| number = ML112640246
| number = ML112640246
| issue date = 09/20/2011
| issue date = 09/20/2011
| title = Beaver Valley, Units 1 & 2, Davis-Besse, Unit 1 and Perry, Unit 1 - License Amendment Request to Change the Name of an Owner Licensee to Firstenergy Nuclear Generation, LLC
| title = License Amendment Request to Change the Name of an Owner Licensee to Firstenergy Nuclear Generation, LLC
| author name = Sena P P
| author name = Sena P
| author affiliation = FirstEnergy Nuclear Operating Co
| author affiliation = FirstEnergy Nuclear Operating Co
| addressee name =  
| addressee name =  
Line 13: Line 13:
| document type = Letter, License-Application for Facility Operating License (Amend/Renewal) DKT 50
| document type = Letter, License-Application for Facility Operating License (Amend/Renewal) DKT 50
| page count = 88
| page count = 88
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:FENOCF ig. Endgy ttuct@t OqatineCqnpanF 341 ll/hite Pond Dr.Akron. Ohio 44320 September 20,2011 L-11-282 ATTN: Document Control DeskU.S. Nuclear Regulatory Commission Washington, DC 20555-000110 cFR 50.90
{{#Wiki_filter:FENOC F ig. Endgy ttuct@t OqatineCqnpanF 341 ll/hite Pond Dr.
Akron. Ohio 44320 September                 20,2011 L-11-282                                                                         10 cFR 50.90 ATTN:Document                     ControlDesk U.S.NuclearRegulatory                    Commission Washington,                 DC 20555-0001


==SUBJECT:==
==SUBJECT:==
Beaver Valley Power Station, Unit Nos. 1 and2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NpF-73 Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License No. NPF-3 Perry Nuclear Power Plant, Unit No. 1 Docket No. 50-440, License No. NPF-58 License Amendment Request to Chanoe the Name of an Owner Licensee to FirstEnerqy Nuclear Generation.
 
LLC In accordance with the provisions of 10 CFR 50.90, FirstEnergy Nuclear Operating Company (FENOC) is submitting a request for amendments to the operatingficenses (OLs) of Beaver Vafley Power Station, Unit Nos. 1 and 2; Davis-Beise Nuclear Power Station, Unit No. 1 (DBNPS); and Perry Nuclear Power Plant, Unit No. 1 (PNPP). The proposed amendment is administrative in nature and will revise the licenses to reflect the name change of an owner licensee from "FirstEnergy Nuclear Generation corp." to "FirstEnergy Nuclear Generation, LLC." The proposed amendment will also correct errors regarding the name of FirstEnergy Nuclear Generation Corp. in the DBNPS and pNpp OLs.The enclosure contains an evaluation of the proposed amendment.
BeaverValleyPowerStation,UnitNos.1 and2 DocketNo.50-334,LicenseNo. DPR-66 DocketNo.50-412,LicenseNo. NpF-73 Davis-Besse                 NuclearPowerStation,UnitNo. 1 DocketNo.50-346,LicenseNo. NPF-3 PerryNuclearPowerPlant,UnitNo. 1 DocketNo.50-440,LicenseNo. NPF-58 LicenseAmendment                      Requestto Chanoethe Nameof an OwnerLicensee            to FirstEnerqy               NuclearGeneration. LLC In accordance                   withthe provisionsof 10 CFR50.90,FirstEnergy NuclearOperating Company(FENOC)is submitting                       a requestfor amendments to the operating ficenses(OLs)of BeaverVafleyPowerStation,UnitNos. 1 and2; Davis-Beise NuclearPowerStation,UnitNo. 1 (DBNPS);and PerryNuclearPowerPlant,Unit No. 1 (PNPP).The proposedamendment                        is administrative in natureandwill revise the licensesto reflectthe namechangeof an ownerlicenseefrom "FirstEnergy NuclearGeneration                    corp."to "FirstEnergyNuclearGeneration, LLC."
Attachments in the enclosure provide the pages of the existing ols marked up to show the proposed changes, and OL pages with the proposed changes incorporated for information only.NRC approval is requested by December 15, 201 1 with the amendments being implemented within 120 days.
The proposedamendment                      willalsocorrecterrorsregardingthe nameof FirstEnergy NuclearGeneration                    Corp.in the DBNPSand pNpp OLs.
Beaver Valley Power Station, Unit Nos. 1 and 2 Davis-Besse Nuclear Power Station, Unit No. 1 Perry Nuclear Power Plant, Unit No. 1 L-!1-282 Page 2 There are no regulatory commitments contained in this submittal.
The enclosurecontainsan evaluationof the proposedamendment.Attachmentsin the enclosureprovidethe pagesof the existingols markedup to showthe proposedchanges,and OL pageswiththe proposedchangesincorporated                                for information               only.
lf there are any questions or if additional information is required, please contact Mr. Phil H. Lashley, Supervisor - Fleet Licensing, at (330) 315-0808.I declare under penalty of perjury that the foregoing is true and correct. Executed on September to ,2011.Sincerely,/1 ..1 q/t/ * {/-6r' lf7/\ v \-----Peter P. Sena lll President and Chief Operating Officer  
NRCapprovalis requested                     by December15,2011 withthe amendments         being implemented                   within120days.
 
BeaverValleyPowerStation,UnitNos.1 and2 Davis-Besse   NuclearPowerStation,UnitNo. 1 PerryNuclearPowerPlant,UnitNo. 1 L-!1-282 Page2 Thereare no regulatory commitments   containedin thissubmittal.lf thereare any questionsor if additionalinformation          pleasecontactMr. PhilH. Lashley, is required, Supervisor   - FleetLicensing, at (330)315-0808.
I declareunderpenaltyof perjurythatthe foregoingis trueandcorrect.Executed on September     to ,2011.
Sincerely,
    /1     ..1   q
  /t/
* v{/-6r'\-----
lf7/\
PeterP. Senalll President and ChiefOperating  Officer


==Enclosure:==
==Enclosure:==


EVALUATION OF PROPOSED LICENSE AMENDMENT cc: NRC Region lAdministrator NRC Region lll Administrator NRC Project Manager - Beaver Valley Power Station NRC Project Manager - Davis-Besse Nuclear power Station NRC Project Manager - Perry Nuclear Power plant NRC Resident Inspector - Beaver Valley Power Station NRC Resident Inspector - Davis-Besse Nuctear power Station NRC Resident Inspector - Perry Nuclear power plant Director BRP/DEP Site Representative BRP/DEP Executive Director, Ohio Emergency Management Agency, State of Ohio (NRC Liaison)Utility Radiological Safety Board EVALUATION OF PROPOSED LICENSE AMENDMENTPage 1 of7
EVALUATION     OF PROPOSED     LICENSE AMENDMENT cc: NRCRegionlAdministrator NRCRegionlll Administrator NRCProjectManager- BeaverValleyPowerStation NRCProjectManager- Davis-Besse     NuclearpowerStation NRCProjectManager- PerryNuclearPowerplant NRCResidentInspector  - BeaverValleyPowerStation NRCResidentInspector  - Davis-Besse NuctearpowerStation NRCResidentInspector PerryNuclearpowerplant DirectorBRP/DEP Site Representative BRP/DEP ExecutiveDirector, OhioEmergency    Management   Agency, Stateof Ohio(NRCLiaison)
UtilityRadiologicalSafetyBoard
 
EVALUATION   OF PROPOSED   LICENSE   AMENDMENT Page1 of7


==Subject:==
==Subject:==
Amendment Request to change the narne of an owner licensee of theBeaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station, Unit No. 1; and Perry Nuclear Power Plant, Unit No. 1.1.0  
Amendment   Requestto changethe narneof an ownerlicenseeof the BeaverValleyPowerStation,UnitNos.1 and2; Davis-Besse   NuclearPower Station,UnitNo. 1; andPerryNuclearPowerPlant,UnitNo. 1.
1.0  


==SUMMARY==
==SUMMARY==
DESCRIPTION2.0 DETAILED DESCRIPTION 3.0 -IECHNICAL EVALUATION
DESCRIPTION 2.0 DETAILED DESCRIPTION
 
    -IECHNICAL 3.0             EVALUATION
==4.0 REGULATORY EVALUATION==


===4.1 Significant===
==4.0 REGULATORY      EVALUATION==
Hazards Consideration


===4.2 Applicable===
4.1 SignificantHazards Consideration 4.2 Applicable RegulatoryRequirements/Criteria 4.3 Precedent 4.4 Conclusions 5.0 ENVIRONfVIENTAL   CONSIDERATION
Regulatory Requirements/Criteria4.3 Precedent 4.4 Conclusions5.0 ENVIRONfVIENTAL CONSIDERATION


==6.0 REFERENCES==
==6.0 REFERENCES==


ATTACHMENI'S:
ATTACHMENI'S:
1" Proposed Beaver Vafley Power Station, Unit No. 1 Operating L.icense Changes (Mark Up)2. Proposed Beaver Valley Power Station, Unit No. 2 Operating License Changes (Vlark Up)3. Proposed Davis-Besse Nuclear Power Station, Unit No. 1 Operating License Changes (Mark Up)4. Proposed Perry Nuclear Pclwer Plant, Unit No. 1 Operating License Changes (Mark Up)
1" ProposedBeaverVafleyPowerStation,UnitNo. 1 OperatingL.icense Changes(MarkUp)
Page 25. Proposed Beaver Valley Power Station, Unit No. 1 Operating License Changes (Re-typed - For lnformation Only)6. Proposed Beaver Valley Power Station, Unit No. 2 Operating License Changes (Re{yped - For lnformation Only)7. Proposed Davis-Besse Nuclear Power Station, Unit No. 1 Operating License Changes (Retyped - For Information Only)8. Proposed Perry Nuclear Power Plant, Unit No. 1 Operating License Changes (Re-typed - For Information Only)
: 2. ProposedBeaverValleyPowerStation,UnitNo.2 OperatingLicense Changes(VlarkUp)
Page 3 1.0  
: 3. ProposedDavis-Besse NuclearPowerStation,UnitNo. 1 OperatingLicense Changes(MarkUp)
: 4. Proposed PerryNuclearPclwerPlant,UnitNo. 1 OperatingLicenseChanges (MarkUp)
 
Page2
: 5. ProposedBeaverValleyPowerStation,UnitNo. 1 OperatingLicenseChanges
        - For lnformation (Re-typed               Only)
: 6. ProposedBeaverValleyPowerStation,UnitNo.2 OperatingLicenseChanges (Re{yped- For lnformation Only)
: 7. ProposedDavis-BesseNuclearPowerStation,UnitNo. 1 OperatingLicense Changes(Retyped- For Information Only)
: 8. ProposedPerryNuclearPowerPlant,UnitNo. 1 OperatingLicenseChanges
        - For Information (Re-typed               Only)
 
Page3 1.0  


==SUMMARY==
==SUMMARY==
DESCRIPTION This evaluation supports a request to amend the operating licenses of BeaverValley Power Station, Unit Nos. 1 and 2 (DPR-66 and NPF-73, r*spectively);
DESCRIPTION Thisevaluation  supportsa requestto amendthe operatinglicensesof Beaver ValleyPowerStation,UnitNos.1 and 2 (DPR-66and NPF-73,rspectively);
Davis-Besse Nuclear Power Station, Unit No. 1 (NPF-3); and Perry NuclearPower Plant, Unit No. 1 (NPF-58).
Davis-Besse NuclearPowerStation,UnitNo. 1 (NPF-3);and PerryNuclear PowerPlant,UnitNo. 1 (NPF-58).The proposedamendment          will revisethe licensesto reflectthe new nameof one of the ownerlicenseesof the aforementioned          whichhaschangedfrom"FirstEnergy facilities                                    Nuclear Generation Corp."to "FirstEnergy NuclearGeneration, LLC."
The proposed amendment will revise the licenses to reflect the new name of one of the owner licensees of theaforementioned facilities which has changed from "FirstEnergy Nuclear Generation Corp." to "FirstEnergy Nuclear Generation, LLC."2.0 DETAILED DESCRIPTION FirstEnergy Nuclear Generation Corp. is an owner licensee for the followingNuclear Regulatory Commission (NRC) facilities:. 100o/o of Beaver Valley Power Station, Unit No. 1 (BVPS-1). 60.08% of Beaver Valley Power Station, Unit No. 2 (BVPS-2)o 100o/o of Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS)o 87.42o/o of Perry Nuclear Power Plant, Unit No. 1 (PNPP)FirstEnergy Corp. (FE), the overall parent of FirstEnergy Nuclear Generation Corp., proposes converting FirstEnergy Nuclear Generation Corp. from a corporation organized under the laws of the State of Ohio to a limited liability company (LLC) organized under the laws of the State of Ohio. The proposed conversion will occur by operation of the State of Ohio law. As a result, FirstEnergy Nuclear Generation Corp. will change its name to FirstEnergy Nuclear Generation, LLC. Therefore, the operating licenses for the aforementioned units will need to be amended to reflect the revised company name.The proposed amendment will also correct errors in the DBNPS and PNPPoperating licenses regarding the name of FirstEnergy Nuclear Generation Corp.The word "Nuclear" was inadvertently omitted in an entry in both operating licenses, and the word "Corporation" was inadvertently used instead of "Corp." in the DBNPS operating license.
2.0 DETAILED   DESCRIPTION FirstEnergy NuclearGeneration    Corp.is an ownerlicenseefor the following NuclearRegulatory  Commission   (NRC)facilities:
Mark-ups of the Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-BesseNuclear Power Station, Unit No. 1; and Perry Nuclear Power Plant, Unit No. 1operating licenses reflecting these changes are included in Attachments 1 through4, respectively.For informational purposes only, typed versions of the Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station, Unit No. 1; and Perry Nuclear Power Plant, Unit No. 1 operating licenses reflecting these changes are included in Attachments 5 through 8, respectively.
    . 100o/oof BeaverValleyPowerStation,UnitNo. 1 (BVPS-1)
Page
    . 60.08%of BeaverValleyPowerStation,UnitNo.2 (BVPS-2) o 100o/oof Davis-Besse NuclearPowerStation,UnitNo. 1 (DBNPS) o 87.42o/oof PerryNuclearPowerPlant,UnitNo. 1 (PNPP)
FirstEnergy Corp.(FE),the overallparentof FirstEnergy   NuclearGeneration Corp.,proposesconverting    FirstEnergy NuclearGeneration  Corp.froma corporation organizedunderthe lawsof the Stateof Ohioto a limitedliability company(LLC)organized     underthe lawsof the Stateof Ohio. The proposed conversion willoccurby operationof the Stateof Ohiolaw. As a result, FirstEnergy NuclearGeneration    Corp.willchangeits nameto FirstEnergy NuclearGeneration,   LLC. Therefore, the operatinglicensesfor the aforementioned unitswill needto be amendedto reflectthe revisedcompany name.
The proposedamendment      will alsocorrecterrorsin the DBNPSand PNPP operatinglicensesregarding  the nameof FirstEnergy   NuclearGeneration  Corp.
Theword"Nuclear"   was inadvertently omittedin an entryin bothoperating licenses,andthe word"Corporation"   was inadvertently usedinsteadof "Corp."in the DBNPSoperating    license.
Mark-upsof the BeaverValleyPowerStation,UnitNos.1 and 2; Davis-Besse NuclearPowerStation,UnitNo.1; andPerryNuclearPowerPlant,UnitNo.1 operatinglicensesreflecting thesechangesare includedin Attachments     1 through 4, respectively.
For informational purposesonly,typedversionsof the BeaverValleyPower Station,UnitNos.1 and2; Davis-Besse     NuclearPowerStation,UnitNo.1; and PerryNuclearPowerPlant,UnitNo. 1 operatinglicensesreflecting      thesechanges are includedin Attachments 5 through8, respectively.


==43.0 TECHNICAL EVALUATION==
Page4 3.0 TECHNICAL     EVALUATION FirstEnergy NuclearGeneration    Corp.will be converted   to an OhioLLCpursuant to Sections1701.792and1705.361         of the Ohio Revised   Code. The entity, previously knownas FirstEnergy     NuclearGeneration      Corp.,will remainthe ownerlicenseebothbeforeand afterthe conversion,           butwill havea new corporate  formas a limitedliabilitycompany.In accordance         withSection 1705.391of the OhioRevisedCode,thisentitywill remainresponsible            for providing fundingfor the operation of its ownership   sharesin the above-listed facilitiesandfulfillall otherobligations as an ownerlicensee,includingproviding decommissioning    fundingassurance    for its ownership   sharesin compliance with 10 CFR50.75.Therewillbe no ownership           or management   changesas a result of the conversion.The     proposed conversion   will resultin a namechangefor this entity.The namewillbecome"FirstEnergy           NuclearGeneration,   LLC."
FirstEnergy Nuclear Generation Corp. will be converted to an Ohio LLC pursuantto Sections 1701 .792 and 1705.361 of the Ohio Revised Code. The entity, previously known as FirstEnergy Nuclear Generation Corp., will remain the owner licensee both before and after the conversion, but will have a newcorporate form as a limited liability company. In accordance with Section1705.391 of the Ohio Revised Code, this entity will remain responsible for providing funding for the operation of its ownership shares in the above-listed facilities and fulfill all other obligations as an owner licensee, including providingdecommissioning funding assurance for its ownership shares in compliance with 10 CFR 50.75. There will be no ownership or management changes as a resultof the conversion.
The proposed   amendment     willchangethe operating     licenses for BVPS-1, BVPS-2,DBNPS,andPNPPto reflectthischange.The proposed                  amendment  is considered  administrative  in nature.
The proposed conversion will result in a name change for thisentity. The name will become "FirstEnergy Nuclear Generation, LLC." The proposed amendment will change the operating licenses for BVPS-1, BVPS-2, DBNPS, and PNPP to reflect this change.
 
The proposed amendment is considered administrative in nature.
==4.0 REGULATORY          EVALUATION==
 
The FirstEnergy  NuclearOperating    Company(FENOC)requestsNuclear Regulatory  Commission    (NRC)reviewandapprovalof an amendment          to change the nameof an ownerlicenseeof BeaverValleyPowerStation,UnitNos.1 and2; Davis-Besse    NuclearPowerStation,    UnitNo.1; andPerryNuclearPowerPlant, UnitNo. 1. The    proposed  amendment    willrevisethe nameof ownerlicensee FirstEnergy  NuclearGeneration    Corp.to FirstEnergy    NuclearGeneration,  LLC.
4.1 Siqnificant  HazardsConsideration FENOChasevaluated        whetheror nota significant    hazardsconsideration  is involvedwiththe proposedamendment          by focusingon the threestandards    set forthin 10 CFR50.92,"lssuance      of amendment,"    as discussed  below.
: 1. Doesthe proposedamendment          involvea significant  increasein the probability or consequences    of an accidentpreviously  evaluated?
Response:No.
The proposedamendment        changesa nameof an ownerlicensee.The proposed amendment     is considered administrative in nature.Thefunctionsof the owner licenseewill not change.Thereis no impactuponthe otherfacilitylicensees.
 
Page5 FENOCwill remainthe operatorof the facilities.The proposedamendment            does notalterthe design,function,or operationof any      plantequipment. As  such, the accidentandtransientanalysescontainedin the facilityupdatedfinalsafety analysisreportswill not be impacted.Therefore,      the proposedamendment      does notaffectthe probability  or consequences  of an accidentpreviously  evaluated.
: 2. Doesthe proposedamendment          createthe possibility of a newor differentkind of accidentfromanyaccidentpreviously      evaluated?
Response:No.
The proposedamendment        is considered administrative in nature.Thefunctions of the ownerlicenseewill notchange.The proposedamendment            doesnotalter the design,function,or operationof any plantequipment.Therefore,        the proposedamendment        doesnotcreatethe    possibilityof a newor differentkindof accidentfromany accidentpreviously      evaluated.
: 3. Doesthe proposedamendment          involvea significant reductionin a marginof safety?
Response:No.
The proposedamendment        is a namechangeto reflectthe newnameof an ownerlicensee.The proposedamendment          is considered  administrative in nature.Thefunctionsof the ownerlicenseewill notchange.Thereis no impact uponthe otherfacilitylicensees.FENOCwill remainthe operatorof the facilities.
The proposedamendment        doesnot alterthe design,function,or operationof any plantequipment.As such,the accidentandtransientanalysescontainedin the facilityupdatedfinalsafetyanalysisreportswill not be impacted.Therefore,        the proposedamendment        doesnot involvea significant  reductionin a marginof safety.
Basedon the above,FENOCconcludes          thatthe proposedamendment      doesnot involvea significant  hazardsconsideration  underthe  standards  set forthin 10 CFR50.92(c),    and,accordingly,  a findingof "nosignificant  hazards consideration"  is justified.
4.2 Applicable    Requlatorv  Requirements/Criteria In accordance  with 10 CFR50.80,Transferof licenses,no licensefor a utilization facilitycan be transferred  throughtransferof controlof the licenseto anyentity unlessthe NRCconsents      in writing.
 
Page6 FE proposesconverting      FirstEnergy NuclearGeneration    Corp.froma corporation  organizedunderthe lawsof the Stateof Ohioto a limitedliability company(LLC)organizedunderthe lawsof the Stateof Ohio. The proposed conversion  willoccurby operationof the Stateof Ohiolaw. As a result,the entity,previously    knownas FirstEnergy  NuclearGeneration  Corp.,will remainthe ownerlicenseebothbeforeand afterthe conversion,butwith a new corporate formas a limitedliabilitycompany.Thisentitywill remainresponsible        for providing  fundingfor the operation  of its ownership shares in BVPS-1,    BVPS-2, DBNPS,andPNPPandfulfillall otherobligations        as an ownerlicensee.
The proposedamendment          doesnot involvethe transferof controlto another entity.lt is a namechange.FirstEnergy        NuclearGeneration  Corp.will change its nameto FirstEnergy    NuclearGeneration,  LLC. Thereis no impactupon 1 0c F R 5 0 . 8 0 .
4.3 Preceden!
I3yletterdatedMay 14,1999,TexasUtilitiesElectricCompanysubmittedan amendment    to the NRCfor ComanchePeakSteamElectricStation,Units1 and2 to changethe nameof the companyto TXU ElectricCompany.The proposedamendment        indicated thatit was an administrative change.The NRC approvedthe amenclment        on August31, 1999[Agencywide    Documents    Access and Managernent      System(ADAMS)AccessionNo.M10218202831.              The proposedamendment        for the FENOCfacilitiesis similarin thatit describesa namechangeandtheentitywillstillremainresponsible          for fulfilling itsobligations as an ownerlicensee.
4.4 Conclusions In conclusion,  basedon the considerations  discussed  above,(1)thereis reasonable  assurance  thatthe healthandsafetyof the publicwill not be endangered    by operationin the proposedmanner,(2) suchactivities      will be conductedin compliance      withthe NuclearRegulatory    Commission's    regulations, and(3)the issuance    of the amendment    willnotbe inimicalto the common defenseandsecurityor to the healthandsafetyof the public.
5.0 ENVIRONMENTAL          CONSIDERATION A reviewhasdetermined      thatthe proposedamendment      would: 1) changea licensee's  name,and2) makeseditorial,      correctiveor otherminorrevisions    to the license.Accordingly,    the proposedamendment    meetsthe eligibility  criterionfor categorical  exclusionsetforthin 10 CFR 51.22(c\(10xiii)    and (v). Therefore, pursuantto 10 CFR51.22(b),no environmental        impactstatementor environmental    assessment    needbe preparedin connection    withthe proposed amendment.


==4.0 REGULATORY EVALUATION==
The FirstEnergy Nuclear Operating Company (FENOC) requests Nuclear Regulatory Commission (NRC) review and approval of an amendment to changethe name of an owner licensee of Beaver Valley Power Station, Unit Nos. 1 and 2;Davis-Besse Nuclear Power Station, Unit No. 1; and Perry Nuclear Power Plant,Unit No. 1.
The proposed amendment will revise the name of owner licensee FirstEnergy Nuclear Generation Corp. to FirstEnergy Nuclear Generation, LLC.4.1 Siqnificant Hazards Consideration FENOC has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "lssuance of amendment," as discussed below.1. Does the proposed amendment involve a significant increase in the probabilityor consequences of an accident previously evaluated?
Response:
No.The proposed amendment changes a name of an owner licensee.
The proposedamendment is considered administrative in nature. The functions of the owner licensee will not change. There is no impact upon the other facility licensees.
Page 5FENOC will remain the operator of the facilities.
The proposed amendment doesnot alter the design, function, or operation of any plant equipment.
As such, theaccident and transient analyses contained in the facility updated final safety analysis reports will not be impacted.
Therefore, the proposed amendment doesnot affect the probability or consequences of an accident previously evaluated.2. Does the proposed amendment create the possibility of a new or different kindof accident from any accident previously evaluated?
Response:
No.The proposed amendment is considered administrative in nature. The functionsof the owner licensee will not change. The proposed amendment does not alterthe design, function, or operation of any plant equipment.
Therefore, the proposed amendment does not create the possibility of a new or different kind ofaccident from any accident previously evaluated.3. Does the proposed amendment involve a significant reduction in a margin of safety?Response:
No.The proposed amendment is a name change to reflect the new name of anowner licensee.
The proposed amendment is considered administrative in nature. The functions of the owner licensee will not change. There is no impact upon the other facility licensees. FENOC will remain the operator of the facilities.
The proposed amendment does not alter the design, function, or operation of any plant equipment. As such, the accident and transient analyses contained in the facility updated final safety analysis reports will not be impacted.
Therefore, the proposed amendment does not involve a significant reduction in a margin of safety.Based on the above, FENOC concludes that the proposed amendment does not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazardsconsideration" is justified.4.2 Applicable Requlatorv Requirements/CriteriaIn accordance with 10 CFR 50.80, Transfer of licenses, no license for a utilization facility can be transferred through transfer of control of the license to any entity unless the NRC consents in writing.
Page 6 FE proposes converting FirstEnergy Nuclear Generation Corp. from a corporation organized under the laws of the State of Ohio to a limited liability company (LLC) organized under the laws of the State of Ohio. The proposed conversion will occur by operation of the State of Ohio law. As a result, the entity, previously known as FirstEnergy Nuclear Generation Corp., will remain theowner licensee both before and after the conversion, but with a new corporateform as a limited liability company. This entity will remain responsible for providing funding for the operation of its ownership shares in BVPS-1, BVPS-2, DBNPS, and PNPP and fulfill all other obligations as an owner licensee.The proposed amendment does not involve the transfer of control to anotherentity. lt is a name change. FirstEnergy Nuclear Generation Corp. will change its name to FirstEnergy Nuclear Generation, LLC. There is no impact upon 10 cFR 50.80.4.3 Preceden!
I3y letter dated May 14,1999, Texas Utilities Electric Company submitted an amendment to the NRC for Comanche Peak Steam Electric Station, Units 1and 2 to change the name of the company to TXU Electric Company. The proposed amendment indicated that it was an administrative change. The NRC approved the amenclment on August 31, 1999
[Agencywide Documents Access and Managernent System (ADAMS) Accession No. M10218202831. The proposed amendment for the FENOC facilities is similar in that it describes a name change and the entity will still remain responsible for fulfilling its obligations as an owner licensee.4.4 ConclusionsIn conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Nuclear Regulatory Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.5.0 ENVIRONMENTAL CONSIDERATIONA review has determined that the proposed amendment would: 1) change a licensee's name, and 2) makes editorial, corrective or other minor revisions to the license. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c\(10xiii) and (v). Therefore, pursuant to 10 CFR 51 .22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
PageT
PageT


==6.0 REFERENCES==
==6.0 REFERENCES==
: 1. Ohio Revised Code Section 1701.792, "Conversion of domestic corporation into another entity," effective date October 12,2006; 2007 HB134January 1,2008.
: 1. OhioRevisedCodeSection1701.792,     "Conversionof domesticcorporation intoanotherentity,"effectivedateOctober12,2006;2007HB134 January1,2008.
: 2. Ohio Revised Code Section 1705.361, "Conversion of another entity intodomestic limited liability company," effective date October 12,2006.3. Ohio Revised Code Section 1705.391, "Legal effect of conversion - action toset aside," effective date October 12,2006.4. Letter dated August 31 , 1999 from Mr. David H. Jaffe (NRC) to Mr. C. Lance Terry (TU Electric) subject: "COMANCHE PEAK STEAM ELECTRIC STATION,UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS RE: CHANGE IN CORPORATE NAME FROM'TEXAS UTILITIES ELECTRIC COMPANY'TO
: 2. OhioRevisedCodeSection1705.361,     "Conversionof anotherentityinto domesticlimitedliabilitycompany,"effectivedateOctober12,2006.
'TXU ELECTRTC COMPANY' (TAC NOS. MA5551 AND MA5552)," (ADAMS Accession No. ML02 1820283)
: 3. OhioRevisedCodeSection1705.391,                             - actionto "Legaleffectof conversion set aside,"effectivedateOctober12,2006.
Attachment 1 Proposed Beaver Valley Power Station, Unit No. 1Operating License Changes (Mark Up)(Nine Pages Follow)
: 4. LetterdatedAugust31, 1999fromMr. DavidH. Jaffe(NRC)to Mr. C. Lance Terry(TU Electric) subject:"COMANCHE   PEAKSTEAMELECTRICSTATION, UNITS1 AND2 ISSUANCE         OFAMENDMENTS      RE: CHANGEIN CORPORATE     NAMEFROM'TEXAS     UTILITIES ELECTRIC COMPANY'TO
UNITED STATES NUCLEAR REGUIATORY COMMISSIONWASHINGTON. D.C. 20555-0001 FIRSTENERGY NUCLEAR OPERATING COMPANY FIRSTENERGY NUCLEAR GENERATIO]UILC DOCKET NO. 50-334BEAVER VALLEY POWER STATION. UNIT NO. 1RENEWED FACILITY OPERATING LICENSE License No. DPR-66The Nuclear Regulatory Commission (the Commission) having found that:A. The application to renew Facility Operating License No. DPR-66, filed by FirstEnergyNuclear Operating Company (FENOC)- acting on its own behalf and as agent for FirstEnergy Nuclear Generatioq*lltQ (the _l!_cet_s_ee-s).9_o.
'TXUELECTRTC      COMPANY'(TACNOS.MA5551AND MA5552),"         (ADAMS AccessionNo. ML021820283)
t!pl!99 W!tl'-!h9-qt?-r-'q4qq
 
?"ltq.requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter 1, and all required notifications to other agencies or bodies have been duly made;B. Construction of the Beaver Valley Power Station, Unit No.
1 Attachment ProposedBeaverValleyPowerStation,UnitNo. 1 OperatingLicenseChanges(MarkUp)
1 (facility), has beensubstantially completed in conformity with Construction Permit No. CPPR-75 and the application, as amended, the provisions of the Act and the rules and regulations of the Commission; C. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; D. There is reasonable assurance: (i) that the activities authorized by this renewedoperating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the rules and regulations of the Commission;E. FENOC is technically qualified and the licensees are financially qualified to engage inthe activities authorized by this renewed operating license in accordance with the rulesand regulations of the Commission; F. The licensees have satisfied the applicable provisions of 10 CFR Part 140, "FinancialProtection Requirements and Indemnity Agreements," of the Commission's regulations;
(NinePagesFollow)
*FENOC is authorized to act as agent for FirstEnergy Nuclear GeneratiorglLlQ,--qqd h?g-g-{qlqgjyg responsibility and control over the physical construction, operation, and maintenance of the facility.AmendmenlNa-Renewed Operating License DPR-66 Deleted: Deleted: Corp Deleted3 coro.
 
H.G.-2-The issuance of this renewed operating license will not be inimical to the commondefense and security or to the health and safety of the public;After weighing the environmental, economic, technical and other benefits of the facilityagainst environmental and other costs and considering available alternatives, theissuance of Renewed Facility Operating License No. DPR-66 is in accordance with 10CFR Part 5'1 (formerly Appendix D of 10 CFR Part 50) of the Commission's regulations and all applicable requirements have been satisfied; andThe receipt, possession, and use of source, by-product, and special nuclear material asauthorized by this renewed operating license will be in accordance with the Commission's regulations in 10 CFR Parts 30, 40, and 70, including 10 CFR Sections 30.33, 40.32, 70.23, and 70.31.Actions have been identified and have been or will be taken with respect to: (1)managing the effects of aging on the functionality of structures and components that have been identified to require review under 10 CFR U.21(a)(1) during the period of extended operation, and (2) time-limited aging analyses that have been identified torequire review under 10 CFR 5a.21(c), such that there is reasonable assurance that theactivities authorized by this renewed operating license will continue to be conducted inaccordance with the current licensing basis, as defined in 10 CFR 54.3 for the facility,and that any changes made to the facility's current licensing basis in order to complywith 10 CFR 54.29(a) are in accordance with the Act and the Commission's regulations;Renewed Facility Operating License No.
UNITEDSTATES NUCLEAR REGUIATORY COMMISSION WASHINGTON. D.C. 20555-0001 FIRSTENERGY     NUCLEAROPERATING          COMPANY FIRSTENERGY     NUCLEAR   GENERATIO]UILC                                 Deleted:
DPR-66 is hereby issued to FENOC and FirstEnergy Nuctear Generation*lt0 !q te?E ?q-tqlLqWc,This renewed license applies to the Beaver Valley Power Station, Unit No. 1, a pressurized water nuclear reactor and associated equipment (the facility), owned by FirstEnergy Nuclear Generatiorr*lLtQ, enq Cpele!9q _!y EENO_Q."-I-heleelly iC localeE ir_r .1--Beaver County, Pennsylvania, on the southern shore of the Ohio River, and is described in the "Updated Final Safeg Analysis Report" as supplemented and amended and theEnvironmental Report as supplemented and amended.Subject to the conditions and requirements incorporated herein, the Commission hereby licenses: FENOC, pursuant to Section 104b of the Act and 10 CFR Part 50, "Licensing ofProduction and Utilization Facilities," to possess, use, and operate the facility,and FirstEnergy Nuclear GeneratiorglLlQ tq poq-sqgq lhq fe_cltiff e!.!he -ldesignated location in Beaver County, Pennsylvania in accordance with the procedures and limitations set forth in this renewed license; FENOC, pursuant to the Act and 10 CFR Part 70, to receive, possess, and use atany time special nuclear material as reactor fuel, in accordance with thelimitations for storage and amounts required for reactor operation, as describedin the Updated Final Safety Analysis Report, as supplemented and amended; J.2.(1)(2)Amendment No.,__[-----
DOCKETNO.50-334 BEAVERVALLEYPOWERSTATION.UNITNO. 1 RENEWED    FACILITY   OPERATING     LICENSE LicenseNo. DPR-66 The NuclearRegulatoryCommission(the Commission)havingfoundthat:
Renewed Operating License DPR-66 Deleted: Corp.Deleted: corp.Deleted: Corp Deleted3 285Beaver Valley Unit 1 (3)(4)(5)-3-FENOC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required;FENOC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; FENOC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter 1:Part 20, Section 30.34 of Part 30, Section 40.41 ot Pa( 40, Sections 50.54 and 50.59 ofPart 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of theAct and to the rules, regulations, and orders of the Commission now or hereafter ineffect; and is subject to the additional conditions specified or incorporated below: Maximum Power Level FENOC is authorized to operate the facility at a steady state reactor core power level of 2900 megawatts thermal.
A. The applicationto renewFacilityOperatingLicenseNo. DPR-66,filed by FirstEnergy NuclearOperatingCompany(FENOC)-actingon its own behalfand as agent for FirstEnergy NuclearGeneratioq*lltQ   (the_l!_cet_s_ee-s).9_o.         qt?-r-'q4qq t!pl!99W!tl'-!h9-       ?"ltq. Deleted: Corp requirements   of theAtomicEnergyActof 1954,as amended         (theAct),andthe Commission's   rulesandregulations setforthin 10CFRChapter1, andall required notificationsto otheragencies  or bodieshavebeendulymade; B. Construction of the BeaverValleyPowerStation,UnitNo.1 (facility),     hasbeen substantially completed in conformity withConstruction  PermitNo.CPPR-75     andthe application,as amended,   the provisions of theActandtherulesandregulations      of the Commission; C. Thefacilitywilloperatein conformity withtheapplication,   the provisionsof theAct,and the rulesandregulations  of theCommission; D. Thereis reasonable   assurance:(i)thattheactivities  authorized bythisrenewed operating licensecanbe conducted   withoutendangering    the healthandsafetyof the public,and(ii)thatsuchactivities  willbe conducted   in compliance withthe rulesand regulations of theCommission; E. FENOCis technically   qualifiedandthe licensees arefinancially  qualified to engagein theactivities authorized bythisrenewed  operating licensein accordance   withthe rules andregulations  of theCommission; F. Thelicensees  havesatisfied  theapplicable  provisions of 10CFRPart140,"Financial Protection Requirements   andIndemnity  Agreements,"   of theCommission's   regulations;
Technical SoecificationsThe Technical Specifications contained in Appendix A, as revised through Amendment No. , are hereby incorporated in the license. The licensee shalloperate the facility in accordance with the Technical Specifications.Auxiliarv River Water System (Deleted by Amendment No.
*FENOCis authorizedto actas agentfor FirstEnergy   NuclearGeneratiorglLlQ,--qqd                     Deleted3 coro.
8)c.(1)(2)(3)Amendment No.,-l---Renewed Operating License DPR-66Deleted: 286Beaver Valley Unit 1 (10)(11)-6-Additional ConditionsThe Additional Conditions contained in Appendix C, as revised through Am end m ent No-, -qq_ h-gl_qDy insCtpqtaleQ r-1!C tt'i9 I ieen ge. F,E- -N Qqshall operate the facility in accordance with the Additional Conditions.
h?g-g-{qlqgjyg andcontroloverthephysical responsibility                           construction, operation, andmaintenance  of thefacility.
Mitioation Strateqv License ConditionThe licensee shall develop and maintain strategies for addressing large fires andexplosions and that include the following key areas:
AmendmenlNa-Renewed   OperatingLicenseDPR-66
Fire fighting response strategy with the following elements:1. Pre-defined coordinated fire response strategy and guidance2. Assessment of mutual aid fire fighting assets
 
: 3. Designated staging areas for equipment and materials 4. Command and control5. Training of response personnelOperations to mitigate fuel damage considering the following:1. Protection and use of personnel assets 2. Communications3. Minimizing fire spread4. Procedures for implementing integrated fire response strategy 5. ldentificationof readily-availablepre-staged equipment6. Training on integrated fire response strategy7. Spent fuel pool mitigation measures Actions to minimize release to include consideration of: 1. Water spray scrubbing2. Dose to onsite responders Deleted; 278Deleted: 285 (a)(b)(c)Beaver Valley Unit 1 Amendment No.,--[---"Renewed Operating License DPR-66 APPENDIX C ADDITIONAL CONDITIONSOPERATING LICENSE NO. DPR.66FirstEnergy Nuclear Operating Company and FirstEnergy Nuclear Generatiorl*lLll 9_h-qLl-9-oq1p.fy-Wit!
G. The issuanceof this renewedoperatinglicensewill not be inimicalto the common defenseand securityor to the healthand safetyof the public; H. After weighingthe environmental,   economic,technicaland other benefitsof the facility againstenvironmentaland othercosts and consideringavailablealternatives,         the issuanceof RenewedFacilityOperatingLicenseNo. DPR-66is in accordancewith 10 CFR Part 5'1(formerlyAppendixD of 10 CFR Part 50) of the Commission'sregulations and all applicablerequirementshave been satisfied;and The receipt,possession,and use of source,by-product,and specialnuclearmaterialas authorizedby this renewedoperatinglicensewill be in accordancewith the Commission'sregulationsin 10 CFR Parts30, 40, and 70, including10 CFR Sections 30.33,40.32,70.23,and 70.31.
the following conditions on the schedules noted below: Amendment Number 202 209 Beaver Vallev Unit 1 210Additional ConditionThe licensee is authorized to relocate certain Technical Specification requirements to licensee-controlled documents.
J. Actionshave been identifiedand have been or will be takenwith respectto: (1) managingthe effectsof aging on the functionalityof structuresand componentsthat have been identifiedto requirereviewunder10 CFR U.21(a)(1) duringthe periodof extendedoperation,and (2) time-limitedaging analysesthat have been identifiedto requirereviewunder 10 CFR 5a.21(c),suchthat there is reasonableassurancethat the activitiesauthorizedby this renewedoperatinglicensewill continueto be conductedin accordancewith the currentlicensingbasis,as definedin 10 CFR 54.3 for the facility, and that any changesmadeto the facility'scurrentlicensingbasisin orderto comply with 10 CFR 54.29(a)are in accordancewith the Act and the Commission'sregulations;
lmplementation of this amendment shall include the relocation of thesetechnical specification requirements to theappropriate documents, as described in the licensee's application dated September 9, 1996,and evaluated in the staffs safety evaluation attached to this amendment.The licensee is authorized to relocate certain Technical Specification requirements to licensee-controlled documents.
: 2. Renewed    FacilityOperating  LicenseNo.DPR-66is herebyissuedto FENOCandFirstEnergy NuctearGeneration*lt0!q te?E?q-tqlLqWc,                                                                 Deleted: Corp.
lmplementation of this amendment shall include the relocation of thesetechnical speciflcation requirements to theappropriate documents, as described in the licensee's application dated March 14, 1997, as supplemented July 29 and August 13, 1997, andevaluated in the staffs safetv evaluation attachedto this amendment.
Thisrenewed    licenseappliesto the BeaverValleyPowerStation,UnitNo.1, a pressurized waternuclearreactorandassociated      equipment   (thefacility),ownedby FirstEnergy NuclearGeneratiorr*lLtQ, enqCpele!9q   _!yEENO_Q."-I-heleelly   iClocaleEir_r.1-- Deleted: corp.
The licensee is authorized to relocate certainTechnical Specification requirements to licensee-controlled documents.
BeaverCounty,Pennsylvania,     on thesouthern  shoreof theOhioRiver,andis described in the"Updated   FinalSafegAnalysisReport"as supplemented         andamended      andthe Environmental  Reportas supplemented   andamended.
lmplementation of this amendment shall include the relocation of thesetechnical specification requirements to the appropriate documents, as described in the licensee's application dated September 11, 1997,and evaluated in the staffs safety evaluationattached to this amendment.
Subjectto theconditions  andrequirements  incorporated   herein,theCommission    hereby licenses:
lmplementation DateThe amendment shallbeimplemented within 60 days from April14, 1997The amendmentshall beimplemented within 60 days fromDecember 10.
(1)    FENOC,pursuant     to Section104bof theActand10CFRPart50,"Licensing           of Production  andUtilization          to possess, Facilities,"           use,andoperatethefacility, and FirstEnergy NuclearGeneratiorglLlQ    tq poq-sqgq lhq fe_cltiff e!.!he           -l    Deleted: Corp designated  locationin BeaverCounty,Pennsylvania     in accordance withthe procedures andlimitations  setforthin thisrenewed  license; (2)    FENOC,pursuant     to theActand10CFRPart70,to receive,       possess,   anduseat anytimespecialnuclearmaterial    as reactorfuel,in accordance   withthe limitationsfor storageandamountsrequired      for reactoroperation, as described in the UpdatedFinalSafetyAnalysisReport,as supplemented       andamended; Amendment    No.,__[-----
1997The amendment shallbeimplemented within30 days from January 20, 1998Amendment No., Deleted: Corp Deleted: 285 c-1 APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE NO. DPR-66 FirstEnergy Nuclear Operating Company and FirstEnergy Nuclear Generatior;lttQ g_bALl-_c_o!!p_fy Wth -[the following conditions on the schedules noted below: Amendment Number 225 Additional ConditionThe licensee is authorized to relocate certain Technical Specification requirements to licensee-controlled documents. lmplementation of thisamendment shall include the relocation of theseTechnical Specification requirements to theappropriate documents as described in the licensee's application dated December 24, 1998,as supplemented June 15, June 17, and July 7, 1999, and evaluated in the staffs safetyevaluation attached to this amendment.
Deleted3285 BeaverValleyUnit 1                                              Renewed   Operating LicenseDPR-66
On the closing date(s) of the transfers to FENGenCol of their interests in Beaver Valley Power Station, UnitNo. 1, Pennsylvania Power Company and Ohio EdisonCompany shall transfer to FENGenCol all of eachtransferor's respective accumulated decommissioningfunds for Beaver Valley Power Station, Unit No.
 
