(3 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML072420116 | | | number = ML072420116 |
| | issue date = 09/07/2007 | | | issue date = 09/07/2007 |
| | title = Diablo Canyon Power Plant, Unit No. 2 - Evaluation of Finite Element Analysis in Support of Alloy 82/182 Pressurizer Butt Weld Inspections in 2008 as Provided by CAL NRR-07-007 (Tac MD4150) | | | title = Evaluation of Finite Element Analysis in Support of Alloy 82/182 Pressurizer Butt Weld Inspections in 2008 as Provided by CAL NRR-07-007 (Tac MD4150) |
| | author name = Haney C | | | author name = Haney C |
| | author affiliation = NRC/NRR/ADRO/DORL/LPLIV | | | author affiliation = NRC/NRR/ADRO/DORL/LPLIV |
| | addressee name = Keenan J S | | | addressee name = Keenan J |
| | addressee affiliation = Pacific Gas & Electric Co | | | addressee affiliation = Pacific Gas & Electric Co |
| | docket = 05000323 | | | docket = 05000323 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:September 7, 2007Mr. John S. KeenanSenior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 770000, Mail Code B32 San Francisco, CA 94177-0001 | | {{#Wiki_filter:September 7, 2007 Mr. John S. Keenan Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 770000, Mail Code B32 San Francisco, CA 94177-0001 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| DIABLO CANYON POWER PLANT, UNIT NO. 2 - EVALUATION OF FINITEELEMENT ANALYSIS IN SUPPORT OF ALLOY 82/182 PRESSURIZER BUTT WELD INSPECTIONS IN 2008 AS PROVIDED BY CONFIRMATORY ACTION LETTER NRR-07-003 (TAC NO. MD4150) | | DIABLO CANYON POWER PLANT, UNIT NO. 2 - EVALUATION OF FINITE ELEMENT ANALYSIS IN SUPPORT OF ALLOY 82/182 PRESSURIZER BUTT WELD INSPECTIONS IN 2008 AS PROVIDED BY CONFIRMATORY ACTION LETTER NRR-07-003 (TAC NO. MD4150) |
|
| |
|
| ==Dear Mr. Keenan:== | | ==Dear Mr. Keenan:== |
|
| |
|
| On March 15, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued ConfirmatoryAction Letter (CAL) No. NRR-07-003 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070670425) regarding dissimilar metal welds in the pressurizer surge, spray, and safety/relief nozzle-to-safe end welds at Diablo Canyon Power Plant (DCPP), Unit No. 2. The CAL and the supporting commitment letter (ADAMS AccessionNo. ML070580128) indicate that inspection and mitigation actions may be conducted duringyour spring 2008 refueling outage, contingent on the industry providing an analysis thatdemonstrates an acceptable level of safety to the NRC for the operation of these welds untilspring 2008. This letter acknowledges receipt of your letter dated August 7, 2007 (ADAMS Accession No. ML072410199), informing the NRC that the analysis referred to by this CAL andthe supporting commitment letter has been completed, and that the analysis is applicable to your plant.The NRC received MRP-216, Rev. 1, "Materials Reliability Program: Advanced FEA [FiniteElement Analysis] Evaluation of Growth of Postulated Circumferential PWSCC [Primary Water Stress-Corrosion Cracking] Flaws in Pressurizer Nozzle Dissimilar Metal Welds," on August 13,2007 (ADAMS Accession No. ML072410235). Based on our review of this report, the NRC concludes that the analysis provides adequate justification to permit inspections during yourspring 2008 refueling outage, and that the analysis is applicable to DCPP, Unit No. 2. The results of the staff's review are contained in a safety assessment dated August 31, 2007(ADAMS Accession No. ML072400199), and the associated contractor report (ADAMS Accession No. ML072470394).Based on the above, the NRC concludes that a plant shutdown by December 31, 2007, is nolonger required. Therefore, the pressurizer surge, spray, and safety/relief nozzle-to-safe end Alloy 82/182 butt weld inspections for DCPP, Unit No. 2 must be performed prior to exiting your scheduled spring 2008 refueling outage. All other requirements of the CAL and the supporting commitment letter regarding enhanced inspection and leakage monitoring requirements for thereactor coolant system and associated reports remain valid. | | On March 15, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-003 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070670425) regarding dissimilar metal welds in the pressurizer surge, spray, and safety/relief nozzle-to-safe end welds at Diablo Canyon Power Plant (DCPP), Unit No. 2. The CAL and the supporting commitment letter (ADAMS Accession No. ML070580128) indicate that inspection and mitigation actions may be conducted during your spring 2008 refueling outage, contingent on the industry providing an analysis that demonstrates an acceptable level of safety to the NRC for the operation of these welds until spring 2008. This letter acknowledges receipt of your letter dated August 7, 2007 (ADAMS Accession No. ML072410199), informing the NRC that the analysis referred to by this CAL and the supporting commitment letter has been completed, and that the analysis is applicable to your plant. |
| J. S. Keenan-2-The CAL will remain open until all CAL commitments pertaining to DCPP, Unit No. 2 arecomplete. Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and theNRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy orEnforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).In accordance with Section 2.390 of Title 10 of the Code of Federal Regulations, of the NRC's"Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS),
| | The NRC received MRP-216, Rev. 1, Materials Reliability Program: Advanced FEA [Finite Element Analysis] Evaluation of Growth of Postulated Circumferential PWSCC [Primary Water Stress-Corrosion Cracking] Flaws in Pressurizer Nozzle Dissimilar Metal Welds, on August 13, 2007 (ADAMS Accession No. ML072410235). Based on our review of this report, the NRC concludes that the analysis provides adequate justification to permit inspections during your spring 2008 refueling outage, and that the analysis is applicable to DCPP, Unit No. 2. The results of the staffs review are contained in a safety assessment dated August 31, 2007 (ADAMS Accession No. ML072400199), and the associated contractor report (ADAMS Accession No. ML072470394). |
| accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html
| | Based on the above, the NRC concludes that a plant shutdown by December 31, 2007, is no longer required. Therefore, the pressurizer surge, spray, and safety/relief nozzle-to-safe end Alloy 82/182 butt weld inspections for DCPP, Unit No. 2 must be performed prior to exiting your scheduled spring 2008 refueling outage. All other requirements of the CAL and the supporting commitment letter regarding enhanced inspection and leakage monitoring requirements for the reactor coolant system and associated reports remain valid. |
| .Sincerely,/RA/Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-323 cc: See next page
| |
|
| |
|
| ML072420116OFFICEDCI/CPNBDCI/CPNBLPL4/PMLPL4/LALPL4/BCNAMETLupoldTChanAwang, JND forJBurkhardtThiltz, BKS for DATE9/6/079/6/079/6/079/5/079/6/07 OFFICEDCI/DDRP/D, RGN4DORL/D NAMEMEvansDChamberlainCHaney DATE9/7/079/7/07 WJones for9/7/07 August 2007Diablo Canyon Power Plant, Units 1 and 2 cc:NRC Resident Inspector Diablo Canyon Power Plant c/o U.S. Nuclear Regulatory Commission P.O. Box 369 Avila Beach, CA 93424Sierra Club San Lucia ChapterATTN: Andrew Christie P.O. Box 15755 San Luis Obispo, CA 93406Ms. Nancy CulverSan Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, CA 93448ChairmanSan Luis Obispo County Board of Supervisors 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408Mr. Truman BurnsMr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, CA 94102Diablo Canyon Independent Safety Committee Attn: Robert R. Wellington, Esq.
