| | issue date = 06/20/2017 | | | issue date = 06/20/2017 |
| | title = Submittal of SL2-23 Outage, Owner'S Activity Report, Form OAR-1 | | | title = Submittal of SL2-23 Outage, Owner'S Activity Report, Form OAR-1 |
| | author name = Snyder M J | | | author name = Snyder M |
| | author affiliation = Florida Power & Light Co | | | author affiliation = Florida Power & Light Co |
| | addressee name = | | | addressee name = |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20.555 Re: St. Lucie Unit 2 Docket No. 50-389 In-Service Inspection Program JUN 2 0 2017 ISI Fourth Interval -First Period -SL2-23 Refueling Outage Owner's Activity Report (OAR-1) L-2017-117 10 CFR 50.36 10 CFR 50.55a Enclosed is the St. Lucie Unit 2, SL2-23 outage, Owner's Activity Report, Form OAR-1. The OAR-1 report is prepared, certified, and submitted upon completion of each refueling outage. The SL2-23 refueling outage ended on March 24, 2017. Please contact Ken Frehafer at 772-467-77 48 if there are any questions about this submittal. | | {{#Wiki_filter:JUN 2 0 2017 L-2017-117 10 CFR 50.36 10 CFR 50.55a U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20.555 Re: St. Lucie Unit 2 Docket No. 50-389 In-Service Inspection Program ISI Fourth Interval - First Period - SL2-23 Refueling Outage Owner's Activity Report (OAR-1) |
| Sincerely, Michael J Snyder Licensing Manager St. Lucie Plant MJS/KWF Attachment cc: NRC Region II Administrator St. Lucie Plant NRC Senior Resident Inspector Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957 L-2017-117 Attachment Page 1of5 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Plant | | Enclosed is the St. Lucie Unit 2, SL2-23 outage, Owner's Activity Report, Form OAR-1. |
| * St Lucie Nuclear Power Plant Unit 2 6501. South Ocean Drive Jensen Beach, Florida 34957 Commercial Service Date: August 8, 1983 Refueling Outage No.: SL2-23 Current Inspection Interval: | | The OAR-1 report is prepared, certified, and submitted upon completion of each refueling outage. The SL2-23 refueling outage ended on March 24, 2017. |
| ISi-Fourth, IWE-Secohd Current Inspection Period:-!Sl-flrst, IWE.:.Third Edition and Addenda of Section XI applicable to the inspection plans: ISi -2007 with Addenda through 2008 !WE -2001 Edition with Addenda through 2003 Date and Rev.lsion of inspection plans: ISi-January 30, 2017, Revision 2, 17, 201:5, .Revision 2 Edition and Addenda of Section XI applicable to. repairs and rep!acern,ehts, if different than the inspection plan: Sarne Code Cases Used: N-532-5. N-586-1 N-649 N-706-'1 N-722-1 N-751 N-729-1 & N-770-'.1. | | Please contact Ken Frehafer at 772-467-77 48 if there are any questions about this submittal. |
| CERTIFICATE OF CONFORMANCE I certify that. (a) the statements made in this report are correct; (b) the examinations and tests meet.the Inspection plan as requ.ired by the ASME Code, Section XI; and (c) the repairlreplacemenf activities and .evaluations supporting the completiop ofSL2..:23 | | Sincerely, Michael J Snyder Licensing Manager St. Lucie Plant MJS/KWF Attachment cc: NRC Region II Administrator St. Lucie Plant NRC Senior Resident Inspector Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957 |
| '?)nfbrm to the requirements of Section XL . | | |
| J,1 / fl'-t' :R. i). bJ 1,i Pk.ct Rw;r.i-..-v.l | | L-2017-117 Attachment Page 1of5 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Nurrib~r: ISl-P$l,-2~20'!7 Plant |
| 'i 7 A.Jy Date f.v * / s;. I=;-Owner or.Owner's Designee, Title . -CERTIFICATE OF INSERVICE lNSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Vessel Inspectors and the State or Province of Georgia and employed by the Hartford Steam Boiler Inspection and Insurance Company*of | | * St Lucie Nuclear Power Plant Unit 2 6501. South Ocean Drive Jensen Beach, Florida 34957 Commercial Service Date: August 8, 1983 Refueling Outage No.: SL2-23 Current Inspection Interval: ISi-Fourth, IWE-Secohd Current Inspection Period:-!Sl-flrst, IWE.:.Third Edition and Addenda of Section XI applicable to the inspection plans: ISi - 2007 with Addenda through 2008 |
| *Connecticut have .inspected the items described in this Owner's . .Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance With the requirements ofSection XL By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concemlng the repair/replacement activities and evaluation described in *this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for ariy person<1I injury or property damage or loss ofany kind arising from or conn.ected | | !WE - 2001 Edition with Addenda through 2003 Date and Rev.lsion of inspection plans: ISi-January 30, 2017, Revision 2, IWE~July 17, 201:5, .Revision 2 Edition and Addenda of Section XI applicable to. repairs and rep!acern,ehts, if different than the inspection plan: Sarne Code Cases Used: N-532-5. N-586-1 N-649 N-706-'1 N-722-1 N-751 N-729-1 & N-770-'.1. |
| \Ni t | | CERTIFICATE OF CONFORMANCE I certify that. (a) the statements made in this report are correct; (b) the examinations and tests meet.the Inspection plan as requ.ired by the ASME Code, Section XI; and (c) the repairlreplacemenf activities and .evaluations supporting the completiop ofSL2..:23 '?)nfbrm to the requirements of Section XL . |
| | Signe~ J,1 /~ fl'-t' :R. i). bJ 1,i Pk.ct Rw;r.i-..-v.l 'i A.Jy Date f.v * /s;. I=;- |
| | Owner or.Owner's Designee, Title 7. - |
| | CERTIFICATE OF INSERVICE lNSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pres~;ure Vessel Inspectors and the State or Province of Georgia and employed by the Hartford Steam Boiler Inspection and Insurance Company*of |
| | *Connecticut have .inspected the items described in this Owner's ..Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance With the requirements ofSection XL By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concemlng the repair/replacement activities and evaluation described in *this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for ariy person<1I injury or property damage or loss ofany kind arising from I:\'. |
| | or conn.ected \Ni t |
| * s * | | * s * |
| * I: \'. | | * L-2017-117 Attachment Page 2 of 5 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR REVELANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE PSL 2 ..., JS!. 4TH Interval, tst Period - Outcige 23 |
| L-2017-117 Attachment Page 2 of 5 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR REVELANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE E:i..>amlnation Category and *item Number None PSL 2 ..., JS!. 4 TH Interval, tst Period -Outcige 23 . PSL 2 -!WE 21)d Interval, Period -Outage 23 Item Description Evaluation bescripticm None None i I I "! I I I I *I l I l l I I I t I I f 1* I I i I f: u n ' li E *f: .. ! ' ;{ I f t g tt !; fi f i :;: t I | | . PSL 2 - !WE 21)d Interval, 3~d Period - Outage 23 i II I |
| * l I D i R *" i a '
| | I E:i..>amlnation I I |
| * I ! ii" ' t i f' I r J *1 t* l L-2017-117 Attachment FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 2 ISi 4TH Interval, 1st Period -Outage 23 PSL 2 -IWE 2nd Interval, 3rd Period -Outage 23 Code Item Description Date Repair./ Class Description ofV\!c>rk Completed Replacement Plan Number 3 HCV-14-88 REPLACE VALVE AND FLANGE 5/17/2017 SL2-13055
| | *I Category and Item Description Evaluation bescripticm |
| * | | *item Number l |
| * FASTENERS WELD BUILD UP OF PUMP ! .INTERNALS TO OBTAIN PROPER 2 LPSI PP 2B FJTFOR NEW STUFFING BOX AND 5/24/2017 SL2-13064 INSTALL COUPLING RETROFIT KIT PER EC275737 1 SE-02-3 REPLACEMENT OFVALVE AND 6113/2017 SL2-13069 ADJACENT Pl PING BY WELDING 3 CW-10 WELD BUILDUP ON FLANGES TO 6/14/2017 SL2-15011 RESTORE THICKNESS REPAIR THROUGH-WALL LEAK BY 3 CW-72 WELDING UTILIZING CODE CASE N-11/11/20'.15 SL2*'15065 661-2 REPLACE ELBOW FASTENERS 3 CW-72 FOLLOWING INTERNAL 5/312017 Sl2-15065 | | l l |
| * INSPl3CTION | | I None None None I It ~ |
| .3 HCV-21-7A REPLACE VALVE BY FLANGED 5/4/2017 Sl2-15066 . CONNECTION 2 V2326 REPLACE REL! EF VAL VE 5/4/2017 Sl2-16001 INTERNALS PERFORM WELD BUILDUP OF 3 HCV-21-78 VALVE AND PIPE FLANGE 5/24/2017 SL2-16012 SURFACES *3 V21208 REPLACE VALVE FLANGE 5/3/2017 SL2-16013 FASTENERS 1 *sG2B REPLACE SG 28 PRIMARY 6/13/2017 SLZ-16014 MANWAY *STUD 1 SG2B MACHINE REPLACEMENT STUD 6/13/2017 Sl2-'.16014 PER VENDOR RECOMMENDATIONS 1 PZR REPLACE PRESSURIZER MANWAY 6/15/2017 SL2-16015 STUDS/NUTS | | III f |
| ! INSTALL SEAL WELD FOLLOWING 2 V3495 INTERNAL VALVE INSPECTION 5/25/2017 SL2-16016 | | 1* |
| * REPLACE MAIN STEAM SAFETY I 2 V8202 RELIEF VALVE FASTENERS 5/3112017 SL2-16017 3 V2115. REPLACE RELIEF VALVE FLANGE 5/1712017 SL2-16019 FASTENERS 2 V2324 | | II i I |
| * REPLACE RELfEF VALVE : INTERNALS OF REMOVED VALVE 5/3112017 SL2-16.020 REPLACE RELIEF VALVE 2 V2325 INTERNALS 5/3/2017 SL2-16021 L-2017-117 Attachment FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2 Code Date Class Item Description Description of Work Completed 1 V3527 REPLACE CHECK VALVE 6/13/2017 FASTENERS 2 V8203 REPLACE RELIEF VALVE INTERNALS AND FASTENERS FUEL POOL REPLACE FLANGE FASTENERS | | ~ |
| .. i 3 PP2B 5/4/2017 2 FCV-25-26 REPLACEVALVEFASTENERS
| | u f: |
| .. 6/112017 1 S!G2A INSTALL TU!3E PLUGS IN 2A SIG 5/18/2017
| | -~ n |
| : 2. V8209 REPLACE REUEF VALVE AND 5/4/2017 FASTENERS ATTACH REVISED NAMEPLATE | | ..E!' |
| -.MC CNTMNTVSL FOLLOWING RE-RA TJNG OF 5/4/2017 CONTAINMENT VESSEL EXTERNAL PRESSURE REPLACE RELIEF VAf..VE 2 V8212 INTERNALS AND FASTENERS 5/31/2017 2 V8216 REPLACE RELIEF VALVE 5/3112017
| | li |
| ' INTE:RNALS AND FASTENERS 3 CW-105 PREFABRICATE REPLACEMENT 5124/2017 PIPE ELBOW SPOOL BY WELDING I REPLACE PIPE ELBOW BY 3 CW-105 WELDING AND FLANGED 5/25/2017 CONNECTION REPLACE GODE SAFETY RELIEF 1 V1200 VALVE INTERNALS AND INLET 5/31/2017 FASTENERS 1 V1201 REPLACE GODE SAFETY RELIEF 5/3112017 VALVE INTERNALS . . ... 3 HCV-14-10 REPLACE VALVE AND FASTENERS 5/4/2017 2 V3107 REPLACE VALVE FASTENERS I :Sl1/2017 3 HCV-25..:.3 lNSTALL FLANGES BY WELDING 5117/2017 AND BOLTED CONNECTION 3 HCV-25-4 INSTALL FLANGES BY WELDING 5/24/2017 AND BOLTED *CONNECTION REPLACE PIPE SPOOLS CW-72-4 3 CW-72 AND CW-72-5 BY WELDING AND 5/25/2017 BOLTED CONNECTIONS 3 V08163 | | *f: |
| | ~ |
| | ~ ;{' |
| | I t f |
| | g tt fi !;~ |
| | ~ |
| | f :;: |
| | i t |
| | Il I |
| | D i |
| | R i |
| | a |
| | ~ |
| | ~! Iii" |
| | ~' |
| | ~; |
| | tf' i ~: |
| | I r J |
| | *1 |
| | *.~ |
| | t* |
| | l |
| | |
| | L-2017-117 Attachment FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 2 ~ ISi 4TH Interval, 1st Period - Outage 23 PSL 2 - IWE 2nd Interval, 3rd Period - Outage 23 Repair./ |
| | Code Date Item Description Description ofV\!c>rk Replacement Class Completed Plan Number REPLACE VALVE AND FLANGE 3 HCV-14-88 5/17/2017 SL2-13055 * |
| | * FASTENERS WELD BUILD UP OF PUMP ! |
| | .INTERNALS TO OBTAIN PROPER 2 LPSI PP 2B FJTFOR NEW STUFFING BOX AND 5/24/2017 SL2-13064 INSTALL COUPLING RETROFIT KIT PER EC275737 REPLACEMENT OFVALVE AND 1 SE-02-3 ADJACENT Pl PING BY WELDING 6113/2017 SL2-13069 WELD BUILDUP ON FLANGES TO 3 CW-10 6/14/2017 SL2-15011 RESTORE THICKNESS REPAIR THROUGH-WALL LEAK BY 3 CW-72 WELDING UTILIZING CODE CASE N- 11/11/20'.15 SL2*'15065 661-2 REPLACE ELBOW FASTENERS 3 CW-72 FOLLOWING INTERNAL 5/312017 Sl2-15065 |
| | * INSPl3CTION |
| | .3 REPLACE VALVE BY FLANGED HCV-21-7A 5/4/2017 Sl2-15066 |
| | . CONNECTION REPLACE REL! EF VALVE 2 V2326 5/4/2017 Sl2-16001 INTERNALS PERFORM WELD BUILDUP OF 3 HCV-21-78 VALVE AND PIPE FLANGE 5/24/2017 SL2-16012 SURFACES |
| | *3 REPLACE VALVE FLANGE V21208 5/3/2017 SL2-16013 FASTENERS REPLACE SG 28 PRIMARY 1 *sG2B 6/13/2017 SLZ-16014 MANWAY *STUD MACHINE REPLACEMENT STUD 1 SG2B 6/13/2017 Sl2-'.16014 PER VENDOR RECOMMENDATIONS REPLACE PRESSURIZER MANWAY 1 PZR 6/15/2017 SL2-16015 STUDS/NUTS |
| | ! INSTALL SEAL WELD FOLLOWING 2 V3495 5/25/2017 SL2-16016 INTERNAL VALVE INSPECTION I |
| | * REPLACE MAIN STEAM SAFETY 2 V8202 5/3112017 SL2-16017 RELIEF VALVE FASTENERS REPLACE RELIEF VALVE FLANGE 3 V2115. 5/1712017 SL2-16019 FASTENERS |
| | * REPLACE RELfEF VALVE 2 V2324 5/3112017 SL2-16.020 |
| | : INTERNALS OF REMOVED VALVE REPLACE RELIEF VALVE 2 V2325 INTERNALS 5/3/2017 SL2-16021 |
| | |
| | L-2017-117 Attachment Page 4 of s-FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2 Code Repair I Item Description Description of Work Date Class Completed Replacement Plan Number REPLACE CHECK VALVE 1 V3527 6/13/2017 Sl2-16022 FASTENERS REPLACE RELIEF VALVE 2 V8203 51~1/2017 SL2-16023 INTERNALS AND FASTENERS |
| | ..i FUEL POOL REPLACE FLANGE FASTENERS 3 5/4/2017 SL2-16024 PP2B 2 FCV-25-26 REPLACEVALVEFASTENERS 6/112017 II SL2-16025 1 S!G2A INSTALL TU!3E PLUGS IN 2A SIG 5/18/2017 SL2-16027 REPLACE REUEF VALVE AND |
| | : 2. V8209 5/4/2017 SL2-16029 FASTENERS |
| | - ATTACH REVISED NAMEPLATE FOLLOWING RE-RATJNG OF |
| | .MC CNTMNTVSL 5/4/2017 SL2-16030 CONTAINMENT VESSEL EXTERNAL PRESSURE REPLACE RELIEF VAf..VE 2 V8212 INTERNALS AND FASTENERS 5/31/2017 SL2*16031 REPLACE RELIEF VALVE 2 V8216 5/3112017 SL2-16032 |
| | ' INTE:RNALS AND FASTENERS PREFABRICATE REPLACEMENT 3 CW-105 5124/2017 SL2-16035 PIPE ELBOW SPOOL BY WELDING I REPLACE PIPE ELBOW BY 3 CW-105 WELDING AND FLANGED 5/25/2017 SL2-16035 CONNECTION REPLACE GODE SAFETY RELIEF 1 V1200 VALVE INTERNALS AND INLET 5/31/2017 SL2-16036 FASTENERS REPLACE GODE SAFETY RELIEF 1 V1201 VALVE INTERNALS . .... 5/3112017 SL2-16037 3 HCV-14-10 REPLACE VALVE AND FASTENERS 5/4/2017 SL2-t6041 REPLACE VALVE FASTENERS I 2 V3107 :Sl1/2017 Sl2-16042 lNSTALL FLANGES BY WELDING 3 HCV-25..:.3 5117/2017 J SL2~17001 AND BOLTED CONNECTION I 3 HCV-25-4 INSTALL FLANGES BY WELDING 5/24/2017 l SL2-17001 AND BOLTED *CONNECTION I REPLACE PIPE SPOOLS CW-72-4 3 CW-72 AND CW-72-5 BY WELDING AND 5/25/2017 SL2-17002 BOLTED CONNECTIONS |
| * TACKWELDSEATRINGTOVALVE | | * TACKWELDSEATRINGTOVALVE |
| * 5/3/2017 BODY 1 V3247 REPLACE VALVE FASTENERS 5f31/2017 1 V3526 REPLACE VALVE DISC AND 5131/2017 FASTENERS 3 . REPLACE SPRING CAN SUPPORT 6115/2017 BY WELDING 2 CS-2 REPLACE TWO SPRING CAN i 5/i8/2017 SUPPORTS BYWELDING I I I J I l I Page 4 of s-Repair I Replacement Plan Number Sl2-16022 SL2-16023 SL2-16024 SL2-16025 SL2-16027 SL2-16029 SL2-16030 SL2*16031 SL2-16032 SL2-16035 SL2-16035 SL2-16036 SL2-16037 SL2-t6041 Sl2-16042 SL2-17001 SL2-17002 SL2-17003 SL2-17004 SL2-17006 SL2-17011 SL2-17012 I I ! I I I I I i i ! .. | | * 3 1 |
| L-2017-117 Attachment FORM OAR-1 OWNER,S ACTIVITY REPORT TABLE2 Code I Date Cf ass item Description Description of Work Completed REPLACE Pf PE SECTION BY 1 CH-147 WELDING FOR LICENSE RENEWAL 5/18/20'[7 DESTRUCTIVE TESTING. REPLACE SOLENOID VALVE SEAL. 2 SE-03-2A WELD FOLLOWING INTERNAL 5/3/2017 VALVE INSPECTION 1 SE-02..:1 REPLACE VALVE AND ADJACENT 6/1/2017 PIPING BY WELDJNG REMOVE AND :RE-INSTALL | | V08163 V3247 BODY REPLACE VALVE FASTENERS 5/3/2017 5f31/2017 SL2-17003 SL2-17004 II REPLACE VALVE DISC AND ! |
| .. 2 CC-2080-25 SECTION OF PIPE SUPPORT BY: 5{18/2017 WELDING REMOVE AND RE-INSTALL 2 CC-2080-30 SECTION OF PIPE SUPPORT BY 5/17/2017 WELDING 2. CC-2080-33 REPLACE SECTION OF PIPE. 5/18/2017. | | 1 3 |
| SUPPORT BY WELDING 3 SS-21-18 REPLACE STRAINER FASTENERS 5/4/2017 1 l 028 1 REPLACE SNUBBER 028 5131/2017 Page 5 of 5 Repair I Replacement Plan Number SL2-*F019 SL2-17023 SL2-17026 SL2-17027 SL.2-17027 SL2-17027 SL2:..1JQ29 SL2-17031 I ;, t I I I I}} | | V3526 MV-08~3 FASTENERS |
| | . REPLACE SPRING CAN SUPPORT 5131/2017 6115/2017 SL2-17006 SL2-17011 I |
| | 2 CS-2 BY WELDING REPLACE TWO SPRING CAN i 5/i8/2017 I |
| | I SL2-17012 SUPPORTS BYWELDING I I |
| | I i |
| | i |
| | |
| | L-2017-117 Attachment Page 5 of 5 FORM OAR-1 OWNER,S ACTIVITY REPORT TABLE2 Code item Description I Description of Work Date Repair I Replacement Cfass Completed Plan Number REPLACE Pf PE SECTION BY 1 CH-147 WELDING FOR LICENSE RENEWAL 5/18/20'[7 SL2-*F019 DESTRUCTIVE TESTING. |
| | REPLACE SOLENOID VALVE SEAL. |
| | 2 SE-03-2A WELD FOLLOWING INTERNAL 5/3/2017 SL2-17023 VALVE INSPECTION REPLACE VALVE AND ADJACENT 1 SE-02..:1 PIPING BY WELDJNG 6/1/2017 SL2-17026 REMOVE AND :RE-INSTALL .. |
| | 2 CC-2080-25 SECTION OF PIPE SUPPORT BY: 5{18/2017 SL2-17027 WELDING REMOVE AND RE-INSTALL 2 CC-2080-30 SECTION OF PIPE SUPPORT BY 5/17/2017 SL.2-17027 WELDING REPLACE SECTION OF PIPE. |
| | : 2. CC-2080-33 5/18/2017. SL2-17027 SUPPORT BY WELDING SS-21-18 REPLACE STRAINER FASTENERS SL2:..1JQ29 3 5/4/2017 REPLACE SNUBBER 028 1 028 5131/2017 SL2-17031 l 1 I t I |
| | I I |
| | I}} |
|
---|
Category:Letter type:L
MONTHYEARL-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report L-2023-041, Annual Radiological Environmental Operating Report for Calendar Year 20222023-04-0404 April 2023 Annual Radiological Environmental Operating Report for Calendar Year 2022 L-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes 2024-08-07
[Table view] Category:Report
MONTHYEARL-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report ML22227A0532022-08-15015 August 2022 Biological Opinion for the Continued Operation of St. Lucie Nuclear Power Plant ML22124A0112022-04-30030 April 2022 Scoping Summary Report - Final L-2022-046, Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal2022-04-13013 April 2022 Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal L-2022-015, Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal Weld - RAI2022-01-14014 January 2022 Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal Weld - RAI L-2022-011, Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal Weld2022-01-12012 January 2022 Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal Weld ML22010A0942022-01-0404 January 2022 Trp 29 St. Lucie SLRA - Tank Breakout L-2021-178, Report of 10 CFR 50.59 Plant Changes2021-11-0808 November 2021 Report of 10 CFR 50.59 Plant Changes L-2021-142, Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 20212021-08-0303 August 2021 Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021 ML19252A4002019-09-0909 September 2019 FPL to NRC, Notification of Smalltooth Sawfish Capture at St. Lucie L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds2019-03-19019 March 2019 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds ML18096B3952018-04-0606 April 2018 Exhibit III Estimate of Construction Costs and Exhibit IV Technical Qualifications of Contractors ML18088B1952018-03-29029 March 2018 Hutchinson Island Plant Units 1 and 2 - Chapter 9, Auxiliary Systems and Chapter 10, Steam and Power Conversion System ML18088B1942018-03-29029 March 2018 Hutchinson Island Plant Units 1 and 2 - Chapter 11, Radioactive Waste Management System, Chapter 12, Radiation Protection, and Chapter 13, Conduct of Operations ML18088A0942018-03-29029 March 2018 Unit II Plants ECCS Performance Results L-2017-173, Environmental Protection Plan Report, Unusual or Important Environmental Event - Turtle Mortality - 09/11/2017 Event2017-09-28028 September 2017 Environmental Protection Plan Report, Unusual or Important Environmental Event - Turtle Mortality - 09/11/2017 Event L-2018-081, Kld Engineering, Pc - 2017 Population Update Analysis2017-09-20020 September 2017 Kld Engineering, Pc - 2017 Population Update Analysis L-2017-117, Submittal of SL2-23 Outage, Owner'S Activity Report, Form OAR-12017-06-20020 June 2017 Submittal of SL2-23 Outage, Owner'S Activity Report, Form OAR-1 L-2018-015, Plan of Study 316(b) Implementation2017-04-28028 April 2017 Plan of Study 316(b) Implementation L-2017-015, PWROG-15105-NP PA-MSC-1288 PWR Rv Internals Cold-Work Assessment, Materials Committee.2016-04-30030 April 2016 PWROG-15105-NP PA-MSC-1288 PWR Rv Internals Cold-Work Assessment, Materials Committee. ML16084A6162016-03-24024 March 2016 Submittal of Biological Opinion for the Continued Operation of St. Lucie Nuclear Power Plant, Units 1 and 2 in St. Lucie County, Florida ML16063A0072016-02-26026 February 2016 Participation in Additional Work Under the Support for Applicant Action Items 1, 2, and 7 from the Final Safety Evaluation on MRP-227, Revision 0 PA-MSC-0983 R2 Cafeteria Task 8 and Acceptance Criteria for Measurement Of.. ML15352A0532016-01-0707 January 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Revaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights L-2015-297, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan2015-12-10010 December 2015 Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan L-2015-300, ANP-3352NP, Revision 1, Transition License Amendment Request, Technical Report.2015-11-30030 November 2015 ANP-3352NP, Revision 1, Transition License Amendment Request, Technical Report. ML15314A1602015-10-29029 October 2015 St. Lucie, Units 1 and 2 - License Renewal Commitment, Submittal of Pressurizer Surge Line Welds Inspection Program L-2015-221, Report of 10 CFR 50.59 Plant Changes2015-10-16016 October 2015 Report of 10 CFR 50.59 Plant Changes ML15240A1542015-09-0808 September 2015 Staff Observations of Sump Strainer Head Loss Testing at Alden Laboratory for Generic Safety Issue 191 L-2015-206, ANP-3428NP, Revision 0, St. Lucie Unit 2 Fuel Transition: Response to SNPB-RAI-1, Attachment 4 to L-2015-2062015-07-31031 July 2015 ANP-3428NP, Revision 0, St. Lucie Unit 2 Fuel Transition: Response to SNPB-RAI-1, Attachment 4 to L-2015-206 L-2015-177, Fuel Transition Small Break LOCA Summary Report, ANP-3345NP, Revision 12015-06-30030 June 2015 Fuel Transition Small Break LOCA Summary Report, ANP-3345NP, Revision 1 L-2015-143, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-05-14014 May 2015 Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events L-2015-272, 1301103.401, Revision 0, Flaw Tolerance Evaluation of St. Lucie Surge Line Welds Using ASME Code Section XI, Appendix L, May 20152015-05-0808 May 2015 1301103.401, Revision 0, Flaw Tolerance Evaluation of St. Lucie Surge Line Welds Using ASME Code Section XI, Appendix L, May 2015 L-2016-052, TN-5696-00-02, Revision 0, Technical Note Assessment of Laboratory PWSCC Crack Growth Rate Data Compiled for Alloys 690, 52, and 152 with Regard to Factors of Improvement (Foi) Versus Alloys 600 and 182.2015-03-31031 March 2015 TN-5696-00-02, Revision 0, Technical Note Assessment of Laboratory PWSCC Crack Growth Rate Data Compiled for Alloys 690, 52, and 152 with Regard to Factors of Improvement (Foi) Versus Alloys 600 and 182. L-2015-091, ANP-3396NP, Revision 0, Fuel Transition Supplemental Information to Support the LAR2015-03-31031 March 2015 ANP-3396NP, Revision 0, Fuel Transition Supplemental Information to Support the LAR L-2015-093, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report2015-03-24024 March 2015 Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report L-2015-048, St. Lucie, Units 1 and 2 - Submittal of Revision 0 to FPL-072-PR-002, Flooding Hazards Reevaluation Report2015-03-10010 March 2015 St. Lucie, Units 1 and 2 - Submittal of Revision 0 to FPL-072-PR-002, Flooding Hazards Reevaluation Report ML15083A2642015-03-10010 March 2015 St. Lucie, Units 1 and 2 - Submittal of Revision 0 to FPL-072-PR-002, Flooding Hazards Reevaluation Report L-2015-048, to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Cover Page to Page 1092015-02-0606 February 2015 to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Cover Page to Page 109 L-2015-048, to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Table 2-1 Through Figure 4-92015-02-0606 February 2015 to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Table 2-1 Through Figure 4-9 ML15083A2662015-02-0606 February 2015 to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Figure 4-10 Through the End L-2015-048, to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Figure 4-10 Through the End2015-02-0606 February 2015 to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Figure 4-10 Through the End ML15083A2652015-02-0606 February 2015 to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Table 2-1 Through Figure 4-9 L-2014-366, ANP-3352NP, Revision 0, St. Luice, Unit 2, Fuel Transition License Amendment Request, Technical Report2014-12-31031 December 2014 ANP-3352NP, Revision 0, St. Luice, Unit 2, Fuel Transition License Amendment Request, Technical Report ML14338A5542014-12-0404 December 2014 NRC-2013- TN2986-NRC 2014 St. Lucie ML14338A5552014-12-0404 December 2014 NRC-2013-TN3079-NRC 2014 St. Lucie License Renewal L-2014-125, Report of 10 CFR 50.59 Plant Changes2014-05-0606 May 2014 Report of 10 CFR 50.59 Plant Changes 2024-07-29
[Table view] Category:Miscellaneous
MONTHYEARL-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report ML22227A0532022-08-15015 August 2022 Biological Opinion for the Continued Operation of St. Lucie Nuclear Power Plant ML22124A0112022-04-30030 April 2022 Scoping Summary Report - Final ML22010A0942022-01-0404 January 2022 Trp 29 St. Lucie SLRA - Tank Breakout L-2021-178, Report of 10 CFR 50.59 Plant Changes2021-11-0808 November 2021 Report of 10 CFR 50.59 Plant Changes ML19252A4002019-09-0909 September 2019 FPL to NRC, Notification of Smalltooth Sawfish Capture at St. Lucie L-2017-173, Environmental Protection Plan Report, Unusual or Important Environmental Event - Turtle Mortality - 09/11/2017 Event2017-09-28028 September 2017 Environmental Protection Plan Report, Unusual or Important Environmental Event - Turtle Mortality - 09/11/2017 Event L-2017-117, Submittal of SL2-23 Outage, Owner'S Activity Report, Form OAR-12017-06-20020 June 2017 Submittal of SL2-23 Outage, Owner'S Activity Report, Form OAR-1 ML15352A0532016-01-0707 January 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Revaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights L-2015-297, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan2015-12-10010 December 2015 Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan ML15314A1602015-10-29029 October 2015 St. Lucie, Units 1 and 2 - License Renewal Commitment, Submittal of Pressurizer Surge Line Welds Inspection Program L-2015-221, Report of 10 CFR 50.59 Plant Changes2015-10-16016 October 2015 Report of 10 CFR 50.59 Plant Changes ML15240A1542015-09-0808 September 2015 Staff Observations of Sump Strainer Head Loss Testing at Alden Laboratory for Generic Safety Issue 191 L-2015-143, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-05-14014 May 2015 Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML15083A2642015-03-10010 March 2015 St. Lucie, Units 1 and 2 - Submittal of Revision 0 to FPL-072-PR-002, Flooding Hazards Reevaluation Report L-2015-048, St. Lucie, Units 1 and 2 - Submittal of Revision 0 to FPL-072-PR-002, Flooding Hazards Reevaluation Report2015-03-10010 March 2015 St. Lucie, Units 1 and 2 - Submittal of Revision 0 to FPL-072-PR-002, Flooding Hazards Reevaluation Report ML14338A5552014-12-0404 December 2014 NRC-2013-TN3079-NRC 2014 St. Lucie License Renewal ML14338A5542014-12-0404 December 2014 NRC-2013- TN2986-NRC 2014 St. Lucie L-2014-125, Report of 10 CFR 50.59 Plant Changes2014-05-0606 May 2014 Report of 10 CFR 50.59 Plant Changes ML13360A2022013-12-12012 December 2013 EPA Echo Report Martin County, Fl L-2013-193, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Acceptance Review Clarification Response2013-06-14014 June 2013 Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Acceptance Review Clarification Response L-2013-175, Report of 10 CFR 50.59 Plant Changes2013-05-23023 May 2013 Report of 10 CFR 50.59 Plant Changes L-2012-437, Standardization of Senior Reactor Operator Fuel Handling Duties2012-12-27027 December 2012 Standardization of Senior Reactor Operator Fuel Handling Duties L-2012-105, Response to Nuclear Performance and Code Review Branch Request for Additional Information Identified During an Audit of Analyses Supporting the Extended Power Uprate License Amendment Request2012-03-15015 March 2012 Response to Nuclear Performance and Code Review Branch Request for Additional Information Identified During an Audit of Analyses Supporting the Extended Power Uprate License Amendment Request ML1026405722010-09-14014 September 2010 E-mail St. Lucie Capture Summary Update for January Through August 2010 ML1019304172010-05-0606 May 2010 Tritium Database Report ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants L-2010-059, Florida Dept of Environmental Protection - Wastewater Application Form 2CS - Permit to Discharge Process Wastewater from New or Existing Industrial Wastewater Facilities to Surface Water2010-03-18018 March 2010 Florida Dept of Environmental Protection - Wastewater Application Form 2CS - Permit to Discharge Process Wastewater from New or Existing Industrial Wastewater Facilities to Surface Water ML1008304422010-03-18018 March 2010 Florida Dept of Environmental Protection - Wastewater Application Form 2CS - Permit to Discharge Process Wastewater from New or Existing Industrial Wastewater Facilities to Surface Water L-2009-101, Report of 10 CFR 50.59 Plant Changes, for the Period of May 28, 2007 Through November 21, 20082009-04-22022 April 2009 Report of 10 CFR 50.59 Plant Changes, for the Period of May 28, 2007 Through November 21, 2008 L-2008-261, Technical Specification Special Report Inoperable Containment Sump Wide Range Level Channel B2008-12-16016 December 2008 Technical Specification Special Report Inoperable Containment Sump Wide Range Level Channel B ML0807010172008-03-10010 March 2008 EPRI Reports (St. Lucie Pressurizer Nozzle DM Weld Examination Project Internal Office Report) L-2008-030, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2008-02-27027 February 2008 Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors NOC-AE-07002231, Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46)2007-11-0707 November 2007 Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46) L-2007-167, Report of 10 CFR 50.59 Plant Changes During the Period of December 19, 2005 Through May 27, 20072007-10-29029 October 2007 Report of 10 CFR 50.59 Plant Changes During the Period of December 19, 2005 Through May 27, 2007 L-2007-168, Technical Specifications Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42007-10-29029 October 2007 Technical Specifications Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2007-137, Technical Specification Special Report, Inoperable Containment Sump Wide Range Level Channel B2007-08-31031 August 2007 Technical Specification Special Report, Inoperable Containment Sump Wide Range Level Channel B L-2007-029, Semi-Annual Fitness-For-Duty Program Performance Data for the Six-Month Period Ending December 31, 20062007-02-26026 February 2007 Semi-Annual Fitness-For-Duty Program Performance Data for the Six-Month Period Ending December 31, 2006 L-2007-020, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 20062007-02-0606 February 2007 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2006 L-2006-078, Proposed License Amendment, Containment Spray Nozzle Surveillance Change2006-10-19019 October 2006 Proposed License Amendment, Containment Spray Nozzle Surveillance Change L-2006-217, Day Post Outage Steam Generator Report Technical Specification 4.4.5.5.c2006-09-20020 September 2006 Day Post Outage Steam Generator Report Technical Specification 4.4.5.5.c L-2006-152, NRC Order EA-03-009 - Reactor Vessel Head and Vessel Head Penetration Nozzle Inspection Results SL2-162006-08-10010 August 2006 NRC Order EA-03-009 - Reactor Vessel Head and Vessel Head Penetration Nozzle Inspection Results SL2-16 L-2006-180, Sation; St. Lucie, Units 1 and 2 and Turkey Point, Units 3 and 4 - Groundwater Questionnaire2006-07-31031 July 2006 Sation; St. Lucie, Units 1 and 2 and Turkey Point, Units 3 and 4 - Groundwater Questionnaire L-2006-167, Environmental Protection Plan Report Responses to FDEP Comments on FPL Proposal for Information Collection Clean Water Act Section 316(b)2006-07-0606 July 2006 Environmental Protection Plan Report Responses to FDEP Comments on FPL Proposal for Information Collection Clean Water Act Section 316(b) L-2006-139, Report of 10 CFR 50.59 Plant Changes2006-06-16016 June 2006 Report of 10 CFR 50.59 Plant Changes L-2006-063, Technical Specification Special Report, Radwaste Building Exhaust System, Plant Ventilation Stack Particulate Iodine and Noble Gas (Sping) Radiation - Out of Service2006-02-22022 February 2006 Technical Specification Special Report, Radwaste Building Exhaust System, Plant Ventilation Stack Particulate Iodine and Noble Gas (Sping) Radiation - Out of Service 2024-07-29
[Table view] |
Text
JUN 2 0 2017 L-2017-117 10 CFR 50.36 10 CFR 50.55a U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20.555 Re: St. Lucie Unit 2 Docket No. 50-389 In-Service Inspection Program ISI Fourth Interval - First Period - SL2-23 Refueling Outage Owner's Activity Report (OAR-1)
Enclosed is the St. Lucie Unit 2, SL2-23 outage, Owner's Activity Report, Form OAR-1.
The OAR-1 report is prepared, certified, and submitted upon completion of each refueling outage. The SL2-23 refueling outage ended on March 24, 2017.
Please contact Ken Frehafer at 772-467-77 48 if there are any questions about this submittal.
Sincerely, Michael J Snyder Licensing Manager St. Lucie Plant MJS/KWF Attachment cc: NRC Region II Administrator St. Lucie Plant NRC Senior Resident Inspector Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957
L-2017-117 Attachment Page 1of5 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Nurrib~r: ISl-P$l,-2~20'!7 Plant
- St Lucie Nuclear Power Plant Unit 2 6501. South Ocean Drive Jensen Beach, Florida 34957 Commercial Service Date: August 8, 1983 Refueling Outage No.: SL2-23 Current Inspection Interval: ISi-Fourth, IWE-Secohd Current Inspection Period:-!Sl-flrst, IWE.:.Third Edition and Addenda of Section XI applicable to the inspection plans: ISi - 2007 with Addenda through 2008
!WE - 2001 Edition with Addenda through 2003 Date and Rev.lsion of inspection plans: ISi-January 30, 2017, Revision 2, IWE~July 17, 201:5, .Revision 2 Edition and Addenda of Section XI applicable to. repairs and rep!acern,ehts, if different than the inspection plan: Sarne Code Cases Used: N-532-5. N-586-1 N-649 N-706-'1 N-722-1 N-751 N-729-1 & N-770-'.1.
CERTIFICATE OF CONFORMANCE I certify that. (a) the statements made in this report are correct; (b) the examinations and tests meet.the Inspection plan as requ.ired by the ASME Code,Section XI; and (c) the repairlreplacemenf activities and .evaluations supporting the completiop ofSL2..:23 '?)nfbrm to the requirements of Section XL .
Signe~ J,1 /~ fl'-t' :R. i). bJ 1,i Pk.ct Rw;r.i-..-v.l 'i A.Jy Date f.v * /s;. I=;-
Owner or.Owner's Designee, Title 7. -
CERTIFICATE OF INSERVICE lNSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pres~;ure Vessel Inspectors and the State or Province of Georgia and employed by the Hartford Steam Boiler Inspection and Insurance Company*of
- Connecticut have .inspected the items described in this Owner's ..Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance With the requirements ofSection XL By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concemlng the repair/replacement activities and evaluation described in *this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for ariy person<1I injury or property damage or loss ofany kind arising from I:\'.
or conn.ected \Ni t
- L-2017-117 Attachment Page 2 of 5 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR REVELANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE PSL 2 ..., JS!. 4TH Interval, tst Period - Outcige 23
. PSL 2 - !WE 21)d Interval, 3~d Period - Outage 23 i II I
I E:i..>amlnation I I
- I Category and Item Description Evaluation bescripticm
l l
I None None None I It ~
III f
1*
II i I
~
u f:
-~ n
..E!'
li
~
~ ;{'
I t f
g tt fi !;~
~
f :;:
i t
Il I
D i
R i
a
~
~! Iii"
~'
~;
tf' i ~:
I r J
t*
l
L-2017-117 Attachment FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 2 ~ ISi 4TH Interval, 1st Period - Outage 23 PSL 2 - IWE 2nd Interval, 3rd Period - Outage 23 Repair./
Code Date Item Description Description ofV\!c>rk Replacement Class Completed Plan Number REPLACE VALVE AND FLANGE 3 HCV-14-88 5/17/2017 SL2-13055 *
- FASTENERS WELD BUILD UP OF PUMP !
.INTERNALS TO OBTAIN PROPER 2 LPSI PP 2B FJTFOR NEW STUFFING BOX AND 5/24/2017 SL2-13064 INSTALL COUPLING RETROFIT KIT PER EC275737 REPLACEMENT OFVALVE AND 1 SE-02-3 ADJACENT Pl PING BY WELDING 6113/2017 SL2-13069 WELD BUILDUP ON FLANGES TO 3 CW-10 6/14/2017 SL2-15011 RESTORE THICKNESS REPAIR THROUGH-WALL LEAK BY 3 CW-72 WELDING UTILIZING CODE CASE N- 11/11/20'.15 SL2*'15065 661-2 REPLACE ELBOW FASTENERS 3 CW-72 FOLLOWING INTERNAL 5/312017 Sl2-15065
.3 REPLACE VALVE BY FLANGED HCV-21-7A 5/4/2017 Sl2-15066
. CONNECTION REPLACE REL! EF VALVE 2 V2326 5/4/2017 Sl2-16001 INTERNALS PERFORM WELD BUILDUP OF 3 HCV-21-78 VALVE AND PIPE FLANGE 5/24/2017 SL2-16012 SURFACES
- 3 REPLACE VALVE FLANGE V21208 5/3/2017 SL2-16013 FASTENERS REPLACE SG 28 PRIMARY 1 *sG2B 6/13/2017 SLZ-16014 MANWAY *STUD MACHINE REPLACEMENT STUD 1 SG2B 6/13/2017 Sl2-'.16014 PER VENDOR RECOMMENDATIONS REPLACE PRESSURIZER MANWAY 1 PZR 6/15/2017 SL2-16015 STUDS/NUTS
! INSTALL SEAL WELD FOLLOWING 2 V3495 5/25/2017 SL2-16016 INTERNAL VALVE INSPECTION I
- REPLACE MAIN STEAM SAFETY 2 V8202 5/3112017 SL2-16017 RELIEF VALVE FASTENERS REPLACE RELIEF VALVE FLANGE 3 V2115. 5/1712017 SL2-16019 FASTENERS
- REPLACE RELfEF VALVE 2 V2324 5/3112017 SL2-16.020
- INTERNALS OF REMOVED VALVE REPLACE RELIEF VALVE 2 V2325 INTERNALS 5/3/2017 SL2-16021
L-2017-117 Attachment Page 4 of s-FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2 Code Repair I Item Description Description of Work Date Class Completed Replacement Plan Number REPLACE CHECK VALVE 1 V3527 6/13/2017 Sl2-16022 FASTENERS REPLACE RELIEF VALVE 2 V8203 51~1/2017 SL2-16023 INTERNALS AND FASTENERS
..i FUEL POOL REPLACE FLANGE FASTENERS 3 5/4/2017 SL2-16024 PP2B 2 FCV-25-26 REPLACEVALVEFASTENERS 6/112017 II SL2-16025 1 S!G2A INSTALL TU!3E PLUGS IN 2A SIG 5/18/2017 SL2-16027 REPLACE REUEF VALVE AND
- 2. V8209 5/4/2017 SL2-16029 FASTENERS
- ATTACH REVISED NAMEPLATE FOLLOWING RE-RATJNG OF
.MC CNTMNTVSL 5/4/2017 SL2-16030 CONTAINMENT VESSEL EXTERNAL PRESSURE REPLACE RELIEF VAf..VE 2 V8212 INTERNALS AND FASTENERS 5/31/2017 SL2*16031 REPLACE RELIEF VALVE 2 V8216 5/3112017 SL2-16032
' INTE:RNALS AND FASTENERS PREFABRICATE REPLACEMENT 3 CW-105 5124/2017 SL2-16035 PIPE ELBOW SPOOL BY WELDING I REPLACE PIPE ELBOW BY 3 CW-105 WELDING AND FLANGED 5/25/2017 SL2-16035 CONNECTION REPLACE GODE SAFETY RELIEF 1 V1200 VALVE INTERNALS AND INLET 5/31/2017 SL2-16036 FASTENERS REPLACE GODE SAFETY RELIEF 1 V1201 VALVE INTERNALS . .... 5/3112017 SL2-16037 3 HCV-14-10 REPLACE VALVE AND FASTENERS 5/4/2017 SL2-t6041 REPLACE VALVE FASTENERS I 2 V3107 :Sl1/2017 Sl2-16042 lNSTALL FLANGES BY WELDING 3 HCV-25..:.3 5117/2017 J SL2~17001 AND BOLTED CONNECTION I 3 HCV-25-4 INSTALL FLANGES BY WELDING 5/24/2017 l SL2-17001 AND BOLTED *CONNECTION I REPLACE PIPE SPOOLS CW-72-4 3 CW-72 AND CW-72-5 BY WELDING AND 5/25/2017 SL2-17002 BOLTED CONNECTIONS
V08163 V3247 BODY REPLACE VALVE FASTENERS 5/3/2017 5f31/2017 SL2-17003 SL2-17004 II REPLACE VALVE DISC AND !
1 3
V3526 MV-08~3 FASTENERS
. REPLACE SPRING CAN SUPPORT 5131/2017 6115/2017 SL2-17006 SL2-17011 I
2 CS-2 BY WELDING REPLACE TWO SPRING CAN i 5/i8/2017 I
I SL2-17012 SUPPORTS BYWELDING I I
I i
i
L-2017-117 Attachment Page 5 of 5 FORM OAR-1 OWNER,S ACTIVITY REPORT TABLE2 Code item Description I Description of Work Date Repair I Replacement Cfass Completed Plan Number REPLACE Pf PE SECTION BY 1 CH-147 WELDING FOR LICENSE RENEWAL 5/18/20'[7 SL2-*F019 DESTRUCTIVE TESTING.
REPLACE SOLENOID VALVE SEAL.
2 SE-03-2A WELD FOLLOWING INTERNAL 5/3/2017 SL2-17023 VALVE INSPECTION REPLACE VALVE AND ADJACENT 1 SE-02..:1 PIPING BY WELDJNG 6/1/2017 SL2-17026 REMOVE AND :RE-INSTALL ..
2 CC-2080-25 SECTION OF PIPE SUPPORT BY: 5{18/2017 SL2-17027 WELDING REMOVE AND RE-INSTALL 2 CC-2080-30 SECTION OF PIPE SUPPORT BY 5/17/2017 SL.2-17027 WELDING REPLACE SECTION OF PIPE.
- 2. CC-2080-33 5/18/2017. SL2-17027 SUPPORT BY WELDING SS-21-18 REPLACE STRAINER FASTENERS SL2:..1JQ29 3 5/4/2017 REPLACE SNUBBER 028 1 028 5131/2017 SL2-17031 l 1 I t I