ML17355A013: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(8 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17355A013
| number = ML17355A013
| issue date = 12/20/2017
| issue date = 12/20/2017
| title = 2017/12/20 NRR E-mail Capture - LIC-109 Acceptance of Duane Arnold LAR TSCR-177, Application to Revise Tech Spec to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements - EPID: L-2017-LLA-0385
| title = NRR E-mail Capture - LIC-109 Acceptance of Duane Arnold LAR TSCR-177, Application to Revise Tech Spec to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements - EPID: L-2017-LLA-0385
| author name = Chawla M L
| author name = Chawla M
| author affiliation = NRC/NRR/DORL/LPLIII
| author affiliation = NRC/NRR/DORL/LPLIII
| addressee name = Davis J M
| addressee name = Davis J
| addressee affiliation = Florida Power & Light Co
| addressee affiliation = Florida Power & Light Co
| docket = 05000331
| docket = 05000331
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1NRR-DMPSPEm ResourceFrom:Chawla, MaheshSent:Wednesday, December 20, 2017 5:14 PMTo:Davis, J.Michael (J.Michael.Davis@nexteraenergy.com); laura.swenzinski@nexteraenergy.com; 'Probst, Jim'; Murrell, Bob (Bob.Murrell@nexteraenergy.com)Cc:Catron, Steve (Steve.Catron@fpl.com); Kilby, Gary
{{#Wiki_filter:NRR-DMPSPEm Resource From:                             Chawla, Mahesh Sent:                             Wednesday, December 20, 2017 5:14 PM To:                               Davis, J.Michael (J.Michael.Davis@nexteraenergy.com);
laura.swenzinski@nexteraenergy.com; 'Probst, Jim'; Murrell, Bob (Bob.Murrell@nexteraenergy.com)
Cc:                               Catron, Steve (Steve.Catron@fpl.com); Kilby, Gary


==Subject:==
==Subject:==
LIC-109 Acceptance of Duane Arnold LAR TSCR-177, Application to Revise Tech Spec to Adopt TSTF-551, "Revise Secondary Containment Surveillance Requirements" - EPID: L-2017-LLA-0385
LIC-109 Acceptance of Duane Arnold LAR TSCR-177, Application to Revise Tech Spec to Adopt TSTF-551, "Revise Secondary Containment Surveillance Requirements" - EPID:
L-2017-LLA-0385


==Dear Mr. Davis:==
==Dear Mr. Davis:==


By letter dated November 10, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17318A240), NextEra Energy Duane Arnold, LLC (NextEra) (the licensee) submitted a license amendment request (LAR) for Duane Arnold Energy Center (DAEC). The proposed LAR would revise Technical Specification (TS) 3.6.4.1, "Secondary Containment," Surveillance Requirement (SR) 3.6.4.1.2. The SR is modified to acknowledge that secondary containment access openings may be open for entry and exit.  
By letter dated November 10, 2017 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML17318A240), NextEra Energy Duane Arnold, LLC (NextEra) (the licensee) submitted a license amendment request (LAR) for Duane Arnold Energy Center (DAEC). The proposed LAR would revise Technical Specification (TS) 3.6.4.1, Secondary Containment, Surveillance Requirement (SR) 3.6.4.1.2. The SR is modified to acknowledge that secondary containment access openings may be open for entry and exit.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed LAR in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately [[estimated NRC review hours::370 hours]] to complete. The NRC staff expects to complete this review in approximately 12 months, which is November 30, 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. If you have any questions, please contact me.
1


The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Thanks Mahesh Chawla Project Manager Phone: 301-415-8371 Fax: 301-415-1222 mahesh.chawla@nrc.gov 2
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed LAR in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.  


Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 370 hours to complete. The NRC staff expects to complete this review in approximately 12 months, which is November 30, 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
Hearing Identifier:     NRR_DMPS Email Number:           66 Mail Envelope Properties     (BL0PR0901MB2433766358153117DB035C46F10C0)
These estimates are based on the NRC staff's initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. If you have any questions, please contact me. 
 
2Thanks  Mahesh Chawla Project Manager  Phone: 301-415-8371 Fax: 301-415-1222 mahesh.chawla@nrc.gov Hearing Identifier: NRR_DMPS Email Number: 66   Mail Envelope Properties   (BL0PR0901MB2433766358153117DB035C46F10C0)  


==Subject:==
==Subject:==
LIC-109 Acceptance of Duane Arnold LAR TSCR-177, Application to Revise Tech Spec to Adopt TSTF-551, "Revise Secondary Containment Surveillance Requirements" - EPID: L-2017-LLA-0385 Sent Date:   12/20/2017 5:13:46 PM Received Date: 12/20/2017 5:13:00 PM From:   Chawla, Mahesh Created By:   Mahesh.Chawla@nrc.gov Recipients:     "Catron, Steve (Steve.Catron@fpl.com)" <Steve.Catron@fpl.com> Tracking Status: None "Kilby, Gary" <Gary.Kilby@fpl.com> Tracking Status: None "Davis, J.Michael (J.Michael.Davis@nexteraenergy.com)" <J.Michael.Davis@nexteraenergy.com> Tracking Status: None "laura.swenzinski@nexteraenergy.com" <laura.swenzinski@nexteraenergy.com> Tracking Status: None "'Probst, Jim'" <Jim.Probst@nexteraenergy.com> Tracking Status: None "Murrell, Bob (Bob.Murrell@nexteraenergy.com)" <Bob.Murrell@nexteraenergy.com> Tracking Status: None Post Office:   BL0PR0901MB2433.namprd09.prod.outlook.com   Files     Size     Date & Time MESSAGE   3443     12/20/2017 5:13:00 PM   Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
LIC-109 Acceptance of Duane Arnold LAR TSCR-177, Application to Revise Tech Spec to Adopt TSTF-551, "Revise Secondary Containment Surveillance Requirements" - EPID:
L-2017-LLA-0385 Sent Date:               12/20/2017 5:13:46 PM Received Date:           12/20/2017 5:13:00 PM From:                   Chawla, Mahesh Created By:             Mahesh.Chawla@nrc.gov Recipients:
"Catron, Steve (Steve.Catron@fpl.com)" <Steve.Catron@fpl.com>
Tracking Status: None "Kilby, Gary" <Gary.Kilby@fpl.com>
Tracking Status: None "Davis, J.Michael (J.Michael.Davis@nexteraenergy.com)" <J.Michael.Davis@nexteraenergy.com>
Tracking Status: None "laura.swenzinski@nexteraenergy.com" <laura.swenzinski@nexteraenergy.com>
Tracking Status: None
"'Probst, Jim'" <Jim.Probst@nexteraenergy.com>
Tracking Status: None "Murrell, Bob (Bob.Murrell@nexteraenergy.com)" <Bob.Murrell@nexteraenergy.com>
Tracking Status: None Post Office:             BL0PR0901MB2433.namprd09.prod.outlook.com Files                           Size                   Date & Time MESSAGE                         3443                   12/20/2017 5:13:00 PM Options Priority:                       Standard Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
Recipients Received:}}

Latest revision as of 12:31, 8 March 2020

NRR E-mail Capture - LIC-109 Acceptance of Duane Arnold LAR TSCR-177, Application to Revise Tech Spec to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements - EPID: L-2017-LLA-0385
ML17355A013
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 12/20/2017
From: Mahesh Chawla
Plant Licensing Branch III
To: Jennifer Davis
Florida Power & Light Co
References
L-2017-LLA-0385
Download: ML17355A013 (3)


Text

NRR-DMPSPEm Resource From: Chawla, Mahesh Sent: Wednesday, December 20, 2017 5:14 PM To: Davis, J.Michael (J.Michael.Davis@nexteraenergy.com);

laura.swenzinski@nexteraenergy.com; 'Probst, Jim'; Murrell, Bob (Bob.Murrell@nexteraenergy.com)

Cc: Catron, Steve (Steve.Catron@fpl.com); Kilby, Gary

Subject:

LIC-109 Acceptance of Duane Arnold LAR TSCR-177, Application to Revise Tech Spec to Adopt TSTF-551, "Revise Secondary Containment Surveillance Requirements" - EPID:

L-2017-LLA-0385

Dear Mr. Davis:

By letter dated November 10, 2017 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML17318A240), NextEra Energy Duane Arnold, LLC (NextEra) (the licensee) submitted a license amendment request (LAR) for Duane Arnold Energy Center (DAEC). The proposed LAR would revise Technical Specification (TS) 3.6.4.1, Secondary Containment, Surveillance Requirement (SR) 3.6.4.1.2. The SR is modified to acknowledge that secondary containment access openings may be open for entry and exit.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed LAR in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 370 hours15.417 days <br />2.202 weeks <br />0.507 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is November 30, 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. If you have any questions, please contact me.

1

Thanks Mahesh Chawla Project Manager Phone: 301-415-8371 Fax: 301-415-1222 mahesh.chawla@nrc.gov 2

Hearing Identifier: NRR_DMPS Email Number: 66 Mail Envelope Properties (BL0PR0901MB2433766358153117DB035C46F10C0)

Subject:

LIC-109 Acceptance of Duane Arnold LAR TSCR-177, Application to Revise Tech Spec to Adopt TSTF-551, "Revise Secondary Containment Surveillance Requirements" - EPID:

L-2017-LLA-0385 Sent Date: 12/20/2017 5:13:46 PM Received Date: 12/20/2017 5:13:00 PM From: Chawla, Mahesh Created By: Mahesh.Chawla@nrc.gov Recipients:

"Catron, Steve (Steve.Catron@fpl.com)" <Steve.Catron@fpl.com>

Tracking Status: None "Kilby, Gary" <Gary.Kilby@fpl.com>

Tracking Status: None "Davis, J.Michael (J.Michael.Davis@nexteraenergy.com)" <J.Michael.Davis@nexteraenergy.com>

Tracking Status: None "laura.swenzinski@nexteraenergy.com" <laura.swenzinski@nexteraenergy.com>

Tracking Status: None

"'Probst, Jim'" <Jim.Probst@nexteraenergy.com>

Tracking Status: None "Murrell, Bob (Bob.Murrell@nexteraenergy.com)" <Bob.Murrell@nexteraenergy.com>

Tracking Status: None Post Office: BL0PR0901MB2433.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3443 12/20/2017 5:13:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: