 is 32 psig.
: 2. DWCW Return Header pressure as read on PI-2-0262 is 32 psig.
Line 797: Line 763:
8.8, PCIS Isolation = Groups II and Illyy.
8.8, PCIS Isolation = Groups II and Illyy.


PECO NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET
PECO NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET APPROVALS:
  --
APPROVALS:
I I                    EFFECTIVE DATE:
I I                    EFFECTIVE DATE:
NAME:                                      SOC. SEC. NO.
NAME:                                      SOC. SEC. NO.
Line 807: Line 771:
PlMS CODE:      I I PlMS ENTRY:      I I  PLOR067C Rev008.doc                                            Page 1 of 9
PlMS CODE:      I I PlMS ENTRY:      I I  PLOR067C Rev008.doc                                            Page 1 of 9


TEMPORARY CHANGE FORM LOG
TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-067C                        REV. NO.: -008 TITLE:    Placing the Standby SJAE In-Service and Placing the In-Service SJAE in Standby 1.
  -
CODE NO.: PLOR-067C                        REV. NO.: -008 TITLE:    Placing the Standby SJAE In-Service and Placing the In-Service SJAE in Standby 1.
2.
2.
3.
3.
Line 891: Line 853:
B in AUTO.
B in AUTO.
(Cue: Steam pressure is 120 psig, AO-2236D/E/F is in AUTO.
(Cue: Steam pressure is 120 psig, AO-2236D/E/F is in AUTO.
I
I I  PLOR067C Rev008.doc                                                                    Page 6 of 9
  .-
I  PLOR067C Rev008.doc                                                                    Page 6 of 9


STEP NO                      STEP                      ACT                    STANDARD
STEP NO                      STEP                      ACT                    STANDARD
Line 904: Line 864:
(Cue: AO-2236A,B,C green light is on, red light is off.)
(Cue: AO-2236A,B,C green light is on, red light is off.)
* I6 Adjust setpoint on PIC-2239A to 0 psi.
* I6 Adjust setpoint on PIC-2239A to 0 psi.
(Cue: PI-2472A is quickly decreasing, l p    Control knob on PIG2239A is rotated in the COUNTERCLOCKWISE direction unti the setpoint is at minimum at panel
(Cue: PI-2472A is quickly decreasing, l p    Control knob on PIG2239A is rotated in the COUNTERCLOCKWISE direction unti the setpoint is at minimum at panel controller setpoint (SP) and Process Valve          20C007A.
  -
controller setpoint (SP) and Process Valve          20C007A.
(PV) are slowly decreasing. Controller output stabilizes at 100.)
(PV) are slowly decreasing. Controller output stabilizes at 100.)
                                                 ***NOTE***
                                                 ***NOTE***
Line 916: Line 874:
I PLOR067C Rev008.doc                                                                        Page 7 of 9
I PLOR067C Rev008.doc                                                                        Page 7 of 9


                                                    -
STEP                    ACT                    STANDARD
STEP                    ACT                    STANDARD
   - *19  Close AO-2238A,B,C, "Air Ejector Inlet A    P  AO-2238A,B,C/AO-2!540A, control switch 1st Stage"/AO-2540A "Air Ejector Inter        is placed in the "CLOSE" position at pane Cdsr Drain" valves when steam pressure          20C007A when steam pressure decrease decreases to 30 psig.                          to 30 psig.
   - *19  Close AO-2238A,B,C, "Air Ejector Inlet A    P  AO-2238A,B,C/AO-2!540A, control switch 1st Stage"/AO-2540A "Air Ejector Inter        is placed in the "CLOSE" position at pane Cdsr Drain" valves when steam pressure          20C007A when steam pressure decrease decreases to 30 psig.                          to 30 psig.
Line 936: Line 893:


Under ACT P - must perform S - must simulate
Under ACT P - must perform S - must simulate
-.-
: 1. TERMINATING CUE When SJAE B is in service and SJAE A is in standby, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
: 1. TERMINATING CUE When SJAE B is in service and SJAE A is in standby, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
I PLOR067C Rev008.doc                                                              Page 9 of 9 1
I PLOR067C Rev008.doc                                                              Page 9 of 9 1
Line 1,038: Line 994:
I PLOR075P Rev012.doc                                                    Page 1 of 6
I PLOR075P Rev012.doc                                                    Page 1 of 6


TEMPORARY CHANGE FORM LOG
TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-075P                REV. NO.: -
-
CODE NO.: PLOR-075P                REV. NO.: -
012 TITLE:      SCRAM SOLENOID DE-ENERGIZATION- UNIT 2 (T-213-2) r 9.
012 TITLE:      SCRAM SOLENOID DE-ENERGIZATION- UNIT 2 (T-213-2) r 9.
10.
10.
Line 1,066: Line 1,020:
PLOR075P Rev012.doc                                                                      Page 3 of 6
PLOR075P Rev012.doc                                                                      Page 3 of 6
: 6. TOOLS AND EQUIPMENT
: 6. TOOLS AND EQUIPMENT
: 1.      T-213-2 Tool Package from the Main Control Room Emergency Operating Procedure
: 1.      T-213-2 Tool Package from the Main Control Room Emergency Operating Procedure Tool Box
-
Tool Box
: 2.      EOP Tool Box Key C. REFERENCES Procedure T-213-2, Rev. 9, "Scram Solenoid De-energization" (R)
: 2.      EOP Tool Box Key C. REFERENCES Procedure T-213-2, Rev. 9, "Scram Solenoid De-energization" (R)
D. TASK STANDARD
D. TASK STANDARD
Line 1,082: Line 1,034:
PLOR075P RevO12.doc                                                                      Page 4 of 6
PLOR075P RevO12.doc                                                                      Page 4 of 6


-
H. PERFORMANCE CHECKLIST lSTEp NO                        STEP                  ACT                    STANDARD
H. PERFORMANCE CHECKLIST lSTEp NO                        STEP                  ACT                    STANDARD
       *I    Obtain the key for the Emergency          S    Emergency Operating Procedure Tool Operating Procedure Tool Locker.                Locker Key requested from WECS OR examinee identifies the location of the WECS key box and its associated key.
       *I    Obtain the key for the Emergency          S    Emergency Operating Procedure Tool Operating Procedure Tool Locker.                Locker Key requested from WECS OR examinee identifies the location of the WECS key box and its associated key.
Line 1,096: Line 1,047:
(Cue: Fuse is removed. Control Room reports Control Rod 26-15 is inserting.)
(Cue: Fuse is removed. Control Room reports Control Rod 26-15 is inserting.)
6    Initial on Table 1 by Control Rod 26-15. P  T-213-2, Table 1 is initialed under "FUSES REMOVED" column by Control Rod 26-(Cue: Acknowledge initialing Table 1.)          15.
6    Initial on Table 1 by Control Rod 26-15. P  T-213-2, Table 1 is initialed under "FUSES REMOVED" column by Control Rod 26-(Cue: Acknowledge initialing Table 1.)          15.
  -
PLOR075P RevOl2.doc                                                                  Page 5 of 6
PLOR075P RevOl2.doc                                                                  Page 5 of 6


Line 1,113: Line 1,063:
: 4. Use of procedure T=213-2, Scram Solenoid De-energization has been directed by the T-I00 procedures.
: 4. Use of procedure T=213-2, Scram Solenoid De-energization has been directed by the T-I00 procedures.
: 5. Prerequisites and procedure steps up to and including step 4.3 of procedure T-213-2 have been completed.
: 5. Prerequisites and procedure steps up to and including step 4.3 of procedure T-213-2 have been completed.
INITIATING CUE The Control Room Supervisor directs you, the Equipment Operator, to de-energize Unit 2 Control Rod 2645 scram solenoids in accordance with Steps
INITIATING CUE The Control Room Supervisor directs you, the Equipment Operator, to de-energize Unit 2 Control Rod 2645 scram solenoids in accordance with Steps 4.4.1 4.4.3 of procedure T=213=2,Scram Solenoid De-energizat ion.
      -
4.4.1 4.4.3 of procedure T=213=2,Scram Solenoid De-energizat ion.


EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET RESTORE CONTROL ROOM VENTILATION FOLLOWING A HIGH RADIATION APPROVALS:
EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET RESTORE CONTROL ROOM VENTILATION FOLLOWING A HIGH RADIATION APPROVALS:
Line 1,130: Line 1,078:
1                                                                                  Page 1 of 131
1                                                                                  Page 1 of 131


TEMPORARY CHANGE FORM LOG
TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-062P                              REV. NO.: -015 TITLE:    Restore Control Room Ventilation Following a High Radiation Trip 9.
  --
CODE NO.: PLOR-062P                              REV. NO.: -015 TITLE:    Restore Control Room Ventilation Following a High Radiation Trip 9.
11.
11.
12.
12.
Line 1,151: Line 1,097:
: 1)    For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
: 1)    For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
: 2)    For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
: 2)    For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be
: 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.
  -
given to the examinee.
I PLOR062P Rev015.doc                                                                      Page 3 of 13
I PLOR062P Rev015.doc                                                                      Page 3 of 13


B. TOOLS AND EQUIPMENT None
B. TOOLS AND EQUIPMENT None C. REFERENCES Procedure SO 40D.1 .A Rev. 11, "Control Room Ventilation Startup and Control Room Emergency Ventilation High Radiation Trip Restoration and Automatic Operation Alignment" D. TASK STANDARD
  -
C. REFERENCES Procedure SO 40D.1 .A Rev. 11, "Control Room Ventilation Startup and Control Room Emergency Ventilation High Radiation Trip Restoration and Automatic Operation Alignment" D. TASK STANDARD
: 1. Restoration and startup of Control Room Ventilation completed following a trip due to high radiation. This will include:
: 1. Restoration and startup of Control Room Ventilation completed following a trip due to high radiation. This will include:
: a.      Placing all Control Room ventilation fans to "OFF".
: a.      Placing all Control Room ventilation fans to "OFF".
Line 1,172: Line 1,114:
: 5. Heating Steam System is available to Control Room Ventilation System in accordance with SO 24.1 .A, "Startup of Auxiliary Steam System".
: 5. Heating Steam System is available to Control Room Ventilation System in accordance with SO 24.1 .A, "Startup of Auxiliary Steam System".
: 6. Instrument Air is available to Control Room Ventilation System in accordance with SO 36B.
: 6. Instrument Air is available to Control Room Ventilation System in accordance with SO 36B.
--
I PLOR062P Rev015.doc                                                                          -
I PLOR062P Rev015.doc                                                                          -
Page 4 of 13
Page 4 of 13
Line 1,297: Line 1,238:
45  Verify Fan OOV-326 Control Room Office Area Cooling Unit is running.
45  Verify Fan OOV-326 Control Room Office Area Cooling Unit is running.
(Cue: Unit OOV-326 red light is on.)
(Cue: Unit OOV-326 red light is on.)
    -
switch is in the Filter 'A' Dosition.)
switch is in the Filter 'A' Dosition.)
46  Request that Control Room personnel            S  The Control Room is requested to place place the "Outside Air Filter Select SV-            the "Outside Air Filter Select SV-00154" 00154" control switch to FILTER *A'cB')              control switch to FILTER 'A'(.B') or to (or complete step 4.21.1 ).                      ~ complete step 4.21.1.
46  Request that Control Room personnel            S  The Control Room is requested to place place the "Outside Air Filter Select SV-            the "Outside Air Filter Select SV-00154" 00154" control switch to FILTER *A'cB')              control switch to FILTER 'A'(.B') or to (or complete step 4.21.1 ).                      ~ complete step 4.21.1.
Line 1,313: Line 1,253:
51    4s an evaluator ensure that you have          P    'ositive control established.
51    4s an evaluator ensure that you have          P    'ositive control established.
iositive control of all exam material irovided to the examinee (Task
iositive control of all exam material irovided to the examinee (Task
                                      -
             >onditions/Prerequisites) AND irocedures.
             >onditions/Prerequisites) AND irocedures.
Under "ACT" P - must perform 1
Under "ACT" P - must perform 1
S - must simulate
S - must simulate
: 1. TERMINATING CUE When the Control Room Ventilation system is in operation, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
: 1. TERMINATING CUE When the Control Room Ventilation system is in operation, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.
  .-
I PLOR062P Rev015.doc                                                                      Page 13 of 13
I PLOR062P Rev015.doc                                                                      Page 13 of 13


- _ _
TASK CONDITIONS/PREREQUISlTES
TASK CONDITIONS/PREREQUISlTES
: 1. Initially, the "A" Control Room Ventilation fans were running.
: 1. Initially, the "A" Control Room Ventilation fans were running.

