{{#Wiki_filter:Appendix D Scenario Outline Form ES-D-1 Facility: Callaway Scenario No.:
{{#Wiki_filter:Appendix D                                         Scenario Outline                                 Form ES-D-1 Facility:           Callaway                         Scenario No.:           1   Op Test No.:       NRC Examiners:                                                       Operators:
1 Op Test No.:
Initial Conditions:       100% power, BOL.
NRC Examiners:
Operators:
Initial Conditions: 100% power, BOL.
RE-52, Blowdown Discharge Pumps Discharge Monitor, is OOS.
RE-52, Blowdown Discharge Pumps Discharge Monitor, is OOS.
BB-PCV-455A PORV Leakage - Block Valve Closed.
BB-PCV-455A PORV Leakage - Block Valve Closed.
Motor Driven AFW Pump 'A' OOS. Turnover: Reduce power to less than 90% to remove Condensate Pump 'A' from service due to a seal leak Critical Task: Start EDG 'A' to energize Emergency Bus prior to initiation of ECA 0.0 coping steps.
Motor Driven AFW Pump A OOS.
Manually Start 'A' HHSI pump prior to exit from EOP Attachment 1.
Turnover:                 Reduce power to less than 90% to remove Condensate Pump A from service due to a seal leak Critical Task:           Start EDG A to energize Emergency Bus prior to initiation of ECA 0.0 coping steps.
Event No.
Manually Start A HHSI pump prior to exit from EOP Attachment 1.
Malf. No. Event Type*
Event No.     Malf. No. Event Type*                                 Event Description 1                     R - RO         Reduce power N - BOP, SRO 2                      I - BOP,       SG level transmitter failure.
Event Description 1 R - RO N - BOP, SRO Reduce power I - BOP, SRO SG level transmitter failure.
FWM02A       SRO TS - SRO 3                      C - ALL         4KV Bus NB02 Normal Feeder Breaker trip.
2 FWM02A TS - SRO C - ALL 4KV Bus NB02 Normal Feeder Breaker trip.
EPS05B TS - SRO 4                     I - RO, SRO     Pressurizer Level Transmitter fails low PRS02A TS - SRO        Pressurizer Level Control Valve fails closed and cannot be opened.
3 EPS05B TS - SRO 4 PRS02A BAT I - RO, SRO TS - SRO Pressurizer Level Transmitter fails low Pressurizer Level Control Valve fails closed and cannot be opened.
BAT 5                      C - RO,         RCS Leak requiring reactor trip.
C - RO, SRO RCS Leak requiring reactor trip.
RCS06C       SRO 6                     M - ALL         Loss of off-site power, SBLOCA.
5 RCS06C   6 BAT M - ALL Loss of off-site power, SBLOCA.
BAT 7         EPS06B     C - BOP         B DG Trips - A DG fails to AUTO Start. MANUAL Start required.
7 EPS06B KJS012 C - BOP 'B' DG Trips - 'A' DG fails to AUTO Start. MANUAL Start required.
KJS012 8                     C - RO         A HHSI pump fails to AUTO Start - MANUAL Start required.
8 SBI008C C - RO 'A' HHSI pump fails to AUTO Start - MANUAL Start required.  
SBI008C
* (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor  
      *   (N)ormal,   (R)eactivity, (I)nstrument,   (C)omponent,     (M)ajor Scenario Event Description NRC Scenario 1 The crew will assume the shift at 100% power with instructions to reduce power due to a Condensate Pump seal leak.
 
Scenario Event Description NRC Scenario 1 The crew will assume the shift at 100% power with instructions to reduce power due to a Condensate Pump seal leak.
At approximately 95% power, a Steam Generator Level transmitter will drift low, requiring the crew to take manual control of the feedwater regulating valve for the affected steam generator in accordance with OTO-AE-3. The SRO will also refer to Technical Specifications for the appropriate action requirements.
At approximately 95% power, a Steam Generator Level transmitter will drift low, requiring the crew to take manual control of the feedwater regulating valve for the affected steam generator in accordance with OTO-AE-3. The SRO will also refer to Technical Specifications for the appropriate action requirements.
When technical specifications have been addressed, 4KV Vital Bus NB02 normal feeder breaker will trip. 'B' EDG will automatically start and energize bus NB02. The crew will respond in accordance with alarm response procedures and OTO-SA-1 to stop AFW flow and secure unnecessary equipment started by the Shutdown Sequencer. The SRO will refer to technical specifications.
When technical specifications have been addressed, 4KV Vital Bus NB02 normal feeder breaker will trip. B EDG will automatically start and energize bus NB02. The crew will respond in accordance with alarm response procedures and OTO-SA-1 to stop AFW flow and secure unnecessary equipment started by the Shutdown Sequencer. The SRO will refer to technical specifications.
When the plant is stable, a Pressurizer Level Transmitter will fail low, causing Letdown isolation.
When the plant is stable, a Pressurizer Level Transmitter will fail low, causing Letdown isolation.
When the crew attempts to restore letdown, one letdown control valve will fail closed, requiring the crew to reduce charging and place Excess Letdown in service in accordance with OTO-BG-1 and OTN-BG-1. The SRO will address Technical Specifications.
When the crew attempts to restore letdown, one letdown control valve will fail closed, requiring the crew to reduce charging and place Excess Letdown in service in accordance with OTO-BG-1 and OTN-BG-1. The SRO will address Technical Specifications.
An RCS leak will develop when Excess Letdown is placed in service, requiring the crew to determine that the reactor must be tripped.
An RCS leak will develop when Excess Letdown is placed in service, requiring the crew to determine that the reactor must be tripped.
When the reactor is tripped, a loss of off-site power will occur. The RCS leak will progress to a  
When the reactor is tripped, a loss of off-site power will occur. The RCS leak will progress to a SBLOCA.
Diesel Generator B trips and cannot be started. Diesel Generator A fails to automatically start, and must be manually started and aligned in accordance with E-0 or ECA-0.0. HHSI pump A fails to automatically start, and must be manually started.
The scenario may be terminated upon entry to ES-1.2, Post LOCA Cooldown and Depressurization.
EOP flow path: E-0, ECA-0.0, E-0, E-1, ES-1.2 Scenario 1 Scenario Malfunction List
: 1)  Initialize at IC-20.
: 2)  Run Batch File "iltone.txt", and verify the actions on the following page are loaded correctly.
: 3)  Ensure Immediate Boration Timer is reset.
: 4)  Check RX trip switch has a RED flag.
: 5)  Ensure NIS indicates 100%
: 6)  Ensure step counters for Control Bank D are set at 215 steps and all other step counters are set for 228.
: 7)  Ensure the digital display is selected to REP0480A and RET0499A.
: 8)  Hang hold off tags on the "A" MDAFP.
: 9)  Ensure AE-LT-519 is selected
: 10) Ensure BB-LT-459 is selected
: 11) Ensure Decrease Loading Rate Button is ON.
: 12) Update status board for B Protected Train week. Record "A" MDAFP, LCO 3.7.5, 72 hours.
: 13) Place Letdown orifi A and B in service with a caution tag on C
: 14) White board has the following boron concentrations:
    * "A" MDAFP T/S 3.7.5, Action C.1. 72 Hours. OOS @ 0500 Today
    * 'A' CCP "5 days ago" 1107 ppm
    * 'B' CCP "two weeks ago" 1135 ppm
: 15) Supply turnover and log sheets, Xe Predict, Dilution/Boration calculation and OTG-ZZ-00004.
: 16) Ensure the RM-11 is on the training system.
: 17) Microphones available for each person being evaluated and a video tape is in the VCR.
: 18) Ensure chart recorders are "rolled forward".
: 19) Ensure copies of the following procedures are in the file drawers:
* OTO-AE-00003
* OTO-NB-00002
* OTO-SA-00001
* OTO-BG-00001
* ECA-0.0
* E-0
* E-1                    E-2 Scenario 1 Scenario Malfunction List File:                iltone.TXT
>Author: S. P. Aufdemberge
>Date:                20050504
>=============SCENARIO SETUP ITEMS===========================================
>TAGOUT "A" MDAFW PUMP
> FILE: AL01A.TXT
> Red lights stay on the ESFAS Panel bat al01a.txt
>Simulates de-energization of "A" PORV Block valve due to PORV Leakage ior bbhis8000a_ic (-1 0) 0 irf bbs014 (-1 0) 0
>============================================================================
>========================EVENT PRELOAD=======================================
>EVENT A
>'A' S/G lev xmttr fails to 0 psig over 60 sec from trigger #1 (MANUAL) imf fwm02a (1) 0 60
>============================================================================
>========================EVENT PRELOAD=======================================
>EVENT B
>Loss of NB02 normal feeder breaker, from trigger #2 (MANUAL) imf eps05b (2)
>============================================================================
>========================EVENT PRELOAD=======================================
>EVENT C
>Pressurizer Level Transmitter Fails Low, from trigger #3 (MANUAL) imf prs02a (3) 0 60
> Set Event 4 to automatically close and hold closed BGLCV0459 after 459 initially fails closed.
trgset 4 "x01o150g.eq.true" ior bghis459_og (4) 0 ior bghis459_or (4) 1 ior bghis459_ic (4) 0
>============================================================================
>========================EVENT PRELOAD=======================================
>EVENT D
>RCS leak requiring Reactor trip,Grows to 600gpm over 10 minutes from Manual Trigger #5 imf rcs06c (5) 600 600
>============================================================================
>========================EVENT PRELOAD=======================================
>EVENT E
>Loss of Off-Site Power, from Manual trigger #6
> Incoming Lines imf eps03a (6 0) imf eps03b (6 3) imf eps03c (6 20) imf eps03g (6 5)
>Incoming Line lights irf msb006 (6 0) 0 irf msb007 (6 5) 0 irf msb008 (6 3) 0
>============================================================================
>========================EVENT PRELOAD=======================================
>EVENT F
>"B" EDG trips and "A" EDG will fail to automatically start. "B" EDG fails on the loss of off-site power imf eps06b (7)
>Loss of off-site power "sensed" by green light on RCP control switch trgset 7 "x21o115g.eq.0"
>Disable Automatic start of "A" EDG irf kjs012 (-1 0) 1
>============================================================================
>=======================EVENT PRELOAD========================================
>EVENT G
> "A" CCP fails to auto start, manual will be successful irf sbi008c (-1 0) 1
>end of file Scenario 1 Crew Turnover Separate Turnover sheets provided Appendix D                              Operator Action                          Form ES-D-2 Op Test No.:        1    Scenario #    1    Event #      1                Page 6  of 38 Event


SBLOCA. Diesel Generator 'B' trips and cannot be started.
== Description:==
Diesel Generator 'A' fails to automatically start, and must be manually started and aligned in accordance with E-0 or ECA-0.0. HHSI
Reduce Power Time          Position                        Applicants Actions or Behavior SRO      Refer to OTO-MA-00008, Rapid Load Reduction CREW        Determine amount of boric acid to reduce reactor power to 90%
 
CREW        Record rate of turbine load change Discuss amount and rate of turbine load change and boric acid SRO addition with crew SRO      Notify Load Dispatcher SRO      Notify Chemistry, Health Physics, and Radwaste Initiate boron equalization
pump 'A' fails to automatically start, and must be manually started.
* Energize at least 1 group of backup heaters RO
The scenario may be terminated upon entry to ES-1.2, Post LOCA Cooldown and
* Place the PZR Master Controller in MAN
 
* Lower PZR Master Controller output to 38% to 42%
Depressurization.
* Place the PZR Master Controller in AUTO
EOP flow path:  E-0, ECA-0.0, E-0, E-1, ES-1.2 Scenario 1 Scenario Malfunction List
: 1) Initialize at IC-20. 2) Run Batch File "iltone.txt", and verify the actions on the following page are loaded correctly. 3) Ensure Immediate Boration Timer is reset. 4) Check RX trip switch has a RED flag. 5) Ensure NIS indicates 100% 6) Ensure step counters for Control Bank "D" are set at 215 steps and all other step counters are set for 228. 7) Ensure the digital display is selected to REP0480A and RET0499A. 8) Hang hold off tags on the "A" MDAFP. 9) Ensure AE-LT-519 is selected 10) Ensure BB-LT-459 is selected 11) Ensure Decrease Loading Rate Button is "ON". 12) Update status board for "B" Protected Train week. Record "A" MDAFP, LCO 3.7.5, 72 hours. 13) Place Letdown orifi A and B in service with a caution tag on C 14) White board has the following boron concentrations:  "A" MDAFP T/S 3.7.5, Action C.1. 72 Hours. OOS @ 0500 Today  'A' CCP "5 days ago" 1107 ppm  'B' CCP "two weeks ago" 1135 ppm 15) Supply turnover and log sheets, Xe Predict, Dilution/Boration calculation and  OTG-ZZ-00004. 16) Ensure the RM-11 is on the training system. 17) Microphones available for each person being evaluated and a video tape is in the VCR. 18) Ensure chart recorders are "rolled forward". 19) Ensure copies of the following procedures are in the file drawers:  OTO-AE-00003  OTO-NB-00002  OTO-SA-00001  OTO-BG-00001  ECA-0.0  E-0  E-1    E-2 Scenario 1 Scenario Malfunction List File:  iltone.TXT >Author: S. P. Aufdemberge >Date:  20050504
> >=============SCENARIO SETUP ITEMS=========================================== >TAGOUT "A" MDAFW PUMP >  FILE:  AL01A.TXT  > Red lights stay on the ESFAS Panel bat al01a.txt >Simulates de-energization of "A" PORV Block valve due to PORV Leakage ior bbhis8000a_ic (-1 0) 0 irf bbs014 (-1 0) 0 >============================================================================ >========================EVENT PRELOAD=======================================
>EVENT A >'A' S/G lev xmttr fails to 0 psig over 60 sec from trigger #1 (MANUAL) imf fwm02a (1) 0 60 >============================================================================ >========================EVENT PRELOAD=======================================
>EVENT B >Loss of NB02 normal feeder breaker, from trigger #2 (MANUAL) imf eps05b (2)  >============================================================================ >========================EVENT PRELOAD=======================================
>EVENT C >Pressurizer Level Transmitter Fails Low, from trigger #3 (MANUAL) imf prs02a (3) 0 60 > Set Event 4 to automatically close and hold closed BGLCV0459 after 459 initially fails closed. trgset 4 "x01o150g.eq.true" ior bghis459_og (4) 0 ior bghis459_or (4) 1 ior bghis459_ic (4) 0 >============================================================================ >========================EVENT PRELOAD=======================================
>EVENT D >RCS leak requiring Reactor trip,Grows to 600gpm over 10 minutes from Manual Trigger #5 imf rcs06c (5) 600 600 >============================================================================ >========================EVENT PRELOAD=======================================
>EVENT E >Loss of Off-Site Power, from Manual trigger #6
> Incoming Lines imf eps03a (6 0) imf eps03b (6 3) imf eps03c (6 20) imf eps03g (6 5)
>Incoming Line lights irf msb006 (6 0) 0 irf msb007 (6 5) 0 irf msb008 (6 3) 0 >============================================================================ >========================EVENT PRELOAD=======================================
>EVENT F >"B" EDG trips and "A" EDG will fail to automatically start.  "B" EDG fails on the loss of off-site power imf eps06b (7) >Loss of off-site power "sensed" by green light on RCP control switch trgset 7 "x21o115g.eq.0" >Disable Automatic start of "A" EDG irf kjs012 (-1 0) 1 >============================================================================ >=======================EVENT PRELOAD======================================== >EVENT G > "A" CCP fails to auto start, manual will be successful irf sbi008c (-1 0) 1
> > >end of file


Scenario 1 Crew Turnover Separate Turnover sheets provided Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 1 Page 6 of 38 Event
Appendix D                             Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #   1     Event #       1               Page of 38 Event


== Description:==
== Description:==
Reduce Power Time Position Applicant's Actions or Behavior SRO Refer to OTO-MA-00008, Rapid Load Reduction CREW Determine amount of boric acid to reduce reactor power to 90%
Reduce Power Time         Position                       Applicants Actions or Behavior Borate from the BAST using any of the following:
CREW Record rate of turbine load change SRO Discuss amount and rate of turbine load change and boric acid addition with crew SRO Notify Load Dispatcher SRO Notify Chemistry, Health Physics, and Radwaste RO Initiate boron equalization  Energize at least 1 group of backup heaters  Place the PZR Master Controller in MAN  Lower PZR Master Controller output to 38% to 42%  Place the PZR Master Controller in AUTO
* Emergency Boration o  Start at least 1 Boric Acid Transfer Pump o  Open Emergency Boration to Charging Pump suction BG HIS-8104 o  Check Emergency Borate flow is greater than 30 GPM on BG FI-183A
 
* Borate to the VCT RO o  Place RCS Makeup Control to STOP (BG HS-26) o  Place RCS Makeup Control Selector to BORATE (BG HS-25) o  Reset Boric Acid counter to 000 (BG FY-110B) o  Set BG FY-110B for the desired galloons of boric acid to be added o  Place BG HS-26 in RUN RO        Place Rod Control in AUTO Reduce turbine load at less than or equal to 5% per minute using any of the following:
Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 1 Page 7 of 38 Event
o  Reduce turbine load using the Load Limit potentiometer o  Reduce turbine load using the %/min loading rate o  Rotate Load Limit Set potentiometer clockwise until both of the following are met:
BOP Load Limit light extinguished At Set Load - LIT o  Set Loading Rate Limit %/min to desired value o  Select Decrease Loading Rate - ON o  Lower load set MW toward desired load using DECREASE LOAD pushbutton


== Description:==
Appendix D                             Operator Action                         Form ES-D-2 Op Test No.:       1     Scenario #   1   Event #     1               Page 8   of 38 Event
Reduce Power Time Position Applicant's Actions or Behavior RO Borate from the BAST using any of the following:  Emergency Boration o Start at least 1 Boric Acid Transfer Pump o Open Emergency Boration to Charging Pump suction BG HIS-8104 o Check Emergency Borate flow is greater than 30 GPM on BG FI-183A  Borate to the VCT o Place RCS Makeup Control to STOP (BG HS-
: 26) o Place RCS Makeup Control Selector to BORATE (BG HS-25) o Reset Boric Acid counter to 000 (BG FY-110B) o Set BG FY-110B for the desired galloons of boric acid to be added o Place BG HS-26 in RUN RO Place Rod Control in AUTO BOP Reduce turbine load at less than or equal to 5% per minute using any of the following:
o Reduce turbine load using the Load Limit potentiometer o Reduce turbine load using the %/min loading rate o Rotate Load Limit Set potentiometer clockwise until both of the following are met:  Load Limit light extinguished  At Set Load - LIT o Set Loading Rate Limit %/min to desired value o Select Decrease Loading Rate - ON o Lower load set MW toward desired load using DECREASE LOAD pushbutton Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 1 Page 8 of 38 Event


== Description:==
== Description:==
Reduce Power Time Position Applicant's Actions or Behavior BOP Check MFP Turbine Speed control in AUTO When power has been reduced approximately 5%, or at Lead Evaluator's discretion, proceed to Event 2  
Reduce Power Time         Position                     Applicants Actions or Behavior BOP       Check MFP Turbine Speed control in AUTO When power has been reduced approximately 5%, or at Lead Evaluators discretion, proceed to Event 2


Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 2 Page 9 of 38 Event
Appendix D                               Operator Action                             Form ES-D-2 Op Test No.:       1     Scenario #     1     Event #       2               Page 9   of 38 Event


== Description:==
== Description:==
SG Level Transmitter Failure Time Position Applicant's Actions or Behavior Booth Operator Instructions: When directed, insert command for SG Level Transmitter failure Indications available: REACTOR PARTIAL TRIP, annunciator 83C SG A LEV DEV, annunciator 108C SG A LEV LO, Annunciator 108B SRO Refer to OTO-AE-00002 for level malfunction BOP IDENTIFY failed channel by comparing steam generator level indicators.
SG Level Transmitter Failure Time         Position                           Applicants Actions or Behavior Booth Operator Instructions:
BOP SELECT alternate level channel.
When directed, insert command for SG Level Transmitter failure Indications available:
BOP STABILIZE steam generator level at its programmed level  
REACTOR PARTIAL TRIP, annunciator 83C SG A LEV DEV, annunciator 108C SG A LEV LO, Annunciator 108B SRO       Refer to OTO-AE-00002 for level malfunction IDENTIFY failed channel by comparing steam generator level BOP indicators.
 
BOP       SELECT alternate level channel.
(50%). BOP WHEN steam generator level is returned to programmed level and IF placed in "MANUAL" during the transient, PLACE  
STABILIZE steam generator level at its programmed level BOP (50%).
WHEN steam generator level is returned to programmed level BOP      and IF placed in MANUAL during the transient, PLACE feedwater regulating valve to automatic control.
Refer to T/S LCO 3.3.1 TAB 3.3.1-1 Item 14 and T/S LCO 3.3.2 TAB 3.3.2-1 Item 5 and 6 and ENSURE compliance with SRO      requirement for minimum operable channels and action statements.
o  TS 3.3.1 and 3.3.2 apply (72 Hour Action)
Refer to T/S LCO 3.3.4 and T/S LCO 3.3.3 and ENSURE SRO compliance.


feedwater regulating valve to automatic control.
Appendix D                             Operator Action                             Form ES-D-2 Op Test No.:       1     Scenario #     1     Event #       2               Page 10 of 38 Event
SRO Refer to T/S LCO 3.3.1 TAB 3.3.1-1 Item 14 and T/S LCO 3.3.2
 
TAB 3.3.2-1 Item 5 and 6 and ENSURE compliance with requirement for minimum operable channels and action statements.
o TS 3.3.1 and 3.3.2 apply (72 Hour Action)
SRO Refer to T/S LCO 3.3.4 and T/S LCO 3.3.3 and ENSURE compliance.
 
Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 2 Page 10 of 38 Event


== Description:==
== Description:==
SG Level Transmitter Failure Time Position Applicant's Actions or Behavior SRO Immediately CONTACT I&C to troubleshoot problem and PERFORM requirements of appropriate Attachment, as listed in Table 1, for failed S/G level channel within SIX HOURS.
SG Level Transmitter Failure Time         Position                           Applicants Actions or Behavior Immediately CONTACT I&C to troubleshoot problem and SRO      PERFORM requirements of appropriate Attachment, as listed in Table 1, for failed S/G level channel within SIX HOURS.
SRO Refer to T/S LCO 3.3.4 and T/S LCO 3.3.3 and ENSURE compliance.
Refer to T/S LCO 3.3.4 and T/S LCO 3.3.3 and ENSURE SRO compliance.
SRO Immediately CONTACT I&C to troubleshoot problem and PERFORM requirements of appropriate Attachment, as listed in Table 1, for failed S/G level channel within SIX HOURS.
Immediately CONTACT I&C to troubleshoot problem and SRO      PERFORM requirements of appropriate Attachment, as listed in Table 1, for failed S/G level channel within SIX HOURS.
When Tech Specs have been identified, proceed to Event 3.  
When Tech Specs have been identified, proceed to Event 3.


Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 3 Page 11 of 38 Event
Appendix D                             Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #     1     Event #     3               Page 11 of 38 Event


== Description:==
== Description:==
4KV Bus NB02 Normal Feeder Breaker Trip Time Position Applicant's Actions or Behavior Booth Operator Instructions: When directed, insert command for Bus NB02 breaker trip Indications available: DG B starts and supplies NB02 SHUTDOWN SEQUENCER ACTUATED TRAIN B Annunciator 21C DIESEL GENERATOR NE02 TROUBLE Annunciator 23D NB01 BREAKER NOT OPERABLE Annunciator 18F SRO Refer to OTO-NB-00002, Loss of Power to NB02 RO  Ensure NB02 normal and alternate feeder breakers are open o NB0209 o NB0212     RO Go to OTA-RL-RK021, Attachment C, and verify automatic LSELS actuations o Ensure equipment is in normal alignment SRO Continue in OTO-NB02 to verify DG operation and LSELS  
4KV Bus NB02 Normal Feeder Breaker Trip Time         Position                       Applicants Actions or Behavior Booth Operator Instructions:
When directed, insert command for Bus NB02 breaker trip Indications available:
DG B starts and supplies NB02 SHUTDOWN SEQUENCER ACTUATED TRAIN B Annunciator 21C DIESEL GENERATOR NE02 TROUBLE Annunciator 23D NB01 BREAKER NOT OPERABLE Annunciator 18F SRO       Refer to OTO-NB-00002, Loss of Power to NB02 Ensure NB02 normal and alternate feeder breakers are open RO            o NB0209 o NB0212 Go to OTA-RL-RK021, Attachment C, and verify automatic RO      LSELS actuations o Ensure equipment is in normal alignment Continue in OTO-NB02 to verify DG operation and LSELS SRO actuation.
If discharge flow of TDAFP is not required to maintain SG level, and at SRO discretion, refer to OTN-AL-00001 and throttle or BOP close TDAFP discharge valves to minimize thermal stresses and primary plant cooldown Refer to Attachment 2 for guidance concerning possible Tech SRO      Spec action statements o  TS 3.8.1 applies CREW        Perform OSP-NE-00003


actuation.
Appendix D                               Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #     1     Event #       3               Page 12 of 38 Event
BOP If discharge flow of TDAFP is not required to maintain SG level, and at SRO discretion, refer to OTN-AL-00001 and throttle or close TDAFP discharge valves to minimize thermal stresses and primary plant cooldown SRO Refer to Attachment 2 for guidance concerning possible Tech Spec action statements o TS 3.8.1 applies CREW Perform OSP-NE-00003 Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 3 Page 12 of 38 Event


== Description:==
== Description:==
4KV Bus NB02 Normal Feeder Breaker Trip Time Position Applicant's Actions or Behavior RO/BOP Ensure PN08 has transferred to emergency source by MVB annunciator 14F being lit RO Check pressurizer pressure is being maintained by available  
4KV Bus NB02 Normal Feeder Breaker Trip Time         Position                         Applicants Actions or Behavior Ensure PN08 has transferred to emergency source by MVB RO/BOP annunciator 14F being lit Check pressurizer pressure is being maintained by available RO pressurizer heaters RO/BOP       Ensure A or C Service Air Compressor is running Ensure A SFP Cooling Pump is in service in accordance with RO/BOP OTN-EC-00001 Ensure DC Busses NK04, NK02, PK02, PK04 are being RO/BOP supplied by their associated batteries Monitor battery load and contact system engineer to determine SRO expected battery life If desired, cross-tie PK02 and PK04 to functional battery SRO chargers in accordance with OTN-PK-00001 If Swing Charger (NK26) is available, refer to OTN-NK-00001 SRO and, as required, charge batteries NK12 and NK14 RO/BOP       Ensure A Control Room Air Conditioner is running Ensure A Class 1E Air Conditioner is running and take action SRO      in accordance with FSAR 16.7.13.1 for the inoperable B Class 1E Air Conditioner Verify the following ESFAS actuations in accordance with OTO-RO/BOP      SA-00001 o  SG Blowdown Isolation signal
 
pressurizer heaters RO/BOP Ensure "A" or "C" Service Air Compressor is running RO/BOP Ensure "A" SFP Cooling Pump is in service in accordance with OTN-EC-00001 RO/BOP Ensure DC Busses NK04, NK02, PK02, PK04 are being supplied by their associated batteries SRO Monitor battery load and contact system engineer to determine  
 
expected battery life SRO If desired, cross-tie PK02 and PK04 to functional battery chargers in accordance with OTN-PK-00001 SRO If Swing Charger (NK26) is available, refer to OTN-NK-00001 and, as required, charge batteries NK12 and NK14 RO/BOP Ensure "A" Control Room Air Conditioner is running SRO Ensure "A" Class 1E Air Conditioner is running and take action in accordance with FSAR 16.7.13.1 for the inoperable "B" Class  


1E Air Conditioner RO/BOP Verify the following ESFAS actuations in accordance with OTO-
Appendix D                             Operator Action                         Form ES-D-2 Op Test No.:       1     Scenario #   1     Event #     3               Page 13 of 38 Event
 
SA-00001 o SG Blowdown Isolation signal Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 3 Page 13 of 38 Event


== Description:==
== Description:==
4KV Bus NB02 Normal Feeder Breaker Trip Time Position Applicant's Actions or Behavior o Turbine Driver Auxiliary Feed Actuation signal o NB02 Blackout Load Shed When TDAFP and MDAFP flow is throttled, plant is stable, and Tech Specs have been addressed, proceed to Event 4  
4KV Bus NB02 Normal Feeder Breaker Trip Time         Position                       Applicants Actions or Behavior o   Turbine Driver Auxiliary Feed Actuation signal o   NB02 Blackout Load Shed When TDAFP and MDAFP flow is throttled, plant is stable, and Tech Specs have been addressed, proceed to Event 4


Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 4 Page 14 of 38 Event
Appendix D                               Operator Action                             Form ES-D-2 Op Test No.:       1     Scenario #     1       Event #       4               Page 14 of 38 Event


== Description:==
== Description:==
PZR Level Transmitter fails low. PZR LCV fails closed Time Position Applicant's Actions or Behavior Booth Operator Instructions: When directed, insert command for Pressurizer Level transmitter and LCV failure Indications available: PRESSURIZER LOW LEVEL DEVIATION Annunciator 32C LETDOWN HEAT EXCHANGER DISCHARGE FLOW HIGH LOW Annunciator 39E Letdown isolates CREW Identify the cause of the loss of letdown.
PZR Level Transmitter fails low. PZR LCV fails closed Time         Position                           Applicants Actions or Behavior Booth Operator Instructions:
CREW Determine that PZR LVL INST FAILURE occurred. (LT-459)
When directed, insert command for Pressurizer Level transmitter and LCV failure Indications available:
RO Isolate letdown by closing all orifice isolation valves. (Letdown is already isolated)
PRESSURIZER LOW LEVEL DEVIATION Annunciator 32C LETDOWN HEAT EXCHANGER DISCHARGE FLOW HIGH LOW Annunciator 39E Letdown isolates CREW       Identify the cause of the loss of letdown.
RO Reduce charging flow to minimum required for RCP seal injection as follows:
CREW       Determine that PZR LVL INST FAILURE occurred. (LT-459)
RO If the CCP is in service, SLOWLY CLOSE BH HC-182 while reducing charging flow using BG FK-121. Maintain approximately 8 GPM to each RCP seal.
Isolate letdown by closing all orifice isolation valves. (Letdown RO is already isolated)
RO ENSURE BG-HC-182 is FULL CLOSED.
Reduce charging flow to minimum required for RCP seal RO injection as follows:
RO Verify Reactor Makeup Control System set in automatic for the correct boron concentrations and is maintaining VCT level.
If the CCP is in service, SLOWLY CLOSE BH HC-182 while RO        reducing charging flow using BG FK-121. Maintain approximately 8 GPM to each RCP seal.
RO STABILIZE pressure level as follows:
RO       ENSURE BG-HC-182 is FULL CLOSED.
CREW Restore normal letdown per OTO-BG-00001 (Letdown CANNOT be restored).  
Verify Reactor Makeup Control System set in automatic for the RO correct boron concentrations and is maintaining VCT level.
RO       STABILIZE pressure level as follows:
Restore normal letdown per OTO-BG-00001 (Letdown CREW CANNOT be restored).


Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 4 Page 15 of 38 Event
Appendix D                               Operator Action                             Form ES-D-2 Op Test No.:       1     Scenario #     1       Event #       4               Page 15 of 38 Event


== Description:==
== Description:==
PZR Level Transmitter fails low. PZR LCV fails closed Time Position Applicant's Actions or Behavior CREW PLACE excess letdown in service per OTN-BG-00001, Chemical and Volume Control System.
PZR Level Transmitter fails low. PZR LCV fails closed Time         Position                           Applicants Actions or Behavior PLACE excess letdown in service per OTN-BG-00001, CREW Chemical and Volume Control System.
SRO INFORM HP that Excess Letdown is being placed in service.
SRO       INFORM HP that Excess Letdown is being placed in service.
SRO INFORM Chemistry that Excess Letdown is being placed in service. SRO NOTIFY Radwaste that Excess Letdown is being directed to the RCDT for approximately 2 minute to flush the piping.
INFORM Chemistry that Excess Letdown is being placed in SRO service.
RO VERIFY that the Excess Letdown Heat Exchanger is supplied with CCW by verifying flow on EG FI-128 or EG FI-129 on  
NOTIFY Radwaste that Excess Letdown is being directed to SRO the RCDT for approximately 2 minute to flush the piping.
VERIFY that the Excess Letdown Heat Exchanger is supplied RO      with CCW by verifying flow on EG FI-128 or EG FI-129 on RL020.
ENSURE BG HC-123, the Excess Letdown HX Outlet Flow RO Hand Switch, is in the CLOSED position.
PERFORM the following to equalize boron concentration in the RO Excess Letdown header and the RCS.
RO      PLACE control switch BG HIS-8143, in the RCDT position.
OPEN either set of Reactor Coolant to Excess Letdown HX RO Valves with the applicable control switches:
TRAIN                              HANDSWITCH A              BG HIS-8153A and BG HIS-8154A B              BG HIS-8153B and BG HIS-8154B NOTE:        Excess Letdown temperature indicated on BG TI-122 should remain less than 175°F.


RL020. RO ENSURE BG HC-123, the Excess Letdown HX Outlet Flow Hand Switch, is in the CLOSED position.
Appendix D                               Operator Action                             Form ES-D-2 Op Test No.:       1     Scenario #     1       Event #       4               Page 16 of 38 Event
RO PERFORM the following to equalize boron concentration in the
 
Excess Letdown header and the RCS.
RO PLACE control switch BG HIS-8143, in the RCDT position.
RO OPEN either set of Reactor Coolant to Excess Letdown HX Valves with the applicable control switches:
TRAIN HANDSWITCH A BG HIS-8153A and BG HIS-8154A B BG HIS-8153B and BG HIS-8154B NOTE: Excess Letdown temperature indicated on BG TI-122 should remain less than 175°F.
 
Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 4 Page 16 of 38 Event


== Description:==
== Description:==
PZR Level Transmitter fails low. PZR LCV fails closed Time Position Applicant's Actions or Behavior RO SLOWLY TURN BG HC-123, Ex Ltdn Hx Out Flow Hand Ctrl, to the OPEN position to establish excess letdown flow.
PZR Level Transmitter fails low. PZR LCV fails closed Time         Position                           Applicants Actions or Behavior SLOWLY TURN BG HC-123, Ex Ltdn Hx Out Flow Hand Ctrl, RO to the OPEN position to establish excess letdown flow.
RO ENSURE Excess Letdown HX Outlet temperature using BG TI-122 on panel RL002 does not exceed 175°F.
ENSURE Excess Letdown HX Outlet temperature using RO BG TI-122 on panel RL002 does not exceed 175°F.
NOTE: Excess letdown and RCP seal water leak-off share a common line. This change in back pressure may cause a variation in RCP seal water leak-off flow.
NOTE:       Excess letdown and RCP seal water leak-off share a common line. This change in back pressure may cause a variation in RCP seal water leak-off flow.
RO VERIFY RCP seal water leak-off flow is 1 - 5 GPM with normal RCS operating pressure as indicated on BG FR-154 through BG FR-157 on panel RL022. If RCS pressure is other than 2235 +/- 15 psig, refer to OTN-BB-00003, Reactor Coolant Pumps, Attachment 1 page 4 of 4, for acceptable RCP seal water leak-off flow rates.
VERIFY RCP seal water leak-off flow is 1 - 5 GPM with normal RCS operating pressure as indicated on BG FR-154 through BG FR-157 on panel RL022. If RCS pressure is other than RO 2235 +/- 15 psig, refer to OTN-BB-00003, Reactor Coolant Pumps, Attachment 1 page 4 of 4, for acceptable RCP seal water leak-off flow rates.
RO After approximately 2 minute, direct Excess Letdown flow to the  
After approximately 2 minute, direct Excess Letdown flow to the RO VCT, as follows.
SLOWLY TURN BG HC-123 to the CLOSED position to secure RO excess letdown flow.
ENSURE BG HC-123 in the CLOSED position, and SELECT RO BGHV8143 to the VCT position using BG HIS-8143.
ENSURE OPEN either set of Reactor Coolant to Excess RO Letdown HX Valves with the applicable control switches:
TRAIN                              HANDSWITCH A              BG HIS-8153A and BG HIS-8154A B              BG HIS-8153B and BG HIS-8154B RO        SLOWLY TURN BG HC-123 to the OPEN position to re-


VCT, as follows.
Appendix D                               Operator Action                             Form ES-D-2 Op Test No.:       1     Scenario #     1     Event #       4               Page 17 of 38 Event
RO SLOWLY TURN BG HC-123 to the CLOSED position to secure excess letdown flow.
RO ENSURE BG HC-123 in the CLOSED position, and SELECT BGHV8143 to the VCT position using BG HIS-8143.
RO ENSURE OPEN either set of Reactor Coolant to Excess Letdown HX Valves with the applicable control switches:
TRAIN HANDSWITCH A BG HIS-8153A and BG HIS-8154A B BG HIS-8153B and BG HIS-8154B RO SLOWLY TURN BG HC-123 to the OPEN position to re-Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 4 Page 17 of 38 Event


== Description:==
== Description:==
PZR Level Transmitter fails low. PZR LCV fails closed Time Position Applicant's Actions or Behavior establish Excess Letdown flow.
PZR Level Transmitter fails low. PZR LCV fails closed Time         Position                           Applicants Actions or Behavior establish Excess Letdown flow.
SRO NOTIFY Radwaste that Excess Letdown flow is directed to the VCT. RO ENSURE Excess letdown HX Outlet temperature using BG TI-122 on panel RL002 does not exceed 175°F.
NOTIFY Radwaste that Excess Letdown flow is directed to the SRO VCT.
RO VERIFY RCP seal water leak-off flow is 1 - 5 GPM with normal RCS operating pressure as indicated BG FR-154 through BG FR-157 on panel RL022. If RCS pressure is other than 2235 +/- 15 psig, refer to OTN-BB-00003, Reactor Coolant Pumps, Attachment 1 page 4 of 4, for acceptable RCP seal water leak-
ENSURE Excess letdown HX Outlet temperature using BG TI-RO 122 on panel RL002 does not exceed 175°F.
VERIFY RCP seal water leak-off flow is 1 - 5 GPM with normal RCS operating pressure as indicated BG FR-154 through BG FR-157 on panel RL022. If RCS pressure is other than 2235 +/-
RO 15 psig, refer to OTN-BB-00003, Reactor Coolant Pumps, Attachment 1 page 4 of 4, for acceptable RCP seal water leak-off flow rates.
Directs to UNLOCK and OPEN BG8482, CVCS VCT Seal Wtr SRO      In Iso, and LOG in Locked Component Deviation List of ODP-ZZ-00004, Locked Component Control.
Directs to UNLOCK and CLOSE BG8484, CVCS Seal Wtr Hx SRO      Out Dnstrm Isok, and LOG in Locked Component Deviation List of ODP-ZZ-00004, Locked Component Control.
NOTIFY HP that Excess Letdown is in service. Identify the SRO      flowpath for Excess Letdown so that HP can monitor rooms and components in the flowpath for increased radiation levels.
When Excess Letdown is in service, proceed to Event 5


off flow rates.
Appendix D                                   Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #       1     Event #       6, 7, & 8       Page 18   of 38 Event
SRO Directs to UNLOCK and OPEN BG8482, CVCS VCT Seal Wtr In Iso, and LOG in Locked Component Deviation List of ODP-ZZ-00004, Locked Component Control.
SRO Directs to UNLOCK and CLOSE BG8484, CVCS Seal Wtr Hx Out Dnstrm Isok, and LOG in Locked Component Deviation List of ODP-ZZ-00004, Locked Component Control.
SRO NOTIFY HP that Excess Letdown is in service. Identify the flowpath for Excess Letdown so that HP can monitor rooms and components in the flowpath for increased radiation levels.
When Excess Letdown is in service, proceed to Event 5
 
Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 18 of 38 Event


== Description:==
== Description:==
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicant's Actions or Behavior Booth Operator Instructions:
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time         Position                           Applicants Actions or Behavior Booth Operator Instructions:
When directed, insert commands for remaining events as sequenced Indications available: PROCESS RADIATION HIGH Annunciator 61B Rising trend on Iodine and Particulate Channels 31, 32 CREW DETERMINE the approximate size of the leak. Should determine greater than 50 GPM leak NOTE: The plant computer group tabular time trend GT-SG17 can be used to approximate the leak size.
When directed, insert commands for remaining events as sequenced Indications available:
RO USE trends of VCT level (20% GAL/%) and/or PZR level (60 GAL/%).
PROCESS RADIATION HIGH Annunciator 61B Rising trend on Iodine and Particulate Channels 31, 32 DETERMINE the approximate size of the leak. Should CREW determine greater than 50 GPM leak NOTE:       The plant computer group tabular time trend GT-SG17 can be used to approximate the leak size.
NOTE: Only one charging pump should be in operation until PZR level is increased for the plant cooldown.
USE trends of VCT level (20% GAL/%) and/or PZR level RO (60 GAL/%).
RO COMPARE Charging and Letdown flow rates. Crew should determine that PZR level CANNOT be maintained.
NOTE:       Only one charging pump should be in operation until PZR level is increased for the plant cooldown.
SRO Direct Reactor Trip RO CHECK Reactor Trip:
COMPARE Charging and Letdown flow rates. Crew should RO determine that PZR level CANNOT be maintained.
Rod Bottom Lights - ALL LIT Reactor Trip and Bypass Breakers - OPEN Neutron Flux - LOWERING BOP CHECK Turbine Trip:  
SRO       Direct Reactor Trip RO       CHECK Reactor Trip:
* Rod Bottom Lights - ALL LIT
* Reactor Trip and Bypass Breakers - OPEN
* Neutron Flux - LOWERING BOP       CHECK Turbine Trip:


Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 19 of 38 Event
Appendix D                                   Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #       1     Event #       6, 7, & 8       Page 19   of 38 Event


== Description:==
== Description:==
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicant's Actions or Behavior All turbine Stop valves - CLOSED.
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time         Position                           Applicants Actions or Behavior All turbine Stop valves - CLOSED.
CREW CHECK Power to AC Emergency Buses:
CREW       CHECK Power to AC Emergency Buses:
AC emergency buses - AT LEAST ONE ENERGIZED NB01(NO)
AC emergency buses - AT LEAST ONE ENERGIZED
OR     NB02(NO)
* NB01(NO)
SRO DIRECTS Go to ECA-0.0, Loss of All AC Power, Step 1.
OR
RO CHECK Reactor Trip:
* NB02(NO)
Reactor Trip and Bypass Breakers - OPEN Neutron Flux - LOWERING BOP CHECK Turbine Trip:
SRO       DIRECTS Go to ECA-0.0, Loss of All AC Power, Step 1.
RO       CHECK Reactor Trip:
* Reactor Trip and Bypass Breakers - OPEN
* Neutron Flux - LOWERING BOP       CHECK Turbine Trip:
All Turbine Stop valves - CLOSED.
All Turbine Stop valves - CLOSED.
RO CHECK if RCS is Isolated:
RO       CHECK if RCS is Isolated:
: a. PZR PORVs - CLOSED BB HIS-455A BB HIS-456A
: a. PZR PORVs - CLOSED
* BB HIS-455A
* BB HIS-456A
: b. Letdown Isolation Valves - CLOSED
: b. Letdown Isolation Valves - CLOSED
: 1. Letdown Orifice Isolation valves:
: 1. Letdown Orifice Isolation valves:
BG HIS-8149AA Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 20 of 38 Event
* BG HIS-8149AA
 
Appendix D                                   Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #       1     Event #       6, 7, & 8       Page 20   of 38 Event


== Description:==
== Description:==
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicant's Actions or Behavior BG HIS8149BA BG HIS-8149CA
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time         Position                           Applicants Actions or Behavior
* BG HIS8149BA
* BG HIS-8149CA
: 2. RCS Letdown to Regen HX valves:
: 2. RCS Letdown to Regen HX valves:
BG HIS-459 BG HIS-460
* BG HIS-459
: c. RCS to Excess Letdown HX valves - CLOSED BG HIS-8153A BG HIS-8154A BG HIS-8153B BG HIS-8154B CLOSE valve(s) as necessary.
* BG HIS-460
: d. Reactor Head Vent Valves - CLOSED BB HIS-8001A BB HIS-9002A BB HIS-8001B BB HIS-8002B BOP CHECK AFW Flow - GREATER THAN 300,000 LBM/HR CREW TRY to Restore Power to Any AC Emergency Bus:
: c. RCS to Excess Letdown HX valves - CLOSED
* BG HIS-8153A
* BG HIS-8154A
* BG HIS-8153B
* BG HIS-8154B CLOSE valve(s) as necessary.
: d. Reactor Head Vent Valves - CLOSED
* BB HIS-8001A
* BB HIS-9002A
* BB HIS-8001B
* BB HIS-8002B BOP       CHECK AFW Flow - GREATER THAN 300,000 LBM/HR CREW       TRY to Restore Power to Any AC Emergency Bus:
: a. ENERGIZE AC emergency bus with diesel generator:
: a. ENERGIZE AC emergency bus with diesel generator:
CRITICAL TASK   1. START DG(s):
CRITICAL TASK                               1. START DG(s):
KJ HS-8A - DG - "A" Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 21 of 38 Event
* KJ HS-8A - DG - A
 
Appendix D                                   Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #       1     Event #       6, 7, & 8       Page 21   of 38 Event


== Description:==
== Description:==
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicant's Actions or Behavior
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time         Position                           Applicants Actions or Behavior
: 2. CHECK AC emergency buses - AT LEAST ONE ENERGIZED NB01 - ENERGIZED OR   NB02 - NOT ENERGIZED CREW b. CHECK AC emergency buses - AT LEAST ONE ENERGIZED NB01 - YES BOP c. CHECK ESW Pump associated with energized AC emergency bus(es) - RUNNING EF HIS-55A (NB01) - YES
: 2. CHECK AC emergency buses - AT LEAST ONE ENERGIZED
: d. Return to procedure and step in effect and IMPLEMENT Functional Restoration Procedures as necessary. Crew will review CSF Status Trees. None currently required for implementation SRO DIRECTS return to E-0.
* NB01 - ENERGIZED OR
RO CHECK SI Status:     a. CHECK is SI is actuated:
* NB02 - NOT ENERGIZED
Any SI annunciator 88A through 88D - LIT OR   SB069 SI Actuate RED light - LIT OR   LCOA Sequencer annunciators 30A or 31A - LIT  
: b. CHECK AC emergency buses - AT LEAST ONE CREW ENERGIZED
* NB01 - YES
: c. CHECK ESW Pump associated with energized AC BOP emergency bus(es) - RUNNING
* EF HIS-55A (NB01) - YES
: d. Return to procedure and step in effect and IMPLEMENT Functional Restoration Procedures as necessary.
* Crew will review CSF Status Trees. None currently required for implementation SRO       DIRECTS return to E-0.
RO       CHECK SI Status:
: a. CHECK is SI is actuated:
* Any SI annunciator 88A through 88D - LIT OR
* SB069 SI Actuate RED light - LIT OR
* LCOA Sequencer annunciators 30A or 31A - LIT


Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 22 of 38 Event
Appendix D                                   Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #       1     Event #       6, 7, & 8       Page 22   of 38 Event


== Description:==
== Description:==
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicant's Actions or Behavior
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time         Position                           Applicants Actions or Behavior
: b. CHECK both Trains of SI - ACTUATED LOCA Sequencer annunciator 30A - LIT LOCA Sequencer annunciator 31A - LIT SB069 SI Actuate RED light - LIT SOLID (NOT blinking)
: b. CHECK both Trains of SI - ACTUATED
BOP PERFORM Attachment A, Automatic Action Verification, while continuing with this procedure.
* LOCA Sequencer annunciator 30A - LIT
RO CHECK Generator Output Breakers - OPEN MA ZL-3A (V55)
* LOCA Sequencer annunciator 31A - LIT
MA ZL-4A (V53)
* SB069 SI Actuate RED light - LIT SOLID (NOT blinking)
RO CHECK Feedwater Isolation:
PERFORM Attachment A, Automatic Action Verification, while BOP continuing with this procedure.
: a. Main Feedwater Pumps - TRIPPED Annunciator 120A, MFP A Trip - LIT Annunciator 123A, MFP B Trip - LIT
RO       CHECK Generator Output Breakers - OPEN
: b. Main Feedwater Reg Valves - CLOSED AE ZL-510 (SG A)
* MA ZL-3A (V55)
AE ZL-520 (SG B)
* MA ZL-4A (V53)
AE ZL-530 (SG C)
RO       CHECK Feedwater Isolation:
AE ZL-540 (SG D)
: a. Main Feedwater Pumps - TRIPPED
: c. Main Feedwater Reg Bypass Valves - CLOSED AE ZL-550 (SG A)
* Annunciator 120A, MFP A Trip - LIT
AE ZL-560 (SG B)
* Annunciator 123A, MFP B Trip - LIT
AE ZL-570 (SG C)
: b. Main Feedwater Reg Valves - CLOSED
AE ZL-580 (SG D)
* AE ZL-510 (SG A)
Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 23 of 38 Event
* AE ZL-520 (SG B)
* AE ZL-530 (SG C)
* AE ZL-540 (SG D)
: c. Main Feedwater Reg Bypass Valves - CLOSED
* AE ZL-550 (SG A)
* AE ZL-560 (SG B)
* AE ZL-570 (SG C)
* AE ZL-580 (SG D)
 
Appendix D                                   Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #       1     Event #       6, 7, & 8       Page 23   of 38 Event


== Description:==
== Description:==
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicant's Actions or Behavior
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time         Position                           Applicants Actions or Behavior
: d. Feedwater Isolation Valves - CLOSED AE HIS-39 (SG A)
: d. Feedwater Isolation Valves - CLOSED
AE HIS-40 (SG B)
* AE HIS-39 (SG A)
AE HIS-41 (SG C)
* AE HIS-40 (SG B)
AE HIS-42 (SG D)
* AE HIS-41 (SG C)
RO CHECK AFW Pumps:
* AE HIS-42 (SG D)
: a. MD AFW Pumps - BOTH RUNNING AL HIS-23A AL HIS-22A
RO       CHECK AFW Pumps:
: b. TD AFW Pump - RUNNING IF NECESSARY RO CHECK AFW Valves - PROPER EMERGENCY ALIGNMENT MD AFP Flow Control Valves - THROTTLED AL HK-7A AL HK-9A AL HK-11A AL-HK-5A TD AFP Flow Control Valves - FULL OPEN AL HK-8A AL HK-10A AL HK-12A AL HK-6A RO CHECK Total AFW Flow - GREATER THAN 300,000 LBM/HR  
: a. MD AFW Pumps - BOTH RUNNING
* AL HIS-23A
* AL HIS-22A
: b. TD AFW Pump - RUNNING IF NECESSARY RO       CHECK AFW Valves - PROPER EMERGENCY ALIGNMENT
* MD AFP Flow Control Valves - THROTTLED
* AL HK-7A
* AL HK-9A
* AL HK-11A
* AL-HK-5A
* TD AFP Flow Control Valves - FULL OPEN
* AL HK-8A
* AL HK-10A
* AL HK-12A
* AL HK-6A RO       CHECK Total AFW Flow - GREATER THAN 300,000 LBM/HR


Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 24 of 38 Event
Appendix D                                   Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #       1     Event #       6, 7, & 8       Page 24   of 38 Event


== Description:==
== Description:==
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicant's Actions or Behavior RO CHECK PZR PORVs and Spray Valves:
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time         Position                           Applicants Actions or Behavior RO       CHECK PZR PORVs and Spray Valves:
: a. PZR PORVs - CLOSED BB HIS-455A BB HIS-456A
: a. PZR PORVs - CLOSED
: b. PZR PORVs - BOTH IN AUTO BB HIS-455A BB HIS-456A
* BB HIS-455A
: c. PORV Block Valves - BOTH OPEN BB HIS-8000A BB HIS-8000B
* BB HIS-456A
: d. Normal PZR Spray Valves - CLOSED BB ZL-455B BB ZL-455C RO CHECK If RCPs Should Be Stopped:
: b. PZR PORVs - BOTH IN AUTO
* BB HIS-455A
* BB HIS-456A
: c. PORV Block Valves - BOTH OPEN
* BB HIS-8000A
* BB HIS-8000B
: d. Normal PZR Spray Valves - CLOSED
* BB ZL-455B
* BB ZL-455C RO       CHECK If RCPs Should Be Stopped:
: a. RCPs - ANY RUNNING (NO)
: a. RCPs - ANY RUNNING (NO)
SRO Go to Step 13.
SRO       Go to Step 13.
RO CHECK RCS Temperatures:
RO       CHECK RCS Temperatures:
NO RCPs running - RCS COLD LEG TEMPERATURES STABLE AT 557°F OR TRENDING TO 557°F CREW CHECK If any SG Is Faulted:  
* NO RCPs running - RCS COLD LEG TEMPERATURES STABLE AT 557°F OR TRENDING TO 557°F CREW       CHECK If any SG Is Faulted:


Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 25 of 38 Event
Appendix D                                   Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #       1     Event #       6, 7, & 8       Page 25   of 38 Event


== Description:==
== Description:==
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicant's Actions or Behavior
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time         Position                           Applicants Actions or Behavior
: a. CHECK pressures in all SGs:
: a. CHECK pressures in all SGs:
ANY SG PRESSURE LOWERING IN AN UNCONTROLLED MANNER OR   ANY SG COMPLETELY DEPRESSURIZED SRO Go to Step 15.
* ANY SG PRESSURE LOWERING IN AN UNCONTROLLED MANNER OR
CREW CHECK If SG Tubes Are Intact:
* ANY SG COMPLETELY DEPRESSURIZED SRO       Go to Step 15.
Levels in all SGs:
CREW       CHECK If SG Tubes Are Intact:
NO SG NARROW RANGE LEVEL RISING IN AN UNCONTROLLED MANNER SG Steamline N16 radiation - NORMAL N16 161 (SG A)
* Levels in all SGs:
N16 162 (SG B)
* NO SG NARROW RANGE LEVEL RISING IN AN UNCONTROLLED MANNER
N16 163 (SG C)
* SG Steamline N16 radiation - NORMAL
N16 164 (SG D)
* N16 161 (SG A)
Condenser Air Removal radiation - NORMAL BEFORE ISOLATION GEG 925       SG Blowdown and Sample radiation - NORMAL BEFORE ISOLATION BML 256   SJL 026       SG ASD radiation - NORMAL Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 26 of 38 Event
* N16 162 (SG B)
* N16 163 (SG C)
* N16 164 (SG D)
* Condenser Air Removal radiation - NORMAL BEFORE ISOLATION
* GEG 925
* SG Blowdown and Sample radiation - NORMAL BEFORE ISOLATION
* BML 256
* SJL 026
* SG ASD radiation - NORMAL
 
Appendix D                                   Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #       1     Event #       6, 7, & 8       Page 26   of 38 Event


== Description:==
== Description:==
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicant's Actions or Behavior AB RIC 111 (SG A)
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time         Position                           Applicants Actions or Behavior
AB RIC 112 (SG B)
* AB RIC 111 (SG A)
AB RIC 113 (SG C)
* AB RIC 112 (SG B)
AB RIC 114 (SG D)
* AB RIC 113 (SG C)
Turbine Driven Auxiliary Feedwater Pump exhaust radiation - NORMAL FC RIC 385 RO CHECK If RCS Is Intact:
* AB RIC 114 (SG D)
Containment Pressure - NORMAL (NO)
* Turbine Driven Auxiliary Feedwater Pump exhaust radiation - NORMAL
GN PI-934 GN PI-935 GN PI-936 GN PI-937 GN PR-934 Containment Normal Sump Level - NORMAL EJ LI-8   EJ LI-7   EJ LR-6       Containment Normal sump Level - NORMAL LF LI-9   LF LI-10 Containment Radiation - NORMAL BEFORE ISOLATION GTG 313 Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 27 of 38 Event
* FC RIC 385 RO       CHECK If RCS Is Intact:
* Containment Pressure - NORMAL (NO)
* GN PI-934
* GN PI-935
* GN PI-936
* GN PI-937
* GN PR-934
* Containment Normal Sump Level - NORMAL
* EJ LI-8
* EJ LI-7
* EJ LR-6
* Containment Normal sump Level - NORMAL
* LF LI-9
* LF LI-10
* Containment Radiation - NORMAL BEFORE ISOLATION
* GTG 313
 
Appendix D                                   Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #       1     Event #       6, 7, & 8       Page 27   of 38 Event


== Description:==
== Description:==
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicant's Actions or Behavior GTG 323   GTA 591   GTA 601     SRO Go To E-1, Loss of Reactor or Secondary Coolant, Step 1.
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time         Position                           Applicants Actions or Behavior
NOTE: Seal injection flow should be maintained to all RCPs.
* GTG 323
* GTA 591
* GTA 601 SRO       Go To E-1, Loss of Reactor or Secondary Coolant, Step 1.
NOTE:       Seal injection flow should be maintained to all RCPs.
CHECK If RCPs Should Be Stopped:
CHECK If RCPs Should Be Stopped:
Loss of Power, already - TRIPPED BOP CHECK If Any SG Is Faulted:
Loss of Power, already - TRIPPED BOP       CHECK If Any SG Is Faulted:
CHECK pressures in all SGs:
CHECK pressures in all SGs:
ANY SG PRESSURE LOWERING IN AN UNCONTROLLED MANNER OR   ANY SG COMPLETELY DEPRESSURIZED (NO)
* ANY SG PRESSURE LOWERING IN AN UNCONTROLLED MANNER OR
* ANY SG COMPLETELY DEPRESSURIZED (NO)
Go to Step 3.
Go to Step 3.
BOP CHECK Intact SG Levels:
BOP       CHECK Intact SG Levels:
: a. Narrow range levels - GREATER THAN 7% [25%]
: a. Narrow range levels - GREATER THAN 7% [25%]
: b. CONTROL feed flow to maintain narrow range levels between 7% [25%] and 50%
: b. CONTROL feed flow to maintain narrow range levels between 7% [25%] and 50%
BOP CHECK Secondary Radiation - NORMAL Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 28 of 38 Event
BOP       CHECK Secondary Radiation - NORMAL
 
Appendix D                                   Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #       1     Event #       6, 7, & 8       Page 28   of 38 Event


== Description:==
== Description:==
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicant's Actions or Behavior
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time         Position                           Applicants Actions or Behavior
: a. PERFORM the following:
: a. PERFORM the following:
PERFORM EOP Addendum 11, Restoring SG Sampling After SI Actuation DIRECT Chemistry to periodically sample all SGs for activity.
* PERFORM EOP Addendum 11, Restoring SG Sampling After SI Actuation
DIRECT Health Physics to survey steamlines in Auxiliary Building Area 5 as necessary
* DIRECT Chemistry to periodically sample all SGs for activity.
* DIRECT Health Physics to survey steamlines in Auxiliary Building Area 5 as necessary
: b. CHECK unisolated secondary radiation monitors:
: b. CHECK unisolated secondary radiation monitors:
SG Sample radiation:
* SG Sample radiation:
SJL 026   SG ASD radiation:
* SJL 026
AB RIC 111 (SG A)
* SG ASD radiation:
AB RIC 112 (SG B)
* AB RIC 111 (SG A)
AB RIC 113 (SG C)
* AB RIC 112 (SG B)
AB RIC 114 (SG D)
* AB RIC 113 (SG C)
Turbine Driven Auxiliary Feedwater Pump Exhaust radiation:
* AB RIC 114 (SG D)
FC RIC 385
* Turbine Driven Auxiliary Feedwater Pump Exhaust radiation:
: c. Secondary radiation - NORMAL RO CHECK PZR PORVs and Block Valves:
* FC RIC 385
: a. Power to Block Valves - AVAILABLE BB HIS-8000A (NO)
: c. Secondary radiation - NORMAL RO       CHECK PZR PORVs and Block Valves:
BB HIS-8000B
: a. Power to Block Valves - AVAILABLE
: b. PZR PORVs - CLOSED BB HIS-455A Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 29 of 38 Event
* BB HIS-8000A (NO)
* BB HIS-8000B
: b. PZR PORVs - CLOSED
* BB HIS-455A
 
Appendix D                                   Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #       1     Event #       6, 7, & 8       Page 29   of 38 Event


== Description:==
== Description:==
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicant's Actions or Behavior BB HIS-456A
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time         Position                           Applicants Actions or Behavior
: c. Block Valves - BOTH OPEN BB HIS-8000A (NO)
* BB HIS-456A
BB HIS-8000B Crew CHECK If ECCS Flow Should Be Reduced:
: c. Block Valves - BOTH OPEN
* BB HIS-8000A (NO)
* BB HIS-8000B Crew       CHECK If ECCS Flow Should Be Reduced:
: a. RCS subcooling - GREATER THAN 30°F
: a. RCS subcooling - GREATER THAN 30°F
: b. Secondary heat sink:
: b. Secondary heat sink:
Narrow range level in at least one intact SGT - GREATER THAN 7% [25%]
* Narrow range level in at least one intact SGT -
OR   Total feed flow to intact SGs - GREATER THAN 300,00 LBM/HR
GREATER THAN 7% [25%]
OR
* Total feed flow to intact SGs - GREATER THAN 300,00 LBM/HR
: c. RCS pressure - STABLE OR RISING
: c. RCS pressure - STABLE OR RISING
: d. PZR level - GREATER THAN 9% [29%] (NO)
: d. PZR level - GREATER THAN 9% [29%] (NO)
RO CHECK If Containment Spray should Be Stopped:
RO       CHECK If Containment Spray should Be Stopped:
: a. Spray Pumps - ANY RUNNING SRO Go to Step 8. OBSERVE CAUTIONS prior to Step 8.
: a. Spray Pumps - ANY RUNNING SRO       Go to Step 8. OBSERVE CAUTIONS prior to Step 8.
CAUTION: If RCS pressure lowers in an uncontrolled manner to less than 325 PSIG, the RHR pumps must be manually restarted to supply water to the RCS.
CAUTION:         If RCS pressure lowers in an uncontrolled manner to less than 325 PSIG, the RHR pumps must be manually restarted to supply water to the RCS.
Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 30 of 38 Event
 
Appendix D                                   Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #       1     Event #       6, 7, & 8       Page 30   of 38 Event


== Description:==
== Description:==
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicant's Actions or Behavior RO CHECK If RHR Pumps Should Be Stopped:
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time         Position                           Applicants Actions or Behavior RO       CHECK If RHR Pumps Should Be Stopped:
: a. CHECK RCS pressure:
: a. CHECK RCS pressure:
: 1. Pressure - GREATER THAN 325 PSIG
: 1. Pressure - GREATER THAN 325 PSIG
: 2. Pressure - STABLE OR RISING
: 2. Pressure - STABLE OR RISING
: b. RHR Pumps - ANY RUNNING WITH SUCTION ALIGNED TO RWST     c. RESET SI if necessary:
: b. RHR Pumps - ANY RUNNING WITH SUCTION ALIGNED TO RWST
SB HS-42A SB HS-43A
: c. RESET SI if necessary:
* SB HS-42A
* SB HS-43A
: d. STOP RHR Pumps and PLACE in standby:
: d. STOP RHR Pumps and PLACE in standby:
EJ HIS-1 EJ HIS-2
* EJ HIS-1
: e. MONITOR RCS pressure     CREW CHECK SG and RCS Pressures:
* EJ HIS-2
CHECK pressure in all SGs - STABLE OR RISING CHECK RCS pressure - STABLE OR LOWERING CREW CHECK If Diesel Generators Should Be Stopped:
: e. MONITOR RCS pressure CREW       CHECK SG and RCS Pressures:
: a. AC emergency buses - ENERGIZED BY OFFSITE POWER   NB01 (NO)
* CHECK pressure in all SGs - STABLE OR RISING
Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 31 of 38 Event
* CHECK RCS pressure - STABLE OR LOWERING CREW       CHECK If Diesel Generators Should Be Stopped:
: a. AC emergency buses - ENERGIZED BY OFFSITE POWER
* NB01 (NO)
 
Appendix D                                   Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #       1     Event #       6, 7, & 8       Page 31   of 38 Event


== Description:==
== Description:==
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicant's Actions or Behavior NB02 (NO)
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time         Position                           Applicants Actions or Behavior
* NB02 (NO)
TRY to restore offsite power to AC emergency buses using EOP Addendum 7, Restoring Offsite Power.
TRY to restore offsite power to AC emergency buses using EOP Addendum 7, Restoring Offsite Power.
: b. RESET SI if necessary:
: b. RESET SI if necessary:
SB HS-42A SB HS-43A
* SB HS-42A
* SB HS-43A
: c. LOAD equipment on AC emergency bus(es) as necessary using EOP Addendum 8, Loading Equipment on AC emergency Buses.
: c. LOAD equipment on AC emergency bus(es) as necessary using EOP Addendum 8, Loading Equipment on AC emergency Buses.
CREW INITIATE Evaluation of Plant Status:
CREW       INITIATE Evaluation of Plant Status:
: a. CHECK cold leg recirculation capability:
: a. CHECK cold leg recirculation capability:
Train A - AVAILABLE RHR Pump A (EJ HIS-1)
* Train A - AVAILABLE
CCW Pump A (EG HIS-21) or CCW Pump C (EG HIS-23)
* RHR Pump A (EJ HIS-1)
RWST To RHR Pump A Suction (BN HIS-8812A)
* CCW Pump A (EG HIS-21) or CCW Pump C (EG HIS-23)
Containment Recirc Sump to RHR Pump A Suction (EJ HIS-8811A)
* RWST To RHR Pump A Suction (BN HIS-8812A)
CCW to RHR HX A (EG HIS-101)
* Containment Recirc Sump to RHR Pump A Suction (EJ HIS-8811A)
Train B - AVAILABLE RHR Pump B (EJ HIS-2)
* CCW to RHR HX A (EG HIS-101)
CCW Pump B (EG HIS-22) or CCW Pump D (EG HIS-24)
* Train B - AVAILABLE
RWST To RHR Pump B Suction (BN HIS-8812B)
* RHR Pump B (EJ HIS-2)
CCW to RHR HX B (EG HIS-102)  
* CCW Pump B (EG HIS-22) or CCW Pump D (EG HIS-24)
* RWST To RHR Pump B Suction (BN HIS-8812B)
* CCW to RHR HX B (EG HIS-102)


Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 32 of 38 Event
Appendix D                                   Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #       1     Event #       6, 7, & 8       Page 32   of 38 Event


== Description:==
== Description:==
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicant's Actions or Behavior
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time         Position                           Applicants Actions or Behavior
: b. CHECK Auxiliary Building radiation - NORMAL Aux Building Process Radiation monitor:
: b. CHECK Auxiliary Building radiation - NORMAL
GLP 604   Aux Building Area Radiation monitors TRY to identify and isolate leakage:
* Aux Building Process Radiation monitor:
DIRECT Health Physics and Chemistry to assist in the evaluation as necessary.
* GLP 604
* Aux Building Area Radiation monitors TRY to identify and isolate leakage:
* DIRECT Health Physics and Chemistry to assist in the evaluation as necessary.
IF the cause is a loss of RCS inventory outside containment, THEN Go To ECA-1.2, LOCA Outside Containment, Step 1.
IF the cause is a loss of RCS inventory outside containment, THEN Go To ECA-1.2, LOCA Outside Containment, Step 1.
: c. OBTAIN samples:   1. DIRECT Chemistry to initiate post accident sampling:
: c. OBTAIN samples:
RCS boron concentration RCS activity Containment atmosphere
: 1. DIRECT Chemistry to initiate post accident sampling:
* RCS boron concentration
* RCS activity
* Containment atmosphere
: 2. PLACE Hydrogen Analyzers in Service using EOP Addendum 16, Placing Hydrogen Analyzers In Service.
: 2. PLACE Hydrogen Analyzers in Service using EOP Addendum 16, Placing Hydrogen Analyzers In Service.
: 3. CONSULT Plant Engineering Staff for assessing additional sampling requirements for fuel damage.
: 3. CONSULT Plant Engineering Staff for assessing additional sampling requirements for fuel damage.
: d. EVALUATE plant equipment for long term recovery as necessary:
: d. EVALUATE plant equipment for long term recovery as necessary:
Hydrogen Recombiners Radwaste systems Radiation monitoring Post accident monitoring Operating safeguards equipment:
* Hydrogen Recombiners
CCPs   SI Pumps Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 33 of 38 Event
* Radwaste systems
* Radiation monitoring
* Post accident monitoring
* Operating safeguards equipment:
* CCPs
* SI Pumps
 
Appendix D                                   Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #       1     Event #       6, 7, & 8       Page 33   of 38 Event


== Description:==
== Description:==
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicant's Actions or Behavior RHR Pumps CS Pumps ESW Pumps CCW Pumps Containment Cooler Fans Containment Hydrogen Mixing Fans AFW Pumps Control Room ventilation Auxiliary Building ventilation Fuel Building ventilation
Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time         Position                           Applicants Actions or Behavior
: e. START additional plant equipment to assist in recovery as directed by SS/CRS CREW CHECK If RCS Cooldown And Depressurization Is Required
* RHR Pumps
* CS Pumps
* ESW Pumps
* CCW Pumps
* Containment Cooler Fans
* Containment Hydrogen Mixing Fans
* AFW Pumps
* Control Room ventilation
* Auxiliary Building ventilation
* Fuel Building ventilation
: e. START additional plant equipment to assist in recovery as directed by SS/CRS CREW       CHECK If RCS Cooldown And Depressurization Is Required
: a. RCS pressure - GREATER THAN 325 PSIG
: a. RCS pressure - GREATER THAN 325 PSIG
: b. Go to ES-1.2, Post LOCA Cooldown And Depressurization, Step 1   Scenario may be terminated on transition to ES-1.2  
: b. Go to ES-1.2, Post LOCA Cooldown And Depressurization, Step 1 Scenario may be terminated on transition to ES-1.2


ATTACHMENT A Automatic Action Verification BOP CHECK Charging Pumps:
ATTACHMENT A Automatic Action Verification BOP CHECK Charging Pumps:
CRITICAL TASK BOP a. CCPs - BOTH RUNNING BG HIS-1A (Must manually start HHSI Pump 'A')
CRITICAL TASK     BOP a. CCPs - BOTH RUNNING
BG HIS-2A BOP b. STOP NCP:   BG HIS-3 BOP CHECK SI And RHR Pumps SI Pumps - BOTH RUNNING (NO)
* BG HIS-1A (Must manually start HHSI Pump A)
EM HIS-4 EM HIS-5 RHR Pumps - BOTH RUNNING EJ HIS-1 EJ HIS-2 BOP CHECK ECCS Flow:
* BG HIS-2A BOP b. STOP NCP:
BOP a. CCPs to Boron Inj Header - FLOW INDICATED EM FI-917A EM FI-917B BOP b. RCS pressure - LESS THAN 1700 PSIG BOP c. SI Pump Discharge - FLOW INDICATED EM FI-918 EM FI-922 BOP d. RCS pressure - LESS THAN 325 PSIG  
* BG HIS-3 BOP CHECK SI And RHR Pumps
* SI Pumps - BOTH RUNNING (NO)
* EM HIS-4
* EM HIS-5
* RHR Pumps - BOTH RUNNING
* EJ HIS-1
* EJ HIS-2 BOP CHECK ECCS Flow:
BOP a. CCPs to Boron Inj Header - FLOW INDICATED
* EM FI-917A
* EM FI-917B BOP b. RCS pressure - LESS THAN 1700 PSIG BOP c. SI Pump Discharge - FLOW INDICATED
* EM FI-918
* EM FI-922 BOP d. RCS pressure - LESS THAN 325 PSIG


ATTACHMENT A Automatic Action Verification BOP e. RHR To Accumulator Injection Loop - FLOW INDICATED EJ FI-618 EJ FI-619 CAUTION: If offsite power is lost after SI reset, manual action may be required to restart safeguards equipment.
ATTACHMENT A Automatic Action Verification BOP       e. RHR To Accumulator Injection Loop - FLOW INDICATED
BOP CHECK ESW Pumps - BOTH RUNNING EF HIS-55A EF HIS-56A BOP CHECK CCW Alignment:
* EJ FI-618
BOP a. CCW Pumps - ONE RUNNING IN EACH TRAIN Red Train:
* EJ FI-619 CAUTION: If offsite power is lost after SI reset, manual action may be required to restart safeguards equipment.
EG HIS-21 or EG HIS-23 Yellow Train EG HIS-22 or EG HIS-24 BOP b. CCW Service Loop Supply and Return valves for one operating CCW pump - OPEN EG ZL-15 AND EG ZL-53 OR   EG ZL-16 AND EG ZL-54 BOP CHECK Containment Cooler Fans - RUNNING IN SLOW SPEED   GN HIS-9 GN HIS-17 GN HIS-5 GN HIS-13 BOP CHECK Containment Hydrogen Mixing Fans - RUNNING IN SLOW SPEED  
BOP       CHECK ESW Pumps - BOTH RUNNING
* EF HIS-55A
* EF HIS-56A BOP       CHECK CCW Alignment:
BOP       a. CCW Pumps - ONE RUNNING IN EACH TRAIN
* Red Train:
* EG HIS-21 or EG HIS-23
* Yellow Train
* EG HIS-22 or EG HIS-24
: b. CCW Service Loop Supply and Return valves for one BOP operating CCW pump - OPEN
* EG ZL-15 AND EG ZL-53 OR
* EG ZL-16 AND EG ZL-54 CHECK Containment Cooler Fans - RUNNING IN SLOW BOP SPEED
* GN HIS-9
* GN HIS-17
* GN HIS-5
* GN HIS-13 CHECK Containment Hydrogen Mixing Fans - RUNNING IN BOP SLOW SPEED


ATTACHMENT A Automatic Action Verification GN HIS-2 GN HIS-4 GN HIS-1 GN HIS-3 BOP CHECK If Containment Spray Should Be Actuated:
ATTACHMENT A Automatic Action Verification
* GN HIS-2
* GN HIS-4
* GN HIS-1
* GN HIS-3 BOP CHECK If Containment Spray Should Be Actuated:
BOP a. CHECK the following:
BOP a. CHECK the following:
Containment pressure - GREATER THAN 27 PSIG OR   GN PR-934 indicates containment pressure - HAS BEEN GREATER THAN 27 PSIG OR   Annunciator 59A CSAS - LIT OR   Annunciator 59B CISB - LIT BOP b. Containment Spray Pumps - BOTH RUNNING EN HIS-3 EN HIS-9 BOP c. ESFAS status panels CSAS sections:
* Containment pressure - GREATER THAN 27 PSIG OR
SA066X WHITE lights - ALL LIT SA066Y WHITE lights - ALL LIT BOP d. ESFAS status panels CISB sections:
* GN PR-934 indicates containment pressure - HAS BEEN GREATER THAN 27 PSIG OR
SA066X WHITE lights - ALL LIT SA066Y WHITE lights - ALL LIT BOP CHECK If Main Steamlines Should Be Isolated:
* Annunciator 59A CSAS - LIT OR
* Annunciator 59B CISB - LIT BOP b. Containment Spray Pumps - BOTH RUNNING
* EN HIS-3
* EN HIS-9 BOP c. ESFAS status panels CSAS sections:
* SA066X WHITE lights - ALL LIT
* SA066Y WHITE lights - ALL LIT BOP d. ESFAS status panels CISB sections:
* SA066X WHITE lights - ALL LIT
* SA066Y WHITE lights - ALL LIT BOP CHECK If Main Steamlines Should Be Isolated:
BOP a. CHECK for any of the following:
BOP a. CHECK for any of the following:
Containment pressure - GREATER THAN 17 PSIG  
* Containment pressure - GREATER THAN 17 PSIG


ATTACHMENT A Automatic Action Verification OR   GN PR-934 indicates containment pressure - HAS BEEN GREATER THAN 17 PSIG OR   Steamline pressure - LESS THAN 615 PSIG OR   AB PR-514 or PR-535 indicates steamline pressure - HAS BEEN LESS THAN 615 PSIG BOP b. CHECK MSIVs and Bypass valves - CLOSED BOP CHECK ECCS Valves - PROPER EMERGENCY ALIGNMENT BOP a. ESFAS status panels SIS sections:
ATTACHMENT A Automatic Action Verification OR
SA066X WHITE lights - ALL LIT SA066Y WHITE lights - ALL LIT BOP CHECK Containment Isolation Phase A:
* GN PR-934 indicates containment pressure - HAS BEEN GREATER THAN 17 PSIG OR
BOP a. ESFAS status panels CISA sections:
* Steamline pressure - LESS THAN 615 PSIG OR
SA066X WHITE lights - ALL LIT SA066Y WHITE lights - ALL LIT BOP CHECK SG Blowdown Isolation:
* AB PR-514 or PR-535 indicates steamline pressure -
BOP ESFAS status panels SGBSIS sections:
HAS BEEN LESS THAN 615 PSIG BOP       b. CHECK MSIVs and Bypass valves - CLOSED BOP       CHECK ECCS Valves - PROPER EMERGENCY ALIGNMENT BOP       a. ESFAS status panels SIS sections:
SA066X WHITE lights - ALL LIT SA066Y WHITE lights - ALL LIT CAUTION: If offsite power is lost after SI reset, manual action may be required to restart safeguards equipment.
* SA066X WHITE lights - ALL LIT
BOP CHECK Both Trains of control Room Ventilation Isolation:  
* SA066Y WHITE lights - ALL LIT BOP       CHECK Containment Isolation Phase A:
BOP       a. ESFAS status panels CISA sections:
* SA066X WHITE lights - ALL LIT
* SA066Y WHITE lights - ALL LIT BOP       CHECK SG Blowdown Isolation:
BOP       ESFAS status panels SGBSIS sections:
* SA066X WHITE lights - ALL LIT
* SA066Y WHITE lights - ALL LIT CAUTION: If offsite power is lost after SI reset, manual action may be required to restart safeguards equipment.
BOP       CHECK Both Trains of control Room Ventilation Isolation:


ATTACHMENT A Automatic Action Verification BOP a. ESFAS status panels CRVIS sections:
ATTACHMENT A Automatic Action Verification BOP a. ESFAS status panels CRVIS sections:
SA066X WHITE lights - ALL LIT SA066Y WHITE lights - ALL LIT BOP CHECK Containment Purge Isolation:
* SA066X WHITE lights - ALL LIT
* SA066Y WHITE lights - ALL LIT BOP CHECK Containment Purge Isolation:
BOP a. ESFAS status panels CPIS sections:
BOP a. ESFAS status panels CPIS sections:
SA066X WHITE lights - ALL LIT SA066Y WHITE lights - ALL LIT BOP Notify CRS of the following:
* SA066X WHITE lights - ALL LIT
Manual actions taken Failed Equipment Attachment A, Automatic Action Verification, completed  
* SA066Y WHITE lights - ALL LIT BOP Notify CRS of the following:
* Manual actions taken
* Failed Equipment
* Attachment A, Automatic Action Verification, completed


