=Text=
=Text=
{{#Wiki_filter:-3-(4) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level PPL Susquehanna, LLC is authorized to operate the facility at reactor core power levels not in excess of 3489 megawatts thermal in accordance with the conditions specified herein and in Attachment 1 to this license. The preoperational tests, startup tests and other items identified in Attachment 1 to this license shall be completed as specified.
{{#Wiki_filter:     (4)     PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)     PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
Attachment 1 is hereby incorporated into this license.(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 238, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.For Surveillance Requirements (SRs) that are new in Amendment 178 to Facility Operating License No. NPF-14, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 178. For SRs that existed prior to Amendment 178, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 178.(3) Conduct of Work Activities During Fuel Load and Initial Startup The operating licensee shall review by committee all facility construction, Preoperational Testing, and System Demonstration activities performed concurrently with facility initial fuel loading or with the facility Startup Test Amendment No. 5, +49, +-78, +-80, +88, +-94, 295, 2286, -27, 238 PPL Rev. 2 DC Sources-Operating
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)     Maximum Power Level PPL Susquehanna, LLC is authorized to operate the facility at reactor core power levels not in excess of 3489 megawatts thermal in accordance with the conditions specified herein and in Attachment 1 to this license. The preoperational tests, startup tests and other items identified in Attachment 1 to this license shall be completed as specified. Attachment 1 is hereby incorporated into this license.
(2)     Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 238, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
For Surveillance Requirements (SRs) that are new in Amendment 178 to Facility Operating License No. NPF-14, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 178. For SRs that existed prior to Amendment 178, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 178.
(3)     Conduct of Work Activities During Fuel Load and Initial Startup The operating licensee shall review by committee all facility construction, Preoperational Testing, and System Demonstration activities performed concurrently with facility initial fuel loading or with the facility Startup Test Amendment No. 5, +49, +-78, +-80, +88, +-94,295, 2286, -27,238


====3.8.4 ACTIONS====
PPL Rev. 2 DC Sources-Operating 3.8.4 ACTIONS (continued)
(continued)
CONDITION                       REQUIRED ACTION                   COMPLETION TIME D. Diesel Generator E DC         D.1   Declare Diesel Generator E       [[estimated NRC review hours::2 hours]] electrical power                     inoperable.
CONDITION REQUIRED ACTION COMPLETION TIME D. Diesel Generator E DC D.1 Declare Diesel Generator E 2 hours electrical power inoperable.
subsystem inoperable, when aligned to the Class 1E distribution system.
subsystem inoperable, when aligned to the Class 1 E distribution system.SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is greater than or equal to 7 days the minimum established float voltage.SR 3.8.4.2 Verify each required battery charger supplies its 24 months associated battery at the following rates for > 4 hours at greater than or equal to the minimum established float voltages.a. > 100 amps for the 125V Battery b. 300 amps for the 250V Battery c. >200 amps for the 125V Diesel Generator E Battery (continued)
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                         FREQUENCY SR 3.8.4.1     Verify battery terminal voltage is greater than or equal to   7 days the minimum established float voltage.
I I I SUSQUEHANNA  
SR 3.8.4.2     Verify each required battery charger supplies its             24 months associated battery at the following rates for > [[estimated NRC review hours::4 hours]] at greater than or equal to the minimum established float voltages.
-UNIT 1 TS / 3.8-24 Amendment 18,238 PPL Rev. 2 DC Sources-Operating
: a. > 100 amps for the 125V Battery                                                 I
: b. Ž300 amps for the 250V Battery                                                 I I
: c. >200 amps for the 125V Diesel Generator E Battery (continued)
SUSQUEHANNA - UNIT 1                       TS / 3.8-24                           Amendment 18,238


====3.8.4 SURVEILLANCE====
PPL Rev. 2 DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                              FREQUENCY SR 3.8.4.3 ------------------------------ --NOTES- --------------------------------
: 1. The modified performance discharge test in SR 3.8.6.6 may be performed in lieu of SR 3.8.4.3.
: 2. This Surveillance shall not be Performed in Mode 1, 2, or 3 except for the Diesel Generator E DC electrical power subsystem. This Surveillance can be performed on the Diesel Generator E DC electrical power subsystem when the Diesel Generator E is not aligned to the Class 1E distribution system. However, credit may be taken for unplanned events that satisfy. this SR.
Verify battery capacity is adequate to supply, and maintain                24 months in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.
SUSQUEHANNA - UNIT 1                        TS / 3.8-25                              Amendment 17, 2A, 238.


REQUIREMENTS (continued)
PPL Rev. 2 DC Sources-Operating 3.8.4 Table 3.8.4-1 (page 1 of 1)
SURVEILLANCE FREQUENCY SR 3.8.4.3--NOTES-------------------------------
Unit 1 DC Electrical Power Subsystems TYPE          VOLTAGE                DIVISION .1           DIVISION II Battery Banks        250 V        1 D650                  1D660 1 D653A (Charger)      1D663 (Charger) or 1 D653B (Charger) 125 V        1D610  (Subsys. A)    1D620  (Subsys. B) 1 D613  (Charger A)    1D623  (Charger B) 1D630  (Subsys. C)    1D640  (Subsys. D) 1D633  (Charger C)    1D643  (Charger D)
--------------------------------
DG E              125 V                            0D595 Battery Banks                                    0D596 (Charger)
: 1. The modified performance discharge test in SR 3.8.6.6 may be performed in lieu of SR 3.8.4.3.2. This Surveillance shall not be Performed in Mode 1, 2, or 3 except for the Diesel Generator E DC electrical power subsystem.
SUSQUEHANNA - UNIT 1             TS   3.8-26                      Amendment 1/8,238
This Surveillance can be performed on the Diesel Generator E DC electrical power subsystem when the Diesel Generator E is not aligned to the Class 1 E distribution system. However, credit may be taken for unplanned events that satisfy. this SR.Verify battery capacity is adequate to supply, and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.24 months SUSQUEHANNA  
-UNIT 1 TS / 3.8-25 Amendment 17, 2A, 238.
PPL Rev. 2 DC Sources-Operating


====3.8.4 Table====
PPL Rev. 2 DC Sources-Operating 3.8.4 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 1           TS / 3.8-27             Amendment 1/8,238
3.8.4-1 (page 1 of 1)Unit 1 DC Electrical Power Subsystems TYPE VOLTAGE DIVISION .1 DIVISION II Battery Banks 250 V 1 D650 1 D660 1 D653A (Charger) 1 D663 (Charger)or 1 D653B (Charger)125 V 1 D610 (Subsys. A) 1 D620 (Subsys. B)1 D613 (Charger A) 1 D623 (Charger B)1 D630 (Subsys. C) 1 D640 (Subsys. D)1 D633 (Charger C) 1 D643 (Charger D)DG E 125 V 0D595 Battery Banks 0D596 (Charger)SUSQUEHANNA
-UNIT 1 TS 3.8-26 Amendment 1/8,238 PPL Rev. 2 DC Sources-Operating 3.8.4 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA  
-UNIT 1 TS / 3.8-27 Amendment 1/8,238 PPL Rev. 2 DC Sources-Operating 3.8.4 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA
-UNIT 1 TS / 3.8-28 Amendment 1/8, M PPL Rev. 1 DC Sources-Shutdown


====3.8.5 SURVEILLANCE====
PPL Rev. 2 DC Sources-Operating 3.8.4 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 1          TS / 3.8-28              Amendment 1/8, M


REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.5.1-NOTE -----------------------------...
PPL Rev. 1 DC Sources-Shutdown 3.8.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                               FREQUENCY SR 3.8.5.1                           -NOTE The following SRs must be met, but are not required to be performed: SR 3.8.4.2, and SR 3.8.4.3.                                                   I For DC sources required to be OPERABLE the following                 In accordance with SRs are applicable:                                                 applicable SRs SR 3.8.4.1 SR 3.8.4.2 SR 3.8.4.3 SUSQUEHANNA   - UNIT 1               TS / 3.8-31                                 Amendment 1/8ý 238
..The following SRs must be met, but are not required to be performed:
SR 3.8.4.2, and SR 3.8.4.3.I For DC sources required to be OPERABLE the following SRs are applicable:
SR 3.8.4.1 SR 3.8.4.2 SR 3.8.4.3 In accordance with applicable SRs SUSQUEHANNA  
-UNIT 1 TS / 3.8-31 Amendment 1/8ý 238 PPL Rev. 1 Battery Parameters 3.8.6 3.8 ELECTRICAL POWER SYSTEMS 3.8.6 Battery Parameters I I LCO 3.8.6 Battery parameters for the Class 1 E 250 V batteries and Class 1 E 125 V batteries shall be within limits.APPLICABILITY:
When associated DC electrical power subsystems are required to be OPERABLE.ACTIONS-------.--
.---------------------
.. ----------
-.---------
NOTE ------ ------------------------------------------------
Separate Condition entry is allowed for each battery.CONDITION REQUIRED ACTION COMPLETION TIME A. One 125 VDC electrical A.1 Perform SR 3.8.4.1 2 hours power subsystem or one 250 VDC electrical power AND subsystem with one or more battery cells float A.2 Perform SR 3.8.6.1 2 hours voltage < 2.07 V.AND A.3 Restore affected cell voltage 24 hours2.07 V.(continued)
SUSQUEHANNA
-UNIT 1 TS / 3.8-32.Amendment 1/8,238
.PPL Rev. 1 Battery Parameters


====3.8.6 ACTIONS====
PPL Rev. 1 Battery Parameters 3.8.6 3.8  ELECTRICAL POWER SYSTEMS 3.8.6   Battery Parameters                                                                                      I I
LCO 3.8.6        Battery parameters for the Class 1E 250 V batteries and Class 1E 125 V batteries shall be within limits.
APPLICABILITY:        When associated DC electrical power subsystems are required to be OPERABLE.
ACTIONS NOTE ------ ------------------------------------------------
Separate Condition entry is allowed for each battery.
CONDITION                        REQUIRED ACTION                          COMPLETION TIME A. One 125 VDC electrical          A.1    Perform SR 3.8.4.1                    [[estimated NRC review hours::2 hours]] power subsystem or one 250 VDC electrical power      AND subsystem with one or more battery cells float      A.2    Perform SR 3.8.6.1                    [[estimated NRC review hours::2 hours]] voltage < 2.07 V.
AND A.3  Restore affected cell voltage        [[estimated NRC review hours::24 hours]]
                                          &#x17d;2.07 V.
(continued)
(continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. One 125 VDC electrical B.1 Perform SR 3.8.4.1 2 hours power subsystem or one 250 VDC electrical power AND subsystem with float current > 2 amps. B.2 Restore battery float current 12 hours to < 2 amps.C. ------NOTE --- -----------------
SUSQUEHANNA       -   UNIT 1               TS / 3.8-32                                .Amendment 1/8,238
NOTE ------------------
Required Action C.2 shall Required Actions C.1 and C.2 are*be completed if only applicable if electrolyte level electrolyte level was was below the top of plates.below the top of plates. -----------------------------------------------------
One 125 VDC electrical C.1 Restore electrolyte level to 8 hours power subsystem or one above top of plates.250 VDC electrical power subsystem with one or AND more cells electrolyte level less than minimum established design limits.C.2 Verify no evidence of 12 hours leakage.AND C.3 Restore electrolyte level to 31 days greater than or equal to minimum established design limits.D. One 125 VDC electrical D.1 Restore battery pilot cell 12 hours power subsystem or one temperature to greater than 250 VDC electrical power or equal to minimum subsystem with pilot cell established design limits electrolyte temperature less than minimum established design limits.(continued)
I SUSQUEHANNA  
-UNIT 1 TS / 3.8-33 Amendment 1/8, M PPL Rev. 1 Battery Parameters


====3.8.6 ACTIONS====
                                                                                                    .PPL Rev. 1 Battery Parameters 3.8.6 ACTIONS (continued)
CONDITION                          REQUIRED ACTION                              COMPLETION TIME B. One 125 VDC electrical        B.1      Perform SR 3.8.4.1                          [[estimated NRC review hours::2 hours]] power subsystem or one 250 VDC electrical power      AND subsystem with float current > 2 amps.            B.2      Restore battery float current                [[estimated NRC review hours::12 hours]] to < 2 amps.
C. ------ NOTE ---            ----------------- NOTE ------------------
Required Action C.2 shall Required Actions C.1 and C.2 are
  *be completed if              only applicable if electrolyte level electrolyte level was        was below the top of plates.
below the top of plates.      -----------------------------------------------------
One 125 VDC electrical        C.1      Restore electrolyte level to                [[estimated NRC review hours::8 hours]] power subsystem or one                above top of plates.
250 VDC electrical power subsystem with one or        AND more cells electrolyte level less than minimum established design limits.
C.2      Verify no evidence of                        [[estimated NRC review hours::12 hours]] leakage.
AND                                                                              I C.3      Restore electrolyte level to                31 days greater than or equal to minimum established design limits.
D. One 125 VDC electrical        D.1      Restore battery pilot cell                  [[estimated NRC review hours::12 hours]] power subsystem or one                temperature to greater than 250 VDC electrical power              or equal to minimum subsystem with pilot cell            established design limits electrolyte temperature less than minimum established design limits.
(continued)
(continued)
CONDITION REQUIRED ACTION COMPLETION TIME E. Two 125 VDC electrical E.1 Restore battery parameters 2 hours power subsystems or for batteries in one 125 VDC both 250 VDC electrical electrical power subsystem or power subsystems with one 250 VDC electrical power battery parameters not subsystem to within limits.within limits.F. Required Action and F.1 Declare associated battery Immediately associated Completion inoperable.
SUSQUEHANNA - UNIT 1                             TS / 3.8-33                                  Amendment 1/8, M
Time of Condition A, B, C, D, or E not met.OR One battery on one 125 VDC electrical power subsystem or one 250 VDC electrical power subsystem with one or more battery cells float voltage < 2.07 V and float current > 2 amps.I SUSQUEHANNA  
-UNIT 1 TS / 3.8-34 Amendment 1/8, 238 PPL Rev. 1 Battery Parameters


====3.8.6 SURVEILLANCE====
PPL Rev. 1 Battery Parameters 3.8.6 ACTIONS (continued)
CONDITION                REQUIRED ACTION              COMPLETION TIME E. Two 125 VDC electrical  E.1 Restore battery parameters    [[estimated NRC review hours::2 hours]] power subsystems or          for batteries in one 125 VDC both 250 VDC electrical      electrical power subsystem or power subsystems with        one 250 VDC electrical power battery parameters not      subsystem to within limits.
within limits.
F. Required Action and      F.1  Declare associated battery  Immediately              I associated Completion        inoperable.
Time of Condition A, B, C, D, or E not met.
OR One battery on one 125 VDC electrical power subsystem or one 250 VDC electrical power subsystem with one or more battery cells float voltage < 2.07 V and float current > 2 amps.
SUSQUEHANNA - UNIT 1                TS / 3.8-34                      Amendment 1/8, 238


REQUIREMENTS SURVEILLANCE FREQUENCY 4-SR 3.8.6.1-L ^I------------------------
PPL Rev. 1 Battery Parameters 3.8.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                               FREQUENCY 4-SR 3.8.6.1
LJ i" --- ........ -r -----------------------------------
                                          -L ^I
Not required to be met when battery terminal voltage is less than the minimum established float voltage of SR 3.8.4.1.Verify each battery float current is < 2 amps.7 days SR 3.8.6.2 Verify each battery pilot cell voltage is >_ 2.07 V. 31 days SR 3.8.6.3 Verify each battery connected cell electrolyte level is 31 days greater than or equal to minimum established design limits.SR 3.8.6.4 Verify each battery pilot cell temperature is greater than or 31 days equal to minimum established design limits.SR 3.8.6.5 Verify each battery connected cell voltage is > 2.07 V. 92 days (continued)
            ------------------------           LJ r i"-----------------------------------
SUSQUEHANNA  
Not required to be met when battery terminal voltage is less than the minimum established float voltage of SR 3.8.4.1.
-UNIT 1 TS / 3.8-35 Amendment 1/8, 238 PPL Rev. 1 Battery Parameters
Verify each battery float current is < 2 amps.                                 7 days SR 3.8.6.2 Verify each battery pilot cell voltage is >_2.07 V.                             31 days SR 3.8.6.3 Verify each battery connected cell electrolyte level is                         31 days greater than or equal to minimum established design limits.
SR 3.8.6.4 Verify each battery pilot cell temperature is greater than or                   31 days equal to minimum established design limits.
SR 3.8.6.5 Verify each battery connected cell voltage is > 2.07 V.                         92 days (continued)
SUSQUEHANNA     -   UNIT 1                   TS / 3.8-35                                     Amendment 1/8, 238


====3.8.6 SURVEILLANCE====
PPL Rev. 1 Battery Parameters 3.8.6 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                              FREQUENCY SR 3.8.6.6                            NOTE This Surveillance shall not be Performed in Mode 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR.
Verify battery capacity is _>80% of the manufacturer's                60 months rating when subjected to a performance discharge test or a modified performance discharge test.
AND 12 months when battery shows degradation or has reached 85% of expected service life with capacity
                                                                                < 100% of manufacturer's rating AND 24 months when battery has reached 85% of the expected service life with capacity
_>100% of manufacturer's rating SUSQUEHANNA - UNIT 1                    TS / 3.8-36                                Amendment 1/8, n


REQUIREMENTS (continued)
PPL Rev. 2 Programs and Manuals 5.5 5.5   Programs and Manuals (continued) 5.5.13     Battery Monitoring and Maintenance Program This program provides for battery restoration and maintenance, which includes the following:
SURVEILLANCE FREQUENCY SR 3.8.6.6-----------------................
: a. Actions to restore battery cells with float voltage < 2.13 V; and
NOTE ----------------------------------
: b. Actions to equalize and test battery cells that had been discovered with electrolyte level below the top of the plates; and
This Surveillance shall not be Performed in Mode 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR.Verify battery capacity is _> 80% of the manufacturer's rating when subjected to a performance discharge test or a modified performance discharge test.60 months AND 12 months when battery shows degradation or has reached 85% of expected service life with capacity< 100% of manufacturer's rating AND 24 months when battery has reached 85% of the expected service life with capacity_> 100% of manufacturer's rating SUSQUEHANNA
: c. Actions to verify that the remaining cells are >_ 2.07 V when a cell or cells have been found to be < 2.13 V.
-UNIT 1 TS / 3.8-36 Amendment 1/8, n PPL Rev. 2 Programs and Manuals 5.5 5.5 Programs and Manuals (continued) 5.5.13 Battery Monitoring and Maintenance Program This program provides for battery restoration and maintenance, which includes the following:
SUSQUEHANNA       - UNIT 1               TS / 5.0-18A                                 Amendment 238
: a. Actions to restore battery cells with float voltage < 2.13 V; and b. Actions to equalize and test battery cells that had been discovered with electrolyte level below the top of the plates; and c. Actions to verify that the remaining cells are >_ 2.07 V when a cell or cells have been found to be < 2.13 V.SUSQUEHANNA  
-UNIT 1 TS / 5.0-18A Amendment 238  
--3-(4) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level PPL Susquehanna, LLC is authorized to operate the facility at reactor core power levels not in excess of 3489 megawatts thermal (100% power) in accordance with the conditions specified herein. and in Attachment 1 to this license. The preoperational test, startup tests and other items identified in Attachment 1 to this license shall be completed as specified.
Attachment 1 is hereby incorporated into this license.(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 215, and the Environmental Protection Plan contained in.Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.For Surveillance Requirements (SRs) that are new in Amendment 151 t6 Facility Operating License No. NPF-22, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 151. For SRs that existed prior to Amendment 151, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 151.2.C.(3) PPL Susquehanna, LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Fire Protection Review Report for the facility and as approved in Fire Protection Program, Section 9.5, SER, SSER#1, SSER#2, SSER#3, SSER#4, SSER#6, Safety Evaluation of Fire Protection Report dated August 9, 1989, Safety Evaluation Amendment No. 4, , -G9, 450, +5+, +5,4-2, 469, 2-2, &#xa3;-9, 2-1-4, 215 I PPL Rev. 2 DC Sources-Operating


====3.8.4 SURVEILLANCE====
                                              -        (4)    PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)    PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)    Maximum Power Level PPL Susquehanna, LLC is authorized to operate the facility at reactor core power levels not in excess of 3489 megawatts thermal (100% power) in accordance with the conditions specified herein. and in Attachment 1 to this license. The preoperational test, startup tests and other items identified in Attachment 1 to this license shall be completed as specified. Attachment 1 is hereby incorporated into this license.
(2)    Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 215, and the Environmental Protection Plan contained in.
Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
For Surveillance Requirements (SRs) that are new in Amendment 151 t6 Facility Operating License No. NPF-22, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 151. For SRs that existed prior to Amendment 151, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 151.
2.C.(3)  PPL Susquehanna, LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Fire Protection Review Report for the facility and as approved in Fire Protection Program, Section 9.5, SER, SSER#1, SSER#2, SSER#3, SSER#4, SSER#6, Safety Evaluation of Fire Protection Report dated August 9, 1989, Safety Evaluation Amendment No. 4,      , -G9, 450, +5+, +5,4-2,469, 2-2, &#xa3;-9, 2-1-4, 215  I


REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is greater than or 7 days equal to the minimum established float voltage.SR 3.8.4.2 Verify each required battery charger supplies its 24 months associated battery at the following rates for > 4 hours at greater than or equal to the minimum established float voltages: a) _ 100 amps for the 125V Battery b) _300 amps for the 250V Battery c) _200 amps for the125V Diesel Generator E Battery......._ _(continued)
PPL Rev. 2 DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                           FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is greater than or       7 days equal to the minimum established float voltage.
SUSQUEHANNA  
SR 3.8.4.2 Verify each required battery charger supplies its         24 months associated battery at the following rates for > [[estimated NRC review hours::4 hours]] at greater than or equal to the minimum established float voltages:
-UNIT 2 TS /G.8-28 Amendment 10, 21&#xfd;, 21.5 PPL Rev. 2 DC Sources-Operating
a) _ 100 amps for the 125V Battery b)   _300 amps for the 250V Battery c) _200 amps for the125V Diesel Generator E Battery
                            . ......             _       _(continued)
SUSQUEHANNA - UNIT 2                 TS /G.8-28                           Amendment 10, 21&#xfd;, 21.5


