==Dear Mr. Davis:==
==Dear Mr. Davis:==


By letter June 20, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No.
By letter June 20, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19176A356), NextEra Energy Duane Arnold, LLC (NEDA) (the licensee) submitted a license amendment request (LAR) for Duane Arnold Energy Center (DAEC). The proposed LAR revises the license and associated Technical Specifications consistent with the permanent cessation of reactor operation and permanent defueling of the reactor. In general, the changes propose the elimination of items applicable in operating conditions where fuel is placed in the reactor vessel. The revisions to the DAEC license and technical specifications are proposed in accordance with 10 CFR 50.51(b) and 10 CFR 50.36(c)(6).
ML19176A356), NextEra Energy Duane Arnold, LLC (NEDA) (the licensee) submitted a license amendment request (LAR) for Duane Arnold Energy Center (DAEC). The proposed LAR revises the license and associated Technical Specifications consistent with the permanent cessation of reactor operation and permanent defueling of the reactor. In general, the changes propose the elimination of items applicable in operating conditions where fuel is placed in the reactor vessel. The revisions to the DAEC license and technical specifications are proposed in accordance with 10 CFR 50.51(b) and 10 CFR 50.36(c)(6).
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed LAR in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed LAR in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 1100 hours to complete. The NRC staff expects to complete this review by July 31, 2020. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately [[estimated NRC review hours::1100 hours]] to complete. The NRC staff expects to complete this review by July 31, 2020. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.
1
1

Latest revision as of 19:40, 3 March 2020

NRR E-mail Capture - LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-183) - Application to Revise Operating License and TS for Permanently Defueled Condition - EPID L-2019-LLA-0130
ML19206A218
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 07/25/2019
From: Mahesh Chawla
Plant Licensing Branch III
To: Jennifer Davis
NextEra Energy Duane Arnold
References
L-2019-LLA-0130
Download: ML19206A218 (3)


Text

NRR-DRMAPEm Resource From: Chawla, Mahesh Sent: Thursday, July 25, 2019 11:27 AM To: Davis, J.Michael Cc: laura.swenzinski@nexteraenergy.com; Catron, Steve

Subject:

LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-183) - Application to Revise Operating License and TS for Permanently Defueled Condition - EPID L-2019-LLA-0130

Dear Mr. Davis:

By letter June 20, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19176A356), NextEra Energy Duane Arnold, LLC (NEDA) (the licensee) submitted a license amendment request (LAR) for Duane Arnold Energy Center (DAEC). The proposed LAR revises the license and associated Technical Specifications consistent with the permanent cessation of reactor operation and permanent defueling of the reactor. In general, the changes propose the elimination of items applicable in operating conditions where fuel is placed in the reactor vessel. The revisions to the DAEC license and technical specifications are proposed in accordance with 10 CFR 50.51(b) and 10 CFR 50.36(c)(6).

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed LAR in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 1100 hours45.833 days <br />6.548 weeks <br />1.507 months <br /> to complete. The NRC staff expects to complete this review by July 31, 2020. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.

1

If you have any questions, please contact me. Thanks Mahesh Chawla Project Manager Phone: 301-415-8371 Fax: 301-415-1222 mahesh.chawla@nrc.gov 2

Hearing Identifier: NRR_DRMA Email Number: 135 Mail Envelope Properties (DM5PR0901MB216573390BF9496EB31BF02AF1C10)

Subject:

LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-183) - Application to Revise Operating License and TS for Permanently Defueled Condition - EPID L-2019-LLA-0130 Sent Date: 7/25/2019 11:26:57 AM Received Date: 7/25/2019 11:26:00 AM From: Chawla, Mahesh Created By: Mahesh.Chawla@nrc.gov Recipients:

"laura.swenzinski@nexteraenergy.com" <laura.swenzinski@nexteraenergy.com>

Tracking Status: None "Catron, Steve" <Steve.Catron@fpl.com>

Tracking Status: None "Davis, J.Michael" <J.Michael.Davis@nexteraenergy.com>

Tracking Status: None Post Office: DM5PR0901MB2165.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3580 7/25/2019 11:26:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: