ML102770102: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/30/2010
| issue date = 09/30/2010
| title = Confirmation of Requested Initial Operator License Examinations - Sequoyah
| title = Confirmation of Requested Initial Operator License Examinations - Sequoyah
| author name = Miller C G
| author name = Miller C
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
| addressee name = Krich R M
| addressee name = Krich R
| addressee affiliation = Tennessee Valley Authority
| addressee affiliation = Tennessee Valley Authority
| docket = 05000327, 05000328
| docket = 05000327, 05000328
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 30, 2010 Mr. R. M. Krich Vice President, Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 30, 2010 Mr. R. M. Krich Vice President, Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801


==SUBJECT:==
==SUBJECT:==
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR SEQUOYAH NUCLEAR PLANT
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR SEQUOYAH NUCLEAR PLANT


==Dear Mr. Krich:==
==Dear Mr. Krich:==


In a letter dated August 5, 2010, your staff responded to Regulatory Issue Summary 2010-08 and requested we schedule initial license operator examinations for Sequoyah Nuclear Plant. Based on your letter and following discussions with your staff, we have scheduled the requested examinations as follows:  
In a letter dated August 5, 2010, your staff responded to Regulatory Issue Summary 2010-08 and requested we schedule initial license operator examinations for Sequoyah Nuclear Plant.
Based on your letter and following discussions with your staff, we have scheduled the requested examinations as follows:
Plant /              2011                  2012 Station        Date    Applicants    Date Applicants Sequoyah        N/R        N/R      1/16        18
                        *N/R - None Requested On-site validation of the examinations is typically scheduled to occur approximately three weeks before each examination. If you have a need to change the dates of your scheduled exams from those listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.
We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks.
If the number of applicants is reduced to less than ten (10) for any examination, please inform us as this will impact the examination schedule.
A supplementary letter will be sent to each stations training manager approximately 120 days prior to the initial examination. The letter will provide the training manager with the chief examiners name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Malcolm Widmann, Chief, Operations Branch, at 404-997-4550.


Plant / Station 2011 2012 Date ApplicantsDate Applicants Sequoyah N/R N/R 1/16 18 *N/R - None Requested On-site validation of the examinations is typically scheduled to occur approximately three weeks before each examination. If you have a need to change the dates of your scheduled exams from those listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.
TVA                                           2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC=s public Web site at http://www.nrc.gov/reading-rm/adams.html.
We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks. If the number of applicants is reduced to less than ten (10) for any examination, please inform us as this will impact the examination schedule.
Sincerely,
A supplementary letter will be sent to each station's training manager approximately 120 days prior to the initial examination. The letter will provide the training manager with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Malcolm Widmann, Chief, Operations Branch, at 404-997-4550.
                                                /RA: Harold Christensen for/
TVA 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC
Christopher G. Miller, Acting Director Division of Reactor Safety Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79 cc: (See page 3)
=s public Web site at http://www.nrc.gov/reading-rm/adams.html. Sincerely,
  /RA: Harold Christensen for/
Christopher G. Miller, Acting Director Division of Reactor Safety Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79 cc: (See page 3)  


__                               X   SUNSI REVIEW COMPLETE MTW OFFICE RII:DRS RII:DRS RII:DRS     SIGNATURE RA RA RA     NAME PCapehart MWidmann CMiller     DATE 09/ 30 /2010 09/ 30 /2010 09/ 30 /2010     E-MAIL COPY?     YES NO   YES NO   YES NO   YES NO   YES NO   YES NO   YES NO TVA 3 cc: C.R. Church Vice President Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy-Daisy, TN   37384-2000 K. Langdon Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN   37384-2000 B. A. Wetzel Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN   37384-2000 E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority 6A West Tower 400 West Summit Hill Drive Knoxville, TN   37902 County Mayor Hamilton County Hamilton County Courthouse Chattanooga, TN   37402-2801 Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street Nashville, TN   37243-1532 Senior Resident Inspector U.S. Nuclear Regulatory Commission Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, TN   37379-3624 Ann Harris 341 Swing Loop Rockwood, TN   37854 Coleen Ware Training Manager Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution TVA 4 Letter to R. M. Krich from Christopher G. Miller dated September 30, 2010  
__                                         X SUNSI REVIEW COMPLETE MTW OFFICE             RII:DRS         RII:DRS         RII:DRS SIGNATURE         RA             RA             RA NAME               PCapehart       MWidmann       CMiller DATE                 09/ 30 /2010   09/ 30 /2010   09/ 30 /2010 E-MAIL COPY?         YES       NO YES         NO YES         NO   YES     NO YES       NO YES     NO   YES NO TVA                                   3 cc:                                     Coleen Ware C.R. Church                             Training Manager Vice President                           Sequoyah Nuclear Plant Sequoyah Nuclear Plant                  Tennessee Valley Authority Tennessee Valley Authority              Electronic Mail Distribution P.O. Box 2000 Soddy-Daisy, TN 37384-2000 K. Langdon Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000 B. A. Wetzel Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000 E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority 6A West Tower 400 West Summit Hill Drive Knoxville, TN 37902 County Mayor Hamilton County Hamilton County Courthouse Chattanooga, TN 37402-2801 Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street Nashville, TN 37243-1532 Senior Resident Inspector U.S. Nuclear Regulatory Commission Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, TN 37379-3624 Ann Harris 341 Swing Loop Rockwood, TN 37854
 
TVA                                         4 Letter to R. M. Krich from Christopher G. Miller dated September 30, 2010


==SUBJECT:==
==SUBJECT:==
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR SEQUOYAH NUCLEAR PLANT Distribution
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR SEQUOYAH NUCLEAR PLANT Distribution:
: RIDSNRRDIRS PUBLIC RidsNrrPMSequoyah Resource ORA, RII C. Miller H. Christensen M. Widmann P. Capehart J. Vincent E. Guthrie J. McHale RIDSNRRDIRSIRIB Resource Document Control Desk - Licensing}}
RIDSNRRDIRS PUBLIC RidsNrrPMSequoyah Resource ORA, RII C. Miller H. Christensen M. Widmann P. Capehart J. Vincent E. Guthrie J. McHale RIDSNRRDIRSIRIB Resource Document Control Desk - Licensing}}

Latest revision as of 18:04, 11 March 2020

Confirmation of Requested Initial Operator License Examinations - Sequoyah
ML102770102
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/30/2010
From: Chris Miller
Division of Reactor Safety II
To: Krich R
Tennessee Valley Authority
References
Download: ML102770102 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 30, 2010 Mr. R. M. Krich Vice President, Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR SEQUOYAH NUCLEAR PLANT

Dear Mr. Krich:

In a letter dated August 5, 2010, your staff responded to Regulatory Issue Summary 2010-08 and requested we schedule initial license operator examinations for Sequoyah Nuclear Plant.

Based on your letter and following discussions with your staff, we have scheduled the requested examinations as follows:

Plant / 2011 2012 Station Date Applicants Date Applicants Sequoyah N/R N/R 1/16 18

  • N/R - None Requested On-site validation of the examinations is typically scheduled to occur approximately three weeks before each examination. If you have a need to change the dates of your scheduled exams from those listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.

We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks.

If the number of applicants is reduced to less than ten (10) for any examination, please inform us as this will impact the examination schedule.

A supplementary letter will be sent to each stations training manager approximately 120 days prior to the initial examination. The letter will provide the training manager with the chief examiners name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Malcolm Widmann, Chief, Operations Branch, at 404-997-4550.

TVA 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC=s public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA: Harold Christensen for/

Christopher G. Miller, Acting Director Division of Reactor Safety Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79 cc: (See page 3)

__ X SUNSI REVIEW COMPLETE MTW OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE RA RA RA NAME PCapehart MWidmann CMiller DATE 09/ 30 /2010 09/ 30 /2010 09/ 30 /2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO TVA 3 cc: Coleen Ware C.R. Church Training Manager Vice President Sequoyah Nuclear Plant Sequoyah Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority Electronic Mail Distribution P.O. Box 2000 Soddy-Daisy, TN 37384-2000 K. Langdon Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000 B. A. Wetzel Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000 E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority 6A West Tower 400 West Summit Hill Drive Knoxville, TN 37902 County Mayor Hamilton County Hamilton County Courthouse Chattanooga, TN 37402-2801 Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street Nashville, TN 37243-1532 Senior Resident Inspector U.S. Nuclear Regulatory Commission Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, TN 37379-3624 Ann Harris 341 Swing Loop Rockwood, TN 37854

TVA 4 Letter to R. M. Krich from Christopher G. Miller dated September 30, 2010

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR SEQUOYAH NUCLEAR PLANT Distribution:

RIDSNRRDIRS PUBLIC RidsNrrPMSequoyah Resource ORA, RII C. Miller H. Christensen M. Widmann P. Capehart J. Vincent E. Guthrie J. McHale RIDSNRRDIRSIRIB Resource Document Control Desk - Licensing