1, andtender to FENGenCol additional amounts equal toremaining funds expected to be collected in 2005, as represented in the application dated June 1, 2005, but not yet collected by the time of closing. All of the funds shall be deposited in a separate external trust fund forthe reactor in the same amount as received with respect to the unit to be segregated from other assetsof FENGenCol and outside its administrative control, as required by NRC regulations, and FENGenCol shall take all necessary steps to ensure that this externaltrust fund is maintained in accordance with the requirements of the order approving the transfer of the license and consistent with the safety evaluation supporting the order and in accordance with the requirements of 10 CFR Section 50.75, "Reporting and recordkeeping for decommissioning planning." lmplementation Date The amendment shallbe implemented within60 days fromAugust 30, 1999The amendment
(3)   FENOC,pursuant       to theActand10CFRParts30,40 and70,to receive, possessanduseat anytimeanybyproduct,         sourceandspecialnuclearmaterial as sealedneutronsourcesfor reactorstartup,sealedsourcesfor reactor instrumentation   andradiation monitoringequipment            andas fission calibration, detectors in amountsas required; (4)    FENOC,pursuant       to theActand10CFRParts30,40 and70,to receive, possessandusein amountsas required       anybyproduct, source,or special nuclearmaterial  withoutrestriction          or physical to chemical         form,for sample analysis or instrument   calibration           withradioactive or associated             apparatus or components; (5)    FENOC,pursuant       to theActand10CFRParts30,40,and70,to possess,       but notseparate,   suchbyproduct  andspecialnuclearmaterials  as maybe produced bytheoperation    of thefacility.
: c. Thisrenewed  operating   licenseshallbe deemedto containandis subjectto the conditionsspecified  in thefollowing Commission           in 10 CFRChapter1:
regulations Part20,Section30.34of Part30,Section40.41ot Pa( 40,Sections       50.54and50.59of Part50,andSection70.32of Part70;andis subjectto all applicable     provisionsof the Actandto therules,regulations,     andordersof theCommission  nowor hereafterin effect;andis subjectto theadditional  conditions       or incorporated specified              below:
(1)    MaximumPowerLevel FENOCis authorizedto operatethe facilityat a steadystate reactorcore power levelof 2900 megawattsthermal.
(2)    TechnicalSoecifications The TechnicalSpecifications    containedin AppendixA, as revisedthrough AmendmentNo. , are herebyincorporatedin the license. The licenseeshall operatethe facilityin accordancewith the TechnicalSpecifications.
(3)    AuxiliarvRiverWater System (Deletedby AmendmentNo. 8)
Amendment  No.,-l--- Deleted: 286 BeaverValleyUnit 1                                            Renewed   OperatingLicenseDPR-66
 
( 1 0 ) AdditionalConditions TheAdditional Conditions   contained   in Appendix C, as revisedthrough Amendment No-, -qq_h-gl_qDy     insCtpqtaleQ     tt'i9I ieenge. F,E-r-1!C                -NQq                Deleted;  278 shalloperatethefacilityin accordance     withtheAdditional    Conditions.
( 1 1 ) Mitioation StrateqvLicenseCondition The licenseeshalldevelopand maintainstrategiesfor addressinglargefires and explosionsand that includethe followingkey areas:
(a)  Firefightingresponse    strategy withthefollowing    elements:
: 1. Pre-defined   coordinated   fireresponse  strategy andguidance
: 2. Assessment     of mutualaidfirefightingassets
: 3. Designated     stagingareasfor equipment       andmaterials
: 4. Command     andcontrol
: 5. Training   of response   personnel (b)  Operations to mitigate fueldamageconsidering        thefollowing:
: 1. Protection anduseof personnel       assets
: 2. Communications
: 3. Minimizing   firespread
: 4. Procedures     for implementing   integrated fireresponse  strategy
: 5. ldentificationof   readily-availablepre-staged     equipment
: 6. Trainingon integrated     fireresponse  strategy
: 7. Spentfuelpoolmitigation        measures (c)  Actionsto minimize   releaseto includeconsideration      of:
: 1. Watersprayscrubbing
: 2. Doseto onsiteresponders AmendmentNo.,--[---"Deleted: 285 BeaverValleyUnit1                                              Renewed      OperatingLicenseDPR-66
 
APPENDIX   C ADDITIONAL   CONDITIONS OPERATING    LICENSE   NO.DPR.66 FirstEnergy NuclearOperatingCompanyand FirstEnergy     NuclearGeneratiorl*lLll9_h-qLl-9-oq1p.fy-Wit!Deleted: Corp thefollowing conditionson theschedules  notedbelow:
Amendment       AdditionalCondition                                lmplementation Number                                                               Date 202             The licenseeis authorizedto relocatecertain        The amendment TechnicalSpecificationrequirementsto licensee-     shallbe controlleddocuments. lmplementation   of this       implementedwithin amendmentshallincludethe relocationof these        60 days from technicalspecificationrequirementsto the           A p r i l 1 4 ,1 9 9 7 appropriatedocuments,as describedin the licensee'sapplicationdated September9, 1996, and evaluatedin the staffs safetyevaluation attachedto this amendment.
209              The licenseeis authorizedto relocatecertain        The amendment TechnicalSpecificationrequirementsto licensee-     shallbe controlleddocuments. lmplementation   of this       implementedwithin amendmentshallincludethe relocationof these        60 days from technicalspeciflcationrequirementsto the           December10. 1997 appropriatedocuments,as describedin the licensee'sapplicationdated March14, 1997,as supplemented July29 and August13, 1997,and evaluatedin the staffs safetvevaluationattached to this amendment.
210              The licenseeis authorizedto relocatecertain        Theamendment TechnicalSpecificationrequirementsto licensee-     shallbe controlleddocuments. lmplementation   of this       implemented        within amendmentshallincludethe relocationof these        30 daysfrom technicalspecificationrequirementsto the           January      20,1998 appropriatedocuments,as describedin the licensee'sapplicationdated September11, 1997, and evaluatedin the staffs safetyevaluation attachedto this amendment.
BeaverVallevUnit1                            c-1                    Amendment          No., Deleted: 285
 
APPENDIXC ADDITIONAL   CONDITIONS OPERATINGLICENSENO. DPR-66 FirstEnergyNuclearOperatingCompanyand FirstEnergyNuclearGeneratior;lttQ g_bALl-_c_o!!p_fy   Wth -[ Deleted: Corp.
the followingconditionson the schedulesnotedbelow:
Amendment           AdditionalCondition                                      lmplementation Number                                                                       Date 225               The licenseeis authorizedto relocatecertain                The amendment TechnicalSpecificationrequirementsto licensee-            shallbe controlleddocuments. lmplementation    of this          implementedwithin amendmentshallincludethe relocationof these              60 days from TechnicalSpecificationrequirementsto the                   August30, 1999 appropriatedocumentsas describedin the licensee'sapplicationdated December24, 1998, as supplemented   June 15,June 17,and July7, 1999,and evaluatedin the staffs safety evaluationattachedto this amendment.
269                On the closingdate(s)of the transfersto FENGenCol         The amendment of their interestsin BeaverValleyPowerStation,Unit        shallbe No. 1, PennsylvaniaPowerCompanyand Ohio Edison            implementedwithin Companyshalltransferto FENGenColall of each              30 days from transferor'srespectiveaccumulateddecommissioning          December16. 2005 funds for BeaverValleyPowerStation,Unit No. 1, and tenderto FENGenColadditionalamountsequalto remainingfunds expectedto be collectedin 2005,as representedin the applicationdatedJune 1, 2005, but not yet collectedby the time of closing. All of the funds shall be depositedin a separateexternaltrust fund for the reactorin the same amountas receivedwith respectto the unit to be segregatedfrom otherassets of FENGenColand outsideits administrative       control, as requiredby NRC regulations,and FENGenColshall take all necessarystepsto ensurethat this external trust fund is maintainedin accordancewith the requirementsof the orderapprovingthe transferof the licenseand consistentwith the safetyevaluation supportingthe orderand in accordancewith the requirementsof 10 CFR Section50.75,"Reportingand recordkeepingfor decommissioning    planning."
-"tr*ro"twd""rc"""rrtl GenerctionJlq BeaverValleyUnit 1                              c-2                                                Deleted; 285
 
APPENDIXC ADDITIONAL      CONDITIONS OPERATINGLICENSENO. DPR-66 FirstEnergyNuclearOperatingCompanyand FirstEnergyNuclearGeneratiorgllQ -s-heLl        qglp_fyWlh .l - Deleted: corp the followingconditionson the schedulesnotedbelow:
Amendment          Additional Condition                                      lmplementation Number                                                                        Date 269                Bythedateof closingof thetransferof theownership Theamendment          shall interestsin BeaverValley  PowerStation,UnitNo.1          be implemented within fromPennsylvania    PowerCompany      to FENGenCol, 30 daysfrom FENGenCol    shallobtaina parentcompany      guarantee December  16.2005 fromFirstEnergy  in an initialamountof at least$80 million(in2005dollars)to provideadditional decommissioning    fundingassurance    regarding  such ownership  interests.Required    fundinglevelsshallbe recalculated annually  and,as necessary,    FENGenCo]
shalleitherobtainappropriate    adjustments to the parentcompany    guarantee    or othenvise provideany additionaldecommissioning    fundingassurance necessary  for FENGenCol    to meetNRCrequirements under10CFR50.75.
TheSupport  Agreements    described  in theapplications datedMay18,2005(upto $80million),        andJune1, 2005(upto $400million),    shallbeeffective  consistent withtherepresentations    contained  in theapplications.
FENGenCol    shalltakeno actionto causeFirstEnergy, or itssuccessors  andassigns,    to void,cancel,or modify the Support  Agreements    withoutthepriorwritten consentofthe NRCstaff,except,however,          the$80 millionSupportAgreement      in connection withthe transferof the Pennsylvania    PowerCompany    interests maybe revokedor rescinded      if andwhenthe$400 millionsupport  agreement  described  intheJune1, 2005,application  becomes    effective.FENGenCol    shall informthe Director  of theOtficeof NuclearReactor Regulation, in writing,no laterthantendaysafterany fundsareprovided    to FENGenCol    by FirstEnergy undereitherSupport    Agreement.
- firstfnergv Nucl GenerationJtC=
BeaverValleyUnit 1                                c-3                                                Deleted: 285
 
APPENDIXC ADDITIONAL      CONDITIONS OPERATINGLICENSENO. DPR-66 FirstEnergyNuclearOperatingCompanyand FirstEnergyNuclearGeneratiorl=ltli9_Lr,eLl--c_ollply    Wth -l- --- Deleted: Corp the followingconditionson the schedulesnotedbelow:
Amendment      AdditionalCondition                                                  lmplementation Number                                                                              Date 278            Schedulefor New and RevisedSurveillanceRequirements(SRs)
The schedulefor performingSRs that are new or revisedin            The AmendmentNo. 278 shall be as follows:                              amendment shallbe For SRs that are new in this amendment,the first performance implemented is due at the end of the first surveillanceinterval,wtrichbegins within150days on the date of implementation    of this amendment.              from date of issuance For SRs that existedpriorto this amendment,whose intervals of performanceare beingreduced,the first reduced surveillanceintervalbeginsupon completionof the first surveillanceperformedafter implementation      of this amendment.
For SRs that existedpriorto this amendment,whose intervals of performanceare beingextended,the first extended surveillanceintervalbeginsupon completionof the last surveillanceperformedpriorto implementation      of this amendment.
For SRs that existedpriorto this amendmentthat have modifiedacceptancecriteria,the first performancesubjectto the modifiedacceptancecriteriais due at the end of the first surveillanceintervalthat beganon the date the surveillance was last performedpriorto the implementation      of this amendment.
278            Relocationof CertainTechnicalSoecificationRequirements LicenseAmendmentNo. 278 authorizesthe relocationof certain          The TechnicalSpecifications  to other licensee-controlled  documents. amendment lmplementation  of this amendmentshallincluderelocationof the      shallbe requirementsto the specifieddocuments,as describedin                implemented (1) Sections4D and 4E of the NRC staffs SafetyEvaluation,and        within 150 days (2) Table LA, RemovedDetailChanges,and Table R, Relocated            from date of Specifications, attachedto the NRC staffs SafetyEvaluation,          issuance which is enclosedin this amendment.
BeaverValleyUnit1                                  c4                                                      Deleted:285
 
APPENDIX  C ADDITIONAL    CONDITIONS OPERATING      LICENSE  NO.DPR-66 NuclearOperating FirstEnergy                  Company    andFirstEnergy                            g_onply NuclearGeneration-lLlQ-g-bSl_f      Wt_l1-l Deleted: corp.
thefollowing conditions on theschedules    notedbelow:
Amendment    Additional  Condition                                                lmplementation Number                                                                            Date 281          InitialPerformance    of NewSurveillance  andAssessment Requirements Uponimplementation        of Amendment  No.281adopting  TSTF-448, The Revision  3, thedetermination  of controlroomenvelope  (CRE)      amendment unfiltered air inleakage  as requiredby Surveillance Requirement s h a l l b e (SR)3.7.10.4,    in accordance  withSpecification          the 5.5.14.c(i),      implemented assessment    of CREhabitability  as requiredby Specification      within 120 days 5.5.14.c(ii), andthemeasurement      of CREpressure  as requiredby from date of Specification  5.5.14.d,  shallbeconsidered met. Following          issuance implementation:
(a) Thefirstperformance    of SR3.7.1O.4, in accordance  with Specification  5.5.14.c(i),shallbewithinthespecified Frequency    of 6 years,plusthe 18-month  allowance of SR3.0.2,as measured      fromthedateof themostrecent successful  tracergastest,or withinthe next18monthsif thetimeperiodsincethe mostrecentsuccessful        tracergas testis greaterthan6 years.
(b) Thefirstperformance    of the periodic assessment  of CRE habitability, Specification 5.5.14.c(ii),
shallbewithin 3 years,plusthe9-monthallowance      of SR3.0.2,as measured    fromthedateof themostrecentsuccessful tracergastest,or withinthenext9 monthsif thetime periodsincethemostrecentsuccessful        tracergastestis greaterthan3 years.
(c) Thefirstperformance    of theperiodicmeasurement    of CRE pressure,  Specification 5.5.14.d,shallbewithin18 months, plusthe 138daysallowedby SR3.0.2,as measured          from thedateof themostrecentsuccessful      pressure measurement    test.
BeaverValleyUnit 1                                c-5                        Amendment  No.,        Deleted:285
 
Attachment2 ProposedBeaverValleyPowerStation,UnitNo.2 OperatingLicenseChanges(MarkUp)
(ThirteenPagesFollow)
 
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON,      D.C.20555-0001 FIRSTENERGY      NUCLEAROPERATINGCOMPANY Deleted:
FIRSTENERGY        NUCLEARGENERATTOT{*LLC                                -)
O H I OE D I S O NC O M P A N Y THE TOLEDOEDISONCOMPANY D O C K E TN O . 5 0 - 4 1 2 BEAVERVALLEYPOWERSTATION.UNIT2 RENEWEDFACILITYOPERATINGLICENSE LicenseNo. NPF-73
: 1. The NuclearRegulatoryCommission(the Commissionor the NRC)has foundthat:
A. The applicationto renew FacilityOperatingLicenseNo. NPF-73filed by FirstEnergyNuclearOperatingCompany(FENOC)-actingon its own behalfand as agent for FirstEnergyNuclear Generatiorl=lLtQ 9_btqECjq-qn9qqrpe1y, gfrq            Deleted3 Corp.
The Toledo EdisonCompany(the licensees),complieswith the standardsand requirementsof the Atomic EnergyAct of 1954,as amended(the Act), and the Commission's    regulations set forthin 10 CFR Chapterl, and all required notificationsto other agenciesor bodieshave been duly made; Constructionof the BeaverValley PowerStation,Unit 2 (the facility),has been substantiallycompletedin conformitywith ConstructionPermit No. CPPR-105and the application,as amended,the provisionsof the Act, and the regulationsof the Commission;
: c. The facilitywill operatein conformitywith the application,the provisionsof the Act, and the regulationsof the Commission(exceptas exemptedfrom compliancein Section2.D. below);
D. There is reasonableassurance: (i) that the activitiesauthorizedby this renewed operatinglicensecan be conductedwithoutendangeringthe healthand safetyof the publicand (ii) that such activitieswill be conductedin compliancewith the Commission'sregulationsset forth in 10 CFR Chapterl (exceptas exemptedfrom compliancein Section2.D. below);
'FENOCis authorizedto actas agentfor FirstEnergy  Nuctear  GeneratiorglltQghfCECISS'1,9g!tp_qrly,______,
Deleted: CorD andTheToledoEdisonCompanyandhasexclusive        responsibility  andcontroloverthe physical construction, operation, andmaintenance    of thefacility.
Amendmentl{o.
Renewed  Operating  License NPF-73
 
E. FENOCis technically    qualified  to engagein the activities  authorized  by this renewedoperatinglicensein accordance          withthe Commission's    regulations  set forthin 10CFRChapter      l; F. Thelicensees    havesatisfied  the applicable provisions  of 10 CFRPart140, "Financial Protection  Requirements    and Indemnity  Agreements,"    of the Commission's    regulations; G. Theissuanceof thisrenewedoperating          licensewillnotbe inimical    to the common defenseandsecurityor to the healthandsafetyof thepublic; H. Afterweighingtheenvironmental,        economic,  technical,  andotherbenefitsof the facilityagainstenvironmental    andothercostsandconsidering        available alternatives, the issuance  of thisRenewed    Operating  LicenseNo.NPF-73is subjectto the conditions  for protection of the environment    setforthin the Environmental    Protection Planattachedas AppendixB, is in accordance          with10 CFRPart51 of theCommission's          regulations,andallapplicable    requirements havebeensatisfied;
: t. Thereceipt,possession    anduseof source,byproduct        andspecialnuclearmaterial as authorized  by thislicensewillbe in accordance    withthe Commission's regulations  in 10 CFRParts30,40,and70.
J. Actionshavebeenidentified      andhavebeenor willbe takenwithrespectto: (1) managing  theeffectsof agingon thefunctionality      of structures  andcomponents thathavebeenidentified    to requirereviewunder10 CFR54.21(a)(1)            duringthe periodof extended    operation,  and(2)time-limited  aginganalyses    thathavebeen identifiedto requirereviewunder10 CFR54.2'l(c),suchthatthereis reasonable assurance  thatthe activities authorized  bythisrenewedoperating        licensewill continue to be conducted    in accordance  withthe currentlicensing    basis,as definedin 10 CFR54.3for thefacilig,andthatanychangesmadeto thefacility's currentlicensing  basisin orderto complywith10 CFR54.29(a)are in accordance withtheAct andthe Commission's        regulations; Renewed  Facility  Operating  License  NPF-73  is hereby issued  to FENOC,    FirstEnergy Nuclear Generation*lLtQ,  QhiSEdiqqrr    Qqmpqly.pttd__r_he  Iele{q FClqq!Qp-t1p4:'y    (!t'9--l Deleted: Corp.
licensees)to read as follows:
A. Thisrenewedlicenseappliesto the BeaverValleyPowerStation,Unit2, a pressurized  waterreactorandassociated        equipment  (thefacility), ownedby FirstEnergy  NuclearGeneratioq=lUl      (qWneD..leqqed            ECigqlqg11pery tq 9_t-r!S                          Deleted: Corp.
(lessee), andTheToledoEdisonCompany(lessee)andoperatedby FENOC (collectivelythe licensees).Thefacilityis locatedon the licensees'        siteon the southernshoreof the OhioRiverin BeaverCounty,Pennsylvania,              approximately 22 milesnorthwest    of Pittsburgh  and5 mileseastof EastLiverpool,        Ohio,andis described  in FENOC'sUpdatedFinalSafetyAnalysisReport,as supplemented andamended,      andin itsEnvironmental    Report, as supplemented      andamended; B. Subjectto the conditions  andrequirements    incorporated  herein,the Commission herebylicenses:
(1)    Pursuant  to Section103of theActand10CFRPart50,FENOCto possess,use,andoperatethefacilityat thedesignated            locationin Beaver County,Pennsylvania,      in accordance  withthe procedures    andlimitations setforthin thislicense:
Amendment    No.,,I  Deleted: 171 BeaverValleyUnit2                                          Renewed    Operating  LicenseNPF-73
 
                                            .3-(2)  Pursuant  to theAct and 10CFRPart50, FirstEnergy          NuclearGeneratiorl-[-        Deletedr Corp.
LLe, OhioEdisonCompany,          andTheToledoEdisonCompany            to possessthefacilityat the designated        locationin BeaverCounty, Pennsylvania,  in accordance    withthe procedures    andlimitations  setforth in the license; (3)  Pursuant  to theAct and 10 CFRPart70, FENOC,to receive,possess, anduseat anytimespecialnuclearmaterialas reactorfuel,in accordance    withthe limitations  for storageandamountsrequiredfor reactoroperation,    as described  in the UpdatedFinalSafetyAnalysis Report,as supplemented      andamended; (4)  Pursuant  to theActand10CFRParts30.40,and70,FENOCto receive, possess,anduseat anytimeanybyproduct,              source,andspecialnuclear materialsuchas sealedneutronsourcesfor reactorstartup,sealed sourcesfor reactorinstrumentation      andradiation  monitoring  equipment calibration, andas fissiondetectors      in amountsas required; (5)  Pursuant  to theAct and 10 CFRParts30,40, and70,FENOCto receive, possess,andusein amountsas requiredanybyproduct,              source,or specialnuclearmaterialwithoutrestriction        to chemicalor physicalform, for sampleanalysisor instrument      calibration or otheractivityassociated withradioactive  apparatus  or components; (6)  Pursuant  to theActand10CFRParts30,40,and70,FENOCto possess,butnotseparate,        suchbyproduct    andspecialnuclearmaterials as maybe produced      by theoperation    of thefacilityauthorized herein.
(7)  (a)      OhioEdisonCompany        andTheToledoEdisonCompany            are authorized  to transferanyportionof theirrespective      leased interestsin BVPSUnit2 anda proportionate        shareof theirleased interestsin the BVPScommonfacilities      to certainpotential investors identified in theirsubmittals  of July14,16,22 and31, andSeptember'14,17        and18,1987,andat thesametimeto leasebackfromsuchpurchasers          suchinteresttransferred  in the BVPSUnit2 facility.Thetermof the leaseis for approximately 29-112years  subjectto a rightof renewal.Suchsaleand leaseback  transactions  aresubjectto the representations    and conditions  setforthin the aforementioned      submittals.Specifically, a lessorandanyoneelsewhomayacquirean interestunder thesetransactions    are prohibited  fromexercising  directlyor indirectlyanycontroloverthe licenseof BVPSUnit2. For purposes  of thiscondition  thelimitations in 10CFR50.81,as now in effectandas maybe subsequently          amended,  arefully applicable  to the lessorandanysuccessor        in interestto that lessoras longas the licensefor BVPSUnit2 remainsin effect; thesefinancialtransactions      shallhaveno effecton the licensefor the BVPSUnit2 facilitythroughout        thetermof the license.
A m e n d m e nN t o.,-[--- Deleted: 171 BeaverValleyUnit2                                          RenewedOperatingLicenseNPF-73
 
(b)      Further,the licensees  arealsorequired to notifythe NRCin writingpriorto anychangein: (i)thetermor conditions      of anyleaseagreements    executed as partof these transactions; (ii)the BVPSOperating  Agreement,  (iii)the existingpropertyinsurance  coverage  for BVPSUnit2, and (iv)anyactionby a lessoror othersthatmayhaveadverse effecton the safeoperationof the facility.
: c. Thisrenewedoperating      licenseshallbe deemedto containandis subject to the conditions  specified in thefollowingCommission  regulations  set forthin 10 CFRChapter1 andis subjectto all applicable      provisions  of the Act andto the rules,regulations,    andordersof the Commission  nowor hereafter  in effect;andis subjectto theadditional conditions specified  or incorporated  below:
(1)    MaximumPower Level FENOC is authorizedto operatethe facilityat a steadystate reactor core power levelof 2900 megawattsthermal.
(2)    TechnicalSpecifications The TechnicalSpecificationscontainedin AppendixA, as revised through AmendmentNo*, qnd lhe EnVrfSI        11t    Ptqtesli_o-!-
e!!e-L            Plen          Deleted:173 containedin AppendixB, both of which are attachedheretoare herebyincorporatedin the license. FENOCshall operatethe facilityin accordancewith the TechnicalSpecificationsand the EnvironmentalProtectionPlan.
Amendment  No.,_[-----
Deleted:173 BeaverValleyUnit2                                        Renewed  Operating  LicenseNPF-73
 
                                            .6-(8)    DetailedControlRoom DesiqnReview(DCRDR)
Deleted (e)    Safetv ParameterDisplavSvstem(SPDS)
Deleted (10)  Fire ProtectionModifications(Section9.5.1 of SER Supplement6)
Deleted (11)  AdditionalConditions The AdditionalConditionscontainedin AppendixD, as revisedthrough AmendmentNo.*9_r-9-!91--e!y-    j!99lp9r:?-tedinlq tb!-s-!r-q9ft99,--f-FNqq ,t -' Deleted3 163, shalloperatethefacilityin accordance    withtheAdditional  Conditions.
('12)  Steam GeneratorSurveillancelntervalExtension Deleted (13)  MitiqationStrateqvLicenseCondition The licenseeshall developand maintainstrategiesfor addressinglarge fires and explosionsand that includethe followingkey areas:
(a)    Firefightingresponse  strategywiththefollowing    elements:
: 1. Pre-defined  coordinated  fireresponse  strategyandguidance
: 2. Assessment      of mutualaidfirefightingassets
: 3. Designated    stagingareasfor equipment      andmaterials
: 4. Command      andcontrol
: 5. Trainingof response      personnel (b)  Operations  to mitigatefueldamageconsidering      thefollowing:
: 1. Protection  anduseof personnel      assets
: 2. Communications
: 3. Minimizing  firespread
: 4. Procedures    for implementing  integrated fireresponsestrategy
: 5. ldentificationofreadily-availablepre-stagedequipment
: 6. Trainingon integrated    fire response strategy
: 7. Spentfuelpoolmitigation        measures (c) Actionsto minimizereleaseto includeconsideration        of:
: 1. Watersprayscrubbing
: 2. Doseto onsiteresponders Amendment    No.,-[  Deleted: 171 BeaverValley Unit 2                                        Renewed  Operating  LicenseNPF-73
 
A P P E N D I XB TO FACILITYOPERATINGLICENSENO. NPF-73 BEAVERVALLEY POWER STATION U N I T2 FIRSTENERGY  NUCLEAROPERATINGCOMPANY,ET AL D O C K E TN O . 5 0 - 4 1 2 ENVIRONMENTAL    PROTECTIONPLAN (NONRADTOLOGTCAL)
A U G U S T1 9 8 7 NO CHANGESTHIS PAGE. INCLUDEDFOR CONTEXT.
BeaverValley Unit 2                        B-i                    No.171 Amendment
 
APPENDIX                B TO FACILITY                OPERATING                LICENSE  NO.NPF-73 BEAVERVALLEYPOWERSTATION UNIT2 ENVIRONMENTAL                    PROTECTION        PLAN (NONRADTOLOGTCAL)
TABLEOF CONTENTS Section                                                                                                                            Paqe 1.0    Objectivesof the Environmental                      ProtectionPlan..............                  ..................          B-1 2.0    E n v i r o n m e n tP  a rl o t e c t i o1ns s u e s . . . . . . . . . .              . . . . . . . . . . . . . . . . . . .B. .-. 1 ...
3.0    C o n s i s t e n cRye q u i r e m e n t s . . . . . . . . . . . . . . . . . .          . . . . . . . . . . . . . . . . . . .B. . -. .1. .
3.1    P l a n tD e s i g na n d O p e r a t i o n . . . . . . . . . . . . . . . . . .          .................B                  . . -. .1. . .
3.2    ReportingRelatedto the NPDES Permitand State Certifications                                                          ......B-2 J.J    ChangesRequiredfor Compliance                          with OtherEnvironmental      Regulations.............B-2 4.0    E n v i r o n m e n tC  aol nditions                                                    . . . . . . . . . . . . . . . . . . .B. .-.2. .
4.1    Unusualor lmportantEnvironmental                            Events                                  .................        B-2 4.2    E n v i r o n m e n tM  a lo n i t o r i n g                                              . . . . . . . . . . . . . . . . . . .B. .-.3. .
5.0    A d m i n i s t r a t i vPer o c e d u r e s                                                . . . . . . . . . . . . . . . . . .B. .-.3. .
5.1    R e v i e wa n dA u d i t                                                                            . . . . . . . . . . . . .B. .-.3 5.2    R e c o r d sR e t e n t i o n                                                                          . . . . . . . . . . .B. . -. 3 5.3    Changesin Environmental                      ProtectionPlan..........                                          .........B-4 5.4    P l a n tR e p o r t i n Rg equirements..............                                    . . . . . . . . . . . . . . . . . . .B. .-.4. .
NO CHANGESTHIS PAGE, INCLUDEDFOR CONTEXT.
BeaverValleyUnit2                                                        B-ii                  Amendment                No.171
 
1.0    Obiectives  of the Environmental  ProtectionPlan The Environmental    Protection Plan(EPP)is to providefor protection  of nonradiological environrnental  valuesduringoperation    of the BeaverValleyPowerStation,Unit2 (facility).The principal objectives of the EPPareas follows:
(1)    Verifythatthefacilityis operatedin an environmentally  acceptable manner,as established  bythe FinalEnvironmental    Statement - Operating LicenseStage(FES-OL) andotherNRCenvironmental        impactassessments.
(2)    Coordinate  NRCrequirements    andmaintainconsistency  withotherFederal,State,and localrequirements  for environmental  protection.
(3)    KeepNRCinformedof the environmental        effectsof facilityconstruction andoperation andof actionstakento controlthoseeffects.
Environmentalconcernsidentifiedin the FES-OL(September1985, NUREG-1094)which relate to water qualitymattersare regulatedby way of the licensee's*NPDESpermit.
2.O    EnvironmentalProtection  lssues In the FES-OL(NUREG-1094,      September1985),the staffconsideredthe environmental impactsassociatedwith the operationof the BeaverValley PowerStation,Unit 2. No aquatic/waterquality,terrestrial,or noise issueswere identified.
3.0 Consistencv      Requirements 3 . 1 PlantDesiqnandOperation The licenseemay make changesin stationdesignor operationor performtests or experiments affectingthe environmentprovidedsuch activitiesdo not involvean unreviewedenvironmental questionand do not involvea change in the EPP*. Changesin stationdesignor operationor performanceof tests or experimentswhich do not affect the environmentare not subjectto the requirementsof this EPP. Activitiesgovernedby Section3.3 are not subjectto the requirementsof this Section.
Beforeengagingin additionalconstructionor operationalactivitieswhich may significantlyaffect the environment,the licenseeshall prepareand recordan environmentalevaluationof such activity. Activitiesare excludedfrom this requirementif all measurablenonradiological environmentaleffectsare confinedto the on-siteareas previouslydisturbedduringsite preparationand plant construction.When the evaluationindicatesthat such activityinvolvesan unreviewedenvironmentalquestion,the licenseeshall providea writtenevaluationof such activityand obtainprior NRC approval. Such activityand changeto the EPP may be implementedonly in accordancewith an appropriatelicenseamendmentas set forth in Section5.3 of this EPP.
*"Licensee"  refersto FirstEnergy Nuclear  Operating Company,  operator            and ofthefacility, actingasagentforFirstEnergy      Nuclear  Generatiorg!19-9-Iiq  ECi,sq!1            lh-g -
Qqqryany,-e_lC        ,t Deletedr Corp.
Toledo  Edison  Company,    owners or lessees  ofthefacility.
BeaverValley Unit 2                              B-1                                            Deleted: 171
 
A P P E N D I XD A D D I T I O N AC L ONDITIONS OPERATINGLICENSENO. NPF.73 FirstEnergyNuclearOperatingCompany,FirstEnergyNuclearGeneratioq*lLlQ,Qtrjq-EdLgq-r-t_            Deleted:
                                                                                        .____.t-.--        Corp Company,and The Toledo EdisonCompanyshall complywith the followingconditionson the schedulesnoted below:
Amendment          AdditionalCondition                                      lmplementation Number                                                                      Date 83                The licensee is authorizedto relocate certain          The amendment TechnicalSpecificationrequirementsto licensee-          shallbe implemented controlleddocuments. lmplementationof this              within 60 days amendmentshall includethe relocationof these            from April 14,1997 technicalspecificationrequirementsto the appropriatedocuments,as describedin the licensee'sapplicationdated September9, 1996, and evaluatedin the staffs safetyevaluation attachedto this amendment.
87                The licenseeis authorizedto relocatecertain            The amendment TechnicalSpecificationrequirementsto licensee-          shallbe implemented controlleddocuments. lmplementationof this              within 60 days from amendmentshall includethe relocationof these            December10. 1997 technicalspecificationrequirementsto the appropriatedocuments,as describedin the licensee'sapplication  datedMarch14, 1997,as supplemented  July29 and August13, 1997,and evaluatedin the staffs safety evaluationattached to this amendment.
88                The licenseeis authorizedto relocatecertain            Theamendment TechnicalSpecificationrequirementsto licensee-          shallbe implemented controlleddocuments. lmplementationof this              within30 daysfrom amendmentshall includethe relocationof these            January  20, 1998 technicalspecificationrequirementsto the appropriatedocuments,as describedin the licensee'sapplicationdated September1 1, 1997, and evaluatedin the staffs safetyevaluation attachedto this amendment.
98                The licenseecommitsto performvisualacceptance          Theamendment examinationsof sleevewelds; post weld heat treatment    shallbeimplemented of sleevewelds:and the NRC-                            within60 daysfrom recommendedinspectionsof repairedtubes as              March26. 1999 describedin the licensee'sapplicationdated March10, 1997,as supplemented        July 28, 1997, September17, 1997, April 30, 1998, and January29, 1999,and evaluatedin the staffs safetyevaluationattachedto this amendment.
BeaverValleyUnit2                              D-1                    AmendmentNo..        t. Deleted:171
 
A P P E N D I XD A D D I T I O N AC L ONDITIONS OPERATINGLICENSENO. NPF-73 FirstEnergyNuclearOperatingCompany,FirstEnergyNuclearGeneration=lLlQ,--QhjC-Ed-r-Sqn              Deleted: Corp.
Company,and The Toledo EdisonCompanyshallcomplywith the followingconditionson the schedulesnoted below:
Amendment          Additional Condition                                        lmplementation Number                                                                          Date 102                Thelicenseeis authorized      to relocatecertain            Theamendment Technical  Specification  requirements  to licensee-      shallbeimplemented controlled documents.lmplementation        of this          within60 days amendment    shallincludethe relocation    of these        fromAugust30, Technical  Specification  requirements  to the            1999 appropriate  documents    as described  in the ficensee's application  datedDecember      24,'1998,  as suppfemented    June15,June17, andJuly7, 1999, andevaluated    in the staffsevaluation    attachedto thisamendment.
151                On theclosingdate(s)of thetransfers        to FENGenCol      Theamendment  I of theirinterests  in BeaverValleyPowerStation,Unit          shallbe No.2, Pennsylvania      PowerCompany,      TheCleveland      implemented within Electricllluminating  Company,    OhioEdisonCompany,      30 daysfrom andTheToledoEdisonCompany            shalltransferto        December  16.2005 FENGenGol    all of eachtransferor's  respective accumulated  decommissioning      fundsfor BeaverValley PowerStation,UnitNo.2, exceptfor fundsassociated withthe leasedportionsof BeaverValleyPower Station, UnitNo.2, andtenderto FENGenCol additional amountsequalto remaining        fundsexpected to be collected in 2005,as represented      in the application datedJune1,2005,butnotyet collected          by thetimeof closing.All of thefundsshallbe deposited in a separateexternaltrustfundfor the reactorin the sameamountas received        withrespectto the unitto be segregated  fromotherassetsof FENGenCol            and outsideits administrative    control,as requiredby NRC regulations, andFENGenCo!        shalltakeall necessary stepsto ensurethatthisexternaltrustfundis maintained  in accordance    withthe requirements  of the orderapproving    thetransferof the licenseand consistent withthe safetyevaluation      supporting the orderandin accordance      withthe requirements    of 10CFRSection      50.75,"Reporting    andrecordkeeping for decommissioning      planning."
. firrtf""rg" Nr.
GenerationJl0 BeaverValleyUnit2                                                          AmendmentNo..________...Deleted: 171
 
A P P E N D I XD A D D I T I O N AC L ONDITIONS OPERATINGLICENSENO. NPF-73 FirstEnergyNuclearOperatingCompany,FirstEnergyNuclearGeneratior$lQ, Qftjg EdLqq!-                  Deleteal: Corp.
Company,and The Toledo EdisonCompanyshall complywith the followingconditionson the schedulesnoted below:
Amendment          Additional Condition                                          lmplementation Number                                                                            Date 151                Bythe dateof closingof thetransferof theownership Theamendment interestsin BeaverValleyPowerStation,UnitNo.2                shallbe implemented fromPennsylvania    PowerCompany        to FENGenCol, within30 daysfrQm FENGenCol    shallobtaina parentcompanyguarantee December              16,20P5 fromFirstEnergy    in an initialamountof at least$80 million(in2005dollars)to provideadditional decommissioning    fundingassurance      regarding  such ownership  interests.Required      fundinglevelsshallbe recalculated annually    and,as necessary,    FENGenCol shalleitherobtainappropriate      adjustments  to the parent companyguarantee        or otherwise  provideanyadditional decommissioning    fundingassurance      necessary  for FENGenCol    to meetNRCrequirements            under10CFR 50.75.
TheSupportAgreements        described  in theapplications datedMay18,2005(upto $80million),            andJune1, 2005(upto $400million),shallbe effectiveconsistent withthe representations    contained  in the applications.
FENGenCol    shalltakeno actionto causeFirstEnergy, or its successors  andassigns,to void,cancel,or modify the SupportAgreements      withoutthe priorwritten consentof the NRCstaff,except,however,          the $80 millionSupportAgreement      in connection    withthe transferof the Pennsylvania    PowerCompanyinterests maybe revokedor rescinded        if andwhenthe $400 million supportagreement      described  in theJune1, 2005,application  becomeseffective.FENGenCol          shall informthe Directorof the Officeof NuclearReactor Regulation, in writing,no laterthanten daysafterany fundsare provided    to FENGenCol      by FirstEnergy  under eitherSupportAgreement.
- firstEnergvNucl GenemtionJlA BeaverValley Unit 2                              D-3
 
A P P E N D I XD ADDITIONALCONDITIONS OPERATINGLICENSENO. NPF.73 FirstEnergyNuclearOperatingCompany,FirstEnergyNuclearGeneration=lLli,-Qhjp-EdLS_o!                Deleted: Corp.
Company,and The Toledo EdisonCompanyshallcomplywith the followingconditionson the schedulesnoted below:
Amendment AdditionalCondition                                                      lmplementation Number                                                                              Date 161          Schedulefor New and RevisedSurveillanceRequirements(SRs)
The schedulefor performingSRs that are new or revisedin              The AmendmentNo. 161 shallbe as follows:                                amendment shallbe For SRs that are new in this amendment,the first performance implemented is due at the end of the first surveillanceinterval,which begins within150 days on the date of implementationof this amendment.                  from date of lssuance ForSRsthatexistedpriorto thisamendment,          whoseintervals of performance  are beingreduced,      thefirstreduced surveillance intervalbeginsuponcompletion      of thefirst surveillance performed  afterimplementation    of this amendment.
ForSRsthatexistedpriorto thisamendment,          whoseintervals of performance  are beingextended,      thefirstextended surveillance intervalbeginsuponcompletion      of the last surveillance performed  priorto implementation    of this amendment.
ForSRsthatexistedpriorto thisamendment          thathave modifiedacceptance    criteria,thefirstperformance    subjectto the modifiedacceptance    criteriais dueat theendof thefirst surveillance intervalthatbeganon the datethe surveillance waslastperformed    priorto the implementation    of this amendment.
161          Relocation  of CertainTechnical    Specification Requirements LicenseAmendmentNo. 161 authorizesthe relocationof certain          The TechnicalSpecificationsto other licensee-controlled      documents. amendment lmplementationof this amendmentshall includerelocationof the        shallbe requirementsto the specifieddocuments,as describedin                implemented (1) Sections4D and 4E of the NRC staffs SafetyEvaluation,and        within150 days (2) Table LA, RemovedDetailChanges,and Table R, Relocated            from date of Specifications,attachedto the NRC staffs SafetyEvaluation,          issuance which is enclosedin this amendment.
BeaverValleyUnit2                              D-4                        Amendment No...-,-----_,1-.--.
Deleted:171
 
APPENDIXD ADDITIONALCONDITIONS OPERATINGLICENSENO. NPF-73 FirstEnergyNuclearOperatingCompany,FirstEnergyNuclearGeneratior$tlQ. Qbjq Edj-qqr-t- -"-        Deleted: Corp.
Company,and The Toledo EdisonCompanyshallcomplywith the followingconditionson the schedulesnoted below:
Amendment Additional    Condition                                                lmplementation Number                                                                            Date 163          InitialPerformance    of NewSurveillance  andAssessment Requirements Uponimplementation      of Amendment    No. 163adoptingTSTF-448,  The Revision  3, the determination  of controlroomenvelope(CRE)        amendment unfiltered air inleakage  as requiredby Surveillance  Requirement  shallbe (SR)3.7.10.4,    in accordance  withSpecification            the 5.5.14.c(i),      implemented assessment    of CREhabitability  as requiredby Specification      within120 days 5.5.14.c(ii),andthemeasurement        of CREpressure  as requiredby from date of Specification  5.5.14.d,  shallbe considered  met. Following        issuance implemeniation:
(a) Thefirstperformance    of SR3.7.10.4,in accordance  with Specification  5.5.14.c(D, shallbe withinthe specified Frequency    of 6 years,plusthe 18-month  allowance of SR 3.0.2,as measured    fromthe dateof the mostrecent successful  tracergastest,or withinthe next18 monthsif thetimeperiodsincethe mostrecentsuccessful        tracergas testis greaterthan6 years.
(b) Thefirstperformance    of theperiodicassessment  of CRE habitabillty, Specification 5.5.14.c(ii),
shallbewithin 3 years,plusthe9-month      allowance of SR3.0.2,as measured    fromthe dateof the mostrecentsuccessful tracergastest,or withinthe next9 monthsif thetime periodsincethe mostrecentsuccessful      tracergastestis greaterthan3 years.
(c) Thefirslperformance    of the periodicmeasurement  of CRE pressure,  Specification5.5.14.d, shallbewithin18 months, plusthe 138daysallowedby SR 3.0.2,as measured        from the dateof the mostrecentsuccessful    pressure measurement    test.
BeaverValleyUnit2                              D-5                      AmendmentNo.r.-__--_____r----'
Deleted: 171
 
Attachment3 ProposedDavis-BesseNuclearPowerStation,UnitNo. 1 OperatingLicenseChanges(MarkUp)
(SevenPagesFollow)
 
UNITEDSTATES NUCLEARREGULATORYCOMMISSION wASHTNGTON,      D.C.20555.{'001 FIRSTENERGY NUCLEAR OPERATING COMPANY AND FIRSTENERGY NUCLEAR GENERATIO\_H                                                  . . . . . _ - 1 . Deleted:
D O C K E TN O . 5 0 - 3 4 5 DAVIS-BESSE      NUCIJEAR POWER STATION,              UNIT NO. 1 FACII,ITY    OPERATING I,ICENSE IJicense  No . NPF- 3 t-. The Nucl-ear    Regul-atory    Commission        (tshe Commission)            having    found  that:
The application        for license        filed      by FirstEnergy          Nuclear Operatsing company (FENOC)I, acting                  on it.s own behalf            and as agent f or FirstBnersy      Nuclear      ceneratiou              - ( r i gglqegg )_ -g-gllpl +g g -y-i-!h            Deleted: corp.
the standards      and requirements            of the Atomic          Energry Act of l-954, as amended (the Act),          and the Commission's                rules    and regrulations se! forth    in L0 CFR Chapter I and afl                  reguired        notifications        to other    agencies    or bodies      have been duly made; B.      Construction      of the Davis-Besse            Nuclear      Power St,ation,          Unit No.      1 (the facility)      has been substanEialLy                completed        in conformitsy i"rith Const.ructsion Permit No. CPPR-8o and t.he application,                            as amended, the provisions            of the Act and tshe rules                and regulations of the Commission;
: c.      The facility      will    operate      in conformity          with the      application,        as amended, the provisions            of the Act,        and the rules          and regulations of the Commission; FENOC is    authorized    to  act  as agent        for    FirstEnergy        Nuclear    ceneralion-          I
    ,L!9-1-ar1phar qrgl-gi+yg r9?-p-91-giuugy9tq 9919{9} 9y9{ !!g p4-y-erg+_l                                          .1..'- Deleted: corp.
const.rucEion,    operation,      and maintenance            of  tshe facility.
L-1                Amendment No.                                          Defeted: r52,  228, 270
 
l-.D.      There is reasonable          assurance:        (i) that      the acclvities authorized    by this      operating    License can be conducted without endangering      the health      and safet.y of the puJrlic,              and (ii)      that such activities      v/iI1 be conducted          in compliance          with the rules and reg'ulat.ions      of the Commission; E.      The FirstEnergry      Nuclear      Operaling      Company is technically qualified    and the l-icensees are financially                  qualified        tso engage in the activities        authorized      by tshis operating          license      in accordance    with the rules        and requlations          of Lhe Commission; F.      The licensees      have satisfied        tshe applicable        provisions        of 10 CFR Part 140, "Financial-          Protection      Requirementss and fndemniEy Agree-ment.s, ,, of the commission,s          re$rlations, G.      The issuance      of this      operating      license    will    not    be inimical        to the common defense          and securit,v      or to  the health        and safetsv      of the publ j-c; Aft.er weighing      the environmenlal,            economic,      technical.,      and other benefj-ts  of the facility          against    environmentsal        and oLher costs and considering      avaiJ-ab1e alEernat.ives,            t.he issuance        of Facifity Operat,ing License No. NPF-3 subject                to the conditions            for prot,ection    of the environment            set forth      herein      is in accordance wit.h 1-0 CFR Part 51 (formerly            Appendix D Lo 10 CFR Part 50), of the Commissionrs        regulations        and all    applicable          reguirements        have been sat,isfied;      and I.      The receipt,      possession,        and use of source,          byproduct        and specj-al nucLear material        as authorized        by this    license      will    be in accord-ance with the Commissj-on's regrrlations                  in 10 CFR Part 30, 40, and 70, including          l-0 CFR Sections 30.33, 40.32, 70.23, and 70.31.
Facil-ity    Operati.ng License No. NPF-3 is hereby issued to FirstEnergry Nucl-ear Operating        Company (FENOC), and FirstEnergy                  Nuclear      ceneration-
&q    to f9?q ?_q lo"1l.o'Fi________._
A.      This license      applies      to the Davis-Besse          Nucl-ear Power Stsation, Unit No. l-, a pressurized            water nuclear        reactor      and associated equipment    (the facilitsy),        owned by FirstsEnergy            Nuclear Generation-    !L9:    ,rh-e--fa-gf]1_ty    iF l99e!99      _ot -!t-r-9 ?9\l!!-y9!!9!Il          Deleted:com.
shore of Lake Erie in Ottsawa County, Ohj.o, approximately                              21 miles east of Toledo,      Ohio, and is descrj.bed            in the "Final          Safety Analysis    Report"    as supplenented          and amended (Amendmenls l-4 uhrough 44) and the Environmental                  Report    as supplemented          and amended (Supplements          1 tshrough 2) .
AmeDdmen!        No.  ,-                    Defeted: !52, 22s, 270
 
z-E- Subject    to the    conditions    and requj-rements      incorporated      herein, the Commission        hereby licenses:
(1)    FENOC, pursuant        to Sectsion 103 of the Act and l-0 CFR Part 50, "Licensing          of Production      and Utilization Facilities,      " to possess, use, and operate the facility; (21    FirstBnergry      Nucfear ceneratior\,:ryr          !9 -p9gi9gg !4S              _ , , _ _ - . t - - - - Deleted: corp.
facilJ-ty    at the designatsed locat.ion        in Ottawa County,          ohio in accordance        with t.he procedures      and lirnitsatsions se!        forth in this    Iicense; (3)    FENOC, pursuant        to the Act and L0 CFR Part 70, co receive, possess and use at any time special. nuclear                  maLerial    as reactor    fuel,    in accordance      with the limitacions          for storage    and amounts required          for reactor      operation,      as described      in the Final      Safety Analysis        Report,  as supplemented        and amended; (4)    FENOC, pursuan!        to tshe Act    and L0 CFR Parts 30, 40, and              70 to receive,      possess and use      at any time any byproduct, source and special        nuclear    material    as sealed neutron sources    for reactor      startup,    sealed sources for reactor instrumentation        and radiation      monitoring      equipments calibration,        and as fission      detecEors      in amounts as ramr  i rad .
FENOC, pursuant        to the Act and 10 CFR Parts 30, 40 and 70, to receive,      possess and use in amounts as reguired                any byproduct,      source or special      nuclear    material    wichout restriction      to chemical    or physical      form,    for sample analysis      or instrument      cal-ibrat.ion  or associated        with radioact.j.ve    apparatus    or components;      and ta.,    FENOC, pursuanE to the Acts and 10 CFR Parts 30 and 70. !o possess,      but not separate,        such b1{>roducts and special nucl-ear materials        as may be produced        by the operation          of the facility.
Amendment    No. v_          ......t..,, D e l e t e d : 7 s 2 , 2 2 8 , 2 7 0
 
A 2.C. This licenseshallbe deemedto containandis subjectto the conditionsspecifiedin the following Commissionregulationsin 10 CFR ChapterI: Part 20, Section30.34of Part30, Section40.41 ofPart 40, Sections50.54and50.59ofPart 50,andSection70.32ofPart 70; andis subjectto all applicable provisionsofthe Act andto the rules, regulations,andordersof the Commissionnow or hereafterin effect;and is subjectto the additionalconditionsspecifiedor incorporatedbelow:
(l) MaximumPowerLevel FENOCis authorizedto operatethe facility at steadystatereactor corepowerlevelsnot in excessof 2817megawatts(thermal).
Prior to attainingthe powerlevel,ToledoEdisonCompanyshall complywith the conditionsidentifiedin Paragraph(3) (o) below and completethe preoperational  tests,startuptestsandother itemsidentifiedin Attachment2 to this licensein the sequence specified.Attachment2 is an integralpart of this license.
(2) TechnicalSpecifications The TechnicalSpecifications  containedin AppendixA, as revisedthroughAmendmentNo*, -4Iq,b9t9!yllgC.pqtqlgd                                Deleted: 280 in the license.FENOCshalloperatethe facility in accordance  with the TechnicalSoecifications.
(3) AdditionalConditions The mattersspecifiedin the following conditionsshallbe completedto the satisfactionof the Commissionwithin the statedtime periodsfollowing the issuanceof the licenseor within the operationalrestrictionsindicated.The removal of theseconditionsshallbe madeby an amendment      to the licensesupportedby a favorableevaluationby the Commission:
(a) FENOCshall not operatethe reactorin operational Modes I and2 with lessthanthreereactorcoolant pumpsin operation.
(b) Deletedper Amendment6 (c) Deletedper Amendment5 Deleted:278.279.280 No.,.,f' Amendment
 
2.C(4) Fire  Protection FENoc shall    implements and maincain          in effect    afl provisions of the approved      Fire    Prot.eclion    Program as described        in the Updated Safety      analysis    Report    and as approved      in tshe SERS datedJuly    25, 1979, and May 30, 199L, suJrject to the following    provision.
FENOC may make changes to the approved                Fire  Protection Program without      prior    approval    of the commission        only    if those changes would not adversely              affect    the ability    Eo achieve    and maintsain safe shutdown in the event of a fire.
(s) Del-eted  per  Amendment No.        279.
(6) Antitrust    Conditions FENoC and FirstEnergy        Nucl-ear ceneratiorlE:LU;        gbe]l    99Ir]p!y_ ---_t-,--- Deleted: corc wilh  the antitrust      conditions      deLineated      in Condition      2.8 of Lhis license      as i.f named therei.n.          FENOC shalI    not market, or broker    porrer or energy        from the Davis-Besse Nuclear    Power Staeion,      Unit. No. L.        FirstEnergTy Nuclear Generatiorr,  L!11_ 1q 5gqpgnsibl-e      and accguntable      for the            --l----- Deleted: corp, actions    of FENOC to the extent          that    sai-d actions    affect    the marketing    or brokering      of power or energfy from the Davis-Besse Nuclear    Pohrer SLation,        Units No. 1, and in any way, contravene    the antitrust      license    conditions    contained      in the license.
D e f e t e d : ] - 5 , 4 1 , r ' 14 , 2 2 A , 2 ' 7o , 2 7 9
L-5    Amendment No. ,-__________          ,+
 
In accordance          with    the requirement          imposed by the october    I,  1975, order          of the Unit.ed states            court    of Appeafs for the District            of Columbia        Circuit      in Nat.ural      Resources Defense Council          v. Nuclear        Regulatory      Commission,        No. 74-1,385 and 74-l-586,        that    Ehe Nuclear        Regulatory        Commission        "shaf-make any licenses            grantsed bet.ween .fuly 21, 1976 and such time when the mandate is issued                  subject    to Ehe outcome of such proceedings        herein,"        this    license      shalI    be subject        to the out.come of such proceedings.
This license        is effective          as of the      date    of  issuance      and  shaIl expire    at midnight        April      22, 20]-7 .
Based on the Commission's                Order dated            Decenber 16, 2005              and conforming      AmendmenL No. 270                dated Decedber 15, 2005                  regarding the direct. transfer        of the License          from the Cleveland            El-ectric Illuminating      Company (CleveLand              Electric)      and the Tol-edo Edison Company ( Toledo        ndi son) to Fi rstEnergy              NUqJ_e-4lGenerat        ion Corpx___--,-- _--[---- Deleted: oracion (FENGenCo)4, FirstEnergy              Nuclear      OperaEing      Company and FENGenCor                  I sha11 comply with          the fol]owing          conditions      noted beLow:
On the closing          date of tshe transfers              to FENGenCol of their interests      in Davis-Besse,            CLeveland      Electric        and Toledo Edison shall    transfer      to FENGenCo: all            of each transferor's respective      accumulated          decommissioning          funds for Davis-Besse and tender      t.o FENGenCor addit.ional              amounEs equal          to remaining funds expected          to be collected          in 2005, as represented                in the application        dated.fune        I, 2005, but not yet collected                    by the time of closing.            A11 of the funds shall              be deposiLed          in a separate      external      trust      fund for      the reactor        in the same amount as received            with    respect    to Ehe unit        to be segregated from other      assets      of FENGenCor and outside                its  administrative control,      as required        by NRC regulations,            and FENGenCor sha11 take all    necessary        steps to ensure          EhaE this        external-    trust fund is maintained            in accordance          wj-th the requirements              of the order    approvj-ng      the transfer        of the license          and consistent
              $/ith the safeLy          eval-uation        supporting      the order      and in accordance      with    Che reguirements            of 10 CFR Section            50.75, "Reporting      and recordkeeping            for decommissioning            plalning.      "
@iltN""t.erc"""."ti.                                                                              g GenentionJte L- 14                  Amendment      No. ,,,                Deleted: !sr. zio
 
                                                      - 14A-The Supporc Agreement          described      in tshe application      dated June l-, 2005 (up to $400 million).                shal,I be effective      consistent with  the representations          contained      in tshe application.      FENGencol shall    take no action        to cause FirslEnerg-y,        or it,s successors      and assigns,    to void,    cancel,    or modify      the Support Agreement without the prior    vrrit.len  consent of the NRC sEaff.            FENGenCoa sha1l inform    t.he Director      of t,he Office      of Nuclear    Reaccor Regulation, in writing,      no later      than E.en days after        any funds are provided to FENGenCo* by FirstEnergy              under either      Support    Agreement.
FOR THE NUCLEAR REGULATORY COMMISSION Original      Signed by R. C. DeYoung (for)
Roger S. Boyd, Director Division      of Project' Management Office    of Nucfear Reactsor Regulation Attachments:
: 1.        Appendices A & B - Technical Specifications
: 2.        Preoperational      Tests,    Startup Tests and Other ftems Which Must Be Completed Prior          to proceeding t.o Succeeding Operational          Modes Date    of  Issuance:    (APR 22 L977)
. eirstEnersv  Nqele qclery'tiq!*LLe-L- L4A                                Amendment No. Deleted:270
 
4 Attachment ProposedPerryNuclearPowerPlant,UnitNo. 1 OperatingLicenseChanges(MarkUp)
(EightPagesFollow)
 
UNITED  STATES NUCLEAR    REGULATORY    COMMISSION wASHtNGTON.D.C.2955s-0001 FIRSTENERGY        NUCLEAR    OPERATING    COMPANY FIRSTENERGY          NUCLEARGENERATIONI.LL.                              Deleted: CORP.
OHIOEDISONCOMPANY DOCKETNO.50-440 PERRYNUCLEAR            POWER.PLANT.UNITNO.1 FACILITY    OPERATING    LICENSE LicenseNo. NPF-58 1.TheNuclear  Regulatory  Commission    (theCommission) hasfoundthat:
A. The application for licensefiledby FirstEnergy NuclearOperatingCompany(FENOC)I actingon its ownbehalfandas agentfor FirstEnergy    NuclearGeneratiorglp ?4d qbiC      Deleted: Corp.
EdisonCompany,(licensees)      complieswiththe standardsand requirements  of the AtomicEnergyAct of 1954,as amended(theAct),andthe Commission's        regulationsset forthin 10 CFRChapterl, andall requirednotifications  to otheragenciesor bodieshave beendulymade; B. Construction of the PerryNuclearPowerPlant,UnitNo. 1 (thefacility),hasbeen substantiallycompletedin conformity                  PermitNo.CPPR-I48andthe withConstruction application,as amended,the provisions    of theAct,andthe regulations of the Commission:
  'FENOCis authorized  to act as agentfor FirstEnergyNuclearGeneration*$_e  q-r1d O_lr!-o  t oeleted: corp.
EdisonCompany,and hasexclusiveresponsibility      andcontroloverthe physicalconstruction, operation, and maintenance    of thefacility.
Amendment  No.,__
 
c    Thefacilitywilloperatein conformity    withthe application,  as amended,the provisions    of theAct,andthe regulations    of theCommission      (exceptas exemptedfromcompliance        in Section2.D below);
D , Thereis reasonable    assurance:  (l) thatthe activities authorized  by thisoperatinglicense can be conducted    withoutendangering      the healthandsafetyof the public,and (ii)that suchactivities  willbe conducted  in compliance    withthe Commission's    regulations set forthin 10 CFRChapterl (exceptas exemptedfromcompliance              in Section2.D below),
The FirstEnergy  NuclearOperatingCompanyis technically        qualifiedto engagein the activitiesauthorized by thislicensein accordance      withthe Commission's    regulationsset forthin 10 CFRChapterl; The licenseeshavesatisfiedthe applicable        provisions of 10 CFR Part140,"Financial Protection Requirements  and Indemnity      Agreements,"  of theCommission's    regulations; G . The issuanceof thislicensewillnot be inimicalto the commondefenseandsecurityor to thehealthandsafetyof the public; Afterweighingthe environmental,    economic,    technical, andotherbenefitsof thefacility againstenvironmental    andothercostsandconsidering        availablealternatives, the issuanceof this FacilityOperatingLicenseNo.NPF-58,subjectto the conditions            for protection of the environment  setforthin the Environmental      Protection Planattachedas AppendixB, is in accordance  with 10 CFRPart51 of theCommission's          regulationsand all applicable requirements havebeensatisfied;      and The receipt,possession,  and useof source,byproduct,      andspecialnuclearmaterialas authorized by thislicensewillbe in accordance      withthe Commission's    regulationsin 10 CFRParts30,40.and70.
Basedon theforegoingfindingsregarding        thisfacility,the Partial-lnitial Decisions  issued December  2, 1983,and September    3, 1985,by theAtomicSafetyand LicensingBoardin regardto thisfacility(affirmedby ALAB-84'l    , datedJuly25, 1986)and pursuantto approvalby the NuclearRegulatory    Commission  at a meetingon November        7, 1986,FacilityOperating LicenseNo.NPF-58,whichsupersedes          the licensefor fuelloadingand lowpowertesting, LicenseNo. NPF-45,issuedon March18, 1986,is herebyissuedto FirstEnergy                Nuclear Operating  Company,FirstEnergy    NuclearGeneration=lJQ,        ilg qbj-o--Eqiegrl Qg['p?'ly,(!be - -_t--- Deleted: Corp.
licensees) to readas follows:
A. The licenseappliesto the PerryNuclearPowerPlant,UnitNo. 1, a boilingwaternuclear reactorandassociated    equipment(thefacility),ownedby FirstEnergy        Nuclear Generatiorslt1L  (_ojvner) etdleaeeq    !c qbjcEqrqq-l  Cqrpeny    (esqee)              !!'c .1,..
(cqlle.cLryely          Deleted: Corp.
licensees).
Deleted: 137 Amendment
 
The facilityis locatedon the shoreof Lake Erie in LakeCounty,Ohio,approximately 35 milesnortheastof Cleveland,Ohio,and is describedin the licensees'FinalSafetyAnalysisReport,as supplementedand amended,and in the licensees'Environmental        Report,as supplementedand amended.
Subjectto the conditionsand requirementsincorporatedherein,lhe Commissionherebylicenses:
(1)  FENOC,pursuantto Section103 ofthe Act and 10 CFR Part50, to possess,use, and operatethe facility at the designatedlocationin Lake County, Ohio, in accordancewith the proceduresand limitationsset forth in this license; (2)  FirstEnergyNuclearGeneratiorr=llQ-and-9hiqECiC-on        QSlrlp41y,t9 pS9s9-s9!l-e  _ - _--        _l Deletedl  Corp.
facility at the designatedlocationin Lake County, Ohio, in accordancewith the proceduresand limitationsset forth in this license; (3)  FENOC,pursuantto the Act and 10 CFR Parl70,lo receive,possess,and use at any time special nuclearmaterialas reactorfuel, in accordancewith the limitationsfor storageand amountsrequiredfor reactoroperation,as describedin the FinalSafetyAnalysisReport,as supplementedand amended; (4)  FENOC,pursuantto the Act and 10 CFR Parts30, 40, and 70, to receive,possess,and use at any time any byproduct,source,and specialnuclearmaterialsuch as sealedneutronsourcesfor reactor startup,sealedsourcesfor reactorinstrumentation      and radiationmonitoringequipmentcalibration,and fission detectorsin amounts as required; (5)  FENOC,pursuantto the Act and 10 CFR Parts30, 40, and 70, to receive,possess,and use in amountsas requiredany byproduct,source,or specialnuclearmaterialwithoutrestrictionas to chemicalor physicalform,for sampleanalysisor instrumentcalibrationor associatedwith radioactive apparatusor components;and (6)  FENOC,pursuantto the Act and 10 CFR Parts30, 40, and 70, to possess,but nol separate,such byproductand specialnuclearmaterialsas may be producedby the operationof the facility.
(7Xa)Ohio EdisonCompanyis authorizedto transferany portionof its 30.0%ownershipshareof PNPP Unit 1 and a proportionate  shareof its intereslin the PNPPcommonfacilitiesto certainequityinvestors identifiedin ils submissionof January23, 1987, as supplementedon March3, 1987,and at the same time to leasebackfrom such purchaserssuch interestsold in the PNPP Unit I facility.The term of the lease is for approximately29/zyears subjectto a right of Deleted: 137 AmendmentNo.,
 
renewal.Suchsaleandleaseback          transactions aresubjectto the representations  andconditions    setforthin the abovementioned              of application January23, 1987, as supplemented        on March3, 1987,as wellas the letterof the Directorof the Officeof NuclearReactorRegulation        datedMarch16,1987, consenting  to suchtransactions. Specifically,a lessorandanyoneelsewhomay acquirean interestunderthesetransactions        areprohibitedfromexercising directlyor indirectlyanycontroloverthelicensesof PNPPUnit1. Forpurposes of thiscondition the limitations  of 10 CFR50.81, as nowin effectandas maybe subsequently  amended,  arefullyapplicable  to the lessorandanysuccessor    in interestto thatlessoras longas the licensefor PNPPUnit1 remainsin effect; thesefinancialtransactions    shallhaveno effecton the licensefor the Perry Nuclearfacilitythroughout    the termof thelicense.
(b)  Further,the licensees  arealsorequiredto notifythe NRCin writingpriorto any changein: (i) thetermsor conditions      of anyleaseagreements    executedas part of thesetransactions,  (ii)the PNPPOperating      Agreement; (iii)theexisting propertyinsurance  coverage    for PNPPUnit1; and(iv)anyactionby a lessoror othersthat may havean adverseeffecton the safeoperationof the facility.
Thislicenseshallbe deemedto containandis subjectto theconditions          specifiedin theCommission's  regulations  setforthin 10CFRChapterI and is subjectto all applicableprovisions of theAct andto the rules,regulations,    andordersof the Commission  nowor hereafter  in effect;andis subjectto theadditional  conditions specifiedor incorporated below:
(1)  MaximumPowerLevel FENOCis authorized    to operatethefacilityat reactorcorepowerlevelsnotin excessof 3758megawatts        thermal(100%power)in accordance      withthe conditions specifiedherein.
(2)  TechnicalSpecifications TheTechnical    Specifications  contained  in AppendixA andthe Environmental Protection Plancontained    in AppendixB, as ievisedthroughAmendment        No.-________--_---lDeleted: 155 areherebyincorporated    intothe license.FENOCshalloperatethefacilityin accordance  withtheTechnical    Specifications andthe Environmental  Protection Plan (3)  AntitrustConditions
: a. FirstEnergyNuclearceneratio1=tlQ 49 O!!9 _Eqj99!          Q-qryqly                        Deleted: Corp.
Deleted3 155 AmendmentNo..__-_,-_--
                                                                                            -_.r-
 
_6_
shallcomplywith the antitruslconditionsdelineatedin AppendixC to this license;AppendixC is herebyincorporated  into this license.
: b. FENOCshallcomplywith the antitrustconditionsdelineatedin AppendixC to this license as if namedtherein.FENOCshallnot marketor brokerpoweror energyfrom the Perry NuclearPowerPlant,Unit No. 1. The Ownersare responsibleand accountable        for the actionsof FENOC to the extent that said actionsaffect the marketingor brokeringof power or energyfrom the PerryNuclearPowerPlant,UnitNo. 1, and in any way, contravenethe antitrustconditioncontainedin the license.
(4) Deleted (5) Deleted (6) Fire Protection(Section9.5. SER. SSER#'1.2. 3. 4. 7. and 8)
FENOCshallcomplywiththe followingrequirements        of the fire protectionprogram:FENOCshall implementand maintainin effectall provisionsof the approvedfire protectionprogramas describedin the FinalSafetyAnalysisReport,as amended,for the PerryNuclearPowerPlant and as approvedin the SafetyEvaluationReport(NUREG-0887)          datedMay 1982and SupplementNos. 1 through10 thereto,subjectto the followingprovisions:
: a. FENOC may make changesto the approvedfire protectionprogramwithout prior approval of the Commissiononly if thosechangeswouldnot adverselyaffectthe abilityto achieve and maintainsafe shutdownin the eventof a fire.
(7)  Deleted (8)  Deleted (9)  Deleted (10) Deleted (11 ) MitiqationStrateqvLicenseCondition The licenseeshalldevelopand maintainstrategiesfor addressinglargefires and explosionsand that includethe followkey areas:
(a) Fire fightingresponsestrategywith the followingelements:
: 1.      Predefinedcoordinatedfire responsestrategyand guidance
: 2.      Assessmentof mutualaid fire fightingassets
: 3.      Designatedslagingareasfor equipmentand materials ruocunltcEsrHts pnc Amendment  No. 137 Revisedby letter dated July 11,2007
 
H. This licenseis effectiveas of the date of issuanceand shallexpireat midnighton March 18, 2026.
: 3. Basedon the Commission'sOrderdated November15, 2005 and the Commission'srevisedOrder dated December16, 2005 and conformingAmendmentNo. 137 dated December16, 2005 regarding the directtransferof the licensefrom PennsylvaniaPowerCompany,Ohio EdisonCompany,OES Nuclear,Inc.,The ClevelandElectricllluminatingCompany,and the ToledoEdisonCompany,to FirstEnergyNuclealGenerationCorp.(FENGenCo)1,        FirstEnergyNuclearOperatingCompanyand FirstEnergyNuclearGenerationCorp.l shallcomplywith the followingconditionsnotedbelow:
A. On the closingdate(s)of the transfersto FENGenColof their interestsin Perry,Pennsylvania PowerCompany,The ClevelandElectricllluminatingCompany,Ohio EdisonCompany,OES Nuclear,Inc.,and ToledoEdisonCompanyshalltransferto FENGenColall of each transferor's respectiveaccumulateddecommissioning        fundsfor Perry,exceptfor funds associatedwith the leasedporlionsof Perry,and tenderto FENGenColadditionalamountsequalto remainingfunds expectedto be collectedin 2005,as representedin the applicationdatedJune 1,2005,but not yet collectedby the time of closing.All of the fundsshall be deposiledin a separateexernal trust fund for the reactor in the same amount as receivedwith respectto the unil to be segregatedfrom other assetsof FENGenCoiand outsideits administrative      control,as requiredby NRC regulations,and FENGenColshalltake all necessarystepsto ensurethat this externaltrustfund is maintainedin accordancewith the requirementsof the orderapprovingthe transferof the licenseand consistentwith the safetyevaluationsupportingthe orderand in accordancewith the requirementsof 10CFRSection50.75,"Reportingand recordkeeping          for decommissioning planning."
B. By the date of closingof the lransferof the ownershipinterestsin Perryfrom PennsylvaniaPower Companyto FENGenCol,FENGenColshallobtaina parentcompanyguaranteefrom FirstEnergyin an initialamountof at least$80 million(in 2005 dollars)to provideadditional decommissioning  fundingassuranceregardingsuch ownershipinterests.Requiredfundinglevels shallbe recalculatedannuallyand, as necessary,FENGenColshalleitherobtainappropriate adjustmentslo the parentcompanyguaranteeor otherwiseprovideany additional.
decommissioning  fundingassurancenecessaryfor FENGenCo:to meet NRC requirements under10 CFR 50.75.
A m e n d m e nNt o . , _ _ _ _ _ ---_, _
                                                                                                                    - -_ _ _ . r -
 
The SupportAgreementsdescribedin the applicationsdatedMay 18, 2005 (up to $80 million),
and June 1, 2005 (up lo $400 million),shall be effectiveconsistentwith the representations containedin the applications.FENGenColshalltake no actionto causeFirstEnergy,or its successorsand assigns,to void, cancel,or modifythe SupportAgreementswithoutthe prior writtenconsentof the NRC staff,except,however,the $80 millionSupportAgreementin connectionwith the transfer of the Penn Power interestsmay be revoked or rescindedif and when the $400 millionsupportagreementdescribedin the June 1,2005,applicationbecomes effective.FENGenColshall informthe Directorof the Officeof NuclearReactorRegulation,in writing,no laterthan ten days afterany funds are providedto FENGenColby FirstEnergyunder eitherSupportAgreement.
FOR THE NUCLEARREGULATORYCOMMISSION ORIGINALSIGNEDBY:
HaroldR. Denton,Director Officeof NuclearReactorRegulation Attachments/Ap  pendices l.Attachmenlsl-2
: 2. AppendixA - TechnicalSpecifications (NUREG-1204)
: 3. AppendixB - Environmental  Protection Plan
: 4. AppendixC - AntitrustConditions Dateof lssuance:November13, 1986 TirstgnerqyXuclear Genera Generalion*Ite AmendmentNo.,,-
 
APPENDIXC PERRYNUCLEARPOWERPLANT.UNITNO. 1 NPF-58 ANTITRUSTCONDITIONS FOR FIRSTENERGYNUCLEARGENERATION_LLC                                        .      ,J Deleted: CORP.
OHIOEDISONCOMPANY A. The licenseesare subjectto the followingantitrustconditions:
Definitions Applicantsshall meanthe two companieslistedabove.
Entitvshall mean any electricgenerationand/ordistributionsystemor municipalityor cooperativewith a stalutoryrightor privilegeto engagein eitherof thesefunctions.
Wheelinq shall mean transportationof electricityby a utility over ils lines for anotherutility, includingthe receiplfrom and deliveryto anothersystemof like amountsbut not necessarilythe same energy.Federal PowerCommission,The 1970NationalPowerSurvev,Part 1, P. 1-24-8.
LicensinqConditions (1) Applicantsshallnot conditionthe sale or exchangeof wholesalepoweror coordinationservices uponthe conditionthat any otherentity:
(a) enter into any agreementor underslandingrestrictingthe use of or alienationof such energyor servicesto any customersor territories; (b) enter into any agreementor understanding  requiringthe reeeivingentityto, give up any other powersupplyalternativesor to deny itselfany marketopportunities; (c) withdrawany ,petitionto interveneor foregoparticipation    in any proceedingbeforethe NuclearRegulatoryCommissionor refrainfrom instigatingor prosecutingany antitrust actionin any otherforum.
Deleteds137 AmendmentNo.,
 
Attachment 5 ProposedBeaverValleyPowerStation,UnitNo. 1 OperatingLicenseChanges (Re{yped- For lnformation Only)
(NinePagesFollow)
 
UNITED  STATES                                  Proposed NUCLEARREGULATORY            COMMISSION                          Page WASHlNGTON,    D.C.20555-0001 FIRSTENERGY      NUCLEAR  OPERATING    COMPANY FIRSTENERGY      NUCLEAR    GENERATION. LLC DOCKETNO.50-334 BEAVERVALLEYPOWERSTATION.UN]TNO. 1 RENEWED      FACILITY  OPERATING    LICENSE LicenseNo. DPR-66
: 1. The Nuclear  Regulatory  Commission  (theCommission)  havingfoundthat:
A. Theapplication  to renewFacilityOperating  LicenseNo.DPR-66,filedby FirstEnergy NuclearOperating    Company(FENOC)-actingon its ownbehalfandas agentfor FirstEnergy  NuclearGeneration,  LLC(thelicensees)  complies withthe standards and requirements  of theAtomicEnergyAct of 1954,as amended(theAct),andthe Commission's    rulesand regulations setforthin 10 CFRChapter1, andall required notificationsto otheragenciesor bodieshavebeendulymade; B. Construction  of the BeaverValleyPowerStation,UnitNo. 1 (facility),  hasbeen substantially completed  in conformity withConstruction PermitNo.CPPR-75andthe application,as amended,    the provisionsof theAct andthe rulesand regulations of the Commission; C. Thefacilitywilloperatein conformity  withthe application,the provisionsof theAct,and the rulesand regulations  of the Commission; D. Thereis reasonable    assurance:(i) thatthe activitiesauthorizedby thisrenewed operating licensecanbe conducted    withoutendangering  the healthandsafetyof the public,and(ii)thatsuchactivities  willbe conducted in compliance withthe rulesand regulations of the Commission; E. FENOCis technically    qualifiedandthe licensees arefinancially        to engagein oualified the activitiesauthorized by thisrenewedoperating  licensein accordance  withthe rules and regulations  of the Commission; F. The licensees  havesatisfied the applicable provisionsof 10 CFRPart140,"Financial Protection Requirements    and Indemnity Agreements,"  of the Commission's  regulations;
*FENOC is authorizedto act as agentfor FirstEnergyNuclearGeneration,LLC, and has exclusive and controlover the physicalconstruction,operation,and maintenanceof the facility.
responsibility AmendmentNo.
RenewedOperatingLicenseDPR-66
 
Proposed Page G. The issuanceof thisrenewedoperating      licensewillnot be inimicalto the common defenseandsecurityor to the healthandsafetyof the public; H. Afterweighingthe environmental,      economic, technical andotherbenefitsof the facility againstenvironmental    andothercostsandconsidering      availablealternatives,the issuance  of RenewedFacilityOperating    LicenseNo.DPR-66is in accordance      with10 CFRPart51 (formerly      AppendixD of 10 CFRPart50) of the Commission's      regulations andall applicable  requirements  havebeensatisfied;  and L      Thereceipt,possession,      anduseof source,by-product,    and specialnuclearmaterialas authorized  by thisrenewedoperating  licensewillbe in accordance  withthe Commission's    regulations in 10 CFRParts30,40,and70,including      10 CFRSections 30.33,40.32,70.23,    and70.31.
J. Actionshavebeenidentified        andhavebeenor willbe takenwithrespectto: (1) managing    the effectsof agingon thefunctionality  of structuresandcomponents    that havebeenidentified    to requirereviewunder10 CFR5a.21(a)(1)      duringthe periodof extendedoperation,      and (2)time-limited aginganalyses  thathavebeenidentified    to requirereviewunder10 CFR 54.21(c),      suchthatthereis reasonable  assurance  thatthe activities authorized  by thisrenewedoperating  licensewillcontinueto be conducted    in accordance    withthe currentlicensing basis,as definedin 10 CFR54.3for the facility, andthatanychangesmadeto the facility's        currentlicensing basisin orderto comply with10 CFR5a.29(a)are in accordance        withtheAct andthe Commission's    regulations;
: 2. RenewedFacilityOperating        LicenseNo.DPR-66is herebyissuedto FENOCandFirstEnergy NuclearGeneration,      LLCto readas follows:
A. Thisrenewedlicenseappliesto the BeaverValleyPowerStation,UnitNo.1, a pressurized  waternuclearreactorandassociated      equipment  (thefacility),
ownedby FirstEnergy  NuclearGeneration,    LLC,andoperatedby FENOC.Thefacilityis locatedin BeaverCounty,Pennsylvania,        on thesouthernshoreof the OhioRiver,andis described in the "UpdatedFinalSafetyAnalysisReport"as supplemented          andamendedandthe Environmental    Reportas supplemented    andamended.
B. Subjectto the conditions    andrequirements  incorporated herein,the Commission    hereby licenses:
(1)    FENOC,pursuant      to Section104bof theAct and 10 GFRPart50,"Licensing        of Production  and Utilization          to possess,use,andoperatethefacility, Facilities,"
andFirstEnergy    NuclearGeneration,  LLCto possessthefacilityat the designated    locationin BeaverCounty,Pennsylvania    in accordance  withthe procedures    and limitationssetforthin thisrenewedlicense; (2)      FENOC,pursuant      to theAct and 10 CFRPart70,to receive,possess,      and useat anytimespecialnuclearmaterialas reactorfuel,in accordance        withthe limitations for storageand amountsrequired    for reactoroperation, as described in the UpdatedFinalSafetyAnalysisReport,as supplemented        andamended; AmendmentNo.
BeaverValleyUnit1                                                RenewedOperatingLicenseDPR-66
 
Proposed Page (3)    FENOC,pursuantto theAct and 10 CFRParts30,40 and70,to receive, possessand useat anytimeanybyproduct,          sourceandspecialnuclearmaterial as sealedneutronsourcesfor reactorstartup,sealedsourcesfor reactor instrumentation  andradiation    monitoring equipment              andas fission calibration, detectorsin amountsas required; (4)    FENOC,pursuant      to theAct and 10 CFRParts30,40 and70,to receive, possessand usein amountsas requiredanybyproduct,            source,or special nuclearmaterialwithout              to chemicalor physicalform, restriction                              for sample analysisor instrument    calibrationor associated  withradioactive apparatus or components; (5)    FENOC,pursuant      to theAct and 10 CFRParts30,40, and70,to possess,but notseparate,  suchbyproduct      andspecialnuclearmaterials    as maybe produced by the operation of thefacility.
: c. Thisrenewedoperating      licenseshallbe deemedto containandis subjectto the conditions  specifiedin thefollowing  Commission  regulations  in 10 CFRChapter1:
Part20, Section30.34of Part30, Section40.41ofPart40, Sections50.54and50.59of Part50, andSection70.32of Part70;andis subjectto all applicable          provisionsof the Act andto the rules,regulations,    andordersof the Commission      nowor hereafterin effect;and is subjectto the additional  conditions specified or incorporated below:
(1)    MaximumPowerLevel FENOCis authorized      to operatethefacilityat a steadystatereactorcorepower levelof 2900megawatts      thermal.
(2)    Technical Specifications TheTechnical    Specifications  contained in Appendix  A, as revisedthrough Amendment    No. , are herebyincorporated      in the license.The licenseeshall operatethe facilityin accordance    withthe Technical    Specifications.
(3)    AuxiliarvRiverWaterSvstem (Deieteeiby Amendmeni      irio.6)
AmendmentNo.
BeaverValleyUnit 1                                              RenewedOperatingLicenseDPR-66
 
                                              -6                                            Proposed Page (10)  AdditionalConditions The AdditionalConditionscontainedin AppendixC, as revisedthrough AmendmentNo. , are herebyincorporatedintothis license. FENOC shall operatethe facilityin accordancewith the AdditionalConditions.
(11)    MitiqationStrateovLicenseCondition The licensee  shalldevelopandmaintainstrategies    for addressing largefiresand explosions  andthatincludethe followingkeyareas:
(a) Firefightingresponse    strategywiththe following  elements:
: 1. Pre-defined    coordinated  fire response strategyandguidance
: 2. Assessment      of mutualaidfirefightingassets
: 3. Designated    stagingareasfor equipment    andmaterials
: 4. Commandandcontrol
: 5. Trainingof responsepersonnel (b) Operations  to mitigatefueldamageconsidering      the following:
: 1. Protection  and useof personnel    assets
: 2. Communications
: 3. Minimizing  firespread
: 4. Procedures    for implementing            fire responsestrategy integrated
: 5. ldentification  of readily-available pre-stagedequipment
: 6. Trainingon integrated    fireresponse  strategy
: 7. Spentfuelpoolmitigation      measures (c) Actionsto minimize    releaseto includeconsideration    of:
: 1. Watersprayscrubbing
: 2. Doseto onsiteresponders AmendmentNo.
BeaverValleyUnit 1                                              RenewedOperatingLicenseDPR-66
 
APPENDIXC Proposed Page ADDITIONALCONDITIONS OPERATINGLICENSENO. DPR-66 FirstEnergyNuclearOperating  Companyand FirstEnergy    NuclearGeneration,LLCshatlcomplywith    II the followingconditionson the schedules  notedbelow:
Amendment          AdditionalCondition                                    lmplementation Number                                                                    Date 202                The licenseeis authorized  to relocatecertain        The amendment Technical  Specification requirements to licensee-    shallbe controlled documents.lmplementation      of this      implemented  within amendment    shallincludethe relocation  of these    60 daysfrom technical specification requirements to the            April14,1997 appropriatedocuments,as describedin the licensee'sapplicationdated September9, 1996, and evaluatedin the staffs safetyevaluation attachedto this amendment.
2Og                The licenseeis authorizedto relocatecertain          The amendment TechnicalSpecificationrequirementsto licensee-        shall be controlleddocuments. lmplementation      of this      implementedwithin amendmentshall includethe relocationof these          60 days from technical specification requirementsto the            December  10.1997 appropriatedocuments,as describedin the licensee'sapplicationdated March 14, 1997,as supplemented  July 29 and August13, 1997,and evaluatedin the staffs safety evaluationattached to this amendment.
210                The licenseeis authorizedto relocatecertain          The amendment TechnicalSpecificationrequirementsto licensee-        shall be controlleddocuments. lmplementation    of this      implementedwithin amendmentshall includethe relocationof these          30 days from technical  specification requirementsto the            January20, 1998 appropriate documents,    as describedin the licensee's application datedSeptember    11,1997, andevaluated  in the staffssafetyevaluation atiaeheciio thisamendment.
BeaverValleyUnit 1                              c-1                      Amendment  No.        I
 
Proposed A P P E N D I XC                                    Page ADDITIONAL        CONDITIONS OPERATING        LICENSE    NO.DPR-66 FirstEnergyNuclearOperating  CompanyandFirstEnergy            NuclearGeneration,  LLCshallcomplywith thefollowingconditions on the schedules    notedbelow.
Amendment        Additional  Condition                                          lmplementation Number                                                                            Date 225                The licenseeis authorized      to relocatecertain            The amendment TechnicalSpecification      requirements    to licensee-      shallbe controlled documents.lmplementation          of this          implemented within amendment    shallincludethe relocation      of these        60 daysfrom TechnicalSpecification      requirements    to the            August30, 1999 appropriate  documents      as described  in the licensee's application  datedDecember        24, 1998, as supplemented    June15,June17, andJuly7, 1999,andevaluated      in the staffssafety evaluation  attachedto thisamendment.
269                On the closingdate(s)of the transfers        to FENGenCo*      The amendment of theirinterests  in BeaverValleyPowerStation,Unit            shallbe No. 1, Pennsylvania    PowerCompanyandOhioEdison              implementedwithin Companyshalltransferto FENGenCo*              all of each      30 daysfrom transferor's  respective  accumulated    decommissioning      December  16,2005 fundsfor BeaverValleyPowerStation,UnitNo. 1, and tenderto FENGenCo*        additional  amounts    equalto remaining  fundsexpected      to be collected  in 2005,as represented  in the application    datedJune1, 2005,but notyet collected    by thetimeof closing.All of the funds shallbe deposited    in a separateexternaltrustfundfor the reactorin the sameamountas received              with respectto the unitto be segregated        from otherassets of FENGenCo*      andoutsideits administrative      control, as requiredby NRCregulations,          and FENGenCo*      shall takeall necessary    stepsto ensurethatthisexternal trustfundis maintained      in accordance    withthe requirements  of the orderapproving      the transferof the iicenseandconsisient      wiihthe saietyevaiuaiion supporting  the orderandin accordance        withthe requirements  of 10 CFRSection50.75,"Reporting          and recordkeeping  for decommissioning      planning."
" FirstEnergy NuclearGeneration    Corp.(FENGenCo)        hasbeenrenamedFirstEnergy    Nuclear Generation.LLC.
BeaverValleyUnit 1                                  c-2                          AmendmentNo.
 
Proposed APPENDIXC Page ADDITIONALCONDITIONS OPERATINGLICENSENO. DPR-66 FirstEnergy NuclearOperating    Companyand FirstEnergy        NuclearGeneration,  LLCshallcomplywith thefollowingconditions on the schedules    notedbelow:
Amendment          Additional  Condition                                        lmplementation Number                                                                          Date 269              By the dateof closingof thetransferof the ownership          Theamendment  shall interestsin BeaverValleyPowerStation,UnitNo. 1                be implementedwithin fromPennsylvania      PowerCompanyto FENGenCo*,                30 daysfrom FENGenCo*      shallobtaina parentcompanyguarantee            December16.2005 fromFirstEnergy    in an initialamountof at least$80 million(in2005dollars)to provideadditional decommissioning      fundingassurance      regarding  such ownership    interests.Required    fundinglevelsshallbe recalculated  annually  and,as necessary,      FENGenCo*
shalleitherobtainappropriate      adjustments  to the parentcompanyguarantee          or otheruvise  provideany additional  decommissioning    fundingassurance necessary    for FENGenCo*    to meetNRCrequirements u n d e r1 0C F R5 0 .7 5.
The SupportAgreements        described  in the applications datedMay18,2005(upto $80million),            andJune1, 2005(upto $400million),      shallbe effectiveconsistent withthe representations      contained  in the applications.
FENGenCo*      shalltakeno actionto causeFirstEnergy, or its successors  andassigns,to void,cancel,or modify the SupportAgreements        withoutthe priorwritten consentof the NRCstaff,except,however,            the $80 millionSupportAgreement        in connection  withthe transferof the Pennsylvania      PowerCompanyinterests maybe revokedor rescinded        if andwhenthe $400 millionsupportagreement      described  in the June1, 2005,application    becomeseffective.FENGenCo"          shall informthe Directorof the Officeof NuclearReactor Reguiation,  in writing,no iaterthanten ciaysafterany fundsare    provided  to FENGenCo*    by FirstEnergy undereitherSupportAgreement.
. FrrstEnergy NuclearGeneration      Corp.(FENGenCo)      hasbeenrenamed      FirstEnergyNuclear Generation.LLC.
BeaverValleyUnit 1                                  c-3                          AmendmentNo.
 
Proposed APPENDIX    C                                          Page ADDITIONAL      CONDITIONS OPERATING      LICENSE    NO.DPR-66 FirstEnergy NuclearOperating    Companyand FirstEnergy        NuclearGeneration,    LLCshallcomplywith thefollowingconditionson the schedules    notedbelow:
Amendment    Additional Condition                                                      lmplementation Number                                                                                  Date 278          Schedule  for Newand RevisedSurveillance          Requirements    (SRs)
Theschedule    for performing  SRsthatare newor revisedin              The Amendment    No.278shallbe as follows:                                  amendment shall be ForSRsthatare newin thisamendment,            thefirstperformance implemented is due at the endof thefirstsurveillance    interval, whichbegins within150 days on the dateof implementation    of thisamendment.                  from date of issuance ForSRsthatexistedpriorto thisamendment,            whoseintervals of  performance    are beingreduced,the firstreduced surveillance  intervalbeginsuponcompletion        of thefirst surveillance  performed  afterimplementation    of this amendment.
ForSRsthatexistedpriorto thisamendment,            whoseintervals of performance    are beingextended,    the firstextended surveillance  intervalbeginsuponcompletion        of the last surveillance  performed  priorto implementation    of this amendment.
ForSRsthatexistedpriorto thisamendment            thathave modifiedacceptance      criteria,the first performance  subjectto the modifiedacceptance      criteriais due at theendof thefirst surveillance  intervalthatbeganon the datethe surveillance waslastperformed      priorto the implementation    of this amendment.
278          Relocation  of CertainTechnical    Specification  Requirements LicenseAmendment        No.278authorizes    the relocation  of certain The Technical Specifications  to otherlicensee-controlled    documents. amendment lmplementation    of thisamendment    shallincluderelocation    of the  shall be requirements  to the specified documents,    as described  in        implemented (1)Sections4D and 4Eof the NRCstaffsSafetyEvaluation,              and within 150 days (2)TableLA, RemovedDetailChanges,            andTableR, Relocated from date of Specifications,  attachedto the NRCstaffs SafetyEvaluation,              issuance whichis enclosedin thisamendment.
BeaverValleyUnit1                                c-4                              AmendmentNo.
 
Proposed APPEND]XC                                        Page ADDITIONALCONDITIONS OPERATINGLICENSENO. DPR-66 FirstEnergyNuclearOperating    Companyand FirstEnergy            NuclearGeneration,  LLCshallcomplywith the followingconditionson the schedules          notedbelow:
Amendment      Additional Condition                                                          lmplementation Number                                                                                      Date 281            InitialPerformance  of NewSurveillance            andAssessment Requirements Uponimplementation        of Amendment          No.281 adoptingTSTF-448,    The Revision  3, the determination          of controlroomenvelope(CRE)          amendment unfiltered air inleakage      as requiredby Surveillance      Requirement    shallbe (SR)3.7.10.4,in accordance              withSpecification 5.5.14.c(i),
the      implemented assessment    of CREhabitability          as requiredby Specification        within120days 5.5.14.c(ii),andthe measurement              of CREpressureas requiredby    fromdateof Specification  5.5.14.d,shallbe considered          met. Following          issuance implementation:
(a) Thefirstperformance            of SR 3.7.10.4, in accordance with Specification  5.5.14.c(i),      shallbe withinthe specified Frequency  of 6 years,plusthe 18-month            allowanceof SR 3.0.2,as measured              fromthedateof the mostrecent successful  tracergastest,or withinthe next18 monthsif the timeperiodsincethe mostrecentsuccessful              tracergas test is greaterthan6 years.
(b) The first performance            of the periodicassessmentof CRE habitability,Specification          5.5.14.c(ii),
shallbe within 3 years,plusthe 9-monthallowance              of SR 3.0.2,as measured  fromthe dateof the mostrecentsuccessful tracergastest,or withinthe next9 monthsif thetime periodsincethe mostrecentsuccessful              tracergastestis greaterthan3 years.
(c) Thefirstperformance              of the periodicmeasurement  of CRE plessur-e, Specification
                                    -  - tf:  - - Ll 5.5.i4.cj,shaiibe wiihini8 i-r-ronths, plusthe 138daysallowedby SR 3.0.2,as measured                  from the dateof the mostrecentsuccessfulpressure measurement      test.
BeaverValleyUnit1                                          c-5                          Amendment No.
 
Attachment6 ProposedBeaverValleyPowerStation,UnitNo.2 OperatingLicenseChanges (Retyped- For Information Only)
(ElevenPagesFollow)
 
UNITED  STATES                                            Proposed NUCLEAR      REGULATORY          COMMISSION                                  Page WASHINGTON,    D.C. 20555-0001 FIRSTENERGYNUCLEAROPERATINGCOMPANY FIRSTENERGY      NUCLEARGENERATION.          LLC OHIO EDISONCOMPANY THE TOLEDO EDISONCOMPANY DOCKETNO. s0-412 BEAVERVALLEYPOWERSTATION,UNIT2 LicenseNo. NPF-73
: 1. The NuclearRegulatoryCommission(the Commissionor the NRC) has foundthat:
A. The application  to renewFacilityOperating    LicenseNo' NPF-73filedby FirstEnergy  NuclearOperating    bompany(FENOC)"      actingon its ownbehalfand as agentior FirstEnergy    NuclearGeneration,    LLC,OhioEdisonCompany,        and TheToledoEdisoncompany(thelicensees),            complies  with  the standards and requirements  of theAtomicEnergyAct of 1954,as amended(theAct),andthe Commission's    regulations setforthin 10CFRChapterl, andall required to otheragencies notifications                  or bodieshavebeendulymade; B. Construction of the BeaverValleyPowerStation,Unit2 (thefacility),        hasbeen substantiallycompleted  in conformity withConstruction    Permit  No. CPPR-105    and the applicatlon, as amended,  the provisions  of theAct,and  the regulations of the Commission; C. Thefacilitywilloperatein conformity    withthe application,  the provisions of the Act, andthe regulations  of the Commission    (exceptas exempted      from compliance  in Section2.D.below);
D. Thereis reasonable  assurance:(i)thatthe activities  authorized    by thisrenewed operating licensecanbe    conducted  without  endangering  the health  andsafetyof and (ii)thatsuchactivities the publ'rc                            will be conducted  in compliance  withthe .
Commission's  regulations  setforthin 10 CFRChapter    l (except  as exempted  from ccrmplianee !n -Seetion 2.D.below);
.FENOC is authorizedto act as agentfor FirstEnergyNuclearGeneration,LLC,Ohio EdisonCompany, and The Toledo EdisonCompany-andhas exclusiveresponsibilityand controlover the physical construction,operation,and maintenanceof the facility.
AmendmentNo.
RenewedOPeratingLicenseNPF-73
 
Proposed Page E. FENOCis technicallyqualifiedto engagein the activitiesauthorizedby this renewedoperatinglicensein accordancewith the Commission'sregulationsset forthin 10 CFR Chapterl; F. The licenseeshave satisfiedthe applicableprovisionsof 10 CFR Part 140, "FinancialProtectionRequirementsand lndemnityAgreements,"of the Commission'sregulations; G. The issuanceof this renewedoperatinglicensewill not be inimicalto the common defense and securityor to the health and safety of the public; H. After weighingthe environmental,  economic,technical,and other benefitsof the facilityagainstenvironmentaland other costs and consideringavailable alternatives, the issuanceof this RenewedOperatingLicenseNo. NPF-73is subjectto the conditionsfor protectionof the environmentset forth in the Environmental  ProtectionPlan attachedas AppendixB, is in accordancewith 10 CFR Part 51 of the Commission'sregulations,and all applicablerequirements have been satisfied;
: l. The receipt,possessionand use of source,byproductand specialnuclearmaterial as authorizedby this licensewill be in accordancewith the Commission's regulations in 10 CFR Parts30,40, and 70.
J    Actionshave been identifiedand have been or will be taken with respectto: (1) managingthe effectsof aging on the functionalityof structuresand components that have been identifiedto requirereviewunder 10 CFR 54.21(aX1)duringthe periodof extendedoperation,and (2) time-limitedaging analysesthat have been identifiedto requirereviewunder 10 CFR 54.2Uc),such that there is reasonable assurancethat the activitiesauthorizedby this renewedoperatinglicensewill continueto be conductedin accordancewith the currentlicensingbasis,as definedin 10 CFR 54.3 for the facility,and that any changesmade to the facility's currentlicensingbasisin order to complywith 10 CFR 54.29(a)are in accordance with the Act and the Commission'sregulations;
: 2. RenewedFacilityOperatingLicenseNPF-73is herebyissuedto FENOC,FirstEnergy NuclearGeneration,LLC, Ohio EdisonCompany,and The ToledoEdisonCompany(the licensees)to read as follows:
A. This renewedlicenseappliesto the BeaverValleyPowerStation,Unit 2, a pressurizedwater reactorand associatedequipment(the facility),owned by Fit"stEnergy,NuclearGeneration,LLC (owner"). leasedto Ohio FdisonComoany (lessee),and The ToledoEdisonCompany(lessee)and operatedby FENOC (collectivelythe licensees).The facilityis locatedon the licensees'site on the southernshoreof the Ohio Riverin BeaverCounty,Pennsylvania,      approximately 22 milesnorthwestof Pittsburghand 5 mileseast of East Liverpool,Ohio, and is describedin FENOC'sUpdatedFinalSafetyAnalysisReport,as supplemented and amended,and in its Environmental    Report,as supplementedand amended; B. Subjectto the conditionsand requirementsincorporatedherein,the Commission herebylicenses:
(1)    Pursuant  to Section103of theAct and 10 CFRPart50, FENOCto possess,use,andoperatethefacilityat the designated    locationin Beaver County,Pennsylvania,  in accordance  withthe procedures and limitations setforthin thislicense:
AmendmentNo.
BeaverValleyUnit 2                                        RenewedOperatingLicenseNPF-73
 
Proposed Page (2)  Pursuant    to theAct and 10CFRPart50, FirstEnergy                              NuclearGeneration, LLC,OhioEdisonCompany,                    andTheToledoEdisonCompanyto possessthe facilityat the designated                  locationin BeaverCounty, Pennsylvania,      in accordance        withthe procedures                and limitations      setforth in the license; (3)  Pursuant    to theAct and 10 CFRPart70, FENOC,to receive,possess, anduseat anytimespecialnuclearmaterialas reactorfuel,in accordance    withthe limitations          for storageandamountsrequiredfor reactoroperation,        as described        in the UpdatedFinalSafetyAnalysis Report,as supplemented                andamended; (4)  Pursuant    to theAct and 10CFRParts30,40, and70, FENOCto receive, possess,anduseat anytimeanybyproduct,                              source,andspecialnuclear materialsuchas sealedneutronsourcesfor reactorstartup,sealed sourcesfor reactorinstrumentation                  andradiationmonitoring                  equipment calibration,  andas fissiondetectors              in amountsas required; (5)  Pursuant  to theAct and 10 CFRParts30,40, and70, FENOCto receive, possess,and usein amountsas requiredanybyproduct,                                    source,or specialnuclearmaterialwithout                restriction    to chemicalor          physical    form, for sampleanalysisor instrument                  calibration      or otheractivityassociated withradioactive      apparatus        or components; (6)  Pursuant  to theAct and 10CFRParts30,40, and70, FENOCto possess,but notseparate,                suchbyproduct          andspecialnuclearmaterials as maybe producedby the operation                      of the facilityauthorized              herein.
(7)  (a)    OhioEdisonCompanyandTheToledoEdisonCompanyare authorized      to transferanyportionof theirrespective                          leased interestsin BVPSUnit2 anda proportionate                              shareof theirleased interestsin the BVPScommonfacilities                            to certainpotential investors      identified      in theirsubmittals        of July 14,16,22 and31, andSeptember              14,17and18,1987,andat thesametimeto leasebackfromsuchpurchasers                        suchinteresttransferred                in the BVPSUnit2 facility.Thetermof the leaseis for approximately 29-112      yearssubjectto a rightof renewal.Suchsaleand l^^^^l^a^l,    +-^^^^^ri^^                  ,t^i^^l +^ +t^^ -^^-^^^^l^+;^*^            ^^l lsc>s-c'st\    !.!.:! !><!Lt!U! !> 4! g  Dr-lL'j=rrr rl.,! t! lg ! gPl sDsl ll-lLlul l+ c! !u conditions      setforthin the aforementioned                      submittals.Specifically, a lessorand anyoneelsewhomayacquirean interestunder thesetransactions            areprohibited        fromexercising            directlyor indirectly    anycontroloverthe licenseof BVPSUnit2. For purposes      of thiscondition        thelimitations          in 10 CFR50.81,as now in effectandas maybe subsequently                          amended,arefully applicable      to the lessorandanysuccessor                        in interestto that lessoras longas the licensefor BVPSUnit2 remainsin effect; thesefinancial          transactions      shallhaveno effecton the licensefor the BVPSUnit2 facilitythroughout                      thetermof the license.
Amendment        No.
BeaverValleyUnit2                                                      RenewedOperating                LicenseNPF-73
 
Proposed Page (b)    Further,the licensees  are alsorequiredto notifythe NRCin writingpriorto anychangein. (i) the termor conditions      of anyleaseagreements      executedas  part of these transactions; (ii)the BVPSOperating  Agreement,    (iii)the existingpropertyinsurance    coverage for BVPSUnit2, and (iv)anyactionby a lessoror othersthatmayhaveadverse effecton the safeoperationof the facility.
C. Thisrenewedoperating      licenseshallbe deemedto containandis subject to the conditions  specified in thefollowingCommission    regulations  set forthin 10 CFRChapter1 andis subjectto all applicable        provisions  of the Act andto the rules,regulations,    andordersof the Commission    nowor hereafter  in effect;andis subjectto the additional  conditions  specified  or incorporated  below:
(1)    MaximumPowerLevel FENOCis authorized      to operatethe facilityat a steadystatereactor corepowerlevelof 2900megawatts        thermal.
(2)    Technical  Specifications TheTechnical    Specifications  contained in Appendix  A, as revised throughAmendment      No. , andthe Environmental      Protection  Plan contained  in AppendixB, bothof whichare attachedheretoare herebyincorporated    in the license.FENOCshalloperatethe facilityin accordance  withtheTechnical    Specifications andthe Environmental  Protection  Plan.
Amendment  No.
BeaverValleyUnit2                                          RenewedOperating    LicenseNPF-73
 
Proposed Page (8)    DetailedControlRoomDesiqnReview(DCRDR)
Deleted (9)    SafetvParameter        DisplavSvstem(SPDS)
Deleted (10)    FireProtection      Modifications (Section9.5.1of SERSupplement      6)
Deleted (1 1 ) A d d i ti o n a l C onditions TheAdditional        Conditions contained  in AppendixD, as revisedthrough          I Amendment        No. , are herebyincorporated    intothislicense.FENOC            I shalloperatethe facilityin accordance        withtheAdditional  Conditions.
(12)  SteamGenerator        Surveillance  lntervalExtension Deleted (13)  Mitioation    StrateqvLicenseCondition The licenseeshalldevelopandmaintainstrategies            for addressing large firesandexplosions      andthatincludethefollowingkeyareas:
(a) Firefightingresponse          strategywiththefollowing  elements:
: 1. Pre-defined        coordinated fireresponse  strategyandguidance
: 2. Assessment          of mutualaidfirefightingassets
: 3. Designated        stagingareasfor equipment    and materials
: 4. Commandandcontrol
: 5. Trainingof responsepersonnel (b) Operations        to mitigatefueldamageconsidering      the following:
: 1. Protection      and useof personnel    assets
: 2. Communications
: 3. Minimizing        firespread
: 4. Procedures        for implementing  integratedfireresponsestrategy
: 5. ldentification      of readily-availablepre-staged  equipment
: 6. Trainingon integratedfire responsestrategy
: 7. Spentfuelpoolmitigation          measures (c) Actionsto minimize        releaseto includeconsideration    of:
: 1. Watersprayscrubbing
: 2. Doseto onsiteresponders Amendment  No. I BeaverValleyUnit2                                            Renewed    Operating  LicenseNPF-73      I
 
Proposed 1.0    Obiectives  of the Environmental  Protection Plan                                          Page The Environmental    ProtectionPlan (EPP)is to providefor protectionof nonradiological environmentalvaluesduringoperationof the BeaverValleyPowerStation,Unit 2 (facility).The principalobjectivesof the EPP are as follows:
(1)    Verifythatthe facilityis operatedin an environmentally    acceptable manner,as established  by the FinalEnvironmental    Statement  - Operating LicenseStage(FES-OL) andotherNRCenvironmental        impactassessments.
(2)    Coordinate  NRCrequirements      andmaintainconsistency    withotherFederal,State,and localrequirements  for environmental  protection.
(3)    KeepNRCinformedof the environmental        effectsof facilityconstructionandoperation and of actionstakento controlthoseeffects.
Environmental  concernsidentified  in the FES-OL(September      1985,NUREG-1094)    whichrelate to waterqualitymattersare regulated    by wayof the licensee's*  NPDESpermit.
2.0    EnvironmentalProtectionlssues ln the FES-OL(NUREG-1094,      September    1985),the staffconsidered  the environmental impactsassociated    withthe operation  of the BeaverValleyPowerStation,Unit2. No aquatic/water  quality,terrestrial,or noiseissueswereidentified.
3.0    Consistencv  Requirements 3.1    PlantDesiqnandOperation The licenseemaymakechangesin stationdesignor operation            or performtestsor experiments affectingthe environment    providedsuchactivities  do notinvolvean unreviewed    environmental questionanddo notinvolvea changein the EPP.. Changesin stationdesignor operation            or performance  of testsor experiments  whichdo notaffecttheenvironment      are notsubjectto the requirements  of thisEPP. Activities  governedby Section3.3are not subjectto the requirements  of thisSection.
Beforeengagingin additional    construction  or operational activities whichmaysignificantly affect the environment,  the licenseeshallprepareand recordan environmental        evaluation of such activity.Activities are excluded  fromthisrequirement    if all measurable nonradiological environmental  effectsareconfinedto the on-siteareaspreviously      disturbedduringsite preparation  andplanteonstrucjion. Whenthe evaluation    indieates thatsuehactivityinvolvesan unreviewed  environmental  question, the licenseeshallprovidea writtenevaluation  of such activityandobtainpriorNRCapproval.Suchactivityandchangeto the EPPmaybe implemented  onlyin accordance    withan appropriate  licenseamendment    as setforthin Section5.3of thisEPP.
*"Licensee"  refersto FirstEnergy  NuclearOperating  Company,  operatorof thefacility,and actingas agentfor FirstEnergy    NuclearGeneration,    LLC,OhioEdisonCompany,      andThe ToledoEdisonCompany,        ownersor lesseesof thefacility.
BeaverValleyUnit 2                                B-1                      AmendmentNo.
 
Proposed APPENDIXD Page ADDITIONALCONDITIONS OPERATINGLICENSENO. NPF-73 FirstEnergy NuclearOperating  Company,    FirstEnergy  NuclearGeneration,  LLC,OhioEdison Company,  andTheToledoEdisonCompanyshallcomplywiththe followingconditions            on the schedulesnotedbelow:
Amendment          Additional  Condition                                      lmplementation Number                                                                        Date 83                The licenseeis authorized      to relocatecertain          Theamendment Technical  Specification  requirements  to licensee-    shallbe implemented controlled  documents.lmplementation        of this      within60 days amendment      shallincludethe relocation    of these      fromApril14,1997 technical  specification  requirements  to the appropriate  documents,    as described  in the licensee's  application  datedSeptember      9, 1996, andevaluated    in the staffssafetyevaluation attached  to thisamendment.
87                The licenseeis authorized      to relocatecertain          The amendment Technical  Specification  requirements  to licensee-    shall be implemented controlled  documents.lmplementation        of this      within60 days from amendment      shallincludethe relocation    of these      December10, 1997 technical  specification  requirements  to the appropriate  documents,    as described  in the licensee's  application  datedMarch14,1997,as supplemented    July29 andAugust13,1997,and evaluatedin the staff'ssafetyevaluationattached to thisamendment.
88                The licenseeis authorized    to relocatecertain          Theamendment TechnicalSpecification    requirements  to licensee-    shallbe implemented controlled  documents.lmplementation        of this      within30 daysfrom amendment      shallincludethe relocation    of these      January  20, 1998 technical specification  requirements  to the appropriate  documents,    as described  in the licensee's  application  datedSeptember11,1997, and evaii;aieci  in ihe siaffs safeiiievaiuaiion attached  to thisamendment.
98                The licenseecommitsto performvisualacceptance              The amendment examinations    of sleevewelds;postweldheattreatment shallbe implemented of sleevewelds;andthe NRC-                                within60 days from recommended      inspections  of repaired tubesas        March26, 1999 described  in the licensee's  application dated March10,1997,as supplemented          July28, 1997, S e p te mb e1r7 ,1997,  Apr il30,1998,and January29, 1999,andevaluated        in the staffs safetyevaluation    attachedto thisamendment.
BeaverValleyUnit 2                              D-1                      AmendmentNo.
 
APPENDIXD Proposed Page ADDITIONALCONDITIONS OPERAT]NGLICENSENO. NPF-73 FirstEnergy NuclearOperating    Company,        FirstEnergy      NuclearGeneration,          LLC,OhioEdison Company,  andTheToledoEdisonCompanyshallcomplywiththefollowingconditions                                on the schedulesnotedbelow:
Amendment          Additional    Condition                                                        lmplementation Number                                                                                            Date 102              The licenseeis authorized            to relocatecertain                      The amendment Technical    Specification      requirements    to licensee-                shallbe implemented controlled    documents.lmplementation                of this                within60 days amendment        shallincludethe relocation            of these              fromAugust30, TechnicalSpecification            requirements    to the                      1999 appropriate    documents        as described    in the licensee's    application      datedDecember        24, 1998,as supplemented        June15,June17, andJuly7, 1999, andevaluated        in the staff'sevaluation      attachedto thisamendment.
151              On the closingdate(s)of the transfers              to FENGenCo"              The amendment of theirinterests        in BeaverValleyPowerStation,Unit                      shallbe No.2, Pennsylvania            PowerCompany,        The Cleveland              implementedwithin Electric  llluminating      Company,      OhioEdisonCompany,                30 days from andTheToledoEdisonCompanyshalltransferto                                      December16. 2005 FENGenCo"        all of eachtransferor's        respective accumulated        decommissioning          fundsfor BeaverValley PowerStation,UnitNo.2, exceptfor fundsassociated withthe leasedportionsof BeaverValleyPower Station,UnitNo.2, andtenderto FENGenCo*
additional    amountsequaltoremaining                fundsexpected to be collected      in 2005,as represented          in the application    datedJune1, 2005,but notyet collected                      by the timeof closing.All of the fundsshallbe deposited in a separateexternaltrustfundfor the reactorin the sameamountas received              withrespectto the unitto be segregated      fromotherassetsof FENGenCo*                      and
                  ^, ,.^3i^ :3^ ^..'*:^:^+-^3i.,^    ^^^9-^i              ,i-^,.! L., t :D.^
uul)tu5  ii9 ctLilliltltJUCtUvti  uvtil.tLil,4D !<t'.iuilglr  vy  rrr\v regulations,    and FENGenCo*shalltakeall necessary stepsto ensurethat this externaltrust fund is maintainedin accordancewith the requirementsof the order approvingthe transferof the licenseand consistentwith the safetyevaluationsupportingthe order and in accordancewith the requirementsof 10 CFR Section50.75,"Reportingand recordkeeping for decommissioning            planning."
* FirstEnergy NuclearGeneration    Corp.(FENGenCo)              hasbeenrenamedFirstEnergy              Nuclear Generation.
LLC.
BeaverValleyUnit2                                    D-2                                AmendmentNo.
 
Proposed APPENDIX      D Page ADDITIONALCONDITIONS OPERATINGLICENSENO. NPF-73 FirstEnergy NuclearOperating  Company,    FirstEnergy    NuclearGeneration,    LLC,OhioEdison Company, andTheToledoEdisonCompanyshallcomplywiththefollowing                          on the conditions schedulesnotedbelow:
Amendment          Additional Condition                                          lmplementation Number                                                                            Date 151                By the dateof closingof thetransferof the ownership Theamendment interestsin BeaverValleyPowerStation,UnitNo.2                shallbe implemented fromPennsylvania    PowerCompanyto FENGenCo", within30 daysfrom FENGenCo*    shallobtaina parentcompanyguarantee Decem be16,2005        r fromFirstEnergy    in an initialamountof at least$80 million(in2005dollars)to provideadditional decommissioning    fundingassurance      regarding  such ownership  interests.Required    fundinglevelsshallbe recalculated  annually  and,as necessary,      FENGenCo" shalleitherobtainappropriate      adjustments    to the parent companyguarantee      or otheruvise  provideanyadditional decommissioning    fundingassurance      necessary  for FENGenCo*    to meetNRCrequirements          under10 CFR 50.75.
The SupportAgreements      described    in the applications datedMay18,2005(upto $80million),            andJune1, 2005(upto $400million),    shallbe effectiveconsistent withthe representations    contained  in the applications.
FENGenCo*    shalltakeno actionto causeFirstEnergy, or its successors  andassigns,to void,cancel,or modify the SupportAgreements      withoutthe priorwritten consentof the NRCstaff,except,however,          the $80 millionSupportAgreement      in connection    withthe transferof the Pennsylvania    PowerCompanyinterests maybe revokedor rescinded        if andwhenthe $400 millionsupportagreement    described    in the June1, 2005,application  becomeseffective.FENGenCo*            shall infoi'mihe Dii'ecioi'ofihe Officeof tiiucieai'Reacior Regulation,  in writing,no laterthanten daysafterany fundsare provided    to FENGenCo"      by FirstEnergy  under eitherSupportAgreement.
* FirstEnergy NuclearGeneration  Corp.(FENGenCo)        hasbeenrenamedFirstEnergy      Nuclear Generation,LLC.
BeaverValleyUnit 2                            D-3                        AmendmentNo.
 
APPENDIX      D Proposed Page ADDITIONALCONDITIONS OPERAT]NGLICENSENO. NPF-73 FirstEnergyNuclearOperatingCompany,FirstEnergyNuclearGeneration,LLC, Ohio Edison                  I Company,and The ToledoEdisonCompanyshallcomplywith the followingconditionson the                  I schedulesnotedbelow:
Amendment Additional    Condition                                                lmplementation Number                                                                            Date 161          Schedule  for NewandRevisedSurveillance        Requirements  (SRs)
Theschedule  for performing  SRsthatare newor revisedin            The AmendmentNo. 161 shall be as follows:                                amendment shallbe ForSRsthatare newin thisamendment,        thefirstperformance implemented is dueat the endof thefirstsurveillance  interval,whichbegins within150days on the dateof implementation    of thisamendment.              from date of issuance ForSRsthatexistedpriorto thisamendment,        whoseintervals of performance  are beingreduced,the firstreduced surveillanceintervalbeginsuponcompletion      of thefirst surveillanceperformed  afterimplementation  of this amendment.
ForSRsthatexistedpriorto thisamendment,        whoseintervals of performance  are beingextended,    thefirstextended surveillanceintervalbeginsuponcompletion      of the last surveillanceperformed  priorto implementation  of this amendment.
ForSRsthatexistedpriorto thisamendment        thathave modifiedacceptance  criteria,the firstperformance  subjectto the modifiedacceptance  criteriais due at the endof the first surveillanceintervalthatbeganon the datethe surveillance was lastperformed  priorto the implementation  of this amendment.
141          Relocation of eedalnTechnleal    Specifieation Requirernents LicenseAmendmentNo. 161 authorizesthe relocationof certain          The TechnicalSpecifications  to other licensee-controlled  documents. amendment lmplementation  of this amendmentshall includerelocationof the      shall be requirementsto the specifieddocuments,as describedin                implemented (1) Sections4D and 4E of the NRC staffs SafetyEvaluation,and        within 150 days (2) Table LA, RemovedDetailChanges,and Table R, Relocated          from date of Specifications,attachedto the NRC staffs SafetyEvaluation,          issuance which is enclosedin this amendment.
BeaverValleyUnit2                            D-4                      AmendmentNo.
 
Proposed APPENDIXD                                            Page ADDITIONALCONDITIONS OPERATINGLICENSENO. NPF-73 FirstEnergy NuclearOperating    Company,      FirstEnergy NuclearGeneration,  LLC,OhioEdison Company, andThe ToledoEdisonCompanyshallcomplywiththe followingconditions              on the schedules notedbelow:
Amendment    Additional  Condition                                                    lmplementation Number                                                                                Date 163          lnitialPerformance      of NewSurveillance    andAssessment Requirements Uponimplementation        of Amendment    No. 163adoptingTSTF-448,      The Revision  3, the determination    of controlroomenvelope(CRE)          amendment unfiltered  air inleakage  as requiredby Surveillance    Requirement    shallbe (SR)3.7.10.4,    in accordance  withSpecification  5.5.14.c(i),
the    implemented assessment    of CREhabitability    as requiredby Specification        within 120 days 5.5.1a.c(ii), andthemeasurement        of CREpressure    as required by from date of Specification  5.5.14.d,  shallbe considered  met. Following          issuance implementation:
(a) Thefirstperformance      of SR 3.7.10.4,  in accordance  with Specification  5.5.14.c(i),shallbe withinthe specified Frequency    of 6 years,plusthe 18-month      allowance of SR 3.0.2,as measured      fromthedateof the mostrecent successful  tracergastest,or withinthe next18 monthsif the time  period  sincethe mostrecentsuccessfultracer      gas testis greaterthan6 years.
(b) Thefirstperformance      of the periodicassessment    of CRE habitability, Specification  5.5.14.c(ii),
shallbe within 3 years,plusthe 9-monthallowance        of SR 3.0.2,as measured    fromthe dateof the mostrecentsuccessful tracergas test,or withinthe next9 monthsif the time periodsincethe mostrecentsuccessfultracergas test is greaterthan3 years.
(c) The iii-sipei-fcrmance    of ihe pei'iociic measiii'ement  of CRE pressure,  Specification 5.5.14.d, shallbe within18months, plusthe 138daysallowedby SR 3.0.2,as measured            from the dateof the mostrecentsuccessfulpressure measurement    test.
BeaverValleyUnit2                                D-5                      Amendment  No.
 
Attachment  7 NuclearPowerStation,UnitNo. 1 ProposedDavis-Besse OperatingLicenseChanges (Re{yped- For Information Only)
(SevenPagesFollow)
 
Proposed Page UNITEDSTATES NUCLEAR REGULATORY COMMISSION wASHtNGTON,    D.C.20555-0001 FIRSTENERGY NUCLEAR OPERATING COMPANY AND FIRSTENERGY      NUCLEAR GENERATION,              LLC D O C K E TN O . 5 0 - 3 4 6 DAVIS-BESSE      NUCLEAR POWER STATION                I'NIT  NO. 1 FACILITY      OPERATING LICENSE License    No. NPF-3 The  Nuclear    Regulatory    Commission        (the    Commission)      having    found  that:
A. The application        for license        filed      by FirstEnergy      NucLear Operating      Company (FENOC)1, acting              on its    own behalf    and as agent for FirstEnergy        Nuclear Generation,              LLC (Iicensees)      complies with the standards      and reguirements          of the Atomic Energy Act of L954, as amended (the AcU), and the Commission's rules and regulations set forth      in 10 CFR Chapt,er I and all              reguired    notifications      to other agencies or bodies have been duly made; B. Construction      of the Davis-Besse NucLear power Station,                      Unit No. 1 (tshe facility)    has been substantially              completed in conformity with Construction        Permit No. CppR-80 and the application,                    as amended, the provisions            of the Act and the rul_es and regulations of the Commission;
: c. The facility      will  operat,e in conformity              with the applicaEion,          as amended, the provisions            of t.he Act, and the rules and regulations of the Commission; FENOC j-s aut,horized    t.o act as agent for FirstEnergy                  Nuclear GeneraLion, LLC, and has exclusive        responsibility          and control        over the physical construction,    operaiion,      anci maintenance of the facility.
L-1                Amendment    No.
 
Proposed Page
: 1. D.      There is reasonable assurance:              (i) that the activities authorized    by  this    operating    license    can be eonduct.ed without endangering the health and safety of the public,                    and (ii)      Ehat such activities      wil-l be conducted in compliance with the rules and regulat,ions    of the Commission; E.      The FirstEnergy      Nuclear Operat,ing company is technically qualified    and the Ii-censees are financially            qualified        to engage in the activities      authorized    by this operating      license        in accordance with the rules and regulaLions                of t.he Commission; The licensees    have satisfied      the applicable      provisions        of  10 CFR Part l-40, rrFinancial      Protect.i-on Reguirements        and Indemnity          Agree-menLs," of Lhe Commission's regulations; The issuance of this operating            l-icense will" not be inimical the common defense and securitv            or to the health        and safetv        of the public,.
H.      After    weighing the environmental,            economic, technical,          and oLher benefi-ts of the facility        against environmental        and other costs and considering      available    alternaLives,      Ehe issuance of Facility Operating License No. NPF-3 subject to the condj-tions for protection    of the environment        seL fort,h herein    is in accordance with 10 CFR Part 51- (formerly            Appendix D to 10 CFR Part 50), of the Commission's regulations          and all applicable        reguirements          have been satisfied;      and I.      The receipt.,    possession,    and use of source, blproduct                and special nuclear materiaL as authorized            by thi-s license    w j - 1 1 -b e i n a c c o r d -
ance wit.h the Commission's regulations              in l-0 CFR Part 30, 40, and 70, including 10 CFR Sect.ions 30.33, 40.32,70-23,                        and 70.31.
Facilit.y  Operat,ing License No. NPF-3 is hereby issued Lo FirstEnergy Nuclear Operating Company (FENOC), and First.Energy Nuclear Generation, LLC t.o read as follows:
A.      This l-icense applies        to the Davis-Besse Nuc'lear Power Station, Uni-t No. 1, - pr"""rrrized        water nuclear reactor        and associated equi-pment (the facility),        owned by FirstEnergy        Nuclear Generation,    IJLC. The facility        is located on the south-western shore of Lake Erie in Ottawa CounLy, Ohio, approximately                          21 miles east of Toledo, Ohio, and is described                in the "Fina1 Safety Analysis    Report" as supplemented and amended (Amendments 14 through 44) and the Environmental              ReporL as supplemented and amended (Supplements 1 through 2).
L-2              Amendment No.
 
Proposed Page
                                              -5 2 .8. Subject. to the conditions                  and requirements      incorporated      herein, the Commission herebv licenses:
(1)    FENOC, pursuant to Section 103 of t,he Act and 10 CFR Part. 50, 'rLicensing of Product,ion and Utilization Facilities,tt            to possess, use, and operate the facility; (2)    FirstEnergy            Nuclear Generation,        LLC, to possess the facility          at the designated        locat,ion  in Ottawa County,        Ohio in accordance with the procedures and limitations                          set    forth i-n this l-icense; (3)      FENOC, pursuant to the Act. and 10 CFR Part 70, to receive, possess and use at any time special                      nuclear material      as reactor          fuel,  in accordance with the limitations              for storage and amounts required                  for reactor    operation,    as described            in the Final Safety Analysis            Report, as suppJ-emented and amended; (4)    FENOC, pursuant to the Act and 10 CFR parts 30, 40, and 70 to receive,              possess and use at any time any byproduct, source and special              nucl-ear mat,erial as sealed neuLron sources for reactor                startup,  sealed sources for reactor instrumentation              and radiation      monitoring    eguipment ca]ibration,              and as fission      detectors    in amounts as r avm li Ygr l r avAg ,.
(5)    FENOC,pursuanL to the Act and 10 CFR Parts 30, 40 and 70, to receive,              possess and use in amounts as required              any blproduct,              source or special- nuclear        material_ wit,hout restrict.ion              Lo chemical or physical        form, for sample analysis            or instrument. cal-ibration        or associated    with radioactive              apparatus    or components; and (5)    FENOC, pursuant t.o the Act and l-o CFR part,s 30 and 70, to possess,              but not separate,        such byproduct      and special nuclear              materials    as may be produced by the operat,ion              of the facil_ity.
L-3            Amendment No.
 
Proposed Page 2.C. This licenseshall be deemedto contain and is subjectto the conditionsspecifiedin the following Commissionregulationsin 10 CFR ChapterI: Part 20, Section30.34 of Part 30, Section40.4I of Part 40, Sections50.54 and 50.59 of Part 50, and Section70.32 of Part 70; and is subjectto all applicableprovisionsof the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subjectto the additionalconditionsspecifiedor incorporatedbelow:
(l) Maximum PowerLevel FENOC is authorized to operatethe facility at steadystate reactor core power levels not in excessof 2817 megawatts(thermal).
Prior to attainingthe power level, Toledo Edison Companyshall comply with the conditionsidentified in Paragraph(3) (o) below and complete the preoperationaltests, startup tests and other items identified in Attachment 2 to this license in the sequence specified.Attachment2 is an integral part of this license.
(2) Technical Specifications The TechnicalSpecificationscontainedin Appendix A, as revisedthroughAmendmentNo. , are herebyincorporated in the license. FENOC shall operatethe facility in accordancewith the TechnicalSpecifications.
(3) Additional Conditions The mattersspecifiedin the following conditionsshall be completedto the satisfactionof the Commissionwithin the statedtime periodsfollowing the issuanceof the licenseor within the operationalrestrictionsindicated.The removal of theseconditionsshall be madeby an amendmentto the licensesupportedby a favorableevaluationby the Commission:
(a\  FF.Nf}C  chell nnf nnprefc fhe rcanfnr in nneraf inrral ModesI and?with lessthanthreereactorcoolant pumps m operatlon.
(b) Deletedper Amendment6 (c) Deletedper Amendment5 L-4                          AmendmentNo.
 
Proposed Page 2.C(4) fire  Protection FENOCshaf] implement and maintain                    in effect        al} provisions of the approved Fire Protection                Program as described                in t,he Updated Safety Analysis            Report and as approved in the SERs dated JuIy 26, L979, and May 30, !99:.-, subject Lo the following    provision:
FENOC may make changes to the approved Fire Protection Program without        prior    approval      of the Commission only if those changes would noE adversely                    affect  the ability          to achieve and maintain          safe strutdown in Lhe event of a fire                      -
(s) Del-eted per    Amendment No. 279.
(6) Antit.rust    Conditions FENOC and FirstEnergy          Nuclear Generation,            LLC shall          comply wiLh the antitrust          conditions      delineated      in Condition            2.8 of this license        as if named therein.                FENOCshall not market or broker power or energy from the Davis-Besse Nucl-ear Power Station,          Unit No. 1.            FirstEnergy          Nuclear Generation,    LLC is responsible            and accountabfe              for the actions    o f F E N O Ct o t h e e x t e n E t h a t s a i d a c t i o n s    affect    the marketing    or brokering      of power or energy from Ehe Davis-Besse Nuclear Power Station,                Unit No. 1, and in any way, conLravene the antiLrust            license      conditions          contained      in the license.
L-6      Amendment        No.
 
Proposed Page
                                                -l        G.      In accordance with the requirement              imposed by the October 8, L9'76, order of the United States Court of Appeals for the Dist,rict      of Columbia CircuiL        in Natural Resources Defense Council v. Nuclear Regulatory                Commission, No. 74-L385 and 74-1586, that Lhe Nucl-ear Regulatory              Commission "shalL make any licenses        granted between July 21, 19'76 and such time when the mandate is issued subject              to the outcome of such proceedings      herein,"      Ehis license    shall be subject to the outcome of such proceedings.
H.      This license      is effective      as of the    date  of issuance  and shal-l-expire at midnight, April          22, 20L7.
: 3.      Based on the Commission's Order dated                  December 15, 2005        and conforming Amendment No. 270 dated December 15, 2OO5                        regarding the direct. transfer        of the license      from the Cleveland Electric Il-luminating    Company (CLeveland Electric)            and Lhe Toledo Edison Company (Toledo ndison) to FirstEnergy                NucLear Generation Corp.
(FENGenCo)*, FirstEnergy            Nuclear Operating      Company and FENGenCo*
shall comply with the following              conditions    noted bel_ow:
A.      On t.he closing      date of the transfers          to FENGenCo* of their interesLs    in Davis-Besse,        Cleveland Electric      and Toledo Edison shal-l- transfer    to FENGenCo* all of each transferor,            s respective      accumulated decommj-ssioning funds for Davis-Besse and tender to FENGenCo* additional              amounEs equal to remaining funds expected to be collected              in 2005, as represented      in t,he application      dated June 1, 2005, but not yet collected              by the time of closing.          AlI of the funds shatl be deposited          in a separate    external      trust  fund for the reactor      in the same amount as received          with respecE to the unj_t to be segregated from other assets of FENGenCo* and out,side its administrative controL,    as reqluired by NRC regulaEions,            and FENGenCo* shall take all necessary sleps to ensure that this external_ trust fund is maintained          in accordance with t,he requirements          of the order approving        the transfer      of the license    and consistent with the safety evaluation            supporting    the order and in accordance with the reguirements              of 10 CFR SecLion 50.75, "Reporting    and recordkeeping        for decommissioning planning.,'
* FirstEnergy Nuclear Generation Corp. (FENGenCo)* has been renamedFirstEnergy Nuclear Generation,LLC.
L-T4                Amendment  No.
 
Proposed Page
                                              - 14A-The Support Agreement described          in the application      dated June 1, 2005 (up to $400 million),            shall be effectj-ve consistent with the representations        contained    in t.he application. FENGenCo*
shall  take no action to cause FirstEnergy,            or its successors and assigns,    to void,  cancel,    or modify t.he Support Agreement without the prior    written  consenL of the NRC staff.          FENGenCo* shalf inform the Director      of the Office      of Nuclear ReacEor Regulation, in writing,    no lat.er than ten days after          any funds are provided to FENGenCo* by FirstEnergy        under either      Support Agreement.
FOR THE NUCLEAR REGULATORYCOMMISSION Original-    Signed by R. C. DeYourxg (for)
Roger S. Boyd, Di-rector Division    of Project  Management Office    of Nuclear Reactor Regulation Attachments:
: 1.      Appendices A & B - Technical Specifications
: 2.      Preoperational-    Tests, Startup Tests and OLher Items Which Must Be Completed Prior      to Proceeding Lo Succeeding Operational      Modes Date of  Issuance:    (APR 22 1977)
* FirstEnergyNuclearGenerationCorp.(FENGenCo)*hasbeenrenamedFirstEnergyNuclear Generation.
LLC.
L- 14A                              Amendment No.
 
Attachment8 ProposedPerryNuclearPowerPlant,UnitNo. 1 OperatingLicenseChanges (Re-typed- For Information Only)
(SevenPagesFollow)


shallbeimplemented within 30 days fromDecember 16. 2005Deleted: Corp.
Proposed Page UNITEDSTATES NUCLEAR    REGULATORY     COMMISSION WASHTNGTON, D.C. 29555-0001 FIRSTENERGY       NUCLEAROPERATINGCOMPANY FIRSTENERGY       NUCLEARGENERATION.            LLC OHIOEDISONCOMPANY DOCKETNO.50440 PERRYNUCLEARPOWER.PLANT.UNIT NO. 1 FACILITYOPERATINGLICENSE LicenseNo.NPF-58
Deleted; 285 269-"tr*ro"twd""rc"""rrtl GenerctionJlq Beaver Valley Unit 1 c-2 APPENDIX CADDITIONAL CONDITIONS OPERATING LICENSE NO. DPR-66 FirstEnergy Nuclear Operating Company and FirstEnergy Nuclear GeneratiorgllQ -s-heLl qglp_fy Wlh .l -the following conditions on the schedules noted below:Deleted: corp Amendment Number 269 Additional ConditionBy the date of closing of the transfer of the ownership interests in BeaverValley Power Station, Unit No. 1 from Pennsylvania Power Company to FENGenCol, FENGenCol shall obtain a parent company guarantee from FirstEnergy in an initial amount of at least $80 million (in 2005 dollars) to provide additionaldecommissioning funding assurance regarding such ownership interests. Required funding levels shall be recalculated annually and, as necessary, FENGenCo]
: 1. TheNuclearRegulatory  Commission   (theCommission)   hasfoundthat:
shall either obtain appropriate adjustments to the parent company guarantee or othenvise provide any additional decommissioning funding assurance necessary for FENGenCol to meet NRC requirementsunder 10 CFR 50.75.
A. Theapplication for licensefiledby FirstEnergy NuclearOperating  Company(FENOC)I actingon itsownbehalfandas agentfor FiriienergyNuilearGJneration,      LLCandOhio EdisonCompany,   (licensees) complies withthestandards  andrequirements of the           I AtomicEnergyActof 1954,as amended(theAct),andtheCommission's                     set regulations forthin 10CFRChapterl, andall required     notifications             or bodieshave to otheragencies beendulymade; B. Constructionof the PerryNuclearPowerPlant,UnitNo.1 (thefacility),   hasbeen substantially completed   in conformitywithConstruction  PermitNo.CPPR-148  andthe application, as amended,   theprovisions of theAct,andtheregulations of the Commission:
The Support Agreements described in the applications dated May 18, 2005 (up to $80 million), and June 1, 2005 (up to $400 million), shall be effective consistent with the representations contained in the applications.
tFEtrtOC is authorizedto act as agentfor FirstEnergyNuclearGeneration,LLC and Ohio EdisonCompany,and has exclusiveresponsibility    and controloverthe physicalconstruction, operation,and maintenanceof the facility.
FENGenCol shall take no action to cause FirstEnergy,or its successors and assigns, to void, cancel, or modify the Support Agreements without the prior written consent ofthe NRC staff, except, however, the
AmendmentNo.
$80 million Support Agreement in connection with the transfer of the Pennsylvania Power Company interests may be revoked or rescinded if and when the $400 million support agreement described in the June 1, 2005, application becomes effective. FENGenCol shall inform the Director of the Otfice of Nuclear Reactor Regulation, in writing, no later than ten days after any funds are provided to FENGenCol by FirstEnergy under either Support Agreement.
lmplementation DateThe amendment shall be implemented within30 days fromDecember 16. 2005- firstfnergv Nucl GenerationJtC=Beaver Valley Unit 1 c-3Deleted: 285 APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE NO.
DPR-66FirstEnergy Nuclear Operating Company and FirstEnergy Nuclear Generatiorl=ltli9_Lr,eLl--c_ollply Wth -l- ---the following conditions on the schedules noted below:Deleted: Corp Amendment Number 278 278 Additional Condition Schedule for New and Revised Surveillance Requirements (SRs)The schedule for performing SRs that are new or revised in Amendment No. 278 shall be as follows:
For SRs that are new in this amendment, the first performance is due at the end of the first surveillance interval, wtrich beginson the date of implementation of this amendment.For SRs that existed prior to this amendment, whose intervals of performance are being reduced, the first reducedsurveillance interval begins upon completion of the first surveillance performed after implementation of this amendment.For SRs that existed prior to this amendment, whose intervals of performance are being extended, the first extendedsurveillance interval begins upon completion of the last surveillance performed prior to implementation of this amendment.
For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance subject to the modified acceptance criteria is due at the end of the first surveillance interval that began on the date the surveillancewas last performed prior to the implementation of this amendment.
Relocation of Certain Technical Soecification Requirements License Amendment No. 278 authorizes the relocation of certain Technical Specifications to other licensee-controlled documents.
lmplementation of this amendment shall include relocation of the requirements to the specified documents, as described in (1) Sections 4D and 4E of the NRC staffs Safety Evaluation, and (2) Table LA, Removed DetailChanges, and Table R, Relocated Specifications, attached to the NRC staffs Safety Evaluation, which is enclosed in this amendment.
lmplementation Date The amendment shallbe implementedwithin 150 days from date of issuance The amendment shallbe implementedwithin 150 days from date of issuanceBeaver Valley Unit 1 c4 Deleted:285 APPENDIX CADDITIONAL CONDITIONS OPERATING LICENSE NO. DPR-66 FirstEnergy Nuclear Operating Company and FirstEnergy Nuclear Generation-lLlQ-g-bSl_f g_onply Wt_l1 -l the following conditions on the schedules noted below:
Amendment Number 281 Beaver Valley Unit 1 Additional Condition Initial Performance of New Surveillance and Assessment Requirements Upon implementation of Amendment No. 281 adopting TSTF-448, Revision 3, the determination of control room envelope (CRE)unfiltered air inleakage as required by Surveillance Requirement (SR) 3.7.10.4, in accordance with Specification 5.5.14.c(i), theassessment of CRE habitability as required by Specification 5.5.14.c(ii), and the measurement of CRE pressure as required by Specification 5.5.14.d, shall be considered met. Following implementation: (a) The first performance of SR 3.7.1O.4, in accordance withSpecification 5.5.14.c(i), shall be within the specified Frequency of 6 years, plus the 18-month allowance ofSR 3.0.2, as measured from the date of the most recentsuccessful tracer gas test, or within the next 18 months ifthe time period since the most recent successful tracer gastest is greater than 6 years.(b) The first performance of the periodic assessment of CRE habitability, Specification 5.5.14.c(ii), shall be within 3 years, plus the 9-month allowance of SR 3.0.2, as measured from the date of the most recent successful tracer gas test, or within the next 9 months if the time period since the most recent successful tracer gas test is greater than 3 years.(c) The first performance of the periodic measurement of CRE pressure, Specification 5.5.14.d, shall be within 18 months, plus the 138 days allowed by SR 3.0.2, as measured from the date of the most recent successful pressure measurement test.lmplementation Date The amendment shallbe implemented within 120 daysfrom date of issuance Deleted: corp.Deleted:285 c-5 Amendment No.,
Attachment 2 Proposed Beaver Valley Power Station, Unit No. 2 Operating License Changes (Mark Up)(Thirteen Pages Follow) 1.UNITED STATESNUCLEAR REGULATORY COMMISSIONWASHINGTON, D.C. 20555-0001 FIRSTENERGY NUCLEAR OPERATING COMPANY FIRSTENERGY NUCLEAR GENERATTOT{*LLC  
-)OHIO EDISON COMPANYTHE TOLEDO EDISON COMPANY DOCKET NO.50-412BEAVER VALLEY POWER STATION. UNIT 2RENEWED FACILITY OPERATING LICENSELicense No. NPF-73 The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
The application to renew Facility Operating License No. NPF-73 filed by FirstEnergy Nuclear Operating Company (FENOC)- acting on its own behalf andas agent for FirstEnergy Nuclear Generatiorl=lLtQ 9_btq ECjq-qn 9qqrpe1y, gfrq The Toledo Edison Company (the licensees), complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and theCommission's regulations set forth in 10 CFR Chapter l, and all required notifications to other agencies or bodies have been duly made;Construction of the Beaver Valley Power Station, Unit 2 (the facility), has been substantially completed in conformity with Construction Permit No. CPPR-105 andthe application, as amended, the provisions of the Act, and the regulations of the Commission;The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission (except as exempted from compliance in Section 2.D. below);There is reasonable assurance: (i) that the activities authorized by this renewedoperating license can be conducted without endangering the health and safety of the public and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter l (except as exempted from compliance in Section 2.D. below);'FENOC is authorized to act as agent for FirstEnergy Nuctear GeneratiorglltQ ghfC ECISS'1,9g!tp_qrly,______, and The Toledo Edison Company and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.Amendmentl{o.Renewed Operating License NPF-73 Deleted: Deleted3 Corp.Deleted: CorD A.c.D.
E.F.-2-FENOC is technically qualified to engage in the activities authorized by this renewed operating license in accordance with the Commission's regulations setforth in 10 CFR Chapter l;The licensees have satisfied the applicable provisions of 10 CFR Part 140,"Financial Protection Requirements and Indemnity Agreements," of theCommission's regulations;The issuance of this renewed operating license will not be inimical to the commondefense and security or to the health and safety of the public;After weighing the environmental, economic, technical, and other benefits of thefacility against environmental and other costs and considering available alternatives, the issuance of this Renewed Operating License No. NPF-73 issubject to the conditions for protection of the environment set forth in the Environmental Protection Plan attached as Appendix B, is in accordance with 10 CFR Part 51 of the Commission's regulations, and all applicable requirements have been satisfied;The receipt, possession and use of source, byproduct and special nuclear materialas authorized by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30,40, and 70.Actions have been identified and have been or will be taken with respect to: (1)managing the effects of aging on the functionality of structures and componentsthat have been identified to require review under 10 CFR 54.21(a)(1) during the period of extended operation, and (2) time-limited aging analyses that have been identified to require review under 10 CFR 54.2'l(c), such that there is reasonable assurance that the activities authorized by this renewed operating license willcontinue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3 for the facilig, and that any changes made to the facility's current licensing basis in order to comply with 10 CFR 54.29(a) are in accordancewith the Act and the Commission's regulations; t.Renewed Facility Operating License NPF-73 is hereby issued to FENOC, FirstEnergy Nuclear Generation*lLtQ, QhiS Ediqqrr Qqmpqly.pttd__r_he Iele{q FClqq! Qp-t1p4:'y
(!t'9- -l licensees) to read as follows: This renewed license applies to the Beaver Valley Power Station, Unit 2, a pressurized water reactor and associated equipment (the facility), owned by FirstEnergy Nuclear Generatioq=lUl (qWneD..leqqed tq 9_t-r!S ECigql qg11pery (lessee), and The Toledo Edison Company (lessee) and operated by FENOC (collectively the licensees). The facility is located on the licensees' site on thesouthern shore of the Ohio River in Beaver County, Pennsylvania, approximately22 miles northwest of Pittsburgh and 5 miles east of East Liverpool, Ohio, and isdescribed in FENOC's Updated Final Safety Analysis Report, as supplementedand amended, and in its Environmental Report, as supplemented and amended; Subject to the conditions and requirements incorporated herein, the Commission hereby licenses: (1) Pursuant to Section 103 of the Act and 10 CFR Part 50, FENOC to possess, use, and operate the facility at the designated location in BeaverCounty, Pennsylvania, in accordance with the procedures and limitations set forth in this license: G.H.J.A.Amendment No.,,IRenewed Operating License NPF-73Deleted: Corp.
Deleted: Corp.Deleted: 171 B.Beaver Valley Unit 2 (2)(3)(4)(5).3-Pursuant to the Act and 10 CFR Part 50, FirstEnergy Nuclear Generatiorl
-[-LLe, Ohio Edison Company, and The Toledo Edison Company to possess the facility at the designated location in Beaver County,Pennsylvania, in accordance with the procedures and limitations set forthin the license;Pursuant to the Act and 10 CFR Part 70, FENOC, to receive, possess,and use at any time special nuclear material as reactor fuel, inaccordance with the limitations for storage and amounts required forreactor operation, as described in the Updated Final Safety AnalysisReport, as supplemented and amended; Pursuant to the Act and 10 CFR Parts 30. 40, and 70, FENOC to receive, possess, and use at any time any byproduct, source, and special nuclearmaterial such as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipmentcalibration, and as fission detectors in amounts as required;Pursuant to the Act and 10 CFR Parts 30, 40, and 70, FENOC to receive, possess, and use in amounts as required any byproduct, source, orspecial nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or other activity associatedwith radioactive apparatus or components;Pursuant to the Act and 10 CFR Parts 30, 40, and 70, FENOC to possess, but not separate, such byproduct and special nuclear materialsas may be produced by the operation of the facility authorized herein.(a) Ohio Edison Company and The Toledo Edison Company areauthorized to transfer any portion of their respective leasedinterests in BVPS Unit 2 and a proportionate share of their leasedinterests in the BVPS common facilities to certain potentialinvestors identified in their submittals of July 14, 16,22 and 31,and September'14,17 and 18, 1987, and at the same time tolease back from such purchasers such interest transferred in the BVPS Unit 2 facility. The term of the lease is for approximately 29-112years subject to a right of renewal. Such sale andleaseback transactions are subject to the representations and conditions set forth in the aforementioned submittals.
Specifically,a lessor and anyone else who may acquire an interest underthese transactions are prohibited from exercising directly or indirectly any control over the license of BVPS Unit 2.
For purposes of this condition the limitations in 10 CFR 50.81, as now in effect and as may be subsequently amended, are fully applicable to the lessor and any successor in interest to that lessor as long as the license for BVPS Unit 2 remains in effect;these financial transactions shall have no effect on the license forthe BVPS Unit 2 facility throughout the term of the license.Amendment No.,-[---Renewed Operating License NPF-73 Deletedr Corp.Deleted: 171 (6)(7)Beaver Valley Unit 2 c.-4-(b) Further, the licensees are also required to notify the NRC in writing prior to any change in: (i) the term or conditions of any lease agreements executed as part of these transactions; (ii) the BVPS Operating Agreement, (iii) the existing property insurance coverage for BVPS Unit 2, and (iv) any action by a lessor or others that may have adverseeffect on the safe operation of the facility.This renewed operating license shall be deemed to contain and is subjectto the conditions specified in the following Commission regulations setforth in 10 CFR Chapter 1 and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:Maximum Power Level FENOC is authorized to operate the facility at a steady state reactor core power level of 2900 megawatts thermal.
Technical Specifi cations The Technical Specifications contained in Appendix A, as revised th rou g h Ame nd ment N o
*, q n d lhe EnVrfSI 11t e!!e-L Ptqtesli_o-!- Ple n contained in Appendix B, both of which are attached hereto are hereby incorporated in the license. FENOC shall operate the facility in accordance with the Technical Specifications and theEnvironmental Protection Plan.
(1)(2)Amendment No.,_[-----Renewed Operating License NPF-73 Deleted:173 Deleted:173Beaver Valley Unit 2 (8)(e).6-Detailed Control Room Desiqn Review (DCRDR)DeletedSafetv Parameter Displav Svstem (SPDS)Deleted (10) Fire Protection Modifications (Section 9.5.1 of SER Supplement 6)Deleted (1 1) Additional ConditionsThe Additional Conditions contained in Appendix D, as revised through Amendment No. *9_r-9-!91--e!y-j!99lp9r:?-ted inlq tb!-s-!r-q9ft99,--f-FNqqshall operate the facility in accordance with the Additional Conditions.
('12) Steam Generator Surveillance lnterval Extension Deleted (13) Mitiqation Strateqv License ConditionThe licensee shall develop and maintain strategies for addressing largefires and explosions and that include the following key areas:
Fire fighting response strategy with the following elements:1. Pre-defined coordinated fire response strategy and guidance 2. Assessment of mutual aid fire fighting assets
: 3. Designated staging areas for equipment and materials 4. Command and control5. Training of response personnelOperations to mitigate fuel damage considering the following:1. Protection and use of personnel assets2. Communications3. Minimizing fire spread
: 4. Procedures for implementing integrated fire response strategy5. ldentificationofreadily-availablepre-stagedequipment6. Training on integrated fire response strategy
: 7. Spent fuel pool mitigation measures Actions to minimize release to include consideration of:1. Water spray scrubbing2. Dose to onsite responders Amendment No.,-[Renewed Operating License NPF-73 ,t -'Deleted3 163,Deleted: 171 (a)(b)(c)Beaver Valley Unit 2
Beaver Valley Unit 2APPENDIX BTO FACILITY OPERATING LICENSE NO. NPF-73BEAVER VALLEY POWER STATIONUNIT 2 FIRSTENERGY NUCLEAR OPERATING COMPANY, ET ALDOCKET NO.50-412 ENVIRONMENTAL PROTECTION PLAN (NONRADTOLOGTCAL)
AUGUST 1987 NO CHANGES THIS PAGE. INCLUDED FOR CONTEXT.Amendment No.
171 B-i Section 1.0 2.0 3.0 3.1 3.2 J.J 4.0 4.1 4.2 5.0 5.1 5.2 5.3 5.4APPENDIX B TO FACILITY OPERATING LICENSE NO. NPF-73BEAVER VALLEY POWER STATIONUNIT 2ENVIRONMENTAL PROTECTION PLAN (NONRADTOLOGTCAL)TABLE OF CONTENTS PaqeObjectives of the Environmental Protection Plan..............
..................
B-1 Environmental Protection 1ssues..........
.........................
B-1Consistency Requirements..................
.........................
B-1Plant Design and Operation..................
........................
B-1Reporting Related to the NPDES Permit and State Certifications
...... B-2Changes Required for Compliance with Other Environmental Regulations.............B-2 Environmental Conditions
........................
B-2 Unusual or lmportant Environmental Events
.................
B-2 Environmental Monitoring ........................ B-3 Administrative Procedures ....................... B-3 Review and Audit
................
B-3Records Retention
..............
B-3Changes in Environmental Protection Plan.......... ......... B-4Plant Reporting Requirements..............
........................
B-4 NO CHANGES THIS PAGE, INCLUDED FOR CONTEXT.Beaver Valley Unit 2Amendment No. 171 B-ii (1)(2)(3)1.0Obiectives of the Environmental Protection Plan The Environmental Protection Plan (EPP) is to provide for protection of nonradiologicalenvironrnental values during operation of the Beaver Valley Power Station, Unit 2 (facility). The principal objectives of the EPP are as follows:Verify that the facility is operated in an environmentally acceptable manner, asestablished by the Final Environmental Statement - Operating License Stage (FES-OL)and other NRC environmental impact assessments.
Coordinate NRC requirements and maintain consistency with other Federal, State, andlocal requirements for environmental protection.Keep NRC informed of the environmental effects of facility construction and operationand of actions taken to control those effects.Environmental concerns identified in the FES-OL (September 1985, NUREG-1094) which relateto water quality matters are regulated by way of the licensee's*
NPDES permit.2.O EnvironmentalProtection lssuesIn the FES-OL (NUREG-1094, September 1985), the staff considered the environmental impacts associated with the operation of the Beaver Valley Power Station, Unit 2. No aquatic/water quality, terrestrial, or noise issues were identified.
Consistencv RequirementsPlant Desiqn and Operation The licensee may make changes in station design or operation or perform tests or experiments affecting the environment provided such activities do not involve an unreviewed environmental question and do not involve a change in the EPP*.
Changes in station design or operation or performance of tests or experiments which do not affect the environment are not subject to the requirements of this EPP.
Activities governed by Section 3.3 are not subject to the requirements of this Section.
Before engaging in additional construction or operational activities which may significantly affectthe environment, the licensee shall prepare and record an environmental evaluation of suchactivity. Activities are excluded from this requirement if all measurable nonradiological environmental effects are confined to the on-site areas previously disturbed during site preparation and plant construction. When the evaluation indicates that such activity involves an unreviewed environmental question, the licensee shall provide a written evaluation of such activity and obtain prior NRC approval. Such activity and change to the EPP may be implemented only in accordance with an appropriate license amendment as set forth inSection 5.3 of this EPP.
*"Licensee" refers to FirstEnergy Nuclear Operating Company, operator of the facility, and acting as agent for FirstEnergy Nuclear Generatiorg!19-9-Iiq ECi,sq!1 Qqqryany,-e_lC lh-g - ,t Toledo Edison Company, owners or lessees of the facility.
Beaver Valley Unit 2 3.0 3.1 B-1 Deletedr Corp.Deleted: 171 APPENDIX D ADDITIONAL CONDITIONS OPERATING LICENSE NO. NPF.73 FirstEnergy Nuclear Operating Company, FirstEnergy Nuclear Generatioq*lLlQ, Qtrjq-EdLgq-r-t_
.____.t-.--
Company, and The Toledo Edison Company shall comply with the following conditions on the schedules noted below:
87 Amendment Number 83 Beaver Valley Unit 2 Additional ConditionThe licensee is authorized to relocate certain Technical Specification requirements to licensee-controlled documents.
lmplementation of this amendment shall include the relocation of these technical specification requirements to the appropriate documents, as described in the licensee's application dated September 9, 1996,and evaluated in the staffs safety evaluation attached to this amendment.
The licensee is authorized to relocate certain Technical Specification requirements to licensee-controlled documents.
lmplementation of this amendment shall include the relocation of these technical specification requirements to the appropriate documents, as described in the licensee's application dated March 14, 1997, as supplemented July 29 and August 13, 1997, and evaluated in the staffs safety evaluation attachedto this amendment.
The licensee is authorized to relocate certain Technical Specification requirements to licensee-controlled documents. lmplementation of this amendment shall include the relocation of these technical specification requirements to the appropriate documents, as described in the licensee's application dated September 1 1 , 1997,and evaluated in the staffs safety evaluation attached to this amendment.The licensee commits to perform visual acceptance examinations of sleeve welds; post weld heat treatmentof sleeve welds: and the NRC-recommended inspections of repaired tubes as described in the licensee's application dated March 10, 1997, as supplemented July 28, 1997, September 17 , 1997 , April 30, 1 998, and January 29, 1999, and evaluated in the staffs safety evaluation attached to this amendment.
lmplementation DateThe amendment


shall be implemented within 60 days from April 14,1997The amendment
Proposed Page C. The facilitywilloperatein conformitywith the application, as amended,the provisionsof the Act, and the regulationsof the Commission(exceptas exemptedfrom complianeein Section2.D below);
D. There is reasonableassurance:(l) that the activitiesauthorizedby this operatinglicense can be conductedwithoutendangeringthe healthand safetyof the public,and (ii) that such activitieswill be conductedin compliancewith the Commission'sregulationsset forth in 10 CFR Chapterl (exceptas exemptedfrom compliancein Section2.D below);
E. The FirstEnergyNuclearOperatingCompanyis technicallyqualifiedto engagein the activitiesauthorizedby this licensein accordancewith the Commission'sregulationsset forth in 10 CFR Chapterl; F. The licenseeshavesatisfiedthe applicableprovisionsof 10 CFR Part 140, "Financial ProtectionRequirements    and lndemnityAgreements,"    of the Commission'sregulations; G. The issuanceof this licensewill not be inimicalto the commondefenseand securityor to the healthand safety of the public; H. Afterweighingthe environmental,    economic,technical,and other benefitsof the facility againstenvironmental    and othercostsand consideringavailablealternatives,      the issuanceof this FacilityOperatingLicenseNo. NPF-58,subjectto the conditionsfor protectionof the environmentset forth in the EnvironmentalProtectionPlan attachedas AppendixB, is in accordancewith 10 CFR Part 51 of the Commission'sregulationsand allapplicablerequirementshave been satisfied;and
: l. The receipt,possession,and use of source,byproduct,and specialnuclearmaterialas authorizedby this licensewillbe in accordancewith the Commission'sregulationsin 10 CFR Parts30, 40, and 70.
: 2. Basedon the foregoingfindingsregardingthis facility,the Partial-lnitial    Decisionsissued December2, 1983,and September3, 1985,by the AtomicSafetyand LicensingBoardin regardto this facility(affirmedby ALAB-841,datedJuly 25, 1986)and pursuantto approvalby the NuclearRegulatoryCommissionat a meetingon November7, 1986,FacilityOperating LicenseNo. NPF-58,which supersedesthe licensefor fuel loadingand low powertesting, LicenseNo. NPF-45,issuedon March18, 1986,is herebyissuedto FirstEnergyNuclear OperatingCompany,FirstEnergyNuclearGeneration,LLC,and Ohio EdisonCompany,(the licensees)to read as follows:
A. The iicenseappiiesto ihe Pei-i-yi.iucieai'Power Plani, Unit l.!o. '1,a boiiingwaier nuciear reactorand associatedequipment(the facility),ownedby FirstEnergyNuclear Generation,LLC (owner)and leasedto Ohio EdisonCompany(lessee)(collectively            the licensees).
AmendmentNo.


