| number = ML12314A266
| number = ML12314A266
| issue date = 10/18/2012
| issue date = 10/18/2012
| title = Beaver Valley Unit 2 - Miscellaneous Exam Material (Folder 1)
| title = Miscellaneous Exam Material (Folder 1)
| author name = Silk D M
| author name = Silk D
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name = Rudolph W J
| addressee name = Rudolph W
| addressee affiliation = FirstEnergy Nuclear Operating Co
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000412
| docket = 05000412
| license number = DPR-028
| license number = DPR-028
| contact person = Jackson D E
| contact person = Jackson D
| case reference number = TAC U01850
| case reference number = TAC U01850
| package number = ML12136A033
| package number = ML12136A033
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:2LOT8 NRC ANSWER KEY 1. .J @ © @ -.. © @ 51. @ © @ @ 2. @ @ @ /"'" @ 52. @ © @ @ 3.  @ @ @ -"'"\ @ c'3\J * ......., @ © @ '-' @ © @ 4.  @ © @ © @ 54.  @ © @ © 5.  @ @ -', ,r/ @ © @ 55.  "-' © © @ 6.  @ © - @ @ 56. @ @ @ '-' 7. @ © @ @  
{{#Wiki_filter:2LOT8 NRC Exam ANSWER KEY
.--/ @ 57. @ © @ @ :© "-"' , '/' 8. .J © @ J @ © @ 58. @ © - © --' 9. @ © J @ © @ 59. © @ .@. © '-'" 10.  @ © ) @ © @ 60. @ @ @ @ 11.  @ ) @ "' © @ 61. @ © © @ 12.  ) © @ @ '"" @ 62. @ © @ .-., @ © @ 13.  @ © @ '\ @ 63. @ © '-' @ ,r @. 14. '\ @ © @ ""'" © @ 64. © @ @ © @ 15.  @ -; @ @ © --/ 65. @ © @@ @ 16. "\ ..J @ © @ @ @ 66. (' \© @ 91. ,, 17. @ @ @ '" "-' @ E57. ........, @ © @ 92. ,@ © @ 18. " © @ . @ © '\ -68. @ © @   @ 19. --.. @ © @ @ © @ 69. @ © -.../ @ @ 20. ) @ © @ "'\ @ © @ 70. @ © . @ © 21. @ ') ,@  ,............
: 1. .J
© @ 71. @ @ ""'" @ © 22.  @ © " .-. © @ 72. @ © @ @ © @ 23.  @ © >> --.. © @ 73. @ © "-'  © @ 24.  @ © '"""'\ @ .... @ '74. "-"' © @ @ @ 25.  @ " @ \ @ © @ '75.  '-' © @ 100. '-@ © @
          @   © @       -.. ©                   @   51.           @     © ~          @               @
,. 2LOT8 NRC Examination Student Questions During Exam and Proctor Time Individual Question/Response 0841 RO Question # 15 Regarding the generator capacity curve: Is this line the gas pressure number or this solid line? Response:
: 2.   @         @       @                 /"'"
I cannot answer that for you. This is our approved plant curve. 0908 SRO-I Question # 88 Since I have entered the MSP, I have tripped all bistables.
                                                    @   52.   @             ©             @               @
Therefore, both channels are technically INOPERABLE.
                                                                                          ~
Do you want me to answer this based on the bistable tripping or the as found values? Response:
: 3.  @                   @ "'"\                       c'3 ......., @       ©                 @   ©       @
Answer based on the "As found" values. This clarification was written on a flipchart and all candidates were made aware of the clarification.
: 4.  @
0911 SRO-I Question # 34 Choice B states "consistent". Does this mean equal to OR consistent with steam table for Psat equals Tsat? Response:
: 5.  @
There is sufficient information to answer the question.
              ~
0912 SRO-I Question # 97 Choice S, Does this mean the US physically looks at the meter or justs verifies via paperwork?
              ©
Response:
                        -      @ ©
You have sufficient information to answer the question.
                          -', @ ©
0915 RO Question # 36 What is meant by NSA position in Choice D? Does this mean demand OR valve position/control?
                            ,r/
Response:
                                                        \J
You have sufficient information to answer the question.
* 54.
0924 RO Question # 40 Does this reflect auto actions as a direct result of stated actions which already occurred OR does it include things which will occur in the future? Response:
55.
There is sufficient information to answer the question.
                                                                              ©
1015 RO Question # 49 Does this mean eventually OR right now? Response:
                                                                              © @
There is sufficient information to answer the question.
                                                                                                    ©
1019 RO Question # 65 Should choice Dread 1856 psig? Response:
                                                                                                    ©
There is sufficient information to answer the question.
: 6.  @       ©   -     @                       @   56.           @     ~
1022 SRO-I Question # 61 Is the question asking minimum C b (Fuel Pool) to require TS action? Response:
                                                                                @           @ '~©          '-'
There is sufficient information to answer the question.
                                              ~.-"
1035 SRO-I Question # 34 Does consistent mean the same as PZR Temp? (Essentially the same question asked by M. Phillips at 0911) Response:
: 7.       @   © @       @                 .--/
There is sufficient information to answer the question.
                                                    @   57.   '-
1037 RO Question # 54 3 rd bullet -SI from what signal? AND Did we have Train "A" only on both the reactor trip and the SI or just the SI? Response:
                                                                        @     © @           @ :©           "-"'
There is sufficient information to answer the question.
                                                                              © -
Beaver Valley Unit 2 2LOT8 October 3,2012 Page 1 of 2 
                                                                                                        '/'
,; 2LOT8 NRC Examination Student Questions During Exam and Proctor Time Individual Question/Response 1040 RO Question # 36 Are you looking for the final state result or some intermediate time frame? Response:
: 8.       .J © @       J     @ ©                 @   58.           @       '-             ©           -'
We are looking for the initial response to the transmitter failure. NOT long term or final condition.
: 9.   @       ©   ~)      J     @ ©                 @   59.           '-  © @         .@. ©             '-'"
This clarification was written on a flipchart and all candidates were made aware of the clarification.
: 10.  @       ©   )     ,~
1110 SRO*I Question # 64 Does this include all available indications computer and bench board? Response:
                                @ ©                 @   60.   @               @         @       ',-    @
Yes! 1129 SRO*I Question # 87 Does this mean "Direct" or eventual (long term) impact? (regarding item (1) Response:
: 11.  @
Eventual (long term) 1212 SRO*I Question # 98 Is this a batch release OR a continuous release? Response:
: 12.        )
There is sufficient information to answer the question.
              )
1236 RO Question # 64 Does this include the plant computer?
              ©  @
Response:
                                  "'         © 61.
Yes! 1252 RO Question # 50 Is this immediate OR long term alarm? Response:
62.
There is sufficient information to answer the question.
                                                                              ©
1320 SRO*I Question # 83 Can I assume the operators took the correct procedure transitions?
                                                                              ©
Response:
                                                                                                ©
Yes! 1330 RO Question # 49 Is the question implying that a loss of cooling water will cause the EDG to trip? Response:
                                                                                                @   ©
There is sufficient information to answer the question.
                ".~
1407 RO Question # 9 Is this immediate or eventually?
                                                                                                      ,r
Response:
: 13.  @       ©           @ '\                     @   63.   @             © '-'         @               @.
There is sufficient information to answer the question.
: 14. '\ @     © @       ""'" ©                   @   64.           \... © @               @   © @
1415 SRO*I Question # 95 Are there any annunciators in? Response:
: 15.  @       -; @       @ ©                     --/ 65.   @             © '-
There is sufficient information to answer the question.
: 16. ..J"\ @   © @       @                       @   66.   \,
1510 SRO-I Question # 68 Is 2FWS-F1475 yellow CH IV? Response:
('
The mark number should be 2MSS-F1475 and yes it is the yellow channel. I Beaver Valley Unit 2 2LOT8 October 3, 2012 Page 2 of 2 Beaver Valley 2LOT8 NRC Written Exam Seating Chart Rear Tables I Door SRO-I 10lIl 1101 RO 10lIl 1101 SRO-I -4 Feet -4 Feet -4 Feet -4 Feet -4 Feet Room 103 BVPS Training Center 
                                                                              © @     91.   ,, ~          '
                                                                                                    ©
              ~.
: 17. @           @       @ "-''"                  @   E57. ........, @     © @     92. ,@                 @
                @                                  '\                                                      @
18.
          "©         . @ ©                     -   68.             @     © @                  
              © @             @ ©                                                         @              @
                          ~
: 19.                                                @   69.   @             © -.../
: 20. )     @   © @       "'\
                                @ ©                 @   70.   @             © .
                                                                                '          @       ©
                                                                                                    ©~
: 21.     @   ')
                                            ©     @   71.           @ '- @                 @
: 22.  @       ©
                  "       .-. ©                   @   72. '
                                                                        @ © @             @     '- © @
: 23.  @       ©   >>       --.. ©                   @   73.           @     © "-'            '  © @
: 24.  @       ©   '"""'\
                          @ ....             ~
                                                    @   '74.           "-"' © @           @       '
: 25.  @
              " @       \     @ ©                 @   '75.  '-'           © @     100. '- @     ©       @