Latest revision as of 00:21, 15 March 2020

Draft - Section B Operating (Folder 2)
ML051030161
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 11/19/2004
From: Nielsen P
Exelon Generation Co, Exelon Nuclear
To: Todd Fish
NRC/RGN-I/DRS/OSB
Conte R
References
-RFPFR
Download: ML051030161 (93)


Text

--

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL;COVERSHEET

[lW[

sigrature I Title Date APPROVED FOR USE:

Signalwe I Title Date I EFFECTIVE DATE: I NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

COMMENTS:

~

Training Review for Completeness: PlMS CODE:

SignaturelDate I ENTRY:

SBLC JPM.doc Page 1 of 6

TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-NEW REV. NO.: QO J

TITLE: lniect SBLC (Alternate Path - Low SBLC Dischame Pressure) 1.

2.

3.

~~~ ~

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

114. 1 1 115. I I

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor ODerator/Senior Reactor ODerator TASK-JPM DESIGNATOR: 21302204011PLOR-NEW K/A: , 295024EA1.07 URO: 3.8 SRO: 3.9 TASK DESCRIPTION: lniect SBLC (Alternate Path - Low SBLC Discharae Pressure)

A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph 0.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

SBLC JPM.doc Page 3 of 6

B. TOOLS AND EQUIPMENT None C. REFERENCES RRC 11.1-2, Rev. 0, Standby iquid Syslam Initiation During a Plant Event D. TASK STANDARD

1. Satisfactory task completion is indicated when Standby Liquid Control is injecting into the RPV at adequate discharge pressure using the B SBLC Pump.
2. Estimated time to complete: 12 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, inject SBLC into the RPV using the A SBLC Pump using RRC 11.I-2, Standby Liquid System Initiation during a Plant Event. Iwill describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISITES

1. An attempt has been made to scram the reactor.
2. An Electric ATWS has resulted and SBLC injection is required.
3. Reactor Pressure is 1000 psig with the Turbine EHC system in control.
4. Reactor Level is in the normal band with feedwater in automatic control.

G. INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to inject Standby Liquid Control using the A SBLC Pump in accordance with RRC 11-1-2, Standby Liquid System lniection Durina a Plant Event.

SBLC JPM.doc Page 4 of 6

H. PERFORMANCE CHECKLIST

-- NO I STEP I STEP I I ACT STANDARD I 1 Obtain a copy of procedure RRC 11-1-2.

Verify CLOSED the AO-39 AND AO-40, P P A copy of procedure RRC I1.1-2 is obtained.

AO-39 AND A 0 4 0 green lights are ON "Recirc Sample Inboard and Outboard and red lights are OFF on Panel Isolation" valves. 20C005A.

(Cue: AO-39 AND A 0 4 0 green lights are ON and red lights are OFF.)

I *3 Istart the 'A SBLC Pump. The SBLC switch is placed in the 'START SYS A" position on Panel 20C005A.

(Cue: Acknowledge switch movement.)

4 Verify that the RWCU system isolates. P Verify green lights ON and red lights OFF (Cue: Valves checked have the green for the follow-ng valves on Panel lights ON and the red lights off.) 20C004A:

MO-2-12-15, RWCU Inboard Isolation MO-2-12-18, RWCU Outboard Isolation MO-2-12-68, RWCU Outlet valve 5

' Verify that SBLC is injecting. P Recognize that SBLC Pump discharge pressure on PI-2-1 1-065 is lower than (Cue: Pump Red Light is on, Discharge reactor pressure and therefore SBLC is pressure 400 psig, tank level steady.) NOT injecting.

NOTE:

Candidate may immediately move to inject with the 'B' SBLC Pump OR may not@ the CRS of the failure to inject. If the.candidate notifies the CRS, then direct him to inject with the 'B' SBLC Pump.

  • 6 Start the 'BySBLC Pump. P The SBLC switch is placed in the "START SYS B" position on Panel 20C005A.

(Cue: Acknowledge switch operation.)

7 Verify that SBLC is injecting. P Venfy that SBLC Discharge pressure is now greater than reactor pressure.

(Cue when checked: Pump Red Light is on, Discharge pressure 1050 psig, tank level is lowering.)

SBLC JPM.doc Page 5 of 6

STEP ACT STANDARD 8 Inform Control Room Supervisor of task P Task completion reported.

completion.

(Cue: Control Room Supervisor acknow-ledges report.)

9 As an evaluator, ensure that you have P Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites)AND procedures.

Under "ACT" P - must perform S - must simulate I. TERMINATING CUE When SBLC is injecting at greater than reactor pressure, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

SBLC JPM.doc Page 6 of 6

TASK CONDITIONS/PREREQUISITES I. An attempt has been made to scram the reactor.

2. A n Electric ATWS has resulted and SBLC injection is required.
3. Reactor Pressure is 1000 psig with the Turbine EHC system in control.
4. Reactor Level is in the normal band with feedwater in automatic control.

INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to inject Standby Liquid Control using the A SBLC Pump in accordance with RRC 1I.I-2, Standby Liquid System Injection During a Plant Event.

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET Ixl R SigmtUreIMle Date Signatwe I Title Date I

I APPROVED FOR USE:

signam I Title Date EFFECTIVE DATE: J I NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

COMMENTS:

I I Training Review for Completeness: I PlMS CODE:

PlMS ENTRY:

RClC JPM Rev000.doc Page 1 Of 7

-~ ~- __

TEMPORARY CHANGE FORM LOG

-CODE NO.: PLOR-3??CA REV. NO.: 000 TITLE: Manually Initiate RClC (Alternate Path - Cooling Water Fails to Automatically Align) 1.

2.

3.

4.

5.

6.

7.

8.

9.

IO.

11.

12.

13.

14.

~~

15.

1 I

+

RClC JPM Rev000.doc Page 2 of 7

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2008070501 / PLOR-3??CA WA: 295031EA1.05 URO: 4.3 SRO: 4.3 TASK DESCRIPTI0N: Manually Initiate RClC (Alternate Path - Cooling Water Fails to Automatically Align)

A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. * "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performanceof this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

RClC JPM Rev000.doc Page 3 of 7

B. TOOLS AND EQUIPMENT

1. None

--c. REFERENCES

1. RRC 13.1-2 Rev. 0, "RCIC System Operation During A Plant Event" D. TASK STANDARD
1. Satisfactory task completion is indicated when RClC is injecting to the RPV with cooling water properly aligned.
2. Estimated time to complete: 6 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to manually initiate the RClC system and inject into the Reactor vessel at a flow rate of approximately 600 gpm using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDtTtONSIPREREQUISrTES

1. Reactor Scram has occurred on low level due to a loss of all Feedwater.
2. Reactor level is -25" and dropping slowly.

G. INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to initiate the RClC System using the RClC Manual Initiation pushbutton and inject to the Reactor vessel at approximately 600 gpm using RRC 13.1-2 "RCIC System Operation During a Plant Event."

RClC JPM Rev000.doc Page 4 of 7

H. PERFORMANCE CHECKLIST I

3TEP NO STEP I

ACT STANDARD 1 Obtain a copy of procedure RRC 13.1-2. P A copy of procedure RRC 13.1-2 is obtained.

  • 2 Arm the RCIC Manual Initiation P RCIC Manual Initiation pushbutton collar i:

pushbutton, 13A-S80. rotated clockwise to the ARMED position at panel 20C004C.

(Cue: Acknowledge pushbutton collar operation; annunciator A-2 on alarm panel 222 is alarming.)

  • 3 Depress the RCIC Manual Initiation 'P RCIC Manual Initiation pushbutton is pushbutton, 13A-S80. momentarily DEPRESSED at panel 20cmc.

(Cue: Acknowledge Manual Initiation pushbutton pushbutton operation; annunciator 222 C-5 "RCIC Barometric Condenser Vacuum Pump Running" is alarming.)

4 Acknowledge the "RCIC BAROMETRIC P The annunciator .ACKNOWLEDGE" CONDENSER VACUUM PUMP pushbutton is depressed.

RUNNING" annunciator.

[Cue: Annunciator 222 C-5 is lit solid. ~~

5 Verify MO-2-13-131, RCIC Turbine Supply P MO-2-13-131 red light is verified ON at ialve, opens. panel 20C004C.

Cue: MO-131 red light is on, green light s off.)

6 Jerify MO-2-13-021, RCIC to Feed Line P MO-2-13-021 red light is verifted ON at ialve, opens. Dane1 20C004C.

Cue: MO-021 red light is on, green light s off.)
  • 7 Jerify MO-2-13-132, RClC Cooling Water P MO-2-13-132 red light discovered to be ralve, is open. 3FF at panel 20C004C.

Cue: MO-132 green light is on, red light s off.)

RClC JPM Rev000.doc Page 5 of 7

I STEP ACT STANDARD

  • 8 Place the switch for MO-2-13-132, RClC The control switch for MO-2-13-132 is Cooling Water valve, to the OPEN placed in the OPEN position until the valve position. begins stroking open.

(Cue: Acknowledge switch manipulation.

9 Verify M0-2-13-132, RCIC Cooling Water P MO-2-13-132 red light is verified to be to valve, is open. be ON at panel 20C004C.

(Cue: MO-132 red light is on, green light is off.)

10 Verify AO-2-13-034 and AO-2-13-035, P AO-2-13-034 and AO-2-13-035 green RClC Drain Is01 to Mn Cndr valves, close. lights verified ON at panel 20C004C.

(Cue: AO-034 and AO-035 green lights are on, red lights are off.)

11 Verify 20P046, Vacuum Pump, starts. P 20PO46 red light verified ON at panel 2oc004c.

(Cue: 20P046 red light is on, green light is out. Alarm 222 C-5 lit.)

12 Verify RClC system flowrate is 600 gpm. P 3CIC Flow is verified to be 600 gpm on

)anel 20C004C.

(Cue: FI-2-13-091 indicates 600 gpm.

RCIC Flow Controller output meter indicates 80%.)

13 Verify MO-2-13-027, RClC Min Flow valve, P 40-2-13-027 red light verified ON at pane closes after normal flowrate is established. !OCOO4C when RClC pump flowrate eaches 600 gpm.

(Cue: MO-27 green light is on, red light is off at normal RClC pump flow.)

14 Inform Control Room Supervisor of task P rask completion reported.

completion.

(Cue: Control Room Supervisor acknowledges report.)

15 As an evaluator ensure that you have P 'ositiie control established.

positive control of all exam material provided to the examinee (Task ConditiondPrerequisites)AND Drocedures.

RClC JPM Rev000.doc Page 6 of 7

Under ACT P - must perform S - must simulate TERMINATING CUE I

When RClC is injecting into the Reactor vessel with cooling water aligned, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

PRClC JPM Rev000.doc a g e 7 o f 7

TASK CONDITIONS/PREREQUISlTES

-- I. Reactor Scram has occurred on low level due to a loss of all Feedwater.

2. Reactor level is -25 and dropping slowly.

INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator to initiate the RCIC System using the RCIC Manual Initiation pushbutton and inject to the Reactor vessel at approximately 600 gpm using RRC 13.1 -2 RCIC System Operation During a Plant Event.

PECO NUCLEAR Nuclear Generation Group OJTCTPE MATERIAL COVERSHEET H

PPROVED FOR USE:

I EFFECTIVE DATE: I NAME: SOC. SEC. NO.

Last First M.I.

ISSUE DATE: COMPLETION DATE:

COMMENTS:

PlMS CODE:

PIMS ENTRY:

PLOR023C RevOO6.doc

- Page 1 of 7

TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-023C 006 REV-NO.: -

TITLE: ADS RESET FOLLOWING BLOWDOWN 2.

I 3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

PLOR023C RevOO6.doc Page 2 of 7

PECO NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2180040101 / PLOR-023C WA: 218000A4.03 RO: 4.2 SRO: 4.2 TASK DESCRIPTION: ADS RESET FOLLOWING BLOWDOWN A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing 'in-Plant" JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performanceof this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be

- given to the examinee.

PLOR023C RevOO6.doc Page 3 of 7

B. TOOLS AND EQUIPMENT None C. REFERENCES Procedure SO 1G.7.C-2, Rev. 8, "Automatic Depressurization System Reset Following Blowdown" (R)

D. TASK STANDARD

1. Satisfactory task completion is indicated when ADS logic reset, Vacuum breaker position indication reset, and ADS relief valve position indication reset.
2. Estimated time to complete: 7 minutes (A.5) Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to reset the ADS system using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES

1. RPV water level is greater than -160" and the capability exists to maintain level above

