Numb 6
13 28 32 48 IPEC Unit 2 2014 Written Exam Analysis Page 1 of2 Description of Question This question was missed by 7 of 11 applicants.
This question asks the long term system lineup if RHR is lost during RCS vacuum refill.
This question was missed by 5 of 11 applicants.
This question addresses the normal lineup ofPORV Block valves (Closed) and the impact of a loss of power to the Block Valve This question was missed by 5 of 11 applicants.
This question evaluates RCP conditions and determines actions based on those conditions.
This question was missed by 8 of 11 applicants.
This question evaluates what could be the cause ofleakage into the PRT.
This question was missed by 5 of 11 applicants.
This question tests a requirement to have MTG voltage above system voltage when synchronizing.
There is The com material.
The cane period at hours.
This que applican No furtl There is The con' material.
All5 of Conclusions no problem with this question.
- ept is included in the training lidates did not recognize the long time 1d 1the lineup that would exist after 24 stion was reviewed with all ts.
ter action is necessary.
no problem with this question.
- ept is included in the training incorrec1 the applicants selected the same
- answer. The answer selected was t because it was not procedurally incorrec directed.
This que applican No furtl There is This con stion was reviewed with all ts.
1er action is necessary.
no problem with this question.
cept is included in the training materiaL This can didates did not recognize that the actions f flow are or a# 1 RCP seal failure with low the same as a failure with high flow.
stion was reviewed with all This que:
applican ts.
No furtl 1er action is necessary There is This con no problem with this question.
cept is included in the training materiaL The can' RHR val iidates misunderstood the status of lves during testing.
This que: stion was reviewed with all ts.
applican No furtl ter* action is necessary There is This con no problem with this question.
lCept is included in the training material.
This is a candidat the ques note in the procedure that some es did not remember when answering tion.
This que: stion was reviewed with all ts.
applican No furtl ter* action is necessary
58 82 88 91 99 100 IPEC Unit 2 2014 Written Exam Analysis Page 2 of2 This question was missed by 5 of 11 applicants.
This question tests knowledge of Tech Spec associated with misaligned rods.
This question was missed by 6 of 9 applicants.
This question tests requirements for SG Tube Leak after taking unit off line.
This question was missed by 7 of 9 applicants.
This question tests knowledge of electrical Tech Specs.
This question was missed by 7 of 9 applicants.
This question tests knowledge of the refueling gripper interlocks and actions for a dropped fuel assembly that does not cause fuel damage.
This question was missed by 9 of 9 applicants.
This question tests knowledge of EALs for loss of annunciators.
This question was missed by 5 of 9 applicants.
This question tests knowledge of expected alarms during transfer to hot leg recirculation and procedural transition after this activity.
There is no problem with this question.
ept is included in the training The cone material.
This que stion is challenging in a closed book format.
This que applican stion was reviewed with all ts.
No furtl ter action is necessary There is The con<
no problem with this question.
~ept is included in the training material.
There an ~ subtle differences between the
- ~.kt:::n for a leak when compared to a actions t; rupture.
This que applican stion was reviewed with all ts.
No furtl ter action is necessary There is The cane 480V bu no problem with this question.
lidates were confused as to when the s LCO applies.
This que applican No furtl There is The con<
material.
The cane for refue This que applican stion was reviewed with all ts.
ter action is necessary no problem with this question.
~ept is included in the training lidates were confused by terminology ling equipment.
stion was reviewed with all ts.
No furtl ter action is necessary There is Howeve1 the EAL The con<
material.
No furtl There is The con<
no problem with this question.
r, it may be too challenging without chart.
~ept is included in the training ter action is necessary no problem with question.
~ept is included in the training material.
The cane lidates were unsure of what procedure ion to.
to transit No furtl ter action is necessary