Silk, David From: Munro, John Sent: Thursday, September 20,201210:21 AM To: Silk, David Cc: McHale, John: Jackson, Donald  
2LOT8 NRC Examination Student Questions During Exam and Proctor Responses Time        Individual                                    Question/Response 0841              RO    Question # 15 Regarding the generator capacity curve: Is this line the gas pressure number or this solid line?
Response: I cannot answer that for you. This is our approved plant curve.
0908          SRO-I    Question # 88 Since I have entered the MSP, I have tripped all bistables. Therefore, both channels are technically INOPERABLE. Do you want me to answer this based on the bistable tripping or the as found values?
Response: Answer based on the "As found" values. This clarification was written on a flipchart and all candidates were made aware of the clarification.
0911          SRO-I    Question # 34 Choice B states "consistent". Does this mean equal to OR consistent with steam table for Psat equals Tsat?
Response: There is sufficient information to answer the question.
0912          SRO-I    Question # 97 Choice S, Does this mean the US physically looks at the meter or justs verifies via paperwork?
Response: You have sufficient information to answer the question.
0915              RO    Question # 36 What is meant by NSA position in Choice D? Does this mean demand OR valve position/control?
Response: You have sufficient information to answer the question.
0924              RO    Question # 40 Does this reflect auto actions as a direct result of stated actions which already occurred OR does it include things which will occur in the future?
Response: There is sufficient information to answer the question.
1015              RO    Question # 49 Does this mean eventually OR right now?
Response: There is sufficient information to answer the question.
1019              RO    Question # 65 Should choice Dread 1856 psig?
Response: There is sufficient information to answer the question.
1022          SRO-I    Question # 61 Is the question asking minimum Cb (Fuel Pool) to require TS action?
Response: There is sufficient information to answer the question.
1035          SRO-I    Question # 34 Does consistent mean the same as PZR Temp? (Essentially the same question asked by M. Phillips at 0911)
Response: There is sufficient information to answer the question.
1037              RO    Question # 54 3rd bullet - SI from what signal? AND Did we have Train "A" only on both the reactor trip and the SI or just the SI?
Response: There is sufficient information to answer the question.
Beaver Valley Unit 2 2LOT8 October 3,2012                          Page 1 of 2
 