| | J. S. Keenan The CAL will remain open until all CAL commitments pertaining to DCPP, Unit No. 2 are complete. |
| Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940Regional Adminstrator, Region IVU.S. Nuclear Regulatory Commission Harris Tower & Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064Jennifer Post, Esq.Pacific Gas & Electric Company P.O. Box 7442 San Francisco, CA 94120City EditorThe Tribune 3825 South Higuera Street P.O. Box 112 San Luis, Obispo, CA 94306-0112Director, Radiologic Health BranchState Department of Health Services P.O. Box 997414, MS 7610 Sacramento, CA 95899-7414Mr. James Boyd, CommissionerCalifornia Energy Commission 1516 Ninth Street MS (31)
| | Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays). |
| Sacramento, CA 95831Mr. James R. Becker, Vice PresidentDiablo Canyon Operations and Station Director Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424Jennifer TangField Representative United States Senator Barbara Boxer 1700 Montgomery Street, Suite 240 San Francisco, CA 94111Mr. John T. ConwaySite Vice President Diablo Canyon Power Plant P. O. Box 56 Avila Beach, California 93424}} | | In accordance with Section 2.390 of Title 10 of the Code of Federal Regulations, of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), |
| | accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html. |
| | Sincerely, |
| | /RA/ |
| | Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-323 cc: See next page |
| | |
| | ML072420116 OFFICE DCI/CPNB DCI/CPNB LPL4/PM LPL4/LA LPL4/BC NAME TLupold TChan Awang, JND for JBurkhardt Thiltz, BKS for DATE 9/6/07 9/6/07 9/6/07 9/5/07 9/6/07 OFFICE DCI/D DRP/D, RGN4 DORL/D NAME MEvans DChamberlain CHaney DATE 9/7/07 9/7/07 WJones for 9/7/07 Diablo Canyon Power Plant, Units 1 and 2 cc: |
| | NRC Resident Inspector Jennifer Post, Esq. |
| | Diablo Canyon Power Plant Pacific Gas & Electric Company c/o U.S. Nuclear Regulatory Commission P.O. Box 7442 P.O. Box 369 San Francisco, CA 94120 Avila Beach, CA 93424 City Editor Sierra Club San Lucia Chapter The Tribune ATTN: Andrew Christie 3825 South Higuera Street P.O. Box 15755 P.O. Box 112 San Luis Obispo, CA 93406 San Luis, Obispo, CA 94306-0112 Ms. Nancy Culver Director, Radiologic Health Branch San Luis Obispo State Department of Health Services Mothers for Peace P.O. Box 997414, MS 7610 P.O. Box 164 Sacramento, CA 95899-7414 Pismo Beach, CA 93448 Mr. James Boyd, Commissioner Chairman California Energy Commission San Luis Obispo County 1516 Ninth Street MS (31) |
| | Board of Supervisors Sacramento, CA 95831 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Mr. James R. Becker, Vice President Diablo Canyon Operations and Mr. Truman Burns Station Director Mr. Robert Kinosian Diablo Canyon Power Plant California Public Utilities Commission P.O. Box 56 505 Van Ness, Room 4102 Avila Beach, CA 93424 San Francisco, CA 94102 Jennifer Tang Diablo Canyon Independent Safety Field Representative Committee United States Senator Barbara Boxer Attn: Robert R. Wellington, Esq. 1700 Montgomery Street, Suite 240 Legal Counsel San Francisco, CA 94111 857 Cass Street, Suite D Monterey, CA 93940 Mr. John T. Conway Site Vice President Regional Adminstrator, Region IV Diablo Canyon Power Plant U.S. Nuclear Regulatory Commission P. O. Box 56 Harris Tower & Pavillion Avila Beach, California 93424 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 August 2007}} |
Letter Sequence Other |
---|
|
|
MONTHYEARDCL-07-009, Additional Commitments Related to Inspection and Mitigation of Alloy 600/82/182 Pressurizer Butt Welds2007-02-20020 February 2007 Additional Commitments Related to Inspection and Mitigation of Alloy 600/82/182 Pressurizer Butt Welds Project stage: Request ML0706704252007-03-15015 March 2007 Confirmatory Action Letter Alloy 82/182 Pressurizer Butt Welds Project stage: Other ML0724101992007-08-0707 August 2007 Mitigation of Alloy 600/82/182 Pressurizer Butt Welds in 2008 Project stage: Request ML0724201162007-09-0707 September 2007 Evaluation of Finite Element Analysis in Support of Alloy 82/182 Pressurizer Butt Weld Inspections in 2008 as Provided by CAL NRR-07-007 (Tac MD4150) Project stage: Other DCL-07-099, ASME Section XI Inservice Inspection Program Relief Request REP-1 U2, Revision 1, and Response to Request for Additional Information2007-10-22022 October 2007 ASME Section XI Inservice Inspection Program Relief Request REP-1 U2, Revision 1, and Response to Request for Additional Information Project stage: Response to RAI DCL-07-105, ASME Section XI Inservice Inspection Program Relief Request REP-1 U2, Revision 1; Response to Request for Additional Information2007-11-29029 November 2007 ASME Section XI Inservice Inspection Program Relief Request REP-1 U2, Revision 1; Response to Request for Additional Information Project stage: Response to RAI ML0801100012008-02-0606 February 2008 Approval of Relief Request REP-1 U2, Revision 1, for the Application of Weld Overlay on Dissimilar Metal Welds of Pressurizer Nozzles Project stage: Acceptance Review ML0803700262008-02-13013 February 2008 Request for Additional Information Requests for Alternative ANO1-R&R-011 for Unit 1 and ANO2-R&R-005 for Unit 2, Structural Weld Overlay Repairs to Improve Dissimilar Metal Weld Integrity Project stage: RAI DCL-08-039, Mitigation Status of Alloy 600/82/182 Pressurizer Butt Welds, Structural Weld Overlay Ultrasonic Examination Results2008-04-24024 April 2008 Mitigation Status of Alloy 600/82/182 Pressurizer Butt Welds, Structural Weld Overlay Ultrasonic Examination Results Project stage: Other 2007-08-07