====3.8.4 SURVEILLANCE====
PPL Rev. 2 DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                  FREQUENCY SR 3.8.4.3 --------------- NOTES                    -------------
: 1. The modified performance discharge test in SR 3.8.6.6 may be performed in lieu of SR 3.8.4.3.
: 2. This Surveillance shall not be Performed in Mode 1, 2 or 3 except for the Diesel Generator E DC electrical power subsystem.
This Surveillance can be performed on the Diesel Generator E DC electrical power subsystem when the Diesel Generator E is not aligned to the Class 1E distribution system. However, credit may be taken for unplanned events that satisfy this SR.
Verify battery capacity is adequate to supply,  24 months and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.
SR 3.8.4.4  --------------------------- NOTE --------------                                  I When Unit 1 is in MODE 4 or 5, or moving irradiated fuel assemblies in the secondary containment, the Note to Unit 1 SR 3.8.5.1 is applicable.
For required Unit 1 DC electrical power              In accordance with subsystems, the SRs for Unit 1 Specification        applicable SRs 3.8.4 are applicable.
SUSQUEHANNA          UNIT 2                TS / 3.8-29                  Amendment 10, 2p, 215


REQUIREMENTS (continued)
PPL Rev. 2 DC Sources-Operating 3.8.4 Table 3.8.4-1 (page 1 of 1)
SURVEILLANCE FREQUENCY SR 3.8.4.3 ---------------
Unit 2 DC Electrical Power Subsystems TYPE          VOLTAGE                  DIVISION I            DIVISION II Battery Banks          250 V              2D650                  2D660 2D653A (Charger)        2D663 (Charger) or 2D653B (Charger) 125 V            1 D610 (Subsys. A)    1 D620 (Subsys. B) 1 D613 (Charger A)    1 D623 (Charger B) 2D610 (Subsys. A)      2D620 (Subsys. B) 2D613 (Charger A)      2D623 (Charger B) 1 D630 (Subsys. C)    1 D640 (Subsys. D) 1D633 (Charger C)      1D643 (Charger D) 2D630 (Subsys. C)      2D640 (Subsys. D) 2D633 (Charger C)      2D643 (Charger D)
NOTES -------------
DG E              125 V                              0D595 Battery Banks                                          0D596 (Charger)
: 1. The modified performance discharge test in SR 3.8.6.6 may be performed in lieu of SR 3.8.4.3.2. This Surveillance shall not be Performed in Mode 1, 2 or 3 except for the Diesel Generator E DC electrical power subsystem.
SUSQUEHANNA - UNIT 2           TS / 3.8-30                            Amendment 15/,215
This Surveillance can be performed on the Diesel Generator E DC electrical power subsystem when the Diesel Generator E is not aligned to the Class 1 E distribution system. However, credit may be taken for unplanned events that satisfy this SR.Verify battery capacity is adequate to supply, 24 months and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.SR 3.8.4.4 ---------------------------
NOTE --------------
When Unit 1 is in MODE 4 or 5, or moving irradiated fuel assemblies in the secondary containment, the Note to Unit 1 SR 3.8.5.1 is applicable.
For required Unit 1 DC electrical power In accordance with subsystems, the SRs for Unit 1 Specification applicable SRs 3.8.4 are applicable.
I SUSQUEHANNA UNIT 2 TS / 3.8-29 Amendment 10, 2p, 215 PPL Rev. 2 DC Sources-Operating


====3.8.4 Table====
PPL Rev. 2 DC Sources-Operating 3.8.4 SUSQUEHANNA - UNIT 2 TS / 3.8-31      Amendment 1V, ZL5
3.8.4-1 (page 1 of 1)Unit 2 DC Electrical Power Subsystems TYPE VOLTAGE DIVISION I DIVISION II Battery Banks 250 V 2D650 2D660 2D653A (Charger) 2D663 (Charger)or 2D653B (Charger)125 V 1 D610 (Subsys. A) 1 D620 (Subsys. B)1 D613 (Charger A) 1 D623 (Charger B)2D610 (Subsys. A) 2D620 (Subsys. B)2D613 (Charger A) 2D623 (Charger B)1 D630 (Subsys. C) 1 D640 (Subsys. D)1 D633 (Charger C) 1D643 (Charger D)2D630 (Subsys. C) 2D640 (Subsys. D)2D633 (Charger C) 2D643 (Charger D)DG E 125 V 0D595 Battery Banks 0D596 (Charger)SUSQUEHANNA  
-UNIT 2 TS / 3.8-30 Amendment 15/,215 PPL Rev. 2 DC Sources-Operating


====3.8.4 SUSQUEHANNA====
PPL Rev. 2 DC Sources-Operating 3.8.4 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 2          TS / 3.8-32                  Amendment 1V, 215 N


-UNIT 2 TS / 3.8-31 Amendment 1V, ZL5 PPL Rev. 2 DC Sources-Operating 3.8.4 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA  
PPL Rev. 2 DC Sources-Operating 3.8.4 SUSQUEHANNA - UNIT 2 TS'/3.8-33      Amendment 15/, 215
-UNIT 2 TS / 3.8-32 Amendment 1 V, 215 N PPL Rev. 2 DC Sources-Operating


====3.8.4 SUSQUEHANNA====
PPL Rev. 1 DC Sources-Shutdown 3.8.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                    FREQUENCY SR 3.8.5.1 The following SRs must be met, but are not required to be performed: SR 3.8.4.2 and SR 3.8.4.3.                                                                        I For DC sources required to be OPERABLE the        In accordance with applicable following SRs are applicable:                      SRs SR 3.8.4.1                                                                        I SR 3.8.4.2                                                                        I SR 3.8.4.3 SR 3.8.5.2                      NOTE-----------------------
When Unit 1 is in MODE 4 or 5, or moving irradiated fuel assemblies in the secondary containment, the Note to Unit 1 SR 3.8.5.1 is applicable.
For required Unit 1 DC electrical power            In accordance with applicable subsystems, the SRs for Unit 1 Specification 3.8.4 SRs are applicable.
SUSQUEHANNA     - UNIT 2            TS / 3.8-38                            Amendment 1V, 215


-UNIT 2 TS'/3.8-33 Amendment 15/, 215 PPL Rev. 1 DC Sources-Shutdown
PPL Rev. 1 Battery Parameters
                                                                                                                                            .3.8.6 3.8              ELECTRICAL POWER SYSTEMS 3.8.6            Battery Parameters                                                                                                                    I I
LCO 3.8.6        Battery parameters for the Class 1 E 250 V batteries and Class 1E 125 V batteries shall be within limits.
APPLICABIL .ITY:          When associated DC electrical power subsystems are required to be OPERABLE.
ACTIONS
------------------------------------------------ ---- NOT t--- -- -- -- -- ------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- ----
Separate Condition entry is allowed for each batti CONDITION                              REQUIRED ACTION                                        COMPLETION TIME A. One 125 VDC electrical                    A.1  Perform SR 3.8.4.1                                      [[estimated NRC review hours::2 hours]] power subsystem or-one 250 VDC electrical power                AND subsystem with one or more battery cells float voltage              A.2  Perform SR 3.8.6.1                                      [[estimated NRC review hours::2 hours]]
    < 2.07 V.
AND A.3 Restore affected cell voltage                            [[estimated NRC review hours::24 hours]]
                                                  > 2.07 V.
(continued)
SUSQUEHANNA - UNIT 2                             TS / 3.8-39                                                        Amendment 15/, a5


====3.8.5 SURVEILLANCE====
PPL Rev. 1 Battery Parameters 3.8.6 ACTIONS (continued)
 
CONDITION                      REQUIRED ACTION                COMPLETION TIME B. One 125 VDC electrical        B.1   Perform SR 3.8.4.1              [[estimated NRC review hours::2 hours]] power subsystem or one.
REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.5.1 The following SRs must be met, but are not required to be performed:
250 VDC electrical power       AND subsystem with float current
SR 3.8.4.2 and SR 3.8.4.3.For DC sources required to be OPERABLE the following SRs are applicable:
  > 2 amps.                     B.2  Restore battery Iloat current to [[estimated NRC review hours::12 hours]]
SR 3.8.4.1 SR 3.8.4.2 SR 3.8.4.3 I In accordance with applicable SRs I I I SR 3.8.5.2----------
_< 2 amps C. ------ NOTE----- -------------------- NOTE ------------------
NOTE -------------
Required Action C.2 shall be Required Actions C.1 and C.2 are completed if electrolyte level only applicable if electrolyte level was below the top of plates. was below the top of plates.
When Unit 1 is in MODE 4 or 5, or moving irradiated fuel assemblies in the secondary containment, the Note to Unit 1 SR 3.8.5.1 is applicable.
One 125 VDC electrical         C.1   Restore electrolyte level to    [[estimated NRC review hours::8 hours]] power subsystem or one               above top of plates.
For required Unit 1 DC electrical power subsystems, the SRs for Unit 1 Specification 3.8.4 are applicable.
250 VDC electrical power subsystem with one or more     AND cells electrolyte level less than minimum established design limits.
In accordance with applicable SRs SUSQUEHANNA
C.2   Verify no evidence of            [[estimated NRC review hours::12 hours]] leakage.
-UNIT 2 TS / 3.8-38 Amendment 1 V, 215 PPL Rev. 1 Battery Parameters
AND C.3   Restore electrolyte level to    31 days greater than or equal to minimum established design limits.
.3.8.6 3.8 ELECTRICAL POWER SYSTEMS Battery Parameters 3.8.6 I I LCO 3.8.6 APPLICABIL Battery parameters for the Class 1 E 250 V batteries and Class 1 E 125 V batteries shall be within limits..ITY: When associated DC electrical power subsystems are required to be OPERABLE.ACTIONS------------------------------------------------  
(continued)
---- NOT Separate Condition entry is allowed for each batti t --- -- -- -- -- ----- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- ----CONDITION REQUIRED ACTION COMPLETION TIME A. One 125 VDC electrical A.1 Perform SR 3.8.4.1 2 hours power subsystem or-one 250 VDC electrical power AND subsystem with one or more battery cells float voltage A.2 Perform SR 3.8.6.1 2 hours< 2.07 V.AND A.3 Restore affected cell voltage 24 hours> 2.07 V.(continued)
SUSQUEHANNA       - UNIT 2           TS / 3.8-40                            Amendment 1&#xfd; 1 215
SUSQUEHANNA  
-UNIT 2 TS / 3.8-39 Amendment 15/, a5 PPL Rev. 1 Battery Parameters


====3.8.6 ACTIONS====
PPL Rev. 1 Battery Parameters 3.8.6 ACTIONS (continued)
(continued)
CONDITION                   REQUIRED ACTION             COMPLETION TIME D. One 125 VDC electrical       D.1   Restore battery pilot cell [[estimated NRC review hours::12 hours]] power subsystem or one            temperature to greater 250 VDC electrical power          than or equal to minimum subsystem with pilot cell          established design limits.
CONDITION REQUIRED ACTION COMPLETION TIME B. One 125 VDC electrical B.1 Perform SR 3.8.4.1 2 hours power subsystem or one.250 VDC electrical power AND subsystem with float current> 2 amps. B.2 Restore battery Iloat current to 12 hours_< 2 amps C. ------NOTE ----- --------------------
electrolyte temperature less than minimum established design limits.
NOTE ------------------
E. Two 125 VDC electrical        E.1   Restore battery            [[estimated NRC review hours::2 hours]] power subsystems or both          parameters for batteries in 250 VDC electrical power          one 125 VDC electrical subsystems with battery            power subsystem or one parameters not within limits.     250 VDC electrical power subsystem to within limits.
Required Action C.2 shall be Required Actions C.1 and C.2 are completed if electrolyte level only applicable if electrolyte level was below the top of plates. was below the top of plates.One 125 VDC electrical C.1 Restore electrolyte level to 8 hours power subsystem or one above top of plates.250 VDC electrical power subsystem with one or more AND cells electrolyte level less than minimum established design limits.C.2 Verify no evidence of 12 hours leakage.AND C.3 Restore electrolyte level to 31 days greater than or equal to minimum established design limits.(continued)
F. Required Action and          F.1 Declare associated battery  Immediately associated Completion              inoperable.
SUSQUEHANNA  
Time of Condition A, B, C, D, or E not met.
-UNIT 2 TS / 3.8-40 Amendment 1 &#xfd; 1 215 PPL Rev. 1 Battery Parameters
OR One battery on one 125 VDC electrical power subsystem or on one 250 VDC electrical power subsystem with one or more battery cells float voltage
  < 2.07 V and float current
  > 2 amps.
SUSQUEHANNA- UNIT 2                 TS / 3.8-41                          Amendment 1&#xfd; 1215


====3.8.6 ACTIONS====
PPL Rev. 1 Battery Parameters 3.8.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                    FREQUENCY SR 3.8.6.1
      ---------------------- NOTE ----------------------------------
Not required to be met when battery terminal voltage is less than the minimum established float voltage of SR 3.8.4.1.
Verify each battery float current is < 2 amps.        7 days SR 3.8.6.2      Verify each battery pilot cell voltage is &#x17d;_2.07 V. 31 days SR 3.8.6.3      Verify each battery connected cell electrolyte      31 days level is greater than or equal to minimum established design limits.
SR 3.8.6.4      Verify each battery pilot cell temperature is        31 days greater than or equal to minimum established design limits.
(continued)
(continued)
CONDITION REQUIRED ACTION COMPLETION TIME D. One 125 VDC electrical D.1 Restore battery pilot cell 12 hours power subsystem or one temperature to greater 250 VDC electrical power than or equal to minimum subsystem with pilot cell established design limits.electrolyte temperature less than minimum established design limits.E. Two 125 VDC electrical E.1 Restore battery 2 hours power subsystems or both parameters for batteries in 250 VDC electrical power one 125 VDC electrical subsystems with battery power subsystem or one parameters not within limits. 250 VDC electrical power subsystem to within limits.F. Required Action and F.1 Declare associated battery Immediately associated Completion inoperable.
SUSQUEHANNA         - UNIT 2                 TS / 3.8-42                        Amendment 4,      45
Time of Condition A, B, C, D, or E not met.OR One battery on one 125 VDC electrical power subsystem or on one 250 VDC electrical power subsystem with one or more battery cells float voltage< 2.07 V and float current> 2 amps.SUSQUEHANNA-UNIT 2 TS / 3.8-41 Amendment 1 &#xfd; 1 215 PPL Rev. 1 Battery Parameters


