ML23062A511

From kanterella
Jump to navigation Jump to search
Refueling Outage Unit 1 R33 Owners Activity Report for Class 1. 2, 3 and Mc Inservice Inspections
ML23062A511
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 03/03/2023
From: Borgen T
Northern States Power Company, Minnesota, Xcel Energy
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
L-Pl-23-004
Download: ML23062A511 (1)


Text

Xcel Energy March 03, 2023 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Unit 1 Docket No. 50-282 Renewed Facility Operating License No. DPR-42 1717 Wakonade Drive Welch, MN 55089 L-Pl-23-004 10 CFR 50.55a Refueling Outage Unit 1 R33 Owner's Activity Report for Class 1. 2, 3 and MC lnservice Inspections Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM"), hereby submits the lnservice Inspection Summary report for inspections conducted prior to and during the Prairie Island Nuclear Generating Plant (PINGP) refueling outage U1 R33 that concluded on November 9, 2022.

The Enclosure to this letter contains Form OAR-1, "Owner's Activity Report" for lnservice Inspections for Class 1, 2, 3 and MC components.

Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.

--z;

Timothy P. s&(gen Plant Manager, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota Enclosure cc:

Administrator, Region Ill, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC

ENCLOSURE FORM OAR-1, OWNER'S ACTIVITY REPORT FOR INSERVICE INSPECTION, FOR CLASS 1, 2, 3 AND MC COMPONENTS 2 pages follow

Report Number FORM OAR-1 OWNER'S ACTIVITY REPORT Prairie Island Nuclear Generating Plant As required by the provisions of ASME Code Case N-532-5 1R33 Plant _ _,_

P,.,

ra'-'irc,:ie"-"ls,elae,n,,d,.,.,Ne,Ue,c,,le"'a"-r_,G,.,e,,.n.,,ec,_ra,,_te,in_,,q'-'-P-"la,,_n"-t.1'-'7'---1,.,7_W=a,,,k,,,o,_,ne,a,,de

"----'D=riv,,,e'----=E"a""st,.._, _,W-"e,,,l,,c,.,h"'. M

"'"-'in-"n-"e"'s"'o"ta.,,_,5"'5"'0"'8"9 ___ _

UnnNo. __ ---

Commercial service date __ 12"-/16"/_,_19,,_7"3'-----

R e fueling outage no. __ 1R3,.,3'--

Current inspection interval 5th ISi Inspection Interval for class 1. 2. and 3. 3 IWE Inspection Interval for class MC Current inspection period 3 ISi Inspection Period for class 1, 2. and 3. 2"' IWE Inspection period for class MC Edition and Addenda of Section XI applicable to the inspection plans 2007 Edition - 2008 Add enda for class 1 2 and 3.

2013 Edition for class MC __ _

Date and revision of inspection plans __ _c4cc/"26,,,/_,, 2.,2,R,.,eccv. -"13,,_,,fo,,_r_,c,sla,ss,,s_,1-'--"'2'--'a"'n.,,dec3sc.2"'/.,,2"'4/ce2e,0_,_R.,,e,.,v. _,_12*foe,r_,c,,,la.,s,,,s_,_M"-C Edition and Addenda of Section XI applicable to repair/replacem ent activities. if different than the inspection plans Same as Inspection Plan for class 1.2. and 3. 2007 Edition - 2008 Addenda for class MC Code Cases us ed for insp ection and evaluation:

N-532-5 N-716-1 N-729-6 N-892 CERTIFICATE OF CONFORMANCE l certify that (a) the statements made in this Owner's Activity Report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI: and (c) the repair/replacement activities and evaluations supporting the completion of refueling outage number 1 R33 conform to the requirements of Section XI.

Date _.=

2..'°"/ 3 /-=2.c.co_* Z..='---

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

 D3, 2.o23 Enclosure Page 1

TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category Item Description Evaluation Description and Item Number B-P, B15.10 SP 1392 UNIT 1 INSULATED RC-2-1 Loop A RTD Outlet valve, tsp dry, BOLTED CONNECTION white, boric acid at body to bonnet. Accepted INSPECTION by evaluation QIM 501000067539.

B-P, B15.10 SP 1392 UNIT 1 INSULATED 135-011 Excess Ltdn Hx, 1/4 tsp dry, white BOLTED CONNECTION boric acid at bottom flange bolted connection.

INSPECTION Accepted by evaluation QIM 501000067539.

B-P, B15.10 SP 1392 UNIT 1 INSULATED MV-32165 RCS LP A Hot Leg RHR Supply BOLTED CONNECTION MV, trace, white, boric acid at body to bonnet.

INSPECTION Accepted by evaluation QIM 501000067539.

B-P, B15.10 SP 1392 UNIT 1 INSULATED 134-011 11 SG Manway, Hot leg bolt 37 trace BOLTED CONNECTION white boric acid. Cold leg bolt 16 trace dry INSPECTION brown boric acid, bolt 17 trace dry white boric acid. Accepted by evaluation QIM 501000067539.

B-P, B15.10 SP 1392 UNIT 1 INSULATED 134-012 12 SG Manway, Hot leg Bolt 24 and BOLTED CONNECTION 31, trace white boric acid. SG12 Cold leg Bolt INSPECTION 17 trace dry white boric acid. Accepted by evaluation QIM 501000067539.

C-H, C7.10 SP 1392 UNIT 1 INSULATED MV-32083 BAST Supply to SI Pumps lsol BOLTED CONNECTION MV, 1/2 cup dry, white, boric acid indication at INSPECTION body to bonnet. Accepted by evaluation QIM 501000067539.

C-H, C7.10 SP 1168.3 RHR PIT PRESSURE RH-1-4 11 RHR Hx Tube lnlt valve, tbsp dry TEST UNIT 1 white boric acid at body to bonnet. Accepted by evaluation QIM 501000067848.

C-H, C7.10 SP 1168.3 RHR PIT PRESSURE RH-2-6 11 RHR Hx Outl Xtie valve, 4 tbsp dry TEST - UNIT 1 white boric acid at body to bonnet. Accepted by evaluation QIM 501000067848.

C-H, C7.10 SP 1168.3 RHR PIT PRESSURE RH-135-3 11 RHR Pmp Suet Press Test Root TEST - UNIT 1 lsol valve, tbsp dry white boric acid at body to bonnet. Accepted by evaluation QIM 501000067848.

C-H, C7.10 SP 1168.3 RHR PIT PRESSURE 12-RH-5B 12 RHR Sue Fig, tbsp dry TEST - UNIT 1 white/brown boric acid bottom of flange.

Accepted by evaluation QIM 501000067848.

C-H, C7.10 SP 1168.3 RHR PIT PRESSURE RH-2-5 12 RHR Hx Outl Xtie valve, tbsp dry TEST - UNIT 1 white boric acid at body to bonnet. Accepted by evaluation QIM 501000067848.

C-H, C7.10 SP 1168.14 CONTAINMENT CS-133-6 11 CS Pmp Disch Test Root lsol SPRAY SYSTEM PRESSURE TEST valve, less than tbsp dry, white, boric acid at body to bonnet. Accepted by evaluation QIM 501000062155.

TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE

' ' Code, Plant IDi#

l)./riptl<>n pf Work Cprnplet0(I Date' /

R 1I i,ff1;,;";

  • Compted
  • None Enclosure Page 2