shall be implementedwithin 60 days from December 10. 1997The amendmentshall be implementedwithin 30 days from January 20, 1998The amendment shallbe implementedwithin 60 days fromMarch 26.
Proposed Page The facilityis locatedon the shore of Lake Erie in Lake County,Ohio, approximately 35 milesnortheastof Cleveland,Ohio,and is describedin the licensees'FinalSafetyAnalysisReport,as supplemented   and amended,and in the licensees'Environmental   Report,as supplemented   and amended.
1999Amendment No..
B. Subjectto the conditionsand requirementsincorporated    herein,the Commissionherebylicenses:
Deleted: Corp Deleted:171 88 98 t.D-1 APPENDIX D ADDITIONAL CONDITIONS OPERATING LICENSE NO. NPF-73FirstEnergy Nuclear Operating Company, FirstEnergy Nuclear Generation=lLlQ,--QhjC-Ed-r-Sqn Company, and The Toledo Edison Company shall comply with the following conditions on theschedules noted below: Amendment Number 102 Additional ConditionThe licensee is authorized to relocate certain Technical Specification requirements to licensee-controlled documents. lmplementation of thisamendment shall include the relocation of these Technical Specification requirements to the appropriate documents as described in theficensee's application dated December 24,'1998, assuppfemented June 15, June 17 , and July 7, 1999,and evaluated in the staffs evaluation attached tothis amendment.On the closing date(s) of the transfers to FENGenColof their interests in Beaver Valley Power Station, UnitNo. 2, Pennsylvania Power Company, The ClevelandElectric llluminating Company, Ohio Edison Company,and The Toledo Edison Company shall transfer to FENGenGol all of each transferor's respective accumulated decommissioning funds for Beaver ValleyPower Station, Unit No. 2, except for funds associated with the leased portions of Beaver Valley PowerStation, Unit No. 2, and tender to FENGenColadditional amounts equal to remaining funds expected to be collected in 2005, as represented in the application dated June 1, 2005, but not yet collected by the time of closing.
(1)   FENOC,pursuantto Section103 of the Act and 10 CFR Part 50, to possess,use, and operatethe facilityat the designatedlocationin Lake County,Ohio,in accordancewith the proceduresand limitationsset forth in this license; (2)   FirstEnergyNuclearGeneration,LLC and Ohio EdisonCompany,to possessthe facilityat the designatedlocationin LakeCounty,Ohio,in accordancewith the proceduresand limitationsset forth in this license:
All of the funds shall be deposited in a separate external trust fund for the reactor in thesame amount as received with respect to the unit to besegregated from other assets of FENGenCol and outside its administrative control, as required by NRC regulations, and FENGenCo! shall take all necessary steps to ensure that this external trust fund is maintained in accordance with the requirements of theorder approving the transfer of the license andconsistent with the safety evaluation supporting theorder and in accordance with the requirements of 10 CFR Section 50.75, "Reporting and recordkeeping for decommissioning planning." lmplementation DateThe amendmentshallbe implemented within 60 daysfrom August 30,1 999The amendment I shallbe implemented within30 days fromDecember 16. 2005 Deleted: Corp.Deleted: 171 151. firrtf""rg" Nr.GenerationJl0Beaver Valley Unit 2Amendment No..________...
(3)   FENOC,pursuant       to theActand10CFRPart70,to receive,possess,       anduseat anytimespecial nuclearmaterial  as reactorfuel,in accordance                   for storageandamountsrequired withthe limitations                               for reactoroperation,   as described in theFinalSafetyAnalysisReport,as supplemented   andamended; (4)   FENOC,pursuant     to theAct and10CFRParts30,40,and70,to receive,         possess, anduseat any timeanybyproduct,     source,andspecialnuclearmaterial  suchas sealedneutronsourcesfor reactor startup, sealedsourcesfor reactorinstrumentation  andradiation  monitoring equipment           and calibration, fissiondetectors  in amountsas required; (5)   FENOC,pursuant     to theActand10CFRParts30,40,and70,to receive,         possess, andusein amountsas required     anybyproduct, source,or specialnuclearmaterialwithout restriction as to chemicalor physicalform,for sampleanalysisor instrument     calibrationor associated withradioactive apparatus   or components;   and (6)   FENOC,pursuantto the Act and 10 CFR Parts30, 40, and 70, to possess,but not separate,such byproductand specialnuclearmaterialsas may be producedby the operationof the facility.
APPENDIX D ADDITIONAL CONDITIONS OPERATING LICENSE NO. NPF-73FirstEnergy Nuclear Operating Company, FirstEnergy Nuclear Generatior$lQ, Qftjg EdLqq!-
(7)(a)Ohio EdisonCompanyis authorizedto transferany portionof its 30.0%ownershipshareof PNPP Unit 1 and a proportionateshare of its interestin the PNPP common facilitiesto certainequity investors identifiedin its submissionof January23, 1987, as supplementedon March3, 1987,and at the same time to lease back from such purchaserssuch interestsold in the PNPP Unit 1 facility.The term of the lease is for approximately29% years subjectto a right of AmendmentNo.
Company, and The Toledo Edison Company shall comply with the following conditions on the schedules noted below:Deleteal: Corp.
lmplementation DateThe amendment shall be implemented within 30 days frQmDecember 16,20P5 Amendment Number 151Beaver Valley Unit 2- firstEnergv Nucl GenemtionJlAAdditional ConditionBy the date of closing of the transfer of the ownershipinterests in Beaver Valley Power Station, Unit No. 2from Pennsylvania Power Company to FENGenCol, FENGenCol shall obtain a parent company guaranteefrom FirstEnergy in an initial amount of at least
$80 million (in 2005 dollars) to provide additionaldecommissioning funding assurance regarding suchownership interests. Required funding levels shall be recalculated annually and, as necessary, FENGenColshall either obtain appropriate adjustments to the parent company guarantee or otherwise provide any additionaldecommissioning funding assurance necessary for FENGenCol to meet NRC requirements under 10 CFR 50.75.The Support Agreements described in the applicationsdated May 18, 2005 (up to $80 million), and June 1, 2005 (up to $400 million), shall be effective consistent with the representations contained in the applications.
FENGenCol shalltake no action to cause FirstEnergy, or its successors and assigns, to void, cancel, or modifythe Support Agreements without the prior written consent of the NRC staff, except, however, the
$80 million Support Agreement in connection with thetransfer of the Pennsylvania Power Company interests may be revoked or rescinded if and when the $400 million support agreement described in the June 1,2005, application becomes effective. FENGenCol shall inform the Director of the Office of Nuclear Reactor Regulation, in writing, no later than ten days after any funds are provided to FENGenCol by FirstEnergy undereither Support Agreement.
D-3 APPENDIX D ADDITIONAL CONDITIONS OPERATING LICENSE NO. NPF.73FirstEnergy Nuclear Operating Company, FirstEnergy Nuclear Generation=lLli,-Qhjp-EdLS_o!
Company, and The Toledo Edison Company shall comply with the following conditions on theschedules noted below: Amendment Number 161 Beaver Valley Unit 2 161 Additional ConditionSchedule for New and Revised Surveillance Requirements (SRs)The schedule for performing SRs that are new or revised inAmendment No. 161 shall be as follows:
For SRs that are new in this amendment, the first performance is due at the end of the first surveillance interval, which beginson the date of implementation of this amendment.
License Amendment No. 161 authorizes the relocation of certain Technical Specifications to other licensee-controlled documents.
lmplementation of this amendment shall include relocation of the requirements to the specified documents, as described in (1) Sections 4D and 4E of the NRC staffs Safety Evaluation, and (2) Table LA, Removed DetailChanges, and Table R, Relocated Specifications, attached to the NRC staffs Safety Evaluation,which is enclosed in this amendment.
lssuance For SRs that existed prior to this amendment, whose intervals of performance are being reduced, the first reducedsurveillance interval begins upon completion of the first surveillance performed after implementation of this amendment.For SRs that existed prior to this amendment, whose intervals of performance are being extended, the first extendedsurveillance interval begins upon completion of the last surveillance performed prior to implementation of this amendment.
For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance subject tothe modified acceptance criteria is due at the end of the firstsurveillance interval that began on the date the surveillancewas last performed prior to the implementation of this amendment.
Relocation of Certain Technical Specification Requirements lmplementation Date The amendment shallbe implementedwithin 150 daysfrom date of The amendment shall be implementedwithin 150 days from date of issuanceAmendment No...-,-----_,1-.--.
Deleted: Corp.Deleted:171 D-4 APPENDIX D ADDITIONAL CONDITIONSOPERATING LICENSE NO. NPF-73 FirstEnergy Nuclear Operating Company, FirstEnergy Nuclear Generatior$tlQ.
Qbjq Edj-qqr-t-
-"-Company, and The Toledo Edison Company shall comply with the following conditions on theschedules noted below: Amendment Number 163Beaver Valley Unit 2 Additional ConditionInitial Performance of New Surveillance and Assessment RequirementsUpon implementation of Amendment No. 163 adopting TSTF-448, Revision 3, the determination of control room envelope (CRE)unfiltered air inleakage as required by Surveillance Requirement (SR) 3.7.10.4, in accordance with Specification 5.5.14.c(i), the assessment of CRE habitability as required by Specification5.5.14.c(ii), and the measurement of CRE pressure as required bySpecification 5.5.14.d, shall be considered met.
Following implemeniation: (a) The first performance of SR 3.7.10.4, in accordance with Specification 5.5.14.c(D, shall be within the specified Frequency of 6 years, plus the 18-month allowance ofSR 3.0.2, as measured from the date of the most recent successful tracer gas test, or within the next 18 months ifthe time period since the most recent successful tracer gas test is greater than 6 years.(b) The first performance of the periodic assessment of CRE habitabillty, Specification 5.5.14.c(ii), shall be within 3 years, plus the 9-month allowance of SR 3.0.2, as measured from the date of the most recent successful tracer gas test, or within the next 9 months if the time period since the most recent successful tracer gas test is greater than 3 years.(c) The firsl performance of the periodic measurement of CRE pressure, Specification 5.5.14.d, shall be within 18 months, plus the 138 days allowed by SR 3.0.2, as measured fromthe date of the most recent successful pressure measurement test.lmplementation Date The amendment shallbe implementedwithin 120 daysfrom date of issuance Amendment No. r.-__--_____r----'
Deleted: Corp.Deleted: 171 D-5 Attachment 3Proposed Davis-Besse Nuclear Power Station, Unit No. 1Operating License Changes (Mark Up)(Seven Pages Follow)
UNITED STATESNUCLEAR REGULATORY COMMISSION wASHTNGTON, D.C. 20555.{'001FIRSTENERGY NUCLEAR OPERATING COMPANYFIRSTENERGY NUCLEAR GENERATIO\*_H
....._-1..
DOCKET NO. 50-345 DAVIS-BESSE NUCIJEAR POWER STATION, UNIT NO. 1 FACII,ITY OPERATING I,ICENSE IJicense No . NPF- 3 t-.The Nucl-ear Regul-atory Commission (tshe Commission) having found that:
c.The application for license filed by FirstEnergy NuclearOperatsing company (FENOC)I, acting on it.s own behalf and as agentf or FirstBnersy Nuclear ceneratiou - ( r i gglqegg )_ -g-gllpl +g g -y-i-!h the standards and requirements of the Atomic Energry Act of l-954,as amended (the Act), and the Commission's rules and regrulationsse! forth in L0 CFR Chapter I and afl reguired notifications to other agencies or bodies have been duly made; Construction of the Davis-Besse Nuclear Power St,ation, Unit No. 1 (the facility) has been substanEialLy completed in conformitsy i"rith Const.ructsion Permit No. CPPR-8o and t.he application, as amended, the provisions of the Act and tshe rules and regulationsof the Commission;The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; FENOC is authorized to act as agent for FirstEnergy Nuclear ceneralion-I,L!9-1 -ar1p har qrgl-gi+yg r9?-p-91-giuugy 9tq 9919{9} 9y9{ !!g p4-y-erg+_l
.1..'-const.rucEion, operation, and maintenance of tshe facility.
AND Deleted: Deleted: corp.Deleted: corp.
B.L-1Amendment No.Defeted: r52, 228, 270 l-.D.There is reasonable assurance: (i) that the acclvities authorized by this operating License can be conducted without endangering the health and safet.y of the puJrlic, and (ii) that such activities v/iI1 be conducted in compliance with the rules and reg'ulat.ions of the Commission;E. The FirstEnergry Nuclear Operaling Company is technically qualified and the l-icensees are financially qualified tso engage in the activities authorized by tshis operating license in accordance with the rules and requlations of Lhe Commission;F. The licensees have satisfied tshe applicable provisions of 10 CFR Part 140, "Financial-Protection Requirementss and fndemniEy Agree-ment.s, ,, of the commission,s re$rlations, G.The issuance of this operating license will not be inimical to the common defense and securit,v or to the health and safetsv ofthe publ j-c;Aft.er weighing the environmenlal, economic, technical., and other benefj-ts of the facility against environmentsal and oLher costs and considering avaiJ-ab1e alEernat.ives, t.he issuance of Facifity Operat,ing License No. NPF-3 subject to the conditions for prot,ection of the environment set forth herein is in accordance wit.h 1-0 CFR Part 51 (formerly Appendix D Lo 10 CFR Part 50), of the Commissionrs regulations and all applicable reguirements have been sat,isfied; and I. The receipt, possession, and use of source, byproduct and specj-al nucLear material as authorized by this license will be in accord-ance with the Commissj-on's regrrlations in 10 CFR Part 30, 40, and 70, including l-0 CFR Sections 30.33, 40.32, 70.23, and 70.31.Facil-ity Operati.ng License No. NPF-3 is hereby issued to FirstEnergry Nucl-ear Operating Company (FENOC), and FirstEnergy Nuclear ceneration-
&q to f9?q ?_q lo"1l.o'Fi________._A. This license applies to the Davis-Besse Nucl-ear Power Stsation, Unit No. l-, a pressurized water nuclear reactor and associated equipment (the facilitsy), owned by FirstsEnergy Nuclear Generation-
!L9: ,rh-e--fa-gf]1_ty iF l99e!99 _ot -!t-r-9
?9\l!!-y9!!9!Il shore of Lake Erie in Ottsawa County, Ohj.o, approximately 21 miles east of Toledo, Ohio, and is descrj.bed in the "Final Safety Analysis Report" as supplenented and amended (Amendmenls l-4 uhrough 44) and the Environmental Report as supplemented and amended (Supplements 1 tshrough 2)
.AmeDdmen!
No. ,-Deleted: com.Defeted: !52, 22s, 270 z-E--3-Subject to the conditions and requj-rements incorporated herein,the Commission hereby licenses:
(1) FENOC, pursuant to Sectsion 103 of the Act and l-0 CFR Part 50, "Licensing of Production and Utilization Facilities, " to possess, use, and operate the facility;FirstBnergry Nucfear ceneratior\,:ryr !9 -p9gi9gg
!4S _,,_ _-.t----
facilJ-ty at the designatsed locat.ion in Ottawa County, ohioin accordance with t.he procedures and lirnitsatsions se! forth in this Iicense;FENOC, pursuant to the Act and L0 CFR Part 70, co receive, possess and use at any time special.
nuclear maLerial as reactor fuel, in accordance with the limitacions for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended;FENOC, pursuan! to tshe Act and L0 CFR Parts 30, 40, and 70to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipments calibration, and as fission detecEors in amounts asramr i rad
.FENOC, pursuant to the Act and 10 CFR Parts 30, 40 and 70,to receive, possess and use in amounts as reguired any byproduct, source or special nuclear material wichout restriction to chemical or physical form, for sample analysis or instrument cal-ibrat.ion or associated with radioact.j.ve apparatus or components; andFENOC, pursuanE to the Acts and 10 CFR Parts 30 and 70. !o possess, but not separate, such b1{>roducts and special nucl-ear materials as may be produced by the operation of the facility.(21 (3)(4)ta., Deleted: corp.Deleted:7s2, 228, 270Amendment No.
v_......t..,,
A2.C. This license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in l0 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 ofPart 40, Sections 50.54 and 50.59 ofPart 50, and Section 70.32 ofPart70; and is subject to all applicable provisions ofthe Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; andis subject to the additional conditions specified or incorporated below: (l) Maximum Power Level FENOC is authorized to operate the facility at steady state reactor core power levels not in excess of 2817 megawatts (thermal).
Prior to attaining the power level, Toledo Edison Company shall comply with the conditions identified in Paragraph (3) (o) below and complete the preoperational tests, startup tests and other items identified in Attachment 2 to this license in the sequence specified. Attachment 2 is an integral part of this license.
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revi sed through Amendment No*, -4Iq,b9t9!y llgC.pqtqlgd in the license. FENOC shall operate the facility in accordance with the Technical Soecifi cations.
(3) Additional Conditions The matters specified in the following conditions shall be completed to the satisfaction of the Commission within the stated time periods following the issuance of the license or within the operational restrictions indicated. The removal of these conditions shall be made by an amendment to the license supported by a favorable evaluation by the Commission: (a) FENOC shall not operate the reactor in operationalModes I and 2 with less than three reactor coolant pumps in operation.(b) Deleted per Amendment 6 (c) Deleted per Amendment 5Deleted: 280 Deleted:278.279.280 Amendment No.,.,f' 2.C(4) Fire Protection FENoc shall implements and maincain in effect afl provisionsof the approved Fire Prot.eclion Program as described in the Updated Safety analysis Report and as approved in tshe SERS datedJuly 25, 1979, and May 30, 199L, suJrject to the following provision.FENOC may make changes to the approved Fire ProtectionProgram without prior approval of the commission only ifthose changes would not adversely affect the ability Eoachieve and maintsain safe shutdown in the event of a fire.Del-eted per Amendment No.
279.Antitrust Conditions FENoC and FirstEnergy Nucl-ear ceneratiorlE:LU; gbe]l 99Ir]p!y_
---_t-,---
wilh the antitrust conditions deLineated in Condition 2.8 of Lhis license as i.f named therei.n. FENOC shalI not market, or broker porrer or energy from the Davis-Besse Nuclear Power Staeion, Unit. No. L. FirstEnergTy NuclearGeneratiorr, L!11_ 1q 5gqpgnsibl-e and accguntable for the --l-----actions of FENOC to the extent that sai-d actions affect the marketing or brokering of power or energfy from the Davis-Besse Nuclear Pohrer SLation, Units No. 1, and in any way, contravene the antitrust license conditions contained inthe license.(s)(6)Deleted: corc Deleted: corp, Defeted: ]-5, 41, r'1 4, 22A, 2'7 o, 27 9L-5 Amendment No.
,-__________
,+
In accordance with the requirement imposed by the october I, 1975, order of the Unit.ed states court of Appeafs for the District of Columbia Circuit in Nat.ural Resources Defense Council v. Nuclear Regulatory Commission, No.
74-1,385 and 74-l-586, that Ehe Nuclear Regulatory Commission "shaf-make any licenses grantsed bet.ween .fuly 21, 1976 and such time when the mandate is issued subject to Ehe outcome of such proceedings herein," this license shalI be subject to the out.come of such proceedings.
This license is effective as of the date of issuance and shaIl expire at midnight April 22, 20]-7 .Based on the Commission's Order dated Decenber 16, 2005 and conforming AmendmenL No. 270 dated Decedber 15, 2005 regardingthe direct.
transfer of the License from the Cleveland El-ectric Illuminating Company (CleveLand Electric) and the Tol-edo Edison Company ( Toledo ndi son) to Fi rstEnergy NUqJ_e-4lGenerat ion Corpx___--,--
_--[----(FENGenCo)4, FirstEnergy Nuclear OperaEing Company and FENGenCor Isha11 comply with the fol]owing conditions noted beLow:
On the closing date of tshe transfers to FENGenCol of their interests in Davis-Besse, CLeveland Electric and Toledo Edison shall transfer to FENGenCo: all of each transferor's respective accumulated decommissioning funds for Davis-Besse and tender t.o FENGenCor addit.ional amounEs equal to remaining funds expected to be collected in 2005, as represented in the application dated.fune I, 2005, but not yet collected by the time of closing. A11 of the funds shall be deposiLed in a separate external trust fund for the reactor in the same amount as received with respect to Ehe unit to be segregated from other assets of FENGenCor and outside its administrative control, as required by NRC regulations, and FENGenCor sha11 take all necessary steps to ensure EhaE this external- trust fund is maintained in accordance wj-th the requirements of the order approvj-ng the transfer of the license and consistent
$/ith the safeLy eval-uation supporting the order and in accordance with Che reguirements of 10 CFR Section 50.75,"Reporting and recordkeeping for decommissioning plalning.
"@iltN""t.erc"""."ti.
g GenentionJteL- 14Amendment No.
,,,Deleted: oracion Deleted: !sr. zio
- 14A-The Supporc Agreement described in tshe application datedJune l-, 2005 (up to $400 million). shal,I be effective consistent with the representations contained in tshe application.
FENGencolshall take no action to cause FirslEnerg-y, or it,s successors and assigns, to void, cancel, or modify the Support Agreement without the prior vrrit.len consent of the NRC sEaff. FENGenCoa sha1l inform t.he Director of t,he Office of Nuclear Reaccor Regulation,in writing, no later than E.en days after any funds are providedto FENGenCo* by FirstEnergy under either Support Agreement.FOR THE NUCLEAR REGULATORY COMMISSIONOriginal Signed by R. C. DeYoung (for)Roger S. Boyd, Director Division of Project' ManagementOffice of Nucfear Reactsor Regulation Attachments:
: 1. Appendices A & B - Technical Specifications
: 2. Preoperational Tests, Startup Tests and Other ftems Which Must Be Completed Prior to proceedingt.o Succeeding Operational ModesDate of Issuance: (APR 22 L977). eirstEnersv Nqele qclery'tiq!*LLe-L- L4AAmendment No.
Deleted: 270 Attachment 4Proposed Perry Nuclear Power Plant, Unit No.
1 Operating License Changes (Mark Up)(Eight Pages Follow)
UNITED STATESNUCLEAR REGULATORY COMMISSIONwASHtNGTON. D.C. 2955s-0001 FIRSTENERGY NUCLEAR OPERATING COMPANYFI RSTENERGY NUCLEAR GEN ERATIONI.LL.
OHIO EDISON COMPANYDOCKET NO. 50-440PERRY NUCLEAR POWER. PLANT. UNIT NO. 1FACILITY OPERATING LICENSE1. The Nuclear Regulatory Commission (the Commission) has found that:Deleted: CORP.
License No. NPF-58A. The application for license filed by FirstEnergy Nuclear Operating Company (FENOC)Iacting on its own behalf and as agent for FirstEnergy Nuclear Generatiorglp
?4d qbiC Deleted: Corp.Edison Company, (licensees) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations setforth in 10 CFR Chapter l, and all required notifications to other agencies or bodies havebeen duly made;B. Construction of the Perry Nuclear Power Plant, Unit No. 1 (the facility), has been substantially completed in conformity with Construction Permit No. CPPR-I48 and the application, as amended, the provisions of the Act, and the regulations of the Commission:
'FENOC is authorized to act as agent for FirstEnergy Nuclear Generation*$_e q-r1d O_lr!-o Edison Company, and has exclusive responsibility and control over the physical construction,operation, and maintenance of the facility.
Amendment No.,__t oeleted: corp.
c D,-2-The facility will operate in conformity with the application, as amended, the provisions ofthe Act, and the regulations of the Commission (except as exempted from compliance inSection 2.D below);
There is reasonable assurance: (l) that the activities authorized by this operating licensecan be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations setforth in 10 CFR Chapter l (except as exempted from compliance in Section 2.D below),The FirstEnergy Nuclear Operating Company is technically qualified to engage in the activities authorized by this license in accordance with the Commission's regulations setforth in 10 CFR Chapter l;The licensees have satisfied the applicable provisions of 10 CFR Part 140, "FinancialProtection Requirements and Indemnity Agreements," of the Commission's regulations;The issuance of this license will not be inimical to the common defense and security or to the health and safety of the public;After weighing the environmental, economic, technical, and other benefits of the facilityagainst environmental and other costs and considering available alternatives, the issuance of this Facility Operating License No. NPF-58, subject to the conditions for protection of the environment set forth in the Environmental Protection Plan attached as Appendix B, is in accordance with 10 CFR Part 51 of the Commission's regulations andall applicable requirements have been satisfied; andThe receipt, possession, and use of source, byproduct, and special nuclear material as authorized by this license will be in accordance with the Commission's regulations in 10CFR Parts 30, 40. and 70.Based on the foregoing findings regarding this facility, the Partial-lnitial Decisions issued December 2, 1983, and September 3, 1985, by the Atomic Safety and Licensing Board in regard to this facility (affirmed by ALAB-84'l , dated July 25, 1986) and pursuant to approval bythe Nuclear Regulatory Commission at a meeting on November 7, 1986, Facility OperatingLicense No.
NPF-58, which supersedes the license for fuel loading and low power testing,License No. NPF-45, issued on March 18, 1986, is hereby issued to FirstEnergy Nuclear Operating Company, FirstEnergy Nuclear Generation=lJQ, ilg qbj-o--Eqiegrl Qg['p?'ly, (!be - -_t- --licensees) to read as follows:A. The license applies to the Perry Nuclear Power Plant, Unit No. 1, a boiling water nuclear reactor and associated equipment (the facility), owned by FirstEnergy NuclearGeneratiorslt1L (_ojvner) etd leaeeq !c qbjc Eqrqq-l Cqrpeny (esqee) (cqlle.cLryely
!!'c .1, ..licensees).
G.Deleted: Corp.Deleted: Corp.
Deleted: 137 Amendment (3)(4)(5)(6)-3-The facility is located on the shore of Lake Erie in Lake County, Ohio, approximately 35 miles northeast of Cleveland, Ohio, and is described in the licensees' Final Safety Analysis Report, as supplemented and amended, and in the licensees'Environmental Report, as supplemented and amended.Subject to the conditions and requirements incorporated herein, lhe Commission hereby licenses: (1) FENOC, pursuant to Section 103 ofthe Act and 10 CFR Part 50, to possess, use, and operate the facility at the designated location in Lake County, Ohio, in accordance with the procedures andlimitations set forth in this license; (2) FirstEnergy Nuclear Generatiorr=llQ-and-9hiq ECiC-on QSlrlp41y, t9 pS9s9-s9 !l-e _ - _-- _l facility at the designated location in Lake County, Ohio, in accordance with the procedures and limitations set forth in this license; FENOC, pursuant to the Act and 10 CFR Parl70,lo receive, possess, and use at any time specialnuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended;FENOC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use at anytime any byproduct, source, and special nuclear material such as sealed neutron sources for reactorstartup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and fission detectors in amounts as required; FENOC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction as to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and FENOC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but nol separate, suchbyproduct and special nuclear materials as may be produced by the operation of the facility.(7Xa) Ohio Edison Company is authorized to transfer any portion of its 30.0% ownership share of PNPP Unit 1 and a proportionate share of its interesl in the PNPP common facilities to certain equity investors identified in ils submission of January 23, 1987 , as supplemented on March 3, 1987, and at the sametime to lease back from such purchasers such interest sold in the PNPP Unit I facility. The term of thelease is for approximately 29/zyears subject to a right ofAmendment No.,Deletedl Corp.
Deleted: 137  renewal. Such sale and leaseback transactions are subject to the representations and conditions set forth in the above mentioned application ofJanuary 23, 1987 , as supplemented on March 3, 1987, as well as the letter of the Director of the Office of Nuclear Reactor Regulation dated March 16, 1987,consenting to such transactions. Specifically, a lessor and anyone else who mayacquire an interest under these transactions are prohibited from exercisingdirectly or indirectly any control over the licenses of PNPP Unit 1. For purposesof this condition the limitations of 10 CFR 50.81 , as now in effect and as may besubsequently amended, are fully applicable to the lessor and any successor in interest to that lessor as long as the license for PNPP Unit 1 remains in effect;these financial transactions shall have no effect on the license for the PerryNuclear facility throughout the term of the license.(b) Further, the licensees are also required to notify the NRC in writing prior to anychange in: (i) the terms or conditions of any lease agreements executed as partof these transactions, (ii) the PNPP Operating Agreement; (iii) the existing property insurance coverage for PNPP Unit 1; and (iv) any action by a lessor orothers that may have an adverse effect on the safe operation of the facility.This license shall be deemed to contain and is subject to the conditions specified inthe Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of theCommission now or hereafter in effect; and is subject to the additional conditionsspecified or incorporated below: (1) Maximum Power LevelFENOC is authorized to operate the facility at reactor core power levels not in excess of 3758 megawatts thermal (100% power) in accordance with the conditions specified herein.
(2) TechnicalSpecificationsThe Technical Specifications contained in Appendix A and the EnvironmentalProtection Plan contained in Appendix B, as ievised through Amendment No. -________--_---lare hereby incorporated into the license. FENOC shall operate the facility inaccordance with the Technical Specifications and the Environmental Protection Plan (3) AntitrustConditions
: a. FirstEnergy Nuclear ceneratio1=tlQ 49 O!!9 _Eqj99! Q-qryqly Amendment No..__-_,-_--
-_.r-Deleted: 155Deleted: Corp.
Deleted3 155
_6_shall comply with the antitrusl conditions delineated in Appendix C to this license; Appendix C is hereby incorporated into this license.b. FENOC shall comply with the antitrust conditions delineated in Appendix C to this licenseas if named therein. FENOC shall not market or broker power or energy from the PerryNuclear Power Plant, Unit No. 1. The Owners are responsible and accountable for the actions of FENOC to the extent that said actions affect the marketing or brokering of poweror energy from the Perry Nuclear Power Plant, Unit No. 1, and in any way, contravene the antitrust condition contained in the license.
Deleted Deleted Fire Protection (Section 9.5. SER.
SSER #'1. 2. 3. 4. 7. and 8)
FENOC shall comply with the following requirements of the fire protection program:
FENOC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report, as amended, for the Perry Nuclear Power Plant and as approved in the Safety Evaluation Report (NUREG-0887) dated May 1982 andSupplement Nos. 1 through 10 thereto, subject to the following provisions:a. FENOC may make changes to the approved fire protection program without prior approvalof the Commission only if those changes would not adversely affect the ability to achieveand maintain safe shutdown in the event of a fire.
(7) Deleted (8) Deleted (9) Deleted (10) Deleted (1 1 ) Mitiqation Strateqv License ConditionThe licensee shall develop and maintain strategies for addressing large fires and explosions and that include the follow key areas: (a) Fire fighting response strategy with the following elements: 1. Predefined coordinated fire response strategy and guidance 2. Assessment of mutual aid fire fighting assets 3. Designated slaging areas for equipment and materials ruo cunltcEs rHts pnc Amendment No. 137 Revised by letter dated July 11,2007 (4)(5)(6)
H. This license is effective as of the date of issuance and shall expire at midnight on March 18, 2026.3. Based on the Commission's Order dated November 15, 2005 and the Commission's revised Orderdated December 16, 2005 and conforming Amendment No. 137 dated December 16, 2005 regardingthe direct transfer of the license from Pennsylvania Power Company, Ohio Edison Company, OES Nuclear, Inc., The Cleveland Electric llluminating Company, and the Toledo Edison Company, to FirstEnergy NuclealGeneration Corp. (FENGenCo)1, FirstEnergy Nuclear Operating Company andFirstEnergy Nuclear Generation Corp.l shall comply with the following conditions noted below:
A. On the closing date(s) of the transfers to FENGenCol of their interests in Perry, Pennsylvania Power Company, The Cleveland Electric llluminating Company, Ohio Edison Company, OESNuclear, Inc., and Toledo Edison Company shall transfer to FENGenCol all of each transferor's respective accumulated decommissioning funds for Perry, except for funds associated with the leased porlions of Perry, and tender to FENGenCol additional amounts equal to remaining fundsexpected to be collected in 2005, as represented in the application dated June 1,2005, but not yetcollected by the time of closing.
All of the funds shall be deposiled in a separate exernal trustfund for the reactor in the same amount as received with respect to the unil to be segregated fromother assets of FENGenCoi and outside its administrative control, as required by NRC regulations, and FENGenCol shall take all necessary steps to ensure that this external trust fundis maintained in accordance with the requirements of the order approving the transfer of the license and consistent with the safety evaluation supporting the order and in accordance with the requirements of 10CFR Section 50.75, "Reporting and recordkeeping for decommissioning planning."B. By the date of closing of the lransfer of the ownership interests in Perry from Pennsylvania Power Company to FENGenCol, FENGenCol shall obtain a parent company guarantee from FirstEnergy in an initial amount of at least $80 million (in 2005 dollars) to provide additional decommissioning funding assurance regarding such ownership interests. Required funding levels shall be recalculated annually and, as necessary, FENGenCol shall either obtain appropriate adjustments lo the parent company guarantee or otherwise provide any additional
.decommissioning funding assurance necessary for FENGenCo: to meet NRC requirementsunder 10 CFR 50.75.
Amendment No.,_____--,--
-_____.r-  The Support Agreements described in the applications dated May 18, 2005 (up to $80 million), and June 1, 2005 (up lo $400 million), shall be effective consistent with the representations contained in the applications. FENGenCol shall take no action to cause FirstEnergy, or its successors and assigns, to void, cancel, or modify the Support Agreements without the prior written consent of the NRC staff, except, however, the
$80 million Support Agreement inconnection with the transfer of the Penn Power interests may be revoked or rescinded if andwhen the $400 million support agreement described in the June 1,2005, application becomes effective. FENGenCol shall inform the Director of the Office of Nuclear Reactor Regulation, inwriting, no later than ten days after any funds are provided to FENGenCol by FirstEnergy undereither Support Agreement.FOR THE NUCLEAR REGULATORY COMMISSIONORIGINAL SIGNED BY:Harold R. Denton, DirectorOffice of Nuclear Reactor Regulation Attachments/Ap pendices l.Attachmenlsl-2
: 2. Appendix A - Technical Specifications (NUREG -1204)3. Appendix B - Environmental Protection Plan4. Appendix C - Antitrust Conditions Date of lssuance:
November 13, 1986 TirstgnerqyXuclear Genera Generalion*IteAmendment No.,,-
APPENDIX C PERRY NUCLEAR POWER PLANT. UNIT NO. 1 NPF-58 ANTITRUST CONDITIONS FOR FIRSTENERGY NUCLEAR GENERATION_LLC . ,J OHIO EDISON COMPANY A. The licensees are subject to the following antitrust conditions:
Definitions Applicants shall mean the two companies listed above.Entitv shall mean any electric generation and/or distribution system or municipality or cooperative with a stalutory right or privilege to engage in either of these functions.
Wheelinq shall mean transportation of electricity by a utility over ils lines for another utility, including thereceipl from and delivery to another system of like amounts but not necessarily the same energy. FederalPower Commission, The 1970 National Power Survev, Part 1, P. 1-24-8.
Licensinq Conditions (1) Applicants shall not condition the sale or exchange of wholesale power or coordination servicesupon the condition that any other entity: (a) enter into any agreement or underslanding restricting the use of or alienation of such energy or services to any customers or territories;(b) enter into any agreement or understanding requiring the reeeiving entity to, give up any other power supply alternatives or to deny itself any market opportunities;(c) withdraw any ,petition to intervene or forego participation in any proceeding before the Nuclear Regulatory Commission or refrain from instigating or prosecuting any antitrust action in any other forum.Amendment No.,Deleted: CORP.
Deleteds 137 Attachment 5Proposed Beaver Valley Power Station, Unit No. 1Operating License Changes (Re{yped - For lnformation Only)(Nine Pages Follow)
UNITED STATESNUCLEAR REGULATORY COMMISSION WASHlNGTON, D.C. 20555-0001FIRSTENERGY NUCLEAR OPERATING COMPANY FIRSTENERGY NUCLEAR GENERATION.
LLCDOCKET NO. 50-334BEAVER VALLEY POWER STATION. UN]T NO. 1RENEWED FACILITY OPERATING LICENSE Proposed Page 1.License No. DPR-66The Nuclear Regulatory Commission (the Commission) having found that:A. The application to renew Facility Operating License No. DPR-66, filed by FirstEnergyNuclear Operating Company (FENOC)- acting on its own behalf and as agent forFirstEnergy Nuclear Generation, LLC (the licensees) complies with the standards andrequirements of the Atomic Energy Act of 1954, as amended (the Act), and theCommission's rules and regulations set forth in 10 CFR Chapter 1, and all required notifications to other agencies or bodies have been duly made; B. Construction of the Beaver Valley Power Station, Unit No. 1 (facility), has been substantially completed in conformity with Construction Permit No. CPPR-75 and the application, as amended, the provisions of the Act and the rules and regulations of the Commission;C. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; D. There is reasonable assurance: (i) that the activities authorized by this renewedoperating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the rules and regulations of the Commission; E. FENOC is technically qualified and the licensees are financially oualified to engage in the activities authorized by this renewed operating license in accordance with the rulesand regulations of the Commission;F. The licensees have satisfied the applicable provisions of 10 CFR Part140, "FinancialProtection Requirements and Indemnity Agreements," of the Commission's regulations;
*FENOC is authorized to act as agent for FirstEnergy Nuclear Generation, LLC, and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.Amendment No.Renewed Operating License DPR-66  Proposed Page 2.G. The issuance of this renewed operating license will not be inimical to the common defense and security or to the health and safety of the public;H. After weighing the environmental, economic, technical and other benefits of the facility against environmental and other costs and considering available alternatives, the issuance of Renewed Facility Operating License No. DPR-66 is in accordance with 10 CFR Part 51 (formerly Appendix D of 10 CFR Part 50) of the Commission's regulations and all applicable requirements have been satisfied; and L The receipt, possession, and use of source, by-product, and special nuclear material as authorized by this renewed operating license will be in accordance with the Commission's regulations in 10 CFR Parts 30, 40, and 70, including 10 CFR Sections 30.33, 40.32,70.23, and 70.31.
J. Actions have been identified and have been or will be taken with respect to: (1)managing the effects of aging on the functionality of structures and components that have been identified to require review under 10 CFR 5a.21(a)(1) during the period of extended operation, and (2) time-limited aging analyses that have been identified to require review under 10 CFR 54.21(c), such that there is reasonable assurance that the activities authorized by this renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3 for the facility, and that any changes made to the facility's current licensing basis in order to comply with 10 CFR 5a.29(a) are in accordance with the Act and the Commission's regulations; Renewed Facility Operating License No. DPR-66 is hereby issued to FENOC and FirstEnergy Nuclear Generation, LLC to read as follows:
A. This renewed license applies to the Beaver Valley Power Station, Unit No. 1, a pressurized water nuclear reactor and associated equipment (the facility), owned by FirstEnergy Nuclear Generation, LLC, and operated by FENOC. The facility is located in Beaver County, Pennsylvania, on the southern shore of the Ohio River, and is described in the "Updated Final Safety Analysis Report" as supplemented and amended and the Environmental Report as supplemented and amended.
B. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses: (1) FENOC, pursuant to Section 104b of the Act and 10 GFR Part 50, "Licensing of Production and Utilization Facilities," to possess, use, and operate the facility,and FirstEnergy Nuclear Generation, LLC to possess the facility at the designated location in Beaver County, Pennsylvania in accordance with the procedures and limitations set forth in this renewed license; FENOC, pursuant to the Act and 10 CFR Part 70, to receive, possess, and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Updated Final Safety Analysis Report, as supplemented and amended; Amendment No.Renewed Operating License DPR-66 (2)Beaver Valley Unit 1  (3) FENOC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) FENOC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source, or special nuclear materialwithout restriction to chemical or physicalform, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (5) FENOC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be producedby the operation of the facility.
This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter 1:Part 20, Section 30.34 of Part 30, Section 40.41of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level FENOC is authorized to operate the facility at a steady state reactor core power level of 2900 megawatts thermal.(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. , are hereby incorporated in the license. The licensee shalloperate the facility in accordance with the Technical Specifications.
(3) Auxiliarv River Water Svstem (Deieteei by Amendmeni irio. 6)Amendment No.Renewed Operating License DPR-66 Proposed Page c.Beaver Valley Unit 1
-6 Proposed Page (10) AdditionalConditionsThe Additional Conditions contained in Appendix C, as revised throughAmendment No. , are hereby incorporated into this license. FENOCshall operate the facility in accordance with the Additional Conditions.
(11) Mitiqation Strateov License ConditionThe licensee shall develop and maintain strategies for addressing large fires andexplosions and that include the following key areas: (a) Fire fighting response strategy with the following elements:
: 1. Pre-defined coordinated fire response strategy and guidance2. Assessment of mutual aid fire fighting assets 3. Designated staging areas for equipment and materials
: 4. Command and control 5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:1. Protection and use of personnel assets2. Communications3. Minimizing fire spread 4. Procedures for implementing integrated fire response strategy 5. ldentification of readily-available pre-stagedequipment6. Training on integrated fire response strategy 7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of: 1. Water spray scrubbing 2. Dose to onsite respondersAmendment No.
Renewed Operating License DPR-66Beaver Valley Unit 1 APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE NO.
DPR-66 Proposed PageFirstEnergy Nuclear Operating Company and FirstEnergy Nuclear Generation, LLC shatl comply with I the following conditions on the schedules noted below: I Amendment Additional Condition Number lmplementation Date 202The licensee is authorized to relocate certain The amendment Technical Specification requirements to licensee- shall be controlled documents. lmplementation of this implemented within amendment shall include the relocation of these 60 days fromtechnical specification requirements to the April14,1997 appropriate documents, as described in the licensee's application dated September 9, 1996, and evaluated in the staffs safety evaluation attached to this amendment.
2Og The licensee is authorized to relocate certain The amendment Technical Specification requirements to licensee- shall be controlled documents. lmplementation of this implemented within amendment shall include the relocation of these 60 days from technical specification requirements to theDecember 10. 1997 appropriate documents, as described in the licensee's application dated March 14, 1997, as supplemented July 29 and August 13, 1997, and evaluated in the staffs safety evaluation attachedto this amendment.
210 The licensee is authorized to relocate certain The amendment Technical Specification requirements to licensee- shall be controlled documents. lmplementation of this implemented within amendment shall include the relocation of these 30 days from technical specification requirements to theappropriate documents, as described in the licensee's application dated September 11, 1997, and evaluated in the staffs safety evaluation atiaeheci io this amendment.January 20, 1998 c-1 Beaver Valley Unit 1Amendment No.
I APPENDIX C Additional Condition The licensee is authorized to relocate certainTechnical Specification requirements to licensee-controlled documents. lmplementation of this amendment shall include the relocation of these Technical Specification requirements to theappropriate documents as described in thelicensee's application dated December 24, 1998, as supplemented June 15, June 17 , and July 7, 1999, and evaluated in the staffs safety evaluation attached to this amendment.On the closing date(s) of the transfers to FENGenCo*of their interests in Beaver Valley Power Station, Unit No. 1, Pennsylvania Power Company and Ohio EdisonCompany shall transfer to FENGenCo* all of eachtransferor's respective accumulated decommissioning funds for Beaver Valley Power Station, Unit No.
1, and tender to FENGenCo* additional amounts equal toremaining funds expected to be collected in 2005, asrepresented in the application dated June 1, 2005, but not yet collected by the time of closing. All of the fundsshall be deposited in a separate external trust fund forthe reactor in the same amount as received with respect to the unit to be segregated from other assetsof FENGenCo* and outside its administrative control, as required by NRC regulations, and FENGenCo* shall take all necessary steps to ensure that this externaltrust fund is maintained in accordance with therequirements of the order approving the transfer of the iicense and consisient wiih the saiety evaiuaiion supporting the order and in accordance with therequirements of 10 CFR Section 50.75, "Reporting andrecordkeeping for decommissioning planning." Proposed Page ADDITIONAL CONDITIONSOPERATING LICENSE NO. DPR-66FirstEnergy Nuclear Operating Company and FirstEnergy Nuclear Generation, LLC shall comply withthe following conditions on the schedules noted below.
Amendment Number 225 269 lmplementation DateThe amendmentshall be implemented within60 days fromAugust 30, 1999The amendmentshall beimplemented within 30 days fromDecember 16, 2005" FirstEnergy Nuclear Generation Corp. (FENGenCo) has been renamed FirstEnergy NuclearGeneration. LLC.Beaver Valley Unit 1 c-2Amendment No.
APPENDIX C ADDITIONAL CONDITIONSOPERATING LICENSE NO. DPR-66 FirstEnergy Nuclear Operating Company and FirstEnergy Nuclear Generation, LLC shall comply with the following conditions on the schedules noted below: Proposed Page Amendment Number 269. FrrstEnergy Nuclear Generation Corp.Generation. LLC.
Additional ConditionBy the date of closing of the transfer of the ownership interests in Beaver Valley Power Station, Unit No. 1from Pennsylvania Power Company to FENGenCo*, FENGenCo* shall obtain a parent company guarantee from FirstEnergy in an initial amount of at least
$80 million (in 2005 dollars) to provide additional decommissioning funding assurance regarding such ownership interests. Required funding levels shall be recalculated annually and, as necessary, FENGenCo*shall either obtain appropriate adjustments to the parent company guarantee or otheruvise provide any additional decommissioning funding assurance necessary for FENGenCo*
to meet NRC requirementsunder 10 CFR 50.75.
The Support Agreements described in the applicationsdated May 18, 2005 (up to $80 million), and June 1, 2005 (up to $400 million), shall be effective consistent with the representations contained in the applications.
FENGenCo*
shalltake no action to cause FirstEnergy, or its successors and assigns, to void, cancel, or modifythe Support Agreements without the prior written consent of the NRC staff, except, however, the $80 million Support Agreement in connection with the transfer of the Pennsylvania Power Company interests may be revoked or rescinded if and when the
$400 million support agreement described in the June 1, 2005, application becomes effective. FENGenCo" shall inform the Director of the Office of Nuclear Reactor Reguiation, in writing, no iater than ten ciays after any funds are provided to FENGenCo* by FirstEnergy under either Support Agreement.
lmplementation DateThe amendment shallbe implemented within30 days from December 16. 2005 (FENGenCo) has been renamed FirstEnergy NuclearBeaver Valley Unit 1 c-3 Amendment No.
APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE NO. DPR-66 FirstEnergy Nuclear Operating Company and FirstEnergy Nuclear Generation, LLC shall comply withthe following conditions on the schedules noted below: Proposed Page Amendment Number 278 278Additional ConditionSchedule for New and Revised Surveillance Requirements (SRs)The schedule for performing SRs that are new or revised inAmendment No. 278 shall be as follows:
For SRs that are new in this amendment, the first performanceis due at the end of the first surveillance interval, which beginson the date of implementation of this amendment.For SRs that existed prior to this amendment, whose intervals of performance are being reduced, the first reducedsurveillance interval begins upon completion of the first surveillance performed after implementation of this amendment.For SRs that existed prior to this amendment, whose intervals of performance are being extended, the first extendedsurveillance interval begins upon completion of the last surveillance performed prior to implementation of this amendment.For SRs that existed prior to this amendment that havemodified acceptance criteria, the first performance subject to the modified acceptance criteria is due at the end of the firstsurveillance interval that began on the date the surveillance was last performed prior to the implementation of this amendment.
Relocation of Certain Technical Specification RequirementsLicense Amendment No. 278 authorizes the relocation of certain Technical Specifications to other licensee-controlled documents.
lmplementation of this amendment shall include relocation of the requirements to the specified documents, as described in (1) Sections 4D and 4Eof the NRC staffs Safety Evaluation, and (2) Table LA, Removed Detail Changes, and Table R, Relocated Specifications, attached to the NRC staffs Safety Evaluation, which is enclosed in this amendment.
lmplementation Date The amendment shall be implemented within 150 daysfrom date of issuance The amendment shall be implementedwithin 150 days from date of issuance Beaver Valley Unit 1 c-4Amendment No.
Proposed Page APPEND]X C ADDITIONAL CONDITIONSOPERATING LICENSE NO. DPR-66 FirstEnergy Nuclear Operating Company and FirstEnergy Nuclear Generation, LLC shall comply with the following conditions on the schedules noted below: Amendment Number 281 Additional Condition Initial Performance of New Surveillance and Assessment Requirements Upon implementation of Amendment No. 281 adopting TSTF-448, Revision 3, the determination of control room envelope (CRE)unfiltered air inleakage as required by Surveillance Requirement (SR) 3.7.10.4, in accordance with Specification 5.5.14.c(i), theassessment of CRE habitability as required by Specification5.5.14.c(ii), and the measurement of CRE pressure as required bySpecification 5.5.14.d, shall be considered met. Following implementation: (a) The first performance of SR 3.7.10.4, in accordance with Specification 5.5.14.c(i), shall be within the specified Frequency of 6 years, plus the 18-month allowance of SR 3.0.2, as measured from the date of the most recent successful tracer gas test, or within the next 18 months ifthe time period since the most recent successful tracer gastest is greater than 6 years.(b) The first performance of the periodic assessment of CRE habitability, Specification 5.5.14.c(ii), shall be within 3 years, plus the 9-month allowance of SR 3.0.2, asmeasured from the date of the most recent successful tracer gas test, or within the next 9 months if the time period since the most recent successful tracer gas test is greater than 3 years.(c) The first performance of the periodic measurement of CRE- - tf: - - Ll plessur-e, Specification 5.5.i4.cj, shaii be wiihin i8 i-r-ronths, plus the 138 days allowed by SR 3.0.2, as measured from the date of the most recent successful pressure measurement test.lmplementation Date The amendmentshall be implementedwithin 120 daysfrom date of issuance Beaver Valley Unit 1 c-5 Amendment No.
Proposed Beaver Valley Power Station, Unit No. 2 Operating License Changes (Retyped - For Information Only)(Eleven Pages Follow)
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 FIRSTENERGY NUCLEAR OPERATING COMPANY FIRSTENERGY NUCLEAR GENERATION.
LLC OHIO EDISON COMPANY THE TOLEDO EDISON COMPANY DOCKET NO. s0-412 License No. NPF-73 The Nuclear Regulatory Commission (the Commission or the NRC) has found that:The application to renew Facility Operating License No' NPF-73 filed by FirstEnergy Nuclear Operating bompany (FENOC)" acting on its own behalf andas agent ior FirstEnergy Nuclear Generation, LLC, Ohio Edison Company, andThe Toledo Edison company (the licensees), complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 1O CFR Chapter l, and all required notifications to other agencies or bodies have been duly made;Construction of the Beaver Valley Power Station, Unit 2 (the facility), has been substantially completed in conformity with Construction Permit No. CPPR-105 and the applicatlon, as amended, the provisions of the Act, and the regulations of the Commission;The facility will operate in conformity with the application, the provisions of the Act,and the regulations of the Commission (except as exempted from compliance in Section 2.D. below);
There is reasonable assurance: (i) that the activities authorized by this renewed operating license can be conducted without endangering the health and safety of the publ'rc and (ii) that such activities will be conducted in compliance with the .Commission's regulations set forth in 10 CFR Chapter l (except as exempted from ccrmplianee !n -Seetion 2.D. below);
Amendment No.Renewed OPerating License NPF-73 Proposed Page 1.A.B.C.D..FENOC is authorized to act as agent for FirstEnergy Nuclear Generation, LLC, Ohio Edison Company, and The Toledo Edison Company-and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.BEAVER VALLEY POWER STATION, UNIT 2  FENOC is technically qualified to engage in the activities authorized by this renewed operating license in accordance with the Commission's regulations set forth in 10 CFR Chapter l;The licensees have satisfied the applicable provisions of 10 CFR Part 140,"Financial Protection Requirements and lndemnity Agreements," of the Commission's regulations; G.The issuance of this renewed operating license will not be inimical to the common defense and security or to the health and safety of the public;After weighing the environmental, economic, technical, and other benefits of the facility against environmental and other costs and considering available alternatives, the issuance of this Renewed Operating License No. NPF-73 is subject to the conditions for protection of the environment set forth in the Environmental Protection Plan attached as Appendix B, is in accordance with 10 CFR Part 51 of the Commission's regulations, and all applicable requirements have been satisfied; The receipt, possession and use of source, byproduct and special nuclear material as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30,40, and 70.
Actions have been identified and have been or will be taken with respect to: (1)managing the effects of aging on the functionality of structures and components that have been identified to require review under 10 CFR 54.21(aX1) during the period of extended operation, and (2) time-limited aging analyses that have been identified to require review under 10 CFR 54.2Uc), such that there is reasonable assurance that the activities authorized by this renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3 for the facility, and that any changes made to the facility's current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance with the Act and the Commission's regulations; l.Renewed Facility Operating License NPF-73 is hereby issued to FENOC, FirstEnergy Nuclear Generation, LLC, Ohio Edison Company, and The Toledo Edison Company (the licensees) to read as follows: This renewed license applies to the Beaver Valley Power Station, Unit 2, a pressurized water reactor and associated equipment (the facility), owned by Fit"stEnergy, Nuclear Generation, LLC (owner"). leased to Ohio Fdison Comoany (lessee), and The Toledo Edison Company (lessee) and operated by FENOC (collectively the licensees). The facility is located on the licensees' site on the southern shore of the Ohio River in Beaver County, Pennsylvania, approximately 22 miles northwest of Pittsburgh and 5 miles east of East Liverpool, Ohio, and is described in FENOC's Updated Final Safety Analysis Report, as supplemented and amended, and in its Environmental Report, as supplemented and amended; Subject to the conditions and requirements incorporated herein, the Commission hereby licenses: (1)Pursuant to Section 103 of the Act and 10 CFR Part 50, FENOC to possess, use, and operate the facility at the designated location in Beaver County, Pennsylvania, in accordance with the procedures and limitationsset forth in this license:Amendment No.
Renewed Operating License NPF-73 Proposed Page E.F.H.J 2.A.B.Beaver Valley Unit 2  Pursuant to the Act and 10 CFR Part 50, FirstEnergy Nuclear Generation,LLC, Ohio Edison Company, and The Toledo Edison Company to possess the facility at the designated location in Beaver County, Pennsylvania, in accordance with the procedures and limitations set forth in the license;Pursuant to the Act and 10 CFR Part 70, FENOC, to receive, possess,and use at any time special nuclear material as reactor fuel, inaccordance with the limitations for storage and amounts required for reactor operation, as described in the Updated Final Safety Analysis Report, as supplemented and amended;Pursuant to the Act and 10 CFR Parts 30, 40, and 70, FENOC to receive, possess, and use at any time any byproduct, source, and special nuclear material such as sealed neutron sources for reactor startup, sealedsources for reactor instrumentation and radiation monitoring equipmentcalibration, and as fission detectors in amounts as required;Pursuant to the Act and 10 CFR Parts 30, 40, and 70, FENOC to receive, possess, and use in amounts as required any byproduct, source, orspecial nuclear materialwithout restriction to chemical or physical form, for sample analysis or instrument calibration or other activity associated with radioactive apparatus or components; Pursuant to the Act and 10 CFR Parts 30, 40, and 70, FENOC to possess, but not separate, such byproduct and special nuclear materialsas may be produced by the operation of the facility authorized herein.Ohio Edison Company and The Toledo Edison Company are authorized to transfer any portion of their respective leased interests in BVPS Unit 2 and a proportionate share of their leased interests in the BVPS common facilities to certain potentialinvestors identified in their submittals of July 14, 16,22 and 31, and September 14,17 and 18, 1987, and at the same time tolease back from such purchasers such interest transferred in the BVPS Unit 2 facility. The term of the lease is for approximately 29-112 years subject to a right of renewal. Such sale and l^^^^l^a^l, +-^^^^^ri^^ ,t^i^^l +^ +t^^ -^^-^^^^l^+;^*^
^^llsc>s-c'st\ !.!.:! !><!Lt!U! !> 4! g Dr-lL'j=rrr rl.,! t! lg !
gPl sDsl ll-lLlul l+
c! !u conditions set forth in the aforementioned submittals. Specifically,a lessor and anyone else who may acquire an interest underthese transactions are prohibited from exercising directly or indirectly any control over the license of BVPS Unit 2. For purposes of this condition the limitations in 10 CFR 50.81, as now in effect and as may be subsequently amended, are fully applicable to the lessor and any successor in interest to that lessor as long as the license for BVPS Unit 2 remains in effect;these financial transactions shall have no effect on the license forthe BVPS Unit 2 facility throughout the term of the license.
Amendment No.Renewed Operating License NPF-73 Proposed Page (2)(3)(4)(5)(6)(7)(a)Beaver Valley Unit 2  (b) Further, the licensees are also required to notify the NRC in writing prior to any change in. (i) the term or conditions ofany lease agreements executed as part of these transactions; (ii) the BVPS Operating Agreement, (iii) the existing property insurance coverage for BVPS Unit 2, and (iv) any action by a lessor or others that may have adverseeffect on the safe operation of the facility.This renewed operating license shall be deemed to contain and is subjectto the conditions specified in the following Commission regulations set forth in 10 CFR Chapter 1 and is subject to all applicable provisions of theAct and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level FENOC is authorized to operate the facility at a steady state reactor core power level of 2900 megawatts thermal.(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. , and the Environmental Protection Plancontained in Appendix B, both of which are attached hereto are hereby incorporated in the license. FENOC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.Proposed Page C.Amendment No.
Renewed Operating License NPF-73 Beaver Valley Unit 2  (8) Detailed Control Room Desiqn Review (DCRDR)Deleted (9) Safetv Parameter Displav Svstem (SPDS)Deleted (10) Fire Protection Modifications (Section 9.5.1 of SER Supplement 6)
Deleted (11) AdditionalConditionsThe Additional Conditions contained in Appendix D, as revised through I Amendment No. , are hereby incorporated into this license. FENOC Ishall operate the facility in accordance with the Additional Conditions.
(12) Steam Generator Surveillance lnterval Extension Deleted (13) Mitioation Strateqv License Condition The licensee shall develop and maintain strategies for addressing large fires and explosions and that include the following key areas: (a) Fire fighting response strategy with the following elements:1. Pre-defined coordinated fire response strategy and guidance 2. Assessment of mutual aid fire fighting assets3. Designated staging areas for equipment and materials4. Command and control5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
: 1. Protection and use of personnel assets 2. Communications
: 3. Minimizing fire spread4. Procedures for implementing integrated fire response strategy5. ldentification of readily-available pre-staged equipment6. Training on integrated fire response strategy 7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
: 1. Water spray scrubbing
: 2. Dose to onsite responders Proposed PageBeaver Valley Unit 2 Amendment No. I Renewed Operating License NPF-73 I


