ML14080A508: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(10 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14080A508
| number = ML14080A508
| issue date = 01/30/2014
| issue date = 01/30/2014
| title = Indian Point Station, Unit 2, Final Operating Exam (Sections a, B, and C) (Folder 3)
| title = Final Operating Exam (Sections a, B, and C) (Folder 3)
| author name = Silk D M
| author name = Silk D
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000247
| docket = 05000247
| license number = DPR-026
| license number = DPR-026
| contact person = Jackson D E
| contact person = Jackson D
| case reference number = UO1890
| case reference number = UO1890
| package number = ML13252A147
| package number = ML13252A147
Line 15: Line 15:
| page count = 229
| page count = 229
}}
}}
=Text=
{{#Wiki_filter:Appendix C                              Job Performance                        Form ES-C-1 Measure Worksheet IPEC Facility:          Unit 2                          Task No:    2000650102 Task
==Title:==
Replace a Watchstander due to Illness KIA                          2.1.5              Job Performance Measure          ROAdmin
==Reference:==
RO- 2.9              No:                              C0-1 Examinee:                                        NRC Examiner:
Facility Evaluator:                              Date:
Method of testing:
Simulated Performance                                Actual Performance            X Classroom                X              Simulator - - - - -              Plant - - - - -
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
* The Shift Manager has contacted you on Sunday, 2/23 (a scheduled day off), to report to the control room to work a 12 hour overtime shift from 0600-1800.
* You were on vacation from 1/26 to 2/8.
* Your work history for the previous 2 weeks is as follows (all hours worked performing licensed operating duties):
Sunday          Monday        Tuesday      Wednesday        Thursday      Friday    Saturday 2/9            2/10          2/11              2/12          2/13          2/14      2/15 Worked                                                      Worked Worked            0600-        Worked          Worked          Worked        0600-    Worked 1200-1800          1800        0600-1800      0600-1400        0600-1400      1400    0600-1400 Sunday          Monday        Tuesday      Wednesday        Thursday      Friday    Saturday 2/16            2/17          2/18              2/19          2/20          2/21      2/22 Worked                                                      Worked Worked            0600-                                        Worked        0800-    Worked 0600-1500          2100          OFF              OFF        0600-1800      1200    0600-2100 1 of 6
Appendix C                        Job Performance                    Form ES-C-1 Measure Worksheet Task Standard: Reviews the work hour history and determines that overtime request will result in exceeding work hour limits and also previously worked schedule violates additional work hour rules.
Required Materials:
General
==References:==
Initiating Cue:
Using the work history provided:
: 1. Determine if your prior work schedule met work hour requirements.
: 2. Determine if you can work the entire requested shift schedule, if not, list any and ALL restrictions that apply.
: 3. Document your conclusion on the cue sheet below.
Time Critical Task: No Validation Time: 30 2 of 6
Appendix C                            Page 3                        Form ES-C-1 Performance Information (Denote critical steps with a check mark --./)
: 1. Performance Step:        Obtain correct procedures Standard:            Obtain EN-OM-123 IP-SMM-OP-1 03 CUE: Give candidates procedure.
Comment:
..J 2. Performance Step: Determines that the required 10 hour break between work periods will not be met, and that the additional hours will result in exceeding 26 hours in any 48 hours period.
Standard:                    10 hours break not met- (From 2100 to 0600    =9 hours) 27hrs in 48hr period - (Sat 10/6 [15 hrs] + Sun
                                          =
10/7 [12 hrs] 27 hrs Comment:
3 of 6
Appendix C                            Page4                        Form ES-C-1 Performance Information (Denote critical steps with a check mark  >I)
...J 3. Performance Step: Determines that the previously worked schedule, there was NOT a 34 hour break in any 9 day period.
9 day period [2/9 -2/17] did not have a 34 hour break Standard:                    Determines that previously worked schedule violation occurred due to not having a 34 hour break in a 9 day period.
Actual Break- Mon 2/17 (2100) to Thus 2/20 (0600)
                            = 33 hours.
Comment:
Terminating Cue: JPM Complete 4 of6
Appendix C                        Page 5              Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
===Response===
Result: SAT or UNSAT Examiner's signature and date: _ _ _ _ _ _ _ _ _ _ __
5 of6
Page 6 of 6 Initial Conditions:
* The Shift Manager has contacted you on Sunday, 2/23 (a scheduled day off), to report to the control room to work a 12 hour overtime shift from 0600-1800.
* You were on vacation from 1/26 to 2/8.
* Your work history for the previous 2 weeks is as follows (all hours worked performing licensed operating duties):
Sunday            Monday          Tuesday      Wednesda    Thursday        Friday      Saturday 2/9              2/10          2/11        y 2/12        2/13          2/14        2/15 Worked            Worked        Worked        Worked      Worked        Worked        Worked 1200-1800        0600-1800      0600-1800    0600-1400    0600-1400    0600-1400    0600-1400 Sunday            Monday          Tuesday      Wednesda    Thursday        Friday      Saturday 2/16              2/17          2/18        y 2/19        2/20          2/21        2/22 Worked            Worked                                    Worked      Worked        Worked 0600-1500        0600-2100          OFF          OFF      0600-1800    0800-1200    0600-2100 Initiating Cue:
Using the work history provided:
: 1. Determine if your prior work schedule met work hour requirements.
: 2. Determine if you can work the entire requested shift schedule, if not, list any and ALL restrictions that apply.
: 3. Document your conclusion on the cue sheet below.
File: 2000651602-1.doc Task Number: 200*065*01 *02
Appendix C                          Job Performance Measure                      Form ES-C-1 Worksheet IPEC Facility:        UNIT2                            Task No:    0001250502 Task
==Title:==
Determine Reactor Vessel Venting Time Per FR-1.3, Attachment 1 KIA                2.1.25                      Job Performance Measure          RO Admin
==Reference:==
RO- 3.9 SRO- 4.2            No:                              C0-2 Examinee:                                        NRC Examiner:
Facility Evaluator:                              Date:
Method of testing:
X Simulated Performance                                Actual Performance Classroom              X          Simulator                        Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
: 1. An event occurred 24 hours ago that resulted in a YELLOW path condition on the Inventory Critical Safety Function Status Tree, FR-1.3.
: 2. The TSC has requested that the Reactor Vessel be vented in accordance with FR-1.3, Response to Voids in Reactor Vessel.
: 3. Given the following information:
Containment Pressure                    2.6 psig Containment Temperature                172°F Containment Hydrogen                    2.3%
RCS Pressure                            550 psig Task Standard: Vessel Venting time is properly calculated.
Required Materials: Calculator General
==References:==
2-FR-1.3 1 of 8
Appendix C                      Job Performance Measure                    Form ES-C-1 Worksheet Initiating Cue: You are the spare RO and the CRS has directed you to calculate Reactor Vessel Venting Time in accordance with FR-1.3 Attachment 1 and Figure FRI3-3.
Time Critical Task: No Validation Time: 20 min 2 of 8
Appendix C                              Page 3                        Form ES-C-1 Performance Information (Denote critical steps with a check mark ..J)
: 1. Performance Step:          Obtain correct procedure Standard:                      Obtains FR-1.3 Comment:
..J 2. Performance Step:      Determine Containment Volume at STP (A)
Standard:                      A= 2.61 E6 X 17.3/14.7 X 492/632 A= 2.39 E6 Comment:
..J 3. Performance Step:      Determine Maximum Hydrogen volume that can be vented (B)
Standard:                      B =(3.0 - 2.3 X2.39 E6) 100 B =1.67 E4 Comment:
..J 4. Performance Step:      Determine Hydrogen flow rate as a function of RCS pressure (C)
Standard:                    Using FRI3-3;      C =1500 SCFM Comment:
3 of 8
Appendix C                              Page4          Form ES-C-1 Performance Information (Denote critical steps with a check mark --./)
...J 5. Performance Step: Calculate maximum venting time Standard:                      Time =1.67 E4 1500 Time =11 minutes Comment:
Terminating Cue: JPM Complete 4 of 8
Appendix C                                                            Page 5                                          Form ES-C-1 Number:                      fitl e:                                                                        Rev*i ~ion Number:
2-fH-!.3                                        RESPONSE ro VOIDS IN      fH'ACTOR  VESSEL                      REV. 2 FIGURE FRI3-3 Hydrogen Flonrate (SCFM) 6() 00 __,..,.....,.....,..,..,..,..,.
5000 3000 2000 0                        250                    1COO    1250    1500    1750      2000      2250    2500 FIGUR~; f1Rl3
* 3. HYDROGEN FLOWRATE      VERSUS  RCS P:.i.ESSURE
                                                                        *END-19 of ?0 5 of 8
Appendix C                                          Page 6                          Form ES-C-1 Number:        r it 1e:                                                      Revision Number:
2-FR-1.3                    RESPONSE TO VOlDS IN REACTOR VESSEL                REV. 2 ATTACHMENT 1        (Attachment page 1 of 1)
INSfRUCTIONS FOR DElTRMINING VENTING LIME
: 1. Determine containment air volume at STP -
11.~
A =  2. 61 E6 cu ft  X        p        X 992" R 14 . 7 psi a      T (, 1\l.
where: P (psi a)      Containment pressure (psigl + 14.7 and:      T (* Rl    Containment temperature ("F) + 460
: 2. Determine maxi mum hydrogen vo 1ume that c.iln be vented = B
                                                ~. ~              ~-Y'l~t.
B = (3.0% - __C_q_nj;_ainrnent Hv\lrogen Concentrati~
100%
: 3. Determine hydrogen flow rate as a fu ction of RCS a) Check RCS pressure.
bl Using FIGURE FRI3-3, read hydrogen flow rate.
: 4. Calculate_maximum venting time*
Maximum venting time          ____e__ _
c Maximum venting t'rne            ll
                                                    -END-20 of 20 6 of 8
Appendix C                        Simulator Setup      Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
===Response===
Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -
7 of 8
Initial Conditions:
: 1.      An event occurred 24 hours ago that resulted in a YELLOW path condition on the Inventory Critical Safety Function Status Tree, FR-1.3.
: 2.      The TSC has requested that the Reactor Vessel be vented in accordance with FR-1.3, Response to Voids in Reactor Vessel.
: 4.      Given the following information:
Containment Pressure                2.6 psig Containment Temperature            172°F Containment Hydrogen                2.3%
RCS Pressure                        550 psig Initiating Cue:
You are the spare RO and the CRS has directed you to calculate Reactor Vessel Venting Time in accordance with FR-1.3 Attachment 1 and Figure FRI3-3.
Appendix C                          Job Performance Measure                      Form ES-C-1 Worksheet IPEC Facility:        UNIT2                            Task No:    0350040421 Task
==Title:==
Perform a SG tube Leakrate Determination using 2-AOP-SG-1 2.3.14              Job Performance Measure          RO Admin KIA
==Reference:==
RO- 3.4              No:                              RC-1 Examinee:                                        NRC Examiner:
Facility Evaluator:                              Date:
Method of testing:
Simulated Performance                                Actual Performance              X Classroom              X          Simulator                        Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
* The plant is operating at 25% power
* Radiation Monitor 45 is in alert.
* The operating crew is responding in accordance with 2-AOP-SG-1 Steam Generator Tube Leak.
* Condenser air in leakage is 2.7 SCFM
* RCS Total Gaseous Activity 1.53 X 10-2 j.JCi/cc
* Given the attached Leakrate Log Task Standard: SG Tube Leakage calculated using 2-AOP-SG-1 Attachment 1 Required Materials: Leakrate Log, Calculator, 2-AOP-SG-1 General
==References:==
2-AOP-SG-1 Attachment 1 and 2 1 of 12
Appendix C                    Job Performance Measure                    Form ES-C-1 Worksheet Initiating Cue: You are the BOP and the CRS has directed you to estimate the SG Tube Leakage, and determine sample frequency.
Time Critical Task: NA Validation Time: 15 Minutes 2 of 12
Appendix C                          Initial Conditions                Form ES-C-1 Performance Information (Denote critical steps with a check mark~)
: 1. Performance Step:          Review data Standard:                      Candidate may use Attachment 1 or separate paper Comment:
v2. Performance Step:          Calculate SG Tube Leakage for 1215 Standard:                      Determines SG Tube Leakage is 48.1 gpd Comment:
v3. Performance Step:          Calculate SG Tube Leakage for 1230 Standard:                      Determines SG Tube Leakage is 54.7 gpd Comment:
v4. Performance Step:        Calculate Delta Leakrate Standard:                      Determines leakrate has increased 6.6 gpd over last hour.
Comment:
Appendix C                          Initial Conditions                Form ES-C-1 Performance Information (Denote critical steps with a check mark --./)
"' 5. Performance Step:        Determine sample frequency Standard:                      Determines sample frequency is every 15 minutes Comment:
Terminating Cue: JPM Complete
Appendix C                        Initial Conditions                    Form ES-C-1 Steam Generator Tube Leak                      2-AOP-SG-1 Rev. 15 Page 39 of 69 Attachment 1 R-45 Estimated Leak Rate Page 1 of 1 NOTE For low levels of radioactivity as read on R-45, the estimated leak rate will be higher than actual.
: 1. Obtain the following A. RCS total gaseous activity (from Chemistry Data Book or WINCDMS)                                                    l.S~e . .:1        ~tCi/cc B. Condenser air in leakage                                              :}.1          SCFM C. R-45 reading                                                  :J. ~f>(!3.. . ~ ~tCi!cc
: 2. Calculate primary to secondary leak rate using the following formula per the following frequency requirements:
* leak rate unstable or NOT positively identified as stable - every 15 minutes
* leak rate stable per Attachment 2 - Use Attachment 2 frequencies
[(B  J.]      )  X (C J.!~G .. ~)        X  10770 =  [..___S.;;;;.....4-"-._._7_ _ _ ___.l Primary to secondary leak rate (gpd)
Appendix C                            Initial Conditions            Form ES-C-1 Steam Generator Tube Leak              2-AOP-SG-1 Rev. 15 Page 39 of 69 Attachment 1 R-45 Estimated Leak Rate Page 1 of 1 NOTE For low levels of radioactivity as read on R-45, the estimated leak rate will be higher than actual.
: 1. Obtain the following A. RCS total gaseous activity (from Chemistry Data Book orWINCDMS)                                              _;:__1.~-'--~=-G----'--'- ~LCi/cc B. Condenser air inleakage                                  __.a_.__.]__ SCFM C. R-45 reading
: 2. Calculate primary to secondary leak rate using the following formula per the following frequency requirements:
* leak rate unstable or NOT positively identified as stable- every 15 minutes
* leak rate stable per Attachment 2 - Use Attachment 2 frequencies
[(B :J.. 7    )  X (C 3*~~-            5"") X 10770  =          4i.f                        J (A  l. S~E= .. ;)..    )                      Primary to secondary leak rate (gpd)
Steam Generator Tube Leak                                  2-AOP-SG-1          Rev. 11 Attachment 2 SG Leak Rate Data Sheet                                    Page 41of 69 Page 1 of 1
* If leak rate is unknown, take data & determine LR every 15 minutes.
* If leak < 30 gpd, take data once every 4 hours.
* If leak increases  z 30 gpd but < 75 gpd take data & determine LR every 15 minutes.
* If leak z 30 gpd but < 75 gpd and stable for 1 hour (::; 5 gpd increase in 1 hour), take data every 2 hours.
* If leak z 30 gpd but < 75 gpd and stable for 24 hours (::; 10% increase in 1 hour), take data at frequency for normal operation.
* If leak z 75 gpd, take data & determine LR every 15 minutes.
DATE/      RX          R-45          R-49      ATT 1                N-16 (gpd)            Chemistry Grab Sample (gpd)
TIME      POWER      (When 1/S)  (When 1/S)    CALC            {When > 30% power)          (When Chemistry provides)
(When performed)
(~Ci/cc)            (gpd)      21      22      23      24    21    22      23      24 1115    25%        2.39 E-05                  45.4 gpd    NA      NA      NA    NA 1130    25%        2.40 E-05                  45.6 gpd    NA      NA      NA    NA 1145    25%        2.46E-05                  46.7 gpd    NA      NA      NA    NA 1200    25%        2.50E-05                  47.5 gpd    NA      NA      NA    NA 1215    25%        2.53E-05                  48.1 gpd    NA      NA      NA    NA 1230    25%        2.88E-05                  54.7 gpd    NA      NA      NA    NA NA      NA      NA    NA NA      NA      NA    NA NA      NA      NA    NA The difference between the two values is 6. 6 gpd over the last hour. This is greater than a 5 gpd change in last !?our and the frequency should be 15 minutes.
Appendix C                        Simulator Setup      Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
===Response===
Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -
Initial Conditions:
* The plant is operating at 25% power
* Radiation Monitor 45 is in alert.
* The operating crew is responding in accordance with 2-AOP-SG-1 Steam Generator Tube Leak.
* Condenser air in leakage is 2.7 SCFM
* RCS Gaseous Activity 1.53 X 1o-2 !Jci/cc
* Given the attached Leakrate Log Initiating Cue:        You are the BOP and the CRS has directed you to estimate the SG Tube Leakage, and determine sample frequency.
Steam Generator Tube Leak            2-AOP-SG-1 Rev. 15 Page 39 of 69 Attachment 1 R-45 Estimated Leak Rate Page 1 of 1 NOTE For low levels of radioactivity as read on R-45, the estimated leak rate will be higher than actual.
: 1.      Obtain the following A.        RCS total gaseous activity (from Chemistry Data Book orWINCDMS)                                                _ _ _ _ _ _ J.!Ci/cc B.        Condenser air inleakage                                  _ _ _ _ _ _ SCFM C.        R-45 reading                                              _ _ _ _ _ _ J.!Ci/cc
: 2. Calculate primary to secondary leak rate using the following formula per the following requirements:
* leak rate unstable or NOT positively identified as stable -every 15 minutes
* leak rate stable per Attachment 2 - Use Attachment 2 frequencies
__~.[.l.::(B=---_ _ _)t___.:_:X_l.:(C=------'--  X  10770    =
(A_ _ _ _,)                                  Primary to secondary leak rate (gpd)
Steam Generator Tube Leak                              2-AOP-SG-1      Rev. 11 Attachment 2 SG Leak Rate Data Sheet                                Page 41of 69 Page 1 of 2
* If leak rate is unknown, take data & determine LR every 15 minutes.
* If leak< 30 gpd, take data once every 4 hours.
* If leak increases  ~ 30 gpd but < 75 gpd take data & determine LR every 15 minutes.
* If leak~ 30 gpd but < 75 gpd and stable for 1 hour    (~ 5 gpd increase in 1 hour), take data every 2 hours.
* If leak~ 30 gpd but< 75 gpd and stable for 24      hours(~  10% increase in 1 hour), take data at frequency for normal operation.
* If leak ~ 75 gpd, take data & determine LR every 15 minutes.
DATE/      RX          R-45          R-49    ATT 1              N-16 (gpd)          Chemistry Grab Sample (gpd)
TIME      POWER    (When 1/S)    (When 1/S)  CALC          (When > 30% power)        (When Chemistry provides)
(When performed)
(JlCi/cc)          (gpd)      21    22      23    24    21    22    23      24 1115    25%        2.39 E-05                45.4 gpd    NA    NA    NA    NA 1130    25%        2.40 E-05                45.6 gpd    NA    NA    NA    NA 1145    25%        2.46E-05                  46.7 gpd    NA    NA    NA    NA 1200    25%        2.50E-05                  47.5 gpd    NA      NA    NA    NA 1215    25%        2.53E-05                              NA      NA    NA    NA 1230    25%        2.88E-05                              NA      NA    NA    NA NA      NA    NA    NA NA      NA    NA    NA NA      NA    NA    NA
Steam Generator Tube Leak 2-AOP-SG-1  Rev. 11 Attachment 2 SG Leak Rate Data Sheet  Page 41of 69
Appendix C                          Job Performance Measure                      Form ES-C-1 Worksheet IPEC Facility:        UNIT2                            Task No:    0430010321 Task
==Title:==
Demonstrate Proficiency in use of Generator Capability Curve KIA                2.2.41                      Job Performance Measure          ROAdmin
==Reference:==
RO - 3.4 SRO - 3.8          No:                              EC-1 Examinee:                                        NRC Examiner:
Facility Evaluator:                              Date:
Method of testing:
X Simulated Performance                                Actual Performance Classroom              X          Simulator                        Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
* Reactor is at 100% power, equilibrium Xenon, EOL
* An NPO incorrectly operated valves resulting in a loss of some Hydrogen from the Main Generator
* The Hydrogen vent path has been isolated Task Standard: MVAR adjustment accurately evaluated.
Required Materials: Ruler General
==References:==
Graph EL-1 Initiating Cue: You are the BOP and the CRS has directed you to determine if the Main Generator is operating within the limits of Graph EL-1 for current conditions.
Time Critical Task: No Validation Time: 15 1 of 8
Appendix C                              Page 2                        Form ES-C-1 Performance Information (Denote critical steps with a check mark "./)
: 1. Performance Step:Obtain correct procedure Standard:      Obtains Graph-EL-1 Comment:
v2. Performance Step:        Obtain current generator gas pressure Standard:      Determines Gas Pressure is approximately 45 psig Comment:
v3. Performance Step:        Obtain current generator gross megawatts Standard:      Determines approximately 950 Comment:
v4. Performance Step:        Obtain current MVAR load Standard:      Determine MVAR load is approximately 460 Leading Comment:
2 of 8
Appendix C                              Page 3                    Form ES-C-1 Performance Information (Denote critical steps with a check mark -/)
~ 5. Performance Step:        Evaluate conditions using Graph EL-1 Standard:      Determines MVAR Loading is outside allowable on Graph EL-1 Comment:
Terminating Cue: JPM Complete 3 of 8
Page4                                  Form ES-C-1 Appendix C 150 UriJ
                                                                                            /(8(
INDIAN POINT 2 AlB 4 POLE 1,439,200 KVA. 1800 RPM. 22000 VOLTS
                    .81 PF*. 58 SCR. 75 PSIG HYDROGEN PRESSURE. 535 VOLTS EXCITA110N
  <!)[8001
:S t'400'
[_ __ j SSL 22KV SSL .*
23.1 KV CURVE A8 LIMITED BY FIElD HEATING CURVE BC LIMITED BY ARMATURE HEATING CURVE CD LIMITED BY ARMATURE CORE END HEATING rsti*Mted CapitbiHty Cqrvos    EL-1 tl'w<J. 48)11h532              Rev. 4.
4 of 8
Appendix C                        Simulator Setup      Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
===Response===
Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -
5 of 8
JPM-0450010101                                                                  SIMULATOR Initial Conditions:
* Reactor is at 100% power, equilibrium Xenon, EOL
* An NPO incorrectly operated valves resulting in a loss of some Hydrogen from the Main Generator
* The Hydrogen vent path has been isolated Initiating Cue:
You are the BOP and the CRS has directed you to determine if the Main Generator is operating within the limits of Graph EL-1 for current conditions 6 of 8
JPM-0450010101                                                    SIMULATOR r=, Er**.J EF',II,Fr F' H.::
PF'E::::::UF'E OUT    400
                                                \
600
                      .-............ c **-.
r1.1,E I__, .t--t. *.* .H. r.. *=*
7 of 8
JPM-0450010101                      SIMULATOR A-C MEGAWATTS 8 of 8
Appendix C                          Job Performance Measure                      Form ES-C-1 Worksheet IPEC Facility:        UNIT2                            Task No:    2000650102 Task
==Title:==
Replace a Watchstander due to Illness KIA                            2.1.5            Job Performance Measure          SROAdmin
==Reference:==
SRO- 3.9            No:                              C0-1 Examinee:                                        NRC Examiner:
Facility Evaluator:                              Date:
Method of testing:
X Simulated Performance                                Actual Performance Classroom              X          Simulator                        Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
* Unit 2 is at 100% power.
* An oncoming RO for the 1800-0600 shift has called in sick
* Date is 2/25
* Time is 1700 Reference the attached RO work hour sheet.
Task Standard:
Reviews the work hour history for various RO candidates and determines if any one of the candidates can stand an entire shift. Explains whether or not RO can stand the entire shift Required Materials: Operations Schedule (Included)
General
==References:==
EN-OM-123 IP-SMM-OP-1 03 1 of 10
Appendix C                  Job Performance Measure                      Form ES-C-1 Worksheet Initiating Cue:
There are 5 RO's available to fill the position. You are told to perform verification of overtime hours to determine which RO, if any, can stand the entire shift.
Document your conclusion(s) below (why or why NOT)
Time Critical Task: No Validation Time: 30 Min 2 of 10
Appendix C                              Page 3                          Form ES-C-1 Performance Information (Denote critical steps with a check mark ~)
: 1. Performance Step:          Obtain correct procedures Standard:              Obtain EN-OM-123 IP-SMM-OP-1 03 CUE: Give candidates procedures and schedule.
Comment:
: 2. Performance Step:          Review Ops Schedule and procedural requirements Standard:                      Reviews Schedule and determines scheduling requirements Comment:
v3. Performance Step: Determines that the RO candidate #1 CANNOT fill the RO position because R0#1 violates >72 hrs in any 7 days - from 2/19-2/25 (12+13+12+12+12+12=73 hrs)
Standard:                      Determines that the RO candidate #1 CANNOT fill the RO position because R0#1 violates >72 hrs in any 7 days - from 2/19-2/25 (12+13+12+12+12+12=73 hrs)
Comment:
3 of 10
Appendix C                                Page4                      Form ES-C-1 Performance Information (Denote critical steps with a check mark --./)
--./ 4. Performance Step:      Determines that the RO candidate #2 CANNOT fill the RO position because R0#2 violates <34 hours break in any 9 days (no 34 hr break from 2/17-2/25)
Standard:                      Determines that the RO candidate #2 CANNOT fill the RO position because R0#2 violates <34 hours break in any 9 days (no 34 hr break from 2/17 -
2/25).
Comment:
"' 5. Performance Step:        Determines that the RO candidate #3 CAN fill the RO position. NO violation of the work hour limits ....
Standard:                      Determines that the RO candidate #3 CAN fill the RO position. NO violation of the work hour limits.
Comment:
4 of 10
Appendix C                              Page 5                      Form ES-C-1 Performance Information (Denote critical steps with a check mark .,f)
..J 6. Performance Step:      Determines that the RO candidate #4 CANNOT fill the RO position because R0#4 violates >26 hrs in any 48 hours -from 2/24-2/25 [15hrs {2/24-
                                                    =
25)+12hrs {2/17 -18) 27 hrs]
Standard:                      Determines that the RO candidate #4 CANNOT fill the RO position because R0#4 violates >26 hrs in any 48 hours -from 2/24-2/25 [15hrs {2/24-
                                                    =
25)+12hrs {2/17 -18) 27 hrs]
Comment:
..J 6. Performance Step:      Determines that the RO candidate #5 CANNOT fill the RO position because R0#5 violates <10 hours break {between work period) on 2/25 {0900 to
                                            =
1800(2/25) 9hrs break)
Standard:                      Determines that the RO candidate #5 CANNOT fill the RO position because RO #5 violates <1 0 hours break {between work period) on 2/25 {0900 to 1800{2/25) = 9hrs break)
Comment:
Terminating Cue: JPM Complete 5 of 10
Appendix C                                                                    Page 6                                                    Form ES-C-1 SRO Admin JPM A1.1 -ANSWER KEY RO 2/16                      2/17        2/18        2/19        2/20          2/21        2/22        2/23        2/24        iQ~
1                                        1800(2/18)- 1800(2/19)-              1800(2/21 )- 1800(2/22)- 1800(2/23)- 1800(2/24)-  !t\Q9(2/25)i 0200(2/19)  0600(2/20)                0700(2/22)  0600(2/23)  0600(2/24)  0600(2/25)  11111(10/11) 0                    0          8          12          0            13          12          12          12              12 2                            0600(2/17)- 0600(2/18)- 0600(2/19)- 0600(2/20)-  0600(2/21 )- 0600(2/22)- 0600(2/23)- 0600(2/24 )- <~(2/25)'!!
1800(2/17)  1800(2/18)  1800(2/19)  1800(2/20)    1200(2/21)  1000(2/22)  1200(2/23)  1000(2/24)  IICMJ(10/11) 0                  12          12          12          12            6          4            6          4              12 3  0600(2/16)-                          1800(2/18)-            1800(2/20)-  1800(2/21 )- 1800(2/22)- 1800(2/23)-              '6QQ(2/25)1i 1800(2/16)                            0600(2/19)              0800(2/21)    0600(2/22)  0800(2/23)  0600(2/24)              bliQ(10/11) 12                    0          12          0          14            12          14          12          0              12 4  0800(2/16)-              0800(2/17)- 0800(2/18)- 0800(2/19)-                            1800(2/22)- 1800(2/23)- 1700(2/24)-  IA6QP(2/25)i 1600(2/16)                1600(2/17)  1600(2/18)  1600(2/19)                            0000(2/23)  0600(2/24)  0800(2/25)  IIQI(10/11)
I 12                    12          12          12          0            0            6          12          15              12        I
                                                                                                                                  ~~~6~~~)
5                                        0700(2/18)- 0700(2/19)- 0700(2/20)-  0700(2/21 )-            0600(2/23)- 2300(2/24 )-
1500(2/18)  1500(2/19)  1500(2/20)    1500(2/21)              11 00(2/23) 0900(2/25) 0                    0          8          8          8            8            0            5          10              12 6 of 10
Appendix C                                                        Page 7                                  Form ES-C-1 SRO Admin JPM A1.1 -ANSWER KEY
  )r >16 hrs in any 24 hours-
  )r >26 hrs in any 48 hours- RO Candidate# 4 violation (15(2/24-25)+12(2/17-18) = 27 hrs)
  )r >72 hrs in any 7 days- RO Candidate #1 violation (12+13+12+12+12+12=73 hrs)
  )r <1 0 hours break (between work period)- RO Candidate# 5 violation (0900 to 1800(2/25) = 9hrs break)
  )r <34 hours break in any 9 days - RO Candidate # 2 violation (no 34 hr break from 2/17 - 2/25) 7 of 10
Appendix C                          Page 8            Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
===Response===
Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -
8 of 10
Page 9 of 10 Initial Conditions:
* Unit 2 is at 100% power.
* An oncoming RO for the 1800-0600 shift has called in sick
* Date is 2/25
* Time is 1700 Reference the attached RO work hour sheet.
Initiating Cue:
There are 5 RO's available to fill the position. You are told to perform verification of overtime hours to determine which RO, if any, can stand the entire shift.
Document your conclusion(s) below (why or why NOT)?
ANSWER:
R0#1:
R0#2:
R0#3:
R0#4:
R0#5:
File: 2000651602-1.doc Task Number: 200*065*01 *02
Page 10 of 10 RO 2/16          2/17      2/18        2/19      2/20      2/21      2/22 1                              1800(2/18)  1800(2/19)            1800(2/21) 1800(21 0200(2/19)  0600(2/20)            0700(2/22) 0600(21 2                  0600(2/17) 0600(2/18)  0600(2/19) 0600(2/20) 0600(2/21) 0600(21 1800(2/17) 1800(2/18)  1800(2/19) 1800(2/20) 1200(2/21) 1000(21 3    0600(2/16)              1800(2/18)            1800(2/20) 1800(2/21) 1800(21 1800(2/16)              0600(2/19)            0800(2/21) 0600(2/22) 0800(21 4    0800(2/16)    0800(2/17) 0800(2/18)  0800(2/19)                      1800(21 1600(2/16)    1600(2/17) 1600(2/18)  1600(2/19)                      0000(21 5                              0700(2/18)  0700(2/19) 0700(2/20) 0700(2/21) 1500(2/18)  1500(2/19) 1500(2/20) 1500(2/21)
File: 2000651602-1.doc Task Number: 200*065*01*02
Appendix C                          Job Performance Measure                      Form ES-C-1 Worksheet IPEC Facility:        UNIT2                            Task No:    0001250502 Task
==Title:==
Review Reactor Vessel Venting Time Calculation Per FR-1.3, Attachment 1 KIA                2.1.25                      Job Performance Measure          SRO Admin
==Reference:==
RO- 3.9 SRO- 4.2            No:                              C0-2 Examinee:                                        NRC Examiner:
Facility Evaluator:                              Date:
Method of testing:
X Simulated Performance                                Actual Performance Classroom              X          Simulator                        Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
: 1. An event occurred 24 hours ago that resulted in a YELLOW path condition on the Inventory Critical Safety Function Status Tree, FR-1.3.
: 2. The TSC has requested that the Reactor Vessel be vented in accordance with FR-1.3, Response to Voids in Reactor Vessel.
: 3. Given the following information:
Containment Pressure                    2.6 psig Containment Temperature                172&deg;F Containment Hydrogen                    3.2%
RCS Pressure                            550 psig Task Standard: Vessel Venting time is properly calculated.
Required Materials: Calculator General
==References:==
2-FR-1.3 1 of 8
Appendix C                      Job Performance Measure                  Form ES-C-1 Worksheet Initiating Cue:
You are the CRS and a spare RO has calculated Reactor Vessel Venting Time in accordance with FR-1.3 Attachment 1 and Figure FRI3-3. The SM has directed you to review the calculation and determine what, if any, actions are required.
Time Critical Task: No Validation Time: 20 min 2 of 8
Appendix C                                Page 3                          Form ES-C-1 Performance Information (Denote critical steps with a check mark  .V) v1. Performance Step:          Obtain correct procedure Standard:                      Obtains FR-1.3 Comment:        It is possible for the candidate to determine that the Reactor Vessel cannot be vented with containment hydrogen at 3.2% before reviewing the calculation.
NOTE: See Step 3
: 2. Performance Step:            Determine Containment Volume at STP (A)
Standard:                      A= 2.61 E6 X 17.3/14.7 X 492/632 A= 2.39 E6 Determines calculation is correct.
Comment:
v3. Performance Step:          Determine Maximum Hydrogen volume that can be vented (B)
Standard:                      8 =(3.0- 3.2 X 1.32 E6) 100 8 =-4.22 E4 Comment:        There are two elements wrong with this step.
: 1. The number used for the calculation was transposed
: 2. In the body of the procedure, the Reactor Vessel cannot be vented if containment hydrogen is greater than 3%.
Procedure Step 17 directs consultation with the TSC if containment hydrogen is > 3.0%
Terminating Cue: JPM Complete 3 of 8
Appendix C                        Simulator Setup      Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
===Response===
Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -
4 of 8
Initial Conditions:
: 1.      An event occurred 24 hours ago that resulted in a YELLOW path condition on the Inventory Critical Safety Function Status Tree, FR-1.3.
: 2.      The TSC has requested that the Reactor Vessel be vented in accordance with FR-1.3, Response to Voids in Reactor Vessel.
: 4.      Given the following information:
Containment Pressure                2.6 psig Containment Temperature              172&deg;F Containment Hydrogen                3.2%
RCS Pressure                        550 psig Initiating Cue:
You are the CRS and a spare RO has calculated Reactor Vessel Venting Time in accordance with FR-1.3 Attachment 1 and Figure FRI3-3. The SM has directed you to review the calculation and determine what, if any, actions are required.
Number:
==Title:==
Rev*ision Number:
2-FR-I.3                  RESPONSE TO VOIDS IN RE/\CTOR VESSEL                REV. 2 ATTACHMENT 1          (Attachment page 1 of 1)
INSTRUCTIONS FOR DETERMINING VENTING TIME
: l. Determine containment air volume at STP
                                    ,,.~
A = 2.61 E6 cu ft X        P 14.7 psia where: P (psia)    Containment pressure (psig) + 14.7 and:    T ( R) 0 Containment temperature (&deg;F) + 460
: 2. Determine maximum hydrogen volume that can be vented = B B = (3.0%
:J, ~                a.~''-
Containment Hydrogen Concentration) x A 100%
: 3. petermine Qygro en flow rate as a function of RCS      ressure a) Check RCS pressure.
b) Using FIGURE FRl3-3, read hydrogen flow rate.
: 4. Calculate maximum venting time:
Maximum venting time          8 c
Maximum venting time        II
                                                -END-
Number:
==Title:==
Revision Number:
2-FR-I.3                    RESPONSE TO VOIDS It4 REACTOR VESSt:.L                REV. 2 FIGURE FR13-3 Hydrogen Flowrate !SCcM) 6000 5000 4000 3000 2000 1000 0        ' '1
                      ?.J\)  500    750    1000      iZSO l'.iC 0 1150 2000    2250    2500 f[GURE fRl3-3. llYDROGEN FLOWRATE VERSUS RCS PRESSURE
                                                ***END-19 of 20
Appendix C                          Job Performance Measure                      Form ES-C-1 Worksheet IPEC Facility:        UNIT2                            Task No:      0350060402 Task
==Title:==
Review a SG tube Leakrate Determination using 2-AOP-SG-1 KIA
==Reference:==
      ~-~6~      _                ~~~Performance Measure          ~~~Admin 38 Examinee:                                        NRC Examiner:
Facility Evaluator:                              Date:
Method of testing:
Simulated Performance                                Actual Performance            X Classroom            X          Simulator                        Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
* The plant is operating at 25% power
* Radiation Monitor 45 is in alert.
* The operating crew is responding in accordance with 2-AOP-SG-1 Steam Generator Tube Leak.
* Condenser air in leakage is 2. 7 SCFM
* RCS Total Gaseous Activity 1.53 X 1        o-2 IJCi/cc
* Given the attached Leakrate Log
* R-49 Automatic Actions have occurred.
Task Standard: SG Tube Leakage calculation reviewed using 2-AOP-SG-1  and 2 Required Materials: Leakrate Log General
==References:==
2-AOP-SG-1 Attachment 1 and 2 1 of 9
Appendix C                  Job Performance Measure              Form ES-C-1 Worksheet Initiating Cue:
You are the CRS and the SM has directed you to review the estimated SG Tube Leakage, and determine:
* sample frequency
* recommend actions (if any)
Time Critical Task: NA Validation Time: 15 Minutes 2 of 9
Appendix C                          Initial Conditions                  Form ES-C-1 Performance Information (Denote critical steps with a check mark .V)
: 1. Performance Step:          Check Calculations Standard:                      Candidate may use Attachment 1 or separate paper Candidate should determine that the calculations for 1115 through 1215 are correct.
Comment:
.V2. Performance Step:        Check Calculation for 1230 Standard:                      Determines calculation is incorrect. The correct value is 60.81 gpd Comment:
...J 3. Performance Step:      Check Calculation for 1245 Standard:                      Determines calculation is incorrect. The correct value is 76.02 gpd In addition to the calculation being incorrect, The CRS should recognize that the leakrate is > 75 gpd and the plant should be placed in MODE 3 within the next 2 hours (procedure step 4.63).
Comment:
Appendix C                            Initial Conditions              Form ES-C-1 Performance Information (Denote critical steps with a check mark ..J)
..J 4. Performance Step:      Calculate SG Tube Leakage change over last hour Standard:                      Determines SG Tube Leakage has increased by:
* 13.3 gpd from 1130 to 1230
* 27.9 from 1145 to 1245.
Comment:
..J 5. Performance Step:      Calculate SG Tube Leakage change over last hour Standard:                    Determines SG Tube Leakage has increased by 13.3 gpd from 1130 to 1230.
Comment:
: 6. Performance Step:          Review Sample frequency recommendation by RO Standard:                    Identify Sample frequency recommendation by RO is correct Comment:
Terminating Cue: JPM Complete
Steam Generator Tube Leak                              2-AOP-SG-1      Rev. 11 Page 41of69 Attachment 2 SG Leak Rate Data Sheet Page 1 of 1
* If leak rate is unknown, take data & determine LR every 15 minutes.
* If leak< 30 gpd, take data once every 4 hours.
* If leak increases 2:: 30 gpd but < 75 gpd take data & determine LR every 15 minutes.
* If leak 2:: 30 gpd but < 75 gpd and stable for 1 hour    (~ 5 gpd increase in 1 hour), take data every 2 hours.
* If leak 2:: 30 gpd but < 75 gpd and stable for 24 hours    (~  10% increase in 1 hour), take data at frequency for normal operation.
* If leak 2:: 75 gpd, take data & determine LR every 15 minutes.
DATE/        RX        R-45          R-49    ATT 1                N-16 (gpd)        Chemistry Grab Sample (gpd)
TIME      POWER      (When 1/S)    (When 1/S)  CALC            (When > 30% power)      (When Chemistry provides)
(When performed)
(!!Ci/cc)          (gpd)      21      22      23    24    21    22      23    24 1115    25%          2.46E-05                      46.75  NA      NA    NA    NA 1130    25%          2.50E-05                      47.51  NA      NA    NA    NA                                '
1145    25%          2.53E-05                      48.08 NA        NA    NA    NA 1200    25%          2.68E-05                      50.93 NA        NA    NA    NA 1215    25%          2.90E-05                      55.11 NA        NA    NA    NA 1230    25%          3.20E-05          60.81      58.81 NA        NA    NA    NA 1245    25%          4.00E-05          76.02      65.02 NA        NA    NA    NA NA      NA    NA    NA NA      NA    NA    NA The calculated value for 1230 is incorrect The correct value should be 60.81 gpd.
The calculated value for 1245 is incorrect The correct value should be 76.02 gpd.
The leakrate has exceeded 75 gpd and the plant should be placed in MODE 3 within an additional 2 hours.
Appendix C                        Simulator Setup      Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
===Response===
Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -
Initial Conditions:
* The plant is operating at 25% power
* Radiation Monitor 45 is in alert.
* The operating crew is responding in accordance with 2-AOP-SG-1 Steam Generator Tube Leak.
* Condenser air in leakage is 2.7 SCFM
* RCS Total Gaseous Activity 1.53 X 1o-2 !Jci/cc
* Given the attached Leakrate Log
* R-49 Automatic Actions have occurred.
Initiating Cue:
You are the CRS and the SM has directed you to review the estimated SG Tube Leakage, and determine:
* sample frequency
* recommend actions (if any)
Steam Generator Tube Leak              2-AOP-SG-1 Rev. 15 Page 39 of 69 Page 1 of 1 NOTE For low levels of radioactivity as read on R-45, the estimated leak rate will be higher than actual.
: 1.      Obtain the following A. RCS total gaseous activity (from Chemistry Data Book or WINCDMS)                                            _ _ _ _ _ _ /-LCi/cc B. Condenser air inleakage                                _ _ _ _ _ _ SCFM C. R-45 reading                                            _ _ _ _ _ _ 1-LCilcc
: 2. Calculate primary to secondary leak rate using the following formula per the following requirements:
* leak rate unstable or NOT positively identified as stable -every 15 minutes
* leak rate stable per Attachment 2 - Use Attachment 2 frequencies
__.,[~(B=-----L-)__:_::X---l....:(C=-----'--- X 10770  =
(A._ _ _ _)                                  Primary to secondary leak rate (gpd)
Steam Generator Tube Leak                                2-AOP-SG-1      Rev. 15 Page 41of69 Attachment 2 SG Leak Rate Data Sheet Page 1 of 1
* If leak rate is unknown, take data & determine LR every 15 minutes.
* If leak < 30 gpd, take data once every 4 hours.
* If leak increases  ~ 30 gpd but < 75 gpd take data & determine LR every 15 minutes.
* If leak~ 30 gpd but < 75 gpd and stable for 1 hour      (~ 5 gpd increase in 1 hour), take data every 2 hours.
* If leak~ 30 gpd but < 75 gpd and stable for 24 hours        (~  10% increase in 1 hour), take data at frequency for normal operation.
* If leak~ 75 gpd, take data & determine LR every 15 minutes.
DATE/      RX          R-45          R-49    ATI1                N-16 (gpd)        Chemistry Grab Sample (gpd)
TIME      POWER      (When 1/S)    (When 1/S)  CALC            (When > 30% power)      (When Chemistry provides)
(When performed)
(11Ci/cc)          (gpd)      21      22      23    24    21    22      23    24 1115    25%          2.46E-05                      46.75  NA      NA    NA    NA 1130    25%          2.50E-05                      47.51  NA      NA    NA    NA 1145    25%          2.53E-05                      48.08  NA      NA    NA    NA 1200    25%          2.68E-05                      50.93  NA      NA    NA    NA 1215    25%          2.90E-05                      55.11  NA      NA    NA    NA 1230    25%          3.20E-05                      58.81  NA      NA    NA    NA 1245    25%          4.00E-05                      65.02  NA      NA    NA    NA NA      NA    NA    NA NA      NA    NA    NA Based on calculated leakrate sample frequency should remain every 15 minutes.
Appendix C                          Job Performance Measure                      Form ES-C-1 Worksheet IPEC Facility:        UNIT2                            Task No:    0430010321 Task
==Title:==
Demonstrate Proficiency in use of Generator Capability Curve KIA                2.2.41                      Job Performance Measure          SROAdmin
==Reference:==
RO - 3.4 SRO - 3.8          No:                              EC-1 Examinee:                                        NRC Examiner:
Facility Evaluator:                              Date:
Method of testing:
X Simulated Performance                                Actual Performance Classroom              X          Simulator                        Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
* Reactor is at 100% power, equilibrium Xenon, EOL
* Main Generator Hydrogen makeup is not available
* Machine Gas High Low Pressure alarm is up on the TG Monitor Panel
* The given conditions have been stable for the last hour.
Task Standard: MVAR adjustment accurately evaluated and acceptable recommendation identified.
Required Materials: Ruler General
==References:==
Graph EL-1 2-ARP-042, G. E. Unit Aux Board GE Generator 2-SOP-26.2 Hydrogen and Carbon Dioxide to Main Generator Initiating Cue: You are the CRS, evaluate the given conditions and provide recommendation and explanation.
Time Critical Task: No 1 of 9
Appendix C          Job Performance Measure Form ES-C-1 Worksheet Validation Time: 15 2 of 9
Appendix C                              Page 3                        Form ES-C-1 Performance Information (Denote critical steps with a check mark -1)
: 1. Performance Step: Obtain correct procedure Standard:      Obtains Graph-EL-1 Comment:
..J 2. Performance Step:      Obtain current generator gas pressure Standard:      Determines Gas Pressure is approximately 45 psig Comment:
..J 3. Performance Step:      Obtain current generator gross megawatts Standard:                      Determines approximately 950 Comment:
..J 4. Performance Step:      Obtain current MVAR load Standard:      Determine MVAR load is approximately 460 Leading Comment:
3 of 9
Appendix C                              Page4                          Form ES-C-1 Performance Information (Denote critical steps with a check mark ~)
~ 5. Performance Step:        Evaluate conditions using Graph EL-1 Standard:      Determines MVAR Loading is outside allowable on Graph EL-1 Comment:
~ 6. Performance Step:        Make acceptable recommendation Standard:                      Based on given information, raising Machine Gas Pressure is NOT acceptable Reducing value of Leading VARS, until point on EL-1 is above URAL 22KV line, is acceptable.
OR Reduce Turbine Load, until point on EL-1 is above URAL 22KV line, is acceptable Comment:
Terminating Cue: JPM Complete 4 of 9
Page 5                                            Form ES-C-1 Appendix C tffiD UtiJ fEy INDIAN POINT 2 ATB 4 POlE 1,439,200 KVA. 1800 RPM. 22000 VOLTS
                      .81 PF*. 58 SCR. 75 PSIG HYDROGEN PRESSURE. 535 VOLTS EXCITATlON 0
16ool
  ~-
t;400'
[ __ j SSL 20.9KV SSL .*
23.1 KV URAL 22l<V
[:SOOl
                                                                                    .. T CURVE A8 LIMITED BY FIElD HEATING CURVE BC LIMITED BY ARMATURE HEATING CURVE CD LIMITED BY ARMATURE CORE END HEATING r:stimated      Cap~bili.ty  Cm:vas      El-1 Rev. 4 .
                                                          . f}:"'J*. _48]111\5)2 5 of 9
Appendix C                        Simulator Setup      Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
===Response===
Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -
6 of 9
JPM-0450010101                                                              SIMULATOR Initial Conditions:
* Reactor is at 100% power, equilibrium Xenon, EOL
* Main Generator Hydrogen makeup is not available
* Machine Gas High Low Pressure alarm is up on the TG Monitor Panel
* The given conditions have been stable for the last hour.
Initiating Cue:
You are the CRS, evaluate the given conditions and provide recommendation and explanation.
7 of 9
JPM-045001 0101                                        SIMULATOR
                                                  ,=, Er**.J EF'.I.\.T1=1 R H.:::
PF' E:::::::: 1_1 F' E OUT    400
                                    \
600 til, E(1 A\/A D :=:
I  *-**Ill .... -
8 of 9
JPM-0450010101        SIMULATOR 9 of 9
Appendix C                          Job Performance Measure                      Form ES-C-1 Worksheet IPEC Facility:        UNIT2                            Task No:    1500010522 Task
==Title:==
Classify Emergency Events Requiring Emergency Plan lm plementation 2.4.38              Job Performance Measure        SROADMIN KIA
==Reference:==
SRO -4.4            No:                            EP-1 Examinee:                                        NRC Examiner:
Facility Evaluator:                              Date:
Method of testing:
Simulated Performance                                Actual Performance              X Classroom              X          Simulator                        Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
1 of 7
Appendix C                        Job Performance Measure                      Form ES-C-1 Worksheet Initial Conditions:
Indian Point Energy Center Unit 2 was operating at 100% and has been there for 100 days.
24 Containment Fan Cooler Unit is inoperable for circuit breaker maintenance.
Unit 3 is at 100% power; no issues.
Safety Injection automatically initiated due to a large break LOCA inside containment.
The following plant conditions exist:
* The team is responding per E-0, Reactor Trip or Safety Injection.
* Containment Isolation Phase A and B have been confirmed.
* 21 and 22 Containment Spray Pumps failed to start and attempts to start the pumps were unsuccessful.
* 24 Containment Fan Cooler Unit remains unavailable
* RCS Subcooling is 0.0&deg;F
* Containment Pressure is 38 psig and stable
* R-25 is reading 19 R/hr and R-26 is reading 21 Rlhr
* RVLIS, Full Range is reading 44%
Meteorological Conditions:
* Wind Speed:              3.5 meters/second
* Wind Direction:          120 degrees @ 10 meters
* Stability Class:          c I will perform duties of Offsite Communicator.
Task Standard: Proper E-Pian Classification and Part 1 form properly filled out .
Required Materials: EAL Wall Chart.
General
==References:==
IP-EP-115 IP-EP-120 IP-EP-210 IP-EP-410 Initiating Cue:
You are the CRS and the SM is unable to get to the control room. Classify the event and complete the Radiological Emergency Data Form.
Time Critical Task: Yes (Declare event in 15 minutes and Initiate notification within 15 minutes of declaration) 2 of 7
Appendix C              Job Performance Measure Form ES-C-1 Worksheet Validation Time: 30 min 3 of?
Appendix C                                Page4                          Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)
: 1. Performance Step:          Obtain correct procedure IP-EP-120 orEAL chart Standard:                      Give candidate Wall Chart Comment:
..J 2. Performance Step:      Evaluate Initiating Cues to determine aGE classification applies.
Standard:                      Determine EAL FG1.1 applies Fuel Clad - C.3 Loss RCS - D.2 Loss CNMT- D. 7 Potential Loss Comment:        This action is time critical Mark Time when Declaration is made.
..J 3. Performance Step:      Complete "New York State Radiological Emergency Data Form, Part 1" Standard:                      Complete IP-EP-115 Comment:        Critical elements on Part 1 form are marked with an asterisk
..J 4. Performance Step:      Direct Communicator to initiate notification.
Standard:                    Hand completed Part 1 form to evaluator and direct them to initiate notification.
CUE: Acknowledge direction to initiate notification.
Comment:      This action is time critical.
Terminating Cue: JPM Complete 4 of 7
New York State Indian P01nt Energy Center
!---.                  --~ .....~DIOLOGICAL EMERGEfi~.':::                      D          *---      ~                  No.!J.fic~on # _j_,
: 1. 1 This is an:    ~                    ACTUAL EMERGENCY                    t the Indian Pomt Energy Center The  Emergen~;.          . *A. Unusual Event              ... ,~---~-  AI;;;-------*            -    C  Site Area  Em~r~~ncy -*-*
I, Classiflcalion is:                                        ~
: 2. I                                                                          Emergency Terminated ThiS Emergency Classification declared on: _:..;:;..:;:.,::- t-:--_ _ at          'Tt~t .i :Dec{ava~
(Time  2fhr clock)
Release of Radioactive Materials due to the Classified Event:
To Water:
A. NO Release 3.
B. Release BELOW Federal Limits                                        B. Release BELOW Federal limits C. Release ABOVE Federal Limits                                        C. Release ABOVE Federal Limits
      ! D. Unmonitored Release Requiring Evaluation                        .L~: Unmomtore~-~~lease Reqwing Evaluation The following Protective Actions are recommended to be implemented as soon as practicable A. NO NEED for PROTECTIVE ACTIONS outside the site boundary
            <!)EVACUATE and IMPLEMENT the Kl PLAN for the following Sectors                    ~
C. SHELTER-IN-PLACE and IMPLEMENT the Kl PLAN for the following Sectors
: 4.      2 miles around 5-miles downwind:
In the foUowing Sectors:U) (})        6)      4    5      6    7    8    9      10    11      12    13    14    15
                                                                                                                                          ~;
2 miles around 10-miles downwind:
In the following Sectors: 1      2      3      4    5      6    7    8    9      10    11      12    13    14    15    16 All remaming Areas MONITOR the EMERGENCY ALERT SYSTEM NOTE: OFFSITE AUTHORITIES SHOULD CONSIDER SHELTER-IN-PLACE+ TAKE KIIF EVACUATION IS NOT FEASIBLE EAL#:      t~- ~I          ""                                                                                    Affected  Location:
I s.
Q... UNITD.;C-
'                                                                                                                            8. UNIT 3
-      ----~----~~-------------------->--C.                                                                                    IP;C  ~~
Reactor  Status:
: 6. Unit 2: Operational    o~                  at      (Date)                            ( T i m e } - - - - - - (24 hr clock)
I Unit 3:. ~er:~~~o~ ~hutdo~.n-                at      (Date)                            (Time)::::::::::::::::===="'~4~hr_~lock} ... --;
: 1. Wind Speed:        ~' 6'                Meters/Sec at elevation 10 meters
: 8. Wind Direction: <From)
A
                                      \ !W__.... ~-~---
B          -~. --*;- . G Degrees at elevation 10 meters
                                                                                                                        --1
                                            - - - - - - - - - - - - - Telephone#---------
(Communica!Dr's Name)
I Emergency Director A p p r o v a l : - - - - - - - - - - - - -                        Daterrime: - - - - - - - - - - -
(Direc!Dr's Name)
Page 1 of 1                                            Form EP-1 Rev 5
Appendix C                        Simulator Setup      Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
===Response===
Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -
6 of?
Appendix C                              Initial Conditions                    Form ES-C-1 Initial Conditions:
Indian Point Energy Center Unit 2 was operating at 100% and has been there for 100 days.
24 Containment Fan Cooler Unit is inoperable for circuit breaker maintenance.
Unit 3 is at 100% power; no issues.
The events below occurred today approximately 5 minutes ago.
Safety Injection automatically initiated due to a large break LOCA inside containment.
The following plant conditions exist:
* The team is responding per E-0, Reactor Trip or Safety Injection.
* Containment Isolation Phase A and B have been confirmed.
* 21 and 22 Containment Spray Pumps failed to start and attempts to start the pumps were unsuccessful.
* 24 Containment Fan Cooler Unit remains unavailable
* RCS Subcooling is 0.0&deg;F
* Containment Pressure is 38 psig and stable
* R-25 is reading 19 Rlhr and R-26 is reading 21 R/hr
* RVLIS, Full Range is reading 44%
Meteorological Conditions:
* Wind Speed:              3.5 meters/second
* Wind Direction:          120 degrees @ 10 meters
* Stability Class:          c I will perform duties of Offsite Communicator.
Initiating Cue:
You are the CRS and the SM is unable to get to the control room. Classify the event and complete the Radiological Emergency Data Form.
Appendix C                          Job Performance Measure                      Form ES-C-1 Worksheet IPEC Facility:        UNIT2                          Task No:      0040420421 Task
==Title:==
Emergency Borate the RCS 004000A4.18                Job Performance Measure KIA
==Reference:==
RO- 4.3 SRO- 4.1                  No:                              SimA Examinee:                                        NRC Examiner:
Facility Evaluator:                              Date:
Method of testing:
Simulated Performance                                Actual Performance              X Classroom                          Simulator          X            Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
* A Reactor Trip has occurred.
* The Crew is performing ES-0.1, Reactor Trip Response
* At step 6 the crew determined 4 Control Rods did not fully insert on the trip
* RCS Tavg is 54rF.
* RCS Boron is 1221 PPM, at 327 EFPD.
Task Standard: The correct amount of boron addition determined and boration has been commenced using MOV-333 Boration Path.
Required Materials: 2-SOP-3.2 General
==References:==
2-SOP-3.2 Initiating Cue: You are the ATC and the CRS has directed you to initiate Emergency Boration in accordance with 2-SOP-3.2 Time Critical Task: No Validation Time: 15 Min 11/18/2013
Unit 2 NRC 2014                                      Exam Date 02/10/2014 Performance Information (Denote critical steps with a check mark  >/)
: 1. Performance Step:        Obtain Correct Procedure Standard:                    Obtains 2-SOP-3.2 and Reviews Precautions and Limitations Comment:
: 2. Performance Step:        Observe NOTES before Step 4.6.5 Standard:                    Reviews NOTES Comment:
11/18/2013
Unit 2 NRC 2014                                      Exam Date 02/10/2014 Performance Information (Denote critical steps with a check mark  -.J)
-.J 3. Performance Step:    Determine RCS Boron Concentration must be increased 667 ppm Standard:                    1309 Minimum Shutdown Boron Concentration 1221 Current Boron Concentration 88 ppm to achieve Min Shutdown Boron Cone.
193 ppm increase for each rod > 1 (3 rods) 193 ppm per rod X three rods = 579
                                      =
579 + 88 667 ppm increase boron concentration required.
Using Attachment 1 approximately 1985 gallons of Boric Acid is required Using 2.99 gal/ppm, approximately 1995 gallons of Boric Acid is required Comment:      At some point during the performance of this JPM the candidate must determine that between 1985 and 2005gallons of boric acid are required.
The candidate may wait until boric acid addition has commenced to calculate the amount of boric acid necessary.
: 4. Performance Step:        Observe NOTES before Step 4.6.12 Standard:                    Reviews NOTES Comment:
11/18/2013
Unit 2 NRC 2014                                        Exam Date 02/10/2014 Performance Information (Denote critical steps with a check mark ...f)
: 5. Performance Step:        Initiate boration using the desired method Standard:                    Normal Boration is identified as the Preferred method, and it is expected that the candidate will start with this method.
Go To Attachment 3 Comment:      Step 6.5.12
: 6. Performance Step:        Observe Caution before Step 1.0 of Attachment 3 Standard:                    Review CAUTION Comment:
: 7. Performance Step:        Place Makeup Mode Selector Switch to BORATE Standard:                    Rotate switch to BORATE Comment:      Step 1.1 of Attachment 3 Panel FCF
: 8. Performance Step:        Set Boric Acid Integrator to 600 gallons Standard:                    Set thumbwheels to 600.0 Comment:      Step 1.2 of Attachment 3 Panel FBF 11/18/2013
Unit 2 NRC 2014                                      Exam Date 02/10/2014 Performance Information (Denote critical steps with a check mark --J)
: 9. Performance Step:        Place Makeup Control Switch to START Standard:                    Rotate switch to START position Observe boration does NOT begin.
Return to Step 4. 6. 12 Comment:      Step 1.3 of Attachment 3 Panel FCF Candidate may make several attempts to start Boration.
11/18/2013
Unit 2 NRC 2014                                      Exam Date 02/10/2014 Performance Information (Denote critical steps with a check mark --./)
11/18/2013
Unit 2 NRC 2014                                      Exam Date 02/10/2014 Performance Information (Denote critical steps with a check mark .V) 11/18/2013
Unit 2 NRC 2014                                      Exam Date 0211 0/2014 Performance Information (Denote critical steps with a check mark  --J)
: 24. Performance Step:        Return both Boric Acid Transfer Pumps to SLOW Standard:                    Rotate switches to slow speed Candidate should observe Red Slow indicating light ON Comment: Step 2.2 of Attachment 5, For Time consideration the JPM can be Terminated at this point. There are no additional critical steps 11/18/2013
Unit 2 NRC 2014                                      Exam Date 02/10/2014 Performance Information (Denote critical steps with a check mark    .Y)
: 25. Performance Step:        Dispatch NPO to OPEN the immediately CLOSE 330, Boric Acid Blender Primary Water Bypass Stop to flush line 208 Standard:                    Contact Nuc Side NPO and direct to OPEN then CLOSE 330.
Comment: CUE: Acknowledge request as NPO and report valve has been OPENED and CLOSED.
: 26. Performance Step:        Place running Charging Pump speed controller in AUTO Standard:
* Place Charging Pump Speed Controller in MAN-BAL
* ADJUST the Bias Knob until the deviation meter indicates zero
* Place Charging Pump speed controller to AUTO
* Slowly turn the Bias Knob back to zero Comment:
: 27. Performance Step:      ADJUST HCV-142 to maintain RCP Seals between 6 and 12 gpm Standard:                    Rotate potentiometer in close direction as necessary Comment:
11/18/2013
Unit 2 NRC 2014                                        Exam Date 02/10/2014 Performance Information (Denote critical steps with a check mark ~)
: 28. Performance Step:        Direct Chemistry to obtain RCS Boron Sample.
Standard:                    Contact Chemistry and direct them to obtain RCS Boron Sample Comment: CUE Acknowledge request as Chemist
: 29. Performance Step:        When Chemistry reports Boron Concentration, the set FIC-11 0, Boric Acid Control for the new Boron Concentration per Graph-CVCS-1 B Standard:                    Sets FIC-110 to proper setting Comment:
Terminating Cue: JPM Complete 11/18/2013
Appendix C                        Page 11                Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
===Response===
Result: SAT or UNSAT Examiner's signature and date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
11/18/2013
Appendix C                        Simulator Setup    Form ES-C-1 Reset the Simulator to any 100% power IC Insert the following Malfunctions for Stuck Rods MAL-CFR001A          Rod D-4      UNTRI P MAL-CFR001AJ        Rod H-12      UNTRIP MAL-CFR001 D        Rod M-4      UNTRI P MAL-CRF001AX        Rod F14        UNTRIP SWI-CVC033A          LCV-1128 CLOSE POS SWI-CVC048          MAKEUP MODE SELECTOR SWITCH AUTO MAKEUP Trip the reactor and allow the plant to stabilize.
Freeze the Simulator Take a snapshot if JPM is to be used more than once.
11/18/2013
Appendix C                            Initial Conditions                      Form ES-C-1 Initial Conditions:
* A Reactor Trip has occurred.
* The Crew is performing ES-0.1, Reactor Trip Response
* At step 6 the crew determined 4 Control Rods did not fully insert on the trip
* RCS Tavg is 54rF.
* RCS Boron is 1221 PPM, at 327 EFPD.
Initiating Cue:
You are the ATC and the CRS has directed you to initiate Emergency Boration in accordance with 2-SOP-3.2
Appendix C                          Job Performance Measure                      Form ES-C-1 Worksheet IPEC Facility:        UNIT2                            Task No:    0000390521 Task
==Title:==
Perform the Required Action to Align the 51 System for Recirculation during Transfer to Cold Leg Recirculation KIA                000011A1.11                  Job Performance Measure          Sim B
==Reference:==
SRO - 4.2 RO - 4.2          No:
Examinee:                                        NRC Examiner:
Facility Evaluator:                              Date:
Method of testing:
X Simulated Performance                                Actual Performance Classroom                          Simulator          X            Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
* A large break LOCA has occurred.
* Safety Injection has been RESET in accordance with E-1, Loss of Reactor or Secondary coolant.
* The RWST level has decreased to 9.24 feet and the CRS has directed you to transfer to cold leg recirculation in accordance with ES-1.3
* All steps up through and including step 18 of E-1 have been completed.
* FSB Ventilation was previously shutdown
* The service water system is aligned for three header operation.
* The first 3 steps of ES-1.3 have been completed.
Task Standard: Cold leg recirculation flow is established and the core is adequately cooled (i.e., adequate Recirc flow).
Required Materials: None General
==References:==
2-ES-1.3, Transfer to Cold Leg Recirculation 1 of 13
Appendix C                  Job Performance Measure                Form ES-C-1 Worksheet Initiating Cue:
You are the BOP and the CRS has directed you to align the plant for cold leg Recirc in accordance with ES-1.3, Transfer to Cold Leg Recirculation, commencing at step 4 up to and including the determination that adequate low head recirculation flow has been established.
Time Critical Task: No Validation Time: 20 Minutes 2 of 13
Appendix C                                Page 3                              Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)
: 1. Performance Step:          Obtain Correct Procedure Standard:                      Obtain current revision of 2-ES-1.3 Comment:
: 2. Performance Step:          Observe CAUTION before step 4 Standard:                      Reviews Caution Comment:      Step 4 Note for examiner. This CAUTION is important because it tells the candidate to trip safeguards pumps to prevent damage due to loss of suction. The candidates should be periodically monitoring RWST level to determine if Sl and Containment Spray pumps should be stopped.
: 3. Performance Step:          Reduce 480V Bus Loads Standard:                      Observe Charging Pumps OFF Observe PRZR Heaters OFF Comment: Step 4
: 4. Performance Step:          One at time, Depress Containment Spray Reset Push buttons Standard:                      Depress Pushbuttons Comment:      Step 5 It is not necessary to reset Containment Spray at this time. It was reset at step 6 of E-1.
Candidate may attempt to reset and/or verify relays are reset.
3 of 13
Appendix C                                Page4                              Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)
..J 5. Performance Step:      Place Safety Injection Recirc Switches 1 and 3 to ON Standard:                      Rotate Recirc Switches 1 and 3 to ON position Check 22 Sl Pump Stopped Panel SBF-2 Check 21 Containment Spray Pump Stopped Panel SBF-1 Check RHR Pumps Both Stopped Panel SBF-1 Comment: Step 6
: 6. Performance Step:          Align Service Water as follows:
Check Service Water Aligned for 3 header cps.
Verify SWN-4 & 5 Closed Standard:                      Three header ops was given in Initial Conditions.
Contact Conventional NPO to verify SWN-4 & 5 Closed CUE: SWN-4 and 5 are closed.
Comment: Step 7
: 7. Performance Step:          Observe NOTE before Step 8 Standard:                    Reviews NOTE before Step 8 Comment:
4 of 13
Appendix C                              Page 5                          Form ES-C-1 Performance Information (Denote critical steps with a check mark --J)
...J 8. Performance Step:            Place Safety Injection Recirc Switch 2 to ON Standard:                      Rotate Switch to ON position Check one service water pump supplying Non-Essential Header Yes Check 3 CCW Pumps Running Yes Stop 23 CCW Pump Panel SGF Check Function Complete Light LIT YES Panel SBF-1 Comment: Step 8 Only Recirc Switch reposition is critical
...J 9. Performance Step:      Verify One RHR Heat Exchange Isolated Check 822A & B Open Check 746 & 747 Open Close 746 Standard:                      Observes 822A & B Open Panel SBF-1 Check 746 & 747 Open Panel SBF-1 Rotate Switch for 746 to Close Panel Comment: Only action to Close 746 is critical.
: 10. Performance Step:        Align Safety Injection Recirc Switch 4 as follows Manually Start 21 Recirculation Pump Standard:                    Rotate Switch to Start Position Observe Pump Not Running Comment: Step 10 Panel SBF-1 5 of 13
Appendix C                                Page 6        Form ES-C-1 Performance Information (Denote critical steps with a check mark ...f) 6 of 13
Appendix C                              Page 7          Form ES-C-1 Performance Information (Denote critical steps with a check mark "./)
7 of 13
Appendix C                                Page 8        Form ES-C-1 Performance Information (Denote critical steps with a check mark"'./)
8 of 13
Appendix C                                Page 9        Form ES-C-1 Performance Information (Denote critical steps with a check mark  ..J)
: 24. Performance Step:          Return to Step in effect Standard:                      Returns to Step 11 Comment:
9 of 13
Appendix C                              Page 10                          Form ES-C-1 Performance Information (Denote critical steps with a check mark ..../)
: 25. Performance Step:          Determine if Adequate Low Head Recirculation Flow has been established Check ALL Flow meters (946A-D) Greater than 500 gpm Standard:                      Observes all 956 indicators greater than 500 gpm Comment: Step 11 Panel SBF-2 Terminating Cue: JPM Complete 10 of 13
Appendix C                          Page 11          Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
===Response===
Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -
11 of 13
Appendix C                        Simulator Setup                Form ES-C-1 Reset Simulator to any 100% IC Insert Malfunction MAL-RCS-005A Perform the actions of E-0 including Attachment 1.
Perform the first 18 steps of E-1.
Perform the first 5 steps of ES-1.3 Allow RWST level to decrease to 9.24 feet.
Ensure both RWST Low Low Level Alarms are up.
Ensure Three Header Operations Placard is in place at the service water header selector switch.
12 of 13
Perform the Required Actions to Align the 51 System for Recirculation during Transfer to Cold Leg Recirculation (Manual Start of 21 Recirc Pump)
Page 13 of 7 Initial Conditions:
* A large break LOCA has occurred.
* Safety Injection has been RESET in accordance with E-1, Loss of Reactor or Secondary coolant.
* The RWST level has decreased to 9.24 feet and the CRS has directed you to transfer to cold leg recirculation in accordance with ES-1.3
* All steps up through and including step 18 of E-1 have been completed.
* FSB Ventilation was previously shutdown
* The service water system is aligned for three header operation.
* The first 3 steps of ES-1.3 have been completed.
Initiating Cue:
You are the BOP and the CRS has directed you to align the plant for cold leg Recirc in accordance with ES-1.3, Transfer to Cold Leg Recirculation, commencing at step 6 up to and including the determination that adequate low head recirculation flow has been established.
File: (3000121601-1.doc)                Difficulty: 3      Time: 20 minutes ES-1.3
Appendix C                          Job Performance Measure                      Form ES-C-1 Worksheet IPEC Facility:        UNIT2                            Task No:    0100180421 Task
==Title:==
Respond to a Pressurizer Low Pressure Alarm 000027 A 101                Job Performance Measure          SimC
- KIA
==Reference:==
RO- 4.0 SR0-3.9              No:
Examinee:                                        NRC Examiner:
Facility Evaluator:                              Date:
Method of testing:
Simulated Performance                                Actual Performance            X Classroom                              Simulator - - -X- - -              Plant _ _ _ __
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
* The plant is operating at 100% power
* No Equipment is Out of Service Task Standard: Pressurizer pressure stable, reactor tripped with 23, 24 and 21or 22 RCPs tripped.
Required Materials: None General
==References:==
2-ARP-SAF Initiating Cue:
You are the ATC. Respond to changing plant conditions or events.
Time Critical Task: No Validation Time: 15 minutes 1 of 7
Appendix C                                Page 2                          Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)
NOTE:
Candidate may diagnose failed open Spray Valve at any time during this JPM. The exact order of actions before the Reactor Trip is not important, and they may be performed in any order.
The reactor must be tripped before the Reactor Coolant Pumps are tripped.
: 1. Performance Step:          Acknowledge Pressurizer Low Pressure 2185 psig Alarm and refer to ARP Standard:                      Observe alarm and retrieve ARP from holder Comment: Candidate may recognize pressure lowering before alarm annunciates.
: 2. Performance Step:          Compare redundant Pressurizer Pressure indicators Standard:                      Observe pressure decreasing on all 4 channels Comment: ARP Step 3.1
: 3. Performance Step:          Verify Heaters and Sprays are operating properly.
Standard:                      Observe Heaters energized and one spray valve opened Comment: ARP Step 3.2 Candidate may diagnose stuck open spray valve at this time
: 4. Performance Step:          Evaluate and perform the following:
* If pressure reduction is due to a rapid temperature reduction OR rapid load increase then go to appropriate procedure.
Standard:                      Determine pressure reduction NOT due to temperature or load change Comment: ARP Step 3.3 2 of 7
Appendix C                                Page 3                            Form ES-C-1 Performance Information (Denote critical steps with a check mark--./)
: 5. Performance Step:          IF the Pressurizer heaters or sprays are NOT operating properly, THEN PLACE Pressurizer Pressure Master Controller in MANUAL and ATTEMPT to establish RCS pressure at 2235 psig.
Standard:                      Transfer controller to Manual (T-bar up) and output adjusted to Heaters (Left of null)
Comment: ARP Step 3.4 3 of 7
Appendix C                                Page 4                            Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)
: 9. Performance Step:          Go To E-0 Reactor Trip or Safety Injection Standard:                      Observes conditions to verify reactor tripped Comment: ARP Step 3.5.2.4 Terminating Cue: JPM Complete NOTE: If a Safety Injection occurs during the performance of this JPM, it is likely a failure. The candidate's progress through the required actions will determine actual pass or fail grade.
4 of 7
Appendix C                          Page 5          Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
===Response===
Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - -
5 of?
Appendix C                      Simulator Setup                        Form ES-C-1 Reset Simulator to any 100% IC Insert Malfunction: MAL-CVH-RCS002B 75% 120 Second Ramp.
Insert Schedule: Failed auto rx trips.sch to fail automatic reactor trip with manual trip available.
6 of?
Appendix C                            Initial Conditions        Form ES-C-1 Initial Conditions:
* The plant is operating at 100% power
* No Equipment is Out of Service Initiating Cue:
You are the ATC. Respond to changing plant conditions or events.
Appendix C                          Job Performance Measure                      Form ES-C-1 Worksheet IPEC Facility:        UNIT2                            Task No:    0590060321 Task
==Title:==
Transfer Main Feed from LFBV to MFRV During Power Ascension 059000A403                  Job Performance Measure KIA
==Reference:==
RO- 2.9 SRO- 2.9                  No:                              Sim D Examinee:                                        NRC Examiner:
Facility Evaluator:                              Date:
Method of testing:
Simulated Performance                                Actual Performance            X Classroom                          Simulator          X            Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
* The plant is at approximately 30% power
* Steam and Feed Flow signals are approximately 900,000 lbm/hr
* SG level is currently being maintained by the Low Flow Bypass Valves
* 22, 23, and 24 FRVs are in Automatic.
* An NPO is standing by 21 FRV.
* All necessary Precautions and Limitations are met.
Task Standard: 21 Steam Generator Level is being control by 21 Main Feedwater Regulating Valve in Automatic.
Required Materials: None General
==References:==
2-SOP-21.1, Main Feedwater System 1 of 9
Appendix C                      Job Performance Measure                    Form ES-C-1 Worksheet Initiating Cue: You are the ATC and the CRS has directed you to
* Transfer 21 SG feedwater control from the Low Flow Bypass Valve to the Main Feed Regulating Valve (MFRV) in MANUAL in accordance with 2-SOP-21.1, Main Feedwater System Step 4.2.1.1 c(1)-
4.2.1.1c(7).
* When 21 MFRV operation is verified satisfactory transfer 21 MFRV to Automatic.
Time Critical Task: No Validation Time: 15 2 of 9
Appendix C                                Page 3                              Form ES-C-1 Performance Information (Denote critical steps with a check mark .,f)
: 1. Performance Step:          Obtain correct procedure Standard:                      Obtains 2-SOP-21.1 Comment: Hand the candidate the procedure.
: 2. Performance Step:          Observe NOTES before step 4.2.1.1 Standard:                      Reviews NOTES Comment:
: 3. Performance Step:          Verify selected 21 FW Regulator controller on the Flight Panel is in MAN AND Closed.
Standard:                      Observes Controller in MAN and Potentiometer rotated to 0 position Comment: Step 4.2.1.1 a Panel FBF
: 4. Performance Step:          If desired to transfer level control in AUTO then go to step 4.2.1.1d.
Standard:                    It is not desired to transfer level control in AUTO Comment:
3 of9
Appendix C                                Page4                          Form ES-C-1 Performance Information (Denote critical steps with a check mark"-'>
v5. Performance Step:          SLOWLY begin closing 21 Feedwater Bypass Valve until SG level begins to trend down.
Standard:                      Rotate 21 Feedwater Bypass Valve potentiometer in the close direction (clockwise)
Comment:        Step 4.2.1.1c(1) Panel FBF v6. Performance Step:          OPEN 21 Man Feedwater Regulating Valve to restore level to program Standard:                      Rotate 21 Main Feedwater Regulating Valve potentiometer in the open direction (counter clockwise)
Comment:        Step 4.2.1.1 c(2) Panel FBF v7. Performance Step:          REPEAT steps 4.2.1.1c(1) AND 4.2.1.1c(2) until Feedwater Bypass Valve is Closed Standard:                      Rotate 21 Feedwater Bypass Valve potentiometer in close direction Rotate 21 Main Feedwater Regulating Valve potentiometer in open direction Comment:        Step 4.2.1.1c(3) Panel FBF 4 of9
Appendix C                                  Page 5                            Form ES-C-1 Performance Information (Denote critical steps with a check mark  ..J)
: 8. Performance Step:          Verify 21 3 element controller FC-417 in Rack 85 is in AUTO Standard:                      Locate Controller in Rack 85 and observe it is in AUTO CUE: A Spare operator will monitor SG levels Comment:        Step 4.2.1.1c(4) Rack 85
: 9. Performance Step:            Verify 21 SG level is on trend near programmed level Standard:                      Observe 21 SG level trend; make adjustments as necessary.
Comment:        This is dependent on the candidate ability to smoothly control feedwater flow in Manual Step 4.2.1.1 c(5) Panel F8F
: 10. Performance Step:          Verify 21 SG Steam Flow and Feed Flow indication are matched Standard:                      Observe 21 SG Steam Flow and Feed Flow approximately equal at 900,000 lbm/hr Comment:        This is dependent on the candidate ability to smoothly control feedwater flow in Manual Step 4.2.1.1 c(6) Panel F8F 5 of9
Appendix C                                Page6                        Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)
'\/11. Performance Step:      Place 21 FW Regulator controller to AUTO Standard:                      Move switch to AUTO position Observe FRV response stable (NOT erratic)
Comment: Step 4.2.1.1 c(7) Panel FBF Terminating Cue: JPM Complete 6 of 9
Appendix C                          Page 7          Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
===Response===
Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - -
7 of 9
Appendix C                      Simulator Setup                      Form ES-C-1 Reset Simulator to IC 231 Place MFRVs in Manual Open LFBVs and Close MFRVs.
Stabilize SG Level.
Override 22 Booster Fan Switch to Stop Position to prevent starting.
SWI HVA011A- STOP Position Take a snapshot if JPM is given more than once.
8 of9
Appendix C                            Initial Conditions                Form ES-C-1 Initial Conditions:
* The plant is at approximately 30% power
* Steam and Feed Flow signals are approximately 900,000 lbm/hr
* SG level is currently being maintained by the Low Flow Bypass Valves
* An NPO is standing by 21 FRV.
* All necessary Precautions and Limitations are met.
Initiating Cue:
You are the ATC and the CRS has directed you to
* Transfer 21 SG feedwater control from the Low Flow Bypass Valve to the Main Feed Regulating Valve (MFRV) in MANUAL in accordance with 2-SOP-21.1, Main Feedwater System Step 4.2.1.1 c(1)- 4.2.1.1 c(7).
* When 21 MFRV operation is verified satisfactory transfer 21 MFRV to Automatic.
Appendix C                          Job Performance Measure                      Form ES-C-1 Worksheet IPEC Facility:          UNIT2                          Task No:    0000300521 Task
==Title:==
Perform the Required Actions to Reset FCU Services and CCR Ventilation KIA                  022000A4.01                Job Performance Measure
==Reference:==
SRO- 3.6 RO- 3.6            No:                            -Sim
                                                                                    - E- - -
Examinee:                                        NRC Examiner:
Facility Evaluator:                              Date:
Method of testing:
X Simulated Performance                                Actual Performance Classroom                          Simulator          X            Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
* Sl was initiated due to a steam break in the Turbine Building.
* MSIVs were closed
* All required actions of E-0 have been completed.
* Sl, Phase A & B have been reset.
* The CRS is addressing the remainder of the items in step 22.
Task Standard: Fan Cooler Unit Services and CCR Ventilation have been RESET.
Required Materials: Screwdriver General
==References:==
2-ES-1.1 Sl Termination Initiating Cue: You are the BOP and the CRS has directed you to reset FCU Services and CCR Ventilation in accordance with ES-1.1 step 22.
Time Critical Task: No Validation Time: 15 Min 1 of 7
Appendix C                                Page 2                          Form ES-C-1 Performance Information (Denote critical steps with a check mark ..J)
: 1. Performance Step:          Obtain Correct Procedure Standard:                      Obtain current revision of 2-ES-1.1 Comment:
...J 2. Performance Step: Place the following control switches in the position indicated:
* TCV-1104                        OPEN
* TCV-1105                        OPEN Standard:                      Rotate switches to Open position Comment:Step 22 (6th bullet) Panel SBF-1
: 3. Performance Step:          Verify the following control switches in the position indicated:
* FCU NORM OUT valves              OPEN Standard:                      Observe Switches in OPEN Comment: Step 22 (6th bullet) Panel SBF-2 2 of 7
Appendix C                              Page 3                  Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)
...J  4. Performance Step: Place the following control switches in the position indicated:
* Place Mode Selector Switch to 2 Standard:                      Rotate switch to position 2 Comment: Step 22 (6th bullet) Panel PY2
...J 5. Performance Step: Place the following switches to CUTOUT
* Unit -1 K-8 fan switch (OT2-3)
* OT2-1
* OT2-2 Standard:                    Rotate switches to CUTOUT Comment: Step 22 (6th Bullet) Panel PY2 Back corner of Simulator Control Room 3 of7
Appendix C                              Page4                      Form ES-C-1 Performance Information (Denote critical steps with a check mark ~)
...J 6. Performance Step:      Depress both Reset buttons in racks E-7 and F-8 for each of the following:
* FCU service Water
* FCU ventilation
* CCR Ventilation Standard:                      Reset Pushbuttons Depressed Comment: Step 22 (61h bullet) Racks E-7 and F-8 in back of Simulator Control Room Terminating Cue: JPM Complete 4 of 7
Appendix C                          Page 5          Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No. Simulator E Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
===Response===
Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - -
5 of 7
Appendix C                      Simulator Setup                  Form ES-C-1 Reset Simulator to any 100% Power IC.
Manually Actuate Sl Perform applicable actions of E-0 including Attachment 1 and ES-1.1 up to 22.
Take a snapshot if JPM is to be given multiple times.
6 of 7
Initial Conditions:
* Sl was initiated due to a steam break in the Turbine Building.
* MSIVs were closed
* All required actions of E-0 have been completed.
* Sl, Phase A & B have been reset.
* The CRS is addressing the remainder of the items in step 22.
Initiating Cue:
You are the BOP and the CRS has directed you to reset FCU Services and CCR Ventilation in accordance with ES-1.1 step 22.
Appendix C                          Job Performance Measure                      Form ES-C-1 Worksheet IPEC Facility:        UNIT2                            Task No:    0800300121 Task
==Title:==
Transfer Buses 1and 2 to the Unit Auxiliary Transformer 062000A401                  Job Performance Measure KIA
==Reference:==
RO- 3.3 SRO- 3.1            No:                              Sim F Examinee:                                        NRC Examiner:
Facility Evaluator:                              Date:
Method of testing:
X Simulated Performance                                Actual Performance Classroom                          Simulator          X            Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
* A Plant startup is in progress in accordance with 2-POP-1.3 Plant Startup from Zero to 45% Power.
* The turbine has been synchronized with Breakers 7 and 9 closed.
Task Standard: Buses 1 - 4 are transferred to the Unit Auxiliary Transformer.
Required Materials: None General
==References:==
2-SOP-27 .1.4 Initiating Cue: You are the BOP and the CRS has directed you to transfer 6.9 kV buses 1 and 2 to the Unit Auxiliary Transformer in accordance with 2-SOP-27 .1.4 Time Critical Task: No Validation Time: 10 1 of 9
Appendix C                                Page 2                            Form ES-C-1 Performance Information (Denote critical steps with a check mark -..f)
: 1. Performance Step:          Obtain Correct Procedure and Reviews Precautions and Limitations Standard:                      Obtains 2-SOP-27.1.4 P&Ls reviewed Comment:
: 2. Performance Step:          VERIFY Unit Auxiliary Transformer and Station Auxiliary Transformer are within 50 volts.
Standard:                      Observes UAT and SAT are within 50 Volts Comment: Step 4.2.1.1 NOTE to examiner: If Station Auxiliary and Unit Auxiliary Transformer voltages are not within 50 Volts, perform JPM steps 3-5 below.
: 3. Performance Step:          Place the appropriate Tap Changer in MANUAL Standard:                      Push in handle to place UAT Tap Changer in Manual Comment: Step 4.1. 7.1 NOTE: During validation, the Unit Aux Tap Changer meter was not functioning and the Station Aux volt meter was not indicating properly.
If necessary CUE candidate to use SAT volt meter on the Supervisory Panel SHF.
2 of9
Appendix C                                Page 3                            Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)
: 4. Performance Step:          Manually adjust Unit Aux Tap Changer to match voltages Standard:                      Rotate switch to raise of lower voltage as necessary Comment: Step 4.1. 7.2
: 5. Performance Step:          Place UAT Tap Changer in AUTO Standard:                      Pull Tap Changer Switch to OUT Comment: Step 4.1.7.3
..J 6. Performance Step:      Place 6900V Bus 1 Synchroscope switch to Bus 1 -
Unit Standard:                      Place Handle into switch location and rotate to Bus 1 Unit position Comment: Step 4.2.1.2
: 7. Performance Step:          Verify Synchroscope at approximately 12 o'clock Standard:                    Observes Synchroscope at 12 o'clock Comment: Step 4.2.1.3 3 of9
Appendix C                                Page 4                          Form ES-C-1 Performance Information (Denote critical steps with a check mark -1)
..J 8. Performance Step:      Close Normal Feed Breaker UT -1 Standard:                      Rotate Normal Feed Breaker Switch to Close Comment: Step 4.2.1.4
<\J 9. Performance Step:      Open Bus 1-5 Tie Breaker UT1-ST5 Standard:                      Rotate Tie Breaker Switch to Open Comment: Step 4.2.1.5
..J 10. Performance Step:      Place Synchroscope to OFF Standard:                      Rotate Switch to OFF Comment: Step 4.2.1.6
: 11. Performance Step:        VERIFY Unit Auxiliary Transformer and Station Auxiliary Transformer are within 50 volts.
Standard:                    Observes UAT and SAT are within 50 Volts Comment:Step Step 4.2.2.1 4 of9
Appendix C                                Page 5                            Form ES-C-1 Performance Information (Denote critical steps with a check mark --./)
'\1 12. Performance Step:    Place 6900V Bus 2 Synchroscope switch to Bus 2 -
Unit Standard:                      Place Handle into switch location and rotate to Bus 2 Unit position Comment: Step 4.2.2.2
: 13. Performance Step:        Verify Synchroscope at approximately 12 o'clock Standard:                    Observes Synchroscope at 12 o'clock Comment: Step 4.2.2.3
..J 14. Performance Step:    Close Normal Feed Breaker UT-2 Standard:                    Rotate Normal Feed Breaker Switch to Close Comment: Step 4.2.2.4
'\1 15. Performance Step:    Open Bus 2-5 Tie Breaker UT2-ST5 Standard:                    Rotate Tie Breaker Switch to Open Comment: Step 4.2.2.5 5 of 9
Appendix C                                Page 6        Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)
"' 16. Performance Step:      Place Synchroscope to OFF Standard:                      Rotate Switch to OFF Comment: Step 4.2.2.6 Terminating Cue: JPM Complete 6 of 9
Appendix C                          Page 7            Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
===Response===
Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -
7 of 9
Appendix C                        Initial Conditions              Form ES-C-1 Initial Conditions:
* A Plant startup is in progress in accordance with 2-POP-1.3 Plant Startup from Zero to 45% Power.
* The turbine has been synchronized with Breakers 7 and 9 closed.
Initiating Cue:
You are the BOP and the CRS has directed you to transfer 6.9 kV buses 1 and 2 to the Unit Auxiliary Transformer in accordance with 2-SOP-27 .1.4
Appendix C                          Job Performance Measure                      Form ES-C-1 Worksheet IPEC Facility:        UNIT2                            Task No:    0450040421 Task
==Title:==