====3.8.6 SURVEILLANCE====
PPL Rev. 1 Battery Parameters I 3.8.6 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                            FREQUENCY SR 3.8.6.5 Verify each battery connected cell voltage is  92 days
_2.07 V.
SR 3.8.6.6 ------------------------- NOTE ---------------
This Surveillance shall not be Performed in Mode 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR.
Verify battery capacity is _>80% of the        60 months manufacturer's rating when subjected to a performance discharge test or a modified performance discharge test.                    AND 12 months when battery shows degradation or has reached 85% of expected service life with capacity
                                                          <100% of manufacturer's rating AND 24 months when battery has reached 85% of the expected service life with capacity &#x17d;_100% of manufacturer's rating SUSQUEHANNA    - UNIT 2                TS / 3.8-43                    Amendment 14,215


REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.6.1----------------------
PPL Rev. 2 Programs and Manuals 5.5 5.5 Programs and Manuals (continued) 5.5.13     Battery Monitoring and Maintenance Program This program provides for battery restoration and maintenance, which includes the following:
NOTE ----------------------------------
: a. Actions to restore battery cells with float voltage < 2.13 V; and
Not required to be met when battery terminal voltage is less than the minimum established float voltage of SR 3.8.4.1.Verify each battery float current is < 2 amps. 7 days SR 3.8.6.2 Verify each battery pilot cell voltage is _2.07 V. 31 days SR 3.8.6.3 Verify each battery connected cell electrolyte 31 days level is greater than or equal to minimum established design limits.SR 3.8.6.4 Verify each battery pilot cell temperature is 31 days greater than or equal to minimum established design limits.(continued)
: b. Actions to equalize and test battery cells that had been discovered with electrolyte level below the top of the plates; and
SUSQUEHANNA
: c. Actions to verify that the remaining cells are > 2.07 V when a cell or cells have been found to be < 2.13 V.
-UNIT 2 TS / 3.8-42 Amendment 4, 45 PPL Rev. 1 Battery Parameters 3.8.6 I SURVEILLANCE REQUIREMENTS (continued)
SUSQUEHANNA       - UNIT 2               TS / 5.0-18A                                 Amendment 215}}
SURVEILLANCE FREQUENCY SR 3.8.6.5 Verify each battery connected cell voltage is 92 days_2.07 V.SR 3.8.6.6 -------------------------
NOTE ---------------
This Surveillance shall not be Performed in Mode 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR.Verify battery capacity is _> 80% of the 60 months manufacturer's rating when subjected to a performance discharge test or a modified performance discharge test. AND 12 months when battery shows degradation or has reached 85% of expected service life with capacity<100% of manufacturer's rating AND 24 months when battery has reached 85% of the expected service life with capacity _ 100% of manufacturer's rating SUSQUEHANNA
-UNIT 2 TS / 3.8-43 Amendment 14,215 PPL Rev. 2 Programs and Manuals 5.5 5.5 Programs and Manuals (continued) 5.5.13 Battery Monitoring and Maintenance Program This program provides for battery restoration and maintenance, which includes the following:
: a. Actions to restore battery cells with float voltage < 2.13 V; and b. Actions to equalize and test battery cells that had been discovered with electrolyte level below the top of the plates; and c. Actions to verify that the remaining cells are > 2.07 V when a cell or cells have been found to be < 2.13 V.SUSQUEHANNA  
-UNIT 2 TS / 5.0-18A Amendment 215}}

Latest revision as of 01:19, 14 March 2020

Tech Spec Pages for Amendments 238 and 215 DC Electrical Power Systems Technical Specification Task Force 360
ML062750005
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/28/2006
From:
NRC/NRR/ADRO/DORL/LPLI-1
To:
References
TAC MC5153, TAC MC5154
Download: ML062750005 (27)


Text

(4) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level PPL Susquehanna, LLC is authorized to operate the facility at reactor core power levels not in excess of 3489 megawatts thermal in accordance with the conditions specified herein and in Attachment 1 to this license. The preoperational tests, startup tests and other items identified in Attachment 1 to this license shall be completed as specified. Attachment 1 is hereby incorporated into this license.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 238, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

For Surveillance Requirements (SRs) that are new in Amendment 178 to Facility Operating License No. NPF-14, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 178. For SRs that existed prior to Amendment 178, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 178.

(3) Conduct of Work Activities During Fuel Load and Initial Startup The operating licensee shall review by committee all facility construction, Preoperational Testing, and System Demonstration activities performed concurrently with facility initial fuel loading or with the facility Startup Test Amendment No. 5, +49, +-78, +-80, +88, +-94,295, 2286, -27,238

PPL Rev. 2 DC Sources-Operating 3.8.4 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. Diesel Generator E DC D.1 Declare Diesel Generator E 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> electrical power inoperable.

subsystem inoperable, when aligned to the Class 1E distribution system.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is greater than or equal to 7 days the minimum established float voltage.

SR 3.8.4.2 Verify each required battery charger supplies its 24 months associated battery at the following rates for > 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br /> at greater than or equal to the minimum established float voltages.

a. > 100 amps for the 125V Battery I
b. Ž300 amps for the 250V Battery I I
c. >200 amps for the 125V Diesel Generator E Battery (continued)

SUSQUEHANNA - UNIT 1 TS / 3.8-24 Amendment 18,238

PPL Rev. 2 DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.4.3 ------------------------------ --NOTES- --------------------------------

1. The modified performance discharge test in SR 3.8.6.6 may be performed in lieu of SR 3.8.4.3.
2. This Surveillance shall not be Performed in Mode 1, 2, or 3 except for the Diesel Generator E DC electrical power subsystem. This Surveillance can be performed on the Diesel Generator E DC electrical power subsystem when the Diesel Generator E is not aligned to the Class 1E distribution system. However, credit may be taken for unplanned events that satisfy. this SR.

Verify battery capacity is adequate to supply, and maintain 24 months in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.

SUSQUEHANNA - UNIT 1 TS / 3.8-25 Amendment 17, 2A, 238.

PPL Rev. 2 DC Sources-Operating 3.8.4 Table 3.8.4-1 (page 1 of 1)

Unit 1 DC Electrical Power Subsystems TYPE VOLTAGE DIVISION .1 DIVISION II Battery Banks 250 V 1 D650 1D660 1 D653A (Charger) 1D663 (Charger) or 1 D653B (Charger) 125 V 1D610 (Subsys. A) 1D620 (Subsys. B) 1 D613 (Charger A) 1D623 (Charger B) 1D630 (Subsys. C) 1D640 (Subsys. D) 1D633 (Charger C) 1D643 (Charger D)

DG E 125 V 0D595 Battery Banks 0D596 (Charger)

SUSQUEHANNA - UNIT 1 TS 3.8-26 Amendment 1/8,238

PPL Rev. 2 DC Sources-Operating 3.8.4 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 1 TS / 3.8-27 Amendment 1/8,238

PPL Rev. 2 DC Sources-Operating 3.8.4 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 1 TS / 3.8-28 Amendment 1/8, M

PPL Rev. 1 DC Sources-Shutdown 3.8.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.5.1 -NOTE The following SRs must be met, but are not required to be performed: SR 3.8.4.2, and SR 3.8.4.3. I For DC sources required to be OPERABLE the following In accordance with SRs are applicable: applicable SRs SR 3.8.4.1 SR 3.8.4.2 SR 3.8.4.3 SUSQUEHANNA - UNIT 1 TS / 3.8-31 Amendment 1/8ý 238

PPL Rev. 1 Battery Parameters 3.8.6 3.8 ELECTRICAL POWER SYSTEMS 3.8.6 Battery Parameters I I

LCO 3.8.6 Battery parameters for the Class 1E 250 V batteries and Class 1E 125 V batteries shall be within limits.

