{{#Wiki_filter:-3-(4) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level PPL Susquehanna, LLC is authorized to operate the facility at reactor core power levels not in excess of 3489 megawatts thermal in accordance with the conditions specified herein and in Attachment 1 to this license. The preoperational tests, startup tests and other items identified in Attachment 1 to this license shall be completed as specified.
{{#Wiki_filter:     (4)     PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)     PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
Attachment 1 is hereby incorporated into this license.(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 238, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.For Surveillance Requirements (SRs) that are new in Amendment 178 to Facility Operating License No. NPF-14, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 178. For SRs that existed prior to Amendment 178, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 178.(3) Conduct of Work Activities During Fuel Load and Initial Startup The operating licensee shall review by committee all facility construction, Preoperational Testing, and System Demonstration activities performed concurrently with facility initial fuel loading or with the facility Startup Test Amendment No. 5, +49, +-78, +-80, +88, +-94, 295, 2286, -27, 238 PPL Rev. 2 DC Sources-Operating 3.8.4 ACTIONS (continued)
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
CONDITION REQUIRED ACTION COMPLETION TIME D. Diesel Generator E DC D.1 Declare Diesel Generator E [[estimated NRC review hours::2 hours]] electrical power inoperable.
(1)     Maximum Power Level PPL Susquehanna, LLC is authorized to operate the facility at reactor core power levels not in excess of 3489 megawatts thermal in accordance with the conditions specified herein and in Attachment 1 to this license. The preoperational tests, startup tests and other items identified in Attachment 1 to this license shall be completed as specified. Attachment 1 is hereby incorporated into this license.
subsystem inoperable, when aligned to the Class 1 E distribution system.SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is greater than or equal to 7 days the minimum established float voltage.SR 3.8.4.2 Verify each required battery charger supplies its 24 months associated battery at the following rates for > [[estimated NRC review hours::4 hours]] at greater than or equal to the minimum established float voltages.a. > 100 amps for the 125V Battery b. 300 amps for the 250V Battery c. >200 amps for the 125V Diesel Generator E Battery (continued)
(2)     Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 238, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
I I I SUSQUEHANNA  
For Surveillance Requirements (SRs) that are new in Amendment 178 to Facility Operating License No. NPF-14, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 178. For SRs that existed prior to Amendment 178, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 178.
-UNIT 1 TS / 3.8-24 Amendment 18,238 PPL Rev. 2 DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
(3)     Conduct of Work Activities During Fuel Load and Initial Startup The operating licensee shall review by committee all facility construction, Preoperational Testing, and System Demonstration activities performed concurrently with facility initial fuel loading or with the facility Startup Test Amendment No. 5, +49, +-78, +-80, +88, +-94,295, 2286, -27,238
SURVEILLANCE FREQUENCY SR 3.8.4.3--NOTES-------------------------------
 
--------------------------------
PPL Rev. 2 DC Sources-Operating 3.8.4 ACTIONS (continued)
: 1. The modified performance discharge test in SR 3.8.6.6 may be performed in lieu of SR 3.8.4.3.2. This Surveillance shall not be Performed in Mode 1, 2, or 3 except for the Diesel Generator E DC electrical power subsystem.
CONDITION                       REQUIRED ACTION                   COMPLETION TIME D. Diesel Generator E DC         D.1   Declare Diesel Generator E       [[estimated NRC review hours::2 hours]] electrical power                     inoperable.
This Surveillance can be performed on the Diesel Generator E DC electrical power subsystem when the Diesel Generator E is not aligned to the Class 1 E distribution system. However, credit may be taken for unplanned events that satisfy. this SR.Verify battery capacity is adequate to supply, and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.24 months SUSQUEHANNA  
subsystem inoperable, when aligned to the Class 1E distribution system.
-UNIT 1 TS / 3.8-25 Amendment 17, 2A, 238.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                         FREQUENCY SR 3.8.4.1     Verify battery terminal voltage is greater than or equal to   7 days the minimum established float voltage.
PPL Rev. 2 DC Sources-Operating 3.8.4 Table 3.8.4-1 (page 1 of 1)Unit 1 DC Electrical Power Subsystems TYPE VOLTAGE DIVISION .1 DIVISION II Battery Banks 250 V 1 D650 1 D660 1 D653A (Charger) 1 D663 (Charger)or 1 D653B (Charger)125 V 1 D610 (Subsys. A) 1 D620 (Subsys. B)1 D613 (Charger A) 1 D623 (Charger B)1 D630 (Subsys. C) 1 D640 (Subsys. D)1 D633 (Charger C) 1 D643 (Charger D)DG E 125 V 0D595 Battery Banks 0D596 (Charger)SUSQUEHANNA  
SR 3.8.4.2     Verify each required battery charger supplies its             24 months associated battery at the following rates for > [[estimated NRC review hours::4 hours]] at greater than or equal to the minimum established float voltages.
-UNIT 1 TS 3.8-26 Amendment 1/8,238 PPL Rev. 2 DC Sources-Operating 3.8.4 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA  
: a. > 100 amps for the 125V Battery                                                 I
-UNIT 1 TS / 3.8-27 Amendment 1/8,238 PPL Rev. 2 DC Sources-Operating 3.8.4 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA  
: b. Ž300 amps for the 250V Battery                                                 I I
-UNIT 1 TS / 3.8-28 Amendment 1/8, M PPL Rev. 1 DC Sources-Shutdown 3.8.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.5.1-NOTE -----------------------------...
: c. >200 amps for the 125V Diesel Generator E Battery (continued)
..The following SRs must be met, but are not required to be performed:
SUSQUEHANNA - UNIT 1                       TS / 3.8-24                           Amendment 18,238
SR 3.8.4.2, and SR 3.8.4.3.I For DC sources required to be OPERABLE the following SRs are applicable:
 
SR 3.8.4.1 SR 3.8.4.2 SR 3.8.4.3 In accordance with applicable SRs SUSQUEHANNA  
PPL Rev. 2 DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
-UNIT 1 TS / 3.8-31 Amendment 1/8ý 238 PPL Rev. 1 Battery Parameters 3.8.6 3.8 ELECTRICAL POWER SYSTEMS 3.8.6 Battery Parameters I I LCO 3.8.6 Battery parameters for the Class 1 E 250 V batteries and Class 1 E 125 V batteries shall be within limits.APPLICABILITY:
SURVEILLANCE                                               FREQUENCY SR 3.8.4.3 ------------------------------ --NOTES- --------------------------------
When associated DC electrical power subsystems are required to be OPERABLE.ACTIONS-------.--  
: 1. The modified performance discharge test in SR 3.8.6.6 may be performed in lieu of SR 3.8.4.3.
.---------------------  
: 2. This Surveillance shall not be Performed in Mode 1, 2, or 3 except for the Diesel Generator E DC electrical power subsystem. This Surveillance can be performed on the Diesel Generator E DC electrical power subsystem when the Diesel Generator E is not aligned to the Class 1E distribution system. However, credit may be taken for unplanned events that satisfy. this SR.
.. ----------  
Verify battery capacity is adequate to supply, and maintain               24 months in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.
-.---------
SUSQUEHANNA - UNIT 1                         TS / 3.8-25                               Amendment 17, 2A, 238.
NOTE ------ ------------------------------------------------
 
Separate Condition entry is allowed for each battery.CONDITION REQUIRED ACTION COMPLETION TIME A. One 125 VDC electrical A.1 Perform SR 3.8.4.1 [[estimated NRC review hours::2 hours]] power subsystem or one 250 VDC electrical power AND subsystem with one or more battery cells float A.2 Perform SR 3.8.6.1 [[estimated NRC review hours::2 hours]] voltage < 2.07 V.AND A.3 Restore affected cell voltage [[estimated NRC review hours::24 hours]]2.07 V.(continued)
PPL Rev. 2 DC Sources-Operating 3.8.4 Table 3.8.4-1 (page 1 of 1)
SUSQUEHANNA  
Unit 1 DC Electrical Power Subsystems TYPE           VOLTAGE               DIVISION .1           DIVISION II Battery Banks         250 V       1 D650                 1D660 1 D653A (Charger)       1D663 (Charger) or 1 D653B (Charger) 125 V       1D610  (Subsys. A)     1D620  (Subsys. B) 1 D613 (Charger A)     1D623  (Charger B) 1D630  (Subsys. C)     1D640  (Subsys. D) 1D633  (Charger C)     1D643  (Charger D)
-UNIT 1 TS / 3.8-32.Amendment 1/8,238  
DG E             125 V                           0D595 Battery Banks                                     0D596 (Charger)
.PPL Rev. 1 Battery Parameters 3.8.6 ACTIONS (continued)
SUSQUEHANNA - UNIT 1             TS   3.8-26                       Amendment 1/8,238
CONDITION REQUIRED ACTION COMPLETION TIME B. One 125 VDC electrical B.1 Perform SR 3.8.4.1 [[estimated NRC review hours::2 hours]] power subsystem or one 250 VDC electrical power AND subsystem with float current > 2 amps. B.2 Restore battery float current [[estimated NRC review hours::12 hours]] to < 2 amps.C. ------NOTE --- -----------------
 
NOTE ------------------
PPL Rev. 2 DC Sources-Operating 3.8.4 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 1           TS / 3.8-27             Amendment 1/8,238
Required Action C.2 shall Required Actions C.1 and C.2 are*be completed if only applicable if electrolyte level electrolyte level was was below the top of plates.below the top of plates. -----------------------------------------------------
 
One 125 VDC electrical C.1 Restore electrolyte level to [[estimated NRC review hours::8 hours]] power subsystem or one above top of plates.250 VDC electrical power subsystem with one or AND more cells electrolyte level less than minimum established design limits.C.2 Verify no evidence of [[estimated NRC review hours::12 hours]] leakage.AND C.3 Restore electrolyte level to 31 days greater than or equal to minimum established design limits.D. One 125 VDC electrical D.1 Restore battery pilot cell [[estimated NRC review hours::12 hours]] power subsystem or one temperature to greater than 250 VDC electrical power or equal to minimum subsystem with pilot cell established design limits electrolyte temperature less than minimum established design limits.(continued)
PPL Rev. 2 DC Sources-Operating 3.8.4 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 1           TS / 3.8-28               Amendment 1/8, M
I SUSQUEHANNA  
 
-UNIT 1 TS / 3.8-33 Amendment 1/8, M PPL Rev. 1 Battery Parameters 3.8.6 ACTIONS (continued)
PPL Rev. 1 DC Sources-Shutdown 3.8.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                               FREQUENCY SR 3.8.5.1                           -NOTE The following SRs must be met, but are not required to be performed: SR 3.8.4.2, and SR 3.8.4.3.                                                   I For DC sources required to be OPERABLE the following                 In accordance with SRs are applicable:                                                 applicable SRs SR 3.8.4.1 SR 3.8.4.2 SR 3.8.4.3 SUSQUEHANNA   - UNIT 1               TS / 3.8-31                                 Amendment 1/8&#xfd; 238
CONDITION REQUIRED ACTION COMPLETION TIME E. Two 125 VDC electrical E.1 Restore battery parameters [[estimated NRC review hours::2 hours]] power subsystems or for batteries in one 125 VDC both 250 VDC electrical electrical power subsystem or power subsystems with one 250 VDC electrical power battery parameters not subsystem to within limits.within limits.F. Required Action and F.1 Declare associated battery Immediately associated Completion inoperable.
 
Time of Condition A, B, C, D, or E not met.OR One battery on one 125 VDC electrical power subsystem or one 250 VDC electrical power subsystem with one or more battery cells float voltage < 2.07 V and float current > 2 amps.I SUSQUEHANNA  
PPL Rev. 1 Battery Parameters 3.8.6 3.8   ELECTRICAL POWER SYSTEMS 3.8.6   Battery Parameters                                                                                     I I
-UNIT 1 TS / 3.8-34 Amendment 1/8, 238 PPL Rev. 1 Battery Parameters 3.8.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY 4-SR 3.8.6.1-L ^I------------------------
LCO 3.8.6         Battery parameters for the Class 1E 250 V batteries and Class 1E 125 V batteries shall be within limits.
LJ i" --- ........ -r -----------------------------------
APPLICABILITY:       When associated DC electrical power subsystems are required to be OPERABLE.
Not required to be met when battery terminal voltage is less than the minimum established float voltage of SR 3.8.4.1.Verify each battery float current is < 2 amps.7 days SR 3.8.6.2 Verify each battery pilot cell voltage is >_ 2.07 V. 31 days SR 3.8.6.3 Verify each battery connected cell electrolyte level is 31 days greater than or equal to minimum established design limits.SR 3.8.6.4 Verify each battery pilot cell temperature is greater than or 31 days equal to minimum established design limits.SR 3.8.6.5 Verify each battery connected cell voltage is > 2.07 V. 92 days (continued)
ACTIONS NOTE ------ ------------------------------------------------
SUSQUEHANNA  
Separate Condition entry is allowed for each battery.
-UNIT 1 TS / 3.8-35 Amendment 1/8, 238 PPL Rev. 1 Battery Parameters 3.8.6 SURVEILLANCE REQUIREMENTS (continued)
CONDITION                        REQUIRED ACTION                          COMPLETION TIME A. One 125 VDC electrical          A.1    Perform SR 3.8.4.1                   [[estimated NRC review hours::2 hours]] power subsystem or one 250 VDC electrical power       AND subsystem with one or more battery cells float       A.2   Perform SR 3.8.6.1                   [[estimated NRC review hours::2 hours]] voltage < 2.07 V.
SURVEILLANCE FREQUENCY SR 3.8.6.6-----------------................
AND A.3   Restore affected cell voltage         [[estimated NRC review hours::24 hours]]
NOTE ----------------------------------
                                          &#x17d;2.07 V.
This Surveillance shall not be Performed in Mode 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR.Verify battery capacity is _> 80% of the manufacturer's rating when subjected to a performance discharge test or a modified performance discharge test.60 months AND 12 months when battery shows degradation or has reached 85% of expected service life with capacity< 100% of manufacturer's rating AND 24 months when battery has reached 85% of the expected service life with capacity_> 100% of manufacturer's rating SUSQUEHANNA
(continued)
-UNIT 1 TS / 3.8-36 Amendment 1/8, n PPL Rev. 2 Programs and Manuals 5.5 5.5 Programs and Manuals (continued) 5.5.13 Battery Monitoring and Maintenance Program This program provides for battery restoration and maintenance, which includes the following:
SUSQUEHANNA       -   UNIT 1               TS / 3.8-32                               .Amendment 1/8,238
: a. Actions to restore battery cells with float voltage < 2.13 V; and b. Actions to equalize and test battery cells that had been discovered with electrolyte level below the top of the plates; and c. Actions to verify that the remaining cells are >_ 2.07 V when a cell or cells have been found to be < 2.13 V.SUSQUEHANNA
 
-UNIT 1 TS / 5.0-18A Amendment 238
                                                                                                    .PPL Rev. 1 Battery Parameters 3.8.6 ACTIONS (continued)
--3-(4) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level PPL Susquehanna, LLC is authorized to operate the facility at reactor core power levels not in excess of 3489 megawatts thermal (100% power) in accordance with the conditions specified herein. and in Attachment 1 to this license. The preoperational test, startup tests and other items identified in Attachment 1 to this license shall be completed as specified.
CONDITION                         REQUIRED ACTION                             COMPLETION TIME B. One 125 VDC electrical       B.1     Perform SR 3.8.4.1                           [[estimated NRC review hours::2 hours]] power subsystem or one 250 VDC electrical power     AND subsystem with float current > 2 amps.             B.2     Restore battery float current               [[estimated NRC review hours::12 hours]] to < 2 amps.
Attachment 1 is hereby incorporated into this license.(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 215, and the Environmental Protection Plan contained in.Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.For Surveillance Requirements (SRs) that are new in Amendment 151 t6 Facility Operating License No. NPF-22, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 151. For SRs that existed prior to Amendment 151, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 151.2.C.(3) PPL Susquehanna, LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Fire Protection Review Report for the facility and as approved in Fire Protection Program, Section 9.5, SER, SSER#1, SSER#2, SSER#3, SSER#4, SSER#6, Safety Evaluation of Fire Protection Report dated August 9, 1989, Safety Evaluation Amendment No. 4, , -G9, 450, +5+, +5,4-2, 469, 2-2, &#xa3;-9, 2-1-4, 215 I PPL Rev. 2 DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is greater than or 7 days equal to the minimum established float voltage.SR 3.8.4.2 Verify each required battery charger supplies its 24 months associated battery at the following rates for > [[estimated NRC review hours::4 hours]] at greater than or equal to the minimum established float voltages: a) _ 100 amps for the 125V Battery b) _300 amps for the 250V Battery c) _200 amps for the125V Diesel Generator E Battery......._ _(continued)
C. ------ NOTE ---           ----------------- NOTE ------------------
SUSQUEHANNA
Required Action C.2 shall Required Actions C.1 and C.2 are
-UNIT 2 TS /G.8-28 Amendment 10, 21&#xfd;, 21.5 PPL Rev. 2 DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
  *be completed if             only applicable if electrolyte level electrolyte level was         was below the top of plates.
SURVEILLANCE FREQUENCY SR 3.8.4.3 ---------------
below the top of plates.     -----------------------------------------------------
NOTES -------------
One 125 VDC electrical       C.1     Restore electrolyte level to                 [[estimated NRC review hours::8 hours]] power subsystem or one                 above top of plates.
: 1. The modified performance discharge test in SR 3.8.6.6 may be performed in lieu of SR 3.8.4.3.2. This Surveillance shall not be Performed in Mode 1, 2 or 3 except for the Diesel Generator E DC electrical power subsystem.
250 VDC electrical power subsystem with one or         AND more cells electrolyte level less than minimum established design limits.
This Surveillance can be performed on the Diesel Generator E DC electrical power subsystem when the Diesel Generator E is not aligned to the Class 1 E distribution system. However, credit may be taken for unplanned events that satisfy this SR.Verify battery capacity is adequate to supply, 24 months and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.SR 3.8.4.4 ---------------------------
C.2     Verify no evidence of                       [[estimated NRC review hours::12 hours]] leakage.
NOTE --------------
AND                                                                             I C.3     Restore electrolyte level to                 31 days greater than or equal to minimum established design limits.
D. One 125 VDC electrical       D.1       Restore battery pilot cell                 [[estimated NRC review hours::12 hours]] power subsystem or one                 temperature to greater than 250 VDC electrical power               or equal to minimum subsystem with pilot cell             established design limits electrolyte temperature less than minimum established design limits.
(continued)
SUSQUEHANNA - UNIT 1                             TS / 3.8-33                                   Amendment 1/8, M
 
PPL Rev. 1 Battery Parameters 3.8.6 ACTIONS (continued)
CONDITION                 REQUIRED ACTION               COMPLETION TIME E. Two 125 VDC electrical   E.1 Restore battery parameters   [[estimated NRC review hours::2 hours]] power subsystems or         for batteries in one 125 VDC both 250 VDC electrical     electrical power subsystem or power subsystems with       one 250 VDC electrical power battery parameters not       subsystem to within limits.
within limits.
F. Required Action and     F.1 Declare associated battery   Immediately             I associated Completion         inoperable.
Time of Condition A, B, C, D, or E not met.
OR One battery on one 125 VDC electrical power subsystem or one 250 VDC electrical power subsystem with one or more battery cells float voltage < 2.07 V and float current > 2 amps.
SUSQUEHANNA - UNIT 1                 TS / 3.8-34                     Amendment 1/8, 238
 
PPL Rev. 1 Battery Parameters 3.8.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                               FREQUENCY 4-SR 3.8.6.1
                                          -L ^I
            ------------------------           LJ r i"-----------------------------------
Not required to be met when battery terminal voltage is less than the minimum established float voltage of SR 3.8.4.1.
Verify each battery float current is < 2 amps.                                 7 days SR 3.8.6.2 Verify each battery pilot cell voltage is >_2.07 V.                             31 days SR 3.8.6.3 Verify each battery connected cell electrolyte level is                         31 days greater than or equal to minimum established design limits.
SR 3.8.6.4 Verify each battery pilot cell temperature is greater than or                   31 days equal to minimum established design limits.
SR 3.8.6.5 Verify each battery connected cell voltage is > 2.07 V.                         92 days (continued)
SUSQUEHANNA     -   UNIT 1                   TS / 3.8-35                                     Amendment 1/8, 238
 
PPL Rev. 1 Battery Parameters 3.8.6 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                               FREQUENCY SR 3.8.6.6                           NOTE This Surveillance shall not be Performed in Mode 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR.
Verify battery capacity is _>80% of the manufacturer's                60 months rating when subjected to a performance discharge test or a modified performance discharge test.
AND 12 months when battery shows degradation or has reached 85% of expected service life with capacity
                                                                                < 100% of manufacturer's rating AND 24 months when battery has reached 85% of the expected service life with capacity
_>100% of manufacturer's rating SUSQUEHANNA - UNIT 1                    TS / 3.8-36                                Amendment 1/8, n
 
PPL Rev. 2 Programs and Manuals 5.5 5.5    Programs and Manuals (continued) 5.5.13    Battery Monitoring and Maintenance Program This program provides for battery restoration and maintenance, which includes the following:
: a. Actions to restore battery cells with float voltage < 2.13 V; and
: b. Actions to equalize and test battery cells that had been discovered with electrolyte level below the top of the plates; and
: c. Actions to verify that the remaining cells are >_ 2.07 V when a cell or cells have been found to be < 2.13 V.
SUSQUEHANNA      - UNIT 1               TS / 5.0-18A                                Amendment 238
 