-160".

2. The following annunciators have been reset:
a. "System I ECCS REAC VESSEL LO-LO-LO LEVEL", panel 227 D-2.
b. "System I1ECCS REAC VESSEL LO-LO-LO LEVEL", panel 228 C-2.
3. Blowdown of the RPV is complete by evidence of valves closed due to lack of pressure to keep them open.
4. Relief Valve Tailpipe Temperatures indicated on TR-2-02-103 on Panel 2OCOO3-01 are all 200°F and lowering.
5. Reactor pressure is at 0 psig.

6.' Drywell pressure is 0.25 psig.

G. INITIATING CUE The Control Room Supervisor directs you to reset the ADS system following an automatic initiation by completing SO 1G.7.C-2, Automatic Depressurization System Reset Following Blowdown.

PLOR023C RevOO6.doc Page 4 of 7

H. PERFORMANCE CHECKLIST STEP NO

  • I STEP Depress the "A" ADS LOGIC RESET-ACT I STANDARD P The "A" ADS LOGIC TIMER RESET TIMER pushbutton, 2E-S2A. pushbutton, 2E-S2A, is momentarily depressed at panel 2OCOO3-0 1.

(Cue: Acknowledge pushbutton operation.)

  • 2 Depress the "B" ADS LOGIC RESET- P The "B" ADS LOGIC TIMER RESET TIMER pushbutton, 2E-S2B. pushbutton, 2E-S2B, is momentarily depressed at panel 20C003-01.

(Cue: Acknowledge pushbutton operation.)

3 Reset the following annunciators: P The alarm 'RESET" Pushbutton is momentarily depressed on panel 20C003.

a. "BLOWDOWN AUX RELAYS ENERGIZED RHR OR CS" (227 E-4)
b. "BLOWDOWN RELIEF VALVES HIGH TEMP" (227 B-4)

(Cue: Acknowledge pushbutton operation.)

4 Verify "BLOWDOWN AUX RELAYS P 'BLOWDOWN AUX RELAYS ENERGIZE[

ENERGIZED RHR OR CS" and RHR OR CS" and "BLOWDOWN RELIEF

'BLOWDOWN RELIEF VALVES HIGH VALVES HIGH TEMP" annunciators are TEMP" annunciators are clear. verified clear on alarm panels 227 E-4 and 227 8-4.

[Cue: Annunciators 227 E 4 and 227 B-4 i r e not lit.)

5 Verify "BLOWDOWN TIMERS INITIATED" P 'BLOWDOWN TIMERS INITIATED" annunciator reset. annunciator is verified clear on alarm panel 227 0-4.

[Cue: Annunciator 227 D-4 is not lit.)

Verify "SAFETY RELIEF VALVE OPEN" P 'SAFETY RELIEF VALVE OPEN" annunciator reset. annunciator is verified clear on alarm panel 210 D-2.

'Cue: Annunciator 210 D-2 is not lit.)

Verify the ADS valves indicate closed.

verified ON at panel 2OCOO3-01.

Cue: RV-2-02-71A. B, C, G, & K green ights are on, red lights are off.)
      • NOTE***

If candidate begins to look at TR-2-02-103 to check SRV Tailpipe Temperatures, then refer them to the initial task conditions information Drovided.

_ _ ~

PLOR023C RevOO6.doc Page 5 of 7

Ir STEP i

NO 8

I STEP Monitor temperature recorder TR-2-02-10; to ensure each valve has reseated. ADS valve has reseated at panel 20C003-01.

(Cue: TR-2-02-103 points TE-2-2-113A, B, C, G, & K read 200°F and decreasing slowlv.

  • 9 Depress the " A ADS LOGIC RESET - P The "A" ADS DRYWELL HIGH DRYWELL HIGH PRESS pushbutton, 2E- PRESSURE LOGIC RESET pushbutton, S3A. 2A-S3A, is momentarily depressed at panel 2OCOO3-0 1.

(Cue: Acknowledge pushbutton operation.)

  • 10 Depress the "B" ADS LOGIC RESET P The "B" ADS DRYWELL HIGH PRESS DRYWELL HIGH PRESS pushbutton 2E- LOGIC RESET pushbutton, 2E-S3B, is S3B. momentarily depressed at panel 20C003-01.

(Cue: Acknowledge pushbutton operation, 11 Reset the following annunciators: P The alarm "RESET" pushbutton is momentarily depressed on panel 20C003.

a. "DRYWELL HI PRESS SIGNAL SEALED IN" (227 A-4).
b. "HIGH DRYWELL PRESSURE BYPASS TIMERS INITIATED" (227 A-3).

(Cue: Acknowledge pushbutton oPeration.1 12 Veriv "DRYWELL HI PRESS SIGNAL SEALED IN" and "HIGH DRYWELL IN" and "HIGH DRYWELL PRESSURE PRESSURE BYPASS TIMERS BYPASS TIMERS INITIATED" INITIATED" annunciators are clear. annunciators are verified clear on alarm panels 227 A 4 and 227 A-3.

(Cue: Annunciators 227 A 4 and 227 A-3 are not lit.)

13 Verify "MSRV DlSCH LIN VAC RELIEF P "MSRV DISCH LINE VAC RELIEF VALVE VALVE OPEN" annunciator is clear. OPEN" annunciator is verified clear on alarm panel 219 C-5.

(Cue: Annunciator 219 C-5 is not lit.)

14 Verify vacuum breaker amber lights out. P All of the ADS valve vacuum breaker amber lights verified OUT at panel (Cue: All ADS valve vacuum breaker 2ocoo3-01.

amber lights are not lit.)

PLOR023C RevOO6.doc Page 6 of 7

SO 1G.7.C-2 in the Cable Spread Room.

Under "ACT" P - must perform

~ S - must simulate

1. TERMINATING CUE When the ADS logic has been reset, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

PLOR023C RevOO6.doc Page 7 of 7

TASK CONDITIONS/PREREQUISlTES L

I. RPV water level is greater than =16OYy and the capability exists to maintain level above =16OYy.

2. The following annunciators have been reset:
a. System I ECCS REAC VESSEL LO=LO=LO LEVEL, panel 227 DD2.
b. System II ECCS REAC VESSEL LO-LO-LO LEVEL, panel 228 C=2.
3. Blowdown of the RPV is complete by evidence of valves closed due to lack of pressure to keep them open.
4. Relief Valve Tailpipe Temperatures indicated on TR-2=02=103on Panel 20C003=01 are all 200°F and lowering
4. Reactor pressure is at 0 psig.
5. Drywell pressure is 0.25 psig.

INITIATING CUE The Control Room Supervisor directs you to reset the ADS system following an automatic initiation by completing SO 1GD7.C=2,Automatic Depressurization System Reset Following

- Blowdown.

EXELON NUCLEAR Nuclear Generation Group OJTmPE MATERIAL COVERSHEET Ixl R APPROVALS:

I signatwe I Title Date signature I Title Date I

I APPROVED FOR USE:

s i t w e I Title Date4 I EFFECTIVE DATE:

NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

COMMENTS:

Training Review for Completeness: I PIMS CODE: I Signature/Date I PlMS ENTRY:

PLOR323CA Rev000.doc Page 1 of 6

TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-323CA REV. NO.: -000 TITLE: Transfer HPCl Pump Suction from CST to Torus (Alternate Path - CST Suction Valve Fails to Auto Close)

I I-2.

3.

4.

5.

6.

7.

- a.

9.

10.

11.

12.

13.

14.

15.

PLOR323CA Rev000.doc Page 2 of 6

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2060250101 / PLOR-323CA WA: 206000A2.09 URO: 3.5 SRO: 3.7 TASK DESCRIPTION: Transfer HPCI Pump Suction from CST to Torus (Alternate Path - CST Suction Valve Fails to Auto Close)

A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.

~. 5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

PLOR323CA Rev000.doc Page 3 of 6

B. TOOLS AND EQUIPMENT None C. REFERENCES Procedure SO 23.7.B-2, Rev. 5, "Transfer of HPCl Pump Suction from CST to Torus" (R)

D. TASK STANDARD I. Satisfactory task completion is indicated when HPCl pump suction is manually transferred from the CST to the Torus (Torus suction valves open and CST suction valve closed) without adverse effects on RPV injection.

2. Estimated time to complete: 7 'minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to manually transfer HPCl pump suction to the Torus using appropriate procedures. I will desaibe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES

1. HPCl is injecting into the RPV in response to a plant transient.
2. Torus Cooling is in service per SO 10.1.D-2, "Residual Heat Removal System Torus Cooling."
3. SBGT is in service per SO 9A.1 .B, "Standby Gas Treatment System Manual Startup."
4. ST-0-007-540-2, "Torus Water Temperatures" is in progress.
5. While using HPCl to restore RPV level, a large leak develops in the HPCl suction line from the Unit 2 CST.
6. Unit 2 CST level is 18 feet and dropping fast.

G. INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to transfer the HPCI suction from the CST to the Torus using SO 23.7.B-2, "Transfer of HPCl Pump Suction from CST to Torus."

PLOR323CA Rev000.doc Page 4 of 6

H. PERFORMANCE CHECKLIST

--- NO 1

STEP Obtain a copy of procedure SO 23.7.B-2.

I I ACT STANDARD A copy of procedure SO 23.7.B-2 is obtained.

  • 2 ~ Open MO-2-23-057 and MO-2-23-058, P MO-2-23-057 and MO-2-23-058 control

' HPCl Torus Suction valves. switches are momentarily placed in the OPEN position then released at panel (Cue: Acknowledge control switch I 20C004B.

operation.)

3 Verify MO-2-23-057 and MO-2-23-058, P MO-2-23-057 and MO-2-23-058 red lights HPCI Torus Suction valves are open. are verified ON,and green lights OFF at panel 20C004B.

(Cue: MO-57 and MO-58 red lights are on, green lights are off.)

4 Verify MO-2-23-017 Cond Tank Suction MO-2-23-017 green light is verified OFF valve automatically closes when and red light is verified ON at panel MO-2-23-057 and MO-2-23-058 are full 20C004B.

open.

(Cue: MO-17 green light is off, red light is on.)

Close M0-2-23-017, Cond Tank Suction P MO-2-23-017 control switch is valve. momentarily placed in the CLOSE position then released at panel 20C004B.

(Cue: Acknowledge control switch operation.)

Verify M0-2-23-017, Cond Tank Suction P MO-2-23-017 green light is verified ON, valve is closed. and red light OFF at panel 20C004B.

(Cue: MO-17 green light is on, red light is Off.)

Verify HPCl has been declared S Control Room Supervisor is informed that inoperable. HPCl is inoperable.

PLOR323CA Rev000.doc

STEP STANDARD 8 Inform Control Room Supervisor of task P Task completion reported.

completion.

(Cue: Control Room Supervisor acknowledges report.)

9 As an evaluator, ensure that you have P Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND Drocedures.

Under "ACT" P - must perform S - must simulate I. TERMINATING CUE When the HPCI suction has been transferred to the Toms, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

PLOR323CA Rev000.doc Page 6 of 6

TASK CONDITIONS/PREREQUISlTES

. I. HPCl is injecting into the RPV in response to a plant transient.

2. Torus Cooling is in service per SO 10.1.D=2, Residual Heat Removal System Torus Cooling.
3. SBGT is in service per SO 9Aml.B, Standby Gas Treatment System Manual Startup.
4. ST-0-007-540-2, Torus Water Temperatures is in progress.
5. While using HPCl to restore RPV level, a large leak develops in the HPCl suction line from the Unit 2 CST.
6. Unit 2 CST level is 18 feet and dropping fast.

INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to transfer the HPCl suction from the CST to the Torus using SO 23.7.8-2, Transfer of HPCI Pump Suction from CST to Torus.

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET APPROVALS:

V SitureITitle Date SignatureI T i Date IIAPPROVED FOR USE:

EFFECTIVE DATE:

SisMtWlTitle Date ISSUE DATE:

COMMENTS:

ITraining Review for Completeness:

II II PlMS CODE: 1 n Signature/Date I ENTRY:

PLOR034C Rev011.doc Page 1 of 6

TEMPORARY CHANGE FORM LOG L

CODE NO.: PLOR-034C REV. NO.: -

011 TITLE: CAD System Nitrogen Addition To Containment During Normal Operations 2.

I I 3- i I 4.

I 5.

6.

7.

8.

9.

IO.

11.

12.

13.

14.

115. 1 1 PLOR034C Rev01 1.doc Page 2 of 6

EXELON NUCLEAR PEACH BOlTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2240130101 / PLOR-OMC WA: 223001A4.10 URO: 3.2 SRO: 3.2 TASK DESCRIPTION: CAD System Nitrogen Addition To Containment During Normal Operations A. NOTES TO EVALUATOR:

1. An asterisk r) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. "Control Room" JPMs are designed to be performed in the simulator. If a

'Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).

b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.

L

5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

PLORO34C Rev01 1.doc Page 3 of 6

B. TOOLS AND EQUIPMENT None C. REFERENCES Procedure SO 7C.l.B-2, Rev. 18, CAD System Nitrogen Addition to Containment During Normal Operations (R)

D. TASK STANDARD

1. Satisfactory task completion is indicated when Nitrogen has been added to containment with an N, flow of 55-65scfm.
2. Estimated time to complete: 14 minutes (A.5) Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to perform a normal nitrogen addition to the Drywell from the CAD system using appropriate procedures. Iwill describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES

1. All SO 7C.1.B-2, CAD System Nitrogen Addition to Containment During Normal Operations procedural prerequisites are met.
2. Primary Containment venting is NOT required.
3. CAD Tank level is 45 inches.

G. INITIATING CUE I The Control Room Supervisor directs you, the Plant Reactor Operator, to add nitrogen to the Drywell using A loop of the CAD system at 60 scfm in accordance with SO 7C.1.B-2, CAD System Nitrogen Addition to Containment During Normal Operations.

PLOR034C Rev011.doc Page 4 of 6

H. PERFORMANCE CHECKLIST ACT STANDARD P A copy of procedure SO 7C.1 .B-2 is obtained.

P SV-4948A control switch is placed in the OPEN position at panel 20C484A.

owledge control switch P

P ISV4949A control switch is placed in the OPEN position at panel 20C484A.

Cue: Acknowledge control switch P SV-4949A red lght is verified ON at panel 20C484A.

P HCS-4947A manual adjustment knob is obtain a flow rate of 60 scfm on FI-4947A. rotated clockwise until 50 to 70 scfm is obtained on FI4947A at panel 20C484A.

(Cue: [CLOCKWISE HCS-4947A manual adjustment knob is rotated.] HCS-4947A indicates 55% controller output; FI-4947A indicates 60 scfm; FR4947A indicates 62 7 Inform the Control Room Supervisor of P Task completion reported.

task completion.

(Cue: Control Room Supervisor acknow-ledges report.)

8 As an evaluator, ensure that you have P Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND procedures.

PLOR034C Rev011 .doc Page 5 of 6

Under "ACT" P - must perform S - must simulate

\

1. TERMINATING CUE When nitrogen is being added to the Drywell at a flow rate of 60 scfm, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

PLORO34C Rev01 1.doc Page 6 of 6

TASK CONDITIONS/PREREQUISITES L

1. All SO 7C.l.B-2, CAD System Nitrogen Addition to Containment During Normal Operations procedural prerequisites are met.
2. Primary Containment venting is NOT required.
3. CAD Tank level is 45 inches.

INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to add nitrogen to the Drywell using A loop of the CAD system at 60 scfm in accordance with SO 7C.l.B-2, CAD System Nitrogen Addition to Containment During Normal Operations.

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET APPROVALS:

IAPPROVED FOR USE: SigMtUre I Title Date I signature I Ti* Date I EFFECTIVE DATE: I I NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

~

I Training Review for Completeness: I PlMS CODE: I I Signature/Date I ENTRY:

PLOR322CA Rev001.doc Page 1 of 10

TEMPORARY CHANGE FORM LOG REV. NO.: -

_ /

CODE NO.: PLOR-322CA 001 TITLE: Diesel Generator Load Test (Alternate Path - Load Control Difficulty) 1 4.

5.

6.

7.

0.

9.

IO.

11.

12.

13.

14.

15.

PLOR322CA Rev001.doc Page 2 of 10

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2640020101 / PLOR-322CA WA: 264000A4.04 URO: 3.7 SRO: 3.7 TASK DESCRlPTI0N: -

Diesel Generator Load Test (Alternate Path Load Control Difficulty)

A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

PLOR322CA Rev001.doc Page 3 of 10

B. TOOLS AND EQUIPMENT Synchronizing Switch Removable Handle C. REFERENCES Procedure SO 52A.1.B, Rev. 32, "Diesel Generator Operations" (R)

D. TASK STANDARD

1. Satisfactory task completion is indicated when the E 4 3 breaker has been opened - OR the E 4 Diesel Generator tripped by the examinee (due to E 4 Diesel Generator load cont rot diffkuI ty).
2. Estimated time to complete: 23 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, synchronize the E 4 Diesel to the E43 bus and pick up 2600 KW and 1000 KVAR for testing purposes using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES

1. The E 4 Diesel Generator has been "SLOW started and is running in accordance with Section 4.1 of SO 52A.1.B, "Diesel Generator Operations."
2. The E 4 Diesel Generator is running at rated frequency and voltage.
3. The E 4 3 Bus is being supplied by 2SUE.
4. The ESW system is supplying Diesel Generator cooling water.

G. INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to synchronize the E 4 Diesel Generator to the E 4 3 Bus and pick up 2600 KW and 1000 KVAR in accordance with Section 4.2 of SO 52A.1 .B, "Diesel Generator Operations."

PLOR322CA Rev001 .doc Page 4 of 10

~

H. PERFORMANCE CHECKLIST 7

STEP Obtain a copy of procedure SO 52A.l.B. P A copy of procedure SO 52A. 1.B is obtained.

Verify E-4 D/G is running at rated P E-4 D/G frequency is verified at 58.8 to frequency and voltage. 61-2 Hz on E-4 D/G Freq. meter. E-4 D/C voltage is verified at 4.1 6 to 4.4 KV on E-l D/G Volt meter.

(Cue: E-4 D/G frequency is 60 HZ and voltage is 4280 volts.)

Insert Sync scope key in E 4 3 Breaker P E 4 3 Breaker Sync Switch (3-125-1807) iz Sync Switch and tum ON. placed in the "ON" position at panel OOC026A.

(Cue: Both Sync Scopes rotating, ncoming and running lights "ON" at 30ttOm Dead Center and "OFF" at Top 3ead Center.)

derify E 4 D/G speed control. P E 4 D/G frequency is raised to 60.5 Hz then lowered to 55.5 Hz on E-4 D/G FREC

Cue: "GOVERNOR" control switch meter using the "GOVERNOR" control

-aises, lowers frequency 0.5 Hz switch (165-DGI 2) then returned to the above/below the initial value, then returns initiil value at panel OOC026D.

o initial value.)

Jerify E-4 D/G voltage control. P E 4 DIG voltage is raised and lowered 50 vdts abovebelow initial value on E-4 D/G Cue: "AUTO VOLT REG" raises then volts meter using the "AUTO VOLT REG" owers voltage 50 volts above/below initial control switch (90-DG14) then returned to ralue, then returns to initial value.) the initial value at panel 00C026D.

heck both synchronizing lights for proper P Both sync lights are verified "ON" at

)peration. Bottom Dead Center and "OFF" at Top Dead Center at panels OOC026A or Cue: Both lights "ON" when sync scope OOC026C.

it "Bottom Dead Center" and both lights OFF" when sync scope at "Top Dead

enter".)

PLOR322CA Rev001.doc Page 5 of 10

.a

STEP ACT STANDARD

  • 7 Adjust E 4 D/G engine speed using P Sync scope is verified rotating slowly in "GOVERNOR" control switch until sync "FAST" direction at panels 00C026A OR scope is rotating slowly in "FAST" OOC026C.

direction.

(Cue: Acknowledge control switch operation. Synchroscope is rotating slowlb in the fast direction.)

8 Adjust E-4 diesel generator voltage until P Incoming voltmeter about 50 volts but les!

"INCOMING" voltmeter is slightly higher than 100 volts above bus voltage at panel than "RUNNING" voltmeter. DOC026C.

(Cue: Acknowledge control switch operation. Incoming is slightly higher than running.)

9 Verify sync scope rotating slowly in P Sync scope is verified rotating slowly in "FAST" direction. 'FAST" direction at Panels 00C026A OR lOC026C.

(Cue: Sync scope rotating slowly in "FAST".)

  • 10 Close the E 4 3 breaker when the sync P Nhen the sync scope is within 13 degrees scope is within 13 degrees of "Top Dead >f"Top Dead Center, the E 4 3 breaker Center". nntrol switch is taken to the "CLOSED" msition and released at panel 00C026D.

(Cue: Acknowledge [CLOCKWISE]

breaker control switch operation.)

11 Verify the E 4 3 breaker is closed. P 543 breaker red light lit, sync scope

topped at 12 o'clock, and sync lights

[Cue: E 4 3 breaker red light on, both sync OFF" verified at panel OOC026C and scopes stopped at 12 o'clock and sync IOC026D.

4 ights "OFF".)

mmediately load the E-4 diesel to P I4 D/G KW load is promptly raised by 200-300 KW. nomentarily placing the "GOVERNOR" ontrol switch (165-DGl2) to "RAISE" at

Cue: [CLOCKWISE, "GOVERNOR" lanet 00C026D. No reverse power trip of
ontrol switch is taken to "RAISE"]. l e E 4 3 breaker occurs.

Jerify E 4 D/G load is 200-300KW. P i-4 D/G load is verified to be 150 - 350

W on the E-4 D/G KW meter at panel Cue: E 4 D/G load is 250 KW.)

J OC026D.

PLOR322CA Rev001.doc Page 6 of 10

STEP Immediately load the E 4 Diesel Generato P E 4 D/G KVAR load is promptly raised by to 100 KVAR. momentarily placing the AUTO VOLT REG control switch (90-DG14) in "RAISE' at panel 00C026D.

(Cue: [CLOCKWISE, AUTO VOLT REG control switch is taken to "RAISE'I.

15 IVerify E-4 D/G load is 100 KVAR. P E 4 D/G load is verified to be 50-150 W A R on the E 4 D/G W A R meter at panel OOC026D.

(Cue: E-4 D/G load is 100 WAR.)

16 Place the E-43 "BKR SYNC" switch to P E 4 3 'BKR SYNC" switch taken to "OFF" "OFF". 1st Panel OOC026D.

(Cue: Acknowledge COUNTERCLOCKWISE control switch operation.)

17 Verify the E-43 "BKR SYNC" in "OFF". P 'BKR SYNC" verified in "OFF" via INCOMING and RUNNING voltmeters dropping to zero.

(Cue: INCOMING AND RUNNING voltmeters drop to zero.)

18 Check generator output voltage for all 3 P Generator output voltage is checked by phases. rotating the VOLT SEL switch through (Cue: Acknowledge VOLT SEL switch positions '1-2", "2-3", "3-1" on panel operation.) OOC026D.

19 Check generator amperage for all 3 P Generator amperage is checked by phases. rotating the AMP SEL switch through Cue: Acknowledge AMP SEL switch positions 'l", '2","3".

operation.)

20 Pick up desired KW and KVAR loading on P E 4 D/G 'Governor" control switch E-4 D/G. (165DG12) and AUTO VOLT REG control Cue: [CLOCKWISE, "GOVERNOR" and switches are momentarily placed in AUTO VOLT REG control switches are "RAISE".

momentarily placed in "RAISE".].

21 Verify E-4 D/G load. P E 4 D/G load is verified to be 1500 KW and rising fast on the E 4 DIG KW meter (Cue: E 4 D/G load is 1500 KW and rising at panel 00C026D.

fast.)

PLOR322CA Rev001.doc Page 7 of 10

22 Attempt to reduce E 4 D/G loading rate to p DG I "GOVERNOR" control switch below 300 KW / minute. (165-DGl2) taken to lower at panel Cue: [COUNTERCLOCKWISE, bOC026D. .

"GOVERNOR" control switch is taken to "LOW ER1.

23 Verify E-4 D/G load. P E 4 D/G load is verified to be 2500 W and rising fast on the E 4 DIG KW meter (Cue: E 4 D/G load is 2500 Kw and rising at panel 00C026D.

fast.)

24 Attempt to reduce E-4 D/G loading rate to p E-4 D/G "GOVERNOR" control switch below 300 KW / minute. (165-DG12) taken to lower at panel Cue: [COUNTERCLOCKWISE, 00C026D.

"GOVERNOR" control switch is taken to "LOWERY.

25 Verify E-4 D/G load. E 4 D/G load is verified to be approximately 3500 KW and stable on the (Cue: E 4 D/G load is approximately 3500 E 4 D/G KW meter at panel 00C026D.

KW and stable.)

  • 26 Reduce E 4 D/G loading to below 3000 P E 4 D/G 'GOVERNOR" control switch KW OR trip the E 4 3 breaker stop the (16SDG12) is promptly taken to lower E 4 D/G. until E d D/G load is below 3000 KW Cue: ([COUNTERCLOCKWISE], the E 4 3 breaker control switch is taken to "GOVERNOR" control switch is taken to the "TRIP" position and released the "LOWER" E 4 3 breaker control switch E 4 D/G control switch is taken to "STOP" placed in "TRIP" the E-4 D/G control and released at panel 00C026D.

switch placed in "STOP."

27 Verify action taken in the previous step. P E 4 D/G load is verified below 3000 KW and stable on the E 4 D/G KW meter at (Cue: E 4 D/G load is below 3000 KW panel 00C026D the E 4 3 breaker and stable OR E 4 3 breaker green light green light on, red light off, KW and W A R on, red light off, KW and W A R load load indicate zero at panel 00C026D.

indicated zero.)

"NOTE ***

IPM Steps 28 through 35 do not apply if the E 4 3 breaker or E 4 DIG were tripped in the above step.

PLOR322CA Rev001.doc Page 8 of 10

STEP ACT STANDARD 28 Reduce E-4 D/G loading to 1500 KW. P E-4 D/G "GOVERNOR" control switch Cue: [COUNTERCLOCKWISE, (16SDG12) is taken to lower at panel "GOVERNOR control switch is taken to 00C026D. E 4 D/G is run at 1500 KW foi "LOW ER'1. 5 minutes.

29 Verify E-4 D/G load. P E-4 D/G load is verified 1400 - 1600 KW on the E 4 D/G KW meter at panel (Cue: E-4 D/G load is 1500 KW and 00C026D.

stable.)

~

30 Verify E-4 D/G load to below 1200 KVAR. P The E-4 D/G KVAR load is verified below 1200 KVAR at panel 00C026D.

(Cue: The E-4 D/G W A R load is verified below 1200 KVAR at panel 00C026D.)

31 Reduce E-4 D/G loading to 100 -150 W . P E-4 D/G "GOVERNOR" control switch Cue: [COUNTERCLOCKWISE, (165DG 12) is taken to lower at panel "GOVERNOR" control switch is taken to OOC026D.

"LOWERY.

~ ~~

32 Verify E-4 D/G load. P E 4 D/G load is verified 50 - 200 KW on the E-4 D/G KW meter at panel 00C026D (Cue: E-4 D/G load is 100 - 150 KW and stable.)

~~~~ ~~~ ~

33 Reduce E-4 D/G load to 50 KVAR. P E 4 D/G KVAR load is LOWERED by momentarily placing the AUTO VOLT REG control switch (90-DG14) in (Cue: [COUNTERCLOCKWISE, AUTO "LOWER" at panel 00C026D until E 4 VOLT REG control switch is taken to D/G load is 25 - 75 WAR.

34

  • 35

'LOWER7.

Verify E-4 D/G load at 50 WAR.

[Cue: E 4 D/G load is 50 WAR.)

Trip the E 4 3 breaker.

CUE: Acknowledge I

P E-4 D/G load is verified 25 - 75 KVAR on the E 4 D/G KVAR meter at panel OOC026D The E 4 3 breaker control switch is taken to the "TRIP" position and released at SOUNTERCLOCKW ISE control switch panel 00C026D.

2peration.)

36 derify the E-43 breaker is open.

CUE: E-43 breaker green light on, red off, KW and KVAR load indicate zero at ight off, KW and KVAR load indicate panel 00C026D.

rero.)

I -

PLOR322CA Rev001.doc Page 9 of 10

I

~

E P STEP I ACT STANDARD 37 Notify the Control Room Supervisor that P Information provided to the Control Room the E 4 3 breaker is open, the E 4 D/G is Supervisor.

inoperable and that an internal inspection of the E-4 D/G is required.

(CUE: Control Room Supervisor acknowledges report.)

s an evaluator ensure that you have 'ositive control established.

positive control of all exam material provided to the examinee (Task Prerequisites) AND Under "ACT" P - must perform S - must simulate

1. TERMINATING CUE When the E 4 3 breaker is opened D/G tripped by the examinee, then the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

PLOR322CA Rev001 .doc Page 10 of 10

TASK CONDITIONS/PREREQUISITES I. The E 4 Diesel Generator has been SLOW started and is running in accordance with Section 4.1 of SO 52A.I.B, Diesel Generator Operations?

2. The E 4 Diesel Generator is running at rated frequency and voltage.
3. The E 4 3 Bus is being supplied by ZSUE.
4. The ESW system is supplying Diesel Generator cooling water.

INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to synchronize the E 4 Diesel Generator to the E43 Bus and pick up 2600 KW and 1000 KVAR.in accordance with Section 4.2 of SO 52A.I.B, Diesel Generator Operations.

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET I Signature I Title signatwe IT i Date Date IAPPROVED FOR USE:

Signature ITitle Date

~

EFFECTIVE DATE: I I NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

COMMENTS:

Training Review for Completeness: I PlMS CODE: I Signaturemate I ENTRY:

DWCW-RBCCW JPM.dOC Page 1 of 6

TEMPORARY CHANGE FORM LOG L

CODE NO.: PLOR-NEW REV. NO.: 000 TITLE: Verify Isolation of Drywell Chilled Water and RBCCW 1.

2.

3.

4.

5.

6.

7.

r 8.

9.

I IO. I

11. I I 12.

13.

14. I I 15.

I I DWCW-RBCCW JPM.dW Page 2 of 6

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2130220401/ PLOR-NEW WA: 295024EA1.07 URO: 3.8 SRO: 3.9 TASK DESCRIPTION: Verify Isolation of Drywell Chilled Water and RBCCW A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performancechecklist are to be provided to the examinee when no system response is available.
3. JPM Performance

- a. . Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).

b. When performing In-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph 0.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completionwithin the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be

- given to the examinee.

DWCW-RBCCW JPM.doc Page 3 of 6

6. TOOLS AND EQUIPMENT None C. REFERENCES GP-8.B, Rev. 17, PCIS Isolation - Groups 1 I and 111 (R)

D. TASK STANDARD

1. Satisfactory task completion is indicated when the Drywell Chilled Water isolation valves, M0-2200A 8, B and MO-2201A & B are closed, The Drywell Chillers are tripped, and the DWCW Pump control switches are in PULL TO LOCK.
2. Estimated time to complete: 12 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps of GP 8.B Section 3.5 PCIS Isolation -

Groups II and Ill. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISITES

1. The Reactor has just been scrammed.
3. DWCW Return Header pressure as read on PI-2-0262 is 32 psig.
4. Drywell pressure is approximately 24 psig.

G. INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to perform step 3.5 of GP-8.B, PCIS Isolation - Groups II and 111.

DWCW-RBCCW JPM.dOC Page 4 of 6

H. PERFORMANCE CHECKLIST 3TEP NO STEP ACT STANDARD 1 1 Obtain a copy of procedure GP-8.B. P I A copy of procedure GP-8.6 is obtained.

2 Verify MO-20245 AND MO-20246 aligned P MO-20245 AND MO-20246 red "CHILLEI in the "CHILLED WATER" position. WATER" lights are lit. MO-20245 AND MO-20246 red "RX BLDG CLG WATER" (Cue: MO-20245 AND MO-20246 red lights are out at Panel 20C005A.

"CHILLED WATER" lights are lit. MO-20245 AND MO-20246 red "RX BLDG CLG WATER" lights are out.)

~~

  • 3 ~ Calculate corrected RBCCW pressure P ~ Indicated RBCCW pressure is checked, (CRP) by taking indicated RBCCW then 25 psig is subtracted to determine a pressure on PI-2350 - 25 psig. CRP of approximately 15 psig.

(Cue: PI-2350 is indicating 40 psig.)

4 Compare Drywell pressure to DWCW P Recognize that DWCW Return Header Return Header pressure. pressure is greater than Drywell pressure (Cue: Comparison acknowledged) and DWCW isolation is not required and not performed.

  • 5 Compare Drywell pressure to Corrected P Corrected RBCCW Pressure (CRP) is RBCCW Pressure (CRP) to determine determined to be less than PR-2508 or which pressure is greater. PR-4805 or PR-8102A(B) at panels 20C003/ 20C004C.

(Cue: PR-2508 indicates 24 psig.)

  • 5 Trip BOTH Recirc pumps. P The contrd switches for the Drive Motor Breakers on both A and B Recirc "DRIVE (Cue: Both Recirc pumps breaker green MOTOR" breakers are placed in TRIP at lights are on and red lights are off. panel 20C004A.

Annunciators 214 C-3 and H-3 are lit.)

6 Venfy BOTH Recirc pumps are tripped. P A and B Recirc "DRIVE MOTOR" breaker green lghts are verified to be ON at panel (Cue: Both Recirc pumps breaker green 2OC004A.

lights are on and red lights are off.

Annunciators 214 C-3 and H-3 are lit.)

"6 Close MO-2373. RBCCW Isolation valve. P MO-2373 control switch is momentarily placed in the "CLOSE" position at panel (Cue: Acknowledge control switch 2ocOl2.

operation.)

DWCW-RBCCW JPM.dX Page 5 of 6

STEP ACT STANDARD Verify the M0-2373, the RBCCW Isolation P MO-2373 green light is verified ON and valve is closed. red light is verified OFF at panel 20C012.

(Cue: MO-2373 green light is on, red light is off.)

Close MO-2374, the RBCCW Isolation P MO-2374 control switch is momentarily valve. placed in the "CLOSE" position at panel 20c012.

(Cue: Acknowledge control switch operation.)

Verify the MO-2374, the RBCCW Isolation P MO-2374 green light is verified ON and valve is closed. red light is verified OFF at panel 20C012.

(Cue: MO-2374 green light is on, red light is off.)

Inform Control Room Supervisor of task completion.

(Cue: Control Room Supervisor acknow-P ITask completion reported.

ledges report.)

9s an evaluator, ensure that you have positive control of all exam material Drovided to the examinee (Task Sonditions/Prerequisites) AND Under "ACT" P - must perform S - must simulate

1. TERMINATING CUE When step 3.5 of GP-8.B has been completed, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

DWCW -RBCCW JPM .doc Page 6 of 6

TASK CONDITIONS/PREREQUISlTES

1. The Reactor has just been scrammed.
2. DWCW Return Header pressure as read on PI-2-0262 is 32 psig.
3. Drywell pressure is 24 psig.

INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to perform step 3.5 of GP=

8.8, PCIS Isolation = Groups II and Illyy.

PECO NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET APPROVALS:

I I EFFECTIVE DATE:

NAME: SOC. SEC. NO.

Last First M.I.

ISSUE DATE: I COMPLETION DATE:

COMMENTS:

PlMS CODE: I I PlMS ENTRY: I I PLOR067C Rev008.doc Page 1 of 9

TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-067C REV. NO.: -008 TITLE: Placing the Standby SJAE In-Service and Placing the In-Service SJAE in Standby 1.

2.

3.

4.

5.

6.

~~ ~

9.

IO.

11.

12.

13.

14.

15.

1 PLOR067C Rev008.doc Page 2 of 9 i

PECO NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2550030101 / PLOR-067C WA: 271OOOA4.09 URO: 3.3 SRO: 3.2 TASK DESCRIPTION: Placing the Standby SJAE In-Service and Placing the In-Service SJAE in Standby A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctty will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

I PLOR067C Rev008.doc Page 3 of 9

B. TOOLS AND EQUIPMENT None C. REFERENCES

1. Procedure SO 8A.6.A-2 Rev. 13, Placing the Standby SJAE In-Service and Placing the In-Service SJAE in Standby (R)
2. P&ID M-310, Air Ejector and Off-Gas (A)
3. P&ID M-307, Condensate System (A)

D. TASK STANDARD I. Satisfactory task completion is indicated when B SJAE placed in service and A SJAE placed in standby.