Appendix D Scenario Outline Form ES-D-1 Facility:
Appendix D                                     Scenario Outline                               Form ES-D-1 Facility:         Callaway                       Scenario No.:         2   Op Test No.:     NRC Examiners:                                                 Operators:
Callaway Scenario No.: 2 Op Test No.:
Initial Conditions:   50% power, BOL.
NRC Examiners:
Operators:
Initial Conditions: 50% power, BOL.
RE-52, Blowdown Discharge Pumps Discharge Monitor, is OOS.
RE-52, Blowdown Discharge Pumps Discharge Monitor, is OOS.
BB-PCV-455A PORV Leakage - Block Valve Closed.
BB-PCV-455A PORV Leakage - Block Valve Closed.
Motor Driven AFW Pump 'A' OOS.
Motor Driven AFW Pump A OOS.
Turnover: Maintain stable plant conditions Critical Task: Insert negative reactivity by inserting control rods or initiating emergency boration prior to the end of step 4 of FR-S.1.
Turnover:             Maintain stable plant conditions Critical Task:         Insert negative reactivity by inserting control rods or initiating emergency boration prior to the end of step 4 of FR-S.1.
Isolate AFW to faulted SG prior to occurrence of an ORANGE condition on the Integrity CSF Status Tree.
Isolate AFW to faulted SG prior to occurrence of an ORANGE condition on the Integrity CSF Status Tree.
Event No. Malf. No. Event Type* Event Description I - RO, SRO Pressurizer pressure instrument fails high 1 T+10 PRS01A TS - SRO 2 T+25 FWM03B C - BOP, SRO  'B' Feedwater Control Valve fails closed in automatic I - ALL Turbine First Stage Pressure Transmitter fails low 3 T+35 PCS02B TS - SRO   4 T+50 CRF04_52 CRF04_53 M - ALL Multiple Dropped Rods - requires reactor trip 5 CRF13 C - ALL ATWS 6 MSS14A C - BOP Stuck open safety valve.  
Event          Malf. Event                                        Event No.         No.       Type*                                     Description 1                    I - RO,       Pressurizer pressure instrument fails high T+10       PRS01A     SRO TS - SRO 2                   C - BOP,       B Feedwater Control Valve fails closed in automatic T+25      FWM03B      SRO 3                    I - ALL       Turbine First Stage Pressure Transmitter fails low T+35       PCS02B     TS - SRO 4       CRF04_52   M - ALL       Multiple Dropped Rods - requires reactor trip T+50        CRF04_53 5                   C - ALL       ATWS CRF13 6                   C - BOP       Stuck open safety valve.
* (N)ormal,    (R)eactivity,    (I)nstrument,   (C)omponent,   (M)ajor
MSS14A
 
    *   (N)ormal,    (R)eactivity,    (I)nstrument,     (C)omponent,       (M)ajor Scenario Event Description NRC Scenario 2 The crew will assume the shift with instructions to maintain present plant conditions Prior to actual power reduction, the controlling pressurizer pressure transmitter will fail high, requiring the crew to select an alternate pressure channel to control heaters and spray in accordance with OTO-BB-6. The SRO will also determine the appropriate technical specification action requirements.
Scenario Event Description NRC Scenario 2 The crew will assume the shift with instructions to maintain present plant conditions Prior to actual power reduction, the controlling pressurizer pressure transmitter will fail high, requiring the crew to select an alternate pressure channel to control heaters and spray in accordance with OTO-BB-6. The SRO will also determine the appropriate technical specification action requirements.
When the plant is stable, a Feedwater Control Valve will fail closed in automatic, requiring manual operation to restore SG level.
When the plant is stable, a Feedwater Control Valve will fail closed in automatic, requiring manual operation to restore SG level.
When SG level is restored, PT-506 will fail low, requiring the RO to place Rod Control in manual to stop rod motion, the BOP to select PT-505 for control, reset C-7, and place steam dumps in the Steam Pressure mode in accordance with OTO-AC-3. The SRO will also address Technical Specifications.
When SG level is restored, PT-506 will fail low, requiring the RO to place Rod Control in manual to stop rod motion, the BOP to select PT-505 for control, reset C-7, and place steam dumps in the Steam Pressure mode in accordance with OTO-AC-3. The SRO will also address Technical Specifications.
Multiple control rods will drop. A reactor trip is required but an ATWS occurs. The crew must take action to initiate RCS emergency boration and de-energize rod drive MG sets. A SG safety valve will stick open, requiring the crew to isolate AFW flow to the SG and attempt isolation.
Multiple control rods will drop. A reactor trip is required but an ATWS occurs. The crew must take action to initiate RCS emergency boration and de-energize rod drive MG sets. A SG safety valve will stick open, requiring the crew to isolate AFW flow to the SG and attempt isolation.
The scenario may be terminated when the crew transitions to ES-1.1, SI Termination.
The scenario may be terminated when the crew transitions to ES-1.1, SI Termination.
EOP Flow Path: E-0, FR-S.1, E-0, E-2, ES-1.1         
EOP Flow Path: E-0, FR-S.1, E-0, E-2, ES-1.1 Scenario 2 Scenario Malfunction List
: 1)  Initialize at IC-17, 50%.
: 2)  Run Batch File ilttwo.txt and verify the actions on the following page are loaded correctly.
: 3)  Ensure immediate boration timer is reset.
: 4)  Ensure BB PT-455 is selected as the controlling channel.
: 5)  Ensure NIS indicates 50% power.
: 6)  Check Rx Trip switch has a red flag.
: 7)  Ensure step counters for Control Bank "D" are set at 150 steps and all other step counters are set at 228 steps.
: 8)  Ensure the digital display is selected to REP0480A and RET0499A.
: 9)  Place 'A' MDAFP in PTL and hand a Hold Off tag on handswitch ALHIS23A.
: 10) Ensure Decrease Loading Rate Button is "ON".
: 11) Update the status board for "B" train week.
: 12) Update Status Board - 'A' MDAFP, TS 3.7.5, Condition C, 72 hrs. Current outage time is 16 hours.
: 13) Ensure Letdown orifi A and B are in service, and a caution tag placed on C
: 14) Ensure AEHV38 is appropriately throttled
: 15) White board has the following boron concentrations:
    *    "A" CCP 5 days ago 1105 ppm
    *    "B" CCP 15 days ago 1132 ppm
* RCS boron = 1090
* PZR boron = 1093
: 16) Ensure chart recorders are "rolled forward".
: 17) Microphones are available for each person being evaluated and a videotape is in the VCR.
: 18) Ensure the RM-11 is on the training system.
: 19) Ensure turnover sheets and log sheets are on the desks.
: 20) Ensure copies of the following procedures are in the file drawers:
* OTO-BB-00006
* OTO-AE-00001
* OTO-AC-00003
* E-0
* FR-S.1
* E-2
* ES-1.1 Scenario 2 Scenario Malfunction List File:                ilttwo.TXT
>Author: S. P. Aufdemberge
>Date:                20050504
>=============SCENARIO SETUP ITEMS===========================================
>Remove 'A' MDAFP from service
>FILE AL01A.TXT
>Simulates tag out of the MD AFP A in the Pull-to-lock position bat al01a.txt
>Simulates de-energization of "A" PORV Block valve due to PORV Leakage ior bbhis8000a_ic (-1 0) 0 irf bbs014 (-1 0) 0
>===========================================================================
>=============EVENT PRELOAD=================================================
>EVENT 1
>Pressurizer Pressure Channel BBPT0455 fails to 2500 over 60 seconds
>Manually Input Event 1 imf prs01a (1 0) 2500 60
>===========================================================================
>=============EVENT PRELOAD=================================================
>EVENT 2
>"B" Feed Reg Valve fails closed in Automatic over 90 seconds
>Manually Input Event 2 imf fwm03b (2 0) 0 90
>===========================================================================
>=============EVENT PRELOAD=================================================
>EVENT 3
>ACPT0506 fails low over 60 second ramp
>Manually Input Event 3 imf pcs02b (3 0) 0 60
>===========================================================================
>=============EVENT PRELOAD=================================================
> EVENT 4
>Multiple Dropped Rods
>Manually Input Event 4 imf crf04_52 (4) imf crf04_53 (4)
>===========================================================================
>=============EVENT PRELOAD=================================================
>EVENT 5
>PROTECTIVE SYSTEM FAILURE (ATWS) Preloaded into scenario. No Manual Input >required imf crf13 (-1 0) both
>===========================================================================
>=============EVENT PRELOAD=================================================
>EVENT 6
>Main Steam Safety Valve Fails 100% Open, with a 10 sec delay, and a 1 sec >ramp from trigger #6 (CONDITIONAL) trgset 6 "sac.le.10" imf mss14a (6 10) 100 1
>===========================================================================
>end of file Scenario 2 Crew Turnover Separate Turnover Sheets provided Appendix D                                Operator Action                            Form ES-D-2 Op Test No.:       1    Scenario #      2      Event #      1                Page 6  of 27 Event


Scenario 2 Scenario Malfunction List
== Description:==
: 1) Initialize at IC-17, 50%. 2) Run Batch File ilttwo.txt and verify the actions on the following page are loaded correctly. 3) Ensure immediate boration timer is reset. 4) Ensure BB PT-455 is selected as the controlling channel. 5) Ensure NIS indicates 50% power. 6) Check Rx Trip switch has a red flag. 7) Ensure step counters for Control Bank "D" are set at 150 steps and all other step counters are set at 228 steps. 8) Ensure the digital display is selected to REP0480A and RET0499A. 9) Place 'A' MDAFP in PTL and hand a Hold Off tag on handswitch ALHIS23A. 10) Ensure Decrease Loading Rate Button is "ON". 11) Update the status board for "B" train week. 12) Update Status Board - 'A' MDAFP, TS 3.7.5, Condition C, 72 hrs. Current outage time is 16 hours. 13) Ensure Letdown orifi A and B are in service, and a caution tag placed on C 14) Ensure AEHV38 is appropriately throttled 15) White board has the following boron concentrations: "A" CCP 5 days ago 1105 ppm "B" CCP 15 days ago 1132 ppm RCS boron = 1090 PZR boron = 1093 16) Ensure chart recorders are "rolled forward". 17) Microphones are available for each person being evaluated and a videotape is in the VCR. 18) Ensure the RM-11 is on the training system. 19) Ensure turnover sheets and log sheets are on the desks. 20) Ensure copies of the following procedures are in the file drawers:  OTO-BB-00006  OTO-AE-00001  OTO-AC-00003  E-0  FR-S.1 E-2  ES-1.1 Scenario 2 Scenario Malfunction List File:  ilttwo.TXT >Author: S. P. Aufdemberge >Date:  20050504
Pressurizer Pressure Instrument Failure Time          Position                          Applicants Actions or Behavior Booth Operator Instructions:
> > >=============SCENARIO SETUP ITEMS=========================================== >Remove 'A' MDAFP from service >FILE  AL01A.TXT  >Simulates tag out of the MD AFP A in the Pull-to-lock position bat al01a.txt >Simulates de-energization of "A" PORV Block valve due to PORV Leakage ior bbhis8000a_ic (-1 0) 0 irf bbs014 (-1 0) 0 >=========================================================================== >=============EVENT PRELOAD=================================================
When directed, insert command for PT-455 failure Indications Available:
>EVENT 1 >Pressurizer Pressure Channel BBPT0455 fails to 2500 over 60 seconds >Manually Input Event 1 imf prs01a (1 0) 2500 60 >=========================================================================== >=============EVENT PRELOAD=================================================
PRESSURIZER HIGH PRESSURE DEVIATION Annunciator 33B PRESSURIZER PRESSURE LOW HEATERS ON Annunciator 33C REACTOR PARTIAL TRIP Annunciator 83C PT-455 indicates high Refer to OTO-BB-0006, Pressurizer Pressure Control System SRO Instrument Failures RO      Select an alternate channel RO      Check RCS pressure 2200 - 2250 psig RO      Check P-11 (Not Lit) correct state BOP      Select recorder to valid channel SRO      Direct I&C to trip the affected bistables SRO      Refer to Tech Specs
>EVENT 2 >"B" Feed Reg Valve fails closed in Automatic over 90 seconds >Manually Input Event 2 imf fwm03b (2 0) 0 90 >=========================================================================== >=============EVENT PRELOAD=================================================
* 3.3.1, Condition E, M
>EVENT 3 >ACPT0506 fails low over 60 second ramp >Manually Input Event 3 imf pcs02b (3 0) 0 60 >=========================================================================== >=============EVENT PRELOAD=================================================
* 3.3.2 Condition D, L
> EVENT 4 >Multiple Dropped Rods >Manually Input Event 4 imf crf04_52 (4) imf crf04_53 (4) >=========================================================================== >=============EVENT PRELOAD=================================================
* 3.3.4 Item 3
>EVENT 5 >PROTECTIVE SYSTEM FAILURE (ATWS) Preloaded into scenario. No Manual Input >required imf crf13 (-1 0) both >=========================================================================== >=============EVENT PRELOAD=================================================
* 3.4.1 (DNB)
>EVENT 6 >Main Steam Safety Valve Fails 100% Open, with a 10 sec delay, and a 1 sec >ramp from trigger #6 (CONDITIONAL) trgset 6 "sac.le.10" imf mss14a (6 10) 100 1 >===========================================================================
After Technical Specifications have been addressed, proceed to Event 2
>end of file


Scenario 2 Crew Turnover Separate Turnover Sheets provided
Appendix D                               Operator Action                             Form ES-D-2 Op Test No.:       1     Scenario #     2       Event #       2              Page of 27 Event
 
Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 1 Page 6 of 27 Event


== Description:==
== Description:==
Pressurizer Pressure Instrument Failure Time Position Applicant's Actions or Behavior Booth Operator Instructions:
B Feedwater Control Valve fails closed in automatic Time         Position                         Applicants Actions or Behavior Booth Operator Instructions:
When directed, insert command for PT-455 failure Indications Available: PRESSURIZER HIGH PRESSURE DEVIATION Annunciator 33B PRESSURIZER PRESSURE LOW HEATERS ON Annunciator 33C REACTOR PARTIAL TRIP Annunciator 83C PT-455 indicates high SRO Refer to OTO-BB-0006, Pressurizer Pressure Control System Instrument Failures RO Select an alternate channel RO Check RCS pressure 2200 - 2250 psig RO Check P-11 (Not Lit) correct state BOP Select recorder to valid channel SRO Direct I&C to trip the affected bistables SRO Refer to Tech Specs 3.3.1, Condition E, M  3.3.2 Condition D, L  3.3.4 Item 3  3.4.1 (DNB)
When directed, insert command for Feedwater Control Valve failure Indications Available:
After Technical Specifications have been addressed, proceed to Event 2
B FRV failing closed Feedwater flow to B SG Lowering STEAM GENERATOR B FLOW MISMATCH Annunciator 109D BOP        Determines SG B level is lowering.
 
Place AE-FK-520, SG B MFW Reg Valve Control, in BOP MANUAL, and restore SG level.
Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 2 Page 7 of 27 Event
SRO       Refer to OTO-AE-0001, Feedwater System Malfunctions.
BOP        Check Main Feed Pump tripped (NO)
BOP        Check Main Feed Pump Speed controlling in auto and stable Check Main Feed Reg Valves controlling in Auto (NO)
BOP
* Ensure Manual control
* Check Main Feed Reg Bypass Valves in service (NO)
BOP
* Check Condensate Pump operation
* Check Heater Drain Pump operation BOP        Verify SG NR level trend 45 - 55%
RO        Monitor or operate rod control to maintain Tave/Tref +/- 5 °F BOP        Check MFP Oil Pressure normal


== Description:==
Appendix D                               Operator Action                             Form ES-D-2 Op Test No.:       1     Scenario #     2       Event #       2               Page 8   of 27 Event
"B" Feedwater Control Valve fails closed in automatic Time Position Applicant's Actions or Behavior Booth Operator Instructions: When directed, insert command for Feedwater Control Valve failure Indications Available: 'B' FRV failing closed Feedwater flow to "B" SG Lowering STEAM GENERATOR B FLOW MISMATCH Annunciator 109D BOP Determines SG "B" level is lowering.
BOP Place AE-FK-520, SG "B" MFW Reg Valve Control, in MANUAL, and restore SG level.
SRO Refer to OTO-AE-0001, Feedwater System Malfunctions.
BOP Check Main Feed Pump tripped (NO)
BOP Check Main Feed Pump Speed controlling in auto and stable BOP Check Main Feed Reg Valves controlling in Auto (NO)  Ensure Manual control BOP  Check Main Feed Reg Bypass Valves in service (NO)  Check Condensate Pump operation  Check Heater Drain Pump operation BOP Verify SG NR level trend 45 - 55%
RO Monitor or operate rod control to maintain Tave/Tref +/- 5 °F BOP Check MFP Oil Pressure normal Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 2 Page 8 of 27 Event


== Description:==
== Description:==
"B" Feedwater Control Valve fails closed in automatic Time Position Applicant's Actions or Behavior SRO Perform communications per Ops Communications-01 SRO Verify Power change less than 15% in 1 hour When the plant is stable, proceed to Event 3  
B Feedwater Control Valve fails closed in automatic Time         Position                         Applicants Actions or Behavior SRO       Perform communications per Ops Communications-01 SRO       Verify Power change less than 15% in 1 hour When the plant is stable, proceed to Event 3


Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 3 Page 9 of 27 Event
Appendix D                                 Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #       2     Event #       3               Page 9   of 27 Event


== Description:==
== Description:==
Turbine First Stage Pressure Transmitter Fails Low Time Position Applicant's Actions or Behavior Booth Operator Instructions: When directed, insert command for First Stage Pressure Channel PT-506 failing low Indications Available: PT-506 indication failing low Control Rods stepping in if in auto SRO Refer to OTO-AC-00003, Turbine Impulse Pressure Channel  
Turbine First Stage Pressure Transmitter Fails Low Time         Position                           Applicants Actions or Behavior Booth Operator Instructions:
When directed, insert command for First Stage Pressure Channel PT-506 failing low Indications Available:
PT-506 indication failing low Control Rods stepping in if in auto Refer to OTO-AC-00003, Turbine Impulse Pressure Channel SRO Failure RO      Place Rod Control in MANUAL Identify the failed channel by comparing meter indications and BOP identifying alarmed annunciators. (PT-506)
Select the alternate impulse pressure channel by utilizing the BOP Impulse Pressure selector switch AC PS-505Z.
RO      Check Tave within 1.5°F of Tref Check Rod Control in AUTO RO
* Will place in AUTO if directed by SRO and Tave and Tref are matched Maintain Tavg at the corresponding Tref value for existing plant RO power. Ensure RX power is less than 3565 MWth.
Place the Steam Dump Interlock Selector switches (AB-HS-64 BOP and AB-HS-63) to the OFF/RESET position.
BOP      Check C-7, Load Loss Stm Dump Armed - Extinguished


Failure    RO Place Rod Control in MANUAL BOP Identify the failed channel by comparing meter indications and identifying alarmed annunciators.  (PT-506)
Appendix D                                 Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #       2     Event #       3               Page 10 of 27 Event
BOP Select the alternate impulse pressure channel by utilizing the Impulse Pressure selector switch AC PS-505Z.
RO Check Tave within 1.5°F of Tref RO Check Rod Control in AUTO  Will place in AUTO if directed by SRO and Tave and Tref are matched RO Maintain Tavg at the corresponding Tref value for existing plant power. Ensure RX power is less than 3565 MWth.
BOP Place the Steam Dump Interlock Selector switches (AB-HS-64 and AB-HS-63) to the OFF/RESET position.
BOP Check C-7, Load Loss Stm Dump Armed - Extinguished Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 3 Page 10 of 27 Event


== Description:==
== Description:==
Turbine First Stage Pressure Transmitter Fails Low Time Position Applicant's Actions or Behavior BOP Transfer Steam Dumps to the Steam Pressure Mode: Set the AB PK-507, Steam Header Pressure controller for 7.28 turns (1092 psig) Place the Steam Dump Select to STEAM PRESS BOP Place the Steam Dump Bypass Interlock switches to ON CREW Check the following permissives are in their correct state within 1 hour of the channel failure per Attachment B, permissives: P-7 P-13     SRO Refer to T/S LCO 3.3.1 (Improved T/S LCO 3.3.1) to ensure compliance with the requirements for minimum channels. Condition T When Tech Specs have been addressed, proceed to Event 4  
Turbine First Stage Pressure Transmitter Fails Low Time         Position                           Applicants Actions or Behavior Transfer Steam Dumps to the Steam Pressure Mode:
* Set the AB PK-507, Steam Header Pressure controller BOP for 7.28 turns (1092 psig)
* Place the Steam Dump Select to STEAM PRESS BOP       Place the Steam Dump Bypass Interlock switches to ON Check the following permissives are in their correct state within 1 hour of the channel failure per Attachment B, permissives:
CREW
* P-7
* P-13 Refer to T/S LCO 3.3.1 (Improved T/S LCO 3.3.1) to ensure SRO      compliance with the requirements for minimum channels.
* Condition T When Tech Specs have been addressed, proceed to Event 4


Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 11 of 27 Event
Appendix D                                 Operator Action                             Form ES-D-2 Op Test No.:       1     Scenario #     2       Event #     4,5,6           Page 11   of 27 Event


== Description:==
== Description:==
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicant's Actions or Behavior Booth Instructor Instructions:
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time         Position                           Applicants Actions or Behavior Booth Instructor Instructions:
When directed, insert commands to initiate remainder of events as sequenced Indications Available: Two dropped control rods Rod Bottom lights Multiple annunciators CREW Recognizes more than one control rod dropped.
When directed, insert commands to initiate remainder of events as sequenced Indications Available:
SRO Directs reactor trip.
Two dropped control rods Rod Bottom lights Multiple annunciators CREW       Recognizes more than one control rod dropped.
RO Attempts to trip reactor. Reactor will not trip.
SRO       Directs reactor trip.
SRO Directs entry to FR-S.1 RO CHECK Reactor Trip:
RO       Attempts to trip reactor. Reactor will not trip.
Rod Bottom Lights - ALL LIT Reactor Trip and Bypass Breakers -OPEN Neutron Flux - LOWERING (NO)
SRO       Directs entry to FR-S.1 RO       CHECK Reactor Trip:
* Rod Bottom Lights - ALL LIT
* Reactor Trip and Bypass Breakers -OPEN
* Neutron Flux - LOWERING (NO)
Manually TRIP Reactor:
Manually TRIP Reactor:
SB HS-1   SB-HS-42 (BOP)
* SB HS-1
* SB-HS-42 (BOP)
IF reactor will NOT trip, THEN PERFORM the following:
IF reactor will NOT trip, THEN PERFORM the following:
CRITICAL TASK  a. Manually INSERT control rods when AUTO slows below 48 SPM.  
CRITICAL                     a. Manually INSERT control rods when AUTO slows TASK                              below 48 SPM.


Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 12 of 27 Event
Appendix D                                   Operator Action                               Form ES-D-2 Op Test No.:       1     Scenario #       2     Event #     4,5,6           Page   12     of 27 Event


== Description:==
== Description:==
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicant's Actions or Behavior
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time         Position                           Applicants Actions or Behavior
: b. OPEN supply breakers to PG19 and PG20:
: b. OPEN supply breakers to PG19 and PG20:
PG HIS-16 PG HIS-18 WHEN reactor is tripped, THEN CLOSE supply breakers to PG19 and PG20.
* PG HIS-16
BOP CHECK Turbine trip:
* PG HIS-18 WHEN reactor is tripped, THEN CLOSE supply breakers to PG19 and PG20.
All Turbine Stop valves - CLOSED BOP CHECK AFW Pumps Running:
BOP       CHECK Turbine trip:
All Turbine Stop valves - CLOSED BOP       CHECK AFW Pumps Running:
: a. MD AFW Pumps - BOTH RUNNING (Must start)
: a. MD AFW Pumps - BOTH RUNNING (Must start)
AL HIS-23A AL HIS-22A
* AL HIS-23A
: b. TD AFW Pump - RUNNING IF NECESSARY   (May need to start)
* AL HIS-22A
CRITICAL TASK RO INITIATE Emergency Boration of RCS:
: b. TD AFW Pump - RUNNING IF NECESSARY (May need to start)
Note:   If SI is actuated, HHSI will be providing boration flow via the RWST
CRITICAL TASK               RO       INITIATE Emergency Boration of RCS:
: a. CHECK charging pumps - AT LEAST ONE RUNNING CCP(s):   BG HIS-1A BG HIS-2A OR   NCP:   BG HIS-3 Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 13 of 27 Event
Note:
If SI is actuated, HHSI will be providing boration flow via the RWST
: a. CHECK charging pumps - AT LEAST ONE RUNNING
* CCP(s):
* BG HIS-1A
* BG HIS-2A OR
* NCP:
* BG HIS-3
 
Appendix D                                 Operator Action                             Form ES-D-2 Op Test No.:       1     Scenario #     2       Event #     4,5,6           Page 13   of 27 Event


== Description:==
== Description:==
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicant's Actions or Behavior
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time         Position                           Applicants Actions or Behavior
: b. ALIGN emergency boration flow path:
: b. ALIGN emergency boration flow path:
: 1. START Boric Acid Transfer Pumps:
: 1. START Boric Acid Transfer Pumps:
BG HIS-5A BG HIS-6A
* BG HIS-5A
: 2. OPEN Emergency Borate to Charging Pump Suction valve:   BG HIS-8104
* BG HIS-6A
: 3. CHECK Emergency Boration Flow - GREATER THAN 30 GPM BG FI-183A
: 2. OPEN Emergency Borate to Charging Pump Suction valve:
* BG HIS-8104
: 3. CHECK Emergency Boration Flow - GREATER THAN 30 GPM
* BG FI-183A
: 4. MAINTAIN charging flow - GREATER THAN EMERGENCY BORATION FLOW
: 4. MAINTAIN charging flow - GREATER THAN EMERGENCY BORATION FLOW
: c. CHECK PZR Pressure - LESS THAN 2335 PSIG CREW CHECK Containment Purge Isolation:
: c. CHECK PZR Pressure - LESS THAN 2335 PSIG CREW       CHECK Containment Purge Isolation:
: a. ESFAS status panels CPIS sections:
: a. ESFAS status panels CPIS sections:
SA066X WHITE lights - ALL LIT SA066Y WHITE lights - ALL LIT RO CHECK If the Following Trips Have Occurred:
* SA066X WHITE lights - ALL LIT
: a. Reactor trip:   Rod Bottom Lights - ALL LIT Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 14 of 27 Event
* SA066Y WHITE lights - ALL LIT RO       CHECK If the Following Trips Have Occurred:
: a. Reactor trip:
* Rod Bottom Lights - ALL LIT
 
Appendix D                                   Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #       2     Event #     4,5,6           Page 14   of 27 Event


== Description:==
== Description:==
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicant's Actions or Behavior Reactor Trip and Bypass Breakers - OPEN Neutron Flux - LOWERING BOP b. Turbine trip:   All Turbine Stop Valves - CLOSED RO CHECK If Reactor Is Subcritical:
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time         Position                           Applicants Actions or Behavior
* Reactor Trip and Bypass Breakers - OPEN
* Neutron Flux - LOWERING BOP       b. Turbine trip:
* All Turbine Stop Valves - CLOSED RO       CHECK If Reactor Is Subcritical:
: a. Power Range channels - LESS THAN 5% (POST ACCIDENT PR - LESS THAN 5%)
: a. Power Range channels - LESS THAN 5% (POST ACCIDENT PR - LESS THAN 5%)
: b. Intermediate Range channels - NEGATIVE STARTUP RATE (POST ACCIDENT PR - STABLE OR LOWERING)
: b. Intermediate Range channels - NEGATIVE STARTUP RATE (POST ACCIDENT PR - STABLE OR LOWERING)
SRO  Go to Step 16. OBSERVE CAUTION prior to Step 16. Directs entry to E-0.
Go to Step 16. OBSERVE CAUTION prior to Step 16.
RO CHECK Reactor Trip:
SRO Directs entry to E-0.
Rod Bottom Lights - ALL LIT Reactor Trip and Bypass Breakers - OPEN Neutron Flux - LOWERING BOP CHECK Turbine Trip:
RO       CHECK Reactor Trip:
: a. All turbine Stop Valves - CLOSED BOP CHECK Power to AC Emergency Buses:
* Rod Bottom Lights - ALL LIT
: a. AC emergency buses - AT LEAST ONE ENERGIZED NB01 Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 15 of 27 Event
* Reactor Trip and Bypass Breakers - OPEN
* Neutron Flux - LOWERING BOP       CHECK Turbine Trip:
: a. All turbine Stop Valves - CLOSED BOP       CHECK Power to AC Emergency Buses:
: a. AC emergency buses - AT LEAST ONE ENERGIZED
* NB01
 
Appendix D                                   Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #       2     Event #     4,5,6           Page 15   of 27 Event


== Description:==
== Description:==
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicant's Actions or Behavior OR   NB02     b. AC emergency buses - BOTH ENERGIZED CREW CHECK SI Status:     a. CHECK if SI is actuated:
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time         Position                           Applicants Actions or Behavior OR
Any SI annunciator 88A through 88D - LIT OR   SB069 SI Actuate RED light - LIT OR   LOCA Sequencer annunciators 30A or 31A - LIT
* NB02
: b. CHECK both Trains of SI - ACTUATED LOCA Sequencer annunciator 30A - LIT LOCA Sequencer annunciator 31A - LIT SB069 SI Actuate RED light - LIT SOLID (NOT blinking)
: b. AC emergency buses - BOTH ENERGIZED CREW       CHECK SI Status:
BOP PERFORM Attachment A, Automatic Action Verification, while continuing with this procedure.
: a. CHECK if SI is actuated:
BOP CHECK Generator Output Breakers - OPEN MA ZL-3A (V55)
* Any SI annunciator 88A through 88D - LIT OR
MA ZL-4A (V53)
* SB069 SI Actuate RED light - LIT OR
BOP CHECK Feedwater Isolation:
* LOCA Sequencer annunciators 30A or 31A - LIT
: a. Main Feedwater Pumps - TRIPPED Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 16 of 27 Event
: b. CHECK both Trains of SI - ACTUATED
* LOCA Sequencer annunciator 30A - LIT
* LOCA Sequencer annunciator 31A - LIT
* SB069 SI Actuate RED light - LIT SOLID (NOT blinking)
PERFORM Attachment A, Automatic Action Verification, while BOP continuing with this procedure.
BOP       CHECK Generator Output Breakers - OPEN
* MA ZL-3A (V55)
* MA ZL-4A (V53)
BOP       CHECK Feedwater Isolation:
: a. Main Feedwater Pumps - TRIPPED
 
Appendix D                                 Operator Action                             Form ES-D-2 Op Test No.:       1     Scenario #     2       Event #     4,5,6           Page 16   of 27 Event


== Description:==
== Description:==
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicant's Actions or Behavior Annunciator 120A, MFP A Trip - LIT Annunciator 123A, MFP B Trip - LIT
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time         Position                           Applicants Actions or Behavior
: b. Main Feedwater Reg Valves - CLOSED AE ZL-510 (SG A)
* Annunciator 120A, MFP A Trip - LIT
AE ZL-520 (SG B)
* Annunciator 123A, MFP B Trip - LIT
AE ZL-530 (SG C)
: b. Main Feedwater Reg Valves - CLOSED
AE ZL-540 (SG D)
* AE ZL-510 (SG A)
: c. Main Feedwater Reg Bypass Valves - CLOSED AE ZL-550 (SG A)
* AE ZL-520 (SG B)
AE ZL-560 (SG B)
* AE ZL-530 (SG C)
AE ZL-570 (SG C)
* AE ZL-540 (SG D)
AE ZL-580 (SG D)
: c. Main Feedwater Reg Bypass Valves - CLOSED
: d. Feedwater Isolation Valves - CLOSED AE HIS-39 (SG A)
* AE ZL-550 (SG A)
AE HIS-40 (SG B)
* AE ZL-560 (SG B)
AE HIS-41 (SG C)
* AE ZL-570 (SG C)
AE HIS-42 (SG D)
* AE ZL-580 (SG D)
BOP CHECK AFW Pumps:
: d. Feedwater Isolation Valves - CLOSED
: a. MD AFW Pumps - BOTH RUNNING AL HIS-23A AL HIS-22A
* AE HIS-39 (SG A)
: b. TD AFW Pump - RUNNING IF NECESSARY  
* AE HIS-40 (SG B)
* AE HIS-41 (SG C)
* AE HIS-42 (SG D)
BOP       CHECK AFW Pumps:
: a. MD AFW Pumps - BOTH RUNNING
* AL HIS-23A
* AL HIS-22A
: b. TD AFW Pump - RUNNING IF NECESSARY


Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 17 of 27 Event
Appendix D                                 Operator Action                             Form ES-D-2 Op Test No.:       1     Scenario #     2       Event #     4,5,6           Page 17   of 27 Event


== Description:==
== Description:==
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicant's Actions or Behavior BOP CHECK AFW Valves - PROPER EMERGENCY ALIGNMENT MD AFP Flow Control Valves - THROTTLED AL HK-7A AL HK-9A AL HK-11A AL HK-5A TD AFP Flow Control Valves - FULL OPEN (May isolate to faulted SG)
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time         Position                           Applicants Actions or Behavior BOP       CHECK AFW Valves - PROPER EMERGENCY ALIGNMENT
AL HK-8A AL HK-10A AL HK-12A AL HK-6A BOP CHECK total AFW Flow - GREATER THAN 300,000 LBM/HR RO CHECK PZR PORVs and Spray Valves:
* MD AFP Flow Control Valves - THROTTLED
: a. PZR PORVs - CLOSED BB HIS-455A BB HIS-456A
* AL HK-7A
: b. PZR PORVs - BOTH IN AUTO BB HIS-455A BB HIS-456A
* AL HK-9A
* AL HK-11A
* AL HK-5A
* TD AFP Flow Control Valves - FULL OPEN (May isolate to faulted SG)
* AL HK-8A
* AL HK-10A
* AL HK-12A
* AL HK-6A BOP       CHECK total AFW Flow - GREATER THAN 300,000 LBM/HR RO       CHECK PZR PORVs and Spray Valves:
: a.       PZR PORVs - CLOSED
* BB HIS-455A
* BB HIS-456A
: b.       PZR PORVs - BOTH IN AUTO
* BB HIS-455A
* BB HIS-456A
: c. PORV Block Valves - BOTH OPEN (NO)
: c. PORV Block Valves - BOTH OPEN (NO)
BB HIS-8000A (CLOSED)
* BB HIS-8000A (CLOSED)
BB HIS-8000B  
* BB HIS-8000B


Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 18 of 27 Event
Appendix D                                 Operator Action                             Form ES-D-2 Op Test No.:       1     Scenario #     2       Event #     4,5,6           Page 18   of 27 Event


== Description:==
== Description:==
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicant's Actions or Behavior
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time         Position                           Applicants Actions or Behavior
: d. Normal PZR Spray Valves - CLOSED BB ZL-455B BB ZL-455C NOTE: Seal injection flow should be maintained to all RCPs.
: d. Normal PZR Spray Valves - CLOSED
* BB ZL-455B
* BB ZL-455C NOTE:       Seal injection flow should be maintained to all RCPs.
CHECK If RCPs Should Be Stopped:
CHECK If RCPs Should Be Stopped:
: a. RCPs - ANY RUNNING
: a. RCPs - ANY RUNNING
: b. ECCS Pumps - AT LEAST ONE RUNNING CCP   OR   SI Pump     c. RCS pressure - LESS THAN 1425 PSIG (NO)
: b. ECCS Pumps - AT LEAST ONE RUNNING
CREW CHECK RCS Temperatures:
* CCP OR
Any RCP running - RCS TAVG STABLE AT 557°F OR TRENDING TO 557°F (NO)
* SI Pump
: c. RCS pressure - LESS THAN 1425 PSIG (NO)
CREW       CHECK RCS Temperatures:
* Any RCP running - RCS TAVG STABLE AT 557°F OR TRENDING TO 557°F (NO)
If TEMPERATURE IS LESS THAN 557°F and LOWERING, then perform THE FOLLOWING:
If TEMPERATURE IS LESS THAN 557°F and LOWERING, then perform THE FOLLOWING:
: a. STOP dumping steam.
: a. STOP dumping steam.
: b. IF cooldown continues, THEN CONTROL total feed flow:
: b. IF cooldown continues, THEN CONTROL total feed flow:
MAINTAIN total feed flow greater than 300,000 LBM/HR until narrow range level is greater than 7%  
* MAINTAIN total feed flow greater than 300,000 LBM/HR until narrow range level is greater than 7%
 
[25%] in at least one SG.
[25%] in at least one SG.  


Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 19 of 27 Event
Appendix D                                 Operator Action                             Form ES-D-2 Op Test No.:       1     Scenario #     2       Event #     4,5,6           Page 19   of 27 Event


== Description:==
== Description:==
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicant's Actions or Behavior
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time         Position                           Applicants Actions or Behavior
: c. IF cooldown continues, THEN FAST CLOSE all MSIVs and Bypass valves: (May have been performed)
: c. IF cooldown continues, THEN FAST CLOSE all MSIVs and Bypass valves: (May have been performed)
AB HS-79 AB HS-80 BOP CHECK If Any SG Is Faulted:
* AB HS-79
* AB HS-80 BOP       CHECK If Any SG Is Faulted:
: a. CHECK pressures in all SGs:
: a. CHECK pressures in all SGs:
ANY SG PRESSURE LOWERING IN AN UNCONTROLLED MANNER ("A" SG)
* ANY SG PRESSURE LOWERING IN AN UNCONTROLLED MANNER (A SG)
OR   ANY SG COMPLETELY DEPRESSURIZED
OR
* ANY SG COMPLETELY DEPRESSURIZED
: b. Go To E-2, Faulted Steam Generator Isolation, Step 1.
: b. Go To E-2, Faulted Steam Generator Isolation, Step 1.
CAUTIONS: At least one SG must be maintained available for RCS cooldown.
CAUTIONS:         At least one SG must be maintained available for RCS cooldown.
Any faulted SG or secondary break should remain isolated during subsequent recovery actions unless needed for RCS cooldown.
Any faulted SG or secondary break should remain isolated during subsequent recovery actions unless needed for RCS cooldown.
BOP CHECK MSIVs and Bypass Valves - CLOSED BOP CHECK If Any SG Secondary Pressure Boundary Is Intact:
BOP       CHECK MSIVs and Bypass Valves - CLOSED BOP       CHECK If Any SG Secondary Pressure Boundary Is Intact:
: a. CHECK pressures in all SGs - ANY STABLE OR RISING BOP IDENTIFY Faulted SG(s):
: a. CHECK pressures in all SGs - ANY STABLE OR RISING BOP       IDENTIFY Faulted SG(s):
: a. CHECK pressures in all SGs:
: a. CHECK pressures in all SGs:
ANY SG PRESSURE LOWERING IN AN UNCONTROLLED MANNER ("A")
* ANY SG PRESSURE LOWERING IN AN UNCONTROLLED MANNER (A)
OR Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 20 of 27 Event
OR
 
Appendix D                                 Operator Action                             Form ES-D-2 Op Test No.:       1     Scenario #     2       Event #     4,5,6           Page 20   of 27 Event


== Description:==
== Description:==
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicant's Actions or Behavior ANY SG COMPLETELY DEPRESSURIZED ISOLATE Faulted SG(s):
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time         Position                           Applicants Actions or Behavior
CRITICAL TASK a. ISOLATE AFW flow to faulted SG(s):
* ANY SG COMPLETELY DEPRESSURIZED ISOLATE Faulted SG(s):
CLOSE associated MD AFP Flow Control Valve(s):
CRITICAL TASK                         a. ISOLATE AFW flow to faulted SG(s):
AL HK-7A (SG A)
* CLOSE associated MD AFP Flow Control Valve(s):
CLOSE associated TD AFP Flow Control Valve(s):
* AL HK-7A (SG A)
AL HK-8A (SG A)
* CLOSE associated TD AFP Flow Control Valve(s):
: b. CHECK ASD from faulted SG(s) - CLOSED AB PIC-1A (SG A)
* AL HK-8A (SG A)
: b. CHECK ASD from faulted SG(s) - CLOSED
* AB PIC-1A (SG A)
: c. Locally CLOSE TDAFP Steam Supply From Main steam Loop Manual Isolation valve from faulted SG(s):
: c. Locally CLOSE TDAFP Steam Supply From Main steam Loop Manual Isolation valve from faulted SG(s):
ABV0085 (SG B)
* ABV0085 (SG B)
ABV0087 (SB C)
* ABV0087 (SB C)
: d. CHECK Main Feedwater valves to faulted SG(s) - CLOSED   Main Feedwater Reg Valves:
: d. CHECK Main Feedwater valves to faulted SG(s) -
AE ZL-510 (SG A)
CLOSED
Main Feedwater Reg Valves:
* Main Feedwater Reg Valves:
AE ZL-550 (SG A)
* AE ZL-510 (SG A)
Feedwater Isolation Valve:
* Main Feedwater Reg Valves:
AE HIS-39 (SG A)
* AE ZL-550 (SG A)
: e. CHECK SG Blowdown containment Isolation Valve from faulted SG(s) - CLOSED BM HIS-1A (SG A)
* Feedwater Isolation Valve:
Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 21 of 27 Event
* AE HIS-39 (SG A)
: e. CHECK SG Blowdown containment Isolation Valve from faulted SG(s) - CLOSED
* BM HIS-1A (SG A)
 
Appendix D                                 Operator Action                             Form ES-D-2 Op Test No.:       1     Scenario #     2       Event #     4,5,6           Page 21   of 27 Event


== Description:==
== Description:==
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicant's Actions or Behavior
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time         Position                           Applicants Actions or Behavior
: f. CLOSE Steamline Low Point Drain valve from faulted SG(s):   AB HIS-9 (SG A)
: f. CLOSE Steamline Low Point Drain valve from faulted SG(s):
BOP CHECK CST To AFP Suction Header Pressure - GREATER THAN 2.7 PSIG CREW CHECK Secondary Radiation:
* AB HIS-9 (SG A)
: a. PERFORM EOP Addendum 11, Restoring SG Sampling After SI Actuation PERFORM EOP Addendum 11, Restoring SG Sampling After SI Actuation DIRECT Chemistry to periodically sample all SGs for activity   DIRECT Health Physics to survey steamlines in Auxiliary Building Area 5 as necessary
CHECK CST To AFP Suction Header Pressure - GREATER BOP THAN 2.7 PSIG CREW       CHECK Secondary Radiation:
: a. PERFORM EOP Addendum 11, Restoring SG Sampling After SI Actuation
* PERFORM EOP Addendum 11, Restoring SG Sampling After SI Actuation
* DIRECT Chemistry to periodically sample all SGs for activity
* DIRECT Health Physics to survey steamlines in Auxiliary Building Area 5 as necessary
: b. CHECK unisolated secondary radiation monitors:
: b. CHECK unisolated secondary radiation monitors:
SG Sample radiation:
* SG Sample radiation:
SJL 026   SG ASD radiation:
* SJL 026
AB RIC 111 (SG A)
* SG ASD radiation:
AB RIC 112 (SG B)
* AB RIC 111 (SG A)
AB RIC 113 (SG C)
* AB RIC 112 (SG B)
AB RIC 114 (SG D)
* AB RIC 113 (SG C)
Turbine Driven Auxiliary Feedwater Pump Exhaust radiation:
* AB RIC 114 (SG D)
FC RIC 385
* Turbine Driven Auxiliary Feedwater Pump Exhaust radiation:
: c. Secondary radiation - NORMAL Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 22 of 27 Event
* FC RIC 385
: c. Secondary radiation - NORMAL
 
Appendix D                                 Operator Action                             Form ES-D-2 Op Test No.:       1     Scenario #     2       Event #     4,5,6           Page 22   of 27 Event


== Description:==
== Description:==
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicant's Actions or Behavior CREW CHECK If ECCS Flow Should Be Reduced:
Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time         Position                           Applicants Actions or Behavior CREW       CHECK If ECCS Flow Should Be Reduced:
: a. RCS subcooling - GREATER THAN 30°F
: a. RCS subcooling - GREATER THAN 30°F
: b. Secondary heat sink:
: b. Secondary heat sink:
Narrow range level in at least one intact SG - GREATER THAN 7% [25%]
* Narrow range level in at least one intact SG -
OR   Total feed flow to intact SGs - GREATER THAN 300,000 LBM/HR
GREATER THAN 7% [25%]
OR
* Total feed flow to intact SGs - GREATER THAN 300,000 LBM/HR
: c. RCS pressure - STABLE OR RISING
: c. RCS pressure - STABLE OR RISING
: d. PZR level - GREATER THAN 9% [29%]
: d. PZR level - GREATER THAN 9% [29%]
RO RESET SI:   SB HS-42A SB HS-43A RO STOP All But One CCP:
RO       RESET SI:
BG HIS-1A OR   BG HIS-2A SRO Go To ES-1.1, SI Termination, Step 3.
* SB HS-42A
Scenario may be terminated upon transition to ES-1.1 ATTACHMENT A Automatic Action Verification BOP CHECK Charging Pumps:
* SB HS-43A RO       STOP All But One CCP:
BOP a. CCPs - BOTH RUNNING BG HIS-1A BG HIS-2A BOP b. STOP NCP:   BG HIS-3 BOP CHECK SI And RHR Pumps SI Pumps - BOTH RUNNING EM HIS-4 EM HIS-5 RHR Pumps - BOTH RUNNING EJ HIS-1 EJ HIS-2 BOP CHECK ECCS Flow:
* BG HIS-1A OR
BOP a. CCPs to Boron Inj Header - FLOW INDICATED EM FI-917A EM FI-917B BOP b. RCS pressure - LESS THAN 1700 PSIG BOP c. SI Pump Discharge - FLOW INDICATED EM FI-918 EM FI-922 BOP d. RCS pressure - LESS THAN 325 PSIG BOP e. RHR To Accumulator Injection Loop - FLOW INDICATED EJ FI-618  
* BG HIS-2A SRO       Go To ES-1.1, SI Termination, Step 3.
Scenario may be terminated upon transition to ES-1.1
 
ATTACHMENT A Automatic Action Verification BOP CHECK Charging Pumps:
BOP a. CCPs - BOTH RUNNING
* BG HIS-1A
* BG HIS-2A BOP b. STOP NCP:
* BG HIS-3 BOP CHECK SI And RHR Pumps
* SI Pumps - BOTH RUNNING
* EM HIS-4
* EM HIS-5
* RHR Pumps - BOTH RUNNING
* EJ HIS-1
* EJ HIS-2 BOP CHECK ECCS Flow:
BOP a. CCPs to Boron Inj Header - FLOW INDICATED
* EM FI-917A
* EM FI-917B BOP b. RCS pressure - LESS THAN 1700 PSIG BOP c. SI Pump Discharge - FLOW INDICATED
* EM FI-918
* EM FI-922 BOP d. RCS pressure - LESS THAN 325 PSIG BOP e. RHR To Accumulator Injection Loop - FLOW INDICATED
* EJ FI-618


ATTACHMENT A Automatic Action Verification EJ FI-619 CAUTION: If offsite power is lost after SI reset, manual action may be required to restart safeguards equipment.
ATTACHMENT A Automatic Action Verification
BOP CHECK ESW Pumps - BOTH RUNNING EF HIS-55A EF HIS-56A BOP CHECK CCW Alignment:
* EJ FI-619 CAUTION: If offsite power is lost after SI reset, manual action may be required to restart safeguards equipment.
BOP a. CCW Pumps - ONE RUNNING IN EACH TRAIN Red Train:
BOP       CHECK ESW Pumps - BOTH RUNNING
EG HIS-21 or EG HIS-23 Yellow Train EG HIS-22 or EG HIS-24 BOP b. CCW Service Loop Supply and Return valves for one operating CCW pump - OPEN EG ZL-15 AND EG ZL-53 OR   EG ZL-16 AND EG ZL-54 BOP CHECK Containment Cooler Fans - RUNNING IN SLOW SPEED   GN HIS-9 GN HIS-17 GN HIS-5 GN HIS-13 BOP CHECK Containment Hydrogen Mixing Fans - RUNNING IN SLOW SPEED GN HIS-2 GN HIS-4  
* EF HIS-55A
* EF HIS-56A BOP       CHECK CCW Alignment:
BOP       a. CCW Pumps - ONE RUNNING IN EACH TRAIN
* Red Train:
* EG HIS-21 or EG HIS-23
* Yellow Train
* EG HIS-22 or EG HIS-24
: b. CCW Service Loop Supply and Return valves for one BOP operating CCW pump - OPEN
* EG ZL-15 AND EG ZL-53 OR
* EG ZL-16 AND EG ZL-54 CHECK Containment Cooler Fans - RUNNING IN SLOW BOP SPEED
* GN HIS-9
* GN HIS-17
* GN HIS-5
* GN HIS-13 CHECK Containment Hydrogen Mixing Fans - RUNNING IN BOP SLOW SPEED
* GN HIS-2
* GN HIS-4


ATTACHMENT A Automatic Action Verification GN HIS-1 GN HIS-3 BOP CHECK If Containment Spray Should Be Actuated:
ATTACHMENT A Automatic Action Verification
* GN HIS-1
* GN HIS-3 BOP CHECK If Containment Spray Should Be Actuated:
BOP a. CHECK the following:
BOP a. CHECK the following:
Containment pressure - GREATER THAN 27 PSIG OR   GN PR-934 indicates containment pressure - HAS BEEN GREATER THAN 27 PSIG OR   Annunciator 59A CSAS - LIT OR   Annunciator 59B CISB - LIT BOP b. Containment Spray Pumps - BOTH RUNNING EN HIS-3 EN HIS-9 BOP c. ESFAS status panels CSAS sections:
* Containment pressure - GREATER THAN 27 PSIG OR
SA066X WHITE lights - ALL LIT SA066Y WHITE lights - ALL LIT BOP d. ESFAS status panels CISB sections:
* GN PR-934 indicates containment pressure - HAS BEEN GREATER THAN 27 PSIG OR
SA066X WHITE lights - ALL LIT SA066Y WHITE lights - ALL LIT BOP CHECK If Main Steamlines Should Be Isolated:
* Annunciator 59A CSAS - LIT OR
* Annunciator 59B CISB - LIT BOP b. Containment Spray Pumps - BOTH RUNNING
* EN HIS-3
* EN HIS-9 BOP c. ESFAS status panels CSAS sections:
* SA066X WHITE lights - ALL LIT
* SA066Y WHITE lights - ALL LIT BOP d. ESFAS status panels CISB sections:
* SA066X WHITE lights - ALL LIT
* SA066Y WHITE lights - ALL LIT BOP CHECK If Main Steamlines Should Be Isolated:
BOP a. CHECK for any of the following:
BOP a. CHECK for any of the following:
Containment pressure - GREATER THAN 17 PSIG OR   GN PR-934 indicates containment pressure - HAS  
* Containment pressure - GREATER THAN 17 PSIG OR
* GN PR-934 indicates containment pressure - HAS


ATTACHMENT A Automatic Action Verification BEEN GREATER THAN 17 PSIG OR   Steamline pressure - LESS THAN 615 PSIG OR   AB PR-514 or PR-535 indicates steamline pressure - HAS BEEN LESS THAN 615 PSIG BOP b. CHECK MSIVs and Bypass valves - CLOSED BOP CHECK ECCS Valves - PROPER EMERGENCY ALIGNMENT BOP a. ESFAS status panels SIS sections:
ATTACHMENT A Automatic Action Verification BEEN GREATER THAN 17 PSIG OR
SA066X WHITE lights - ALL LIT SA066Y WHITE lights - ALL LIT BOP CHECK Containment Isolation Phase A:
* Steamline pressure - LESS THAN 615 PSIG OR
BOP a. ESFAS status panels CISA sections:
* AB PR-514 or PR-535 indicates steamline pressure -
SA066X WHITE lights - ALL LIT SA066Y WHITE lights - ALL LIT BOP CHECK SG Blowdown Isolation:
HAS BEEN LESS THAN 615 PSIG BOP       b. CHECK MSIVs and Bypass valves - CLOSED BOP       CHECK ECCS Valves - PROPER EMERGENCY ALIGNMENT BOP       a. ESFAS status panels SIS sections:
BOP ESFAS status panels SGBSIS sections:
* SA066X WHITE lights - ALL LIT
SA066X WHITE lights - ALL LIT SA066Y WHITE lights - ALL LIT CAUTION: If offsite power is lost after SI reset, manual action may be required to restart safeguards equipment.
* SA066Y WHITE lights - ALL LIT BOP       CHECK Containment Isolation Phase A:
BOP CHECK Both Trains of control Room Ventilation Isolation:
BOP       a. ESFAS status panels CISA sections:
BOP a. ESFAS status panels CRVIS sections:
* SA066X WHITE lights - ALL LIT
SA066X WHITE lights - ALL LIT  
* SA066Y WHITE lights - ALL LIT BOP       CHECK SG Blowdown Isolation:
BOP       ESFAS status panels SGBSIS sections:
* SA066X WHITE lights - ALL LIT
* SA066Y WHITE lights - ALL LIT CAUTION: If offsite power is lost after SI reset, manual action may be required to restart safeguards equipment.
BOP       CHECK Both Trains of control Room Ventilation Isolation:
BOP       a. ESFAS status panels CRVIS sections:
* SA066X WHITE lights - ALL LIT


ATTACHMENT A Automatic Action Verification SA066Y WHITE lights - ALL LIT BOP CHECK Containment Purge Isolation:
ATTACHMENT A Automatic Action Verification
* SA066Y WHITE lights - ALL LIT BOP CHECK Containment Purge Isolation:
BOP a. ESFAS status panels CPIS sections:
BOP a. ESFAS status panels CPIS sections:
SA066X WHITE lights - ALL LIT SA066Y WHITE lights - ALL LIT BOP Notify CRS of the following:
* SA066X WHITE lights - ALL LIT
Manual actions taken Failed Equipment Attachment A, Automatic Action Verification, completed  
* SA066Y WHITE lights - ALL LIT BOP Notify CRS of the following:
* Manual actions taken
* Failed Equipment
* Attachment A, Automatic Action Verification, completed


Appendix D Scenario Outline Form ES-D-1 Facility:
Appendix D                                       Scenario Outline                               Form ES-D-1 Facility:         Callaway                       Scenario No.:         3   Op Test No.:       NRC Examiners:                                                   Operators:
Callaway Scenario No.: 3 Op Test No.:
Initial Conditions:     5 - 10% power, BOL.
NRC Examiners:
Operators:
Initial Conditions:
5 - 10% power, BOL.
RE-52, Blowdown Discharge Pumps Discharge Monitor, is OOS.
RE-52, Blowdown Discharge Pumps Discharge Monitor, is OOS.
BB-PCV-455A PORV Leakage - Block Valve Closed. Turnover: Increase power to 100% at 3% per hour Critical Task: Isolate ruptured SG in step 3 of E-3.
BB-PCV-455A PORV Leakage - Block Valve Closed.
Establish and Maintain RCS temperature below that required for depressurization of the ruptured SG. Event No. Malf. No. Event Type* Event Description R - RO Raise power.
Turnover:               Increase power to 100% at 3% per hour Critical Task:           Isolate ruptured SG in step 3 of E-3.
1 T+0 N - BOP, SRO I - ALL Power Range NI failure.
Establish and Maintain RCS temperature below that required for depressurization of the ruptured SG.
2 T+10 NIS03D TS - SRO I - BOP, Steam Dump pressure setpoint failure.
Event          Malf.      Event                                        Event No.         No.       Type*                                   Description 1                    R - RO         Raise power.
3 T+30 MSS13B SRO 4 T+40 BBV001 C - RO, SRO TS - SRO RCP high vibration.
T+0                     N - BOP, SRO 2                    I - ALL       Power Range NI failure.
5 T+60 RCS02A M - ALL SGTR. Reactor trip required.
NIS03D T+10                     TS - SRO 3                    I - BOP,       Steam Dump pressure setpoint failure.
6 MSS07A C - BOP Atmospheric dump valve fails open, requiring manual isolation.
MSS13B T+30                     SRO 4                     C - RO,       RCP high vibration.
7 Component Override KAHIS29 C - RO Instrument air to containment fails closed, requiring alternate RCS depressurization.  
T+40        BBV001      SRO TS - SRO 5                    M - ALL       SGTR. Reactor trip required.
* (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor
RCS02A T+60 6                     C - BOP       Atmospheric dump valve fails open, requiring manual isolation.
 
MSS07A 7       Component     C - RO         Instrument air to containment fails closed, requiring alternate RCS Override                  depressurization.
Scenario Event Description NRC Scenario 3 The crew will assume the shift with instructions to raise reactor power in preparation for returning the unit to full power.
KAHIS29
    *   (N)ormal,     (R)eactivity,   (I)nstrument,     (C)omponent,     (M)ajor Scenario Event Description NRC Scenario 3 The crew will assume the shift with instructions to raise reactor power in preparation for returning the unit to full power.
When the power ascension is in progress, a power range instrument will fail high, requiring the crew to respond in accordance with OTO-SE-1. The crew will manually control feedwater bypass flow and remove the failed channel from service. The SRO will also determine the appropriate technical specification action requirements.
When the power ascension is in progress, a power range instrument will fail high, requiring the crew to respond in accordance with OTO-SE-1. The crew will manually control feedwater bypass flow and remove the failed channel from service. The SRO will also determine the appropriate technical specification action requirements.
When the plant is stable and technical specifications have been addressed, a steam dump pressure setpoint failure will require the crew to place steam dumps in off/reset and control reactor power and Tave manually in accordance with OTO-AB-1 and OTO-AB-4.
When the plant is stable and technical specifications have been addressed, a steam dump pressure setpoint failure will require the crew to place steam dumps in off/reset and control reactor power and Tave manually in accordance with OTO-AB-1 and OTO-AB-4.
When the plant is stable, increasing RCP vibration will require the crew to enter OTO-BB-2 to determine that the RCP must be stopped in accordance with OTN-BB-3. The crew will stop the affected RCP after determining reactor power is below P-8. Actions of OTO-BB-4 will also be performed to defeat Loop Delta T and Tave inputs. The SRO will also determine the appropriate technical specification action requirements.
When the plant is stable, increasing RCP vibration will require the crew to enter OTO-BB-2 to determine that the RCP must be stopped in accordance with OTN-BB-3. The crew will stop the affected RCP after determining reactor power is below P-8. Actions of OTO-BB-4 will also be performed to defeat Loop Delta T and Tave inputs. The SRO will also determine the appropriate technical specification action requirements.
When the plant is stable, a SGTR develops, requiring the crew to trip the reactor and initiate Safety Injection. An atmospheric dump valve will fail open in automatic and require manual closure. Instrument Air to containment will fail closed, requiring alternate RCS depressurization.
When the plant is stable, a SGTR develops, requiring the crew to trip the reactor and initiate Safety Injection. An atmospheric dump valve will fail open in automatic and require manual closure. Instrument Air to containment will fail closed, requiring alternate RCS depressurization.
The scenario may be terminated when ECCS pumps are stopped in E-3, Steam Generator  
The scenario may be terminated when ECCS pumps are stopped in E-3, Steam Generator Tube Rupture.
EOP Flow Path: E-0, E-3 SCENARIO SETUP GUIDE                                        EXAM #:      ILT-1 Scenario Malfunction List
: 1)  Initialize at IC-13.
: 2)  Run Batch File "iltthree.txt", and verify the actions on the following page are loaded correctly.
: 3)  Ensure Immediate Boration Timer is reset.
: 4)  Check RX trip switch has a RED flag.
: 5)  Ensure NIS indicates 10%
: 6)  Ensure step counters for Control Bank D are set at 114 steps and all other step counters are set for 228.
: 7)  Ensure the digital display is selected to REP0480A and RET0499A.
: 8)  Ensure Decrease Loading Rate Button is ON.
: 9)  Update status board for B Protected Train week.
: 10) Place Letdown orifi A and B in service with a caution tag on C
: 11) White board has the following boron concentrations:
    * "A" MDAFP T/S 3.7.5, Action C.1. 72 Hours. OOS @ 0500 Today
    * 'A' CCP "5 days ago" 1107 ppm
    * 'B' CCP "two weeks ago" 1135 ppm
: 12) Supply turnover and log sheets, Xe Predict, Dilution/Boration calculation and OTG-ZZ-00003.
: 13) Ensure the RM-11 is on the training system.
: 14) Microphones available for each person being evaluated and a video tape is in the VCR.
: 15) Ensure chart recorders are "rolled forward".
: 16) Ensure copies of the following procedures are in the file drawers:
* OTO-SE-00001
* OTO-AB-00004
* OTO-AB-00001
* OTO-BB-00002
* OTN-BB-00003
* E-0
* E-3 Scenario 3
>File:                iltthree.txt
>Author: S. P. Aufdemberge
>Date:                20050517
>=============SCENARIO SETUP ITEMS===========================================
>Simulates de-energization of "A" PORV Block valve due to PORV Leakage irf bbs014 (-1 0) 0
>BMRE52 OOS Pre-Setup imf rms6_08 (-1 0)
>============================================================================
>========================EVENT PRELOAD=======================================
>EVENT A
>Fail N44 to full scale high imf nis03d (1 0) 200 10
>============================================================================
>========================EVENT PRELOAD=======================================
>EVENT B
>Steam Dump Pressure Setpoint Failure imf mss13b (2 0) 1500 100
>============================================================================
>========================EVENT PRELOAD=======================================
>EVENT C
>RCP Hi Vibration irf bbv001 (3 0) 6.1 30
>============================================================================
>========================EVENT PRELOAD=======================================
>EVENT D
>SGTR A Leak grows from 0 to 300 over 100 seconds AUTOMATICALLY inserted when >BBHIS37 taken to stop or PTL.
trgset 4 x21i115s imf rcs02a (4 120) 300 100
>============================================================================
>========================EVENT PRELOAD=======================================
>EVENT E
> A ASD fails open requiring manual isolation trgset 5 x04o9o imf mss07a (5 0)
>============================================================================
>========================EVENT PRELOAD=======================================
>EVENT F
>Instrument Air Fails closed requiring Alternate RCS Depressurization trgset 6 jstsisa.eq.1 ior kahis29_ic (6) on ior kahis29_io (6) off ior kahis29_og (6) on ior kahis29_or (6) off
>================================================================================
==============================================================================
To FAST CLOSE A MSIV ONLY:
SAS013A set to OFF SAS013B set to OFF SAS013C set to OFF SAS017 set to ENABLE SAS018A set to FC
>end of file Scenario 3 Crew Turnover Separate Turnover sheets provided Appendix D                                Operator Action                          Form ES-D-2 Op Test No.:        1    Scenario #      3    Event #      1                Page 6  of 31 Event


Tube Rupture.
== Description:==
EOP Flow Path:  E-0, E-3  
Raise Power Time          Position                          Applicants Actions or Behavior Refer to OTG-ZZ-0003, Plant Startup Hot Zero Power to 30%
SRO Power, section 6.3 Perform a Pre-Job Brief of power ascension:
* General strategy for proceeding to 30% Power.
* Any items not completed as expected to this point.
* Applicable Precautions and Limitations
* Activities that can be performed at any time during the next CREW              sections(s) of this procedure such as Stroking MFRV's and Placing Reboiler in service.
* MFP and MFRV control status
* Extraction Steam Line Drain and FW Preheating status
* Steam Dump strategy Discuss the use of Optional Parameter Alarms as an aid to avoid undesired challenges to legal or system requirements BOP      Initiate a 3% per hour loading rate RO      Commence raising reactor power When power is >10%, verify P-7 and P-10 permissives are RO illuminated When control of the plant is demonstrated during startup, proceed to the next event


SCENARIO SETUP GUIDE EXAM #:  ILT-1    Scenario Malfunction List
Appendix D                             Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #     3     Event #     2                Page of 31 Event
: 1) Initialize at IC-13. 2) Run Batch File "iltthree.txt", and verify the actions on the following page are loaded correctly. 3) Ensure Immediate Boration Timer is reset. 4) Check RX trip switch has a RED flag. 5) Ensure NIS indicates 10% 6) Ensure step counters for Control Bank "D" are set at 114 steps and all other step counters are set for 228. 7) Ensure the digital display is selected to REP0480A and RET0499A. 8) Ensure Decrease Loading Rate Button is "ON". 9) Update status board for "B" Protected Train week. 10) Place Letdown orifi A and B in service with a caution tag on C 11) White board has the following boron concentrations:  "A" MDAFP T/S 3.7.5, Action C.1. 72 Hours. OOS @ 0500 Today  'A' CCP "5 days ago" 1107 ppm  'B' CCP "two weeks ago" 1135 ppm 12) Supply turnover and log sheets, Xe Predict, Dilution/Boration calculation and  OTG-ZZ-00003. 13) Ensure the RM-11 is on the training system. 14) Microphones available for each person being evaluated and a video tape is in the VCR. 15) Ensure chart recorders are "rolled forward". 16) Ensure copies of the following procedures are in the file drawers:  OTO-SE-00001  OTO-AB-00004  OTO-AB-00001  OTO-BB-00002  OTN-BB-00003  E-0  E-3 Scenario 3
  >File:  iltthree.txt >Author: S. P. Aufdemberge >Date:  20050517
> >=============SCENARIO SETUP ITEMS=========================================== >Simulates de-energization of "A" PORV Block valve due to PORV Leakage irf bbs014 (-1 0) 0 >BMRE52 OOS Pre-Setup imf rms6_08 (-1 0) >============================================================================ >========================EVENT PRELOAD=======================================
>EVENT A >Fail N44 to full scale high imf nis03d (1 0) 200 10 >============================================================================ >========================EVENT PRELOAD=======================================
>EVENT B >Steam Dump Pressure Setpoint Failure imf mss13b (2 0) 1500 100 >============================================================================ >========================EVENT PRELOAD=======================================
>EVENT C 
>RCP Hi Vibration irf bbv001 (3 0) 6.1 30 >============================================================================ >========================EVENT PRELOAD=======================================
>EVENT D >SGTR A Leak grows from 0 to 300 over 100 seconds AUTOMATICALLY inserted when >BBHIS37 taken to stop or PTL. trgset 4 "x21i115s" imf rcs02a (4 120) 300 100 >============================================================================ >========================EVENT PRELOAD=======================================
>EVENT E > "A" ASD fails open requiring manual isolation trgset 5 "x04o9o" imf mss07a (5 0)  >============================================================================ >========================EVENT PRELOAD=======================================
>EVENT F >Instrument Air Fails closed requiring Alternate RCS Depressurization trgset 6 "jstsisa.eq.1" ior kahis29_ic (6) on ior kahis29_io (6) off ior kahis29_og (6) on ior kahis29_or (6) off >================================================================================ ============================================================================== To FAST CLOSE "A" MSIV ONLY: SAS013A set to "OFF" SAS013B set to "OFF" SAS013C set to "OFF" SAS017 set to "ENABLE" SAS018A set to "FC"
>end of file
 
Scenario 3 Crew Turnover Separate Turnover sheets provided Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 1 Page 6 of 31 Event


== Description:==
== Description:==
Raise Power Time Position Applicant's Actions or Behavior SRO Refer to OTG-ZZ-0003, Plant Startup Hot Zero Power to 30%
Power Range NI Failure Time         Position                         Applicants Actions or Behavior Booth Instructor Instructions:
Power, section 6.3 CREW Perform a Pre-Job Brief of power ascension:
When directed, insert command for Power Range NI failure Indications Available:
General strategy for proceeding to 30% Power. Any items not completed as expected to this point. Applicable Precautions and Limitations  Activities that can be performed at any time during the next sections(s) of this procedure such as Stroking MFRV's and
PRNI N-44 failing HIGH Annunciators 78A, 78E, 82A for Power Range Channel deviation REACTOR PARTIAL TRIP Annunciator 83C BOP      Refer to Annunciator Response procedures SRO       Refer to OTO-SE-00001, Nuclear Instrument Malfunction Check Power Range Instruments normal.
 
RO
Placing Reboiler in service. MFP and MFRV control status  Extraction Steam Line Drain and FW Preheating status  Steam Dump strategy Discuss the use of Optional Parameter Alarms as an aid to avoid undesired challenges to legal or system requirements BOP Initiate a 3% per hour loading rate RO Commence raising reactor power RO When power is >10%, verify P-7 and P-10 permissives are illuminated When control of the plant is demonstrated during startup, proceed to the next event Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 2 Page 7 of 31 Event
* N-44 is failing high RO        Ensure Rod Control is in MANUAL BOP      Place SG Main Feed Reg Bypass valves in MANUAL BOP      Control SG levels from 45 - 55%
BOP      Stop any Main Turbine load changes (None in progress)
RO        Maintain Tave/Tref within 1.5°F using manual rod control Check the following permissives are in their required state
* P-7 CREW
* P-8
* P-9
* P-10 CREW        Select an operable channel on the NI Recorder


== Description:==
Appendix D                             Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #     3     Event #     2               Page 8   of 31 Event
Power Range NI Failure Time Position Applicant's Actions or Behavior Booth Instructor Instructions: When directed, insert command for Power Range NI failure Indications Available: PRNI N-44 failing HIGH Annunciators 78A, 78E, 82A for Power Range Channel deviation REACTOR PARTIAL TRIP Annunciator 83C BOP Refer to Annunciator Response procedures SRO Refer to OTO-SE-00001, Nuclear Instrument Malfunction RO Check Power Range Instruments normal. N-44 is failing high RO Ensure Rod Control is in MANUAL BOP Place SG Main Feed Reg Bypass valves in MANUAL BOP Control SG levels from 45 - 55%
BOP Stop any Main Turbine load changes (None in progress)
RO Maintain Tave/Tref within 1.5°F using manual rod control CREW Check the following permissives are in their required state  P-7  P-8  P-9  P-10    CREW Select an operable channel on the NI Recorder Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 2 Page 8 of 31 Event


== Description:==
== Description:==
Power Range NI Failure Time Position Applicant's Actions or Behavior CREW Bypass the malfunctioning channel at the Detector Current Comparator Drawer Place UPPER SECTION switch to N-44 Place LOWER SECTION switch to N-44 Place ROD STOP BYPASS switch to N-44 Place POWER MISMATCH BYPASS switch to N-44 CREW At the Comparator and Rate drawer, place Comparator Channel Defeat switch to N-44 CREW Ensure the following annunciator windows are extinguished: 78A, PR CHANNEL DEV 78B, PR UPPER DETECTOR FLUX DEV 78C, PR LOWER DETECTOR FLUX DEV 82A, PR OVER PWR ROD STOP RO Check Rod Control in AUTO Rod Control is in MANUAL BOP Return Feed Reg Bypass valves to automatic operation as  
Power Range NI Failure Time         Position                         Applicants Actions or Behavior Bypass the malfunctioning channel at the Detector Current Comparator Drawer
* Place UPPER SECTION switch to N-44 CREW
* Place LOWER SECTION switch to N-44
* Place ROD STOP BYPASS switch to N-44
* Place POWER MISMATCH BYPASS switch to N-44 At the Comparator and Rate drawer, place Comparator CREW Channel Defeat switch to N-44 Ensure the following annunciator windows are extinguished:
* 78A, PR CHANNEL DEV CREW
* 78B, PR UPPER DETECTOR FLUX DEV
* 78C, PR LOWER DETECTOR FLUX DEV
* 82A, PR OVER PWR ROD STOP Check Rod Control in AUTO RO
* Rod Control is in MANUAL Return Feed Reg Bypass valves to automatic operation as BOP required by the SRO BOP      Control SG levels at 45 - 55%
Check Reactor Power >10% (NO)
CREW
* Perform Attachment B, Low Power Trips Enabled, within the time limit specified in TS Refer to applicable Tech Specs SRO
* TS 3.3.1 Condition D, E, S


required by the SRO BOP Control SG levels at 45 - 55%
Appendix D                             Operator Action                           Form ES-D-2 Op Test No.:       1     Scenario #     3     Event #     2               Page 9   of 31 Event
CREW Check Reactor Power >10% (NO)  Perform Attachment B, Low Power Trips Enabled, within the time limit specified in TS SRO Refer to applicable Tech Specs  TS 3.3.1 Condition D, E, S Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 2 Page 9 of 31 Event


== Description:==
== Description:==
Power Range NI Failure Time Position Applicant's Actions or Behavior When Tech Specs have been identified, proceed to Event 3  
Power Range NI Failure Time         Position                         Applicants Actions or Behavior When Tech Specs have been identified, proceed to Event 3


Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 3 Page 10 of 31 Event
Appendix D                               Operator Action                         Form ES-D-2 Op Test No.:       1     Scenario #     3     Event #     3               Page 10 of 31 Event


== Description:==
== Description:==
Steam Dump Pressure Setpoint Failure Time Position Applicant's Actions or Behavior Booth Instructor Instructions:
Steam Dump Pressure Setpoint Failure Time         Position                         Applicants Actions or Behavior Booth Instructor Instructions:
When directed, insert command for the Steam Dump pressure transmitter failure Indications Available: Steam Dumps start to open SRO Refers to OTO-AB-00004, Steam Header Pressure Channel Failure     BOP Check Steam header pressure indicator AB PI-507 indicating significantly different than SG pressure indicators BOP Check Feed Pump Speed Changing due to failed channel Must control feed pump speed using GE potentiometers with speed controller in manual, due to PT-507 failure Restore programmed DP BOP Check Steam Dump Control in Pressure Mode BOP Place Steam Header Pressure Controller in MANUAL BOP Check steam dumps responding in MANUAL BOP Manually control SG pressure to the desired value SRO Initiate actions to repair failed transmitter SRO Perform notifications per OPS-Communications-01 When steam pressure is under manual control, proceed to the next event  
When directed, insert command for the Steam Dump pressure transmitter failure Indications Available:
Steam Dumps start to open Refers to OTO-AB-00004, Steam Header Pressure Channel SRO Failure Check Steam header pressure indicator AB PI-507 indicating BOP significantly different than SG pressure indicators Check Feed Pump Speed Changing due to failed channel
* Must control feed pump speed using GE potentiometers BOP with speed controller in manual, due to PT-507 failure
* Restore programmed DP BOP       Check Steam Dump Control in Pressure Mode BOP       Place Steam Header Pressure Controller in MANUAL BOP       Check steam dumps responding in MANUAL BOP       Manually control SG pressure to the desired value SRO       Initiate actions to repair failed transmitter SRO       Perform notifications per OPS-Communications-01 When steam pressure is under manual control, proceed to the next event


Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 4 Page 11 of 31 Event
Appendix D                               Operator Action                         Form ES-D-2 Op Test No.:       1     Scenario #     3   Event #       4               Page 11 of 31 Event


== Description:==
== Description:==
RCP High Vibration Time Position Applicant's Actions or Behavior Booth Operator Instructions:
RCP High Vibration Time         Position                       Applicants Actions or Behavior Booth Operator Instructions:
When directed, insert command to initiate RCP high vibration Indications Available: RCP VIB DANGER Annunciator 70A RCP VIB/SYS ALERT Annunciator 70B NOTE: In Modes 1 & 2 when a RCP is stopped, the idle loop RTD channel is INOPERABLE and the actions of OTO-BB-00004, RTD Channel Failures, should be performed.
When directed, insert command to initiate RCP high vibration Indications Available:
SRO Refer to OTO-BB-00002, Reactor Coolant Pump Off-Normal RO Check RCP Vibrations
RCP VIB DANGER Annunciator 70A RCP VIB/SYS ALERT Annunciator 70B NOTE:
: a. RCP Vibration level; ALL RCPs Less than 5 MILS on the frame AND   ALL RCPs Less than 20 MILS on the shaft (at RP312, B YI-471) (NO)
In Modes 1 & 2 when a RCP is stopped, the idle loop RTD channel is INOPERABLE and the actions of OTO-BB-00004, RTD Channel Failures, should be performed.
SRO       Refer to OTO-BB-00002, Reactor Coolant Pump Off-Normal RO       Check RCP Vibrations
: a. RCP Vibration level;
* ALL RCPs Less than 5 MILS on the frame AND
* ALL RCPs Less than 20 MILS on the shaft (at RP312, B YI-471) (NO)
IF Reactor power LESS THAN 48%
IF Reactor power LESS THAN 48%
(P-8 extinguished on SB069)
(P-8 extinguished on SB069)
RO SECURE the affected RCP IAW OTN-BB-00003.
RO       SECURE the affected RCP IAW OTN-BB-00003.
RO Continue to MONITOR RCP parameters for all RCPs.
RO       Continue to MONITOR RCP parameters for all RCPs.
SRO REFER to OTG-ZZ-00004, Power Operations, to shutdown the  
REFER to OTG-ZZ-00004, Power Operations, to shutdown the SRO plant.
SRO      Refer to T/S LCO 3.3.1, T/S LCO 3.3.2, and T/S LCO 3.4.4.


plant. SRO Refer to T/S LCO 3.3.1, T/S LCO 3.3.2, and T/S LCO 3.4.4.
Appendix D                               Operator Action                         Form ES-D-2 Op Test No.:       1     Scenario #     3   Event #     4               Page 12 of 31 Event
Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 4 Page 12 of 31 Event


== Description:==
== Description:==
RCP High Vibration Time Position Applicant's Actions or Behavior CREW Verify that permissive P8 is extinguished.
RCP High Vibration Time         Position                       Applicants Actions or Behavior CREW       Verify that permissive P8 is extinguished.
CAUTION: Consider the effects of securing the RCP WILL have on S/G level and Pzr Pressure control. The FRV in Auto should handle the transient but will later need to be closed and the FRV Bypass placed in service to prevent a high level Turbine Trip. If the "D" RCP is secured, Pzr Press control is accomplished by cycling heaters.
CAUTION:         Consider the effects of securing the RCP WILL have on S/G level and Pzr Pressure control. The FRV in Auto should handle the transient but will later need to be closed and the FRV Bypass placed in service to prevent a high level Turbine Trip. If the D RCP is secured, Pzr Press control is accomplished by cycling heaters.
RO STOP the Reactor Coolant Pump.
RO       STOP the Reactor Coolant Pump.
CREW In Modes 1, and 2, when a RCP is stopped, the idle loop RTD channel is INOPERABLE. PERFORM actions of OTO-BB-00004, RTD CHANNEL FAILURES, for the INOPERABLE RTD channel and refer to T/S LCO 3.3.1, T/S LCO 3.3.2, T/S LCO 3.4.4 and CARS 199601236.
In Modes 1, and 2, when a RCP is stopped, the idle loop RTD channel is INOPERABLE. PERFORM actions of OTO-BB-CREW        00004, RTD CHANNEL FAILURES, for the INOPERABLE RTD channel and refer to T/S LCO 3.3.1, T/S LCO 3.3.2, T/S LCO 3.4.4 and CARS 199601236.
CREW GO TO OTG-ZZ-00005, Plant Shutdown 20% Power to Hot  
GO TO OTG-ZZ-00005, Plant Shutdown 20% Power to Hot CREW Standby.
The next event is initiated on a trigger from RCP trip


Standby.      The next event is initiated on a trigger from RCP trip
Appendix D                                Operator Action                              Form ES-D-2 Op Test No.:        1    Scenario #    3    Event #       5, 6, 7          Page 13      of  31 Event


Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 13 of 31 Event
== Description:==
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time          Position                        Applicants Actions or Behavior Indications Available:
PRESSURIZER LOW LEVEL DEVIATION Annunciator 32C PRESSURIZER PRESSURE LOW HEATERS ON Annunciator 33C RO        Determines PZR level dropping rapidly.
SRO      Directs Reactor Trip and Safety Injection actuation.
RO        CHECK Reactor Trip:
* Rod Bottom Lights - ALL LIT
* Reactor Trip and Bypass Breakers - OPEN
* Neutron Flux - LOWERING BOP      CHECK Turbine Trip:
: a. All Turbine Stop valves - CLOSED CREW        CHECK Power To AC Emergency Buses:
: a. AC emergency buses - AT LEAST ONE ENERGIZED
* NB01 OR
* NB02
: b. AC emergency buses - BOTH ENERGIZED CHECK SI Status:
: a. CHECK if SI is actuated:
* Any SI annunciator 88A through 88D - LIT


== Description:==
Appendix D                                 Operator Action                               Form ES-D-2 Op Test No.:       1     Scenario #     3     Event #       5, 6, 7         Page 14     of 31 Event
SGTR;  Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicant's Actions or Behavior Indications Available: PRESSURIZER LOW LEVEL DEVIATION Annunciator 32C PRESSURIZER PRESSURE LOW HEATERS ON Annunciator 33C RO Determines PZR level dropping rapidly.
SRO Directs Reactor Trip and Safety Injection actuation.
RO CHECK Reactor Trip:
Rod Bottom Lights - ALL LIT Reactor Trip and Bypass Breakers - OPEN Neutron Flux - LOWERING BOP CHECK Turbine Trip:
: a. All Turbine Stop valves - CLOSED CREW CHECK Power To AC Emergency Buses:
: a. AC emergency buses - AT LEAST ONE ENERGIZED NB01    OR    NB02      b. AC emergency buses - BOTH ENERGIZED CHECK SI Status:      a. CHECK if SI is actuated:
Any SI annunciator 88A through 88D - LIT Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 14 of 31 Event


== Description:==
== Description:==
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicant's Actions or Behavior OR   SB069 SI Actuate RED light - LIT OR   LOCA Sequencer annunciators 30A or 31A - LIT
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time         Position                         Applicants Actions or Behavior OR
: b. CHECK both Trains of SI - ACTUATED LOCA Sequencer annunciator 30A - LIT LOCA Sequencer annunciator 31A - LIT SB069 SI Actuate RED light - LIT SOLID (NOT blinking)
* SB069 SI Actuate RED light - LIT OR
BOP PERFORM Attachment A, Automatic Action Verification, while continuing with this procedure.
* LOCA Sequencer annunciators 30A or 31A - LIT
BOP CHECK Generator Output Breakers - OPEN MA ZL-3A (V55)
: b. CHECK both Trains of SI - ACTUATED
MA ZL-4A (V53)
* LOCA Sequencer annunciator 30A - LIT
BOP CHECK Feedwater Isolation:
* LOCA Sequencer annunciator 31A - LIT
: a. Main Feedwater Pumps - TRIPPED Annunciator 120A, MFP A Trip - LIT Annunciator 123A, MFP B Trip - LIT
* SB069 SI Actuate RED light - LIT SOLID (NOT blinking)
: b. Main Feedwater Reg Valves - CLOSED AE ZL-510 (SG A)
PERFORM Attachment A, Automatic Action Verification, while BOP continuing with this procedure.
AE ZL 520 (SG B)
BOP       CHECK Generator Output Breakers - OPEN
AE ZL 530 (SG C)
* MA ZL-3A (V55)
AE ZL 540 (SG D)  
* MA ZL-4A (V53)
BOP       CHECK Feedwater Isolation:
: a. Main Feedwater Pumps - TRIPPED
* Annunciator 120A, MFP A Trip - LIT
* Annunciator 123A, MFP B Trip - LIT
: b. Main Feedwater Reg Valves - CLOSED
* AE ZL-510 (SG A)
* AE ZL 520 (SG B)
* AE ZL 530 (SG C)
* AE ZL 540 (SG D)


Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 15 of 31 Event
Appendix D                               Operator Action                               Form ES-D-2 Op Test No.:       1     Scenario #   3     Event #     5, 6, 7           Page 15     of 31 Event


== Description:==
== Description:==
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicant's Actions or Behavior
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time         Position                       Applicants Actions or Behavior
: c. Main Feedwater Reg Bypass Valves - CLOSED AE ZL-550 (SG A)
: c. Main Feedwater Reg Bypass Valves - CLOSED
AE ZL 560 (SG B)
* AE ZL-550 (SG A)
AE ZL 570 (SG C)
* AE ZL 560 (SG B)
AE ZL 580 (SG D)
* AE ZL 570 (SG C)
: d. Feedwater Isolation valves - CLOSED AE HIS-39 (SG A)
* AE ZL 580 (SG D)
AE HIS-40 (SG B)
: d. Feedwater Isolation valves - CLOSED
AE HIS-41 (SG C)
* AE HIS-39 (SG A)
AE HIS-42 (SG D)
* AE HIS-40 (SG B)
RO CHECK AFW Pumps:
* AE HIS-41 (SG C)
: a. MD AFW Pumps - BOTH RUNNING AL HIS-23A AL-HIS-22A
* AE HIS-42 (SG D)
: b. TD AFW Pumps - RUNNING IF NECESSARY RO CHECK AFW Valves - PROPER EMERGENCY ALIGNMENT MD AFP Flow Control Valves - THROTTLED AL HK-7A AL HK-9A AL HK-11A AL HK-5A TD AFP Flow Control Valves - FULL OPEN AL HK-8A AL HK-10A Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 16 of 31 Event
RO       CHECK AFW Pumps:
: a. MD AFW Pumps - BOTH RUNNING
* AL HIS-23A
* AL-HIS-22A
: b. TD AFW Pumps - RUNNING IF NECESSARY RO       CHECK AFW Valves - PROPER EMERGENCY ALIGNMENT
* MD AFP Flow Control Valves - THROTTLED
* AL HK-7A
* AL HK-9A
* AL HK-11A
* AL HK-5A
* TD AFP Flow Control Valves - FULL OPEN
* AL HK-8A
* AL HK-10A
 
Appendix D                               Operator Action                               Form ES-D-2 Op Test No.:       1     Scenario #   3     Event #     5, 6, 7           Page 16     of 31 Event


== Description:==
== Description:==
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicant's Actions or Behavior AL HK-12A AL HK-6A RO CHECK Total AFW Flow - GREATER THAN 300,00 LBM/HR RO CHECK PZR PORVs and Spray Valves:
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time         Position                       Applicants Actions or Behavior
: a. PZR PORVs - CLOSED BB HIS-455A BB-HIS-456A
* AL HK-12A
: b. PZR PORVs - BOTH IN AUTO BB HIS-455A BB-HIS-456A
* AL HK-6A RO       CHECK Total AFW Flow - GREATER THAN 300,00 LBM/HR RO       CHECK PZR PORVs and Spray Valves:
: a. PZR PORVs - CLOSED
* BB HIS-455A
* BB-HIS-456A
: b. PZR PORVs - BOTH IN AUTO
* BB HIS-455A
* BB-HIS-456A
: c. PORV Block Valves - BOTH OPEN (NO)
: c. PORV Block Valves - BOTH OPEN (NO)
BB HIS-8000A (Closed)
* BB HIS-8000A (Closed)
BB-HIS-8000A
* BB-HIS-8000A
: d. Normal PZR Spray Valves - CLOSED BB ZL-455A BB-ZL-456A RO CHECK If RCPs Should Be Stopped:
: d. Normal PZR Spray Valves - CLOSED
* BB ZL-455A
* BB-ZL-456A RO       CHECK If RCPs Should Be Stopped:
: a. RCPs - ANY RUNNING
: a. RCPs - ANY RUNNING
: b. ECCS Pumps - AT LEAST ONE RUNNING CCP Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 17 of 31 Event
: b. ECCS Pumps - AT LEAST ONE RUNNING
* CCP
 
Appendix D                               Operator Action                               Form ES-D-2 Op Test No.:       1     Scenario #   3       Event #     5, 6, 7         Page 17     of 31 Event


== Description:==
== Description:==
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicant's Actions or Behavior OR   SI Pump     c. RCS pressure - LESS THAN 1425 PSIG RO CHECK RCS Temperatures:
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time         Position                         Applicants Actions or Behavior OR
Any RCP running - RCS TAVG STABLE AT 557°F OR TRENDING TO 557°F RO CHECK If Any SG Is Faulted:
* SI Pump
: c. RCS pressure - LESS THAN 1425 PSIG RO       CHECK RCS Temperatures:
* Any RCP running - RCS TAVG STABLE AT 557°F OR TRENDING TO 557°F RO       CHECK If Any SG Is Faulted:
: a. CHECK pressures in all SGs:
: a. CHECK pressures in all SGs:
ANY SG PRESSURE LOWERING IN AN UNCONTROLLED MANNER (NO)
* ANY SG PRESSURE LOWERING IN AN UNCONTROLLED MANNER (NO)
OR   ANY SG COMPLETELY DEPRESSURIZED RO CHECK If SG Tubes Are Intact:
OR
Levels in all SGs:
* ANY SG COMPLETELY DEPRESSURIZED RO       CHECK If SG Tubes Are Intact:
NO SG NARROW RANGE LEVEL RISING IN AN UNCONTROLLED MANNER SG Steamline N16 radiation - NORMAL N16 161 (SGA)
* Levels in all SGs:
N16 162 (SGB)
* NO SG NARROW RANGE LEVEL RISING IN AN UNCONTROLLED MANNER
N16 163 (SGC)
* SG Steamline N16 radiation - NORMAL
N16 164 (SGD)
* N16 161 (SGA)
Condenser Air Removal radiation - NORMAL BEFORE ISOLATION GEG 925   SG Blowdown and Sample radiation - NORMAL BEFORE ISOLATION Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 18 of 31 Event
* N16 162 (SGB)
* N16 163 (SGC)
* N16 164 (SGD)
* Condenser Air Removal radiation - NORMAL BEFORE ISOLATION
* GEG 925
* SG Blowdown and Sample radiation - NORMAL BEFORE ISOLATION
 
Appendix D                                 Operator Action                               Form ES-D-2 Op Test No.:       1     Scenario #     3     Event #       5, 6, 7         Page 18     of 31 Event


== Description:==
== Description:==
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicant's Actions or Behavior BML 256   SJL 026   SG ASD radiation - NORMAL AB RIC 111 (SG A) (NO)
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time         Position                         Applicants Actions or Behavior
AB RIC 112 (SG B)
* BML 256
AB RIC 113 (SG C)
* SJL 026
AB RIC 114 (SG D)
* SG ASD radiation - NORMAL
Turbine Driven Auxiliary Feedwater Pump Exhaust Radiation - NORMAL FC RIC 385 SRO Go To E-3, Steam Generator Tube Rupture, Step 1 RO CHECK If RCPs Should Be Stopped:
* AB RIC 111 (SG A) (NO)
* AB RIC 112 (SG B)
* AB RIC 113 (SG C)
* AB RIC 114 (SG D)
* Turbine Driven Auxiliary Feedwater Pump Exhaust Radiation - NORMAL
* FC RIC 385 SRO       Go To E-3, Steam Generator Tube Rupture, Step 1 RO       CHECK If RCPs Should Be Stopped:
: a. RCPs - ANY RUNNING
: a. RCPs - ANY RUNNING
: b. ECCS pumps - AT LEAST ONE RUNNING CCP   OR   SI Pump     c. RCS pressure - LESS THAN 1425 PSIG CREW IDENTIFY Ruptured SG(s):
: b. ECCS pumps - AT LEAST ONE RUNNING
Unexpected rise in any SG narrow range level ("A" SG)
* CCP OR
OR   High radiation from any SG sample OR   High radiation from any SG steamline Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 19 of 31 Event
* SI Pump
: c. RCS pressure - LESS THAN 1425 PSIG CREW       IDENTIFY Ruptured SG(s):
* Unexpected rise in any SG narrow range level (A SG)
OR
* High radiation from any SG sample OR
* High radiation from any SG steamline
 
Appendix D                                 Operator Action                               Form ES-D-2 Op Test No.:       1     Scenario #     3     Event #       5, 6, 7         Page 19     of 31 Event


== Description:==
== Description:==
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicant's Actions or Behavior OR   High radiation from any SG Blowdown line sample CRITICAL TASK BOP ISOLATE Flow From Ruptured SG(s):
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time         Position                         Applicants Actions or Behavior OR
* High radiation from any SG Blowdown line sample CRITICAL TASK               BOP       ISOLATE Flow From Ruptured SG(s):
: a. ADJUST ruptured SG(s) ASD controller setpoint to 1160 PSIG:
: a. ADJUST ruptured SG(s) ASD controller setpoint to 1160 PSIG:
AB PIC-1A (SG A)
* AB PIC-1A (SG A)
: b. CHECK ruptured SG(s) ADS - CLOSED AB PIC-1A (SG A)
: b. CHECK ruptured SG(s) ADS - CLOSED
BOP IF SG ASD is NOT closed, THEN PLACE SG ASD controller in MANUAL and CLOSE SGT ASD.
* AB PIC-1A (SG A)
: c. Locally CLOSE TDAFP Steam Supply From Main Steam Loop Manual Isolation valve from ruptured  
IF SG ASD is NOT closed, THEN PLACE SG ASD controller BOP in MANUAL and CLOSE SGT ASD.
: c. Locally CLOSE TDAFP Steam Supply From Main Steam Loop Manual Isolation valve from ruptured SG(s):
* ABV0085 (SG B)
* ABV0087 (SG C)
: d. CHECK SG Blowdown and Sample Isolation valves from ruptured SG(s) - CLOSED
* Blowdown Containment Isolation Valve:
* BM HIS-1A (SG A)
* Upper Sample Inner Containment Isolation valve:
* BM HIS-19 (SG A)
: e. CLOSE Steamline Low Point Drain valve from ruptured SG(s):
* AB HIS-9 (SG A)


SG(s):    ABV0085 (SG B)
Appendix D                               Operator Action                               Form ES-D-2 Op Test No.:       1     Scenario #   3     Event #     5, 6, 7           Page 20     of 31 Event
ABV0087 (SG C)
: d. CHECK SG Blowdown and Sample Isolation valves from ruptured SG(s) - CLOSED Blowdown Containment Isolation Valve:
BM HIS-1A (SG A)
Upper Sample Inner Containment Isolation valve:
BM HIS-19 (SG A)
: e. CLOSE Steamline Low Point Drain valve from ruptured SG(s):    AB HIS-9 (SG A)
Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 20 of 31 Event


== Description:==
== Description:==
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicant's Actions or Behavior
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time         Position                       Applicants Actions or Behavior
: f. CHECK if C-9 interlocks - LIT
: f. CHECK if C-9 interlocks - LIT
: g. CLOSE MSIV and MSIV Bypass valve from ruptured SG(s):   CLOSE ruptured SG(s) MSIV (preferred order):
: g. CLOSE MSIV and MSIV Bypass valve from ruptured SG(s):
FAST CLOSE using EOP Addendum 35, MSIV Fast Closure, at MSFIS cabinets SA075A and SA075B     OR   CLOSE all MSIV Bypass valves (preferred order):   USE Main Steamline Isolation Bypass Valves Controller AB HIK-15 OR   Locally ISOLATE MSIV Bypass valve(s) as necessary CREW CHECK Ruptured SG(s) Level:
* CLOSE ruptured SG(s) MSIV (preferred order):
* FAST CLOSE using EOP Addendum 35, MSIV Fast Closure, at MSFIS cabinets SA075A and SA075B OR
* CLOSE all MSIV Bypass valves (preferred order):
* USE Main Steamline Isolation Bypass Valves Controller AB HIK-15 OR
* Locally ISOLATE MSIV Bypass valve(s) as necessary CREW       CHECK Ruptured SG(s) Level:
: a. Narrow range level - GREATER THAN 7% [25%]
: a. Narrow range level - GREATER THAN 7% [25%]
Stop Feed flow to the ruptured SG Close MDAFP flow control valve AL-HK-7A Close TDAFP flow control valve AL-HK-8A BOP CHECK Ruptured SG(s) Pressure - GREATER THAN 340 PSIG     BOP INITIATE RCS Cooldown:
Stop Feed flow to the ruptured SG
: a. CHECK RCS pressure - LESS THAN 1970 PSIG Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 21 of 31 Event
* Close MDAFP flow control valve AL-HK-7A
* Close TDAFP flow control valve AL-HK-8A CHECK Ruptured SG(s) Pressure - GREATER THAN 340 BOP PSIG BOP       INITIATE RCS Cooldown:
: a. CHECK RCS pressure - LESS THAN 1970 PSIG
 
Appendix D                                 Operator Action                               Form ES-D-2 Op Test No.:       1     Scenario #     3     Event #     5, 6, 7         Page 21     of 31 Event


== Description:==
== Description:==
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicant's Actions or Behavior P-11 light - LIT
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time         Position                         Applicants Actions or Behavior
* P-11 light - LIT
: b. BLOCK Steamline Pressure SI:
: b. BLOCK Steamline Pressure SI:
SB HS-9   SB-HS-10 CRITICAL TASK CREW c. DETERMINE required core exit temperature: (variable)
* SB HS-9
BOP d. DUMP steam to condenser from intact SG(s) at maximum rate:       1. CHECK condenser - AVAILABLE C-9 interlocks - LIT MSIVs - ANY OPEN
* SB-HS-10 CRITICAL TASK             CREW       c. DETERMINE required core exit temperature: (variable)
: d. DUMP steam to condenser from intact SG(s) at maximum BOP rate:
: 1. CHECK condenser - AVAILABLE
* C-9 interlocks - LIT
* MSIVs - ANY OPEN
: 2. PLACE Steam Header Pressure Controller in MANUAL and ZERO OUTPUT:
: 2. PLACE Steam Header Pressure Controller in MANUAL and ZERO OUTPUT:
AB PK-507
* AB PK-507
: 3. PLACE Steam Dump Select switch in STM PRESS position:
: 3. PLACE Steam Dump Select switch in STM PRESS position:
AB US-500Z
* AB US-500Z
: 4. ADJUST Steam Header Pressure Controller in STM PRESS mode to achieve maximum cooldown rate:
: 4. ADJUST Steam Header Pressure Controller in STM PRESS mode to achieve maximum cooldown rate:
AB PK-507
* AB PK-507
: e. Core exit TCs - LESS THAN REQUIRED TEMPERATURE
: e. Core exit TCs - LESS THAN REQUIRED TEMPERATURE
: f. STOP RCS cooldown Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 22 of 31 Event
: f. STOP RCS cooldown
 
Appendix D                               Operator Action                               Form ES-D-2 Op Test No.:       1     Scenario #   3     Event #     5, 6, 7           Page 22     of 31 Event


== Description:==
== Description:==
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicant's Actions or Behavior
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time         Position                       Applicants Actions or Behavior
: g. MAINTAIN core exit TCs - LESS THAN REQUIRED TEMPERATURE BOP CHECK Intact SG Levels:
: g. MAINTAIN core exit TCs - LESS THAN REQUIRED TEMPERATURE BOP       CHECK Intact SG Levels:
: a. Narrow range levels - GREATER THAN 7% [25%]
: a. Narrow range levels - GREATER THAN 7% [25%]
: b. CONTROL feed flow to maintain narrow range levels between 27% and 50%
: b. CONTROL feed flow to maintain narrow range levels between 27% and 50%
RO CHECK PZR PORVs And Block Valves:
RO       CHECK PZR PORVs And Block Valves:
: a. Power to Block Valves - AVAILABLE BB HIS 8000A BB HIS 8000B
: a. Power to Block Valves - AVAILABLE
: b. PZR PORVs - CLOSED BB HIS 455A BB HIS 456B
* BB HIS 8000A
: c. Block Valves - AT LEAST ONE OPEN BB HIS 8000A BB HIS 8000B RO RESET SI:   SB HS-42A SB HS-43A RO RESET Containment Isolation Phase A and Phase B Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 23 of 31 Event
* BB HIS 8000B
: b. PZR PORVs - CLOSED
* BB HIS 455A
* BB HIS 456B
: c. Block Valves - AT LEAST ONE OPEN
* BB HIS 8000A
* BB HIS 8000B RO       RESET SI:
* SB HS-42A
* SB HS-43A RO       RESET Containment Isolation Phase A and Phase B
 
Appendix D                                 Operator Action                               Form ES-D-2 Op Test No.:       1     Scenario #     3     Event #       5, 6, 7         Page 23     of 31 Event


== Description:==
== Description:==
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicant's Actions or Behavior Phase A (CISA):
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time         Position                         Applicants Actions or Behavior
SB HS-53 SB HS-56 Phase B (CISB):
* Phase A (CISA):
SB HS-52 SB HS-55 RO ESTABLISH Instrument Air To Containment:
* SB HS-53
: a. CHECK if ESW To Air Compressor valves - OPEN EF HIS-43 EF HIS-44
* SB HS-56
* Phase B (CISB):
* SB HS-52
* SB HS-55 RO       ESTABLISH Instrument Air To Containment:
: a. CHECK if ESW To Air Compressor valves - OPEN
* EF HIS-43
* EF HIS-44
: b. START Air Compressor(s):
: b. START Air Compressor(s):
KA HIS-3C KA HIS-2C
* KA HIS-3C
* KA HIS-2C
: c. OPEN Instrument Air Supply Containment Isolation valve:
: c. OPEN Instrument Air Supply Containment Isolation valve:
KA HIS-29 (will not open)
* KA HIS-29 (will not open)
PERFORM the following:
PERFORM the following:
IF valve CANNOT be opened, THEN locally OPEN valve. (2000 Aux South piping pen room, P-30) (Will NOT open)
IF valve CANNOT be opened, THEN locally OPEN valve.
RO CHECK If RHR Pumps Should Be Stopped:
(2000 Aux South piping pen room, P-30) (Will NOT open)
: a. RHR Pumps - ANY RUNNING WITH SUCTION ALIGNED TO RWST     b. RCS pressure - GREATER THAN 325 PSIG Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 24 of 31 Event
RO       CHECK If RHR Pumps Should Be Stopped:
: a. RHR Pumps - ANY RUNNING WITH SUCTION ALIGNED TO RWST
: b. RCS pressure - GREATER THAN 325 PSIG
 
Appendix D                               Operator Action                               Form ES-D-2 Op Test No.:       1     Scenario #   3     Event #     5, 6, 7           Page 24     of 31 Event


== Description:==
== Description:==
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicant's Actions or Behavior
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time         Position                       Applicants Actions or Behavior
: c. STOP RHR Pumps and PLACE in standby:
: c. STOP RHR Pumps and PLACE in standby:
EJ HIS-1 EJ HIS-2
* EJ HIS-1
: d. MONITOR RCS pressure     BOP CHECK If RCS Cooldown Should Be Stopped:
* EJ HIS-2
: d. MONITOR RCS pressure BOP       CHECK If RCS Cooldown Should Be Stopped:
: a. Core exit TCs - LESS THAN REQUIRED TEMPERATURE
: a. Core exit TCs - LESS THAN REQUIRED TEMPERATURE
: b. STOP RCS cooldown     c. MAINTAIN core exit TCs - LESS THAN REQUIRED TEMPERATURE BOP CHECK Ruptured SG(s) Pressure - STABLE OR RISING RO CHECK RCS Subcooling - GREATER THAN 50°F DEPRESSURIZE RCS To minimize Break Flow And Refill PZR:     a. Normal PZR spray - AVAILABLE (NO)
: b. STOP RCS cooldown
RO DEPRESSURIZE RCS Using PZR PORV To Minimize Break  
: c. MAINTAIN core exit TCs - LESS THAN REQUIRED TEMPERATURE BOP       CHECK Ruptured SG(s) Pressure - STABLE OR RISING RO       CHECK RCS Subcooling - GREATER THAN 50°F DEPRESSURIZE RCS To minimize Break Flow And Refill PZR:
: a. Normal PZR spray - AVAILABLE (NO)
DEPRESSURIZE RCS Using PZR PORV To Minimize Break RO Flow And Refill PZR:
: a. PZR PORV - AT LEAST ONE AVAILABLE
* BB HIS-455A OR


Flow And Refill PZR:
Appendix D                                 Operator Action                             Form ES-D-2 Op Test No.:       1     Scenario #     3     Event #       5, 6, 7         Page 25     of 31 Event
: a. PZR PORV - AT LEAST ONE AVAILABLE BB HIS-455A OR Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 25 of 31 Event


== Description:==
== Description:==
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicant's Actions or Behavior BB HIS-456A
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time         Position                         Applicants Actions or Behavior
* BB HIS-456A
: b. OPEN one PZR PORV until any of the following conditions satisfied:
: b. OPEN one PZR PORV until any of the following conditions satisfied:
Both of the following:
* Both of the following:
: 1. RCS pressure - LESS THAN RUPTURED SG(s) PRESSURE   2. PZR level - GREATER THAN 9% [29%]
: 1. RCS pressure - LESS THAN RUPTURED SG(s)
OR   PZR level - GREATER THAN 74% [64%]
PRESSURE
OR   RCS subcooling LESS THAN 30°F
: 2. PZR level - GREATER THAN 9% [29%]
OR
* PZR level - GREATER THAN 74% [64%]
OR
* RCS subcooling LESS THAN 30°F
: c. CLOSE PZR PORV:
: c. CLOSE PZR PORV:
BB HIS-455A BB HIS-456A RO CHECK RCS Pressure - RISING CREW CHECK If ECCS Flow Should Be Terminated:
* BB HIS-455A
* BB HIS-456A RO       CHECK RCS Pressure - RISING CREW       CHECK If ECCS Flow Should Be Terminated:
: a. RCS subcooling - GREATER THAN 30°f
: a. RCS subcooling - GREATER THAN 30°f
: b. Secondary heat sink:
: b. Secondary heat sink:
Narrow range level in at least one intact SG - GREATER THAN 7% [25%]
* Narrow range level in at least one intact SG -
OR   Total feed flow to SG(s) - GREATER THAN 300,000 LBM/HR     c. RCS pressure - STABLE OR RISING Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 26 of 31 Event
GREATER THAN 7% [25%]
OR
* Total feed flow to SG(s) - GREATER THAN 300,000 LBM/HR
: c. RCS pressure - STABLE OR RISING
 
Appendix D                                 Operator Action                             Form ES-D-2 Op Test No.:       1     Scenario #     3     Event #       5, 6, 7         Page 26     of 31 Event


== Description:==
== Description:==
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicant's Actions or Behavior
SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time         Position                         Applicants Actions or Behavior
: d. PZR level - GREATER THAN 9% [29%]
: d. PZR level - GREATER THAN 9% [29%]
RO STOP ECCS Pumps And Place In Standby:
RO       STOP ECCS Pumps And Place In Standby:
: a. Both SI Pumps:
: a. Both SI Pumps:
EM HIS-4 EM HIS-5
* EM HIS-4
* EM HIS-5
: b. All but one CCP:
: b. All but one CCP:
BG HIS-1A OR   BG HIS-2A Scenario may be terminated when ECCS pumps are stopped.
* BG HIS-1A OR
* BG HIS-2A Scenario may be terminated when ECCS pumps are stopped.
 
ATTACHMENT A Automatic Action Verification BOP CHECK Charging Pumps:
ATTACHMENT A Automatic Action Verification BOP CHECK Charging Pumps:
BOP a. CCPs - BOTH RUNNING BG HIS-1A BG HIS-2A BOP b. STOP NCP:   BG HIS-3 BOP CHECK SI And RHR Pumps SI Pumps - BOTH RUNNING EM HIS-4 EM HIS-5 RHR Pumps - BOTH RUNNING EJ HIS-1 EJ HIS-2 BOP CHECK ECCS Flow:
BOP a. CCPs - BOTH RUNNING
BOP a. CCPs to Boron Inj Header - FLOW INDICATED EM FI-917A EM FI-917B BOP b. RCS pressure - LESS THAN 1700 PSIG BOP c. SI Pump Discharge - FLOW INDICATED EM FI-918 EM FI-922 BOP d. RCS pressure - LESS THAN 325 PSIG BOP e. RHR To Accumulator Injection Loop - FLOW INDICATED  
* BG HIS-1A
* BG HIS-2A BOP b. STOP NCP:
* BG HIS-3 BOP CHECK SI And RHR Pumps
* SI Pumps - BOTH RUNNING
* EM HIS-4
* EM HIS-5
* RHR Pumps - BOTH RUNNING
* EJ HIS-1
* EJ HIS-2 BOP CHECK ECCS Flow:
BOP a. CCPs to Boron Inj Header - FLOW INDICATED
* EM FI-917A
* EM FI-917B BOP b. RCS pressure - LESS THAN 1700 PSIG BOP c. SI Pump Discharge - FLOW INDICATED
* EM FI-918
* EM FI-922 BOP d. RCS pressure - LESS THAN 325 PSIG BOP e. RHR To Accumulator Injection Loop - FLOW INDICATED


ATTACHMENT A Automatic Action Verification EJ FI-618 EJ FI-619 CAUTION: If offsite power is lost after SI reset, manual action may be required to restart safeguards equipment.
ATTACHMENT A Automatic Action Verification
BOP CHECK ESW Pumps - BOTH RUNNING EF HIS-55A EF HIS-56A BOP CHECK CCW Alignment:
* EJ FI-618
BOP a. CCW Pumps - ONE RUNNING IN EACH TRAIN Red Train:
* EJ FI-619 CAUTION: If offsite power is lost after SI reset, manual action may be required to restart safeguards equipment.
EG HIS-21 or EG HIS-23 Yellow Train EG HIS-22 or EG HIS-24 BOP b. CCW Service Loop Supply and Return valves for one operating CCW pump - OPEN EG ZL-15 AND EG ZL-53 OR   EG ZL-16 AND EG ZL-54 BOP CHECK Containment Cooler Fans - RUNNING IN SLOW SPEED   GN HIS-9 GN HIS-17 GN HIS-5 GN HIS-13 BOP CHECK Containment Hydrogen Mixing Fans - RUNNING IN SLOW SPEED GN HIS-2  
BOP       CHECK ESW Pumps - BOTH RUNNING
* EF HIS-55A
* EF HIS-56A BOP       CHECK CCW Alignment:
BOP       a. CCW Pumps - ONE RUNNING IN EACH TRAIN
* Red Train:
* EG HIS-21 or EG HIS-23
* Yellow Train
* EG HIS-22 or EG HIS-24
: b. CCW Service Loop Supply and Return valves for one BOP operating CCW pump - OPEN
* EG ZL-15 AND EG ZL-53 OR
* EG ZL-16 AND EG ZL-54 CHECK Containment Cooler Fans - RUNNING IN SLOW BOP SPEED
* GN HIS-9
* GN HIS-17
* GN HIS-5
* GN HIS-13 CHECK Containment Hydrogen Mixing Fans - RUNNING IN BOP SLOW SPEED
* GN HIS-2


ATTACHMENT A Automatic Action Verification GN HIS-4 GN HIS-1 GN HIS-3 BOP CHECK If Containment Spray Should Be Actuated:
ATTACHMENT A Automatic Action Verification
* GN HIS-4
* GN HIS-1
* GN HIS-3 BOP CHECK If Containment Spray Should Be Actuated:
BOP a. CHECK the following:
BOP a. CHECK the following:
Containment pressure - GREATER THAN 27 PSIG OR   GN PR-934 indicates containment pressure - HAS BEEN GREATER THAN 27 PSIG OR   Annunciator 59A CSAS - LIT OR   Annunciator 59B CISB - LIT BOP b. Containment Spray Pumps - BOTH RUNNING EN HIS-3 EN HIS-9 BOP c. ESFAS status panels CSAS sections:
* Containment pressure - GREATER THAN 27 PSIG OR
SA066X WHITE lights - ALL LIT SA066Y WHITE lights - ALL LIT BOP d. ESFAS status panels CISB sections:
* GN PR-934 indicates containment pressure - HAS BEEN GREATER THAN 27 PSIG OR
SA066X WHITE lights - ALL LIT SA066Y WHITE lights - ALL LIT BOP CHECK If Main Steamlines Should Be Isolated:
* Annunciator 59A CSAS - LIT OR
* Annunciator 59B CISB - LIT BOP b. Containment Spray Pumps - BOTH RUNNING
* EN HIS-3
* EN HIS-9 BOP c. ESFAS status panels CSAS sections:
* SA066X WHITE lights - ALL LIT
* SA066Y WHITE lights - ALL LIT BOP d. ESFAS status panels CISB sections:
* SA066X WHITE lights - ALL LIT
* SA066Y WHITE lights - ALL LIT BOP CHECK If Main Steamlines Should Be Isolated:
BOP a. CHECK for any of the following:
BOP a. CHECK for any of the following:
Containment pressure - GREATER THAN 17 PSIG OR ATTACHMENT A Automatic Action Verification GN PR-934 indicates containment pressure - HAS BEEN GREATER THAN 17 PSIG OR   Steamline pressure - LESS THAN 615 PSIG OR   AB PR-514 or PR-535 indicates steamline pressure - HAS BEEN LESS THAN 615 PSIG BOP b. CHECK MSIVs and Bypass valves - CLOSED BOP CHECK ECCS Valves - PROPER EMERGENCY ALIGNMENT BOP a. ESFAS status panels SIS sections:
* Containment pressure - GREATER THAN 17 PSIG OR
SA066X WHITE lights - ALL LIT SA066Y WHITE lights - ALL LIT BOP CHECK Containment Isolation Phase A:
 
BOP a. ESFAS status panels CISA sections:
ATTACHMENT A Automatic Action Verification
SA066X WHITE lights - ALL LIT SA066Y WHITE lights - ALL LIT BOP CHECK SG Blowdown Isolation:
* GN PR-934 indicates containment pressure - HAS BEEN GREATER THAN 17 PSIG OR
BOP ESFAS status panels SGBSIS sections:
* Steamline pressure - LESS THAN 615 PSIG OR
SA066X WHITE lights - ALL LIT SA066Y WHITE lights - ALL LIT CAUTION: If offsite power is lost after SI reset, manual action may be required to restart safeguards equipment.
* AB PR-514 or PR-535 indicates steamline pressure -
BOP CHECK Both Trains of control Room Ventilation Isolation:
HAS BEEN LESS THAN 615 PSIG BOP       b. CHECK MSIVs and Bypass valves - CLOSED BOP       CHECK ECCS Valves - PROPER EMERGENCY ALIGNMENT BOP       a. ESFAS status panels SIS sections:
BOP a. ESFAS status panels CRVIS sections:  
* SA066X WHITE lights - ALL LIT
* SA066Y WHITE lights - ALL LIT BOP       CHECK Containment Isolation Phase A:
BOP       a. ESFAS status panels CISA sections:
* SA066X WHITE lights - ALL LIT
* SA066Y WHITE lights - ALL LIT BOP       CHECK SG Blowdown Isolation:
BOP       ESFAS status panels SGBSIS sections:
* SA066X WHITE lights - ALL LIT
* SA066Y WHITE lights - ALL LIT CAUTION: If offsite power is lost after SI reset, manual action may be required to restart safeguards equipment.
BOP       CHECK Both Trains of control Room Ventilation Isolation:
BOP       a. ESFAS status panels CRVIS sections:


ATTACHMENT A Automatic Action Verification SA066X WHITE lights - ALL LIT SA066Y WHITE lights - ALL LIT BOP CHECK Containment Purge Isolation:
ATTACHMENT A Automatic Action Verification
* SA066X WHITE lights - ALL LIT
* SA066Y WHITE lights - ALL LIT BOP CHECK Containment Purge Isolation:
BOP a. ESFAS status panels CPIS sections:
BOP a. ESFAS status panels CPIS sections:
SA066X WHITE lights - ALL LIT SA066Y WHITE lights - ALL LIT BOP Notify CRS of the following:
* SA066X WHITE lights - ALL LIT
Manual actions taken Failed Equipment Attachment A, Automatic Action Verification, completed  
* SA066Y WHITE lights - ALL LIT BOP Notify CRS of the following:
* Manual actions taken
* Failed Equipment
* Attachment A, Automatic Action Verification, completed
 
Appendix C                                  Job Performance Measure                    Form ES-C-1 Worksheet Facility:              Callaway                                  Task No.:
Task


Appendix C Job Performance Measure Form ES-C-1 Worksheet Callaway RO/SRO A1-1 Rev 0  NUREG 1021, Revision 9, Supplement 1 Facility:
==Title:==
Callaway Task No.:      Task Title: Perform a shutdown margin calculation.
Perform a shutdown margin                 JPM No.:     2005 NRC RO/SRO calculation.                                            A1-1 K/A  
JPM No.: 2005 NRC RO/SRO A1-1   K/A  


==Reference:==
==Reference:==
2.1.32 (3.4)
2.1.32 (3.4)
Examinee:
Examinee:                                                     NRC Examiner:
NRC Examiner:
Facility Evaluator:                                           Date:
Facility Evaluator:
Method of testing: This JPM can be performed in any setting with the available references.
Date: Method of testing: This JPM can be performed in any setting with the available references.
Simulated Performance:                                       Actual Performance:       X Classroom           X     Simulator           Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Simulated Performance:
Initial Conditions:
Actual Performance: X Classroom X Simulator Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
* The reactor tripped 18 hours ago.
Initial Conditions: The reactor tripped 18 hours ago. The current time is 0800 The unit had been at 100 % power for 22 days. Core Burnup is 275 EFPD. (12,400 MWD/MTU) Tavg is 557  
* The current time is 0800
ûF. Boron Concentration at the time of the trip was 1075 PPM and has not changed. Control Bank D was at 210 steps. The operating crew is preparing to withdraw the shutdown bank rods. Task Standard: Critical steps completed within specified boundaries.
* The unit had been at 100 % power for 22 days.
Required Materials: Calculator Straight Edge WINPCNDR General  
* Core Burnup is 275 EFPD. (12,400 MWD/MTU)
* Tavg is 557 F.
* Boron Concentration at the time of the trip was 1075 PPM and has not changed.
* Control Bank D was at 210 steps.
* The operating crew is preparing to withdraw the shutdown bank rods.
Task Standard:             Critical steps completed within specified boundaries.
Required Materials:
* Calculator
* Straight Edge
* WINPCNDR General  


==References:==
==References:==
OSP-SF-0001, SHUTDOWN MARGIN CALCULATION, Rev. 028 Handouts: OSP-SF-00001 Curve Book Initiating Cue: The Shift Supervisor has assigned you to perform a Shutdown Margin Calculation in accordance with OSP-SF-0001, prior to withdrawing the  
OSP-SF-0001, SHUTDOWN MARGIN CALCULATION, Rev. 028 Handouts:
* OSP-SF-00001
* Curve Book Initiating Cue:             The Shift Supervisor has assigned you to perform a Shutdown Margin Calculation in accordance with OSP-SF-0001, prior to withdrawing the shutdown bank rods.
Time Critical Task:        No Callaway RO/SRO A1-1 Rev 0                                  NUREG 1021, Revision 9, Supplement 1


shutdown bank rods.
Appendix C                   Job Performance Measure               Form ES-C-1 Worksheet Validation Time:   65 Minutes Callaway RO/SRO A1-1 Rev 0                 NUREG 1021, Revision 9, Supplement 1
Time Critical Task:
No Appendix C Job Performance Measure Form ES-C-1 Worksheet Callaway RO/SRO A1-1 Rev 0  NUREG 1021, Revision 9, Supplement 1 Validation Time:
65 Minutes Appendix C Job Performance Measure Form ES-C-1 Worksheet Callaway RO/SRO A1-1 Rev 0 NUREG 1021, Revision 9, Supplement 1 SIMULATOR SETUP


Appendix C Page 4 of 13 Form ES-C-1 PERFORMANCE INFORMATION Callaway RO/SRO A1-1 Rev 0 NUREG 1021, Revision 9, Supplement 1 (Denote Critical Steps with a )   Performance Step: 1 Locate/review procedure.
Appendix C                 Job Performance Measure              Form ES-C-1 Worksheet SIMULATOR SETUP Callaway RO/SRO A1-1 Rev 0               NUREG 1021, Revision 9, Supplement 1
Standard: Determines METHOD 2 applies and proceeds to Section 7.5.
 
Comment:   Evaluator Cue: Provide a copy of OSP-SF-0001.
Appendix C                                    Page 4 of 13                          Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a )
Performance Step: 2 Complete ATTACHMENT 2: Signs onto ATTACHMENT 2.
Performance Step: 1       Locate/review procedure.
Standard: Records Name, Initials, Date, and Time.
Standard:                 Determines METHOD 2 applies and proceeds to Section 7.5.
Comment:   Performance Step: 3 Log critical conditions prior to the shutdown.
Comment:
Standard: Transposes information from Initial Conditions.
Evaluator Cue:             Provide a copy of OSP-SF-0001.
Comment:    Performance Step: 4  Record the total power defect for the associated power level and burnup from Curve Book Table 1-8, Section II.
Performance Step: 2       Complete ATTACHMENT 2:
Standard: Records 1745 pcm in 7.5.1.5. (1725 - 1765 acceptable)
* Signs onto ATTACHMENT 2.
Standard:                 Records Name, Initials, Date, and Time.
Comment:
Performance Step: 3
* Log critical conditions prior to the shutdown.
Standard:                 Transposes information from Initial Conditions.
Comment:
Comment:
Appendix C Page 5 of 13 Form ES-C-1  PERFORMANCE INFORMATION Callaway RO/SRO A1-1 Rev 0  NUREG 1021, Revision 9, Supplement 1 Performance Step: Record the redistribution allowance and voids reactivity from Curve Book Table 1-8, Section II.
Performance Step: 4
Standard: Records 279 pcm in 7.5.1.5.(277-279 is acceptable)
* Record the total power defect for the associated power level and burnup from Curve Book Table 1-8, Section II.
Comment:    Performance Step: 6  Add the redistribution allowance and voids reactivity (Step 7.5.1.5.1) to the total power defect (Step 7.5.1.5) to obtain the corrected total power defect.
Standard:                 Records 1745 pcm in 7.5.1.5. (1725 - 1765 acceptable)
Standard: Records 2024 pcm (1745 + 279) in 7.5.1.5.2. 2002 to 2044 is acceptable Comment:    Performance Step: 7  Record the available rod worth from Curve Book Table 1-8, Section II.
Comment:
Standard: Records 4691 pcm in 7.5.1.6.
Callaway RO/SRO A1-1 Rev 0                             NUREG 1021, Revision 9, Supplement 1
Comment:    Performance Step: 8  Record the worst stuck rod's reactivity worth from Curve Book Table 1-8, Section II.
Standard: Records 1115 pcm in 7.5.1.7 Comment:
Appendix C Page 6 of 13 Form ES-C-1  PERFORMANCE INFORMATION Callaway RO/SRO A1-1 Rev 0 NUREG 1021, Revision 9, Supplement 1 Performance Step: 9  If any rods are considered (a) untrippable and not fully inserted, or (b) trippable but misaligned below its bank; multiply the number of such rods by the reactivity of the most reactive rod (step 7.5.1.7) and record the total reactivity.
Standard:
Records ZERO in 7.5.1.8 Comment:  Evaluator Cue: All rods are operable and aligned with their respective banks. Performance Step: 10  Total the reactivities from steps 7.5.1.5.2, 7.5.1.6, and 7.5.1.8 to obtain the shutdown reactivity.
Standard: Performs algebraic addition and records -2667 pcm in 7.5.1.9.
Comment:    Procedure NOTE prior to Xenon determination: T/S BSR 3.1.1.1 requires the consideration of Samarium concentration when determining SDM. In the interest of providing a conservative SDM calculation, the Samarium concentration and associated reactivity worth is considered to be


zero  Performance Step: 11 SHUTDOWN REACTIVITY CORRECTIONS: XENON  Record the Xenon reactivity, prior to the shutdown, from XEPRED on the PC; or from computer point REU1504.
Appendix C                                Page 5 of 13                          Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 5
Standard:
* Record the redistribution allowance and voids reactivity from Curve Book Table 1-8, Section II.
Attempts to locate computer point Evaluator Cue: Computer Point REU1504 indicates 2902.2 pcm Xenon.
Standard:              Records 279 pcm in 7.5.1.5.1 (277-279 is acceptable)
Comment:
Performance Step: 6
* Add the redistribution allowance and voids reactivity (Step 7.5.1.5.1) to the total power defect (Step 7.5.1.5) to obtain the corrected total power defect.
Standard:             Records 2024 pcm (1745 + 279) in 7.5.1.5.2.
2002 to 2044 is acceptable Comment:
Performance Step: 7
* Record the available rod worth from Curve Book Table 1-8, Section II.
Standard:              Records 4691 pcm in 7.5.1.6.
Comment:
Comment:
Appendix C Page 7 of 13 Form ES-C-1  PERFORMANCE INFORMATION Callaway RO/SRO A1-1 Rev 0  NUREG 1021, Revision 9, Supplement 1 Performance Step: 12  Determine the time interval since shutdown (step 7.5.1.1). Record the Xenon reactivity worth for the elapsed time interval after shutdown as derived from XEPRED on the PC; or computer point REU1504.
Performance Step: 8
Standard: Records 18 hours from Initial Conditions. Attempts to locate computer point.
* Record the worst stuck rod's reactivity worth from Curve Book Table 1-8, Section II.
Evaluator Cue: Computer Point REU1504 indicates 3967.5 pcm Xenon.
Standard:             Records 1115 pcm in 7.5.1.7 Comment:
Comment:    Performance Step: 13  Subtract xenon reactivity in step 7.6.1.1 from step 7.6.1.3 to obtain the net xenon reactivity.
Callaway RO/SRO A1-1 Rev 0                        NUREG 1021, Revision 9, Supplement 1
Standard: Performs algebraic addition and records -1064.7 pcm in 7.6.1.4.
Comment:  Performance Step: 14 SHUTDOWN REACTIVITY CORRECTIONS: RODS  Record the controlling control rod bank and its height prior to the shutdown from the step counters or from the URO Logbook entry at the beginning of the shift the last time the


unit was at steady state power or from the plant computer.
Appendix C                                Page 6 of 13                          Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 9
See Attachment 7. From WINPCNDR (Integral Rod Worths for HFP and HZP, respectively), record the remaining amount of negative reactivity that could be withdrawn from the core, based on the recorded bank height, power level, and burnup which existed prior to the shutdown. (SOS 95-1204)
* If any rods are considered (a) untrippable and not fully inserted, or (b) trippable but misaligned below its bank; multiply the number of such rods by the reactivity of the most reactive rod (step 7.5.1.7) and record the total reactivity.
Standard: Records Bank D @ 210 steps from Initial Conditions. Attempts to locate value on WINPCNDR Evaluator Cue:
Standard:              Records ZERO in 7.5.1.8 Comment:
Evaluator Cue:        All rods are operable and aligned with their respective banks.
Performance Step: 10
* Total the reactivities from steps 7.5.1.5.2, 7.5.1.6, and 7.5.1.8 to obtain the shutdown reactivity.
Standard:             Performs algebraic addition and records -2667 pcm in 7.5.1.9.
Comment:
Comment:
Appendix C Page 8 of 13 Form ES-C-1  PERFORMANCE INFORMATION Callaway RO/SRO A1-1 Rev 0  NUREG 1021, Revision 9, Supplement 1 Performance Step: 15  From Curve Book Figure 13-1, record the Rod Insertion Limit (RIL) for the power level which existed prior to the shutdown.
Procedure NOTE prior  T/S BSR 3.1.1.1 requires the consideration of Samarium to Xenon              concentration when determining SDM. In the interest of determination:         providing a conservative SDM calculation, the Samarium concentration and associated reactivity worth is considered to be zero Performance Step: 11  SHUTDOWN REACTIVITY CORRECTIONS: XENON
Standard: Records 'D' at 161 inches in 7.6.2.3 Comment:    Performance Step: 16  From WINPCNDR, record the reactivity associated with the RIL in 7.6.2.3, based on the power level and burnup which existed prior to the shutdown.
* Record the Xenon reactivity, prior to the shutdown, from XEPRED on the PC; or from computer point REU1504.
Standard: Records 203.4 pcm in 7.6.2.4.
Standard:             Attempts to locate computer point Evaluator Cue:        Computer Point REU1504 indicates 2902.2 pcm Xenon.
Evaluator Cue:
Comment:
Comment:    Performance Step: 17  Calculate control rod correction by subtracting the critical rod worth (7.6.2.2) from the RIL worth (7.6.2.4) and multiplying by 0.90. This allows for a 10% rod worth uncertainty.
Callaway RO/SRO A1-1 Rev 0                           NUREG 1021, Revision 9, Supplement 1
Standard: Records .90(7.6.2.4 - 7.6.2.2) = 162.3 pcm.
Comment:    Performance Step: 18 SHUTDOWN REACTIVITY CORRECTIONS: TEMPERATURE  Enter the minimum temperature anticipated during the shutdown. Using WINPCNDR, record the isothermal temperature defect for critical boron concentration from step 7.5.1.4 and the minimum anticipated temperature from step 7.6.3.1.
Standard: Using WINPCNDR, records 0.1 pcm.
Appendix C Page 9 of 13 Form ES-C-1  PERFORMANCE INFORMATION Callaway RO/SRO A1-1 Rev 0 NUREG 1021, Revision 9, Supplement 1 Evaluator Cue:
Comment:    Procedure NOTE prior to boron correction steps. Boron integral worth values from WINPCNDR are positive values as supplied by Westinghouse. The intent for this section is to determine the integral boron worth for a change in boron concentration.
Performance Step: 19 SHUTDOWN REACTIVITY CORRECTIONS: BORON  Using WINPCNDR record the integral boron worth for the critical boron concentration obtained in Step 7.5.1.4, and the minimum temperature from 7.6.3.1. Record the actual boron concentration from the most recent sample. Enter the B-10 depletion correction. If step 7.6.4.2
< step 7.5.1.4, this is 0. Otherwise, it is (step 7.6.4.2 - step


7.5.1.4) x (-0.025) (SOS 95-1985).
Appendix C                                Page 7 of 13                          Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 12
Record the integral boron worth for the corrected measured boron concentration and minimum temperature
* Determine the time interval since shutdown (step 7.5.1.1).
* Record the Xenon reactivity worth for the elapsed time interval after shutdown as derived from XEPRED on the PC; or computer point REU1504.
Standard:
* Records 18 hours from Initial Conditions.
* Attempts to locate computer point.
Evaluator Cue:        Computer Point REU1504 indicates 3967.5 pcm Xenon.
Comment:
Performance Step: 13
* Subtract xenon reactivity in step 7.6.1.1 from step 7.6.1.3 to obtain the net xenon reactivity.
Standard:              Performs algebraic addition and records -1064.7 pcm in 7.6.1.4.
Comment:
Performance Step: 14  SHUTDOWN REACTIVITY CORRECTIONS: RODS
* Record the controlling control rod bank and its height prior to the shutdown from the step counters or from the URO Logbook entry at the beginning of the shift the last time the unit was at steady state power or from the plant computer.
See Attachment 7.
* From WINPCNDR (Integral Rod Worths for HFP and HZP, respectively), record the remaining amount of negative reactivity that could be withdrawn from the core, based on the recorded bank height, power level, and burnup which existed prior to the shutdown. (SOS 95-1204)
Standard:
* Records Bank D @ 210 steps from Initial Conditions.
* Attempts to locate value on WINPCNDR Evaluator Cue:
Comment:
Callaway RO/SRO A1-1 Rev 0                          NUREG 1021, Revision 9, Supplement 1


from 7.6.3.1 using WINPCNDR. Subtract the integral boron worth for the corrected measured boron concentration (step 7.6.4.5) from the integral boron worth for the critical boron concentration (steps 7.6.4.1).
Appendix C                                Page 8 of 13                        Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 15
Standard: The net result of performing these steps will be ZERO. Using WINPCNDR, determines Integral Boron Worth is 1050.5 pcm.
* From Curve Book Figure 13-1, record the Rod Insertion Limit (RIL) for the power level which existed prior to the shutdown.
Enters 0 for Boron depletion Enters 1050.5 pcm for corrected measured boron concentration Determines correction is 0 Comment: If the candidate fails to read or understand the note prior to the steps then he/she may perform these steps/calculations.
Standard:              Records D at 161 inches in 7.6.2.3 Comment:
The net result will be ZERO since boron concentration did not change. 
Performance Step: 16
* From WINPCNDR, record the reactivity associated with the RIL in 7.6.2.3, based on the power level and burnup which existed prior to the shutdown.
Standard:              Records 203.4 pcm in 7.6.2.4.
Evaluator Cue:
Comment:
Performance Step: 17
* Calculate control rod correction by subtracting the critical rod worth (7.6.2.2) from the RIL worth (7.6.2.4) and multiplying by 0.90. This allows for a 10% rod worth uncertainty.
Standard:              Records .90(7.6.2.4 - 7.6.2.2) = 162.3 pcm.
Comment:
Performance Step: 18  SHUTDOWN REACTIVITY CORRECTIONS: TEMPERATURE
* Enter the minimum temperature anticipated during the shutdown.
* Using WINPCNDR, record the isothermal temperature defect for critical boron concentration from step 7.5.1.4 and the minimum anticipated temperature from step 7.6.3.1.
Standard:              Using WINPCNDR, records 0.1 pcm.
Callaway RO/SRO A1-1 Rev 0                          NUREG 1021, Revision 9, Supplement 1


Appendix C Page 10 of 13 Form ES-C-1 PERFORMANCE INFORMATION Callaway RO/SRO A1-1 Rev 0  NUREG 1021, Revision 9, Supplement 1  Performance Step: 20 Add the change in boron worth (Step 7.6.4.6) and the poison competition correction factor (Step 7.6.4.7) to determine the corrected change in boron worth.
Appendix C                                 Page 9 of 13                           Form ES-C-1 PERFORMANCE INFORMATION Evaluator Cue:
Standard:
Comment:
Records +300 pcm by carrying down the pre-inserted value in 7.6.4.7 to 7.6.4.8.
Procedure NOTE prior  Boron integral worth values from WINPCNDR are positive to boron correction    values as supplied by Westinghouse. The intent for this steps.                section is to determine the integral boron worth for a change in boron concentration.
Comment:   Performance Step: 21 TOTAL SHUTDOWN REACTIVITY (SHUTDOWN MARGIN
Performance Step: 19  SHUTDOWN REACTIVITY CORRECTIONS: BORON
* Using WINPCNDR record the integral boron worth for the critical boron concentration obtained in Step 7.5.1.4, and the minimum temperature from 7.6.3.1.
* Record the actual boron concentration from the most recent sample.
* Enter the B-10 depletion correction. If step 7.6.4.2 <
step 7.5.1.4, this is 0. Otherwise, it is (step 7.6.4.2 - step 7.5.1.4) x (-0.025) (SOS 95-1985).
* Record the integral boron worth for the corrected measured boron concentration and minimum temperature from 7.6.3.1 using WINPCNDR.
* Subtract the integral boron worth for the corrected measured boron concentration (step 7.6.4.5) from the integral boron worth for the critical boron concentration (steps 7.6.4.1).
Standard:              The net result of performing these steps will be ZERO. Using WINPCNDR, determines Integral Boron Worth is 1050.5 pcm.
Enters 0 for Boron depletion Enters 1050.5 pcm for corrected measured boron concentration Determines correction is 0 Comment:               If the candidate fails to read or understand the note prior to the steps then he/she may perform these steps/calculations.
The net result will be ZERO since boron concentration did not change.
Callaway RO/SRO A1-1 Rev 0                          NUREG 1021, Revision 9, Supplement 1


DETERMINATION): Total the reactivities from steps 7.5.1.9, 7.6.1.4, 7.6.2.5, 7.6.3.2, and 7.6.4.8.
Appendix C                                Page 10 of 13                          Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 20  Add the change in boron worth (Step 7.6.4.6) and the poison competition correction factor (Step 7.6.4.7) to determine the corrected change in boron worth.
Standard: Performs algebraic addition of steps 7.5.1.9, 7.6.1.4, 7.6.2.5, 7.6.3.2, and 7.6.4.8 and records -3612.1 pcm 7.6.5.1.
Standard:              Records +300 pcm by carrying down the pre-inserted value in 7.6.4.7 to 7.6.4.8.
Comment:   Performance Step: 22 COLR COMPARISON:
Comment:
Record the reactivity required to meet shutdown limits for the  
Performance Step: 21  TOTAL SHUTDOWN REACTIVITY (SHUTDOWN MARGIN DETERMINATION):
* Total the reactivities from steps 7.5.1.9, 7.6.1.4, 7.6.2.5, 7.6.3.2, and 7.6.4.8.
Standard:             Performs algebraic addition of steps 7.5.1.9, 7.6.1.4, 7.6.2.5, 7.6.3.2, and 7.6.4.8 and records -3612.1 pcm 7.6.5.1.
Comment:
Performance Step: 22   COLR COMPARISON:
Record the reactivity required to meet shutdown limits for the current mode.
* Modes 1 - 4, use COLR section 2.1.1 Standard:              Consults COLR and records 1.3% DK/K (-1300 pcm)
Comment:
Callaway RO/SRO A1-1 Rev 0                          NUREG 1021, Revision 9, Supplement 1


current mode. Modes 1 - 4, use COLR section 2.1.1 Standard: Consults COLR and records 1.3% DK/K  (-1300 pcm)
Appendix C                                Page 11 of 13                      Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 23  Record the Total Shutdown Reactivity from step 7.6.5.1.
Standard:              Records -3612.1 pcm (Accept -3450 to -3750 pcm)
Comment:
Performance Step: 24  Determine if the Total Shutdown Reactivity recorded in step 7.7.2 is more negative than the limits provided in COLR recorded in step 7.7.1. (Circle Yes or No)
Standard:              Circles YES.
Comment:
Comment:
Appendix C Page 11 of 13 Form ES-C-1  PERFORMANCE INFORMATION Callaway RO/SRO A1-1 Rev 0 NUREG 1021, Revision 9, Supplement 1 Performance Step: 23 Record the Total Shutdown Reactivity from step 7.6.5.1.
Terminating Cue:          After the COLR comparison is complete: This JPM is complete.
Standard: Records -3612.1 pcm (Accept -3450 to -3750 pcm)
Callaway RO/SRO A1-1 Rev 0                         NUREG 1021, Revision 9, Supplement 1
Comment:    Performance Step: 24 Determine if the Total Shutdown Reactivity recorded in step 7.7.2 is more negative than the limits provided in COLR recorded in step 7.7.1. (Circle Yes or No)
Standard:
Circles YES.
Comment:  Terminating Cue: After the COLR comparison is complete: This JPM is complete.


Appendix C Page 12 of 13 Form ES-C-1 VERIFICATION OF COMPLETION Callaway RO/SRO A1-1 Rev 0  NUREG 1021, Revision 9, Supplement 1 Job Performance Measure No.: 2005 NRC RO A1-1 Examinee's Name:
Appendix C                           Page 12 of 13                   Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC RO A1-1 Examinees Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,102: Line 1,858:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Appendix C Page 13 of 13 Form ES-C-1 JPM CUE SHEET Callaway RO/SRO A1-1 Rev 0  NUREG 1021, Revision 9, Supplement 1 INITIAL CONDITIONS:  The reactor tripped 18 hours ago. The current time is 0800  The unit had been at 100 % power for 22 days. Core Burnup is 275 EFPD. (12,400 MWD/MTU)  Tavg is 557
&#xfb;F. Boron Concentration at the time of the trip was 1075 PPM and has not changed. Control Bank D was at 210 steps. The operating crew is preparing to withdraw the shutdown bank rods.
INITIATING CUE: The Shift Supervisor has assigned you to perform a Shutdown Margin Calculation in accordance with OSP-SF-0001, prior to withdrawing the shutdown bank rods.


Appendix C Job Performance Measure Form ES-C-1 Worksheet NUREG 1021, Revision 9, Supplement 1 Facility:
===Response===
Callaway Task No.:     Task Title: Determine the volume and RMCS controls settings for raising RWST level. JPM No.: 2005 NRC RO/SRO A1-2   K/A  
Result:                      SAT            UNSAT Examiners Signature:                                Date:
Callaway RO/SRO A1-1 Rev 0                    NUREG 1021, Revision 9, Supplement 1
 
Appendix C                             Page 13 of 13                        Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
* The reactor tripped 18 hours ago.
* The current time is 0800
* The unit had been at 100 % power for 22 days.
* Core Burnup is 275 EFPD. (12,400 MWD/MTU)
* Tavg is 557 F.
* Boron Concentration at the time of the trip was 1075 PPM and has not changed.
* Control Bank D was at 210 steps.
* The operating crew is preparing to withdraw the shutdown bank rods.
INITIATING CUE:          The Shift Supervisor has assigned you to perform a Shutdown Margin Calculation in accordance with OSP-SF-0001, prior to withdrawing the shutdown bank rods.
Callaway RO/SRO A1-1 Rev 0                        NUREG 1021, Revision 9, Supplement 1
 
Appendix C                                  Job Performance Measure                    Form ES-C-1 Worksheet Facility:               Callaway                                 Task No.:
Task
 
==Title:==
Determine the volume and RMCS             JPM No.:     2005 NRC RO/SRO controls settings for raising RWST                    A1-2 level.
K/A  


==Reference:==
==Reference:==
2.1.25 (2.8)
2.1.25 (2.8)
Examinee:
Examinee:                                                     NRC Examiner:
NRC Examiner:
Facility Evaluator:                                           Date:
Facility Evaluator:
Method of testing: This JPM can be performed in any setting with the required references available.
Date: Method of testing:
Simulated Performance:                                       Actual Performance:       X Classroom           X     Simulator             Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
This JPM can be performed in any setting with the required references available.
Initial Conditions:
Simulated Performance:
* The unit is coming out of a refueling outage.
Actual Performance: X Classroom X Simulator Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
* A significant leak occurred during the refuel pool draindown process.
Initial Conditions: The unit is coming out of a refueling outage. A significant leak occurred during the refuel pool draindown process. RWST level is 92%. RWST Boron Concentration is 2400 PPM. BAST concentration is 7000 ppm Task Standard: Volume addition and controls settings within the specified range.
* RWST level is 92%.
Required Materials: Straight Edge Calculator General  
* RWST Boron Concentration is 2400 PPM.
* BAST concentration is 7000 ppm Task Standard:             Volume addition and controls settings within the specified range.
Required Materials:
* Straight Edge
* Calculator General  


==References:==
==References:==
OTN-BG-00002, REACTOR MAKEUP CONTROL AND BORON THERMAL REGENERATION SYSTEM, Rev. 020 Handouts: OTN-BG-0002 RWST Level/Volume Curve Initiating Cue: You have been directed to determine the volume addition required to establish the RWST level to 98% and the Reactor Makeup Control System settings to maintain RWST boron concentration at it's current  
OTN-BG-00002, REACTOR MAKEUP CONTROL AND BORON THERMAL REGENERATION SYSTEM, Rev. 020 Handouts:
* OTN-BG-0002
* RWST Level/Volume Curve Initiating Cue:             You have been directed to determine the volume addition required to establish the RWST level to 98% and the Reactor Makeup Control System settings to maintain RWST boron concentration at its current value with a makeup flow rate of 90 GPM Time Critical Task:        No Validation Time:            10 Minutes NUREG 1021, Revision 9, Supplement 1


value with a makeup flow rate of 90 GPM Time Critical Task:
Appendix C Job Performance Measure               Form ES-C-1 Worksheet SIMULATOR SETUP N/A NUREG 1021, Revision 9, Supplement 1
No  Validation Time:
10 Minutes Appendix C Job Performance Measure Form ES-C-1 Worksheet NUREG 1021, Revision 9, Supplement 1 SIMULATOR SETUP N/A Appendix C Page 3 of 6 Form ES-C-1  PERFORMANCE INFORMATION NUREG 1021, Revision 9, Supplement 1 (Denote Critical Steps with a )  Evaluator Note: There is no required sequence of steps. The candidate may first refer to OTN-BG-0002.
Performance Step: 1 Determine the volume to be added.
Standard:
Refers to RWST Level/Volume Curve and determines  23,500 gallons but  25,500 must be added.
Comment:  Evaluator Cue: Provide a copy of the RWST Level/Volume Curve if the book is not available where the JPM is performed or the existing document cannot be marked.
Performance Step: 2 Locate/review the applicable procedure.
Standard: Locates OTN-BG-0002 and determines that Section 5.5 - MANUAL MODE OF RMCS OPERATION applies.
Comment:  Evaluator Cue: Provide OTN-BG-0002, Section 5.5.


Appendix C Page 4 of 6 Form ES-C-1 PERFORMANCE INFORMATION NUREG 1021, Revision 9, Supplement 1 Procedure NOTES preceding the step: If the makeup water is to be blended for use somewhere other than the Chemical and Volume Control System, ensure that the VCT level is sufficient for expected plant operating conditions. If makeup is required to the Spent Fuel Pool refer to OTN-EC-00001 Performance Step: 3 Determine the desired boric acid and makeup water flow rates, for blended flow using Figure 7-2.
Appendix C                                     Page 3 of 6                     Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a )
Standard:
Evaluator Note:             There is no required sequence of steps. The candidate may first refer to OTN-BG-0002.
Refers to Figure 7-2 and determines: Boric Acid flow =30.86 GPM. Makeup Water flow = 59.14 GPM Evaluator Cue: Assume that adequate supply capacity is available to perform the evolution.
Performance Step: 1        Determine the volume to be added.
Performance Step: 4 Determines RMCS settings based upon required blended flow
Standard:                   Refers to RWST Level/Volume Curve and determines  23,500 gallons but  25,500 must be added.
Comment:
Evaluator Cue:             Provide a copy of the RWST Level/Volume Curve if the book is not available where the JPM is performed or the existing document cannot be marked.
Performance Step: 2        Locate/review the applicable procedure.
Standard:                  Locates OTN-BG-0002 and determines that Section 5.5 -
MANUAL MODE OF RMCS OPERATION applies.
Comment:
Evaluator Cue:              Provide OTN-BG-0002, Section 5.5.
NUREG 1021, Revision 9, Supplement 1


rates     Standard:
Appendix C                            Page 4 of 6                          Form ES-C-1 PERFORMANCE INFORMATION Procedure NOTES
Refers to Figure 7-2 and determines: Boric Acid flow BG-FK-111 potentiometer setting 7.71. Blended flow BG-FK-110 potentiometer setting 5.63 Evaluator Cue: Assume that adequate supply capacity is available to perform the evolution.
* If the makeup water is to be blended for use somewhere preceding the step:        other than the Chemical and Volume Control System, ensure that the VCT level is sufficient for expected plant operating conditions.
Terminating Cue: After the controls settings are determined: This JPM is complete.  
* If makeup is required to the Spent Fuel Pool refer to OTN-EC-00001 Performance Step: 3 Determine the desired boric acid and makeup water flow rates, for blended flow using Figure 7-2.
Standard:           Refers to Figure 7-2 and determines:
* Boric Acid flow =30.86 GPM.
* Makeup Water flow = 59.14 GPM Evaluator Cue:      Assume that adequate supply capacity is available to perform the evolution.
Performance Step: 4 Determines RMCS settings based upon required blended flow rates Standard:          Refers to Figure 7-2 and determines:
* Boric Acid flow BG-FK-111 potentiometer setting 7.71.
* Blended flow BG-FK-110 potentiometer setting 5.63 Evaluator Cue:     Assume that adequate supply capacity is available to perform the evolution.
Terminating Cue:       After the controls settings are determined: This JPM is complete.
NUREG 1021, Revision 9, Supplement 1


Appendix C Page 5 of 6 Form ES-C-1 VERIFICATION OF COMPLETION NUREG 1021, Revision 9, Supplement 1 Job Performance Measure No.: 2005 NRC RO/SRO A1-2 Examinee's Name:
Appendix C                             Page 5 of 6                   Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC RO/SRO A1-2 Examinees Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,155: Line 1,937:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Appendix C Page 6 of 6 Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 9, Supplement 1 INITIAL CONDITIONS:  The unit is coming out of a refueling outage. A significant leak occurred during the refuel pool draindown process. RWST level is 92%. RWST Boron Concentration is 2400 PPM. BAST concentration is 7000 ppm INITIATING CUE: You have been directed to determine the volume addition required to establish the RWST level to 98% and the Reactor Makeup Control System settings to maintain RWST boron concentration at its current value with a makeup flow rate of 90 GPM.


Appendix C Job Performance Measure Form ES-C-1 Worksheet Callaway 2005 NRC RO A2 NUREG 1021, Revision 9 Facility: Callaway Plant Task No.:
===Response===
Task Title: Determine isolation points for a tagging request JPM No.: 2005 NRC RO A2 K/A
Result:                      SAT            UNSAT Examiners Signature:                                Date:
NUREG 1021, Revision 9, Supplement 1
 
Appendix C                           Page 6 of 6                          Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
* The unit is coming out of a refueling outage.
* A significant leak occurred during the refuel pool draindown process.
* RWST level is 92%.
* RWST Boron Concentration is 2400 PPM.
* BAST concentration is 7000 ppm INITIATING CUE:     You have been directed to determine the volume addition required to establish the RWST level to 98% and the Reactor Makeup Control System settings to maintain RWST boron concentration at its current value with a makeup flow rate of 90 GPM.
NUREG 1021, Revision 9, Supplement 1


==Reference:==
Appendix C                                Job Performance Measure                      Form ES-C-1 Worksheet Facility:               Callaway Plant                            Task No.:
Task


2.2.13  (3.6)
==Title:==
Examinee:
Determine isolation points for a          JPM No.:     2005 NRC RO A2 tagging request K/A  
NRC Examiner:
Facility Evaluator:
Date:  Method of testing:
Simulated Performance:
Actual Performance: X  Classroom X Simulator Plant  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions: Containment Spray Pump "A" flow element EN FE-5 is leaking on the high side tap. A job has been initiated to drain the associated piping and repair the


flow element Task Standard: Tagging boundaries are identified to provide minimum isolation of EN FE-5   Required Materials: ODP-ZZ-00310, Workmen's Protection Assurance M-22BN01, M-22EN01, E-23EN01 General  
==Reference:==
2.2.13 (3.6)
Examinee:                                                    NRC Examiner:
Facility Evaluator:                                          Date:
Method of testing:
Simulated Performance:                                        Actual Performance:      X Classroom          X    Simulator            Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:        Containment Spray Pump A flow element EN FE-5 is leaking on the high side tap.
A job has been initiated to drain the associated piping and repair the flow element Task Standard:             Tagging boundaries are identified to provide minimum isolation of EN FE-5 Required Materials:         ODP-ZZ-00310, Workmens Protection Assurance M-22BN01, M-22EN01, E-23EN01 General  


==References:==
==References:==
ODP-ZZ-0310, Workmen's Protection Assurance M-22BN01, M-22EN01, E-23EN01 Initiating Cue: You have been directed to identify the tagging boundaries to allow work to be performed on flow element EN FE-5.
ODP-ZZ-0310, Workmens Protection Assurance M-22BN01, M-22EN01, E-23EN01 Initiating Cue:             You have been directed to identify the tagging boundaries to allow work to be performed on flow element EN FE-5.
Time Critical Task:
Time Critical Task:         NO Validation Time:           15 Minutes Callaway 2005 NRC RO A2                                                    NUREG 1021, Revision 9
NO   Validation Time:
15 Minutes  


Appendix C Job Performance Measure Form ES-C-1 Worksheet Callaway 2005 NRC RO A2 NUREG 1021, Revision 9 SIMULATOR SETUP None Required Appendix C Page 3 of 6 Form ES-C-1 PERFORMANCE INFORMATION Callaway 2005 NRC RO A2 NUREG 1021, Revision 9 (Denote Critical Steps with a check mark)
Appendix C               Job Performance Measure         Form ES-C-1 Worksheet SIMULATOR SETUP None Required Callaway 2005 NRC RO A2                         NUREG 1021, Revision 9
 
Appendix C                                   Page 3 of 6                         Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)
START TIME:
START TIME:
Performance Step: 1 Obtains required drawings Standard: Locates print rack and identifies required drawings Evaluator Note: Isolation points may be identified in any order Comment:       Performance Step: 2 EN HV-1, Containment Recirc Sump Supply valve will be closed Standard: Locates and marks EN HV-1 closed Comment:       Performance Step: 3 EN HV-6, Containment Spray "A" discharge to Containment will be closed Standard: Locates and marks EN HV-6 closed Comment:       Performance Step: 4 EN V-24, Recirculation valve to RWST, will be closed Standard: Locates and marks EN V-24 closed Comment:
Performance Step: 1     Obtains required drawings Standard:               Locates print rack and identifies required drawings Evaluator Note:         Isolation points may be identified in any order Comment:
Appendix C Page 4 of 6 Form ES-C-1  PERFORMANCE INFORMATION Callaway 2005 NRC RO A2 NUREG 1021, Revision 9 Performance Step: 5 BN HV-4, RWST suction supply to Containment Spray Pump "A", will be closed Standard: Locates and marks BN HV-4 closed Comment:        Performance Step: 6 EN V-90, Containment Spray line vent valve, will be open Standard: Locates and marks EN V-90 open Comment:        Performance Step: 7 EITHER ONE of EN V-92 or EN V-67, Containment Spray line drain valves, will be open Standard: Locates and marks either EN V-92 or EN V-67 open Comment:        Performance Step: 8 Pump breaker must be opened and electrically isolated Standard: Identifies isolation of Containment Spray Pump "A" electrical circuit breaker Comment:    Terminating Cue:
Performance Step: 2     EN HV-1, Containment Recirc Sump Supply valve will be closed Standard:               Locates and marks EN HV-1 closed Comment:
When the applicant has determined the isolation boundaries for the work to be performed.
Performance Step: 3     EN HV-6, Containment Spray A discharge to Containment will be closed Standard:               Locates and marks EN HV-6 closed Comment:
STOP TIME:
Performance Step: 4     EN V-24, Recirculation valve to RWST, will be closed Standard:               Locates and marks EN V-24 closed Comment:
Callaway 2005 NRC RO A2                                               NUREG 1021, Revision 9


Appendix C Page 5 of 6 Form ES-C-1 VERIFICATION OF COMPLETION Callaway 2005 NRC RO A2 NUREG 1021, Revision 9 Job Performance Measure No.: 2005 NRC RO A2 Examinee's Name:
Appendix C                               Page 4 of 6                     Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 5 BN HV-4, RWST suction supply to Containment Spray Pump A, will be closed Standard:          Locates and marks BN HV-4 closed Comment:
Performance Step: 6 EN V-90, Containment Spray line vent valve, will be open Standard:          Locates and marks EN V-90 open Comment:
Performance Step: 7 EITHER ONE of EN V-92 or EN V-67, Containment Spray line drain valves, will be open Standard:          Locates and marks either EN V-92 or EN V-67 open Comment:
Performance Step: 8 Pump breaker must be opened and electrically isolated Standard:          Identifies isolation of Containment Spray Pump A electrical circuit breaker Comment:
Terminating Cue:        When the applicant has determined the isolation boundaries for the work to be performed.
STOP TIME:
Callaway 2005 NRC RO A2                                         NUREG 1021, Revision 9
 
Appendix C                            Page 5 of 6                Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC RO A2 Examinees Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,196: Line 1,994:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Appendix C Page 6 of 6 Form ES-C-1 JPM CUE SHEET Callaway 2005 NRC RO A2 NUREG 1021, Revision 9 INITIAL CONDITIONS: Containment Spray Pump "A" flow element EN FE-5 is leaking on the high side tap. A job has been initiated to drain the associated piping and repair the flow element INITIATING CUE: You have been directed to identify the tagging boundaries to allow work to be performed.


Appendix C Job Performance Measure Form ES-C-1 Worksheet Callaway 2005 NRC SRO A2 NUREG 1021, Revision 9 Facility: Callaway Plant Task No.:
===Response===
Task Title: Review a tagging request for approval JPM No.: 2005 NRC SRO A2 K/A
Result:                      SAT            UNSAT Examiners Signature:                                Date:
Callaway 2005 NRC RO A2                                 NUREG 1021, Revision 9
 
Appendix C                              Page 6 of 6                          Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:     Containment Spray Pump A flow element EN FE-5 is leaking on the high side tap.
A job has been initiated to drain the associated piping and repair the flow element INITIATING CUE:         You have been directed to identify the tagging boundaries to allow work to be performed.
Callaway 2005 NRC RO A2                                         NUREG 1021, Revision 9


==Reference:==
Appendix C                                Job Performance Measure                      Form ES-C-1 Worksheet Facility:               Callaway Plant                            Task No.:
Task


2.2.13  (3.6)
==Title:==
Examinee:
Review a tagging request for             JPM No.:     2005 NRC SRO A2 approval K/A  
NRC Examiner:
Facility Evaluator:
Date:  Method of testing:
Simulated Performance:
Actual Performance: X  Classroom X Simulator Plant  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions: Containment Spray Pump "A" flow element EN FE-5 is leaking on the high side tap. A job has been initiated to drain the associated piping and repair the


flow element Task Standard: Tagging boundaries are identified to provide minimum isolation of EN FE-5. WPA not approved due to 2 deficiencies Required Materials: ODP-ZZ-00310, Workmen's Protection Assurance M-22BN01, M-22EN01, E-23EN01 General  
==Reference:==
2.2.13 (3.6)
Examinee:                                                    NRC Examiner:
Facility Evaluator:                                          Date:
Method of testing:
Simulated Performance:                                        Actual Performance:      X Classroom          X    Simulator            Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:        Containment Spray Pump A flow element EN FE-5 is leaking on the high side tap.
A job has been initiated to drain the associated piping and repair the flow element Task Standard:             Tagging boundaries are identified to provide minimum isolation of EN FE-5. WPA not approved due to 2 deficiencies Required Materials:         ODP-ZZ-00310, Workmens Protection Assurance M-22BN01, M-22EN01, E-23EN01 General  


==References:==
==References:==
ODP-ZZ-0310, Workmen's Protection Assurance M-22BN01, M-22EN01, E-23EN01 Initiating Cue: You have been directed to review the WPA for approval to allow work to be performed on flow element EN FE-5.
ODP-ZZ-0310, Workmens Protection Assurance M-22BN01, M-22EN01, E-23EN01 Initiating Cue:             You have been directed to review the WPA for approval to allow work to be performed on flow element EN FE-5.
Time Critical Task:
Time Critical Task:         NO Validation Time:           15 minutes Callaway 2005 NRC SRO A2                                                    NUREG 1021, Revision 9
NO   Validation Time:
15 minutes  


Appendix C Job Performance Measure Form ES-C-1 Worksheet Callaway 2005 NRC SRO A2 NUREG 1021, Revision 9 SIMULATOR SETUP None Required Appendix C Page 3 of 6 Form ES-C-1 PERFORMANCE INFORMATION Callaway 2005 NRC SRO A2 NUREG 1021, Revision 9 (Denote Critical Steps with a check mark)
Appendix C               Job Performance Measure         Form ES-C-1 Worksheet SIMULATOR SETUP None Required Callaway 2005 NRC SRO A2                         NUREG 1021, Revision 9
 
Appendix C                                   Page 3 of 6                       Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)
START TIME:
START TIME:
Performance Step: 1 Obtains required drawings Standard: Locates print rack and identifies required drawings Evaluator Note: Isolation points may be identified in any order Comment:       Performance Step: 2 Reviews WPA to determine appropriate isolation points for Containment Spray Pump "A" flow element FE-5 Standard: Reviews tag listing Comment:       Performance Step: 3 Determines that BN HV-4, RWST suction supply to Containment Spray Pump "A" must be closed and tagged Standard: Identifies deficiency on tagging request. Local handwheel must be tagged as part of valve isolation Comment:       Performance Step: 4 Determines that Containment Spray Pump "A" breaker must be tagged Standard: Identifies that the Containment Spray Pump "A" breaker is not tagged and requires tagging Comment:
Performance Step: 1     Obtains required drawings Standard:               Locates print rack and identifies required drawings Evaluator Note:         Isolation points may be identified in any order Comment:
Appendix C Page 4 of 6 Form ES-C-1  PERFORMANCE INFORMATION Callaway 2005 NRC SRO A2 NUREG 1021, Revision 9 Performance Step: 5 Return the WPA without approval Standard: Determines that WPA cannot be approved Comment:    Terminating Cue:
Performance Step: 2     Reviews WPA to determine appropriate isolation points for Containment Spray Pump A flow element FE-5 Standard:               Reviews tag listing Comment:
When the applicant has provided disposition of the WPA, this JPM is complete STOP TIME:
Performance Step: 3     Determines that BN HV-4, RWST suction supply to Containment Spray Pump A must be closed and tagged Standard:               Identifies deficiency on tagging request. Local handwheel must be tagged as part of valve isolation Comment:
Performance Step: 4     Determines that Containment Spray Pump A breaker must be tagged Standard:               Identifies that the Containment Spray Pump A breaker is not tagged and requires tagging Comment:
Callaway 2005 NRC SRO A2                                             NUREG 1021, Revision 9


Appendix C Page 5 of 6 Form ES-C-1  VERIFICATION OF COMPLETION Callaway 2005 NRC SRO A2 NUREG 1021, Revision 9 Job Performance Measure No.: 2005 NRC RO A2 Examinee's Name:
Appendix C                             Page 4 of 6                     Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 5 Return the WPA without approval Standard:            Determines that WPA cannot be approved Comment:
Terminating Cue:        When the applicant has provided disposition of the WPA, this JPM is complete STOP TIME:
Callaway 2005 NRC SRO A2                                   NUREG 1021, Revision 9
 
Appendix C                            Page 5 of 6                Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC RO A2 Examinees Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,236: Line 2,043:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Appendix C Page 6 of 6 Form ES-C-1 JPM CUE SHEET Callaway 2005 NRC SRO A2 NUREG 1021, Revision 9 INITIAL CONDITIONS: Containment Spray Pump "A" flow element EN FE-5 is leaking on the high side tap. A job has been initiated to drain the associated piping and repair the flow element INITIATING CUE: You have been directed to review the WPA for approval to allow work to be performed on flow element EN FE-5.


Appendix C Job Performance Measure Form ES-C-1 Worksheet Callaway 2005 NRC RO/SRO A3  NUREG 1021, Revision 9 Facility: Callaway Plant Task No.:
===Response===
N/A     Task Title: Determine Maximum Allowable Stay Time JPM No.: 2005 NRC RO A3 K/A  
Result:                      SAT            UNSAT Examiners Signature:                                Date:
Callaway 2005 NRC SRO A2                                NUREG 1021, Revision 9
 
Appendix C                               Page 6 of 6                          Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:      Containment Spray Pump A flow element EN FE-5 is leaking on the high side tap.
A job has been initiated to drain the associated piping and repair the flow element INITIATING CUE:          You have been directed to review the WPA for approval to allow work to be performed on flow element EN FE-5.
Callaway 2005 NRC SRO A2                                          NUREG 1021, Revision 9
 
Appendix C                                  Job Performance Measure                    Form ES-C-1 Worksheet Facility:               Callaway Plant                           Task No.:   N/A Task
 
==Title:==
Determine Maximum Allowable Stay         JPM No.:   2005 NRC RO A3 Time K/A  


==Reference:==
==Reference:==
 
2.3.2 (2.5)
2.3.2 (2.5)
Examinee:                                                     NRC Examiner:
Examinee:
Facility Evaluator:                                           Date:
NRC Examiner:
Method of testing:
Facility Evaluator:
Simulated Performance:                                       Actual Performance:       X Classroom                 Simulator             Plant       X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Date: Method of testing:
Initial Conditions:         A job is being performed on RHR Pump A that requires isolating and draining system piping.
Simulated Performance:
You have been directed to open RHR Pump A drain valve EJ V-148 and route a hose to the local floor drain Task Standard:             Correct RWP is selected and stay time identified as 30 minutes based upon exceeding maximum dose Required Materials:         RWPs, Survey Maps General  
Actual Performance: X Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions: A job is being performed on RHR Pump "A" that requires isolating and draining system piping. You have been directed to open RHR Pump "A" drain valve EJ V-148 and route a hose to the local floor drain Task Standard: Correct RWP is selected and stay time identified as 30 minutes based upon exceeding maximum dose Required Materials:
RWPs, Survey Maps General  


==References:==
==References:==
RWPs, Survey Maps Initiating Cue:            Identify the appropriate RWP for entry and determine maximum allowable stay time before a dosimeter limit is exceeded.
Time Critical Task:        NO Validation Time:            8 Minutes Callaway 2005 NRC RO/SRO A3                                                NUREG 1021, Revision 9


RWPs, Survey Maps Initiating Cue: Identify the appropriate RWP for entry and determine maximum allowable stay time before a dosimeter limit is exceeded.
Appendix C                   Job Performance Measure         Form ES-C-1 Worksheet SIMULATOR SETUP None Required Callaway 2005 NRC RO/SRO A3                         NUREG 1021, Revision 9
Time Critical Task:
NO  Validation Time:
8 Minutes
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Callaway 2005 NRC RO/SRO A3 NUREG 1021, Revision 9 SIMULATOR SETUP None Required


Appendix C Page 3 of 5 Form ES-C-1 PERFORMANCE INFORMATION Callaway 2005 NRC RO/SRO A3  NUREG 1021, Revision 9 (Denote Critical Steps with a check mark)
Appendix C                                 Page 3 of 5                         Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)
START TIME:
START TIME:
Performance Step: 1 Determine RWP required for task performed Standard:
Performance Step: 1     Determine RWP required for task performed Standard:               Selects RWP 500501WPA Comment:
Selects RWP 500501WPA Comment:       Performance Step: 2 Determines stay time based upon dosimeter setting Standard: Determines dosimeter setting is 10 mr total dose and 100 mr/hr dose rate.
Performance Step: 2     Determines stay time based upon dosimeter setting Standard:               Determines dosimeter setting is 10 mr total dose and 100 mr/hr dose rate.
Standard: Selects survey map #1111, RHR Pump "A" room Standard: Determines dose rate in the area of the work is 20 mr/hr Standard: Determines maximum stay time at 20 mr/hr is 30 minutes to  
Standard:               Selects survey map #1111, RHR Pump A room Standard:               Determines dose rate in the area of the work is 20 mr/hr Standard:               Determines maximum stay time at 20 mr/hr is 30 minutes to avoid exceeding 10 mr total dose.
 
Comment:
avoid exceeding 10 mr total dose.
Terminating Cue:             When the candidate indicates stay time for the work performed, this JPM is complete STOP TIME:
Comment:     Terminating Cue: When the candidate indicates stay time for the work performed, this JPM is complete STOP TIME:  
Callaway 2005 NRC RO/SRO A3                                        NUREG 1021, Revision 9


Appendix C Page 4 of 5 Form ES-C-1 VERIFICATION OF COMPLETION Callaway 2005 NRC RO/SRO A3  NUREG 1021, Revision 9 Job Performance Measure No.: 2005 NRC RO A3 Examinee's Name:
Appendix C                             Page 4 of 5               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC RO A3 Examinees Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,281: Line 2,088:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Appendix C Page 5 of 5 Form ES-C-1 JPM CUE SHEET Callaway 2005 NRC RO/SRO A3  NUREG 1021, Revision 9 INITIAL CONDITIONS: A job is being performed on RHR Pump "A" that requires isolating and draining system piping. You have been directed to open RHR Pump "A" drain valve EJ V-148 and route a hose to the local floor drain INITIATING CUE: Identify the appropriate RWP for entry and determine maximum allowable stay time before a dosimeter limit is exceeded.


Appendix C Job Performance Measure Form ES-C-1 Worksheet Callaway SRO NRC JPM A4  NUREG 1021, Revision 9, Supplement 1 Facility:
===Response===
Callaway Task No.:     Task Title: Evaluate plant conditions, upgrade the emergency classification and make a PAR.
Result:                      SAT            UNSAT Examiners Signature:                                Date:
JPM No.: 2005 NRC SRO A4 K/A  
Callaway 2005 NRC RO/SRO A3                              NUREG 1021, Revision 9
 
Appendix C                               Page 5 of 5                        Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:    A job is being performed on RHR Pump A that requires isolating and draining system piping.
You have been directed to open RHR Pump A drain valve EJ V-148 and route a hose to the local floor drain INITIATING CUE:        Identify the appropriate RWP for entry and determine maximum allowable stay time before a dosimeter limit is exceeded.
Callaway 2005 NRC RO/SRO A3                                      NUREG 1021, Revision 9
 
Appendix C                                Job Performance Measure                      Form ES-C-1 Worksheet Facility:               Callaway                               Task No.:
Task
 
==Title:==
Evaluate plant conditions, upgrade     JPM No.:    2005 NRC SRO A4 the emergency classification and make a PAR.
K/A  


==Reference:==
==Reference:==
2.4.44 (4.0)
2.4.44 (4.0)
Examinee:
Examinee:                                                   NRC Examiner:
NRC Examiner:
Facility Evaluator:                                         Date:
Facility Evaluator:
Method of testing:
Date: Method of testing:
Simulated Performance:                                       Actual Performance:       X Classroom               Simulator       X   Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Simulated Performance:
Initial Conditions:
Actual Performance: X Classroom Simulator X Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
* A large break LOCA is in progress.
Initial Conditions: A large break LOCA is in progress. Attempts to initiate Containment Spray have failed. A Site Emergency was declared 20 minutes ago based on loss of the RCS subcooling and radiation monitor GT-RE-59 reading  
* Attempts to initiate Containment Spray have failed.
* A Site Emergency was declared 20 minutes ago based on loss of the RCS subcooling and radiation monitor GT-RE-59 reading 3.1E+3 R/hr.
* One minute ago containment pressure lowered rapidly and now continues to lower at a slower rate.
* Wind speed is 5 Miles/Hr.
* Wind direction is from 218&deg;
* The outside temperature is 88 F.
Task Standard:              Upgrades classification and makes a PAR.
Required Materials:        SENTRY Computer General


3.1E+3 R/hr. One minute ago containment pressure lowered rapidly and now continues to lower at a slower rate. Wind speed is 5 Miles/Hr. Wind direction is from 218&deg;  The outside temperature is 88
==References:==
&#xfb;F. Task Standard: Upgrades classification and makes a PAR.
* EIP-ZZ-00101, CLASSIFICATION OF EMERGENCIES, Rev.
Required Materials:
032
SENTRY Computer General
* EIP-ZZ-00102, EMERGENCY IMPLEMENTING ACTIONS, Rev.
034
* EIP-ZZ-00212, PROTECTIVE ACTION RECOMMENDATIONS, Rev. 021 Handouts:                   EIP-ZZ-00101, EIP-ZZ-00102, EIP-ZZ-00212 Initiating Cue:            Reevaluate the Emergency Classification and perform required follow up actions required of the Emergency Coordinator.
Callaway SRO NRC JPM A4                                    NUREG 1021, Revision 9, Supplement 1


==References:==
Appendix C                     Job Performance Measure               Form ES-C-1 Worksheet Time Critical Task: Yes Validation Time:    24 Minutes Callaway SRO NRC JPM A4                     NUREG 1021, Revision 9, Supplement 1
EIP-ZZ-00101, CLASSIFICATION OF EMERGENCIES, Rev.
032  EIP-ZZ-00102, EMERGENCY IMPLEMENTING ACTIONS, Rev.
034  EIP-ZZ-00212, PROTECTIVE ACTION RECOMMENDATIONS, Rev. 021  Handouts:
EIP-ZZ-00101, EIP-ZZ-00102, EIP-ZZ-00212 Initiating Cue: Reevaluate the Emergency Classification and perform required follow up actions required of the Emergency Coordinator.
Appendix C Job Performance Measure Form ES-C-1 Worksheet Callaway SRO NRC JPM A4 NUREG 1021, Revision 9, Supplement 1 Time Critical Task:
Yes  Validation Time:
24 Minutes


Appendix C Job Performance Measure Form ES-C-1 Worksheet Callaway SRO NRC JPM A4  NUREG 1021, Revision 9, Supplement 1 SIMULATOR SETUP N/A   JPM Setup:
Appendix C                           Job Performance Measure               Form ES-C-1 Worksheet SIMULATOR SETUP N/A JPM Setup:
Ensure SENTRY Screen is called up on computer with plant 'WIND SECTOR" data deleted, then minimize screen prior to JPM performance Appendix C Page 4 of 8 Form ES-C-1  PERFORMANCE INFORMATION Callaway SRO NRC JPM A4 NUREG 1021, Revision 9, Supplement 1 (Denote Critical Steps with a )  Performance Step: 1 Review changing conditions.
Ensure SENTRY Screen is called up on computer with plant WIND SECTOR data deleted, then minimize screen prior to JPM performance Callaway SRO NRC JPM A4                             NUREG 1021, Revision 9, Supplement 1
Standard:  Enters EIP-ZZ-00101  Reviews Group 2 (Fission Product Barrier) EAL's  Declares General Emergency based on uncontrolled depressurization of containment.
Comment:    Performance Step: 2 Enters EIP-ZZ-00102 Standard: Announces GE and reason to control room personnel.
Comment: The candidate may work through the next several steps using EIP-ZZ-00102, ATTACHMENT 5 (flowcharted procedure steps). Mark the time of the GE announcement: __________. ATTACHMENT 4, OFF SITE NOTIFICATION FORM, must be provided to the communicator within 15 minutes from this


time. Performance Step: 3 Manually initiate ERFIS.
Appendix C                                    Page 4 of 8                      Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a )
Performance Step: 1        Review changing conditions.
Standard:
Standard:
Locates ERFIS button.
* Enters EIP-ZZ-00101
Comment:   Evaluator Cue: ERFIS was actuated when the Site Emergency was declared.  
* Reviews Group 2 (Fission Product Barrier) EALs
* Declares General Emergency based on uncontrolled depressurization of containment.
Comment:
Performance Step: 2        Enters EIP-ZZ-00102 Standard:                  Announces GE and reason to control room personnel.
Comment:                  The candidate may work through the next several steps using EIP-ZZ-00102, ATTACHMENT 5 (flowcharted procedure steps).
Mark the time of the GE announcement: __________.
ATTACHMENT 4, OFF SITE NOTIFICATION FORM, must be provided to the communicator within 15 minutes from this time.
Performance Step: 3        Manually initiate ERFIS.
Standard:                  Locates ERFIS button.
Comment:
Evaluator Cue:             ERFIS was actuated when the Site Emergency was declared.
Callaway SRO NRC JPM A4                              NUREG 1021, Revision 9, Supplement 1


Appendix C Page 5 of 8 Form ES-C-1 PERFORMANCE INFORMATION Callaway SRO NRC JPM A4  NUREG 1021, Revision 9, Supplement 1 Performance Step: 4 Notify On-site personnel Standard: Completes ATTACHMENT 1 Sounds plant emergency alarm. Makes the scripted announcement and repeats.
Appendix C                             Page 5 of 8                     Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 4 Notify On-site personnel Standard:
Comment:   Evaluator Cue: For the purpose of examination security, direct the candidate to simulate the alarm actuation and announcement.
* Completes ATTACHMENT 1
* Sounds plant emergency alarm.
* Makes the scripted announcement and repeats.
Comment:
Evaluator Cue:     For the purpose of examination security, direct the candidate to simulate the alarm actuation and announcement.
Performance Step: 5 Have SAS activate the callout.
Performance Step: 5 Have SAS activate the callout.
Standard:
Standard:           Acknowledges cue.
Acknowledges cue.
Comment:
Comment:   Evaluator Cue: SAS was activated when the Site Emergency was declared.
Evaluator Cue:     SAS was activated when the Site Emergency was declared.
Performance Step: 6 Complete the SENTRY screen or fill out ATTACHMENT 4.
Performance Step: 6 Complete the SENTRY screen or fill out ATTACHMENT 4.
Standard: Completes the SENTRY screen. Critical task data: GE Release in progress Wind speed and direction PAR - Evacuate 2 miles all around and 5 miles in downwind sectors B, C, and D Comment:
Standard:           Completes the SENTRY screen. Critical task data:
Appendix C Page 6 of 8 Form ES-C-1  PERFORMANCE INFORMATION Callaway SRO NRC JPM A4 NUREG 1021, Revision 9, Supplement 1 Performance Step: 7 Provide ATTACHMENT 4 to the communicator.
* GE
Standard: Provides ATTACHMENT 4 to the communicator within 15 minutes after the GE declaration.
* Release in progress
Comment: Mark the time that ATTACHMENT 4 is provided to the communicator: __________.
* Wind speed and direction
Terminating Cue: After ATTACHMENT 4 is provided to the communicator, this JPM is complete.
* PAR - Evacuate 2 miles all around and 5 miles in downwind sectors B, C, and D Comment:
Callaway SRO NRC JPM A4                         NUREG 1021, Revision 9, Supplement 1


Appendix C Page 7 of 8 Form ES-C-1 VERIFICATION OF COMPLETION Callaway SRO NRC JPM A4 NUREG 1021, Revision 9, Supplement 1 Job Performance Measure No.: 2005 NRC SRO A4 Examinee's Name:
Appendix C                             Page 6 of 8                   Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 7 Provide ATTACHMENT 4 to the communicator.
Standard:          Provides ATTACHMENT 4 to the communicator within 15 minutes after the GE declaration.
Comment:            Mark the time that ATTACHMENT 4 is provided to the communicator: __________.
Terminating Cue:        After ATTACHMENT 4 is provided to the communicator, this JPM is complete.
Callaway SRO NRC JPM A4                       NUREG 1021, Revision 9, Supplement 1
 
Appendix C                            Page 7 of 8                    Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC SRO A4 Examinees Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,346: Line 2,182:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Appendix C Page 8 of 8 Form ES-C-1 JPM CUE SHEET Callaway SRO NRC JPM A4  NUREG 1021, Revision 9, Supplement 1 INITIAL CONDITIONS:  A large break LOCA is in progress. Attempts to initiate Containment Spray have failed. A Site Emergency was declared 20 minutes ago based on loss of the RCS subcooling and radiation monitor GT-RE-59 reading 3.1E+3 R/hr. One minute ago containment pressure lowered rapidly and now continues to lower at a slower rate. Wind speed is 5 Miles/Hr  Wind direction is from 218&deg;  The outside temperature is 88
&#xfb;F. INITIATING CUE: Reevaluate the Emergency Classification and perform required follow up actions required of the Emergency Coordinator.


Appendix C Job Performance Measure Form ES-C-1 Worksheet 2005 NRC JPM P1 NUREG 1021, Revision 9 Facility:
===Response===
Callaway Task No.:     Task Title:
Result:                      SAT            UNSAT Examiners Signature:                                Date:
Borate RCS During Cooldown Outside the Control Room JPM No.: 2005 NRC JPM P1 K/A  
Callaway SRO NRC JPM A4                      NUREG 1021, Revision 9, Supplement 1
 
Appendix C                               Page 8 of 8                      Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
* A large break LOCA is in progress.
* Attempts to initiate Containment Spray have failed.
* A Site Emergency was declared 20 minutes ago based on loss of the RCS subcooling and radiation monitor GT-RE-59 reading 3.1E+3 R/hr.
* One minute ago containment pressure lowered rapidly and now continues to lower at a slower rate.
* Wind speed is 5 Miles/Hr
* Wind direction is from 218&deg;
* The outside temperature is 88 F.
INITIATING CUE:        Reevaluate the Emergency Classification and perform required follow up actions required of the Emergency Coordinator.
Callaway SRO NRC JPM A4                            NUREG 1021, Revision 9, Supplement 1
 
Appendix C                                  Job Performance Measure                    Form ES-C-1 Worksheet Facility:               Callaway                                 Task No.:
Task
 
==Title:==
Borate RCS During Cooldown               JPM No.:     2005 NRC JPM P1 Outside the Control Room K/A  


==Reference:==
==Reference:==
068 EA 1.11 3.9 / 4.1 Examinee:
068 EA 1.11     3.9 / 4.1 Examinee:                                                     NRC Examiner:
NRC Examiner:
Facility Evaluator:                                           Date:
Facility Evaluator:
Method of testing:
Date: Method of testing:
Simulated Performance:             X                         Actual Performance:
Simulated Performance: X Actual Performance:
Classroom                 Simulator             Plant       X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:         The control room is damaged beyond use and systems are aligned as per OTO-ZZ-00001, Control Room Inaccessibility. The plant is shutdown with control from the Aux S/D Panel due to a fire. The plant is in Mode 3 at normal operating temperature and pressure. Pressurizer level is 25%, RCS boron concentration is 1000 ppm, and all shutdown and control rods are fully inserted. Core burnup is 295 EFPD. The B CCP is in service.
Initial Conditions: The control room is damaged beyond use and systems are aligned as per OTO-ZZ-00001, Control Room Inaccessibility. The plant is shutdown with control from the Aux S/D Panel due to a fire. The plant is in Mode 3 at normal operating temperature and pressure. Pressurizer level is 25%, RCS boron concentration is 1000 ppm, and all shutdown and control rods are fully inserted. Core burnup is 295 EFPD. The "B" CCP is in service.
Task Standard:             RCS boration from outside the control room has been completed Required Materials:         OTS-ZZ-00001, Cooldown From Outside the Control Room, Revision 13 Curve Book Table 1-8 General  
Task Standard: RCS boration from outside the control room has been completed Required Materials: OTS-ZZ-00001, Cooldown From Outside the Control Room, Revision 13 Curve Book Table 1-8 General  


==References:==
==References:==
OTS-ZZ-00001, Cooldown From Outside the Control Room, Revision 13 Initiating Cue: You have been directed by the Shift Supervisor to perform Section 4.1 of OTS-ZZ-00001 to borate the RCS.
OTS-ZZ-00001, Cooldown From Outside the Control Room, Revision 13 Initiating Cue:             You have been directed by the Shift Supervisor to perform Section 4.1 of OTS-ZZ-00001 to borate the RCS.
Time Critical Task:
Time Critical Task:         NO Validation Time:           19 minutes 2005 NRC JPM P1                                                            NUREG 1021, Revision 9
NO   Validation Time:
19 minutes  


Appendix C Page 2 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM P1 NUREG 1021, Revision 9 (Denote Critical Steps with a check mark)
Appendix C                                   Page 2 of 7                         Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)
START TIME:
START TIME:
Performance Step: 1 Obtain a controlled copy of OTS-ZZ-00001, Cooldown From Outside the Control Room.
Performance Step: 1       Obtain a controlled copy of OTS-ZZ-00001, Cooldown From Outside the Control Room.
Standard: Operator should obtain procedure copy.
Standard:                 Operator should obtain procedure copy.
Comment:     Step 2.0 Performance Step: 2 Review the Precautions and Limitations of OTS-ZZ-00001.
Comment:
Standard: Operator should review all precautions and limitations.
Step 2.0 Performance Step: 2       Review the Precautions and Limitations of OTS-ZZ-00001.
Comment:   Evaluator's Cue: All Precautions and Limitations are satisfied.
Standard:                 Operator should review all precautions and limitations.
Performance Step: 3 Review the Initial Conditions of OTS-ZZ-00001.
Comment:
Standard: Operator should review all Initial Conditions.
Evaluators Cue:         All Precautions and Limitations are satisfied.
Comment:   Evaluator's Cue:
Performance Step: 3       Review the Initial Conditions of OTS-ZZ-00001.
All Initial Conditions are satisfied.
Standard:                 Operator should review all Initial Conditions.
Comment:
Evaluators Cue:         All Initial Conditions are satisfied.
Ask if the Operator understands the Initial Conditions and Initiating Cues.
Ask if the Operator understands the Initial Conditions and Initiating Cues.
Step 4.1 Performance Step: 4 Borate the RCS to Xenon-Free Cold Shutdown as follows.
Step 4.1 Performance Step: 4       Borate the RCS to Xenon-Free Cold Shutdown as follows.
Standard: Operator should determine to borate the RCS to Cold Xenon-
Standard:                 Operator should determine to borate the RCS to Cold Xenon-Free Shutdown.
Comment:
2005 NRC JPM P1                                                      NUREG 1021, Revision 9


Free Shutdown.
Appendix C                            Page 3 of 7                        Form ES-C-1 PERFORMANCE INFORMATION Step 4.1.1 Performance Step: 5 Determine the required boron concentration for cold shutdown using Curve Book Table 1-8.
Standard:          Operator should determine required boron concentration is approximately 1150 ppm.
Comment:
Step 4.1.1.1 Performance Step: 6 Determine the number of gallons of 4 WT % boric acid from the BAT required to achieve the boron concentration in Step 4.1.1 using Figure 7-3 of the Curve Book.
Standard:          Operator should calculate 1567 +/- 200 GAL.
515676              7000-1000 VB B                    In  (                )
8.33                7000-1150 Comment:            Nomograph indicates approximately 1350 -1400 gallons Step 4.1.2.1 Performance Step: 7 Start a Boric Acid Transfer Pump A or B with local control switch or with the pushbutton on the associated breaker pump A(B) NG01AHF4 (NG02AAF4).
Standard:          Operator should start A or B Boric Acid Pump.
Comment:
Evaluators Cue:    The Boric Acid Transfer Pump is running.
Step 4.1.2.2 Performance Step: 8 Open the Immediate Boration valve BGHV8104.
Standard:          Operator goes to A SI Pump Room and manually OPENS BG-HV-8104.
Comment:
Comment:
Appendix C Page 3 of 7 Form ES-C-1  PERFORMANCE INFORMATION 2005 NRC JPM P1 NUREG 1021, Revision 9 Step 4.1.1  Performance Step: 5 Determine the required boron concentration for cold shutdown using Curve Book Table 1-8.
Evaluators Cue:    BGHV8104 is OPEN.
Standard: Operator should determine required boron concentration is approximately 1150 ppm.
2005 NRC JPM P1                                                 NUREG 1021, Revision 9
Comment:      Step 4.1.1.1  Performance Step: 6 Determine the number of gallons of 4 WT % boric acid from the BAT required to achieve the boron concentration in Step 4.1.1 using Figure 7-3 of the Curve Book.
Standard: Operator should calculate 1567 +/- 200 GAL.
515676 7000-1000 V B B 8.33 In ( 7000-1150 )    Comment: Nomograph indicates approximately 1350 -1400 gallons Step 4.1.2.1  Performance Step: 7 Start a Boric Acid Transfer Pump "A" or "B" with local control switch or with the pushbutton on the associated breaker pump A(B) NG01AHF4 (NG02AAF4).
Standard: Operator should start "A" or "B" Boric Acid Pump.
Comment:  Evaluator's Cue:
The Boric Acid Transfer Pump is running.
Step 4.1.2.2  Performance Step: 8 Open the Immediate Boration valve BGHV8104.
Standard: Operator goes to "A" SI Pump Room and manually OPENS BG-HV-8104.
Comment:  Evaluator's Cue:
BGHV8104 is OPEN.


Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM P1 NUREG 1021, Revision 9 Step 4.1.2.3 Performance Step: 9 Monitor boric acid flow on Local Indicator BGFI183B.
Appendix C                             Page 4 of 7                       Form ES-C-1 PERFORMANCE INFORMATION Step 4.1.2.3 Performance Step: 9 Monitor boric acid flow on Local Indicator BGFI183B.
Standard: Operator should monitor boric acid flow on BGFI183B.
Standard:           Operator should monitor boric acid flow on BGFI183B.
Comment:   Evaluator's Cue: Local Indicator shows 100 GPM.
Comment:
Evaluators Cue:     Local Indicator shows 100 GPM.
Step 4.1.4 Performance Step: 10 Determine the boration time required by dividing the gallons of acid by the flow rate indicated.
Step 4.1.4 Performance Step: 10 Determine the boration time required by dividing the gallons of acid by the flow rate indicated.
1567 GAL Standard:
Standard:              1567 GAL
100 GPM = 16 MIN (+/- 3 MIN)
                                            = 16 MIN (+/- 3 MIN) 100 GPM Comment:
Comment:   Evaluator's Cue:
Evaluators Cue:     The required time has elapsed.
The required time has elapsed.
Step 4.1.5.1 Performance Step: 11 When the required time has elapsed, stop the Boric Acid Transfer Pump.
Step 4.1.5.1 Performance Step: 11 When the required time has elapsed, stop the Boric Acid  
Standard:           Operator should secure A or B Boric Acid Pump with the local control switch or the pushbutton on the breaker A - NG01AHF4 B - NG02AAF4 Comment:
 
Evaluators Cue:     The Boric Acid Transfer Pump is STOPPED.
Transfer Pump.
Standard: Operator should secure "A" or "BBoric Acid Pump with the local control switch or the pushbutton on the breaker A - NG01AHF4 B - NG02AAF4 Comment:   Evaluator's Cue: The Boric Acid Transfer Pump is STOPPED.
Step 4.1.5.2 Performance Step: 12 CLOSE BGHV8104.
Step 4.1.5.2 Performance Step: 12 CLOSE BGHV8104.
Standard: Operator should CLOSE BGHV8104.
Standard:           Operator should CLOSE BGHV8104.
Comment:   Evaluator's Cue: BGHV8104 is CLOSED.  
Comment:
Evaluators Cue:     BGHV8104 is CLOSED.
2005 NRC JPM P1                                                NUREG 1021, Revision 9


Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM P1 NUREG 1021, Revision 9 Step 4.1.7 Performance Step: 13 Have the RCS sampled to ensure the required SDM has been obtained.
Appendix C                           Page 5 of 7                         Form ES-C-1 PERFORMANCE INFORMATION Step 4.1.7 Performance Step: 13 Have the RCS sampled to ensure the required SDM has been obtained.
Standard: Operator should call for Chemistry to sample RCS for boron.
Standard:           Operator should call for Chemistry to sample RCS for boron.
Comment:   Evaluator's Cue: When called, Hot Lab Chem Tech will sample RCS for boron.
Comment:
Terminating Cue: When boration of the RCS has been performed, this JPM is complete.
Evaluators Cue:     When called, Hot Lab Chem Tech will sample RCS for boron.
STOP TIME:  
Terminating Cue:       When boration of the RCS has been performed, this JPM is complete.
STOP TIME:
2005 NRC JPM P1                                                NUREG 1021, Revision 9


Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION 2005 NRC JPM P1 NUREG 1021, Revision 9 Job Performance Measure No.: 2005 NRC JPM P1 Examinee's Name:
Appendix C                             Page 6 of 7               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC JPM P1 Examinees Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,431: Line 2,284:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET 2005 NRC JPM P1 NUREG 1021, Revision 9 INITIAL CONDITIONS: The control room is damaged beyond use and systems are aligned as per OTO-ZZ-00001, Control Room Inaccessibility. The plant is shutdown with control from the Aux S/D Panel due to a fire. The plant is in Mode 3 at normal operating temperature and pressure. Pressurizer level is 25%, RCS boron concentration is 1000 ppm, and all shutdown and control rods are fully inserted.
Core burnup is 295 EFPD. The "B" CCP is in service.
INITIATING CUE: You have been directed by the Shift Supervisor to perform Section 4.1 of OTS-ZZ-00001 to borate the RCS.


Appendix C Job Performance Measure Form ES-C-1 Worksheet 2005 NRC JPM P2 NUREG 1021, Revision 9 Facility:
===Response===
Callaway Task No.:     Task Title:
Result:                      SAT            UNSAT Examiners Signature:                                Date:
Locally Close Valves for CIS-B JPM No.: 2005 NRC JPM P2 K/A  
2005 NRC JPM P1                                          NUREG 1021, Revision 9
 
Appendix C                           Page 7 of 7                      Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: The control room is damaged beyond use and systems are aligned as per OTO-ZZ-00001, Control Room Inaccessibility. The plant is shutdown with control from the Aux S/D Panel due to a fire. The plant is in Mode 3 at normal operating temperature and pressure. Pressurizer level is 25%, RCS boron concentration is 1000 ppm, and all shutdown and control rods are fully inserted.
Core burnup is 295 EFPD. The B CCP is in service.
INITIATING CUE:    You have been directed by the Shift Supervisor to perform Section 4.1 of OTS-ZZ-00001 to borate the RCS.
2005 NRC JPM P1                                              NUREG 1021, Revision 9
 
Appendix C                                  Job Performance Measure                    Form ES-C-1 Worksheet Facility:               Callaway                                 Task No.:
Task
 
==Title:==
Locally Close Valves for CIS-B           JPM No.:   2005 NRC JPM P2 K/A  


==Reference:==
==Reference:==
103 A2.03 3.5 / 3.8 Examinee:
103 A2.03       3.5 / 3.8 Examinee:                                                     NRC Examiner:
NRC Examiner:
Facility Evaluator:                                           Date:
Facility Evaluator:
Method of testing:
Date: Method of testing:
Simulated Performance:           X                           Actual Performance:
Simulated Performance: X Actual Performance:
Classroom                 Simulator             Plant       X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:         Callaway Plant was at 100% power when a Loss of All AC Power occurred. The Control Room entered emergency procedure ECA-0.0, Loss of All AC Power. A containment spray signal has been received and required valve positions can not be performed from the Control Room.
Initial Conditions: Callaway Plant was at 100% power when a Loss of All AC Power occurred. The Control Room entered emergency procedure ECA-0.0, Loss of All AC Power. A containment spray signal has been received and required valve positions can not be performed from the Control Room. Task Standard: Upon completion of this JPM, valves associated with Penetrations 74, 75, and 76 will be closed or verified closed.
Task Standard:             Upon completion of this JPM, valves associated with Penetrations 74, 75, and 76 will be closed or verified closed.
Required Materials:
Required Materials:         None General  
None   General  


==References:==
==References:==
ECA-0.0, Loss of All AC Power, Revision 5 Initiating Cue: The Control Room supervisor has directed you to perform Local Operator Actions of Step 21B RNO (CISB Outer Containment Valves),
ECA-0.0, Loss of All AC Power, Revision 5 Initiating Cue:             The Control Room supervisor has directed you to perform Local Operator Actions of Step 21B RNO (CISB Outer Containment Valves),
of ECA-0.0. Reposition any required valves and inform him when done.
of ECA-0.0. Reposition any required valves and inform him when done.
Time Critical Task:
Time Critical Task:         NO Validation Time:           10 minutes 2005 NRC JPM P2                                                            NUREG 1021, Revision 9
NO   Validation Time:
10 minutes  


Appendix C Page 2 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM P2 NUREG 1021, Revision 9 (Denote Critical Steps with a check mark)
Appendix C                                   Page 2 of 9                       Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)
START TIME:
START TIME:
Performance Step: 1 Obtain a verified working copy of ECA-0.0, Loss of All AC Power.
Performance Step: 1       Obtain a verified working copy of ECA-0.0, Loss of All AC Power.
Standard: Operator should obtain ECA-0.0 copy.
Standard:                 Operator should obtain ECA-0.0 copy.
Comment:   Evaluator's Cue: Provide operator with copy of ECA-0.0.
Comment:
Performance Step: 2 Go to the Aux Building North Piping Penetration Room #1323.
Evaluators Cue:         Provide operator with copy of ECA-0.0.
Standard: Operator should go to the North Piping Penetration Room #1323.
Performance Step: 2       Go to the Aux Building North Piping Penetration Room #1323.
NOTE: Operator should go thru RP Access.
Standard:                 Operator should go to the North Piping Penetration Room #1323.
Comment:       Performance Step: 3 Verify CLOSED EG-HV-58, CCW to RCS outer CTMT ISO.
NOTE:                     Operator should go thru RP Access.
Standard:
Comment:
Operator should demonstrate knowledge of how to verify a motor-operated valve OPEN/CLOSED.
Performance Step: 3       Verify CLOSED EG-HV-58, CCW to RCS outer CTMT ISO.
NOTE: Pen 74, valves in Steps 3 through 8 can be operated in any order. Comment:   Evaluator Cue:
Standard:                 Operator should demonstrate knowledge of how to verify a motor-operated valve OPEN/CLOSED.
EG-HV-58 is open  
NOTE:                     Pen 74, valves in Steps 3 through 8 can be operated in any order.
Comment:
Evaluator Cue:           EG-HV-58 is open 2005 NRC JPM P2                                                    NUREG 1021, Revision 9


Appendix C Page 3 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM P2 NUREG 1021, Revision 9 Performance Step: 4 CLOSE EG-HV-58, CCW to RCS Outer CTMT ISO.
Appendix C                           Page 3 of 9                       Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 4 CLOSE EG-HV-58, CCW to RCS Outer CTMT ISO.
Standard:
Standard:           Operator should CLOSE EG-HV-58.
Operator should CLOSE EG-HV-58.
NOTE:               Operator should be able to describe how to CLOSE a limitorque valve.
NOTE: Operator should be able to describe how to CLOSE a limitorque valve.
Standard:           Valves in Steps 3 through 8 can be operated in any order.
Standard: Valves in Steps 3 through 8 can be operated in any order.
Comment:
Comment:   Evaluator's Cue: EG-HV-58 is now CLOSED.
Evaluators Cue:   EG-HV-58 is now CLOSED.
Performance Step: 5 Verify CLOSED EG-HV-71, CCW to RCS Outer CTMT ISO.
Performance Step: 5 Verify CLOSED EG-HV-71, CCW to RCS Outer CTMT ISO.
Standard: Operator should verify position of EG-HV-71.
Standard:           Operator should verify position of EG-HV-71.
NOTE: Pen 74     Standard: Valves in Steps 3 through 8 can be operated in any order.
NOTE:               Pen 74 Standard:           Valves in Steps 3 through 8 can be operated in any order.
Comment:   Evaluator's Cue:
Comment:
EG-HV-71 is OPEN.  
Evaluators Cue:   EG-HV-71 is OPEN.
2005 NRC JPM P2                                              NUREG 1021, Revision 9


Appendix C Page 4 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM P2 NUREG 1021, Revision 9 Performance Step: 6 Operator should CLOSE EG-HV-71, CCW to RCS Outer CTMT ISO. Standard:
Appendix C                           Page 4 of 9                       Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 6 Operator should CLOSE EG-HV-71, CCW to RCS Outer CTMT ISO.
Operator should CLOSE EG-HV-71.
Standard:           Operator should CLOSE EG-HV-71.
NOTE: Pen 74     Standard: Valves in Steps 3 through 8 can be operated in any order.
NOTE:               Pen 74 Standard:           Valves in Steps 3 through 8 can be operated in any order.
Comment:   Evaluator's Cue: EG-HV-71 is now CLOSED.
Comment:
Evaluators Cue:   EG-HV-71 is now CLOSED.
Performance Step: 7 Verify CLOSED EG-HV-126, CCW to RCS CTMT Bypass.
Performance Step: 7 Verify CLOSED EG-HV-126, CCW to RCS CTMT Bypass.
Standard:
Standard:           Operator should verify CLOSED EG-HV-126, CCW to RCS CTMT Bypass.
Operator should verify CLOSED EG-HV-126, CCW to RCS CTMT Bypass.
NOTE:               Pen 74 Standard:           Valves in Steps 3 through 8 can be operated in any order.
NOTE: Pen 74     Standard: Valves in Steps 3 through 8 can be operated in any order.
Comment:
Comment:   Evaluator's Cue: EG-HV-126 is CLOSED.  
Evaluators Cue:   EG-HV-126 is CLOSED.
2005 NRC JPM P2                                              NUREG 1021, Revision 9


Appendix C Page 5 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM P2 NUREG 1021, Revision 9 Performance Step: 8 Verify CLOSED EG-HV-127, CCW to RCS CTMT Bypass.
Appendix C                             Page 5 of 9                       Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 8 Verify CLOSED EG-HV-127, CCW to RCS CTMT Bypass.
Standard:
Standard:           Operator should verify CLOSED EG-HV-127, CCW to RCS CTMT Bypass.
Operator should verify CLOSED EG-HV-127, CCW to RCS CTMT Bypass.
NOTE:               Pen 74 Standard:           Valves in Steps 3 through 8 can be operated in any order.
NOTE: Pen 74     Standard: Valves in Steps 3 through 8 can be operated in any order.
Comment:
Comment:   Evaluator's Cue: EG-HV-127 is CLOSED.
Evaluators Cue:     EG-HV-127 is CLOSED.
Performance Step: 9 Verify CLOSED EG-HV-59, CCW from RCS Outer CTMT ISO.
Performance Step: 9 Verify CLOSED EG-HV-59, CCW from RCS Outer CTMT ISO.
Standard: Operator should verify position of EG-HV-59.
Standard:           Operator should verify position of EG-HV-59.
NOTE: Pen 75     Standard: Valves in Steps 9 through 11 can be operated in any order.
NOTE:               Pen 75 Standard:           Valves in Steps 9 through 11 can be operated in any order.
Comment:   Evaluator's Cue:
Comment:
EG-HV-59 is OPEN.
Evaluators Cue:     EG-HV-59 is OPEN.
Performance Step: 10 CLOSE EG-HV-59, CCW from Outer CTMT ISO.
Performance Step: 10 CLOSE EG-HV-59, CCW from Outer CTMT ISO.
Standard:
Standard:           Operator should CLOSE EG-HV-59.
Operator should CLOSE EG-HV-59.
NOTE:               Pen 75 Standard:           Valves in Steps 9 through 11 can be operated in any order.
NOTE: Pen 75     Standard: Valves in Steps 9 through 11 can be operated in any order.
Comment:
Comment:   Evaluator's Cue: EG-HV-59 is now CLOSED.  
Evaluators Cue:     EG-HV-59 is now CLOSED.
2005 NRC JPM P2                                                NUREG 1021, Revision 9


Appendix C Page 6 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM P2 NUREG 1021, Revision 9 Performance Step: 11 Verify CLOSED EG-HV-131, CCW from RCS CTMT Bypass.
Appendix C                             Page 6 of 9                       Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 11 Verify CLOSED EG-HV-131, CCW from RCS CTMT Bypass.
Standard:
Standard:           Operator should verify CLOSED EG-HV-131.
Operator should verify CLOSED EG-HV-131.
NOTE:               Pen 75 Standard:           Valves in Steps 9 through 11 can be operated in any order.
NOTE: Pen 75     Standard: Valves in Steps 9 through 11 can be operated in any order.
Comment:
Comment:   Evaluator's Cue: EG-HV-131 is CLOSED.
Evaluators Cue:     EG-HV-131 is CLOSED.
Performance Step: 12 Verify CLOSED EG-HV-61, CCW from RCS Outer CTMT ISO.
Performance Step: 12 Verify CLOSED EG-HV-61, CCW from RCS Outer CTMT ISO.
Standard: Operator should verify position of EG-HV-61.
Standard:           Operator should verify position of EG-HV-61.
NOTE: Pen 76     Standard: Valves in Steps 12 through 14 can be operated in any order.
NOTE:               Pen 76 Standard:           Valves in Steps 12 through 14 can be operated in any order.
Comment:   Evaluator's Cue:
Comment:
EG-HV-61 is OPEN.
Evaluators Cue:     EG-HV-61 is OPEN.
Performance Step: 13 CLOSE EG-HV-61, CCW from RCS Outer CTMT ISO.
Performance Step: 13 CLOSE EG-HV-61, CCW from RCS Outer CTMT ISO.
Standard: Operator should CLOSE EG-HV-61, CCW from RCS Outer CTMT ISO.
Standard:           Operator should CLOSE EG-HV-61, CCW from RCS Outer CTMT ISO.
NOTE: Pen 76     Standard: Valves in Steps 12 through 14 can be operated in any order.
NOTE:               Pen 76 Standard:           Valves in Steps 12 through 14 can be operated in any order.
Comment:   Evaluator's Cue: EG-HV-61 is now CLOSED.  
Comment:
Evaluators Cue:     EG-HV-61 is now CLOSED.
2005 NRC JPM P2                                                NUREG 1021, Revision 9


Appendix C Page 7 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM P2 NUREG 1021, Revision 9 Performance Step: 14 Verify CLOSED EG-HV-133, CCW from RCS CTMT BYPASS.
Appendix C                             Page 7 of 9                       Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 14 Verify CLOSED EG-HV-133, CCW from RCS CTMT BYPASS.
Standard:
Standard:           Operator should verify CLOSED EG-HV-133.
Operator should verify CLOSED EG-HV-133.
NOTE:               Pen 76 Standard:           Valves in Steps 12 through 14 can be operated in any order.
NOTE: Pen 76     Standard: Valves in Steps 12 through 14 can be operated in any order.
Comment:
Comment:   Evaluator's Cue: EG-HV-133 is CLOSED.
Evaluators Cue:     EG-HV-133 is CLOSED.
Performance Step: 15 Standard:
Performance Step: 15 Standard:           Operator should inform Control Room Supervisor Local Operator Action is completed to Isolated CIS-B Valves.
Operator should inform Control Room Supervisor Local Operator Action is completed to Isolated CIS-B Valves.
Comment:
Comment:   Evaluator's Cue: Control Room Supervisor acknowledges.
Evaluators Cue:     Control Room Supervisor acknowledges.
Terminating Cue: When all CIS-B valves are closed, the JPM is complete STOP TIME:  
Terminating Cue:       When all CIS-B valves are closed, the JPM is complete STOP TIME:
2005 NRC JPM P2                                                NUREG 1021, Revision 9


Appendix C Page 8 of 9 Form ES-C-1 VERIFICATION OF COMPLETION 2005 NRC JPM P2 NUREG 1021, Revision 9 Job Performance Measure No.: 2005 NRC JPM P2 Examinee's Name:
Appendix C                             Page 8 of 9               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC JPM P2 Examinees Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,544: Line 2,408:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Appendix C Page 9 of 9 Form ES-C-1 JPM CUE SHEET 2005 NRC JPM P2 NUREG 1021, Revision 9 INITIAL CONDITIONS: Callaway Plant was at 100% power when a Loss of All AC Power occurred. The Control Room entered emergency procedure ECA-0.0, Loss of All AC Power. A containment spray signal has been received and required valve positions can not be performed from the Control Room.
INITIATING CUE:
The Control Room supervisor has directed you to perform Local Operator Actions of Step 21B RNO (CISB Outer Containment Valves), of ECA-0.0. Reposition any required valves and inform


him when done.  
===Response===
Result:                      SAT            UNSAT Examiners Signature:                                Date:
2005 NRC JPM P2                                          NUREG 1021, Revision 9
 
Appendix C                          Page 9 of 9                        Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: Callaway Plant was at 100% power when a Loss of All AC Power occurred. The Control Room entered emergency procedure ECA-0.0, Loss of All AC Power. A containment spray signal has been received and required valve positions can not be performed from the Control Room.
INITIATING CUE:    The Control Room supervisor has directed you to perform Local Operator Actions of Step 21B RNO (CISB Outer Containment Valves), of ECA-0.0. Reposition any required valves and inform him when done.
2005 NRC JPM P2                                            NUREG 1021, Revision 9
 
Appendix C                                  Job Performance Measure                    Form ES-C-1 Worksheet Facility:              Callaway                                Task No.:
Task


Appendix C Job Performance Measure Form ES-C-1 Worksheet 2005 NRC JPM P3 NUREG 1021, Revision 9 Facility:
==Title:==
Callaway Task No.:      Task Title: Perform Fire Water System Makeup to CST JPM No.: 2005 NRC JPM P3 K/A  
Perform Fire Water System Makeup       JPM No.:     2005 NRC JPM P3 to CST K/A  


==Reference:==
==Reference:==
061 K4.01 3.9 / 4.2 Examinee:
061 K4.01       3.9 / 4.2 Examinee:                                                   NRC Examiner:
NRC Examiner:
Facility Evaluator:                                         Date:
Facility Evaluator:
Method of testing:
Date: Method of testing:
Simulated Performance:           X                         Actual Performance:
Simulated Performance: X Actual Performance:
Classroom               Simulator             Plant       X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:         Callaway Plant has lost all AC power due to an earthquake. Plant operators are currently in emergency procedure ECA-0.0, Loss of All AC Power, stabilizing the plant.
Initial Conditions: Callaway Plant has lost all AC power due to an earthquake. Plant operators are currently in emergency procedure ECA-0.0, Loss of All AC Power, stabilizing the plant.
Task Standard:             Upon completion of this JPM, the operator will have commenced filling the CST from the Firewater System.
Task Standard: Upon completion of this JPM, the operator will have commenced filling the CST from the Firewater System.
Required Materials:         Key #131, Locked Valve and Breaker Key General  
Required Materials:
Key #131, Locked Valve and Breaker Key General  


==References:==
==References:==
EOP Addendum 23, Local CST Emergency Fill Initiating Cue: The Control Room Supervisor has directed you to fill the condensate storage tank using Addendum 23, Local CST Emergency Fill. Inform the Control Room Supervisor when you have started filling the CST.
EOP Addendum 23, Local CST Emergency Fill Initiating Cue:             The Control Room Supervisor has directed you to fill the condensate storage tank using Addendum 23, Local CST Emergency Fill. Inform the Control Room Supervisor when you have started filling the CST.
Time Critical Task:
Time Critical Task:         NO Validation Time:           10 minutes 2005 NRC JPM P3                                                            NUREG 1021, Revision 9
NO   Validation Time:
10 minutes  


Appendix C Page 2 of 6 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM P3 NUREG 1021, Revision 9 (Denote Critical Steps with a check mark)
Appendix C                                   Page 2 of 6                         Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)
START TIME:
START TIME:
Performance Step: 1 Obtain a copy of Addendum 23, Local CST Emergency Fill.
Performance Step: 1       Obtain a copy of Addendum 23, Local CST Emergency Fill.
Standard: Operator should obtain procedure copy.
Standard:                 Operator should obtain procedure copy.
Comment:       Performance Step: 2 Review Addendum.
Comment:
Standard: Operator may review Addendum.
Performance Step: 2       Review Addendum.
Comment:     Step 1.0 Performance Step: 3 Obtain hydrant wrench, 1 50 ft. section of 2 1/2" fire hose, 1 spanner wrench, 1 fire water to CST emergency fill connector.
Standard:                 Operator may review Addendum.
Standard: Operator should Obtain hydrant wrench, 1 50 ft. section of 2 1/2" fire hose, 1 spanner wrench, 1 Fire Water to CST Emergency Fill  
Comment:
Step 1.0 Performance Step: 3       Obtain hydrant wrench, 1 50 ft. section of 2 1/2 fire hose, 1 spanner wrench, 1 fire water to CST emergency fill connector.
Standard:                 Operator should Obtain hydrant wrench, 1 50 ft. section of 2 1/2 fire hose, 1 spanner wrench, 1 Fire Water to CST Emergency Fill Connector.
Comment:
Step 2.A Performance Step: 4      Connect the CST Emergency Fill Connector to the Ecolo Chem Connection on APV0043.
Standard:                Operator should hook up CST Emergency Fill Connector to the Ecolo Chem Connection on APV0043 located plant south side of CST.
Comment:
Evaluators Cue:          CST Emergency Fill Connector is hooked up to APV0043 2005 NRC JPM P3                                                    NUREG 1021, Revision 9


Connector.
Appendix C                            Page 3 of 6                        Form ES-C-1 PERFORMANCE INFORMATION Step 2.B Performance Step: 5 Connect 2 1/2 fire hose to the CST Emergency Fill Connector at APV0043.
Comment:      Step 2.Performance Step: 4 Connect the CST Emergency Fill Connector to the Ecolo Chem Connection on APV0043.
Standard:           Operator should connect the 2 1/2 fire hose to the CST Emergency Fill Connector.
Standard: Operator should hook up CST Emergency Fill Connector to the Ecolo Chem Connection on APV0043 located plant south side of CST. Comment:   Evaluator's Cue: CST Emergency Fill Connector is hooked up to APV0043  
Comment:
Evaluators Cue:   2 1/2 fire hose is hooked up to the CST Emergency Fill Connector.
Step 2.C Performance Step: 6 Hook up the 2 1/2 hose to the fire hydrant.
Standard:          Operator should hook up the 2 1/2 hose to the fire hydrant.
Comment:
Evaluators Cue:    2 1/2 hose is hooked up to the fire hydrant.
Step 3.B Performance Step: 7 Open APV0043, CST Deoxygenated Water Outlet Valve.
Standard:          Operator should break the lock (or unlock) and open APV0043, CST Deoxygenated Water Outlet Valve.
Comment:
Evaluators Cue:    APV0043 is OPEN.
Step 3.C Performance Step: 8 Open fire water hydrant using hydrant wrench.
Standard:          Operator should open fire water hydrant.
Comment:
Evaluators Cue:    Fire water hydrant is OPEN.
2005 NRC JPM P3                                              NUREG 1021, Revision 9


Appendix C Page 3 of 6 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM P3 NUREG 1021, Revision 9 Step 2.B  Performance Step: 5 Connect 2 1/2" fire hose to the CST Emergency Fill Connector at APV0043. Standard: Operator should connect the 2 1/2" fire hose to the CST Emergency Fill Connector.
Appendix C                             Page 4 of 6                         Form ES-C-1 PERFORMANCE INFORMATION Step 4 Performance Step: 9  Ensure fire water is flowing to the CST.
Comment:   Evaluator's Cue: 2 1/2" fire hose is hooked up to the CST Emergency Fill Connector.
Standard:           Operator should verify the fire water is flowing.
Step 2.C  Performance Step: 6 Hook up the 2 1/2" hose to the fire hydrant.
Comment:
Standard: Operator should hook up the 2 1/2" hose to the fire hydrant.
Evaluators Cue:     2 1/2 fire hose fills and fire water starts to flow.
Comment:   Evaluator's Cue: 2 1/2" hose is hooked up to the fire hydrant.
Step 5 Performance Step: 10 Notify SS/CRS of CST Emergency Fill status.
Step 3.B  Performance Step: 7 Open APV0043, CST Deoxygenated Water Outlet Valve.
Standard:           Operator should notify SS/OS of CST Fill from fire water.
Standard: Operator should break the lock (or unlock) and open APV0043, CST Deoxygenated Water Outlet Valve.
Comment:
Comment:  Evaluator's Cue: APV0043 is OPEN.
Evaluators Cue:     SS/CRS acknowledges.
Step 3.C  Performance Step: 8 Open fire water hydrant using hydrant wrench.
Terminating Cue:       When the control room has been informed, this JPM is complete.
Standard: Operator should open fire water hydrant.
STOP TIME:
Comment:  Evaluator's Cue: Fire water hydrant is OPEN.
2005 NRC JPM P3                                                  NUREG 1021, Revision 9


Appendix C Page 4 of 6 Form ES-C-1  PERFORMANCE INFORMATION 2005 NRC JPM P3 NUREG 1021, Revision 9 Step 4  Performance Step: 9 Ensure fire water is flowing to the CST.
Appendix C                             Page 5 of 6               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC JPM P3 Examinees Name:
Standard:
Operator should verify the fire water is flowing.
Comment:  Evaluator's Cue: 2 1/2" fire hose fills and fire water starts to flow.
Step 5  Performance Step: 10 Notify SS/CRS of CST Emergency Fill status.
Standard: Operator should notify SS/OS of CST Fill from fire water.
Comment:  Evaluator's Cue: SS/CRS acknowledges.
Terminating Cue: When the control room has been informed, this JPM is complete.
STOP TIME:
 
Appendix C Page 5 of 6 Form ES-C-1 VERIFICATION OF COMPLETION 2005 NRC JPM P3 NUREG 1021, Revision 9 Job Performance Measure No.: 2005 NRC JPM P3 Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,616: Line 2,490:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Appendix C Page 6 of 6 Form ES-C-1 JPM CUE SHEET 2005 NRC JPM P3 NUREG 1021, Revision 9 INITIAL CONDITIONS: Callaway Plant has lost all AC power due to an earthquake. Plant operators are currently in emergency procedure ECA-0.0, Loss of All AC Power, stabilizing the plant.
INITIATING CUE:
The Control Room Supervisor has directed you to fill the condensate storage tank using Addendum 23, Local CST Emergency Fill. Inform the Control Room Supervisor when you have started filling the CST.


Appendix C Job Performance Measure Form ES-C-1 Worksheet Callaway NRC JPM S1 NUREG 1021, Revision 9 Facility: Callaway Plant Task No.:
===Response===
Task Title:
Result:                      SAT            UNSAT Examiners Signature:                                Date:
Raise Reactor Power To 10
2005 NRC JPM P3                                          NUREG 1021, Revision 9
-8 Amps JPM No.: 2005 NRC JPM S1 K/A  
 
Appendix C                           Page 6 of 6                      Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: Callaway Plant has lost all AC power due to an earthquake. Plant operators are currently in emergency procedure ECA-0.0, Loss of All AC Power, stabilizing the plant.
INITIATING CUE:    The Control Room Supervisor has directed you to fill the condensate storage tank using Addendum 23, Local CST Emergency Fill. Inform the Control Room Supervisor when you have started filling the CST.
2005 NRC JPM P3                                            NUREG 1021, Revision 9
 
Appendix C                                      Job Performance Measure                          Form ES-C-1 Worksheet Facility:                 Callaway Plant                               Task No.:
Task
 
==Title:==
Raise Reactor Power To 10-8 Amps             JPM No.:     2005 NRC JPM S1 K/A  


==Reference:==
==Reference:==
001 A2.11 (4.4/4.7) 001 AA1.05 (4.3/4.2)
001 A2.11       (4.4/4.7)                   001 AA1.05     (4.3/4.2)
Examinee:
Examinee:                                                         NRC Examiner:
NRC Examiner:
Facility Evaluator:                                               Date:
Facility Evaluator:
Method of testing:
Date: Method of testing:
Simulated Performance:                                             Actual Performance:           X Classroom                 Simulator       X     Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Simulated Performance:
Initial Conditions:           A reactor startup is in progress in accordance with OTG-ZZ-00002, Reactor Startup The following conditions exist:
Actual Performance:
All shutdown bank rods are fully withdrawn.
X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, t he objective for this Job Performance Measure will be satisfied.
Control Bank D is at 92 steps.
Initial Conditions: A reactor startup is in progress in accordance with OTG-ZZ-00002, Reactor Startup The following conditions exist: All shutdown bank rods are fully withdrawn. Control Bank "D" is at 92 steps. The estimated critical position is 101 steps on Control Bank "D". Most recent ICRR predicts 100 steps on Control Bank D Task Standard: The reactor is tripped in response to inappropriate continuous control rod motion. Required Materials:
The estimated critical position is 101 steps on Control Bank D.
None   General  
Most recent ICRR predicts 100 steps on Control Bank D Task Standard:               The reactor is tripped in response to inappropriate continuous control rod motion.
Required Materials:           None General  


==References:==
==References:==
OTG-ZZ-00002, Reactor Startup Handouts: OTG-ZZ-00002, Reactor Startup Initiating Cue: The Control Room Supervisor directs you to continue with the reactor startup and withdraw control rods to criticality in accordance with OTG-ZZ-00002, Reactor Startup, beginning at Step 4.1.18.
OTG-ZZ-00002, Reactor Startup Handouts:                     OTG-ZZ-00002, Reactor Startup Initiating Cue:               The Control Room Supervisor directs you to continue with the reactor startup and withdraw control rods to criticality in accordance with OTG-ZZ-00002, Reactor Startup, beginning at Step 4.1.18.
Time Critical Task:
Time Critical Task:           NO Validation Time:             12 minutes Callaway NRC JPM S1                                                              NUREG 1021, Revision 9
NO   Validation Time:
 
12 minutes Appendix C Job Performance Measure Form ES-C-1 Worksheet Callaway NRC JPM S1 NUREG 1021, Revision 9 Simulator Setup: reset to IC-187 Password = startup Run Batch File startup.txt  
Appendix C                         Job Performance Measure         Form ES-C-1 Worksheet Simulator Setup:     reset to IC-187 Password = startup Run Batch File startup.txt Callaway NRC JPM S1                                        NUREG 1021, Revision 9


Appendix C Page 3 of 8 Form ES-C-1 PERFORMANCE INFORMATION Callaway NRC JPM S1 NUREG 1021, Revision 9 (Denote Critical Steps with a check mark)
Appendix C                                     Page 3 of 8                       Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)
START TIME:
START TIME:
Performance Step: 1 Candidate initiates control bank withdrawal, monitoring Source Range counts, Intermediate Range Amps, and P-6 bistables.
Performance Step: 1       Candidate initiates control bank withdrawal, monitoring Source Range counts, Intermediate Range Amps, and P-6 bistables.
Standard: Candidate determines that P-6 is energized and refers to Comment:       Performance Step: 2 Verify one decade of overlap between the source and intermediate range level instruments.
Standard:                 Candidate determines that P-6 is energized and refers to Attachment 3 Comment:
Standard:
Performance Step: 2       Verify one decade of overlap between the source and intermediate range level instruments.
Observes Source Range and Intermediate Range instruments and determines that sufficient overlap exists Comment:
Standard:                 Observes Source Range and Intermediate Range instruments and determines that sufficient overlap exists Comment:
Appendix C Page 4 of 8 Form ES-C-1  PERFORMANCE INFORMATION Callaway NRC JPM S1 NUREG 1021, Revision 9 Performance Step: 3 Verify indication on both the source and intermediate startup rate instruments.
Callaway NRC JPM S1                                                   NUREG 1021, Revision 9
Standard: Candidate determines that SR and IR startup rate indication


exists     Comment:       Performance Step: 4 Transfer the SE NR-45 recorder to the intermediate ranges.
Appendix C                              Page 4 of 8                        Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 3 Verify indication on both the source and intermediate startup rate instruments.
Standard:
Standard:          Candidate determines that SR and IR startup rate indication exists Comment:
Transfers NR-45 trend to IR channels Comment:       Performance Step: 5 Prior to exceeding 5E4 CPS on SR instruments, BLOCK the Source Range High Flux Trips Standard: Block "A" Train by depressing the BLOCK pushbutton on  
Performance Step: 4 Transfer the SE NR-45 recorder to the intermediate ranges.
Standard:           Transfers NR-45 trend to IR channels Comment:
Performance Step: 5 Prior to exceeding 5E4 CPS on SR instruments, BLOCK the Source Range High Flux Trips Standard:           Block A Train by depressing the BLOCK pushbutton on SE HS-5.
Standard:          Verify SR TRIP A BLOC illuminates on SB069.
Standard:          Block B Train by depressing the BLOCK pushbutton on SE HS-10.
Callaway NRC JPM S1                                            NUREG 1021, Revision 9


SE HS-5. Standard: Verify SR TRIP A BLOC illuminates on SB069.
Appendix C                                Page 5 of 8                          Form ES-C-1 PERFORMANCE INFORMATION Standard:             Verify SR TRIP B BLOCK illuminates on SB069.
Standard: Block "B" Train by depressing the BLOCK pushbutton on
Standard:             Verify that the high voltage has been removed from the source range detectors.
Comment:
Evaluator Cue:        If the candidate reports that Source Range High Flux Trips have been blocked, acknowledge and provide direction to continue the control rod withdrawal Performance Step: 6  Continue incremental rod withdrawal until the reactor is critical, as indicated by a stable positive startup rate with no rod motion, on the intermediate range instrumentation once the prompt jump has receded.
Standard:            Candidate initiates control rod withdrawal in small increments Comment:
Note: The following steps represent the alternate path of this JPM Performance Step: 7  Determine that rods are withdrawing with NO demand signal.
Standard:            Candidate determines from CONTROL BANK D GROUP 1 and GROUP 2 ROD POSITION indication that rods are withdrawing with NO demand signal.
Comment:
Callaway NRC JPM S1                                                NUREG 1021, Revision 9


SE HS-10.
Appendix C                                 Page 6 of 8                         Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 8   Trip the reactor in response to inappropriate continuous rod motion.
Appendix C Page 5 of 8 Form ES-C-1  PERFORMANCE INFORMATION Callaway NRC JPM S1 NUREG 1021, Revision 9 Standard: Verify SR TRIP B BLOCK illuminates on SB069.
Candidate trips the reactor in response to inappropriate continuous rod motion.
Standard: Verify that the high voltage has been removed from the source range detectors.
Comment:      Evaluator Cue:
If the candidate reports that Source Range High Flux Trips have been blocked, acknowledge and provide direction to continue the control rod withdrawal Performance Step: 6 Continue incremental rod withdrawal until the reactor is critical, as indicated by a stable positive startup rate with no rod motion, on the intermediate range instrumentation once the prompt jump has receded. Standard: Candidate initiates control rod withdrawal in small increments Comment:  Note: The following steps represent th e alternate path of this JPM Performance Step: 7 Determine that rods are withdrawing with NO demand signal.
Standard: Candidate determines from CONTROL BANK D GROUP 1 and GROUP 2 ROD POSITION indication that rods are withdrawing
 
with NO demand signal.
Comment:
Appendix C Page 6 of 8 Form ES-C-1 PERFORMANCE INFORMATION Callaway NRC JPM S1 NUREG 1021, Revision 9 Performance Step: 8 Trip the reactor in response to inappropriate continuous rod motion. Candidate trips the reactor in response to inappropriate continuous rod motion.
Standard:
Standard:
NOTE: Candidate may refer to OTO-SF-00001 and determine that a reactor trip is required based on Step 6 RNO.
NOTE: Candidate may refer to OTO-SF-00001 and determine that a reactor trip is required based on Step 6 RNO.
Comment:   Terminating Cue: When the Candidate trips the reactor, the evaluation for this JPM is  
Comment:
Terminating Cue:   When the Candidate trips the reactor, the evaluation for this JPM is complete.
STOP TIME:
Callaway NRC JPM S1                                              NUREG 1021, Revision 9


complete.
Appendix C                                 Page 7 of 8               Form ES-C-1 VERIFICATION OF COMPLETION JPM No.:                     2005 JPM S1 Examinees Name:
STOP TIME:
Examiners Name:
 
Appendix C Page 7 of 8 Form ES-C-1 VERIFICATION OF COMPLETION Callaway NRC JPM S1 NUREG 1021, Revision 9 JPM No.: 2005 JPM S1 Examinee's Name:
Examiner's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,686: Line 2,567:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:          
Question:


Response:          
===Response===
Result: Satisfactory/Unsatisfactory Examiners Signature:                                            Date:
Callaway NRC JPM S1                                          NUREG 1021, Revision 9


Result: Satisfactory/Unsatisfactory Examiner's Signature:
Appendix C                           Page 8 of 8                           Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: A reactor startup is in progress in accordance with OTG-ZZ-00002, Reactor Startup. The following conditions exist:
Date:
All shutdown bank rods are fully withdrawn.
Appendix C Page 8 of 8 Form ES-C-1 JPM CUE SHEET Callaway NRC JPM S1 NUREG 1021, Revision 9 INITIAL CONDITIONS: A reactor startup is in progress in accordance with OTG-ZZ-00002, Reactor Startup. The following conditions exist: All shutdown bank rods are fully withdrawn. Control Bank "D" is at 92 steps. The estimated critical position is 101 steps on Control Bank "D". Most recent ICRR predicts 100 steps on Control Bank D INITIATING CUE: The Control Room Supervisor directs you to continue with the reactor startup and withdraw control rods to criticality in accordance with OTG-ZZ-00002, Reactor Startup, beginning at Step 4.1.18.  
Control Bank D is at 92 steps.
The estimated critical position is 101 steps on Control Bank D.
Most recent ICRR predicts 100 steps on Control Bank D INITIATING CUE:     The Control Room Supervisor directs you to continue with the reactor startup and withdraw control rods to criticality in accordance with OTG-ZZ-00002, Reactor Startup, beginning at Step 4.1.18.
Callaway NRC JPM S1                                          NUREG 1021, Revision 9


Appendix C Job Performance Measure Form ES-C-1 Worksheet Callaway JPM S2 NUREG 1021, Revision 9 Facility: Callaway Task No.:
Appendix C                                 Job Performance Measure                     Form ES-C-1 Worksheet Facility:               Callaway                                     Task No.:   0111-011-01-013 Task
0111-011-01-013 Task Title: Isolate SI Accumulators During a LOCA JPM No.: 2005 NRC JPM S2 K/A  
 
==Title:==
Isolate SI Accumulators During a LOCA       JPM No.:   2005 NRC JPM S2 K/A  


==Reference:==
==Reference:==
009 EA1.13 (4.4/4.4)
009 EA1.13     (4.4/4.4)
Examinee:
Examinee:                                                   NRC Examiner:
NRC Examiner:
Facility Evaluator:                                         Date:
Facility Evaluator:
Method of testing:
Date: Method of testing:
Simulated Performance:                                       Actual Performance:       X Classroom               Simulator       X     Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Simulated Performance:
Initial Conditions:         A LOCA has occurred. The crew is performing ES-1.2, Post LOCA Cooldown and Depressurization.
Actual Performance:
Task Standard:             SI Accumulators A, B, and C are isolated. SI Accumulator D is vented.
X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied. Initial Conditions: A LOCA has occurred. The crew is performing ES-1.2, Post LOCA Cooldown and Depressurization. Task Standard: SI Accumulators A, B, and C are isolated. SI Accumulator D is vented.
Required Materials:         None General  
Required Materials:
None General  


==References:==
==References:==
ES-1.2, Post LOCA Cooldown and Depressurization Handouts: ES-1.2, Post LOCA Cooldown and Depressurization Initiating Cue: The Control Room Supervisor directs you to isolate the SI accumulators in accordance with ES-1.2, Post LOCA Cooldown and Depressurization, Step 23. Time Critical Task:
ES-1.2, Post LOCA Cooldown and Depressurization Handouts:                   ES-1.2, Post LOCA Cooldown and Depressurization Initiating Cue:             The Control Room Supervisor directs you to isolate the SI accumulators in accordance with ES-1.2, Post LOCA Cooldown and Depressurization, Step 23.
NO Validation Time:
Time Critical Task:         NO Validation Time:           7 Minutes Callaway JPM S2                                                            NUREG 1021, Revision 9
7 Minutes Appendix C Job Performance Measure Form ES-C-1 Worksheet Callaway JPM S2 NUREG 1021, Revision 9 Simulator Setup: Initialize IC-184 Password spa321 Run bat.siacc.txt
 
Appendix C                       Job Performance Measure         Form ES-C-1 Worksheet Simulator Setup:   Initialize IC-184 Password spa321 Run bat.siacc.txt Callaway JPM S2                                          NUREG 1021, Revision 9


Appendix C Page 3 of 7 Form ES-C-1 PERFORMANCE INFORMATION Callaway JPM S2 NUREG 1021, Revision 9 (Denote Critical Steps with a check mark)
Appendix C                                   Page 3 of 7                         Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)
START TIME:
START TIME:
Performance Step: 1 (Step 23.a) RCS subcooling based on core exit TCs - GREATER THAN 30&deg;F Standard: Candidate verifies RCS subcooling based on core exit TCs is greater than 30&deg;F Comment:       Performance Step: 2 (Step 23.b) PRZR level - GREATER THAN 9% [29% ADVERSE CNMT]
Performance Step: 1       RCS subcooling based on core exit TCs - GREATER THAN 30&deg;F (Step 23.a)
Standard: Candidate locates and verifies PRZR level indication is greater  
Standard:                 Candidate verifies RCS subcooling based on core exit TCs is greater than 30&deg;F Comment:
Performance Step: 2       PRZR level - GREATER THAN 9% [29% ADVERSE CNMT]
(Step 23.b)
Standard:                 Candidate locates and verifies PRZR level indication is greater than 9%.
Comment:
Performance Step: 3        Restore power to EP-HV-8808A, B, C, D (Step 23.c)
Standard:                  Candidate directs Local Operator to restore power to EP-HV-8808A - D Standard:                  Candidate contacts Local Operator to restore power Comment:                  Booth Instructor: Inform candidate that power is restored to all 4 accumulator outlet valves Callaway JPM S2                                                      NUREG 1021, Revision 9


than 9%. Comment:      Performance Step: 3 (Step 23.c) Restore power to EP-HV-8808A, B, C, D Standard: Candidate directs Local Operator to restore power to EP-HV-
Appendix C                                 Page 4 of 7                         Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 4     Close EP-HV-8808A, B, C, D (Step 23.d)
 
Standard:               Candidate locates EP-HV-8808A, B, and D control switches and places in CLOSE.
8808A - D Standard: Candidate contacts Local Operator to restore power Comment: Booth Instructor:  Inform candidate that power is restored to all 4 accumulator outlet valves
Standard:               Candidate verifies green close light on and red open light off for each valve.
 
Comment:
Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION Callaway JPM S2 NUREG 1021, Revision 9 Performance Step: 4 (Step 23.d)
Performance Step: 5     Close EP-HV-8808A, B, C, and D (Step 23.d)
Close EP-HV-8808A, B, C, D Standard: Candidate locates EP-HV-8808A, B, and D control switches and places in CLOSE.
Standard:               Candidate locates EP-HV-8808C control switch and places in Close.
Standard: Candidate verifies green close light on and red open light off for each valve.
Standard:              Candidate verifies red open light remains on indicating valve NOT closed.
Comment:       Performance Step: 5 (Step 23.d)
NOTE:                Valve is overridden in the Open position.
Close EP-HV-8808A, B, C, and D Standard: Candidate locates EP-HV-8808C control switch and places in  
Comment:
NOTE:    The following step represents the alternate path portion of the JPM.
Performance Step: 6    If any accumulator cannot be isolated, then open associated accumulator vent valve (Step 23.d RNO)
Standard:              Locates control switch for EITHER EP HIS-8950D OR EP-HIS-8950E, and places switch in OPEN Standard:              Observes Green Light OFF, Red Light ON, and accumulator C pressure lowering Comment:
Callaway JPM S2                                                    NUREG 1021, Revision 9


Close. Standard: Candidate verifies red open light remains on indicating valve NOT closed. NOTE: Valve is overridden in the Open position.
Appendix C                               Page 5 of 7                     Form ES-C-1 PERFORMANCE INFORMATION Terminating Cue: When the Candidate verifies that accumulator C pressure is lowering, the evaluation for this JPM is complete.
Comment:    NOTE: The following step represents the alternate path portion of the JPM.
STOP TIME:
Performance Step: 6 (Step 23.d RNO)
Callaway JPM S2                                                NUREG 1021, Revision 9
If any accumulator cannot be isolated, then open associated accumulator vent valve Standard: Locates control switch for EITHER EP HIS-8950D OR EP-HIS-8950E, and places switch in OPEN Standard:
Observes Green Light OFF, Red Light ON, and accumulator C pressure lowering Comment:
Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION Callaway JPM S2 NUREG 1021, Revision 9 Terminating Cue: When the Candidate verifies that accumulator C pressure is lowering, the evaluation for this JPM is complete.
STOP TIME:  


Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Callaway JPM S2 NUREG 1021, Revision 9 JPM No.: 2005 JPM S2 Examinee's Name:
Appendix C                                 Page 6 of 7               Form ES-C-1 VERIFICATION OF COMPLETION JPM No.:                   2005 JPM S2 Examinees Name:
Examiner's Name:
Examiners Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,744: Line 2,637:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:          
Question:
 
===Response===
Result: Satisfactory/Unsatisfactory Examiners Signature:                                            Date:
Callaway JPM S2                                              NUREG 1021, Revision 9


Response:          
Appendix C                          Page 7 of 7                        Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: A LOCA has occurred. The crew is performing ES-1.2, Post LOCA Cooldown and Depressurization.
INITIATING CUE:    The Control Room Supervisor directs you to isolate the SI accumulators in accordance with ES-1.2, Post LOCA Cooldown and Depressurization, Step 23.
Callaway JPM S2                                          NUREG 1021, Revision 9


Result: Satisfactory/Unsatisfactory Examiner's Signature:
Appendix C                                 Job Performance Measure                    Form ES-C-1 Worksheet Facility:              Callaway Plant                          Task No.:
Date:
Task
Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET Callaway JPM S2 NUREG 1021, Revision 9 INITIAL CONDITIONS: A LOCA has occurred. The crew is performing ES-1.2, Post LOCA Cooldown and Depressurization.
INITIATING CUE: The Control Room Supervisor directs you to isolate the SI accumulators in accordance with ES-1.2, Post LOCA Cooldown and Depressurization, Step 23.