APPLICABILITY: When associated DC electrical power subsystems are required to be OPERABLE.

ACTIONS NOTE ------ ------------------------------------------------

Separate Condition entry is allowed for each battery.

CONDITION REQUIRED ACTION COMPLETION TIME A. One 125 VDC electrical A.1 Perform SR 3.8.4.1 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> power subsystem or one 250 VDC electrical power AND subsystem with one or more battery cells float A.2 Perform SR 3.8.6.1 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> voltage < 2.07 V.

AND A.3 Restore affected cell voltage 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />

Ž2.07 V.

(continued)

SUSQUEHANNA - UNIT 1 TS / 3.8-32 .Amendment 1/8,238

.PPL Rev. 1 Battery Parameters 3.8.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. One 125 VDC electrical B.1 Perform SR 3.8.4.1 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> power subsystem or one 250 VDC electrical power AND subsystem with float current > 2 amps. B.2 Restore battery float current 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> to < 2 amps.

C. ------ NOTE --- ----------------- NOTE ------------------

Required Action C.2 shall Required Actions C.1 and C.2 are

  • be completed if only applicable if electrolyte level electrolyte level was was below the top of plates.

below the top of plates. -----------------------------------------------------

One 125 VDC electrical C.1 Restore electrolyte level to 8 hours0.333 days <br />0.0476 weeks <br />0.011 months <br /> power subsystem or one above top of plates.

250 VDC electrical power subsystem with one or AND more cells electrolyte level less than minimum established design limits.

C.2 Verify no evidence of 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> leakage.

AND I C.3 Restore electrolyte level to 31 days greater than or equal to minimum established design limits.

D. One 125 VDC electrical D.1 Restore battery pilot cell 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> power subsystem or one temperature to greater than 250 VDC electrical power or equal to minimum subsystem with pilot cell established design limits electrolyte temperature less than minimum established design limits.

(continued)

SUSQUEHANNA - UNIT 1 TS / 3.8-33 Amendment 1/8, M

PPL Rev. 1 Battery Parameters 3.8.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. Two 125 VDC electrical E.1 Restore battery parameters 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> power subsystems or for batteries in one 125 VDC both 250 VDC electrical electrical power subsystem or power subsystems with one 250 VDC electrical power battery parameters not subsystem to within limits.

within limits.

F. Required Action and F.1 Declare associated battery Immediately I associated Completion inoperable.

Time of Condition A, B, C, D, or E not met.

OR One battery on one 125 VDC electrical power subsystem or one 250 VDC electrical power subsystem with one or more battery cells float voltage < 2.07 V and float current > 2 amps.

SUSQUEHANNA - UNIT 1 TS / 3.8-34 Amendment 1/8, 238

PPL Rev. 1 Battery Parameters 3.8.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY 4-SR 3.8.6.1

-L ^I


LJ r i"-----------------------------------

Not required to be met when battery terminal voltage is less than the minimum established float voltage of SR 3.8.4.1.

Verify each battery float current is < 2 amps. 7 days SR 3.8.6.2 Verify each battery pilot cell voltage is >_2.07 V. 31 days SR 3.8.6.3 Verify each battery connected cell electrolyte level is 31 days greater than or equal to minimum established design limits.

SR 3.8.6.4 Verify each battery pilot cell temperature is greater than or 31 days equal to minimum established design limits.

SR 3.8.6.5 Verify each battery connected cell voltage is > 2.07 V. 92 days (continued)

SUSQUEHANNA - UNIT 1 TS / 3.8-35 Amendment 1/8, 238

PPL Rev. 1 Battery Parameters 3.8.6 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.6.6 NOTE This Surveillance shall not be Performed in Mode 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR.

Verify battery capacity is _>80% of the manufacturer's 60 months rating when subjected to a performance discharge test or a modified performance discharge test.

AND 12 months when battery shows degradation or has reached 85% of expected service life with capacity

< 100% of manufacturer's rating AND 24 months when battery has reached 85% of the expected service life with capacity

_>100% of manufacturer's rating SUSQUEHANNA - UNIT 1 TS / 3.8-36 Amendment 1/8, n

PPL Rev. 2 Programs and Manuals 5.5 5.5 Programs and Manuals (continued) 5.5.13 Battery Monitoring and Maintenance Program This program provides for battery restoration and maintenance, which includes the following:

a. Actions to restore battery cells with float voltage < 2.13 V; and
b. Actions to equalize and test battery cells that had been discovered with electrolyte level below the top of the plates; and
c. Actions to verify that the remaining cells are >_ 2.07 V when a cell or cells have been found to be < 2.13 V.

SUSQUEHANNA - UNIT 1 TS / 5.0-18A Amendment 238

- (4) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level PPL Susquehanna, LLC is authorized to operate the facility at reactor core power levels not in excess of 3489 megawatts thermal (100% power) in accordance with the conditions specified herein. and in Attachment 1 to this license. The preoperational test, startup tests and other items identified in Attachment 1 to this license shall be completed as specified. Attachment 1 is hereby incorporated into this license.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 215, and the Environmental Protection Plan contained in.

Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

For Surveillance Requirements (SRs) that are new in Amendment 151 t6 Facility Operating License No. NPF-22, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 151. For SRs that existed prior to Amendment 151, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 151.

2.C.(3) PPL Susquehanna, LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Fire Protection Review Report for the facility and as approved in Fire Protection Program, Section 9.5, SER, SSER#1, SSER#2, SSER#3, SSER#4, SSER#6, Safety Evaluation of Fire Protection Report dated August 9, 1989, Safety Evaluation Amendment No. 4, , -G9, 450, +5+, +5,4-2,469, 2-2, £-9, 2-1-4, 215 I

PPL Rev. 2 DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is greater than or 7 days equal to the minimum established float voltage.

SR 3.8.4.2 Verify each required battery charger supplies its 24 months associated battery at the following rates for > 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br /> at greater than or equal to the minimum established float voltages:

a) _ 100 amps for the 125V Battery b) _300 amps for the 250V Battery c) _200 amps for the125V Diesel Generator E Battery

. ...... _ _(continued)

SUSQUEHANNA - UNIT 2 TS /G.8-28 Amendment 10, 21ý, 21.5

PPL Rev. 2 DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.4.3 --------------- NOTES -------------

1. The modified performance discharge test in SR 3.8.6.6 may be performed in lieu of SR 3.8.4.3.
2. This Surveillance shall not be Performed in Mode 1, 2 or 3 except for the Diesel Generator E DC electrical power subsystem.

This Surveillance can be performed on the Diesel Generator E DC electrical power subsystem when the Diesel Generator E is not aligned to the Class 1E distribution system. However, credit may be taken for unplanned events that satisfy this SR.

Verify battery capacity is adequate to supply, 24 months and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.

SR 3.8.4.4 --------------------------- NOTE -------------- I When Unit 1 is in MODE 4 or 5, or moving irradiated fuel assemblies in the secondary containment, the Note to Unit 1 SR 3.8.5.1 is applicable.