===1.0 Obiectives===
Proposed Page renewal.Suchsaleand leaseback                      transactions            are subjectto the representations        andconditions          set forthin the abovementioned                          application  of January23, 1987            , as supplemented          on    March        3,    1987,    as well      as  the      of letter  the Directorof the Officeof NuclearReactorRegulation                                    datedMarch16, 1987, consenting        to suchtransactions.            Specifically,        a lessorandanyoneelsewhomay acquirean interestunderthesetransactions                              are prohibited          fromexercising directlyor indirectly          anycontroloverthelicenses                        of PNPPUnit1. Forpurposes of thiscondition        the limitations        of 10CFR50.81,as nowin effectandas maybe subsequently        amended,        arefullyapplicable              to the lessorandanysuccessor                      in interestto thatlessoras longas the license                            for  PNPP        Unit  1  remains      in effect; thesefinancialtransactions                shallhaveno effecton the licensefor the Perry Nuclearfacilitythroughout                thetermof the license.
(b)  Further,    the licensees        arealsorequired            to notifythe NRCin writingpriorto any changein: (i)thetermsor conditions                      of anyleaseagreements                          executed    as part of thesetransactions;            (ii)the PNPPOperating                  Agreement;          (iii)theexisting property      insurance      coverage      for PNPPUnit1; and(iv)anyactionby a lessoror othersthat mayhavean adverseeffecton the safeoperationof thefacility.
C. Thislicenseshallbe deemedto containandis subjectto theconditions                                                  specified in theCommission's        regulations        setforthin 10CFRChapterI andis subjectto all applicable  provisions      of theActandto therules,regulations,                              andordersof the Commission      nowor hereafter            in effect;andis subjectto theadditional                            conditions specifiedor incorporated            below:
(1)  MaximumPowerLevel FENOCis authorized                to operatethe facilityat reactorcorepowerlevelsnot in excessof 3758megawatts                    thermal('100o/o        power)in accordance                    withthe conditions        specified    herein.
(2)  TechnicalSpecifications TheTechnical          Specifications          contained      in Appendix            A andthe Environmental Protection        Plancontained          in Appendix      B, as revisedthroughAmendment                            No.
areherebyincorporated                intothelicense.FENOCshalloperatethefacilityin accordance        withtheTechnical            Specifications          andthe Environmental                  Protection Plan (3)  AntitrustConditions 6  f ;.-iE^^r^.,    i.i, '-i^ar  /laaaralian      l ! i-  -:irr,l  l1!''ir. F,-lic,rn  i/].-rn-,n=ni/
o-  l rrJLLrrElv)f    l!uvlgqt      vgrrvrqfrvrr,    LLv    srrv      vlllv    Lvrevrl Amendment      No.


of the Environmental Protection Plan The Environmental Protection Plan (EPP) is to provide for protection of nonradiological environmental values during operation of the Beaver Valley Power Station, Unit 2 (facility).
Proposed Page H. Thislicenseis effective    as of thedateof issuance    andshallexpireat midnight      on March18, 2026.
The principal objectives of the EPP are as follows:
: 3. Basedon theCommission's      OrderdatedNovember          15.2005andtheCommission's          revisedOrder datedDecember    16,2005andconforming        Amendment      No.137datedDecember          16,2005regarding thedirecttransferof thelicensefromPennsylvania        PowerCompany,        OhioEdisonCompany,      OES Nuclear, Inc.,TheCleveland    Electric llluminating Company,    andtheToledoEdisonCompany,        to FirstEnergy NuclearGeneration      Corp.(FENGenCo)*,      FirstEnergy  NuclearOperating    Company  and FirstEnergy NuclearGeneration      Corp.*shallcomplywiththefollowing        conditions  notedbelow:
Verify that the facility is operated in an environmentally acceptable manner, as established by the Final Environmental Statement - Operating License Stage (FES-OL)and other NRC environmental impact assessments.
On theclosingdate(s)of thetransfers      to FENGenCo*      of theirinterests in Perry,Pennsylvania PowerCompany,      TheCleveland    Electricllluminating  Company,    OhioEdisonCompany,      OES Nuclear, lnc.,andToledoEdisonCompany            shalltransfer  to FENGenCo*    all of eachtransferor's respective  accumulated    decommissioning    fundsfor Perry,exceptfor fundsassociated        withthe leasedportions    of Perry,andtenderto FENGenCo*          additional amountsequalto remaining    funds expected  to be collected  in 2005,as represented    in theapplication  datedJune1,2005,   butnotyet collectedby thetimeof closing.All of thefundsshallbe depositedin a separateexternaltrust fundfor the reactorin the sameamountas receivedwithrespectto the unitto be segregated              from otherassetsof FENGenCo*        andoutsideitsadministrative      control,as requiredby  NRC regulations, and FENGenCo"      shalltakealtnecessarystepsto ensurethat thisexternaltrustfund is maintained  in accordance  withtherequirements      of theorderapproving    thetransferof the licenseandconsistent    withthesafetyevaluation      supporting  theorderand in accordance    withthe requirements   of 10CFRSection50.75,"Reporting        andrecordkeeping    for decommissioning planning."
Coordinate NRC requirements and maintain consistency with other Federal, State, and local requirements for environmental protection.
B . By the dateof closingof the transferof theownershipinterestsin PerryfromPennsylvania              Power Company    to FENGenCo*,    FENGenCo*    shallobtaina parentcompany        guarantee  from FirstEnergy  in an initialamountof at least$80million(in2005dollars)        to provideadditional decommissioning    fundingassurance    regarding  suchownership    interests. Required  fundinglevels shallbe recalculated  annually  and,as necessary,     FENGenCo*    shalleitherobtainappropriate adjustments  to the parentcompany    guarantee  or otherwise  provideanyadditional decommissioning    fundingassurance    necessary    for FENGenCo*     to meetNRCrequirements under10CFR50.75.
Keep NRC informed of the environmental effects of facility construction and operation and of actions taken to control those effects.Environmental concerns identified in the FES-OL (September 1985, NUREG-1094) which relateto water quality matters are regulated by way of the licensee's*
* FirstEnergyNuclearGeneration      Corp.(FENGenCo)"      hasbeenrenamedFirstEnergy          Nuclear Generation, LLC.
NPDES permit.2.0 EnvironmentalProtectionlssues ln the FES-OL (NUREG-1094, September 1985), the staff considered the environmental impacts associated with the operation of the Beaver Valley Power Station, Unit 2. No aquatic/water quality, terrestrial, or noise issues were identified.
AmendmentNo.


===3.0 Consistencv===
Proposed Page
: c. The SupportAgreementsdescribedin the applications    datedMay 18, 2005 (up to $80 million),
and June 1,2005 (up to $400 million),shallbe effectiveconsistentwith the representations containedin the applications.FENGenCo*shalltakeno actionto cause FirstEnergy,    or its successorsand assigns,to void,cancel,or modifythe SupportAgreementswithoutthe prior written consentof the NRC staff, except,however,the $80 millionSupportAgreementin connectionwith the transferof the Penn Power interestsmay be revokedor rescindedif and when the $400 millionsupportagreementdescribedin the June 1,2005,applicationbecomes effective.FENGenCo"shallinformthe Directorof the Officeof NuclearReactorRegulation,in writing,no laterthan ten days afterany fundsare providedto FENGenCo*by FirstEnergyunder eitherSupportAgreement.
FOR THE NUCLEARREGULATORY          COMMISSION ORIGINALSIGNEDBY:
HaroldR. Denton,Director Officeof NuclearReactorRegulation Attachments/Appendices
: 1. Attachments1 - 2
: 2. AppendixA - TechnicalSpecifications (NUREG-1204\
: 3. AppendixB - Environmental  Protection Plan
: 4. AppendixC - AntitrustConditions Dateof lssuance:November13. 19Bo
* FirstEnergyNuclearGeneration  Corp.(FENGenCo)*    hasbeenrenamedFirstEnergy    Nuclear Generation, LLC.
AmendmentNo.


Requirements3.1 Plant Desiqn and Operation The licensee may make changes in station design or operation or perform tests or experiments affecting the environment provided such activities do not involve an unreviewed environmental question and do not involve a change in the EPP..
Proposed Page APPENDIXC PERRYNUCLEARPOWERPLANT.UNITNO. 1 NPF-58 ANTITRUSTCONDITIONS FOR FIRSTENERGY     NUCLEARGENERATION.           LLC OHIO EDISONCOMPANY A. The licenseesare subjectto the followingantitrustconditions:
Changes in station design or operation or performance of tests or experiments which do not affect the environment are not subject to the requirements of this EPP. Activities governed by Section 3.3 are not subject to the requirements of this Section.Before engaging in additional construction or operational activities which may significantly affect the environment, the licensee shall prepare and record an environmental evaluation of such activity.
Definitions Applicantsshall meanthe two companieslistedabove.
Activities are excluded from this requirement if all measurable nonradiological environmental effects are confined to the on-site areas previously disturbed during site preparation and plant eonstrucjion.
Entityshall mean any electricgenerationand/or distributionsystem or municipalityor cooperativewith a statutoryright or privilegeto engage in either of these functions.
When the evaluation indieates that sueh activity involves an unreviewed environmental question, the licensee shall provide a written evaluation of such activity and obtain prior NRC approval.
Wheelinqshallmeantransportation    of electricityby a utilityover its linesfor anotherutility,includingthe receiptfrom and deliveryto anothersystemof like amountsbut not necessarilythe same energy.Federal PowerCommission,The 1970 NationalPowerSurvev,Part 1, P. 1-24-8.
Such activity and change to the EPP may be implemented only in accordance with an appropriate license amendment as set forth in Section 5.3 of this EPP.*"Licensee" refers to FirstEnergy Nuclear Operating Company, operator of the facility, and acting as agent for FirstEnergy Nuclear Generation, LLC, Ohio Edison Company, and The Toledo Edison Company, owners or lessees of the facility.
Licensinq Conditions (1) Applicants shallnotcondition thesaleor exchange     of wholesale   poweror coordination services uponthe conditionthatanyotherentity:
Proposed Page (1)(2)(3)Beaver Valley Unit 2 B-1 Amendment No.
(a) enterintoanyagreement    or understanding             the useof or alienation restricting                      of such energyor servicesto anycustomers      or territories; (b) enterintoanyagreement    or understanding   requiringthe receiving entityto,giveup anyother powersuppiyaitei-natives or io denyitseifanymai'keiopporii:niiies; (c) withdrawany ,petitionto interveneor foregoparticipation      in any proceeding beforethe NuclearRegulatory    Commission   or refrainfrominstigating    or prosecutinganyantitrust actionin anyotherforum.
APPENDIX D ADDITIONAL CONDITIONSOPERATING LICENSE NO. NPF-73 FirstEnergy Nuclear Operating Company, FirstEnergy Nuclear Generation, LLC, Ohio Edison Company, and The Toledo Edison Company shall comply with the following conditions on the schedules noted below: Proposed Page 87 Amendment Number 83 Additional Condition The licensee is authorized to relocate certain Technical Specification requirements to licensee-controlled documents.
AmendmentNo.}}
lmplementation of this amendment shall include the relocation of thesetechnical specification requirements to the appropriate documents, as described in thelicensee's application dated September 9, 1996,and evaluated in the staffs safety evaluationattached to this amendment.The licensee is authorized to relocate certainTechnical Specification requirements to licensee-controlled documents.
lmplementation of this amendment shall include the relocation of these technical specification requirements to theappropriate documents, as described in the licensee's application dated March 14, 1997, as supplemented July 29 and August 13, 1997, and evaluated in the staff's safety evaluation attached to this amendment.
The licensee is authorized to relocate certainTechnical Specification requirements to licensee-controlled documents.
lmplementation of this amendment shall include the relocation of these technical specification requirements to the appropriate documents, as described in the licensee's application dated September 11, 1997
,and evaii;aieci in ihe siaffs safeiii evaiuaiion attached to this amendment.
The licensee commits to perform visual acceptance examinations of sleeve welds; post weld heat treatmentof sleeve welds; and the NRC-recommended inspections of repaired tubes as described in the licensee's application datedMarch 10, 1997, as supplemented July 28, 1997 ,September 17,1997, April 30, 1998, and January 29, 1999, and evaluated in the staffssafety evaluation attached to this amendment.
lmplementation DateThe amendment shall be implemented within 60 daysfrom April 14,1997The amendment shall be implemented within 60 days fromDecember 10, 1997The amendmentshall be implementedwithin 30 days fromJanuary 20, 1998 The amendmentshall be implemented within 60 days fromMarch 26, 1999 88 98Beaver Valley Unit 2 D-1 Amendment No.
APPENDIX DADDITIONAL CONDITIONSOPERAT]NG LICENSE NO. NPF-73 FirstEnergy Nuclear Operating Company, FirstEnergy Nuclear Generation, LLC, Ohio EdisonCompany, and The Toledo Edison Company shall comply with the following conditions on theschedules noted below:
Proposed Page Amendment Number 102 151Additional Condition The licensee is authorized to relocate certainTechnical Specification requirements to licensee-controlled documents. lmplementation of thisamendment shall include the relocation of these Technical Specification requirements to theappropriate documents as described in thelicensee's application dated December 24, 1998, assupplemented June 15, June 17 , and July 7 , 1999,and evaluated in the staff's evaluation attached tothis amendment.
On the closing date(s) of the transfers to FENGenCo"of their interests in Beaver Valley Power Station, UnitNo. 2, Pennsylvania Power Company, The ClevelandElectric llluminating Company, Ohio Edison Company,and The Toledo Edison Company shall transfer to FENGenCo" all of each transferor's respectiveaccumulated decommissioning funds for Beaver ValleyPower Station, Unit No. 2, except for funds associated with the leased portions of Beaver Valley PowerStation, Unit No. 2, and tender to FENGenCo*additional amounts equalto remaining funds expectedto be collected in 2005, as represented in theapplication dated June 1, 2005, but not yet collected by the time of closing. All of the funds shall be depositedin a separate external trust fund for the reactor in thesame amount as received with respect to the unit to besegregated from other assets of FENGenCo* and^, ,.^3i^ :3^ ^..'*:^:^+-^3i.,^ ^^^9-^i ,i-^,.! L., t :D.^uul)tu5 ii9 ctLilliltltJUCtUvti uvtil.tLil,4D !<t'.iuilglr vy rrr\v regulations, and FENGenCo* shalltake all necessarysteps to ensure that this external trust fund ismaintained in accordance with the requirements of the order approving the transfer of the license andconsistent with the safety evaluation supporting theorder and in accordance with the requirements of10 CFR Section 50.75, "Reporting and recordkeepingfor decommissioning planning." (FENGenCo) has been renamed FirstEnergy Nuclear lmplementation DateThe amendmentshall be implemented within 60 daysfrom August 30, 1999The amendment shall be implemented within30 days fromDecember 16.
2005* FirstEnergy Nuclear Generation Corp.Generation. LLC.Beaver Valley Unit 2 D-2 Amendment No.
APPENDIX D ADDITIONAL CONDITIONS OPERATING LICENSE NO. NPF-73 FirstEnergy Nuclear Operating Company, FirstEnergy Nuclear Generation, LLC, Ohio Edison Company, and The Toledo Edison Company shall comply with the following conditions on the schedules noted below:
Proposed Page Amendment Number 151* FirstEnergy Nuclear Generation Corp.Generation, LLC.Additional Condition By the date of closing of the transfer of the ownership interests in Beaver Valley Power Station, Unit No. 2 from Pennsylvania Power Company to FENGenCo", FENGenCo* shall obtain a parent company guaranteefrom FirstEnergy in an initial amount of at least $80 million (in 2005 dollars) to provide additional decommissioning funding assurance regarding such ownership interests. Required funding levels shall be recalculated annually and, as necessary, FENGenCo" shall either obtain appropriate adjustments to the parent company guarantee or otheruvise provide any additional decommissioning funding assurance necessary for FENGenCo*
to meet NRC requirements under 10 CFR 50.75.The Support Agreements described in the applications dated May 18, 2005 (up to $80 million), and June 1, 2005 (up to $400 million), shall be effective consistent with the representations contained in the applications.
FENGenCo*
shalltake no action to cause FirstEnergy,or its successors and assigns, to void, cancel, or modify the Support Agreements without the prior written consent of the NRC staff, except, however, the $80 million Support Agreement in connection with the transfer of the Pennsylvania Power Company interests may be revoked or rescinded if and when the $400 million support agreement described in the June 1, 2005, application becomes effective. FENGenCo*
shall infoi'm ihe Dii'ecioi'of ihe Office of tiiucieai'Reacior Regulation, in writing, no later than ten days after any funds are provided to FENGenCo" by FirstEnergy under either Support Agreement.
lmplementation Date The amendmentshall be implemented within 30 days fromDecember 16,2005 (FENGenCo) has been renamed FirstEnergy Nuclear Beaver Valley Unit 2 D-3 Amendment No.
APPENDIX D Proposed Page ADDITIONAL CONDITIONS OPERAT]NG LICENSE NO. NPF-73 FirstEnergy Nuclear Operating Company, FirstEnergy Nuclear Generation, LLC, Ohio Edison I Company, and The Toledo Edison Company shall comply with the following conditions on the I schedules noted below: Amendment Additional Condition Number 161 Schedule for New and Revised Surveillance Requirements (SRs)The schedule for performing SRs that are new or revised in The Amendment No. 161 shall be as follows:
lmplementation Date amendmentshall be For SRs that are new in this amendment, the first performance implementedis due at the end of the first surveillance interval, which begins within 150 daysfrom date of issuance on the date of implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being reduced, the first reducedsurveillance interval begins upon completion of the first surveillance performed after implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being extended, the first extendedsurveillance interval begins upon completion of the last surveillance performed prior to implementation of this amendment.
For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance subject to the modified acceptance criteria is due at the end of the first surveillance interval that began on the date the surveillance was last performed prior to the implementation of this amendment.
141 Relocation of eedaln Technleal Specifieation Requirernents License Amendment No. 161 authorizes the relocation of certain The Technical Specifications to other licensee-controlled documents. amendment lmplementation of this amendment shall include relocation of the shall be requirements to the specified documents, as described in implemented (1) Sections 4D and 4E of the NRC staffs Safety Evaluation, and within 150 days (2) Table LA, Removed Detail Changes, and Table R, Relocated from date of Specifications, attached to the NRC staffs Safety Evaluation, issuance which is enclosed in this amendment.
Beaver Valley Unit 2 D-4Amendment No.
APPENDIX DADDITIONAL CONDITIONSOPERATING LICENSE NO. NPF-73 FirstEnergy Nuclear Operating Company, FirstEnergy Nuclear Generation, LLC, Ohio Edison Company, and The Toledo Edison Company shall comply with the following conditions on the schedules noted below: Proposed Page Amendment Number 163Additional Condition lnitial Performance of New Surveillance and Assessment RequirementsUpon implementation of Amendment No. 163 adopting TSTF-448,Revision 3, the determination of control room envelope (CRE)unfiltered air inleakage as required by Surveillance Requirement (SR) 3.7.10.4, in accordance with Specification 5.5.14.c(i), the assessment of CRE habitability as required by Specification5.5.1a.c(ii), and the measurement of CRE pressure as required bySpecification 5.5.14.d, shall be considered met. Following implementation: (a) The first performance of SR 3.7.10.4, in accordance with Specification 5.5.14.c(i), shall be within the specifiedFrequency of 6 years, plus the 18-month allowance ofSR 3.0.2, as measured from the date of the most recentsuccessful tracer gas test, or within the next 18 months ifthe time period since the most recent successfultracer gas test is greater than 6 years.(b) The first performance of the periodic assessment of CREhabitability, Specification 5.5.14.c(ii), shall be within 3 years, plus the 9-month allowance of SR 3.0.2, as measured from the date of the most recent successful tracer gas test, or within the next 9 months if the time period since the most recent successful tracer gas test is greater than 3 years.(c) The iii-si pei-fcrmance of ihe pei'iociic measiii'ement of CRE pressure, Specification 5.5.14.d, shall be within 18 months, plus the 138 days allowed by SR 3.0.2, as measured fromthe date of the most recent successful pressure measurement test.lmplementation Date The amendmentshall be implementedwithin 120 days from date of issuance Beaver Valley Unit 2 D-5 Amendment No.
Attachment 7Proposed Davis-Besse Nuclear Power Station, Unit No. 1Operating License Changes (Re{yped - For Information Only)(Seven Pages Follow)
Proposed Page UNITED STATESNUC LEAR REGU LATORY COMMISSIONwASHtNGTON, D.C. 20555-0001 FIRSTENERGY NUCLEAR OPERATING COMPANY FIRSTENERGY NUCLEAR GENERATION, LLC DOCKET NO. 50-346 DAVIS-BESSE NUCLEAR POWER STATION I'NIT NO. 1 FACILITY OPERATING LICENSE The License No. NPF-3 Nuclear Regulatory Commission (the Commission) having found that:The application for license filed by FirstEnergy NucLear Operating Company (FENOC) 1, acting on its own behalf and as agent for FirstEnergy Nuclear Generation, LLC (Iicensees) complies with the standards and reguirements of the Atomic Energy Act of L954, as amended (the AcU), and the Commission's rules and regulations set forth in 10 CFR Chapt,er I and all reguired notifications to other agencies or bodies have been duly made; Construction of the Davis-Besse NucLear power Station, Unit No. 1 (tshe facility) has been substantially completed in conformity with Construction Permit No. CppR-80 and the application, as amended, the provisions of the Act and the rul_es and regulationsof the Commission;The facility will operat,e in conformity with the applicaEion, as amended, the provisions of t.he Act, and the rules and regulations of the Commission; FENOC j-s aut,horized t.o act as agent for FirstEnergy Nuclear GeneraLion, LLC, and has exclusive responsibility and control over the physical construction, operaiion, anci maintenance of the facility.
AND A.B.c.L-1Amendment No.
Proposed Page-2-1. D.There is reasonable assurance: (i) that the activities authorized by this operating license can be eonduct.ed withoutendangering the health and safety of the public, and (ii) Ehatsuch activities wil-l be conducted in compliance with the rulesand regulat,ions of the Commission; E. The FirstEnergy Nuclear Operat,ing company is technically qualified and the Ii-censees are financially qualified to engage in the activities authorized by this operating license in accordance with the rules and regulaLions of t.he Commission; The licensees have satisfied the applicable provisions of 10 CFRPart l-40, rrFinancial Protect.i-on Reguirements and Indemnity Agree-menLs," of Lhe Commission's regulations; The issuance of this operating l-icense will" not be inimicalthe common defense and securitv or to the health and safetv the public,.H. After weighing the environmental, economic, technical, and oLher benefi-ts of the facility against environmental and other costs and considering available alternaLives, Ehe issuance of Facility Operating License No. NPF-3 subject to the condj-tions for protection of the environment seL fort,h herein is in accordance with 10 CFR Part 51- (formerly Appendix D to 10 CFR Part 50), ofthe Commission's regulations and all applicable reguirements have been satisfied; and I. The receipt., possession, and use of source, blproduct and special nuclear materiaL as authorized by thi-s license wj be in accord-ance wit.h the Commission's regulations in l-0 CFR Part 30, 40,and 70, including 10 CFR Sect.ions 30.33, 40.32,70-23, and 70.31.
Facilit.y Operat,ing License No. NPF-3 is hereby issued Lo FirstEnergy Nuclear Operating Company (FENOC), and First.Energy Nuclear Generation, LLC t.o read as follows:
A. This l-icense applies to the Davis-Besse Nuc'lear Power Station, Uni-t No. 1, - pr"""rrrized water nuclear reactor and associated equi-pment (the facility), owned by FirstEnergy Nuclear Generation, IJLC. The facility is located on the south-western shore of Lake Erie in Ottawa CounLy, Ohio, approximately 21 miles east of Toledo, Ohio, and is described in the "Fina1 Safety Analysis Report" as supplemented and amended (Amendments 14through 44) and the Environmental ReporL as supplemented and amended (Supplements 1 through 2).
of L-2 Amendment No.
Proposed Page2 .8.-5 Subject. to the conditions and requirements incorporated herein,the Commission herebv licenses:
(1) FENOC, pursuant to Section 103 of t,he Act and 10 CFR Part. 50, 'rLicensing of Product,ion and Utilization Facilities,tt to possess, use, and operate the facility; (2) FirstEnergy Nuclear Generation, LLC, to possess the facility at the designated locat,ion in Ottawa County, Ohio in accordance with the procedures and limitations set forth i-n this l-icense; (3) FENOC, pursuant to the Act. and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations forstorage and amounts required for reactor operation, asdescribed in the Final Safety Analysis Report, as suppJ-emented and amended;(4) FENOC, pursuant to the Act and 10 CFR parts 30, 40, and 70to receive, possess and use at any time any byproduct, source and special nucl-ear mat,erial as sealed neuLron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring eguipment ca]ibration, and as fission detectors in amounts asramli raA.. vYgrl vg, (5) FENOC, pursuanL to the Act and 10 CFR Parts 30, 40 and 70,to receive, possess and use in amounts as required any blproduct, source or special- nuclear material_ wit,hout restrict.ion Lo chemical or physical form, for sample analysis or instrument.
cal-ibration or associated with radioactive apparatus or components; and (5) FENOC, pursuant t.o the Act and l-o CFR part,s 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operat,ion ofthe facil_ity.
L-3Amendment No. 2.C. This license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations inl0 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.4Iof Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (l) Maximum Power LevelFENOC is authorized to operate the facility at steady state reactor core power levels not in excess of 2817 megawatts (thermal).
Prior to attaining the power level, Toledo Edison Company shall comply with the conditions identified in Paragraph (3) (o) belowand complete the preoperational tests, startup tests and other items identified in Attachment 2 to this license in the sequencespecified. Attachment 2 is an integral part of this license.(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. , are hereby incorporated in the license. FENOC shall operate the facility in accordance with the Technical Specifications.
(3) Additional Conditions The matters specified in the following conditions shall be completed to the satisfaction of the Commission within thestated time periods following the issuance of the license or within the operational restrictions indicated. The removal of these conditions shall be made by an amendment to the license supported by a favorable evaluation by the Commission: (a\ FF.Nf}C chell nnf nnprefc fhe rcanfnr in nneraf inrral Modes I and? with less than three reactor coolant pumps m operatlon.Deleted per Amendment 6 Deleted per Amendment 5 Proposed Page (b)
(c)L-4Amendment No.
Proposed Page-5-2.C(4) fire ProtectionFENOC shaf] implement and maintain in effect al} provisionsof the approved Fire Protection Program as described in t,he Updated Safety Analysis Report and as approved in the SERsdated JuIy 26, L979, and May 30, !99:.-, subject Lo the following provision:FENOC may make changes to the approved Fire Protection Program without prior approval of the Commission only if those changes would noE adversely affect the ability to achieve and maintain safe strutdown in Lhe event of a fire -Del-eted per Amendment No.
279.Antit.rust ConditionsFENOC and FirstEnergy Nuclear Generation, LLC shall complywiLh the antitrust conditions delineated in Condition 2.8of this license as if named therein. FENOC shall not market or broker power or energy from the Davis-BesseNucl-ear Power Station, Unit No. 1. FirstEnergy Nuclear Generation, LLC is responsible and accountabfe for the actions of FENOC to the extenE that said actions affect the marketing or brokering of power or energy from Ehe Davis-Besse Nuclear Power Station, Unit No. 1, and in any way, conLravene the antiLrust license conditions contained inthe license.(s)(6)L-6 Amendment No.
Proposed Page 3.-l-4-G. In accordance with the requirement imposed by the October 8, L9'76, order of the United States Court of Appealsfor the Dist,rict of Columbia CircuiL in Natural Resources Defense Council v. Nuclear Regulatory Commission, No.
74-L385and 74-1586, that Lhe Nucl-ear Regulatory Commission "shalL make any licenses granted between July 21, 19'76 and such time when the mandate is issued subject to the outcome of such proceedings herein," Ehis license shall be subject to theoutcome of such proceedings.
H. This license is effective as of the date of issuance and shal-l-expire at midnight, April 22, 20L7.Based on the Commission's Order dated December 15, 2005 and conforming Amendment No. 270 dated December 15, 2OO5 regardingthe direct.
transfer of the license from the Cleveland Electric Il-luminating Company (CLeveland Electric) and Lhe Toledo Edison Company (Toledo ndison) to FirstEnergy NucLear Generation Corp.(FENGenCo)*, FirstEnergy Nuclear Operating Company and FENGenCo*
shall comply with the following conditions noted bel_ow:
A. On t.he closing date of the transfers to FENGenCo* of their interesLs in Davis-Besse, Cleveland Electric and Toledo Edisonshal-l- transfer to FENGenCo*
all of each transferor, s respective accumulated decommj-ssioning funds for Davis-Besse and tender to FENGenCo*
additional amounEs equal to remaining funds expected to be collected in 2005, as represented in t,he application dated June 1, 2005, but not yet collected by the time of closing. AlI of the funds shatl be deposited in a separate external trust fund for the reactor in the same amount as received with respecE to the unj_t to be segregated from other assets of FENGenCo* and out,side its administrative controL, as reqluired by NRC regulaEions, and FENGenCo*
shalltake all necessary sleps to ensure that this external_
trust fund is maintained in accordance with t,he requirements of the order approving the transfer of the license and consistent with the safety evaluation supporting the order and in accordance with the reguirements of 10 CFR SecLion 50.75,"Reporting and recordkeeping for decommissioning planning.,'
* FirstEnergy Nuclear Generation Corp. (FENGenCo)*
has been renamed FirstEnergy Nuclear Generation, LLC.L-T4Amendment No.
Proposed Page- 14A-The Support Agreement described in the application dated June 1, 2005 (up to $400 million), shall be effectj-ve consistent with the representations contained in t.he application.
FENGenCo*shall take no action to cause FirstEnergy, or its successors andassigns, to void, cancel, or modify t.he Support Agreement without the prior written consenL of the NRC staff.
FENGenCo*
shalfinform the Director of the Office of Nuclear ReacEor Regulation,in writing, no lat.er than ten days after any funds are providedto FENGenCo* by FirstEnergy under either Support Agreement.FOR THE NUCLEAR REGULATORY COMMISSIONOriginal- Signed by R. C. DeYourxg (for)Roger S. Boyd, Di-rectorDivision of Project ManagementOffice of Nuclear Reactor Regulation Attachments:
: 1. Appendices A & B - Technical Specifications2. Preoperational-Tests, Startup Tests and OLher Items Which Must Be Completed Prior to Proceeding Lo Succeeding Operational Modes Date of Issuance: (APR 22 1977)* FirstEnergy Nuclear Generation Corp. (FENGenCo)*
has been renamed FirstEnergy Nuclear Generation.
LLC.L- 14A Amendment No. Proposed Perry Nuclear Power Plant, Unit No. 1Operating License Changes (Re-typed - For Information Only)(Seven Pages Follow)
Proposed PageUNITED STATESN UCLEAR REGULATORY COMMISSIONWASHTNGTON, D.C.
29555-0001FIRSTENERGY NUCLEAR OPERATING COMPANYFIRSTENERGY NUCLEAR GENERATION.
LLCOHIO EDISON COMPANYDOCKET NO.50440PERRY NUCLEAR POWER. PLANT. UNIT NO. 1FAC ILITY OPERATING LICENSELicense No.
NPF-58 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for license filed by FirstEnergy Nuclear Operating Company (FENOC)Iacting on its own behalf and as agent for Firiienergy Nuilear GJneration, LLC and Ohio IEdison Company, (licensees) complies with the standards and requirements of theAtomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter l, and all required notifications to other agencies or bodies havebeen duly made; B. Construction of the Perry Nuclear Power Plant, Unit No. 1 (the facility), has been substantially completed in conformity with Construction Permit No. CPPR-148 and the application, as amended, the provisions of the Act, and the regulations of the Commission:
tFEtrtOC is authorized to act as agent for FirstEnergy Nuclear Generation, LLC and Ohio Edison Company, and has exclusive responsibility and control over the physical construction,operation, and maintenance of the facility.Amendment No.
Proposed Page-2-C. The facility willoperate in conformity with the application, as amended, the provisions ofthe Act, and the regulations of the Commission (except as exempted from complianee in Section 2.D below);
D. There is reasonable assurance: (l) that the activities authorized by this operating licensecan be conducted without endangering the health and safety of the public, and (ii) thatsuch activities will be conducted in compliance with the Commission's regulations setforth in 10 CFR Chapter l (except as exempted from compliance in Section 2.D below);
E. The FirstEnergy Nuclear Operating Company is technically qualified to engage in theactivities authorized by this license in accordance with the Commission's regulations set forth in 10 CFR Chapter l;F. The licensees have satisfied the applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and lndemnity Agreements," of the Commission's regulations; G. The issuance of this license will not be inimical to the common defense and security or tothe health and safety of the public;H. After weighing the environmental, economic, technical, and other benefits of the facilityagainst environmental and other costs and considering available alternatives, the issuance of this Facility Operating License No. NPF-58, subject to the conditions for protection of the environment set forth in the Environmental Protection Plan attached as Appendix B, is in accordance with 10 CFR Part 51 of the Commission's regulations and allapplicable requirements have been satisfied; andl. The receipt, possession, and use of source, byproduct, and special nuclear material as authorized by this license willbe in accordance with the Commission's regulations in 10CFR Parts 30, 40, and 70.2. Based on the foregoing findings regarding this facility, the Partial-lnitial Decisions issued December 2, 1983, and September 3, 1985, by the Atomic Safety and Licensing Board in regard to this facility (affirmed by ALAB-841, dated July 25, 1986) and pursuant to approval bythe Nuclear Regulatory Commission at a meeting on November 7, 1986, Facility Operating License No. NPF-58, which supersedes the license for fuel loading and low power testing, License No. NPF-45, issued on March 18, 1986, is hereby issued to FirstEnergy Nuclear Operating Company, FirstEnergy Nuclear Generation, LLC, and Ohio Edison Company, (the licensees) to read as follows:A. The iicense appiies to ihe Pei-i-y i.iucieai' Power Plani, Unit l.!o. '1, a boiiing waier nuciear reactor and associated equipment (the facility), owned by FirstEnergy NuclearGeneration, LLC (owner) and leased to Ohio Edison Company (lessee) (collectively the licensees).
Amendment No. Proposed PageThe facility is located on the shore of Lake Erie in Lake County, Ohio, approximately35 miles northeast of Cleveland, Ohio, and is described in the licensees' Final Safety Analysis Report, as supplemented and amended, and in the licensees' Environmental Report, as supplemented and amended.B. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:
(1) FENOC, pursuant to Section 103 of the Act and 10 CFR Part 50, to possess, use, and operate the facility at the designated location in Lake County, Ohio, in accordance with the procedures and limitations set forth in this license;(2) FirstEnergy Nuclear Generation, LLC and Ohio Edison Company, to possess the facility at the designated location in Lake County, Ohio, in accordance with the procedures and limitations set forth in this license:
FENOC, pursuant to the Act and 10 CFR Part 70, to receive, possess, and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; FENOC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source, and special nuclear material such as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and fission detectors in amounts as required; FENOC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear materialwithout restriction as to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) FENOC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
(7)(a) Ohio Edison Company is authorized to transfer any portion of its 30.0% ownership share of PNPP Unit1 and a proportionate share of its interest in the PNPP common facilities to certain equity investors identified in its submission of January 23, 1987 , as supplemented on March 3, 1987, and at the same time to lease back from such purchasers such interest sold in the PNPP Unit 1 facility. The term of the lease is for approximately 29%
years subject to a right of (3)(4)(5)Amendment No.
Proposed Page-4-renewal. Such sale and leaseback transactions are subject to therepresentations and conditions set forth in the above mentioned application of January 23, 1987 , as supplemented on March 3, 1987, as well as the letter of theDirector of the Office of Nuclear Reactor Regulation dated March 16, 1987,consenting to such transactions.
Specifically, a lessor and anyone else who mayacquire an interest under these transactions are prohibited from exercisingdirectly or indirectly any control over the licenses of PNPP Unit 1. For purposesof this condition the limitations of 10 CFR 50.81, as now in effect and as may be subsequently amended, are fully applicable to the lessor and any successor ininterest to that lessor as long as the license for PNPP Unit 1 remains in effect;these financial transactions shall have no effect on the license for the PerryNuclear facility throughout the term of the license.(b) Further, the licensees are also required to notify the NRC in writing prior to any change in: (i) the terms or conditions of any lease agreements executed as partof these transactions; (ii) the PNPP Operating Agreement; (iii) the existing property insurance coverage for PNPP Unit 1; and (iv) any action by a lessor orothers that may have an adverse effect on the safe operation of the facility.C. This license shall be deemed to contain and is subject to the conditions specified inthe Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditionsspecified or incorporated below:
(1) Maximum Power LevelFENOC is authorized to operate the facility at reactor core power levels not inexcess of 3758 megawatts thermal
('100o/o power) in accordance with theconditions specified herein.(2) TechnicalSpecifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.are hereby incorporated into the license. FENOC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan (3) AntitrustConditions6 f ;.-iE^^r^., i.i, '-i^ar /laaaralian l ! i-
-:irr,l l1!''ir. F,-lic,rn i/].-rn-,n=ni/o- l rrJLLrrElv)f l!uvlgqt vgrrvrqfrvrr, LLv srrv vlllv Lvrevrl Amendment No. H. This license is effective as of the date of issuance and shall expire at midnight on March 18, 2026.3. Based on the Commission's Order dated November 15. 2005 and the Commission's revised Order dated December 16, 2005 and conforming Amendment No. 137 dated December 16, 2005 regardingthe direct transfer of the license from Pennsylvania Power Company, Ohio Edison Company, OES Nuclear, Inc., The Cleveland Electric llluminating Company, and the Toledo Edison Company, to FirstEnergy Nuclear Generation Corp. (FENGenCo)*, FirstEnergy Nuclear Operating Company and FirstEnergy Nuclear Generation Corp.* shall comply with the following conditions noted below:
On the closing date(s) of the transfers to FENGenCo* of their interests in Perry, PennsylvaniaPower Company, The Cleveland Electric llluminating Company, Ohio Edison Company, OES Nuclear, lnc., and Toledo Edison Company shall transfer to FENGenCo* all of each transferor's respective accumulated decommissioning funds for Perry, except for funds associated with the leased portions of Perry, and tender to FENGenCo* additional amounts equal to remaining fundsexpected to be collected in 2005, as represented in the application dated June 1,2005, but not yet collected by the time of closing.
All of the funds shall be deposited in a separate external trust fund for the reactor in the same amount as received with respect to the unit to be segregated from other assets of FENGenCo* and outside its administrative control, as required by NRC regulations, and FENGenCo" shall take alt necessary steps to ensure that this external trust fundis maintained in accordance with the requirements of the order approving the transfer of thelicense and consistent with the safety evaluation supporting the order and in accordance with the requirements of 10CFR Section 50.75, "Reporting and recordkeeping for decommissioning planning." By the date of closing of the transfer of the ownership interests in Perry from Pennsylvania Power Company to FENGenCo*, FENGenCo* shall obtain a parent company guarantee from FirstEnergy in an initial amount of at least $80 million (in 2005 dollars) to provide additional decommissioning funding assurance regarding such ownership interests. Required funding levels shall be recalculated annually and, as necessary, FENGenCo* shall either obtain appropriate adjustments to the parent company guarantee or otherwise provide any additional decommissioning funding assurance necessary for FENGenCo* to meet NRC requirementsunder 10 CFR 50.75.
* FirstEnergy Nuclear Generation Corp. (FENGenCo)" has been renamed FirstEnergy NuclearGeneration, LLC.
Proposed Page B.Amendment No. Proposed Page c.The Support Agreements described in the applications dated May 18, 2005 (up to $80 million),and June 1,2005 (up to $400 million), shall be effective consistent with the representationscontained in the applications. FENGenCo* shalltake no action to cause FirstEnergy, or itssuccessors and assigns, to void, cancel, or modify the Support Agreements without the prior written consent of the NRC staff, except, however, the
$80 million Support Agreement inconnection with the transfer of the Penn Power interests may be revoked or rescinded if andwhen the $400 million support agreement described in the June 1,2005, application becomeseffective. FENGenCo" shall inform the Director of the Office of Nuclear Reactor Regulation, in writing, no later than ten days after any funds are provided to FENGenCo* by FirstEnergy undereither Support Agreement.FOR THE NUCLEAR REGULATORY COMMISSIONORIGINAL SIGNED BY:Harold R. Denton, Director Office of Nuclear Reactor RegulationAttach ments/Appendices1. Attachments 1 - 2 2. Appendix A - Technical Specifications (NUREG -1204\3. Appendix B - Environmental Protection Plan4. Appendix C - Antitrust ConditionsDate of lssuance:
November 13. 19Bo* FirstEnergy Nuclear Generation Corp. (FENGenCo)* has been renamed FirstEnergy Nuclear Generation, LLC.Amendment No.
Proposed Page APPENDIX CPERRY NUCLEAR POWER PLANT. UNIT NO. 1 NPF-58ANTITRUST CONDITIONS FOR FIRSTENERGY NUCLEAR GENERATION.
LLCOHIO EDISON COMPANYA. The licensees are subject to the following antitrust conditions:
Definitions Applicants shall mean the two companies listed above.Entity shall mean any electric generation and/or distribution system or municipality or cooperative with astatutory right or privilege to engage in either of these functions.Wheelinq shall mean transportation of electricity by a utility over its lines for another utility, including the receipt from and delivery to another system of like amounts but not necessarily the same energy.
Federal Power Commission, The 1970 National Power Survev, Part 1 , P. 1-24-8.Licensinq Conditions (1) Applicants shall not condition the sale or exchange of wholesale power or coordination servicesupon the condition that any other entity: (a) enter into any agreement or understanding restricting the use of or alienation of suchenergy or services to any customers or territories;(b) enter into any agreement or understanding requiring the receiving entity to, give up any other power suppiy aitei-natives or io deny itseif any mai'kei opporii:niiies;(c) withdraw any ,petition to intervene or forego participation in any proceeding before theNuclear Regulatory Commission or refrain from instigating or prosecuting any antitrust action in any other forum.Amendment No.}}