                                              -        (4)    PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)    PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)   Maximum Power Level PPL Susquehanna, LLC is authorized to operate the facility at reactor core power levels not in excess of 3489 megawatts thermal (100% power) in accordance with the conditions specified herein. and in Attachment 1 to this license. The preoperational test, startup tests and other items identified in Attachment 1 to this license shall be completed as specified. Attachment 1 is hereby incorporated into this license.
(2)   Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 215, and the Environmental Protection Plan contained in.
Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
For Surveillance Requirements (SRs) that are new in Amendment 151 t6 Facility Operating License No. NPF-22, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 151. For SRs that existed prior to Amendment 151, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 151.
2.C.(3)  PPL Susquehanna, LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Fire Protection Review Report for the facility and as approved in Fire Protection Program, Section 9.5, SER, SSER#1, SSER#2, SSER#3, SSER#4, SSER#6, Safety Evaluation of Fire Protection Report dated August 9, 1989, Safety Evaluation Amendment No. 4,      , -G9, 450, +5+, +5,4-2,469, 2-2, &#xa3;-9, 2-1-4, 215  I
 
PPL Rev. 2 DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                          FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is greater than or        7 days equal to the minimum established float voltage.
SR 3.8.4.2 Verify each required battery charger supplies its        24 months associated battery at the following rates for > [[estimated NRC review hours::4 hours]] at greater than or equal to the minimum established float voltages:
a) _ 100 amps for the 125V Battery b)  _300 amps for the 250V Battery c) _200 amps for the125V Diesel Generator E Battery
                            . ......             _      _(continued)
SUSQUEHANNA - UNIT 2                 TS /G.8-28                            Amendment 10, 21&#xfd;, 21.5
 
PPL Rev. 2 DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                  FREQUENCY SR 3.8.4.3 --------------- NOTES                   -------------
: 1. The modified performance discharge test in SR 3.8.6.6 may be performed in lieu of SR 3.8.4.3.
: 2. This Surveillance shall not be Performed in Mode 1, 2 or 3 except for the Diesel Generator E DC electrical power subsystem.
This Surveillance can be performed on the Diesel Generator E DC electrical power subsystem when the Diesel Generator E is not aligned to the Class 1E distribution system. However, credit may be taken for unplanned events that satisfy this SR.
Verify battery capacity is adequate to supply, 24 months and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.
SR 3.8.4.4  --------------------------- NOTE --------------                                  I When Unit 1 is in MODE 4 or 5, or moving irradiated fuel assemblies in the secondary containment, the Note to Unit 1 SR 3.8.5.1 is applicable.
For required Unit 1 DC electrical power              In accordance with subsystems, the SRs for Unit 1 Specification        applicable SRs 3.8.4 are applicable.
SUSQUEHANNA          UNIT 2                TS / 3.8-29                  Amendment 10, 2p, 215
 
PPL Rev. 2 DC Sources-Operating 3.8.4 Table 3.8.4-1 (page 1 of 1)
Unit 2 DC Electrical Power Subsystems TYPE          VOLTAGE                  DIVISION I            DIVISION II Battery Banks          250 V              2D650                  2D660 2D653A (Charger)        2D663 (Charger) or 2D653B (Charger) 125 V            1 D610 (Subsys. A)    1 D620 (Subsys. B) 1 D613 (Charger A)    1 D623 (Charger B) 2D610 (Subsys. A)      2D620 (Subsys. B) 2D613 (Charger A)      2D623 (Charger B) 1 D630 (Subsys. C)    1 D640 (Subsys. D) 1D633 (Charger C)      1D643 (Charger D) 2D630 (Subsys. C)      2D640 (Subsys. D) 2D633 (Charger C)      2D643 (Charger D)
DG E              125 V                              0D595 Battery Banks                                          0D596 (Charger)
SUSQUEHANNA - UNIT 2            TS / 3.8-30                            Amendment 15/,215
 
PPL Rev. 2 DC Sources-Operating 3.8.4 SUSQUEHANNA - UNIT 2 TS / 3.8-31      Amendment 1V, ZL5
 
PPL Rev. 2 DC Sources-Operating 3.8.4 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 2          TS / 3.8-32                  Amendment 1V, 215 N
 
PPL Rev. 2 DC Sources-Operating 3.8.4 SUSQUEHANNA - UNIT 2 TS'/3.8-33      Amendment 15/, 215
 
PPL Rev. 1 DC Sources-Shutdown 3.8.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                    FREQUENCY SR 3.8.5.1 The following SRs must be met, but are not required to be performed: SR 3.8.4.2 and SR 3.8.4.3.                                                                        I For DC sources required to be OPERABLE the        In accordance with applicable following SRs are applicable:                      SRs SR 3.8.4.1                                                                        I SR 3.8.4.2                                                                        I SR 3.8.4.3 SR 3.8.5.2                      NOTE-----------------------
When Unit 1 is in MODE 4 or 5, or moving irradiated fuel assemblies in the secondary containment, the Note to Unit 1 SR 3.8.5.1 is applicable.
When Unit 1 is in MODE 4 or 5, or moving irradiated fuel assemblies in the secondary containment, the Note to Unit 1 SR 3.8.5.1 is applicable.
For required Unit 1 DC electrical power In accordance with subsystems, the SRs for Unit 1 Specification applicable SRs 3.8.4 are applicable.
For required Unit 1 DC electrical power           In accordance with applicable subsystems, the SRs for Unit 1 Specification 3.8.4 SRs are applicable.
I SUSQUEHANNA UNIT 2 TS / 3.8-29 Amendment 10, 2p, 215 PPL Rev. 2 DC Sources-Operating 3.8.4 Table 3.8.4-1 (page 1 of 1)Unit 2 DC Electrical Power Subsystems TYPE VOLTAGE DIVISION I DIVISION II Battery Banks 250 V 2D650 2D660 2D653A (Charger) 2D663 (Charger)or 2D653B (Charger)125 V 1 D610 (Subsys. A) 1 D620 (Subsys. B)1 D613 (Charger A) 1 D623 (Charger B)2D610 (Subsys. A) 2D620 (Subsys. B)2D613 (Charger A) 2D623 (Charger B)1 D630 (Subsys. C) 1 D640 (Subsys. D)1 D633 (Charger C) 1D643 (Charger D)2D630 (Subsys. C) 2D640 (Subsys. D)2D633 (Charger C) 2D643 (Charger D)DG E 125 V 0D595 Battery Banks 0D596 (Charger)SUSQUEHANNA
SUSQUEHANNA     - UNIT 2           TS / 3.8-38                            Amendment 1V, 215
-UNIT 2 TS / 3.8-30 Amendment 15/,215 PPL Rev. 2 DC Sources-Operating 3.8.4 SUSQUEHANNA
 
-UNIT 2 TS / 3.8-31 Amendment 1V, ZL5 PPL Rev. 2 DC Sources-Operating 3.8.4 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA
PPL Rev. 1 Battery Parameters
-UNIT 2 TS / 3.8-32 Amendment 1 V, 215 N PPL Rev. 2 DC Sources-Operating 3.8.4 SUSQUEHANNA
                                                                                                                                            .3.8.6 3.8              ELECTRICAL POWER SYSTEMS 3.8.6            Battery Parameters                                                                                                                    I I
-UNIT 2 TS'/3.8-33 Amendment 15/, 215 PPL Rev. 1 DC Sources-Shutdown 3.8.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.5.1 The following SRs must be met, but are not required to be performed:
LCO 3.8.6        Battery parameters for the Class 1 E 250 V batteries and Class 1E 125 V batteries shall be within limits.
SR 3.8.4.2 and SR 3.8.4.3.For DC sources required to be OPERABLE the following SRs are applicable:
APPLICABIL .ITY:          When associated DC electrical power subsystems are required to be OPERABLE.
SR 3.8.4.1 SR 3.8.4.2 SR 3.8.4.3 I In accordance with applicable SRs I I I SR 3.8.5.2----------
ACTIONS
NOTE -------------
------------------------------------------------ ---- NOT t--- -- -- -- -- ------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- ----
When Unit 1 is in MODE 4 or 5, or moving irradiated fuel assemblies in the secondary containment, the Note to Unit 1 SR 3.8.5.1 is applicable.
Separate Condition entry is allowed for each batti CONDITION                              REQUIRED ACTION                                        COMPLETION TIME A. One 125 VDC electrical                    A.1 Perform SR 3.8.4.1                                      [[estimated NRC review hours::2 hours]] power subsystem or-one 250 VDC electrical power                AND subsystem with one or more battery cells float voltage              A.2  Perform SR 3.8.6.1                                      [[estimated NRC review hours::2 hours]]
For required Unit 1 DC electrical power subsystems, the SRs for Unit 1 Specification 3.8.4 are applicable.
    < 2.07 V.
In accordance with applicable SRs SUSQUEHANNA
AND A.3 Restore affected cell voltage                            [[estimated NRC review hours::24 hours]]
-UNIT 2 TS / 3.8-38 Amendment 1 V, 215 PPL Rev. 1 Battery Parameters
                                                  > 2.07 V.
.3.8.6 3.8 ELECTRICAL POWER SYSTEMS Battery Parameters 3.8.6 I I LCO 3.8.6 APPLICABIL Battery parameters for the Class 1 E 250 V batteries and Class 1 E 125 V batteries shall be within limits..ITY: When associated DC electrical power subsystems are required to be OPERABLE.ACTIONS------------------------------------------------  
(continued)
---- NOT Separate Condition entry is allowed for each batti t --- -- -- -- -- ----- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- ----CONDITION REQUIRED ACTION COMPLETION TIME A. One 125 VDC electrical A.1 Perform SR 3.8.4.1 [[estimated NRC review hours::2 hours]] power subsystem or-one 250 VDC electrical power AND subsystem with one or more battery cells float voltage A.2 Perform SR 3.8.6.1 [[estimated NRC review hours::2 hours]]< 2.07 V.AND A.3 Restore affected cell voltage [[estimated NRC review hours::24 hours]]> 2.07 V.(continued)
SUSQUEHANNA - UNIT 2                              TS / 3.8-39                                                        Amendment 15/, a5
SUSQUEHANNA
 
-UNIT 2 TS / 3.8-39 Amendment 15/, a5 PPL Rev. 1 Battery Parameters 3.8.6 ACTIONS (continued)
PPL Rev. 1 Battery Parameters 3.8.6 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. One 125 VDC electrical B.1 Perform SR 3.8.4.1 [[estimated NRC review hours::2 hours]] power subsystem or one.250 VDC electrical power AND subsystem with float current> 2 amps. B.2 Restore battery Iloat current to [[estimated NRC review hours::12 hours]]_< 2 amps C. ------NOTE ----- --------------------
CONDITION                      REQUIRED ACTION                COMPLETION TIME B. One 125 VDC electrical         B.1   Perform SR 3.8.4.1              [[estimated NRC review hours::2 hours]] power subsystem or one.
NOTE ------------------
250 VDC electrical power      AND subsystem with float current
Required Action C.2 shall be Required Actions C.1 and C.2 are completed if electrolyte level only applicable if electrolyte level was below the top of plates. was below the top of plates.One 125 VDC electrical C.1 Restore electrolyte level to [[estimated NRC review hours::8 hours]] power subsystem or one above top of plates.250 VDC electrical power subsystem with one or more AND cells electrolyte level less than minimum established design limits.C.2 Verify no evidence of [[estimated NRC review hours::12 hours]] leakage.AND C.3 Restore electrolyte level to 31 days greater than or equal to minimum established design limits.(continued)
  > 2 amps.                     B.2  Restore battery Iloat current to [[estimated NRC review hours::12 hours]]
SUSQUEHANNA  
_< 2 amps C. ------ NOTE----- -------------------- NOTE ------------------
-UNIT 2 TS / 3.8-40 Amendment 1 &#xfd; 1 215 PPL Rev. 1 Battery Parameters 3.8.6 ACTIONS (continued)
Required Action C.2 shall be Required Actions C.1 and C.2 are completed if electrolyte level only applicable if electrolyte level was below the top of plates. was below the top of plates.
CONDITION REQUIRED ACTION COMPLETION TIME D. One 125 VDC electrical D.1 Restore battery pilot cell [[estimated NRC review hours::12 hours]] power subsystem or one temperature to greater 250 VDC electrical power than or equal to minimum subsystem with pilot cell established design limits.electrolyte temperature less than minimum established design limits.E. Two 125 VDC electrical E.1 Restore battery [[estimated NRC review hours::2 hours]] power subsystems or both parameters for batteries in 250 VDC electrical power one 125 VDC electrical subsystems with battery power subsystem or one parameters not within limits. 250 VDC electrical power subsystem to within limits.F. Required Action and F.1 Declare associated battery Immediately associated Completion inoperable.
One 125 VDC electrical        C.1  Restore electrolyte level to    [[estimated NRC review hours::8 hours]] power subsystem or one              above top of plates.
Time of Condition A, B, C, D, or E not met.OR One battery on one 125 VDC electrical power subsystem or on one 250 VDC electrical power subsystem with one or more battery cells float voltage< 2.07 V and float current> 2 amps.SUSQUEHANNA-UNIT 2 TS / 3.8-41 Amendment 1 &#xfd; 1 215 PPL Rev. 1 Battery Parameters 3.8.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.6.1----------------------
250 VDC electrical power subsystem with one or more    AND cells electrolyte level less than minimum established design limits.
NOTE ----------------------------------
C.2  Verify no evidence of            [[estimated NRC review hours::12 hours]] leakage.
Not required to be met when battery terminal voltage is less than the minimum established float voltage of SR 3.8.4.1.Verify each battery float current is < 2 amps. 7 days SR 3.8.6.2 Verify each battery pilot cell voltage is _2.07 V. 31 days SR 3.8.6.3 Verify each battery connected cell electrolyte 31 days level is greater than or equal to minimum established design limits.SR 3.8.6.4 Verify each battery pilot cell temperature is 31 days greater than or equal to minimum established design limits.(continued)
AND C.3   Restore electrolyte level to    31 days greater than or equal to minimum established design limits.
SUSQUEHANNA
(continued)
-UNIT 2 TS / 3.8-42 Amendment 4, 45 PPL Rev. 1 Battery Parameters 3.8.6 I SURVEILLANCE REQUIREMENTS (continued)
SUSQUEHANNA        - UNIT 2           TS / 3.8-40                            Amendment 1&#xfd; 1 215
SURVEILLANCE FREQUENCY SR 3.8.6.5 Verify each battery connected cell voltage is 92 days_2.07 V.SR 3.8.6.6 -------------------------
 
NOTE ---------------
PPL Rev. 1 Battery Parameters 3.8.6 ACTIONS (continued)
This Surveillance shall not be Performed in Mode 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR.Verify battery capacity is _> 80% of the 60 months manufacturer's rating when subjected to a performance discharge test or a modified performance discharge test. AND 12 months when battery shows degradation or has reached 85% of expected service life with capacity<100% of manufacturer's rating AND 24 months when battery has reached 85% of the expected service life with capacity _ 100% of manufacturer's rating SUSQUEHANNA
CONDITION                    REQUIRED ACTION              COMPLETION TIME D. One 125 VDC electrical        D.1  Restore battery pilot cell [[estimated NRC review hours::12 hours]] power subsystem or one            temperature to greater 250 VDC electrical power          than or equal to minimum subsystem with pilot cell          established design limits.
-UNIT 2 TS / 3.8-43 Amendment 14,215 PPL Rev. 2 Programs and Manuals 5.5 5.5 Programs and Manuals (continued) 5.5.13 Battery Monitoring and Maintenance Program This program provides for battery restoration and maintenance, which includes the following:
electrolyte temperature less than minimum established design limits.
: a. Actions to restore battery cells with float voltage < 2.13 V; and b. Actions to equalize and test battery cells that had been discovered with electrolyte level below the top of the plates; and c. Actions to verify that the remaining cells are > 2.07 V when a cell or cells have been found to be < 2.13 V.SUSQUEHANNA  
E. Two 125 VDC electrical        E.1   Restore battery            [[estimated NRC review hours::2 hours]] power subsystems or both          parameters for batteries in 250 VDC electrical power          one 125 VDC electrical subsystems with battery            power subsystem or one parameters not within limits.     250 VDC electrical power subsystem to within limits.
-UNIT 2 TS / 5.0-18A Amendment 215}}
F. Required Action and          F.1 Declare associated battery  Immediately associated Completion              inoperable.
Time of Condition A, B, C, D, or E not met.
OR One battery on one 125 VDC electrical power subsystem or on one 250 VDC electrical power subsystem with one or more battery cells float voltage
  < 2.07 V and float current
  > 2 amps.
SUSQUEHANNA- UNIT 2                  TS / 3.8-41                          Amendment 1&#xfd; 1215
 
PPL Rev. 1 Battery Parameters 3.8.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                    FREQUENCY SR 3.8.6.1
      ---------------------- NOTE ----------------------------------
Not required to be met when battery terminal voltage is less than the minimum established float voltage of SR 3.8.4.1.
Verify each battery float current is < 2 amps.       7 days SR 3.8.6.2      Verify each battery pilot cell voltage is &#x17d;_2.07 V. 31 days SR 3.8.6.3      Verify each battery connected cell electrolyte       31 days level is greater than or equal to minimum established design limits.
SR 3.8.6.4      Verify each battery pilot cell temperature is        31 days greater than or equal to minimum established design limits.
(continued)
SUSQUEHANNA         - UNIT 2                 TS / 3.8-42                        Amendment 4,      45
 
PPL Rev. 1 Battery Parameters I 3.8.6 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                            FREQUENCY SR 3.8.6.5 Verify each battery connected cell voltage is  92 days
_2.07 V.
SR 3.8.6.6 ------------------------- NOTE ---------------
This Surveillance shall not be Performed in Mode 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR.
Verify battery capacity is _>80% of the        60 months manufacturer's rating when subjected to a performance discharge test or a modified performance discharge test.                   AND 12 months when battery shows degradation or has reached 85% of expected service life with capacity
                                                          <100% of manufacturer's rating AND 24 months when battery has reached 85% of the expected service life with capacity &#x17d;_100% of manufacturer's rating SUSQUEHANNA     - UNIT 2               TS / 3.8-43                    Amendment 14,215
 
PPL Rev. 2 Programs and Manuals 5.5 5.5 Programs and Manuals (continued) 5.5.13    Battery Monitoring and Maintenance Program This program provides for battery restoration and maintenance, which includes the following:
: a. Actions to restore battery cells with float voltage < 2.13 V; and
: b. Actions to equalize and test battery cells that had been discovered with electrolyte level below the top of the plates; and
: c. Actions to verify that the remaining cells are > 2.07 V when a cell or cells have been found to be < 2.13 V.
SUSQUEHANNA       - UNIT 2               TS / 5.0-18A                                 Amendment 215}}

Latest revision as of 01:19, 14 March 2020

Tech Spec Pages for Amendments 238 and 215 DC Electrical Power Systems Technical Specification Task Force 360
ML062750005
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/28/2006
From:
NRC/NRR/ADRO/DORL/LPLI-1
To:
References
TAC MC5153, TAC MC5154
Download: ML062750005 (27)


Text

(4) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level PPL Susquehanna, LLC is authorized to operate the facility at reactor core power levels not in excess of 3489 megawatts thermal in accordance with the conditions specified herein and in Attachment 1 to this license. The preoperational tests, startup tests and other items identified in Attachment 1 to this license shall be completed as specified. Attachment 1 is hereby incorporated into this license.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 238, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

For Surveillance Requirements (SRs) that are new in Amendment 178 to Facility Operating License No. NPF-14, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 178. For SRs that existed prior to Amendment 178, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 178.

(3) Conduct of Work Activities During Fuel Load and Initial Startup The operating licensee shall review by committee all facility construction, Preoperational Testing, and System Demonstration activities performed concurrently with facility initial fuel loading or with the facility Startup Test Amendment No. 5, +49, +-78, +-80, +88, +-94,295, 2286, -27,238

PPL Rev. 2 DC Sources-Operating 3.8.4 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. Diesel Generator E DC D.1 Declare Diesel Generator E 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> electrical power inoperable.

subsystem inoperable, when aligned to the Class 1E distribution system.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is greater than or equal to 7 days the minimum established float voltage.

SR 3.8.4.2 Verify each required battery charger supplies its 24 months associated battery at the following rates for > 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br /> at greater than or equal to the minimum established float voltages.

a. > 100 amps for the 125V Battery I
b. Ž300 amps for the 250V Battery I I
c. >200 amps for the 125V Diesel Generator E Battery (continued)

SUSQUEHANNA - UNIT 1 TS / 3.8-24 Amendment 18,238

PPL Rev. 2 DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.4.3 ------------------------------ --NOTES- --------------------------------

1. The modified performance discharge test in SR 3.8.6.6 may be performed in lieu of SR 3.8.4.3.
2. This Surveillance shall not be Performed in Mode 1, 2, or 3 except for the Diesel Generator E DC electrical power subsystem. This Surveillance can be performed on the Diesel Generator E DC electrical power subsystem when the Diesel Generator E is not aligned to the Class 1E distribution system. However, credit may be taken for unplanned events that satisfy. this SR.

Verify battery capacity is adequate to supply, and maintain 24 months in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.

SUSQUEHANNA - UNIT 1 TS / 3.8-25 Amendment 17, 2A, 238.

PPL Rev. 2 DC Sources-Operating 3.8.4 Table 3.8.4-1 (page 1 of 1)

Unit 1 DC Electrical Power Subsystems TYPE VOLTAGE DIVISION .1 DIVISION II Battery Banks 250 V 1 D650 1D660 1 D653A (Charger) 1D663 (Charger) or 1 D653B (Charger) 125 V 1D610 (Subsys. A) 1D620 (Subsys. B) 1 D613 (Charger A) 1D623 (Charger B) 1D630 (Subsys. C) 1D640 (Subsys. D) 1D633 (Charger C) 1D643 (Charger D)

DG E 125 V 0D595 Battery Banks 0D596 (Charger)

SUSQUEHANNA - UNIT 1 TS 3.8-26 Amendment 1/8,238

PPL Rev. 2 DC Sources-Operating 3.8.4 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 1 TS / 3.8-27 Amendment 1/8,238

PPL Rev. 2 DC Sources-Operating 3.8.4 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 1 TS / 3.8-28 Amendment 1/8, M

PPL Rev. 1 DC Sources-Shutdown 3.8.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.5.1 -NOTE The following SRs must be met, but are not required to be performed: SR 3.8.4.2, and SR 3.8.4.3. I For DC sources required to be OPERABLE the following In accordance with SRs are applicable: applicable SRs SR 3.8.4.1 SR 3.8.4.2 SR 3.8.4.3 SUSQUEHANNA - UNIT 1 TS / 3.8-31 Amendment 1/8ý 238

PPL Rev. 1 Battery Parameters 3.8.6 3.8 ELECTRICAL POWER SYSTEMS 3.8.6 Battery Parameters I I

LCO 3.8.6 Battery parameters for the Class 1E 250 V batteries and Class 1E 125 V batteries shall be within limits.

APPLICABILITY: When associated DC electrical power subsystems are required to be OPERABLE.

ACTIONS NOTE ------ ------------------------------------------------

Separate Condition entry is allowed for each battery.

CONDITION REQUIRED ACTION COMPLETION TIME A. One 125 VDC electrical A.1 Perform SR 3.8.4.1 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> power subsystem or one 250 VDC electrical power AND subsystem with one or more battery cells float A.2 Perform SR 3.8.6.1 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> voltage < 2.07 V.

AND A.3 Restore affected cell voltage 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />

Ž2.07 V.

(continued)

SUSQUEHANNA - UNIT 1 TS / 3.8-32 .Amendment 1/8,238

.PPL Rev. 1 Battery Parameters 3.8.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. One 125 VDC electrical B.1 Perform SR 3.8.4.1 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> power subsystem or one 250 VDC electrical power AND subsystem with float current > 2 amps. B.2 Restore battery float current 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> to < 2 amps.

C. ------ NOTE --- ----------------- NOTE ------------------

Required Action C.2 shall Required Actions C.1 and C.2 are

  • be completed if only applicable if electrolyte level electrolyte level was was below the top of plates.

below the top of plates. -----------------------------------------------------

One 125 VDC electrical C.1 Restore electrolyte level to 8 hours0.333 days <br />0.0476 weeks <br />0.011 months <br /> power subsystem or one above top of plates.

250 VDC electrical power subsystem with one or AND more cells electrolyte level less than minimum established design limits.

C.2 Verify no evidence of 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> leakage.

AND I C.3 Restore electrolyte level to 31 days greater than or equal to minimum established design limits.

D. One 125 VDC electrical D.1 Restore battery pilot cell 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> power subsystem or one temperature to greater than 250 VDC electrical power or equal to minimum subsystem with pilot cell established design limits electrolyte temperature less than minimum established design limits.

(continued)

SUSQUEHANNA - UNIT 1 TS / 3.8-33 Amendment 1/8, M

PPL Rev. 1 Battery Parameters 3.8.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. Two 125 VDC electrical E.1 Restore battery parameters 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> power subsystems or for batteries in one 125 VDC both 250 VDC electrical electrical power subsystem or power subsystems with one 250 VDC electrical power battery parameters not subsystem to within limits.

within limits.

F. Required Action and F.1 Declare associated battery Immediately I associated Completion inoperable.

Time of Condition A, B, C, D, or E not met.

OR One battery on one 125 VDC electrical power subsystem or one 250 VDC electrical power subsystem with one or more battery cells float voltage < 2.07 V and float current > 2 amps.

SUSQUEHANNA - UNIT 1 TS / 3.8-34 Amendment 1/8, 238

PPL Rev. 1 Battery Parameters 3.8.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY 4-SR 3.8.6.1

-L ^I


LJ r i"-----------------------------------

Not required to be met when battery terminal voltage is less than the minimum established float voltage of SR 3.8.4.1.

Verify each battery float current is < 2 amps. 7 days SR 3.8.6.2 Verify each battery pilot cell voltage is >_2.07 V. 31 days SR 3.8.6.3 Verify each battery connected cell electrolyte level is 31 days greater than or equal to minimum established design limits.

SR 3.8.6.4 Verify each battery pilot cell temperature is greater than or 31 days equal to minimum established design limits.

SR 3.8.6.5 Verify each battery connected cell voltage is > 2.07 V. 92 days (continued)

SUSQUEHANNA - UNIT 1 TS / 3.8-35 Amendment 1/8, 238

PPL Rev. 1 Battery Parameters 3.8.6 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.6.6 NOTE This Surveillance shall not be Performed in Mode 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR.

Verify battery capacity is _>80% of the manufacturer's 60 months rating when subjected to a performance discharge test or a modified performance discharge test.

AND 12 months when battery shows degradation or has reached 85% of expected service life with capacity

< 100% of manufacturer's rating AND 24 months when battery has reached 85% of the expected service life with capacity

_>100% of manufacturer's rating SUSQUEHANNA - UNIT 1 TS / 3.8-36 Amendment 1/8, n

PPL Rev. 2 Programs and Manuals 5.5 5.5 Programs and Manuals (continued) 5.5.13 Battery Monitoring and Maintenance Program This program provides for battery restoration and maintenance, which includes the following:

a. Actions to restore battery cells with float voltage < 2.13 V; and
b. Actions to equalize and test battery cells that had been discovered with electrolyte level below the top of the plates; and
c. Actions to verify that the remaining cells are >_ 2.07 V when a cell or cells have been found to be < 2.13 V.

SUSQUEHANNA - UNIT 1 TS / 5.0-18A Amendment 238

- (4) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level PPL Susquehanna, LLC is authorized to operate the facility at reactor core power levels not in excess of 3489 megawatts thermal (100% power) in accordance with the conditions specified herein. and in Attachment 1 to this license. The preoperational test, startup tests and other items identified in Attachment 1 to this license shall be completed as specified. Attachment 1 is hereby incorporated into this license.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 215, and the Environmental Protection Plan contained in.

Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

For Surveillance Requirements (SRs) that are new in Amendment 151 t6 Facility Operating License No. NPF-22, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 151. For SRs that existed prior to Amendment 151, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 151.

2.C.(3) PPL Susquehanna, LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Fire Protection Review Report for the facility and as approved in Fire Protection Program, Section 9.5, SER, SSER#1, SSER#2, SSER#3, SSER#4, SSER#6, Safety Evaluation of Fire Protection Report dated August 9, 1989, Safety Evaluation Amendment No. 4, , -G9, 450, +5+, +5,4-2,469, 2-2, £-9, 2-1-4, 215 I

PPL Rev. 2 DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is greater than or 7 days equal to the minimum established float voltage.

SR 3.8.4.2 Verify each required battery charger supplies its 24 months associated battery at the following rates for > 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br /> at greater than or equal to the minimum established float voltages:

a) _ 100 amps for the 125V Battery b) _300 amps for the 250V Battery c) _200 amps for the125V Diesel Generator E Battery

. ...... _ _(continued)

SUSQUEHANNA - UNIT 2 TS /G.8-28 Amendment 10, 21ý, 21.5

PPL Rev. 2 DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.4.3 --------------- NOTES -------------

1. The modified performance discharge test in SR 3.8.6.6 may be performed in lieu of SR 3.8.4.3.
2. This Surveillance shall not be Performed in Mode 1, 2 or 3 except for the Diesel Generator E DC electrical power subsystem.

This Surveillance can be performed on the Diesel Generator E DC electrical power subsystem when the Diesel Generator E is not aligned to the Class 1E distribution system. However, credit may be taken for unplanned events that satisfy this SR.

Verify battery capacity is adequate to supply, 24 months and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.

SR 3.8.4.4 --------------------------- NOTE -------------- I When Unit 1 is in MODE 4 or 5, or moving irradiated fuel assemblies in the secondary containment, the Note to Unit 1 SR 3.8.5.1 is applicable.

For required Unit 1 DC electrical power In accordance with subsystems, the SRs for Unit 1 Specification applicable SRs 3.8.4 are applicable.

SUSQUEHANNA UNIT 2 TS / 3.8-29 Amendment 10, 2p, 215

PPL Rev. 2 DC Sources-Operating 3.8.4 Table 3.8.4-1 (page 1 of 1)

Unit 2 DC Electrical Power Subsystems TYPE VOLTAGE DIVISION I DIVISION II Battery Banks 250 V 2D650 2D660 2D653A (Charger) 2D663 (Charger) or 2D653B (Charger) 125 V 1 D610 (Subsys. A) 1 D620 (Subsys. B) 1 D613 (Charger A) 1 D623 (Charger B) 2D610 (Subsys. A) 2D620 (Subsys. B) 2D613 (Charger A) 2D623 (Charger B) 1 D630 (Subsys. C) 1 D640 (Subsys. D) 1D633 (Charger C) 1D643 (Charger D) 2D630 (Subsys. C) 2D640 (Subsys. D) 2D633 (Charger C) 2D643 (Charger D)

DG E 125 V 0D595 Battery Banks 0D596 (Charger)

SUSQUEHANNA - UNIT 2 TS / 3.8-30 Amendment 15/,215

PPL Rev. 2 DC Sources-Operating 3.8.4 SUSQUEHANNA - UNIT 2 TS / 3.8-31 Amendment 1V, ZL5

PPL Rev. 2 DC Sources-Operating 3.8.4 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 2 TS / 3.8-32 Amendment 1V, 215 N

PPL Rev. 2 DC Sources-Operating 3.8.4 SUSQUEHANNA - UNIT 2 TS'/3.8-33 Amendment 15/, 215

PPL Rev. 1 DC Sources-Shutdown 3.8.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.5.1 The following SRs must be met, but are not required to be performed: SR 3.8.4.2 and SR 3.8.4.3. I For DC sources required to be OPERABLE the In accordance with applicable following SRs are applicable: SRs SR 3.8.4.1 I SR 3.8.4.2 I SR 3.8.4.3 SR 3.8.5.2 NOTE-----------------------

When Unit 1 is in MODE 4 or 5, or moving irradiated fuel assemblies in the secondary containment, the Note to Unit 1 SR 3.8.5.1 is applicable.

For required Unit 1 DC electrical power In accordance with applicable subsystems, the SRs for Unit 1 Specification 3.8.4 SRs are applicable.

SUSQUEHANNA - UNIT 2 TS / 3.8-38 Amendment 1V, 215

PPL Rev. 1 Battery Parameters

.3.8.6 3.8 ELECTRICAL POWER SYSTEMS 3.8.6 Battery Parameters I I

LCO 3.8.6 Battery parameters for the Class 1 E 250 V batteries and Class 1E 125 V batteries shall be within limits.

APPLICABIL .ITY: When associated DC electrical power subsystems are required to be OPERABLE.

ACTIONS


---- NOT t--- -- -- -- -- ------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- ----

Separate Condition entry is allowed for each batti CONDITION REQUIRED ACTION COMPLETION TIME A. One 125 VDC electrical A.1 Perform SR 3.8.4.1 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> power subsystem or-one 250 VDC electrical power AND subsystem with one or more battery cells float voltage A.2 Perform SR 3.8.6.1 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br />

< 2.07 V.

AND A.3 Restore affected cell voltage 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />

> 2.07 V.

(continued)

SUSQUEHANNA - UNIT 2 TS / 3.8-39 Amendment 15/, a5

PPL Rev. 1 Battery Parameters 3.8.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. One 125 VDC electrical B.1 Perform SR 3.8.4.1 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> power subsystem or one.

250 VDC electrical power AND subsystem with float current

> 2 amps. B.2 Restore battery Iloat current to 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br />

_< 2 amps C. ------ NOTE----- -------------------- NOTE ------------------

Required Action C.2 shall be Required Actions C.1 and C.2 are completed if electrolyte level only applicable if electrolyte level was below the top of plates. was below the top of plates.

One 125 VDC electrical C.1 Restore electrolyte level to 8 hours0.333 days <br />0.0476 weeks <br />0.011 months <br /> power subsystem or one above top of plates.

250 VDC electrical power subsystem with one or more AND cells electrolyte level less than minimum established design limits.

C.2 Verify no evidence of 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> leakage.

AND C.3 Restore electrolyte level to 31 days greater than or equal to minimum established design limits.

(continued)

SUSQUEHANNA - UNIT 2 TS / 3.8-40 Amendment 1ý 1 215

PPL Rev. 1 Battery Parameters 3.8.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. One 125 VDC electrical D.1 Restore battery pilot cell 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> power subsystem or one temperature to greater 250 VDC electrical power than or equal to minimum subsystem with pilot cell established design limits.

electrolyte temperature less than minimum established design limits.

E. Two 125 VDC electrical E.1 Restore battery 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> power subsystems or both parameters for batteries in 250 VDC electrical power one 125 VDC electrical subsystems with battery power subsystem or one parameters not within limits. 250 VDC electrical power subsystem to within limits.

F. Required Action and F.1 Declare associated battery Immediately associated Completion inoperable.

Time of Condition A, B, C, D, or E not met.

OR One battery on one 125 VDC electrical power subsystem or on one 250 VDC electrical power subsystem with one or more battery cells float voltage

< 2.07 V and float current

> 2 amps.

SUSQUEHANNA- UNIT 2 TS / 3.8-41 Amendment 1ý 1215

PPL Rev. 1 Battery Parameters 3.8.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.6.1


NOTE ----------------------------------

Not required to be met when battery terminal voltage is less than the minimum established float voltage of SR 3.8.4.1.

Verify each battery float current is < 2 amps. 7 days SR 3.8.6.2 Verify each battery pilot cell voltage is Ž_2.07 V. 31 days SR 3.8.6.3 Verify each battery connected cell electrolyte 31 days level is greater than or equal to minimum established design limits.

SR 3.8.6.4 Verify each battery pilot cell temperature is 31 days greater than or equal to minimum established design limits.

(continued)

SUSQUEHANNA - UNIT 2 TS / 3.8-42 Amendment 4, 45

PPL Rev. 1 Battery Parameters I 3.8.6 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.6.5 Verify each battery connected cell voltage is 92 days

_2.07 V.

SR 3.8.6.6 ------------------------- NOTE ---------------

This Surveillance shall not be Performed in Mode 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR.

Verify battery capacity is _>80% of the 60 months manufacturer's rating when subjected to a performance discharge test or a modified performance discharge test. AND 12 months when battery shows degradation or has reached 85% of expected service life with capacity

<100% of manufacturer's rating AND 24 months when battery has reached 85% of the expected service life with capacity Ž_100% of manufacturer's rating SUSQUEHANNA - UNIT 2 TS / 3.8-43 Amendment 14,215

PPL Rev. 2 Programs and Manuals 5.5 5.5 Programs and Manuals (continued) 5.5.13 Battery Monitoring and Maintenance Program This program provides for battery restoration and maintenance, which includes the following:

a. Actions to restore battery cells with float voltage < 2.13 V; and
b. Actions to equalize and test battery cells that had been discovered with electrolyte level below the top of the plates; and
c. Actions to verify that the remaining cells are > 2.07 V when a cell or cells have been found to be < 2.13 V.

SUSQUEHANNA - UNIT 2 TS / 5.0-18A Amendment 215