Respond to Turbine First Stage Pressure Transmitter Failure 016000A2.01                  Job Performance Measure KIA
==Reference:==
RO- 3.0 SRO- 3.1            No:                              Sim G Examinee:                                        NRC Examiner:
Facility Evaluator:                              Date:
Method of testing:
Simulated Performance                                Actual Performance            X Classroom                          Simulator          X            Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
* Reactor at indicated power.
* Steady State, equilibrium Xenon.
* No equipment out of service.
Task Standard: .
Required Materials: None General
==References:==
2-AOP-INST-1, Instrument or Controller Failures 2-AOP-ROD-1, Rod Control and Indication System Malfunctions Initiating Cue: You are the ATC.
Time Critical Task: No Validation Time: 10 1 of 8
Appendix C                                Page 2                            Form ES-C-1 Performance Information (Denote critical steps with a check mark  -1)
..J 1. Performance Step:      Operator takes Immediate Actions from memory (steps 3.1-3.3)
Note: Immediate actions of 2-AOP-INST -1 Standard:                      1. Checks all parameters listed
: 2. Determines that PT -412A has failed low Comment:
..J 2. Performance Step:      Take manual actions as necessary to control parameters and stabilize the plant Standard:                      Place Rod Control in Manual Comment:        Procedure step 3.2
: 3. Performance Step:          Have all controls systems listed in step 3.1 been checked as being affected?
Standard:                    Observe all systems were checked during performance of immediate operator actions.
Comment:      Procedure step 3.3 2 of 8
Appendix C                                  Page 3                            Form ES-C-1 Performance Information (Denote critical steps with a check mark  .V)
: 4. Performance Step:          Has an instrument failure occurred?
Standard:                      Determine an instrument failure has occurred PT-412A failed low.
Comment:        Procedure step 4.1
: 5. Performance Step:          Go To applicable step for the indicated failure Standard:                      Identify step 4.168 is the affected step Comment:        Procedure step 4.2
: 6. Performance Step:          Has Channel A failed low?
Standard:                      Determine 412A has failed low using PICS Comment:        Procedure step 4.168 7 Performance Step:            Are control rods in Manual?
Standard:                      Rod control should be in manual at this time Comment:        Procedure step 4.169 3 of 8
Appendix C                                Page4                            Form ES-C-1 Performance Information (Denote critical steps with a check mark ...f)
: 8. Performance Step:          Maintain Tavg and Tref per graph RPC-4 (RCS T-ref vs Reactor Power) and restore delta flux to target per CRS direction using any of the following
* Rod Control
* Boration
* Adjust Turbine Load CUE: The CRS directs restoring Tave using Control Rods.
Standard:                      Withdraw Control Rods to restore Tavg Comment:        Procedure step 4.170 4 of 8
Appendix C                                Page 5        Form ES-C-1 Performance Information (Denote critical steps with a check mark--./)
Terminating Cue: JPM Complete 5 of 8
Appendix C                          Page 6            Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
===Response===
Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -
6 of 8
Appendix C                        Simulator Setup        Form ES-C-1 Any 100 % Power IC ENSURE GROUP 92 IS DISPLAYEO ON ENG CRT PIGS MONITOR SHOW GROUP 92 PT-412A, First Stage Turbine Pressure fails Low XMT-MSS053A FIXED OUTPUT:
PT-412A FIRST STAGE TURBINE PRESSURE C SEVERITY -14.7 Continuous Rod Motion Insert Malfunction: MAL-CRF004A to 72 step/min This malfunction will start when rod motion is initiated.
7 of 8
Appendix C                          Initial Conditions Form ES-C-1 Initial Conditions:
* Reactor at indicated power.
* Steady State, equilibrium Xenon.
* No equipment out of service.
Initiating Cue:
You are the ATC.
Appendix C                          Job Performance Measure                      Form ES-C-1 Worksheet Facility:      Indian Point 2                      Task No:    0030010101 Task
==Title:==
Start a Reactor Coolant Pump 003000A406            Job Performance Measure          Sim H KIA
==Reference:==
RO- 2.9 SRO- 2.9            No:
Examinee:                                        NRC Examiner:
Facility Evaluator:                              Date:
Method of testing:
Simulated Performance                                Actual Performance              X Classroom                          Simulator          X            Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
* Reactor is shutdown with RCS temperature and pressure as indicated
* 21 Reactor Coolant Pump is fully operational
* The RCS is aligned per COL 1.1
* All applicable Precautions and Limitations are satisfied
* DMIMS is in service
* An NPO is standing by 21 RCP
* The RCP has been secured for 12 hours Task Standard: 21 RCP is running and its Lift Oil Pump is secured.
Required Materials: None General
==References:==
2-SOP-1.3, Reactor Coolant Pump Startup and Shutdown.
Initiating Cue: You are the BOP and the CRS has directed you to start 21 RCP in accordance with 2-SOP-1.3 steps 4.1.1 through 4.1.17 Time Critical Task: No Validation Time: 20 1 of 12
Appendix C                                Page 2                            Form ES-C-1 Performance Information (Denote critical steps with a check mark ..../)
: 1. Performance Step:          Obtain correct procedure Standard:                      Obtains SOP-1.3 Comment:        Evaluator may give candidate the procedure at this time
: 2. Performance Step:          Review Precautions and Limitations Standard:                      Check plant lineup and conditions Comment:        Candidate was given all P&Ls were met in Initial Conditions.
Candidate may take some time to look at P&Ls but should not take time to evaluate all.
: 3. Performance Step:          If the Containment is accessible then
* Inspect Bearing Lift Oil System for leaks if RCP secured for 30 days or longer
* Inspect JO Bell Oil Level Alarm tubing for damage and leaks Standard:                      Bearing Lift Oil System Inspection is not necessary Contact NPO to inspect Oil Level Alarm CUE: NPO reports "All conditions normal for 21 RCP" Comment:        Step 4.1.1 2 of 12
Appendix C                                Page 3                        Form ES-C-1 Performance Information (Denote critical steps with a check mark ..J)
: 4. Performance Step:          Check if RCP should be rotated by hand Standard:                      Determine rotation is not necessary (three remaining RCPs are running.
Comment:        Step 4.1.2
: 5. Performance Step:      Observe NOTES before step 4.1.3 Standard:                      Reviews NOTES Comment:
...J 6. Performance Step:      Verify Bearing Lift Pump is Running Standard:                      Rotate 21 Bearing Lift Pump switch to Start Observe red light (breaker closed) and white light (21 Lift Pressure) are both lit Comment:        Step 4.1.3 Panel SAF 3 of 12
Appendix C                                Page4                          Form ES-C-1 Performance Information (Denote critical steps with a check mark ...f)
: 7. Performance Step:          Select Containment Microphone to the RCP (21) to be started Standard:                      Rotate Microphone switch to 21 RCP Comment:        Step 4.1.4 CRS desk
: 8. Performance Step:          Verify DMIMS Signal Recorder is in service Standard:                      DMIMS signal recorder is in service given in Initial Conditions.
CUE: DMIMS Signal Recorder is in service.
Comment: Step 4.1.5
: 9. Performance Step:            If power is being supplied from the Station Auxiliary Transformer
* Place the Tap Changer in MANUAL
* RAISE the bus voltage to 7.2 KV Standard:                      Push Tap Changer Handle IN for Manual Rotate switch to RAISE to establish 7.2 KV.
CUE:            SAT meter on rear of flight panel is not indicating properly. Use the volt meter on Supervisory Panel SHF.
Comment:        This is not critical because on the Simulator the RCP will Start regardless of the voltage.
Step 4.1.6 Panel FCR (rear of flight panel) 4 of 12
Appendix C                                Page 5                              Form ES-C-1 Performance Information (Denote critical steps with a check mark --./)
: 10. Performance Step:          If power is being supplied from GT25/26 Standard:                      Determine power is NOT being supplied from GT-25/26 No Action is Required Comment:        Step 4.1.7
: 11. Performance Step:          Prior to starting the first of either 23 or 24 RCP, Verify that both spray valves are CLOSED to prevent a pressure transient on the RCS.
Standard:                      Observer both 23 and 24 RCP are operating No Action Required Comment:        Step 4.1.8
: 12. Performance Step:          Verify Bearing Lift Pump has been running for at least two minutes Standard:                      Determine pump has been operating for 2 minutes Comment:        It is expected that two minutes has elapsed since the pump was started. If not the candidate should wait until 2 minutes has elapsed.
This is NOT critical because the pump would start in less than two minutes. This is an administrative requirement.
Step 4.1.9 5 of 12
Appendix C                                Page 6                        Form ES-C-1 Performance Information (Denote critical steps with a check mark -/)
: 13. Performance Step:          Observe NOTE before step 4.1.1 0 Standard:                      Reviews the NOTE Comment:
: 14. Performance Step:          NOTIFY Security, the start of an RCP is imminent and the accompanying voltage dip may cause auto start of the Security Diesel Standard:                      Using phone or radio simulate contact Security and inform of imminent start of 21 RCP CUE: Acknowledge as Security the start of 21 RCP Comment:        Step 4.1.1 0
: 15. Performance Step:          Observe CAUTIONS and NOTES before step 4.1.11 Standard:                      Reviews Cautions and Notes Comment:
6 of 12
Appendix C                                Page 7                      Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)
...J 16. Performance Step: Start the RCP Standard:                      Rotate Switch for 21 RCP to Start position Observe Motor Amps off scale high Observe Flow indication increasing Verify Reactor Coolant 21 Loop Low Flow Channel Trip 90% alarm clears before motor current returns on scale.
Comment: Step 4.1.11 Panel SAF
: 17. Performance Step:        Verify the normal running current Standard:                    Observe AC Amps approximately 400 Comment: Step 4.1.12
: 18. Performance Step:        Place the Containment Microphone to OFF Standard:                    Rotate switch to OFF CUE:          IF CRS asked if it is desired to turn off the microphone "Yes the CRS desires the microphone turned off" Comment:      Step 4.1.13 7 of 12
Appendix C                              Page 8                      Form ES-C-1 Performance Information (Denote critical steps with a check mark >/)
: 19. Performance Step:          Closely MONITOR Digital Metal Impact Monitor System DMIMS Standard:                      Observes DMIMS display Comment:        Step 4.1.14 DMIMS rack (behind the Flight Panel)
: 20. Performance Step:          MONITOR the following RCP parameters until stable
* RCS Pressure
* Loop flow
* AC Amps
* Steam Generator Levels
* RCP Seal 1 Leak off flow
* Seal injection flow
* Seal inlet temperature
* Seal outlet temperature
* RCP Vibration
* RCP Bearing temperatures
* RCP Stator temperature Standard:                      Observe RCP parameters Comment:        Step 4.1.15 8 of 12
Appendix C                                Page 9                          Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)
: 21. Performance Step:          If power is being supplied from the station Auxiliary Transformer then
* RAISE the bus voltage to 7.05 to 7.15 KV
* PLACE the tap changer in AUTO Standard:                      Rotate switch as necessary to set bus voltage to 7.05
                              -7.15 KV.
Pull switch OUT to place tap changer in AUTO Comment:        Step 4.1.16 Panel FCR (rear of flight panel)
: 22. Performance Step:          When the RCP has run for at least 1 minute then STOP the Bearing Lift Oil Pump Standard:                      Observe 1 minute has elapsed Rotate switch to STOP position Comment:        Step 4.1.17 Panel SAF Terminating Cue: JPM Complete 9 of 12
Appendix C                          Page 10          Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
===Response===
Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - -
10 of 12
Appendix C                          Simulator Setup            Form ES-C-1 Reset Simulator to IC-5 Trip 21 RCP Allow simulator to run to stabilize plant conditions If JPM is to be run more than once, take a Snapshot.
Ensure Seal Return Flow is 1.1 gpm or greater. If necessary override indication to 1.1 gpm.
XMT -CVC009A set to 1.1 XMT -CVCOOBA set to 1.1 11 of 12
Page 12 of 12 Initial Conditions:
* Reactor is shutdown with RCS temperature and pressure as indicated
* 21 Reactor Coolant Pump is fully operational
* The RCS is aligned per COL 1.1
* All applicable Precautions and Limitations are satisfied
* DMIMS is in service
* An NPO is standing by 21 RCP
* The RCP has been secured for 12 hours Initiating Cue:
You are the BOP and the CRS has directed you to start 21 RCP in accordance with 2-SOP-1.3 steps 4.1.1 through 4.1.17 File: 0030011601-1.doc Parent Task# 003*001 *01 *01
Appendix C                          Job Performance Measure                      Form ES-C-1 Worksheet IPEC Facility:        UNIT2                            Task No:    0840140421 Task
==Title:==
Align Nitrogen Bottle to 21 Atmospheric Steam Dump 039000A407                  Job Performance Measure KIA
==Reference:==
RO- 2.8 SRO- 2.9            No:                              In Plant I Examinee:                                        NRC Examiner:
Facility Evaluator:                              Date:
Method of testing:
X Simulated Performance                                Actual Performance Classroom                          Simulator                        Plant            X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
* Work in the transformer yard resulted in a loss of instrument air and unit trip.
* All MSIVs were closed.
* RCS temperature is slowly rising.
Task Standard: Nitrogen Bottle is aligned to supply 21 SG Atmospheric valve operator.
Required Materials: None General
==References:==
2-SOP-ESP-001, Local Equipment Operation and Contingency Actions Initiating Cue: You are the Conventional NPO and the CRS has directed you to align backup nitrogen to 21 Atmospheric Steam Dump Valve in accordance with 2-SOP-ESP-001 Section 4.12.
Time Critical Task: No Validation Time: 10 Minutes 1 of 8
Appendix C                                Page 2                          Form ES-C-1 Performance Information (Denote critical steps with a check mark ")
: 1. Performance Step:          Obtain Correct Procedure Standard:                      Obtains 2-SOP-ESP-001 and review Precautions and Limitation CUE: Hand the candidate the procedure Comment:
: 2. Performance Step:          Observe NOTEs before step 4.12.1 Standard:                      Reviews Notes Comment:
-v3. Performance Step:        To align 21 Atmospheric go to Step 4.12.2 Standard:                      Continues procedure with step 4.12.2 Comment:
: 4. Performance Step:          If PCV-1134 (21 ATMO) needs to be operated from the CCR, then align backup N2 as follows Standard:                      The next 7 JPM steps will align N2to 21 ATMO Comment:        Step 4.12.2 2 of 8
Appendix C                                Page 3                          Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)
: 5. Performance Step:          Verify MS 3A, (PCV-1134 Inlet Stop Main Steam Line 21 is OPEN Standard:                      Locates MS-3A and observes valve position CUE:            When valve is located and simulated checked open, "MS-3A is Opened".
Comment:        Step 4.12.2.1
..J 6. Performance Step:      Connect both Nitrogen bottle quick disconnect to the fittings upstream of SGN-522/SGN-524 Standard:                      Locates quick disconnect hoses and indicates where they are to be connected.
CUE:            When disconnect hoses are located and simulated connected "Quick Disconnect Hoses are connected".
Comment:        Step 4.12.2.2
..J 7 Performance Step:        Open both Nitrogen bottle isolation valves Standard:                      Locate Nitrogen bottle isolation valve Cue:          When valves are located, Both Nitrogen bottle valves are open Comment:        NOTE Only ONE nitrogen bottle valve open is critical.
3 of 8
Appendix C                                Page4                                Form ES-C-1 Performance Information (Denote critical steps with a check mark ..../)
...J  8. Performance Step:    Open one of the following valves
* N-853
* N-855 Standard:                      Locate Valve and Open CUE:            When either valve is located and simulated opened " The valve is open".
Comment:        Step 4.12.2.4
: 9. Performance Step:          Verify both f the following regulators are set for 85 psig
* N-850
* N-854 Standard:                    Locate regulators and demonstrate how to adjust pressure CUE:            When regulators located and candidate demonstrates how to adjust pressure, "The Regulators are set at 85 psig" Comment:        Step 4.12.2.5
...J 10. Performance Step:    Close IA-806 21 SG ATMO Relief lnst Air Stop Standard:                    Locate valve and simulate closing CUE:          When valve is located and simulated closed "The Valve is Closed" Comment:
4 of 8
Appendix C                                Page 5                            Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J) v11. Performance Step:        Open SGN-522 CCR Remote Backup Nitrogen Inlet Stop to 21 ATMO Standard:                      Locate valve and simulate opening CUE:            When the valve is located and simulated opened "The valve is opened".
Comment:        Step 4.12.2. 7
: 12. Performance Step:          Notify the CCR N2 Bottle Supply is aligned to PCV-1134.
Standard:                      Simulate calling CCR using radio CUE: Acknowledge as CCR Comment:        Step 4.12.2.8 Terminating Cue: JPM Complete 5 of 8
Appendix C                        Initial Conditions  Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
===Response===
Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -
Appendix C                                          Initial Conditions                                                      Form ES-C-1 POSITIONER lA SUPPLY N2 SUPPLY Quick disconllOIIICt and1'1ex "Ku                                                                                                hose (P-3)
                                                                                                                                            "0"
                  .!          3- 27psi
: l. _. . . . . . . .
1G-50ma VENT VALVE NUMBERING TABLE Local
  ~ l-----~-t-:-:-::F'::'O:-R-P_c_y._11_34__ *** -~~ PC_V*1-13_5---f-:..,-F""O:::R:-P-C_V_-1_1_36_+~EO::::R:-P-C_V_*_11_3_Z--i              nitrogen cylinder Lll.-806                  IA-807                IA-808                    IA-809 IA-1206                    IA-1207                IA-1208 SGN ...500                SGN-501                SGN-502                    SGN-503 SGN-508                    SGN-509                SGN-510                    SGN-511 IA-1008                    IA-1009                IA-1010                    IA-1011 ALTERNATE N2 IA-1202                    IA-1203                IA-1204                    IA-1205 SUPPLY PRV-5607                  PRV-5e09 PRV-5609                  PRV-5610 PH$110 P~6111 P~6112 Pl-6113 N-853 N-850
Appendix C                        Initial Conditions                    Form ES-C-1 Initial Conditions:
* Work in the transformer yard resulted in a loss of instrument air and unit trip.
* All MSIVs were closed.
* RCS temperature is slowly rising.
Initiating Cue:
You are the Spare RO and the CRS has directed you to align backup nitrogen to 21 Atmospheric Steam Dump Valve in accordance with 2-SOP-ESP-001 Section 4.12.
Appendix C                          Job Performance Measure                      Form ES-C-1 Worksheet IPEC Facility:        UNIT2                            Task No:    0720060122 Task
==Title:==
Secure Discharge Lineup for 23 Large Gas Decay Tank and Lineup 24 Large Gas Decay Tank for Release.
071000A405 KIA
==Reference:==
RO - 2.6 SRO- 2.6            Job Performance Measure No:      In Plant J Examinee:                                          NRC Examiner:
Facility Evaluator:                                Date:
Method of testing:
X Simulated Performance                                Actual Performance Classroom                        Simulator                        Plant            X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
* The system is aligned in accordance with COL 5.2.1.
* Preparations are being made for a refueling outage
* Release of 23 Large Gas Decay Tank (LGDT) has just been completed
* N2 purge of 23 LGDT will NOT be performed
* The SM has directed 24 Large Gas Decay Tank is to be released.
* 24 Large Gas Decay Tank had been isolated, sampled, and the sample has been analyzed.
* A PAB Exhaust Fan is Running
* Iodine and Particulate Composite Collection Device IS in place
* Release Permit has been completed and approved to release 24 LGDT in accordance with SOP-5.2.1.
* Radiation Monitor R-44 is in service
* Radiation Monitor R-44 High Alarm setpoint was NOT adjusted
* RrA for the release permit is 3.525 E-06 IJCi/cc
* Release Permit Number 140015
* TMIN 45 min
* Planned Release Time 20 min 1 of 11
Appendix C                    Job Performance Measure                Form ES-C-1 Worksheet Task Standard: 23 Large Gas Decay Tank Lineup secured and 24 Large Gas Decay Tank is lined up for release.
Required Materials: None General
==References:==
2-SOP-5.2.1, Gaseous Waste Disposal System Operation 2-SOP-5.2.3, Gas Analyzer Initiating Cue:
You have been directed to SIMULATE securing the lineup for 23 Large Gas Decay Tank in accordance with SOP-5.2.1 step 4.4.13 and lineup 24 Large Gas Decay Tank for release in accordance with SOP-5.2.1 Attachment 4 section 1 Time Critical Task: No Validation Time: 20 minutes 2 of 11
Appendix C                                Page 3                          Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)
" 1. Performance Step:        When release has been completed,:
* If N2 purge will not be performed then close RCV-014 and go to step 4.4.14 Standard:                      N2 purge will not be performed (given in initial conditions)
Rotate regulator to left to decrease air pressure on indicator on Waste Disposal Panel CUE: Air pressure is ZERO Green Light is LIT Red Light is OFF Comment:        Procedure step 4.4.13.1
: 2. Performance Step:          Enter finishing time in Unit Narrative Log Standard:
CUE: "The FSS has made the Unit Narrative Log entry".
Comment:        Procedure step 4.4.14 3 of 11
Appendix C                                Page 4                            Form ES-C-1 Performance Information (Denote critical steps with a check mark--./)
" 3. Performance Step:        Verify Gas Analyzer is returned to AUTO (sampling the in service GOT}
* Verify all Sample-Bypass Switches are BYPASSED per step 4.1. 7 with the noted exception (Not Critical)
* Place the LGDT Sample-Bypass Switch in SAMPLE
* Place the MODE Switch in AUTO (Not Critical)
Standard:                      Observes all switches in BYPASS (Not Critical)
Rotate the LGDT Sample-Bypass Switch to SAMPLE Rotate the MODE Switch to AUTO CUE: hand candidate procedure 2-SOP-5.2.3 When switches are located:
      "All Sample-Bypass Switches are in BYPASS" "The LGDT Sample-BYPASS switch is in Sample" "The MODE Switch is in AUTO" Comment:        Procedure 2-SOP-5.2.3
: 4. Performance Step:          Complete Section 2 of Discharge Sample Checkoff to restore normal system lineup Standard:                      Perform next 3 JPM Steps Comment:        Procedure Step 4.4.15 4 of 11
Appendix C                                  Page 5                            Form ES-C-1 Performance Information (Denote critical steps with a check mark ~)
~ 5. Performance Step:        1619 23 LGDT Outlet Stop- Closed Standard:                      Locate Valve and Simulate Closing CUE: When valve is located, "The valve is closed" Comment:        2-SOP-5.2.1 Attachment 3 Section 2
-1/ 6. Performance Step:      1644C PCV-1038A Inlet Stop- OPEN Standard:                      Locate Valve and Simulate Opening CUE: When valve is located, "The valve is opened" Comment:        2-SOP-5.2.1 Attachment 3 Section 2 7 Performance Step:            1643C 23 LGDT Stop (Inlet and PT)- OPEN Standard:                      Locate Valve and Observe OPENED CUE When Valve is located, "The valve is opened".
Comment:        This step is not critical; the valve is expected to be opened.
: 8. Performance Step:          Return completed applicable attachment to CCR Standard:
CUE:          "The FSS will return the attachment to the CCR" Comment:
5 of 11
Appendix C                                    Page6                            Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)
: 9. Performance Step:          Verify RCV-014 Plant Stack Discharge Valve is CLOSED Standard:                      Locate Valve and observe closed indications.
CUE: When the valve is located, "The valve is closed" Comment:        This step is not critical; the valve was closed at the beginning of this evolution.
: 10. Performance Step:          Determine appropriate Discharge/Sample Checkoff Attachment to be used for discharge and Align selected GOT (Attachment 4 - 24 LGDT) for release by completing Section 1 Standard:                      Simulate performing the next 3 JPM steps Comment:
...J 11. Performance Step:      16440 PCV-1 039 Outlet Stop- CLOSED Standard:                      Locate 16440 and simulate closing CUE: When the valve is located, "The valve is closed" Comment:        2-SOP-5.2.1 Attachment 4 Section 1 6 of 11
Appendix C                                Page 7                          Form ES-C-1 Performance Information (Denote critical steps with a check mark ")
" 12. Performance Step:        1620 24 LGDT Outlet Stop- OPENED Standard:                      Locate 1620 and simulate closing CUE: When the valve is located, "The valve is opened" Comment:        2-SOP-5.2.1 Attachment 4 Section 1
: 13. Performance Step:          1643D 24 LGDT Stop {Inlet and PT)- OPENED Standard:                      Locate 1644D and simulate Verifying Open CUE: When the valve is located, "The valve is OPENED" Comment:        2-SOP-5.2.1 Attachment 4 Section 1
: 14. Performance Step:        Verify remaining valves on Attachment 4 - CLOSED Standard:                      Locate each valve and simulate checking CLOSED CUE: When valves are located, "The valve is closed".
Comment:        Valves 1632 and PCV-1 0398 can be verified closed on the Waste Disposal Panel or the valves can be visually verified closed locally.
Terminating Cue: JPM Complete 7 of 11
Appendix C                          Page 8            Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
===Response===
Result: SAT or UN SAT Examiner's signature and date: - - - - - - - - - - - -
8 of 11
Appendix C                                  Page  9                          Form ES-C-1 No:2-SOP-5.2.1        Rev: 33 GASEOUS WASTE DISPOSAL SYSTEM OPERATION                            Page 36 of 41 ATTACHMENT 3 23 LGDT Discharge I Sample Checkoff (Page 1 of 1}
Release Permit Number        l4DD l-5"                                                )!Ci/cc T MIN  =_tf_._1_._____ min. {SEE Attachment 8}      Planned Release Time (T) = .:J 0      mim NOTE
  );>- WHEN multiple LGDTs are to be sampled and released, THEN additional associated discharge stops are NOT closed as called for below.
  )o>  Chemistry Manager permission is required, when a 23 LGDT is >1 E-2 uCi/cc 1.0      23 Large Gas Decay Tank Start of Discharge              Position
* 1644C        PCV-1038A Inlet Stop            CLOSED
* 1631          23 LGDT Reuse Outlet            CLOSED
* PCV-10388    Gas Analyzer Sample Inlet      CLOSED
* 1617          21 LGDT Outlet Stop            CLOSED
* 1618          22 LGDT Outlet Stop            CLOSED
* 1620          24 LGDT Outlet Stop            CLOSED
* 1652F          21 SGDT Outlet Stop            CLOSED
* 1652E          22 SGDT Outlet Stop            CLOSED
* 1652D          23 SGDT Outlet Stop            CLOSED
* 1652C          24 SGDT Outlet Stop            CLOSED
* 16528          25 SGDT Outlet Stop            CLOSED
* 1652A          26 SGDT Outlet Stop            CLOSED
* 1619          23 LGDT Outlet Stop            OPEN
* 1643C          23 LGDT Stop (Inlet and PT)    OPEN 2.0      Termination of Discharge
* 1619          23 LGDT Outlet Stop            CLOSED
* 1644C          PCV-1038A Inlet Stop            OPEN
* 1643C          23 LGDT Stop (Inlet and PT)    OPEN Completed by: _ _ _ _ _ _ _ _ _ _ __                  Date:
                                                              ----          Time:* - - - - -
9 of 11
Page 10                          Form ES-C-1 Appendix C GASEOUS WASTE DISPOSAL SYSTEM                          No:2-SOP-5.2.1        Rev:33 OPERATION                              Page 37 of 41 ATTACHMENT 4 24 LGOT Discharge I Sample Checkoff (Page 1 of 1)
Release Permit Number    (t..f OOI (,                      RTA = 3. 5.;>~ ~-lao    J!Ci/cc T MIN = __tf_t;"
___ min. {SEE Attachment 8}          Planned Release Time (T) = .:J b      mim NOTE
      );. WHEN multiple LGDTs are to be sampled and released, THEN additional associated discharge stops are NOT closed as called for below.
      );>  Chemistry Manager permission is required, when a 24 LGDT is >1 E-2 uCi/cc 1.0    24 large Gas Decay Tank Start of Discharge          Position    lnit. Date
* 1644D            PCV-1039A Inlet Stop            CLOSED
* 1632              24 LGDT Reuse Outlet            CLOSED
* PCV-10398        Gas Analyzer Sample Inlet      CLOSED
* 1617            21 LGDT Outlet Stop            CLOSED
* 1618            22 LGDT Outlet Stop            CLOSED
* 1619            23 LGDT Outlet Stop            CLOSED
* 1652F            21 SGDT Outlet Stop            CLOSED
* 1652E            22 SGDT Outlet Stop            CLOSED
* 1652D            23 SGOT Outlet Stop            CLOSED
* 1652C            24 SGDT Outlet Stop            CLOSED
* 16528            25 SGDT Outlet Stop            CLOSED
* 1652A            26 SGDT Outlet Stop            CLOSED
* 1620            24 LGDT Outlet Stop            OPEN
* 1643D          24 LGDT Stop (Inlet and PT)    OPEN 2.0    Termination of Discharge
* 1620            24 LGDT Outlet Stop            CLOSED
* 16440          PCV-1039A Inlet Stop            OPEN
* 1643D          24 LGDT Stop (Inlet and PT)    OPEN Completed by: _ _ _ _ _ _ _ _ _ _ __                Date: _ _ __        Time: _ _ _ __
10 of 11
Appendix C                            Initial Conditions                Form ES-C-1 Initial Conditions:
* The system is aligned in accordance with COL 5.2.1.
* Preparations are being made for a refueling outage
* Release of 23 Large Gas Decay Tank (LGDT) has just been completed
* N2 purge of 23 LGDT will NOT be performed
* The SM has directed 24 Large Gas Decay Tank is to be released.
* 24 Large Gas Decay Tank had been isolated, sampled, and the sample has been analyzed.
* A PAB Exhaust Fan is Running
* Iodine and Particulate Composite Collection Device IS in place
* Release Permit has been completed and approved to release 24 LGDT in accordance with SOP-5.2.1.
* Radiation Monitor R-44 is in service
* Radiation Monitor R-44 High Alarm setpoint was NOT adjusted
* RrA for the release permit is 3.525 E-06 !JCi/cc
* Release Permit Number 140015
* TMIN 45 min
* Planned Release Time 20 min Initiating Cue:
You have been directed to SIMULATE securing the lineup for 23 Large Gas Decay Tank in accordance with SOP-5.2.1 step 4.4.13 and lineup 24 Large Gas Decay Tank for release in accordance with SOP-5.2.1 Attachment 4 section 1
Appendix C                          Job Performance Measure                      Form ES-C-1 Worksheet Facility:      IIPEC Unit 2                        Task No:    0001070521 Task
==Title:==
Perform the Required Actions to Replace 21 Feedwater Regulating Bypass Valve Air Lines for Local Operation during Loss of Secondary Heat Sink OOWE05A101                  Job Performance Measure          In-Plant K KIA
==Reference:==
RO- 4.1 SRO- 4.0            No:
Examinee:                                        NRC Examiner:
Facility Evaluator:                              Date:
Method of testing:
X Simulated Performance                                Actual Performance Classroom                          Simulator                        Plant            X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
* A loss of Secondary Heat Sink has occurred.
Task Standard: Air control line for Main Feed Bypass Regulating Valve, FCV-417L, replaced properly in accordance with FR-H.1, Attachment 2.
Required Materials: None General
==References:==
2-FR-H.1, Loss of Secondary Heat Sink Initiating Cue:
The CCR has directed you to replace the control air line on FCV-417L Main Feed Bypass Regulating Valve for 21 Feed Line, in accordance with Attachment 2 of FR-H.1.
Time Critical Task: No Validation Time: 25 1 of 6
Appendix C                                Page 2                        Form ES-C-1 Performance Information (Denote critical steps with a check mark --./)
: 1. Performance Step:          Obtain correct procedure Standard:                      Obtains current revision of 2-FR-H.1 Comment:        Hand candidate 2-FR-H.1
..J 2. Performance Step:      Locate Flexible Air Line and wrench Standard:                      Flexible Air hose and wrench located in Aux Boiler Feed Pump Building Comment:        Tubing is located in pipe attached to hand rail by Feedwater Regulating Bypass Valves .
..J 3. Performance Step:      Disconnect Positioner Output Air Line Standard:                      Air line disconnected at point A on Attachment 2 CUE: Airline is disconnected Comment:
2 of6
Appendix C                                Page 3                        Form ES-C-1 Performance Information (Denote critical steps with a check mark--./)
..J 4. Performance Step:      Disconnect Steam Generator Feedwater Trip Solenoid Air Line Tubing Standard:                      Air Line disconnected at point 8 on Attachment 2 (Bottom of diaphragm)
CUE: Airline is disconnected Comment:
..J 5. Performance Step:      Connect male end of flex tubing to Positioner Output Airline Tubing Standard:                      Airline connected at Point A on Attachment 2 CUE: Airline is connected Comment:
..J 6. Performance Step:      Connect female end of flex tubing Standard:                      Airline connected at point 8 on Attachment 2 (bottom of diaphragm)
CUE: Airline is connected Comment:
3 of6
Appendix C                                Page4                          Form ES-C-1 Performance Information (Denote critical steps with a check mark"./)
7 Performance Step:            Notify Control Room to place 21 SG bypass feedwater flow control valve controller to OPEN Standard:                      Contact Control Room using radio.
CUE: Acknowledge Place 21 SG bypass flow control valve to OPEN.
Comment:
Terminating Cue: JPM Complete 4 of6
Appendix C                          Page 5            Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
===Response===
Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -
5 of6
Appendix C                        Initial Conditions                Form ES-C-1 Initial Conditions:
* A loss of Secondary Heat Sink has occurred.
Initiating Cue:
The CCR has directed you to replace the control air line on FCV-417L Main Feed Bypass Regulating Valve for 21 Feed Line, in accordance with Attachment 2 of FR-H.1.
Facility:  Indian Point 2    Scenario No.:    1                                Op-Test No.: _1 Examiners:                                            Operators:
Initial Conditions:
Reset simulator to 90% power IC Load Simulator Schedule-Scenario1 The Plant is at 90% power.
22 Sl Pump is OOS Ensure 23 Charging Pump, 23 SWP and 26 SWP are in service Turnover:
Return plant to 100% power over the next hour.
Event      Malf. No. Event                                        Event No.                      Type*                                    Description R (ATC) 1      N/A N (CRS)        Power Escalation N (BOP) 2        MOT-          C(BOP)
TS(CRS)        23 SW Pump trips.
SWS008A 3      XMT-          I (ATC)
SGN034A        I (CRS)        PT-404 Steam Header Pressure fails high causing MBFPs to be placed in manual.
4        MAL-          C (ALL)
EPS007D                        480V Bus 6A fault.
TS(CRS) 5      MAL-M(ALL)          Small Break LOCA RCS006A 6      BKR-PPL003/4        M(ALL)        ATWS 7      MOC-          C(CRS)
AFW001                        21 AFW Pump failure C(BOP) 8      RLY-PPL487/48      C(CRS)        Automatic Safety Injection failure 8
9      RLY-            C(CRS)
PPL085/09                      Phase A Isolation failure 0              C(BOP)
*        (N)ormal,  (R)eactivity, (l)nstrument,  (C)omponent,  (M)ajor U2 NRC 2014 Scenario 1 Page 1 of 16
SESSION OUTLINE:
The evaluation begins with the plant at 90% power steady state operation. The team has been directed to return the plant to 100%. 22 Sl pump is out of service for bearing inspection. 22 Sl Pump was removed from service 8 hours ago, expected return in 6 hours.
The crew will take the watch and start increasing power. After power ascension has begun, 23 Service Water Pump will trip. BOP will diagnose and another pump will be started per the alarm response procedure. The CRS will evaluate Tech Specs.
When power ascension resumes, PT-404 (Steam Header Pressure) fails high. ATC diagnoses failure and places Main Boiler Feed Pump speed control to manual. CRS directs crew to perform AOP-INST-1, Instrument/Controller Failures.
Next, a fault occurs on Bus 6A. Team enters AOP-480V-1, Loss of 480 V Bus to stabilize the plant. The crew will start a charging pump, evaluate Tech Specs, and commence a shutdown per POP-2.1.
After formulating a shutdown plan, a SBLOCA occurs. Auto reactor trip is demanded but the Reactor trip breakers do not open. The team will attempt to manually trip the reactor and then go to FR-S.1. The turbine will be manually tripped. Motor driven AFW pumps can not be started. AFW must be manually aligned using the turbine driven AFW pump. The crew will begin manually inserting control rods and then will align emergency Boration using the alternate path in the RNO because MOV 333 is de-energized. Following main generator trip, blackout with unit trip logic strips 480V busses resulting in rod insertion. The team will transition back to E-0. Sl will be manually actuated.
21 Sl pump will be in service. 23 Sl pump cannot be powered. 22 Sl pump is OOS.
Charging will be established after manual action to align suction to the RWST. The team will diagnose RCS not intact and transition to E-1, Loss of Reactor or Secondary Coolant.
The scenario is terminated after transition to E-1 has been made.
Procedure Flow path: POP-2.1, ARP-SJF, AOP-INST-1, AOP-480V-1, POP-2.1, FR-S.1, E-0, and E-1 U2 NRC 2014 Scenario 1 Page 2 of 16
CRITICAL TASKS:
FR-S.1 -- C          Insert negative reactivity into the core by at least one of the following methods before step 4 of FR-S.1 is complete:
o  De-energize the Rod Drive MG Sets (can be satisfied by tripping turbine) o  Manually insert the rods o  Establish Emergency Boration E-0 -- F              Establish at least 400 gpm AFW flow to the S/Gs before completion of FR-S.1 step 3.
E-0 -- D              Manually actuate at least one train of SIS actuated safeguards before completion of E-0 step 4 EXPLANATION OF CREDITED MALFUNCTIONS:
Event 1 -Power escalation. ATC will withdraw control rods and/or dilute. The BOP will raise turbine power.
Event 2 -A running service water pump will trip. The BOP will be credited with the malfunction since another pump will be started on his panel.
Event 3- PT-404 (Steam Header Pressure) will fail which affects MFW Pump speed.
The ATC is credited with the malfunction since feed pump control is on his panel.
Event 4 - Due to initial conditions specified in the scenario, the loss of this bus will require pumps to be started on both control board operators' panels. (ATC charging pump, BOP SW pump)
Event 7- 21 AFW Pump will not start and 23 AFW Pump does not have power due to loss of Bus 6A. Therefore, 22 AFW will require manual action to place in service. This will be performed by the BOP.
Event 8- A manual safety injection will be required. This was not credited to either control board operator since it could be performed by either the ATC or BOP.
Event 9- Phase A isolation will be manually actuated. This occurs on the BOP's panel.
U2 NRC 2014 Scenario 1 Page 3 of 16
<SCHEDULE> 2014 scenario_l_setup_revO.sch Insert remote LOA-EPS070 to OUT Insert remote LOA-EPS071 to OUT Insert malfunction RL Y-PPL487 to STUCK CONTACTS RELAY FAlLURES: SIA-2 (B)
Insert malfunction RL Y-PPL488 to SAFETY INJECTION AUTO STUCK CONTACTS MASTERRLY RELAY FAlLURES: C-Al Insert malfunction RL Y-PPL085 to CONT.ISOLA TION PHASE A STUCK CONTACTS TRAIN A
                                                          ****----~~-~--*******--*** ;
RELAY FAILURES: C-A2 Insert malfunction RL Y-PPL090 to CONT.ISOLA TION PHASE A STUCK CONTACTS TRAINB
  ...... ,.~--~~- ***~~'----''              ...
Insert malfunction BKR-PPL004 to FAIL ASIS Insert malfunction BKR-PPL003 to FAIL ASIS Insert malfunction MOC-AFWOOI to ASIS Insert malfunction MOC-SWS008 to TRIP on event 2 Insert malfunction XMT-SGN034A to 1200.00000 in 120 on
                                . event 3 Insert malfunction MAL-EPS007D 480V BUS 6A FAULT
                                        ~~"~
Insert malfunction MAL-RCS006A                    SMALL BREAK LOCA LOOP A to 1.00000 in 300 on event 5                      HOTLEG(NR)
U2 NRC 2014 Scenario 1 Page 4 of 16
Simulator Setup and Instructor Directions Setup/Event    INSTRUCTOR ACTIONS                  EXPECTED RESPONSE/INSTRUCTOR CUES IC Reset                                            Reset Simulator to 90% power ILO IC.
SES Setup    Run setup schedule file and verify    Removes 22 SI pump OOS.
Schedule File malfunctions and over-rides have      Loads 23 SW pump failure on trigger 2.
been entered.
Loads SIA Train A and B failures.
Loads Phase A and B failures.
Loads RTB A and B failures.
Loads 21 AFW Pump failure.
Loads PT -404 failure on trigger 3.
Loads Loss of bus 6A on trigger 4.
Loads SBLOCA on trigger 5.
Floor Setup  1. Start 23 Charging pump            Provide turnover to the crew.
and secure all others.
: 2. Place control switch for          Watch team walks the panels and assumes the 22 SI pump to pullout and        watch.
apply a danger tag. Put protected equipment placards on 21 and 23 SI pumps.
: 3. Update the protected equipment computer.
: 4. Perform setup checklist.
Event 1      None- Power Ascension                Perform field action LOAs as requested per NPO task list.
Event 2      Actuate Trigger 2                    MOC-SWS008 At lead evaluator direction          Event: 2 Delay: 0 Final Value: TRIP Ramp: 0 Role Play    If NPO Dispatched                    Report motor is extremely hot. Breaker indicates overcurrent trip.
Check 23 SWP and breaker Event 3      Actuate Trigger 3                    XMT-SGN034A At lead evaluator direction          Event: 3 Delay: 0 Final Value: 1200 Ramp: 120 Role Play    Acknowledge requests for              I&C will develop a troubleshooting plan.
I&C to troubleshoot.
U2 NRC 2014 Scenario 1 Page 5 of 16
Simulator Setup and Instructor Directions Setup/Event    INSTRUCTOR ACTIONS                EXPECTED RESPONSE/INSTRUCTOR CUES Event 4    Actuate Trigger 4                  1\  MAL-EPS007D 480V BUS 6A FAULT At lead evaluator direction        IMF MAL-EPS007D Event: 4 Delay: 0 Final Value: TRUE Ramp: 0 Role Play  If NPO Dispatched                  Acrid odor at rear of bus 6A bus work. Supply breaker tripped on short term over-current. No smoke or fire.
If NPO dispatched align 21          Close 370 and open 369 BATP to blender Event 5    Actuate Trigger 5                  1\ MAL-RCS006A SMALL BREAK LOCA LOOP A At lead evaluator direction        HOT LEG (NR)
IMF MAL-RCS006A Event: 5 Delay: 0 Final Value: 1.0 Ramp: 300 Role Play  When NPO dispatched to locally trip the reactor, then Delete BKR-PPL004 and BKR-PPL003.
Role Play  At CCR request                      Perform field action LOAs as requested per NPO task list.
U2 NRC 2014 Scenario 1 Page 6 of 16
Appendix D                            Required Operator Actions                      Form ES-D-2 Op-Test No.: 1 Scenario No.: 1 Event No.: 1                                          Page 1 of 2 Event
== Description:==
Power Escalation
  -r:        Position                              Applicant's Actions or Behavior Note:
The reactivity plan for the power ascension should be developed by the team in the briefing room prior to taking the watch. The plan could call for dilution and/or rod withdrawal CRS                Assigns roles for power ascension ATC                Reviews reactivity plan ATC                If rods are withdrawn:
* Places/verifies rods are in Manual
* Withdraws rods
* Observes:
0  Proper rod motion 0  Tavg 0  Power BOP              Peer checks rod withdrawal ATC                If dilution is performed:
* Places RCS Makeup control to Stop
* Place RCS Makeup Mode selector to Dilute
* Adjusts integrator to desired dilution amount
* Places RCS Makeup control to Start
* Observes:
0    Proper makeup response 0  Tavg 0    Power BOP              Peer check dilution BOP              Raises MTG load using governor U2 NRC 2014 Scenario 1 Page 7 of 16
Op-Test No.: 1 Scenario No.: 1 Event No.: 1                                        Page 1 of 2 Event
== Description:==
Power Escalation ATC            Peer checks MTG load increase Lead Evaluator            When the following has been demonstrated/observed:
* Sufficient load ascension .
* Sufficient normal plant operations by the BOP .
Then instruct Booth to insert Event 2.
U2 NRC 2014 Scenario 1 Page 8 of 16
Appendix D                          Required Operator Actions                            Form ES-D-2 Op-Test No.: 1 Scenario No.: 1 Event No.: 2                                              Page 1 of 1 Event
== Description:==
23 Service Water Pump Trips Time        Position                          . Applicant's Actions or Behavior BOP              Diagnose that 23 SWP has tripped.
BOP ofCRS        Recommend I direct starting either 21 or 22 SWP per the alarm response procedure.
BOP              Starts 21 or 22 SWP Note:
Although not required, it is possible that the CRS may enter AOP-RW-001 BOP              Refers to ARPs for alarms CRS              Evaluate Tech Specs. LCO 3.7.8 will not be satisfied. Condition A will apply placing plant in 72 hour action statement.
Lead Evaluator            When the following has been demonstrated/observed:
* Service Water pressure has been stabilized
* T.S. have been evaluated Then instruct Booth to insert Event 3 U2 NRC 2014 Scenario 1 Page 9 of 16
Appendix D                          Required Operator Actions                            Form ES-D-2 Op-Test No.: 1 Scenario No.: 1 Event No.: 3                                              Page 1 of 1 Event
== Description:==
PT-404 Steam Header Pressure fails high causing MBFPs to be placed in manual.
Time        Position                            Applicant's Actions or Behavior ATC              Diagnosis failure of PT-404 high due to changes MFW Pump speed and meter indication ATC              Place MFW Pump Master Speed Controller to manual to maintain SG levels CRS              Directs team to perform immediate operator actions of AOP-INST-1 ATC            Checks instruments listed in AOP-INST-1 CRS              Implements 2-AOP-INST-1
* Verifies no other instrument failures
* Ensures actions have been taken to stabilize the plant
* Ensures steam dumps are in temperature mode Team            Contact I&C to investiqate PT-404 failure Lead Evaluator            When the following has been demonstrated/observed:
* MFW Pumps have been placed in manual
* SG levels are stable
* I&C contacted Then instruct Booth to insert Event 4 U2 NRC 2014 Scenario 1 Page 10 of 16
Appendix D                              Required Operator Actions                          Form ES-D-2 Op-Test No.: 1 Scenario No.: 1 Event No.: 4                                                Page 1 of 1 Event
== Description:==
480V Bus 6A fault.
Time        Position                              Applicant's Actions or Behavior Team              Diagnose that 480V Bus 6A CRS                Will enter AOP-480V-1 ATC                Start 21 or 22 Charging Pump BOP                Start 24 or 25 SWP ATC                Ensure Primary Water Pump is in service Team              Dispatch operator to monitor EDGs BOP                Initiate Attachment 3:
* 6A will be confirmed to be faulted
* 23 EDG will be shutdown CRS                Direct initiating SOP 5.2.1 to maintain vent header pressure ATC                Verifies that Boric Acid Transfer Pump is in service CRS                Evaluate Tech Specs. The most limiting T.S. action statement is per 3.8.4.
Additionally, 3.8.9, 3.8.1, and 3.5.2 should be evaluated.
Because 22 Safety Injection pump was OOS and 23 has now lost power, the plant will have to proceed to Mode 5.
Note:
If needed, the booth will call as the Operations Manager to direct the CRS to proceed to shutdown and cooldown.
CRS                Will begin plans for shutdown and cooldown to MODE 5.
Lead Evaluator                When the following has been demonstrated/observed:
* Plant is stabilized
* Tech Specs evaluated
* Shutdown being planned Then instruct Booth to insert Event 5 U2 NRC 2014 Scenario 1 Page 11 of 16
Appendix D                          Required Operator Actions                          Form ES-D-2 Op-Test No.: 1 Scenario No.: 1 Event No.: 5                                            Page 1 of 1 Event
== Description:==
Small Break LOCA Time        Position                            Applicant's Actions or Behavior ATC              Diagnose loss of RCS inventory based on PZR level trend Note:
CRS may direct entry in AOP-LEAK-1 CRS              Direct reactor trip and safety injection ATC              Presses reactor trip push button on flight panel ATC              Notes that reactor did not trip BOP              Presses reactor trip push button on supervisory panel ATC              Notes that reactor did not trip BOP              Trips turbine CRS              Directs team to perform immediate operator actions of FR-S.1 The team will now proceed to Event 6 for the A TWS U2 NRC 2014 Scenario 1 Page 12 of 16
Appendix D                              Required Operator Actions                          Form ES-D-2 Op-Test No.: 1 Scenario No.: 1 Event No.: 6/7/8/9                                          Page 1 of 3 Event
== Description:==
ATWS/Loss of 21 AFW Pump/Failure of Auto SI/Failure of Auto Phase A ATC                Manual! drive control rods CRS/BOP            Dis                              reactor breakers Note:
The reactor trip breakers will be opened locally after emergency boration is established.
BOP BOP                Initiate Emergency Boration:
* Determine MOV-333 not powered and RWST will be used
* Open LCV-112B suction from RWST
* Close LCV-112C suction from VCT
* Place makeup control switch to stop Establish maximum charging flow BOP BOP Note:
The CRS m      direct the BOP to                  1-9 of E-0 based on a caution in FR-S.1 U2 NRC 2014 Scenario 1 Page 13 of 16
Op-Test No.: 1 Scenario No.: 1 Event No.: 6/7/8/9                                                Page 1 of 3 Event
== Description:==
ATWS/Loss of 21 AFW Pump/Failure of Auto SI/Failure of Auto Phase A If not, the following step will be performed when the CRS exits FR-S.1 BOP                Perform E-0 steps 1-9 per caution in FR-S.1:
* Verify reactor trip (will be tripped at this point)
* Verify turbine trip (will be tripped)
* Verify power to 480V busses (all but 6A will be powered)
* Check Sl status:
o Will note Sl required but Auto Sl did not actuate o Will manually Sl
* Perform Attachment 1 of E-0 o Establish charging o Check electrical status o Secure condensate pumps o Verify FW isolation o Verify SW lineup o Verify Sl pump and valve alignment o Verify FCU alignment o Verify AFW flow- may reduce flow at this point o Verify Containment isolation -will manually actuate Phase A
o    Checks containment spray status o    Checks CCR AC ATC                Verify reactor is subcritical:
* Power range < 5%
* Negative SUR CRS                Returns to E-0 TEAM              Performs or re-performs E-0 steps 1-4:
* Verify reactor trip (will be tripped at this point)
* Verify turbine trip (will be tripped)
* Verify power to 480V busses (all but 6A will be powered)
* Check Status BOP              Performs Attachment 1 of E-0 if not al ATC                Verifies AFW flow - flow          be reduced at this time if not    done.
U2 NRC 2014 Scenario 1 Page 14 of 16
Op-Test No.: 1 Scenario No.: 1 Event No.: 6/7/8/9                                    Page 1 of 3 Event
== Description:==
ATWS/Loss of 21 AFW Pump/Failure of Auto SI/Failure of Auto Phase A ATC/BOP        Verify Sl flow ATC/BOP        Check RCP cooling ATC/BOP        Align valves to support start of a NESW pump ATC            Check RCS temperature ATC            Check PORV status ATC            Check if RCPs should be stopped. RCPs will be tripped if not already done.
ATC            Check if SGs are faulted ATC            Check if SG tubes are intact ATC            Check if RCS is intact CRS            Transition to E-1 Lead Evaluator          Terminate scenario U2 NRC 2014 Scenario 1 Page15of16
EMERGENCY PLAN DECLARATION Site Area Emergency EAL SS2.1 Failure of an automatic trip signal to reduce power range< 5% AND Manual trip actions taken at the reactor controls console (manual reactor trip switches) are not successful U2 NRC 2014 Scenario 1 Page 16 of 16
Facility:  Indian Point 2    Scenario No.:    2                                  Op-Test No.: _1 Examiners:                                            Operators:
Initial Conditions:
Reset simulator to 100% power IC Load Simulator Schedule-Scenario2 The Plant is at 100% power.
Ensure 25 SWP and 22 Charging Pump in service.
Turnover:
Perform power reduction to 90% for turbine valve testing.
Event        Malf. No. Event                                        Event No.                      Type*                                      Description R (ATC) 1      N/A N (CRS)        Power Reduction N (BOP}
2        MOT-          C (ALL)
TS(CRS)        21 Condensate Pump trip. TS for AFD.
CFW001B 3        BST-          C(BOP)          RCP Thermal Barrier CCW Return Valve (FCV-625) spurious CCW009A        C(CRS)          closure.
4        MAL-          C (ALL)
EPS007B                        480V Bus 3A fault.
TS(CRS}
5      CNH-          C(ATC)
PCS007D                        22 FRV fails in auto.
C(CRS) 6        CVH-M(ALL)        22 FRV fails in manual.
CFW005A 7      MOC-AFW002                        Failure of 22 and 23 AFW to start which along with other M(ALL)
CVH-                          conditions leads to loss of heat sink.
ATS017B 8      AOV-MSS036N        C(ALL}
Failure of Turbine Stop/Control Valve pair.
CVH-MSS030B 9      AOV-            C(ALL)
RCS002A                        Failure of PORV requiring opening of reactor head vent valves
*        (N)ormal,  (R)eactivity, (l)nstrument,  (C)omponent,  (M)alor U2 NRC 2014 Scenario 2 Page 1 of 18
SESSION OUTLINE:
The evaluation begins with the plant at 100% power steady state operation with no significant equipment out of service. The team has been directed to lower power to 90%
for turbine valve testing.
After taking the watch, the team will begin reducing load. Once reduction is started 21 Condensate Pump will trip. This will cause the team to rapidly reduce power and challenge TS 3.2.3 for Axial Flux Difference.
When the team has stabilized the plant (or is reducing power to <50%), MOV-625 will spuriously close. This valve is the CCW return valve from the RCP thermal barriers. The team will re-open the valve using ARP guidance. Subsequently, a fault will occur on 480V Bus 3A. The team will take actions in accordance with AOP-480V-1, "Loss of Normal Power to any Safeguards 480V Bus." Due to the fault on Bus 3A, 22 EDG cannot re-energize the bus. TS require plant shutdown.
After the team stabilizes the plant and evaluates tech specs, 22 FRV will fail closed in automatic. Manual control will work initially, but the valve will eventually fail closed regardless of position. This will lead to an automatic reactor trip due to low SG level or the team will trip the reactor manually before the trip setpoint is reached.
When the reactor is tripped, the turbine upper left stop and control valve pair fail to close. MSIV's must be manually closed to trip the turbine, but the valves will initially fail open requiring local action. The MSIVs will be closed when SG inventory is reduced to a value closer to bleed and feed criteria.
23 AFW Pump will not auto start and will not be able to be manually started from the Control Room due to 480V circuit breaker failure. 22 AFW Pump will not be available due to the governor valve not opening. 21 AFW pump cannot be run since 3A is not powered.
The team will transition to FR-H.1, "Loss of Secondary Heat Sink" due to a loss of AFW flow. SG WR levels will lower until bleed and feed is required.
One PRZR PORV will not open when required. The crew will open the Reactor Head Vent valves. After the head vent valves are opened, 23 AFW pump from its normal supply after racking the breaker out and back in. The team will restore AFW flow to 23 and 24 SGs. The scenario can be terminated after the head vent valves have been closed, or at the discretion of the lead evaluator.
Procedure flow path: POP-2.1, AOP-FW-1, ARP-SGF, AOP-480V-1, AOP-FW-1, E-0, FR-H.1 U2 NRC 2014 Scenario 2 Page 2 of 18
CRITICAL TASKS:
E-0 -- P          Manually trip the main turbine before a severe (orange-path) challenge develops to either the sub-criticality or the integrity CSF or before transition to ECA-2.1, whichever happens first FR-H.1 -- F        Establish RCS bleed and feed when the average of the three lowest S/G levels reach 20% WR.
EXPLANATION OF CREDITED MALFUNCTIONS:
Event 1: Power reduction. The ATC gets credit for a reactivity manipulation for boration.
The BOP and CRS get credit for a normal evolution.
Event 2: 21 Condensate Pump trip will require further boration and power reduction, so all operators are credit with this malfunction. Maintaining axial flux distribution in required band is a challenge for this event, so the CR will have to evaluate tech specs for axial flux difference.
Event 3: FCV-625 will close. The valve is on the BOP panel and will be reopened per the ARP or AOP.
Event 4: Loss of 480V Bus 3A will require restoration of equipment on both the ATC and BOP panels. This will put the plant in a tech spec action statement.
Event 5: The FRV is on the ATC panel and will initially be placed in manual to control 22 SG level.
Event 6: The FRV failing in manual will lead the team to trip the reactor or cause an automatic trip.
Event 7: The failure of 22 and 23 AFW Pumps in conjunction with loss of 480V Bus 3A (21 AFW Pump power) will lead to a loss of heat sink.
Event 8: The failure of the stop and control valve pair will require closing MSIVs and drive the team to bleed and feed criteria.
Event 9: The failure of the PORV will require the use reactor head vent valves for bleed and feed.
U2 NRC 2014 Scenario 2 Page 3 of 18
Description BRG 1 FAILURE: CP21 CONDENSATEPUMP21MTR
                              ~----~~---:----=-:=~~~~~-~-~(-~---~----
Insertmalfunction BST-CCW009A                                    FAILURE: FIC-625-H FCV-625 to TRIP_(JBST=T) on event 3                                      HIGH FLOW CLOSEURE delete in 5 Insert malfunction MAL-EPS007B MCB CTRLR FIXED AUTO ONLY: FIC-427 SG 22 FD REG VLVCONT AIM
                                                                                                              ~c 'c I~sert malfunction CVH-CFW005A                                    FAILMODE: FCV-427 SG 22 FW
                ; to CLOSE on event 6                                              REGULA TOR Insert malfunction MOC-AFW002                                    AFJ AUX FEED WATER PUMP to ASIS                                                          MOTOR N0.23
                                                                      ------------------;VA
_ _ _ _ RIABLE POSN: HCV-1118 1 Insert malfunction CVH-ATS017B                                    AUX BFP 22 TURBINE I to 0                                                              GOVERNOR Insert malfunction AOV -MSS036A                                    GENERAL F AlLURE: MS-863 HP
                . to FAIL_AS_IS                                                    TURB STOP FROM SG21 Create Event 30 jbkrta == 0 -desc jbkrta Insert malfunction AOV-RCS002A to FAIL_AS_IS Insert malfunction CVH-MSS030B                                    VARIABLE POSN: PCV-5991 HP to 45.00000 on event 30                                            TURB THROTTLE FROM SG21 Insert malfunction AOV-SGN001B VARIABLE POSN: MS-1-21 MAIN to 100.00000 on event 30 delete in STEAM STOP VALVE MS-1-21 180 Insert malfunction AOV -SGN002B VARIABLE POSN: MS-1-22 MAIN to 100.00000 on event 30 delete in
                '                                                                    STEAM STOP VALVE MS-1-22 I  200 Insert malfunction AOV-SGN003B VARIABLE POSN: MS-1-23 MAIN
. 00:00:00 None    to 100.00000 on event 30 delete in STEAM STOP VALVE MS-1-23 215 Insert malfunction AOV -SGN004B VARIABLE POSN: MS-1-24 MAIN to 100.00000 on event 30 delete in STEAM STOP VALVE MS-1-24 195 U2 NRC 2014 Scenario 2 Page 4 of 18
Simulator Setup and Instructor Directions Setup/Event    INSTRUCTOR ACTIONS          EXPECTED RESPONSE/INSTRUCTOR CUES IC Reset    228 or saved 100% IC          Reset Simulator to 100% power IC SES Setup  Run schedule and verify        Loads 22 & 23 AFW pumps failures Schedule    malfunctions and over-        Fails Upper Left Stop Valve File        rides have been entered        Loads PORV 455C failure Loads MSIV failures Loads 625 failure on event 3 Loads bus 3A fault on event 4 Loads 22 FRV auto failure on event 5 Loads 22 FRV manual failure on event 5 Floor Setup      Ensure that 22 Charging            Update Update the Protected Equipment Pump is in service.                Computer display. Risk is green.
Ensure that 25 SWP is in service.                      Watch team walks the panels and assumes the watch.
Perform setup checklist Distribute Turn over sheets Event1      Power Reduction                Provide information as requested by team.
Event2      Actuate Event 2 21 Condensate Pump Trip Role Play  When called about 21            Motor is very hot Condensate Pump At lead evaluator direction Event3      Actuate Event 3                Spurious closure of MOV-625 At lead evaluator direction Role Play  If NPO sent to investigate      NPO reports no obvious damage, but a MOV-625 closure                team is removing scaffold in the Pipe Pen.
Area immediately adjacent to the flow switch and may have bumped the instrument.
U2 NRC 2014 Scenario 2 Page 5 of 18
Simulator Setup and Instructor Directions Setup/Event    INSTRUCTOR ACTIONS          EXPECTED RESPONSE/INSTRUCTOR CUES Event 4    Actuate Event 4                Bus 3A Fault At lead evaluator direction Role Play  If NPO sent to investigate      NPO reports no obvious damage, but bus Bus 3A Trip                    supply breaker tripped on over current and strong odor of ozone.
Acknowledge requests for I&C to troubleshoot            I&C will develop a troubleshooting plan Event 5    Actuate Event 5                22 FRV fails in auto At lead evaluator direction Role Play  If asked to investigate 22      Valve appears normal. Cannot tell reason FRV                            for failure.
Event 6    Actuate Event 6                22 FRV fails in manual At lead evaluator direction NOTE:      When Rx is tripped              Upper left stop and control valve do not close.
MSIVs will not close NOTE:      When SG WR Level reaches about 30%,
modify the following malfunctions to 0%:
AOV-SGN001 8 AOV-SGN0028 AOV-SGN0038 AOV-SGN0048 Role Play  As NPO sent to close MSIVS, let the control room know that either you closed them or they had closed before you got there depending on timing.
U2 NRC 2014 Scenario 2 Page 6 of 18
Simulator Setup and Instructor Directions Setup/Event  INSTRUCTOR ACTIONS          EXPECTED RESPONSE/INSTRUCTOR CUES Role Play  AFW Status:                  21 de-energized 22 governor valve will not open 23 pump appears normal. Breaker appears normal.
Role Play  When NPO dispatched to        Close breaker for HCV-31 00 energize head vent valves    0    MCC 26A Sheet 2 (EPS 18) LOA-at MCC 26AIB                        EPS431 Close breaker for HCV-31 01 0    MCC 268 Sheet 2 (EPS 22) LOA-EPS523 After head vent valves        Fix 23 ABFP 480V brkr: Call CCR and have been opened:              request 23 ABFP control switch be placed in pullout to support breaker check. From the Director- Delete MOC-AFW002. NPO reports that the 480V breaker for 23 ABFP has been swapped with the spare breaker.
Request CCR to attempt to start 23 ABFP.
Role Play  At CCR request                Perform various LOA's per NPO local task list U2 NRC 2014 Scenario 2 Page 7 of 18
Op-Test No.: 1 Scenario No.: 2 Event No.: 1                                          Page 1of 2 Event
== Description:==
Power Reduction Time        Position                              Applicant's Actions or Behavior Note:
The reactivity plan for the power reduction should be developed by the team in the briefing room prior to takin ~ the watch. The plan could call for boration and/or rod insertion CRS                Assigns roles for power reduction ATC                Reviews reactivity plan ATC              If rods are inserted:
* Places/verifies rods are in Manual
* Inserts rods specified number of steps
* Observes:
0    Proper rod motion 0    Tavg 0    Power BOP              Peer checks rod insertion ATC              If boration is performed:
* Energize All Pressurizer Heaters
* Places RCS Makeup control to Stop
* Place RCS Makeup Mode selector to borate
* Adjusts integrator to desired boration amount
* Places RCS Makeup control to Start
* Observes:
0    Proper makeup response 0    Tavg 0    Power BOP              Peer check boration U2 NRC 2014 Scenario 2 Page 8 of 18
Op-Test No.: 1 Scenario No.: 2 Event No.: 1                                            Page 1of 2 Event
== Description:==
Power Reduction ATC/BOP          Initiate Turbine Load Reduction at desired rate
* Governor (Preferred)
* Load Limit 1
* Load Limit 2 ATC            Maintain the manual setpoint for the MFRV Controllers Nulled.
ATC            Adjust Control Rod Position per TS and Graph-RPC-16 Lead Evaluator            When the following has been demonstrated/observed:
* Sufficient load reduction .
* Sufficient normal plant operations by the BOP .
Then instruct Booth to insert Event 2 U2 NRC 2014 Scenario 2 Page 9 of 18
Op-Test No.: 1 Scenario No.: 2 Event No.: 2                                              Page 1 of 1 Event
== Description:==
21 Condensate Pump Trip Time        Position                          Applicant's Actions or Behavior BOP            Announces 21 Condensate Pump tripped after observing 6.9 KV Motor Trip Alarm and indications of pump trip CRS              Instructs team to perform immediate operator actions of AOP-FW-1 ATC              Checks MFW Pumps are both in service and announces that immediate actions are complete ATC/BOP        Continue load reduction to get steam flow:::; feed flow:
* Continue/increase boration
* Operate governor to reduce turbine load CRS            Evaluate axial flux difference to determine if TS 3.2.3 is met.
Depending on team response could be in:
* 15 minute action to restore AFD with additional 15 minutes to get
                                  < 90% power.
* 30 minute action to Qet to < 50% power .
ATC/BOP        May neeed to remove windup from FRVs by placing in manual and returning to automatic.
ATC/BOP        May place MFW master speed controller to manual ATC/BOP        May place FRVs in manual Lead Evaluator            When the plant has been stabilized and AFD TS has been addressed:
Then instruct Booth to insert Event 3 U2 NRC 2014 Scenario 2 Page 10 of 18
Op-Test No.: _1_ Scenario No.:__&#xa3;_ Event No.: __L                                        Page _1_of J.
Event
== Description:==
RCP Thermal Barrier CCW Return Valve (FCV-625) spurious closure.
Time        Position
* Applicant's Actions or Behavior BOP            Notes CCW Thermal Barrier Return Low Flow alarm BOP            Observes FCV-625 has gone closed BOP            Refers to ARP-2-ARP-SGF Note:
CRS should determine based on ARP guidance and indications that the closure was spurious and re-opening the valve is appropriate. If the valve remains closed, the scenario can continue.
BOP            Re-open FCV-625 BOP            Direct Nuke NPO to monitor flow at Fl-625 Lead Evaluator            When valve is re-opened, or it is clear it will remain closed, instruct Booth to initiate Event 5.
U2 NRC 2014 Scenario 2 Page 11 of 18
Op-Test No.: 1 Scenario No.: 2 Event No.: 4                                          Page 1 of 1 Event
== Description:==
Time    Position                          Examinee's Actions or Behavior BOP/ATC      Diagnose bus 3A de-energized:
* Numerous alarms
* 22 EDG Running
* Loss of running charging pump
* Indications for Bus 3A Normal Feed Breaker CRS          Announces entry into AOP-480V-1.
ATC          Start 21 or 23 Charging pump and adjust speed to match 22 prior to trip.
If flashing in letdown line occurs, then first close LCV-459, start a charging pump and re-establish letdown per 2-SOP-3.1 BOP          Check CCW pumps running and 625 open Check SW Pressure - 1,2,3 Header pressure is low May start 21 or 23 SWP Dispatch NPO to monitor EDGs Initiate review of the following TS to determine required actions based on plant conditions:
CRS 3.8.9 Distribution Systems- Operating Condition A Determine that bus 3A is inoperable putting plant in 8 hour action statement. Based on the faulted bus the team may assume shutdown should be commenced at this time.
Lead Evaluator      When plant is stable and tech specs have been addressed:
Then instruct Booth to insert Event 5 U2 NRC 2014 Scenario 2 Page 12 of 18
Op-Test No.: 1 Scenario No.: 2 Event No.: 5                                            Page 1 of 1 Event
== Description:==
22 FRV fails in auto I  Time        Position                          Applicant's Actions or Behavior ATC              Diagnose 22 FRV failure based on lower level on all channels. Steam Generator Level Deviation Alarm may annunciate.
ATC              Places 22 FRV in manual and stabilizes 22 SG level.
CRS              Announces to team to perform immediate operator actions of either AOP-INST-1 or AOP-FW-1 TEAM            Goes through AOP. No actions are taken other than controlling 22 SG level in manual Lead Evaluator            When the SG is stable:
Then instruct Booth to insert Event 6 U2 NRC 2014 Scenario 2 Page 13 of 18
Op-Test No.: 1 Scenario No.: 2 Event No.: 6                                                  Page 1of 2 Event
== Description:==
22 FRV fails in manual Time                                            Examinee's Actions or Behavior Note:
If team did not stabilize 22 SG level for previous event, and automatic or manual reactor trip may have already occurred.
ATC          Notices that 22 SG level is trending down and 22 FRV is not responding.
ATC          Trips reactor CRS          When Unit trips, direct team to perform immediate actions of E-0
* Verifies immediate actions using the procedure.
When the CRS directs "Perform the Immediate Operator Actions of E-0, the A TC and BOP will first perform the IOAs silently only announcing unexpected conditions. The crew will then re-perform the IOAs verbalizing each item.
ATC          Verifies Reactor Trip:
* Reactor trip and bypass breakers open
* Rod bottom lights lit
* IRPis < 12.5 inches U2 NRC 2014 Scenario 2 Page 14 of 18
Op-Test No.: 1 Scenario No.: 2 Event No.: 6                                                    Page 1of 2 Event
== Description:==
22 FRV fails in manual ATC          Verifies Turbine Trip:
* Observes stop and control valve are not all closed
* Trip Turbine
* Takes MSIV switches to closed
* Notes MSIVs did not close
* Dispatches NPO to locally close MSIVs (MSIVs will be closed when sufficient mass has been removed from SGs to meet bleed and feed criteria without lengthy delay.
BOP          Check status of 480V buses:
* Observe ALL busses energized from Offsite Power except Bus 3A Note:
Depending on timing, an Sl signal may be present at step 4 of E-0. The scenario will progress with or without an Sl signal at this point.
If there is no Sl signal, an evaluator will have to step in as STA when transition to ES-0.1 occurs or if CRS is looking for concurrence to go to FR-H.1 for the loss of heat sink. This will not be necessary if there is an Sl signal.
ATC          Check Sl status Determine Sl is Actuated
* Any Sl Annunciator - Lit
* Sl Pumps Any Running Determines Sl NOT actuated and NOT required BOP/ATC      Check AFW Status
* Observes no AFW flow
* Attempted to use 22 AFW pump to establish flow CRS          Transition to ES-0.1 U2 NRC 2014 Scenario 2 Page 15 of 18
Op-Test No.: 1 Scenario No.: 2 Event No.: 7/8/9                                            Page 1 of 3 Event
== Description:==
Failure of 22 and 23 AFW to start which along with other conditions leads to loss of heat sink I Failure of Turbine Stop/Control Valve pair I Failure of PORV requiring opening of reactor head vent valves Time        Position                                icant's Actions or Behavior Note:
Bleed and Feed criteria of the average of the three lowest SGs being < 20% will eventually be met.
How much of the early steps of FR-H.1 are performed will depend on when this happens. These steps assume that criteria are met when step 2 is read.
CRS              Enters FR-H.1 Team            Verifies secondary heat sink is required:
RCS press > SG press BOP/ATC ATC/BOP ATC/BOP ATC              Starts 21 and 23 BOP              0      s HCV-142 ATC              Verifies HHSI ATC/BOP          Verifies Sl valve li ATC ATC                                        observes 455C will not      n BOP                                        ize HCV-3100/3101 ATC/BOP ATC/BOP          Reset Sl:
* Check CCW pumps
* Place key switches in Sl reset position
* Reset Sl U2 NRC 2014 Scenario 2 Page 16 of 18
Op-Test No.: 1 Scenario No.: 2 Event No.: 7/8/9                                              Page 1 of 3 Event
== Description:==
Failure of 22 and 23 AFW to start which along with other conditions leads to loss of heat sink I Failure of Turbine Stop/Control Valve pair I Failure of PORV requiring opening of reactor head vent valves ATC/BOP            Reset Phase A:
* Place IVSW switches to open for 1410, 1413, 3518, 3519
* Place containment rad monitor weld channel valves to open
* Verify airlocks in incident
* Close all remaining Phase A valve switches
* Reset Phase A Note:
At this point, the FSS will call about restoring 23 AFW pump. The team will be asked to place the switch in pull to lock. After another few minutes, the team will be told that 23 AFW should be available.
CRS                Evaluate SG conditions per foldout prior to re-establishing AFW flow to 23 and 24 SGs ATC/BOP            Start 23 AFW pump ATC/BOP            Establish 400 gpm total to 23 and 24 SGs Lead Evaluator                Terminate the scenario.
U2 NRC 2014 Scenario 2 Page 17 of 18
EMERGENCY PLAN DECLARATION Site Area Emergency EAL FS1.1 Loss or potential loss of any two barriers.
Loss of heat sink will lead to a call based on the Fission Product Barrier Matrix:
Potential Loss of Fuel Cladding (A.CSFST)
Potential Loss of RCS (A.CSFST)
U2 NRC 2014 Scenario 2 Page18of18
Facility:  Indian Point 2    Scenario No.:    3                                Op-Test No.: _1 Examiners:                                              Operators:
Initial Conditions:
Reset simulator to 4% power IC Load Simulator Schedule-Scenario3 The Plant is at 4% power. 23 Charging Pump is OOS. 22 MBFP is OOS. PORV 456 is OOS Ensure 21 Charging Pump in service, Ensure 23 CCW Pump is in service Turnover:
Perform power ascension to 10% for turbine sync.
Event      Malf. No. Event                                        Event No.                      Type*                                      Description R (ATC) 1      N/A N (CRS)        Power Ascension N (BOP) 2      MOT-          C (ATC)
CVC003B        C(CRS)          21 Charging Pump trip TS(CRS) 3      MOC-          C (BOP)
CCW003A        C (CRS)        23 CCW pump trip with failure of other CCW pumps to autos tart TS(CRS) 4        XMT-          TS(CRS)        Control Rod D8 IRPI fails low.
CRF012A 5      XMT-          C (ALL)        PT-408A fails high causing 21 MFW Pump to go to minimum CFW036A                        speed.
6      MAL-M(ALL)        21 MFW Pump trips.
ATS005A 7      MAL-RCS014D        M(ALL)          24 SGTR.
8      AOV-          C(ALL)
CAS009A                        Failure of air to containment making PORVs required for depressurization.
9      AOV-            C(ALL)
RCS002A                        PORV will not close causing team to transition to ECA-3.1 10      MOC-C(BOP)        21 and 22 Containment Recirc Fans fail to autostart.
CNM008/9
*        (N)ormal  (R)eactivity, (l)nstrument,  (C)omponent,    (M)ajor U2 NRC 2014 Scenario 3 Page1of18
SESSION OUTLINE:
The evaluation begins with the plant at 4% power during startup. The following equipment is out of service:
* PORV 456 due to blowing fuses.
* 23 Charging Pump for seal replacement.
* 22 MBFP since forced outage work is not complete.
When the team takes the watch, they will raise power in anticipation of putting the MTG in service.
Following some power ascension, 21 Charging Pump will trip. 22 Charging Pump will be placed in service. TR0-3.1.8.1 will not be met putting the plant in a 24 hour AOT.
23 CCW Pump will trip and the low pressure auto start has been disabled for 21 and 22 CCW Pumps. The BOP will start a CCW Pump per ARP-SGF.
Control Rod 08 IRPI fails low. The team will take actions in accordance with AOP-ROD-1, "Rod Control and Indication Systems Malfunction."
PT -408A will fail high causing 21 MBFP to slow down to minimum. If the team does not recognize the failure and place 21 MBFP in manual, the reactor will trip on low SG level.
If the team places the pump in manual, an overspeed trip of the MFW pump will eventually be inserted. With power above 4%, the team will manually trip the reactor. If power is< 4% and the team does not trip the reactor, the SGTR can be initiated which will drive a trip and Sl.
When the reactor trips, a SGTR will occur in 24 SG. The team will take actions per E-0, "Reactor Trip or Safety Injection". The team will then transition to E-3, "Steam Generator Tube Rupture."
When Sl is reset, PCV-1228 (Instrument Air to Containment) will fail in the closed position. The team will need to use a Pressurizer PORV to depressurize. When the team goes to close the PORV, the valve will fail open. This will cause the team to ultimately go to ECA-3.1 for recovery.
Procedure flow path: POP-1.3, AOP-CVCS-1, ARP-SGF, AOP-ROD-1, AOP-AIR-1, E-O, E-3, ECA-3.1 U2 NRC 2014 Scenario 3 Page 2 of 18
CRITICAL TASKS:
E-3 --A      Isolate feedwater flow to and steam flow from the ruptured SG before transition to ECA-3.1 occurs.
E-3 -- B      Establish and maintain RCS temperature so that transition from E-3 does not occur due to either of the following:
* RCS temperature TOO HIGH to maintain required sub-cooling in E-3 step16 table, OR
* RCS temperature TOO LOW results in a severe challenge to the Sub-criticality or Integrity CSF.
EXPLANATION OF CREDITED MALFUNCTIONS:
Event 1 - Power ascension. This is a reactivity manipulation for ATC. BOP will be controlling SG levels manually and CRS will be supervising evolution.
Event 2- Charging pump trip. The ATC will start another charging pump. Since two charging pumps are now inoperable, the CRS will have to determine that the plant is in a 24 hour action statement.
Event 3 - The running CCW pump will trip and the other two will have all auto starts blocked. The BOP will have to start a CCW pump.
Event 4- IRPI for rod D-8 will fail. The CRS will evaluate TS 3.1.7 for the inoperable IRPI.
Event 5- PT-408A (MFW pressure) fails high which causes the MFW pump to go to minimum speed. The ATC will have to place MFW control in manual. The BOP will have to make adjustments to Low Flow FRVs.
Event 6 - The only MFW pump trips which will require a reactor trip if power when above 4%.
Event 7 - SGTR in 24 SG causes Sl to be initiated. Diagnosis is a challenge at low power since there will be less radiation monitor response.
Event 8- Failure of instrument air to containment needs to be diagnosed by the BOP and will change the depressurization method used by the ATC.
Event 9 - The PORV failing to close will lead team to contingency procedure.
Event 10-21 and 22 Containment Recirc Fans will not start. The BOP will have to notice this while performing E-0 Attachment 1 and start the fans.
U2 NRC 2014 Scenario 3 Page 3 of 18
2014_scenario_3_setup_rev1.html At Time                                              Description BRG 1 FAILURE: C1 CHARGING PMP21 MOTOR SETPOINT DRIFT: PC-600-L Insert malfunction BST-ACS/COMP CLNG PUMP DISCH CCW017B to 0 PRESS Insert malfunction MOC- . . . . CC3 COMPONENT COOLING PUMP CCW003 to TRIP on event 3          MOTOR23 Insert malfunction XMT-FIXED OUTPUT: LVDT-D8 LVDT CRF012A to 1.4013e-045 on FORCRDMD8
: Insert malfunction XMT-          I CFW036A to 1400.00000 in 30        FIXED OUTPUT: PT-408A 26 HTRS on event 5                          COMMON OUTLET PRESSURE Insert malfunction MAL-MBFP 21 OVERSPEED
                . ATS005A on event 6 Insert malfunction MAL-RCS014D to 10.00000 on event        STEAM GENERATOR 24 TUBE 30                                  LEAK(NR)
Insert malfunction AOV-GENERAL FAILURE: PCV-1228 AIR CAS009A to CLOSE on event FILTER DISCHARGE - CONT BLDG 29 GENERAL FAlLURE: PCV -455C PZR POWER OPERATED RELIEF VALVE Insert malfunction MOV-535 PZR PORV ISOLATION VALVE RCSOO 1 to N/A on event 9
                . Insert malfunction MOC- . .        CRF 1 21 CON.TAINMENT...
00:00:00 None
: CNM008 to AUT CLS                  RECIRCULATION FAN
                ' Insert malfunction MOC- .          CRF2 22 CONTAINMENT 00:00:00 None CNM009 to AUT CLS                  RECIRCULATION FAN
                                  **~~~--*'"*,.;-~*****
U2 NRC 2014 Scenario 3 Page 4 of 18
Simulator Setup and Instructor Directions Setup/Event    INSTRUCTOR ACTIONS              EXPECTED RESPONSE/INSTRUCTOR CUES IC Reset                                      Reset Simulator to 4% power IC SES Setup  Run setup schedule file and Schedule    verify malfunctions and over-File        rides have been entered Floor Setup Ensure 21 Charging Pump in        HANG PROTECTED EQUIPMENT tags service                          for:
Ensure 23 CCW Pump in            21 and 22 Charging Pumps service                            Update the Protected Equipment Display PC Place 23 Charging pump in TPO and apply Danger Tags Place PCV-456 in closed and 536 in TPO and apply Danger Tags Distribute Turn over sheets Event1      Power Ascension                    Respond to notifications Event2      Actuate Trigger 2                  Initiates trip of 21 Charging Pump At lead evaluator direction Role Play  When called about Charging        21 Charging Pump is hot and breaker Pumps and breakers                appears to have tripped on overcurrent.
22 Charging Pump is running sat after being placed in service.
Event 3    Actuate Trigger 3                  Initiates trip of 23 CCW Pump At lead evaluator direction Role Play  When called about CCW              You cannot tell why 23 tripped. Which ever Pumps.                            pump is started appears to being running sat.
Event4    Actuate Trigger 4                  Initiates IRP failure for 08:
At lead evaluator direction U2 NRC 2014 Scenario 3 Page 5 of 18
Simulator Setup and Instructor Directions Setup/Event    INSTRUCTOR ACTIONS            EXPECTED RESPONSE/INSTRUCTOR CUES Role Play  If I&C asked to investigate    Report that technicians will be sent to investigate. The problem will not be solved during the scenario.
Event 5    Actuate Trigger 5              Initiates failure of PT-408A high.
At lead evaluator direction Role Play  If I&C asked to investigate    Report that technicians will be sent to investigate. The problem will not be solved during the scenario.
EventS      Actuate Trigger 6              Initiates trip of 21 MFW Pump At lead evaluator direction Role Play  If asked to investigate        Report that personnel will be sent to investigate. The problem will not be solved during the scenario.
Role Play  If NPO sent to investigate      Report the following: There is a large air PCV-1228                        leak near PCV-1228. The NPO may be able to wrap the leak and reduce the air leakage. This repair will not be completed before the scenario is terminated Role Play  As requested by Control        Perform various LOA's per NPO Local Task Room                            List.
U2 NRC 2014 Scenario 3 Page 6 of 18
Op-Test No.: _1_ Scenario  No.:~      Event No.: _1_                              Page _1_of _l Event
== Description:==
Power Ascension Time        Position                              Applicant's Actions or Behavior Note:
The reactivity plan for the power ascension should be developed by team in briefing room prior to taking the watch. The plan could call for dilution and/or rod withdrawal.
CRS              Assigns roles for power ascension ATC              Reviews reactivity plan ATC              If rods are withdrawn:
* Places/verifies rods are in Manual
* Withdraws rods
* Observes:
0  Proper rod motion 0  Tavg 0  Power BOP              Peer checks rod withdrawal ATC              If dilution is performed:
* Places RCS Makeup control to Stop
* Place RCS Makeup Mode selector to Dilute
* Adjusts integrator to desired dilution amount
* Places RCS Makeup control to Start
* Observes:
0    Proper makeup response 0  Tavg 0    Power BOP              Peer check dilution Adjust Low Flow Feed Reg Valves to maintain SG levels.
U2 NRC 2014 Scenario 3 Page 7 of 18
Op-Test No.: _1_ Scenario No.: .2_ Event No.: _1_                                Page _1_of .l Event
== Description:==
Power Ascension Lead Evaluator            When the following has been demonstrated/observed:
* Sufficient load ascension .
* Sufficient normal plant operations by the BOP .
Then instruct Booth to insert Event 2.
U2 NRC 2014 Scenario 3 Page 8 of 18
Op-Test No.: 1 Scenario No.: 3 Event No.: 2                                                Page 1 of 1 Event
== Description:==
21 Charging Pump Trip Time        Position                          Applicant's Actions or Behavior BOP              Notes 480V Motor Trip Alarm ATC              Diagnoses that 21 Charging Pump has tripped CRS              Announces entry in AOP-CVCS-1 ATC/BOP          Verify there is no gas binding or issue preventing start of 22 Charging Pump ATC              Starts 22 Charging Pump CRS              Evaluates TRM TRO 3.1. B.1 and determines plant is in 24 hour action statement Lead Evaluator            When the following has been demonstrated/observed:
Then instruct Booth to insert Event 3 U2 NRC 2014 Scenario 3 Page 9 of 18
Op-Test No.: _1_ Scenario No.: _l_ Event No.: _l_                                        Page _1_of j_
Event
== Description:==
Trip of 23 CCW pump.
Time        Position                              Applicant's Actions or Behavior BOP              Diagnose that 23 CCW pump has tripped:
BOP              Realize that a standby pump should have started and did not.
Start 21 or 22 CCW as directed by ARP-SGF which may be referenced after starting the pump.
CRS              May Enter 2-AOP-CCW-1 CRS/BOP            If prior actions have not been taken based on Auto-Start Failure Pump starts described above will be directed at Step 1 of the procedure.
CRS              CRS will evaluate TS 3.7.7 and determine that the plant is in a 72 hour actions statement due to having two CCW Pumps out of service.
Lead Evaluator              When CCW is restored initiate Event 4 U2 NRC 2014 Scenario 3 Page10of18
Op-Test No.: 1 Scenario No.: 3 Event No.: 4                                            Page 1 of 1 Event
== Description:==
Control Rod D8 IRPI fails low Time        Position                            Applicant's Actions or Behavior BOP              Acknowledge Rod Bottom Rod Stop alarm ATC              Diagnose that an IRPI has failed (may announce actual dropped rod):
* D8 IRPI reading 0 and rod bottom light lit
* No power change
* No NIS Dropped Rod alarm
* No QPTR tilt indications CRS              Announce entry into AOP-ROD-1 CRS/ATC          Determine failed IRPI CRS              Refers to TS 3.1. 7 and determines that immediate compensatory actions are needed.
Lead Evaluator            When the following has been demonstrated/observed:
TS evaluated Then instruct Booth to insert Event 5 U2 NRC 2014 Scenario 3 Page 11 of 18
Op-Test No.: 1 Scenario No.: 3 Event No.: 5                                              Page 1 of 1 Event
== Description:==
PT-408A fails high causing MBFP to go to minimum speed Time        Position                            Applicant's Actions or Behavior ATC              Diagnoses failure based on:
* Changing speed on 21 MFW Pump
* Changing SG Levels
* Possible SG Level Deviation Alarm
* Meter indication for PT-408A ATC              Places MFW master speed controller or 21 MFW speed controller in manual to control speed.
BOP            Adjusts Low Flow FRVs to maintain SG Levels CRS            Directs team to perform immediate operator actions of AOP-INST-1 ATC            Checks all instruments listed in AOP-INST-1 CRS            Implements AOP-INST-1
* Verifies no other instrument failures
* Ensures actions have been taken to stabilize the plant Lead Evaluator            When the following has been demonstrated/observed:
SG levels stable Then instruct Booth to insert Event 6 U2 NRC 2014 Scenario 3 Page 12 of 18
Op-Test No.: _1_ Scenario No.: _l_ Event No.: 7/8/9/10                                Page _1_of _Q Event
== Description:==
24 SGTR, loss of instrument air to containment, PORV fails open Time  I Position  I                          Applicant's Actions or Behavior Note:
The diagnoses of 24 SGTR will happen during the performance of E-0 ATC          Diagnose that SGTR exits in 24 SG:
* Decreasing PZR level
* VCT lowering level
* 24 SG level increasing without feed CRS          Directs ATC to trip Reactor if not already done Directs ATC or BOP to Initiate Sl ATC          Trips reactor if not already done ATC or      Initiates Safety Injection BOP CRS          Directs Operators to perform immediate operator actions of EO.
ATC          Verifies Reactor Trip:
* Checks trip breakers open
* Checks flux decreasing
* Checks rod bottom lights lit
* Checks IRPis <12.5 inches ATC          Verifies Turbine Trip by observing all Turbine Stop Valves closed.
BOP          Verifies Power to 480V Busses:
* 2A, 3A, SA and 6A are energized ATC          Checks Sl Status:
* Sl Annunciators are lit
* Sl Pumps are running
* Both Trains of Sl are actuated U2 NRC 2014 Scenario 3 Page 14 of 18
Note:
The first 4 steps of E-0 are performed twice. Once by the A TC and BOP using placards, and a second time with the CRS reading the procedure.
CRS          Directs BOP to perform Attachment 1 of E-0 BOP          Performs Attachment 1 in parallel with the CRS/ATC progressing through E-0:
* Start a charging pump and align suction to RWST by opening LCV-112B and closing LCV-112C.
* Starts 21 and 22 Containment Recirc Fans
* Dispatch NPO to reset lighting and MCCS 24A, 27A, and 29A.
* Stop condensate pumps .
* Use 22 AFWP to align AFW flow to 23 and 24 SGs if not already done .
CRS/ATC      Manually start 23 AFW Pump to supply 23 SG (24 will be fed if team does not realize that it is ruptured)
CRS/ATC      Verify Sl System Flow:
Checks RCS Pressure Checks Sl Flow indicated if RCS Pressure is below 1720 psig Secures and places one RHR Pump in Pullout.
CRS/ATC      Check RCP Seal Cooling:
* Checks CCW
* Direct Service Water Valves SWN-4, SWN-5 be closed locally
* When valves are closed start NESW pump CRS/ATC      Check RCS Temperature:
AFW Flow may be throttled back to just above 400 gpm at this point to maintain RCS Temperature.
CRS/ATC      Will check that Spray_, Aux Spray, and PORVs are all closed.
CRS/ATC      Check if RCPs should be stopped:
They will be left in service CRS/ATC      Check for Faulted SG CRS/ATC      Check for Ruptured SG:
* 24 SG Level will be increasing in an uncontrolled manner Team will identify 24 SG is ruptured.
CRS          Transition to E-3 Steam Generator Tube Rupture U2 NRC 2014 Scenario 3 Page 15 of 18
CRS/ATC  Check if RCPs should be stopped:
Pum    will not be secured Isolating AFW Flow to 24 SG and adjusting the ADV may have occurred in E-0 when level reached 10% as a Prudent              Action.
ATC/BOP CRS/ATC                                                  done CRS/ATC          blowdown isolated from 24 SG CRS/ATC  Direct closure of steam                of24 SG CRS/ATC  Direct check that MS-55D                  is closed.
CRS/ATC  Close 24 MSIV CRS/ATC  Check 24 SG level > 10%
CRS/ATC  Check 24 SG ressure > 440 CRS/ATC  Commence Cooldown to target CET temperature:
* Place HP Steam Dumps in Pressure Mode and Manual
* Initiate Cooldown
* Do not exceed 0.5E6 lbs/hr on each of 21, 22, 24 SG Team will continue in procedure while CETs are lowering When CET temperatures are less than target:
* Stop cooldown by closing HP Steam Dumps Maintain CET          rature below CRS/ATC    Check SG Levels and maintain AFW flow U2 NRC 2014 Scenario 3 Page 16 of 18
CRS/ATC    Check PORVs and Block Valves. A block valve will be opened.
CRS/ATC    Reset Sl:
* Place CCW Pumps in Trip Pullout
* Close MFRV and Bypass FRVs
* Place Sl Defeat Key Switches in Defeat
* Press Sl Reset Pushbuttons CRS/BO    Reset Phase A:
p
* Place switches in open for IVSW valves 141, 1413, SOV-3518, SOV-3519
* Place Containment Rad Monitor WCPS Valve Switch to open
* Place VC Hatch switches in incident
* Place all remaining Phase A Valve switches to close
* Depress Phase A reset pushbuttons CRS/BO    Attempt to establish instrument air to containment. 1228 will not open p
CRS/BO    Secure remaining in service RHR Pump p
CRS/ATC    After cooldown stopped, check 24 SG Pressure stable or increasing. It will be stable CRS/ATC    Check subcooling > 43F CRS        Determine that PORV will be needed to depressurize RCS CRS/ATC    Use PORV PCV-455C to depressurize CRS/ATC    When depressurizing termination criteria are met:
* Attempt to close PCV-455C
* Attempt to close block valve CRS        Transition to ECA-3.1 I. Evaluator Lead      I Terminate scenario.
I U2 NRC 2014 Scenario 3 Page17of18
EMERGENCY PLAN DECLARATION Alert FA 1.1 Any loss or potential loss of fuel clad or RCS From the fission product barrier matrix, RCS will be lost (D. Inventory Rupture SG results in ECCS actuation)
U2 NRC 2014 Scenario 3 Page 18 of 18}}

Latest revision as of 15:05, 25 February 2020

Final Operating Exam (Sections a, B, and C) (Folder 3)
ML14080A508
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 01/30/2014
From: David Silk
Operations Branch I
To:
Entergy Nuclear Indian Point 2
Jackson D
Shared Package
ML13252A147 List:
References
UO1890
Download: ML14080A508 (229)


Text

Appendix C Job Performance Form ES-C-1 Measure Worksheet IPEC Facility: Unit 2 Task No: 2000650102 Task

Title:

Replace a Watchstander due to Illness KIA 2.1.5 Job Performance Measure ROAdmin

Reference:

RO- 2.9 No: C0-1 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance X Classroom X Simulator - - - - - Plant - - - - -

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • The Shift Manager has contacted you on Sunday, 2/23 (a scheduled day off), to report to the control room to work a 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> overtime shift from 0600-1800.
  • You were on vacation from 1/26 to 2/8.
  • Your work history for the previous 2 weeks is as follows (all hours worked performing licensed operating duties):

Sunday Monday Tuesday Wednesday Thursday Friday Saturday 2/9 2/10 2/11 2/12 2/13 2/14 2/15 Worked Worked Worked 0600- Worked Worked Worked 0600- Worked 1200-1800 1800 0600-1800 0600-1400 0600-1400 1400 0600-1400 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 2/16 2/17 2/18 2/19 2/20 2/21 2/22 Worked Worked Worked 0600- Worked 0800- Worked 0600-1500 2100 OFF OFF 0600-1800 1200 0600-2100 1 of 6

Appendix C Job Performance Form ES-C-1 Measure Worksheet Task Standard: Reviews the work hour history and determines that overtime request will result in exceeding work hour limits and also previously worked schedule violates additional work hour rules.

Required Materials:

General

References:

Initiating Cue:

Using the work history provided:

1. Determine if your prior work schedule met work hour requirements.
2. Determine if you can work the entire requested shift schedule, if not, list any and ALL restrictions that apply.
3. Document your conclusion on the cue sheet below.

Time Critical Task: No Validation Time: 30 2 of 6

Appendix C Page 3 Form ES-C-1 Performance Information (Denote critical steps with a check mark --./)

1. Performance Step: Obtain correct procedures Standard: Obtain EN-OM-123 IP-SMM-OP-1 03 CUE: Give candidates procedure.

Comment:

..J 2. Performance Step: Determines that the required 10 hour1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> break between work periods will not be met, and that the additional hours will result in exceeding 26 hours3.009259e-4 days <br />0.00722 hours <br />4.298942e-5 weeks <br />9.893e-6 months <br /> in any 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period.

Standard: 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> break not met- (From 2100 to 0600 =9 hours) 27hrs in 48hr period - (Sat 10/6 [15 hrs] + Sun

=

10/7 [12 hrs] 27 hrs Comment:

3 of 6

Appendix C Page4 Form ES-C-1 Performance Information (Denote critical steps with a check mark >I)

...J 3. Performance Step: Determines that the previously worked schedule, there was NOT a 34 hour3.935185e-4 days <br />0.00944 hours <br />5.621693e-5 weeks <br />1.2937e-5 months <br /> break in any 9 day period.

9 day period [2/9 -2/17] did not have a 34 hour3.935185e-4 days <br />0.00944 hours <br />5.621693e-5 weeks <br />1.2937e-5 months <br /> break Standard: Determines that previously worked schedule violation occurred due to not having a 34 hour3.935185e-4 days <br />0.00944 hours <br />5.621693e-5 weeks <br />1.2937e-5 months <br /> break in a 9 day period.

Actual Break- Mon 2/17 (2100) to Thus 2/20 (0600)

= 33 hours3.819444e-4 days <br />0.00917 hours <br />5.456349e-5 weeks <br />1.25565e-5 months <br />.

Comment:

Terminating Cue: JPM Complete 4 of6

Appendix C Page 5 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.

Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT or UNSAT Examiner's signature and date: _ _ _ _ _ _ _ _ _ _ __

5 of6

Page 6 of 6 Initial Conditions:

  • The Shift Manager has contacted you on Sunday, 2/23 (a scheduled day off), to report to the control room to work a 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> overtime shift from 0600-1800.
  • You were on vacation from 1/26 to 2/8.
  • Your work history for the previous 2 weeks is as follows (all hours worked performing licensed operating duties):

Sunday Monday Tuesday Wednesda Thursday Friday Saturday 2/9 2/10 2/11 y 2/12 2/13 2/14 2/15 Worked Worked Worked Worked Worked Worked Worked 1200-1800 0600-1800 0600-1800 0600-1400 0600-1400 0600-1400 0600-1400 Sunday Monday Tuesday Wednesda Thursday Friday Saturday 2/16 2/17 2/18 y 2/19 2/20 2/21 2/22 Worked Worked Worked Worked Worked 0600-1500 0600-2100 OFF OFF 0600-1800 0800-1200 0600-2100 Initiating Cue:

Using the work history provided:

1. Determine if your prior work schedule met work hour requirements.
2. Determine if you can work the entire requested shift schedule, if not, list any and ALL restrictions that apply.
3. Document your conclusion on the cue sheet below.

File: 2000651602-1.doc Task Number: 200*065*01 *02

Appendix C Job Performance Measure Form ES-C-1 Worksheet IPEC Facility: UNIT2 Task No: 0001250502 Task

Title:

Determine Reactor Vessel Venting Time Per FR-1.3, Attachment 1 KIA 2.1.25 Job Performance Measure RO Admin

Reference:

RO- 3.9 SRO- 4.2 No: C0-2 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

X Simulated Performance Actual Performance Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. An event occurred 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ago that resulted in a YELLOW path condition on the Inventory Critical Safety Function Status Tree, FR-1.3.
2. The TSC has requested that the Reactor Vessel be vented in accordance with FR-1.3, Response to Voids in Reactor Vessel.
3. Given the following information:

Containment Pressure 2.6 psig Containment Temperature 172°F Containment Hydrogen 2.3%

RCS Pressure 550 psig Task Standard: Vessel Venting time is properly calculated.

Required Materials: Calculator General

References:

2-FR-1.3 1 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet Initiating Cue: You are the spare RO and the CRS has directed you to calculate Reactor Vessel Venting Time in accordance with FR-1.3 Attachment 1 and Figure FRI3-3.

Time Critical Task: No Validation Time: 20 min 2 of 8

Appendix C Page 3 Form ES-C-1 Performance Information (Denote critical steps with a check mark ..J)

1. Performance Step: Obtain correct procedure Standard: Obtains FR-1.3 Comment:

..J 2. Performance Step: Determine Containment Volume at STP (A)

Standard: A= 2.61 E6 X 17.3/14.7 X 492/632 A= 2.39 E6 Comment:

..J 3. Performance Step: Determine Maximum Hydrogen volume that can be vented (B)

Standard: B =(3.0 - 2.3 X2.39 E6) 100 B =1.67 E4 Comment:

..J 4. Performance Step: Determine Hydrogen flow rate as a function of RCS pressure (C)

Standard: Using FRI3-3; C =1500 SCFM Comment:

3 of 8

Appendix C Page4 Form ES-C-1 Performance Information (Denote critical steps with a check mark --./)

...J 5. Performance Step: Calculate maximum venting time Standard: Time =1.67 E4 1500 Time =11 minutes Comment:

Terminating Cue: JPM Complete 4 of 8

Appendix C Page 5 Form ES-C-1 Number: fitl e: Rev*i ~ion Number:

2-fH-!.3 RESPONSE ro VOIDS IN fH'ACTOR VESSEL REV. 2 FIGURE FRI3-3 Hydrogen Flonrate (SCFM) 6() 00 __,..,.....,.....,..,..,..,..,.

5000 3000 2000 0 250 1COO 1250 1500 1750 2000 2250 2500 FIGUR~; f1Rl3

  • END-19 of ?0 5 of 8

Appendix C Page 6 Form ES-C-1 Number: r it 1e: Revision Number:

2-FR-1.3 RESPONSE TO VOlDS IN REACTOR VESSEL REV. 2 ATTACHMENT 1 (Attachment page 1 of 1)

INSfRUCTIONS FOR DElTRMINING VENTING LIME

1. Determine containment air volume at STP -

11.~

A = 2. 61 E6 cu ft X p X 992" R 14 . 7 psi a T (, 1\l.

where: P (psi a) Containment pressure (psigl + 14.7 and: T (* Rl Containment temperature ("F) + 460

2. Determine maxi mum hydrogen vo 1ume that c.iln be vented = B

~. ~ ~-Y'l~t.

B = (3.0% - __C_q_nj;_ainrnent Hv\lrogen Concentrati~

100%

3. Determine hydrogen flow rate as a fu ction of RCS a) Check RCS pressure.

bl Using FIGURE FRI3-3, read hydrogen flow rate.

4. Calculate_maximum venting time*

Maximum venting time ____e__ _

c Maximum venting t'rne ll

-END-20 of 20 6 of 8

Appendix C Simulator Setup Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.

Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -

7 of 8

Initial Conditions:

1. An event occurred 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ago that resulted in a YELLOW path condition on the Inventory Critical Safety Function Status Tree, FR-1.3.
2. The TSC has requested that the Reactor Vessel be vented in accordance with FR-1.3, Response to Voids in Reactor Vessel.
4. Given the following information:

Containment Pressure 2.6 psig Containment Temperature 172°F Containment Hydrogen 2.3%

RCS Pressure 550 psig Initiating Cue:

You are the spare RO and the CRS has directed you to calculate Reactor Vessel Venting Time in accordance with FR-1.3 Attachment 1 and Figure FRI3-3.

Appendix C Job Performance Measure Form ES-C-1 Worksheet IPEC Facility: UNIT2 Task No: 0350040421 Task

Title:

Perform a SG tube Leakrate Determination using 2-AOP-SG-1 2.3.14 Job Performance Measure RO Admin KIA

Reference:

RO- 3.4 No: RC-1 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • The plant is operating at 25% power
  • Radiation Monitor 45 is in alert.
  • The operating crew is responding in accordance with 2-AOP-SG-1 Steam Generator Tube Leak.
  • Condenser air in leakage is 2.7 SCFM
  • RCS Total Gaseous Activity 1.53 X 10-2 j.JCi/cc
  • Given the attached Leakrate Log Task Standard: SG Tube Leakage calculated using 2-AOP-SG-1 Attachment 1 Required Materials: Leakrate Log, Calculator, 2-AOP-SG-1 General

References:

2-AOP-SG-1 Attachment 1 and 2 1 of 12

Appendix C Job Performance Measure Form ES-C-1 Worksheet Initiating Cue: You are the BOP and the CRS has directed you to estimate the SG Tube Leakage, and determine sample frequency.

Time Critical Task: NA Validation Time: 15 Minutes 2 of 12

Appendix C Initial Conditions Form ES-C-1 Performance Information (Denote critical steps with a check mark~)

1. Performance Step: Review data Standard: Candidate may use Attachment 1 or separate paper Comment:

v2. Performance Step: Calculate SG Tube Leakage for 1215 Standard: Determines SG Tube Leakage is 48.1 gpd Comment:

v3. Performance Step: Calculate SG Tube Leakage for 1230 Standard: Determines SG Tube Leakage is 54.7 gpd Comment:

v4. Performance Step: Calculate Delta Leakrate Standard: Determines leakrate has increased 6.6 gpd over last hour.

Comment:

Appendix C Initial Conditions Form ES-C-1 Performance Information (Denote critical steps with a check mark --./)

"' 5. Performance Step: Determine sample frequency Standard: Determines sample frequency is every 15 minutes Comment:

Terminating Cue: JPM Complete

Appendix C Initial Conditions Form ES-C-1 Steam Generator Tube Leak 2-AOP-SG-1 Rev. 15 Page 39 of 69 Attachment 1 R-45 Estimated Leak Rate Page 1 of 1 NOTE For low levels of radioactivity as read on R-45, the estimated leak rate will be higher than actual.

1. Obtain the following A. RCS total gaseous activity (from Chemistry Data Book or WINCDMS) l.S~e . .:1 ~tCi/cc B. Condenser air in leakage  :}.1 SCFM C. R-45 reading :J. ~f>(!3.. . ~ ~tCi!cc
2. Calculate primary to secondary leak rate using the following formula per the following frequency requirements:
  • leak rate unstable or NOT positively identified as stable - every 15 minutes
  • leak rate stable per Attachment 2 - Use Attachment 2 frequencies

[(B J.] ) X (C J.!~G .. ~) X 10770 = [..___S.;;;;.....4-"-._._7_ _ _ ___.l Primary to secondary leak rate (gpd)

Appendix C Initial Conditions Form ES-C-1 Steam Generator Tube Leak 2-AOP-SG-1 Rev. 15 Page 39 of 69 Attachment 1 R-45 Estimated Leak Rate Page 1 of 1 NOTE For low levels of radioactivity as read on R-45, the estimated leak rate will be higher than actual.

1. Obtain the following A. RCS total gaseous activity (from Chemistry Data Book orWINCDMS) _;:__1.~-'--~=-G----'--'- ~LCi/cc B. Condenser air inleakage __.a_.__.]__ SCFM C. R-45 reading
2. Calculate primary to secondary leak rate using the following formula per the following frequency requirements:
  • leak rate unstable or NOT positively identified as stable- every 15 minutes
  • leak rate stable per Attachment 2 - Use Attachment 2 frequencies

[(B :J.. 7 ) X (C 3*~~- 5"") X 10770 = 4i.f J (A l. S~E= .. ;).. ) Primary to secondary leak rate (gpd)

Steam Generator Tube Leak 2-AOP-SG-1 Rev. 11 Attachment 2 SG Leak Rate Data Sheet Page 41of 69 Page 1 of 1

  • If leak rate is unknown, take data & determine LR every 15 minutes.
  • If leak < 30 gpd, take data once every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
  • If leak increases z 30 gpd but < 75 gpd take data & determine LR every 15 minutes.
  • If leak z 30 gpd but < 75 gpd and stable for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (::; 5 gpd increase in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />), take data every 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
  • If leak z 30 gpd but < 75 gpd and stable for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (::; 10% increase in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />), take data at frequency for normal operation.
  • If leak z 75 gpd, take data & determine LR every 15 minutes.

DATE/ RX R-45 R-49 ATT 1 N-16 (gpd) Chemistry Grab Sample (gpd)

TIME POWER (When 1/S) (When 1/S) CALC {When > 30% power) (When Chemistry provides)

(When performed)

(~Ci/cc) (gpd) 21 22 23 24 21 22 23 24 1115 25% 2.39 E-05 45.4 gpd NA NA NA NA 1130 25% 2.40 E-05 45.6 gpd NA NA NA NA 1145 25% 2.46E-05 46.7 gpd NA NA NA NA 1200 25% 2.50E-05 47.5 gpd NA NA NA NA 1215 25% 2.53E-05 48.1 gpd NA NA NA NA 1230 25% 2.88E-05 54.7 gpd NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA The difference between the two values is 6. 6 gpd over the last hour. This is greater than a 5 gpd change in last !?our and the frequency should be 15 minutes.

Appendix C Simulator Setup Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.

Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -

Initial Conditions:

  • The plant is operating at 25% power
  • Radiation Monitor 45 is in alert.
  • The operating crew is responding in accordance with 2-AOP-SG-1 Steam Generator Tube Leak.
  • Condenser air in leakage is 2.7 SCFM
  • RCS Gaseous Activity 1.53 X 1o-2 !Jci/cc
  • Given the attached Leakrate Log Initiating Cue: You are the BOP and the CRS has directed you to estimate the SG Tube Leakage, and determine sample frequency.

Steam Generator Tube Leak 2-AOP-SG-1 Rev. 15 Page 39 of 69 Attachment 1 R-45 Estimated Leak Rate Page 1 of 1 NOTE For low levels of radioactivity as read on R-45, the estimated leak rate will be higher than actual.

1. Obtain the following A. RCS total gaseous activity (from Chemistry Data Book orWINCDMS) _ _ _ _ _ _ J.!Ci/cc B. Condenser air inleakage _ _ _ _ _ _ SCFM C. R-45 reading _ _ _ _ _ _ J.!Ci/cc
2. Calculate primary to secondary leak rate using the following formula per the following requirements:
  • leak rate unstable or NOT positively identified as stable -every 15 minutes
  • leak rate stable per Attachment 2 - Use Attachment 2 frequencies

__~.[.l.::(B=---_ _ _)t___.:_:X_l.:(C=------'-- X 10770 =

(A_ _ _ _,) Primary to secondary leak rate (gpd)

Steam Generator Tube Leak 2-AOP-SG-1 Rev. 11 Attachment 2 SG Leak Rate Data Sheet Page 41of 69 Page 1 of 2

  • If leak rate is unknown, take data & determine LR every 15 minutes.
  • If leak< 30 gpd, take data once every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
  • If leak increases ~ 30 gpd but < 75 gpd take data & determine LR every 15 minutes.
  • If leak~ 30 gpd but < 75 gpd and stable for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (~ 5 gpd increase in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />), take data every 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
  • If leak~ 30 gpd but< 75 gpd and stable for 24 hours(~ 10% increase in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />), take data at frequency for normal operation.
  • If leak ~ 75 gpd, take data & determine LR every 15 minutes.

DATE/ RX R-45 R-49 ATT 1 N-16 (gpd) Chemistry Grab Sample (gpd)

TIME POWER (When 1/S) (When 1/S) CALC (When > 30% power) (When Chemistry provides)

(When performed)

(JlCi/cc) (gpd) 21 22 23 24 21 22 23 24 1115 25% 2.39 E-05 45.4 gpd NA NA NA NA 1130 25% 2.40 E-05 45.6 gpd NA NA NA NA 1145 25% 2.46E-05 46.7 gpd NA NA NA NA 1200 25% 2.50E-05 47.5 gpd NA NA NA NA 1215 25% 2.53E-05 NA NA NA NA 1230 25% 2.88E-05 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

Steam Generator Tube Leak 2-AOP-SG-1 Rev. 11 Attachment 2 SG Leak Rate Data Sheet Page 41of 69

Appendix C Job Performance Measure Form ES-C-1 Worksheet IPEC Facility: UNIT2 Task No: 0430010321 Task

Title:

Demonstrate Proficiency in use of Generator Capability Curve KIA 2.2.41 Job Performance Measure ROAdmin

Reference:

RO - 3.4 SRO - 3.8 No: EC-1 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

X Simulated Performance Actual Performance Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • Reactor is at 100% power, equilibrium Xenon, EOL
  • An NPO incorrectly operated valves resulting in a loss of some Hydrogen from the Main Generator
  • The Hydrogen vent path has been isolated Task Standard: MVAR adjustment accurately evaluated.

Required Materials: Ruler General

References:

Graph EL-1 Initiating Cue: You are the BOP and the CRS has directed you to determine if the Main Generator is operating within the limits of Graph EL-1 for current conditions.

Time Critical Task: No Validation Time: 15 1 of 8

Appendix C Page 2 Form ES-C-1 Performance Information (Denote critical steps with a check mark "./)

1. Performance Step:Obtain correct procedure Standard: Obtains Graph-EL-1 Comment:

v2. Performance Step: Obtain current generator gas pressure Standard: Determines Gas Pressure is approximately 45 psig Comment:

v3. Performance Step: Obtain current generator gross megawatts Standard: Determines approximately 950 Comment:

v4. Performance Step: Obtain current MVAR load Standard: Determine MVAR load is approximately 460 Leading Comment:

2 of 8

Appendix C Page 3 Form ES-C-1 Performance Information (Denote critical steps with a check mark -/)

~ 5. Performance Step: Evaluate conditions using Graph EL-1 Standard: Determines MVAR Loading is outside allowable on Graph EL-1 Comment:

Terminating Cue: JPM Complete 3 of 8

Page4 Form ES-C-1 Appendix C 150 UriJ

/(8(

INDIAN POINT 2 AlB 4 POLE 1,439,200 KVA. 1800 RPM. 22000 VOLTS

.81 PF*. 58 SCR. 75 PSIG HYDROGEN PRESSURE. 535 VOLTS EXCITA110N

<!)[8001

S t'400'

[_ __ j SSL 22KV SSL .*

23.1 KV CURVE A8 LIMITED BY FIElD HEATING CURVE BC LIMITED BY ARMATURE HEATING CURVE CD LIMITED BY ARMATURE CORE END HEATING rsti*Mted CapitbiHty Cqrvos EL-1 tl'w<J. 48)11h532 Rev. 4.

4 of 8

Appendix C Simulator Setup Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.

Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -

5 of 8

JPM-0450010101 SIMULATOR Initial Conditions:

  • Reactor is at 100% power, equilibrium Xenon, EOL
  • An NPO incorrectly operated valves resulting in a loss of some Hydrogen from the Main Generator
  • The Hydrogen vent path has been isolated Initiating Cue:

You are the BOP and the CRS has directed you to determine if the Main Generator is operating within the limits of Graph EL-1 for current conditions 6 of 8

JPM-0450010101 SIMULATOR r=, Er**.J EF',II,Fr F' H.::

PF'E::::::UF'E OUT 400

\

600

.-............ c **-.

r1.1,E I__, .t--t. *.* .H. r.. *=*

7 of 8

JPM-0450010101 SIMULATOR A-C MEGAWATTS 8 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet IPEC Facility: UNIT2 Task No: 2000650102 Task

Title:

Replace a Watchstander due to Illness KIA 2.1.5 Job Performance Measure SROAdmin

Reference:

SRO- 3.9 No: C0-1 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

X Simulated Performance Actual Performance Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • Unit 2 is at 100% power.
  • An oncoming RO for the 1800-0600 shift has called in sick
  • Date is 2/25
  • Time is 1700 Reference the attached RO work hour sheet.

Task Standard:

Reviews the work hour history for various RO candidates and determines if any one of the candidates can stand an entire shift. Explains whether or not RO can stand the entire shift Required Materials: Operations Schedule (Included)

General

References:

EN-OM-123 IP-SMM-OP-1 03 1 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet Initiating Cue:

There are 5 RO's available to fill the position. You are told to perform verification of overtime hours to determine which RO, if any, can stand the entire shift.

Document your conclusion(s) below (why or why NOT)

Time Critical Task: No Validation Time: 30 Min 2 of 10

Appendix C Page 3 Form ES-C-1 Performance Information (Denote critical steps with a check mark ~)

1. Performance Step: Obtain correct procedures Standard: Obtain EN-OM-123 IP-SMM-OP-1 03 CUE: Give candidates procedures and schedule.

Comment:

2. Performance Step: Review Ops Schedule and procedural requirements Standard: Reviews Schedule and determines scheduling requirements Comment:

v3. Performance Step: Determines that the RO candidate #1 CANNOT fill the RO position because R0#1 violates >72 hrs in any 7 days - from 2/19-2/25 (12+13+12+12+12+12=73 hrs)

Standard: Determines that the RO candidate #1 CANNOT fill the RO position because R0#1 violates >72 hrs in any 7 days - from 2/19-2/25 (12+13+12+12+12+12=73 hrs)

Comment:

3 of 10

Appendix C Page4 Form ES-C-1 Performance Information (Denote critical steps with a check mark --./)

--./ 4. Performance Step: Determines that the RO candidate #2 CANNOT fill the RO position because R0#2 violates <34 hours break in any 9 days (no 34 hr break from 2/17-2/25)

Standard: Determines that the RO candidate #2 CANNOT fill the RO position because R0#2 violates <34 hours break in any 9 days (no 34 hr break from 2/17 -

2/25).

Comment:

"' 5. Performance Step: Determines that the RO candidate #3 CAN fill the RO position. NO violation of the work hour limits ....

Standard: Determines that the RO candidate #3 CAN fill the RO position. NO violation of the work hour limits.

Comment:

4 of 10

Appendix C Page 5 Form ES-C-1 Performance Information (Denote critical steps with a check mark .,f)

..J 6. Performance Step: Determines that the RO candidate #4 CANNOT fill the RO position because R0#4 violates >26 hrs in any 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> -from 2/24-2/25 [15hrs {2/24-

=

25)+12hrs {2/17 -18) 27 hrs]

Standard: Determines that the RO candidate #4 CANNOT fill the RO position because R0#4 violates >26 hrs in any 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> -from 2/24-2/25 [15hrs {2/24-

=

25)+12hrs {2/17 -18) 27 hrs]

Comment:

..J 6. Performance Step: Determines that the RO candidate #5 CANNOT fill the RO position because R0#5 violates <10 hours break {between work period) on 2/25 {0900 to

=

1800(2/25) 9hrs break)

Standard: Determines that the RO candidate #5 CANNOT fill the RO position because RO #5 violates <1 0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> break {between work period) on 2/25 {0900 to 1800{2/25) = 9hrs break)

Comment:

Terminating Cue: JPM Complete 5 of 10

Appendix C Page 6 Form ES-C-1 SRO Admin JPM A1.1 -ANSWER KEY RO 2/16 2/17 2/18 2/19 2/20 2/21 2/22 2/23 2/24 iQ~

1 1800(2/18)- 1800(2/19)- 1800(2/21 )- 1800(2/22)- 1800(2/23)- 1800(2/24)- !t\Q9(2/25)i 0200(2/19) 0600(2/20) 0700(2/22) 0600(2/23) 0600(2/24) 0600(2/25) 11111(10/11) 0 0 8 12 0 13 12 12 12 12 2 0600(2/17)- 0600(2/18)- 0600(2/19)- 0600(2/20)- 0600(2/21 )- 0600(2/22)- 0600(2/23)- 0600(2/24 )- <~(2/25)'!!

1800(2/17) 1800(2/18) 1800(2/19) 1800(2/20) 1200(2/21) 1000(2/22) 1200(2/23) 1000(2/24) IICMJ(10/11) 0 12 12 12 12 6 4 6 4 12 3 0600(2/16)- 1800(2/18)- 1800(2/20)- 1800(2/21 )- 1800(2/22)- 1800(2/23)- '6QQ(2/25)1i 1800(2/16) 0600(2/19) 0800(2/21) 0600(2/22) 0800(2/23) 0600(2/24) bliQ(10/11) 12 0 12 0 14 12 14 12 0 12 4 0800(2/16)- 0800(2/17)- 0800(2/18)- 0800(2/19)- 1800(2/22)- 1800(2/23)- 1700(2/24)- IA6QP(2/25)i 1600(2/16) 1600(2/17) 1600(2/18) 1600(2/19) 0000(2/23) 0600(2/24) 0800(2/25) IIQI(10/11)

I 12 12 12 12 0 0 6 12 15 12 I

~~~6~~~)

5 0700(2/18)- 0700(2/19)- 0700(2/20)- 0700(2/21 )- 0600(2/23)- 2300(2/24 )-

1500(2/18) 1500(2/19) 1500(2/20) 1500(2/21) 11 00(2/23) 0900(2/25) 0 0 8 8 8 8 0 5 10 12 6 of 10

Appendix C Page 7 Form ES-C-1 SRO Admin JPM A1.1 -ANSWER KEY

)r >16 hrs in any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s-

)r >26 hrs in any 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />s- RO Candidate# 4 violation (15(2/24-25)+12(2/17-18) = 27 hrs)

)r >72 hrs in any 7 days- RO Candidate #1 violation (12+13+12+12+12+12=73 hrs)

)r <1 0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> break (between work period)- RO Candidate# 5 violation (0900 to 1800(2/25) = 9hrs break)

)r <34 hours break in any 9 days - RO Candidate # 2 violation (no 34 hr break from 2/17 - 2/25) 7 of 10

Appendix C Page 8 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.

Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -

8 of 10

Page 9 of 10 Initial Conditions:

  • Unit 2 is at 100% power.
  • An oncoming RO for the 1800-0600 shift has called in sick
  • Date is 2/25
  • Time is 1700 Reference the attached RO work hour sheet.

Initiating Cue:

There are 5 RO's available to fill the position. You are told to perform verification of overtime hours to determine which RO, if any, can stand the entire shift.

Document your conclusion(s) below (why or why NOT)?

ANSWER:

R0#1:

R0#2:

R0#3:

R0#4:

R0#5:

File: 2000651602-1.doc Task Number: 200*065*01 *02

Page 10 of 10 RO 2/16 2/17 2/18 2/19 2/20 2/21 2/22 1 1800(2/18) 1800(2/19) 1800(2/21) 1800(21 0200(2/19) 0600(2/20) 0700(2/22) 0600(21 2 0600(2/17) 0600(2/18) 0600(2/19) 0600(2/20) 0600(2/21) 0600(21 1800(2/17) 1800(2/18) 1800(2/19) 1800(2/20) 1200(2/21) 1000(21 3 0600(2/16) 1800(2/18) 1800(2/20) 1800(2/21) 1800(21 1800(2/16) 0600(2/19) 0800(2/21) 0600(2/22) 0800(21 4 0800(2/16) 0800(2/17) 0800(2/18) 0800(2/19) 1800(21 1600(2/16) 1600(2/17) 1600(2/18) 1600(2/19) 0000(21 5 0700(2/18) 0700(2/19) 0700(2/20) 0700(2/21) 1500(2/18) 1500(2/19) 1500(2/20) 1500(2/21)

File: 2000651602-1.doc Task Number: 200*065*01*02

Appendix C Job Performance Measure Form ES-C-1 Worksheet IPEC Facility: UNIT2 Task No: 0001250502 Task

Title:

Review Reactor Vessel Venting Time Calculation Per FR-1.3, Attachment 1 KIA 2.1.25 Job Performance Measure SRO Admin

Reference:

RO- 3.9 SRO- 4.2 No: C0-2 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

X Simulated Performance Actual Performance Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. An event occurred 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ago that resulted in a YELLOW path condition on the Inventory Critical Safety Function Status Tree, FR-1.3.
2. The TSC has requested that the Reactor Vessel be vented in accordance with FR-1.3, Response to Voids in Reactor Vessel.
3. Given the following information:

Containment Pressure 2.6 psig Containment Temperature 172°F Containment Hydrogen 3.2%

RCS Pressure 550 psig Task Standard: Vessel Venting time is properly calculated.

Required Materials: Calculator General

References:

2-FR-1.3 1 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet Initiating Cue:

You are the CRS and a spare RO has calculated Reactor Vessel Venting Time in accordance with FR-1.3 Attachment 1 and Figure FRI3-3. The SM has directed you to review the calculation and determine what, if any, actions are required.

Time Critical Task: No Validation Time: 20 min 2 of 8

Appendix C Page 3 Form ES-C-1 Performance Information (Denote critical steps with a check mark .V) v1. Performance Step: Obtain correct procedure Standard: Obtains FR-1.3 Comment: It is possible for the candidate to determine that the Reactor Vessel cannot be vented with containment hydrogen at 3.2% before reviewing the calculation.

NOTE: See Step 3

2. Performance Step: Determine Containment Volume at STP (A)

Standard: A= 2.61 E6 X 17.3/14.7 X 492/632 A= 2.39 E6 Determines calculation is correct.

Comment:

v3. Performance Step: Determine Maximum Hydrogen volume that can be vented (B)

Standard: 8 =(3.0- 3.2 X 1.32 E6) 100 8 =-4.22 E4 Comment: There are two elements wrong with this step.

1. The number used for the calculation was transposed
2. In the body of the procedure, the Reactor Vessel cannot be vented if containment hydrogen is greater than 3%.

Procedure Step 17 directs consultation with the TSC if containment hydrogen is > 3.0%

Terminating Cue: JPM Complete 3 of 8

Appendix C Simulator Setup Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.

Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -

4 of 8

Initial Conditions:

1. An event occurred 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ago that resulted in a YELLOW path condition on the Inventory Critical Safety Function Status Tree, FR-1.3.
2. The TSC has requested that the Reactor Vessel be vented in accordance with FR-1.3, Response to Voids in Reactor Vessel.
4. Given the following information:

Containment Pressure 2.6 psig Containment Temperature 172°F Containment Hydrogen 3.2%

RCS Pressure 550 psig Initiating Cue:

You are the CRS and a spare RO has calculated Reactor Vessel Venting Time in accordance with FR-1.3 Attachment 1 and Figure FRI3-3. The SM has directed you to review the calculation and determine what, if any, actions are required.

Number:

Title:

Rev*ision Number:

2-FR-I.3 RESPONSE TO VOIDS IN RE/\CTOR VESSEL REV. 2 ATTACHMENT 1 (Attachment page 1 of 1)

INSTRUCTIONS FOR DETERMINING VENTING TIME

l. Determine containment air volume at STP

,,.~

A = 2.61 E6 cu ft X P 14.7 psia where: P (psia) Containment pressure (psig) + 14.7 and: T ( R) 0 Containment temperature (°F) + 460

2. Determine maximum hydrogen volume that can be vented = B B = (3.0%
J, ~ a.~-

Containment Hydrogen Concentration) x A 100%

3. petermine Qygro en flow rate as a function of RCS ressure a) Check RCS pressure.

b) Using FIGURE FRl3-3, read hydrogen flow rate.

4. Calculate maximum venting time:

Maximum venting time 8 c

Maximum venting time II

-END-

Number:

Title:

Revision Number:

2-FR-I.3 RESPONSE TO VOIDS It4 REACTOR VESSt:.L REV. 2 FIGURE FR13-3 Hydrogen Flowrate !SCcM) 6000 5000 4000 3000 2000 1000 0 ' '1

?.J\) 500 750 1000 iZSO l'.iC 0 1150 2000 2250 2500 f[GURE fRl3-3. llYDROGEN FLOWRATE VERSUS RCS PRESSURE

      • END-19 of 20

Appendix C Job Performance Measure Form ES-C-1 Worksheet IPEC Facility: UNIT2 Task No: 0350060402 Task

Title:

Review a SG tube Leakrate Determination using 2-AOP-SG-1 KIA

Reference:

~-~6~ _ ~~~Performance Measure ~~~Admin 38 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • The plant is operating at 25% power
  • Radiation Monitor 45 is in alert.
  • The operating crew is responding in accordance with 2-AOP-SG-1 Steam Generator Tube Leak.
  • Condenser air in leakage is 2. 7 SCFM
  • RCS Total Gaseous Activity 1.53 X 1 o-2 IJCi/cc
  • Given the attached Leakrate Log
  • R-49 Automatic Actions have occurred.

Task Standard: SG Tube Leakage calculation reviewed using 2-AOP-SG-1 and 2 Required Materials: Leakrate Log General

References:

2-AOP-SG-1 Attachment 1 and 2 1 of 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Initiating Cue:

You are the CRS and the SM has directed you to review the estimated SG Tube Leakage, and determine:

  • sample frequency
  • recommend actions (if any)

Time Critical Task: NA Validation Time: 15 Minutes 2 of 9

Appendix C Initial Conditions Form ES-C-1 Performance Information (Denote critical steps with a check mark .V)

1. Performance Step: Check Calculations Standard: Candidate may use Attachment 1 or separate paper Candidate should determine that the calculations for 1115 through 1215 are correct.

Comment:

.V2. Performance Step: Check Calculation for 1230 Standard: Determines calculation is incorrect. The correct value is 60.81 gpd Comment:

...J 3. Performance Step: Check Calculation for 1245 Standard: Determines calculation is incorrect. The correct value is 76.02 gpd In addition to the calculation being incorrect, The CRS should recognize that the leakrate is > 75 gpd and the plant should be placed in MODE 3 within the next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> (procedure step 4.63).

Comment:

Appendix C Initial Conditions Form ES-C-1 Performance Information (Denote critical steps with a check mark ..J)

..J 4. Performance Step: Calculate SG Tube Leakage change over last hour Standard: Determines SG Tube Leakage has increased by:

  • 13.3 gpd from 1130 to 1230
  • 27.9 from 1145 to 1245.

Comment:

..J 5. Performance Step: Calculate SG Tube Leakage change over last hour Standard: Determines SG Tube Leakage has increased by 13.3 gpd from 1130 to 1230.

Comment:

6. Performance Step: Review Sample frequency recommendation by RO Standard: Identify Sample frequency recommendation by RO is correct Comment:

Terminating Cue: JPM Complete

Steam Generator Tube Leak 2-AOP-SG-1 Rev. 11 Page 41of69 Attachment 2 SG Leak Rate Data Sheet Page 1 of 1

  • If leak rate is unknown, take data & determine LR every 15 minutes.
  • If leak< 30 gpd, take data once every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
  • If leak increases 2:: 30 gpd but < 75 gpd take data & determine LR every 15 minutes.
  • If leak 2:: 30 gpd but < 75 gpd and stable for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (~ 5 gpd increase in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />), take data every 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
  • If leak 2:: 30 gpd but < 75 gpd and stable for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (~ 10% increase in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />), take data at frequency for normal operation.
  • If leak 2:: 75 gpd, take data & determine LR every 15 minutes.

DATE/ RX R-45 R-49 ATT 1 N-16 (gpd) Chemistry Grab Sample (gpd)

TIME POWER (When 1/S) (When 1/S) CALC (When > 30% power) (When Chemistry provides)

(When performed)

(!!Ci/cc) (gpd) 21 22 23 24 21 22 23 24 1115 25% 2.46E-05 46.75 NA NA NA NA 1130 25% 2.50E-05 47.51 NA NA NA NA '

1145 25% 2.53E-05 48.08 NA NA NA NA 1200 25% 2.68E-05 50.93 NA NA NA NA 1215 25% 2.90E-05 55.11 NA NA NA NA 1230 25% 3.20E-05 60.81 58.81 NA NA NA NA 1245 25% 4.00E-05 76.02 65.02 NA NA NA NA NA NA NA NA NA NA NA NA The calculated value for 1230 is incorrect The correct value should be 60.81 gpd.

The calculated value for 1245 is incorrect The correct value should be 76.02 gpd.

The leakrate has exceeded 75 gpd and the plant should be placed in MODE 3 within an additional 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

Appendix C Simulator Setup Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.

Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -

Initial Conditions:

  • The plant is operating at 25% power
  • Radiation Monitor 45 is in alert.
  • The operating crew is responding in accordance with 2-AOP-SG-1 Steam Generator Tube Leak.
  • Condenser air in leakage is 2.7 SCFM
  • RCS Total Gaseous Activity 1.53 X 1o-2 !Jci/cc
  • Given the attached Leakrate Log
  • R-49 Automatic Actions have occurred.

Initiating Cue:

You are the CRS and the SM has directed you to review the estimated SG Tube Leakage, and determine:

  • sample frequency
  • recommend actions (if any)

Steam Generator Tube Leak 2-AOP-SG-1 Rev. 15 Page 39 of 69 Page 1 of 1 NOTE For low levels of radioactivity as read on R-45, the estimated leak rate will be higher than actual.

1. Obtain the following A. RCS total gaseous activity (from Chemistry Data Book or WINCDMS) _ _ _ _ _ _ /-LCi/cc B. Condenser air inleakage _ _ _ _ _ _ SCFM C. R-45 reading _ _ _ _ _ _ 1-LCilcc
2. Calculate primary to secondary leak rate using the following formula per the following requirements:
  • leak rate unstable or NOT positively identified as stable -every 15 minutes
  • leak rate stable per Attachment 2 - Use Attachment 2 frequencies

__.,[~(B=-----L-)__:_::X---l....:(C=-----'--- X 10770 =

(A._ _ _ _) Primary to secondary leak rate (gpd)

Steam Generator Tube Leak 2-AOP-SG-1 Rev. 15 Page 41of69 Attachment 2 SG Leak Rate Data Sheet Page 1 of 1

  • If leak rate is unknown, take data & determine LR every 15 minutes.
  • If leak < 30 gpd, take data once every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
  • If leak increases ~ 30 gpd but < 75 gpd take data & determine LR every 15 minutes.
  • If leak~ 30 gpd but < 75 gpd and stable for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (~ 5 gpd increase in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />), take data every 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
  • If leak~ 30 gpd but < 75 gpd and stable for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (~ 10% increase in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />), take data at frequency for normal operation.
  • If leak~ 75 gpd, take data & determine LR every 15 minutes.

DATE/ RX R-45 R-49 ATI1 N-16 (gpd) Chemistry Grab Sample (gpd)

TIME POWER (When 1/S) (When 1/S) CALC (When > 30% power) (When Chemistry provides)

(When performed)

(11Ci/cc) (gpd) 21 22 23 24 21 22 23 24 1115 25% 2.46E-05 46.75 NA NA NA NA 1130 25% 2.50E-05 47.51 NA NA NA NA 1145 25% 2.53E-05 48.08 NA NA NA NA 1200 25% 2.68E-05 50.93 NA NA NA NA 1215 25% 2.90E-05 55.11 NA NA NA NA 1230 25% 3.20E-05 58.81 NA NA NA NA 1245 25% 4.00E-05 65.02 NA NA NA NA NA NA NA NA NA NA NA NA Based on calculated leakrate sample frequency should remain every 15 minutes.

Appendix C Job Performance Measure Form ES-C-1 Worksheet IPEC Facility: UNIT2 Task No: 0430010321 Task

Title:

Demonstrate Proficiency in use of Generator Capability Curve KIA 2.2.41 Job Performance Measure SROAdmin

Reference:

RO - 3.4 SRO - 3.8 No: EC-1 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

X Simulated Performance Actual Performance Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • Reactor is at 100% power, equilibrium Xenon, EOL
  • Main Generator Hydrogen makeup is not available
  • Machine Gas High Low Pressure alarm is up on the TG Monitor Panel
  • The given conditions have been stable for the last hour.

Task Standard: MVAR adjustment accurately evaluated and acceptable recommendation identified.

Required Materials: Ruler General

References:

Graph EL-1 2-ARP-042, G. E. Unit Aux Board GE Generator 2-SOP-26.2 Hydrogen and Carbon Dioxide to Main Generator Initiating Cue: You are the CRS, evaluate the given conditions and provide recommendation and explanation.

Time Critical Task: No 1 of 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Validation Time: 15 2 of 9

Appendix C Page 3 Form ES-C-1 Performance Information (Denote critical steps with a check mark -1)

1. Performance Step: Obtain correct procedure Standard: Obtains Graph-EL-1 Comment:

..J 2. Performance Step: Obtain current generator gas pressure Standard: Determines Gas Pressure is approximately 45 psig Comment:

..J 3. Performance Step: Obtain current generator gross megawatts Standard: Determines approximately 950 Comment:

..J 4. Performance Step: Obtain current MVAR load Standard: Determine MVAR load is approximately 460 Leading Comment:

3 of 9

Appendix C Page4 Form ES-C-1 Performance Information (Denote critical steps with a check mark ~)

~ 5. Performance Step: Evaluate conditions using Graph EL-1 Standard: Determines MVAR Loading is outside allowable on Graph EL-1 Comment:

~ 6. Performance Step: Make acceptable recommendation Standard: Based on given information, raising Machine Gas Pressure is NOT acceptable Reducing value of Leading VARS, until point on EL-1 is above URAL 22KV line, is acceptable.

OR Reduce Turbine Load, until point on EL-1 is above URAL 22KV line, is acceptable Comment:

Terminating Cue: JPM Complete 4 of 9

Page 5 Form ES-C-1 Appendix C tffiD UtiJ fEy INDIAN POINT 2 ATB 4 POlE 1,439,200 KVA. 1800 RPM. 22000 VOLTS

.81 PF*. 58 SCR. 75 PSIG HYDROGEN PRESSURE. 535 VOLTS EXCITATlON 0

16ool

~-

t;400'

[ __ j SSL 20.9KV SSL .*

23.1 KV URAL 22l<V

[:SOOl

.. T CURVE A8 LIMITED BY FIElD HEATING CURVE BC LIMITED BY ARMATURE HEATING CURVE CD LIMITED BY ARMATURE CORE END HEATING r:stimated Cap~bili.ty Cm:vas El-1 Rev. 4 .

. f}:"'J*. _48]111\5)2 5 of 9

Appendix C Simulator Setup Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.

Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -

6 of 9

JPM-0450010101 SIMULATOR Initial Conditions:

  • Reactor is at 100% power, equilibrium Xenon, EOL
  • Main Generator Hydrogen makeup is not available
  • Machine Gas High Low Pressure alarm is up on the TG Monitor Panel
  • The given conditions have been stable for the last hour.

Initiating Cue:

You are the CRS, evaluate the given conditions and provide recommendation and explanation.

7 of 9

JPM-045001 0101 SIMULATOR

,=, Er**.J EF'.I.\.T1=1 R H.:::

PF' E:::::::: 1_1 F' E OUT 400

\

600 til, E(1 A\/A D :=:

I *-**Ill .... -

8 of 9

JPM-0450010101 SIMULATOR 9 of 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet IPEC Facility: UNIT2 Task No: 1500010522 Task

Title:

Classify Emergency Events Requiring Emergency Plan lm plementation 2.4.38 Job Performance Measure SROADMIN KIA

Reference:

SRO -4.4 No: EP-1 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

1 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet Initial Conditions:

Indian Point Energy Center Unit 2 was operating at 100% and has been there for 100 days.

24 Containment Fan Cooler Unit is inoperable for circuit breaker maintenance.

Unit 3 is at 100% power; no issues.

Safety Injection automatically initiated due to a large break LOCA inside containment.

The following plant conditions exist:

  • The team is responding per E-0, Reactor Trip or Safety Injection.
  • Containment Isolation Phase A and B have been confirmed.
  • 21 and 22 Containment Spray Pumps failed to start and attempts to start the pumps were unsuccessful.
  • 24 Containment Fan Cooler Unit remains unavailable
  • RCS Subcooling is 0.0°F
  • Containment Pressure is 38 psig and stable
  • R-25 is reading 19 R/hr and R-26 is reading 21 Rlhr
  • RVLIS, Full Range is reading 44%

Meteorological Conditions:

  • Wind Speed: 3.5 meters/second
  • Wind Direction: 120 degrees @ 10 meters
  • Stability Class: c I will perform duties of Offsite Communicator.

Task Standard: Proper E-Pian Classification and Part 1 form properly filled out .

Required Materials: EAL Wall Chart.

General

References:

IP-EP-115 IP-EP-120 IP-EP-210 IP-EP-410 Initiating Cue:

You are the CRS and the SM is unable to get to the control room. Classify the event and complete the Radiological Emergency Data Form.

Time Critical Task: Yes (Declare event in 15 minutes and Initiate notification within 15 minutes of declaration) 2 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet Validation Time: 30 min 3 of?

Appendix C Page4 Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)

1. Performance Step: Obtain correct procedure IP-EP-120 orEAL chart Standard: Give candidate Wall Chart Comment:

..J 2. Performance Step: Evaluate Initiating Cues to determine aGE classification applies.

Standard: Determine EAL FG1.1 applies Fuel Clad - C.3 Loss RCS - D.2 Loss CNMT- D. 7 Potential Loss Comment: This action is time critical Mark Time when Declaration is made.

..J 3. Performance Step: Complete "New York State Radiological Emergency Data Form, Part 1" Standard: Complete IP-EP-115 Comment: Critical elements on Part 1 form are marked with an asterisk

..J 4. Performance Step: Direct Communicator to initiate notification.

Standard: Hand completed Part 1 form to evaluator and direct them to initiate notification.

CUE: Acknowledge direction to initiate notification.

Comment: This action is time critical.

Terminating Cue: JPM Complete 4 of 7

New York State Indian P01nt Energy Center

!---. --~ .....~DIOLOGICAL EMERGEfi~.'::: D *--- ~ No.!J.fic~on # _j_,

1. 1 This is an: ~ ACTUAL EMERGENCY t the Indian Pomt Energy Center The Emergen~;. . *A. Unusual Event ... ,~---~- AI;;;-------* - C Site Area Em~r~~ncy -*-*

I, Classiflcalion is: ~

2. I Emergency Terminated ThiS Emergency Classification declared on: _:..;:;..:;:.,::- t-:--_ _ at 'Tt~t .i :Dec{ava~

(Time 2fhr clock)

Release of Radioactive Materials due to the Classified Event:

To Water:

A. NO Release 3.

B. Release BELOW Federal Limits B. Release BELOW Federal limits C. Release ABOVE Federal Limits C. Release ABOVE Federal Limits

! D. Unmonitored Release Requiring Evaluation .L~: Unmomtore~-~~lease Reqwing Evaluation The following Protective Actions are recommended to be implemented as soon as practicable A. NO NEED for PROTECTIVE ACTIONS outside the site boundary

<!)EVACUATE and IMPLEMENT the Kl PLAN for the following Sectors ~

C. SHELTER-IN-PLACE and IMPLEMENT the Kl PLAN for the following Sectors

4. 2 miles around 5-miles downwind:

In the foUowing Sectors:U) (}) 6) 4 5 6 7 8 9 10 11 12 13 14 15

~;

2 miles around 10-miles downwind:

In the following Sectors: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 All remaming Areas MONITOR the EMERGENCY ALERT SYSTEM NOTE: OFFSITE AUTHORITIES SHOULD CONSIDER SHELTER-IN-PLACE+ TAKE KIIF EVACUATION IS NOT FEASIBLE EAL#: t~- ~I "" Affected Location:

I s.

Q... UNITD.;C-

' 8. UNIT 3

- ----~----~~-------------------->--C. IP;C ~~

Reactor Status:

6. Unit 2: Operational o~ at (Date) ( T i m e } - - - - - - (24 hr clock)

I Unit 3:. ~er:~~~o~ ~hutdo~.n- at (Date) (Time)::::::::::::::::===="'~4~hr_~lock} ... --;

1. Wind Speed: ~' 6' Meters/Sec at elevation 10 meters
8. Wind Direction: <From)

A

\ !W__.... ~-~---

B -~. --*;- . G Degrees at elevation 10 meters

--1

- - - - - - - - - - - - - Telephone#---------

(Communica!Dr's Name)

I Emergency Director A p p r o v a l : - - - - - - - - - - - - - Daterrime: - - - - - - - - - - -

(Direc!Dr's Name)

Page 1 of 1 Form EP-1 Rev 5

Appendix C Simulator Setup Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.

Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -

6 of?

Appendix C Initial Conditions Form ES-C-1 Initial Conditions:

Indian Point Energy Center Unit 2 was operating at 100% and has been there for 100 days.

24 Containment Fan Cooler Unit is inoperable for circuit breaker maintenance.

Unit 3 is at 100% power; no issues.

The events below occurred today approximately 5 minutes ago.

Safety Injection automatically initiated due to a large break LOCA inside containment.

The following plant conditions exist:

  • The team is responding per E-0, Reactor Trip or Safety Injection.
  • Containment Isolation Phase A and B have been confirmed.
  • 21 and 22 Containment Spray Pumps failed to start and attempts to start the pumps were unsuccessful.
  • 24 Containment Fan Cooler Unit remains unavailable
  • RCS Subcooling is 0.0°F
  • Containment Pressure is 38 psig and stable
  • R-25 is reading 19 Rlhr and R-26 is reading 21 R/hr
  • RVLIS, Full Range is reading 44%

Meteorological Conditions:

  • Wind Speed: 3.5 meters/second
  • Wind Direction: 120 degrees @ 10 meters
  • Stability Class: c I will perform duties of Offsite Communicator.

Initiating Cue:

You are the CRS and the SM is unable to get to the control room. Classify the event and complete the Radiological Emergency Data Form.

Appendix C Job Performance Measure Form ES-C-1 Worksheet IPEC Facility: UNIT2 Task No: 0040420421 Task

Title:

Emergency Borate the RCS 004000A4.18 Job Performance Measure KIA

Reference:

RO- 4.3 SRO- 4.1 No: SimA Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • At step 6 the crew determined 4 Control Rods did not fully insert on the trip
  • RCS Tavg is 54rF.

Task Standard: The correct amount of boron addition determined and boration has been commenced using MOV-333 Boration Path.

Required Materials: 2-SOP-3.2 General

References:

2-SOP-3.2 Initiating Cue: You are the ATC and the CRS has directed you to initiate Emergency Boration in accordance with 2-SOP-3.2 Time Critical Task: No Validation Time: 15 Min 11/18/2013

Unit 2 NRC 2014 Exam Date 02/10/2014 Performance Information (Denote critical steps with a check mark >/)

1. Performance Step: Obtain Correct Procedure Standard: Obtains 2-SOP-3.2 and Reviews Precautions and Limitations Comment:
2. Performance Step: Observe NOTES before Step 4.6.5 Standard: Reviews NOTES Comment:

11/18/2013

Unit 2 NRC 2014 Exam Date 02/10/2014 Performance Information (Denote critical steps with a check mark -.J)

-.J 3. Performance Step: Determine RCS Boron Concentration must be increased 667 ppm Standard: 1309 Minimum Shutdown Boron Concentration 1221 Current Boron Concentration 88 ppm to achieve Min Shutdown Boron Cone.

193 ppm increase for each rod > 1 (3 rods) 193 ppm per rod X three rods = 579

=

579 + 88 667 ppm increase boron concentration required.

Using Attachment 1 approximately 1985 gallons of Boric Acid is required Using 2.99 gal/ppm, approximately 1995 gallons of Boric Acid is required Comment: At some point during the performance of this JPM the candidate must determine that between 1985 and 2005gallons of boric acid are required.

The candidate may wait until boric acid addition has commenced to calculate the amount of boric acid necessary.

4. Performance Step: Observe NOTES before Step 4.6.12 Standard: Reviews NOTES Comment:

11/18/2013

Unit 2 NRC 2014 Exam Date 02/10/2014 Performance Information (Denote critical steps with a check mark ...f)

5. Performance Step: Initiate boration using the desired method Standard: Normal Boration is identified as the Preferred method, and it is expected that the candidate will start with this method.

Go To Attachment 3 Comment: Step 6.5.12

6. Performance Step: Observe Caution before Step 1.0 of Attachment 3 Standard: Review CAUTION Comment:
7. Performance Step: Place Makeup Mode Selector Switch to BORATE Standard: Rotate switch to BORATE Comment: Step 1.1 of Attachment 3 Panel FCF
8. Performance Step: Set Boric Acid Integrator to 600 gallons Standard: Set thumbwheels to 600.0 Comment: Step 1.2 of Attachment 3 Panel FBF 11/18/2013

Unit 2 NRC 2014 Exam Date 02/10/2014 Performance Information (Denote critical steps with a check mark --J)

9. Performance Step: Place Makeup Control Switch to START Standard: Rotate switch to START position Observe boration does NOT begin.

Return to Step 4. 6. 12 Comment: Step 1.3 of Attachment 3 Panel FCF Candidate may make several attempts to start Boration.

11/18/2013

Unit 2 NRC 2014 Exam Date 02/10/2014 Performance Information (Denote critical steps with a check mark --./)

11/18/2013

Unit 2 NRC 2014 Exam Date 02/10/2014 Performance Information (Denote critical steps with a check mark .V) 11/18/2013

Unit 2 NRC 2014 Exam Date 0211 0/2014 Performance Information (Denote critical steps with a check mark --J)

24. Performance Step: Return both Boric Acid Transfer Pumps to SLOW Standard: Rotate switches to slow speed Candidate should observe Red Slow indicating light ON Comment: Step 2.2 of Attachment 5, For Time consideration the JPM can be Terminated at this point. There are no additional critical steps 11/18/2013

Unit 2 NRC 2014 Exam Date 02/10/2014 Performance Information (Denote critical steps with a check mark .Y)

25. Performance Step: Dispatch NPO to OPEN the immediately CLOSE 330, Boric Acid Blender Primary Water Bypass Stop to flush line 208 Standard: Contact Nuc Side NPO and direct to OPEN then CLOSE 330.

Comment: CUE: Acknowledge request as NPO and report valve has been OPENED and CLOSED.

26. Performance Step: Place running Charging Pump speed controller in AUTO Standard:
  • Place Charging Pump Speed Controller in MAN-BAL
  • ADJUST the Bias Knob until the deviation meter indicates zero
  • Place Charging Pump speed controller to AUTO
  • Slowly turn the Bias Knob back to zero Comment:
27. Performance Step: ADJUST HCV-142 to maintain RCP Seals between 6 and 12 gpm Standard: Rotate potentiometer in close direction as necessary Comment:

11/18/2013

Unit 2 NRC 2014 Exam Date 02/10/2014 Performance Information (Denote critical steps with a check mark ~)

28. Performance Step: Direct Chemistry to obtain RCS Boron Sample.

Standard: Contact Chemistry and direct them to obtain RCS Boron Sample Comment: CUE Acknowledge request as Chemist

29. Performance Step: When Chemistry reports Boron Concentration, the set FIC-11 0, Boric Acid Control for the new Boron Concentration per Graph-CVCS-1 B Standard: Sets FIC-110 to proper setting Comment:

Terminating Cue: JPM Complete 11/18/2013

Appendix C Page 11 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.

Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT or UNSAT Examiner's signature and date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

11/18/2013

Appendix C Simulator Setup Form ES-C-1 Reset the Simulator to any 100% power IC Insert the following Malfunctions for Stuck Rods MAL-CFR001A Rod D-4 UNTRI P MAL-CFR001AJ Rod H-12 UNTRIP MAL-CFR001 D Rod M-4 UNTRI P MAL-CRF001AX Rod F14 UNTRIP SWI-CVC033A LCV-1128 CLOSE POS SWI-CVC048 MAKEUP MODE SELECTOR SWITCH AUTO MAKEUP Trip the reactor and allow the plant to stabilize.

Freeze the Simulator Take a snapshot if JPM is to be used more than once.

11/18/2013

Appendix C Initial Conditions Form ES-C-1 Initial Conditions:

  • At step 6 the crew determined 4 Control Rods did not fully insert on the trip
  • RCS Tavg is 54rF.

Initiating Cue:

You are the ATC and the CRS has directed you to initiate Emergency Boration in accordance with 2-SOP-3.2

Appendix C Job Performance Measure Form ES-C-1 Worksheet IPEC Facility: UNIT2 Task No: 0000390521 Task

Title:

Perform the Required Action to Align the 51 System for Recirculation during Transfer to Cold Leg Recirculation KIA 000011A1.11 Job Performance Measure Sim B

Reference:

SRO - 4.2 RO - 4.2 No:

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

X Simulated Performance Actual Performance Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • A large break LOCA has occurred.
  • Safety Injection has been RESET in accordance with E-1, Loss of Reactor or Secondary coolant.
  • The RWST level has decreased to 9.24 feet and the CRS has directed you to transfer to cold leg recirculation in accordance with ES-1.3
  • All steps up through and including step 18 of E-1 have been completed.
  • FSB Ventilation was previously shutdown
  • The first 3 steps of ES-1.3 have been completed.

Task Standard: Cold leg recirculation flow is established and the core is adequately cooled (i.e., adequate Recirc flow).

Required Materials: None General

References:

2-ES-1.3, Transfer to Cold Leg Recirculation 1 of 13

Appendix C Job Performance Measure Form ES-C-1 Worksheet Initiating Cue:

You are the BOP and the CRS has directed you to align the plant for cold leg Recirc in accordance with ES-1.3, Transfer to Cold Leg Recirculation, commencing at step 4 up to and including the determination that adequate low head recirculation flow has been established.

Time Critical Task: No Validation Time: 20 Minutes 2 of 13

Appendix C Page 3 Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)

1. Performance Step: Obtain Correct Procedure Standard: Obtain current revision of 2-ES-1.3 Comment:
2. Performance Step: Observe CAUTION before step 4 Standard: Reviews Caution Comment: Step 4 Note for examiner. This CAUTION is important because it tells the candidate to trip safeguards pumps to prevent damage due to loss of suction. The candidates should be periodically monitoring RWST level to determine if Sl and Containment Spray pumps should be stopped.
3. Performance Step: Reduce 480V Bus Loads Standard: Observe Charging Pumps OFF Observe PRZR Heaters OFF Comment: Step 4
4. Performance Step: One at time, Depress Containment Spray Reset Push buttons Standard: Depress Pushbuttons Comment: Step 5 It is not necessary to reset Containment Spray at this time. It was reset at step 6 of E-1.

Candidate may attempt to reset and/or verify relays are reset.

3 of 13

Appendix C Page4 Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)

..J 5. Performance Step: Place Safety Injection Recirc Switches 1 and 3 to ON Standard: Rotate Recirc Switches 1 and 3 to ON position Check 22 Sl Pump Stopped Panel SBF-2 Check 21 Containment Spray Pump Stopped Panel SBF-1 Check RHR Pumps Both Stopped Panel SBF-1 Comment: Step 6

6. Performance Step: Align Service Water as follows:

Check Service Water Aligned for 3 header cps.

Verify SWN-4 & 5 Closed Standard: Three header ops was given in Initial Conditions.

Contact Conventional NPO to verify SWN-4 & 5 Closed CUE: SWN-4 and 5 are closed.

Comment: Step 7

7. Performance Step: Observe NOTE before Step 8 Standard: Reviews NOTE before Step 8 Comment:

4 of 13

Appendix C Page 5 Form ES-C-1 Performance Information (Denote critical steps with a check mark --J)

...J 8. Performance Step: Place Safety Injection Recirc Switch 2 to ON Standard: Rotate Switch to ON position Check one service water pump supplying Non-Essential Header Yes Check 3 CCW Pumps Running Yes Stop 23 CCW Pump Panel SGF Check Function Complete Light LIT YES Panel SBF-1 Comment: Step 8 Only Recirc Switch reposition is critical

...J 9. Performance Step: Verify One RHR Heat Exchange Isolated Check 822A & B Open Check 746 & 747 Open Close 746 Standard: Observes 822A & B Open Panel SBF-1 Check 746 & 747 Open Panel SBF-1 Rotate Switch for 746 to Close Panel Comment: Only action to Close 746 is critical.

10. Performance Step: Align Safety Injection Recirc Switch 4 as follows Manually Start 21 Recirculation Pump Standard: Rotate Switch to Start Position Observe Pump Not Running Comment: Step 10 Panel SBF-1 5 of 13

Appendix C Page 6 Form ES-C-1 Performance Information (Denote critical steps with a check mark ...f) 6 of 13

Appendix C Page 7 Form ES-C-1 Performance Information (Denote critical steps with a check mark "./)

7 of 13

Appendix C Page 8 Form ES-C-1 Performance Information (Denote critical steps with a check mark"'./)

8 of 13

Appendix C Page 9 Form ES-C-1 Performance Information (Denote critical steps with a check mark ..J)

24. Performance Step: Return to Step in effect Standard: Returns to Step 11 Comment:

9 of 13

Appendix C Page 10 Form ES-C-1 Performance Information (Denote critical steps with a check mark ..../)

25. Performance Step: Determine if Adequate Low Head Recirculation Flow has been established Check ALL Flow meters (946A-D) Greater than 500 gpm Standard: Observes all 956 indicators greater than 500 gpm Comment: Step 11 Panel SBF-2 Terminating Cue: JPM Complete 10 of 13

Appendix C Page 11 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.

Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -

11 of 13

Appendix C Simulator Setup Form ES-C-1 Reset Simulator to any 100% IC Insert Malfunction MAL-RCS-005A Perform the actions of E-0 including Attachment 1.

Perform the first 18 steps of E-1.

Perform the first 5 steps of ES-1.3 Allow RWST level to decrease to 9.24 feet.

Ensure both RWST Low Low Level Alarms are up.

Ensure Three Header Operations Placard is in place at the service water header selector switch.

12 of 13

Perform the Required Actions to Align the 51 System for Recirculation during Transfer to Cold Leg Recirculation (Manual Start of 21 Recirc Pump)

Page 13 of 7 Initial Conditions:

  • A large break LOCA has occurred.
  • Safety Injection has been RESET in accordance with E-1, Loss of Reactor or Secondary coolant.
  • The RWST level has decreased to 9.24 feet and the CRS has directed you to transfer to cold leg recirculation in accordance with ES-1.3
  • All steps up through and including step 18 of E-1 have been completed.
  • FSB Ventilation was previously shutdown
  • The first 3 steps of ES-1.3 have been completed.

Initiating Cue:

You are the BOP and the CRS has directed you to align the plant for cold leg Recirc in accordance with ES-1.3, Transfer to Cold Leg Recirculation, commencing at step 6 up to and including the determination that adequate low head recirculation flow has been established.

File: (3000121601-1.doc) Difficulty: 3 Time: 20 minutes ES-1.3

Appendix C Job Performance Measure Form ES-C-1 Worksheet IPEC Facility: UNIT2 Task No: 0100180421 Task

Title:

Respond to a Pressurizer Low Pressure Alarm 000027 A 101 Job Performance Measure SimC

- KIA

Reference:

RO- 4.0 SR0-3.9 No:

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance X Classroom Simulator - - -X- - - Plant _ _ _ __

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • The plant is operating at 100% power
  • No Equipment is Out of Service Task Standard: Pressurizer pressure stable, reactor tripped with 23, 24 and 21or 22 RCPs tripped.

Required Materials: None General

References:

2-ARP-SAF Initiating Cue:

You are the ATC. Respond to changing plant conditions or events.

Time Critical Task: No Validation Time: 15 minutes 1 of 7

Appendix C Page 2 Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)

NOTE:

Candidate may diagnose failed open Spray Valve at any time during this JPM. The exact order of actions before the Reactor Trip is not important, and they may be performed in any order.

The reactor must be tripped before the Reactor Coolant Pumps are tripped.

1. Performance Step: Acknowledge Pressurizer Low Pressure 2185 psig Alarm and refer to ARP Standard: Observe alarm and retrieve ARP from holder Comment: Candidate may recognize pressure lowering before alarm annunciates.
2. Performance Step: Compare redundant Pressurizer Pressure indicators Standard: Observe pressure decreasing on all 4 channels Comment: ARP Step 3.1
3. Performance Step: Verify Heaters and Sprays are operating properly.

Standard: Observe Heaters energized and one spray valve opened Comment: ARP Step 3.2 Candidate may diagnose stuck open spray valve at this time

4. Performance Step: Evaluate and perform the following:
  • If pressure reduction is due to a rapid temperature reduction OR rapid load increase then go to appropriate procedure.

Standard: Determine pressure reduction NOT due to temperature or load change Comment: ARP Step 3.3 2 of 7

Appendix C Page 3 Form ES-C-1 Performance Information (Denote critical steps with a check mark--./)

5. Performance Step: IF the Pressurizer heaters or sprays are NOT operating properly, THEN PLACE Pressurizer Pressure Master Controller in MANUAL and ATTEMPT to establish RCS pressure at 2235 psig.

Standard: Transfer controller to Manual (T-bar up) and output adjusted to Heaters (Left of null)

Comment: ARP Step 3.4 3 of 7

Appendix C Page 4 Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)

9. Performance Step: Go To E-0 Reactor Trip or Safety Injection Standard: Observes conditions to verify reactor tripped Comment: ARP Step 3.5.2.4 Terminating Cue: JPM Complete NOTE: If a Safety Injection occurs during the performance of this JPM, it is likely a failure. The candidate's progress through the required actions will determine actual pass or fail grade.

4 of 7

Appendix C Page 5 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.

Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - -

5 of?

Appendix C Simulator Setup Form ES-C-1 Reset Simulator to any 100% IC Insert Malfunction: MAL-CVH-RCS002B 75% 120 Second Ramp.

Insert Schedule: Failed auto rx trips.sch to fail automatic reactor trip with manual trip available.

6 of?

Appendix C Initial Conditions Form ES-C-1 Initial Conditions:

  • The plant is operating at 100% power
  • No Equipment is Out of Service Initiating Cue:

You are the ATC. Respond to changing plant conditions or events.

Appendix C Job Performance Measure Form ES-C-1 Worksheet IPEC Facility: UNIT2 Task No: 0590060321 Task

Title:

Transfer Main Feed from LFBV to MFRV During Power Ascension 059000A403 Job Performance Measure KIA

Reference:

RO- 2.9 SRO- 2.9 No: Sim D Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • The plant is at approximately 30% power
  • Steam and Feed Flow signals are approximately 900,000 lbm/hr
  • SG level is currently being maintained by the Low Flow Bypass Valves
  • 22, 23, and 24 FRVs are in Automatic.
  • All necessary Precautions and Limitations are met.

Task Standard: 21 Steam Generator Level is being control by 21 Main Feedwater Regulating Valve in Automatic.

Required Materials: None General

References:

2-SOP-21.1, Main Feedwater System 1 of 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Initiating Cue: You are the ATC and the CRS has directed you to

  • Transfer 21 SG feedwater control from the Low Flow Bypass Valve to the Main Feed Regulating Valve (MFRV) in MANUAL in accordance with 2-SOP-21.1, Main Feedwater System Step 4.2.1.1 c(1)-

4.2.1.1c(7).

  • When 21 MFRV operation is verified satisfactory transfer 21 MFRV to Automatic.

Time Critical Task: No Validation Time: 15 2 of 9

Appendix C Page 3 Form ES-C-1 Performance Information (Denote critical steps with a check mark .,f)

1. Performance Step: Obtain correct procedure Standard: Obtains 2-SOP-21.1 Comment: Hand the candidate the procedure.
2. Performance Step: Observe NOTES before step 4.2.1.1 Standard: Reviews NOTES Comment:
3. Performance Step: Verify selected 21 FW Regulator controller on the Flight Panel is in MAN AND Closed.

Standard: Observes Controller in MAN and Potentiometer rotated to 0 position Comment: Step 4.2.1.1 a Panel FBF

4. Performance Step: If desired to transfer level control in AUTO then go to step 4.2.1.1d.

Standard: It is not desired to transfer level control in AUTO Comment:

3 of9

Appendix C Page4 Form ES-C-1 Performance Information (Denote critical steps with a check mark"-'>

v5. Performance Step: SLOWLY begin closing 21 Feedwater Bypass Valve until SG level begins to trend down.

Standard: Rotate 21 Feedwater Bypass Valve potentiometer in the close direction (clockwise)

Comment: Step 4.2.1.1c(1) Panel FBF v6. Performance Step: OPEN 21 Man Feedwater Regulating Valve to restore level to program Standard: Rotate 21 Main Feedwater Regulating Valve potentiometer in the open direction (counter clockwise)

Comment: Step 4.2.1.1 c(2) Panel FBF v7. Performance Step: REPEAT steps 4.2.1.1c(1) AND 4.2.1.1c(2) until Feedwater Bypass Valve is Closed Standard: Rotate 21 Feedwater Bypass Valve potentiometer in close direction Rotate 21 Main Feedwater Regulating Valve potentiometer in open direction Comment: Step 4.2.1.1c(3) Panel FBF 4 of9

Appendix C Page 5 Form ES-C-1 Performance Information (Denote critical steps with a check mark ..J)

8. Performance Step: Verify 21 3 element controller FC-417 in Rack 85 is in AUTO Standard: Locate Controller in Rack 85 and observe it is in AUTO CUE: A Spare operator will monitor SG levels Comment: Step 4.2.1.1c(4) Rack 85
9. Performance Step: Verify 21 SG level is on trend near programmed level Standard: Observe 21 SG level trend; make adjustments as necessary.

Comment: This is dependent on the candidate ability to smoothly control feedwater flow in Manual Step 4.2.1.1 c(5) Panel F8F

10. Performance Step: Verify 21 SG Steam Flow and Feed Flow indication are matched Standard: Observe 21 SG Steam Flow and Feed Flow approximately equal at 900,000 lbm/hr Comment: This is dependent on the candidate ability to smoothly control feedwater flow in Manual Step 4.2.1.1 c(6) Panel F8F 5 of9

Appendix C Page6 Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)

'\/11. Performance Step: Place 21 FW Regulator controller to AUTO Standard: Move switch to AUTO position Observe FRV response stable (NOT erratic)

Comment: Step 4.2.1.1 c(7) Panel FBF Terminating Cue: JPM Complete 6 of 9

Appendix C Page 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.

Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - -

7 of 9

Appendix C Simulator Setup Form ES-C-1 Reset Simulator to IC 231 Place MFRVs in Manual Open LFBVs and Close MFRVs.

Stabilize SG Level.

Override 22 Booster Fan Switch to Stop Position to prevent starting.

SWI HVA011A- STOP Position Take a snapshot if JPM is given more than once.

8 of9

Appendix C Initial Conditions Form ES-C-1 Initial Conditions:

  • The plant is at approximately 30% power
  • Steam and Feed Flow signals are approximately 900,000 lbm/hr
  • SG level is currently being maintained by the Low Flow Bypass Valves
  • All necessary Precautions and Limitations are met.

Initiating Cue:

You are the ATC and the CRS has directed you to

  • Transfer 21 SG feedwater control from the Low Flow Bypass Valve to the Main Feed Regulating Valve (MFRV) in MANUAL in accordance with 2-SOP-21.1, Main Feedwater System Step 4.2.1.1 c(1)- 4.2.1.1 c(7).
  • When 21 MFRV operation is verified satisfactory transfer 21 MFRV to Automatic.

Appendix C Job Performance Measure Form ES-C-1 Worksheet IPEC Facility: UNIT2 Task No: 0000300521 Task

Title:

Perform the Required Actions to Reset FCU Services and CCR Ventilation KIA 022000A4.01 Job Performance Measure

Reference:

SRO- 3.6 RO- 3.6 No: -Sim

- E- - -

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

X Simulated Performance Actual Performance Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • Sl was initiated due to a steam break in the Turbine Building.
  • All required actions of E-0 have been completed.
  • Sl, Phase A & B have been reset.
  • The CRS is addressing the remainder of the items in step 22.

Task Standard: Fan Cooler Unit Services and CCR Ventilation have been RESET.

Required Materials: Screwdriver General

References:

2-ES-1.1 Sl Termination Initiating Cue: You are the BOP and the CRS has directed you to reset FCU Services and CCR Ventilation in accordance with ES-1.1 step 22.

Time Critical Task: No Validation Time: 15 Min 1 of 7

Appendix C Page 2 Form ES-C-1 Performance Information (Denote critical steps with a check mark ..J)

1. Performance Step: Obtain Correct Procedure Standard: Obtain current revision of 2-ES-1.1 Comment:

...J 2. Performance Step: Place the following control switches in the position indicated:

  • TCV-1104 OPEN
  • TCV-1105 OPEN Standard: Rotate switches to Open position Comment:Step 22 (6th bullet) Panel SBF-1
3. Performance Step: Verify the following control switches in the position indicated:
  • FCU NORM OUT valves OPEN Standard: Observe Switches in OPEN Comment: Step 22 (6th bullet) Panel SBF-2 2 of 7

Appendix C Page 3 Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)

...J 4. Performance Step: Place the following control switches in the position indicated:

  • Place Mode Selector Switch to 2 Standard: Rotate switch to position 2 Comment: Step 22 (6th bullet) Panel PY2

...J 5. Performance Step: Place the following switches to CUTOUT

  • Unit -1 K-8 fan switch (OT2-3)
  • OT2-1
  • OT2-2 Standard: Rotate switches to CUTOUT Comment: Step 22 (6th Bullet) Panel PY2 Back corner of Simulator Control Room 3 of7

Appendix C Page4 Form ES-C-1 Performance Information (Denote critical steps with a check mark ~)

...J 6. Performance Step: Depress both Reset buttons in racks E-7 and F-8 for each of the following:

  • FCU ventilation
  • CCR Ventilation Standard: Reset Pushbuttons Depressed Comment: Step 22 (61h bullet) Racks E-7 and F-8 in back of Simulator Control Room Terminating Cue: JPM Complete 4 of 7

Appendix C Page 5 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No. Simulator E Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - -

5 of 7

Appendix C Simulator Setup Form ES-C-1 Reset Simulator to any 100% Power IC.

Manually Actuate Sl Perform applicable actions of E-0 including Attachment 1 and ES-1.1 up to 22.

Take a snapshot if JPM is to be given multiple times.

6 of 7

Initial Conditions:

  • Sl was initiated due to a steam break in the Turbine Building.
  • All required actions of E-0 have been completed.
  • Sl, Phase A & B have been reset.
  • The CRS is addressing the remainder of the items in step 22.

Initiating Cue:

You are the BOP and the CRS has directed you to reset FCU Services and CCR Ventilation in accordance with ES-1.1 step 22.

Appendix C Job Performance Measure Form ES-C-1 Worksheet IPEC Facility: UNIT2 Task No: 0800300121 Task

Title:

Transfer Buses 1and 2 to the Unit Auxiliary Transformer 062000A401 Job Performance Measure KIA

Reference:

RO- 3.3 SRO- 3.1 No: Sim F Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

X Simulated Performance Actual Performance Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • A Plant startup is in progress in accordance with 2-POP-1.3 Plant Startup from Zero to 45% Power.
  • The turbine has been synchronized with Breakers 7 and 9 closed.

Task Standard: Buses 1 - 4 are transferred to the Unit Auxiliary Transformer.

Required Materials: None General

References:

2-SOP-27 .1.4 Initiating Cue: You are the BOP and the CRS has directed you to transfer 6.9 kV buses 1 and 2 to the Unit Auxiliary Transformer in accordance with 2-SOP-27 .1.4 Time Critical Task: No Validation Time: 10 1 of 9

Appendix C Page 2 Form ES-C-1 Performance Information (Denote critical steps with a check mark -..f)

1. Performance Step: Obtain Correct Procedure and Reviews Precautions and Limitations Standard: Obtains 2-SOP-27.1.4 P&Ls reviewed Comment:
2. Performance Step: VERIFY Unit Auxiliary Transformer and Station Auxiliary Transformer are within 50 volts.

Standard: Observes UAT and SAT are within 50 Volts Comment: Step 4.2.1.1 NOTE to examiner: If Station Auxiliary and Unit Auxiliary Transformer voltages are not within 50 Volts, perform JPM steps 3-5 below.

3. Performance Step: Place the appropriate Tap Changer in MANUAL Standard: Push in handle to place UAT Tap Changer in Manual Comment: Step 4.1. 7.1 NOTE: During validation, the Unit Aux Tap Changer meter was not functioning and the Station Aux volt meter was not indicating properly.

If necessary CUE candidate to use SAT volt meter on the Supervisory Panel SHF.

2 of9

Appendix C Page 3 Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)

4. Performance Step: Manually adjust Unit Aux Tap Changer to match voltages Standard: Rotate switch to raise of lower voltage as necessary Comment: Step 4.1. 7.2
5. Performance Step: Place UAT Tap Changer in AUTO Standard: Pull Tap Changer Switch to OUT Comment: Step 4.1.7.3

..J 6. Performance Step: Place 6900V Bus 1 Synchroscope switch to Bus 1 -

Unit Standard: Place Handle into switch location and rotate to Bus 1 Unit position Comment: Step 4.2.1.2

7. Performance Step: Verify Synchroscope at approximately 12 o'clock Standard: Observes Synchroscope at 12 o'clock Comment: Step 4.2.1.3 3 of9

Appendix C Page 4 Form ES-C-1 Performance Information (Denote critical steps with a check mark -1)

..J 8. Performance Step: Close Normal Feed Breaker UT -1 Standard: Rotate Normal Feed Breaker Switch to Close Comment: Step 4.2.1.4

<\J 9. Performance Step: Open Bus 1-5 Tie Breaker UT1-ST5 Standard: Rotate Tie Breaker Switch to Open Comment: Step 4.2.1.5

..J 10. Performance Step: Place Synchroscope to OFF Standard: Rotate Switch to OFF Comment: Step 4.2.1.6

11. Performance Step: VERIFY Unit Auxiliary Transformer and Station Auxiliary Transformer are within 50 volts.

Standard: Observes UAT and SAT are within 50 Volts Comment:Step Step 4.2.2.1 4 of9

Appendix C Page 5 Form ES-C-1 Performance Information (Denote critical steps with a check mark --./)

'\1 12. Performance Step: Place 6900V Bus 2 Synchroscope switch to Bus 2 -

Unit Standard: Place Handle into switch location and rotate to Bus 2 Unit position Comment: Step 4.2.2.2

13. Performance Step: Verify Synchroscope at approximately 12 o'clock Standard: Observes Synchroscope at 12 o'clock Comment: Step 4.2.2.3

..J 14. Performance Step: Close Normal Feed Breaker UT-2 Standard: Rotate Normal Feed Breaker Switch to Close Comment: Step 4.2.2.4

'\1 15. Performance Step: Open Bus 2-5 Tie Breaker UT2-ST5 Standard: Rotate Tie Breaker Switch to Open Comment: Step 4.2.2.5 5 of 9

Appendix C Page 6 Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)

"' 16. Performance Step: Place Synchroscope to OFF Standard: Rotate Switch to OFF Comment: Step 4.2.2.6 Terminating Cue: JPM Complete 6 of 9

Appendix C Page 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.

Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -

7 of 9

Appendix C Initial Conditions Form ES-C-1 Initial Conditions:

  • A Plant startup is in progress in accordance with 2-POP-1.3 Plant Startup from Zero to 45% Power.
  • The turbine has been synchronized with Breakers 7 and 9 closed.

Initiating Cue:

You are the BOP and the CRS has directed you to transfer 6.9 kV buses 1 and 2 to the Unit Auxiliary Transformer in accordance with 2-SOP-27 .1.4

Appendix C Job Performance Measure Form ES-C-1 Worksheet IPEC Facility: UNIT2 Task No: 0450040421 Task

Title:

Respond to Turbine First Stage Pressure Transmitter Failure 016000A2.01 Job Performance Measure KIA

Reference:

RO- 3.0 SRO- 3.1 No: Sim G Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • Reactor at indicated power.
  • Steady State, equilibrium Xenon.
  • No equipment out of service.

Task Standard: .

Required Materials: None General

References:

2-AOP-INST-1, Instrument or Controller Failures 2-AOP-ROD-1, Rod Control and Indication System Malfunctions Initiating Cue: You are the ATC.

Time Critical Task: No Validation Time: 10 1 of 8

Appendix C Page 2 Form ES-C-1 Performance Information (Denote critical steps with a check mark -1)

..J 1. Performance Step: Operator takes Immediate Actions from memory (steps 3.1-3.3)

Note: Immediate actions of 2-AOP-INST -1 Standard: 1. Checks all parameters listed

2. Determines that PT -412A has failed low Comment:

..J 2. Performance Step: Take manual actions as necessary to control parameters and stabilize the plant Standard: Place Rod Control in Manual Comment: Procedure step 3.2

3. Performance Step: Have all controls systems listed in step 3.1 been checked as being affected?

Standard: Observe all systems were checked during performance of immediate operator actions.

Comment: Procedure step 3.3 2 of 8

Appendix C Page 3 Form ES-C-1 Performance Information (Denote critical steps with a check mark .V)

4. Performance Step: Has an instrument failure occurred?

Standard: Determine an instrument failure has occurred PT-412A failed low.

Comment: Procedure step 4.1

5. Performance Step: Go To applicable step for the indicated failure Standard: Identify step 4.168 is the affected step Comment: Procedure step 4.2
6. Performance Step: Has Channel A failed low?

Standard: Determine 412A has failed low using PICS Comment: Procedure step 4.168 7 Performance Step: Are control rods in Manual?

Standard: Rod control should be in manual at this time Comment: Procedure step 4.169 3 of 8

Appendix C Page4 Form ES-C-1 Performance Information (Denote critical steps with a check mark ...f)

8. Performance Step: Maintain Tavg and Tref per graph RPC-4 (RCS T-ref vs Reactor Power) and restore delta flux to target per CRS direction using any of the following
  • Rod Control
  • Boration
  • Adjust Turbine Load CUE: The CRS directs restoring Tave using Control Rods.

Standard: Withdraw Control Rods to restore Tavg Comment: Procedure step 4.170 4 of 8

Appendix C Page 5 Form ES-C-1 Performance Information (Denote critical steps with a check mark--./)

Terminating Cue: JPM Complete 5 of 8

Appendix C Page 6 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.

Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -

6 of 8

Appendix C Simulator Setup Form ES-C-1 Any 100 % Power IC ENSURE GROUP 92 IS DISPLAYEO ON ENG CRT PIGS MONITOR SHOW GROUP 92 PT-412A, First Stage Turbine Pressure fails Low XMT-MSS053A FIXED OUTPUT:

PT-412A FIRST STAGE TURBINE PRESSURE C SEVERITY -14.7 Continuous Rod Motion Insert Malfunction: MAL-CRF004A to 72 step/min This malfunction will start when rod motion is initiated.

7 of 8

Appendix C Initial Conditions Form ES-C-1 Initial Conditions:

  • Reactor at indicated power.
  • Steady State, equilibrium Xenon.
  • No equipment out of service.

Initiating Cue:

You are the ATC.

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Indian Point 2 Task No: 0030010101 Task

Title:

Start a Reactor Coolant Pump 003000A406 Job Performance Measure Sim H KIA

Reference:

RO- 2.9 SRO- 2.9 No:

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • Reactor is shutdown with RCS temperature and pressure as indicated
  • The RCS is aligned per COL 1.1
  • All applicable Precautions and Limitations are satisfied
  • DMIMS is in service
  • The RCP has been secured for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Task Standard: 21 RCP is running and its Lift Oil Pump is secured.

Required Materials: None General

References:

2-SOP-1.3, Reactor Coolant Pump Startup and Shutdown.

Initiating Cue: You are the BOP and the CRS has directed you to start 21 RCP in accordance with 2-SOP-1.3 steps 4.1.1 through 4.1.17 Time Critical Task: No Validation Time: 20 1 of 12

Appendix C Page 2 Form ES-C-1 Performance Information (Denote critical steps with a check mark ..../)

1. Performance Step: Obtain correct procedure Standard: Obtains SOP-1.3 Comment: Evaluator may give candidate the procedure at this time
2. Performance Step: Review Precautions and Limitations Standard: Check plant lineup and conditions Comment: Candidate was given all P&Ls were met in Initial Conditions.

Candidate may take some time to look at P&Ls but should not take time to evaluate all.

3. Performance Step: If the Containment is accessible then
  • Inspect Bearing Lift Oil System for leaks if RCP secured for 30 days or longer
  • Inspect JO Bell Oil Level Alarm tubing for damage and leaks Standard: Bearing Lift Oil System Inspection is not necessary Contact NPO to inspect Oil Level Alarm CUE: NPO reports "All conditions normal for 21 RCP" Comment: Step 4.1.1 2 of 12

Appendix C Page 3 Form ES-C-1 Performance Information (Denote critical steps with a check mark ..J)

4. Performance Step: Check if RCP should be rotated by hand Standard: Determine rotation is not necessary (three remaining RCPs are running.

Comment: Step 4.1.2

5. Performance Step: Observe NOTES before step 4.1.3 Standard: Reviews NOTES Comment:

...J 6. Performance Step: Verify Bearing Lift Pump is Running Standard: Rotate 21 Bearing Lift Pump switch to Start Observe red light (breaker closed) and white light (21 Lift Pressure) are both lit Comment: Step 4.1.3 Panel SAF 3 of 12

Appendix C Page4 Form ES-C-1 Performance Information (Denote critical steps with a check mark ...f)

7. Performance Step: Select Containment Microphone to the RCP (21) to be started Standard: Rotate Microphone switch to 21 RCP Comment: Step 4.1.4 CRS desk
8. Performance Step: Verify DMIMS Signal Recorder is in service Standard: DMIMS signal recorder is in service given in Initial Conditions.

CUE: DMIMS Signal Recorder is in service.

Comment: Step 4.1.5

9. Performance Step: If power is being supplied from the Station Auxiliary Transformer
  • Place the Tap Changer in MANUAL
  • RAISE the bus voltage to 7.2 KV Standard: Push Tap Changer Handle IN for Manual Rotate switch to RAISE to establish 7.2 KV.

CUE: SAT meter on rear of flight panel is not indicating properly. Use the volt meter on Supervisory Panel SHF.

Comment: This is not critical because on the Simulator the RCP will Start regardless of the voltage.

Step 4.1.6 Panel FCR (rear of flight panel) 4 of 12

Appendix C Page 5 Form ES-C-1 Performance Information (Denote critical steps with a check mark --./)

10. Performance Step: If power is being supplied from GT25/26 Standard: Determine power is NOT being supplied from GT-25/26 No Action is Required Comment: Step 4.1.7
11. Performance Step: Prior to starting the first of either 23 or 24 RCP, Verify that both spray valves are CLOSED to prevent a pressure transient on the RCS.

Standard: Observer both 23 and 24 RCP are operating No Action Required Comment: Step 4.1.8

12. Performance Step: Verify Bearing Lift Pump has been running for at least two minutes Standard: Determine pump has been operating for 2 minutes Comment: It is expected that two minutes has elapsed since the pump was started. If not the candidate should wait until 2 minutes has elapsed.

This is NOT critical because the pump would start in less than two minutes. This is an administrative requirement.

Step 4.1.9 5 of 12

Appendix C Page 6 Form ES-C-1 Performance Information (Denote critical steps with a check mark -/)

13. Performance Step: Observe NOTE before step 4.1.1 0 Standard: Reviews the NOTE Comment:
14. Performance Step: NOTIFY Security, the start of an RCP is imminent and the accompanying voltage dip may cause auto start of the Security Diesel Standard: Using phone or radio simulate contact Security and inform of imminent start of 21 RCP CUE: Acknowledge as Security the start of 21 RCP Comment: Step 4.1.1 0
15. Performance Step: Observe CAUTIONS and NOTES before step 4.1.11 Standard: Reviews Cautions and Notes Comment:

6 of 12

Appendix C Page 7 Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)

...J 16. Performance Step: Start the RCP Standard: Rotate Switch for 21 RCP to Start position Observe Motor Amps off scale high Observe Flow indication increasing Verify Reactor Coolant 21 Loop Low Flow Channel Trip 90% alarm clears before motor current returns on scale.

Comment: Step 4.1.11 Panel SAF

17. Performance Step: Verify the normal running current Standard: Observe AC Amps approximately 400 Comment: Step 4.1.12
18. Performance Step: Place the Containment Microphone to OFF Standard: Rotate switch to OFF CUE: IF CRS asked if it is desired to turn off the microphone "Yes the CRS desires the microphone turned off" Comment: Step 4.1.13 7 of 12

Appendix C Page 8 Form ES-C-1 Performance Information (Denote critical steps with a check mark >/)

19. Performance Step: Closely MONITOR Digital Metal Impact Monitor System DMIMS Standard: Observes DMIMS display Comment: Step 4.1.14 DMIMS rack (behind the Flight Panel)
20. Performance Step: MONITOR the following RCP parameters until stable
  • Loop flow
  • RCP Seal 1 Leak off flow
  • Seal injection flow
  • Seal inlet temperature
  • Seal outlet temperature
  • RCP Bearing temperatures
  • RCP Stator temperature Standard: Observe RCP parameters Comment: Step 4.1.15 8 of 12

Appendix C Page 9 Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)

21. Performance Step: If power is being supplied from the station Auxiliary Transformer then
  • RAISE the bus voltage to 7.05 to 7.15 KV
  • PLACE the tap changer in AUTO Standard: Rotate switch as necessary to set bus voltage to 7.05

-7.15 KV.

Pull switch OUT to place tap changer in AUTO Comment: Step 4.1.16 Panel FCR (rear of flight panel)

22. Performance Step: When the RCP has run for at least 1 minute then STOP the Bearing Lift Oil Pump Standard: Observe 1 minute has elapsed Rotate switch to STOP position Comment: Step 4.1.17 Panel SAF Terminating Cue: JPM Complete 9 of 12

Appendix C Page 10 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.

Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - -

10 of 12

Appendix C Simulator Setup Form ES-C-1 Reset Simulator to IC-5 Trip 21 RCP Allow simulator to run to stabilize plant conditions If JPM is to be run more than once, take a Snapshot.

Ensure Seal Return Flow is 1.1 gpm or greater. If necessary override indication to 1.1 gpm.

XMT -CVC009A set to 1.1 XMT -CVCOOBA set to 1.1 11 of 12

Page 12 of 12 Initial Conditions:

  • Reactor is shutdown with RCS temperature and pressure as indicated
  • The RCS is aligned per COL 1.1
  • All applicable Precautions and Limitations are satisfied
  • DMIMS is in service
  • The RCP has been secured for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Initiating Cue:

You are the BOP and the CRS has directed you to start 21 RCP in accordance with 2-SOP-1.3 steps 4.1.1 through 4.1.17 File: 0030011601-1.doc Parent Task# 003*001 *01 *01

Appendix C Job Performance Measure Form ES-C-1 Worksheet IPEC Facility: UNIT2 Task No: 0840140421 Task

Title:

Align Nitrogen Bottle to 21 Atmospheric Steam Dump 039000A407 Job Performance Measure KIA

Reference:

RO- 2.8 SRO- 2.9 No: In Plant I Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

X Simulated Performance Actual Performance Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • Work in the transformer yard resulted in a loss of instrument air and unit trip.
  • RCS temperature is slowly rising.

Task Standard: Nitrogen Bottle is aligned to supply 21 SG Atmospheric valve operator.

Required Materials: None General

References:

2-SOP-ESP-001, Local Equipment Operation and Contingency Actions Initiating Cue: You are the Conventional NPO and the CRS has directed you to align backup nitrogen to 21 Atmospheric Steam Dump Valve in accordance with 2-SOP-ESP-001 Section 4.12.

Time Critical Task: No Validation Time: 10 Minutes 1 of 8

Appendix C Page 2 Form ES-C-1 Performance Information (Denote critical steps with a check mark ")

1. Performance Step: Obtain Correct Procedure Standard: Obtains 2-SOP-ESP-001 and review Precautions and Limitation CUE: Hand the candidate the procedure Comment:
2. Performance Step: Observe NOTEs before step 4.12.1 Standard: Reviews Notes Comment:

-v3. Performance Step: To align 21 Atmospheric go to Step 4.12.2 Standard: Continues procedure with step 4.12.2 Comment:

4. Performance Step: If PCV-1134 (21 ATMO) needs to be operated from the CCR, then align backup N2 as follows Standard: The next 7 JPM steps will align N2to 21 ATMO Comment: Step 4.12.2 2 of 8

Appendix C Page 3 Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)

5. Performance Step: Verify MS 3A, (PCV-1134 Inlet Stop Main Steam Line 21 is OPEN Standard: Locates MS-3A and observes valve position CUE: When valve is located and simulated checked open, "MS-3A is Opened".

Comment: Step 4.12.2.1

..J 6. Performance Step: Connect both Nitrogen bottle quick disconnect to the fittings upstream of SGN-522/SGN-524 Standard: Locates quick disconnect hoses and indicates where they are to be connected.

CUE: When disconnect hoses are located and simulated connected "Quick Disconnect Hoses are connected".

Comment: Step 4.12.2.2

..J 7 Performance Step: Open both Nitrogen bottle isolation valves Standard: Locate Nitrogen bottle isolation valve Cue: When valves are located, Both Nitrogen bottle valves are open Comment: NOTE Only ONE nitrogen bottle valve open is critical.

3 of 8

Appendix C Page4 Form ES-C-1 Performance Information (Denote critical steps with a check mark ..../)

...J 8. Performance Step: Open one of the following valves

  • N-853
  • N-855 Standard: Locate Valve and Open CUE: When either valve is located and simulated opened " The valve is open".

Comment: Step 4.12.2.4

9. Performance Step: Verify both f the following regulators are set for 85 psig
  • N-850
  • N-854 Standard: Locate regulators and demonstrate how to adjust pressure CUE: When regulators located and candidate demonstrates how to adjust pressure, "The Regulators are set at 85 psig" Comment: Step 4.12.2.5

...J 10. Performance Step: Close IA-806 21 SG ATMO Relief lnst Air Stop Standard: Locate valve and simulate closing CUE: When valve is located and simulated closed "The Valve is Closed" Comment:

4 of 8

Appendix C Page 5 Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J) v11. Performance Step: Open SGN-522 CCR Remote Backup Nitrogen Inlet Stop to 21 ATMO Standard: Locate valve and simulate opening CUE: When the valve is located and simulated opened "The valve is opened".

Comment: Step 4.12.2. 7

12. Performance Step: Notify the CCR N2 Bottle Supply is aligned to PCV-1134.

Standard: Simulate calling CCR using radio CUE: Acknowledge as CCR Comment: Step 4.12.2.8 Terminating Cue: JPM Complete 5 of 8

Appendix C Initial Conditions Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.

Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -

Appendix C Initial Conditions Form ES-C-1 POSITIONER lA SUPPLY N2 SUPPLY Quick disconllOIIICt and1'1ex "Ku hose (P-3)

"0"

.! 3- 27psi

l. _. . . . . . . .

1G-50ma VENT VALVE NUMBERING TABLE Local

~ l-----~-t-:-:-::F'::'O:-R-P_c_y._11_34__ *** -~~ PC_V*1-13_5---f-:..,-F""O:::R:-P-C_V_-1_1_36_+~EO::::R:-P-C_V_*_11_3_Z--i nitrogen cylinder Lll.-806 IA-807 IA-808 IA-809 IA-1206 IA-1207 IA-1208 SGN ...500 SGN-501 SGN-502 SGN-503 SGN-508 SGN-509 SGN-510 SGN-511 IA-1008 IA-1009 IA-1010 IA-1011 ALTERNATE N2 IA-1202 IA-1203 IA-1204 IA-1205 SUPPLY PRV-5607 PRV-5e09 PRV-5609 PRV-5610 PH$110 P~6111 P~6112 Pl-6113 N-853 N-850

Appendix C Initial Conditions Form ES-C-1 Initial Conditions:

  • Work in the transformer yard resulted in a loss of instrument air and unit trip.
  • RCS temperature is slowly rising.

Initiating Cue:

You are the Spare RO and the CRS has directed you to align backup nitrogen to 21 Atmospheric Steam Dump Valve in accordance with 2-SOP-ESP-001 Section 4.12.

Appendix C Job Performance Measure Form ES-C-1 Worksheet IPEC Facility: UNIT2 Task No: 0720060122 Task

Title:

Secure Discharge Lineup for 23 Large Gas Decay Tank and Lineup 24 Large Gas Decay Tank for Release.

071000A405 KIA

Reference:

RO - 2.6 SRO- 2.6 Job Performance Measure No: In Plant J Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

X Simulated Performance Actual Performance Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • The system is aligned in accordance with COL 5.2.1.
  • Preparations are being made for a refueling outage
  • Release of 23 Large Gas Decay Tank (LGDT) has just been completed
  • N2 purge of 23 LGDT will NOT be performed
  • The SM has directed 24 Large Gas Decay Tank is to be released.
  • 24 Large Gas Decay Tank had been isolated, sampled, and the sample has been analyzed.
  • A PAB Exhaust Fan is Running
  • Iodine and Particulate Composite Collection Device IS in place
  • Release Permit has been completed and approved to release 24 LGDT in accordance with SOP-5.2.1.
  • Radiation Monitor R-44 is in service
  • Radiation Monitor R-44 High Alarm setpoint was NOT adjusted
  • RrA for the release permit is 3.525 E-06 IJCi/cc
  • Release Permit Number 140015
  • TMIN 45 min
  • Planned Release Time 20 min 1 of 11

Appendix C Job Performance Measure Form ES-C-1 Worksheet Task Standard: 23 Large Gas Decay Tank Lineup secured and 24 Large Gas Decay Tank is lined up for release.

Required Materials: None General

References:

2-SOP-5.2.1, Gaseous Waste Disposal System Operation 2-SOP-5.2.3, Gas Analyzer Initiating Cue:

You have been directed to SIMULATE securing the lineup for 23 Large Gas Decay Tank in accordance with SOP-5.2.1 step 4.4.13 and lineup 24 Large Gas Decay Tank for release in accordance with SOP-5.2.1 Attachment 4 section 1 Time Critical Task: No Validation Time: 20 minutes 2 of 11

Appendix C Page 3 Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)

" 1. Performance Step: When release has been completed,:

  • If N2 purge will not be performed then close RCV-014 and go to step 4.4.14 Standard: N2 purge will not be performed (given in initial conditions)

Rotate regulator to left to decrease air pressure on indicator on Waste Disposal Panel CUE: Air pressure is ZERO Green Light is LIT Red Light is OFF Comment: Procedure step 4.4.13.1

2. Performance Step: Enter finishing time in Unit Narrative Log Standard:

CUE: "The FSS has made the Unit Narrative Log entry".

Comment: Procedure step 4.4.14 3 of 11

Appendix C Page 4 Form ES-C-1 Performance Information (Denote critical steps with a check mark--./)

" 3. Performance Step: Verify Gas Analyzer is returned to AUTO (sampling the in service GOT}

  • Verify all Sample-Bypass Switches are BYPASSED per step 4.1. 7 with the noted exception (Not Critical)
  • Place the LGDT Sample-Bypass Switch in SAMPLE
  • Place the MODE Switch in AUTO (Not Critical)

Standard: Observes all switches in BYPASS (Not Critical)

Rotate the LGDT Sample-Bypass Switch to SAMPLE Rotate the MODE Switch to AUTO CUE: hand candidate procedure 2-SOP-5.2.3 When switches are located:

"All Sample-Bypass Switches are in BYPASS" "The LGDT Sample-BYPASS switch is in Sample" "The MODE Switch is in AUTO" Comment: Procedure 2-SOP-5.2.3

4. Performance Step: Complete Section 2 of Discharge Sample Checkoff to restore normal system lineup Standard: Perform next 3 JPM Steps Comment: Procedure Step 4.4.15 4 of 11

Appendix C Page 5 Form ES-C-1 Performance Information (Denote critical steps with a check mark ~)

~ 5. Performance Step: 1619 23 LGDT Outlet Stop- Closed Standard: Locate Valve and Simulate Closing CUE: When valve is located, "The valve is closed" Comment: 2-SOP-5.2.1 Attachment 3 Section 2

-1/ 6. Performance Step: 1644C PCV-1038A Inlet Stop- OPEN Standard: Locate Valve and Simulate Opening CUE: When valve is located, "The valve is opened" Comment: 2-SOP-5.2.1 Attachment 3 Section 2 7 Performance Step: 1643C 23 LGDT Stop (Inlet and PT)- OPEN Standard: Locate Valve and Observe OPENED CUE When Valve is located, "The valve is opened".

Comment: This step is not critical; the valve is expected to be opened.

8. Performance Step: Return completed applicable attachment to CCR Standard:

CUE: "The FSS will return the attachment to the CCR" Comment:

5 of 11

Appendix C Page6 Form ES-C-1 Performance Information (Denote critical steps with a check mark ...J)

9. Performance Step: Verify RCV-014 Plant Stack Discharge Valve is CLOSED Standard: Locate Valve and observe closed indications.

CUE: When the valve is located, "The valve is closed" Comment: This step is not critical; the valve was closed at the beginning of this evolution.

10. Performance Step: Determine appropriate Discharge/Sample Checkoff Attachment to be used for discharge and Align selected GOT (Attachment 4 - 24 LGDT) for release by completing Section 1 Standard: Simulate performing the next 3 JPM steps Comment:

...J 11. Performance Step: 16440 PCV-1 039 Outlet Stop- CLOSED Standard: Locate 16440 and simulate closing CUE: When the valve is located, "The valve is closed" Comment: 2-SOP-5.2.1 Attachment 4 Section 1 6 of 11

Appendix C Page 7 Form ES-C-1 Performance Information (Denote critical steps with a check mark ")

" 12. Performance Step: 1620 24 LGDT Outlet Stop- OPENED Standard: Locate 1620 and simulate closing CUE: When the valve is located, "The valve is opened" Comment: 2-SOP-5.2.1 Attachment 4 Section 1

13. Performance Step: 1643D 24 LGDT Stop {Inlet and PT)- OPENED Standard: Locate 1644D and simulate Verifying Open CUE: When the valve is located, "The valve is OPENED" Comment: 2-SOP-5.2.1 Attachment 4 Section 1
14. Performance Step: Verify remaining valves on Attachment 4 - CLOSED Standard: Locate each valve and simulate checking CLOSED CUE: When valves are located, "The valve is closed".

Comment: Valves 1632 and PCV-1 0398 can be verified closed on the Waste Disposal Panel or the valves can be visually verified closed locally.

Terminating Cue: JPM Complete 7 of 11

Appendix C Page 8 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.

Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT or UN SAT Examiner's signature and date: - - - - - - - - - - - -

8 of 11

Appendix C Page 9 Form ES-C-1 No:2-SOP-5.2.1 Rev: 33 GASEOUS WASTE DISPOSAL SYSTEM OPERATION Page 36 of 41 ATTACHMENT 3 23 LGDT Discharge I Sample Checkoff (Page 1 of 1}

Release Permit Number l4DD l-5" )!Ci/cc T MIN =_tf_._1_._____ min. {SEE Attachment 8} Planned Release Time (T) = .:J 0 mim NOTE

);>- WHEN multiple LGDTs are to be sampled and released, THEN additional associated discharge stops are NOT closed as called for below.

)o> Chemistry Manager permission is required, when a 23 LGDT is >1 E-2 uCi/cc 1.0 23 Large Gas Decay Tank Start of Discharge Position

  • 1644C PCV-1038A Inlet Stop CLOSED
  • 1631 23 LGDT Reuse Outlet CLOSED
  • PCV-10388 Gas Analyzer Sample Inlet CLOSED
  • 1617 21 LGDT Outlet Stop CLOSED
  • 1618 22 LGDT Outlet Stop CLOSED
  • 1620 24 LGDT Outlet Stop CLOSED
  • 1652F 21 SGDT Outlet Stop CLOSED
  • 1652E 22 SGDT Outlet Stop CLOSED
  • 1652D 23 SGDT Outlet Stop CLOSED
  • 1652C 24 SGDT Outlet Stop CLOSED
  • 16528 25 SGDT Outlet Stop CLOSED
  • 1652A 26 SGDT Outlet Stop CLOSED
  • 1619 23 LGDT Outlet Stop OPEN
  • 1643C 23 LGDT Stop (Inlet and PT) OPEN 2.0 Termination of Discharge
  • 1619 23 LGDT Outlet Stop CLOSED
  • 1644C PCV-1038A Inlet Stop OPEN
  • 1643C 23 LGDT Stop (Inlet and PT) OPEN Completed by: _ _ _ _ _ _ _ _ _ _ __ Date:

Time:* - - - - -

9 of 11

Page 10 Form ES-C-1 Appendix C GASEOUS WASTE DISPOSAL SYSTEM No:2-SOP-5.2.1 Rev:33 OPERATION Page 37 of 41 ATTACHMENT 4 24 LGOT Discharge I Sample Checkoff (Page 1 of 1)

Release Permit Number (t..f OOI (, RTA = 3. 5.;>~ ~-lao J!Ci/cc T MIN = __tf_t;"

___ min. {SEE Attachment 8} Planned Release Time (T) = .:J b mim NOTE

);. WHEN multiple LGDTs are to be sampled and released, THEN additional associated discharge stops are NOT closed as called for below.

);> Chemistry Manager permission is required, when a 24 LGDT is >1 E-2 uCi/cc 1.0 24 large Gas Decay Tank Start of Discharge Position lnit. Date

  • 1644D PCV-1039A Inlet Stop CLOSED
  • 1632 24 LGDT Reuse Outlet CLOSED
  • PCV-10398 Gas Analyzer Sample Inlet CLOSED
  • 1617 21 LGDT Outlet Stop CLOSED
  • 1618 22 LGDT Outlet Stop CLOSED
  • 1619 23 LGDT Outlet Stop CLOSED
  • 1652F 21 SGDT Outlet Stop CLOSED
  • 1652E 22 SGDT Outlet Stop CLOSED
  • 1652D 23 SGOT Outlet Stop CLOSED
  • 1652C 24 SGDT Outlet Stop CLOSED
  • 16528 25 SGDT Outlet Stop CLOSED
  • 1652A 26 SGDT Outlet Stop CLOSED
  • 1620 24 LGDT Outlet Stop OPEN
  • 1643D 24 LGDT Stop (Inlet and PT) OPEN 2.0 Termination of Discharge
  • 1620 24 LGDT Outlet Stop CLOSED
  • 16440 PCV-1039A Inlet Stop OPEN
  • 1643D 24 LGDT Stop (Inlet and PT) OPEN Completed by: _ _ _ _ _ _ _ _ _ _ __ Date: _ _ __ Time: _ _ _ __

10 of 11

Appendix C Initial Conditions Form ES-C-1 Initial Conditions:

  • The system is aligned in accordance with COL 5.2.1.
  • Preparations are being made for a refueling outage
  • Release of 23 Large Gas Decay Tank (LGDT) has just been completed
  • N2 purge of 23 LGDT will NOT be performed
  • The SM has directed 24 Large Gas Decay Tank is to be released.
  • 24 Large Gas Decay Tank had been isolated, sampled, and the sample has been analyzed.
  • A PAB Exhaust Fan is Running
  • Iodine and Particulate Composite Collection Device IS in place
  • Release Permit has been completed and approved to release 24 LGDT in accordance with SOP-5.2.1.
  • Radiation Monitor R-44 is in service
  • Radiation Monitor R-44 High Alarm setpoint was NOT adjusted
  • RrA for the release permit is 3.525 E-06 !JCi/cc
  • Release Permit Number 140015
  • TMIN 45 min
  • Planned Release Time 20 min Initiating Cue:

You have been directed to SIMULATE securing the lineup for 23 Large Gas Decay Tank in accordance with SOP-5.2.1 step 4.4.13 and lineup 24 Large Gas Decay Tank for release in accordance with SOP-5.2.1 Attachment 4 section 1

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: IIPEC Unit 2 Task No: 0001070521 Task

Title:

Perform the Required Actions to Replace 21 Feedwater Regulating Bypass Valve Air Lines for Local Operation during Loss of Secondary Heat Sink OOWE05A101 Job Performance Measure In-Plant K KIA

Reference:

RO- 4.1 SRO- 4.0 No:

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

X Simulated Performance Actual Performance Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • A loss of Secondary Heat Sink has occurred.

Task Standard: Air control line for Main Feed Bypass Regulating Valve, FCV-417L, replaced properly in accordance with FR-H.1, Attachment 2.

Required Materials: None General

References:

2-FR-H.1, Loss of Secondary Heat Sink Initiating Cue:

The CCR has directed you to replace the control air line on FCV-417L Main Feed Bypass Regulating Valve for 21 Feed Line, in accordance with Attachment 2 of FR-H.1.

Time Critical Task: No Validation Time: 25 1 of 6

Appendix C Page 2 Form ES-C-1 Performance Information (Denote critical steps with a check mark --./)

1. Performance Step: Obtain correct procedure Standard: Obtains current revision of 2-FR-H.1 Comment: Hand candidate 2-FR-H.1

..J 2. Performance Step: Locate Flexible Air Line and wrench Standard: Flexible Air hose and wrench located in Aux Boiler Feed Pump Building Comment: Tubing is located in pipe attached to hand rail by Feedwater Regulating Bypass Valves .

..J 3. Performance Step: Disconnect Positioner Output Air Line Standard: Air line disconnected at point A on Attachment 2 CUE: Airline is disconnected Comment:

2 of6

Appendix C Page 3 Form ES-C-1 Performance Information (Denote critical steps with a check mark--./)

..J 4. Performance Step: Disconnect Steam Generator Feedwater Trip Solenoid Air Line Tubing Standard: Air Line disconnected at point 8 on Attachment 2 (Bottom of diaphragm)

CUE: Airline is disconnected Comment:

..J 5. Performance Step: Connect male end of flex tubing to Positioner Output Airline Tubing Standard: Airline connected at Point A on Attachment 2 CUE: Airline is connected Comment:

..J 6. Performance Step: Connect female end of flex tubing Standard: Airline connected at point 8 on Attachment 2 (bottom of diaphragm)

CUE: Airline is connected Comment:

3 of6

Appendix C Page4 Form ES-C-1 Performance Information (Denote critical steps with a check mark"./)

7 Performance Step: Notify Control Room to place 21 SG bypass feedwater flow control valve controller to OPEN Standard: Contact Control Room using radio.

CUE: Acknowledge Place 21 SG bypass flow control valve to OPEN.

Comment:

Terminating Cue: JPM Complete 4 of6

Appendix C Page 5 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.

Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT or UNSAT Examiner's signature and date: - - - - - - - - - - - -

5 of6

Appendix C Initial Conditions Form ES-C-1 Initial Conditions:

  • A loss of Secondary Heat Sink has occurred.

Initiating Cue:

The CCR has directed you to replace the control air line on FCV-417L Main Feed Bypass Regulating Valve for 21 Feed Line, in accordance with Attachment 2 of FR-H.1.

Facility: Indian Point 2 Scenario No.: 1 Op-Test No.: _1 Examiners: Operators:

Initial Conditions:

Reset simulator to 90% power IC Load Simulator Schedule-Scenario1 The Plant is at 90% power.

22 Sl Pump is OOS Ensure 23 Charging Pump, 23 SWP and 26 SWP are in service Turnover:

Return plant to 100% power over the next hour.

Event Malf. No. Event Event No. Type* Description R (ATC) 1 N/A N (CRS) Power Escalation N (BOP) 2 MOT- C(BOP)

TS(CRS) 23 SW Pump trips.

SWS008A 3 XMT- I (ATC)

SGN034A I (CRS) PT-404 Steam Header Pressure fails high causing MBFPs to be placed in manual.

4 MAL- C (ALL)

EPS007D 480V Bus 6A fault.

TS(CRS) 5 MAL-M(ALL) Small Break LOCA RCS006A 6 BKR-PPL003/4 M(ALL) ATWS 7 MOC- C(CRS)

AFW001 21 AFW Pump failure C(BOP) 8 RLY-PPL487/48 C(CRS) Automatic Safety Injection failure 8

9 RLY- C(CRS)

PPL085/09 Phase A Isolation failure 0 C(BOP)

  • (N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor U2 NRC 2014 Scenario 1 Page 1 of 16

SESSION OUTLINE:

The evaluation begins with the plant at 90% power steady state operation. The team has been directed to return the plant to 100%. 22 Sl pump is out of service for bearing inspection. 22 Sl Pump was removed from service 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> ago, expected return in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

The crew will take the watch and start increasing power. After power ascension has begun, 23 Service Water Pump will trip. BOP will diagnose and another pump will be started per the alarm response procedure. The CRS will evaluate Tech Specs.

When power ascension resumes, PT-404 (Steam Header Pressure) fails high. ATC diagnoses failure and places Main Boiler Feed Pump speed control to manual. CRS directs crew to perform AOP-INST-1, Instrument/Controller Failures.

Next, a fault occurs on Bus 6A. Team enters AOP-480V-1, Loss of 480 V Bus to stabilize the plant. The crew will start a charging pump, evaluate Tech Specs, and commence a shutdown per POP-2.1.

After formulating a shutdown plan, a SBLOCA occurs. Auto reactor trip is demanded but the Reactor trip breakers do not open. The team will attempt to manually trip the reactor and then go to FR-S.1. The turbine will be manually tripped. Motor driven AFW pumps can not be started. AFW must be manually aligned using the turbine driven AFW pump. The crew will begin manually inserting control rods and then will align emergency Boration using the alternate path in the RNO because MOV 333 is de-energized. Following main generator trip, blackout with unit trip logic strips 480V busses resulting in rod insertion. The team will transition back to E-0. Sl will be manually actuated.

21 Sl pump will be in service. 23 Sl pump cannot be powered. 22 Sl pump is OOS.

Charging will be established after manual action to align suction to the RWST. The team will diagnose RCS not intact and transition to E-1, Loss of Reactor or Secondary Coolant.

The scenario is terminated after transition to E-1 has been made.

Procedure Flow path: POP-2.1, ARP-SJF, AOP-INST-1, AOP-480V-1, POP-2.1, FR-S.1, E-0, and E-1 U2 NRC 2014 Scenario 1 Page 2 of 16

CRITICAL TASKS:

FR-S.1 -- C Insert negative reactivity into the core by at least one of the following methods before step 4 of FR-S.1 is complete:

o De-energize the Rod Drive MG Sets (can be satisfied by tripping turbine) o Manually insert the rods o Establish Emergency Boration E-0 -- F Establish at least 400 gpm AFW flow to the S/Gs before completion of FR-S.1 step 3.

E-0 -- D Manually actuate at least one train of SIS actuated safeguards before completion of E-0 step 4 EXPLANATION OF CREDITED MALFUNCTIONS:

Event 1 -Power escalation. ATC will withdraw control rods and/or dilute. The BOP will raise turbine power.

Event 2 -A running service water pump will trip. The BOP will be credited with the malfunction since another pump will be started on his panel.

Event 3- PT-404 (Steam Header Pressure) will fail which affects MFW Pump speed.

The ATC is credited with the malfunction since feed pump control is on his panel.

Event 4 - Due to initial conditions specified in the scenario, the loss of this bus will require pumps to be started on both control board operators' panels. (ATC charging pump, BOP SW pump)

Event 7- 21 AFW Pump will not start and 23 AFW Pump does not have power due to loss of Bus 6A. Therefore, 22 AFW will require manual action to place in service. This will be performed by the BOP.

Event 8- A manual safety injection will be required. This was not credited to either control board operator since it could be performed by either the ATC or BOP.

Event 9- Phase A isolation will be manually actuated. This occurs on the BOP's panel.

U2 NRC 2014 Scenario 1 Page 3 of 16

<SCHEDULE> 2014 scenario_l_setup_revO.sch Insert remote LOA-EPS070 to OUT Insert remote LOA-EPS071 to OUT Insert malfunction RL Y-PPL487 to STUCK CONTACTS RELAY FAlLURES: SIA-2 (B)

Insert malfunction RL Y-PPL488 to SAFETY INJECTION AUTO STUCK CONTACTS MASTERRLY RELAY FAlLURES: C-Al Insert malfunction RL Y-PPL085 to CONT.ISOLA TION PHASE A STUCK CONTACTS TRAIN A

        • ----~~-~--*******--*** ;

RELAY FAILURES: C-A2 Insert malfunction RL Y-PPL090 to CONT.ISOLA TION PHASE A STUCK CONTACTS TRAINB

...... ,.~--~~- ***~~'---- ...

Insert malfunction BKR-PPL004 to FAIL ASIS Insert malfunction BKR-PPL003 to FAIL ASIS Insert malfunction MOC-AFWOOI to ASIS Insert malfunction MOC-SWS008 to TRIP on event 2 Insert malfunction XMT-SGN034A to 1200.00000 in 120 on

. event 3 Insert malfunction MAL-EPS007D 480V BUS 6A FAULT

~~"~

Insert malfunction MAL-RCS006A SMALL BREAK LOCA LOOP A to 1.00000 in 300 on event 5 HOTLEG(NR)

U2 NRC 2014 Scenario 1 Page 4 of 16

Simulator Setup and Instructor Directions Setup/Event INSTRUCTOR ACTIONS EXPECTED RESPONSE/INSTRUCTOR CUES IC Reset Reset Simulator to 90% power ILO IC.

SES Setup Run setup schedule file and verify Removes 22 SI pump OOS.

Schedule File malfunctions and over-rides have Loads 23 SW pump failure on trigger 2.

been entered.

Loads SIA Train A and B failures.

Loads Phase A and B failures.

Loads RTB A and B failures.

Loads 21 AFW Pump failure.

Loads PT -404 failure on trigger 3.

Loads Loss of bus 6A on trigger 4.

Loads SBLOCA on trigger 5.

Floor Setup 1. Start 23 Charging pump Provide turnover to the crew.

and secure all others.

2. Place control switch for Watch team walks the panels and assumes the 22 SI pump to pullout and watch.

apply a danger tag. Put protected equipment placards on 21 and 23 SI pumps.

3. Update the protected equipment computer.
4. Perform setup checklist.

Event 1 None- Power Ascension Perform field action LOAs as requested per NPO task list.

Event 2 Actuate Trigger 2 MOC-SWS008 At lead evaluator direction Event: 2 Delay: 0 Final Value: TRIP Ramp: 0 Role Play If NPO Dispatched Report motor is extremely hot. Breaker indicates overcurrent trip.

Check 23 SWP and breaker Event 3 Actuate Trigger 3 XMT-SGN034A At lead evaluator direction Event: 3 Delay: 0 Final Value: 1200 Ramp: 120 Role Play Acknowledge requests for I&C will develop a troubleshooting plan.

I&C to troubleshoot.

U2 NRC 2014 Scenario 1 Page 5 of 16

Simulator Setup and Instructor Directions Setup/Event INSTRUCTOR ACTIONS EXPECTED RESPONSE/INSTRUCTOR CUES Event 4 Actuate Trigger 4 1\ MAL-EPS007D 480V BUS 6A FAULT At lead evaluator direction IMF MAL-EPS007D Event: 4 Delay: 0 Final Value: TRUE Ramp: 0 Role Play If NPO Dispatched Acrid odor at rear of bus 6A bus work. Supply breaker tripped on short term over-current. No smoke or fire.