Latest revision as of 23:59, 6 February 2020

License Amendment Request to Change the Name of an Owner Licensee to Firstenergy Nuclear Generation, LLC
ML112640246
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 09/20/2011
From: Sena P
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-11-28
Download: ML112640246 (88)


Text

{{#Wiki_filter:FENOC F ig. Endgy ttuct@t OqatineCqnpanF 341 ll/hite Pond Dr. Akron. Ohio 44320 September 20,2011 L-11-282 10 cFR 50.90 ATTN:Document ControlDesk U.S.NuclearRegulatory Commission Washington, DC 20555-0001

SUBJECT:

BeaverValleyPowerStation,UnitNos.1 and2 DocketNo.50-334,LicenseNo. DPR-66 DocketNo.50-412,LicenseNo. NpF-73 Davis-Besse NuclearPowerStation,UnitNo. 1 DocketNo.50-346,LicenseNo. NPF-3 PerryNuclearPowerPlant,UnitNo. 1 DocketNo.50-440,LicenseNo. NPF-58 LicenseAmendment Requestto Chanoethe Nameof an OwnerLicensee to FirstEnerqy NuclearGeneration. LLC In accordance withthe provisionsof 10 CFR50.90,FirstEnergy NuclearOperating Company(FENOC)is submitting a requestfor amendments to the operating ficenses(OLs)of BeaverVafleyPowerStation,UnitNos. 1 and2; Davis-Beise NuclearPowerStation,UnitNo. 1 (DBNPS);and PerryNuclearPowerPlant,Unit No. 1 (PNPP).The proposedamendment is administrative in natureandwill revise the licensesto reflectthe namechangeof an ownerlicenseefrom "FirstEnergy NuclearGeneration corp."to "FirstEnergyNuclearGeneration, LLC." The proposedamendment willalsocorrecterrorsregardingthe nameof FirstEnergy NuclearGeneration Corp.in the DBNPSand pNpp OLs. The enclosurecontainsan evaluationof the proposedamendment.Attachmentsin the enclosureprovidethe pagesof the existingols markedup to showthe proposedchanges,and OL pageswiththe proposedchangesincorporated for information only. NRCapprovalis requested by December15,2011 withthe amendments being implemented within120days.

BeaverValleyPowerStation,UnitNos.1 and2 Davis-Besse NuclearPowerStation,UnitNo. 1 PerryNuclearPowerPlant,UnitNo. 1 L-!1-282 Page2 Thereare no regulatory commitments containedin thissubmittal.lf thereare any questionsor if additionalinformation pleasecontactMr. PhilH. Lashley, is required, Supervisor - FleetLicensing, at (330)315-0808. I declareunderpenaltyof perjurythatthe foregoingis trueandcorrect.Executed on September to ,2011. Sincerely,

    /1     ..1    q
  /t/
  • v{/-6r'\-----

lf7/\ PeterP. Senalll President and ChiefOperating Officer

Enclosure:

EVALUATION OF PROPOSED LICENSE AMENDMENT cc: NRCRegionlAdministrator NRCRegionlll Administrator NRCProjectManager- BeaverValleyPowerStation NRCProjectManager- Davis-Besse NuclearpowerStation NRCProjectManager- PerryNuclearPowerplant NRCResidentInspector - BeaverValleyPowerStation NRCResidentInspector - Davis-Besse NuctearpowerStation NRCResidentInspector PerryNuclearpowerplant DirectorBRP/DEP Site Representative BRP/DEP ExecutiveDirector, OhioEmergency Management Agency, Stateof Ohio(NRCLiaison) UtilityRadiologicalSafetyBoard

EVALUATION OF PROPOSED LICENSE AMENDMENT Page1 of7

Subject:

Amendment Requestto changethe narneof an ownerlicenseeof the BeaverValleyPowerStation,UnitNos.1 and2; Davis-Besse NuclearPower Station,UnitNo. 1; andPerryNuclearPowerPlant,UnitNo. 1. 1.0

SUMMARY

DESCRIPTION 2.0 DETAILED DESCRIPTION

   -IECHNICAL 3.0             EVALUATION

4.0 REGULATORY EVALUATION

4.1 SignificantHazards Consideration 4.2 Applicable RegulatoryRequirements/Criteria 4.3 Precedent 4.4 Conclusions 5.0 ENVIRONfVIENTAL CONSIDERATION

6.0 REFERENCES

ATTACHMENI'S: 1" ProposedBeaverVafleyPowerStation,UnitNo. 1 OperatingL.icense Changes(MarkUp)

2. ProposedBeaverValleyPowerStation,UnitNo.2 OperatingLicense Changes(VlarkUp)
3. ProposedDavis-Besse NuclearPowerStation,UnitNo. 1 OperatingLicense Changes(MarkUp)
4. Proposed PerryNuclearPclwerPlant,UnitNo. 1 OperatingLicenseChanges (MarkUp)

Page2

5. ProposedBeaverValleyPowerStation,UnitNo. 1 OperatingLicenseChanges
       - For lnformation (Re-typed               Only)
6. ProposedBeaverValleyPowerStation,UnitNo.2 OperatingLicenseChanges (Re{yped- For lnformation Only)
7. ProposedDavis-BesseNuclearPowerStation,UnitNo. 1 OperatingLicense Changes(Retyped- For Information Only)
8. ProposedPerryNuclearPowerPlant,UnitNo. 1 OperatingLicenseChanges
       - For Information (Re-typed               Only)

Page3 1.0

SUMMARY

DESCRIPTION Thisevaluation supportsa requestto amendthe operatinglicensesof Beaver ValleyPowerStation,UnitNos.1 and 2 (DPR-66and NPF-73,rspectively); Davis-Besse NuclearPowerStation,UnitNo. 1 (NPF-3);and PerryNuclear PowerPlant,UnitNo. 1 (NPF-58).The proposedamendment will revisethe licensesto reflectthe new nameof one of the ownerlicenseesof the aforementioned whichhaschangedfrom"FirstEnergy facilities Nuclear Generation Corp."to "FirstEnergy NuclearGeneration, LLC." 2.0 DETAILED DESCRIPTION FirstEnergy NuclearGeneration Corp.is an ownerlicenseefor the following NuclearRegulatory Commission (NRC)facilities:

   . 100o/oof BeaverValleyPowerStation,UnitNo. 1 (BVPS-1)
   . 60.08%of BeaverValleyPowerStation,UnitNo.2 (BVPS-2) o  100o/oof Davis-Besse  NuclearPowerStation,UnitNo. 1 (DBNPS) o  87.42o/oof PerryNuclearPowerPlant,UnitNo. 1 (PNPP)

FirstEnergy Corp.(FE),the overallparentof FirstEnergy NuclearGeneration Corp.,proposesconverting FirstEnergy NuclearGeneration Corp.froma corporation organizedunderthe lawsof the Stateof Ohioto a limitedliability company(LLC)organized underthe lawsof the Stateof Ohio. The proposed conversion willoccurby operationof the Stateof Ohiolaw. As a result, FirstEnergy NuclearGeneration Corp.willchangeits nameto FirstEnergy NuclearGeneration, LLC. Therefore, the operatinglicensesfor the aforementioned unitswill needto be amendedto reflectthe revisedcompany name. The proposedamendment will alsocorrecterrorsin the DBNPSand PNPP operatinglicensesregarding the nameof FirstEnergy NuclearGeneration Corp. Theword"Nuclear" was inadvertently omittedin an entryin bothoperating licenses,andthe word"Corporation" was inadvertently usedinsteadof "Corp."in the DBNPSoperating license. Mark-upsof the BeaverValleyPowerStation,UnitNos.1 and 2; Davis-Besse NuclearPowerStation,UnitNo.1; andPerryNuclearPowerPlant,UnitNo.1 operatinglicensesreflecting thesechangesare includedin Attachments 1 through 4, respectively. For informational purposesonly,typedversionsof the BeaverValleyPower Station,UnitNos.1 and2; Davis-Besse NuclearPowerStation,UnitNo.1; and PerryNuclearPowerPlant,UnitNo. 1 operatinglicensesreflecting thesechanges are includedin Attachments 5 through8, respectively.

Page4 3.0 TECHNICAL EVALUATION FirstEnergy NuclearGeneration Corp.will be converted to an OhioLLCpursuant to Sections1701.792and1705.361 of the Ohio Revised Code. The entity, previously knownas FirstEnergy NuclearGeneration Corp.,will remainthe ownerlicenseebothbeforeand afterthe conversion, butwill havea new corporate formas a limitedliabilitycompany.In accordance withSection 1705.391of the OhioRevisedCode,thisentitywill remainresponsible for providing fundingfor the operation of its ownership sharesin the above-listed facilitiesandfulfillall otherobligations as an ownerlicensee,includingproviding decommissioning fundingassurance for its ownership sharesin compliance with 10 CFR50.75.Therewillbe no ownership or management changesas a result of the conversion.The proposed conversion will resultin a namechangefor this entity.The namewillbecome"FirstEnergy NuclearGeneration, LLC." The proposed amendment willchangethe operating licenses for BVPS-1, BVPS-2,DBNPS,andPNPPto reflectthischange.The proposed amendment is considered administrative in nature.

4.0 REGULATORY EVALUATION

The FirstEnergy NuclearOperating Company(FENOC)requestsNuclear Regulatory Commission (NRC)reviewandapprovalof an amendment to change the nameof an ownerlicenseeof BeaverValleyPowerStation,UnitNos.1 and2; Davis-Besse NuclearPowerStation, UnitNo.1; andPerryNuclearPowerPlant, UnitNo. 1. The proposed amendment willrevisethe nameof ownerlicensee FirstEnergy NuclearGeneration Corp.to FirstEnergy NuclearGeneration, LLC. 4.1 Siqnificant HazardsConsideration FENOChasevaluated whetheror nota significant hazardsconsideration is involvedwiththe proposedamendment by focusingon the threestandards set forthin 10 CFR50.92,"lssuance of amendment," as discussed below.

1. Doesthe proposedamendment involvea significant increasein the probability or consequences of an accidentpreviously evaluated?

Response:No. The proposedamendment changesa nameof an ownerlicensee.The proposed amendment is considered administrative in nature.Thefunctionsof the owner licenseewill not change.Thereis no impactuponthe otherfacilitylicensees.

Page5 FENOCwill remainthe operatorof the facilities.The proposedamendment does notalterthe design,function,or operationof any plantequipment. As such, the accidentandtransientanalysescontainedin the facilityupdatedfinalsafety analysisreportswill not be impacted.Therefore, the proposedamendment does notaffectthe probability or consequences of an accidentpreviously evaluated.

2. Doesthe proposedamendment createthe possibility of a newor differentkind of accidentfromanyaccidentpreviously evaluated?

Response:No. The proposedamendment is considered administrative in nature.Thefunctions of the ownerlicenseewill notchange.The proposedamendment doesnotalter the design,function,or operationof any plantequipment.Therefore, the proposedamendment doesnotcreatethe possibilityof a newor differentkindof accidentfromany accidentpreviously evaluated.

3. Doesthe proposedamendment involvea significant reductionin a marginof safety?

Response:No. The proposedamendment is a namechangeto reflectthe newnameof an ownerlicensee.The proposedamendment is considered administrative in nature.Thefunctionsof the ownerlicenseewill notchange.Thereis no impact uponthe otherfacilitylicensees.FENOCwill remainthe operatorof the facilities. The proposedamendment doesnot alterthe design,function,or operationof any plantequipment.As such,the accidentandtransientanalysescontainedin the facilityupdatedfinalsafetyanalysisreportswill not be impacted.Therefore, the proposedamendment doesnot involvea significant reductionin a marginof safety. Basedon the above,FENOCconcludes thatthe proposedamendment doesnot involvea significant hazardsconsideration underthe standards set forthin 10 CFR50.92(c), and,accordingly, a findingof "nosignificant hazards consideration" is justified. 4.2 Applicable Requlatorv Requirements/Criteria In accordance with 10 CFR50.80,Transferof licenses,no licensefor a utilization facilitycan be transferred throughtransferof controlof the licenseto anyentity unlessthe NRCconsents in writing.

Page6 FE proposesconverting FirstEnergy NuclearGeneration Corp.froma corporation organizedunderthe lawsof the Stateof Ohioto a limitedliability company(LLC)organizedunderthe lawsof the Stateof Ohio. The proposed conversion willoccurby operationof the Stateof Ohiolaw. As a result,the entity,previously knownas FirstEnergy NuclearGeneration Corp.,will remainthe ownerlicenseebothbeforeand afterthe conversion,butwith a new corporate formas a limitedliabilitycompany.Thisentitywill remainresponsible for providing fundingfor the operation of its ownership shares in BVPS-1, BVPS-2, DBNPS,andPNPPandfulfillall otherobligations as an ownerlicensee. The proposedamendment doesnot involvethe transferof controlto another entity.lt is a namechange.FirstEnergy NuclearGeneration Corp.will change its nameto FirstEnergy NuclearGeneration, LLC. Thereis no impactupon 1 0c F R 5 0 . 8 0 . 4.3 Preceden! I3yletterdatedMay 14,1999,TexasUtilitiesElectricCompanysubmittedan amendment to the NRCfor ComanchePeakSteamElectricStation,Units1 and2 to changethe nameof the companyto TXU ElectricCompany.The proposedamendment indicated thatit was an administrative change.The NRC approvedthe amenclment on August31, 1999[Agencywide Documents Access and Managernent System(ADAMS)AccessionNo.M10218202831. The proposedamendment for the FENOCfacilitiesis similarin thatit describesa namechangeandtheentitywillstillremainresponsible for fulfilling itsobligations as an ownerlicensee. 4.4 Conclusions In conclusion, basedon the considerations discussed above,(1)thereis reasonable assurance thatthe healthandsafetyof the publicwill not be endangered by operationin the proposedmanner,(2) suchactivities will be conductedin compliance withthe NuclearRegulatory Commission's regulations, and(3)the issuance of the amendment willnotbe inimicalto the common defenseandsecurityor to the healthandsafetyof the public. 5.0 ENVIRONMENTAL CONSIDERATION A reviewhasdetermined thatthe proposedamendment would: 1) changea licensee's name,and2) makeseditorial, correctiveor otherminorrevisions to the license.Accordingly, the proposedamendment meetsthe eligibility criterionfor categorical exclusionsetforthin 10 CFR 51.22(c\(10xiii) and (v). Therefore, pursuantto 10 CFR51.22(b),no environmental impactstatementor environmental assessment needbe preparedin connection withthe proposed amendment.

PageT

6.0 REFERENCES

1. OhioRevisedCodeSection1701.792, "Conversionof domesticcorporation intoanotherentity,"effectivedateOctober12,2006;2007HB134 January1,2008.
2. OhioRevisedCodeSection1705.361, "Conversionof anotherentityinto domesticlimitedliabilitycompany,"effectivedateOctober12,2006.
3. OhioRevisedCodeSection1705.391, - actionto "Legaleffectof conversion set aside,"effectivedateOctober12,2006.
4. LetterdatedAugust31, 1999fromMr. DavidH. Jaffe(NRC)to Mr. C. Lance Terry(TU Electric) subject:"COMANCHE PEAKSTEAMELECTRICSTATION, UNITS1 AND2 ISSUANCE OFAMENDMENTS RE: CHANGEIN CORPORATE NAMEFROM'TEXAS UTILITIES ELECTRIC COMPANY'TO

'TXUELECTRTC COMPANY'(TACNOS.MA5551AND MA5552)," (ADAMS AccessionNo. ML021820283)

1 Attachment ProposedBeaverValleyPowerStation,UnitNo. 1 OperatingLicenseChanges(MarkUp) (NinePagesFollow)

UNITEDSTATES NUCLEAR REGUIATORY COMMISSION WASHINGTON. D.C. 20555-0001 FIRSTENERGY NUCLEAROPERATING COMPANY FIRSTENERGY NUCLEAR GENERATIO]UILC Deleted: DOCKETNO.50-334 BEAVERVALLEYPOWERSTATION.UNITNO. 1 RENEWED FACILITY OPERATING LICENSE LicenseNo. DPR-66 The NuclearRegulatoryCommission(the Commission)havingfoundthat: A. The applicationto renewFacilityOperatingLicenseNo. DPR-66,filed by FirstEnergy NuclearOperatingCompany(FENOC)-actingon its own behalfand as agent for FirstEnergy NuclearGeneratioq*lltQ (the_l!_cet_s_ee-s).9_o. qt?-r-'q4qq t!pl!99W!tl'-!h9-  ?"ltq. Deleted: Corp requirements of theAtomicEnergyActof 1954,as amended (theAct),andthe Commission's rulesandregulations setforthin 10CFRChapter1, andall required notificationsto otheragencies or bodieshavebeendulymade; B. Construction of the BeaverValleyPowerStation,UnitNo.1 (facility), hasbeen substantially completed in conformity withConstruction PermitNo.CPPR-75 andthe application,as amended, the provisions of theActandtherulesandregulations of the Commission; C. Thefacilitywilloperatein conformity withtheapplication, the provisionsof theAct,and the rulesandregulations of theCommission; D. Thereis reasonable assurance:(i)thattheactivities authorized bythisrenewed operating licensecanbe conducted withoutendangering the healthandsafetyof the public,and(ii)thatsuchactivities willbe conducted in compliance withthe rulesand regulations of theCommission; E. FENOCis technically qualifiedandthe licensees arefinancially qualified to engagein theactivities authorized bythisrenewed operating licensein accordance withthe rules andregulations of theCommission; F. Thelicensees havesatisfied theapplicable provisions of 10CFRPart140,"Financial Protection Requirements andIndemnity Agreements," of theCommission's regulations;

  • FENOCis authorizedto actas agentfor FirstEnergy NuclearGeneratiorglLlQ,--qqd Deleted3 coro.

h?g-g-{qlqgjyg andcontroloverthephysical responsibility construction, operation, andmaintenance of thefacility. AmendmenlNa-Renewed OperatingLicenseDPR-66

G. The issuanceof this renewedoperatinglicensewill not be inimicalto the common defenseand securityor to the healthand safetyof the public; H. After weighingthe environmental, economic,technicaland other benefitsof the facility againstenvironmentaland othercosts and consideringavailablealternatives, the issuanceof RenewedFacilityOperatingLicenseNo. DPR-66is in accordancewith 10 CFR Part 5'1(formerlyAppendixD of 10 CFR Part 50) of the Commission'sregulations and all applicablerequirementshave been satisfied;and The receipt,possession,and use of source,by-product,and specialnuclearmaterialas authorizedby this renewedoperatinglicensewill be in accordancewith the Commission'sregulationsin 10 CFR Parts30, 40, and 70, including10 CFR Sections 30.33,40.32,70.23,and 70.31. J. Actionshave been identifiedand have been or will be takenwith respectto: (1) managingthe effectsof aging on the functionalityof structuresand componentsthat have been identifiedto requirereviewunder10 CFR U.21(a)(1) duringthe periodof extendedoperation,and (2) time-limitedaging analysesthat have been identifiedto requirereviewunder 10 CFR 5a.21(c),suchthat there is reasonableassurancethat the activitiesauthorizedby this renewedoperatinglicensewill continueto be conductedin accordancewith the currentlicensingbasis,as definedin 10 CFR 54.3 for the facility, and that any changesmadeto the facility'scurrentlicensingbasisin orderto comply with 10 CFR 54.29(a)are in accordancewith the Act and the Commission'sregulations;

2. Renewed FacilityOperating LicenseNo.DPR-66is herebyissuedto FENOCandFirstEnergy NuctearGeneration*lt0!q te?E?q-tqlLqWc, Deleted: Corp.

Thisrenewed licenseappliesto the BeaverValleyPowerStation,UnitNo.1, a pressurized waternuclearreactorandassociated equipment (thefacility),ownedby FirstEnergy NuclearGeneratiorr*lLtQ, enqCpele!9q _!yEENO_Q."-I-heleelly iClocaleEir_r.1-- Deleted: corp. BeaverCounty,Pennsylvania, on thesouthern shoreof theOhioRiver,andis described in the"Updated FinalSafegAnalysisReport"as supplemented andamended andthe Environmental Reportas supplemented andamended. Subjectto theconditions andrequirements incorporated herein,theCommission hereby licenses: (1) FENOC,pursuant to Section104bof theActand10CFRPart50,"Licensing of Production andUtilization to possess, Facilities," use,andoperatethefacility, and FirstEnergy NuclearGeneratiorglLlQ tq poq-sqgq lhq fe_cltiff e!.!he -l Deleted: Corp designated locationin BeaverCounty,Pennsylvania in accordance withthe procedures andlimitations setforthin thisrenewed license; (2) FENOC,pursuant to theActand10CFRPart70,to receive, possess, anduseat anytimespecialnuclearmaterial as reactorfuel,in accordance withthe limitationsfor storageandamountsrequired for reactoroperation, as described in the UpdatedFinalSafetyAnalysisReport,as supplemented andamended; Amendment No.,__[----- Deleted3285 BeaverValleyUnit 1 Renewed Operating LicenseDPR-66

(3) FENOC,pursuant to theActand10CFRParts30,40 and70,to receive, possessanduseat anytimeanybyproduct, sourceandspecialnuclearmaterial as sealedneutronsourcesfor reactorstartup,sealedsourcesfor reactor instrumentation andradiation monitoringequipment andas fission calibration, detectors in amountsas required; (4) FENOC,pursuant to theActand10CFRParts30,40 and70,to receive, possessandusein amountsas required anybyproduct, source,or special nuclearmaterial withoutrestriction or physical to chemical form,for sample analysis or instrument calibration withradioactive or associated apparatus or components; (5) FENOC,pursuant to theActand10CFRParts30,40,and70,to possess, but notseparate, suchbyproduct andspecialnuclearmaterials as maybe produced bytheoperation of thefacility.

c. Thisrenewed operating licenseshallbe deemedto containandis subjectto the conditionsspecified in thefollowing Commission in 10 CFRChapter1:

regulations Part20,Section30.34of Part30,Section40.41ot Pa( 40,Sections 50.54and50.59of Part50,andSection70.32of Part70;andis subjectto all applicable provisionsof the Actandto therules,regulations, andordersof theCommission nowor hereafterin effect;andis subjectto theadditional conditions or incorporated specified below: (1) MaximumPowerLevel FENOCis authorizedto operatethe facilityat a steadystate reactorcore power levelof 2900 megawattsthermal. (2) TechnicalSoecifications The TechnicalSpecifications containedin AppendixA, as revisedthrough AmendmentNo. , are herebyincorporatedin the license. The licenseeshall operatethe facilityin accordancewith the TechnicalSpecifications. (3) AuxiliarvRiverWater System (Deletedby AmendmentNo. 8) Amendment No.,-l--- Deleted: 286 BeaverValleyUnit 1 Renewed OperatingLicenseDPR-66

( 1 0 ) AdditionalConditions TheAdditional Conditions contained in Appendix C, as revisedthrough Amendment No-, -qq_h-gl_qDy insCtpqtaleQ tt'i9I ieenge. F,E-r-1!C -NQq Deleted; 278 shalloperatethefacilityin accordance withtheAdditional Conditions. ( 1 1 ) Mitioation StrateqvLicenseCondition The licenseeshalldevelopand maintainstrategiesfor addressinglargefires and explosionsand that includethe followingkey areas: (a) Firefightingresponse strategy withthefollowing elements:

1. Pre-defined coordinated fireresponse strategy andguidance
2. Assessment of mutualaidfirefightingassets
3. Designated stagingareasfor equipment andmaterials
4. Command andcontrol
5. Training of response personnel (b) Operations to mitigate fueldamageconsidering thefollowing:
1. Protection anduseof personnel assets
2. Communications
3. Minimizing firespread
4. Procedures for implementing integrated fireresponse strategy
5. ldentificationof readily-availablepre-staged equipment
6. Trainingon integrated fireresponse strategy
7. Spentfuelpoolmitigation measures (c) Actionsto minimize releaseto includeconsideration of:
1. Watersprayscrubbing
2. Doseto onsiteresponders AmendmentNo.,--[---"Deleted: 285 BeaverValleyUnit1 Renewed OperatingLicenseDPR-66

APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE NO.DPR.66 FirstEnergy NuclearOperatingCompanyand FirstEnergy NuclearGeneratiorl*lLll9_h-qLl-9-oq1p.fy-Wit!Deleted: Corp thefollowing conditionson theschedules notedbelow: Amendment AdditionalCondition lmplementation Number Date 202 The licenseeis authorizedto relocatecertain The amendment TechnicalSpecificationrequirementsto licensee- shallbe controlleddocuments. lmplementation of this implementedwithin amendmentshallincludethe relocationof these 60 days from technicalspecificationrequirementsto the A p r i l 1 4 ,1 9 9 7 appropriatedocuments,as describedin the licensee'sapplicationdated September9, 1996, and evaluatedin the staffs safetyevaluation attachedto this amendment. 209 The licenseeis authorizedto relocatecertain The amendment TechnicalSpecificationrequirementsto licensee- shallbe controlleddocuments. lmplementation of this implementedwithin amendmentshallincludethe relocationof these 60 days from technicalspeciflcationrequirementsto the December10. 1997 appropriatedocuments,as describedin the licensee'sapplicationdated March14, 1997,as supplemented July29 and August13, 1997,and evaluatedin the staffs safetvevaluationattached to this amendment. 210 The licenseeis authorizedto relocatecertain Theamendment TechnicalSpecificationrequirementsto licensee- shallbe controlleddocuments. lmplementation of this implemented within amendmentshallincludethe relocationof these 30 daysfrom technicalspecificationrequirementsto the January 20,1998 appropriatedocuments,as describedin the licensee'sapplicationdated September11, 1997, and evaluatedin the staffs safetyevaluation attachedto this amendment. BeaverVallevUnit1 c-1 Amendment No., Deleted: 285

APPENDIXC ADDITIONAL CONDITIONS OPERATINGLICENSENO. DPR-66 FirstEnergyNuclearOperatingCompanyand FirstEnergyNuclearGeneratior;lttQ g_bALl-_c_o!!p_fy Wth -[ Deleted: Corp. the followingconditionson the schedulesnotedbelow: Amendment AdditionalCondition lmplementation Number Date 225 The licenseeis authorizedto relocatecertain The amendment TechnicalSpecificationrequirementsto licensee- shallbe controlleddocuments. lmplementation of this implementedwithin amendmentshallincludethe relocationof these 60 days from TechnicalSpecificationrequirementsto the August30, 1999 appropriatedocumentsas describedin the licensee'sapplicationdated December24, 1998, as supplemented June 15,June 17,and July7, 1999,and evaluatedin the staffs safety evaluationattachedto this amendment. 269 On the closingdate(s)of the transfersto FENGenCol The amendment of their interestsin BeaverValleyPowerStation,Unit shallbe No. 1, PennsylvaniaPowerCompanyand Ohio Edison implementedwithin Companyshalltransferto FENGenColall of each 30 days from transferor'srespectiveaccumulateddecommissioning December16. 2005 funds for BeaverValleyPowerStation,Unit No. 1, and tenderto FENGenColadditionalamountsequalto remainingfunds expectedto be collectedin 2005,as representedin the applicationdatedJune 1, 2005, but not yet collectedby the time of closing. All of the funds shall be depositedin a separateexternaltrust fund for the reactorin the same amountas receivedwith respectto the unit to be segregatedfrom otherassets of FENGenColand outsideits administrative control, as requiredby NRC regulations,and FENGenColshall take all necessarystepsto ensurethat this external trust fund is maintainedin accordancewith the requirementsof the orderapprovingthe transferof the licenseand consistentwith the safetyevaluation supportingthe orderand in accordancewith the requirementsof 10 CFR Section50.75,"Reportingand recordkeepingfor decommissioning planning." -"tr*ro"twd""rc"""rrtl GenerctionJlq BeaverValleyUnit 1 c-2 Deleted; 285

APPENDIXC ADDITIONAL CONDITIONS OPERATINGLICENSENO. DPR-66 FirstEnergyNuclearOperatingCompanyand FirstEnergyNuclearGeneratiorgllQ -s-heLl qglp_fyWlh .l - Deleted: corp the followingconditionson the schedulesnotedbelow: Amendment Additional Condition lmplementation Number Date 269 Bythedateof closingof thetransferof theownership Theamendment shall interestsin BeaverValley PowerStation,UnitNo.1 be implemented within fromPennsylvania PowerCompany to FENGenCol, 30 daysfrom FENGenCol shallobtaina parentcompany guarantee December 16.2005 fromFirstEnergy in an initialamountof at least$80 million(in2005dollars)to provideadditional decommissioning fundingassurance regarding such ownership interests.Required fundinglevelsshallbe recalculated annually and,as necessary, FENGenCo] shalleitherobtainappropriate adjustments to the parentcompany guarantee or othenvise provideany additionaldecommissioning fundingassurance necessary for FENGenCol to meetNRCrequirements under10CFR50.75. TheSupport Agreements described in theapplications datedMay18,2005(upto $80million), andJune1, 2005(upto $400million), shallbeeffective consistent withtherepresentations contained in theapplications. FENGenCol shalltakeno actionto causeFirstEnergy, or itssuccessors andassigns, to void,cancel,or modify the Support Agreements withoutthepriorwritten consentofthe NRCstaff,except,however, the$80 millionSupportAgreement in connection withthe transferof the Pennsylvania PowerCompany interests maybe revokedor rescinded if andwhenthe$400 millionsupport agreement described intheJune1, 2005,application becomes effective.FENGenCol shall informthe Director of theOtficeof NuclearReactor Regulation, in writing,no laterthantendaysafterany fundsareprovided to FENGenCol by FirstEnergy undereitherSupport Agreement. - firstfnergv Nucl GenerationJtC= BeaverValleyUnit 1 c-3 Deleted: 285

APPENDIXC ADDITIONAL CONDITIONS OPERATINGLICENSENO. DPR-66 FirstEnergyNuclearOperatingCompanyand FirstEnergyNuclearGeneratiorl=ltli9_Lr,eLl--c_ollply Wth -l- --- Deleted: Corp the followingconditionson the schedulesnotedbelow: Amendment AdditionalCondition lmplementation Number Date 278 Schedulefor New and RevisedSurveillanceRequirements(SRs) The schedulefor performingSRs that are new or revisedin The AmendmentNo. 278 shall be as follows: amendment shallbe For SRs that are new in this amendment,the first performance implemented is due at the end of the first surveillanceinterval,wtrichbegins within150days on the date of implementation of this amendment. from date of issuance For SRs that existedpriorto this amendment,whose intervals of performanceare beingreduced,the first reduced surveillanceintervalbeginsupon completionof the first surveillanceperformedafter implementation of this amendment. For SRs that existedpriorto this amendment,whose intervals of performanceare beingextended,the first extended surveillanceintervalbeginsupon completionof the last surveillanceperformedpriorto implementation of this amendment. For SRs that existedpriorto this amendmentthat have modifiedacceptancecriteria,the first performancesubjectto the modifiedacceptancecriteriais due at the end of the first surveillanceintervalthat beganon the date the surveillance was last performedpriorto the implementation of this amendment. 278 Relocationof CertainTechnicalSoecificationRequirements LicenseAmendmentNo. 278 authorizesthe relocationof certain The TechnicalSpecifications to other licensee-controlled documents. amendment lmplementation of this amendmentshallincluderelocationof the shallbe requirementsto the specifieddocuments,as describedin implemented (1) Sections4D and 4E of the NRC staffs SafetyEvaluation,and within 150 days (2) Table LA, RemovedDetailChanges,and Table R, Relocated from date of Specifications, attachedto the NRC staffs SafetyEvaluation, issuance which is enclosedin this amendment. BeaverValleyUnit1 c4 Deleted:285

APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE NO.DPR-66 NuclearOperating FirstEnergy Company andFirstEnergy g_onply NuclearGeneration-lLlQ-g-bSl_f Wt_l1-l Deleted: corp. thefollowing conditions on theschedules notedbelow: Amendment Additional Condition lmplementation Number Date 281 InitialPerformance of NewSurveillance andAssessment Requirements Uponimplementation of Amendment No.281adopting TSTF-448, The Revision 3, thedetermination of controlroomenvelope (CRE) amendment unfiltered air inleakage as requiredby Surveillance Requirement s h a l l b e (SR)3.7.10.4, in accordance withSpecification the 5.5.14.c(i), implemented assessment of CREhabitability as requiredby Specification within 120 days 5.5.14.c(ii), andthemeasurement of CREpressure as requiredby from date of Specification 5.5.14.d, shallbeconsidered met. Following issuance implementation: (a) Thefirstperformance of SR3.7.1O.4, in accordance with Specification 5.5.14.c(i),shallbewithinthespecified Frequency of 6 years,plusthe 18-month allowance of SR3.0.2,as measured fromthedateof themostrecent successful tracergastest,or withinthe next18monthsif thetimeperiodsincethe mostrecentsuccessful tracergas testis greaterthan6 years. (b) Thefirstperformance of the periodic assessment of CRE habitability, Specification 5.5.14.c(ii), shallbewithin 3 years,plusthe9-monthallowance of SR3.0.2,as measured fromthedateof themostrecentsuccessful tracergastest,or withinthenext9 monthsif thetime periodsincethemostrecentsuccessful tracergastestis greaterthan3 years. (c) Thefirstperformance of theperiodicmeasurement of CRE pressure, Specification 5.5.14.d,shallbewithin18 months, plusthe 138daysallowedby SR3.0.2,as measured from thedateof themostrecentsuccessful pressure measurement test. BeaverValleyUnit 1 c-5 Amendment No., Deleted:285

Attachment2 ProposedBeaverValleyPowerStation,UnitNo.2 OperatingLicenseChanges(MarkUp) (ThirteenPagesFollow)

UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C.20555-0001 FIRSTENERGY NUCLEAROPERATINGCOMPANY Deleted: FIRSTENERGY NUCLEARGENERATTOT{*LLC -) O H I OE D I S O NC O M P A N Y THE TOLEDOEDISONCOMPANY D O C K E TN O . 5 0 - 4 1 2 BEAVERVALLEYPOWERSTATION.UNIT2 RENEWEDFACILITYOPERATINGLICENSE LicenseNo. NPF-73

1. The NuclearRegulatoryCommission(the Commissionor the NRC)has foundthat:

A. The applicationto renew FacilityOperatingLicenseNo. NPF-73filed by FirstEnergyNuclearOperatingCompany(FENOC)-actingon its own behalfand as agent for FirstEnergyNuclear Generatiorl=lLtQ 9_btqECjq-qn9qqrpe1y, gfrq Deleted3 Corp. The Toledo EdisonCompany(the licensees),complieswith the standardsand requirementsof the Atomic EnergyAct of 1954,as amended(the Act), and the Commission's regulations set forthin 10 CFR Chapterl, and all required notificationsto other agenciesor bodieshave been duly made; Constructionof the BeaverValley PowerStation,Unit 2 (the facility),has been substantiallycompletedin conformitywith ConstructionPermit No. CPPR-105and the application,as amended,the provisionsof the Act, and the regulationsof the Commission;

c. The facilitywill operatein conformitywith the application,the provisionsof the Act, and the regulationsof the Commission(exceptas exemptedfrom compliancein Section2.D. below);

D. There is reasonableassurance: (i) that the activitiesauthorizedby this renewed operatinglicensecan be conductedwithoutendangeringthe healthand safetyof the publicand (ii) that such activitieswill be conductedin compliancewith the Commission'sregulationsset forth in 10 CFR Chapterl (exceptas exemptedfrom compliancein Section2.D. below); 'FENOCis authorizedto actas agentfor FirstEnergy Nuctear GeneratiorglltQghfCECISS'1,9g!tp_qrly,______, Deleted: CorD andTheToledoEdisonCompanyandhasexclusive responsibility andcontroloverthe physical construction, operation, andmaintenance of thefacility. Amendmentl{o. Renewed Operating License NPF-73

E. FENOCis technically qualified to engagein the activities authorized by this renewedoperatinglicensein accordance withthe Commission's regulations set forthin 10CFRChapter l; F. Thelicensees havesatisfied the applicable provisions of 10 CFRPart140, "Financial Protection Requirements and Indemnity Agreements," of the Commission's regulations; G. Theissuanceof thisrenewedoperating licensewillnotbe inimical to the common defenseandsecurityor to the healthandsafetyof thepublic; H. Afterweighingtheenvironmental, economic, technical, andotherbenefitsof the facilityagainstenvironmental andothercostsandconsidering available alternatives, the issuance of thisRenewed Operating LicenseNo.NPF-73is subjectto the conditions for protection of the environment setforthin the Environmental Protection Planattachedas AppendixB, is in accordance with10 CFRPart51 of theCommission's regulations,andallapplicable requirements havebeensatisfied;

t. Thereceipt,possession anduseof source,byproduct andspecialnuclearmaterial as authorized by thislicensewillbe in accordance withthe Commission's regulations in 10 CFRParts30,40,and70.

J. Actionshavebeenidentified andhavebeenor willbe takenwithrespectto: (1) managing theeffectsof agingon thefunctionality of structures andcomponents thathavebeenidentified to requirereviewunder10 CFR54.21(a)(1) duringthe periodof extended operation, and(2)time-limited aginganalyses thathavebeen identifiedto requirereviewunder10 CFR54.2'l(c),suchthatthereis reasonable assurance thatthe activities authorized bythisrenewedoperating licensewill continue to be conducted in accordance withthe currentlicensing basis,as definedin 10 CFR54.3for thefacilig,andthatanychangesmadeto thefacility's currentlicensing basisin orderto complywith10 CFR54.29(a)are in accordance withtheAct andthe Commission's regulations; Renewed Facility Operating License NPF-73 is hereby issued to FENOC, FirstEnergy Nuclear Generation*lLtQ, QhiSEdiqqrr Qqmpqly.pttd__r_he Iele{q FClqq!Qp-t1p4:'y (!t'9--l Deleted: Corp. licensees)to read as follows: A. Thisrenewedlicenseappliesto the BeaverValleyPowerStation,Unit2, a pressurized waterreactorandassociated equipment (thefacility), ownedby FirstEnergy NuclearGeneratioq=lUl (qWneD..leqqed ECigqlqg11pery tq 9_t-r!S Deleted: Corp. (lessee), andTheToledoEdisonCompany(lessee)andoperatedby FENOC (collectivelythe licensees).Thefacilityis locatedon the licensees' siteon the southernshoreof the OhioRiverin BeaverCounty,Pennsylvania, approximately 22 milesnorthwest of Pittsburgh and5 mileseastof EastLiverpool, Ohio,andis described in FENOC'sUpdatedFinalSafetyAnalysisReport,as supplemented andamended, andin itsEnvironmental Report, as supplemented andamended; B. Subjectto the conditions andrequirements incorporated herein,the Commission herebylicenses: (1) Pursuant to Section103of theActand10CFRPart50,FENOCto possess,use,andoperatethefacilityat thedesignated locationin Beaver County,Pennsylvania, in accordance withthe procedures andlimitations setforthin thislicense: Amendment No.,,I Deleted: 171 BeaverValleyUnit2 Renewed Operating LicenseNPF-73

                                            .3-(2)   Pursuant   to theAct and 10CFRPart50, FirstEnergy           NuclearGeneratiorl-[-        Deletedr Corp.