2LOT8 NRC Examination Student Questions During Exam and Proctor Responses Time        Individual                                    Question/Response 1040              RO    Question # 36 Are you looking for the final state result or some intermediate time frame?
Response: We are looking for the initial response to the transmitter failure. NOT long term or final condition. This clarification was written on a flipchart and all candidates were made aware of the clarification.
1110          SRO*I    Question # 64 Does this include all available indications computer and bench board?
Response: Yes!
1129          SRO*I    Question # 87 Does this mean "Direct" or eventual (long term) impact? (regarding item (1)
Response: Eventual (long term) 1212          SRO*I    Question # 98 Is this a batch release OR a continuous release?
Response: There is sufficient information to answer the question.
1236              RO    Question # 64 Does this include the plant computer?
Response: Yes!
1252              RO    Question # 50 Is this immediate OR long term alarm?
Response: There is sufficient information to answer the question.
1320          SRO*I    Question # 83 Can I assume the operators took the correct procedure transitions?
Response: Yes!
1330              RO    Question # 49 Is the question implying that a loss of cooling water will cause the EDG to trip?
Response: There is sufficient information to answer the question.
1407              RO    Question # 9 Is this immediate or eventually?
Response: There is sufficient information to answer the question.
1415          SRO*I    Question # 95 Are there any annunciators in?
Response: There is sufficient information to answer the question.
1510          SRO-I    Question # 68 Is 2FWS-F1475 yellow CH IV?
Response: The mark number should be 2MSS-F1475 and yes it is the yellow channel.      I Beaver Valley Unit 2 2LOT8 October 3, 2012                          Page 2 of 2
 
Beaver Valley 2LOT8 NRC Written Exam Seating Chart 10/3/12 Rear                            Lun~h Tables I                                        i Door SRO-I          10lIl          1101 RO            10lIl        1101 SRO-I
                            -4 Feet                            -4 Feet
              -4 Feet                            -4 Feet                          -4 Feet Room 103 BVPS Training Center
 
