ML11111A098: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/25/2011
| issue date = 04/25/2011
| title = 2011 Point Beach Nuclear Plant Initial License Examination ES-301-2 SRO JPM Form
| title = 2011 Point Beach Nuclear Plant Initial License Examination ES-301-2 SRO JPM Form
| author name = McNeil D R
| author name = Mcneil D
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:ES-301 Control Room/In
{{#Wiki_filter:ES-301                               Control Room/In-Plant Systems Outline                                     Form ES-301-2 Facility: Point Beach                                                           Date of Examination: 04/25-5/6/2011 Exam Level: RO                 SRO-I         SRO-U                             Operating Test No.: 2011301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
-Plant Systems Outline Form ES-301-2   Facility: Point Beach Date of Examination: 04/25
System / JPM Title                                                                 Safety Type Code*
-5/6/2011 Exam Level: RO SRO-I       SRO-U       Operating Test No.: 2011301 Control Room Systems
Function
@ (8 for RO); (7 for SRO
: a. CRD / Recovery of a Dropped Rod                                                             A/N/S                   1
-I); (2 or 3 for SRO
: b. CVCS / Respond to Failure of Normal Boration Path                                             D/S                   2
-U, including 1 ESF)
: c. SI / Restore 1A Accumulator Pressure                                                         D/S                   3
System / JPM Title Type Code*
: d. TG / Synchronize Turbine Generator with Grid                                                 D/S                   4S
Safety Function a. CRD / Recovery of a Dropped Rod A/N/S 1 b. CVCS / Respond to Failure of Normal Boration Path D/S 2 c. SI / Restore 1A Accumulator Pressure D/S 3 d. TG / Synchronize Turbine Generator with Grid D/S 4S e. HVAC / Perform Accident Recirc Fan
: e. HVAC / Perform Accident Recirc Fan-Cooler Surveillance                                     D/L/S                   5
-Cooler Surveillance D/L/S 5 f. RH R / Respond to a Shutdown LOCA D/L/S 4P g. CCW / Switch Operating CCW Pumps D/S 8 h. n/a   In-Plant Systems
: f. RHR / Respond to a Shutdown LOCA                                                           D/L/S                   4P
@ (3 for RO); (3 for SRO
: g. CCW / Switch Operating CCW Pumps                                                             D/S                   8
-I); (3 or 2 for SRO
: h. n/a In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
-U) i. EDG / Local Manual Start of an EDG A/N/P 6 j. RHR / Transfer to Containment Sump Recirculation D/P 4P k. AFW / Perform Designated AOP 10 Steps D/P 4S @ All RO and SRO
: i. EDG / Local Manual Start of an EDG                                                         A/N/P                   6
-I control room (and in
: j. RHR / Transfer to Containment Sump Recirculation                                             D/P                   4P
-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in
: k. AFW / Perform Designated AOP 10 Steps                                                         D/P                   4S
-plant systems and functions may overlap those tested in the control room.
@           All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes Criteria for RO / SRO
* Type Codes                                         Criteria for RO / SRO-I / SRO-U (A)lternate path                                                                       4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                                     9/8/4 (E)mergency or abnormal in-plant                                                       1/1/1 (EN)gineered safety feature                                                             - / - / 1 (control room system)
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
(L)ow-Power / Shutdown                                                                 1/1/1 (N)ew or (M)odified from bank including 1(A)                                           2/2/1 (P)revious 2 exams                                                                       3 /  3 /  2 (randomly selected)
-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(R)CA                                                                                   1/1/1 (S)imulator}}
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3      -  /  -  /      3 /}}

Latest revision as of 04:27, 11 March 2020

2011 Point Beach Nuclear Plant Initial License Examination ES-301-2 SRO JPM Form
ML11111A098
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/25/2011
From: Mcneil D
Operations Branch III
To:
References
Download: ML11111A098 (1)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Point Beach Date of Examination: 04/25-5/6/2011 Exam Level: RO SRO-I SRO-U Operating Test No.: 2011301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Safety Type Code*

Function

a. CRD / Recovery of a Dropped Rod A/N/S 1
b. CVCS / Respond to Failure of Normal Boration Path D/S 2
c. SI / Restore 1A Accumulator Pressure D/S 3
d. TG / Synchronize Turbine Generator with Grid D/S 4S
e. HVAC / Perform Accident Recirc Fan-Cooler Surveillance D/L/S 5
f. RHR / Respond to a Shutdown LOCA D/L/S 4P
g. CCW / Switch Operating CCW Pumps D/S 8
h. n/a In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. EDG / Local Manual Start of an EDG A/N/P 6
j. RHR / Transfer to Containment Sump Recirculation D/P 4P
k. AFW / Perform Designated AOP 10 Steps D/P 4S

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature - / - / 1 (control room system)

(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator