Category:Inservice/Preservice Inspection and Test Report
MONTHYEARML23062A5112023-03-0303 March 2023 Refueling Outage Unit 1 R33 Owner'S Activity Report for Class 1. 2, 3 and Mc Inservice Inspections L-PI-22-047, Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report2022-12-21021 December 2022 Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report ML20009F3312020-01-0909 January 2020 Refueling Outage Unit 2 R31 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations ML19108A2912019-04-18018 April 2019 Submittal of 2018 Unit 1 180-Day Steam Generator Tube Inspection Report ML19018A2042019-01-18018 January 2019 Inservice Inspection Summary Report Unit 1, Interval 5, Period 2, Outage 1 Refueling Outage Dates: 9/21/2018 to 10/26/2018 L-PI-18-003, Inservice Inspection Summary Report Unit 2, Refueling Outage Dates: 10/13/2017 to 11/20/2017, Fuel Cycle 29: 12/07/2015 to 11/20/20172018-02-12012 February 2018 Inservice Inspection Summary Report Unit 2, Refueling Outage Dates: 10/13/2017 to 11/20/2017, Fuel Cycle 29: 12/07/2015 to 11/20/2017 ML17046A6592017-02-15015 February 2017 Lnservice Inspection Summary Report Unit 1, Interval 5, Period 1, Outage 1, Refueling Outage Dates: 10/15/2016 to 11/20/2016, Fuel Cycle 29: 11/23/2014 to 11/20/2016 L-PI-16-030, Transmittal of 2015 180-Day Steam Generator Tube Inspection Report2016-05-20020 May 2016 Transmittal of 2015 180-Day Steam Generator Tube Inspection Report L-PI-16-013, Inservice Inspection Summary Report Refueling Outage Dates: 10/17/2015 to 12/06/2015, Fuel Cycle 28: 01/05/2014 to 12/06/20152016-03-0202 March 2016 Inservice Inspection Summary Report Refueling Outage Dates: 10/17/2015 to 12/06/2015, Fuel Cycle 28: 01/05/2014 to 12/06/2015 L-PI-15-025, Inservice Inspection Summary Report Unit 1, Interval 4, Period 3, Outage 2 - Refueling Outage Dates: 10/08/2014 to 11/22/2014, Fuel Cycle 28: 01/03/2013 to 11/22/20142015-02-18018 February 2015 Inservice Inspection Summary Report Unit 1, Interval 4, Period 3, Outage 2 - Refueling Outage Dates: 10/08/2014 to 11/22/2014, Fuel Cycle 28: 01/03/2013 to 11/22/2014 L-PI-15-016, Supplement to 10 CFR 50.55a Requests (RR) 1-RR-4-9 and 2-RR-4-9 (TACs MF4795 and MF4796) Associated with Prairie Island Nuclear Generating Plant (PINGP) Fourth Ten-Year Interval Inservice Inspection (ISI) Program2015-02-0404 February 2015 Supplement to 10 CFR 50.55a Requests (RR) 1-RR-4-9 and 2-RR-4-9 (TACs MF4795 and MF4796) Associated with Prairie Island Nuclear Generating Plant (PINGP) Fourth Ten-Year Interval Inservice Inspection (ISI) Program L-PI-15-013, Supplement to 10 CFR 50.55a Requests (RR) 1-RR-5-5 and 2-RR-5-5 (TACs MF4839 and MF4840) Associated with Prairie Island Nuclear Generating Plant (PINGP) Fifth Ten-Year Interval Inservice Inspection (ISI) Program2015-02-0404 February 2015 Supplement to 10 CFR 50.55a Requests (RR) 1-RR-5-5 and 2-RR-5-5 (TACs MF4839 and MF4840) Associated with Prairie Island Nuclear Generating Plant (PINGP) Fifth Ten-Year Interval Inservice Inspection (ISI) Program L-PI-14-127, Fifth Interval Inservice Inspection Plan December 21, 2014 Through December 20, 20242014-12-18018 December 2014 Fifth Interval Inservice Inspection Plan December 21, 2014 Through December 20, 2024 L-PI-14-117, Withdrawal of 10 CFR 50.55a Request RR-01 Associated with the Fifth Ten-Year Interval for the Inservice Test Program (TAC Nos. MF3928 and Mf 3929)2014-11-24024 November 2014 Withdrawal of 10 CFR 50.55a Request RR-01 Associated with the Fifth Ten-Year Interval for the Inservice Test Program (TAC Nos. MF3928 and Mf 3929) L-PI-14-096, Supplement to 10 CFR 50.55a Requests RR-01, RR-03, RR-05, RR-06 and RR-07 Associated with the Fifth Ten-Year Interval for the Inservice Test Program2014-09-19019 September 2014 Supplement to 10 CFR 50.55a Requests RR-01, RR-03, RR-05, RR-06 and RR-07 Associated with the Fifth Ten-Year Interval for the Inservice Test Program L-PI-14-095, 10 CFR 50.55a Requests 1-RR-5-7 and 2-RR-5-7 Associated with the Fifth Ten-Year Interval for the Lnservice Inspection Program2014-09-15015 September 2014 10 CFR 50.55a Requests 1-RR-5-7 and 2-RR-5-7 Associated with the Fifth Ten-Year Interval for the Lnservice Inspection Program L-PI-14-085, 10CFR 50.55a Requests Associated with the Fifth Ten-Year Interval for the Inservice Inspection Program2014-09-15015 September 2014 10CFR 50.55a Requests Associated with the Fifth Ten-Year Interval for the Inservice Inspection Program L-PI-14-080, 10 CFR 50.55a Requests 1-RR-4-9, 2-RR-4-9 and 2-RR-4-10 Associated with the Fourth Ten-Year Interval for the Inservice Inspection Program2014-09-0303 September 2014 10 CFR 50.55a Requests 1-RR-4-9, 2-RR-4-9 and 2-RR-4-10 Associated with the Fourth Ten-Year Interval for the Inservice Inspection Program L-PI-14-015, 10 CFR 50.55a Requests RR-01, RR-03. RR-05, RR-06 and RR-07 Associated with the Fifth Ten-Year Interval for the Lnservice Test Program2014-04-0909 April 2014 10 CFR 50.55a Requests RR-01, RR-03. RR-05, RR-06 and RR-07 Associated with the Fifth Ten-Year Interval for the Lnservice Test Program L-PI-14-029, Lnservice Inspection Summary Report Unit 2. Interval 4, Period 3, Outage 2, Refueling Outage Dates: 09/21/2013 to 01/04/2014, Fuel Cycle 27: 05/29/2012 to 01/04/20142014-04-0303 April 2014 Lnservice Inspection Summary Report Unit 2. Interval 4, Period 3, Outage 2, Refueling Outage Dates: 09/21/2013 to 01/04/2014, Fuel Cycle 27: 05/29/2012 to 01/04/2014 L-PI-13-089, Supplement to Aging Management Program Submittals2013-10-0808 October 2013 Supplement to Aging Management Program Submittals L-PI-13-027, Inservice Inspection Summary Report, Interval 4, Period 3, Outage 1, Refueling Outage Dates: 10-23-2012 to 01-02-2013 Unit 1, Fuel Cycle 27: 06-12-2011 to 01-02-20132013-03-29029 March 2013 Inservice Inspection Summary Report, Interval 4, Period 3, Outage 1, Refueling Outage Dates: 10-23-2012 to 01-02-2013 Unit 1, Fuel Cycle 27: 06-12-2011 to 01-02-2013 L-PI-12-077, Inservice Inspection Summary Report, Interval 4, Period 3, Outage 1, Refueling Outage Dates: 02-21-2012 to 05-29-2012 U2, Fuel Cycle 26: 05-26-2010 to 05-29-20122012-08-23023 August 2012 Inservice Inspection Summary Report, Interval 4, Period 3, Outage 1, Refueling Outage Dates: 02-21-2012 to 05-29-2012 U2, Fuel Cycle 26: 05-26-2010 to 05-29-2012 L-PI-11-087, Lnservice Inspection Summary Report, Interval 4, Period 2, Outage 2 Refueling Outage Dates: 04-29-2011 to 06-11-2011 Unit 1, Fuel Cycle 26: 11-23-2009 to 06-11-20112011-09-0808 September 2011 Lnservice Inspection Summary Report, Interval 4, Period 2, Outage 2 Refueling Outage Dates: 04-29-2011 to 06-11-2011 Unit 1, Fuel Cycle 26: 11-23-2009 to 06-11-2011 L-PI-10-099, Unit 2 180-Day Steam Generator Tube Inspection Report2010-11-12012 November 2010 Unit 2 180-Day Steam Generator Tube Inspection Report L-PI-10-083, Inservice Inspection Summary Report, Interval 4, Period 2, Outage 2, Refueling Outage Dates: 04-16-2010 to 05-24-2010 Unit 2, Fuel Cycle 25: 11-02-2008 to 05-24-20102010-08-20020 August 2010 Inservice Inspection Summary Report, Interval 4, Period 2, Outage 2, Refueling Outage Dates: 04-16-2010 to 05-24-2010 Unit 2, Fuel Cycle 25: 11-02-2008 to 05-24-2010 L-PI-10-051, Revision to Inservice Inspection Summary Report, Interval 4, Period 1, Refueling Outage Dates: 04-28-2006 to 06-06-2006 Fuel Cycle 23: 11-23-2004 to 06-06-2006 and Revision to 2008 Unit 1 180-Day Steam Generator Tube Inspection Report2010-06-0101 June 2010 Revision to Inservice Inspection Summary Report, Interval 4, Period 1, Refueling Outage Dates: 04-28-2006 to 06-06-2006 Fuel Cycle 23: 11-23-2004 to 06-06-2006 and Revision to 2008 Unit 1 180-Day Steam Generator Tube Inspection Report L-PI-10-013, Inservice Inspection Summary Report, Interval 4, Period 2, Outage 1, Refueling Outage Dates: 09-12-2009 to 11-23-2009, Unit 1, Fuel Cycle 25: 03-23-2008 to 11-23-20092010-02-22022 February 2010 Inservice Inspection Summary Report, Interval 4, Period 2, Outage 1, Refueling Outage Dates: 09-12-2009 to 11-23-2009, Unit 1, Fuel Cycle 25: 03-23-2008 to 11-23-2009 L-PI-09-015, Submittal of Inservice Inspection Examination Summary Report, Interval 4, Period 2, Outage 1, Refueling Outage, Dates: 09-19-2008 to 11-01-2008 Unit 2, Fuel Cycle 24:12-15-2006 to 11-01-20082009-01-28028 January 2009 Submittal of Inservice Inspection Examination Summary Report, Interval 4, Period 2, Outage 1, Refueling Outage, Dates: 09-19-2008 to 11-01-2008 Unit 2, Fuel Cycle 24:12-15-2006 to 11-01-2008 L-PI-08-082, Amendment to Unit 2 Inservice Inspection Summary Report, Interval 4, Period 1, Outage 2, Refueling Outage Dates: 11-15-2006 to 12-15-2006, Fuel Cycle 23: 06-11-2005 to 12-15-20062008-10-0707 October 2008 Amendment to Unit 2 Inservice Inspection Summary Report, Interval 4, Period 1, Outage 2, Refueling Outage Dates: 11-15-2006 to 12-15-2006, Fuel Cycle 23: 06-11-2005 to 12-15-2006 L-PI-08-055, Inservice Inspection Summary Report, Interval 4, Period 1, Outage 2 Refueling Outage Dates: 02-13-2008 to 03-23-2008, Fuel Cycle 24: 06-06-2006 to 03-23-20082008-06-19019 June 2008 Inservice Inspection Summary Report, Interval 4, Period 1, Outage 2 Refueling Outage Dates: 02-13-2008 to 03-23-2008, Fuel Cycle 24: 06-06-2006 to 03-23-2008 ML0727800262007-10-31031 October 2007 Relief Request from ASME Code, Section X1, Inservice Inspection Program Relief Requests Nos. 1-RR-4-7 and 2-RR-4-7 L-PI-07-037, 10 CFR 50.55a Request 1-RR-4-6 for the Prairie Island, Unit 1, Fourth Ten-year Interval Inservice Inspection Program2007-05-11011 May 2007 10 CFR 50.55a Request 1-RR-4-6 for the Prairie Island, Unit 1, Fourth Ten-year Interval Inservice Inspection Program L-PI-07-023, Inservice Inspection Summary Report, Interval 4, Period 1, Outage 2, Refueling Outage Dates: 11-15-2006 to 12-15-2006, Fuel Cycle 23: 06-11-2005 to 12-15-20062007-03-14014 March 2007 Inservice Inspection Summary Report, Interval 4, Period 1, Outage 2, Refueling Outage Dates: 11-15-2006 to 12-15-2006, Fuel Cycle 23: 06-11-2005 to 12-15-2006 L-PI-06-102, Unit 2 Steam Generator Inspection Results - 15 Day Report2006-12-18018 December 2006 Unit 2 Steam Generator Inspection Results - 15 Day Report L-PI-06-096, CFR 50.55a Requests 1-RR-4-7 and 2-RR-4-7 for the Units 1 and 2 Fourth 10-Year Interval Inservice Inspection Program2006-12-14014 December 2006 CFR 50.55a Requests 1-RR-4-7 and 2-RR-4-7 for the Units 1 and 2 Fourth 10-Year Interval Inservice Inspection Program ML0627701952006-10-0202 October 2006 Notification of NRC Inspection and Request for Information L-PI-06-072, Inservice Inspection Summary Report, Interval 4, Period 1, Refueling Outage Dates: 04-28-2006 to 06-06-2006, Fuel Cycle 23: 11-23-2004 to 06-06-20062006-09-0101 September 2006 Inservice Inspection Summary Report, Interval 4, Period 1, Refueling Outage Dates: 04-28-2006 to 06-06-2006, Fuel Cycle 23: 11-23-2004 to 06-06-2006 L-PI-05-082, Request for Relief No. 21, for the Plant 3rd 10-Year Interval Inservice Inspection Program2005-09-0808 September 2005 Request for Relief No. 21, for the Plant 3rd 10-Year Interval Inservice Inspection Program L-PI-04-135, Inservice Inspection Summary Report, Interval 3, Period 3, Interval 4, Period 1 Refueling Outage Dates: April 16, 2005 - June 10, 2005, Fuel Cycle 22: October 11, 2003 - June 10, 20052005-09-0808 September 2005 Inservice Inspection Summary Report, Interval 3, Period 3, Interval 4, Period 1 Refueling Outage Dates: April 16, 2005 - June 10, 2005, Fuel Cycle 22: October 11, 2003 - June 10, 2005 L-PI-05-074, Response to Request for Additional Information Regarding the Unit 1 Lnservice Lnspection Summary Report, Interval 3, Period 3, Refueling Outage Dates: 9-10-2004 to 11-23-2004 Fuel Cycle 22..2005-08-22022 August 2005 Response to Request for Additional Information Regarding the Unit 1 Lnservice Lnspection Summary Report, Interval 3, Period 3, Refueling Outage Dates: 9-10-2004 to 11-23-2004 Fuel Cycle 22.. L-PI-05-013, Inservice Inspection Summary Report, Interval 3, Period 3, Refueling Outage Dates 09-10-04 Fuel Cycle 22: 12-7-2002 to 11-23-042005-02-22022 February 2005 Inservice Inspection Summary Report, Interval 3, Period 3, Refueling Outage Dates 09-10-04 Fuel Cycle 22: 12-7-2002 to 11-23-04 L-PI-05-012, Request for Relief No. 17, Revision 0, for the Plant 3rd 10-year Interval Inservice Inspection Program2005-02-22022 February 2005 Request for Relief No. 17, Revision 0, for the Plant 3rd 10-year Interval Inservice Inspection Program L-PI-05-002, 60-Day Report Pursuant to NRC Bulletin 2003-02 for 2004 Prairie Island Unit 1 Lower Head Penetration Inspection2005-01-24024 January 2005 60-Day Report Pursuant to NRC Bulletin 2003-02 for 2004 Prairie Island Unit 1 Lower Head Penetration Inspection L-PI-04-009, Inservice Inspection Summary Report, Interval 3, Period 3, Refueling Outage Dates: 9-13-2003 to 10-10-2003 Fuel Cycle 21: 3-3-2002 to 10-10-20032004-01-0707 January 2004 Inservice Inspection Summary Report, Interval 3, Period 3, Refueling Outage Dates: 9-13-2003 to 10-10-2003 Fuel Cycle 21: 3-3-2002 to 10-10-2003 L-PI-04-005, Request for Relief No. 16, Revision 0 for the Third 10-Year Interval Inservice Inspection Program2004-01-0707 January 2004 Request for Relief No. 16, Revision 0 for the Third 10-Year Interval Inservice Inspection Program L-PI-03-035, Relief Request to Perform a Visual Examination in Lieu of Volumetric Examination of Reactor Vessel Nozzle Inner Radius Sections Per Code Case N-648-12003-04-0303 April 2003 Relief Request to Perform a Visual Examination in Lieu of Volumetric Examination of Reactor Vessel Nozzle Inner Radius Sections Per Code Case N-648-1 L-PI-03-025, Relief Request to Use VT-1 Visual Examination in Lieu of Surface Examination of Reactor Vessel Head Closure Nuts2003-03-14014 March 2003 Relief Request to Use VT-1 Visual Examination in Lieu of Surface Examination of Reactor Vessel Head Closure Nuts ML0309003422003-03-0606 March 2003 Request for Relief No.14 for Unit 1 3rd 10-Year Interval Inservice Inspection Program L-PI-03-029, Inservice Inspection Summary Report, Interval 3, Period 3, Refueling Outage Dates:11-15-2002 to 12-6-2002 Fuel Cycle 21: 2-25-2001 to 12-6-02, Items 1-18-010 - I-19-10062003-03-0606 March 2003 Inservice Inspection Summary Report, Interval 3, Period 3, Refueling Outage Dates:11-15-2002 to 12-6-2002 Fuel Cycle 21: 2-25-2001 to 12-6-02, Items 1-18-010 - I-19-1006 2023-03-03
[Table view] Category:Letter type:L
MONTHYEARL-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-023, Baffle Former Bolts Alternate Aging Management Strategy2023-09-11011 September 2023 Baffle Former Bolts Alternate Aging Management Strategy L-PI-23-018, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT2023-07-14014 July 2023 License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions2023-06-22022 June 2023 License Amendment Request to Revise Technical Specification 3.7.8 Required Actions L-PI-23-016, 2022 10 CFR 50.46 LOCA Annual Report2023-06-14014 June 2023 2022 10 CFR 50.46 LOCA Annual Report L-PI-23-010, Annual Report of Individual Monitoring2023-04-27027 April 2023 Annual Report of Individual Monitoring L-PI-23-007, Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2023-03-28028 March 2023 Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-23-005, CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2023-03-0303 March 2023 CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) L-PI-23-001, Day Steam Generator Tube Inspection Report2023-01-30030 January 2023 Day Steam Generator Tube Inspection Report L-PI-22-047, Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report2022-12-21021 December 2022 Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report L-PI-22-020, Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2022-12-0202 December 2022 Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-22-040, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0606 October 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-037, Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts2022-09-20020 September 2022 Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts L-PI-22-032, CFR 50.46 LOCA Annual Report2022-06-16016 June 2022 CFR 50.46 LOCA Annual Report L-PI-22-033, Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles2022-06-10010 June 2022 Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles L-PI-22-003, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0707 June 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-024, Supplement to Application for License Amendment to Implement 24-Month Operating Cycle2022-03-0707 March 2022 Supplement to Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-047, Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 22021-12-0707 December 2021 Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 2 L-PI-21-045, Response to Request for Additional Information Cooling Water System License Amendment Request2021-11-0404 November 2021 Response to Request for Additional Information Cooling Water System License Amendment Request L-PI-21-029, Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.12021-10-0707 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.1 L-PI-21-006, License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions2021-10-0202 October 2021 License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions L-PI-21-032, Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island2021-09-30030 September 2021 Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island L-PI-21-016, Application for License Amendment to Implement 24-Month Operating Cycle2021-08-0606 August 2021 Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-027, 2020 10 CFR 50.46 LOCA Annual Report2021-06-28028 June 2021 2020 10 CFR 50.46 LOCA Annual Report L-PI-21-023, Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report2021-05-14014 May 2021 Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report L-PI-21-007, Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes2021-04-19019 April 2021 Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes L-PI-20-050, Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic2020-10-0707 October 2020 Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic L-PI-20-051, Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2020-09-28028 September 2020 Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-20-026, Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiativ2020-09-0101 September 2020 Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 L-PI-20-035, = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule2020-07-28028 July 2020 = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule L-PI-20-023, Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI)2020-06-10010 June 2020 Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI) L-PI-20-014, Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI2020-04-29029 April 2020 Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI L-PI-20-004, License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.132020-03-30030 March 2020 License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.13 L-PI-20-001, License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-12020-01-29029 January 2020 License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-1 L-PI-19-041, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2019-12-23023 December 2019 Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-19-031, License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-12-16016 December 2019 License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency2019-10-0707 October 2019 License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency L-PI-19-038, Submittal of Revised Pressure and Temperature Limits Report2019-09-19019 September 2019 Submittal of Revised Pressure and Temperature Limits Report L-PI-19-037, Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals2019-09-16016 September 2019 Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals L-PI-19-025, Request to Approve Site-Specific Probabilistic Risk Assessment (PRA) Model for Flowserve N-Seal Abeyance Seal and Dynamic Testing for the Prairie Island Nuclear Generating Plant (PINGP)2019-08-27027 August 2019 Request to Approve Site-Specific Probabilistic Risk Assessment (PRA) Model for Flowserve N-Seal Abeyance Seal and Dynamic Testing for the Prairie Island Nuclear Generating Plant (PINGP) L-PI-19-029, Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For...2019-08-0505 August 2019 Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For... L-PI-19-002, 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 22019-06-13013 June 2019 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 2 L-PI-19-014, Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2019-04-29029 April 2019 Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-PI-19-003, Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule for Prairie Island Nuclear Generating Plant (PINGP)2019-02-0404 February 2019 Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule for Prairie Island Nuclear Generating Plant (PINGP) L-PI-19-006, Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements2019-01-29029 January 2019 Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements L-PI-19-005, Online Reference Portal for NRC Review of License Amendment Request to Implement 10 CFR 50.692019-01-15015 January 2019 Online Reference Portal for NRC Review of License Amendment Request to Implement 10 CFR 50.69 L-PI-18-063, Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 8052018-12-0606 December 2018 Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 805 2024-01-02
[Table view] |