[Table View] |
|
---|
Category:Letter
MONTHYEARML24260A1222024-09-14014 September 2024 14 Sept 2024 Ltr - California Coastal Commission to Pg&E, Incomplete Consistency Certification for Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - IR 05000275/20243012024-08-26026 August 2024 NRC Examination Report 05000275/2024301; 05000323/2024301 IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL ML24155A2182024-06-18018 June 2024 OEDO-23-00350-NRR - (LTR-23-0228-1) - Closure Letter - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) ML24200A2052024-06-0707 June 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project for Diablo Canyon License Renewal ML24099A2192024-05-29029 May 2024 Issuance of Amendment Nos. 245 and 247 Revision to TSs to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24117A0132024-05-20020 May 2024 Letter to Paula Gerfen-Diablo Canyon Units 1 and 2-Regulatory Audit Regarding Severe Accident Mitigation Alternatives for the License Renewal Application DCL-24-054, LCO 3.0.3 Completion Time Limits2024-05-17017 May 2024 LCO 3.0.3 Completion Time Limits DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage ML24127A2042024-05-0202 May 2024 02May2024 Ltr - California Coastal Commission to Pg&E, Coastal Development Permit Needed for Pg&E’S Proposed Relicensing of Diablo Canyon Nuclear Power Plant DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report L-24-004, Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007)2024-04-30030 April 2024 Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007) DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 IR 05000275/20240012024-04-23023 April 2024 Integrated Inspection Report 05000275/2024001 and 05000323/2024001 ML24114A2032024-04-22022 April 2024 Request for Information for EP Program and Performance Indicator Verification Inspection (Wolf Creek Nuclear Generating Station) Inspection Report 05000482/2024003 ML24106A2882024-04-18018 April 2024 License Renewal Application Environmental Review RCIs and RAIs ML24106A2892024-04-18018 April 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of March 2024 Audit Regarding the Environmental Review of the License Renewal Application DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24108A1122024-04-15015 April 2024 License Amendment Request 24-02 Request for Approval of DCPP Early Warning System to Meet 10 CFR 73.55(i)(2) and 10 CFR 73.55(e)(9)(vi)(A) DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant ML24082A2592024-03-25025 March 2024 Notice of Enforcement Discretion for Diablo Canyon Power Plant, Unit 2 (EPID L-2024-LLD-0002) - March 25, 2024 ML24081A0462024-03-22022 March 2024 Audit Summary in Support of the License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability ML24081A4052024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability 2024-09-09
[Table view] Category:Confirmatory Action Letter (CAL)
MONTHYEARML0724201162007-09-0707 September 2007 Evaluation of Finite Element Analysis in Support of Alloy 82/182 Pressurizer Butt Weld Inspections in 2008 as Provided by CAL NRR-07-007 (Tac MD4150) ML0706704252007-03-15015 March 2007 Confirmatory Action Letter Alloy 82/182 Pressurizer Butt Welds 2007-09-07
[Table view] |
Text
September 7, 2007 Mr. John S. Keenan Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 770000, Mail Code B32 San Francisco, CA 94177-0001
SUBJECT:
DIABLO CANYON POWER PLANT, UNIT NO. 2 - EVALUATION OF FINITE ELEMENT ANALYSIS IN SUPPORT OF ALLOY 82/182 PRESSURIZER BUTT WELD INSPECTIONS IN 2008 AS PROVIDED BY CONFIRMATORY ACTION LETTER NRR-07-003 (TAC NO. MD4150)
Dear Mr. Keenan:
On March 15, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-003 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070670425) regarding dissimilar metal welds in the pressurizer surge, spray, and safety/relief nozzle-to-safe end welds at Diablo Canyon Power Plant (DCPP), Unit No. 2. The CAL and the supporting commitment letter (ADAMS Accession No. ML070580128) indicate that inspection and mitigation actions may be conducted during your spring 2008 refueling outage, contingent on the industry providing an analysis that demonstrates an acceptable level of safety to the NRC for the operation of these welds until spring 2008. This letter acknowledges receipt of your letter dated August 7, 2007 (ADAMS Accession No. ML072410199), informing the NRC that the analysis referred to by this CAL and the supporting commitment letter has been completed, and that the analysis is applicable to your plant.
The NRC received MRP-216, Rev. 1, Materials Reliability Program: Advanced FEA [Finite Element Analysis] Evaluation of Growth of Postulated Circumferential PWSCC [Primary Water Stress-Corrosion Cracking] Flaws in Pressurizer Nozzle Dissimilar Metal Welds, on August 13, 2007 (ADAMS Accession No. ML072410235). Based on our review of this report, the NRC concludes that the analysis provides adequate justification to permit inspections during your spring 2008 refueling outage, and that the analysis is applicable to DCPP, Unit No. 2. The results of the staffs review are contained in a safety assessment dated August 31, 2007 (ADAMS Accession No. ML072400199), and the associated contractor report (ADAMS Accession No. ML072470394).
Based on the above, the NRC concludes that a plant shutdown by December 31, 2007, is no longer required. Therefore, the pressurizer surge, spray, and safety/relief nozzle-to-safe end Alloy 82/182 butt weld inspections for DCPP, Unit No. 2 must be performed prior to exiting your scheduled spring 2008 refueling outage. All other requirements of the CAL and the supporting commitment letter regarding enhanced inspection and leakage monitoring requirements for the reactor coolant system and associated reports remain valid.
J. S. Keenan The CAL will remain open until all CAL commitments pertaining to DCPP, Unit No. 2 are complete.
Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).
In accordance with Section 2.390 of Title 10 of the Code of Federal Regulations, of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.
Sincerely,
/RA/
Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-323 cc: See next page
ML072420116 OFFICE DCI/CPNB DCI/CPNB LPL4/PM LPL4/LA LPL4/BC NAME TLupold TChan Awang, JND for JBurkhardt Thiltz, BKS for DATE 9/6/07 9/6/07 9/6/07 9/5/07 9/6/07 OFFICE DCI/D DRP/D, RGN4 DORL/D NAME MEvans DChamberlain CHaney DATE 9/7/07 9/7/07 WJones for 9/7/07 Diablo Canyon Power Plant, Units 1 and 2 cc:
NRC Resident Inspector Jennifer Post, Esq.
Diablo Canyon Power Plant Pacific Gas & Electric Company c/o U.S. Nuclear Regulatory Commission P.O. Box 7442 P.O. Box 369 San Francisco, CA 94120 Avila Beach, CA 93424 City Editor Sierra Club San Lucia Chapter The Tribune ATTN: Andrew Christie 3825 South Higuera Street P.O. Box 15755 P.O. Box 112 San Luis Obispo, CA 93406 San Luis, Obispo, CA 94306-0112 Ms. Nancy Culver Director, Radiologic Health Branch San Luis Obispo State Department of Health Services Mothers for Peace P.O. Box 997414, MS 7610 P.O. Box 164 Sacramento, CA 95899-7414 Pismo Beach, CA 93448 Mr. James Boyd, Commissioner Chairman California Energy Commission San Luis Obispo County 1516 Ninth Street MS (31)
Board of Supervisors Sacramento, CA 95831 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Mr. James R. Becker, Vice President Diablo Canyon Operations and Mr. Truman Burns Station Director Mr. Robert Kinosian Diablo Canyon Power Plant California Public Utilities Commission P.O. Box 56 505 Van Ness, Room 4102 Avila Beach, CA 93424 San Francisco, CA 94102 Jennifer Tang Diablo Canyon Independent Safety Field Representative Committee United States Senator Barbara Boxer Attn: Robert R. Wellington, Esq. 1700 Montgomery Street, Suite 240 Legal Counsel San Francisco, CA 94111 857 Cass Street, Suite D Monterey, CA 93940 Mr. John T. Conway Site Vice President Regional Adminstrator, Region IV Diablo Canyon Power Plant U.S. Nuclear Regulatory Commission P. O. Box 56 Harris Tower & Pavillion Avila Beach, California 93424 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 August 2007