If NPO dispatched align 21 Close 370 and open 369 BATP to blender Event 5 Actuate Trigger 5 1\ MAL-RCS006A SMALL BREAK LOCA LOOP A At lead evaluator direction HOT LEG (NR)

IMF MAL-RCS006A Event: 5 Delay: 0 Final Value: 1.0 Ramp: 300 Role Play When NPO dispatched to locally trip the reactor, then Delete BKR-PPL004 and BKR-PPL003.

Role Play At CCR request Perform field action LOAs as requested per NPO task list.

U2 NRC 2014 Scenario 1 Page 6 of 16

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 1 Event No.: 1 Page 1 of 2 Event

Description:

Power Escalation

-r: Position Applicant's Actions or Behavior Note:

The reactivity plan for the power ascension should be developed by the team in the briefing room prior to taking the watch. The plan could call for dilution and/or rod withdrawal CRS Assigns roles for power ascension ATC Reviews reactivity plan ATC If rods are withdrawn:

  • Places/verifies rods are in Manual
  • Withdraws rods
  • Observes:

0 Proper rod motion 0 Tavg 0 Power BOP Peer checks rod withdrawal ATC If dilution is performed:

  • Places RCS Makeup control to Stop
  • Place RCS Makeup Mode selector to Dilute
  • Adjusts integrator to desired dilution amount
  • Places RCS Makeup control to Start
  • Observes:

0 Proper makeup response 0 Tavg 0 Power BOP Peer check dilution BOP Raises MTG load using governor U2 NRC 2014 Scenario 1 Page 7 of 16

Op-Test No.: 1 Scenario No.: 1 Event No.: 1 Page 1 of 2 Event

Description:

Power Escalation ATC Peer checks MTG load increase Lead Evaluator When the following has been demonstrated/observed:

  • Sufficient load ascension .
  • Sufficient normal plant operations by the BOP .

Then instruct Booth to insert Event 2.

U2 NRC 2014 Scenario 1 Page 8 of 16

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 1 Event No.: 2 Page 1 of 1 Event

Description:

23 Service Water Pump Trips Time Position . Applicant's Actions or Behavior BOP Diagnose that 23 SWP has tripped.

BOP ofCRS Recommend I direct starting either 21 or 22 SWP per the alarm response procedure.

BOP Starts 21 or 22 SWP Note:

Although not required, it is possible that the CRS may enter AOP-RW-001 BOP Refers to ARPs for alarms CRS Evaluate Tech Specs. LCO 3.7.8 will not be satisfied. Condition A will apply placing plant in 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement.

Lead Evaluator When the following has been demonstrated/observed:

  • T.S. have been evaluated Then instruct Booth to insert Event 3 U2 NRC 2014 Scenario 1 Page 9 of 16

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 1 Event No.: 3 Page 1 of 1 Event

Description:

PT-404 Steam Header Pressure fails high causing MBFPs to be placed in manual.

Time Position Applicant's Actions or Behavior ATC Diagnosis failure of PT-404 high due to changes MFW Pump speed and meter indication ATC Place MFW Pump Master Speed Controller to manual to maintain SG levels CRS Directs team to perform immediate operator actions of AOP-INST-1 ATC Checks instruments listed in AOP-INST-1 CRS Implements 2-AOP-INST-1

  • Verifies no other instrument failures
  • Ensures actions have been taken to stabilize the plant
  • Ensures steam dumps are in temperature mode Team Contact I&C to investiqate PT-404 failure Lead Evaluator When the following has been demonstrated/observed:
  • MFW Pumps have been placed in manual
  • SG levels are stable
  • I&C contacted Then instruct Booth to insert Event 4 U2 NRC 2014 Scenario 1 Page 10 of 16

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Page 1 of 1 Event

Description:

480V Bus 6A fault.

Time Position Applicant's Actions or Behavior Team Diagnose that 480V Bus 6A CRS Will enter AOP-480V-1 ATC Start 21 or 22 Charging Pump BOP Start 24 or 25 SWP ATC Ensure Primary Water Pump is in service Team Dispatch operator to monitor EDGs BOP Initiate Attachment 3:

  • 6A will be confirmed to be faulted
  • 23 EDG will be shutdown CRS Direct initiating SOP 5.2.1 to maintain vent header pressure ATC Verifies that Boric Acid Transfer Pump is in service CRS Evaluate Tech Specs. The most limiting T.S. action statement is per 3.8.4.

Additionally, 3.8.9, 3.8.1, and 3.5.2 should be evaluated.

Because 22 Safety Injection pump was OOS and 23 has now lost power, the plant will have to proceed to Mode 5.

Note:

If needed, the booth will call as the Operations Manager to direct the CRS to proceed to shutdown and cooldown.

CRS Will begin plans for shutdown and cooldown to MODE 5.

Lead Evaluator When the following has been demonstrated/observed:

  • Plant is stabilized
  • Tech Specs evaluated
  • Shutdown being planned Then instruct Booth to insert Event 5 U2 NRC 2014 Scenario 1 Page 11 of 16

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 1 Event No.: 5 Page 1 of 1 Event

Description:

Small Break LOCA Time Position Applicant's Actions or Behavior ATC Diagnose loss of RCS inventory based on PZR level trend Note:

CRS may direct entry in AOP-LEAK-1 CRS Direct reactor trip and safety injection ATC Presses reactor trip push button on flight panel ATC Notes that reactor did not trip BOP Presses reactor trip push button on supervisory panel ATC Notes that reactor did not trip BOP Trips turbine CRS Directs team to perform immediate operator actions of FR-S.1 The team will now proceed to Event 6 for the A TWS U2 NRC 2014 Scenario 1 Page 12 of 16

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 1 Event No.: 6/7/8/9 Page 1 of 3 Event

Description:

ATWS/Loss of 21 AFW Pump/Failure of Auto SI/Failure of Auto Phase A ATC Manual! drive control rods CRS/BOP Dis reactor breakers Note:

The reactor trip breakers will be opened locally after emergency boration is established.

BOP BOP Initiate Emergency Boration:

  • Determine MOV-333 not powered and RWST will be used
  • Open LCV-112B suction from RWST
  • Close LCV-112C suction from VCT
  • Place makeup control switch to stop Establish maximum charging flow BOP BOP Note:

The CRS m direct the BOP to 1-9 of E-0 based on a caution in FR-S.1 U2 NRC 2014 Scenario 1 Page 13 of 16

Op-Test No.: 1 Scenario No.: 1 Event No.: 6/7/8/9 Page 1 of 3 Event

Description:

ATWS/Loss of 21 AFW Pump/Failure of Auto SI/Failure of Auto Phase A If not, the following step will be performed when the CRS exits FR-S.1 BOP Perform E-0 steps 1-9 per caution in FR-S.1:

  • Verify power to 480V busses (all but 6A will be powered)
  • Check Sl status:

o Will note Sl required but Auto Sl did not actuate o Will manually Sl

  • Perform Attachment 1 of E-0 o Establish charging o Check electrical status o Secure condensate pumps o Verify FW isolation o Verify SW lineup o Verify Sl pump and valve alignment o Verify FCU alignment o Verify AFW flow- may reduce flow at this point o Verify Containment isolation -will manually actuate Phase A

o Checks containment spray status o Checks CCR AC ATC Verify reactor is subcritical:

  • Power range < 5%
  • Negative SUR CRS Returns to E-0 TEAM Performs or re-performs E-0 steps 1-4:
  • Verify power to 480V busses (all but 6A will be powered)
  • Check Status BOP Performs Attachment 1 of E-0 if not al ATC Verifies AFW flow - flow be reduced at this time if not done.

U2 NRC 2014 Scenario 1 Page 14 of 16

Op-Test No.: 1 Scenario No.: 1 Event No.: 6/7/8/9 Page 1 of 3 Event

Description:

ATWS/Loss of 21 AFW Pump/Failure of Auto SI/Failure of Auto Phase A ATC/BOP Verify Sl flow ATC/BOP Check RCP cooling ATC/BOP Align valves to support start of a NESW pump ATC Check RCS temperature ATC Check PORV status ATC Check if RCPs should be stopped. RCPs will be tripped if not already done.

ATC Check if SGs are faulted ATC Check if SG tubes are intact ATC Check if RCS is intact CRS Transition to E-1 Lead Evaluator Terminate scenario U2 NRC 2014 Scenario 1 Page15of16

EMERGENCY PLAN DECLARATION Site Area Emergency EAL SS2.1 Failure of an automatic trip signal to reduce power range< 5% AND Manual trip actions taken at the reactor controls console (manual reactor trip switches) are not successful U2 NRC 2014 Scenario 1 Page 16 of 16

Facility: Indian Point 2 Scenario No.: 2 Op-Test No.: _1 Examiners: Operators:

Initial Conditions:

Reset simulator to 100% power IC Load Simulator Schedule-Scenario2 The Plant is at 100% power.

Ensure 25 SWP and 22 Charging Pump in service.

Turnover:

Perform power reduction to 90% for turbine valve testing.

Event Malf. No. Event Event No. Type* Description R (ATC) 1 N/A N (CRS) Power Reduction N (BOP}

2 MOT- C (ALL)

TS(CRS) 21 Condensate Pump trip. TS for AFD.

CFW001B 3 BST- C(BOP) RCP Thermal Barrier CCW Return Valve (FCV-625) spurious CCW009A C(CRS) closure.

4 MAL- C (ALL)

EPS007B 480V Bus 3A fault.

TS(CRS}

5 CNH- C(ATC)

PCS007D 22 FRV fails in auto.

C(CRS) 6 CVH-M(ALL) 22 FRV fails in manual.

CFW005A 7 MOC-AFW002 Failure of 22 and 23 AFW to start which along with other M(ALL)

CVH- conditions leads to loss of heat sink.

ATS017B 8 AOV-MSS036N C(ALL}

Failure of Turbine Stop/Control Valve pair.

CVH-MSS030B 9 AOV- C(ALL)

RCS002A Failure of PORV requiring opening of reactor head vent valves

  • (N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)alor U2 NRC 2014 Scenario 2 Page 1 of 18

SESSION OUTLINE:

The evaluation begins with the plant at 100% power steady state operation with no significant equipment out of service. The team has been directed to lower power to 90%

for turbine valve testing.

After taking the watch, the team will begin reducing load. Once reduction is started 21 Condensate Pump will trip. This will cause the team to rapidly reduce power and challenge TS 3.2.3 for Axial Flux Difference.

When the team has stabilized the plant (or is reducing power to <50%), MOV-625 will spuriously close. This valve is the CCW return valve from the RCP thermal barriers. The team will re-open the valve using ARP guidance. Subsequently, a fault will occur on 480V Bus 3A. The team will take actions in accordance with AOP-480V-1, "Loss of Normal Power to any Safeguards 480V Bus." Due to the fault on Bus 3A, 22 EDG cannot re-energize the bus. TS require plant shutdown.

After the team stabilizes the plant and evaluates tech specs, 22 FRV will fail closed in automatic. Manual control will work initially, but the valve will eventually fail closed regardless of position. This will lead to an automatic reactor trip due to low SG level or the team will trip the reactor manually before the trip setpoint is reached.

When the reactor is tripped, the turbine upper left stop and control valve pair fail to close. MSIV's must be manually closed to trip the turbine, but the valves will initially fail open requiring local action. The MSIVs will be closed when SG inventory is reduced to a value closer to bleed and feed criteria.

23 AFW Pump will not auto start and will not be able to be manually started from the Control Room due to 480V circuit breaker failure. 22 AFW Pump will not be available due to the governor valve not opening. 21 AFW pump cannot be run since 3A is not powered.

The team will transition to FR-H.1, "Loss of Secondary Heat Sink" due to a loss of AFW flow. SG WR levels will lower until bleed and feed is required.

One PRZR PORV will not open when required. The crew will open the Reactor Head Vent valves. After the head vent valves are opened, 23 AFW pump from its normal supply after racking the breaker out and back in. The team will restore AFW flow to 23 and 24 SGs. The scenario can be terminated after the head vent valves have been closed, or at the discretion of the lead evaluator.

Procedure flow path: POP-2.1, AOP-FW-1, ARP-SGF, AOP-480V-1, AOP-FW-1, E-0, FR-H.1 U2 NRC 2014 Scenario 2 Page 2 of 18

CRITICAL TASKS:

E-0 -- P Manually trip the main turbine before a severe (orange-path) challenge develops to either the sub-criticality or the integrity CSF or before transition to ECA-2.1, whichever happens first FR-H.1 -- F Establish RCS bleed and feed when the average of the three lowest S/G levels reach 20% WR.

EXPLANATION OF CREDITED MALFUNCTIONS:

Event 1: Power reduction. The ATC gets credit for a reactivity manipulation for boration.

The BOP and CRS get credit for a normal evolution.

Event 2: 21 Condensate Pump trip will require further boration and power reduction, so all operators are credit with this malfunction. Maintaining axial flux distribution in required band is a challenge for this event, so the CR will have to evaluate tech specs for axial flux difference.

Event 3: FCV-625 will close. The valve is on the BOP panel and will be reopened per the ARP or AOP.

Event 4: Loss of 480V Bus 3A will require restoration of equipment on both the ATC and BOP panels. This will put the plant in a tech spec action statement.

Event 5: The FRV is on the ATC panel and will initially be placed in manual to control 22 SG level.

Event 6: The FRV failing in manual will lead the team to trip the reactor or cause an automatic trip.

Event 7: The failure of 22 and 23 AFW Pumps in conjunction with loss of 480V Bus 3A (21 AFW Pump power) will lead to a loss of heat sink.

Event 8: The failure of the stop and control valve pair will require closing MSIVs and drive the team to bleed and feed criteria.

Event 9: The failure of the PORV will require the use reactor head vent valves for bleed and feed.

U2 NRC 2014 Scenario 2 Page 3 of 18

Description BRG 1 FAILURE: CP21 CONDENSATEPUMP21MTR

~----~~---:----=-:=~~~~~-~-~(-~---~----

Insertmalfunction BST-CCW009A FAILURE: FIC-625-H FCV-625 to TRIP_(JBST=T) on event 3 HIGH FLOW CLOSEURE delete in 5 Insert malfunction MAL-EPS007B MCB CTRLR FIXED AUTO ONLY: FIC-427 SG 22 FD REG VLVCONT AIM

~c 'c I~sert malfunction CVH-CFW005A FAILMODE: FCV-427 SG 22 FW

to CLOSE on event 6 REGULA TOR Insert malfunction MOC-AFW002 AFJ AUX FEED WATER PUMP to ASIS MOTOR N0.23

;VA

_ _ _ _ RIABLE POSN: HCV-1118 1 Insert malfunction CVH-ATS017B AUX BFP 22 TURBINE I to 0 GOVERNOR Insert malfunction AOV -MSS036A GENERAL F AlLURE: MS-863 HP

. to FAIL_AS_IS TURB STOP FROM SG21 Create Event 30 jbkrta == 0 -desc jbkrta Insert malfunction AOV-RCS002A to FAIL_AS_IS Insert malfunction CVH-MSS030B VARIABLE POSN: PCV-5991 HP to 45.00000 on event 30 TURB THROTTLE FROM SG21 Insert malfunction AOV-SGN001B VARIABLE POSN: MS-1-21 MAIN to 100.00000 on event 30 delete in STEAM STOP VALVE MS-1-21 180 Insert malfunction AOV -SGN002B VARIABLE POSN: MS-1-22 MAIN to 100.00000 on event 30 delete in

' STEAM STOP VALVE MS-1-22 I 200 Insert malfunction AOV-SGN003B VARIABLE POSN: MS-1-23 MAIN

. 00:00:00 None to 100.00000 on event 30 delete in STEAM STOP VALVE MS-1-23 215 Insert malfunction AOV -SGN004B VARIABLE POSN: MS-1-24 MAIN to 100.00000 on event 30 delete in STEAM STOP VALVE MS-1-24 195 U2 NRC 2014 Scenario 2 Page 4 of 18

Simulator Setup and Instructor Directions Setup/Event INSTRUCTOR ACTIONS EXPECTED RESPONSE/INSTRUCTOR CUES IC Reset 228 or saved 100% IC Reset Simulator to 100% power IC SES Setup Run schedule and verify Loads 22 & 23 AFW pumps failures Schedule malfunctions and over- Fails Upper Left Stop Valve File rides have been entered Loads PORV 455C failure Loads MSIV failures Loads 625 failure on event 3 Loads bus 3A fault on event 4 Loads 22 FRV auto failure on event 5 Loads 22 FRV manual failure on event 5 Floor Setup Ensure that 22 Charging Update Update the Protected Equipment Pump is in service. Computer display. Risk is green.

Ensure that 25 SWP is in service. Watch team walks the panels and assumes the watch.

Perform setup checklist Distribute Turn over sheets Event1 Power Reduction Provide information as requested by team.

Event2 Actuate Event 2 21 Condensate Pump Trip Role Play When called about 21 Motor is very hot Condensate Pump At lead evaluator direction Event3 Actuate Event 3 Spurious closure of MOV-625 At lead evaluator direction Role Play If NPO sent to investigate NPO reports no obvious damage, but a MOV-625 closure team is removing scaffold in the Pipe Pen.

Area immediately adjacent to the flow switch and may have bumped the instrument.

U2 NRC 2014 Scenario 2 Page 5 of 18

Simulator Setup and Instructor Directions Setup/Event INSTRUCTOR ACTIONS EXPECTED RESPONSE/INSTRUCTOR CUES Event 4 Actuate Event 4 Bus 3A Fault At lead evaluator direction Role Play If NPO sent to investigate NPO reports no obvious damage, but bus Bus 3A Trip supply breaker tripped on over current and strong odor of ozone.

Acknowledge requests for I&C to troubleshoot I&C will develop a troubleshooting plan Event 5 Actuate Event 5 22 FRV fails in auto At lead evaluator direction Role Play If asked to investigate 22 Valve appears normal. Cannot tell reason FRV for failure.

Event 6 Actuate Event 6 22 FRV fails in manual At lead evaluator direction NOTE: When Rx is tripped Upper left stop and control valve do not close.

MSIVs will not close NOTE: When SG WR Level reaches about 30%,

modify the following malfunctions to 0%:

AOV-SGN001 8 AOV-SGN0028 AOV-SGN0038 AOV-SGN0048 Role Play As NPO sent to close MSIVS, let the control room know that either you closed them or they had closed before you got there depending on timing.

U2 NRC 2014 Scenario 2 Page 6 of 18

Simulator Setup and Instructor Directions Setup/Event INSTRUCTOR ACTIONS EXPECTED RESPONSE/INSTRUCTOR CUES Role Play AFW Status: 21 de-energized 22 governor valve will not open 23 pump appears normal. Breaker appears normal.

Role Play When NPO dispatched to Close breaker for HCV-31 00 energize head vent valves 0 MCC 26A Sheet 2 (EPS 18) LOA-at MCC 26AIB EPS431 Close breaker for HCV-31 01 0 MCC 268 Sheet 2 (EPS 22) LOA-EPS523 After head vent valves Fix 23 ABFP 480V brkr: Call CCR and have been opened: request 23 ABFP control switch be placed in pullout to support breaker check. From the Director- Delete MOC-AFW002. NPO reports that the 480V breaker for 23 ABFP has been swapped with the spare breaker.

Request CCR to attempt to start 23 ABFP.

Role Play At CCR request Perform various LOA's per NPO local task list U2 NRC 2014 Scenario 2 Page 7 of 18

Op-Test No.: 1 Scenario No.: 2 Event No.: 1 Page 1of 2 Event

Description:

Power Reduction Time Position Applicant's Actions or Behavior Note:

The reactivity plan for the power reduction should be developed by the team in the briefing room prior to takin ~ the watch. The plan could call for boration and/or rod insertion CRS Assigns roles for power reduction ATC Reviews reactivity plan ATC If rods are inserted:

  • Places/verifies rods are in Manual
  • Inserts rods specified number of steps
  • Observes:

0 Proper rod motion 0 Tavg 0 Power BOP Peer checks rod insertion ATC If boration is performed:

  • Energize All Pressurizer Heaters
  • Places RCS Makeup control to Stop
  • Place RCS Makeup Mode selector to borate
  • Adjusts integrator to desired boration amount
  • Places RCS Makeup control to Start
  • Observes:

0 Proper makeup response 0 Tavg 0 Power BOP Peer check boration U2 NRC 2014 Scenario 2 Page 8 of 18

Op-Test No.: 1 Scenario No.: 2 Event No.: 1 Page 1of 2 Event

Description:

Power Reduction ATC/BOP Initiate Turbine Load Reduction at desired rate

  • Governor (Preferred)
  • Load Limit 1
  • Load Limit 2 ATC Maintain the manual setpoint for the MFRV Controllers Nulled.

ATC Adjust Control Rod Position per TS and Graph-RPC-16 Lead Evaluator When the following has been demonstrated/observed:

  • Sufficient load reduction .
  • Sufficient normal plant operations by the BOP .

Then instruct Booth to insert Event 2 U2 NRC 2014 Scenario 2 Page 9 of 18

Op-Test No.: 1 Scenario No.: 2 Event No.: 2 Page 1 of 1 Event

Description:

21 Condensate Pump Trip Time Position Applicant's Actions or Behavior BOP Announces 21 Condensate Pump tripped after observing 6.9 KV Motor Trip Alarm and indications of pump trip CRS Instructs team to perform immediate operator actions of AOP-FW-1 ATC Checks MFW Pumps are both in service and announces that immediate actions are complete ATC/BOP Continue load reduction to get steam flow:::; feed flow:

  • Continue/increase boration
  • Operate governor to reduce turbine load CRS Evaluate axial flux difference to determine if TS 3.2.3 is met.

Depending on team response could be in:

  • 15 minute action to restore AFD with additional 15 minutes to get

< 90% power.

  • 30 minute action to Qet to < 50% power .

ATC/BOP May neeed to remove windup from FRVs by placing in manual and returning to automatic.

ATC/BOP May place MFW master speed controller to manual ATC/BOP May place FRVs in manual Lead Evaluator When the plant has been stabilized and AFD TS has been addressed:

Then instruct Booth to insert Event 3 U2 NRC 2014 Scenario 2 Page 10 of 18

Op-Test No.: _1_ Scenario No.:__£_ Event No.: __L Page _1_of J.

Event

Description:

RCP Thermal Barrier CCW Return Valve (FCV-625) spurious closure.

Time Position

  • Applicant's Actions or Behavior BOP Notes CCW Thermal Barrier Return Low Flow alarm BOP Observes FCV-625 has gone closed BOP Refers to ARP-2-ARP-SGF Note:

CRS should determine based on ARP guidance and indications that the closure was spurious and re-opening the valve is appropriate. If the valve remains closed, the scenario can continue.

BOP Re-open FCV-625 BOP Direct Nuke NPO to monitor flow at Fl-625 Lead Evaluator When valve is re-opened, or it is clear it will remain closed, instruct Booth to initiate Event 5.

U2 NRC 2014 Scenario 2 Page 11 of 18

Op-Test No.: 1 Scenario No.: 2 Event No.: 4 Page 1 of 1 Event

Description:

Time Position Examinee's Actions or Behavior BOP/ATC Diagnose bus 3A de-energized:

  • Numerous alarms
  • Loss of running charging pump
  • Indications for Bus 3A Normal Feed Breaker CRS Announces entry into AOP-480V-1.

ATC Start 21 or 23 Charging pump and adjust speed to match 22 prior to trip.

If flashing in letdown line occurs, then first close LCV-459, start a charging pump and re-establish letdown per 2-SOP-3.1 BOP Check CCW pumps running and 625 open Check SW Pressure - 1,2,3 Header pressure is low May start 21 or 23 SWP Dispatch NPO to monitor EDGs Initiate review of the following TS to determine required actions based on plant conditions:

CRS 3.8.9 Distribution Systems- Operating Condition A Determine that bus 3A is inoperable putting plant in 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> action statement. Based on the faulted bus the team may assume shutdown should be commenced at this time.

Lead Evaluator When plant is stable and tech specs have been addressed:

Then instruct Booth to insert Event 5 U2 NRC 2014 Scenario 2 Page 12 of 18

Op-Test No.: 1 Scenario No.: 2 Event No.: 5 Page 1 of 1 Event

Description:

22 FRV fails in auto I Time Position Applicant's Actions or Behavior ATC Diagnose 22 FRV failure based on lower level on all channels. Steam Generator Level Deviation Alarm may annunciate.

ATC Places 22 FRV in manual and stabilizes 22 SG level.

CRS Announces to team to perform immediate operator actions of either AOP-INST-1 or AOP-FW-1 TEAM Goes through AOP. No actions are taken other than controlling 22 SG level in manual Lead Evaluator When the SG is stable:

Then instruct Booth to insert Event 6 U2 NRC 2014 Scenario 2 Page 13 of 18

Op-Test No.: 1 Scenario No.: 2 Event No.: 6 Page 1of 2 Event

Description:

22 FRV fails in manual Time Examinee's Actions or Behavior Note:

If team did not stabilize 22 SG level for previous event, and automatic or manual reactor trip may have already occurred.

ATC Notices that 22 SG level is trending down and 22 FRV is not responding.

ATC Trips reactor CRS When Unit trips, direct team to perform immediate actions of E-0

  • Verifies immediate actions using the procedure.

When the CRS directs "Perform the Immediate Operator Actions of E-0, the A TC and BOP will first perform the IOAs silently only announcing unexpected conditions. The crew will then re-perform the IOAs verbalizing each item.

ATC Verifies Reactor Trip:

  • Rod bottom lights lit
  • IRPis < 12.5 inches U2 NRC 2014 Scenario 2 Page 14 of 18

Op-Test No.: 1 Scenario No.: 2 Event No.: 6 Page 1of 2 Event

Description:

22 FRV fails in manual ATC Verifies Turbine Trip:

  • Observes stop and control valve are not all closed
  • Trip Turbine
  • Takes MSIV switches to closed
  • Notes MSIVs did not close
  • Dispatches NPO to locally close MSIVs (MSIVs will be closed when sufficient mass has been removed from SGs to meet bleed and feed criteria without lengthy delay.

BOP Check status of 480V buses:

  • Observe ALL busses energized from Offsite Power except Bus 3A Note:

Depending on timing, an Sl signal may be present at step 4 of E-0. The scenario will progress with or without an Sl signal at this point.

If there is no Sl signal, an evaluator will have to step in as STA when transition to ES-0.1 occurs or if CRS is looking for concurrence to go to FR-H.1 for the loss of heat sink. This will not be necessary if there is an Sl signal.

ATC Check Sl status Determine Sl is Actuated

  • Sl Pumps Any Running Determines Sl NOT actuated and NOT required BOP/ATC Check AFW Status
  • Observes no AFW flow
  • Attempted to use 22 AFW pump to establish flow CRS Transition to ES-0.1 U2 NRC 2014 Scenario 2 Page 15 of 18

Op-Test No.: 1 Scenario No.: 2 Event No.: 7/8/9 Page 1 of 3 Event

Description:

Failure of 22 and 23 AFW to start which along with other conditions leads to loss of heat sink I Failure of Turbine Stop/Control Valve pair I Failure of PORV requiring opening of reactor head vent valves Time Position icant's Actions or Behavior Note:

Bleed and Feed criteria of the average of the three lowest SGs being < 20% will eventually be met.

How much of the early steps of FR-H.1 are performed will depend on when this happens. These steps assume that criteria are met when step 2 is read.

CRS Enters FR-H.1 Team Verifies secondary heat sink is required:

RCS press > SG press BOP/ATC ATC/BOP ATC/BOP ATC Starts 21 and 23 BOP 0 s HCV-142 ATC Verifies HHSI ATC/BOP Verifies Sl valve li ATC ATC observes 455C will not n BOP ize HCV-3100/3101 ATC/BOP ATC/BOP Reset Sl:

  • Check CCW pumps
  • Place key switches in Sl reset position
  • Reset Sl U2 NRC 2014 Scenario 2 Page 16 of 18

Op-Test No.: 1 Scenario No.: 2 Event No.: 7/8/9 Page 1 of 3 Event

Description:

Failure of 22 and 23 AFW to start which along with other conditions leads to loss of heat sink I Failure of Turbine Stop/Control Valve pair I Failure of PORV requiring opening of reactor head vent valves ATC/BOP Reset Phase A:

  • Place IVSW switches to open for 1410, 1413, 3518, 3519
  • Place containment rad monitor weld channel valves to open
  • Verify airlocks in incident
  • Close all remaining Phase A valve switches
  • Reset Phase A Note:

At this point, the FSS will call about restoring 23 AFW pump. The team will be asked to place the switch in pull to lock. After another few minutes, the team will be told that 23 AFW should be available.

CRS Evaluate SG conditions per foldout prior to re-establishing AFW flow to 23 and 24 SGs ATC/BOP Start 23 AFW pump ATC/BOP Establish 400 gpm total to 23 and 24 SGs Lead Evaluator Terminate the scenario.

U2 NRC 2014 Scenario 2 Page 17 of 18

EMERGENCY PLAN DECLARATION Site Area Emergency EAL FS1.1 Loss or potential loss of any two barriers.

Loss of heat sink will lead to a call based on the Fission Product Barrier Matrix:

Potential Loss of Fuel Cladding (A.CSFST)

Potential Loss of RCS (A.CSFST)

U2 NRC 2014 Scenario 2 Page18of18

Facility: Indian Point 2 Scenario No.: 3 Op-Test No.: _1 Examiners: Operators:

Initial Conditions:

Reset simulator to 4% power IC Load Simulator Schedule-Scenario3 The Plant is at 4% power. 23 Charging Pump is OOS. 22 MBFP is OOS. PORV 456 is OOS Ensure 21 Charging Pump in service, Ensure 23 CCW Pump is in service Turnover:

Perform power ascension to 10% for turbine sync.

Event Malf. No. Event Event No. Type* Description R (ATC) 1 N/A N (CRS) Power Ascension N (BOP) 2 MOT- C (ATC)

CVC003B C(CRS) 21 Charging Pump trip TS(CRS) 3 MOC- C (BOP)

CCW003A C (CRS) 23 CCW pump trip with failure of other CCW pumps to autos tart TS(CRS) 4 XMT- TS(CRS) Control Rod D8 IRPI fails low.

CRF012A 5 XMT- C (ALL) PT-408A fails high causing 21 MFW Pump to go to minimum CFW036A speed.

6 MAL-M(ALL) 21 MFW Pump trips.

ATS005A 7 MAL-RCS014D M(ALL) 24 SGTR.

8 AOV- C(ALL)

CAS009A Failure of air to containment making PORVs required for depressurization.

9 AOV- C(ALL)

RCS002A PORV will not close causing team to transition to ECA-3.1 10 MOC-C(BOP) 21 and 22 Containment Recirc Fans fail to autostart.

CNM008/9

  • (N)ormal (R)eactivity, (l)nstrument, (C)omponent, (M)ajor U2 NRC 2014 Scenario 3 Page1of18

SESSION OUTLINE:

The evaluation begins with the plant at 4% power during startup. The following equipment is out of service:

  • PORV 456 due to blowing fuses.
  • 23 Charging Pump for seal replacement.
  • 22 MBFP since forced outage work is not complete.

When the team takes the watch, they will raise power in anticipation of putting the MTG in service.

Following some power ascension, 21 Charging Pump will trip. 22 Charging Pump will be placed in service. TR0-3.1.8.1 will not be met putting the plant in a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AOT.

23 CCW Pump will trip and the low pressure auto start has been disabled for 21 and 22 CCW Pumps. The BOP will start a CCW Pump per ARP-SGF.

Control Rod 08 IRPI fails low. The team will take actions in accordance with AOP-ROD-1, "Rod Control and Indication Systems Malfunction."

PT -408A will fail high causing 21 MBFP to slow down to minimum. If the team does not recognize the failure and place 21 MBFP in manual, the reactor will trip on low SG level.

If the team places the pump in manual, an overspeed trip of the MFW pump will eventually be inserted. With power above 4%, the team will manually trip the reactor. If power is< 4% and the team does not trip the reactor, the SGTR can be initiated which will drive a trip and Sl.

When the reactor trips, a SGTR will occur in 24 SG. The team will take actions per E-0, "Reactor Trip or Safety Injection". The team will then transition to E-3, "Steam Generator Tube Rupture."

When Sl is reset, PCV-1228 (Instrument Air to Containment) will fail in the closed position. The team will need to use a Pressurizer PORV to depressurize. When the team goes to close the PORV, the valve will fail open. This will cause the team to ultimately go to ECA-3.1 for recovery.

Procedure flow path: POP-1.3, AOP-CVCS-1, ARP-SGF, AOP-ROD-1, AOP-AIR-1, E-O, E-3, ECA-3.1 U2 NRC 2014 Scenario 3 Page 2 of 18

CRITICAL TASKS:

E-3 --A Isolate feedwater flow to and steam flow from the ruptured SG before transition to ECA-3.1 occurs.

E-3 -- B Establish and maintain RCS temperature so that transition from E-3 does not occur due to either of the following:

  • RCS temperature TOO HIGH to maintain required sub-cooling in E-3 step16 table, OR
  • RCS temperature TOO LOW results in a severe challenge to the Sub-criticality or Integrity CSF.

EXPLANATION OF CREDITED MALFUNCTIONS:

Event 1 - Power ascension. This is a reactivity manipulation for ATC. BOP will be controlling SG levels manually and CRS will be supervising evolution.

Event 2- Charging pump trip. The ATC will start another charging pump. Since two charging pumps are now inoperable, the CRS will have to determine that the plant is in a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> action statement.

Event 3 - The running CCW pump will trip and the other two will have all auto starts blocked. The BOP will have to start a CCW pump.

Event 4- IRPI for rod D-8 will fail. The CRS will evaluate TS 3.1.7 for the inoperable IRPI.

Event 5- PT-408A (MFW pressure) fails high which causes the MFW pump to go to minimum speed. The ATC will have to place MFW control in manual. The BOP will have to make adjustments to Low Flow FRVs.

Event 6 - The only MFW pump trips which will require a reactor trip if power when above 4%.

Event 7 - SGTR in 24 SG causes Sl to be initiated. Diagnosis is a challenge at low power since there will be less radiation monitor response.

Event 8- Failure of instrument air to containment needs to be diagnosed by the BOP and will change the depressurization method used by the ATC.

Event 9 - The PORV failing to close will lead team to contingency procedure.

Event 10-21 and 22 Containment Recirc Fans will not start. The BOP will have to notice this while performing E-0 Attachment 1 and start the fans.

U2 NRC 2014 Scenario 3 Page 3 of 18

2014_scenario_3_setup_rev1.html At Time Description BRG 1 FAILURE: C1 CHARGING PMP21 MOTOR SETPOINT DRIFT: PC-600-L Insert malfunction BST-ACS/COMP CLNG PUMP DISCH CCW017B to 0 PRESS Insert malfunction MOC- . . . . CC3 COMPONENT COOLING PUMP CCW003 to TRIP on event 3 MOTOR23 Insert malfunction XMT-FIXED OUTPUT: LVDT-D8 LVDT CRF012A to 1.4013e-045 on FORCRDMD8

Insert malfunction XMT- I CFW036A to 1400.00000 in 30 FIXED OUTPUT: PT-408A 26 HTRS on event 5 COMMON OUTLET PRESSURE Insert malfunction MAL-MBFP 21 OVERSPEED

. ATS005A on event 6 Insert malfunction MAL-RCS014D to 10.00000 on event STEAM GENERATOR 24 TUBE 30 LEAK(NR)

Insert malfunction AOV-GENERAL FAILURE: PCV-1228 AIR CAS009A to CLOSE on event FILTER DISCHARGE - CONT BLDG 29 GENERAL FAlLURE: PCV -455C PZR POWER OPERATED RELIEF VALVE Insert malfunction MOV-535 PZR PORV ISOLATION VALVE RCSOO 1 to N/A on event 9

. Insert malfunction MOC- . . CRF 1 21 CON.TAINMENT...

00:00:00 None

CNM008 to AUT CLS RECIRCULATION FAN

' Insert malfunction MOC- . CRF2 22 CONTAINMENT 00:00:00 None CNM009 to AUT CLS RECIRCULATION FAN

    • ~~~--*'"*,.;-~*****

U2 NRC 2014 Scenario 3 Page 4 of 18

Simulator Setup and Instructor Directions Setup/Event INSTRUCTOR ACTIONS EXPECTED RESPONSE/INSTRUCTOR CUES IC Reset Reset Simulator to 4% power IC SES Setup Run setup schedule file and Schedule verify malfunctions and over-File rides have been entered Floor Setup Ensure 21 Charging Pump in HANG PROTECTED EQUIPMENT tags service for:

Ensure 23 CCW Pump in 21 and 22 Charging Pumps service Update the Protected Equipment Display PC Place 23 Charging pump in TPO and apply Danger Tags Place PCV-456 in closed and 536 in TPO and apply Danger Tags Distribute Turn over sheets Event1 Power Ascension Respond to notifications Event2 Actuate Trigger 2 Initiates trip of 21 Charging Pump At lead evaluator direction Role Play When called about Charging 21 Charging Pump is hot and breaker Pumps and breakers appears to have tripped on overcurrent.

22 Charging Pump is running sat after being placed in service.

Event 3 Actuate Trigger 3 Initiates trip of 23 CCW Pump At lead evaluator direction Role Play When called about CCW You cannot tell why 23 tripped. Which ever Pumps. pump is started appears to being running sat.

Event4 Actuate Trigger 4 Initiates IRP failure for 08:

At lead evaluator direction U2 NRC 2014 Scenario 3 Page 5 of 18

Simulator Setup and Instructor Directions Setup/Event INSTRUCTOR ACTIONS EXPECTED RESPONSE/INSTRUCTOR CUES Role Play If I&C asked to investigate Report that technicians will be sent to investigate. The problem will not be solved during the scenario.

Event 5 Actuate Trigger 5 Initiates failure of PT-408A high.

At lead evaluator direction Role Play If I&C asked to investigate Report that technicians will be sent to investigate. The problem will not be solved during the scenario.

EventS Actuate Trigger 6 Initiates trip of 21 MFW Pump At lead evaluator direction Role Play If asked to investigate Report that personnel will be sent to investigate. The problem will not be solved during the scenario.

Role Play If NPO sent to investigate Report the following: There is a large air PCV-1228 leak near PCV-1228. The NPO may be able to wrap the leak and reduce the air leakage. This repair will not be completed before the scenario is terminated Role Play As requested by Control Perform various LOA's per NPO Local Task Room List.

U2 NRC 2014 Scenario 3 Page 6 of 18

Op-Test No.: _1_ Scenario No.:~ Event No.: _1_ Page _1_of _l Event

Description:

Power Ascension Time Position Applicant's Actions or Behavior Note:

The reactivity plan for the power ascension should be developed by team in briefing room prior to taking the watch. The plan could call for dilution and/or rod withdrawal.

CRS Assigns roles for power ascension ATC Reviews reactivity plan ATC If rods are withdrawn:

  • Places/verifies rods are in Manual
  • Withdraws rods
  • Observes:

0 Proper rod motion 0 Tavg 0 Power BOP Peer checks rod withdrawal ATC If dilution is performed:

  • Places RCS Makeup control to Stop
  • Place RCS Makeup Mode selector to Dilute
  • Adjusts integrator to desired dilution amount
  • Places RCS Makeup control to Start
  • Observes:

0 Proper makeup response 0 Tavg 0 Power BOP Peer check dilution Adjust Low Flow Feed Reg Valves to maintain SG levels.

U2 NRC 2014 Scenario 3 Page 7 of 18

Op-Test No.: _1_ Scenario No.: .2_ Event No.: _1_ Page _1_of .l Event

Description:

Power Ascension Lead Evaluator When the following has been demonstrated/observed:

  • Sufficient load ascension .
  • Sufficient normal plant operations by the BOP .

Then instruct Booth to insert Event 2.

U2 NRC 2014 Scenario 3 Page 8 of 18

Op-Test No.: 1 Scenario No.: 3 Event No.: 2 Page 1 of 1 Event

Description:

21 Charging Pump Trip Time Position Applicant's Actions or Behavior BOP Notes 480V Motor Trip Alarm ATC Diagnoses that 21 Charging Pump has tripped CRS Announces entry in AOP-CVCS-1 ATC/BOP Verify there is no gas binding or issue preventing start of 22 Charging Pump ATC Starts 22 Charging Pump CRS Evaluates TRM TRO 3.1. B.1 and determines plant is in 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> action statement Lead Evaluator When the following has been demonstrated/observed:

Then instruct Booth to insert Event 3 U2 NRC 2014 Scenario 3 Page 9 of 18

Op-Test No.: _1_ Scenario No.: _l_ Event No.: _l_ Page _1_of j_

Event

Description:

Trip of 23 CCW pump.

Time Position Applicant's Actions or Behavior BOP Diagnose that 23 CCW pump has tripped:

BOP Realize that a standby pump should have started and did not.

Start 21 or 22 CCW as directed by ARP-SGF which may be referenced after starting the pump.

CRS May Enter 2-AOP-CCW-1 CRS/BOP If prior actions have not been taken based on Auto-Start Failure Pump starts described above will be directed at Step 1 of the procedure.

CRS CRS will evaluate TS 3.7.7 and determine that the plant is in a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> actions statement due to having two CCW Pumps out of service.

Lead Evaluator When CCW is restored initiate Event 4 U2 NRC 2014 Scenario 3 Page10of18

Op-Test No.: 1 Scenario No.: 3 Event No.: 4 Page 1 of 1 Event

Description:

Control Rod D8 IRPI fails low Time Position Applicant's Actions or Behavior BOP Acknowledge Rod Bottom Rod Stop alarm ATC Diagnose that an IRPI has failed (may announce actual dropped rod):

  • D8 IRPI reading 0 and rod bottom light lit
  • No NIS Dropped Rod alarm
  • No QPTR tilt indications CRS Announce entry into AOP-ROD-1 CRS/ATC Determine failed IRPI CRS Refers to TS 3.1. 7 and determines that immediate compensatory actions are needed.

Lead Evaluator When the following has been demonstrated/observed:

TS evaluated Then instruct Booth to insert Event 5 U2 NRC 2014 Scenario 3 Page 11 of 18

Op-Test No.: 1 Scenario No.: 3 Event No.: 5 Page 1 of 1 Event

Description:

PT-408A fails high causing MBFP to go to minimum speed Time Position Applicant's Actions or Behavior ATC Diagnoses failure based on:

  • Changing speed on 21 MFW Pump
  • Changing SG Levels
  • Possible SG Level Deviation Alarm
  • Meter indication for PT-408A ATC Places MFW master speed controller or 21 MFW speed controller in manual to control speed.

BOP Adjusts Low Flow FRVs to maintain SG Levels CRS Directs team to perform immediate operator actions of AOP-INST-1 ATC Checks all instruments listed in AOP-INST-1 CRS Implements AOP-INST-1

  • Verifies no other instrument failures
  • Ensures actions have been taken to stabilize the plant Lead Evaluator When the following has been demonstrated/observed:

SG levels stable Then instruct Booth to insert Event 6 U2 NRC 2014 Scenario 3 Page 12 of 18

Op-Test No.: _1_ Scenario No.: _l_ Event No.: 7/8/9/10 Page _1_of _Q Event

Description:

24 SGTR, loss of instrument air to containment, PORV fails open Time I Position I Applicant's Actions or Behavior Note:

The diagnoses of 24 SGTR will happen during the performance of E-0 ATC Diagnose that SGTR exits in 24 SG:

  • Decreasing PZR level
  • VCT lowering level
  • 24 SG level increasing without feed CRS Directs ATC to trip Reactor if not already done Directs ATC or BOP to Initiate Sl ATC Trips reactor if not already done ATC or Initiates Safety Injection BOP CRS Directs Operators to perform immediate operator actions of EO.

ATC Verifies Reactor Trip:

  • Checks trip breakers open
  • Checks flux decreasing
  • Checks rod bottom lights lit
  • Checks IRPis <12.5 inches ATC Verifies Turbine Trip by observing all Turbine Stop Valves closed.

BOP Verifies Power to 480V Busses:

  • 2A, 3A, SA and 6A are energized ATC Checks Sl Status:
  • Sl Pumps are running
  • Both Trains of Sl are actuated U2 NRC 2014 Scenario 3 Page 14 of 18

Note:

The first 4 steps of E-0 are performed twice. Once by the A TC and BOP using placards, and a second time with the CRS reading the procedure.

CRS Directs BOP to perform Attachment 1 of E-0 BOP Performs Attachment 1 in parallel with the CRS/ATC progressing through E-0:

  • Start a charging pump and align suction to RWST by opening LCV-112B and closing LCV-112C.
  • Starts 21 and 22 Containment Recirc Fans
  • Dispatch NPO to reset lighting and MCCS 24A, 27A, and 29A.
  • Stop condensate pumps .
  • Use 22 AFWP to align AFW flow to 23 and 24 SGs if not already done .

CRS/ATC Manually start 23 AFW Pump to supply 23 SG (24 will be fed if team does not realize that it is ruptured)

CRS/ATC Verify Sl System Flow:

Checks RCS Pressure Checks Sl Flow indicated if RCS Pressure is below 1720 psig Secures and places one RHR Pump in Pullout.

CRS/ATC Check RCP Seal Cooling:

  • When valves are closed start NESW pump CRS/ATC Check RCS Temperature:

AFW Flow may be throttled back to just above 400 gpm at this point to maintain RCS Temperature.

CRS/ATC Will check that Spray_, Aux Spray, and PORVs are all closed.

CRS/ATC Check if RCPs should be stopped:

They will be left in service CRS/ATC Check for Faulted SG CRS/ATC Check for Ruptured SG:

  • 24 SG Level will be increasing in an uncontrolled manner Team will identify 24 SG is ruptured.

CRS Transition to E-3 Steam Generator Tube Rupture U2 NRC 2014 Scenario 3 Page 15 of 18

CRS/ATC Check if RCPs should be stopped:

Pum will not be secured Isolating AFW Flow to 24 SG and adjusting the ADV may have occurred in E-0 when level reached 10% as a Prudent Action.

ATC/BOP CRS/ATC done CRS/ATC blowdown isolated from 24 SG CRS/ATC Direct closure of steam of24 SG CRS/ATC Direct check that MS-55D is closed.

CRS/ATC Close 24 MSIV CRS/ATC Check 24 SG level > 10%

CRS/ATC Check 24 SG ressure > 440 CRS/ATC Commence Cooldown to target CET temperature:

  • Place HP Steam Dumps in Pressure Mode and Manual
  • Initiate Cooldown
  • Do not exceed 0.5E6 lbs/hr on each of 21, 22, 24 SG Team will continue in procedure while CETs are lowering When CET temperatures are less than target:
  • Stop cooldown by closing HP Steam Dumps Maintain CET rature below CRS/ATC Check SG Levels and maintain AFW flow U2 NRC 2014 Scenario 3 Page 16 of 18

CRS/ATC Check PORVs and Block Valves. A block valve will be opened.

CRS/ATC Reset Sl:

  • Place CCW Pumps in Trip Pullout
  • Place Sl Defeat Key Switches in Defeat
  • Press Sl Reset Pushbuttons CRS/BO Reset Phase A:

p

  • Place switches in open for IVSW valves 141, 1413, SOV-3518, SOV-3519
  • Place Containment Rad Monitor WCPS Valve Switch to open
  • Place VC Hatch switches in incident
  • Place all remaining Phase A Valve switches to close
  • Depress Phase A reset pushbuttons CRS/BO Attempt to establish instrument air to containment. 1228 will not open p

CRS/BO Secure remaining in service RHR Pump p

CRS/ATC After cooldown stopped, check 24 SG Pressure stable or increasing. It will be stable CRS/ATC Check subcooling > 43F CRS Determine that PORV will be needed to depressurize RCS CRS/ATC Use PORV PCV-455C to depressurize CRS/ATC When depressurizing termination criteria are met:

  • Attempt to close PCV-455C
  • Attempt to close block valve CRS Transition to ECA-3.1 I. Evaluator Lead I Terminate scenario.

I U2 NRC 2014 Scenario 3 Page17of18

EMERGENCY PLAN DECLARATION Alert FA 1.1 Any loss or potential loss of fuel clad or RCS From the fission product barrier matrix, RCS will be lost (D. Inventory Rupture SG results in ECCS actuation)