2. Estimated time to complete: 25 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to place B SJAE in service and place ASJAE in standby using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES

1. Plant is at steady state conditions.
2. ASJAE in service.
3. Air ejector inter/after condenser loop seals have been established IAW GP-2 Attachment 1.

G. INITIATING CUE The Control Room Supervisor directs you to place the B SJAE in service and place A SJAE in standby in accordance with SO 8A.6.A-2 Placing the Standby SJAE In-Service and Placing the In-Service SJAE in Standby.

I PLOR067C Rev008.doc Page 4 of 9

__ ~-

H. PERFORMANCE CHECKLIST 5G

- NO 1

STEP Obtain a copy of procedure SO 8A.6.A-2.

I I ACT P

STANDARD A copy of procedure SO 8A.6.A-2 is obtained.

2 Verify MO-21048, SPE B Isolation valve P MO-21048 and MO-2105B, red lights are and MO-2105B, SJAE B Isolation valve verified ON at panel 20C007A.

are open.

(Cue: MO-2104B and MO-2105B red lights are on, green lights are off.)

3 Verify PIC-2239B, B SJAE Main Steam P PIC-2239B is verified to be in "MANUAL",

Supply Hdr Controller is in "MANUAL" and point at panel 20C007A by ensuring lower the control valve is closed by adjusting the portion of auto/manual selector switch is setpoint to minimum. lit.

(Cue: PIC-2239B (SP) is in "MANUAL".) 1 I 4 Adjust PIC-2239B setpoint to the minimum P PIC-2239B auto setpoint knob is verified msition and depress the "CLOSE" button. at 0 psig. Controller manual close pushbutton is depressed as required to ensure setpoint at minimum, controller

Cue: PIC-2239B controller indicates 0 output of 100%.

x i g with a controller output of loo%.)

  • 5 3pen AO-2244/45/47B, Air Ejector Inlet B P A0-2244/45/478 control switch is placed 2nd Stage valves. in the "OPEN" position at panel 20C007A.
Cue: Acknowledge control switch iperation.)

6 Jerify AO-2244/45/47B, Air Ejector Inlet B P AO-2244/45/47B red light is verified ON

?ndStage valves are open. and green light is verified OFF at panel 20C007A.

Cue: AO-2244/45/47B red light is on, jreen light is off.)

      • NOTE***

The following direction to the Equipment Operator requires simulator instructor action:

MRF MSSOSB OPEN I PLOR067C Rev008.doc Page 5 of 9

I sNTF STEP ACT STANDARD

- *7 Direct Equipment Operator to adjust HCS- P Equipment Operator directed to adjust 2-8A-2466B. Main Steam Isolation Valve HCS-2-8A-2466B for 35 to 40 psi.

to SJAE 2B, for 35 to 40 psi.

(Cue: Equipment Operator acknowledges direction and reports HCS-2-8A-2466B adjusted to 35 psi.)

  • 8 Place PIC-2239B in AUTO. P PIC-2239B auto portion of Auto/Manual selector switch is depressed and verified it.

(Cue: PIC-2239B is in AUTO.)

  • 9 Raise setpoint on PIC-2239B in 20 psig P IC-2239B control knob is rotated in the increments to between 115 and 125 psig. 3LOCKWISE direction in increments (20 isig increments over several minutes) at (Cue: PI-2472B is slowly increasing, )anel 20C007A to increase SJAE B stean controller setpoint (SP) and Process Valve iressure to 115 to 125 psig on PI-2472B (PV) slowly increase. Controller output is at panel 20C006B.

slowly decreasing until PI-2472B reaches 120 psig.

  • I0 Open AO-2238D, E, F Air Ejector Inlet B P 40-2238D, E & F/AO-2540B control 1st Stage1/AO-2540BAir Ejector Inner ;witch is placed in the OPEN position at Cdsr Drain valves when SJAE B 2nd lane1 20C007A when SJAE B 2nd stage 1

stage pressure is greater than 13 inches )ressure is greater than 13 inches of Hg. nercury on Pl-22468 at panel 20C006B.

(Cue: Acknowledge control switch operation.)

I1 Verify AO-2238D,E,F, Air Eject Inlet B 1st P AO-2238D,E,F/AO-2540B red light is Stage valves are open. verified ON and green light is verified OFF at panel 20C007A.

(Cue: AO-2238D,E,F red light is on, green light is off.)

  • I 2 When steam pressure reaches 115 to 125 P Steam pressure on PI-2472B is verified to psig, place the control switch for be 115 to 125 psig and the control switch AO-2236D/E/F Air Ejector Off-Gas Inlet for AO-2236D/E/F is placed in AUTO.

B in AUTO.

(Cue: Steam pressure is 120 psig, AO-2236D/E/F is in AUTO.

I I PLOR067C Rev008.doc Page 6 of 9

STEP NO STEP ACT STANDARD

- I3 Verify AO-2236D,E and F Off Gas Inlet B P AO-2236D,E and F red light is verified 01 in AUTO. and green light is verified OFF at panel 20C007A.

(Cue: AO-2236D,E and F red light on, green light off.)

Place control switch for AO-2236A,B,C, P AO-2236A,B,C control switch is placed in Air Ejector Off Gas Inlet A valves in the "CLOSE" position at panel 20C007A.

CLOSE.

(Cue: Acknowledge control switch operation.)

15 Verify AO-2236A,B,C Air Ejector Off Gas P AO-2236A,B,C green light is verified ON Inlet A valves closed. and red light verified OFF at panel 20C007A.

(Cue: AO-2236A,B,C green light is on, red light is off.)

  • I6 Adjust setpoint on PIC-2239A to 0 psi.

(Cue: PI-2472A is quickly decreasing, l p Control knob on PIG2239A is rotated in the COUNTERCLOCKWISE direction unti the setpoint is at minimum at panel controller setpoint (SP) and Process Valve 20C007A.

(PV) are slowly decreasing. Controller output stabilizes at 100.)

      • NOTE***

The following direction to the Equipment Operator requires simulator instructor action:

MRF MSS05A CLOSE 17 Direct Equipment Operator to adjust HCS-2-8A-2466A, Main Steam Isolation valve to SJAE 2A, to 0 psi.

P IEquipment Operator directed to adjust HCS-2-8A-2466A to 0 psi, at panel (Cue: Equipment Operator acknowledges direction and reports HCS-2-8A-2466A adjusted to 0 psi.)

18 Verify pressure on PI-2472A decreases to P Pressure on PI-2472A is verified to be at 0 0 psig. psig at panel 20C006B.

(Cue: PI-2472A indicates 0 psig.)

I PLOR067C Rev008.doc Page 7 of 9

STEP ACT STANDARD

- *19 Close AO-2238A,B,C, "Air Ejector Inlet A P AO-2238A,B,C/AO-2!540A, control switch 1st Stage"/AO-2540A "Air Ejector Inter is placed in the "CLOSE" position at pane Cdsr Drain" valves when steam pressure 20C007A when steam pressure decrease decreases to 30 psig. to 30 psig.

(Cue: Acknowledge control switch operation.)

20 Verify AO-2238A,B,C, "Air Ejector Inlet A P AO-2238A,B,C, AO-2!540A, green light is 1st Stage" AO-2540A "Air Ejector Inter verified ON and red light is verified OFF a Cdsr Drain", valves are closed. panel 20C007A.

(Cue: AO-2238A,B,C green light is on, red light is off.)

  • 2 1 Close AO-2244/45/47A, Air Ejector Inlet A 40-2244/45/47A control switch is placed 2nd Stage valves. n the "CLOSE" position at panel 20COO7A.

(Cue: Acknowledge control switch 3peration.)

22 Verify AO-2244/45/47A, Air Ejector Inlet A 40-2244/45/47A green light is verified ON 2nd Stage valves are closed. and red light is verified OFF at panel

!OC007A.

Cue: AO-2244/45/47A green light is on,
  • ed light is off.)

23 Jerify "B" SJAE parameters are within 6" SJAE 1st stage pressure on PI-24726 lesired limits. s verified to be within 115-125 psig and B" SJAE 2nd stage pressure is verified to

,Cue: PR-2154 is 28" Hg; Pl-24728 be greater than 13 inches Hg at panel ndicates 120 psig, Pl-22466 indicates 15" !OC006B.

24 Inform Control Room Supervisor of task Task completion reported.

completion.

(Cue: Control Room Supervisor acknowledges report.)

1 Page 8 of 9 1

Under ACT P - must perform S - must simulate

1. TERMINATING CUE When SJAE B is in service and SJAE A is in standby, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

I PLOR067C Rev008.doc Page 9 of 9 1

TASK CONDITIONS/PREREQUISlTES

1. Plant is at steady state conditions.
2. A SJAE in service.
3. Air ejector intedafter condenser loop seals have been established IAW GP-2 Attachment 1.

INITIATING CUE The Control Room Supervisor directs you to place the BySJAE in service and place A SJAE in standby in accordance with SO 8A.6.A=2 Placing the Standby SJAE In-Service and Placing the In-Service SJAE in Standby.

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET v

APPROVALS:

V Signature I T i Date A Signature I Tile Date APPROVED FOR USE:

I Signature I r i EFFECTIVE DATE: J NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

COMMENTS:

1 Training Review for Completeness: I PlMS CODE:

I I I

II I I

II SignatureIDate I I

P'MS ENTRY: I I PLORl18P Rev007.doc Page 1 of 6

TEMPORARY CHANGE FORM LOG 1

CODE NO.: PLOR-118P REV.NO.: -

007 TITLE: Closing a Stuck Open MSlV - Unit 2

12. i 1

9.

IO.

11.

12.

13.

14.

15.

( Page 2 of 6

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/SeniorReactor Operator TASK-JPM DESIGNATOR: 2390110401 1 PLOR-118P WA: 239001G.2.4.35 URO: 3.3 SRO: 3.5 TASK DESCRIPTION: Closing a Stuck Open MSlV - Unit 2 A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performedcorrectly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

I PLORll8P Rev007.doc Page 3 of 6

B. TOOLS AND EQUIPMENT Insulated Fuse Pullers 1

C. REFERENCES 1 A 0 1A.2-2, Rev. 12, "Closing a Stuck Open Inboard or Outboard Main Steam Isolation Valve" D. TASK STANDARD

1. Satisfactory task completion is indicated when the Unit 2 Outboard MSIV AC AND DC solenoid valve control power fuses are removed.
2. Estimated time to complete: 15 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to close the stuck open outboard MSlVs using appropriate procedures. Iwill describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES I. Unit 2 has just been manually scrammed (Unit 2 Mode Switch in "Shutdown").

2. RPV level is -175 inches (Group I isolation signal is present).
3. All Outboard MSlVs failed to isolate.
4. The MSlVs did not close using the Test Pushbuttons in accordance with Steps 4.1.1 and 4.1.2 of A 0 1A.2-2, Closing a Stuck Open Inboard or Outboard MSIV.
5. Radiological conditions do NOT allow entry into the Outboard MSIV Room.

G. INITIATING CUE The Control Room Supervisor directs you, the Equipment Operator, to close the Unit 2 Outboard MSlVs using A 0 1A.2-2, "Closing a Stuck Open Inboard or Outboard MSIV" beginning with step 4.1.3.

1 PLORl18P Rev007.doc Page 4 of 6

H. PERFORMANCE CHECKLIST 7 STEP I ACT I STANDARD I NO 1 Obtain a copy of procedure A 0 1A.2-2. P A copy of procedure A 0 1A.2-2 is-obtained. 1 Examinee should utilize Section 4.1 of A 0 1A.2-2. I

  • 2 Open panel 206042 front panel doors. P Door handle turned, doors pulled outward to gain access to the outboard MSlV AC (Cue: Panel 206042 doors are open.) and DC solenoid valve fuses at the front of panel 20C042 in the Cable Spreading Room.
  • 3 Pull the outboard MSlV AC solenoid valve S Fuse 16A-FI2B is identified as the fourth fuse 16A-F12B. fuse from the top of terminal strip BB located inside the IeWrear of Panel (Cue: Fuse is removed.) 20C042. Fuse puller is attached to outboard MSlV AC solenoid valve fuse 16.

F12B fuse is pulled outward until fuse is free of fuse holder.

4 Direct the Unit Reactor Operator to S Unit Reactor Operator is contacted to monitor outboard MSlV position indication. monitor outboard MSlV position indication, (Cue: Outboard MSlVs are open.)

  • 5 Pull the outboard MSIV DC solenoid valve S Fuse 16A-FI IB is identified as the eighth for 16A-F11B. fuse from the top of terminal strip BB located inside the lefthear of Panel (Cue: Fuse is removed.) 206042. Fuse puller is attached to outboard MSIV DC solenoid valve fuse 16A-Fl1B. Fuse is pulled outward until fuse is free of fuse holder.

6 Direct the Unit Reactor Operator to S Unit Reactor Operator is contacted to monitor Main Steam line flow using FI monitor Main Steam line flow on FI-2 06-088A,B,C,D on panel 20C008A. 088A,B,C,D at panel 20C008A.

(Cue: Main steam line FI-2 088A,B,C,D read 0 Mlbm/hr.

7 Close panel 20C042 front panel doors. P Door closed and relatched using handle.

(Cue: Panel 20C042 doors are closed.)

8 Inform Control Room of task completion. S Task completion reported using telephone or GAI-TRONICS page system.

(Cue: Control Room acknowledges report.

Outboard MSlV are closed.)

I PLORll8P Rev007.doc d

Page 5 of 6 d

m STANDARD ensure you have positive P Positive control established control of all exam material provided to the examinee (Task Conditions/Prerequisites)

AND Drocedures.

Under "ACT" P - must perform S - must simulate

1. TERMINATING CUE When the Unit 2 Outboard MSlVs are closed, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

1 Page 6 of 6 1

TASK CONDITIONS/PREREQUISlTES 1

I. Unit 2 has just been manually scrammed (Unit 2 Mode Switch in Shutdown.

2. RPV level is -175 inches (Group I isolation signal is present).
3. All Outboard MSIVs failed to isolate.
4. The MSlVs did not close using the Test Pushbuttons in accordance with Steps 4.1.1 and 4.1.2 of A 0 1A.2-2, Closing a Stuck Open Inboard or Outboard MSIV.
5. Radiological conditions do NOT allow entry into the Outboard MSIV Room.

INITIATING CUE The Control Room Supervisor directs you, the Equipment Operator, to close the Unit 2 Outboard MSIVs using A 0 1A.2-2, Closing a Stuck Open Inboard or Outboard MSIV beginning with Step 4.1.3.

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET APPROVALS:

I Signature I T i e Date I signature I Title Date Y EFFECTIVE DATE: I I NAME: SOC. SEC. NO.

Last First M.I.

ISSUE DATE: COMPLETION DATE:

~

COMMENTS:

PlMS CODE:

PlMS ENTRY:

I PLOR075P Rev012.doc Page 1 of 6

TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-075P REV. NO.: -

012 TITLE: SCRAM SOLENOID DE-ENERGIZATION- UNIT 2 (T-213-2) r 9.

10.

11.

12.

13.

14.

15.

PLOR075P Rev012.doc Page 2 of 6

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2003730599 / PLOR-075P WA: 295037EA1. O l URO: 4.6 SRO: 4.6 TASK DESC RIPTI0N: -

Scram Solenoid De-energization Unit 2 (T-213-2)

A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

PLOR075P Rev012.doc Page 3 of 6

6. TOOLS AND EQUIPMENT
1. T-213-2 Tool Package from the Main Control Room Emergency Operating Procedure Tool Box
2. EOP Tool Box Key C. REFERENCES Procedure T-213-2, Rev. 9, "Scram Solenoid De-energization" (R)

D. TASK STANDARD

1. Satisfactory task completion is indicated when Unit 2 Control Rod 26-15 scram solenoid fuses are removed.
2. Estimated time to complete: 5 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to de-energize Unit 2 Control Rod 26-15 scram solenoids using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

-. TASK CONDITIONS/PREREQUISlTES

1. Unit 2 was initially at 100% power.
2. RPV level then drops to the scram setpoint due to partial loss of feedwater flow.
3. Control Rod 26-15 and Control Rod 42-43 are stuck at position 48 with their blue scram lights NOT lit on the Full Core Display.
4. Use of procedure T-213-2, "Scram Solenoid De-energization"has been directed by the T-100 procedures.
5. Prerequisites and procedure steps up to and including step 4.3 of procedure T-213-2 have been completed.

G. INITIATING CUE The Control Room Supervisor directs you, the Equipment Operator, to de-energize Unit 2 Control Rod 26-15 scram solenoids in accordance with Steps 4.4.1 - 4.4.3 of procedure T-213-2, "Scram Solenoid De-energization".

PLOR075P RevO12.doc Page 4 of 6

H. PERFORMANCE CHECKLIST lSTEp NO STEP ACT STANDARD

  • I Obtain the key for the Emergency S Emergency Operating Procedure Tool Operating Procedure Tool Locker. Locker Key requested from WECS OR examinee identifies the location of the WECS key box and its associated key.

(Cue: When examinee requests EOP Tool Locker key from WECS - OR examinee identifies the location of the WECS key box and its associated key then evaluator should provide the EOP Tool Locker key.)

  • 2 Open Emergency Operation Procedure P Tool Locker located on Radwaste Building Tool Locker and obtain T-213 Tool Kit E. 165' is unlocked, opened and T-213 equipment. Tool Kit is located.

(Cue: Equipment obtained.)

m

""NOTE When examinee locates tool kit, inform him that he now has the tools to perform the procedure. Provide the examinee with a copy of the T-ZOO procedure which corresponds to the tool kit that has been chosen. DO NOT allow equipment to be removed from the locker. Relock the locker before leaving the area.

  • 3 Open panel 2CC068 door. P Panel fasteners unfastened, door pulled outward to gain access to Control Rod 26-(Cue: Panel 2CC068 door is open.) 15 fuses.
  • 4 Pull the Channel A fuse for Control Rod S Control Rod 26-15 Channel A fuse is 26-15. removed at panel 2CC068 using fusepuller from T-213-2 Tool Kit.

(Cue: Fuse is removed.)

  • 5 Pull the Channel B fuse for Control Rod S Control Rod 26-15 Channel B fuse is 26-15. removed at panel 2CC068 using fusepuller from T-213-2 Tool Kit.

(Cue: Fuse is removed. Control Room reports Control Rod 26-15 is inserting.)

6 Initial on Table 1 by Control Rod 26-15. P T-213-2, Table 1 is initialed under "FUSES REMOVED" column by Control Rod 26-(Cue: Acknowledge initialing Table 1.) 15.

PLOR075P RevOl2.doc Page 5 of 6

~

STEP ACT STANDARD 7 Inform Control Room of task completion. S Task completion reported using telephone hand held radio or GAI-TRONICS page (Cue: Control Room acknowledges system.

report. Control Rod 26-15 blue scram lights are lit.)

8 As an evaluator ensure that you have P Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND Drocedures.

Under ACT P - must perform S - must simulate

1. TERMINATING CUE When Control Rod 26-15 scram solenoid fuses have been pulled, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

PLOR075P Rev012.doc Page 6-0f 6

TASK CONDITIONS/PREREQUISlTES I. Unit 2 was initially at 100% power.

2. RPV level then drops to the scram setpoint due to partial loss of feedwater flow.
3. Control Rod 26-15 and Control Rod 42-43 are stuck at position 48 with their blue scram lights NOT lit on the Full Core Display.
4. Use of procedure T=213-2, Scram Solenoid De-energization has been directed by the T-I00 procedures.
5. Prerequisites and procedure steps up to and including step 4.3 of procedure T-213-2 have been completed.

INITIATING CUE The Control Room Supervisor directs you, the Equipment Operator, to de-energize Unit 2 Control Rod 2645 scram solenoids in accordance with Steps 4.4.1 4.4.3 of procedure T=213=2,Scram Solenoid De-energizat ion.

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET RESTORE CONTROL ROOM VENTILATION FOLLOWING A HIGH RADIATION APPROVALS:

Signature I Title Date II signature I Title Date II APPROVED FOR USE:

EFFECTIVE DATE:

signature I T i I I Date I NAME:

Last SOC. SEC. NO.

First M.I.

ISSUE DATE:

COMPLETION DATE:

~~ ~

COMMENTS:

1 Training Review for Completeness: I PlMS CODE: I H I I II SignatureIDate I ENTRY:

1 Page 1 of 131

TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-062P REV. NO.: -015 TITLE: Restore Control Room Ventilation Following a High Radiation Trip 9.

11.

12.

13.

14.

15.

1 Page 2 of 13 1

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2880010101/ PLOR-062P WA: 29003A4.01 URO: 3.2 SRO: 3.2 TASK DESCRIPTION: Restore Control Room Ventilation Following a High Radiation Trip A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. "Control Room" JPMs are designed to be performed in the simulator. If a "Control Room" JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing "In-Plant" JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performanceof this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

I PLOR062P Rev015.doc Page 3 of 13

B. TOOLS AND EQUIPMENT None C. REFERENCES Procedure SO 40D.1 .A Rev. 11, "Control Room Ventilation Startup and Control Room Emergency Ventilation High Radiation Trip Restoration and Automatic Operation Alignment" D. TASK STANDARD

1. Restoration and startup of Control Room Ventilation completed following a trip due to high radiation. This will include:
a. Placing all Control Room ventilation fans to "OFF".
b. Startup of Control Room A/C Supply, N C Return, and Fresh Air Supply Fans.
c. Startup of Toilet Room Fan and Control Room Office cooling unit.
2. Estimated time to complete: 24 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to restore and startup Control Room Ventilation following a high radiation trip using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDlTlONS/PREREQUlSlTES

1. Initially, the "A" Control Room Ventilation fans were running.
2. Control Room Ventilation spuriously tripped on high radiation and CREV initiated on its

" A Fan.

3. Control Room Chilled Water is available to the Control Room Ventilation System in accordance with SO 448.
4. 480V MCC System is available to the Control Room Ventilation System in accordance with SO 56.
5. Heating Steam System is available to Control Room Ventilation System in accordance with SO 24.1 .A, "Startup of Auxiliary Steam System".
6. Instrument Air is available to Control Room Ventilation System in accordance with SO 36B.

I PLOR062P Rev015.doc -

Page 4 of 13

7. 120 VAC is available to the Control Room Ventilation System in accordance with SO 58A.

\

8. The Control Room Emergency Ventilation Filter Plenum A(B) is available for operation with all filters installed and operable.
9. Airborne activity levels in the ventilation intake have been verified acceptable by Health Physics.
10. Communication is established between OOCI33 and Control Room (simulated).
11. Shift management has determined that COL 40D.l .A is not required to be performed.

G. INITIATING CUE The Control Room Supervisor directs you, the Equipment Operator, to reset Control Room Ventilation following a high radiation trip and restore the Control Room Ventilation System using SO 40D.1 .A, 'Control Room Ventilation Startup and Control Room Emergency Ventilation High Radiation Trip Restoration and Automatic Operating Alignment", to the following lineup:

a "A" Control Room Ventilation fans running.

a Both Control Room Emergency Ventilation Supply Fans aligned for automatic start.

"B" Control Room Ventilation fans aligned for automatic start.

Notify the control mom when the system is running and another operator will perform the routine inspection.

I PLOR062P Rev015.doc - Page 5 of 13

H. PERFORMANCE CHECKLIST I STEP STEP NO 1 Obtain a copy of procedure SO 40D.1 .A. P A copy of procedure SO 400.1 .A is obtained.

I 2. Verify OOS092 "CR Emerg Vent Supply Fan A OAV030 Transfer Sw OOS092" is in P OOS092 Switch is observed to be in the "Normal" position.

S OAV-028 control switch placed in "OFF" i panel OOC133.

S OAV-028 green light is verified ON at panel OOC133.

(Cue: OAV-028 green light is on.)

  • 4 Place OBV-028, CR A/C Supply Fan, S OBV-028 control switch placed in "OFF" a I

control switch to OFF. panel OOCl33.

(Cue: Acknowledge control switch operation.)

I 5 Verify OBV-028, CR A/C Supply Fan, is S OBV-028 green lght is verified ON at panel OOCl33.

S OAV-029 control switch placed in "OFF" a control switch to OFF. panel OOC133.

(Cue: Acknowledge control switch S OAV-029 green light is verified ON at panel OOC133.