For required Unit 1 DC electrical power In accordance with subsystems, the SRs for Unit 1 Specification applicable SRs 3.8.4 are applicable.

SUSQUEHANNA UNIT 2 TS / 3.8-29 Amendment 10, 2p, 215

PPL Rev. 2 DC Sources-Operating 3.8.4 Table 3.8.4-1 (page 1 of 1)

Unit 2 DC Electrical Power Subsystems TYPE VOLTAGE DIVISION I DIVISION II Battery Banks 250 V 2D650 2D660 2D653A (Charger) 2D663 (Charger) or 2D653B (Charger) 125 V 1 D610 (Subsys. A) 1 D620 (Subsys. B) 1 D613 (Charger A) 1 D623 (Charger B) 2D610 (Subsys. A) 2D620 (Subsys. B) 2D613 (Charger A) 2D623 (Charger B) 1 D630 (Subsys. C) 1 D640 (Subsys. D) 1D633 (Charger C) 1D643 (Charger D) 2D630 (Subsys. C) 2D640 (Subsys. D) 2D633 (Charger C) 2D643 (Charger D)

DG E 125 V 0D595 Battery Banks 0D596 (Charger)

SUSQUEHANNA - UNIT 2 TS / 3.8-30 Amendment 15/,215

PPL Rev. 2 DC Sources-Operating 3.8.4 SUSQUEHANNA - UNIT 2 TS / 3.8-31 Amendment 1V, ZL5

PPL Rev. 2 DC Sources-Operating 3.8.4 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 2 TS / 3.8-32 Amendment 1V, 215 N

PPL Rev. 2 DC Sources-Operating 3.8.4 SUSQUEHANNA - UNIT 2 TS'/3.8-33 Amendment 15/, 215

PPL Rev. 1 DC Sources-Shutdown 3.8.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.5.1 The following SRs must be met, but are not required to be performed: SR 3.8.4.2 and SR 3.8.4.3. I For DC sources required to be OPERABLE the In accordance with applicable following SRs are applicable: SRs SR 3.8.4.1 I SR 3.8.4.2 I SR 3.8.4.3 SR 3.8.5.2 NOTE-----------------------

When Unit 1 is in MODE 4 or 5, or moving irradiated fuel assemblies in the secondary containment, the Note to Unit 1 SR 3.8.5.1 is applicable.

For required Unit 1 DC electrical power In accordance with applicable subsystems, the SRs for Unit 1 Specification 3.8.4 SRs are applicable.

SUSQUEHANNA - UNIT 2 TS / 3.8-38 Amendment 1V, 215

PPL Rev. 1 Battery Parameters

.3.8.6 3.8 ELECTRICAL POWER SYSTEMS 3.8.6 Battery Parameters I I

LCO 3.8.6 Battery parameters for the Class 1 E 250 V batteries and Class 1E 125 V batteries shall be within limits.

APPLICABIL .ITY: When associated DC electrical power subsystems are required to be OPERABLE.

ACTIONS


---- NOT t--- -- -- -- -- ------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- ----

Separate Condition entry is allowed for each batti CONDITION REQUIRED ACTION COMPLETION TIME A. One 125 VDC electrical A.1 Perform SR 3.8.4.1 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> power subsystem or-one 250 VDC electrical power AND subsystem with one or more battery cells float voltage A.2 Perform SR 3.8.6.1 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br />

< 2.07 V.

AND A.3 Restore affected cell voltage 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />

> 2.07 V.

(continued)

SUSQUEHANNA - UNIT 2 TS / 3.8-39 Amendment 15/, a5

PPL Rev. 1 Battery Parameters 3.8.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. One 125 VDC electrical B.1 Perform SR 3.8.4.1 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> power subsystem or one.

250 VDC electrical power AND subsystem with float current

> 2 amps. B.2 Restore battery Iloat current to 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br />

_< 2 amps C. ------ NOTE----- -------------------- NOTE ------------------

Required Action C.2 shall be Required Actions C.1 and C.2 are completed if electrolyte level only applicable if electrolyte level was below the top of plates. was below the top of plates.

One 125 VDC electrical C.1 Restore electrolyte level to 8 hours0.333 days <br />0.0476 weeks <br />0.011 months <br /> power subsystem or one above top of plates.

250 VDC electrical power subsystem with one or more AND cells electrolyte level less than minimum established design limits.

C.2 Verify no evidence of 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> leakage.

AND C.3 Restore electrolyte level to 31 days greater than or equal to minimum established design limits.

(continued)

SUSQUEHANNA - UNIT 2 TS / 3.8-40 Amendment 1ý 1 215

PPL Rev. 1 Battery Parameters 3.8.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. One 125 VDC electrical D.1 Restore battery pilot cell 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> power subsystem or one temperature to greater 250 VDC electrical power than or equal to minimum subsystem with pilot cell established design limits.

electrolyte temperature less than minimum established design limits.

E. Two 125 VDC electrical E.1 Restore battery 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> power subsystems or both parameters for batteries in 250 VDC electrical power one 125 VDC electrical subsystems with battery power subsystem or one parameters not within limits. 250 VDC electrical power subsystem to within limits.

F. Required Action and F.1 Declare associated battery Immediately associated Completion inoperable.

Time of Condition A, B, C, D, or E not met.

OR One battery on one 125 VDC electrical power subsystem or on one 250 VDC electrical power subsystem with one or more battery cells float voltage

< 2.07 V and float current

> 2 amps.

SUSQUEHANNA- UNIT 2 TS / 3.8-41 Amendment 1ý 1215

PPL Rev. 1 Battery Parameters 3.8.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.6.1


NOTE ----------------------------------

Not required to be met when battery terminal voltage is less than the minimum established float voltage of SR 3.8.4.1.

Verify each battery float current is < 2 amps. 7 days SR 3.8.6.2 Verify each battery pilot cell voltage is Ž_2.07 V. 31 days SR 3.8.6.3 Verify each battery connected cell electrolyte 31 days level is greater than or equal to minimum established design limits.

SR 3.8.6.4 Verify each battery pilot cell temperature is 31 days greater than or equal to minimum established design limits.

(continued)

SUSQUEHANNA - UNIT 2 TS / 3.8-42 Amendment 4, 45

PPL Rev. 1 Battery Parameters I 3.8.6 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.6.5 Verify each battery connected cell voltage is 92 days

_2.07 V.

SR 3.8.6.6 ------------------------- NOTE ---------------

This Surveillance shall not be Performed in Mode 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR.

Verify battery capacity is _>80% of the 60 months manufacturer's rating when subjected to a performance discharge test or a modified performance discharge test. AND 12 months when battery shows degradation or has reached 85% of expected service life with capacity

<100% of manufacturer's rating AND 24 months when battery has reached 85% of the expected service life with capacity Ž_100% of manufacturer's rating SUSQUEHANNA - UNIT 2 TS / 3.8-43 Amendment 14,215

PPL Rev. 2 Programs and Manuals 5.5 5.5 Programs and Manuals (continued) 5.5.13 Battery Monitoring and Maintenance Program This program provides for battery restoration and maintenance, which includes the following:

a. Actions to restore battery cells with float voltage < 2.13 V; and
b. Actions to equalize and test battery cells that had been discovered with electrolyte level below the top of the plates; and
c. Actions to verify that the remaining cells are > 2.07 V when a cell or cells have been found to be < 2.13 V.

SUSQUEHANNA - UNIT 2 TS / 5.0-18A Amendment 215