Appendix C Job Performance Measure Form ES-C-1 Worksheet Callaway NRC JPM S3 NUREG 1021, Revision 9 Facility: Callaway Plant Task No.:
==Title:==
Task Title:
Respond to a Stuck Open                 JPM No.:     2005 NRC JPM S3 Pressurizer Spray Valve K/A  
Respond to a Stuck Open Pressurizer Spray Valve JPM No.: 2005 NRC JPM S3 K/A  


==Reference:==
==Reference:==
010 A2.02 (3.9/3.9)
010 A2.02 (3.9/3.9)
Examinee:
Examinee:                                                   NRC Examiner:
NRC Examiner:
Facility Evaluator:                                         Date:
Facility Evaluator:
Method of testing:
Date: Method of testing:
Simulated Performance:                                       Actual Performance:       X Classroom                 Simulator     X     Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Simulated Performance:
Initial Conditions:         A Reactor Trip has occurred. The crew has transitioned to ES-0.1, Reactor Trip Response Task Standard:             RCPs A and D are tripped Required Materials:         ES-0.1 General  
Actual Performance: X Classroom Simulator X Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions: A Reactor Trip has occurred. The crew has transitioned to ES-0.1, Reactor Trip Response Task Standard: RCPs A and D are tripped Required Materials:
ES-0.1   General  


==References:==
==References:==
ES-0.1 Handouts:                  None Initiating Cue:            The Control Room Supervisor directs you to perform actions to stabilize the plant in accordance with ES-0.1 Time Critical Task:        NO Validation Time:            8 minutes Callaway NRC JPM S3                                                        NUREG 1021, Revision 9


ES-0.1   Handouts:
Appendix C          Job Performance Measure          Form ES-C-1 Worksheet SIMULATOR SETUP Reset to IC-188 Password = spray Callaway NRC JPM S3                          NUREG 1021, Revision 9
None  Initiating Cue: The Control Room Supervisor directs you to perform actions to stabilize the plant in accordance with ES-0.1 Time Critical Task:
NO  Validation Time:
8 minutes


Appendix C Job Performance Measure Form ES-C-1 Worksheet Callaway NRC JPM S3 NUREG 1021, Revision 9 SIMULATOR SETUP Reset to IC-188 Password = spray
Appendix C                                     Page 3 of 7                       Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)
 
Appendix C Page 3 of 7 Form ES-C-1 PERFORMANCE INFORMATION Callaway NRC JPM S3 NUREG 1021, Revision 9 (Denote Critical Steps with an asterisk)
START TIME:
START TIME:
Performance Step: 1 Check RCS temperature - ANY RCP Running - Tave stable at or trending to 557&deg;F.
Performance Step: 1       Check RCS temperature - ANY RCP Running - Tave stable at or trending to 557&deg;F.
Standard: Candidate verifies RCPs are running and Tave is at approximately 557&deg;F.
Standard:                 Candidate verifies RCPs are running and Tave is at approximately 557&deg;F.
Comment:       Performance Step: 2 Check Generator Output Breakers open.
Comment:
Standard: Candidate verifies ML ZA-3A (V55) and ML ZA-4A (V53) indicate OPEN. Comment:       Performance Step: 3 Check all AC busses energized by Off-Site power Standard:
Performance Step: 2       Check Generator Output Breakers open.
Determines that PA01 and PA02, NB01 and NB02 are energized  
Standard:                 Candidate verifies ML ZA-3A (V55) and ML ZA-4A (V53) indicate OPEN.
Comment:
Performance Step: 3       Check all AC busses energized by Off-Site power Standard:                 Determines that PA01 and PA02, NB01 and NB02 are energized by off-site power Comment:
Performance Step: 4        Check Pressurizer Pressure Control - Pressure greater than 1849 psig Standard:                  Candidate evaluates pressurizer pressure and determines it is greater than 1849 psig.
Comment:
Callaway NRC JPM S3                                                NUREG 1021, Revision 9


by off-site power Comment:       Performance Step: 4 Check Pressurizer Pressure Control - Pressure greater than
Appendix C                              Page 4 of 7                        Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 5  Check Pressurizer Pressure stable at or trending to 2235 psig.
Standard:            Candidate determines that Pressurizer Pressure is below 2235 psig and lowering.
Comment:
Note: The following steps represent the alternate path of this JPM Performance Step: 6  Check PORVs closed Standard:            Candidate verifies BB-HIS-455A and 456A indicate CLOSED.
Comment:
Performance Step: Check Spray Valves closed Standard:            Candidate determines that Spray Valve BB-PCV-455B is OPEN Comment:
* Performance Step: 8  Close Spray Valve Standard:            Candidate places BB-PCV-455B controller in MANUAL and attempts to reduce output to ZERO. Determines valve remains OPEN Comment:
* Performance Step: 9  Stop RCPs A and D Standard:            Candidate places RCP A and D control switches in STOP Comment:
Callaway NRC JPM S3                                            NUREG 1021, Revision 9


1849 psig Standard: Candidate evaluates pressurizer pressure and determines it is
Appendix C                              Page 5 of 7                  Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 10 Verify PRZR Heaters - ON Standard:           Candidate verifies PRZR Heaters - ON.
 
greater than 1849 psig.
Comment:
Comment:
Appendix C Page 4 of 7 Form ES-C-1  PERFORMANCE INFORMATION Callaway NRC JPM S3 NUREG 1021, Revision 9 Performance Step: 5 Check Pressurizer Pressure stable at or trending to 2235 psig.
Terminating Cue:         When A and D RCPs are tripped or upon completion of ES-0.1 Step 3, this JPM is complete.
Standard: Candidate determines that Pressurizer Pressure is below 2235 psig and lowering.
STOP TIME:
Comment:  Note:  The following steps represent the alternate path of this JPM Performance Step: 6 Check PORVs closed Standard: Candidate verifies BB-HIS-455A and 456A indicate CLOSED.
Callaway NRC JPM S3                                          NUREG 1021, Revision 9
Comment:        Performance Step: 7 Check Spray Valves closed Standard: Candidate determines that Spray Valve BB-PCV-455B is OPEN Comment:
* Performance Step: 8 Close Spray Valve Standard:
Candidate places BB-PCV-455B controller in MANUAL and attempts to reduce output to ZERO. Determines valve remains OPEN    Comment:
* Performance Step: 9 Stop RCPs A and D Standard:
Candidate places RCP A and D control switches in STOP Comment:
Appendix C Page 5 of 7 Form ES-C-1  PERFORMANCE INFORMATION Callaway NRC JPM S3 NUREG 1021, Revision 9 Performance Step: 10 Verify PRZR Heaters - ON Standard:
Candidate verifies PRZR Heaters - ON.
Comment:        Terminating Cue: When A and D RCPs are tripped or upon completion of ES-0.1 Step 3, this JPM is complete.
STOP TIME:  


Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Callaway NRC JPM S3 NUREG 1021, Revision 9 Job Performance Measure No.: Callaway NRC JPM S3 Examinee's Name:
Appendix C                             Page 6 of 7               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: Callaway NRC JPM S3 Examinees Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,812: Line 2,702:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET Callaway NRC JPM S3 NUREG 1021, Revision 9 INITIAL CONDITIONS: A reactor Trip has occurred. The crew has transitioned to ES-0.1, Reactor Trip Response INITIATING CUE: The Control Room Supervisor directs you to perform actions to stabilize the plant in accordance with ES-0.1


Appendix C Job Performance Measure Form ES-C-1 Worksheet 2005 NRC JPM S4 NUREG 1021, Revision 9 Facility:
===Response===
Callaway Task No.:     Task Title: Start "A" Reactor Coolant Pump JPM No.: 2005 NRC JPM S4 K/A  
Result:                      SAT            UNSAT Examiners Signature:                                Date:
Callaway NRC JPM S3                                      NUREG 1021, Revision 9
 
Appendix C                           Page 7 of 7                      Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: A reactor Trip has occurred. The crew has transitioned to ES-0.1, Reactor Trip Response INITIATING CUE:    The Control Room Supervisor directs you to perform actions to stabilize the plant in accordance with ES-0.1 Callaway NRC JPM S3                                          NUREG 1021, Revision 9
 
Appendix C                                  Job Performance Measure                    Form ES-C-1 Worksheet Facility:               Callaway                                 Task No.:
Task
 
==Title:==
Start A Reactor Coolant Pump           JPM No.:     2005 NRC JPM S4 K/A  


==Reference:==
==Reference:==
002 K6.02 3.6 / 3.8 Examinee:
002 K6.02       3.6 / 3.8 Examinee:                                                   NRC Examiner:
NRC Examiner:
Facility Evaluator:                                         Date:
Facility Evaluator:
Method of testing:
Date: Method of testing:
Simulated Performance:                                       Actual Performance:       X Classroom               Simulator       X   Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Simulated Performance:
Initial Conditions:         Callaway Plant is in mode 3 at 557&deg;F and 2235 psig. A Reactor Coolant Pump had been secured for breaker work on PA0107. CCW is in operation and is supplying cooling water to the Thermal Barrier Cooling coils per OTN-EG-00001. There are no personnel in CTMT at this time.
Actual Performance: X Classroom Simulator X Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Task Standard:             Upon completion of this JPM, the operator will have tripped A RCP due to high seal leakoff flow.
Initial Conditions: Callaway Plant is in mode 3 at 557&deg;F and 2235 psig. "A" Reactor Coolant Pump had been secured for breaker work on PA0107. CCW is in operation and is supplying cooling water to the Thermal Barrier Cooling coils per OTN-EG-00001. There are no personnel in CTMT at this time.
Required Materials:         None General  
Task Standard: Upon completion of this JPM, the operator will have tripped "A" RCP due to high seal leakoff flow.
Required Materials:
None   General  


==References:==
==References:==
OTN-BB-00003, Reactor Coolant Pumps, Revision 15 Initiating Cue: Tags have been cleared on PA0107 and signed off. The Control Room Supervisor has directed you to start "A" RCP per OTN-BB-00003, Section 4.1. WPA was restored to the OTN-BB-00003 required positions. Inform the Control Room Supervisor when the "A" Reactor Coolant Pump has been started and the lift oil pump is secured.
OTN-BB-00003, Reactor Coolant Pumps, Revision 15 Initiating Cue:             Tags have been cleared on PA0107 and signed off. The Control Room Supervisor has directed you to start A RCP per OTN-BB-00003, Section 4.1. WPA was restored to the OTN-BB-00003 required positions. Inform the Control Room Supervisor when the A Reactor Coolant Pump has been started and the lift oil pump is secured.
Time Critical Task:
Time Critical Task:         NO Validation Time:           16 minutes 2005 NRC JPM S4                                                            NUREG 1021, Revision 9
NO   Validation Time:
 
16 minutes  
Appendix C                    Job Performance Measure                    Form ES-C-1 Worksheet SIMULATOR SETUP NOTES:          Use IC-7. Secure A RCP, close A seal inj and leakoff with BB HIS-8351A and BB HIS-81141A.
Set Event 1 x21i115r.eq.true 1 is cv06a severity 8, 12 second ramp, 10 second delay 2005 NRC JPM S4                                              NUREG 1021, Revision 9


Appendix C Job Performance Measure Form ES-C-1 Worksheet 2005 NRC JPM S4 NUREG 1021, Revision 9 SIMULATOR SETUP NOTES: Use IC-7. Secure "A" RCP, close "A" seal inj and leakoff with BB HIS-8351A and BB HIS-81141A. Set Event 1 'x21i115r.eq.true' 1 is cv06a severity 8, 12 second ramp, 10 second delay Appendix C Page 3 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S4 NUREG 1021, Revision 9 (Denote Critical Steps with a check mark)
Appendix C                                   Page 3 of 11                       Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)
START TIME:
START TIME:
Performance Step: 1 Obtain a verified working copy of OTN-BB-00003, Reactor Coolant Pumps.
Performance Step: 1       Obtain a verified working copy of OTN-BB-00003, Reactor Coolant Pumps.
Standard: Operator should obtain procedure copy.
Standard:                 Operator should obtain procedure copy.
Comment:     Section 2 Performance Step: 2 Review the Precautions and Limitations of OTN-BB-00003.
Comment:
Standard:
Section 2 Performance Step: 2       Review the Precautions and Limitations of OTN-BB-00003.
Operator should review the Precautions and Limitations.
Standard:                 Operator should review the Precautions and Limitations.
Comment:   Evaluator's Cue: All Precautions and Limitations are satisfied.
Comment:
Section 3 Performance Step: 3 Review the Initial Conditions of OTN-BB-00003.
Evaluators Cue:         All Precautions and Limitations are satisfied.
Standard: Operator should read the Initial Conditions.
Section 3 Performance Step: 3       Review the Initial Conditions of OTN-BB-00003.
Comment:   Evaluator's Cue:
Standard:                 Operator should read the Initial Conditions.
All Initial Conditions are satisfied.
Comment:
NOTE Prior To Step 4.1.1 Performance Step: 4 If the position of the CCW Outlet Throttle Valves are known to have changed, perform Section 5.2.
Evaluators Cue:         All Initial Conditions are satisfied.
Standard: Operator may ask if the WPA altered CCW Outlet Throttle Valve Positions.
NOTE Prior To Step 4.1.1 Performance Step: 4       If the position of the CCW Outlet Throttle Valves are known to have changed, perform Section 5.2.
Comment:   Evaluator's Cue:
Standard:                 Operator may ask if the WPA altered CCW Outlet Throttle Valve Positions.
The CCW Outlet Throttle Valves position did not change.  
Comment:
Evaluators Cue:         The CCW Outlet Throttle Valves position did not change.
2005 NRC JPM S4                                                      NUREG 1021, Revision 9


Appendix C Page 4 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S4 NUREG 1021, Revision 9 Step 4.1.1.1 Performance Step: 5 Initiate Seal Water Injection Flow to "A" RCP. OPEN the RCP Seal Injection Isolation Valve BB HV-8351A with BB-HIS-8351A.
Appendix C                             Page 4 of 11                         Form ES-C-1 PERFORMANCE INFORMATION Step 4.1.1.1 Performance Step: 5 Initiate Seal Water Injection Flow to A RCP. OPEN the RCP Seal Injection Isolation Valve BB HV-8351A with BB-HIS-8351A.
Standard: Operator should initiate seal water injection flow with BB HIS-8351A, RCP "A" Seal WTR INJ VLV, OPEN on RL021.
Standard:           Operator should initiate seal water injection flow with BB HIS-8351A, RCP A Seal WTR INJ VLV, OPEN on RL021.
Comment:   Evaluator's Cue: BB HIS-8351A RED light goes ON and GREEN light goes OFF. Step 4.1.1.2 Performance Step: 6 OPEN "A" RCP #1 Seal Leakoff Isolation Valve with Handswitch BB HIS-8141A.
Comment:
Standard: Operator should OPEN, RCP "A" Seal WTR Return VLV with BB HIS-8141A, on RL001.
Evaluators Cue:   BB HIS-8351A RED light goes ON and GREEN light goes OFF.
Comment:   Evaluator's Cue: BB HIS-8141A RED light goes ON and GREEN light goes OFF. Step 4.1.3 Performance Step: 7 Verify current OSP-BG-00005 or adjust the Seal Water Injection Throttle Valve (BG-V-198) to establish 8 GPM flow to all RCP's.
Step 4.1.1.2 Performance Step: 6 OPEN A RCP #1 Seal Leakoff Isolation Valve with Handswitch BB HIS-8141A.
Standard: Operator should determine seal flow on BB FR-157, RCP "A" Seal Leakoff and Injection Flow, on RL021 or verify OSP-BG-00005 is current.
Standard:           Operator should OPEN, RCP A Seal WTR Return VLV with BB HIS-8141A, on RL001.
Comment:   Evaluator's Cue: OSP-BG-00005 is current all RCP's show a flow of 8 gpm on the Blue Pen for BG FR-157, 156, 155, and 154.  
Comment:
Evaluators Cue:   BB HIS-8141A RED light goes ON and GREEN light goes OFF.
Step 4.1.3 Performance Step: 7 Verify current OSP-BG-00005 or adjust the Seal Water Injection Throttle Valve (BG-V-198) to establish 8 GPM flow to all RCPs.
Standard:           Operator should determine seal flow on BB FR-157, RCP A Seal Leakoff and Injection Flow, on RL021 or verify OSP-BG-00005 is current.
Comment:
Evaluators Cue:   OSP-BG-00005 is current all RCPs show a flow of 8 gpm on the Blue Pen for BG FR-157, 156, 155, and 154.
2005 NRC JPM S4                                                NUREG 1021, Revision 9


Appendix C Page 5 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S4 NUREG 1021, Revision 9 Step 4.1.3.1 Performance Step: 8 Verify "A" RCP Seal Differential Pressure is > 200 psid.
Appendix C                           Page 5 of 11                         Form ES-C-1 PERFORMANCE INFORMATION Step 4.1.3.1 Performance Step: 8 Verify A RCP Seal Differential Pressure is > 200 psid.
Standard: Operator should read BB PI-153A, RCP "A" Seal DP, on RL021.
Standard:           Operator should read BB PI-153A, RCP A Seal DP, on RL021.
Comment:   Evaluator's Cue:  
Comment:
"A" RCP DP indicates > 400 psid.
Evaluators Cue:     A RCP DP indicates > 400 psid.
Step 4.1.3.2 Performance Step: 9 Annunciator 73A RCP #2 Seal Flow HI Alarm is CLEARED.
Step 4.1.3.2 Performance Step: 9 Annunciator 73A RCP #2 Seal Flow HI Alarm is CLEARED.
Standard: Operator should determine status of annunciator 73A, RCP #2 Seal Flow HI Alarm is CLEARED.
Standard:           Operator should determine status of annunciator 73A, RCP #2 Seal Flow HI Alarm is CLEARED.
Comment:   Evaluator's Cue:
Comment:
Annunciator 73A is NOT on.
Evaluators Cue:     Annunciator 73A is NOT on.
Step 4.1.3.3 Performance Step: 10 Verify Annunciator 42C VCT pressure HI/LO is CLEARED.
Step 4.1.3.3 Performance Step: 10 Verify Annunciator 42C VCT pressure HI/LO is CLEARED.
Standard: Operator should determine status of Annunciator 42C, VCT Press HI/LO, on RL018 is CLEARED.
Standard:           Operator should determine status of Annunciator 42C, VCT Press HI/LO, on RL018 is CLEARED.
Comment:   Evaluator's Cue:
Comment:
Annunciator 42C is NOT on.
Evaluators Cue:     Annunciator 42C is NOT on.
Step 4.1.3.4 Performance Step: 11 Verify Annunciator 74D RCP Oil RSVR LEV HI/LO CLEARED.
Step 4.1.3.4 Performance Step: 11 Verify Annunciator 74D RCP Oil RSVR LEV HI/LO CLEARED.
Standard: Operator should determine status of Annunciator 74D, RCP Oil RSVR LEV HI/LO, on RL022 is CLEARED.
Standard:           Operator should determine status of Annunciator 74D, RCP Oil RSVR LEV HI/LO, on RL022 is CLEARED.
Comment:   Evaluator's Cue:
Comment:
Annunciator 74D is NOT on.  
Evaluators Cue:     Annunciator 74D is NOT on.
2005 NRC JPM S4                                                NUREG 1021, Revision 9


Appendix C Page 6 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S4 NUREG 1021, Revision 9 Step 4.1.3.5 Performance Step: 12 Verify Annunciator 71A, RCP #1 Seal dP LO CLEARED.
Appendix C                             Page 6 of 11                     Form ES-C-1 PERFORMANCE INFORMATION Step 4.1.3.5 Performance Step: 12 Verify Annunciator 71A, RCP #1 Seal dP LO CLEARED.
Standard: Operator should determine status of Annunciator 71A, RCP #1 Seal DP LO, on RL022 is cleared.
Standard:           Operator should determine status of Annunciator 71A, RCP #1 Seal DP LO, on RL022 is cleared.
Comment:   Evaluator's Cue: Annunciator 71A RCP #1 seal dP LO is NOT on.
Comment:
Step 4.1.3.6 Performance Step: 13 Verify Annunciators 70 - 73E RCP A - D Standpipe LEV LO CLEARED. Standard: Operator should determine status of Annunciator 70E, RCP "A" Standpipe, LEV LO, on RL022 is CLEARED.
Evaluators Cue:     Annunciator 71A RCP #1 seal dP LO is NOT on.
Comment:   Evaluator's Cue:
Step 4.1.3.6 Performance Step: 13 Verify Annunciators 70 - 73E RCP A - D Standpipe LEV LO CLEARED.
Annunciator 70E is NOT on.
Standard:           Operator should determine status of Annunciator 70E, RCP A Standpipe, LEV LO, on RL022 is CLEARED.
Comment:
Evaluators Cue:     Annunciator 70E is NOT on.
Step 4.1.3.7 Performance Step: 14 Verify Annunciators 70 - 73C RCP A - D THERM BAR CCW Flow CLEARED.
Step 4.1.3.7 Performance Step: 14 Verify Annunciators 70 - 73C RCP A - D THERM BAR CCW Flow CLEARED.
Standard: Operator should determine status of Annunciator 70C, RCP "A" THERM BAR CCW Flow, on Rl022 is CLEARED.
Standard:           Operator should determine status of Annunciator 70C, RCP A THERM BAR CCW Flow, on Rl022 is CLEARED.
Comment:   Evaluator's Cue:
Comment:
Annunciator 70C is NOT on.
Evaluators Cue:     Annunciator 70C is NOT on.
Step 4.1.3.8 Performance Step: 15 Verify #1 Seal Backpressure  15 psig. (VCT pressure).
Step 4.1.3.8 Performance Step: 15 Verify #1 Seal Backpressure  15 psig. (VCT pressure).
Standard: Operator should obtain VCT pressure from BG PI-115 on RL002.
Standard:           Operator should obtain VCT pressure from BG PI-115 on RL002.
Comment:   Evaluator's Cue: VCT pressure indicates 32 psig on BG PI-115.  
Comment:
Evaluators Cue:     VCT pressure indicates 32 psig on BG PI-115.
2005 NRC JPM S4                                              NUREG 1021, Revision 9


Appendix C Page 7 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S4 NUREG 1021, Revision 9 Step 4.1.3.9 Performance Step: 16 Verify "A" RCP Seal Leakoff is within the NORMAL operating range of Figure 1 on Page 4 of Attachment 1.
Appendix C                           Page 7 of 11                         Form ES-C-1 PERFORMANCE INFORMATION Step 4.1.3.9 Performance Step: 16 Verify A RCP Seal Leakoff is within the NORMAL operating range of Figure 1 on Page 4 of Attachment 1.
Standard: Operator should verify "A" RCP Seal Leakoff Flow is within the NORMAL operating range of Figure 1 on page 4 of  
Standard:           Operator should verify A RCP Seal Leakoff Flow is within the NORMAL operating range of Figure 1 on page 4 of Attachment 1.
.
Comment:
Comment:   Evaluator's Cue:  
Evaluators Cue:     A RCP Seal Leakoff Return is within the NORMAL operating range.
"A" RCP Seal Leakoff Return is within the NORMAL operating range.
Step 4.1.3.9 Performance Step: 17 Obtain A RCP Seal Leakoff Indication from BG FR-157.
Step 4.1.3.9 Performance Step: 17 Obtain "A" RCP Seal Leakoff Indication from BG FR-157.
Standard:           Operator should obtain A RCP Seal Leakoff Indication from BG FR-157.
Standard: Operator should obtain "A" RCP Seal Leakoff Indication from BG FR-157.
Comment:
Comment:   Evaluator's Cue: BG FR-157 indicates Seal Leakoff is at 3 gpm on the Green Pen, the Red Pen is FULL SCALE.
Evaluators Cue:     BG FR-157 indicates Seal Leakoff is at 3 gpm on the Green Pen, the Red Pen is FULL SCALE.
Step 4.1.4.1 Performance Step: 18 Dispatch someone to inspect "A" RCP and warn personnel in the  
Step 4.1.4.1 Performance Step: 18 Dispatch someone to inspect A RCP and warn personnel in the vicinity.
Standard:            Operator not required to call due to no personnel in CTMT.
Comment:
Step 4.1.4.2 Performance Step: 19 Start A RCPs Oil Lift Pump with switch BB HIS-41.
Standard:            Operator should select RUN ON BB HIS-41, RCP A Lift Pump.
Comment:
Evaluators Cue:    BB HIS-41 RED light is ON, after 20 seconds, the WHITE light on A Oil Lift Pump goes ON.
2005 NRC JPM S4                                                NUREG 1021, Revision 9


vicinity.
Appendix C                             Page 8 of 11                         Form ES-C-1 PERFORMANCE INFORMATION Step 4.1.4.3 Performance Step: 20 Allow the Oil Lift Pump to RUN for at least 2 minutes.
Standard: Operator not required to call due to no personnel in CTMT.
Standard:           Operator should wait two (2) minutes from start time before performing next step.
Comment:      Step 4.1.4.2  Performance Step: 19 Start "A" RCP's Oil Lift Pump with switch BB HIS-41.
Comment:
Standard: Operator should select RUN ON BB HIS-41, RCP "A" Lift Pump.
Evaluators Cue:     Two (2) minutes has elapsed.
Comment:  Evaluator's Cue: BB HIS-41 RED light is ON, after 20 seconds, the WHITE light on "A" Oil Lift Pump goes ON.
Step 4.1.4.6 Performance Step: 21 Make plant announcement: ATTENTION IN THE PLANT STARTING THE A RCP. STAND CLEAR OF THE PUMP AND PA01 SWITCHGEAR.
 
Standard:           Operator should make plant announcement about starting A RCP.
Appendix C Page 8 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S4 NUREG 1021, Revision 9 Step 4.1.4.3 Performance Step: 20 Allow the Oil Lift Pump to RUN for at least 2 minutes.
Should wait 10 - 15 seconds between announcement and starting pump.
Standard:
Comment:
Operator should wait two (2) minutes from start time before performing next step.
Step 4.1.4.7 Performance Step: 22 Start A RCP by using Switch BB HIS-37.
Comment:   Evaluator's Cue: Two (2) minutes has elapsed.
Standard:            Operator should select RUN on BB HIS-37, RCP A.
Step 4.1.4.6 Performance Step: 21 Make plant announcement: ATTENTION IN THE PLANT STARTING THE "A" RCP. STAND CLEAR OF THE PUMP AND PA01 SWITCHGEAR.
Comment:
Standard: Operator should make plant announcement about starting "A"
Evaluators Cue:    A RCP BB HS-37 RED light is ON and GREEN light is OFF.
Step 4.1.4.5.1 Performance Step: 23 Monitor RCP starting current and running current.
Standard:            Operator should monitor BB-II-1, RCP A Amps, and observe starting current decay away on RL021 to less than 351 amps.
Comment:
2005 NRC JPM S4                                                NUREG 1021, Revision 9


RCP. Should wait 10 - 15 seconds between announcement and starting pump.
Appendix C                                Page 9 of 11                      Form ES-C-1 PERFORMANCE INFORMATION The following steps represent the alternate path of this JPM Performance Step: 24    Acknowledge annunciators.
Comment:      Step 4.1.4.7  Performance Step: 22 Start "A" RCP by using Switch BB HIS-37.
Standard:               Operator should determine that control room annunciators 70B and 72A are received. 72A, RCP #1 SEAL FLO HI, is an unexpected alarm.
Standard: Operator should select RUN on BB HIS-37, RCP "A".
Comment:  Evaluator's Cue:
"A" RCP BB HS-37 RE D light is ON and GREEN light is OFF.
Step 4.1.4.5.1 Performance Step: 23 Monitor RCP starting current and running current.
Standard:
Operator should monitor BB-II-1, RCP "A" Amps, and observe starting current decay away on RL021 to less than 351 amps.
Comment:
Comment:
Appendix C Page 9 of 11 Form ES-C-1  PERFORMANCE INFORMATION 2005 NRC JPM S4 NUREG 1021, Revision 9 The following steps represent the alternate path of this JPM Performance Step: 24 Acknowledge annunciators.
Evaluators Cue:
Standard: Operator should determine that control room annunciators 70B and 72A are received. 72A, RCP #1 SEAL FLO HI, is an unexpected alarm.
Performance Step: 25     Determine RCP A #1 seal flow Standard:               Operator should observe recorder BG FR-157 and verify seal flow is > 5 GPM Comment:
Comment:  Evaluator's Cue:
Evaluators Note:       Candidate MAY refer to the OTAs or OTO-BB-00002 to determine action required on high seal flow.
Performance Step: 25 Determine RCP "A" #1 seal flow Standard: Operator should observe recorder BG FR-157 and verify seal flow is > 5 GPM Comment:   Evaluator's Note: Candidate MAY refer to the OTAs or OTO-BB-00002 to determine action required on high seal flow.
Performance Step: 26     Trip A RCP Standard:               Places RCP A control switch in STOP Comment:
Performance Step: 26 Trip "A" RCP Standard: Places RCP "A" control switch in STOP Comment:     Terminating Cue: When RCP "A" is stopped, this JPM is complete.
Terminating Cue:           When RCP A is stopped, this JPM is complete.
STOP TIME:  
STOP TIME:
2005 NRC JPM S4                                                  NUREG 1021, Revision 9


Appendix C Page 10 of 11 Form ES-C-1 VERIFICATION OF COMPLETION 2005 NRC JPM S4 NUREG 1021, Revision 9 Job Performance Measure No.: 2005 NRC JPM S4 Examinee's Name:
Appendix C                           Page 10 of 11               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC JPM S4 Examinees Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,940: Line 2,852:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Appendix C Page 11 of 11 Form ES-C-1 JPM CUE SHEET 2005 NRC JPM S4 NUREG 1021, Revision 9 INITIAL CONDITIONS: Callaway Plant is in mode 3 at 557&deg;F and 2235 psig.  "A" Reactor Coolant Pump had been secured for breaker work on PA0107. CCW is in operation and is supplying cooling water to the Thermal Barrier Cooling coils per OTN-EG-00001. There are no personnel


in CTMT at this time.
===Response===
INITIATING CUE: Tags have been cleared on PA0107 and signed off. The Control Room Supervisor has directed you to start "A" RCP per OTN-BB-00003, Section 4.1. WPA was restored to the OTN-BB-00003 required positions. Inform the Control Room Supervisor when the "A" Reactor Coolant Pump has been started and the lift oil pump is secured.  
Result:                      SAT            UNSAT Examiners Signature:                                Date:
2005 NRC JPM S4                                          NUREG 1021, Revision 9
 
Appendix C                            Page 11 of 11                    Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: Callaway Plant is in mode 3 at 557&deg;F and 2235 psig. A Reactor Coolant Pump had been secured for breaker work on PA0107.
CCW is in operation and is supplying cooling water to the Thermal Barrier Cooling coils per OTN-EG-00001. There are no personnel in CTMT at this time.
INITIATING CUE:     Tags have been cleared on PA0107 and signed off. The Control Room Supervisor has directed you to start A RCP per OTN-BB-00003, Section 4.1. WPA was restored to the OTN-BB-00003 required positions. Inform the Control Room Supervisor when the A Reactor Coolant Pump has been started and the lift oil pump is secured.
2005 NRC JPM S4                                            NUREG 1021, Revision 9


CALLAWAY PLANT JOB PERFORMANCE MEASURE JPM NO: URO-SAB04C61J(A) KSA NO: 041A4.08 REVISION: 20050413 KSA RATING: 3.0/3.1 JOB TITLE: URO/SRO DUTY: MAIN STEAM TASK TITLE: PLACE STEAM DUMPS IN STEAM PRESSURE MODE COMPLETION TIME: 9 MINUTES The performance of this task was evaluated agai nst the standards contained in this JPM and determined to be:
CALLAWAY PLANT JOB PERFORMANCE MEASURE JPM NO:     URO-SAB04C61J(A)                             KSA NO: 041A4.08 REVISION:     20050413                               KSA RATING: 3.0/3.1 JOB TITLE:     URO/SRO DUTY:     MAIN STEAM TASK TITLE:     PLACE STEAM DUMPS IN STEAM PRESSURE MODE COMPLETION TIME:         9 MINUTES The performance of this task was evaluated against the standards contained in this JPM and determined to be:
[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:
[ ] SATISFACTORY         [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:
EVALUATORS SIGNATURE:
EVALUATORS SIGNATURE:                                                   DATE:
DATE:     TASK PERFORMER:
TASK PERFORMER:
LOCATION OF PERFORMANCE:
LOCATION OF PERFORMANCE:
CONTROL ROOM SIMULATOR/LAB X   PLANT       CLASSROOM METHOD OF PERFORMANCE: SIMULATED PERFORMED X  
CONTROL ROOM               SIMULATOR/LAB       X     PLANT           CLASSROOM METHOD OF PERFORMANCE: SIMULATED                             PERFORMED           X


==REFERENCES:==
==REFERENCES:==
OTN-AB-00001, MAIN STEAM SYSTEM, REVISION 13 TOOLS/EQUIPMENT: NONE PREPARED BY:   DATE:     REVIEWED BY:   DATE:   STS/SS APPROVED BY:   DATE:   DEPARTMENT HEAD JPM NO: URO-SAB04C61J(A) 
OTN-AB-00001, MAIN STEAM SYSTEM, REVISION 13 TOOLS/EQUIPMENT: NONE PREPARED BY:                                                   DATE:
 
REVIEWED BY:                                                   DATE:
PAGE  1  of    6  Read to Performer: I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally
STS/SS APPROVED BY:                                                   DATE:
DEPARTMENT HEAD


available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
JPM NO:      URO-SAB04C61J(A)
Read to Performer: I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions: CALLAWAY PLANT IS SHUTTING DOWN FOR A FALL OUTAGE. REACTOR POWER IS APPROXIMATELY 20%. THE CREW IS PERFORMING OTG-ZZ-00005.
Initial Conditions: CALLAWAY PLANT IS SHUTTING DOWN FOR A FALL OUTAGE. REACTOR POWER IS APPROXIMATELY 20%. THE CREW IS PERFORMING OTG-ZZ-00005.
Initiating Cues: THE CONTROL ROOM SUPERVISOR HAS DIRECTED YOU TO VERIFY THE STEAM DUMP CONTROLLER, AB PK-507, IS SET FOR 1092 PSIG, THEN TRANSFER THE STEAM DUMP SELECTOR SWITCH TO THE STEAM PRESSURE  
Initiating Cues:     THE CONTROL ROOM SUPERVISOR HAS DIRECTED YOU TO VERIFY THE STEAM DUMP CONTROLLER, AB PK-507, IS SET FOR 1092 PSIG, THEN TRANSFER THE STEAM DUMP SELECTOR SWITCH TO THE STEAM PRESSURE MODE PER OTN-AB-00001, MAIN STEAM SYSTEM, SECTION 4.5 AND INFORM THE CRS WHEN DONE.
 
Notes:     USE IC177. (PASSWORD = week1)
MODE PER OTN-AB-00001, MAIN STEAM SYSTEM, SECTION 4.5 AND INFORM THE CRS WHEN DONE.
USE EVENT TRIGGER MODE AND SET X05I162S.EQ.TRUE. SET MALFUNCTION MSS13b TO AB PT-507 READING 1500 PSIG, 30 SECOND RAMP, 0 SECOND TIME DELAY, SET TO EVENT TRIGGER.
Notes: USE IC177. (PASSWORD = week1)
USE EVENT TRIGGER MODE AND SET X05I162S.EQ.TRUE. SET  
 
MALFUNCTION MSS13b TO AB PT-507 READING 1500 PSIG, 30 SECOND  
 
RAMP, 0 SECOND TIME DELAY, SET TO EVENT TRIGGER.  
 
ENSURE AB PK-0507 IS SET AT SOMETHING OTHER THAN 7.28.
ENSURE AB PK-0507 IS SET AT SOMETHING OTHER THAN 7.28.
Task Standard: UPON COMPLETION OF THIS JPM, THE OPERATOR HAS PLACED THE STEAM DUMPS IN THE STEAM PRESSURE MODE AND THEN CLOSED THE FAILED STEAM DUMPS PRIOR TO CAUSING THE STEAM DUMPS TO CLOSE DUE TO  
Task Standard:       UPON COMPLETION OF THIS JPM, THE OPERATOR HAS PLACED THE STEAM DUMPS IN THE STEAM PRESSURE MODE AND THEN CLOSED THE FAILED STEAM DUMPS PRIOR TO CAUSING THE STEAM DUMPS TO CLOSE DUE TO PERMISSIVE P-12 (LO LO TAVE - 550&deg;F).
 
PERMISSIVE P-12 (LO LO TAVE - 550&deg;F).
START TIME:
START TIME:
STOP TIME:  
STOP TIME:
 
PAGE 1 of     6
JPM NO: URO-SAB04C61J(A)
TASK NUMBER  -  ELEMENT CUE  STANDARD  SCORE
* CRITICAL STEP PAGE of     6
: 1. OBTAIN A VERIFIED WORKING COPY OF OTN-AB-00001, MAIN STEAM


SYSTEM  OPERATOR SHOULD OBTAIN A PROCEDURE COPY S        U Comments: 2. REVIEW THE PRECAUTIONS AND  
JPM NO:  URO-SAB04C61J(A)
TASK NUMBER - ELEMENT              CUE              STANDARD    SCORE S  U
: 1. OBTAIN A VERIFIED                      OPERATOR SHOULD WORKING COPY OF                        OBTAIN A         Comments:
OTN-AB-00001,                          PROCEDURE COPY MAIN STEAM SYSTEM S   U
: 2. REVIEW THE        ALL PRECAUTIONS      OPERATOR SHOULD PRECAUTIONS AND    AND LIMITATIONS      READ THE         Comments:
LIMITATIONS OF    ARE SATISFIED        PRECAUTIONS AND OTN-AB-00001                            LIMITATIONS SECTION 2.0 S  U
: 3. REVIEW THE         ALL INITIAL          OPERATOR SHOULD INITIAL            CONDITIONS ARE      READ THE INITIAL Comments:
CONDITIONS OF      SATISFIED            CONDITIONS OTN-AB-00001 ASK IF THE SECTION 3.0        OPERATOR UNDERSTANDS THE INITIAL CONDITIONS AND INITIATING CUES
* CRITICAL STEP PAGE 2 of  6


LIMITATIONS OF
JPM NO:    URO-SAB04C61J(A)
TASK NUMBER - ELEMENT            CUE              STANDARD      SCORE S  U
: 4. THE OPERATOR                        OOA-RL-00004 MAY VERIFY AB PK-                  STATES THAT 1092  Comments:
0507 IS SET FOR 1092                PSIG = 7.28.
PSIG S  U
: 5. ENSURE STEAM                        OPERATOR SHOULD HEADER PRESSURE                    ENSURE AB PK-507  Comments:
CONTROLLER                          STEAM HEADER AB PK-507                          PRESSURE MATCHES STEAM                      CONTROLLER DUMP DEMAND                        MATCHES AB UI-500 AB UI-500 NOTE: CAUTION PRIOR TO STEP 4.5.1 S  U
: 6. PLACE THE STEAM                    OPERATOR SHOULD DUMP SELECTOR                      PLACE STEAM DUMP  Comments:
SWITCH                              SELECTOR SWITCH AB US-0500Z TO                      AB US-0500Z TO RESET                              RESET STEP 4.5.1
* CRITICAL STEP PAGE 3 of  6


OTN-AB-00001
JPM NO:    URO-SAB04C61J(A)
TASK NUMBER - ELEMENT            CUE              STANDARD        SCORE S  U 7* PLACE THE STEAM                      OPERATOR SHOULD DUMP SELECTOR                      PLACE THE STEAM    Comments:
SWITCH                              DUMP SELECTOR AB US-0500Z TO THE                  SWITCH AB US-0500Z STEAM PRESSURE                      TO THE STEAM MODE                                PRESSURE MODE STEP 4.5.1 S  U
: 8.                                      NOTE: WHEN OPERATOR NOTICES    Comments:
THE STEAM DUMP FAILURE, HE MAY THEN OMIT STEPS 9 AND 10 AND CONTINUE WITH STEP 11 S  U
: 9. VERIFY C-7, LOSS                    OPERATOR SHOULD OF LOAD                            VERIFY C-7, LOSS OF Comments:
INTERLOCK LIGHT                    LOAD INTERLOCK IS OFF                              LIGHT IS OFF ON SC066W PANEL STEP 4.5.1.1
* CRITICAL STEP PAGE 4 of  6


SECTION 2.0 ALL PRECAUTIONS
JPM NO:  URO-SAB04C61J(A)
TASK NUMBER - ELEMENT              CUE              STANDARD      SCORE S  U
: 10. OPERATOR MAY      RESPOND BY        OPERATOR MAY ASK INQUIRE IF        INFORMING THE      IF A PLANT        Comments:
COOLDOWN IS        OPERATOR THAT A    COOLDOWN IS REQUIRED          COOLDOWN IS NOT    REQUIRED REQUIRED AT THIS STEP 4.5.2         TIME NOTE:
THE FOLLOWING STEPS REPRESENT THE ALTERNATE PATH OF THIS JPM S  U
: 11.                                       NOTE: WHEN STEAM DUMP FAILURE IS    Comments:
IDENTIFIED, THE FOLLOWING ACTIONS SHOULD BE TAKEN
* CRITICAL STEP PAGE 5 of  6


AND LIMITATIONS
JPM NO:  URO-SAB04C61J(A)
TASK NUMBER - ELEMENT              CUE                STANDARD      SCORE S  U
: 12. PLACE STEAM                            OPERATOR SHOULD DUMP INTERLOCK                        PLACE BOTH STEAM  Comments:
SELECT SWITCHES                        DUMP SELECTOR AB HS-63, 64 IN THE                    SWITCHES AB HS-63, OFF/RESET                              64 IN THE OFF POSITION                              POSITION S  U 13*                                        OPERATOR SHOULD CLOSE STEAM        Comments:
DUMPS BY ANY MEANS PRIOR TO STEAM DUMPS AUTOMATICALLY CLOSING AT 550&deg;F DUE TO P-12, LO LO TAVE.
14.
RECORD STOP TIME ON PAGE 1
* CRITICAL STEP PAGE 6 of  6


ARE SATISFIED OPERATOR SHOULD
Read to Performer: I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
 
READ THE PRECAUTIONS AND
 
LIMITATIONS S        U Comments: 3. REVIEW THE INITIAL CONDITIONS OF
 
OTN-AB-00001
 
SECTION 3.0 ALL INITIAL
 
CONDITIONS ARE
 
SATISFIED
 
ASK IF THE
 
OPERATOR UNDERSTANDS THE
 
INITIAL CONDITIONS
 
AND INITIATING
 
CUES OPERATOR SHOULD
 
READ THE INITIAL
 
CONDITIONS S        U Comments:
JPM NO: URO-SAB04C61J(A)
TASK NUMBER  -  ELEMENT CUE  STANDARD  SCORE
* CRITICAL STEP PAGE  3  of    6  4. THE OPERATOR MAY VERIFY AB PK-0507 IS SET FOR 1092
 
PSIG  OOA-RL-00004 STATES THAT 1092
 
PSIG = 7.28.
S        U Comments: 5. ENSURE STEAM HEADER PRESSURE
 
CONTROLLER
 
AB PK-507
 
MATCHES STEAM
 
DUMP DEMAND
 
AB UI-500
 
NOTE:  CAUTION
 
PRIOR TO STEP 4.5.1 OPERATOR SHOULD ENSURE AB PK-507
 
STEAM HEADER
 
PRESSURE CONTROLLER
 
MATCHES AB UI-500 S        U Comments: 6. PLACE THE STEAM DUMP SELECTOR SWITCH AB US-0500Z TO
 
RESET
 
STEP 4.5.1 OPERATOR SHOULD PLACE STEAM DUMP SELECTOR SWITCH
 
AB US-0500Z TO
 
RESET S        U Comments:
JPM NO: URO-SAB04C61J(A)
TASK NUMBER  -  ELEMENT CUE  STANDARD  SCORE
* CRITICAL STEP PAGE  4  of    6  7* PLACE THE STEAM DUMP SELECTOR SWITCH AB US-0500Z TO THE
 
STEAM PRESSURE
 
MODE
 
STEP 4.5.1 OPERATOR SHOULD PLACE THE STEAM
 
DUMP SELECTOR SWITCH AB US-0500Z
 
TO THE STEAM
 
PRESSURE MODE
 
S        U Comments: 8. NOTE:  WHEN OPERATOR NOTICES
 
THE STEAM DUMP
 
FAILURE, HE MAY
 
THEN OMIT STEPS 9
 
AND 10 AND CONTINUE WITH
 
STEP 11 S        U Comments: 9. VERIFY C-7, LOSS OF LOAD INTERLOCK LIGHT
 
IS OFF
 
STEP 4.5.1.1 OPERATOR SHOULD VERIFY C-7, LOSS OF
 
LOAD INTERLOCK
 
LIGHT IS OFF ON SC066W PANEL S        U Comments:
JPM NO: URO-SAB04C61J(A)
TASK NUMBER  -  ELEMENT CUE  STANDARD  SCORE
* CRITICAL STEP PAGE  5  of    6  10. OPERATOR MAY INQUIRE IF COOLDOWN IS
 
REQUIRED
 
STEP 4.5.2 RESPOND BY
 
INFORMING THE
 
OPERATOR THAT A COOLDOWN IS NOT
 
REQUIRED AT THIS
 
TIME OPERATOR MAY ASK
 
IF A PLANT COOLDOWN IS
 
REQUIRED S        U Comments: NOTE:  THE FOLLOWING STEPS REPRESENT TH E ALTERNATE PATH OF THIS JPM
: 11. NOTE:  WHEN STEAM DUMP FAILURE IS
 
IDENTIFIED, THE FOLLOWING
 
ACTIONS SHOULD BE
 
TAKEN S        U Comments:
JPM NO: URO-SAB04C61J(A)
TASK NUMBER  -  ELEMENT CUE  STANDARD  SCORE
* CRITICAL STEP PAGE  6  of    6  12. PLACE STEAM DUMP INTERLOCK SELECT SWITCHES
 
AB HS-63, 64 IN THE
 
OFF/RESET
 
POSITION  OPERATOR SHOULD PLACE BOTH STEAM
 
DUMP SELECTOR SWITCHES AB HS-63, 64 IN THE OFF
 
POSITION S        U Comments: 13*  OPERATOR SHOULD CLOSE STEAM
 
DUMPS BY ANY
 
MEANS PRIOR TO
 
STEAM DUMPS
 
AUTOMATICALLY
 
CLOSING AT 550&deg;F
 
DUE TO P-12, LO LO
 
TAVE. S        U Comments: 14. RECORD STOP TIME ON PAGE 1 Read to Performer: I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions: CALLAWAY PLANT IS SHUTTING DOWN FOR A FALL OUTAGE. REACTOR POWER IS APPROXIMATELY 20%. THE CREW IS PERFORMING OTG-ZZ-00005.
Initial Conditions: CALLAWAY PLANT IS SHUTTING DOWN FOR A FALL OUTAGE. REACTOR POWER IS APPROXIMATELY 20%. THE CREW IS PERFORMING OTG-ZZ-00005.
Initiating Cues: THE CONTROL ROOM SUPERVISOR HAS DIRECTED YOU TO VERIFY THE STEAM DUMP CONTROLLER, AB PK-507, IS SET FOR 1092 PSIG, THEN TRANSFER THE STEAM DUMP SELECTOR SWITCH TO THE STEAM PRESSURE  
Initiating Cues:   THE CONTROL ROOM SUPERVISOR HAS DIRECTED YOU TO VERIFY THE STEAM DUMP CONTROLLER, AB PK-507, IS SET FOR 1092 PSIG, THEN TRANSFER THE STEAM DUMP SELECTOR SWITCH TO THE STEAM PRESSURE MODE PER OTN-AB-00001, MAIN STEAM SYSTEM, SECTION 4.5 AND INFORM THE CRS WHEN DONE.


MODE PER OTN-AB-00001, MAIN STEAM SYSTEM, SECTION 4.5 AND INFORM THE CRS WHEN DONE.  
Appendix C                                  Job Performance Measure                    Form ES-C-1 Worksheet Facility:              Callaway                                Task No.:
Task


Appendix C Job Performance Measure Form ES-C-1 Worksheet 2005 NRC JPM S6 NUREG 1021, Revision 9 Facility:
==Title:==
Callaway Task No.:      Task Title:
Placing Containment H2 Analyzer In     JPM No.:     2005 NRC JPM S6 Service K/A  
Placing Containment H2 Analyzer In Service JPM No.: 2005 NRC JPM S6 K/A  


==Reference:==
==Reference:==
028 A4.03 3.1 / 3.3 Examinee:
028 A4.03       3.1 / 3.3 Examinee:                                                   NRC Examiner:
NRC Examiner:
Facility Evaluator:                                         Date:
Facility Evaluator:
Method of testing:
Date: Method of testing:
Simulated Performance:                                       Actual Performance:       X Classroom               Simulator       X     Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Simulated Performance:
Initial Conditions:         Callaway Plant has experienced a Large Loss of Coolant Accident. A Safety Injection has occurred.
Actual Performance: X Classroom Simulator X Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Task Standard:             Upon completion of this JPM, the operator will have placed A hydrogen analyzer in-service.
Initial Conditions: Callaway Plant has experienced a Large Loss of Coolant Accident. A Safety Injection has occurred.
Required Materials:         None General  
Task Standard: Upon completion of this JPM, the operator will have placed "A" hydrogen analyzer in-service.
Required Materials:
None   General  


==References:==
==References:==
OTN-GS-00001, Contai nment Hydrogen Control System, Revision 10 Initiating Cue: The Control Room Supervisor has directed you to place the "A" Containment Hydrogen Analyzer, SGS02A, in service per OTN-GS-00001, Section 4.2. The pre-service startup and standby alignment of hydrogen analyzers has already been completed, (Section 4.1). Inform  
OTN-GS-00001, Containment Hydrogen Control System, Revision 10 Initiating Cue:             The Control Room Supervisor has directed you to place the A Containment Hydrogen Analyzer, SGS02A, in service per OTN-GS-00001, Section 4.2. The pre-service startup and standby alignment of hydrogen analyzers has already been completed, (Section 4.1). Inform the Control room Supervisor when SGS02A is in service.
Time Critical Task:        NO Validation Time:            10 minutes 2005 NRC JPM S6                                                            NUREG 1021, Revision 9
 
Appendix C                    Job Performance Measure          Form ES-C-1 Worksheet Simulator Setup Reset to IC-184 CTMT H2 Indication Set Malf Meter
* GSAI19
* Ramp Start=0
* Ramp Time=300 Sec
* Delay Time=60 Sec
* Value=1.5
* Event Trigger=1
* Set Event Triggers
* 1=X20I36A 2005 NRC JPM S6                                        NUREG 1021, Revision 9


the Control room Supervisor when SGS02A is in service.
Appendix C                                   Page 3 of 10                     Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)
Time Critical Task:
NO  Validation Time:
10 minutes Appendix C Job Performance Measure Form ES-C-1 Worksheet 2005 NRC JPM S6 NUREG 1021, Revision 9 Simulator Setup Reset to IC-184 CTMT H2 Indication Set Malf Meter GSAI19  Ramp Start=0 Ramp Time=300 Sec Delay Time=60 Sec Value=1.5 Event Trigger=1 Set Event Triggers 1=X20I36A Appendix C Page 3 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S6 NUREG 1021, Revision 9 (Denote Critical Steps with a check mark)
START TIME:
START TIME:
Performance Step: 1 Obtain a verified working copy of OTN-GS-0001.
Performance Step: 1       Obtain a verified working copy of OTN-GS-0001.
Standard: Operator should obtain procedure copy.
Standard:                 Operator should obtain procedure copy.
Comment:     Section 2 Performance Step: 2 Review Precautions and Limitations.
Comment:
Standard: Operator should review Precautions and Limitations.
Section 2 Performance Step: 2       Review Precautions and Limitations.
Comment:   Evaluator's Cue: All Precautions and Limitations are satisfied.
Standard:                 Operator should review Precautions and Limitations.
Step 4.2.1 Performance Step: 3 Ensure Section 4.1, Pre-service Startup and Standby Alignment of hydrogen analyzers is complete.
Comment:
Standard: Operator may verify Section 4.1 has been completed.
Evaluators Cue:         All Precautions and Limitations are satisfied.
NOTE: Given in Initial Conditions.
Step 4.2.1 Performance Step: 3       Ensure Section 4.1, Pre-service Startup and Standby Alignment of hydrogen analyzers is complete.
Comment:   Evaluator's Cue:
Standard:                 Operator may verify Section 4.1 has been completed.
Section 4.1 has been completed.  
NOTE:                     Given in Initial Conditions.
Comment:
Evaluators Cue:         Section 4.1 has been completed.
2005 NRC JPM S6                                                      NUREG 1021, Revision 9


Appendix C Page 4 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S6 NUREG 1021, Revision 9 Step 4.2.2 Performance Step: 4 Ensure the H2 mixing fans and CTMT coolers re in service.
Appendix C                           Page 4 of 10                       Form ES-C-1 PERFORMANCE INFORMATION Step 4.2.2 Performance Step: 4 Ensure the H2 mixing fans and CTMT coolers re in service.
Standard: Operator should verify H2 mixing fans and CTMT coolers are in service. Comment:   Evaluator's Cue: All H2 mixing fans and CTMT coolers are in service.
Standard:           Operator should verify H2 mixing fans and CTMT coolers are in service.
Step 4.2.3 Performance Step: 5 Restore electrical power to Hydrogen Analyzer "A" CTMT ISO Valves place GS HIS-40 in Non-Iso.
Comment:
Standard: Operator should place GS HIS-40, Hydrogen Analyzer "A" CTMT ISO Valve, in Non-Iso located on RL011.
Evaluators Cue:   All H2 mixing fans and CTMT coolers are in service.
NOTE: Steps 5 and 6 may be performed in any order.
Step 4.2.3 Performance Step: 5 Restore electrical power to Hydrogen Analyzer A CTMT ISO Valves place GS HIS-40 in Non-Iso.
Comment:   Evaluator's Cue: GS HIS-40 is in the Non-Iso position.
Standard:           Operator should place GS HIS-40, Hydrogen Analyzer A CTMT ISO Valve, in Non-Iso located on RL011.
Step 4.2.3 Performance Step: 6 Restore electrical power to Hydrogen Analyzer "A" CTMT ISO Valves, place GS HIS-42 in the Non-Iso position.
NOTE:               Steps 5 and 6 may be performed in any order.
Standard: Operator should place GS HIS-42, Hydrogen Analyzer "A" CTMT ISO Valve in Non-Iso.
Comment:
NOTE: Steps 5 and 6 may be performed in any order.
Evaluators Cue:   GS HIS-40 is in the Non-Iso position.
Comment:   Evaluator's Cue: GS HIS-42 is in the Non-Iso position.  
Step 4.2.3 Performance Step: 6 Restore electrical power to Hydrogen Analyzer A CTMT ISO Valves, place GS HIS-42 in the Non-Iso position.
Standard:           Operator should place GS HIS-42, Hydrogen Analyzer A CTMT ISO Valve in Non-Iso.
NOTE:               Steps 5 and 6 may be performed in any order.
Comment:
Evaluators Cue:   GS HIS-42 is in the Non-Iso position.
2005 NRC JPM S6                                              NUREG 1021, Revision 9


Appendix C Page 5 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S6 NUREG 1021, Revision 9 Step 4.2.4 Performance Step: 7 Open "A" Hydrogen Analyzer CTMT Isolation Valve GS HV-13 with pushbutton GS HIS-13.
Appendix C                           Page 5 of 10                     Form ES-C-1 PERFORMANCE INFORMATION Step 4.2.4 Performance Step: 7 Open A Hydrogen Analyzer CTMT Isolation Valve GS HV-13 with pushbutton GS HIS-13.
Standard: Operator should OPEN "A" Hydrogen Analyzer CTMT Isolation  
Standard:           Operator should OPEN A Hydrogen Analyzer CTMT Isolation Valve GS-HV-13 with pushbutton GS HIS-13.
NOTE:              Steps 7 through 11 may be performed in any order.
Comment:
Evaluators Cue:    GS HIS-13 shows RED light goes ON and GREEN light goes OFF.
Step 4.2.4 Performance Step: 8 Open A Hydrogen Analyzer CTMT Isolation Valve GS HV-14 with pushbutton GS HIS-14.
Standard:          Operator should OPEN A Hydrogen Analyzer CTMT Isolation Valve GS HV-14 with pushbutton GS HIS-14.
NOTE:              Steps 7 through 11 may be performed in any order.
Comment:
Evaluators Cue:    GS HIS-14 shows RED light goes ON and GREEN light goes OFF.
Step 4.2.4 Performance Step: 9 Open A Hydrogen Analyzer CTMT Isolation Valve GS HV-12 with pushbutton GS HIS-12.
Standard:          Operator should OPEN A Hydrogen Analyzer CTMT Isolation Valve GS HV-12 with pushbutton GS HIS-12.
NOTE:              Steps 7 through 11 may be performed in any order.
Comment:
Evaluators Cue:    GS HIS-12 shows RED light goes ON and GREEN light goes OFF.
2005 NRC JPM S6                                          NUREG 1021, Revision 9


Valve GS-HV-13 with pushbutton GS HIS-13.
Appendix C                           Page 6 of 10                       Form ES-C-1 PERFORMANCE INFORMATION Step 4.2.4 Performance Step: 10 Open A Hydrogen Analyzer CTMT Isolation Valve GS HV-17 with pushbutton GS HIS-17.
NOTE: Steps 7 through 11 may be performed in any order.
Standard:           Operator should OPEN A Hydrogen Analyzer CTMT Isolation Valve GS HV-17 with pushbutton GS HIS-17.
Comment:  Evaluator's Cue: GS HIS-13 shows RED light goes ON and GREEN light goes OFF. Step 4.2.4  Performance Step: 8 Open "A" Hydrogen Analyzer CTMT Isolation Valve GS HV-14 with pushbutton GS HIS-14.
NOTE:               Steps 7 through 11 may be performed in any order.
Standard: Operator should OPEN "A" Hydrogen Analyzer CTMT Isolation Valve GS HV-14 with pushbutton GS HIS-14.
Comment:
NOTE: Steps 7 through 11 may be performed in any order.
Evaluators Cue:     GS HIS-17 shows RED light goes ON and GREEN light goes OFF.
Comment:  Evaluator's Cue: GS HIS-14 shows RED light goes ON and GREEN light goes OFF. Step 4.2.4  Performance Step: 9 Open "A" Hydrogen Analyzer CTMT Isolation Valve GS HV-12 with pushbutton GS HIS-12.
Step 4.2.4 Performance Step: 11 Open A Hydrogen Analyzer CTMT Isolation Valve GS HV-18 with pushbutton GS HIS-18.
Standard: Operator should OPEN "A" Hydrogen Analyzer CTMT Isolation Valve GS HV-12 with pushbutton GS HIS-12.
Standard:           Operator should OPEN A Hydrogen Analyzer CTMT Isolation Valve GS HV-18 with pushbutton GS HIS-18.
NOTE: Steps 7 through 11 may be performed in any order.
NOTE:               Steps 7 through 11 may be performed in any order.
Comment:  Evaluator's Cue: GS HIS-12 shows RED light goes ON and GREEN light goes OFF.
Comment:
Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S6 NUREG 1021, Revision 9 Step 4.2.4 Performance Step: 10 Open "A" Hydrogen Analyzer CTMT Isolation Valve GS HV-17 with pushbutton GS HIS-17.
Evaluators Cue:     GS HIS-18 shows RED light goes ON and GREEN light goes OFF.
Standard: Operator should OPEN "A" Hydrogen Analyzer CTMT Isolation Valve GS HV-17 with pushbutton GS HIS-17.
Step 4.2.6 Performance Step: 12 Place Hydrogen Analyzer A in the ANLYZ position by taking switch GS HIS-16A for SGS02A to ANLYZ.
NOTE: Steps 7 through 11 may be performed in any order.
Standard:            Operator should take switch GS HIS-16A to ANLYZ on RL020 Comment:
Comment:   Evaluator's Cue: GS HIS-17 shows RED light goes ON and GREEN light goes OFF. Step 4.2.4 Performance Step: 11 Open "A" Hydrogen Analyzer CTMT Isolation Valve GS HV-18 with pushbutton GS HIS-18.
2005 NRC JPM S6                                              NUREG 1021, Revision 9
Standard: Operator should OPEN "A" Hydrogen Analyzer CTMT Isolation Valve GS HV-18 with pushbutton GS HIS-18.
NOTE: Steps 7 through 11 may be performed in any order.
Comment:   Evaluator's Cue: GS HIS-18 shows RED light goes ON and GREEN light goes OFF. Step 4.2.6 Performance Step: 12 Place Hydrogen Analyzer "A" in the ANLYZ position by taking  


switch GS HIS-16A for SGS02A to "ANLYZ".
Appendix C                             Page 7 of 10                       Form ES-C-1 PERFORMANCE INFORMATION Step 4.2.6.1 Performance Step: 13 Monitor GS AI-19 for hydrogen concentration.
Standard: Operator should take switch GS HIS-16A to "ANLYZ" on RL020 Comment:
Standard:           Operator should monitor GS AI-19 for hydrogen concentration.
Appendix C Page 7 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S6 NUREG 1021, Revision 9 Step 4.2.6.1 Performance Step: 13 Monitor GS AI-19 for hydrogen concentration.
Comment:
Standard: Operator should monitor GS AI-19 for hydrogen concentration.
Evaluators Cue:     Hydrogen concentration indicates approximately 0% on GS AI-19.
Comment:   Evaluator's Cue: Hydrogen concentration indicates approximately 0% on GS AI-19. Step 4.2.6.1 Note b Performance Step: 14 Verify Hydrogen Analyzer SGS02A was in the Standby Lineup.
Step 4.2.6.1 Note b Performance Step: 14 Verify Hydrogen Analyzer SGS02A was in the Standby Lineup.
Standard: Operator may verify "A" Hydrogen Analyzer was in the Standby Lineup. Comment:   Evaluator's Cue: Note "A" Hydrogen analyzer was in the Standby Position.
Standard:           Operator may verify A Hydrogen Analyzer was in the Standby Lineup.
Comment:
Evaluators Cue:     Note A Hydrogen analyzer was in the Standby Position.
Step 4.2.6.1 Note b Performance Step: 15 Wait for a 15 minute warmup period prior to taking data.
Step 4.2.6.1 Note b Performance Step: 15 Wait for a 15 minute warmup period prior to taking data.
Standard: Operator should wait a minimum of 15 minutes for "A" hydrogen  
Standard:           Operator should wait a minimum of 15 minutes for A hydrogen analyzer use.
 
Comment:
analyzer use.
Evaluators Cue:     Over 15 minutes has gone by.
Comment:   Evaluator's Cue: Over 15 minutes has gone by.
Step 4.2.6.1 Performance Step: 16 Monitor containment hydrogen concentration on GS AI-19.
Step 4.2.6.1 Performance Step: 16 Monitor containment hydrogen concentration on GS AI-19.
Standard: Operator should monitor GS AI-19 for hydrogen concentration.
Standard:           Operator should monitor GS AI-19 for hydrogen concentration.
Comment:   Evaluator's Cue: GS AI-19 shows hydrogen concentration to be at 1.5%.  
Comment:
Evaluators Cue:     GS AI-19 shows hydrogen concentration to be at 1.5%.
2005 NRC JPM S6                                              NUREG 1021, Revision 9


Appendix C Page 8 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S6 NUREG 1021, Revision 9 Terminating Cue:
Appendix C                     Page 8 of 10                 Form ES-C-1 PERFORMANCE INFORMATION Terminating Cue: When the candidate has determined that H2 concentration is 0, this JPM is complete.
When the candidate has determined that H2 concentration is 0, this JPM is complete.
STOP TIME:
STOP TIME:  
2005 NRC JPM S6                                  NUREG 1021, Revision 9


Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION 2005 NRC JPM S6 NUREG 1021, Revision 9 Job Performance Measure No.: 2005 NRC JPM S6 Examinee's Name:
Appendix C                             Page 9 of 10               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC JPM S6 Examinees Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 2,242: Line 3,060:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Appendix C Page 10 of 10 Form ES-C-1 JPM CUE SHEET 2005 NRC JPM S6 NUREG 1021, Revision 9 INITIAL CONDITIONS: Callaway Plant has experienced a Large Loss of Coolant Accident. A Safety Injection has occurred.
INITIATING CUE: The Control Room Supervisor has directed you to place the "A" Containment Hydrogen Analyzer, SGS02A, in service per OTN-GS-00001, Section 4.2. The pre-service startup and standby alignment of hydr ogen analyzers has already been completed, (Section 4.1). Inform the Control room Supervisor when SGS02A is in service.


Appendix C Job Performance Measure Form ES-C-1 Worksheet 2005 NRC JPM S7 NUREG 1021, Revision 9 Facility:
===Response===
Callaway Task No.:     Task Title: Paralleling Diesel Generator "A" To XNB01 JPM No.: 2005 NRC JPM S7 K/A  
Result:                      SAT            UNSAT Examiners Signature:                                Date:
2005 NRC JPM S6                                          NUREG 1021, Revision 9
 
Appendix C                         Page 10 of 10                      Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: Callaway Plant has experienced a Large Loss of Coolant Accident. A Safety Injection has occurred.
INITIATING CUE:    The Control Room Supervisor has directed you to place the A Containment Hydrogen Analyzer, SGS02A, in service per OTN-GS-00001, Section 4.2. The pre-service startup and standby alignment of hydrogen analyzers has already been completed, (Section 4.1). Inform the Control room Supervisor when SGS02A is in service.
2005 NRC JPM S6                                            NUREG 1021, Revision 9
 
Appendix C                                  Job Performance Measure                    Form ES-C-1 Worksheet Facility:               Callaway                                 Task No.:
Task
 
==Title:==
Paralleling Diesel Generator A To     JPM No.:     2005 NRC JPM S7 XNB01 K/A  


==Reference:==
==Reference:==
064 A4.01 4.0 / 4.3 Examinee:
064 A4.01         4.0 / 4.3 Examinee:                                                   NRC Examiner:
NRC Examiner:
Facility Evaluator:                                         Date:
Facility Evaluator:
Method of testing:
Date: Method of testing:
Simulated Performance:                                       Actual Performance:       X Classroom                 Simulator     X   Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Simulated Performance:
Initial Conditions:         The plant is operating in Mode 1. The A Emergency Diesel Generator has been started per OTN-NE-0001A, Section 4.3. NB01 is energized from its normal off-site power source. XNB01 LTC is in manual and Tap 13 is set for modes 1 through 4.
Actual Performance: X Classroom Simulator X Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Task Standard:             NE01 is connected to NB01 and is carrying at least 2 Mwe load.
Initial Conditions: The plant is operating in Mode 1. The "A" Emergency Diesel Generator has been started per OTN-NE-0001A, Section 4.3. NB01 is energized from its normal off-site power source. XNB01 LTC is in manual and Tap 13 is set for modes 1 through 4.
Required Materials:         None General  
Task Standard: NE01 is connected to NB01 and is carrying at least 2 Mwe load.
Required Materials:
None   General  


==References:==
==References:==
OTN-NE-0001A, Standby Diesel Generation System Train "A", Rev. 13 Initiating Cue: You have been directed to parallel the "A" Diesel Generator to NB01 and load to at least 2 MW per OTN-NE-0001A, Section 4.4. Inform the Control Room Supervisor when NE01 is running loaded > 2 Mwe.
OTN-NE-0001A, Standby Diesel Generation System Train A, Rev. 13 Initiating Cue:             You have been directed to parallel the A Diesel Generator to NB01 and load to at least 2 MW per OTN-NE-0001A, Section 4.4. Inform the Control Room Supervisor when NE01 is running loaded > 2 Mwe.
Time Critical Task:
Time Critical Task:         NO Validation Time:           15 minutes 2005 NRC JPM S7                                                            NUREG 1021, Revision 9
NO   Validation Time:
15 minutes  


Appendix C Job Performance Measure Form ES-C-1 Worksheet 2005 NRC JPM S7 NUREG 1021, Revision 9 SIMULATOR SETUP NOTES: May be run with JPM S4 Ensure "A" Emergency Diesel Generator is running unloaded if performing on the simulator. Use remote NBHS0037 place in manual.
Appendix C                     Job Performance Measure                 Form ES-C-1 Worksheet SIMULATOR SETUP NOTES:         May be run with JPM S4 Ensure A Emergency Diesel Generator is running unloaded if performing on the simulator. Use remote NBHS0037 place in manual.
Monitor NEPSLTC (1).
2005 NRC JPM S7                                            NUREG 1021, Revision 9


Monitor NEPSLTC (1).
Appendix C                                   Page 3 of 13                     Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)
Appendix C Page 3 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S7 NUREG 1021, Revision 9 (Denote Critical Steps with a check mark)
START TIME:
START TIME:
Performance Step: 1 Obtain a verified working copy of OTN-NE-0001A, Standby Diesel Generation System Train "A".
Performance Step: 1       Obtain a verified working copy of OTN-NE-0001A, Standby Diesel Generation System Train A.
Standard: Operator should obtain procedure copy.
Standard:                 Operator should obtain procedure copy.
Comment:     Section 2 Performance Step: 2 Review the Precautions and Limitations of OTN-NE-0001A.
Comment:
Standard: Operator should read the Precautions and Limitations.
Section 2 Performance Step: 2       Review the Precautions and Limitations of OTN-NE-0001A.
Comment:   Evaluator's Cue: All Precautions and Limitations are satisfied.
Standard:                 Operator should read the Precautions and Limitations.
Section 3 Performance Step: 3 Review the Initial Conditions of OTN-NE-0001A.
Comment:
Standard: Operator should read the Initial Conditions.
Evaluators Cue:         All Precautions and Limitations are satisfied.
Comment:   Evaluator's Cue:
Section 3 Performance Step: 3       Review the Initial Conditions of OTN-NE-0001A.
All Initial Conditions are satisfied.  
Standard:                 Operator should read the Initial Conditions.
Comment:
Evaluators Cue:         All Initial Conditions are satisfied.
2005 NRC JPM S7                                                      NUREG 1021, Revision 9


Appendix C Page 4 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S7 NUREG 1021, Revision 9 Step 4.4.1 Performance Step: 4 Ensure that the Local Master Transfer Switch KJHS0009 is in the AUTO position.
Appendix C                             Page 4 of 13                         Form ES-C-1 PERFORMANCE INFORMATION Step 4.4.1 Performance Step: 4 Ensure that the Local Master Transfer Switch KJHS0009 is in the AUTO position.
Standard: Operator should verify absence of MCB ANN 20E and/or request Local Observation of Master Transfer Switch.
Standard:           Operator should verify absence of MCB ANN 20E and/or request Local Observation of Master Transfer Switch.
Comment:   Evaluator's Cue: The Local Master Transfer Switch KJHS0009 is in the AUTO position.
Comment:
Evaluators Cue:   The Local Master Transfer Switch KJHS0009 is in the AUTO position.
Step 4.4.2 Performance Step: 5 Ensure NE01 has been started in accordance with Section 4.3 or 5.3 of this procedure.
Step 4.4.2 Performance Step: 5 Ensure NE01 has been started in accordance with Section 4.3 or 5.3 of this procedure.
Standard: Operator may verify NE01 has been started in accordance with  
Standard:           Operator may verify NE01 has been started in accordance with Section 4.3 NOTE:              Given in Initial Conditions.
Comment:
Evaluators Cue:    NE01 has been started in accordance with Section 4.3 Step 4.4.3 Performance Step: 6 If the White Parallel Operation Light is not lit, momentarily place NE HS-5, NE01 Unit Parallel SW to the parallel position.
Standard:          Operator should determine WHITE parallel light is lit.
Comment:
Evaluators Cue:    Local operator reports WHITE Parallel Operation Light is lit on NE107.
2005 NRC JPM S7                                                NUREG 1021, Revision 9


Section 4.3 NOTE: Given in Initial Conditions.
Appendix C                           Page 5 of 13                           Form ES-C-1 PERFORMANCE INFORMATION Step 4.4.4.1 Performance Step: 7 Verify the White Parallel Operation Light is lit on NE107.
Comment:  Evaluator's Cue: NE01 has been started in accordance with Section 4.3 Step 4.4.3 Performance Step: 6 If the White Parallel Operation Light is not lit, momentarily place NE HS-5, NE01 Unit Parallel SW to the parallel position.
Standard:           Operator should contact EO to verify the White Parallel Light is lit on NE107.
Standard:
Comment:
Operator should determine WHITE parallel light is lit.
Evaluators Cue:   The White Parallel Light is lit on NE107.
Comment:  Evaluator's Cue:
Local operator reports WHITE Parallel Operation Light is lit on NE107.
 
Appendix C Page 5 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S7 NUREG 1021, Revision 9 Step 4.4.4.1 Performance Step: 7 Verify the White Parallel Operation Light is lit on NE107.
Standard: Operator should contact EO to verify the White Parallel Light is lit on NE107.
Comment:   Evaluator's Cue:
The White Parallel Light is lit on NE107.
Step 4.4.4.2 Performance Step: 8 Verify Main Control board Annunciator 22B, Voltage Control Freeze is lit.
Step 4.4.4.2 Performance Step: 8 Verify Main Control board Annunciator 22B, Voltage Control Freeze is lit.
Standard: Operator should verify Annunciator 22B, Voltage Control Freeze is lit.       Comment:   Evaluator's Cue: Annunciator 22B, Voltage Control Freeze is lit.
Standard:           Operator should verify Annunciator 22B, Voltage Control Freeze is lit.
Comment:
Evaluators Cue:   Annunciator 22B, Voltage Control Freeze is lit.
Step 4.4.4.3 Performance Step: 9 Verify EITHER Computer Point NBQ0003 indicates Capacitor Bank NB03 is in FREEZE OR Disconnect NB0301 is OPEN.
Step 4.4.4.3 Performance Step: 9 Verify EITHER Computer Point NBQ0003 indicates Capacitor Bank NB03 is in FREEZE OR Disconnect NB0301 is OPEN.
Standard: Operator should verify NBQ0003 is in FREEZE or DISCONNECTED.
Standard:           Operator should verify NBQ0003 is in FREEZE or DISCONNECTED.
Comment:   Evaluator's Cue: Computer Point NBQ0003 indicates Capacitor Bank NB03 is in FREEZE mode.  
Comment:
Evaluators Cue:   Computer Point NBQ0003 indicates Capacitor Bank NB03 is in FREEZE mode.
2005 NRC JPM S7                                              NUREG 1021, Revision 9


Appendix C Page 6 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S7 NUREG 1021, Revision 9 Step 4.4.4.4 Performance Step: 10 Verify EITHER Computer Point NBX0001 indicates transformer XNB01 LTC is in MANUAL and set at the appropriate Tap  
Appendix C                             Page 6 of 13                     Form ES-C-1 PERFORMANCE INFORMATION Step 4.4.4.4 Performance Step: 10 Verify EITHER Computer Point NBX0001 indicates transformer XNB01 LTC is in MANUAL and set at the appropriate Tap Changer setting.
Standard:            Operator should verify XNB01 LTC is in MANUAL and Tap Setting 13 is selected OR Computer Point NBX0001 indicates FREEZE NOTE:                Given in Initial Conditions Comment:
Evaluators Cue:    Annunciator 19D, XNB01 XFMR/VOLT CTRL TRBL is LIT AND Computer Point NBX0001 indicates FREEZE.
Step 4.4.5 Performance Step: 11 Place the Sync Transfer Switch NE HS-27 in the ON position.
Standard:            Operator selects ON with Sync Transfer Switch NE HS-27.
Comment:
Evaluators Cue:    NE HS-27 is in the ON position.
Step 4.4.6 Performance Step: 12 Place the Synchroscope Selector Switch NB HS-10 in the D/G Feeder Breaker Position.
Standard:            Operator should place the Synchroscope Selector Switch NB HS-10 in the D/G Feeder Breaker Position.
Comment:
Evaluators Cue:    NB HS-10 is selected to DG Feeder BKR Position.
The Sync Scope is rotating in fast direction; Sync Lights NB ZL-9 are flashing.
2005 NRC JPM S7                                              NUREG 1021, Revision 9


Changer setting.
Appendix C                             Page 7 of 13                         Form ES-C-1 PERFORMANCE INFORMATION Step 4.4.7 Performance Step: 13 Adjust the diesel generator speed using Governor Control, KJ HS-7A until the Synchroscope NB EI-3 is rotating slowly in the fact direction.
Standard: Operator should verify XNB01 LTC is in MANUAL and Tap Setting 13 is selected OR Computer Point NBX0001 indicates FREEZE    NOTE: Given in Initial Conditions Comment:  Evaluator's Cue: Annunciator 19D, XNB01 XFMR/VOLT CTRL TRBL is LIT AND  Computer Point NBX0001 indicates FREEZE.
Standard:           Operator turns KJ HS-7A, DG NE01 GOV, to RAISE if speed is SLOW and to LOWER if speed FAST as indicated by 4.16 KV Bus NB01 Sync Scope, NB EI-13 on RL015 to satisfy Synch check Relay.
Step 4.4.5  Performance Step: 11 Place the Sync Transfer Switch NE HS-27 in the ON position.
Comment:
Standard: Operator selects ON with Sync Transfer Switch NE HS-27.
Evaluators Cue:     Synchroscope NB EI-3 is rotating slowly in the FAST direction.
Comment:  Evaluator's Cue: NE HS-27 is in the ON position.
Step 4.4.6  Performance Step: 12 Place the Synchroscope Selector Switch NB HS-10 in the D/G Feeder Breaker Position.
Standard: Operator should place the Synchroscope Selector Switch NB HS-10 in the D/G Feeder Breaker Position.
Comment:  Evaluator's Cue: NB HS-10 is selected to DG Feeder BKR Position.
The Sync Scope is rotating in fast direction; Sync Lights NB ZL-9 are flashing.
 
Appendix C Page 7 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S7 NUREG 1021, Revision 9 Step 4.4.7 Performance Step: 13 Adjust the diesel generator speed using Governor Control, KJ HS-7A until the Synchroscope NB EI-3 is rotating slowly in the fact direction.
Standard: Operator turns KJ HS-7A, DG NE01 GOV, to RAISE if speed is SLOW and to LOWER if speed FAST as indicated by 4.16 KV Bus NB01 Sync Scope, NB EI-13 on RL015 to satisfy Synch check Relay.
Comment:   Evaluator's Cue: Synchroscope NB EI-3 is rotating slowly in the FAST direction.
Step 4.4.8 Performance Step: 14 Adjust NE01 voltage to be within +50, -0 volts of the NB01 Bus Voltage using the Auto Voltage Regulator NE HS-13A.
Step 4.4.8 Performance Step: 14 Adjust NE01 voltage to be within +50, -0 volts of the NB01 Bus Voltage using the Auto Voltage Regulator NE HS-13A.
Standard: Operator should adjust NE01 voltage to be within +50, -0 volts of the NB01 Bus Voltage using the Auto Voltage Regulator NE HS-13A.
Standard:           Operator should adjust NE01 voltage to be within +50, -0 volts of the NB01 Bus Voltage using the Auto Voltage Regulator NE HS-13A.
Comment:     Step 4.4.8.1 Performance Step: 15 Determine NE01 voltage by placing the Synchroscope Selector  
Comment:
Step 4.4.8.1 Performance Step: 15 Determine NE01 voltage by placing the Synchroscope Selector Switch NB HS-10 in the D/G Feeder Breaker position and reading NB EI-28.
Standard:            Operator should place NB HS-10 in the D/G Feeder Breaker Position and read NB EI-28 to determine NE01 voltage.
Comment:
Evaluators Cue:    NE EI-28 voltage is 4190 volts when NB HS-10 is in the D/G Feeder Breaker Position.
2005 NRC JPM S7                                                NUREG 1021, Revision 9


Switch NB HS-10 in the D/G Feeder Breaker position and reading NB EI-28.
Appendix C                            Page 8 of 13                      Form ES-C-1 PERFORMANCE INFORMATION Step 4.4.8.2 Performance Step: 16 Determine NB01 voltage by placing the Synchroscope Selector Switch NB HS-10 in the Main FDR BKR Position and reading the voltage from NB EI-28.
Standard: Operator should place NB HS-10 in the D/G Feeder Breaker Position and read NB EI-28 to determine NE01 voltage.
Standard:           Operator should determine NB01 voltage by placing NB HS-10 in the Main FDR BKR Position and reading voltage from NB EI-28.
Comment:   Evaluator's Cue: NE EI-28 voltage is 4190 volts when NB HS-10 is in the D/G Feeder Breaker Position.  
Comment:
Evaluators Cue:     NB EI-28 voltage is 4160 when NB HS-10 is in the Main FDR BKR Position.
Step 4.4.9 Performance Step: 17 When NE01 voltage has been verified to be within +50, -0 volts of NB01 voltage, ensure the Synchroscope Selector Switch NB HS-10 is placed in the D/G Feeder Breaker Position.
Standard:            Operator should place NB HS-10 in the D/G Feeder Breaker Position.
Comment:
Step 4.4.9 Performance Step: 18 Verify proper operation of Sync Light NB ZL-9.
Standard:            Operator should verify proper operation of NB ZL-9.
Comment:
Evaluators Cue:    Dimmest at 12 oclock and brightest at 6 oclock on Synch Scope NB EI-3 2005 NRC JPM S7                                                NUREG 1021, Revision 9


Appendix C Page 8 of 13 Form ES-C-1  PERFORMANCE INFORMATION 2005 NRC JPM S7 NUREG 1021, Revision 9 Step 4.4.8.2 Performance Step: 16 Determine NB01 voltage by placing the Synchroscope Selector Switch NB HS-10 in the Main FDR BKR Position and reading the
Appendix C                             Page 9 of 13                       Form ES-C-1 PERFORMANCE INFORMATION Step 4.4.10 Performance Step: 19 Verify that the Diesel Generator to Bus Synchronizing Light NE ZL-27A illuminates when the Synchroscope is between the 11 oclock and the 12 oclock position.
 
Standard:           Operator should verify that the Diesel Generator to Bus Synchronizing Light NE ZL-27A illuminates when the Synchroscope is between the 11 oclock and the 12 oclock position.
voltage from NB EI-28.
Comment:
Standard: Operator should determine NB01 voltage by placing NB HS-10 in the Main FDR BKR Position and reading voltage from NB EI-28.
Evaluators Cue:     NE ZL-27A is coming on at five (5) degrees before the 12 oclock position and off at five (5) degrees after 12 oclock.
Comment:  Evaluator's Cue: NB EI-28 voltage is 4160 when NB HS-10 is in the Main FDR BKR Position.
Step 4.4.9  Performance Step: 17 When NE01 voltage has been verified to be within +50, -0 volts of NB01 voltage, ensure the Synchroscope Selector Switch NB HS-10 is placed in the D/G Feeder Breaker Position.
Standard: Operator should place NB HS-10 in the D/G Feeder Breaker
 
Position.
Comment:      Step 4.4.9 Performance Step: 18 Verify proper operation of Sync Light NB ZL-9.
Standard:
Operator should verify proper operation of NB ZL-9.
Comment:  Evaluator's Cue: Dimmest at 12 o'clock and brightest at 6 o'clock on Synch Scope NB EI-3
 
Appendix C Page 9 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S7 NUREG 1021, Revision 9 Step 4.4.10 Performance Step: 19 Verify that the Diesel Generator to Bus Synchronizing Light NE ZL-27A illuminates when the Synchroscope is between the 11 o'clock and the 12 o'clock position.
Standard:
Operator should verify that the Diesel Generator to Bus Synchronizing Light NE ZL-27A illuminates when the Synchroscope is between the 11 o'clock and the 12 o'clock position.
Comment:   Evaluator's Cue: NE ZL-27A is coming on at five (5) degrees before the 12 o'clock position and off at five (5) degrees after 12 o'clock.
Step 4.4.11 Performance Step: 20 Allow Synchroscope NB EI-3 to complete one revolution to verify proper speed for synchronization.
Step 4.4.11 Performance Step: 20 Allow Synchroscope NB EI-3 to complete one revolution to verify proper speed for synchronization.
Standard:
Standard:           Operator should observe the Sync Scope for one complete revolutions and adjust the speed as necessary.
Operator should observe the Sync Scope for one complete revolutions and adjust the speed as necessary.
Comment:
Comment:   Evaluator's Cue: Synchroscope is rotating in the FAST direction at about the speed of the second had of a clock.
Evaluators Cue:     Synchroscope is rotating in the FAST direction at about the speed of the second had of a clock.
Step 4.4.12 Performance Step: 21 When the Synchroscope reaches the 11 o'clock position turn NE HIS-25 to CLOSE and hold until Breaker NB0111 indicates CLOSED, then release the control switch.
Step 4.4.12 Performance Step: 21 When the Synchroscope reaches the 11 oclock position turn NE HIS-25 to CLOSE and hold until Breaker NB0111 indicates CLOSED, then release the control switch.
Standard:
Standard:           When Sync Scope reaches the 11 oclock position and Synch Check Permissive Light ON, CLOSE NB01 EMERG SPLY BKR NB0111 with Switch NE HIS-25 and hold until the RED light is ON and the GREEN light is OFF, then the operator should release the switch.
When Sync Scope reaches the 11 o'clock position and Synch Check Permissive Light ON, CLOSE NB01 EMERG SPLY BKR NB0111 with Switch NE HIS-25 and hold until the RED light is ON and the GREEN light is OFF, then the operator should release the switch.
Comment:
Comment:   Evaluator's Cue: NE HIS-25 RED light is ON and the GREEN light is OFF.  
Evaluators Cue:     NE HIS-25 RED light is ON and the GREEN light is OFF.
2005 NRC JPM S7                                                NUREG 1021, Revision 9


Appendix C Page 10 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S7 NUREG 1021, Revision 9 Step 4.4.13 Performance Step: 22 Immediately upon closure of the D/G Breaker Pickup Load to at least 0.2 MW by operating the D/G Governor Control JK HS-7A in the RAISE direction if necessary.
Appendix C                           Page 10 of 13                       Form ES-C-1 PERFORMANCE INFORMATION Step 4.4.13 Performance Step: 22 Immediately upon closure of the D/G Breaker Pickup Load to at least 0.2 MW by operating the D/G Governor Control JK HS-7A in the RAISE direction if necessary.
Standard: Operator should RAISE DG Load to prevent NB0111 Reverse  
Standard:           Operator should RAISE DG Load to prevent NB0111 Reverse Power Trip using KJ HS-7A.
 
Comment:
Power Trip using KJ HS-7A.
Evaluators Cue:     D/G Load is 0.2 MW.
Comment:   Evaluator's Cue: D/G Load is 0.2 MW.
Step 4.4.14 Performance Step: 23 Return the Synchroscope Selector Switch NB HS-10 to the OFF position.
Step 4.4.14 Performance Step: 23 Return the Synchroscope Selector Switch NB HS-10 to the  
Standard:           Operator should return the Synchroscope Selector Switch NB HS-10 to the OFF position.
 
Comment:
"OFF" position.
Evaluators Cue:     NB HS-10 is in OFF.
Standard: Operator should return the Synchroscope Selector Switch NB  
 
HS-10 to the "OFF" position.
Comment:   Evaluator's Cue: NB HS-10 is in "OFF".
Performance Step: 24 Place Sync Transfer Switch NE HS-27 in the OFF position.
Performance Step: 24 Place Sync Transfer Switch NE HS-27 in the OFF position.
Standard: Operator should place Sync Transfer Switch NE HS-27 in the OFF position.
Standard:           Operator should place Sync Transfer Switch NE HS-27 in the OFF position.
Comment:   Evaluator's Cue: NE HS-27 is in OFF.
Comment:
Evaluators Cue:     NE HS-27 is in OFF.
Step 4.4.16 Performance Step: 25 Adjust Diesel Generator Voltage with the Auto Voltage Regulator NE HS-13A to maintain a power factor of 0.9 LAG.
Step 4.4.16 Performance Step: 25 Adjust Diesel Generator Voltage with the Auto Voltage Regulator NE HS-13A to maintain a power factor of 0.9 LAG.
Standard: Operator should adjust D/G VAR Loading using NE HS-13A, Auto Voltage Regulator.
Standard:           Operator should adjust D/G VAR Loading using NE HS-13A, Auto Voltage Regulator.
Comment:   Evaluator's Cue: Power factor is 0.9 LAG.  
Comment:
Evaluators Cue:     Power factor is 0.9 LAG.
2005 NRC JPM S7                                                NUREG 1021, Revision 9


Appendix C Page 11 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S7 NUREG 1021, Revision 9 Step 4.4.17 Performance Step: 26 Increase Diesel Generator Load as directed by the SS/OS.
Appendix C                             Page 11 of 13                     Form ES-C-1 PERFORMANCE INFORMATION Step 4.4.17 Performance Step: 26 Increase Diesel Generator Load as directed by the SS/OS.
Standard: The operator should increase Diesel Generator Load as directed by the Control Room Supervisor.
Standard:           The operator should increase Diesel Generator Load as directed by the Control Room Supervisor.
NOTE: Initial Conditions directed NE01 BE Loaded to > 2MW.
NOTE:               Initial Conditions directed NE01 BE Loaded to > 2MW.
Comment:   Evaluator's Cue: The Control Room Supervisor directs you to increase D/G Load to > two (2) MW.
Comment:
Step 4.4.17 Performance Step: 27 Increase Diesel Generator Load, by placing NE HS-7A in the  
Evaluators Cue:     The Control Room Supervisor directs you to increase D/G Load to > two (2) MW.
 
Step 4.4.17 Performance Step: 27 Increase Diesel Generator Load, by placing NE HS-7A in the RAISE position, to > two (2) MW.
RAISE position, to > two (2) MW.
Standard:           Operator should go to RAISE on NE HS-7A on RL015 to RAISE D/G Load to > two (2) MW.
Standard: Operator should go to RAISE on NE HS-7A on RL015 to RAISE D/G Load to > two (2) MW.
Comment:
Comment:   Evaluator's Cue: D/G Load is > two (2) MW.
Evaluators Cue:     D/G Load is > two (2) MW.
Performance Step: 28 Inform the Control Room Supervisor that NE01 is loaded >
Performance Step: 28 Inform the Control Room Supervisor that NE01 is loaded >
2 MWe. Standard: Operator should inform the Control Room Supervisor that NE01 is loaded > 2 Mwe.
2 MWe.
Comment:   Evaluator's Cue: The Control Room Supervisor acknowledges.
Standard:           Operator should inform the Control Room Supervisor that NE01 is loaded > 2 Mwe.
Terminating Cue: When DG load is >2 MW, this JPM is complete.
Comment:
STOP TIME:  
Evaluators Cue:     The Control Room Supervisor acknowledges.
Terminating Cue:       When DG load is >2 MW, this JPM is complete.
STOP TIME:
2005 NRC JPM S7                                              NUREG 1021, Revision 9


Appendix C Page 12 of 13 Form ES-C-1 VERIFICATION OF COMPLETION 2005 NRC JPM S7 NUREG 1021, Revision 9 Job Performance Measure No.: 2005 NRC JPM S7 Examinee's Name:
Appendix C                           Page 12 of 13               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC JPM S7 Examinees Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 2,398: Line 3,230:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
 
Result: SAT   UNSAT     Examiner's Signature:
===Response===
Date:
Result:                     SAT           UNSAT Examiners Signature:                               Date:
Appendix C Page 13 of 13 Form ES-C-1 JPM CUE SHEET 2005 NRC JPM S7 NUREG 1021, Revision 9 INITIAL CONDITIONS: The plant is operating in Mode 1. The "A" Emergency Diesel Generator has been started per OTN-NE-0001A, Section 4.3. NB01 is energized from its normal off-site power source. XNB01 LTC is in manual and Tap 13 is set for modes 1 through 4.
2005 NRC JPM S7                                          NUREG 1021, Revision 9
INITIATING CUE: You have been directed to parallel the "A" Diesel Generator to NB01 and load to at least 2 MW per OTN-NE-0001A, Section 4.4. Inform the Control Room Supervisor when NE01 is running loaded  
 
> 2 Mwe.
Appendix C                         Page 13 of 13                       Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: The plant is operating in Mode 1. The A Emergency Diesel Generator has been started per OTN-NE-0001A, Section 4.3.
Appendix C Job Performance Measure Form ES-C-1 Worksheet 2005 NRC JPM S8 NUREG 1021, Revision 9 Facility:
NB01 is energized from its normal off-site power source. XNB01 LTC is in manual and Tap 13 is set for modes 1 through 4.
Callaway Task No.:     Task Title: Reinitiate CTMT Purge Following CPIS JPM No.: 2005 NRC JPM S8 K/A  
INITIATING CUE:     You have been directed to parallel the A Diesel Generator to NB01 and load to at least 2 MW per OTN-NE-0001A, Section 4.4.
Inform the Control Room Supervisor when NE01 is running loaded
                    > 2 Mwe.
2005 NRC JPM S7                                            NUREG 1021, Revision 9
 
Appendix C                                 Job Performance Measure                     Form ES-C-1 Worksheet Facility:               Callaway                               Task No.:
Task
 
==Title:==
Reinitiate CTMT Purge Following         JPM No.:     2005 NRC JPM S8 CPIS K/A  


==Reference:==
==Reference:==
013 A2.06 3.7 / 4.0 Examinee:
013 A2.06       3.7 / 4.0 Examinee:                                                   NRC Examiner:
NRC Examiner:
Facility Evaluator:                                         Date:
Facility Evaluator:
Method of testing:
Date: Method of testing:
Simulated Performance:                                       Actual Performance:       X Classroom                 Simulator     X     Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Simulated Performance:
Initial Conditions:         Callaway Plant is in Mode 2. A containment mini purge was in progress to prepare for a containment entry. One hour ago, a CPIS/CRVIS occurred due to a spike on GTRE0022. Repairs have been made to GTRE0022 and it is now operable. Outside air temperature is expected to remain > 50&deg;F.
Actual Performance: X Classroom Simulator X Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Task Standard:             Upon completion of this JPM, the operator will have reset CPIS and re-established containment mini purge.
Initial Conditions: Callaway Plant is in Mode 2. A containment mini purge was in progress to prepare for a containment entry. One hour ago, a CPIS/CRVIS occurred due to a spike on GTRE0022. Repairs have been made to GTRE0022 and it is now operable. Outside air temperature is expected to remain > 50&deg;F.
Required Materials:         Copy of Gaseous Radwaste Release Permit Covers installed on the ESFAS Switches for GTRE0022 and GTRE0033 General  
Task Standard: Upon completion of this JPM, the operator will have reset CPIS and re-established containment mini purge.
Required Materials: Copy of Gaseous Radwaste Release Permit Covers installed on the ESFAS Switches for GTRE0022 and GTRE0033 General  


==References:==
==References:==
OTN-GT-00001, Containment Purge System, Revision 19 CAR 199301739, 199400025, 199501723, 199700736 Initiating Cue: The Control Room Supervisor has directed you to re-initiate the containment mini purge per OTN-GT-00001, Section 4.7. The Control Room Supervisor has decided to not realign the control building HVAC at this time. The SS ahs authorized reinitiating CTMT mini purge.
OTN-GT-00001, Containment Purge System, Revision 19 CAR 199301739, 199400025, 199501723, 199700736 Initiating Cue:             The Control Room Supervisor has directed you to re-initiate the containment mini purge per OTN-GT-00001, Section 4.7. The Control Room Supervisor has decided to not realign the control building HVAC at this time. The SS ahs authorized reinitiating CTMT mini purge.
Inform the Control room Supervisor when the mini purge has been re-initiated.
2005 NRC JPM S8                                                            NUREG 1021, Revision 9


Inform the Control room Supervisor when the mini purge has been re-
Appendix C                    Job Performance Measure          Form ES-C-1 Worksheet Time Critical Task: NO Validation Time:    18 minutes 2005 NRC JPM S8                                        NUREG 1021, Revision 9


initiated.  
Appendix C                          Job Performance Measure                Form ES-C-1 Worksheet SIMULATOR SETUP NOTES:              Manually initiate a CPIS and CRVIS (both trains).
May be run on same IC as S5 2005 NRC JPM S8                                                    NUREG 1021, Revision 9


Appendix C Job Performance Measure Form ES-C-1 Worksheet 2005 NRC JPM S8 NUREG 1021, Revision 9 Time Critical Task:
Appendix C                                   Page 4 of 17                       Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)
NO  Validation Time:
18 minutes
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet 2005 NRC JPM S8 NUREG 1021, Revision 9 SIMULATOR SETUP NOTES: Manually initiate a CPIS and CRVIS (both trains). May be run on same IC as S5 Appendix C Page 4 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S8 NUREG 1021, Revision 9 (Denote Critical Steps with a check mark)
START TIME:
START TIME:
Performance Step: 1 Obtain a verified working copy of OTN-GT-00001, Containment Purge System.
Performance Step: 1       Obtain a verified working copy of OTN-GT-00001, Containment Purge System.
Standard: Operator should obtain procedure copy.
Standard:                 Operator should obtain procedure copy.
Comment:     Section 2 Performance Step: 2 Review Precautions and Limitations of OTN-GT-00001.
Comment:
Standard: Operator should review Precautions and Limitations.
Section 2 Performance Step: 2       Review Precautions and Limitations of OTN-GT-00001.
Comment:   Evaluator's Cue: All Precautions and Limitations are satisfied.
Standard:                 Operator should review Precautions and Limitations.
Section 3 Performance Step: 3 Review Initial Conditions of OTN-GT-00001.
Comment:
Standard: Operator should review Initial Conditions.
Evaluators Cue:         All Precautions and Limitations are satisfied.
Comment:  Evaluator's Cue:
Section 3 Performance Step: 3       Review Initial Conditions of OTN-GT-00001.
All Initial Conditions are satisfied.
Standard:                 Operator should review Initial Conditions.
Caution Prior To Step 4.7.1 Performance Step: 4 The purge may be reinitiated w/out terminating the release permit provided the time between stopping and restarting the release does not exceed two hours.
Standard: Operator should realize purge was only secured for one hour and SS has given permission to reinitiate purge.
Comment:
Comment:
Appendix C Page 5 of 17 Form ES-C-1  PERFORMANCE INFORMATION 2005 NRC JPM S8 NUREG 1021, Revision 9 Step 4.7.1 Performance Step: 5 Have the Count Room Technician verify alarm/trip setpoints for GT-RE-21, GT-RE-22, and GT-RE-33 are correct per the release  
Evaluators Cue:          All Initial Conditions are satisfied.
Caution Prior To Step 4.7.1 Performance Step: 4      The purge may be reinitiated w/out terminating the release permit provided the time between stopping and restarting the release does not exceed two hours.
Standard:                Operator should realize purge was only secured for one hour and SS has given permission to reinitiate purge.
Comment:
2005 NRC JPM S8                                                      NUREG 1021, Revision 9


permit. Standard: Operator should contact the Count Room Technician to verify setpoint for GT-RE-21, 22 and 33 are correct per the release permit. Comment:   Evaluator's Cue:
Appendix C                            Page 5 of 17                          Form ES-C-1 PERFORMANCE INFORMATION Step 4.7.1 Performance Step: 5 Have the Count Room Technician verify alarm/trip setpoints for GT-RE-21, GT-RE-22, and GT-RE-33 are correct per the release permit.
The Count Room Technician has verified setpoints correct per the release permit.
Standard:           Operator should contact the Count Room Technician to verify setpoint for GT-RE-21, 22 and 33 are correct per the release permit.
Comment:
Evaluators Cue:   The Count Room Technician has verified setpoints correct per the release permit.
Step 4.7.1.1 Performance Step: 6 If monitor readings are  the high alarm setpoint, close the permit, resample, and generate a new permit.
Step 4.7.1.1 Performance Step: 6 If monitor readings are  the high alarm setpoint, close the permit, resample, and generate a new permit.
Standard: Operator should use the RM11 console to determine the color of channels 211, 212, 221, 222, 223, 331, 332, and 333 are NOT lit  
Standard:           Operator should use the RM11 console to determine the color of channels 211, 212, 221, 222, 223, 331, 332, and 333 are NOT lit RED.
 
Comment:
RED. Comment:   Evaluator's Cue: RM 11 channels 211, 212, 221, 222, 2223, 331, 332, and 333 are lit GREEN.
Evaluators Cue:   RM 11 channels 211, 212, 221, 222, 2223, 331, 332, and 333 are lit GREEN.
Step 4.7.2 Performance Step: 7 Check SA036D and SA036E. If any bistable trip lights are lit, record on the URO Log and reset the bistable by depressing and then releasing the bistable trip light.
Step 4.7.2 Performance Step: 7 Check SA036D and SA036E. If any bistable trip lights are lit, record on the URO Log and reset the bistable by depressing and then releasing the bistable trip light.
Standard: Operator should go to the SA036D and SA036E panel in the back of the Control Room and verify NO bistable lights lit.
Standard:           Operator should go to the SA036D and SA036E panel in the back of the Control Room and verify NO bistable lights lit.
Comment:   Evaluator's Cue: NO bistable lights are lit on SA036D and SA036E.  
Comment:
Evaluators Cue:   NO bistable lights are lit on SA036D and SA036E.
2005 NRC JPM S8                                                NUREG 1021, Revision 9


Appendix C Page 6 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S8 NUREG 1021, Revision 9 Step 4.7.3 Performance Step: 8 If required, with SS/CRS permission, reset the following:
Appendix C                             Page 6 of 17                       Form ES-C-1 PERFORMANCE INFORMATION Step 4.7.3 Performance Step: 8 If required, with SS/CRS permission, reset the following:
Standard:
Standard:
Comment:   Evaluator's Note:
Comment:
The SS has authorized resetting switches.
Evaluators Note:     The SS has authorized resetting switches.
Step 4.7.3 Performance Step: 9 Reset CPIS by depressing SA HS-15, CTMT purge Train B ISO on RL018.
Step 4.7.3 Performance Step: 9 Reset CPIS by depressing SA HS-15, CTMT purge Train B ISO on RL018.
NOTE: Steps 9 through 12 may be performed in any order.
NOTE:               Steps 9 through 12 may be performed in any order.
Standard: Operator should depress the reset button on SA HS-15, CTMT  
Standard:           Operator should depress the reset button on SA HS-15, CTMT Purge Train B ISO on RL018.
Comment:
Evaluators Note:    The reset button on SA HS-15 has been depressed.
Step 4.7.3 Performance Step: 10 Reset CRVIS by depressing SA HS-13, Ctrl Bldg Vent Train B ISO.
NOTE:                Steps 9 through 12 may be performed in any order.
Standard:            Operator should depress the reset button on SA HS-13, Ctrl Bldg Vent Train B ISO on RL018.
Comment:
Evaluators Note:    The reset button on SA HS-13 has been depressed.
2005 NRC JPM S8                                                NUREG 1021, Revision 9


Purge Train B ISO on RL018.
Appendix C                             Page 7 of 17                     Form ES-C-1 PERFORMANCE INFORMATION Step 4.7.3 Performance Step: 11 Reset CPIS by depressing SA HS-11, CTMT Purge Train A ISO on RL018.
Comment:  Evaluator's Note: The reset button on SA HS-15 has been depressed.
NOTE:               Steps 9 through 12 may be performed in any order.
Step 4.7.3 Performance Step: 10 Reset CRVIS by depressing SA HS-13, Ctrl Bldg Vent Train B
Standard:           Operator should depress the reset button on SA HS-11, CTMT Purge Train A ISO on RL018.
 
Comment:
ISO. NOTE: Steps 9 through 12 may be performed in any order.
Evaluators Cue:     The reset button on SA HS-11 has been depressed.
Standard: Operator should depress the reset button on SA HS-13, Ctrl Bldg Vent Train B ISO on RL018.
Step 4.7.3 Performance Step: 12 Reset CRVIS by depressing SA HS-9, Ctrl Bldg Vent Train A ISO on RL018.
Comment:  Evaluator's Note: The reset button on SA HS-13 has been depressed.
NOTE:               Steps 9 through 12 may be performed in any order.
 
Standard:           Operator should depress the reset button on SA HS-9, Ctrl Bldg Vent Train A ISO on RL018.
Appendix C Page 7 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S8 NUREG 1021, Revision 9 Step 4.7.3 Performance Step: 11 Reset CPIS by depressing SA HS-11, CTMT Purge Train A ISO on RL018.
Comment:
NOTE: Steps 9 through 12 may be performed in any order.
Evaluators Cue:     The reset button on SA HS-9 has been depressed.
Standard: Operator should depress the reset button on SA HS-11, CTMT  
 
Purge Train A ISO on RL018.
Comment:   Evaluator's Cue: The reset button on SA HS-11 has been depressed.
Step 4.7.3 Performance Step: 12 Reset CRVIS by depressing SA HS-9, Ctrl Bldg Vent Train A ISO  
 
on RL018.
NOTE: Steps 9 through 12 may be performed in any order.
Standard: Operator should depress the reset button on SA HS-9, Ctrl Bldg Vent Train A ISO on RL018.
Comment:   Evaluator's Cue: The reset button on SA HS-9 has been depressed.
Step 4.7.3.1 Performance Step: 13 Ensure CPIS and CRVIS lights OUT on ESFAS status panels; if required use SA HS-24 and/or SA HS-23, ESF panel mode SEL switches, to reset.
Step 4.7.3.1 Performance Step: 13 Ensure CPIS and CRVIS lights OUT on ESFAS status panels; if required use SA HS-24 and/or SA HS-23, ESF panel mode SEL switches, to reset.
Standard: Operator should ensure CPIS and CRVIS lights OUT on ESFAS  
Standard:           Operator should ensure CPIS and CRVIS lights OUT on ESFAS status panels.
Comment:
Evaluators Cue:    CPIS and CRVIS lights on ESFAS status panel are OUT.
2005 NRC JPM S8                                              NUREG 1021, Revision 9


status panels.
Appendix C                             Page 8 of 17                         Form ES-C-1 PERFORMANCE INFORMATION Step 4.7.3.2 Performance Step: 14 Ensure MCB annunciators 59D (CPIS) and 63A (CRVIS) are clear.
Comment:  Evaluator's Cue: CPIS and CRVIS lights on ESFAS status panel are OUT.
Standard:           Operator should verify MCB annunciators 59D and 63A are clear.
 
Comment:
Appendix C Page 8 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S8 NUREG 1021, Revision 9 Step 4.7.3.2 Performance Step: 14 Ensure MCB annunciators 59D (CPIS) and 63A (CRVIS) are clear. Standard: Operator should verify MCB annunciators 59D and 63A are  
Evaluators Cue:     MCV annunciators 59D and 63A are clear.
 
clear. Comment:   Evaluator's Cue: MCV annunciators 59D and 63A are clear.
Step 4.7.4 Performance Step: 15 If required, realign the Control Building HVAC per OTN-GK-00001.
Step 4.7.4 Performance Step: 15 If required, realign the Control Building HVAC per OTN-GK-00001.
Standard: The operator should continue with Step 4.7.5 and not align Control Building HVAC at this time.
Standard:           The operator should continue with Step 4.7.5 and not align Control Building HVAC at this time.
Given in Initial Conditions.
Given in Initial Conditions.
Comment:   Evaluator's Cue:
Comment:
The O.S. has determined to align mini-purge prior to realigning the Control Building HVAC.
Evaluators Cue:     The O.S. has determined to align mini-purge prior to realigning the Control Building HVAC.
Step 4.7.5 Performance Step: 16 Place Mini-Purge in service per Section 4.3 of this procedure.
Step 4.7.5 Performance Step: 16 Place Mini-Purge in service per Section 4.3 of this procedure.
Standard: Operator should go to Section 4.3.
Standard:           Operator should go to Section 4.3.
Comment:     Section 4.3.1 Performance Step: 17 Ensure Section 4.2 of this procedure has been completed.
Comment:
Standard: Operator should verify Section 4.2 of this procedure has been  
Section 4.3.1 Performance Step: 17 Ensure Section 4.2 of this procedure has been completed.
Standard:           Operator should verify Section 4.2 of this procedure has been completed.
Comment:
Evaluators Cue:    Section 4.2 of this procedure has been completed.
2005 NRC JPM S8                                                  NUREG 1021, Revision 9


completed.
Appendix C                             Page 9 of 17                   Form ES-C-1 PERFORMANCE INFORMATION Step 4.3.2 Performance Step: 18 Monitor or trend SD-RE-41, SD-RE-42, and GT-PDI-040.
Comment:  Evaluator's Cue:
Standard:           Operator monitor or trend SD-RE-41, SD-RE-42, and GT-PD-040. Operator may use time trend minivent.
Section 4.2 of this procedure has been completed.
Comment:
 
Evaluators Cue:     SD-RE-41, SD-RE-42, and GT-PD-040 are all stable.
Appendix C Page 9 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S8 NUREG 1021, Revision 9 Step 4.3.2 Performance Step: 18 Monitor or trend SD-RE-41, SD-RE-42, and GT-PDI-040.
Standard: Operator monitor or trend SD-RE-41, SD-RE-42, and GT-PD-040. Operator may use time trend "minivent".
Comment:   Evaluator's Cue: SD-RE-41, SD-RE-42, and GT-PD-040 are all stable.
Step 4.3.2.1 Performance Step: 19 Record containment pressure, using GTPDI0040 or GTD0040, on the Gaseous Radwaste Permit.
Step 4.3.2.1 Performance Step: 19 Record containment pressure, using GTPDI0040 or GTD0040, on the Gaseous Radwaste Permit.
Standard: Operator should record containment pressure GTPDI0040 or GTD0040, on the Gaseous Radwaste Permit.
Standard:           Operator should record containment pressure GTPDI0040 or GTD0040, on the Gaseous Radwaste Permit.
Comment:   Evaluator's Cue:
Comment:
Containment pressure has been recorded.
Evaluators Cue:     Containment pressure has been recorded.
Step 4.3.3 Performance Step: 20 Ensure that GTRE0022 and GTRE0033 are not in bypass, and ensure the "CTMT Purge In Prog - Do Not Bypass" cover over the ESFAS switches for GTRE0022 and GTRE0033.
Step 4.3.3 Performance Step: 20 Ensure that GTRE0022 and GTRE0033 are not in bypass, and ensure the CTMT Purge In Prog - Do Not Bypass cover over the ESFAS switches for GTRE0022 and GTRE0033.
Standard: Operator should verify GTRE0022 and GTRE0033 are not in bypass and covers have been placed over GTRE0022 and GTRE0033 ESFAS Switches.
Standard:           Operator should verify GTRE0022 and GTRE0033 are not in bypass and covers have been placed over GTRE0022 and GTRE0033 ESFAS Switches.
Comment:   Evaluator's Cue: GTRE022 and GTRE0033 are not in bypass.
Comment:
Evaluators Cue:     GTRE022 and GTRE0033 are not in bypass.
Covers have been placed over GTRE0022 and GTRE0033 ESFAS Switches.
Covers have been placed over GTRE0022 and GTRE0033 ESFAS Switches.
Step 4.3.5 Performance Step: 21 Initial/Date/Time GT RR-21B and GT RR-58 on SP010.
Step 4.3.5 Performance Step: 21 Initial/Date/Time GT RR-21B and GT RR-58 on SP010.
Standard: Initials have been made on GT RR-21B and GT RR-58.
Standard:           Initials have been made on GT RR-21B and GT RR-58.
Comment:   Evaluator's Cue:
Comment:
Initials have been made on GT RR-321B and GT RR-58  
Evaluators Cue:     Initials have been made on GT RR-321B and GT RR-58 2005 NRC JPM S8                                              NUREG 1021, Revision 9


Appendix C Page 10 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S8 NUREG 1021, Revision 9 Step 4.3.6 Performance Step: 22 Start CGT02 Containment Mini Purge Exhaust Fan using GT HIS-20.
Appendix C                           Page 10 of 17                     Form ES-C-1 PERFORMANCE INFORMATION Step 4.3.6 Performance Step: 22 Start CGT02 Containment Mini Purge Exhaust Fan using GT HIS-20.
Standard: Operator should select RUN on GT HIS-20, CTMT Mini Purge  
Standard:           Operator should select RUN on GT HIS-20, CTMT Mini Purge Exh Fan.
Comment:
Evaluators Cue:    GT HIS-20 RED lights illuminate and GREEN lights extinguish.
Step 4.3.7 Performance Step: 23 Open GTHZ0011 using GT HIS-11.
NOTE:                Steps 23 - 26 may be accomplished in any order.
Standard:            Operator should depress and hold the OPEN pushbutton for GT HIS-11.
Comment:
Evaluators Cue:    GT HIS-11 RED light illuminates and three (3) seconds later, the GREEN light extinguishes.
Step 4.3.7 Performance Step: 24 Open GTHZ0012 using GT HIS-12.
NOTE:                Steps 23 - 26 may be accomplished in any order.
Standard:            Operator should depress and hold the OPEN pushbutton for GT HIS-12.
Comment:
Evaluators Cue:    GT HIS-12 RED light illuminates and three (3) seconds later, the GREEN light extinguishes.
2005 NRC JPM S8                                              NUREG 1021, Revision 9


Exh Fan. Comment:  Evaluator's Cue: GT HIS-20 RED lights illuminate and GREEN lights extinguish.
Appendix C                          Page 11 of 17                      Form ES-C-1 PERFORMANCE INFORMATION Step 4.3.7 Performance Step: 25 Open GTHZ0028 using GT HIS-28.
Step 4.3.7 Performance Step: 23 Open GTHZ0011 using GT HIS-11.
NOTE:               Steps 23 - 26 may be accomplished in any order.
NOTE: Steps 23 - 26 may be accomplished in any order.
Standard:           Operator should depress and hold the OPEN pushbutton for GT HIS-28.
Standard: Operator should depress and hold the OPEN pushbutton for GT HIS-11.
Comment:
Comment:   Evaluator's Cue: GT HIS-11 RED light illuminates and three (3) seconds later, the GREEN light extinguishes.
Evaluators Cue:     GT HIS-28 RED light illuminates and three (3) seconds later, the GREEN light extinguishes.
Step 4.3.7 Performance Step: 24 Open GTHZ0012 using GT HIS-12.
Step 4.3.7 Performance Step: 26 Open GTHZ0029 using GT HIS-29.
NOTE: Steps 23 - 26 may be accomplished in any order.
NOTE:               Steps 23 - 26 may be accomplished in any order.
Standard: Operator should depress and hold the OPEN pushbutton for GT HIS-12.
Standard:           Operator should depress and hold the OPEN pushbutton for GT HIS-29.
Comment:   Evaluator's Cue: GT HIS-12 RED light illuminates and three (3) seconds later, the GREEN light extinguishes.  
Comment:
Evaluators Cue:     GT HIS-29 RED light illuminates and three (3) seconds later, the GREEN light extinguishes.
Step 4.3.8 Performance Step: 27 Record the date and time the CTMT Purge Exhaust and Mini Purge Exhaust Dampers are opened on the Gaseous Radwaste Release Permit.
Standard:            Operator should record the date and time the CTMT Purge Exhaust and Mini Purge Exhaust Dampers are opened on the Gaseous Radwaste Release Permit.
Comment:
Evaluators Cue:    The Gaseous Radwaste Release Permit has been updated.
2005 NRC JPM S8                                              NUREG 1021, Revision 9


Appendix C Page 11 of 17 Form ES-C-1  PERFORMANCE INFORMATION 2005 NRC JPM S8 NUREG 1021, Revision 9 Step 4.3.7  Performance Step: 25 Open GTHZ0028 using GT HIS-28.
Appendix C                           Page 12 of 17                       Form ES-C-1 PERFORMANCE INFORMATION Step 4.3.9 Performance Step: 28 Inform Count Room Technician when purge initiated.
NOTE: Steps 23 - 26 may be accomplished in any order.
Standard:           Operator should notify the Count Room Technician of the time the purge was initiated.
Standard: Operator should depress and hold the OPEN pushbutton for GT HIS-28.
Comment:
Comment:  Evaluator's Cue: GT HIS-28 RED light illuminates and three (3) seconds later, the GREEN light extinguishes.
Evaluators Cue:     Count Room Technician acknowledges.
Step 4.3.7  Performance Step: 26 Open GTHZ0029 using GT HIS-29.
Step 4.3.10 Performance Step: 29 When CTMT pressure is less than 10 WG, OPEN GTHZ0041 and GTHZ0042 using GT HIS-41.
NOTE: Steps 23 - 26 may be accomplished in any order.
Standard:           Operator should depress and hold the OPEN pushbutton on GT HIS-41 when CTMT pressure is less than 10 WG.
Standard: Operator should depress and hold the OPEN pushbutton for GT HIS-29.
Comment:
Comment:  Evaluator's Cue: GT HIS-29 RED light illuminates and three (3) seconds later, the GREEN light extinguishes.
Evaluators Cue:     CTMT pressure is less than 10 WG.
Step 4.3.8 Performance Step: 27 Record the date and time the CTMT Purge Exhaust and Mini Purge Exhaust Dampers are opened on the Gaseous Radwaste
 
Release Permit.
Standard: Operator should record the date and time the CTMT Purge Exhaust and Mini Purge Exhaust Dampers are opened on the
 
Gaseous Radwaste Release Permit.
Comment:  Evaluator's Cue: The Gaseous Radwaste Release Permit has been updated.
 
Appendix C Page 12 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S8 NUREG 1021, Revision 9 Step 4.3.9 Performance Step: 28 Inform Count Room Technician when purge initiated.
Standard:
Operator should notify the Count Room Technician of the time the purge was initiated.
Comment:   Evaluator's Cue: Count Room Technician acknowledges.
Step 4.3.10 Performance Step: 29 When CTMT pressure is less than 10" WG, OPEN GTHZ0041 and GTHZ0042 using GT HIS-41.
Standard: Operator should depress and hold the OPEN pushbutton on GT HIS-41 when CTMT pressure is less than 10" WG.
Comment:   Evaluator's Cue: CTMT pressure is less than 10" WG.
GT HIS-41 RED light illuminates and five (5) seconds later, the GREEN light extinguishes.
GT HIS-41 RED light illuminates and five (5) seconds later, the GREEN light extinguishes.
NOTE Prior to Step 4.3.11 Performance Step: 30 When there is NO planned CTMT entry (vent only), omit Steps 4.3.11, 4.3.12, and 4.3.12.1.
NOTE Prior to Step 4.3.11 Performance Step: 30 When there is NO planned CTMT entry (vent only), omit Steps 4.3.11, 4.3.12, and 4.3.12.1.
Standard: Operator should perform Steps 4.3.11, 4.3.12, and 4.3.12.1.
Standard:           Operator should perform Steps 4.3.11, 4.3.12, and 4.3.12.1.
Comment:   Evaluator's Cue: There is a planned CTMT entry.  
Comment:
Evaluators Cue:     There is a planned CTMT entry.
2005 NRC JPM S8                                              NUREG 1021, Revision 9


Appendix C Page 13 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S8 NUREG 1021, Revision 9 Step 4.3.11 Performance Step: 31 When CTMT pressure is less than 4.25" WG, OPEN GTHZ0026 using GT HIS-26.
Appendix C                           Page 13 of 17                       Form ES-C-1 PERFORMANCE INFORMATION Step 4.3.11 Performance Step: 31 When CTMT pressure is less than 4.25 WG, OPEN GTHZ0026 using GT HIS-26.
NOTE: Steps 31 and 32 may be performed in any order.
NOTE:               Steps 31 and 32 may be performed in any order.
Standard: Operator should depress and hold the OPEN pushbutton for GT HIS-26 when CTMT pressure is less than 4.25" WG.
Standard:           Operator should depress and hold the OPEN pushbutton for GT HIS-26 when CTMT pressure is less than 4.25 WG.
Comment:   Evaluator's Cue: CTMT pressure is now 2.5" WG.
Comment:
Evaluators Cue:     CTMT pressure is now 2.5 WG.
GT HIS-26 RED light illuminates and three (3) seconds later, the GREEN light extinguishes.
GT HIS-26 RED light illuminates and three (3) seconds later, the GREEN light extinguishes.
Step 4.3.11 Performance Step: 32 When CTMT pressure is less than 4.25" WG, OPEN GTHZ0027  
Step 4.3.11 Performance Step: 32 When CTMT pressure is less than 4.25 WG, OPEN GTHZ0027 using GT HIS-27.
 
NOTE:               Steps 31 and 32 may be performed in any order.
using GT HIS-27.
Standard:           Operator should depress and hold the OPEN pushbutton for GT HIS-27 when CTMT pressure is less than 4.25 WG.
NOTE: Steps 31 and 32 may be performed in any order.
Comment:
Standard: Operator should depress and hold the OPEN pushbutton for GT HIS-27 when CTMT pressure is less than 4.25" WG.
Evaluators Cue:     CTMT pressure is now 2.5 WG.
Comment:   Evaluator's Cue: CTMT pressure is now 2.5" WG.
GT HIS-27 RED light illuminates and three (3) seconds later, the GREEN light extinguishes.
GT HIS-27 RED light illuminates and three (3) seconds later, the GREEN light extinguishes.
Step 4.3.12 Performance Step: 33 Start SGT02, CTMT Mini Purge Air Supply Unit with GT HIS-23.
Step 4.3.12 Performance Step: 33 Start SGT02, CTMT Mini Purge Air Supply Unit with GT HIS-23.
Standard: Operator should select RUN on GT HIS-23.
Standard:           Operator should select RUN on GT HIS-23.
Comment:   Evaluator's Cue: GT HIS-23 RED light illuminates and the GREEN light extinguishes.  
Comment:
Evaluators Cue:     GT HIS-23 RED light illuminates and the GREEN light extinguishes.
2005 NRC JPM S8                                              NUREG 1021, Revision 9


Appendix C Page 14 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S8 NUREG 1021, Revision 9 Step 4.3.12.1 Performance Step: 34 OPEN GTHZ0005 using GT HIS-5.
Appendix C                             Page 14 of 17                   Form ES-C-1 PERFORMANCE INFORMATION Step 4.3.12.1 Performance Step: 34 OPEN GTHZ0005 using GT HIS-5.
NOTE: Steps 34 and 35 may be performed in any order.
NOTE:               Steps 34 and 35 may be performed in any order.
Standard: Operator should depress and hold the OPEN pushbutton for GT HIS-5.
Standard:           Operator should depress and hold the OPEN pushbutton for GT HIS-5.
Comment:   Evaluator's Cue: GT HIS-5 RED light illuminates and two (2) seconds later, the GREEN light extinguishes.
Comment:
4.3.12.1 Performance Step: 35 OPEN GTHZ0004 using GT HIS-4.
Evaluators Cue:     GT HIS-5 RED light illuminates and two (2) seconds later, the GREEN light extinguishes.
NOTE: Steps 34 and 35 may be performed in any order.
4.3.12.1 Performance Step: 35 OPEN GTHZ0004 using GT HIS-4.
Standard: Operator should depress and hold the OPEN pushbutton for GT HIS-4.
NOTE:               Steps 34 and 35 may be performed in any order.
Comment:   Evaluator's Cue: GT HIS-4 RED light illuminates and two (2) seconds later, the GREEN light extinguishes.
Standard:           Operator should depress and hold the OPEN pushbutton for GT HIS-4.
Comment:
Evaluators Cue:     GT HIS-4 RED light illuminates and two (2) seconds later, the GREEN light extinguishes.
Performance Step: 36 Inform the Control Room Supervisor that CTMT Mini Purge has been reinitiated.
Performance Step: 36 Inform the Control Room Supervisor that CTMT Mini Purge has been reinitiated.
Standard: Operator should inform the Control Room Supervisor that Mini Purge has been reinitiated.
Standard:           Operator should inform the Control Room Supervisor that Mini Purge has been reinitiated.
Comment:   Evaluator's Cue: Control Room Supervisor acknowledges.
Comment:
Terminating Cue: When Mini-Purge is reinitiated, this JPM is complete.  
Evaluators Cue:     Control Room Supervisor acknowledges.
Terminating Cue:       When Mini-Purge is reinitiated, this JPM is complete.
2005 NRC JPM S8                                              NUREG 1021, Revision 9


Appendix C Page 15 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC JPM S8 NUREG 1021, Revision 9 STOP TIME:
Appendix C           Page 15 of 17             Form ES-C-1 PERFORMANCE INFORMATION STOP TIME:
2005 NRC JPM S8                         NUREG 1021, Revision 9


Appendix C Page 16 of 17 Form ES-C-1 VERIFICATION OF COMPLETION 2005 NRC JPM S8 NUREG 1021, Revision 9 Job Performance Measure No.: 2005 NRC JPM S8 Examinee's Name:
Appendix C                           Page 16 of 17               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC JPM S8 Examinees Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 2,601: Line 3,459:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Appendix C Page 17 of 17 Form ES-C-1 JPM CUE SHEET 2005 NRC JPM S8 NUREG 1021, Revision 9 INITIAL CONDITIONS: Callaway Plant is in Mode 2. A containment mini purge was in progress to prepare for a containment entry. One hour ago, a CPIS/CRVIS occurred due to a spike on GTRE0022. Repairs have been made to GTRE0022 and it is now operable. Outside


air temperature is expected to remain > 50&deg;F.
===Response===
INITIATING CUE: The Control Room Supervisor has directed you to re-initiate the containment mini purge per OTN-GT-00001, Section 4.7. The Control Room Supervisor has decided to not realign the control building HVAC at this time. The SS ahs authorized reinitiating CTMT mini purge. Inform the Control room Supervisor when the
Result:                     SAT            UNSAT Examiners Signature:                                Date:
2005 NRC JPM S8                                          NUREG 1021, Revision 9


mini purge has been re-initiated.}}
Appendix C                        Page 17 of 17                      Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: Callaway Plant is in Mode 2. A containment mini purge was in progress to prepare for a containment entry. One hour ago, a CPIS/CRVIS occurred due to a spike on GTRE0022. Repairs have been made to GTRE0022 and it is now operable. Outside air temperature is expected to remain > 50&deg;F.
INITIATING CUE:    The Control Room Supervisor has directed you to re-initiate the containment mini purge per OTN-GT-00001, Section 4.7. The Control Room Supervisor has decided to not realign the control building HVAC at this time. The SS ahs authorized reinitiating CTMT mini purge. Inform the Control room Supervisor when the mini purge has been re-initiated.
2005 NRC JPM S8                                            NUREG 1021, Revision 9}}

Latest revision as of 05:10, 14 March 2020

CW-08-2005-Draft Operating Exam
ML061560131
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/10/2005
From:
NRC Region 4
To:
References
Download: ML061560131 (243)


Text

Appendix D Scenario Outline Form ES-D-1 Facility: Callaway Scenario No.: 1 Op Test No.: NRC Examiners: Operators:

Initial Conditions: 100% power, BOL.

RE-52, Blowdown Discharge Pumps Discharge Monitor, is OOS.

BB-PCV-455A PORV Leakage - Block Valve Closed.

Motor Driven AFW Pump A OOS.

Turnover: Reduce power to less than 90% to remove Condensate Pump A from service due to a seal leak Critical Task: Start EDG A to energize Emergency Bus prior to initiation of ECA 0.0 coping steps.

Manually Start A HHSI pump prior to exit from EOP Attachment 1.

Event No. Malf. No. Event Type* Event Description 1 R - RO Reduce power N - BOP, SRO 2 I - BOP, SG level transmitter failure.

FWM02A SRO TS - SRO 3 C - ALL 4KV Bus NB02 Normal Feeder Breaker trip.

EPS05B TS - SRO 4 I - RO, SRO Pressurizer Level Transmitter fails low PRS02A TS - SRO Pressurizer Level Control Valve fails closed and cannot be opened.

BAT 5 C - RO, RCS Leak requiring reactor trip.

RCS06C SRO 6 M - ALL Loss of off-site power, SBLOCA.

BAT 7 EPS06B C - BOP B DG Trips - A DG fails to AUTO Start. MANUAL Start required.

KJS012 8 C - RO A HHSI pump fails to AUTO Start - MANUAL Start required.

SBI008C

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Scenario Event Description NRC Scenario 1 The crew will assume the shift at 100% power with instructions to reduce power due to a Condensate Pump seal leak.

At approximately 95% power, a Steam Generator Level transmitter will drift low, requiring the crew to take manual control of the feedwater regulating valve for the affected steam generator in accordance with OTO-AE-3. The SRO will also refer to Technical Specifications for the appropriate action requirements.

When technical specifications have been addressed, 4KV Vital Bus NB02 normal feeder breaker will trip. B EDG will automatically start and energize bus NB02. The crew will respond in accordance with alarm response procedures and OTO-SA-1 to stop AFW flow and secure unnecessary equipment started by the Shutdown Sequencer. The SRO will refer to technical specifications.

When the plant is stable, a Pressurizer Level Transmitter will fail low, causing Letdown isolation.

When the crew attempts to restore letdown, one letdown control valve will fail closed, requiring the crew to reduce charging and place Excess Letdown in service in accordance with OTO-BG-1 and OTN-BG-1. The SRO will address Technical Specifications.

An RCS leak will develop when Excess Letdown is placed in service, requiring the crew to determine that the reactor must be tripped.

When the reactor is tripped, a loss of off-site power will occur. The RCS leak will progress to a SBLOCA.

Diesel Generator B trips and cannot be started. Diesel Generator A fails to automatically start, and must be manually started and aligned in accordance with E-0 or ECA-0.0. HHSI pump A fails to automatically start, and must be manually started.

The scenario may be terminated upon entry to ES-1.2, Post LOCA Cooldown and Depressurization.

EOP flow path: E-0, ECA-0.0, E-0, E-1, ES-1.2 Scenario 1 Scenario Malfunction List

1) Initialize at IC-20.
2) Run Batch File "iltone.txt", and verify the actions on the following page are loaded correctly.
3) Ensure Immediate Boration Timer is reset.
4) Check RX trip switch has a RED flag.
5) Ensure NIS indicates 100%
6) Ensure step counters for Control Bank D are set at 215 steps and all other step counters are set for 228.
7) Ensure the digital display is selected to REP0480A and RET0499A.
8) Hang hold off tags on the "A" MDAFP.
9) Ensure AE-LT-519 is selected
10) Ensure BB-LT-459 is selected
11) Ensure Decrease Loading Rate Button is ON.
12) Update status board for B Protected Train week. Record "A" MDAFP, LCO 3.7.5, 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
13) Place Letdown orifi A and B in service with a caution tag on C
14) White board has the following boron concentrations:
  • "A" MDAFP T/S 3.7.5, Action C.1. 72 Hours. OOS @ 0500 Today
  • 'A' CCP "5 days ago" 1107 ppm
  • 'B' CCP "two weeks ago" 1135 ppm
15) Supply turnover and log sheets, Xe Predict, Dilution/Boration calculation and OTG-ZZ-00004.
16) Ensure the RM-11 is on the training system.
17) Microphones available for each person being evaluated and a video tape is in the VCR.
18) Ensure chart recorders are "rolled forward".
19) Ensure copies of the following procedures are in the file drawers:
  • OTO-AE-00003
  • OTO-NB-00002
  • OTO-SA-00001
  • OTO-BG-00001
  • ECA-0.0
  • E-0
  • E-1 E-2 Scenario 1 Scenario Malfunction List File: iltone.TXT

>Author: S. P. Aufdemberge

>Date: 20050504

>=============SCENARIO SETUP ITEMS===========================================

>TAGOUT "A" MDAFW PUMP

> FILE: AL01A.TXT

> Red lights stay on the ESFAS Panel bat al01a.txt

>Simulates de-energization of "A" PORV Block valve due to PORV Leakage ior bbhis8000a_ic (-1 0) 0 irf bbs014 (-1 0) 0

>============================================================================

>========================EVENT PRELOAD=======================================

>EVENT A

>'A' S/G lev xmttr fails to 0 psig over 60 sec from trigger #1 (MANUAL) imf fwm02a (1) 0 60

>============================================================================

>========================EVENT PRELOAD=======================================

>EVENT B

>Loss of NB02 normal feeder breaker, from trigger #2 (MANUAL) imf eps05b (2)

>============================================================================

>========================EVENT PRELOAD=======================================

>EVENT C

>Pressurizer Level Transmitter Fails Low, from trigger #3 (MANUAL) imf prs02a (3) 0 60

> Set Event 4 to automatically close and hold closed BGLCV0459 after 459 initially fails closed.

trgset 4 "x01o150g.eq.true" ior bghis459_og (4) 0 ior bghis459_or (4) 1 ior bghis459_ic (4) 0

>============================================================================

>========================EVENT PRELOAD=======================================

>EVENT D

>RCS leak requiring Reactor trip,Grows to 600gpm over 10 minutes from Manual Trigger #5 imf rcs06c (5) 600 600

>============================================================================

>========================EVENT PRELOAD=======================================

>EVENT E

>Loss of Off-Site Power, from Manual trigger #6

> Incoming Lines imf eps03a (6 0) imf eps03b (6 3) imf eps03c (6 20) imf eps03g (6 5)

>Incoming Line lights irf msb006 (6 0) 0 irf msb007 (6 5) 0 irf msb008 (6 3) 0

>============================================================================

>========================EVENT PRELOAD=======================================

>EVENT F

>"B" EDG trips and "A" EDG will fail to automatically start. "B" EDG fails on the loss of off-site power imf eps06b (7)

>Loss of off-site power "sensed" by green light on RCP control switch trgset 7 "x21o115g.eq.0"

>Disable Automatic start of "A" EDG irf kjs012 (-1 0) 1

>============================================================================

>=======================EVENT PRELOAD========================================

>EVENT G

> "A" CCP fails to auto start, manual will be successful irf sbi008c (-1 0) 1

>end of file Scenario 1 Crew Turnover Separate Turnover sheets provided Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 1 Page 6 of 38 Event

Description:

Reduce Power Time Position Applicants Actions or Behavior SRO Refer to OTO-MA-00008, Rapid Load Reduction CREW Determine amount of boric acid to reduce reactor power to 90%

CREW Record rate of turbine load change Discuss amount and rate of turbine load change and boric acid SRO addition with crew SRO Notify Load Dispatcher SRO Notify Chemistry, Health Physics, and Radwaste Initiate boron equalization

  • Energize at least 1 group of backup heaters RO
  • Place the PZR Master Controller in MAN
  • Lower PZR Master Controller output to 38% to 42%
  • Place the PZR Master Controller in AUTO

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 1 Page 7 of 38 Event

Description:

Reduce Power Time Position Applicants Actions or Behavior Borate from the BAST using any of the following:

  • Emergency Boration o Start at least 1 Boric Acid Transfer Pump o Open Emergency Boration to Charging Pump suction BG HIS-8104 o Check Emergency Borate flow is greater than 30 GPM on BG FI-183A
  • Borate to the VCT RO o Place RCS Makeup Control to STOP (BG HS-26) o Place RCS Makeup Control Selector to BORATE (BG HS-25) o Reset Boric Acid counter to 000 (BG FY-110B) o Set BG FY-110B for the desired galloons of boric acid to be added o Place BG HS-26 in RUN RO Place Rod Control in AUTO Reduce turbine load at less than or equal to 5% per minute using any of the following:

o Reduce turbine load using the Load Limit potentiometer o Reduce turbine load using the %/min loading rate o Rotate Load Limit Set potentiometer clockwise until both of the following are met:

BOP Load Limit light extinguished At Set Load - LIT o Set Loading Rate Limit %/min to desired value o Select Decrease Loading Rate - ON o Lower load set MW toward desired load using DECREASE LOAD pushbutton

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 1 Page 8 of 38 Event

Description:

Reduce Power Time Position Applicants Actions or Behavior BOP Check MFP Turbine Speed control in AUTO When power has been reduced approximately 5%, or at Lead Evaluators discretion, proceed to Event 2

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 2 Page 9 of 38 Event

Description:

SG Level Transmitter Failure Time Position Applicants Actions or Behavior Booth Operator Instructions:

When directed, insert command for SG Level Transmitter failure Indications available:

REACTOR PARTIAL TRIP, annunciator 83C SG A LEV DEV, annunciator 108C SG A LEV LO, Annunciator 108B SRO Refer to OTO-AE-00002 for level malfunction IDENTIFY failed channel by comparing steam generator level BOP indicators.

BOP SELECT alternate level channel.

STABILIZE steam generator level at its programmed level BOP (50%).

WHEN steam generator level is returned to programmed level BOP and IF placed in MANUAL during the transient, PLACE feedwater regulating valve to automatic control.

Refer to T/S LCO 3.3.1 TAB 3.3.1-1 Item 14 and T/S LCO 3.3.2 TAB 3.3.2-1 Item 5 and 6 and ENSURE compliance with SRO requirement for minimum operable channels and action statements.

o TS 3.3.1 and 3.3.2 apply (72 Hour Action)

Refer to T/S LCO 3.3.4 and T/S LCO 3.3.3 and ENSURE SRO compliance.

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 2 Page 10 of 38 Event

Description:

SG Level Transmitter Failure Time Position Applicants Actions or Behavior Immediately CONTACT I&C to troubleshoot problem and SRO PERFORM requirements of appropriate Attachment, as listed in Table 1, for failed S/G level channel within SIX HOURS.

Refer to T/S LCO 3.3.4 and T/S LCO 3.3.3 and ENSURE SRO compliance.

Immediately CONTACT I&C to troubleshoot problem and SRO PERFORM requirements of appropriate Attachment, as listed in Table 1, for failed S/G level channel within SIX HOURS.

When Tech Specs have been identified, proceed to Event 3.

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 3 Page 11 of 38 Event

Description:

4KV Bus NB02 Normal Feeder Breaker Trip Time Position Applicants Actions or Behavior Booth Operator Instructions:

When directed, insert command for Bus NB02 breaker trip Indications available:

DG B starts and supplies NB02 SHUTDOWN SEQUENCER ACTUATED TRAIN B Annunciator 21C DIESEL GENERATOR NE02 TROUBLE Annunciator 23D NB01 BREAKER NOT OPERABLE Annunciator 18F SRO Refer to OTO-NB-00002, Loss of Power to NB02 Ensure NB02 normal and alternate feeder breakers are open RO o NB0209 o NB0212 Go to OTA-RL-RK021, Attachment C, and verify automatic RO LSELS actuations o Ensure equipment is in normal alignment Continue in OTO-NB02 to verify DG operation and LSELS SRO actuation.

If discharge flow of TDAFP is not required to maintain SG level, and at SRO discretion, refer to OTN-AL-00001 and throttle or BOP close TDAFP discharge valves to minimize thermal stresses and primary plant cooldown Refer to Attachment 2 for guidance concerning possible Tech SRO Spec action statements o TS 3.8.1 applies CREW Perform OSP-NE-00003

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 3 Page 12 of 38 Event

Description:

4KV Bus NB02 Normal Feeder Breaker Trip Time Position Applicants Actions or Behavior Ensure PN08 has transferred to emergency source by MVB RO/BOP annunciator 14F being lit Check pressurizer pressure is being maintained by available RO pressurizer heaters RO/BOP Ensure A or C Service Air Compressor is running Ensure A SFP Cooling Pump is in service in accordance with RO/BOP OTN-EC-00001 Ensure DC Busses NK04, NK02, PK02, PK04 are being RO/BOP supplied by their associated batteries Monitor battery load and contact system engineer to determine SRO expected battery life If desired, cross-tie PK02 and PK04 to functional battery SRO chargers in accordance with OTN-PK-00001 If Swing Charger (NK26) is available, refer to OTN-NK-00001 SRO and, as required, charge batteries NK12 and NK14 RO/BOP Ensure A Control Room Air Conditioner is running Ensure A Class 1E Air Conditioner is running and take action SRO in accordance with FSAR 16.7.13.1 for the inoperable B Class 1E Air Conditioner Verify the following ESFAS actuations in accordance with OTO-RO/BOP SA-00001 o SG Blowdown Isolation signal

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 3 Page 13 of 38 Event

Description:

4KV Bus NB02 Normal Feeder Breaker Trip Time Position Applicants Actions or Behavior o Turbine Driver Auxiliary Feed Actuation signal o NB02 Blackout Load Shed When TDAFP and MDAFP flow is throttled, plant is stable, and Tech Specs have been addressed, proceed to Event 4

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 4 Page 14 of 38 Event

Description:

PZR Level Transmitter fails low. PZR LCV fails closed Time Position Applicants Actions or Behavior Booth Operator Instructions:

When directed, insert command for Pressurizer Level transmitter and LCV failure Indications available:

PRESSURIZER LOW LEVEL DEVIATION Annunciator 32C LETDOWN HEAT EXCHANGER DISCHARGE FLOW HIGH LOW Annunciator 39E Letdown isolates CREW Identify the cause of the loss of letdown.

CREW Determine that PZR LVL INST FAILURE occurred. (LT-459)

Isolate letdown by closing all orifice isolation valves. (Letdown RO is already isolated)

Reduce charging flow to minimum required for RCP seal RO injection as follows:

If the CCP is in service, SLOWLY CLOSE BH HC-182 while RO reducing charging flow using BG FK-121. Maintain approximately 8 GPM to each RCP seal.

RO ENSURE BG-HC-182 is FULL CLOSED.

Verify Reactor Makeup Control System set in automatic for the RO correct boron concentrations and is maintaining VCT level.

RO STABILIZE pressure level as follows:

Restore normal letdown per OTO-BG-00001 (Letdown CREW CANNOT be restored).

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 4 Page 15 of 38 Event

Description:

PZR Level Transmitter fails low. PZR LCV fails closed Time Position Applicants Actions or Behavior PLACE excess letdown in service per OTN-BG-00001, CREW Chemical and Volume Control System.

SRO INFORM HP that Excess Letdown is being placed in service.

INFORM Chemistry that Excess Letdown is being placed in SRO service.

NOTIFY Radwaste that Excess Letdown is being directed to SRO the RCDT for approximately 2 minute to flush the piping.

VERIFY that the Excess Letdown Heat Exchanger is supplied RO with CCW by verifying flow on EG FI-128 or EG FI-129 on RL020.

ENSURE BG HC-123, the Excess Letdown HX Outlet Flow RO Hand Switch, is in the CLOSED position.

PERFORM the following to equalize boron concentration in the RO Excess Letdown header and the RCS.

RO PLACE control switch BG HIS-8143, in the RCDT position.

OPEN either set of Reactor Coolant to Excess Letdown HX RO Valves with the applicable control switches:

TRAIN HANDSWITCH A BG HIS-8153A and BG HIS-8154A B BG HIS-8153B and BG HIS-8154B NOTE: Excess Letdown temperature indicated on BG TI-122 should remain less than 175°F.

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 4 Page 16 of 38 Event

Description:

PZR Level Transmitter fails low. PZR LCV fails closed Time Position Applicants Actions or Behavior SLOWLY TURN BG HC-123, Ex Ltdn Hx Out Flow Hand Ctrl, RO to the OPEN position to establish excess letdown flow.

ENSURE Excess Letdown HX Outlet temperature using RO BG TI-122 on panel RL002 does not exceed 175°F.

NOTE: Excess letdown and RCP seal water leak-off share a common line. This change in back pressure may cause a variation in RCP seal water leak-off flow.

VERIFY RCP seal water leak-off flow is 1 - 5 GPM with normal RCS operating pressure as indicated on BG FR-154 through BG FR-157 on panel RL022. If RCS pressure is other than RO 2235 +/- 15 psig, refer to OTN-BB-00003, Reactor Coolant Pumps, Attachment 1 page 4 of 4, for acceptable RCP seal water leak-off flow rates.

After approximately 2 minute, direct Excess Letdown flow to the RO VCT, as follows.

SLOWLY TURN BG HC-123 to the CLOSED position to secure RO excess letdown flow.

ENSURE BG HC-123 in the CLOSED position, and SELECT RO BGHV8143 to the VCT position using BG HIS-8143.

ENSURE OPEN either set of Reactor Coolant to Excess RO Letdown HX Valves with the applicable control switches:

TRAIN HANDSWITCH A BG HIS-8153A and BG HIS-8154A B BG HIS-8153B and BG HIS-8154B RO SLOWLY TURN BG HC-123 to the OPEN position to re-

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 4 Page 17 of 38 Event

Description:

PZR Level Transmitter fails low. PZR LCV fails closed Time Position Applicants Actions or Behavior establish Excess Letdown flow.

NOTIFY Radwaste that Excess Letdown flow is directed to the SRO VCT.

ENSURE Excess letdown HX Outlet temperature using BG TI-RO 122 on panel RL002 does not exceed 175°F.

VERIFY RCP seal water leak-off flow is 1 - 5 GPM with normal RCS operating pressure as indicated BG FR-154 through BG FR-157 on panel RL022. If RCS pressure is other than 2235 +/-

RO 15 psig, refer to OTN-BB-00003, Reactor Coolant Pumps, Attachment 1 page 4 of 4, for acceptable RCP seal water leak-off flow rates.

Directs to UNLOCK and OPEN BG8482, CVCS VCT Seal Wtr SRO In Iso, and LOG in Locked Component Deviation List of ODP-ZZ-00004, Locked Component Control.

Directs to UNLOCK and CLOSE BG8484, CVCS Seal Wtr Hx SRO Out Dnstrm Isok, and LOG in Locked Component Deviation List of ODP-ZZ-00004, Locked Component Control.

NOTIFY HP that Excess Letdown is in service. Identify the SRO flowpath for Excess Letdown so that HP can monitor rooms and components in the flowpath for increased radiation levels.

When Excess Letdown is in service, proceed to Event 5

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 18 of 38 Event

Description:

Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicants Actions or Behavior Booth Operator Instructions:

When directed, insert commands for remaining events as sequenced Indications available:

PROCESS RADIATION HIGH Annunciator 61B Rising trend on Iodine and Particulate Channels 31, 32 DETERMINE the approximate size of the leak. Should CREW determine greater than 50 GPM leak NOTE: The plant computer group tabular time trend GT-SG17 can be used to approximate the leak size.

USE trends of VCT level (20% GAL/%) and/or PZR level RO (60 GAL/%).

NOTE: Only one charging pump should be in operation until PZR level is increased for the plant cooldown.

COMPARE Charging and Letdown flow rates. Crew should RO determine that PZR level CANNOT be maintained.

SRO Direct Reactor Trip RO CHECK Reactor Trip:

  • Rod Bottom Lights - ALL LIT
  • Neutron Flux - LOWERING BOP CHECK Turbine Trip:

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 19 of 38 Event

Description:

Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicants Actions or Behavior All turbine Stop valves - CLOSED.

CREW CHECK Power to AC Emergency Buses:

AC emergency buses - AT LEAST ONE ENERGIZED

  • NB01(NO)

OR

  • NB02(NO)

SRO DIRECTS Go to ECA-0.0, Loss of All AC Power, Step 1.

RO CHECK Reactor Trip:

  • Neutron Flux - LOWERING BOP CHECK Turbine Trip:

All Turbine Stop valves - CLOSED.

RO CHECK if RCS is Isolated:

a. PZR PORVs - CLOSED
  • BB HIS-455A
  • BB HIS-456A
b. Letdown Isolation Valves - CLOSED
1. Letdown Orifice Isolation valves:
  • BG HIS-8149AA

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 20 of 38 Event

Description:

Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicants Actions or Behavior

  • BG HIS8149BA
  • BG HIS-8149CA
2. RCS Letdown to Regen HX valves:
  • BG HIS-459
  • BG HIS-460
c. RCS to Excess Letdown HX valves - CLOSED
  • BG HIS-8153A
  • BG HIS-8154A
  • BG HIS-8153B
  • BG HIS-8154B CLOSE valve(s) as necessary.
d. Reactor Head Vent Valves - CLOSED
  • BB HIS-8001A
  • BB HIS-9002A
  • BB HIS-8001B
  • BB HIS-8002B BOP CHECK AFW Flow - GREATER THAN 300,000 LBM/HR CREW TRY to Restore Power to Any AC Emergency Bus:
a. ENERGIZE AC emergency bus with diesel generator:

CRITICAL TASK 1. START DG(s):

  • KJ HS-8A - DG - A

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 21 of 38 Event

Description:

Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicants Actions or Behavior

2. CHECK AC emergency buses - AT LEAST ONE ENERGIZED
  • NB01 - ENERGIZED OR
  • NB02 - NOT ENERGIZED
b. CHECK AC emergency buses - AT LEAST ONE CREW ENERGIZED
  • NB01 - YES
c. CHECK ESW Pump associated with energized AC BOP emergency bus(es) - RUNNING
  • EF HIS-55A (NB01) - YES
d. Return to procedure and step in effect and IMPLEMENT Functional Restoration Procedures as necessary.
  • Crew will review CSF Status Trees. None currently required for implementation SRO DIRECTS return to E-0.

RO CHECK SI Status:

a. CHECK is SI is actuated:
  • SB069 SI Actuate RED light - LIT OR

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 22 of 38 Event

Description:

Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicants Actions or Behavior

b. CHECK both Trains of SI - ACTUATED
  • SB069 SI Actuate RED light - LIT SOLID (NOT blinking)

PERFORM Attachment A, Automatic Action Verification, while BOP continuing with this procedure.

RO CHECK Generator Output Breakers - OPEN

  • MA ZL-3A (V55)
  • MA ZL-4A (V53)

RO CHECK Feedwater Isolation:

a. Main Feedwater Pumps - TRIPPED
b. Main Feedwater Reg Valves - CLOSED
  • AE ZL-510 (SG A)
  • AE ZL-520 (SG B)
  • AE ZL-530 (SG C)
  • AE ZL-540 (SG D)
c. Main Feedwater Reg Bypass Valves - CLOSED
  • AE ZL-550 (SG A)
  • AE ZL-560 (SG B)
  • AE ZL-570 (SG C)
  • AE ZL-580 (SG D)

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 23 of 38 Event

Description:

Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicants Actions or Behavior

d. Feedwater Isolation Valves - CLOSED
  • AE HIS-39 (SG A)
  • AE HIS-40 (SG B)
  • AE HIS-41 (SG C)
  • AE HIS-42 (SG D)

RO CHECK AFW Pumps:

a. MD AFW Pumps - BOTH RUNNING
  • AL HIS-23A
  • AL HIS-22A
b. TD AFW Pump - RUNNING IF NECESSARY RO CHECK AFW Valves - PROPER EMERGENCY ALIGNMENT
  • MD AFP Flow Control Valves - THROTTLED
  • AL-HK-5A
  • TD AFP Flow Control Valves - FULL OPEN
  • AL HK-6A RO CHECK Total AFW Flow - GREATER THAN 300,000 LBM/HR

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 24 of 38 Event

Description:

Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicants Actions or Behavior RO CHECK PZR PORVs and Spray Valves:

a. PZR PORVs - CLOSED
  • BB HIS-455A
  • BB HIS-456A
b. PZR PORVs - BOTH IN AUTO
  • BB HIS-455A
  • BB HIS-456A
c. PORV Block Valves - BOTH OPEN
  • BB HIS-8000A
  • BB HIS-8000B
d. Normal PZR Spray Valves - CLOSED
  • BB ZL-455B
  • BB ZL-455C RO CHECK If RCPs Should Be Stopped:
a. RCPs - ANY RUNNING (NO)

SRO Go to Step 13.

RO CHECK RCS Temperatures:

  • NO RCPs running - RCS COLD LEG TEMPERATURES STABLE AT 557°F OR TRENDING TO 557°F CREW CHECK If any SG Is Faulted:

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 25 of 38 Event

Description:

Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicants Actions or Behavior

a. CHECK pressures in all SGs:
  • ANY SG PRESSURE LOWERING IN AN UNCONTROLLED MANNER OR
  • ANY SG COMPLETELY DEPRESSURIZED SRO Go to Step 15.

CREW CHECK If SG Tubes Are Intact:

  • Levels in all SGs:
  • NO SG NARROW RANGE LEVEL RISING IN AN UNCONTROLLED MANNER
  • SG Steamline N16 radiation - NORMAL
  • N16 161 (SG A)
  • N16 162 (SG B)
  • N16 163 (SG C)
  • N16 164 (SG D)
  • Condenser Air Removal radiation - NORMAL BEFORE ISOLATION
  • GEG 925
  • SG Blowdown and Sample radiation - NORMAL BEFORE ISOLATION
  • BML 256
  • SJL 026
  • SG ASD radiation - NORMAL

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 26 of 38 Event

Description:

Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicants Actions or Behavior

  • Containment Pressure - NORMAL (NO)
  • GN PI-934
  • GN PI-935
  • GN PI-936
  • GN PI-937
  • GN PR-934
  • Containment Normal Sump Level - NORMAL
  • EJ LI-8
  • EJ LI-7
  • EJ LR-6
  • Containment Normal sump Level - NORMAL
  • LF LI-9
  • LF LI-10
  • Containment Radiation - NORMAL BEFORE ISOLATION
  • GTG 313

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 27 of 38 Event

Description:

Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicants Actions or Behavior

  • GTG 323
  • GTA 591
  • GTA 601 SRO Go To E-1, Loss of Reactor or Secondary Coolant, Step 1.

NOTE: Seal injection flow should be maintained to all RCPs.

CHECK If RCPs Should Be Stopped:

Loss of Power, already - TRIPPED BOP CHECK If Any SG Is Faulted:

CHECK pressures in all SGs:

  • ANY SG PRESSURE LOWERING IN AN UNCONTROLLED MANNER OR
  • ANY SG COMPLETELY DEPRESSURIZED (NO)

Go to Step 3.

BOP CHECK Intact SG Levels:

a. Narrow range levels - GREATER THAN 7% [25%]
b. CONTROL feed flow to maintain narrow range levels between 7% [25%] and 50%

BOP CHECK Secondary Radiation - NORMAL

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 28 of 38 Event

Description:

Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicants Actions or Behavior

a. PERFORM the following:
  • PERFORM EOP Addendum 11, Restoring SG Sampling After SI Actuation
  • DIRECT Chemistry to periodically sample all SGs for activity.
  • DIRECT Health Physics to survey steamlines in Auxiliary Building Area 5 as necessary
b. CHECK unisolated secondary radiation monitors:
  • SG Sample radiation:
  • SJL 026
c. Secondary radiation - NORMAL RO CHECK PZR PORVs and Block Valves:
a. Power to Block Valves - AVAILABLE
  • BB HIS-8000A (NO)
  • BB HIS-8000B
b. PZR PORVs - CLOSED
  • BB HIS-455A

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 29 of 38 Event

Description:

Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicants Actions or Behavior

  • BB HIS-456A
c. Block Valves - BOTH OPEN
  • BB HIS-8000A (NO)
  • BB HIS-8000B Crew CHECK If ECCS Flow Should Be Reduced:
a. RCS subcooling - GREATER THAN 30°F
b. Secondary heat sink:
  • Narrow range level in at least one intact SGT -

GREATER THAN 7% [25%]

OR

  • Total feed flow to intact SGs - GREATER THAN 300,00 LBM/HR
c. RCS pressure - STABLE OR RISING
d. PZR level - GREATER THAN 9% [29%] (NO)

RO CHECK If Containment Spray should Be Stopped:

a. Spray Pumps - ANY RUNNING SRO Go to Step 8. OBSERVE CAUTIONS prior to Step 8.

CAUTION: If RCS pressure lowers in an uncontrolled manner to less than 325 PSIG, the RHR pumps must be manually restarted to supply water to the RCS.

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 30 of 38 Event

Description:

Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicants Actions or Behavior RO CHECK If RHR Pumps Should Be Stopped:

a. CHECK RCS pressure:
1. Pressure - GREATER THAN 325 PSIG
2. Pressure - STABLE OR RISING
b. RHR Pumps - ANY RUNNING WITH SUCTION ALIGNED TO RWST
c. RESET SI if necessary:
d. STOP RHR Pumps and PLACE in standby:
  • EJ HIS-1
  • EJ HIS-2
e. MONITOR RCS pressure CREW CHECK SG and RCS Pressures:
  • CHECK pressure in all SGs - STABLE OR RISING
  • CHECK RCS pressure - STABLE OR LOWERING CREW CHECK If Diesel Generators Should Be Stopped:
a. AC emergency buses - ENERGIZED BY OFFSITE POWER
  • NB01 (NO)

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 31 of 38 Event

Description:

Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicants Actions or Behavior

  • NB02 (NO)

TRY to restore offsite power to AC emergency buses using EOP Addendum 7, Restoring Offsite Power.

b. RESET SI if necessary:
c. LOAD equipment on AC emergency bus(es) as necessary using EOP Addendum 8, Loading Equipment on AC emergency Buses.

CREW INITIATE Evaluation of Plant Status:

a. CHECK cold leg recirculation capability:
  • Train A - AVAILABLE
  • RHR Pump A (EJ HIS-1)
  • CCW Pump A (EG HIS-21) or CCW Pump C (EG HIS-23)
  • RWST To RHR Pump A Suction (BN HIS-8812A)
  • Containment Recirc Sump to RHR Pump A Suction (EJ HIS-8811A)
  • Train B - AVAILABLE
  • RHR Pump B (EJ HIS-2)
  • CCW Pump B (EG HIS-22) or CCW Pump D (EG HIS-24)
  • RWST To RHR Pump B Suction (BN HIS-8812B)

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 32 of 38 Event

Description:

Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicants Actions or Behavior

b. CHECK Auxiliary Building radiation - NORMAL
  • Aux Building Process Radiation monitor:
  • GLP 604
  • Aux Building Area Radiation monitors TRY to identify and isolate leakage:
  • DIRECT Health Physics and Chemistry to assist in the evaluation as necessary.

IF the cause is a loss of RCS inventory outside containment, THEN Go To ECA-1.2, LOCA Outside Containment, Step 1.

c. OBTAIN samples:
1. DIRECT Chemistry to initiate post accident sampling:
  • Containment atmosphere
2. PLACE Hydrogen Analyzers in Service using EOP Addendum 16, Placing Hydrogen Analyzers In Service.
3. CONSULT Plant Engineering Staff for assessing additional sampling requirements for fuel damage.
d. EVALUATE plant equipment for long term recovery as necessary:
  • Radwaste systems
  • Radiation monitoring
  • Operating safeguards equipment:

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 1 Event # 6, 7, & 8 Page 33 of 38 Event

Description:

Loss of Off-Site Power - SBLOCA - DG Trip - HHSI Pump Failure Time Position Applicants Actions or Behavior

  • Containment Cooler Fans
  • Control Room ventilation
  • Auxiliary Building ventilation
  • Fuel Building ventilation
e. START additional plant equipment to assist in recovery as directed by SS/CRS CREW CHECK If RCS Cooldown And Depressurization Is Required
a. RCS pressure - GREATER THAN 325 PSIG
b. Go to ES-1.2, Post LOCA Cooldown And Depressurization, Step 1 Scenario may be terminated on transition to ES-1.2

ATTACHMENT A Automatic Action Verification BOP CHECK Charging Pumps:

CRITICAL TASK BOP a. CCPs - BOTH RUNNING

  • BG HIS-1A (Must manually start HHSI Pump A)
  • BG HIS-2A BOP b. STOP NCP:
  • SI Pumps - BOTH RUNNING (NO)
  • RHR Pumps - BOTH RUNNING
  • EJ HIS-1

BOP a. CCPs to Boron Inj Header - FLOW INDICATED

  • EM FI-917A
  • EM FI-917B BOP b. RCS pressure - LESS THAN 1700 PSIG BOP c. SI Pump Discharge - FLOW INDICATED

ATTACHMENT A Automatic Action Verification BOP e. RHR To Accumulator Injection Loop - FLOW INDICATED

  • EJ FI-618
  • EJ FI-619 CAUTION: If offsite power is lost after SI reset, manual action may be required to restart safeguards equipment.

BOP CHECK ESW Pumps - BOTH RUNNING

  • EF HIS-55A
  • EF HIS-56A BOP CHECK CCW Alignment:

BOP a. CCW Pumps - ONE RUNNING IN EACH TRAIN

  • Red Train:
  • EG HIS-21 or EG HIS-23
  • Yellow Train
  • EG HIS-22 or EG HIS-24
b. CCW Service Loop Supply and Return valves for one BOP operating CCW pump - OPEN
  • EG ZL-15 AND EG ZL-53 OR
  • EG ZL-16 AND EG ZL-54 CHECK Containment Cooler Fans - RUNNING IN SLOW BOP SPEED
  • GN HIS-9
  • GN HIS-17
  • GN HIS-5
  • GN HIS-13 CHECK Containment Hydrogen Mixing Fans - RUNNING IN BOP SLOW SPEED

ATTACHMENT A Automatic Action Verification

  • GN HIS-2
  • GN HIS-4
  • GN HIS-1

BOP a. CHECK the following:

  • Containment pressure - GREATER THAN 27 PSIG OR
  • GN PR-934 indicates containment pressure - HAS BEEN GREATER THAN 27 PSIG OR
  • EN HIS-3
  • SA066X WHITE lights - ALL LIT
  • SA066Y WHITE lights - ALL LIT BOP d. ESFAS status panels CISB sections:
  • SA066X WHITE lights - ALL LIT
  • SA066Y WHITE lights - ALL LIT BOP CHECK If Main Steamlines Should Be Isolated:

BOP a. CHECK for any of the following:

  • Containment pressure - GREATER THAN 17 PSIG

ATTACHMENT A Automatic Action Verification OR

  • GN PR-934 indicates containment pressure - HAS BEEN GREATER THAN 17 PSIG OR
  • Steamline pressure - LESS THAN 615 PSIG OR
  • AB PR-514 or PR-535 indicates steamline pressure -

HAS BEEN LESS THAN 615 PSIG BOP b. CHECK MSIVs and Bypass valves - CLOSED BOP CHECK ECCS Valves - PROPER EMERGENCY ALIGNMENT BOP a. ESFAS status panels SIS sections:

  • SA066X WHITE lights - ALL LIT
  • SA066Y WHITE lights - ALL LIT BOP CHECK Containment Isolation Phase A:

BOP a. ESFAS status panels CISA sections:

  • SA066X WHITE lights - ALL LIT
  • SA066Y WHITE lights - ALL LIT BOP CHECK SG Blowdown Isolation:

BOP ESFAS status panels SGBSIS sections:

  • SA066X WHITE lights - ALL LIT
  • SA066Y WHITE lights - ALL LIT CAUTION: If offsite power is lost after SI reset, manual action may be required to restart safeguards equipment.

BOP CHECK Both Trains of control Room Ventilation Isolation:

ATTACHMENT A Automatic Action Verification BOP a. ESFAS status panels CRVIS sections:

  • SA066X WHITE lights - ALL LIT
  • SA066Y WHITE lights - ALL LIT BOP CHECK Containment Purge Isolation:

BOP a. ESFAS status panels CPIS sections:

  • SA066X WHITE lights - ALL LIT
  • SA066Y WHITE lights - ALL LIT BOP Notify CRS of the following:
  • Manual actions taken
  • Failed Equipment
  • Attachment A, Automatic Action Verification, completed

Appendix D Scenario Outline Form ES-D-1 Facility: Callaway Scenario No.: 2 Op Test No.: NRC Examiners: Operators:

Initial Conditions: 50% power, BOL.

RE-52, Blowdown Discharge Pumps Discharge Monitor, is OOS.

BB-PCV-455A PORV Leakage - Block Valve Closed.

Motor Driven AFW Pump A OOS.

Turnover: Maintain stable plant conditions Critical Task: Insert negative reactivity by inserting control rods or initiating emergency boration prior to the end of step 4 of FR-S.1.

Isolate AFW to faulted SG prior to occurrence of an ORANGE condition on the Integrity CSF Status Tree.

Event Malf. Event Event No. No. Type* Description 1 I - RO, Pressurizer pressure instrument fails high T+10 PRS01A SRO TS - SRO 2 C - BOP, B Feedwater Control Valve fails closed in automatic T+25 FWM03B SRO 3 I - ALL Turbine First Stage Pressure Transmitter fails low T+35 PCS02B TS - SRO 4 CRF04_52 M - ALL Multiple Dropped Rods - requires reactor trip T+50 CRF04_53 5 C - ALL ATWS CRF13 6 C - BOP Stuck open safety valve.

MSS14A

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Scenario Event Description NRC Scenario 2 The crew will assume the shift with instructions to maintain present plant conditions Prior to actual power reduction, the controlling pressurizer pressure transmitter will fail high, requiring the crew to select an alternate pressure channel to control heaters and spray in accordance with OTO-BB-6. The SRO will also determine the appropriate technical specification action requirements.

When the plant is stable, a Feedwater Control Valve will fail closed in automatic, requiring manual operation to restore SG level.

When SG level is restored, PT-506 will fail low, requiring the RO to place Rod Control in manual to stop rod motion, the BOP to select PT-505 for control, reset C-7, and place steam dumps in the Steam Pressure mode in accordance with OTO-AC-3. The SRO will also address Technical Specifications.

Multiple control rods will drop. A reactor trip is required but an ATWS occurs. The crew must take action to initiate RCS emergency boration and de-energize rod drive MG sets. A SG safety valve will stick open, requiring the crew to isolate AFW flow to the SG and attempt isolation.

The scenario may be terminated when the crew transitions to ES-1.1, SI Termination.

EOP Flow Path: E-0, FR-S.1, E-0, E-2, ES-1.1 Scenario 2 Scenario Malfunction List

1) Initialize at IC-17, 50%.
2) Run Batch File ilttwo.txt and verify the actions on the following page are loaded correctly.
3) Ensure immediate boration timer is reset.
4) Ensure BB PT-455 is selected as the controlling channel.
5) Ensure NIS indicates 50% power.
6) Check Rx Trip switch has a red flag.
7) Ensure step counters for Control Bank "D" are set at 150 steps and all other step counters are set at 228 steps.
8) Ensure the digital display is selected to REP0480A and RET0499A.
9) Place 'A' MDAFP in PTL and hand a Hold Off tag on handswitch ALHIS23A.
10) Ensure Decrease Loading Rate Button is "ON".
11) Update the status board for "B" train week.
12) Update Status Board - 'A' MDAFP, TS 3.7.5, Condition C, 72 hrs. Current outage time is 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br />.
13) Ensure Letdown orifi A and B are in service, and a caution tag placed on C
14) Ensure AEHV38 is appropriately throttled
15) White board has the following boron concentrations:
  • "A" CCP 5 days ago 1105 ppm
  • "B" CCP 15 days ago 1132 ppm
16) Ensure chart recorders are "rolled forward".
17) Microphones are available for each person being evaluated and a videotape is in the VCR.
18) Ensure the RM-11 is on the training system.
19) Ensure turnover sheets and log sheets are on the desks.
20) Ensure copies of the following procedures are in the file drawers:
  • OTO-BB-00006
  • OTO-AE-00001
  • OTO-AC-00003
  • E-0
  • FR-S.1
  • E-2
  • ES-1.1 Scenario 2 Scenario Malfunction List File: ilttwo.TXT

>Author: S. P. Aufdemberge

>Date: 20050504

>=============SCENARIO SETUP ITEMS===========================================

>Remove 'A' MDAFP from service

>FILE AL01A.TXT

>Simulates tag out of the MD AFP A in the Pull-to-lock position bat al01a.txt

>Simulates de-energization of "A" PORV Block valve due to PORV Leakage ior bbhis8000a_ic (-1 0) 0 irf bbs014 (-1 0) 0

>===========================================================================

>=============EVENT PRELOAD=================================================

>EVENT 1

>Pressurizer Pressure Channel BBPT0455 fails to 2500 over 60 seconds

>Manually Input Event 1 imf prs01a (1 0) 2500 60

>===========================================================================

>=============EVENT PRELOAD=================================================

>EVENT 2

>"B" Feed Reg Valve fails closed in Automatic over 90 seconds

>Manually Input Event 2 imf fwm03b (2 0) 0 90

>===========================================================================

>=============EVENT PRELOAD=================================================

>EVENT 3

>ACPT0506 fails low over 60 second ramp

>Manually Input Event 3 imf pcs02b (3 0) 0 60

>===========================================================================

>=============EVENT PRELOAD=================================================

> EVENT 4

>Multiple Dropped Rods

>Manually Input Event 4 imf crf04_52 (4) imf crf04_53 (4)

>===========================================================================

>=============EVENT PRELOAD=================================================

>EVENT 5

>PROTECTIVE SYSTEM FAILURE (ATWS) Preloaded into scenario. No Manual Input >required imf crf13 (-1 0) both

>===========================================================================

>=============EVENT PRELOAD=================================================

>EVENT 6

>Main Steam Safety Valve Fails 100% Open, with a 10 sec delay, and a 1 sec >ramp from trigger #6 (CONDITIONAL) trgset 6 "sac.le.10" imf mss14a (6 10) 100 1

>===========================================================================

>end of file Scenario 2 Crew Turnover Separate Turnover Sheets provided Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 1 Page 6 of 27 Event

Description:

Pressurizer Pressure Instrument Failure Time Position Applicants Actions or Behavior Booth Operator Instructions:

When directed, insert command for PT-455 failure Indications Available:

PRESSURIZER HIGH PRESSURE DEVIATION Annunciator 33B PRESSURIZER PRESSURE LOW HEATERS ON Annunciator 33C REACTOR PARTIAL TRIP Annunciator 83C PT-455 indicates high Refer to OTO-BB-0006, Pressurizer Pressure Control System SRO Instrument Failures RO Select an alternate channel RO Check RCS pressure 2200 - 2250 psig RO Check P-11 (Not Lit) correct state BOP Select recorder to valid channel SRO Direct I&C to trip the affected bistables SRO Refer to Tech Specs

  • 3.3.1, Condition E, M
  • 3.3.2 Condition D, L
  • 3.3.4 Item 3

After Technical Specifications have been addressed, proceed to Event 2

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 2 Page 7 of 27 Event

Description:

B Feedwater Control Valve fails closed in automatic Time Position Applicants Actions or Behavior Booth Operator Instructions:

When directed, insert command for Feedwater Control Valve failure Indications Available:

B FRV failing closed Feedwater flow to B SG Lowering STEAM GENERATOR B FLOW MISMATCH Annunciator 109D BOP Determines SG B level is lowering.

Place AE-FK-520, SG B MFW Reg Valve Control, in BOP MANUAL, and restore SG level.

SRO Refer to OTO-AE-0001, Feedwater System Malfunctions.

BOP Check Main Feed Pump tripped (NO)

BOP Check Main Feed Pump Speed controlling in auto and stable Check Main Feed Reg Valves controlling in Auto (NO)

BOP

  • Ensure Manual control
  • Check Main Feed Reg Bypass Valves in service (NO)

BOP

  • Check Condensate Pump operation
  • Check Heater Drain Pump operation BOP Verify SG NR level trend 45 - 55%

RO Monitor or operate rod control to maintain Tave/Tref +/- 5 °F BOP Check MFP Oil Pressure normal

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 2 Page 8 of 27 Event

Description:

B Feedwater Control Valve fails closed in automatic Time Position Applicants Actions or Behavior SRO Perform communications per Ops Communications-01 SRO Verify Power change less than 15% in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> When the plant is stable, proceed to Event 3

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 3 Page 9 of 27 Event

Description:

Turbine First Stage Pressure Transmitter Fails Low Time Position Applicants Actions or Behavior Booth Operator Instructions:

When directed, insert command for First Stage Pressure Channel PT-506 failing low Indications Available:

PT-506 indication failing low Control Rods stepping in if in auto Refer to OTO-AC-00003, Turbine Impulse Pressure Channel SRO Failure RO Place Rod Control in MANUAL Identify the failed channel by comparing meter indications and BOP identifying alarmed annunciators. (PT-506)

Select the alternate impulse pressure channel by utilizing the BOP Impulse Pressure selector switch AC PS-505Z.

RO Check Tave within 1.5°F of Tref Check Rod Control in AUTO RO

  • Will place in AUTO if directed by SRO and Tave and Tref are matched Maintain Tavg at the corresponding Tref value for existing plant RO power. Ensure RX power is less than 3565 MWth.

Place the Steam Dump Interlock Selector switches (AB-HS-64 BOP and AB-HS-63) to the OFF/RESET position.

BOP Check C-7, Load Loss Stm Dump Armed - Extinguished

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 3 Page 10 of 27 Event

Description:

Turbine First Stage Pressure Transmitter Fails Low Time Position Applicants Actions or Behavior Transfer Steam Dumps to the Steam Pressure Mode:

  • Set the AB PK-507, Steam Header Pressure controller BOP for 7.28 turns (1092 psig)
  • Place the Steam Dump Select to STEAM PRESS BOP Place the Steam Dump Bypass Interlock switches to ON Check the following permissives are in their correct state within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of the channel failure per Attachment B, permissives:

CREW

  • P-7
  • P-13 Refer to T/S LCO 3.3.1 (Improved T/S LCO 3.3.1) to ensure SRO compliance with the requirements for minimum channels.
  • Condition T When Tech Specs have been addressed, proceed to Event 4

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 11 of 27 Event

Description:

Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicants Actions or Behavior Booth Instructor Instructions:

When directed, insert commands to initiate remainder of events as sequenced Indications Available:

Two dropped control rods Rod Bottom lights Multiple annunciators CREW Recognizes more than one control rod dropped.

SRO Directs reactor trip.

RO Attempts to trip reactor. Reactor will not trip.

SRO Directs entry to FR-S.1 RO CHECK Reactor Trip:

  • Rod Bottom Lights - ALL LIT
  • Neutron Flux - LOWERING (NO)

Manually TRIP Reactor:

IF reactor will NOT trip, THEN PERFORM the following:

CRITICAL a. Manually INSERT control rods when AUTO slows TASK below 48 SPM.

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 12 of 27 Event

Description:

Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicants Actions or Behavior

b. OPEN supply breakers to PG19 and PG20:
  • PG HIS-16
  • PG HIS-18 WHEN reactor is tripped, THEN CLOSE supply breakers to PG19 and PG20.

BOP CHECK Turbine trip:

All Turbine Stop valves - CLOSED BOP CHECK AFW Pumps Running:

a. MD AFW Pumps - BOTH RUNNING (Must start)
  • AL HIS-23A
  • AL HIS-22A
b. TD AFW Pump - RUNNING IF NECESSARY (May need to start)

CRITICAL TASK RO INITIATE Emergency Boration of RCS:

Note:

If SI is actuated, HHSI will be providing boration flow via the RWST

a. CHECK charging pumps - AT LEAST ONE RUNNING
  • BG HIS-1A
  • BG HIS-2A OR
  • NCP:
  • BG HIS-3

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 13 of 27 Event

Description:

Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicants Actions or Behavior

b. ALIGN emergency boration flow path:
1. START Boric Acid Transfer Pumps:
  • BG HIS-5A
  • BG HIS-6A
2. OPEN Emergency Borate to Charging Pump Suction valve:
  • BG HIS-8104
3. CHECK Emergency Boration Flow - GREATER THAN 30 GPM
  • BG FI-183A
4. MAINTAIN charging flow - GREATER THAN EMERGENCY BORATION FLOW
c. CHECK PZR Pressure - LESS THAN 2335 PSIG CREW CHECK Containment Purge Isolation:
a. ESFAS status panels CPIS sections:
  • SA066X WHITE lights - ALL LIT
  • SA066Y WHITE lights - ALL LIT RO CHECK If the Following Trips Have Occurred:
a. Reactor trip:
  • Rod Bottom Lights - ALL LIT

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 14 of 27 Event

Description:

Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicants Actions or Behavior

  • Neutron Flux - LOWERING BOP b. Turbine trip:
  • All Turbine Stop Valves - CLOSED RO CHECK If Reactor Is Subcritical:
a. Power Range channels - LESS THAN 5% (POST ACCIDENT PR - LESS THAN 5%)
b. Intermediate Range channels - NEGATIVE STARTUP RATE (POST ACCIDENT PR - STABLE OR LOWERING)

Go to Step 16. OBSERVE CAUTION prior to Step 16.

SRO Directs entry to E-0.

RO CHECK Reactor Trip:

  • Rod Bottom Lights - ALL LIT
  • Neutron Flux - LOWERING BOP CHECK Turbine Trip:
a. All turbine Stop Valves - CLOSED BOP CHECK Power to AC Emergency Buses:
a. AC emergency buses - AT LEAST ONE ENERGIZED
  • NB01

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 15 of 27 Event

Description:

Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicants Actions or Behavior OR

  • NB02
b. AC emergency buses - BOTH ENERGIZED CREW CHECK SI Status:
a. CHECK if SI is actuated:
  • SB069 SI Actuate RED light - LIT OR
b. CHECK both Trains of SI - ACTUATED
  • SB069 SI Actuate RED light - LIT SOLID (NOT blinking)

PERFORM Attachment A, Automatic Action Verification, while BOP continuing with this procedure.

BOP CHECK Generator Output Breakers - OPEN

  • MA ZL-3A (V55)
  • MA ZL-4A (V53)

BOP CHECK Feedwater Isolation:

a. Main Feedwater Pumps - TRIPPED

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 16 of 27 Event

Description:

Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicants Actions or Behavior

b. Main Feedwater Reg Valves - CLOSED
  • AE ZL-510 (SG A)
  • AE ZL-520 (SG B)
  • AE ZL-530 (SG C)
  • AE ZL-540 (SG D)
c. Main Feedwater Reg Bypass Valves - CLOSED
  • AE ZL-550 (SG A)
  • AE ZL-560 (SG B)
  • AE ZL-570 (SG C)
  • AE ZL-580 (SG D)
d. Feedwater Isolation Valves - CLOSED
  • AE HIS-39 (SG A)
  • AE HIS-40 (SG B)
  • AE HIS-41 (SG C)
  • AE HIS-42 (SG D)

BOP CHECK AFW Pumps:

a. MD AFW Pumps - BOTH RUNNING
  • AL HIS-23A
  • AL HIS-22A
b. TD AFW Pump - RUNNING IF NECESSARY

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 17 of 27 Event

Description:

Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicants Actions or Behavior BOP CHECK AFW Valves - PROPER EMERGENCY ALIGNMENT

  • MD AFP Flow Control Valves - THROTTLED
  • TD AFP Flow Control Valves - FULL OPEN (May isolate to faulted SG)
  • AL HK-6A BOP CHECK total AFW Flow - GREATER THAN 300,000 LBM/HR RO CHECK PZR PORVs and Spray Valves:
a. PZR PORVs - CLOSED
  • BB HIS-455A
  • BB HIS-456A
b. PZR PORVs - BOTH IN AUTO
  • BB HIS-455A
  • BB HIS-456A
c. PORV Block Valves - BOTH OPEN (NO)
  • BB HIS-8000A (CLOSED)
  • BB HIS-8000B

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 18 of 27 Event

Description:

Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicants Actions or Behavior

d. Normal PZR Spray Valves - CLOSED
  • BB ZL-455B
  • BB ZL-455C NOTE: Seal injection flow should be maintained to all RCPs.

CHECK If RCPs Should Be Stopped:

a. RCPs - ANY RUNNING
b. ECCS Pumps - AT LEAST ONE RUNNING
c. RCS pressure - LESS THAN 1425 PSIG (NO)

CREW CHECK RCS Temperatures:

  • Any RCP running - RCS TAVG STABLE AT 557°F OR TRENDING TO 557°F (NO)

If TEMPERATURE IS LESS THAN 557°F and LOWERING, then perform THE FOLLOWING:

a. STOP dumping steam.
b. IF cooldown continues, THEN CONTROL total feed flow:
  • MAINTAIN total feed flow greater than 300,000 LBM/HR until narrow range level is greater than 7%

[25%] in at least one SG.

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 19 of 27 Event

Description:

Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicants Actions or Behavior

c. IF cooldown continues, THEN FAST CLOSE all MSIVs and Bypass valves: (May have been performed)
  • AB HS-80 BOP CHECK If Any SG Is Faulted:
a. CHECK pressures in all SGs:
  • ANY SG PRESSURE LOWERING IN AN UNCONTROLLED MANNER (A SG)

OR

  • ANY SG COMPLETELY DEPRESSURIZED
b. Go To E-2, Faulted Steam Generator Isolation, Step 1.

CAUTIONS: At least one SG must be maintained available for RCS cooldown.

Any faulted SG or secondary break should remain isolated during subsequent recovery actions unless needed for RCS cooldown.

BOP CHECK MSIVs and Bypass Valves - CLOSED BOP CHECK If Any SG Secondary Pressure Boundary Is Intact:

a. CHECK pressures in all SGs - ANY STABLE OR RISING BOP IDENTIFY Faulted SG(s):
a. CHECK pressures in all SGs:
  • ANY SG PRESSURE LOWERING IN AN UNCONTROLLED MANNER (A)

OR

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 20 of 27 Event

Description:

Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicants Actions or Behavior

  • ANY SG COMPLETELY DEPRESSURIZED ISOLATE Faulted SG(s):

CRITICAL TASK a. ISOLATE AFW flow to faulted SG(s):

  • CLOSE associated MD AFP Flow Control Valve(s):
  • CLOSE associated TD AFP Flow Control Valve(s):
b. CHECK ASD from faulted SG(s) - CLOSED
c. Locally CLOSE TDAFP Steam Supply From Main steam Loop Manual Isolation valve from faulted SG(s):
  • ABV0085 (SG B)
  • ABV0087 (SB C)
d. CHECK Main Feedwater valves to faulted SG(s) -

CLOSED

  • AE ZL-510 (SG A)
  • AE ZL-550 (SG A)
  • AE HIS-39 (SG A)
e. CHECK SG Blowdown containment Isolation Valve from faulted SG(s) - CLOSED
  • BM HIS-1A (SG A)

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 21 of 27 Event

Description:

Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicants Actions or Behavior

f. CLOSE Steamline Low Point Drain valve from faulted SG(s):

CHECK CST To AFP Suction Header Pressure - GREATER BOP THAN 2.7 PSIG CREW CHECK Secondary Radiation:

a. PERFORM EOP Addendum 11, Restoring SG Sampling After SI Actuation
  • PERFORM EOP Addendum 11, Restoring SG Sampling After SI Actuation
  • DIRECT Chemistry to periodically sample all SGs for activity
  • DIRECT Health Physics to survey steamlines in Auxiliary Building Area 5 as necessary
b. CHECK unisolated secondary radiation monitors:
  • SG Sample radiation:
  • SJL 026
c. Secondary radiation - NORMAL

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 2 Event # 4,5,6 Page 22 of 27 Event

Description:

Multiple dropped rods, ATWS, Stuck Open Main Steam Safety Valve Time Position Applicants Actions or Behavior CREW CHECK If ECCS Flow Should Be Reduced:

a. RCS subcooling - GREATER THAN 30°F
b. Secondary heat sink:
  • Narrow range level in at least one intact SG -

GREATER THAN 7% [25%]

OR

  • Total feed flow to intact SGs - GREATER THAN 300,000 LBM/HR
c. RCS pressure - STABLE OR RISING
d. PZR level - GREATER THAN 9% [29%]

RO RESET SI:

  • SB HS-43A RO STOP All But One CCP:
  • BG HIS-1A OR

Scenario may be terminated upon transition to ES-1.1

ATTACHMENT A Automatic Action Verification BOP CHECK Charging Pumps:

BOP a. CCPs - BOTH RUNNING

  • BG HIS-1A
  • BG HIS-2A BOP b. STOP NCP:
  • SI Pumps - BOTH RUNNING
  • RHR Pumps - BOTH RUNNING
  • EJ HIS-1

BOP a. CCPs to Boron Inj Header - FLOW INDICATED

  • EM FI-917A
  • EM FI-917B BOP b. RCS pressure - LESS THAN 1700 PSIG BOP c. SI Pump Discharge - FLOW INDICATED
  • EJ FI-618

ATTACHMENT A Automatic Action Verification

  • EJ FI-619 CAUTION: If offsite power is lost after SI reset, manual action may be required to restart safeguards equipment.

BOP CHECK ESW Pumps - BOTH RUNNING

  • EF HIS-55A
  • EF HIS-56A BOP CHECK CCW Alignment:

BOP a. CCW Pumps - ONE RUNNING IN EACH TRAIN

  • Red Train:
  • EG HIS-21 or EG HIS-23
  • Yellow Train
  • EG HIS-22 or EG HIS-24
b. CCW Service Loop Supply and Return valves for one BOP operating CCW pump - OPEN
  • EG ZL-15 AND EG ZL-53 OR
  • EG ZL-16 AND EG ZL-54 CHECK Containment Cooler Fans - RUNNING IN SLOW BOP SPEED
  • GN HIS-9
  • GN HIS-17
  • GN HIS-5
  • GN HIS-13 CHECK Containment Hydrogen Mixing Fans - RUNNING IN BOP SLOW SPEED
  • GN HIS-2
  • GN HIS-4

ATTACHMENT A Automatic Action Verification

  • GN HIS-1

BOP a. CHECK the following:

  • Containment pressure - GREATER THAN 27 PSIG OR
  • GN PR-934 indicates containment pressure - HAS BEEN GREATER THAN 27 PSIG OR
  • EN HIS-3
  • SA066X WHITE lights - ALL LIT
  • SA066Y WHITE lights - ALL LIT BOP d. ESFAS status panels CISB sections:
  • SA066X WHITE lights - ALL LIT
  • SA066Y WHITE lights - ALL LIT BOP CHECK If Main Steamlines Should Be Isolated:

BOP a. CHECK for any of the following:

  • Containment pressure - GREATER THAN 17 PSIG OR
  • GN PR-934 indicates containment pressure - HAS

ATTACHMENT A Automatic Action Verification BEEN GREATER THAN 17 PSIG OR

  • Steamline pressure - LESS THAN 615 PSIG OR
  • AB PR-514 or PR-535 indicates steamline pressure -

HAS BEEN LESS THAN 615 PSIG BOP b. CHECK MSIVs and Bypass valves - CLOSED BOP CHECK ECCS Valves - PROPER EMERGENCY ALIGNMENT BOP a. ESFAS status panels SIS sections:

  • SA066X WHITE lights - ALL LIT
  • SA066Y WHITE lights - ALL LIT BOP CHECK Containment Isolation Phase A:

BOP a. ESFAS status panels CISA sections:

  • SA066X WHITE lights - ALL LIT
  • SA066Y WHITE lights - ALL LIT BOP CHECK SG Blowdown Isolation:

BOP ESFAS status panels SGBSIS sections:

  • SA066X WHITE lights - ALL LIT
  • SA066Y WHITE lights - ALL LIT CAUTION: If offsite power is lost after SI reset, manual action may be required to restart safeguards equipment.

BOP CHECK Both Trains of control Room Ventilation Isolation:

BOP a. ESFAS status panels CRVIS sections:

  • SA066X WHITE lights - ALL LIT

ATTACHMENT A Automatic Action Verification

  • SA066Y WHITE lights - ALL LIT BOP CHECK Containment Purge Isolation:

BOP a. ESFAS status panels CPIS sections:

  • SA066X WHITE lights - ALL LIT
  • SA066Y WHITE lights - ALL LIT BOP Notify CRS of the following:
  • Manual actions taken
  • Failed Equipment
  • Attachment A, Automatic Action Verification, completed

Appendix D Scenario Outline Form ES-D-1 Facility: Callaway Scenario No.: 3 Op Test No.: NRC Examiners: Operators:

Initial Conditions: 5 - 10% power, BOL.

RE-52, Blowdown Discharge Pumps Discharge Monitor, is OOS.

BB-PCV-455A PORV Leakage - Block Valve Closed.

Turnover: Increase power to 100% at 3% per hour Critical Task: Isolate ruptured SG in step 3 of E-3.

Establish and Maintain RCS temperature below that required for depressurization of the ruptured SG.

Event Malf. Event Event No. No. Type* Description 1 R - RO Raise power.

T+0 N - BOP, SRO 2 I - ALL Power Range NI failure.

NIS03D T+10 TS - SRO 3 I - BOP, Steam Dump pressure setpoint failure.

MSS13B T+30 SRO 4 C - RO, RCP high vibration.

T+40 BBV001 SRO TS - SRO 5 M - ALL SGTR. Reactor trip required.

RCS02A T+60 6 C - BOP Atmospheric dump valve fails open, requiring manual isolation.

MSS07A 7 Component C - RO Instrument air to containment fails closed, requiring alternate RCS Override depressurization.

KAHIS29

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Scenario Event Description NRC Scenario 3 The crew will assume the shift with instructions to raise reactor power in preparation for returning the unit to full power.

When the power ascension is in progress, a power range instrument will fail high, requiring the crew to respond in accordance with OTO-SE-1. The crew will manually control feedwater bypass flow and remove the failed channel from service. The SRO will also determine the appropriate technical specification action requirements.

When the plant is stable and technical specifications have been addressed, a steam dump pressure setpoint failure will require the crew to place steam dumps in off/reset and control reactor power and Tave manually in accordance with OTO-AB-1 and OTO-AB-4.

When the plant is stable, increasing RCP vibration will require the crew to enter OTO-BB-2 to determine that the RCP must be stopped in accordance with OTN-BB-3. The crew will stop the affected RCP after determining reactor power is below P-8. Actions of OTO-BB-4 will also be performed to defeat Loop Delta T and Tave inputs. The SRO will also determine the appropriate technical specification action requirements.

When the plant is stable, a SGTR develops, requiring the crew to trip the reactor and initiate Safety Injection. An atmospheric dump valve will fail open in automatic and require manual closure. Instrument Air to containment will fail closed, requiring alternate RCS depressurization.

The scenario may be terminated when ECCS pumps are stopped in E-3, Steam Generator Tube Rupture.

EOP Flow Path: E-0, E-3 SCENARIO SETUP GUIDE EXAM #: ILT-1 Scenario Malfunction List

1) Initialize at IC-13.
2) Run Batch File "iltthree.txt", and verify the actions on the following page are loaded correctly.
3) Ensure Immediate Boration Timer is reset.
4) Check RX trip switch has a RED flag.
5) Ensure NIS indicates 10%
6) Ensure step counters for Control Bank D are set at 114 steps and all other step counters are set for 228.
7) Ensure the digital display is selected to REP0480A and RET0499A.
8) Ensure Decrease Loading Rate Button is ON.
9) Update status board for B Protected Train week.
10) Place Letdown orifi A and B in service with a caution tag on C
11) White board has the following boron concentrations:
  • "A" MDAFP T/S 3.7.5, Action C.1. 72 Hours. OOS @ 0500 Today
  • 'A' CCP "5 days ago" 1107 ppm
  • 'B' CCP "two weeks ago" 1135 ppm
12) Supply turnover and log sheets, Xe Predict, Dilution/Boration calculation and OTG-ZZ-00003.
13) Ensure the RM-11 is on the training system.
14) Microphones available for each person being evaluated and a video tape is in the VCR.
15) Ensure chart recorders are "rolled forward".
16) Ensure copies of the following procedures are in the file drawers:
  • OTO-SE-00001
  • OTO-AB-00004
  • OTO-AB-00001
  • OTO-BB-00002
  • OTN-BB-00003
  • E-0
  • E-3 Scenario 3

>File: iltthree.txt

>Author: S. P. Aufdemberge

>Date: 20050517

>=============SCENARIO SETUP ITEMS===========================================

>Simulates de-energization of "A" PORV Block valve due to PORV Leakage irf bbs014 (-1 0) 0

>BMRE52 OOS Pre-Setup imf rms6_08 (-1 0)

>============================================================================

>========================EVENT PRELOAD=======================================

>EVENT A

>Fail N44 to full scale high imf nis03d (1 0) 200 10

>============================================================================

>========================EVENT PRELOAD=======================================

>EVENT B

>Steam Dump Pressure Setpoint Failure imf mss13b (2 0) 1500 100

>============================================================================

>========================EVENT PRELOAD=======================================

>EVENT C

>RCP Hi Vibration irf bbv001 (3 0) 6.1 30

>============================================================================

>========================EVENT PRELOAD=======================================

>EVENT D

>SGTR A Leak grows from 0 to 300 over 100 seconds AUTOMATICALLY inserted when >BBHIS37 taken to stop or PTL.

trgset 4 x21i115s imf rcs02a (4 120) 300 100

>============================================================================

>========================EVENT PRELOAD=======================================

>EVENT E

> A ASD fails open requiring manual isolation trgset 5 x04o9o imf mss07a (5 0)

>============================================================================

>========================EVENT PRELOAD=======================================

>EVENT F

>Instrument Air Fails closed requiring Alternate RCS Depressurization trgset 6 jstsisa.eq.1 ior kahis29_ic (6) on ior kahis29_io (6) off ior kahis29_og (6) on ior kahis29_or (6) off

>================================================================================

==================================================================

To FAST CLOSE A MSIV ONLY:

SAS013A set to OFF SAS013B set to OFF SAS013C set to OFF SAS017 set to ENABLE SAS018A set to FC

>end of file Scenario 3 Crew Turnover Separate Turnover sheets provided Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 1 Page 6 of 31 Event

Description:

Raise Power Time Position Applicants Actions or Behavior Refer to OTG-ZZ-0003, Plant Startup Hot Zero Power to 30%

SRO Power, section 6.3 Perform a Pre-Job Brief of power ascension:

  • General strategy for proceeding to 30% Power.
  • Any items not completed as expected to this point.
  • Applicable Precautions and Limitations
  • Activities that can be performed at any time during the next CREW sections(s) of this procedure such as Stroking MFRV's and Placing Reboiler in service.
  • Steam Dump strategy Discuss the use of Optional Parameter Alarms as an aid to avoid undesired challenges to legal or system requirements BOP Initiate a 3% per hour loading rate RO Commence raising reactor power When power is >10%, verify P-7 and P-10 permissives are RO illuminated When control of the plant is demonstrated during startup, proceed to the next event

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 2 Page 7 of 31 Event

Description:

Power Range NI Failure Time Position Applicants Actions or Behavior Booth Instructor Instructions:

When directed, insert command for Power Range NI failure Indications Available:

PRNI N-44 failing HIGH Annunciators 78A, 78E, 82A for Power Range Channel deviation REACTOR PARTIAL TRIP Annunciator 83C BOP Refer to Annunciator Response procedures SRO Refer to OTO-SE-00001, Nuclear Instrument Malfunction Check Power Range Instruments normal.

RO

  • N-44 is failing high RO Ensure Rod Control is in MANUAL BOP Place SG Main Feed Reg Bypass valves in MANUAL BOP Control SG levels from 45 - 55%

BOP Stop any Main Turbine load changes (None in progress)

RO Maintain Tave/Tref within 1.5°F using manual rod control Check the following permissives are in their required state

  • P-7 CREW
  • P-8
  • P-9
  • P-10 CREW Select an operable channel on the NI Recorder

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 2 Page 8 of 31 Event

Description:

Power Range NI Failure Time Position Applicants Actions or Behavior Bypass the malfunctioning channel at the Detector Current Comparator Drawer

  • Place UPPER SECTION switch to N-44 CREW
  • Place LOWER SECTION switch to N-44
  • Place ROD STOP BYPASS switch to N-44
  • Place POWER MISMATCH BYPASS switch to N-44 At the Comparator and Rate drawer, place Comparator CREW Channel Defeat switch to N-44 Ensure the following annunciator windows are extinguished:
  • 78A, PR CHANNEL DEV CREW
  • 78B, PR UPPER DETECTOR FLUX DEV
  • 78C, PR LOWER DETECTOR FLUX DEV
  • 82A, PR OVER PWR ROD STOP Check Rod Control in AUTO RO
  • Rod Control is in MANUAL Return Feed Reg Bypass valves to automatic operation as BOP required by the SRO BOP Control SG levels at 45 - 55%

Check Reactor Power >10% (NO)

CREW

  • Perform Attachment B, Low Power Trips Enabled, within the time limit specified in TS Refer to applicable Tech Specs SRO

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 2 Page 9 of 31 Event

Description:

Power Range NI Failure Time Position Applicants Actions or Behavior When Tech Specs have been identified, proceed to Event 3

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 3 Page 10 of 31 Event

Description:

Steam Dump Pressure Setpoint Failure Time Position Applicants Actions or Behavior Booth Instructor Instructions:

When directed, insert command for the Steam Dump pressure transmitter failure Indications Available:

Steam Dumps start to open Refers to OTO-AB-00004, Steam Header Pressure Channel SRO Failure Check Steam header pressure indicator AB PI-507 indicating BOP significantly different than SG pressure indicators Check Feed Pump Speed Changing due to failed channel

  • Must control feed pump speed using GE potentiometers BOP with speed controller in manual, due to PT-507 failure
  • Restore programmed DP BOP Check Steam Dump Control in Pressure Mode BOP Place Steam Header Pressure Controller in MANUAL BOP Check steam dumps responding in MANUAL BOP Manually control SG pressure to the desired value SRO Initiate actions to repair failed transmitter SRO Perform notifications per OPS-Communications-01 When steam pressure is under manual control, proceed to the next event

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 4 Page 11 of 31 Event

Description:

RCP High Vibration Time Position Applicants Actions or Behavior Booth Operator Instructions:

When directed, insert command to initiate RCP high vibration Indications Available:

RCP VIB DANGER Annunciator 70A RCP VIB/SYS ALERT Annunciator 70B NOTE:

In Modes 1 & 2 when a RCP is stopped, the idle loop RTD channel is INOPERABLE and the actions of OTO-BB-00004, RTD Channel Failures, should be performed.

SRO Refer to OTO-BB-00002, Reactor Coolant Pump Off-Normal RO Check RCP Vibrations

a. RCP Vibration level;
  • ALL RCPs Less than 5 MILS on the frame AND
  • ALL RCPs Less than 20 MILS on the shaft (at RP312, B YI-471) (NO)

IF Reactor power LESS THAN 48%

(P-8 extinguished on SB069)

RO SECURE the affected RCP IAW OTN-BB-00003.

RO Continue to MONITOR RCP parameters for all RCPs.

REFER to OTG-ZZ-00004, Power Operations, to shutdown the SRO plant.

SRO Refer to T/S LCO 3.3.1, T/S LCO 3.3.2, and T/S LCO 3.4.4.

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 4 Page 12 of 31 Event

Description:

RCP High Vibration Time Position Applicants Actions or Behavior CREW Verify that permissive P8 is extinguished.

CAUTION: Consider the effects of securing the RCP WILL have on S/G level and Pzr Pressure control. The FRV in Auto should handle the transient but will later need to be closed and the FRV Bypass placed in service to prevent a high level Turbine Trip. If the D RCP is secured, Pzr Press control is accomplished by cycling heaters.

RO STOP the Reactor Coolant Pump.

In Modes 1, and 2, when a RCP is stopped, the idle loop RTD channel is INOPERABLE. PERFORM actions of OTO-BB-CREW 00004, RTD CHANNEL FAILURES, for the INOPERABLE RTD channel and refer to T/S LCO 3.3.1, T/S LCO 3.3.2, T/S LCO 3.4.4 and CARS 199601236.

GO TO OTG-ZZ-00005, Plant Shutdown 20% Power to Hot CREW Standby.

The next event is initiated on a trigger from RCP trip

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 13 of 31 Event

Description:

SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicants Actions or Behavior Indications Available:

PRESSURIZER LOW LEVEL DEVIATION Annunciator 32C PRESSURIZER PRESSURE LOW HEATERS ON Annunciator 33C RO Determines PZR level dropping rapidly.

SRO Directs Reactor Trip and Safety Injection actuation.

RO CHECK Reactor Trip:

  • Rod Bottom Lights - ALL LIT
  • Neutron Flux - LOWERING BOP CHECK Turbine Trip:
a. All Turbine Stop valves - CLOSED CREW CHECK Power To AC Emergency Buses:
a. AC emergency buses - AT LEAST ONE ENERGIZED
  • NB02
b. AC emergency buses - BOTH ENERGIZED CHECK SI Status:
a. CHECK if SI is actuated:

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 14 of 31 Event

Description:

SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicants Actions or Behavior OR

  • SB069 SI Actuate RED light - LIT OR
b. CHECK both Trains of SI - ACTUATED
  • SB069 SI Actuate RED light - LIT SOLID (NOT blinking)

PERFORM Attachment A, Automatic Action Verification, while BOP continuing with this procedure.

BOP CHECK Generator Output Breakers - OPEN

  • MA ZL-3A (V55)
  • MA ZL-4A (V53)

BOP CHECK Feedwater Isolation:

a. Main Feedwater Pumps - TRIPPED
b. Main Feedwater Reg Valves - CLOSED
  • AE ZL-510 (SG A)
  • AE ZL 520 (SG B)
  • AE ZL 530 (SG C)
  • AE ZL 540 (SG D)

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 15 of 31 Event

Description:

SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicants Actions or Behavior

c. Main Feedwater Reg Bypass Valves - CLOSED
  • AE ZL-550 (SG A)
  • AE ZL 560 (SG B)
  • AE ZL 570 (SG C)
  • AE ZL 580 (SG D)
d. Feedwater Isolation valves - CLOSED
  • AE HIS-39 (SG A)
  • AE HIS-40 (SG B)
  • AE HIS-41 (SG C)
  • AE HIS-42 (SG D)

RO CHECK AFW Pumps:

a. MD AFW Pumps - BOTH RUNNING
  • AL HIS-23A
  • AL-HIS-22A
b. TD AFW Pumps - RUNNING IF NECESSARY RO CHECK AFW Valves - PROPER EMERGENCY ALIGNMENT
  • MD AFP Flow Control Valves - THROTTLED
  • TD AFP Flow Control Valves - FULL OPEN

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 16 of 31 Event

Description:

SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicants Actions or Behavior

  • AL HK-6A RO CHECK Total AFW Flow - GREATER THAN 300,00 LBM/HR RO CHECK PZR PORVs and Spray Valves:
a. PZR PORVs - CLOSED
  • BB HIS-455A
  • BB-HIS-456A
b. PZR PORVs - BOTH IN AUTO
  • BB HIS-455A
  • BB-HIS-456A
c. PORV Block Valves - BOTH OPEN (NO)
  • BB HIS-8000A (Closed)
  • BB-HIS-8000A
d. Normal PZR Spray Valves - CLOSED
  • BB ZL-455A
  • BB-ZL-456A RO CHECK If RCPs Should Be Stopped:
a. RCPs - ANY RUNNING
b. ECCS Pumps - AT LEAST ONE RUNNING

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 17 of 31 Event

Description:

SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicants Actions or Behavior OR

c. RCS pressure - LESS THAN 1425 PSIG RO CHECK RCS Temperatures:
  • Any RCP running - RCS TAVG STABLE AT 557°F OR TRENDING TO 557°F RO CHECK If Any SG Is Faulted:
a. CHECK pressures in all SGs:
  • ANY SG PRESSURE LOWERING IN AN UNCONTROLLED MANNER (NO)

OR

  • ANY SG COMPLETELY DEPRESSURIZED RO CHECK If SG Tubes Are Intact:
  • Levels in all SGs:
  • NO SG NARROW RANGE LEVEL RISING IN AN UNCONTROLLED MANNER
  • SG Steamline N16 radiation - NORMAL
  • N16 161 (SGA)
  • N16 162 (SGB)
  • N16 163 (SGC)
  • N16 164 (SGD)
  • Condenser Air Removal radiation - NORMAL BEFORE ISOLATION
  • GEG 925
  • SG Blowdown and Sample radiation - NORMAL BEFORE ISOLATION

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 18 of 31 Event

Description:

SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicants Actions or Behavior

  • BML 256
  • SJL 026
  • SG ASD radiation - NORMAL
a. RCPs - ANY RUNNING
b. ECCS pumps - AT LEAST ONE RUNNING
c. RCS pressure - LESS THAN 1425 PSIG CREW IDENTIFY Ruptured SG(s):
  • Unexpected rise in any SG narrow range level (A SG)

OR

  • High radiation from any SG sample OR
  • High radiation from any SG steamline

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 19 of 31 Event

Description:

SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicants Actions or Behavior OR

  • High radiation from any SG Blowdown line sample CRITICAL TASK BOP ISOLATE Flow From Ruptured SG(s):
a. ADJUST ruptured SG(s) ASD controller setpoint to 1160 PSIG:
b. CHECK ruptured SG(s) ADS - CLOSED

IF SG ASD is NOT closed, THEN PLACE SG ASD controller BOP in MANUAL and CLOSE SGT ASD.

c. Locally CLOSE TDAFP Steam Supply From Main Steam Loop Manual Isolation valve from ruptured SG(s):
  • ABV0085 (SG B)
  • ABV0087 (SG C)
d. CHECK SG Blowdown and Sample Isolation valves from ruptured SG(s) - CLOSED
  • Blowdown Containment Isolation Valve:
  • BM HIS-1A (SG A)
  • Upper Sample Inner Containment Isolation valve:
  • BM HIS-19 (SG A)
e. CLOSE Steamline Low Point Drain valve from ruptured SG(s):

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 20 of 31 Event

Description:

SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicants Actions or Behavior

f. CHECK if C-9 interlocks - LIT
g. CLOSE MSIV and MSIV Bypass valve from ruptured SG(s):
  • CLOSE ruptured SG(s) MSIV (preferred order):
  • FAST CLOSE using EOP Addendum 35, MSIV Fast Closure, at MSFIS cabinets SA075A and SA075B OR
  • CLOSE all MSIV Bypass valves (preferred order):
  • USE Main Steamline Isolation Bypass Valves Controller AB HIK-15 OR
  • Locally ISOLATE MSIV Bypass valve(s) as necessary CREW CHECK Ruptured SG(s) Level:
a. Narrow range level - GREATER THAN 7% [25%]

Stop Feed flow to the ruptured SG

  • Close MDAFP flow control valve AL-HK-7A
  • Close TDAFP flow control valve AL-HK-8A CHECK Ruptured SG(s) Pressure - GREATER THAN 340 BOP PSIG BOP INITIATE RCS Cooldown:
a. CHECK RCS pressure - LESS THAN 1970 PSIG

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 21 of 31 Event

Description:

SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicants Actions or Behavior

  • P-11 light - LIT
b. BLOCK Steamline Pressure SI:
  • SB-HS-10 CRITICAL TASK CREW c. DETERMINE required core exit temperature: (variable)
d. DUMP steam to condenser from intact SG(s) at maximum BOP rate:
1. CHECK condenser - AVAILABLE
  • C-9 interlocks - LIT
2. PLACE Steam Header Pressure Controller in MANUAL and ZERO OUTPUT:
3. PLACE Steam Dump Select switch in STM PRESS position:
  • AB US-500Z
4. ADJUST Steam Header Pressure Controller in STM PRESS mode to achieve maximum cooldown rate:
e. Core exit TCs - LESS THAN REQUIRED TEMPERATURE
f. STOP RCS cooldown

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 22 of 31 Event

Description:

SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicants Actions or Behavior

g. MAINTAIN core exit TCs - LESS THAN REQUIRED TEMPERATURE BOP CHECK Intact SG Levels:
a. Narrow range levels - GREATER THAN 7% [25%]
b. CONTROL feed flow to maintain narrow range levels between 27% and 50%

RO CHECK PZR PORVs And Block Valves:

a. Power to Block Valves - AVAILABLE
  • BB HIS 8000A
  • BB HIS 8000B
b. PZR PORVs - CLOSED
  • BB HIS 455A
  • BB HIS 456B
c. Block Valves - AT LEAST ONE OPEN
  • BB HIS 8000A
  • BB HIS 8000B RO RESET SI:
  • SB HS-43A RO RESET Containment Isolation Phase A and Phase B

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 23 of 31 Event

Description:

SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicants Actions or Behavior

  • Phase A (CISA):
  • Phase B (CISB):
  • SB HS-55 RO ESTABLISH Instrument Air To Containment:
a. CHECK if ESW To Air Compressor valves - OPEN
  • EF HIS-43
  • EF HIS-44
b. START Air Compressor(s):
c. OPEN Instrument Air Supply Containment Isolation valve:
  • KA HIS-29 (will not open)

PERFORM the following:

IF valve CANNOT be opened, THEN locally OPEN valve.

(2000 Aux South piping pen room, P-30) (Will NOT open)

RO CHECK If RHR Pumps Should Be Stopped:

a. RHR Pumps - ANY RUNNING WITH SUCTION ALIGNED TO RWST
b. RCS pressure - GREATER THAN 325 PSIG

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 24 of 31 Event

Description:

SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicants Actions or Behavior

c. STOP RHR Pumps and PLACE in standby:
  • EJ HIS-1
  • EJ HIS-2
d. MONITOR RCS pressure BOP CHECK If RCS Cooldown Should Be Stopped:
a. Core exit TCs - LESS THAN REQUIRED TEMPERATURE
b. STOP RCS cooldown
c. MAINTAIN core exit TCs - LESS THAN REQUIRED TEMPERATURE BOP CHECK Ruptured SG(s) Pressure - STABLE OR RISING RO CHECK RCS Subcooling - GREATER THAN 50°F DEPRESSURIZE RCS To minimize Break Flow And Refill PZR:
a. Normal PZR spray - AVAILABLE (NO)

DEPRESSURIZE RCS Using PZR PORV To Minimize Break RO Flow And Refill PZR:

a. PZR PORV - AT LEAST ONE AVAILABLE
  • BB HIS-455A OR

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 25 of 31 Event

Description:

SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicants Actions or Behavior

  • BB HIS-456A
b. OPEN one PZR PORV until any of the following conditions satisfied:
  • Both of the following:
1. RCS pressure - LESS THAN RUPTURED SG(s)

PRESSURE

2. PZR level - GREATER THAN 9% [29%]

OR

  • PZR level - GREATER THAN 74% [64%]

OR

  • RCS subcooling LESS THAN 30°F
c. CLOSE PZR PORV:
  • BB HIS-455A
  • BB HIS-456A RO CHECK RCS Pressure - RISING CREW CHECK If ECCS Flow Should Be Terminated:
a. RCS subcooling - GREATER THAN 30°f
b. Secondary heat sink:
  • Narrow range level in at least one intact SG -

GREATER THAN 7% [25%]

OR

  • Total feed flow to SG(s) - GREATER THAN 300,000 LBM/HR
c. RCS pressure - STABLE OR RISING

Appendix D Operator Action Form ES-D-2 Op Test No.: 1 Scenario # 3 Event # 5, 6, 7 Page 26 of 31 Event

Description:

SGTR; Reactor Trip Required, ADV Fails Open, IA to CTMT Fails Closed Time Position Applicants Actions or Behavior

d. PZR level - GREATER THAN 9% [29%]

RO STOP ECCS Pumps And Place In Standby:

a. Both SI Pumps:
b. All but one CCP:
  • BG HIS-1A OR
  • BG HIS-2A Scenario may be terminated when ECCS pumps are stopped.

ATTACHMENT A Automatic Action Verification BOP CHECK Charging Pumps:

BOP a. CCPs - BOTH RUNNING

  • BG HIS-1A
  • BG HIS-2A BOP b. STOP NCP:
  • SI Pumps - BOTH RUNNING
  • RHR Pumps - BOTH RUNNING
  • EJ HIS-1

BOP a. CCPs to Boron Inj Header - FLOW INDICATED

  • EM FI-917A
  • EM FI-917B BOP b. RCS pressure - LESS THAN 1700 PSIG BOP c. SI Pump Discharge - FLOW INDICATED

ATTACHMENT A Automatic Action Verification

  • EJ FI-618
  • EJ FI-619 CAUTION: If offsite power is lost after SI reset, manual action may be required to restart safeguards equipment.

BOP CHECK ESW Pumps - BOTH RUNNING

  • EF HIS-55A
  • EF HIS-56A BOP CHECK CCW Alignment:

BOP a. CCW Pumps - ONE RUNNING IN EACH TRAIN

  • Red Train:
  • EG HIS-21 or EG HIS-23
  • Yellow Train
  • EG HIS-22 or EG HIS-24
b. CCW Service Loop Supply and Return valves for one BOP operating CCW pump - OPEN
  • EG ZL-15 AND EG ZL-53 OR
  • EG ZL-16 AND EG ZL-54 CHECK Containment Cooler Fans - RUNNING IN SLOW BOP SPEED
  • GN HIS-9
  • GN HIS-17
  • GN HIS-5
  • GN HIS-13 CHECK Containment Hydrogen Mixing Fans - RUNNING IN BOP SLOW SPEED
  • GN HIS-2

ATTACHMENT A Automatic Action Verification

  • GN HIS-4
  • GN HIS-1

BOP a. CHECK the following:

  • Containment pressure - GREATER THAN 27 PSIG OR
  • GN PR-934 indicates containment pressure - HAS BEEN GREATER THAN 27 PSIG OR
  • EN HIS-3
  • SA066X WHITE lights - ALL LIT
  • SA066Y WHITE lights - ALL LIT BOP d. ESFAS status panels CISB sections:
  • SA066X WHITE lights - ALL LIT
  • SA066Y WHITE lights - ALL LIT BOP CHECK If Main Steamlines Should Be Isolated:

BOP a. CHECK for any of the following:

  • Containment pressure - GREATER THAN 17 PSIG OR

ATTACHMENT A Automatic Action Verification

  • GN PR-934 indicates containment pressure - HAS BEEN GREATER THAN 17 PSIG OR
  • Steamline pressure - LESS THAN 615 PSIG OR
  • AB PR-514 or PR-535 indicates steamline pressure -

HAS BEEN LESS THAN 615 PSIG BOP b. CHECK MSIVs and Bypass valves - CLOSED BOP CHECK ECCS Valves - PROPER EMERGENCY ALIGNMENT BOP a. ESFAS status panels SIS sections:

  • SA066X WHITE lights - ALL LIT
  • SA066Y WHITE lights - ALL LIT BOP CHECK Containment Isolation Phase A:

BOP a. ESFAS status panels CISA sections:

  • SA066X WHITE lights - ALL LIT
  • SA066Y WHITE lights - ALL LIT BOP CHECK SG Blowdown Isolation:

BOP ESFAS status panels SGBSIS sections:

  • SA066X WHITE lights - ALL LIT
  • SA066Y WHITE lights - ALL LIT CAUTION: If offsite power is lost after SI reset, manual action may be required to restart safeguards equipment.

BOP CHECK Both Trains of control Room Ventilation Isolation:

BOP a. ESFAS status panels CRVIS sections:

ATTACHMENT A Automatic Action Verification

  • SA066X WHITE lights - ALL LIT
  • SA066Y WHITE lights - ALL LIT BOP CHECK Containment Purge Isolation:

BOP a. ESFAS status panels CPIS sections:

  • SA066X WHITE lights - ALL LIT
  • SA066Y WHITE lights - ALL LIT BOP Notify CRS of the following:
  • Manual actions taken
  • Failed Equipment
  • Attachment A, Automatic Action Verification, completed

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Callaway Task No.:

Task

Title:

Perform a shutdown margin JPM No.: 2005 NRC RO/SRO calculation. A1-1 K/A

Reference:

2.1.32 (3.4)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing: This JPM can be performed in any setting with the available references.

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • The reactor tripped 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> ago.
  • The current time is 0800
  • The unit had been at 100 % power for 22 days.
  • Core Burnup is 275 EFPD. (12,400 MWD/MTU)
  • Tavg is 557 F.
  • Boron Concentration at the time of the trip was 1075 PPM and has not changed.
  • Control Bank D was at 210 steps.
  • The operating crew is preparing to withdraw the shutdown bank rods.

Task Standard: Critical steps completed within specified boundaries.

Required Materials:

  • Calculator
  • Straight Edge
  • WINPCNDR General

References:

OSP-SF-0001, SHUTDOWN MARGIN CALCULATION, Rev. 028 Handouts:

  • Curve Book Initiating Cue: The Shift Supervisor has assigned you to perform a Shutdown Margin Calculation in accordance with OSP-SF-0001, prior to withdrawing the shutdown bank rods.

Time Critical Task: No Callaway RO/SRO A1-1 Rev 0 NUREG 1021, Revision 9, Supplement 1

Appendix C Job Performance Measure Form ES-C-1 Worksheet Validation Time: 65 Minutes Callaway RO/SRO A1-1 Rev 0 NUREG 1021, Revision 9, Supplement 1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR SETUP Callaway RO/SRO A1-1 Rev 0 NUREG 1021, Revision 9, Supplement 1

Appendix C Page 4 of 13 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a )

Performance Step: 1 Locate/review procedure.

Standard: Determines METHOD 2 applies and proceeds to Section 7.5.

Comment:

Evaluator Cue: Provide a copy of OSP-SF-0001.

Performance Step: 2 Complete ATTACHMENT 2:

  • Signs onto ATTACHMENT 2.

Standard: Records Name, Initials, Date, and Time.

Comment:

Performance Step: 3

  • Log critical conditions prior to the shutdown.

Standard: Transposes information from Initial Conditions.

Comment:

Performance Step: 4

  • Record the total power defect for the associated power level and burnup from Curve Book Table 1-8,Section II.

Standard: Records 1745 pcm in 7.5.1.5. (1725 - 1765 acceptable)

Comment:

Callaway RO/SRO A1-1 Rev 0 NUREG 1021, Revision 9, Supplement 1

Appendix C Page 5 of 13 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 5

  • Record the redistribution allowance and voids reactivity from Curve Book Table 1-8,Section II.

Standard: Records 279 pcm in 7.5.1.5.1 (277-279 is acceptable)

Comment:

Performance Step: 6

  • Add the redistribution allowance and voids reactivity (Step 7.5.1.5.1) to the total power defect (Step 7.5.1.5) to obtain the corrected total power defect.

Standard: Records 2024 pcm (1745 + 279) in 7.5.1.5.2.

2002 to 2044 is acceptable Comment:

Performance Step: 7

  • Record the available rod worth from Curve Book Table 1-8,Section II.

Standard: Records 4691 pcm in 7.5.1.6.

Comment:

Performance Step: 8

  • Record the worst stuck rod's reactivity worth from Curve Book Table 1-8,Section II.

Standard: Records 1115 pcm in 7.5.1.7 Comment:

Callaway RO/SRO A1-1 Rev 0 NUREG 1021, Revision 9, Supplement 1

Appendix C Page 6 of 13 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 9

  • If any rods are considered (a) untrippable and not fully inserted, or (b) trippable but misaligned below its bank; multiply the number of such rods by the reactivity of the most reactive rod (step 7.5.1.7) and record the total reactivity.

Standard: Records ZERO in 7.5.1.8 Comment:

Evaluator Cue: All rods are operable and aligned with their respective banks.

Performance Step: 10

  • Total the reactivities from steps 7.5.1.5.2, 7.5.1.6, and 7.5.1.8 to obtain the shutdown reactivity.

Standard: Performs algebraic addition and records -2667 pcm in 7.5.1.9.

Comment:

Procedure NOTE prior T/S BSR 3.1.1.1 requires the consideration of Samarium to Xenon concentration when determining SDM. In the interest of determination: providing a conservative SDM calculation, the Samarium concentration and associated reactivity worth is considered to be zero Performance Step: 11 SHUTDOWN REACTIVITY CORRECTIONS: XENON

  • Record the Xenon reactivity, prior to the shutdown, from XEPRED on the PC; or from computer point REU1504.

Standard: Attempts to locate computer point Evaluator Cue: Computer Point REU1504 indicates 2902.2 pcm Xenon.

Comment:

Callaway RO/SRO A1-1 Rev 0 NUREG 1021, Revision 9, Supplement 1

Appendix C Page 7 of 13 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 12

  • Determine the time interval since shutdown (step 7.5.1.1).
  • Record the Xenon reactivity worth for the elapsed time interval after shutdown as derived from XEPRED on the PC; or computer point REU1504.

Standard:

  • Records 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> from Initial Conditions.
  • Attempts to locate computer point.

Evaluator Cue: Computer Point REU1504 indicates 3967.5 pcm Xenon.

Comment:

Performance Step: 13

  • Subtract xenon reactivity in step 7.6.1.1 from step 7.6.1.3 to obtain the net xenon reactivity.

Standard: Performs algebraic addition and records -1064.7 pcm in 7.6.1.4.

Comment:

Performance Step: 14 SHUTDOWN REACTIVITY CORRECTIONS: RODS

  • Record the controlling control rod bank and its height prior to the shutdown from the step counters or from the URO Logbook entry at the beginning of the shift the last time the unit was at steady state power or from the plant computer.

See Attachment 7.

  • From WINPCNDR (Integral Rod Worths for HFP and HZP, respectively), record the remaining amount of negative reactivity that could be withdrawn from the core, based on the recorded bank height, power level, and burnup which existed prior to the shutdown. (SOS 95-1204)

Standard:

  • Records Bank D @ 210 steps from Initial Conditions.
  • Attempts to locate value on WINPCNDR Evaluator Cue:

Comment:

Callaway RO/SRO A1-1 Rev 0 NUREG 1021, Revision 9, Supplement 1

Appendix C Page 8 of 13 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 15

  • From Curve Book Figure 13-1, record the Rod Insertion Limit (RIL) for the power level which existed prior to the shutdown.

Standard: Records D at 161 inches in 7.6.2.3 Comment:

Performance Step: 16

  • From WINPCNDR, record the reactivity associated with the RIL in 7.6.2.3, based on the power level and burnup which existed prior to the shutdown.

Standard: Records 203.4 pcm in 7.6.2.4.

Evaluator Cue:

Comment:

Performance Step: 17

  • Calculate control rod correction by subtracting the critical rod worth (7.6.2.2) from the RIL worth (7.6.2.4) and multiplying by 0.90. This allows for a 10% rod worth uncertainty.

Standard: Records .90(7.6.2.4 - 7.6.2.2) = 162.3 pcm.

Comment:

Performance Step: 18 SHUTDOWN REACTIVITY CORRECTIONS: TEMPERATURE

  • Enter the minimum temperature anticipated during the shutdown.
  • Using WINPCNDR, record the isothermal temperature defect for critical boron concentration from step 7.5.1.4 and the minimum anticipated temperature from step 7.6.3.1.

Standard: Using WINPCNDR, records 0.1 pcm.

Callaway RO/SRO A1-1 Rev 0 NUREG 1021, Revision 9, Supplement 1

Appendix C Page 9 of 13 Form ES-C-1 PERFORMANCE INFORMATION Evaluator Cue:

Comment:

Procedure NOTE prior Boron integral worth values from WINPCNDR are positive to boron correction values as supplied by Westinghouse. The intent for this steps. section is to determine the integral boron worth for a change in boron concentration.

Performance Step: 19 SHUTDOWN REACTIVITY CORRECTIONS: BORON

  • Using WINPCNDR record the integral boron worth for the critical boron concentration obtained in Step 7.5.1.4, and the minimum temperature from 7.6.3.1.
  • Record the actual boron concentration from the most recent sample.
  • Enter the B-10 depletion correction. If step 7.6.4.2 <

step 7.5.1.4, this is 0. Otherwise, it is (step 7.6.4.2 - step 7.5.1.4) x (-0.025) (SOS 95-1985).

  • Record the integral boron worth for the corrected measured boron concentration and minimum temperature from 7.6.3.1 using WINPCNDR.
  • Subtract the integral boron worth for the corrected measured boron concentration (step 7.6.4.5) from the integral boron worth for the critical boron concentration (steps 7.6.4.1).

Standard: The net result of performing these steps will be ZERO. Using WINPCNDR, determines Integral Boron Worth is 1050.5 pcm.

Enters 0 for Boron depletion Enters 1050.5 pcm for corrected measured boron concentration Determines correction is 0 Comment: If the candidate fails to read or understand the note prior to the steps then he/she may perform these steps/calculations.

The net result will be ZERO since boron concentration did not change.

Callaway RO/SRO A1-1 Rev 0 NUREG 1021, Revision 9, Supplement 1

Appendix C Page 10 of 13 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 20 Add the change in boron worth (Step 7.6.4.6) and the poison competition correction factor (Step 7.6.4.7) to determine the corrected change in boron worth.

Standard: Records +300 pcm by carrying down the pre-inserted value in 7.6.4.7 to 7.6.4.8.

Comment:

Performance Step: 21 TOTAL SHUTDOWN REACTIVITY (SHUTDOWN MARGIN DETERMINATION):

  • Total the reactivities from steps 7.5.1.9, 7.6.1.4, 7.6.2.5, 7.6.3.2, and 7.6.4.8.

Standard: Performs algebraic addition of steps 7.5.1.9, 7.6.1.4, 7.6.2.5, 7.6.3.2, and 7.6.4.8 and records -3612.1 pcm 7.6.5.1.

Comment:

Performance Step: 22 COLR COMPARISON:

Record the reactivity required to meet shutdown limits for the current mode.

  • Modes 1 - 4, use COLR section 2.1.1 Standard: Consults COLR and records 1.3% DK/K (-1300 pcm)

Comment:

Callaway RO/SRO A1-1 Rev 0 NUREG 1021, Revision 9, Supplement 1

Appendix C Page 11 of 13 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 23 Record the Total Shutdown Reactivity from step 7.6.5.1.

Standard: Records -3612.1 pcm (Accept -3450 to -3750 pcm)

Comment:

Performance Step: 24 Determine if the Total Shutdown Reactivity recorded in step 7.7.2 is more negative than the limits provided in COLR recorded in step 7.7.1. (Circle Yes or No)

Standard: Circles YES.

Comment:

Terminating Cue: After the COLR comparison is complete: This JPM is complete.

Callaway RO/SRO A1-1 Rev 0 NUREG 1021, Revision 9, Supplement 1

Appendix C Page 12 of 13 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC RO A1-1 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

Callaway RO/SRO A1-1 Rev 0 NUREG 1021, Revision 9, Supplement 1

Appendix C Page 13 of 13 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The reactor tripped 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> ago.
  • The current time is 0800
  • The unit had been at 100 % power for 22 days.
  • Core Burnup is 275 EFPD. (12,400 MWD/MTU)
  • Tavg is 557 F.
  • Boron Concentration at the time of the trip was 1075 PPM and has not changed.
  • Control Bank D was at 210 steps.
  • The operating crew is preparing to withdraw the shutdown bank rods.

INITIATING CUE: The Shift Supervisor has assigned you to perform a Shutdown Margin Calculation in accordance with OSP-SF-0001, prior to withdrawing the shutdown bank rods.

Callaway RO/SRO A1-1 Rev 0 NUREG 1021, Revision 9, Supplement 1

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Callaway Task No.:

Task

Title:

Determine the volume and RMCS JPM No.: 2005 NRC RO/SRO controls settings for raising RWST A1-2 level.

K/A

Reference:

2.1.25 (2.8)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing: This JPM can be performed in any setting with the required references available.

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • The unit is coming out of a refueling outage.
  • A significant leak occurred during the refuel pool draindown process.
  • BAST concentration is 7000 ppm Task Standard: Volume addition and controls settings within the specified range.

Required Materials:

  • Straight Edge
  • Calculator General

References:

OTN-BG-00002, REACTOR MAKEUP CONTROL AND BORON THERMAL REGENERATION SYSTEM, Rev. 020 Handouts:

  • OTN-BG-0002
  • RWST Level/Volume Curve Initiating Cue: You have been directed to determine the volume addition required to establish the RWST level to 98% and the Reactor Makeup Control System settings to maintain RWST boron concentration at its current value with a makeup flow rate of 90 GPM Time Critical Task: No Validation Time: 10 Minutes NUREG 1021, Revision 9, Supplement 1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR SETUP N/A NUREG 1021, Revision 9, Supplement 1

Appendix C Page 3 of 6 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a )

Evaluator Note: There is no required sequence of steps. The candidate may first refer to OTN-BG-0002.

Performance Step: 1 Determine the volume to be added.

Standard: Refers to RWST Level/Volume Curve and determines 23,500 gallons but 25,500 must be added.

Comment:

Evaluator Cue: Provide a copy of the RWST Level/Volume Curve if the book is not available where the JPM is performed or the existing document cannot be marked.

Performance Step: 2 Locate/review the applicable procedure.

Standard: Locates OTN-BG-0002 and determines that Section 5.5 -

MANUAL MODE OF RMCS OPERATION applies.

Comment:

Evaluator Cue: Provide OTN-BG-0002, Section 5.5.

NUREG 1021, Revision 9, Supplement 1

Appendix C Page 4 of 6 Form ES-C-1 PERFORMANCE INFORMATION Procedure NOTES

  • If the makeup water is to be blended for use somewhere preceding the step: other than the Chemical and Volume Control System, ensure that the VCT level is sufficient for expected plant operating conditions.
  • If makeup is required to the Spent Fuel Pool refer to OTN-EC-00001 Performance Step: 3 Determine the desired boric acid and makeup water flow rates, for blended flow using Figure 7-2.

Standard: Refers to Figure 7-2 and determines:

  • Makeup Water flow = 59.14 GPM Evaluator Cue: Assume that adequate supply capacity is available to perform the evolution.

Performance Step: 4 Determines RMCS settings based upon required blended flow rates Standard: Refers to Figure 7-2 and determines:

  • Blended flow BG-FK-110 potentiometer setting 5.63 Evaluator Cue: Assume that adequate supply capacity is available to perform the evolution.

Terminating Cue: After the controls settings are determined: This JPM is complete.

NUREG 1021, Revision 9, Supplement 1

Appendix C Page 5 of 6 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC RO/SRO A1-2 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

NUREG 1021, Revision 9, Supplement 1

Appendix C Page 6 of 6 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The unit is coming out of a refueling outage.
  • A significant leak occurred during the refuel pool draindown process.
  • BAST concentration is 7000 ppm INITIATING CUE: You have been directed to determine the volume addition required to establish the RWST level to 98% and the Reactor Makeup Control System settings to maintain RWST boron concentration at its current value with a makeup flow rate of 90 GPM.

NUREG 1021, Revision 9, Supplement 1

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Callaway Plant Task No.:

Task

Title:

Determine isolation points for a JPM No.: 2005 NRC RO A2 tagging request K/A

Reference:

2.2.13 (3.6)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: Containment Spray Pump A flow element EN FE-5 is leaking on the high side tap.

A job has been initiated to drain the associated piping and repair the flow element Task Standard: Tagging boundaries are identified to provide minimum isolation of EN FE-5 Required Materials: ODP-ZZ-00310, Workmens Protection Assurance M-22BN01, M-22EN01, E-23EN01 General

References:

ODP-ZZ-0310, Workmens Protection Assurance M-22BN01, M-22EN01, E-23EN01 Initiating Cue: You have been directed to identify the tagging boundaries to allow work to be performed on flow element EN FE-5.

Time Critical Task: NO Validation Time: 15 Minutes Callaway 2005 NRC RO A2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR SETUP None Required Callaway 2005 NRC RO A2 NUREG 1021, Revision 9

Appendix C Page 3 of 6 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Obtains required drawings Standard: Locates print rack and identifies required drawings Evaluator Note: Isolation points may be identified in any order Comment:

Performance Step: 2 EN HV-1, Containment Recirc Sump Supply valve will be closed Standard: Locates and marks EN HV-1 closed Comment:

Performance Step: 3 EN HV-6, Containment Spray A discharge to Containment will be closed Standard: Locates and marks EN HV-6 closed Comment:

Performance Step: 4 EN V-24, Recirculation valve to RWST, will be closed Standard: Locates and marks EN V-24 closed Comment:

Callaway 2005 NRC RO A2 NUREG 1021, Revision 9

Appendix C Page 4 of 6 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 5 BN HV-4, RWST suction supply to Containment Spray Pump A, will be closed Standard: Locates and marks BN HV-4 closed Comment:

Performance Step: 6 EN V-90, Containment Spray line vent valve, will be open Standard: Locates and marks EN V-90 open Comment:

Performance Step: 7 EITHER ONE of EN V-92 or EN V-67, Containment Spray line drain valves, will be open Standard: Locates and marks either EN V-92 or EN V-67 open Comment:

Performance Step: 8 Pump breaker must be opened and electrically isolated Standard: Identifies isolation of Containment Spray Pump A electrical circuit breaker Comment:

Terminating Cue: When the applicant has determined the isolation boundaries for the work to be performed.

STOP TIME:

Callaway 2005 NRC RO A2 NUREG 1021, Revision 9

Appendix C Page 5 of 6 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC RO A2 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

Callaway 2005 NRC RO A2 NUREG 1021, Revision 9

Appendix C Page 6 of 6 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: Containment Spray Pump A flow element EN FE-5 is leaking on the high side tap.

A job has been initiated to drain the associated piping and repair the flow element INITIATING CUE: You have been directed to identify the tagging boundaries to allow work to be performed.

Callaway 2005 NRC RO A2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Callaway Plant Task No.:

Task

Title:

Review a tagging request for JPM No.: 2005 NRC SRO A2 approval K/A

Reference:

2.2.13 (3.6)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: Containment Spray Pump A flow element EN FE-5 is leaking on the high side tap.

A job has been initiated to drain the associated piping and repair the flow element Task Standard: Tagging boundaries are identified to provide minimum isolation of EN FE-5. WPA not approved due to 2 deficiencies Required Materials: ODP-ZZ-00310, Workmens Protection Assurance M-22BN01, M-22EN01, E-23EN01 General

References:

ODP-ZZ-0310, Workmens Protection Assurance M-22BN01, M-22EN01, E-23EN01 Initiating Cue: You have been directed to review the WPA for approval to allow work to be performed on flow element EN FE-5.

Time Critical Task: NO Validation Time: 15 minutes Callaway 2005 NRC SRO A2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR SETUP None Required Callaway 2005 NRC SRO A2 NUREG 1021, Revision 9

Appendix C Page 3 of 6 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Obtains required drawings Standard: Locates print rack and identifies required drawings Evaluator Note: Isolation points may be identified in any order Comment:

Performance Step: 2 Reviews WPA to determine appropriate isolation points for Containment Spray Pump A flow element FE-5 Standard: Reviews tag listing Comment:

Performance Step: 3 Determines that BN HV-4, RWST suction supply to Containment Spray Pump A must be closed and tagged Standard: Identifies deficiency on tagging request. Local handwheel must be tagged as part of valve isolation Comment:

Performance Step: 4 Determines that Containment Spray Pump A breaker must be tagged Standard: Identifies that the Containment Spray Pump A breaker is not tagged and requires tagging Comment:

Callaway 2005 NRC SRO A2 NUREG 1021, Revision 9

Appendix C Page 4 of 6 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 5 Return the WPA without approval Standard: Determines that WPA cannot be approved Comment:

Terminating Cue: When the applicant has provided disposition of the WPA, this JPM is complete STOP TIME:

Callaway 2005 NRC SRO A2 NUREG 1021, Revision 9

Appendix C Page 5 of 6 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC RO A2 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

Callaway 2005 NRC SRO A2 NUREG 1021, Revision 9

Appendix C Page 6 of 6 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: Containment Spray Pump A flow element EN FE-5 is leaking on the high side tap.

A job has been initiated to drain the associated piping and repair the flow element INITIATING CUE: You have been directed to review the WPA for approval to allow work to be performed on flow element EN FE-5.

Callaway 2005 NRC SRO A2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Callaway Plant Task No.: N/A Task

Title:

Determine Maximum Allowable Stay JPM No.: 2005 NRC RO A3 Time K/A

Reference:

2.3.2 (2.5)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: A job is being performed on RHR Pump A that requires isolating and draining system piping.

You have been directed to open RHR Pump A drain valve EJ V-148 and route a hose to the local floor drain Task Standard: Correct RWP is selected and stay time identified as 30 minutes based upon exceeding maximum dose Required Materials: RWPs, Survey Maps General

References:

RWPs, Survey Maps Initiating Cue: Identify the appropriate RWP for entry and determine maximum allowable stay time before a dosimeter limit is exceeded.

Time Critical Task: NO Validation Time: 8 Minutes Callaway 2005 NRC RO/SRO A3 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR SETUP None Required Callaway 2005 NRC RO/SRO A3 NUREG 1021, Revision 9

Appendix C Page 3 of 5 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Determine RWP required for task performed Standard: Selects RWP 500501WPA Comment:

Performance Step: 2 Determines stay time based upon dosimeter setting Standard: Determines dosimeter setting is 10 mr total dose and 100 mr/hr dose rate.

Standard: Selects survey map #1111, RHR Pump A room Standard: Determines dose rate in the area of the work is 20 mr/hr Standard: Determines maximum stay time at 20 mr/hr is 30 minutes to avoid exceeding 10 mr total dose.

Comment:

Terminating Cue: When the candidate indicates stay time for the work performed, this JPM is complete STOP TIME:

Callaway 2005 NRC RO/SRO A3 NUREG 1021, Revision 9

Appendix C Page 4 of 5 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC RO A3 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

Callaway 2005 NRC RO/SRO A3 NUREG 1021, Revision 9

Appendix C Page 5 of 5 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: A job is being performed on RHR Pump A that requires isolating and draining system piping.

You have been directed to open RHR Pump A drain valve EJ V-148 and route a hose to the local floor drain INITIATING CUE: Identify the appropriate RWP for entry and determine maximum allowable stay time before a dosimeter limit is exceeded.

Callaway 2005 NRC RO/SRO A3 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Callaway Task No.:

Task

Title:

Evaluate plant conditions, upgrade JPM No.: 2005 NRC SRO A4 the emergency classification and make a PAR.

K/A

Reference:

2.4.44 (4.0)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • A large break LOCA is in progress.
  • A Site Emergency was declared 20 minutes ago based on loss of the RCS subcooling and radiation monitor GT-RE-59 reading 3.1E+3 R/hr.
  • One minute ago containment pressure lowered rapidly and now continues to lower at a slower rate.
  • Wind speed is 5 Miles/Hr.
  • Wind direction is from 218°
  • The outside temperature is 88 F.

Task Standard: Upgrades classification and makes a PAR.

Required Materials: SENTRY Computer General

References:

  • EIP-ZZ-00101, CLASSIFICATION OF EMERGENCIES, Rev.

032

  • EIP-ZZ-00102, EMERGENCY IMPLEMENTING ACTIONS, Rev.

034

  • EIP-ZZ-00212, PROTECTIVE ACTION RECOMMENDATIONS, Rev. 021 Handouts: EIP-ZZ-00101, EIP-ZZ-00102, EIP-ZZ-00212 Initiating Cue: Reevaluate the Emergency Classification and perform required follow up actions required of the Emergency Coordinator.

Callaway SRO NRC JPM A4 NUREG 1021, Revision 9, Supplement 1

Appendix C Job Performance Measure Form ES-C-1 Worksheet Time Critical Task: Yes Validation Time: 24 Minutes Callaway SRO NRC JPM A4 NUREG 1021, Revision 9, Supplement 1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR SETUP N/A JPM Setup:

Ensure SENTRY Screen is called up on computer with plant WIND SECTOR data deleted, then minimize screen prior to JPM performance Callaway SRO NRC JPM A4 NUREG 1021, Revision 9, Supplement 1

Appendix C Page 4 of 8 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a )

Performance Step: 1 Review changing conditions.

Standard:

  • Enters EIP-ZZ-00101
  • Reviews Group 2 (Fission Product Barrier) EALs
  • Declares General Emergency based on uncontrolled depressurization of containment.

Comment:

Performance Step: 2 Enters EIP-ZZ-00102 Standard: Announces GE and reason to control room personnel.

Comment: The candidate may work through the next several steps using EIP-ZZ-00102, ATTACHMENT 5 (flowcharted procedure steps).

Mark the time of the GE announcement: __________.

ATTACHMENT 4, OFF SITE NOTIFICATION FORM, must be provided to the communicator within 15 minutes from this time.

Performance Step: 3 Manually initiate ERFIS.

Standard: Locates ERFIS button.

Comment:

Evaluator Cue: ERFIS was actuated when the Site Emergency was declared.

Callaway SRO NRC JPM A4 NUREG 1021, Revision 9, Supplement 1

Appendix C Page 5 of 8 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 4 Notify On-site personnel Standard:

  • Completes ATTACHMENT 1
  • Sounds plant emergency alarm.
  • Makes the scripted announcement and repeats.

Comment:

Evaluator Cue: For the purpose of examination security, direct the candidate to simulate the alarm actuation and announcement.

Performance Step: 5 Have SAS activate the callout.

Standard: Acknowledges cue.

Comment:

Evaluator Cue: SAS was activated when the Site Emergency was declared.

Performance Step: 6 Complete the SENTRY screen or fill out ATTACHMENT 4.

Standard: Completes the SENTRY screen. Critical task data:

  • Release in progress
  • Wind speed and direction
  • PAR - Evacuate 2 miles all around and 5 miles in downwind sectors B, C, and D Comment:

Callaway SRO NRC JPM A4 NUREG 1021, Revision 9, Supplement 1

Appendix C Page 6 of 8 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 7 Provide ATTACHMENT 4 to the communicator.

Standard: Provides ATTACHMENT 4 to the communicator within 15 minutes after the GE declaration.

Comment: Mark the time that ATTACHMENT 4 is provided to the communicator: __________.

Terminating Cue: After ATTACHMENT 4 is provided to the communicator, this JPM is complete.

Callaway SRO NRC JPM A4 NUREG 1021, Revision 9, Supplement 1

Appendix C Page 7 of 8 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC SRO A4 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

Callaway SRO NRC JPM A4 NUREG 1021, Revision 9, Supplement 1

Appendix C Page 8 of 8 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • A large break LOCA is in progress.
  • A Site Emergency was declared 20 minutes ago based on loss of the RCS subcooling and radiation monitor GT-RE-59 reading 3.1E+3 R/hr.
  • One minute ago containment pressure lowered rapidly and now continues to lower at a slower rate.
  • Wind speed is 5 Miles/Hr
  • Wind direction is from 218°
  • The outside temperature is 88 F.

INITIATING CUE: Reevaluate the Emergency Classification and perform required follow up actions required of the Emergency Coordinator.

Callaway SRO NRC JPM A4 NUREG 1021, Revision 9, Supplement 1

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Callaway Task No.:

Task

Title:

Borate RCS During Cooldown JPM No.: 2005 NRC JPM P1 Outside the Control Room K/A

Reference:

068 EA 1.11 3.9 / 4.1 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: X Actual Performance:

Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The control room is damaged beyond use and systems are aligned as per OTO-ZZ-00001, Control Room Inaccessibility. The plant is shutdown with control from the Aux S/D Panel due to a fire. The plant is in Mode 3 at normal operating temperature and pressure. Pressurizer level is 25%, RCS boron concentration is 1000 ppm, and all shutdown and control rods are fully inserted. Core burnup is 295 EFPD. The B CCP is in service.

Task Standard: RCS boration from outside the control room has been completed Required Materials: OTS-ZZ-00001, Cooldown From Outside the Control Room, Revision 13 Curve Book Table 1-8 General

References:

OTS-ZZ-00001, Cooldown From Outside the Control Room, Revision 13 Initiating Cue: You have been directed by the Shift Supervisor to perform Section 4.1 of OTS-ZZ-00001 to borate the RCS.

Time Critical Task: NO Validation Time: 19 minutes 2005 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Page 2 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Obtain a controlled copy of OTS-ZZ-00001, Cooldown From Outside the Control Room.

Standard: Operator should obtain procedure copy.

Comment:

Step 2.0 Performance Step: 2 Review the Precautions and Limitations of OTS-ZZ-00001.

Standard: Operator should review all precautions and limitations.

Comment:

Evaluators Cue: All Precautions and Limitations are satisfied.

Performance Step: 3 Review the Initial Conditions of OTS-ZZ-00001.

Standard: Operator should review all Initial Conditions.

Comment:

Evaluators Cue: All Initial Conditions are satisfied.

Ask if the Operator understands the Initial Conditions and Initiating Cues.

Step 4.1 Performance Step: 4 Borate the RCS to Xenon-Free Cold Shutdown as follows.

Standard: Operator should determine to borate the RCS to Cold Xenon-Free Shutdown.

Comment:

2005 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Page 3 of 7 Form ES-C-1 PERFORMANCE INFORMATION Step 4.1.1 Performance Step: 5 Determine the required boron concentration for cold shutdown using Curve Book Table 1-8.

Standard: Operator should determine required boron concentration is approximately 1150 ppm.

Comment:

Step 4.1.1.1 Performance Step: 6 Determine the number of gallons of 4 WT % boric acid from the BAT required to achieve the boron concentration in Step 4.1.1 using Figure 7-3 of the Curve Book.

Standard: Operator should calculate 1567 +/- 200 GAL.

515676 7000-1000 VB B In ( )

8.33 7000-1150 Comment: Nomograph indicates approximately 1350 -1400 gallons Step 4.1.2.1 Performance Step: 7 Start a Boric Acid Transfer Pump A or B with local control switch or with the pushbutton on the associated breaker pump A(B) NG01AHF4 (NG02AAF4).

Standard: Operator should start A or B Boric Acid Pump.

Comment:

Evaluators Cue: The Boric Acid Transfer Pump is running.

Step 4.1.2.2 Performance Step: 8 Open the Immediate Boration valve BGHV8104.

Standard: Operator goes to A SI Pump Room and manually OPENS BG-HV-8104.

Comment:

Evaluators Cue: BGHV8104 is OPEN.

2005 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION Step 4.1.2.3 Performance Step: 9 Monitor boric acid flow on Local Indicator BGFI183B.

Standard: Operator should monitor boric acid flow on BGFI183B.

Comment:

Evaluators Cue: Local Indicator shows 100 GPM.

Step 4.1.4 Performance Step: 10 Determine the boration time required by dividing the gallons of acid by the flow rate indicated.

Standard: 1567 GAL

= 16 MIN (+/- 3 MIN) 100 GPM Comment:

Evaluators Cue: The required time has elapsed.

Step 4.1.5.1 Performance Step: 11 When the required time has elapsed, stop the Boric Acid Transfer Pump.

Standard: Operator should secure A or B Boric Acid Pump with the local control switch or the pushbutton on the breaker A - NG01AHF4 B - NG02AAF4 Comment:

Evaluators Cue: The Boric Acid Transfer Pump is STOPPED.

Step 4.1.5.2 Performance Step: 12 CLOSE BGHV8104.

Standard: Operator should CLOSE BGHV8104.

Comment:

Evaluators Cue: BGHV8104 is CLOSED.

2005 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION Step 4.1.7 Performance Step: 13 Have the RCS sampled to ensure the required SDM has been obtained.

Standard: Operator should call for Chemistry to sample RCS for boron.

Comment:

Evaluators Cue: When called, Hot Lab Chem Tech will sample RCS for boron.

Terminating Cue: When boration of the RCS has been performed, this JPM is complete.

STOP TIME:

2005 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC JPM P1 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2005 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: The control room is damaged beyond use and systems are aligned as per OTO-ZZ-00001, Control Room Inaccessibility. The plant is shutdown with control from the Aux S/D Panel due to a fire. The plant is in Mode 3 at normal operating temperature and pressure. Pressurizer level is 25%, RCS boron concentration is 1000 ppm, and all shutdown and control rods are fully inserted.

Core burnup is 295 EFPD. The B CCP is in service.

INITIATING CUE: You have been directed by the Shift Supervisor to perform Section 4.1 of OTS-ZZ-00001 to borate the RCS.

2005 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Callaway Task No.:

Task

Title:

Locally Close Valves for CIS-B JPM No.: 2005 NRC JPM P2 K/A

Reference:

103 A2.03 3.5 / 3.8 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: X Actual Performance:

Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: Callaway Plant was at 100% power when a Loss of All AC Power occurred. The Control Room entered emergency procedure ECA-0.0, Loss of All AC Power. A containment spray signal has been received and required valve positions can not be performed from the Control Room.

Task Standard: Upon completion of this JPM, valves associated with Penetrations 74, 75, and 76 will be closed or verified closed.

Required Materials: None General

References:

ECA-0.0, Loss of All AC Power, Revision 5 Initiating Cue: The Control Room supervisor has directed you to perform Local Operator Actions of Step 21B RNO (CISB Outer Containment Valves),

of ECA-0.0. Reposition any required valves and inform him when done.

Time Critical Task: NO Validation Time: 10 minutes 2005 NRC JPM P2 NUREG 1021, Revision 9

Appendix C Page 2 of 9 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Obtain a verified working copy of ECA-0.0, Loss of All AC Power.

Standard: Operator should obtain ECA-0.0 copy.

Comment:

Evaluators Cue: Provide operator with copy of ECA-0.0.

Performance Step: 2 Go to the Aux Building North Piping Penetration Room #1323.

Standard: Operator should go to the North Piping Penetration Room #1323.

NOTE: Operator should go thru RP Access.

Comment:

Performance Step: 3 Verify CLOSED EG-HV-58, CCW to RCS outer CTMT ISO.

Standard: Operator should demonstrate knowledge of how to verify a motor-operated valve OPEN/CLOSED.

NOTE: Pen 74, valves in Steps 3 through 8 can be operated in any order.

Comment:

Evaluator Cue: EG-HV-58 is open 2005 NRC JPM P2 NUREG 1021, Revision 9

Appendix C Page 3 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 4 CLOSE EG-HV-58, CCW to RCS Outer CTMT ISO.

Standard: Operator should CLOSE EG-HV-58.

NOTE: Operator should be able to describe how to CLOSE a limitorque valve.

Standard: Valves in Steps 3 through 8 can be operated in any order.

Comment:

Evaluators Cue: EG-HV-58 is now CLOSED.

Performance Step: 5 Verify CLOSED EG-HV-71, CCW to RCS Outer CTMT ISO.

Standard: Operator should verify position of EG-HV-71.

NOTE: Pen 74 Standard: Valves in Steps 3 through 8 can be operated in any order.

Comment:

Evaluators Cue: EG-HV-71 is OPEN.

2005 NRC JPM P2 NUREG 1021, Revision 9

Appendix C Page 4 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 6 Operator should CLOSE EG-HV-71, CCW to RCS Outer CTMT ISO.

Standard: Operator should CLOSE EG-HV-71.

NOTE: Pen 74 Standard: Valves in Steps 3 through 8 can be operated in any order.

Comment:

Evaluators Cue: EG-HV-71 is now CLOSED.

Performance Step: 7 Verify CLOSED EG-HV-126, CCW to RCS CTMT Bypass.

Standard: Operator should verify CLOSED EG-HV-126, CCW to RCS CTMT Bypass.

NOTE: Pen 74 Standard: Valves in Steps 3 through 8 can be operated in any order.

Comment:

Evaluators Cue: EG-HV-126 is CLOSED.

2005 NRC JPM P2 NUREG 1021, Revision 9

Appendix C Page 5 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 8 Verify CLOSED EG-HV-127, CCW to RCS CTMT Bypass.

Standard: Operator should verify CLOSED EG-HV-127, CCW to RCS CTMT Bypass.

NOTE: Pen 74 Standard: Valves in Steps 3 through 8 can be operated in any order.

Comment:

Evaluators Cue: EG-HV-127 is CLOSED.

Performance Step: 9 Verify CLOSED EG-HV-59, CCW from RCS Outer CTMT ISO.

Standard: Operator should verify position of EG-HV-59.

NOTE: Pen 75 Standard: Valves in Steps 9 through 11 can be operated in any order.

Comment:

Evaluators Cue: EG-HV-59 is OPEN.

Performance Step: 10 CLOSE EG-HV-59, CCW from Outer CTMT ISO.

Standard: Operator should CLOSE EG-HV-59.

NOTE: Pen 75 Standard: Valves in Steps 9 through 11 can be operated in any order.

Comment:

Evaluators Cue: EG-HV-59 is now CLOSED.

2005 NRC JPM P2 NUREG 1021, Revision 9

Appendix C Page 6 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 11 Verify CLOSED EG-HV-131, CCW from RCS CTMT Bypass.

Standard: Operator should verify CLOSED EG-HV-131.

NOTE: Pen 75 Standard: Valves in Steps 9 through 11 can be operated in any order.

Comment:

Evaluators Cue: EG-HV-131 is CLOSED.

Performance Step: 12 Verify CLOSED EG-HV-61, CCW from RCS Outer CTMT ISO.

Standard: Operator should verify position of EG-HV-61.

NOTE: Pen 76 Standard: Valves in Steps 12 through 14 can be operated in any order.

Comment:

Evaluators Cue: EG-HV-61 is OPEN.

Performance Step: 13 CLOSE EG-HV-61, CCW from RCS Outer CTMT ISO.

Standard: Operator should CLOSE EG-HV-61, CCW from RCS Outer CTMT ISO.

NOTE: Pen 76 Standard: Valves in Steps 12 through 14 can be operated in any order.

Comment:

Evaluators Cue: EG-HV-61 is now CLOSED.

2005 NRC JPM P2 NUREG 1021, Revision 9

Appendix C Page 7 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 14 Verify CLOSED EG-HV-133, CCW from RCS CTMT BYPASS.

Standard: Operator should verify CLOSED EG-HV-133.

NOTE: Pen 76 Standard: Valves in Steps 12 through 14 can be operated in any order.

Comment:

Evaluators Cue: EG-HV-133 is CLOSED.

Performance Step: 15 Standard: Operator should inform Control Room Supervisor Local Operator Action is completed to Isolated CIS-B Valves.

Comment:

Evaluators Cue: Control Room Supervisor acknowledges.

Terminating Cue: When all CIS-B valves are closed, the JPM is complete STOP TIME:

2005 NRC JPM P2 NUREG 1021, Revision 9

Appendix C Page 8 of 9 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC JPM P2 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2005 NRC JPM P2 NUREG 1021, Revision 9

Appendix C Page 9 of 9 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: Callaway Plant was at 100% power when a Loss of All AC Power occurred. The Control Room entered emergency procedure ECA-0.0, Loss of All AC Power. A containment spray signal has been received and required valve positions can not be performed from the Control Room.

INITIATING CUE: The Control Room supervisor has directed you to perform Local Operator Actions of Step 21B RNO (CISB Outer Containment Valves), of ECA-0.0. Reposition any required valves and inform him when done.

2005 NRC JPM P2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Callaway Task No.:

Task

Title:

Perform Fire Water System Makeup JPM No.: 2005 NRC JPM P3 to CST K/A

Reference:

061 K4.01 3.9 / 4.2 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: X Actual Performance:

Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: Callaway Plant has lost all AC power due to an earthquake. Plant operators are currently in emergency procedure ECA-0.0, Loss of All AC Power, stabilizing the plant.

Task Standard: Upon completion of this JPM, the operator will have commenced filling the CST from the Firewater System.

Required Materials: Key #131, Locked Valve and Breaker Key General

References:

EOP Addendum 23, Local CST Emergency Fill Initiating Cue: The Control Room Supervisor has directed you to fill the condensate storage tank using Addendum 23, Local CST Emergency Fill. Inform the Control Room Supervisor when you have started filling the CST.

Time Critical Task: NO Validation Time: 10 minutes 2005 NRC JPM P3 NUREG 1021, Revision 9

Appendix C Page 2 of 6 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Obtain a copy of Addendum 23, Local CST Emergency Fill.

Standard: Operator should obtain procedure copy.

Comment:

Performance Step: 2 Review Addendum.

Standard: Operator may review Addendum.

Comment:

Step 1.0 Performance Step: 3 Obtain hydrant wrench, 1 50 ft. section of 2 1/2 fire hose, 1 spanner wrench, 1 fire water to CST emergency fill connector.

Standard: Operator should Obtain hydrant wrench, 1 50 ft. section of 2 1/2 fire hose, 1 spanner wrench, 1 Fire Water to CST Emergency Fill Connector.

Comment:

Step 2.A Performance Step: 4 Connect the CST Emergency Fill Connector to the Ecolo Chem Connection on APV0043.

Standard: Operator should hook up CST Emergency Fill Connector to the Ecolo Chem Connection on APV0043 located plant south side of CST.

Comment:

Evaluators Cue: CST Emergency Fill Connector is hooked up to APV0043 2005 NRC JPM P3 NUREG 1021, Revision 9

Appendix C Page 3 of 6 Form ES-C-1 PERFORMANCE INFORMATION Step 2.B Performance Step: 5 Connect 2 1/2 fire hose to the CST Emergency Fill Connector at APV0043.

Standard: Operator should connect the 2 1/2 fire hose to the CST Emergency Fill Connector.

Comment:

Evaluators Cue: 2 1/2 fire hose is hooked up to the CST Emergency Fill Connector.

Step 2.C Performance Step: 6 Hook up the 2 1/2 hose to the fire hydrant.

Standard: Operator should hook up the 2 1/2 hose to the fire hydrant.

Comment:

Evaluators Cue: 2 1/2 hose is hooked up to the fire hydrant.

Step 3.B Performance Step: 7 Open APV0043, CST Deoxygenated Water Outlet Valve.

Standard: Operator should break the lock (or unlock) and open APV0043, CST Deoxygenated Water Outlet Valve.

Comment:

Evaluators Cue: APV0043 is OPEN.

Step 3.C Performance Step: 8 Open fire water hydrant using hydrant wrench.

Standard: Operator should open fire water hydrant.

Comment:

Evaluators Cue: Fire water hydrant is OPEN.

2005 NRC JPM P3 NUREG 1021, Revision 9

Appendix C Page 4 of 6 Form ES-C-1 PERFORMANCE INFORMATION Step 4 Performance Step: 9 Ensure fire water is flowing to the CST.

Standard: Operator should verify the fire water is flowing.

Comment:

Evaluators Cue: 2 1/2 fire hose fills and fire water starts to flow.

Step 5 Performance Step: 10 Notify SS/CRS of CST Emergency Fill status.

Standard: Operator should notify SS/OS of CST Fill from fire water.

Comment:

Evaluators Cue: SS/CRS acknowledges.

Terminating Cue: When the control room has been informed, this JPM is complete.

STOP TIME:

2005 NRC JPM P3 NUREG 1021, Revision 9

Appendix C Page 5 of 6 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC JPM P3 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2005 NRC JPM P3 NUREG 1021, Revision 9

Appendix C Page 6 of 6 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: Callaway Plant has lost all AC power due to an earthquake. Plant operators are currently in emergency procedure ECA-0.0, Loss of All AC Power, stabilizing the plant.

INITIATING CUE: The Control Room Supervisor has directed you to fill the condensate storage tank using Addendum 23, Local CST Emergency Fill. Inform the Control Room Supervisor when you have started filling the CST.

2005 NRC JPM P3 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Callaway Plant Task No.:

Task

Title:

Raise Reactor Power To 10-8 Amps JPM No.: 2005 NRC JPM S1 K/A

Reference:

001 A2.11 (4.4/4.7) 001 AA1.05 (4.3/4.2)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: A reactor startup is in progress in accordance with OTG-ZZ-00002, Reactor Startup The following conditions exist:

All shutdown bank rods are fully withdrawn.

Control Bank D is at 92 steps.

The estimated critical position is 101 steps on Control Bank D.

Most recent ICRR predicts 100 steps on Control Bank D Task Standard: The reactor is tripped in response to inappropriate continuous control rod motion.

Required Materials: None General

References:

OTG-ZZ-00002, Reactor Startup Handouts: OTG-ZZ-00002, Reactor Startup Initiating Cue: The Control Room Supervisor directs you to continue with the reactor startup and withdraw control rods to criticality in accordance with OTG-ZZ-00002, Reactor Startup, beginning at Step 4.1.18.

Time Critical Task: NO Validation Time: 12 minutes Callaway NRC JPM S1 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Simulator Setup: reset to IC-187 Password = startup Run Batch File startup.txt Callaway NRC JPM S1 NUREG 1021, Revision 9

Appendix C Page 3 of 8 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Candidate initiates control bank withdrawal, monitoring Source Range counts, Intermediate Range Amps, and P-6 bistables.

Standard: Candidate determines that P-6 is energized and refers to Attachment 3 Comment:

Performance Step: 2 Verify one decade of overlap between the source and intermediate range level instruments.

Standard: Observes Source Range and Intermediate Range instruments and determines that sufficient overlap exists Comment:

Callaway NRC JPM S1 NUREG 1021, Revision 9

Appendix C Page 4 of 8 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 3 Verify indication on both the source and intermediate startup rate instruments.

Standard: Candidate determines that SR and IR startup rate indication exists Comment:

Performance Step: 4 Transfer the SE NR-45 recorder to the intermediate ranges.

Standard: Transfers NR-45 trend to IR channels Comment:

Performance Step: 5 Prior to exceeding 5E4 CPS on SR instruments, BLOCK the Source Range High Flux Trips Standard: Block A Train by depressing the BLOCK pushbutton on SE HS-5.

Standard: Verify SR TRIP A BLOC illuminates on SB069.

Standard: Block B Train by depressing the BLOCK pushbutton on SE HS-10.

Callaway NRC JPM S1 NUREG 1021, Revision 9

Appendix C Page 5 of 8 Form ES-C-1 PERFORMANCE INFORMATION Standard: Verify SR TRIP B BLOCK illuminates on SB069.

Standard: Verify that the high voltage has been removed from the source range detectors.

Comment:

Evaluator Cue: If the candidate reports that Source Range High Flux Trips have been blocked, acknowledge and provide direction to continue the control rod withdrawal Performance Step: 6 Continue incremental rod withdrawal until the reactor is critical, as indicated by a stable positive startup rate with no rod motion, on the intermediate range instrumentation once the prompt jump has receded.

Standard: Candidate initiates control rod withdrawal in small increments Comment:

Note: The following steps represent the alternate path of this JPM Performance Step: 7 Determine that rods are withdrawing with NO demand signal.

Standard: Candidate determines from CONTROL BANK D GROUP 1 and GROUP 2 ROD POSITION indication that rods are withdrawing with NO demand signal.

Comment:

Callaway NRC JPM S1 NUREG 1021, Revision 9

Appendix C Page 6 of 8 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 8 Trip the reactor in response to inappropriate continuous rod motion.

Candidate trips the reactor in response to inappropriate continuous rod motion.

Standard:

NOTE: Candidate may refer to OTO-SF-00001 and determine that a reactor trip is required based on Step 6 RNO.

Comment:

Terminating Cue: When the Candidate trips the reactor, the evaluation for this JPM is complete.

STOP TIME:

Callaway NRC JPM S1 NUREG 1021, Revision 9

Appendix C Page 7 of 8 Form ES-C-1 VERIFICATION OF COMPLETION JPM No.: 2005 JPM S1 Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiners Signature: Date:

Callaway NRC JPM S1 NUREG 1021, Revision 9

Appendix C Page 8 of 8 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: A reactor startup is in progress in accordance with OTG-ZZ-00002, Reactor Startup. The following conditions exist:

All shutdown bank rods are fully withdrawn.

Control Bank D is at 92 steps.

The estimated critical position is 101 steps on Control Bank D.

Most recent ICRR predicts 100 steps on Control Bank D INITIATING CUE: The Control Room Supervisor directs you to continue with the reactor startup and withdraw control rods to criticality in accordance with OTG-ZZ-00002, Reactor Startup, beginning at Step 4.1.18.

Callaway NRC JPM S1 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Callaway Task No.: 0111-011-01-013 Task

Title:

Isolate SI Accumulators During a LOCA JPM No.: 2005 NRC JPM S2 K/A

Reference:

009 EA1.13 (4.4/4.4)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: A LOCA has occurred. The crew is performing ES-1.2, Post LOCA Cooldown and Depressurization.

Task Standard: SI Accumulators A, B, and C are isolated. SI Accumulator D is vented.

Required Materials: None General

References:

ES-1.2, Post LOCA Cooldown and Depressurization Handouts: ES-1.2, Post LOCA Cooldown and Depressurization Initiating Cue: The Control Room Supervisor directs you to isolate the SI accumulators in accordance with ES-1.2, Post LOCA Cooldown and Depressurization, Step 23.

Time Critical Task: NO Validation Time: 7 Minutes Callaway JPM S2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Simulator Setup: Initialize IC-184 Password spa321 Run bat.siacc.txt Callaway JPM S2 NUREG 1021, Revision 9

Appendix C Page 3 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 RCS subcooling based on core exit TCs - GREATER THAN 30°F (Step 23.a)

Standard: Candidate verifies RCS subcooling based on core exit TCs is greater than 30°F Comment:

Performance Step: 2 PRZR level - GREATER THAN 9% [29% ADVERSE CNMT]

(Step 23.b)

Standard: Candidate locates and verifies PRZR level indication is greater than 9%.

Comment:

Performance Step: 3 Restore power to EP-HV-8808A, B, C, D (Step 23.c)

Standard: Candidate directs Local Operator to restore power to EP-HV-8808A - D Standard: Candidate contacts Local Operator to restore power Comment: Booth Instructor: Inform candidate that power is restored to all 4 accumulator outlet valves Callaway JPM S2 NUREG 1021, Revision 9

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 4 Close EP-HV-8808A, B, C, D (Step 23.d)

Standard: Candidate locates EP-HV-8808A, B, and D control switches and places in CLOSE.

Standard: Candidate verifies green close light on and red open light off for each valve.

Comment:

Performance Step: 5 Close EP-HV-8808A, B, C, and D (Step 23.d)

Standard: Candidate locates EP-HV-8808C control switch and places in Close.

Standard: Candidate verifies red open light remains on indicating valve NOT closed.

NOTE: Valve is overridden in the Open position.

Comment:

NOTE: The following step represents the alternate path portion of the JPM.

Performance Step: 6 If any accumulator cannot be isolated, then open associated accumulator vent valve (Step 23.d RNO)

Standard: Locates control switch for EITHER EP HIS-8950D OR EP-HIS-8950E, and places switch in OPEN Standard: Observes Green Light OFF, Red Light ON, and accumulator C pressure lowering Comment:

Callaway JPM S2 NUREG 1021, Revision 9

Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION Terminating Cue: When the Candidate verifies that accumulator C pressure is lowering, the evaluation for this JPM is complete.

STOP TIME:

Callaway JPM S2 NUREG 1021, Revision 9

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION JPM No.: 2005 JPM S2 Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiners Signature: Date:

Callaway JPM S2 NUREG 1021, Revision 9

Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: A LOCA has occurred. The crew is performing ES-1.2, Post LOCA Cooldown and Depressurization.

INITIATING CUE: The Control Room Supervisor directs you to isolate the SI accumulators in accordance with ES-1.2, Post LOCA Cooldown and Depressurization, Step 23.

Callaway JPM S2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Callaway Plant Task No.:

Task

Title:

Respond to a Stuck Open JPM No.: 2005 NRC JPM S3 Pressurizer Spray Valve K/A

Reference:

010 A2.02 (3.9/3.9)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: A Reactor Trip has occurred. The crew has transitioned to ES-0.1, Reactor Trip Response Task Standard: RCPs A and D are tripped Required Materials: ES-0.1 General

References:

ES-0.1 Handouts: None Initiating Cue: The Control Room Supervisor directs you to perform actions to stabilize the plant in accordance with ES-0.1 Time Critical Task: NO Validation Time: 8 minutes Callaway NRC JPM S3 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR SETUP Reset to IC-188 Password = spray Callaway NRC JPM S3 NUREG 1021, Revision 9

Appendix C Page 3 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)

START TIME:

Performance Step: 1 Check RCS temperature - ANY RCP Running - Tave stable at or trending to 557°F.

Standard: Candidate verifies RCPs are running and Tave is at approximately 557°F.

Comment:

Performance Step: 2 Check Generator Output Breakers open.

Standard: Candidate verifies ML ZA-3A (V55) and ML ZA-4A (V53) indicate OPEN.

Comment:

Performance Step: 3 Check all AC busses energized by Off-Site power Standard: Determines that PA01 and PA02, NB01 and NB02 are energized by off-site power Comment:

Performance Step: 4 Check Pressurizer Pressure Control - Pressure greater than 1849 psig Standard: Candidate evaluates pressurizer pressure and determines it is greater than 1849 psig.

Comment:

Callaway NRC JPM S3 NUREG 1021, Revision 9

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 5 Check Pressurizer Pressure stable at or trending to 2235 psig.

Standard: Candidate determines that Pressurizer Pressure is below 2235 psig and lowering.

Comment:

Note: The following steps represent the alternate path of this JPM Performance Step: 6 Check PORVs closed Standard: Candidate verifies BB-HIS-455A and 456A indicate CLOSED.

Comment:

Performance Step: 7 Check Spray Valves closed Standard: Candidate determines that Spray Valve BB-PCV-455B is OPEN Comment:

  • Performance Step: 8 Close Spray Valve Standard: Candidate places BB-PCV-455B controller in MANUAL and attempts to reduce output to ZERO. Determines valve remains OPEN Comment:
  • Performance Step: 9 Stop RCPs A and D Standard: Candidate places RCP A and D control switches in STOP Comment:

Callaway NRC JPM S3 NUREG 1021, Revision 9

Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 10 Verify PRZR Heaters - ON Standard: Candidate verifies PRZR Heaters - ON.

Comment:

Terminating Cue: When A and D RCPs are tripped or upon completion of ES-0.1 Step 3, this JPM is complete.

STOP TIME:

Callaway NRC JPM S3 NUREG 1021, Revision 9

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: Callaway NRC JPM S3 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

Callaway NRC JPM S3 NUREG 1021, Revision 9

Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: A reactor Trip has occurred. The crew has transitioned to ES-0.1, Reactor Trip Response INITIATING CUE: The Control Room Supervisor directs you to perform actions to stabilize the plant in accordance with ES-0.1 Callaway NRC JPM S3 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Callaway Task No.:

Task

Title:

Start A Reactor Coolant Pump JPM No.: 2005 NRC JPM S4 K/A

Reference:

002 K6.02 3.6 / 3.8 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: Callaway Plant is in mode 3 at 557°F and 2235 psig. A Reactor Coolant Pump had been secured for breaker work on PA0107. CCW is in operation and is supplying cooling water to the Thermal Barrier Cooling coils per OTN-EG-00001. There are no personnel in CTMT at this time.

Task Standard: Upon completion of this JPM, the operator will have tripped A RCP due to high seal leakoff flow.

Required Materials: None General

References:

OTN-BB-00003, Reactor Coolant Pumps, Revision 15 Initiating Cue: Tags have been cleared on PA0107 and signed off. The Control Room Supervisor has directed you to start A RCP per OTN-BB-00003, Section 4.1. WPA was restored to the OTN-BB-00003 required positions. Inform the Control Room Supervisor when the A Reactor Coolant Pump has been started and the lift oil pump is secured.

Time Critical Task: NO Validation Time: 16 minutes 2005 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR SETUP NOTES: Use IC-7. Secure A RCP, close A seal inj and leakoff with BB HIS-8351A and BB HIS-81141A.

Set Event 1 x21i115r.eq.true 1 is cv06a severity 8, 12 second ramp, 10 second delay 2005 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 3 of 11 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Obtain a verified working copy of OTN-BB-00003, Reactor Coolant Pumps.

Standard: Operator should obtain procedure copy.

Comment:

Section 2 Performance Step: 2 Review the Precautions and Limitations of OTN-BB-00003.

Standard: Operator should review the Precautions and Limitations.

Comment:

Evaluators Cue: All Precautions and Limitations are satisfied.

Section 3 Performance Step: 3 Review the Initial Conditions of OTN-BB-00003.

Standard: Operator should read the Initial Conditions.

Comment:

Evaluators Cue: All Initial Conditions are satisfied.

NOTE Prior To Step 4.1.1 Performance Step: 4 If the position of the CCW Outlet Throttle Valves are known to have changed, perform Section 5.2.

Standard: Operator may ask if the WPA altered CCW Outlet Throttle Valve Positions.

Comment:

Evaluators Cue: The CCW Outlet Throttle Valves position did not change.

2005 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 4 of 11 Form ES-C-1 PERFORMANCE INFORMATION Step 4.1.1.1 Performance Step: 5 Initiate Seal Water Injection Flow to A RCP. OPEN the RCP Seal Injection Isolation Valve BB HV-8351A with BB-HIS-8351A.

Standard: Operator should initiate seal water injection flow with BB HIS-8351A, RCP A Seal WTR INJ VLV, OPEN on RL021.

Comment:

Evaluators Cue: BB HIS-8351A RED light goes ON and GREEN light goes OFF.

Step 4.1.1.2 Performance Step: 6 OPEN A RCP #1 Seal Leakoff Isolation Valve with Handswitch BB HIS-8141A.

Standard: Operator should OPEN, RCP A Seal WTR Return VLV with BB HIS-8141A, on RL001.

Comment:

Evaluators Cue: BB HIS-8141A RED light goes ON and GREEN light goes OFF.

Step 4.1.3 Performance Step: 7 Verify current OSP-BG-00005 or adjust the Seal Water Injection Throttle Valve (BG-V-198) to establish 8 GPM flow to all RCPs.

Standard: Operator should determine seal flow on BB FR-157, RCP A Seal Leakoff and Injection Flow, on RL021 or verify OSP-BG-00005 is current.

Comment:

Evaluators Cue: OSP-BG-00005 is current all RCPs show a flow of 8 gpm on the Blue Pen for BG FR-157, 156, 155, and 154.

2005 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 5 of 11 Form ES-C-1 PERFORMANCE INFORMATION Step 4.1.3.1 Performance Step: 8 Verify A RCP Seal Differential Pressure is > 200 psid.

Standard: Operator should read BB PI-153A, RCP A Seal DP, on RL021.

Comment:

Evaluators Cue: A RCP DP indicates > 400 psid.

Step 4.1.3.2 Performance Step: 9 Annunciator 73A RCP #2 Seal Flow HI Alarm is CLEARED.

Standard: Operator should determine status of annunciator 73A, RCP #2 Seal Flow HI Alarm is CLEARED.

Comment:

Evaluators Cue: Annunciator 73A is NOT on.

Step 4.1.3.3 Performance Step: 10 Verify Annunciator 42C VCT pressure HI/LO is CLEARED.

Standard: Operator should determine status of Annunciator 42C, VCT Press HI/LO, on RL018 is CLEARED.

Comment:

Evaluators Cue: Annunciator 42C is NOT on.

Step 4.1.3.4 Performance Step: 11 Verify Annunciator 74D RCP Oil RSVR LEV HI/LO CLEARED.

Standard: Operator should determine status of Annunciator 74D, RCP Oil RSVR LEV HI/LO, on RL022 is CLEARED.

Comment:

Evaluators Cue: Annunciator 74D is NOT on.

2005 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 6 of 11 Form ES-C-1 PERFORMANCE INFORMATION Step 4.1.3.5 Performance Step: 12 Verify Annunciator 71A, RCP #1 Seal dP LO CLEARED.

Standard: Operator should determine status of Annunciator 71A, RCP #1 Seal DP LO, on RL022 is cleared.

Comment:

Evaluators Cue: Annunciator 71A RCP #1 seal dP LO is NOT on.

Step 4.1.3.6 Performance Step: 13 Verify Annunciators 70 - 73E RCP A - D Standpipe LEV LO CLEARED.

Standard: Operator should determine status of Annunciator 70E, RCP A Standpipe, LEV LO, on RL022 is CLEARED.

Comment:

Evaluators Cue: Annunciator 70E is NOT on.

Step 4.1.3.7 Performance Step: 14 Verify Annunciators 70 - 73C RCP A - D THERM BAR CCW Flow CLEARED.

Standard: Operator should determine status of Annunciator 70C, RCP A THERM BAR CCW Flow, on Rl022 is CLEARED.

Comment:

Evaluators Cue: Annunciator 70C is NOT on.

Step 4.1.3.8 Performance Step: 15 Verify #1 Seal Backpressure 15 psig. (VCT pressure).

Standard: Operator should obtain VCT pressure from BG PI-115 on RL002.

Comment:

Evaluators Cue: VCT pressure indicates 32 psig on BG PI-115.

2005 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 7 of 11 Form ES-C-1 PERFORMANCE INFORMATION Step 4.1.3.9 Performance Step: 16 Verify A RCP Seal Leakoff is within the NORMAL operating range of Figure 1 on Page 4 of Attachment 1.

Standard: Operator should verify A RCP Seal Leakoff Flow is within the NORMAL operating range of Figure 1 on page 4 of Attachment 1.

Comment:

Evaluators Cue: A RCP Seal Leakoff Return is within the NORMAL operating range.

Step 4.1.3.9 Performance Step: 17 Obtain A RCP Seal Leakoff Indication from BG FR-157.

Standard: Operator should obtain A RCP Seal Leakoff Indication from BG FR-157.

Comment:

Evaluators Cue: BG FR-157 indicates Seal Leakoff is at 3 gpm on the Green Pen, the Red Pen is FULL SCALE.

Step 4.1.4.1 Performance Step: 18 Dispatch someone to inspect A RCP and warn personnel in the vicinity.

Standard: Operator not required to call due to no personnel in CTMT.

Comment:

Step 4.1.4.2 Performance Step: 19 Start A RCPs Oil Lift Pump with switch BB HIS-41.

Standard: Operator should select RUN ON BB HIS-41, RCP A Lift Pump.

Comment:

Evaluators Cue: BB HIS-41 RED light is ON, after 20 seconds, the WHITE light on A Oil Lift Pump goes ON.

2005 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 8 of 11 Form ES-C-1 PERFORMANCE INFORMATION Step 4.1.4.3 Performance Step: 20 Allow the Oil Lift Pump to RUN for at least 2 minutes.

Standard: Operator should wait two (2) minutes from start time before performing next step.

Comment:

Evaluators Cue: Two (2) minutes has elapsed.

Step 4.1.4.6 Performance Step: 21 Make plant announcement: ATTENTION IN THE PLANT STARTING THE A RCP. STAND CLEAR OF THE PUMP AND PA01 SWITCHGEAR.

Standard: Operator should make plant announcement about starting A RCP.

Should wait 10 - 15 seconds between announcement and starting pump.

Comment:

Step 4.1.4.7 Performance Step: 22 Start A RCP by using Switch BB HIS-37.

Standard: Operator should select RUN on BB HIS-37, RCP A.

Comment:

Evaluators Cue: A RCP BB HS-37 RED light is ON and GREEN light is OFF.

Step 4.1.4.5.1 Performance Step: 23 Monitor RCP starting current and running current.

Standard: Operator should monitor BB-II-1, RCP A Amps, and observe starting current decay away on RL021 to less than 351 amps.

Comment:

2005 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 9 of 11 Form ES-C-1 PERFORMANCE INFORMATION The following steps represent the alternate path of this JPM Performance Step: 24 Acknowledge annunciators.

Standard: Operator should determine that control room annunciators 70B and 72A are received. 72A, RCP #1 SEAL FLO HI, is an unexpected alarm.

Comment:

Evaluators Cue:

Performance Step: 25 Determine RCP A #1 seal flow Standard: Operator should observe recorder BG FR-157 and verify seal flow is > 5 GPM Comment:

Evaluators Note: Candidate MAY refer to the OTAs or OTO-BB-00002 to determine action required on high seal flow.

Performance Step: 26 Trip A RCP Standard: Places RCP A control switch in STOP Comment:

Terminating Cue: When RCP A is stopped, this JPM is complete.

STOP TIME:

2005 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 10 of 11 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC JPM S4 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2005 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 11 of 11 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: Callaway Plant is in mode 3 at 557°F and 2235 psig. A Reactor Coolant Pump had been secured for breaker work on PA0107.

CCW is in operation and is supplying cooling water to the Thermal Barrier Cooling coils per OTN-EG-00001. There are no personnel in CTMT at this time.

INITIATING CUE: Tags have been cleared on PA0107 and signed off. The Control Room Supervisor has directed you to start A RCP per OTN-BB-00003, Section 4.1. WPA was restored to the OTN-BB-00003 required positions. Inform the Control Room Supervisor when the A Reactor Coolant Pump has been started and the lift oil pump is secured.

2005 NRC JPM S4 NUREG 1021, Revision 9

CALLAWAY PLANT JOB PERFORMANCE MEASURE JPM NO: URO-SAB04C61J(A) KSA NO: 041A4.08 REVISION: 20050413 KSA RATING: 3.0/3.1 JOB TITLE: URO/SRO DUTY: MAIN STEAM TASK TITLE: PLACE STEAM DUMPS IN STEAM PRESSURE MODE COMPLETION TIME: 9 MINUTES The performance of this task was evaluated against the standards contained in this JPM and determined to be:

[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

TASK PERFORMER:

LOCATION OF PERFORMANCE:

CONTROL ROOM SIMULATOR/LAB X PLANT CLASSROOM METHOD OF PERFORMANCE: SIMULATED PERFORMED X

REFERENCES:

OTN-AB-00001, MAIN STEAM SYSTEM, REVISION 13 TOOLS/EQUIPMENT: NONE PREPARED BY: DATE:

REVIEWED BY: DATE:

STS/SS APPROVED BY: DATE:

DEPARTMENT HEAD

JPM NO: URO-SAB04C61J(A)

Read to Performer: I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: CALLAWAY PLANT IS SHUTTING DOWN FOR A FALL OUTAGE. REACTOR POWER IS APPROXIMATELY 20%. THE CREW IS PERFORMING OTG-ZZ-00005.

Initiating Cues: THE CONTROL ROOM SUPERVISOR HAS DIRECTED YOU TO VERIFY THE STEAM DUMP CONTROLLER, AB PK-507, IS SET FOR 1092 PSIG, THEN TRANSFER THE STEAM DUMP SELECTOR SWITCH TO THE STEAM PRESSURE MODE PER OTN-AB-00001, MAIN STEAM SYSTEM, SECTION 4.5 AND INFORM THE CRS WHEN DONE.

Notes: USE IC177. (PASSWORD = week1)

USE EVENT TRIGGER MODE AND SET X05I162S.EQ.TRUE. SET MALFUNCTION MSS13b TO AB PT-507 READING 1500 PSIG, 30 SECOND RAMP, 0 SECOND TIME DELAY, SET TO EVENT TRIGGER.

ENSURE AB PK-0507 IS SET AT SOMETHING OTHER THAN 7.28.

Task Standard: UPON COMPLETION OF THIS JPM, THE OPERATOR HAS PLACED THE STEAM DUMPS IN THE STEAM PRESSURE MODE AND THEN CLOSED THE FAILED STEAM DUMPS PRIOR TO CAUSING THE STEAM DUMPS TO CLOSE DUE TO PERMISSIVE P-12 (LO LO TAVE - 550°F).

START TIME:

STOP TIME:

PAGE 1 of 6

JPM NO: URO-SAB04C61J(A)

TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

1. OBTAIN A VERIFIED OPERATOR SHOULD WORKING COPY OF OBTAIN A Comments:

OTN-AB-00001, PROCEDURE COPY MAIN STEAM SYSTEM S U

2. REVIEW THE ALL PRECAUTIONS OPERATOR SHOULD PRECAUTIONS AND AND LIMITATIONS READ THE Comments:

LIMITATIONS OF ARE SATISFIED PRECAUTIONS AND OTN-AB-00001 LIMITATIONS SECTION 2.0 S U

3. REVIEW THE ALL INITIAL OPERATOR SHOULD INITIAL CONDITIONS ARE READ THE INITIAL Comments:

CONDITIONS OF SATISFIED CONDITIONS OTN-AB-00001 ASK IF THE SECTION 3.0 OPERATOR UNDERSTANDS THE INITIAL CONDITIONS AND INITIATING CUES

  • CRITICAL STEP PAGE 2 of 6

JPM NO: URO-SAB04C61J(A)

TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

4. THE OPERATOR OOA-RL-00004 MAY VERIFY AB PK- STATES THAT 1092 Comments:

0507 IS SET FOR 1092 PSIG = 7.28.

PSIG S U

5. ENSURE STEAM OPERATOR SHOULD HEADER PRESSURE ENSURE AB PK-507 Comments:

CONTROLLER STEAM HEADER AB PK-507 PRESSURE MATCHES STEAM CONTROLLER DUMP DEMAND MATCHES AB UI-500 AB UI-500 NOTE: CAUTION PRIOR TO STEP 4.5.1 S U

6. PLACE THE STEAM OPERATOR SHOULD DUMP SELECTOR PLACE STEAM DUMP Comments:

SWITCH SELECTOR SWITCH AB US-0500Z TO AB US-0500Z TO RESET RESET STEP 4.5.1

  • CRITICAL STEP PAGE 3 of 6

JPM NO: URO-SAB04C61J(A)

TASK NUMBER - ELEMENT CUE STANDARD SCORE S U 7* PLACE THE STEAM OPERATOR SHOULD DUMP SELECTOR PLACE THE STEAM Comments:

SWITCH DUMP SELECTOR AB US-0500Z TO THE SWITCH AB US-0500Z STEAM PRESSURE TO THE STEAM MODE PRESSURE MODE STEP 4.5.1 S U

8. NOTE: WHEN OPERATOR NOTICES Comments:

THE STEAM DUMP FAILURE, HE MAY THEN OMIT STEPS 9 AND 10 AND CONTINUE WITH STEP 11 S U

9. VERIFY C-7, LOSS OPERATOR SHOULD OF LOAD VERIFY C-7, LOSS OF Comments:

INTERLOCK LIGHT LOAD INTERLOCK IS OFF LIGHT IS OFF ON SC066W PANEL STEP 4.5.1.1

  • CRITICAL STEP PAGE 4 of 6

JPM NO: URO-SAB04C61J(A)

TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

10. OPERATOR MAY RESPOND BY OPERATOR MAY ASK INQUIRE IF INFORMING THE IF A PLANT Comments:

COOLDOWN IS OPERATOR THAT A COOLDOWN IS REQUIRED COOLDOWN IS NOT REQUIRED REQUIRED AT THIS STEP 4.5.2 TIME NOTE:

THE FOLLOWING STEPS REPRESENT THE ALTERNATE PATH OF THIS JPM S U

11. NOTE: WHEN STEAM DUMP FAILURE IS Comments:

IDENTIFIED, THE FOLLOWING ACTIONS SHOULD BE TAKEN

  • CRITICAL STEP PAGE 5 of 6

JPM NO: URO-SAB04C61J(A)

TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

12. PLACE STEAM OPERATOR SHOULD DUMP INTERLOCK PLACE BOTH STEAM Comments:

SELECT SWITCHES DUMP SELECTOR AB HS-63, 64 IN THE SWITCHES AB HS-63, OFF/RESET 64 IN THE OFF POSITION POSITION S U 13* OPERATOR SHOULD CLOSE STEAM Comments:

DUMPS BY ANY MEANS PRIOR TO STEAM DUMPS AUTOMATICALLY CLOSING AT 550°F DUE TO P-12, LO LO TAVE.

14.

RECORD STOP TIME ON PAGE 1

  • CRITICAL STEP PAGE 6 of 6

Read to Performer: I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: CALLAWAY PLANT IS SHUTTING DOWN FOR A FALL OUTAGE. REACTOR POWER IS APPROXIMATELY 20%. THE CREW IS PERFORMING OTG-ZZ-00005.

Initiating Cues: THE CONTROL ROOM SUPERVISOR HAS DIRECTED YOU TO VERIFY THE STEAM DUMP CONTROLLER, AB PK-507, IS SET FOR 1092 PSIG, THEN TRANSFER THE STEAM DUMP SELECTOR SWITCH TO THE STEAM PRESSURE MODE PER OTN-AB-00001, MAIN STEAM SYSTEM, SECTION 4.5 AND INFORM THE CRS WHEN DONE.

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Callaway Task No.:

Task

Title:

Placing Containment H2 Analyzer In JPM No.: 2005 NRC JPM S6 Service K/A

Reference:

028 A4.03 3.1 / 3.3 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: Callaway Plant has experienced a Large Loss of Coolant Accident. A Safety Injection has occurred.

Task Standard: Upon completion of this JPM, the operator will have placed A hydrogen analyzer in-service.

Required Materials: None General

References:

OTN-GS-00001, Containment Hydrogen Control System, Revision 10 Initiating Cue: The Control Room Supervisor has directed you to place the A Containment Hydrogen Analyzer, SGS02A, in service per OTN-GS-00001, Section 4.2. The pre-service startup and standby alignment of hydrogen analyzers has already been completed, (Section 4.1). Inform the Control room Supervisor when SGS02A is in service.

Time Critical Task: NO Validation Time: 10 minutes 2005 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Simulator Setup Reset to IC-184 CTMT H2 Indication Set Malf Meter

  • GSAI19
  • Ramp Start=0
  • Ramp Time=300 Sec
  • Delay Time=60 Sec
  • Value=1.5
  • Event Trigger=1
  • Set Event Triggers

Appendix C Page 3 of 10 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Obtain a verified working copy of OTN-GS-0001.

Standard: Operator should obtain procedure copy.

Comment:

Section 2 Performance Step: 2 Review Precautions and Limitations.

Standard: Operator should review Precautions and Limitations.

Comment:

Evaluators Cue: All Precautions and Limitations are satisfied.

Step 4.2.1 Performance Step: 3 Ensure Section 4.1, Pre-service Startup and Standby Alignment of hydrogen analyzers is complete.

Standard: Operator may verify Section 4.1 has been completed.

NOTE: Given in Initial Conditions.

Comment:

Evaluators Cue: Section 4.1 has been completed.

2005 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Page 4 of 10 Form ES-C-1 PERFORMANCE INFORMATION Step 4.2.2 Performance Step: 4 Ensure the H2 mixing fans and CTMT coolers re in service.

Standard: Operator should verify H2 mixing fans and CTMT coolers are in service.

Comment:

Evaluators Cue: All H2 mixing fans and CTMT coolers are in service.

Step 4.2.3 Performance Step: 5 Restore electrical power to Hydrogen Analyzer A CTMT ISO Valves place GS HIS-40 in Non-Iso.

Standard: Operator should place GS HIS-40, Hydrogen Analyzer A CTMT ISO Valve, in Non-Iso located on RL011.

NOTE: Steps 5 and 6 may be performed in any order.

Comment:

Evaluators Cue: GS HIS-40 is in the Non-Iso position.

Step 4.2.3 Performance Step: 6 Restore electrical power to Hydrogen Analyzer A CTMT ISO Valves, place GS HIS-42 in the Non-Iso position.

Standard: Operator should place GS HIS-42, Hydrogen Analyzer A CTMT ISO Valve in Non-Iso.

NOTE: Steps 5 and 6 may be performed in any order.

Comment:

Evaluators Cue: GS HIS-42 is in the Non-Iso position.

2005 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Page 5 of 10 Form ES-C-1 PERFORMANCE INFORMATION Step 4.2.4 Performance Step: 7 Open A Hydrogen Analyzer CTMT Isolation Valve GS HV-13 with pushbutton GS HIS-13.

Standard: Operator should OPEN A Hydrogen Analyzer CTMT Isolation Valve GS-HV-13 with pushbutton GS HIS-13.

NOTE: Steps 7 through 11 may be performed in any order.

Comment:

Evaluators Cue: GS HIS-13 shows RED light goes ON and GREEN light goes OFF.

Step 4.2.4 Performance Step: 8 Open A Hydrogen Analyzer CTMT Isolation Valve GS HV-14 with pushbutton GS HIS-14.

Standard: Operator should OPEN A Hydrogen Analyzer CTMT Isolation Valve GS HV-14 with pushbutton GS HIS-14.

NOTE: Steps 7 through 11 may be performed in any order.

Comment:

Evaluators Cue: GS HIS-14 shows RED light goes ON and GREEN light goes OFF.

Step 4.2.4 Performance Step: 9 Open A Hydrogen Analyzer CTMT Isolation Valve GS HV-12 with pushbutton GS HIS-12.

Standard: Operator should OPEN A Hydrogen Analyzer CTMT Isolation Valve GS HV-12 with pushbutton GS HIS-12.

NOTE: Steps 7 through 11 may be performed in any order.

Comment:

Evaluators Cue: GS HIS-12 shows RED light goes ON and GREEN light goes OFF.

2005 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION Step 4.2.4 Performance Step: 10 Open A Hydrogen Analyzer CTMT Isolation Valve GS HV-17 with pushbutton GS HIS-17.

Standard: Operator should OPEN A Hydrogen Analyzer CTMT Isolation Valve GS HV-17 with pushbutton GS HIS-17.

NOTE: Steps 7 through 11 may be performed in any order.

Comment:

Evaluators Cue: GS HIS-17 shows RED light goes ON and GREEN light goes OFF.

Step 4.2.4 Performance Step: 11 Open A Hydrogen Analyzer CTMT Isolation Valve GS HV-18 with pushbutton GS HIS-18.

Standard: Operator should OPEN A Hydrogen Analyzer CTMT Isolation Valve GS HV-18 with pushbutton GS HIS-18.

NOTE: Steps 7 through 11 may be performed in any order.

Comment:

Evaluators Cue: GS HIS-18 shows RED light goes ON and GREEN light goes OFF.

Step 4.2.6 Performance Step: 12 Place Hydrogen Analyzer A in the ANLYZ position by taking switch GS HIS-16A for SGS02A to ANLYZ.

Standard: Operator should take switch GS HIS-16A to ANLYZ on RL020 Comment:

2005 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Page 7 of 10 Form ES-C-1 PERFORMANCE INFORMATION Step 4.2.6.1 Performance Step: 13 Monitor GS AI-19 for hydrogen concentration.

Standard: Operator should monitor GS AI-19 for hydrogen concentration.

Comment:

Evaluators Cue: Hydrogen concentration indicates approximately 0% on GS AI-19.

Step 4.2.6.1 Note b Performance Step: 14 Verify Hydrogen Analyzer SGS02A was in the Standby Lineup.

Standard: Operator may verify A Hydrogen Analyzer was in the Standby Lineup.

Comment:

Evaluators Cue: Note A Hydrogen analyzer was in the Standby Position.

Step 4.2.6.1 Note b Performance Step: 15 Wait for a 15 minute warmup period prior to taking data.

Standard: Operator should wait a minimum of 15 minutes for A hydrogen analyzer use.

Comment:

Evaluators Cue: Over 15 minutes has gone by.

Step 4.2.6.1 Performance Step: 16 Monitor containment hydrogen concentration on GS AI-19.

Standard: Operator should monitor GS AI-19 for hydrogen concentration.

Comment:

Evaluators Cue: GS AI-19 shows hydrogen concentration to be at 1.5%.

2005 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Page 8 of 10 Form ES-C-1 PERFORMANCE INFORMATION Terminating Cue: When the candidate has determined that H2 concentration is 0, this JPM is complete.

STOP TIME:

2005 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC JPM S6 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2005 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Page 10 of 10 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: Callaway Plant has experienced a Large Loss of Coolant Accident. A Safety Injection has occurred.

INITIATING CUE: The Control Room Supervisor has directed you to place the A Containment Hydrogen Analyzer, SGS02A, in service per OTN-GS-00001, Section 4.2. The pre-service startup and standby alignment of hydrogen analyzers has already been completed, (Section 4.1). Inform the Control room Supervisor when SGS02A is in service.

2005 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Callaway Task No.:

Task

Title:

Paralleling Diesel Generator A To JPM No.: 2005 NRC JPM S7 XNB01 K/A

Reference:

064 A4.01 4.0 / 4.3 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The plant is operating in Mode 1. The A Emergency Diesel Generator has been started per OTN-NE-0001A, Section 4.3. NB01 is energized from its normal off-site power source. XNB01 LTC is in manual and Tap 13 is set for modes 1 through 4.

Task Standard: NE01 is connected to NB01 and is carrying at least 2 Mwe load.

Required Materials: None General

References:

OTN-NE-0001A, Standby Diesel Generation System Train A, Rev. 13 Initiating Cue: You have been directed to parallel the A Diesel Generator to NB01 and load to at least 2 MW per OTN-NE-0001A, Section 4.4. Inform the Control Room Supervisor when NE01 is running loaded > 2 Mwe.

Time Critical Task: NO Validation Time: 15 minutes 2005 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR SETUP NOTES: May be run with JPM S4 Ensure A Emergency Diesel Generator is running unloaded if performing on the simulator. Use remote NBHS0037 place in manual.

Monitor NEPSLTC (1).

2005 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 3 of 13 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Obtain a verified working copy of OTN-NE-0001A, Standby Diesel Generation System Train A.

Standard: Operator should obtain procedure copy.

Comment:

Section 2 Performance Step: 2 Review the Precautions and Limitations of OTN-NE-0001A.

Standard: Operator should read the Precautions and Limitations.

Comment:

Evaluators Cue: All Precautions and Limitations are satisfied.

Section 3 Performance Step: 3 Review the Initial Conditions of OTN-NE-0001A.

Standard: Operator should read the Initial Conditions.

Comment:

Evaluators Cue: All Initial Conditions are satisfied.

2005 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 4 of 13 Form ES-C-1 PERFORMANCE INFORMATION Step 4.4.1 Performance Step: 4 Ensure that the Local Master Transfer Switch KJHS0009 is in the AUTO position.

Standard: Operator should verify absence of MCB ANN 20E and/or request Local Observation of Master Transfer Switch.

Comment:

Evaluators Cue: The Local Master Transfer Switch KJHS0009 is in the AUTO position.

Step 4.4.2 Performance Step: 5 Ensure NE01 has been started in accordance with Section 4.3 or 5.3 of this procedure.

Standard: Operator may verify NE01 has been started in accordance with Section 4.3 NOTE: Given in Initial Conditions.

Comment:

Evaluators Cue: NE01 has been started in accordance with Section 4.3 Step 4.4.3 Performance Step: 6 If the White Parallel Operation Light is not lit, momentarily place NE HS-5, NE01 Unit Parallel SW to the parallel position.

Standard: Operator should determine WHITE parallel light is lit.

Comment:

Evaluators Cue: Local operator reports WHITE Parallel Operation Light is lit on NE107.

2005 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 5 of 13 Form ES-C-1 PERFORMANCE INFORMATION Step 4.4.4.1 Performance Step: 7 Verify the White Parallel Operation Light is lit on NE107.

Standard: Operator should contact EO to verify the White Parallel Light is lit on NE107.

Comment:

Evaluators Cue: The White Parallel Light is lit on NE107.

Step 4.4.4.2 Performance Step: 8 Verify Main Control board Annunciator 22B, Voltage Control Freeze is lit.

Standard: Operator should verify Annunciator 22B, Voltage Control Freeze is lit.

Comment:

Evaluators Cue: Annunciator 22B, Voltage Control Freeze is lit.

Step 4.4.4.3 Performance Step: 9 Verify EITHER Computer Point NBQ0003 indicates Capacitor Bank NB03 is in FREEZE OR Disconnect NB0301 is OPEN.

Standard: Operator should verify NBQ0003 is in FREEZE or DISCONNECTED.

Comment:

Evaluators Cue: Computer Point NBQ0003 indicates Capacitor Bank NB03 is in FREEZE mode.

2005 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 6 of 13 Form ES-C-1 PERFORMANCE INFORMATION Step 4.4.4.4 Performance Step: 10 Verify EITHER Computer Point NBX0001 indicates transformer XNB01 LTC is in MANUAL and set at the appropriate Tap Changer setting.

Standard: Operator should verify XNB01 LTC is in MANUAL and Tap Setting 13 is selected OR Computer Point NBX0001 indicates FREEZE NOTE: Given in Initial Conditions Comment:

Evaluators Cue: Annunciator 19D, XNB01 XFMR/VOLT CTRL TRBL is LIT AND Computer Point NBX0001 indicates FREEZE.

Step 4.4.5 Performance Step: 11 Place the Sync Transfer Switch NE HS-27 in the ON position.

Standard: Operator selects ON with Sync Transfer Switch NE HS-27.

Comment:

Evaluators Cue: NE HS-27 is in the ON position.

Step 4.4.6 Performance Step: 12 Place the Synchroscope Selector Switch NB HS-10 in the D/G Feeder Breaker Position.

Standard: Operator should place the Synchroscope Selector Switch NB HS-10 in the D/G Feeder Breaker Position.

Comment:

Evaluators Cue: NB HS-10 is selected to DG Feeder BKR Position.

The Sync Scope is rotating in fast direction; Sync Lights NB ZL-9 are flashing.

2005 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 7 of 13 Form ES-C-1 PERFORMANCE INFORMATION Step 4.4.7 Performance Step: 13 Adjust the diesel generator speed using Governor Control, KJ HS-7A until the Synchroscope NB EI-3 is rotating slowly in the fact direction.

Standard: Operator turns KJ HS-7A, DG NE01 GOV, to RAISE if speed is SLOW and to LOWER if speed FAST as indicated by 4.16 KV Bus NB01 Sync Scope, NB EI-13 on RL015 to satisfy Synch check Relay.

Comment:

Evaluators Cue: Synchroscope NB EI-3 is rotating slowly in the FAST direction.

Step 4.4.8 Performance Step: 14 Adjust NE01 voltage to be within +50, -0 volts of the NB01 Bus Voltage using the Auto Voltage Regulator NE HS-13A.

Standard: Operator should adjust NE01 voltage to be within +50, -0 volts of the NB01 Bus Voltage using the Auto Voltage Regulator NE HS-13A.

Comment:

Step 4.4.8.1 Performance Step: 15 Determine NE01 voltage by placing the Synchroscope Selector Switch NB HS-10 in the D/G Feeder Breaker position and reading NB EI-28.

Standard: Operator should place NB HS-10 in the D/G Feeder Breaker Position and read NB EI-28 to determine NE01 voltage.

Comment:

Evaluators Cue: NE EI-28 voltage is 4190 volts when NB HS-10 is in the D/G Feeder Breaker Position.

2005 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 8 of 13 Form ES-C-1 PERFORMANCE INFORMATION Step 4.4.8.2 Performance Step: 16 Determine NB01 voltage by placing the Synchroscope Selector Switch NB HS-10 in the Main FDR BKR Position and reading the voltage from NB EI-28.

Standard: Operator should determine NB01 voltage by placing NB HS-10 in the Main FDR BKR Position and reading voltage from NB EI-28.

Comment:

Evaluators Cue: NB EI-28 voltage is 4160 when NB HS-10 is in the Main FDR BKR Position.

Step 4.4.9 Performance Step: 17 When NE01 voltage has been verified to be within +50, -0 volts of NB01 voltage, ensure the Synchroscope Selector Switch NB HS-10 is placed in the D/G Feeder Breaker Position.

Standard: Operator should place NB HS-10 in the D/G Feeder Breaker Position.

Comment:

Step 4.4.9 Performance Step: 18 Verify proper operation of Sync Light NB ZL-9.

Standard: Operator should verify proper operation of NB ZL-9.

Comment:

Evaluators Cue: Dimmest at 12 oclock and brightest at 6 oclock on Synch Scope NB EI-3 2005 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 9 of 13 Form ES-C-1 PERFORMANCE INFORMATION Step 4.4.10 Performance Step: 19 Verify that the Diesel Generator to Bus Synchronizing Light NE ZL-27A illuminates when the Synchroscope is between the 11 oclock and the 12 oclock position.

Standard: Operator should verify that the Diesel Generator to Bus Synchronizing Light NE ZL-27A illuminates when the Synchroscope is between the 11 oclock and the 12 oclock position.

Comment:

Evaluators Cue: NE ZL-27A is coming on at five (5) degrees before the 12 oclock position and off at five (5) degrees after 12 oclock.

Step 4.4.11 Performance Step: 20 Allow Synchroscope NB EI-3 to complete one revolution to verify proper speed for synchronization.

Standard: Operator should observe the Sync Scope for one complete revolutions and adjust the speed as necessary.

Comment:

Evaluators Cue: Synchroscope is rotating in the FAST direction at about the speed of the second had of a clock.

Step 4.4.12 Performance Step: 21 When the Synchroscope reaches the 11 oclock position turn NE HIS-25 to CLOSE and hold until Breaker NB0111 indicates CLOSED, then release the control switch.

Standard: When Sync Scope reaches the 11 oclock position and Synch Check Permissive Light ON, CLOSE NB01 EMERG SPLY BKR NB0111 with Switch NE HIS-25 and hold until the RED light is ON and the GREEN light is OFF, then the operator should release the switch.

Comment:

Evaluators Cue: NE HIS-25 RED light is ON and the GREEN light is OFF.

2005 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 10 of 13 Form ES-C-1 PERFORMANCE INFORMATION Step 4.4.13 Performance Step: 22 Immediately upon closure of the D/G Breaker Pickup Load to at least 0.2 MW by operating the D/G Governor Control JK HS-7A in the RAISE direction if necessary.

Standard: Operator should RAISE DG Load to prevent NB0111 Reverse Power Trip using KJ HS-7A.

Comment:

Evaluators Cue: D/G Load is 0.2 MW.

Step 4.4.14 Performance Step: 23 Return the Synchroscope Selector Switch NB HS-10 to the OFF position.

Standard: Operator should return the Synchroscope Selector Switch NB HS-10 to the OFF position.

Comment:

Evaluators Cue: NB HS-10 is in OFF.

Performance Step: 24 Place Sync Transfer Switch NE HS-27 in the OFF position.

Standard: Operator should place Sync Transfer Switch NE HS-27 in the OFF position.

Comment:

Evaluators Cue: NE HS-27 is in OFF.

Step 4.4.16 Performance Step: 25 Adjust Diesel Generator Voltage with the Auto Voltage Regulator NE HS-13A to maintain a power factor of 0.9 LAG.

Standard: Operator should adjust D/G VAR Loading using NE HS-13A, Auto Voltage Regulator.

Comment:

Evaluators Cue: Power factor is 0.9 LAG.

2005 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 11 of 13 Form ES-C-1 PERFORMANCE INFORMATION Step 4.4.17 Performance Step: 26 Increase Diesel Generator Load as directed by the SS/OS.

Standard: The operator should increase Diesel Generator Load as directed by the Control Room Supervisor.

NOTE: Initial Conditions directed NE01 BE Loaded to > 2MW.

Comment:

Evaluators Cue: The Control Room Supervisor directs you to increase D/G Load to > two (2) MW.

Step 4.4.17 Performance Step: 27 Increase Diesel Generator Load, by placing NE HS-7A in the RAISE position, to > two (2) MW.

Standard: Operator should go to RAISE on NE HS-7A on RL015 to RAISE D/G Load to > two (2) MW.

Comment:

Evaluators Cue: D/G Load is > two (2) MW.

Performance Step: 28 Inform the Control Room Supervisor that NE01 is loaded >

2 MWe.

Standard: Operator should inform the Control Room Supervisor that NE01 is loaded > 2 Mwe.

Comment:

Evaluators Cue: The Control Room Supervisor acknowledges.

Terminating Cue: When DG load is >2 MW, this JPM is complete.

STOP TIME:

2005 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 12 of 13 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC JPM S7 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2005 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 13 of 13 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: The plant is operating in Mode 1. The A Emergency Diesel Generator has been started per OTN-NE-0001A, Section 4.3.

NB01 is energized from its normal off-site power source. XNB01 LTC is in manual and Tap 13 is set for modes 1 through 4.

INITIATING CUE: You have been directed to parallel the A Diesel Generator to NB01 and load to at least 2 MW per OTN-NE-0001A, Section 4.4.

Inform the Control Room Supervisor when NE01 is running loaded

> 2 Mwe.

2005 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Callaway Task No.:

Task

Title:

Reinitiate CTMT Purge Following JPM No.: 2005 NRC JPM S8 CPIS K/A

Reference:

013 A2.06 3.7 / 4.0 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: Callaway Plant is in Mode 2. A containment mini purge was in progress to prepare for a containment entry. One hour ago, a CPIS/CRVIS occurred due to a spike on GTRE0022. Repairs have been made to GTRE0022 and it is now operable. Outside air temperature is expected to remain > 50°F.

Task Standard: Upon completion of this JPM, the operator will have reset CPIS and re-established containment mini purge.

Required Materials: Copy of Gaseous Radwaste Release Permit Covers installed on the ESFAS Switches for GTRE0022 and GTRE0033 General

References:

OTN-GT-00001, Containment Purge System, Revision 19 CAR 199301739, 199400025, 199501723, 199700736 Initiating Cue: The Control Room Supervisor has directed you to re-initiate the containment mini purge per OTN-GT-00001, Section 4.7. The Control Room Supervisor has decided to not realign the control building HVAC at this time. The SS ahs authorized reinitiating CTMT mini purge.

Inform the Control room Supervisor when the mini purge has been re-initiated.

2005 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Time Critical Task: NO Validation Time: 18 minutes 2005 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR SETUP NOTES: Manually initiate a CPIS and CRVIS (both trains).

May be run on same IC as S5 2005 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 4 of 17 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Obtain a verified working copy of OTN-GT-00001, Containment Purge System.

Standard: Operator should obtain procedure copy.

Comment:

Section 2 Performance Step: 2 Review Precautions and Limitations of OTN-GT-00001.

Standard: Operator should review Precautions and Limitations.

Comment:

Evaluators Cue: All Precautions and Limitations are satisfied.

Section 3 Performance Step: 3 Review Initial Conditions of OTN-GT-00001.

Standard: Operator should review Initial Conditions.

Comment:

Evaluators Cue: All Initial Conditions are satisfied.

Caution Prior To Step 4.7.1 Performance Step: 4 The purge may be reinitiated w/out terminating the release permit provided the time between stopping and restarting the release does not exceed two hours.

Standard: Operator should realize purge was only secured for one hour and SS has given permission to reinitiate purge.

Comment:

2005 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 5 of 17 Form ES-C-1 PERFORMANCE INFORMATION Step 4.7.1 Performance Step: 5 Have the Count Room Technician verify alarm/trip setpoints for GT-RE-21, GT-RE-22, and GT-RE-33 are correct per the release permit.

Standard: Operator should contact the Count Room Technician to verify setpoint for GT-RE-21, 22 and 33 are correct per the release permit.

Comment:

Evaluators Cue: The Count Room Technician has verified setpoints correct per the release permit.

Step 4.7.1.1 Performance Step: 6 If monitor readings are the high alarm setpoint, close the permit, resample, and generate a new permit.

Standard: Operator should use the RM11 console to determine the color of channels 211, 212, 221, 222, 223, 331, 332, and 333 are NOT lit RED.

Comment:

Evaluators Cue: RM 11 channels 211, 212, 221, 222, 2223, 331, 332, and 333 are lit GREEN.

Step 4.7.2 Performance Step: 7 Check SA036D and SA036E. If any bistable trip lights are lit, record on the URO Log and reset the bistable by depressing and then releasing the bistable trip light.

Standard: Operator should go to the SA036D and SA036E panel in the back of the Control Room and verify NO bistable lights lit.

Comment:

Evaluators Cue: NO bistable lights are lit on SA036D and SA036E.

2005 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 6 of 17 Form ES-C-1 PERFORMANCE INFORMATION Step 4.7.3 Performance Step: 8 If required, with SS/CRS permission, reset the following:

Standard:

Comment:

Evaluators Note: The SS has authorized resetting switches.

Step 4.7.3 Performance Step: 9 Reset CPIS by depressing SA HS-15, CTMT purge Train B ISO on RL018.

NOTE: Steps 9 through 12 may be performed in any order.

Standard: Operator should depress the reset button on SA HS-15, CTMT Purge Train B ISO on RL018.

Comment:

Evaluators Note: The reset button on SA HS-15 has been depressed.

Step 4.7.3 Performance Step: 10 Reset CRVIS by depressing SA HS-13, Ctrl Bldg Vent Train B ISO.

NOTE: Steps 9 through 12 may be performed in any order.

Standard: Operator should depress the reset button on SA HS-13, Ctrl Bldg Vent Train B ISO on RL018.

Comment:

Evaluators Note: The reset button on SA HS-13 has been depressed.

2005 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 7 of 17 Form ES-C-1 PERFORMANCE INFORMATION Step 4.7.3 Performance Step: 11 Reset CPIS by depressing SA HS-11, CTMT Purge Train A ISO on RL018.

NOTE: Steps 9 through 12 may be performed in any order.

Standard: Operator should depress the reset button on SA HS-11, CTMT Purge Train A ISO on RL018.

Comment:

Evaluators Cue: The reset button on SA HS-11 has been depressed.

Step 4.7.3 Performance Step: 12 Reset CRVIS by depressing SA HS-9, Ctrl Bldg Vent Train A ISO on RL018.

NOTE: Steps 9 through 12 may be performed in any order.

Standard: Operator should depress the reset button on SA HS-9, Ctrl Bldg Vent Train A ISO on RL018.

Comment:

Evaluators Cue: The reset button on SA HS-9 has been depressed.

Step 4.7.3.1 Performance Step: 13 Ensure CPIS and CRVIS lights OUT on ESFAS status panels; if required use SA HS-24 and/or SA HS-23, ESF panel mode SEL switches, to reset.

Standard: Operator should ensure CPIS and CRVIS lights OUT on ESFAS status panels.

Comment:

Evaluators Cue: CPIS and CRVIS lights on ESFAS status panel are OUT.

2005 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 8 of 17 Form ES-C-1 PERFORMANCE INFORMATION Step 4.7.3.2 Performance Step: 14 Ensure MCB annunciators 59D (CPIS) and 63A (CRVIS) are clear.

Standard: Operator should verify MCB annunciators 59D and 63A are clear.

Comment:

Evaluators Cue: MCV annunciators 59D and 63A are clear.

Step 4.7.4 Performance Step: 15 If required, realign the Control Building HVAC per OTN-GK-00001.

Standard: The operator should continue with Step 4.7.5 and not align Control Building HVAC at this time.

Given in Initial Conditions.

Comment:

Evaluators Cue: The O.S. has determined to align mini-purge prior to realigning the Control Building HVAC.

Step 4.7.5 Performance Step: 16 Place Mini-Purge in service per Section 4.3 of this procedure.

Standard: Operator should go to Section 4.3.

Comment:

Section 4.3.1 Performance Step: 17 Ensure Section 4.2 of this procedure has been completed.

Standard: Operator should verify Section 4.2 of this procedure has been completed.

Comment:

Evaluators Cue: Section 4.2 of this procedure has been completed.

2005 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 9 of 17 Form ES-C-1 PERFORMANCE INFORMATION Step 4.3.2 Performance Step: 18 Monitor or trend SD-RE-41, SD-RE-42, and GT-PDI-040.

Standard: Operator monitor or trend SD-RE-41, SD-RE-42, and GT-PD-040. Operator may use time trend minivent.

Comment:

Evaluators Cue: SD-RE-41, SD-RE-42, and GT-PD-040 are all stable.

Step 4.3.2.1 Performance Step: 19 Record containment pressure, using GTPDI0040 or GTD0040, on the Gaseous Radwaste Permit.

Standard: Operator should record containment pressure GTPDI0040 or GTD0040, on the Gaseous Radwaste Permit.

Comment:

Evaluators Cue: Containment pressure has been recorded.

Step 4.3.3 Performance Step: 20 Ensure that GTRE0022 and GTRE0033 are not in bypass, and ensure the CTMT Purge In Prog - Do Not Bypass cover over the ESFAS switches for GTRE0022 and GTRE0033.

Standard: Operator should verify GTRE0022 and GTRE0033 are not in bypass and covers have been placed over GTRE0022 and GTRE0033 ESFAS Switches.

Comment:

Evaluators Cue: GTRE022 and GTRE0033 are not in bypass.

Covers have been placed over GTRE0022 and GTRE0033 ESFAS Switches.

Step 4.3.5 Performance Step: 21 Initial/Date/Time GT RR-21B and GT RR-58 on SP010.

Standard: Initials have been made on GT RR-21B and GT RR-58.

Comment:

Evaluators Cue: Initials have been made on GT RR-321B and GT RR-58 2005 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 10 of 17 Form ES-C-1 PERFORMANCE INFORMATION Step 4.3.6 Performance Step: 22 Start CGT02 Containment Mini Purge Exhaust Fan using GT HIS-20.

Standard: Operator should select RUN on GT HIS-20, CTMT Mini Purge Exh Fan.

Comment:

Evaluators Cue: GT HIS-20 RED lights illuminate and GREEN lights extinguish.

Step 4.3.7 Performance Step: 23 Open GTHZ0011 using GT HIS-11.

NOTE: Steps 23 - 26 may be accomplished in any order.

Standard: Operator should depress and hold the OPEN pushbutton for GT HIS-11.

Comment:

Evaluators Cue: GT HIS-11 RED light illuminates and three (3) seconds later, the GREEN light extinguishes.

Step 4.3.7 Performance Step: 24 Open GTHZ0012 using GT HIS-12.

NOTE: Steps 23 - 26 may be accomplished in any order.

Standard: Operator should depress and hold the OPEN pushbutton for GT HIS-12.

Comment:

Evaluators Cue: GT HIS-12 RED light illuminates and three (3) seconds later, the GREEN light extinguishes.

2005 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 11 of 17 Form ES-C-1 PERFORMANCE INFORMATION Step 4.3.7 Performance Step: 25 Open GTHZ0028 using GT HIS-28.

NOTE: Steps 23 - 26 may be accomplished in any order.

Standard: Operator should depress and hold the OPEN pushbutton for GT HIS-28.

Comment:

Evaluators Cue: GT HIS-28 RED light illuminates and three (3) seconds later, the GREEN light extinguishes.

Step 4.3.7 Performance Step: 26 Open GTHZ0029 using GT HIS-29.

NOTE: Steps 23 - 26 may be accomplished in any order.

Standard: Operator should depress and hold the OPEN pushbutton for GT HIS-29.

Comment:

Evaluators Cue: GT HIS-29 RED light illuminates and three (3) seconds later, the GREEN light extinguishes.

Step 4.3.8 Performance Step: 27 Record the date and time the CTMT Purge Exhaust and Mini Purge Exhaust Dampers are opened on the Gaseous Radwaste Release Permit.

Standard: Operator should record the date and time the CTMT Purge Exhaust and Mini Purge Exhaust Dampers are opened on the Gaseous Radwaste Release Permit.

Comment:

Evaluators Cue: The Gaseous Radwaste Release Permit has been updated.

2005 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 12 of 17 Form ES-C-1 PERFORMANCE INFORMATION Step 4.3.9 Performance Step: 28 Inform Count Room Technician when purge initiated.

Standard: Operator should notify the Count Room Technician of the time the purge was initiated.

Comment:

Evaluators Cue: Count Room Technician acknowledges.

Step 4.3.10 Performance Step: 29 When CTMT pressure is less than 10 WG, OPEN GTHZ0041 and GTHZ0042 using GT HIS-41.

Standard: Operator should depress and hold the OPEN pushbutton on GT HIS-41 when CTMT pressure is less than 10 WG.

Comment:

Evaluators Cue: CTMT pressure is less than 10 WG.

GT HIS-41 RED light illuminates and five (5) seconds later, the GREEN light extinguishes.

NOTE Prior to Step 4.3.11 Performance Step: 30 When there is NO planned CTMT entry (vent only), omit Steps 4.3.11, 4.3.12, and 4.3.12.1.

Standard: Operator should perform Steps 4.3.11, 4.3.12, and 4.3.12.1.

Comment:

Evaluators Cue: There is a planned CTMT entry.

2005 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 13 of 17 Form ES-C-1 PERFORMANCE INFORMATION Step 4.3.11 Performance Step: 31 When CTMT pressure is less than 4.25 WG, OPEN GTHZ0026 using GT HIS-26.

NOTE: Steps 31 and 32 may be performed in any order.

Standard: Operator should depress and hold the OPEN pushbutton for GT HIS-26 when CTMT pressure is less than 4.25 WG.

Comment:

Evaluators Cue: CTMT pressure is now 2.5 WG.

GT HIS-26 RED light illuminates and three (3) seconds later, the GREEN light extinguishes.

Step 4.3.11 Performance Step: 32 When CTMT pressure is less than 4.25 WG, OPEN GTHZ0027 using GT HIS-27.

NOTE: Steps 31 and 32 may be performed in any order.

Standard: Operator should depress and hold the OPEN pushbutton for GT HIS-27 when CTMT pressure is less than 4.25 WG.

Comment:

Evaluators Cue: CTMT pressure is now 2.5 WG.

GT HIS-27 RED light illuminates and three (3) seconds later, the GREEN light extinguishes.

Step 4.3.12 Performance Step: 33 Start SGT02, CTMT Mini Purge Air Supply Unit with GT HIS-23.

Standard: Operator should select RUN on GT HIS-23.

Comment:

Evaluators Cue: GT HIS-23 RED light illuminates and the GREEN light extinguishes.

2005 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 14 of 17 Form ES-C-1 PERFORMANCE INFORMATION Step 4.3.12.1 Performance Step: 34 OPEN GTHZ0005 using GT HIS-5.

NOTE: Steps 34 and 35 may be performed in any order.

Standard: Operator should depress and hold the OPEN pushbutton for GT HIS-5.

Comment:

Evaluators Cue: GT HIS-5 RED light illuminates and two (2) seconds later, the GREEN light extinguishes.

4.3.12.1 Performance Step: 35 OPEN GTHZ0004 using GT HIS-4.

NOTE: Steps 34 and 35 may be performed in any order.

Standard: Operator should depress and hold the OPEN pushbutton for GT HIS-4.

Comment:

Evaluators Cue: GT HIS-4 RED light illuminates and two (2) seconds later, the GREEN light extinguishes.

Performance Step: 36 Inform the Control Room Supervisor that CTMT Mini Purge has been reinitiated.

Standard: Operator should inform the Control Room Supervisor that Mini Purge has been reinitiated.

Comment:

Evaluators Cue: Control Room Supervisor acknowledges.

Terminating Cue: When Mini-Purge is reinitiated, this JPM is complete.

2005 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 15 of 17 Form ES-C-1 PERFORMANCE INFORMATION STOP TIME:

2005 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 16 of 17 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC JPM S8 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2005 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 17 of 17 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: Callaway Plant is in Mode 2. A containment mini purge was in progress to prepare for a containment entry. One hour ago, a CPIS/CRVIS occurred due to a spike on GTRE0022. Repairs have been made to GTRE0022 and it is now operable. Outside air temperature is expected to remain > 50°F.

INITIATING CUE: The Control Room Supervisor has directed you to re-initiate the containment mini purge per OTN-GT-00001, Section 4.7. The Control Room Supervisor has decided to not realign the control building HVAC at this time. The SS ahs authorized reinitiating CTMT mini purge. Inform the Control room Supervisor when the mini purge has been re-initiated.

2005 NRC JPM S8 NUREG 1021, Revision 9