S OBV-029 control switch placed in "OFF" a1 panel OOCl33.

S 3BV-029 green light is verified ON at

)anel OOCl33.

I PLORO62P Rev015.doc Page 6 of 13

STEP ACT STANDARD Place OAV-079, CR Fresh Air Supply Fan, S OAV-079 control switch placed in 'WFI?

control switch to OFF. panel OOCl33.

(Cue: Acknowledge control switch operation.)

Verify OAV-079, CR Fresh Air Supply Fan, S OAV-079 green light is verified ON at is off. panel OOCl33.

(Cue: OAV-079 green light is on.)

Place OBV-079, CR Fresh Air Supply Fan, S OBV-079 control switch placed in "OFF" a control switch to OFF. panel OOC133.

(Cue: Acknowledge control switch oDeration.

Verify OBV-079, CR Fresh Air Supply Fan, S OBV-079 green light is verified ON at is off. panel OOCl33.

(Cue: OBV-079 green light is on.)

Place OOV-326, CR Office Area Cooling S OOV-326 control switch placed in "OFF" a1 Unit, control switch to OFF. panel OOCl33.

(Cue: Acknowledge control switch Dperation.)

Verify OOV-326, CR Office Area Cooling S 3OV-326 green light is verified ON at Unit, is off. >anelOOCl33.

Cue: OOV-326 green light is on.)

'lace OOV-033, Toilet Room Ventilation S 30V-033 control switch placed in "OFF" a' Exhaust Fan, control switch to OFF. lane1OOCl33.

Cue: Acknowledge control switch iperation.)

-Jerify OOV-033, Toilet Room Ventilation S I >OV-033 green light is verified ON at Zxhaust Fan, is off. lane1OOC133.

Cue: OOV-033 green light is on.)

I PLOR062P Rev015.doc Page 7 of 13 d

STEP STEP

-ACT STANDARD NO

  • 18 Request the Control Room perform step S The Control Room is requested to perfom 4.3 and 4.4 of SO 400.1 .A. step 4.3 and 4.4 of SO 400.1 .A.

(Cue: The Control Room reports that the "Outside Air Filter Bypass" to "IN USE" on Panel 20C012 and radiation monitor trip lights and alarms are clear and directs that Control Room Ventilation be restored per SO 40D.1 .A with the "A" fans running and the "B" fans in "AUTO".)

-NO E-Inform examinee that Shift Management has determined that COL 40D.l.A "Control Ra ,m Ventilation System" does NOT need to be p rfOrmed.

  • 19 Request that Control Room personnel S The Control Room is requested to place place the Control Room Vent Purge the Control Room Vent Purge control control switch to "PURGE" (or perform switch to "PURGE" of SO 40D.1.A (or step 4.6). perform step 4.6).

(Cue: The Control Room reports that the Vent Purge control switch is in the "PURGE" position or that step 4.6 is cornplete.)

  • 20 Request Control Room personnel S Control Room is requested to:

open North and South return shutoff solenoid valves SV-00180 and SV-00181 Open North and South return shutoff on 20C012 (or perform step 4.7). solenoid valves SV-00180 and SV-00181 on 2OCO12 (or perform step 4.7).

(Cue: North and South return solenoid valves are open or step 4.7 is complete.)

21 Verify OBV030, "Control Room S 3BV030 green light is verified to be lit and Emergency Ventilation Supply Fan" is not ts control switch in the AUTO-STBY running AND is in "AUTO-STBY" msition.

(Cue: OBV030 is not running and is in AUTO-STBY.)

I PLOR062P RevOl5.doc Page 8 of 13

STEP STEP ACT STANDARD NO 1

Note the time when the reset switches in Step 22 are operated and the time that the Control Room Fresh Air Supply Fan 'A' is started in Step 28.

Ifthe time exceeds 60 sec., provide the following cue:

(Cue: The 'B' Control Room Emergency Ventilation Supply Fan OBV030 red light is on, green light is off.)

"RESET" position on panel OOC133 and placed in "RESET" and released at panel release. ooc133.

"NOTE-

,The following two steps are only required if the 'B' Control Room Emergency Ventilation upply Fan cue was provided.

  • 23 I Place OBV030 'B'Control Room S OBV030 control switch placed in "OFF" at Emergency Room Ventilation Supply, panel OOCl33.

control switch is OFF.

I (Cue: Acknowledge control switch operation.)

24 Verify OBV030, Control Room Emergency S OBV030 green light is verified ON at panel Ventilation Supply Fan, is OFF. OOCl33.

-I *25

~

Place the OAV030 in the 'OFF" position. S The OAV030 has its switch taken to the "OFF" position.

(Cue: the OAV030 switch is in the "OFF" position.)

26 Verify the OAV030 green light is lit. S The OAV030 green light is verified t o b e 1 lit.

I (Cue: the OAV030 green light is lit.)

27 Place the OAV030 in the "AUTO" position. S AOV030 control switch placed in "AUTO" at panel OOCl33.

Y I (Cue: Acknowledge Control Switch ODeration.)

I PLOR062P RevOl5.doc

.1D -

Page 9 of 13

"RUN" at panel OOC133.

(Cue: Acknowledge control switch operation.)

29 Verify Fan OAV-079, Control Room Fresh S OAV-079 Control Room Fresh Air Supply Air Supply is running. Fan red light is verified ON at panel OOC133.

(Cue: Fan OAV-079 red light is on.)

30 Verify that "CONTROL ROOM SUPPLY S "CONTROL ROOM SUPPLY FAN FAN OA-BV79 STANDBY FAN" OA-BV79 STANDBY FAN" annunciator is annunciator is clear. verified clear at panel OOCl33.

switch in "AUTO". "AUTO" at panel OOCl33.

owledge control switch (Cue: Fan OAV-028 red light is on.)

annunciator is clear. verified clear at panel OOCl33.

(Cue: Annunciator OOC133 R-1 is not lit.)

35 Place the standby fan, OBV-028, control S OW-028 fan control switch is placed in switch in "AUTO". "AUTO" at panel OOCl33.

(Cue: Acknowledge control switch operation.)

I PLOR062P Rev015.doc

--- -P Page 10 of 13

STEP STEP ACT STANDARD NO

  • 36 Start OAV-029, "Control Room A/C Retun S OAV-029 fan control switch is placed in Fan A". "RUN" at panel OOCl33.

(Cue: Acknowledge control switch operation.)

37 Verify OAV-029, "Control Room A/C S OAV-029 Control Room A/C Return Fan Return Fan A" is running. red light is verified ON at panel OOC133.

(Cue: Fan OAV-029 red light is on.)

- I 38 IVerify that "CONTROL ROOM RETURN S "CONTROL ROOM RETURN FAN OA-FAN OA-BV29 STANDBY FAN" BV29 STANDBY FAN" annunciator is annunciator is clear. verified clear at panel OOC133.

39 S OBV-029 fan control switch is placed in switch to "AUTO". "AUTO" at panel OOCl33 (Cue: Acknowledge control switch operation.)

40 Place HS-2-63L-J180 and J181 to the S HS-2-63L-Jl80 and J181 momentarily "RESET" position at panel OOC133 and placed in "RESET" and released.

release.

(Cue: Acknowledge control switch operation.)

41 Request the Control Room personnel S The Control Room is requested to place the Control Room Vent Purge place the Control Room Vent Purge Control switch to "OFF" on panel CO12 Control switch to "OFF on panel 2OCO12 and verify FR-0765 on panel COlO and venfy FR-0765 on panel 2OCO10 indicates 2500-3000 cfm (or that they indicates 2500 -3000 cfm (or to complete perform steps 4.17 and 4.18). steps 4.17 and 4.18).

(Cue: The Control Room reports that the Control Room Vent Purge control switch is in "OFF" and FR-0765 indicates 2800 cfm or that steps 4.17 and 4.18 are complete.)

  • 42 Start OOV-33, the "Toilet Room Exhaust S OOV-33 control switch is placed in "ON" a1 Fan". panel OOCi33..

(Cue: Acknowledge control switch operation.)

1 1 - Page 11 of 13

STEP STEP NO lr 43 Verify OOV-33, Toilet Room Exhaust is running. light is verified ON at panel OOCl33.

(Cue: Fan OOV-33 red light is on.)

  • 44 Start OOV-326, the "Control Room Office Area Cooling Unit".

Office Area Cooling Unit red light is (Cue: Acknowledge control switch verified ON at panel OOC133.

operation on.)

45 Verify Fan OOV-326 Control Room Office Area Cooling Unit is running.

(Cue: Unit OOV-326 red light is on.)

switch is in the Filter 'A' Dosition.)

46 Request that Control Room personnel S The Control Room is requested to place place the "Outside Air Filter Select SV- the "Outside Air Filter Select SV-00154" 00154" control switch to FILTER *A'cB') control switch to FILTER 'A'(.B') or to (or complete step 4.21.1 ). ~ complete step 4.21.1.

(Cue: The Control Room reports that the "Outside Air Filter Select SV-00154" control switch is in the Filter 'A' position or that step 4.21 .I is complete.)

47 Request that Control Room personnel S The Control Room is requested to place place the "Outside Air Filter Bypass SV- the "Outside Air Filter Bypass SV-00153" 00153" to "BYPASS" (orperform step to "BYPASS" or complete step 4.21.2.

4.21.2).

(Cue: The Control Room reports that the "Outside Air Filter Bypass SV-00153" is in the "BYPASS" position or that step 4.21.2 is complete 48 Verify OBV030, "Control Room S OBV030, "Control Room Emergency Emergency Ventilation Supply Fan B" to Ventilation Supply Fan B" is verified in the the "AUTO-STBY" position on Panel "AUTO-STBY" position on Panel OOCl33 OOC133.

(Cue: OBV030, "Control Room Emergency Ventilation Supply Fan B is in the "AUTO-STBY" position on Panel I PLOR062P Rev015.doc Page 12 of 13

.I STEP ACT STANDARD Place OAV030, "Control Room S OAV030, "Control Room Emergency Emergency ventilation Supply Fan A" to Ventilation Supply Fan A" is placed to the the "AUTO" position on Panel OOCl33. "AUTO" position on Panel OOCl33.

(Cue: OAV030, "Control Room Emergency Ventilation Supply Fan A is in the "AUTO" position on Panel OOCl33.)

50 Inform the Control Room Supervisor that P rask completion reported using a hand Control Room Ventilation has been ield radio or GAI-TRONICS page system.

.estored IAW SO 40D.1 .A.

Cue: Control Room Supervisor xknowledges report.) ~

51 4s an evaluator ensure that you have P 'ositive control established.

iositive control of all exam material irovided to the examinee (Task

>onditions/Prerequisites) AND irocedures.

Under "ACT" P - must perform 1

S - must simulate

1. TERMINATING CUE When the Control Room Ventilation system is in operation, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

I PLOR062P Rev015.doc Page 13 of 13

TASK CONDITIONS/PREREQUISlTES

1. Initially, the "A" Control Room Ventilation fans were running.
2. Control Room Ventilation spuriously tripped on high radiation and CREV initiated on its "A" Fan.
3. Control Room Chilled Water is available to the Control Room Ventilation System in accordance with SO 44B.
4. 480V MCC System is available to the Control Room Ventilation System in accordance with SO 56.
5. Heating Steam System is available to Control Room Ventilation System in accordance with SO 24.1 .A, "Startup of Auxiliary Steam System".
6. Instrument Air is available to Control Room Ventilation System in accordance with SO 368.
7. 120 VAC is available to the Control Room Ventilation System in accordance with SO 58A.
8. The Control Room Emergency Ventilation Filter Plenum A(B) is available for operation with all filters installed and operable.
9. Airborne activity levels in the ventilation intake have been verified acceptable by Health Physics.

IO. Communication is established between OOCl33 and Control Room (simulated).

11. Shift management has determined that COL 40D.I.A is not required to be performed.

INITIATING CUE The Control Room Supervisor directs you, the Equipment Operator, to reset Control Room Ventilation following a high radiation trip and restore the Control Room Ventilation System using SO 40D.1 .A, "Control Room Ventilation Startup and Control Room Emergency Ventilation High Radiation Trip Restoration and Automatic Operating Alignment", to the following line-up:

e "A" Control Room Ventilation fans running.

e Both Control Room Emergency Ventilation Supply Fans aligned for automatic start.

e "B" Control Room Ventilation fans aligned for automatic start.

I Notify the control room when the system is running and another operator will perform the routine inspection.