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
 
Silk, David From:                     Munro, John Sent:                     Thursday, September 20,201210:21 AM To:                       Silk, David Cc:                       McHale, John: Jackson, Donald


==Subject:==
==Subject:==
ES-302 -Simulator Exam Administration w/2 examiners for 2 applicants  
ES-302 - Simulator Exam Administration w/2 examiners for 2 applicants - Beaver Valley September 2012 examination Dave - After our discussion concerning the ES-302 guidance that precludes using different examiners on the simulator examination for individual applicants -- "However, simulator operating tests consisting of multiple scenarios shall not be divided among examiners." - I discussed the question with management. Given that the two affected applicants would be removed from their crews and replaced with surrogates to meet this criteria and the other SRO-I applicants will be administered 3 scenarios, IOlB authorizes Region I in this situation to evaluate these two SRO-I applicants with 2 examiners. This allowance is predicated on the fact that the two examiners will both be in the simulator for the 3 scenarios administered to these applicants.
-Beaver Valley September 2012 examination Dave -After our discussion concerning the ES-302 guidance that precludes using different examiners on the simulator examination for individual applicants  
--"However, simulator operating tests consisting of multiple scenarios shall not be divided among examiners." -I discussed the question with management.
Given that the two affected applicants would be removed from their crews and replaced with surrogates to meet this criteria and the other SRO-I applicants will be administered 3 scenarios, IOlB authorizes Region I in this situation to evaluate these two SRO-I applicants with 2 examiners.
This allowance is predicated on the fact that the two examiners will both be in the simulator for the 3 scenarios administered to these applicants.
Also, this allowance is granted for this exam only and should not be applied to other examinations.
Also, this allowance is granted for this exam only and should not be applied to other examinations.
1}}
1}}

Latest revision as of 22:02, 1 March 2020

Miscellaneous Exam Material (Folder 1)
ML12314A266
Person / Time
Site: Beaver Valley
Issue date: 10/18/2012
From: David Silk
Operations Branch I
To: Rudolph W
FirstEnergy Nuclear Operating Co
Jackson D
Shared Package
ML12136A033 List:
References
TAC U01850
Download: ML12314A266 (7)


Text

2LOT8 NRC Exam ANSWER KEY

1. .J

@ © @ -.. © @ 51. @ © ~ @ @

2. @ @ @ /"'"

@ 52. @ © @ @

~

3. @ @ "'"\ c'3 ......., @ © @ © @
4. @
5. @

~

©

- @ ©

-', @ ©

,r/

\J

  • 54.

55.

©

© @

©

©

6. @ © - @ @ 56. @ ~

@ @ '~© '-'

~.-"

7. @ © @ @ .--/

@ 57. '-

@ © @ @ :© "-"'

© -

'/'

8. .J © @ J @ © @ 58. @ '- © -'
9. @ © ~) J @ © @ 59. '- © @ .@. © '-'"
10. @ © ) ,~

@ © @ 60. @ @ @ ',- @

11. @
12. )

)

© @

"' © 61.

62.

©

©

©

@ ©

".~

,r

13. @ © @ '\ @ 63. @ © '-' @ @.
14. '\ @ © @ ""'" © @ 64. \... © @ @ © @
15. @ -; @ @ © --/ 65. @ © '-
16. ..J"\ @ © @ @ @ 66. \,

('

© @ 91. ,, ~ '

©

~.

17. @ @ @ "-" @ E57. ........, @ © @ 92. ,@ @

@ '\ @

18.

"@ © . @ © - 68. @ © @

© @ @ © @ @

~

19. @ 69. @ © -.../
20. ) @ © @ "'\

@ © @ 70. @ © .

' @ ©

©~

21. @ ')

© @ 71. @ '- @ @

22. @ ©

" .-. © @ 72. '

@ © @ @ '- © @

23. @ © >> --.. © @ 73. @ © "-' ' © @
24. @ © '"""'\

@ .... ~

@ '74. "-"' © @ @ '

25. @

" @ \ @ © @ '75. '-' © @ 100. '- @ © @

2LOT8 NRC Examination Student Questions During Exam and Proctor Responses Time Individual Question/Response 0841 RO Question # 15 Regarding the generator capacity curve: Is this line the gas pressure number or this solid line?

Response: I cannot answer that for you. This is our approved plant curve.

0908 SRO-I Question # 88 Since I have entered the MSP, I have tripped all bistables. Therefore, both channels are technically INOPERABLE. Do you want me to answer this based on the bistable tripping or the as found values?

Response: Answer based on the "As found" values. This clarification was written on a flipchart and all candidates were made aware of the clarification.

0911 SRO-I Question # 34 Choice B states "consistent". Does this mean equal to OR consistent with steam table for Psat equals Tsat?

Response: There is sufficient information to answer the question.

0912 SRO-I Question # 97 Choice S, Does this mean the US physically looks at the meter or justs verifies via paperwork?

Response: You have sufficient information to answer the question.

0915 RO Question # 36 What is meant by NSA position in Choice D? Does this mean demand OR valve position/control?

Response: You have sufficient information to answer the question.

0924 RO Question # 40 Does this reflect auto actions as a direct result of stated actions which already occurred OR does it include things which will occur in the future?

Response: There is sufficient information to answer the question.

1015 RO Question # 49 Does this mean eventually OR right now?

Response: There is sufficient information to answer the question.

1019 RO Question # 65 Should choice Dread 1856 psig?

Response: There is sufficient information to answer the question.

1022 SRO-I Question # 61 Is the question asking minimum Cb (Fuel Pool) to require TS action?

Response: There is sufficient information to answer the question.

1035 SRO-I Question # 34 Does consistent mean the same as PZR Temp? (Essentially the same question asked by M. Phillips at 0911)

Response: There is sufficient information to answer the question.

1037 RO Question # 54 3rd bullet - SI from what signal? AND Did we have Train "A" only on both the reactor trip and the SI or just the SI?

Response: There is sufficient information to answer the question.

Beaver Valley Unit 2 2LOT8 October 3,2012 Page 1 of 2

2LOT8 NRC Examination Student Questions During Exam and Proctor Responses Time Individual Question/Response 1040 RO Question # 36 Are you looking for the final state result or some intermediate time frame?

Response: We are looking for the initial response to the transmitter failure. NOT long term or final condition. This clarification was written on a flipchart and all candidates were made aware of the clarification.

1110 SRO*I Question # 64 Does this include all available indications computer and bench board?

Response: Yes!

1129 SRO*I Question # 87 Does this mean "Direct" or eventual (long term) impact? (regarding item (1)

Response: Eventual (long term) 1212 SRO*I Question # 98 Is this a batch release OR a continuous release?

Response: There is sufficient information to answer the question.

1236 RO Question # 64 Does this include the plant computer?

Response: Yes!

1252 RO Question # 50 Is this immediate OR long term alarm?

Response: There is sufficient information to answer the question.

1320 SRO*I Question # 83 Can I assume the operators took the correct procedure transitions?

Response: Yes!

1330 RO Question # 49 Is the question implying that a loss of cooling water will cause the EDG to trip?

Response: There is sufficient information to answer the question.

1407 RO Question # 9 Is this immediate or eventually?

Response: There is sufficient information to answer the question.

1415 SRO*I Question # 95 Are there any annunciators in?

Response: There is sufficient information to answer the question.

1510 SRO-I Question # 68 Is 2FWS-F1475 yellow CH IV?

Response: The mark number should be 2MSS-F1475 and yes it is the yellow channel. I Beaver Valley Unit 2 2LOT8 October 3, 2012 Page 2 of 2

Beaver Valley 2LOT8 NRC Written Exam Seating Chart 10/3/12 Rear Lun~h Tables I i Door SRO-I 10lIl 1101 RO 10lIl 1101 SRO-I

-4 Feet -4 Feet

-4 Feet -4 Feet -4 Feet Room 103 BVPS Training Center

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

Silk, David From: Munro, John Sent: Thursday, September 20,201210:21 AM To: Silk, David Cc: McHale, John: Jackson, Donald

Subject:

ES-302 - Simulator Exam Administration w/2 examiners for 2 applicants - Beaver Valley September 2012 examination Dave - After our discussion concerning the ES-302 guidance that precludes using different examiners on the simulator examination for individual applicants -- "However, simulator operating tests consisting of multiple scenarios shall not be divided among examiners." - I discussed the question with management. Given that the two affected applicants would be removed from their crews and replaced with surrogates to meet this criteria and the other SRO-I applicants will be administered 3 scenarios, IOlB authorizes Region I in this situation to evaluate these two SRO-I applicants with 2 examiners. This allowance is predicated on the fact that the two examiners will both be in the simulator for the 3 scenarios administered to these applicants.

Also, this allowance is granted for this exam only and should not be applied to other examinations.

1