ML11111A098
Jump to navigation
Jump to search
| ML11111A098 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 04/25/2011 |
| From: | Mcneil D Operations Branch III |
| To: | |
| References | |
| Download: ML11111A098 (1) | |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Point Beach Date of Examination: 04/25-5/6/2011 Exam Level: RO SRO-I SRO-U Operating Test No.: 2011301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function
- a. CRD / Recovery of a Dropped Rod A/N/S 1
- b. CVCS / Respond to Failure of Normal Boration Path D/S 2
- c. SI / Restore 1A Accumulator Pressure D/S 3
- d. TG / Synchronize Turbine Generator with Grid D/S 4S
- e. HVAC / Perform Accident Recirc Fan-Cooler Surveillance D/L/S 5
- h. n/a In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- k. AFW / Perform Designated AOP 10 Steps D/P 4S All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1
- / - / 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1