LLe, OhioEdisonCompany, andTheToledoEdisonCompany to possessthefacilityat the designated locationin BeaverCounty, Pennsylvania, in accordance withthe procedures andlimitations setforth in the license; (3) Pursuant to theAct and 10 CFRPart70, FENOC,to receive,possess, anduseat anytimespecialnuclearmaterialas reactorfuel,in accordance withthe limitations for storageandamountsrequiredfor reactoroperation, as described in the UpdatedFinalSafetyAnalysis Report,as supplemented andamended; (4) Pursuant to theActand10CFRParts30.40,and70,FENOCto receive, possess,anduseat anytimeanybyproduct, source,andspecialnuclear materialsuchas sealedneutronsourcesfor reactorstartup,sealed sourcesfor reactorinstrumentation andradiation monitoring equipment calibration, andas fissiondetectors in amountsas required; (5) Pursuant to theAct and 10 CFRParts30,40, and70,FENOCto receive, possess,andusein amountsas requiredanybyproduct, source,or specialnuclearmaterialwithoutrestriction to chemicalor physicalform, for sampleanalysisor instrument calibration or otheractivityassociated withradioactive apparatus or components; (6) Pursuant to theActand10CFRParts30,40,and70,FENOCto possess,butnotseparate, suchbyproduct andspecialnuclearmaterials as maybe produced by theoperation of thefacilityauthorized herein. (7) (a) OhioEdisonCompany andTheToledoEdisonCompany are authorized to transferanyportionof theirrespective leased interestsin BVPSUnit2 anda proportionate shareof theirleased interestsin the BVPScommonfacilities to certainpotential investors identified in theirsubmittals of July14,16,22 and31, andSeptember'14,17 and18,1987,andat thesametimeto leasebackfromsuchpurchasers suchinteresttransferred in the BVPSUnit2 facility.Thetermof the leaseis for approximately 29-112years subjectto a rightof renewal.Suchsaleand leaseback transactions aresubjectto the representations and conditions setforthin the aforementioned submittals.Specifically, a lessorandanyoneelsewhomayacquirean interestunder thesetransactions are prohibited fromexercising directlyor indirectlyanycontroloverthe licenseof BVPSUnit2. For purposes of thiscondition thelimitations in 10CFR50.81,as now in effectandas maybe subsequently amended, arefully applicable to the lessorandanysuccessor in interestto that lessoras longas the licensefor BVPSUnit2 remainsin effect; thesefinancialtransactions shallhaveno effecton the licensefor the BVPSUnit2 facilitythroughout thetermof the license. A m e n d m e nN t o.,-[--- Deleted: 171 BeaverValleyUnit2 RenewedOperatingLicenseNPF-73

(b) Further,the licensees arealsorequired to notifythe NRCin writingpriorto anychangein: (i)thetermor conditions of anyleaseagreements executed as partof these transactions; (ii)the BVPSOperating Agreement, (iii)the existingpropertyinsurance coverage for BVPSUnit2, and (iv)anyactionby a lessoror othersthatmayhaveadverse effecton the safeoperationof the facility.

c. Thisrenewedoperating licenseshallbe deemedto containandis subject to the conditions specified in thefollowingCommission regulations set forthin 10 CFRChapter1 andis subjectto all applicable provisions of the Act andto the rules,regulations, andordersof the Commission nowor hereafter in effect;andis subjectto theadditional conditions specified or incorporated below:

(1) MaximumPower Level FENOC is authorizedto operatethe facilityat a steadystate reactor core power levelof 2900 megawattsthermal. (2) TechnicalSpecifications The TechnicalSpecificationscontainedin AppendixA, as revised through AmendmentNo*, qnd lhe EnVrfSI 11t Ptqtesli_o-!- e!!e-L Plen Deleted:173 containedin AppendixB, both of which are attachedheretoare herebyincorporatedin the license. FENOCshall operatethe facilityin accordancewith the TechnicalSpecificationsand the EnvironmentalProtectionPlan. Amendment No.,_[----- Deleted:173 BeaverValleyUnit2 Renewed Operating LicenseNPF-73

                                            .6-(8)    DetailedControlRoom DesiqnReview(DCRDR)

Deleted (e) Safetv ParameterDisplavSvstem(SPDS) Deleted (10) Fire ProtectionModifications(Section9.5.1 of SER Supplement6) Deleted (11) AdditionalConditions The AdditionalConditionscontainedin AppendixD, as revisedthrough AmendmentNo.*9_r-9-!91--e!y- j!99lp9r:?-tedinlq tb!-s-!r-q9ft99,--f-FNqq ,t -' Deleted3 163, shalloperatethefacilityin accordance withtheAdditional Conditions. ('12) Steam GeneratorSurveillancelntervalExtension Deleted (13) MitiqationStrateqvLicenseCondition The licenseeshall developand maintainstrategiesfor addressinglarge fires and explosionsand that includethe followingkey areas: (a) Firefightingresponse strategywiththefollowing elements:

1. Pre-defined coordinated fireresponse strategyandguidance
2. Assessment of mutualaidfirefightingassets
3. Designated stagingareasfor equipment andmaterials
4. Command andcontrol
5. Trainingof response personnel (b) Operations to mitigatefueldamageconsidering thefollowing:
1. Protection anduseof personnel assets
2. Communications
3. Minimizing firespread
4. Procedures for implementing integrated fireresponsestrategy
5. ldentificationofreadily-availablepre-stagedequipment
6. Trainingon integrated fire response strategy
7. Spentfuelpoolmitigation measures (c) Actionsto minimizereleaseto includeconsideration of:
1. Watersprayscrubbing
2. Doseto onsiteresponders Amendment No.,-[ Deleted: 171 BeaverValley Unit 2 Renewed Operating LicenseNPF-73

A P P E N D I XB TO FACILITYOPERATINGLICENSENO. NPF-73 BEAVERVALLEY POWER STATION U N I T2 FIRSTENERGY NUCLEAROPERATINGCOMPANY,ET AL D O C K E TN O . 5 0 - 4 1 2 ENVIRONMENTAL PROTECTIONPLAN (NONRADTOLOGTCAL) A U G U S T1 9 8 7 NO CHANGESTHIS PAGE. INCLUDEDFOR CONTEXT. BeaverValley Unit 2 B-i No.171 Amendment

APPENDIX B TO FACILITY OPERATING LICENSE NO.NPF-73 BEAVERVALLEYPOWERSTATION UNIT2 ENVIRONMENTAL PROTECTION PLAN (NONRADTOLOGTCAL) TABLEOF CONTENTS Section Paqe 1.0 Objectivesof the Environmental ProtectionPlan.............. .................. B-1 2.0 E n v i r o n m e n tP a rl o t e c t i o1ns s u e s . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B. .-. 1 ... 3.0 C o n s i s t e n cRye q u i r e m e n t s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B. . -. .1. . 3.1 P l a n tD e s i g na n d O p e r a t i o n . . . . . . . . . . . . . . . . . . .................B . . -. .1. . . 3.2 ReportingRelatedto the NPDES Permitand State Certifications ......B-2 J.J ChangesRequiredfor Compliance with OtherEnvironmental Regulations.............B-2 4.0 E n v i r o n m e n tC aol nditions . . . . . . . . . . . . . . . . . . .B. .-.2. . 4.1 Unusualor lmportantEnvironmental Events ................. B-2 4.2 E n v i r o n m e n tM a lo n i t o r i n g . . . . . . . . . . . . . . . . . . .B. .-.3. . 5.0 A d m i n i s t r a t i vPer o c e d u r e s . . . . . . . . . . . . . . . . . .B. .-.3. . 5.1 R e v i e wa n dA u d i t . . . . . . . . . . . . .B. .-.3 5.2 R e c o r d sR e t e n t i o n . . . . . . . . . . .B. . -. 3 5.3 Changesin Environmental ProtectionPlan.......... .........B-4 5.4 P l a n tR e p o r t i n Rg equirements.............. . . . . . . . . . . . . . . . . . . .B. .-.4. . NO CHANGESTHIS PAGE, INCLUDEDFOR CONTEXT. BeaverValleyUnit2 B-ii Amendment No.171

1.0 Obiectives of the Environmental ProtectionPlan The Environmental Protection Plan(EPP)is to providefor protection of nonradiological environrnental valuesduringoperation of the BeaverValleyPowerStation,Unit2 (facility).The principal objectives of the EPPareas follows: (1) Verifythatthefacilityis operatedin an environmentally acceptable manner,as established bythe FinalEnvironmental Statement - Operating LicenseStage(FES-OL) andotherNRCenvironmental impactassessments. (2) Coordinate NRCrequirements andmaintainconsistency withotherFederal,State,and localrequirements for environmental protection. (3) KeepNRCinformedof the environmental effectsof facilityconstruction andoperation andof actionstakento controlthoseeffects. Environmentalconcernsidentifiedin the FES-OL(September1985, NUREG-1094)which relate to water qualitymattersare regulatedby way of the licensee's*NPDESpermit. 2.O EnvironmentalProtection lssues In the FES-OL(NUREG-1094, September1985),the staffconsideredthe environmental impactsassociatedwith the operationof the BeaverValley PowerStation,Unit 2. No aquatic/waterquality,terrestrial,or noise issueswere identified. 3.0 Consistencv Requirements 3 . 1 PlantDesiqnandOperation The licenseemay make changesin stationdesignor operationor performtests or experiments affectingthe environmentprovidedsuch activitiesdo not involvean unreviewedenvironmental questionand do not involvea change in the EPP*. Changesin stationdesignor operationor performanceof tests or experimentswhich do not affect the environmentare not subjectto the requirementsof this EPP. Activitiesgovernedby Section3.3 are not subjectto the requirementsof this Section. Beforeengagingin additionalconstructionor operationalactivitieswhich may significantlyaffect the environment,the licenseeshall prepareand recordan environmentalevaluationof such activity. Activitiesare excludedfrom this requirementif all measurablenonradiological environmentaleffectsare confinedto the on-siteareas previouslydisturbedduringsite preparationand plant construction.When the evaluationindicatesthat such activityinvolvesan unreviewedenvironmentalquestion,the licenseeshall providea writtenevaluationof such activityand obtainprior NRC approval. Such activityand changeto the EPP may be implementedonly in accordancewith an appropriatelicenseamendmentas set forth in Section5.3 of this EPP.

  • "Licensee" refersto FirstEnergy Nuclear Operating Company, operator and ofthefacility, actingasagentforFirstEnergy Nuclear Generatiorg!19-9-Iiq ECi,sq!1 lh-g -

Qqqryany,-e_lC ,t Deletedr Corp. Toledo Edison Company, owners or lessees ofthefacility. BeaverValley Unit 2 B-1 Deleted: 171

A P P E N D I XD A D D I T I O N AC L ONDITIONS OPERATINGLICENSENO. NPF.73 FirstEnergyNuclearOperatingCompany,FirstEnergyNuclearGeneratioq*lLlQ,Qtrjq-EdLgq-r-t_ Deleted:

                                                                                       .____.t-.--        Corp Company,and The Toledo EdisonCompanyshall complywith the followingconditionson the schedulesnoted below:

Amendment AdditionalCondition lmplementation Number Date 83 The licensee is authorizedto relocate certain The amendment TechnicalSpecificationrequirementsto licensee- shallbe implemented controlleddocuments. lmplementationof this within 60 days amendmentshall includethe relocationof these from April 14,1997 technicalspecificationrequirementsto the appropriatedocuments,as describedin the licensee'sapplicationdated September9, 1996, and evaluatedin the staffs safetyevaluation attachedto this amendment. 87 The licenseeis authorizedto relocatecertain The amendment TechnicalSpecificationrequirementsto licensee- shallbe implemented controlleddocuments. lmplementationof this within 60 days from amendmentshall includethe relocationof these December10. 1997 technicalspecificationrequirementsto the appropriatedocuments,as describedin the licensee'sapplication datedMarch14, 1997,as supplemented July29 and August13, 1997,and evaluatedin the staffs safety evaluationattached to this amendment. 88 The licenseeis authorizedto relocatecertain Theamendment TechnicalSpecificationrequirementsto licensee- shallbe implemented controlleddocuments. lmplementationof this within30 daysfrom amendmentshall includethe relocationof these January 20, 1998 technicalspecificationrequirementsto the appropriatedocuments,as describedin the licensee'sapplicationdated September1 1, 1997, and evaluatedin the staffs safetyevaluation attachedto this amendment. 98 The licenseecommitsto performvisualacceptance Theamendment examinationsof sleevewelds; post weld heat treatment shallbeimplemented of sleevewelds:and the NRC- within60 daysfrom recommendedinspectionsof repairedtubes as March26. 1999 describedin the licensee'sapplicationdated March10, 1997,as supplemented July 28, 1997, September17, 1997, April 30, 1998, and January29, 1999,and evaluatedin the staffs safetyevaluationattachedto this amendment. BeaverValleyUnit2 D-1 AmendmentNo.. t. Deleted:171

A P P E N D I XD A D D I T I O N AC L ONDITIONS OPERATINGLICENSENO. NPF-73 FirstEnergyNuclearOperatingCompany,FirstEnergyNuclearGeneration=lLlQ,--QhjC-Ed-r-Sqn Deleted: Corp. Company,and The Toledo EdisonCompanyshallcomplywith the followingconditionson the schedulesnoted below: Amendment Additional Condition lmplementation Number Date 102 Thelicenseeis authorized to relocatecertain Theamendment Technical Specification requirements to licensee- shallbeimplemented controlled documents.lmplementation of this within60 days amendment shallincludethe relocation of these fromAugust30, Technical Specification requirements to the 1999 appropriate documents as described in the ficensee's application datedDecember 24,'1998, as suppfemented June15,June17, andJuly7, 1999, andevaluated in the staffsevaluation attachedto thisamendment. 151 On theclosingdate(s)of thetransfers to FENGenCol Theamendment I of theirinterests in BeaverValleyPowerStation,Unit shallbe No.2, Pennsylvania PowerCompany, TheCleveland implemented within Electricllluminating Company, OhioEdisonCompany, 30 daysfrom andTheToledoEdisonCompany shalltransferto December 16.2005 FENGenGol all of eachtransferor's respective accumulated decommissioning fundsfor BeaverValley PowerStation,UnitNo.2, exceptfor fundsassociated withthe leasedportionsof BeaverValleyPower Station, UnitNo.2, andtenderto FENGenCol additional amountsequalto remaining fundsexpected to be collected in 2005,as represented in the application datedJune1,2005,butnotyet collected by thetimeof closing.All of thefundsshallbe deposited in a separateexternaltrustfundfor the reactorin the sameamountas received withrespectto the unitto be segregated fromotherassetsof FENGenCol and outsideits administrative control,as requiredby NRC regulations, andFENGenCo! shalltakeall necessary stepsto ensurethatthisexternaltrustfundis maintained in accordance withthe requirements of the orderapproving thetransferof the licenseand consistent withthe safetyevaluation supporting the orderandin accordance withthe requirements of 10CFRSection 50.75,"Reporting andrecordkeeping for decommissioning planning." . firrtf""rg" Nr. GenerationJl0 BeaverValleyUnit2 AmendmentNo..________...Deleted: 171

A P P E N D I XD A D D I T I O N AC L ONDITIONS OPERATINGLICENSENO. NPF-73 FirstEnergyNuclearOperatingCompany,FirstEnergyNuclearGeneratior$lQ, Qftjg EdLqq!- Deleteal: Corp. Company,and The Toledo EdisonCompanyshall complywith the followingconditionson the schedulesnoted below: Amendment Additional Condition lmplementation Number Date 151 Bythe dateof closingof thetransferof theownership Theamendment interestsin BeaverValleyPowerStation,UnitNo.2 shallbe implemented fromPennsylvania PowerCompany to FENGenCol, within30 daysfrQm FENGenCol shallobtaina parentcompanyguarantee December 16,20P5 fromFirstEnergy in an initialamountof at least$80 million(in2005dollars)to provideadditional decommissioning fundingassurance regarding such ownership interests.Required fundinglevelsshallbe recalculated annually and,as necessary, FENGenCol shalleitherobtainappropriate adjustments to the parent companyguarantee or otherwise provideanyadditional decommissioning fundingassurance necessary for FENGenCol to meetNRCrequirements under10CFR 50.75. TheSupportAgreements described in theapplications datedMay18,2005(upto $80million), andJune1, 2005(upto $400million),shallbe effectiveconsistent withthe representations contained in the applications. FENGenCol shalltakeno actionto causeFirstEnergy, or its successors andassigns,to void,cancel,or modify the SupportAgreements withoutthe priorwritten consentof the NRCstaff,except,however, the $80 millionSupportAgreement in connection withthe transferof the Pennsylvania PowerCompanyinterests maybe revokedor rescinded if andwhenthe $400 million supportagreement described in theJune1, 2005,application becomeseffective.FENGenCol shall informthe Directorof the Officeof NuclearReactor Regulation, in writing,no laterthanten daysafterany fundsare provided to FENGenCol by FirstEnergy under eitherSupportAgreement. - firstEnergvNucl GenemtionJlA BeaverValley Unit 2 D-3

A P P E N D I XD ADDITIONALCONDITIONS OPERATINGLICENSENO. NPF.73 FirstEnergyNuclearOperatingCompany,FirstEnergyNuclearGeneration=lLli,-Qhjp-EdLS_o! Deleted: Corp. Company,and The Toledo EdisonCompanyshallcomplywith the followingconditionson the schedulesnoted below: Amendment AdditionalCondition lmplementation Number Date 161 Schedulefor New and RevisedSurveillanceRequirements(SRs) The schedulefor performingSRs that are new or revisedin The AmendmentNo. 161 shallbe as follows: amendment shallbe For SRs that are new in this amendment,the first performance implemented is due at the end of the first surveillanceinterval,which begins within150 days on the date of implementationof this amendment. from date of lssuance ForSRsthatexistedpriorto thisamendment, whoseintervals of performance are beingreduced, thefirstreduced surveillance intervalbeginsuponcompletion of thefirst surveillance performed afterimplementation of this amendment. ForSRsthatexistedpriorto thisamendment, whoseintervals of performance are beingextended, thefirstextended surveillance intervalbeginsuponcompletion of the last surveillance performed priorto implementation of this amendment. ForSRsthatexistedpriorto thisamendment thathave modifiedacceptance criteria,thefirstperformance subjectto the modifiedacceptance criteriais dueat theendof thefirst surveillance intervalthatbeganon the datethe surveillance waslastperformed priorto the implementation of this amendment. 161 Relocation of CertainTechnical Specification Requirements LicenseAmendmentNo. 161 authorizesthe relocationof certain The TechnicalSpecificationsto other licensee-controlled documents. amendment lmplementationof this amendmentshall includerelocationof the shallbe requirementsto the specifieddocuments,as describedin implemented (1) Sections4D and 4E of the NRC staffs SafetyEvaluation,and within150 days (2) Table LA, RemovedDetailChanges,and Table R, Relocated from date of Specifications,attachedto the NRC staffs SafetyEvaluation, issuance which is enclosedin this amendment. BeaverValleyUnit2 D-4 Amendment No...-,-----_,1-.--. Deleted:171

APPENDIXD ADDITIONALCONDITIONS OPERATINGLICENSENO. NPF-73 FirstEnergyNuclearOperatingCompany,FirstEnergyNuclearGeneratior$tlQ. Qbjq Edj-qqr-t- -"- Deleted: Corp. Company,and The Toledo EdisonCompanyshallcomplywith the followingconditionson the schedulesnoted below: Amendment Additional Condition lmplementation Number Date 163 InitialPerformance of NewSurveillance andAssessment Requirements Uponimplementation of Amendment No. 163adoptingTSTF-448, The Revision 3, the determination of controlroomenvelope(CRE) amendment unfiltered air inleakage as requiredby Surveillance Requirement shallbe (SR)3.7.10.4, in accordance withSpecification the 5.5.14.c(i), implemented assessment of CREhabitability as requiredby Specification within120 days 5.5.14.c(ii),andthemeasurement of CREpressure as requiredby from date of Specification 5.5.14.d, shallbe considered met. Following issuance implemeniation: (a) Thefirstperformance of SR3.7.10.4,in accordance with Specification 5.5.14.c(D, shallbe withinthe specified Frequency of 6 years,plusthe 18-month allowance of SR 3.0.2,as measured fromthe dateof the mostrecent successful tracergastest,or withinthe next18 monthsif thetimeperiodsincethe mostrecentsuccessful tracergas testis greaterthan6 years. (b) Thefirstperformance of theperiodicassessment of CRE habitabillty, Specification 5.5.14.c(ii), shallbewithin 3 years,plusthe9-month allowance of SR3.0.2,as measured fromthe dateof the mostrecentsuccessful tracergastest,or withinthe next9 monthsif thetime periodsincethe mostrecentsuccessful tracergastestis greaterthan3 years. (c) Thefirslperformance of the periodicmeasurement of CRE pressure, Specification5.5.14.d, shallbewithin18 months, plusthe 138daysallowedby SR 3.0.2,as measured from the dateof the mostrecentsuccessful pressure measurement test. BeaverValleyUnit2 D-5 AmendmentNo.r.-__--_____r----' Deleted: 171

Attachment3 ProposedDavis-BesseNuclearPowerStation,UnitNo. 1 OperatingLicenseChanges(MarkUp) (SevenPagesFollow)

UNITEDSTATES NUCLEARREGULATORYCOMMISSION wASHTNGTON, D.C.20555.{'001 FIRSTENERGY NUCLEAR OPERATING COMPANY AND FIRSTENERGY NUCLEAR GENERATIO\_H . . . . . _ - 1 . Deleted: D O C K E TN O . 5 0 - 3 4 5 DAVIS-BESSE NUCIJEAR POWER STATION, UNIT NO. 1 FACII,ITY OPERATING I,ICENSE IJicense No . NPF- 3 t-. The Nucl-ear Regul-atory Commission (tshe Commission) having found that: The application for license filed by FirstEnergy Nuclear Operatsing company (FENOC)I, acting on it.s own behalf and as agent f or FirstBnersy Nuclear ceneratiou - ( r i gglqegg )_ -g-gllpl +g g -y-i-!h Deleted: corp. the standards and requirements of the Atomic Energry Act of l-954, as amended (the Act), and the Commission's rules and regrulations se! forth in L0 CFR Chapter I and afl reguired notifications to other agencies or bodies have been duly made; B. Construction of the Davis-Besse Nuclear Power St,ation, Unit No. 1 (the facility) has been substanEialLy completed in conformitsy i"rith Const.ructsion Permit No. CPPR-8o and t.he application, as amended, the provisions of the Act and tshe rules and regulations of the Commission;

c. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; FENOC is authorized to act as agent for FirstEnergy Nuclear ceneralion- I
   ,L!9-1-ar1phar qrgl-gi+yg r9?-p-91-giuugy9tq 9919{9} 9y9{ !!g p4-y-erg+_l                                          .1..'- Deleted: corp.

const.rucEion, operation, and maintenance of tshe facility. L-1 Amendment No. Defeted: r52, 228, 270

l-.D. There is reasonable assurance: (i) that the acclvities authorized by this operating License can be conducted without endangering the health and safet.y of the puJrlic, and (ii) that such activities v/iI1 be conducted in compliance with the rules and reg'ulat.ions of the Commission; E. The FirstEnergry Nuclear Operaling Company is technically qualified and the l-icensees are financially qualified tso engage in the activities authorized by tshis operating license in accordance with the rules and requlations of Lhe Commission; F. The licensees have satisfied tshe applicable provisions of 10 CFR Part 140, "Financial- Protection Requirementss and fndemniEy Agree-ment.s, ,, of the commission,s re$rlations, G. The issuance of this operating license will not be inimical to the common defense and securit,v or to the health and safetsv of the publ j-c; Aft.er weighing the environmenlal, economic, technical., and other benefj-ts of the facility against environmentsal and oLher costs and considering avaiJ-ab1e alEernat.ives, t.he issuance of Facifity Operat,ing License No. NPF-3 subject to the conditions for prot,ection of the environment set forth herein is in accordance wit.h 1-0 CFR Part 51 (formerly Appendix D Lo 10 CFR Part 50), of the Commissionrs regulations and all applicable reguirements have been sat,isfied; and I. The receipt, possession, and use of source, byproduct and specj-al nucLear material as authorized by this license will be in accord-ance with the Commissj-on's regrrlations in 10 CFR Part 30, 40, and 70, including l-0 CFR Sections 30.33, 40.32, 70.23, and 70.31. Facil-ity Operati.ng License No. NPF-3 is hereby issued to FirstEnergry Nucl-ear Operating Company (FENOC), and FirstEnergy Nuclear ceneration-

&q    to f9?q ?_q lo"1l.o'Fi________._

A. This license applies to the Davis-Besse Nucl-ear Power Stsation, Unit No. l-, a pressurized water nuclear reactor and associated equipment (the facilitsy), owned by FirstsEnergy Nuclear Generation- !L9: ,rh-e--fa-gf]1_ty iF l99e!99 _ot -!t-r-9 ?9\l!!-y9!!9!Il Deleted:com. shore of Lake Erie in Ottsawa County, Ohj.o, approximately 21 miles east of Toledo, Ohio, and is descrj.bed in the "Final Safety Analysis Report" as supplenented and amended (Amendmenls l-4 uhrough 44) and the Environmental Report as supplemented and amended (Supplements 1 tshrough 2) . AmeDdmen! No. ,- Defeted: !52, 22s, 270

z-E- Subject to the conditions and requj-rements incorporated herein, the Commission hereby licenses: (1) FENOC, pursuant to Sectsion 103 of the Act and l-0 CFR Part 50, "Licensing of Production and Utilization Facilities, " to possess, use, and operate the facility; (21 FirstBnergry Nucfear ceneratior\,:ryr !9 -p9gi9gg !4S _ , , _ _ - . t - - - - Deleted: corp. facilJ-ty at the designatsed locat.ion in Ottawa County, ohio in accordance with t.he procedures and lirnitsatsions se! forth in this Iicense; (3) FENOC, pursuant to the Act and L0 CFR Part 70, co receive, possess and use at any time special. nuclear maLerial as reactor fuel, in accordance with the limitacions for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) FENOC, pursuan! to tshe Act and L0 CFR Parts 30, 40, and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipments calibration, and as fission detecEors in amounts as ramr i rad . FENOC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as reguired any byproduct, source or special nuclear material wichout restriction to chemical or physical form, for sample analysis or instrument cal-ibrat.ion or associated with radioact.j.ve apparatus or components; and ta., FENOC, pursuanE to the Acts and 10 CFR Parts 30 and 70. !o possess, but not separate, such b1{>roducts and special nucl-ear materials as may be produced by the operation of the facility. Amendment No. v_ ......t..,, D e l e t e d : 7 s 2 , 2 2 8 , 2 7 0

A 2.C. This licenseshallbe deemedto containandis subjectto the conditionsspecifiedin the following Commissionregulationsin 10 CFR ChapterI: Part 20, Section30.34of Part30, Section40.41 ofPart 40, Sections50.54and50.59ofPart 50,andSection70.32ofPart 70; andis subjectto all applicable provisionsofthe Act andto the rules, regulations,andordersof the Commissionnow or hereafterin effect;and is subjectto the additionalconditionsspecifiedor incorporatedbelow: (l) MaximumPowerLevel FENOCis authorizedto operatethe facility at steadystatereactor corepowerlevelsnot in excessof 2817megawatts(thermal). Prior to attainingthe powerlevel,ToledoEdisonCompanyshall complywith the conditionsidentifiedin Paragraph(3) (o) below and completethe preoperational tests,startuptestsandother itemsidentifiedin Attachment2 to this licensein the sequence specified.Attachment2 is an integralpart of this license. (2) TechnicalSpecifications The TechnicalSpecifications containedin AppendixA, as revisedthroughAmendmentNo*, -4Iq,b9t9!yllgC.pqtqlgd Deleted: 280 in the license.FENOCshalloperatethe facility in accordance with the TechnicalSoecifications. (3) AdditionalConditions The mattersspecifiedin the following conditionsshallbe completedto the satisfactionof the Commissionwithin the statedtime periodsfollowing the issuanceof the licenseor within the operationalrestrictionsindicated.The removal of theseconditionsshallbe madeby an amendment to the licensesupportedby a favorableevaluationby the Commission: (a) FENOCshall not operatethe reactorin operational Modes I and2 with lessthanthreereactorcoolant pumpsin operation. (b) Deletedper Amendment6 (c) Deletedper Amendment5 Deleted:278.279.280 No.,.,f' Amendment

2.C(4) Fire Protection FENoc shall implements and maincain in effect afl provisions of the approved Fire Prot.eclion Program as described in the Updated Safety analysis Report and as approved in tshe SERS datedJuly 25, 1979, and May 30, 199L, suJrject to the following provision. FENOC may make changes to the approved Fire Protection Program without prior approval of the commission only if those changes would not adversely affect the ability Eo achieve and maintsain safe shutdown in the event of a fire. (s) Del-eted per Amendment No. 279. (6) Antitrust Conditions FENoC and FirstEnergy Nucl-ear ceneratiorlE:LU; gbe]l 99Ir]p!y_ ---_t-,--- Deleted: corc wilh the antitrust conditions deLineated in Condition 2.8 of Lhis license as i.f named therei.n. FENOC shalI not market, or broker porrer or energy from the Davis-Besse Nuclear Power Staeion, Unit. No. L. FirstEnergTy Nuclear Generatiorr, L!11_ 1q 5gqpgnsibl-e and accguntable for the --l----- Deleted: corp, actions of FENOC to the extent that sai-d actions affect the marketing or brokering of power or energfy from the Davis-Besse Nuclear Pohrer SLation, Units No. 1, and in any way, contravene the antitrust license conditions contained in the license. D e f e t e d : ] - 5 , 4 1 , r ' 14 , 2 2 A , 2 ' 7o , 2 7 9 L-5 Amendment No. ,-__________ ,+

In accordance with the requirement imposed by the october I, 1975, order of the Unit.ed states court of Appeafs for the District of Columbia Circuit in Nat.ural Resources Defense Council v. Nuclear Regulatory Commission, No. 74-1,385 and 74-l-586, that Ehe Nuclear Regulatory Commission "shaf-make any licenses grantsed bet.ween .fuly 21, 1976 and such time when the mandate is issued subject to Ehe outcome of such proceedings herein," this license shalI be subject to the out.come of such proceedings. This license is effective as of the date of issuance and shaIl expire at midnight April 22, 20]-7 . Based on the Commission's Order dated Decenber 16, 2005 and conforming AmendmenL No. 270 dated Decedber 15, 2005 regarding the direct. transfer of the License from the Cleveland El-ectric Illuminating Company (CleveLand Electric) and the Tol-edo Edison Company ( Toledo ndi son) to Fi rstEnergy NUqJ_e-4lGenerat ion Corpx___--,-- _--[---- Deleted: oracion (FENGenCo)4, FirstEnergy Nuclear OperaEing Company and FENGenCor I sha11 comply with the fol]owing conditions noted beLow: On the closing date of tshe transfers to FENGenCol of their interests in Davis-Besse, CLeveland Electric and Toledo Edison shall transfer to FENGenCo: all of each transferor's respective accumulated decommissioning funds for Davis-Besse and tender t.o FENGenCor addit.ional amounEs equal to remaining funds expected to be collected in 2005, as represented in the application dated.fune I, 2005, but not yet collected by the time of closing. A11 of the funds shall be deposiLed in a separate external trust fund for the reactor in the same amount as received with respect to Ehe unit to be segregated from other assets of FENGenCor and outside its administrative control, as required by NRC regulations, and FENGenCor sha11 take all necessary steps to ensure EhaE this external- trust fund is maintained in accordance wj-th the requirements of the order approvj-ng the transfer of the license and consistent

              $/ith the safeLy          eval-uation        supporting       the order       and in accordance       with     Che reguirements            of 10 CFR Section            50.75, "Reporting       and recordkeeping             for decommissioning             plalning.      "

@iltN""t.erc"""."ti. g GenentionJte L- 14 Amendment No. ,,, Deleted: !sr. zio

                                                     - 14A-The Supporc Agreement           described      in tshe application       dated June l-, 2005 (up to $400 million).                 shal,I be effective      consistent with   the representations           contained      in tshe application.       FENGencol shall    take no action        to cause FirslEnerg-y,        or it,s successors      and assigns,     to void,     cancel,     or modify       the Support Agreement without the prior     vrrit.len   consent of the NRC sEaff.             FENGenCoa sha1l inform    t.he Director      of t,he Office       of Nuclear    Reaccor Regulation, in writing,      no later      than E.en days after        any funds are provided to FENGenCo* by FirstEnergy              under either      Support    Agreement.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed by R. C. DeYoung (for) Roger S. Boyd, Director Division of Project' Management Office of Nucfear Reactsor Regulation Attachments:

1. Appendices A & B - Technical Specifications
2. Preoperational Tests, Startup Tests and Other ftems Which Must Be Completed Prior to proceeding t.o Succeeding Operational Modes Date of Issuance: (APR 22 L977)

. eirstEnersv Nqele qclery'tiq!*LLe-L- L4A Amendment No. Deleted:270

4 Attachment ProposedPerryNuclearPowerPlant,UnitNo. 1 OperatingLicenseChanges(MarkUp) (EightPagesFollow)

UNITED STATES NUCLEAR REGULATORY COMMISSION wASHtNGTON.D.C.2955s-0001 FIRSTENERGY NUCLEAR OPERATING COMPANY FIRSTENERGY NUCLEARGENERATIONI.LL. Deleted: CORP. OHIOEDISONCOMPANY DOCKETNO.50-440 PERRYNUCLEAR POWER.PLANT.UNITNO.1 FACILITY OPERATING LICENSE LicenseNo. NPF-58 1.TheNuclear Regulatory Commission (theCommission) hasfoundthat: A. The application for licensefiledby FirstEnergy NuclearOperatingCompany(FENOC)I actingon its ownbehalfandas agentfor FirstEnergy NuclearGeneratiorglp ?4d qbiC Deleted: Corp. EdisonCompany,(licensees) complieswiththe standardsand requirements of the AtomicEnergyAct of 1954,as amended(theAct),andthe Commission's regulationsset forthin 10 CFRChapterl, andall requirednotifications to otheragenciesor bodieshave beendulymade; B. Construction of the PerryNuclearPowerPlant,UnitNo. 1 (thefacility),hasbeen substantiallycompletedin conformity PermitNo.CPPR-I48andthe withConstruction application,as amended,the provisions of theAct,andthe regulations of the Commission:

 'FENOCis authorized  to act as agentfor FirstEnergyNuclearGeneration*$_e   q-r1d O_lr!-o   t oeleted: corp.

EdisonCompany,and hasexclusiveresponsibility andcontroloverthe physicalconstruction, operation, and maintenance of thefacility. Amendment No.,__

c Thefacilitywilloperatein conformity withthe application, as amended,the provisions of theAct,andthe regulations of theCommission (exceptas exemptedfromcompliance in Section2.D below); D , Thereis reasonable assurance: (l) thatthe activities authorized by thisoperatinglicense can be conducted withoutendangering the healthandsafetyof the public,and (ii)that suchactivities willbe conducted in compliance withthe Commission's regulations set forthin 10 CFRChapterl (exceptas exemptedfromcompliance in Section2.D below), The FirstEnergy NuclearOperatingCompanyis technically qualifiedto engagein the activitiesauthorized by thislicensein accordance withthe Commission's regulationsset forthin 10 CFRChapterl; The licenseeshavesatisfiedthe applicable provisions of 10 CFR Part140,"Financial Protection Requirements and Indemnity Agreements," of theCommission's regulations; G . The issuanceof thislicensewillnot be inimicalto the commondefenseandsecurityor to thehealthandsafetyof the public; Afterweighingthe environmental, economic, technical, andotherbenefitsof thefacility againstenvironmental andothercostsandconsidering availablealternatives, the issuanceof this FacilityOperatingLicenseNo.NPF-58,subjectto the conditions for protection of the environment setforthin the Environmental Protection Planattachedas AppendixB, is in accordance with 10 CFRPart51 of theCommission's regulationsand all applicable requirements havebeensatisfied; and The receipt,possession, and useof source,byproduct, andspecialnuclearmaterialas authorized by thislicensewillbe in accordance withthe Commission's regulationsin 10 CFRParts30,40.and70. Basedon theforegoingfindingsregarding thisfacility,the Partial-lnitial Decisions issued December 2, 1983,and September 3, 1985,by theAtomicSafetyand LicensingBoardin regardto thisfacility(affirmedby ALAB-84'l , datedJuly25, 1986)and pursuantto approvalby the NuclearRegulatory Commission at a meetingon November 7, 1986,FacilityOperating LicenseNo.NPF-58,whichsupersedes the licensefor fuelloadingand lowpowertesting, LicenseNo. NPF-45,issuedon March18, 1986,is herebyissuedto FirstEnergy Nuclear Operating Company,FirstEnergy NuclearGeneration=lJQ, ilg qbj-o--Eqiegrl Qg['p?'ly,(!be - -_t--- Deleted: Corp. licensees) to readas follows: A. The licenseappliesto the PerryNuclearPowerPlant,UnitNo. 1, a boilingwaternuclear reactorandassociated equipment(thefacility),ownedby FirstEnergy Nuclear Generatiorslt1L (_ojvner) etdleaeeq !c qbjcEqrqq-l Cqrpeny (esqee)  !!'c .1,.. (cqlle.cLryely Deleted: Corp. licensees). Deleted: 137 Amendment

The facilityis locatedon the shoreof Lake Erie in LakeCounty,Ohio,approximately 35 milesnortheastof Cleveland,Ohio,and is describedin the licensees'FinalSafetyAnalysisReport,as supplementedand amended,and in the licensees'Environmental Report,as supplementedand amended. Subjectto the conditionsand requirementsincorporatedherein,lhe Commissionherebylicenses: (1) FENOC,pursuantto Section103 ofthe Act and 10 CFR Part50, to possess,use, and operatethe facility at the designatedlocationin Lake County, Ohio, in accordancewith the proceduresand limitationsset forth in this license; (2) FirstEnergyNuclearGeneratiorr=llQ-and-9hiqECiC-on QSlrlp41y,t9 pS9s9-s9!l-e _ - _-- _l Deletedl Corp. facility at the designatedlocationin Lake County, Ohio, in accordancewith the proceduresand limitationsset forth in this license; (3) FENOC,pursuantto the Act and 10 CFR Parl70,lo receive,possess,and use at any time special nuclearmaterialas reactorfuel, in accordancewith the limitationsfor storageand amountsrequiredfor reactoroperation,as describedin the FinalSafetyAnalysisReport,as supplementedand amended; (4) FENOC,pursuantto the Act and 10 CFR Parts30, 40, and 70, to receive,possess,and use at any time any byproduct,source,and specialnuclearmaterialsuch as sealedneutronsourcesfor reactor startup,sealedsourcesfor reactorinstrumentation and radiationmonitoringequipmentcalibration,and fission detectorsin amounts as required; (5) FENOC,pursuantto the Act and 10 CFR Parts30, 40, and 70, to receive,possess,and use in amountsas requiredany byproduct,source,or specialnuclearmaterialwithoutrestrictionas to chemicalor physicalform,for sampleanalysisor instrumentcalibrationor associatedwith radioactive apparatusor components;and (6) FENOC,pursuantto the Act and 10 CFR Parts30, 40, and 70, to possess,but nol separate,such byproductand specialnuclearmaterialsas may be producedby the operationof the facility. (7Xa)Ohio EdisonCompanyis authorizedto transferany portionof its 30.0%ownershipshareof PNPP Unit 1 and a proportionate shareof its intereslin the PNPPcommonfacilitiesto certainequityinvestors identifiedin ils submissionof January23, 1987, as supplementedon March3, 1987,and at the same time to leasebackfrom such purchaserssuch interestsold in the PNPP Unit I facility.The term of the lease is for approximately29/zyears subjectto a right of Deleted: 137 AmendmentNo.,

renewal.Suchsaleandleaseback transactions aresubjectto the representations andconditions setforthin the abovementioned of application January23, 1987, as supplemented on March3, 1987,as wellas the letterof the Directorof the Officeof NuclearReactorRegulation datedMarch16,1987, consenting to suchtransactions. Specifically,a lessorandanyoneelsewhomay acquirean interestunderthesetransactions areprohibitedfromexercising directlyor indirectlyanycontroloverthelicensesof PNPPUnit1. Forpurposes of thiscondition the limitations of 10 CFR50.81, as nowin effectandas maybe subsequently amended, arefullyapplicable to the lessorandanysuccessor in interestto thatlessoras longas the licensefor PNPPUnit1 remainsin effect; thesefinancialtransactions shallhaveno effecton the licensefor the Perry Nuclearfacilitythroughout the termof thelicense. (b) Further,the licensees arealsorequiredto notifythe NRCin writingpriorto any changein: (i) thetermsor conditions of anyleaseagreements executedas part of thesetransactions, (ii)the PNPPOperating Agreement; (iii)theexisting propertyinsurance coverage for PNPPUnit1; and(iv)anyactionby a lessoror othersthat may havean adverseeffecton the safeoperationof the facility. Thislicenseshallbe deemedto containandis subjectto theconditions specifiedin theCommission's regulations setforthin 10CFRChapterI and is subjectto all applicableprovisions of theAct andto the rules,regulations, andordersof the Commission nowor hereafter in effect;andis subjectto theadditional conditions specifiedor incorporated below: (1) MaximumPowerLevel FENOCis authorized to operatethefacilityat reactorcorepowerlevelsnotin excessof 3758megawatts thermal(100%power)in accordance withthe conditions specifiedherein. (2) TechnicalSpecifications TheTechnical Specifications contained in AppendixA andthe Environmental Protection Plancontained in AppendixB, as ievisedthroughAmendment No.-________--_---lDeleted: 155 areherebyincorporated intothe license.FENOCshalloperatethefacilityin accordance withtheTechnical Specifications andthe Environmental Protection Plan (3) AntitrustConditions

a. FirstEnergyNuclearceneratio1=tlQ 49 O!!9 _Eqj99! Q-qryqly Deleted: Corp.

Deleted3 155 AmendmentNo..__-_,-_--

                                                                                           -_.r-

_6_ shallcomplywith the antitruslconditionsdelineatedin AppendixC to this license;AppendixC is herebyincorporated into this license.

b. FENOCshallcomplywith the antitrustconditionsdelineatedin AppendixC to this license as if namedtherein.FENOCshallnot marketor brokerpoweror energyfrom the Perry NuclearPowerPlant,Unit No. 1. The Ownersare responsibleand accountable for the actionsof FENOC to the extent that said actionsaffect the marketingor brokeringof power or energyfrom the PerryNuclearPowerPlant,UnitNo. 1, and in any way, contravenethe antitrustconditioncontainedin the license.

(4) Deleted (5) Deleted (6) Fire Protection(Section9.5. SER. SSER#'1.2. 3. 4. 7. and 8) FENOCshallcomplywiththe followingrequirements of the fire protectionprogram:FENOCshall implementand maintainin effectall provisionsof the approvedfire protectionprogramas describedin the FinalSafetyAnalysisReport,as amended,for the PerryNuclearPowerPlant and as approvedin the SafetyEvaluationReport(NUREG-0887) datedMay 1982and SupplementNos. 1 through10 thereto,subjectto the followingprovisions:

a. FENOC may make changesto the approvedfire protectionprogramwithout prior approval of the Commissiononly if thosechangeswouldnot adverselyaffectthe abilityto achieve and maintainsafe shutdownin the eventof a fire.

(7) Deleted (8) Deleted (9) Deleted (10) Deleted (11 ) MitiqationStrateqvLicenseCondition The licenseeshalldevelopand maintainstrategiesfor addressinglargefires and explosionsand that includethe followkey areas: (a) Fire fightingresponsestrategywith the followingelements:

1. Predefinedcoordinatedfire responsestrategyand guidance
2. Assessmentof mutualaid fire fightingassets
3. Designatedslagingareasfor equipmentand materials ruocunltcEsrHts pnc Amendment No. 137 Revisedby letter dated July 11,2007

H. This licenseis effectiveas of the date of issuanceand shallexpireat midnighton March 18, 2026.

3. Basedon the Commission'sOrderdated November15, 2005 and the Commission'srevisedOrder dated December16, 2005 and conformingAmendmentNo. 137 dated December16, 2005 regarding the directtransferof the licensefrom PennsylvaniaPowerCompany,Ohio EdisonCompany,OES Nuclear,Inc.,The ClevelandElectricllluminatingCompany,and the ToledoEdisonCompany,to FirstEnergyNuclealGenerationCorp.(FENGenCo)1, FirstEnergyNuclearOperatingCompanyand FirstEnergyNuclearGenerationCorp.l shallcomplywith the followingconditionsnotedbelow:

A. On the closingdate(s)of the transfersto FENGenColof their interestsin Perry,Pennsylvania PowerCompany,The ClevelandElectricllluminatingCompany,Ohio EdisonCompany,OES Nuclear,Inc.,and ToledoEdisonCompanyshalltransferto FENGenColall of each transferor's respectiveaccumulateddecommissioning fundsfor Perry,exceptfor funds associatedwith the leasedporlionsof Perry,and tenderto FENGenColadditionalamountsequalto remainingfunds expectedto be collectedin 2005,as representedin the applicationdatedJune 1,2005,but not yet collectedby the time of closing.All of the fundsshall be deposiledin a separateexernal trust fund for the reactor in the same amount as receivedwith respectto the unil to be segregatedfrom other assetsof FENGenCoiand outsideits administrative control,as requiredby NRC regulations,and FENGenColshalltake all necessarystepsto ensurethat this externaltrustfund is maintainedin accordancewith the requirementsof the orderapprovingthe transferof the licenseand consistentwith the safetyevaluationsupportingthe orderand in accordancewith the requirementsof 10CFRSection50.75,"Reportingand recordkeeping for decommissioning planning." B. By the date of closingof the lransferof the ownershipinterestsin Perryfrom PennsylvaniaPower Companyto FENGenCol,FENGenColshallobtaina parentcompanyguaranteefrom FirstEnergyin an initialamountof at least$80 million(in 2005 dollars)to provideadditional decommissioning fundingassuranceregardingsuch ownershipinterests.Requiredfundinglevels shallbe recalculatedannuallyand, as necessary,FENGenColshalleitherobtainappropriate adjustmentslo the parentcompanyguaranteeor otherwiseprovideany additional. decommissioning fundingassurancenecessaryfor FENGenCo:to meet NRC requirements under10 CFR 50.75. A m e n d m e nNt o . , _ _ _ _ _ ---_, _

                                                                                                                   - -_ _ _ . r -

The SupportAgreementsdescribedin the applicationsdatedMay 18, 2005 (up to $80 million), and June 1, 2005 (up lo $400 million),shall be effectiveconsistentwith the representations containedin the applications.FENGenColshalltake no actionto causeFirstEnergy,or its successorsand assigns,to void, cancel,or modifythe SupportAgreementswithoutthe prior writtenconsentof the NRC staff,except,however,the $80 millionSupportAgreementin connectionwith the transfer of the Penn Power interestsmay be revoked or rescindedif and when the $400 millionsupportagreementdescribedin the June 1,2005,applicationbecomes effective.FENGenColshall informthe Directorof the Officeof NuclearReactorRegulation,in writing,no laterthan ten days afterany funds are providedto FENGenColby FirstEnergyunder eitherSupportAgreement. FOR THE NUCLEARREGULATORYCOMMISSION ORIGINALSIGNEDBY: HaroldR. Denton,Director Officeof NuclearReactorRegulation Attachments/Ap pendices l.Attachmenlsl-2

2. AppendixA - TechnicalSpecifications (NUREG-1204)
3. AppendixB - Environmental Protection Plan
4. AppendixC - AntitrustConditions Dateof lssuance:November13, 1986 TirstgnerqyXuclear Genera Generalion*Ite AmendmentNo.,,-

APPENDIXC PERRYNUCLEARPOWERPLANT.UNITNO. 1 NPF-58 ANTITRUSTCONDITIONS FOR FIRSTENERGYNUCLEARGENERATION_LLC . ,J Deleted: CORP. OHIOEDISONCOMPANY A. The licenseesare subjectto the followingantitrustconditions: Definitions Applicantsshall meanthe two companieslistedabove. Entitvshall mean any electricgenerationand/ordistributionsystemor municipalityor cooperativewith a stalutoryrightor privilegeto engagein eitherof thesefunctions. Wheelinq shall mean transportationof electricityby a utility over ils lines for anotherutility, includingthe receiplfrom and deliveryto anothersystemof like amountsbut not necessarilythe same energy.Federal PowerCommission,The 1970NationalPowerSurvev,Part 1, P. 1-24-8. LicensinqConditions (1) Applicantsshallnot conditionthe sale or exchangeof wholesalepoweror coordinationservices uponthe conditionthat any otherentity: (a) enter into any agreementor underslandingrestrictingthe use of or alienationof such energyor servicesto any customersor territories; (b) enter into any agreementor understanding requiringthe reeeivingentityto, give up any other powersupplyalternativesor to deny itselfany marketopportunities; (c) withdrawany ,petitionto interveneor foregoparticipation in any proceedingbeforethe NuclearRegulatoryCommissionor refrainfrom instigatingor prosecutingany antitrust actionin any otherforum. Deleteds137 AmendmentNo.,

Attachment 5 ProposedBeaverValleyPowerStation,UnitNo. 1 OperatingLicenseChanges (Re{yped- For lnformation Only) (NinePagesFollow)

UNITED STATES Proposed NUCLEARREGULATORY COMMISSION Page WASHlNGTON, D.C.20555-0001 FIRSTENERGY NUCLEAR OPERATING COMPANY FIRSTENERGY NUCLEAR GENERATION. LLC DOCKETNO.50-334 BEAVERVALLEYPOWERSTATION.UN]TNO. 1 RENEWED FACILITY OPERATING LICENSE LicenseNo. DPR-66

1. The Nuclear Regulatory Commission (theCommission) havingfoundthat:

A. Theapplication to renewFacilityOperating LicenseNo.DPR-66,filedby FirstEnergy NuclearOperating Company(FENOC)-actingon its ownbehalfandas agentfor FirstEnergy NuclearGeneration, LLC(thelicensees) complies withthe standards and requirements of theAtomicEnergyAct of 1954,as amended(theAct),andthe Commission's rulesand regulations setforthin 10 CFRChapter1, andall required notificationsto otheragenciesor bodieshavebeendulymade; B. Construction of the BeaverValleyPowerStation,UnitNo. 1 (facility), hasbeen substantially completed in conformity withConstruction PermitNo.CPPR-75andthe application,as amended, the provisionsof theAct andthe rulesand regulations of the Commission; C. Thefacilitywilloperatein conformity withthe application,the provisionsof theAct,and the rulesand regulations of the Commission; D. Thereis reasonable assurance:(i) thatthe activitiesauthorizedby thisrenewed operating licensecanbe conducted withoutendangering the healthandsafetyof the public,and(ii)thatsuchactivities willbe conducted in compliance withthe rulesand regulations of the Commission; E. FENOCis technically qualifiedandthe licensees arefinancially to engagein oualified the activitiesauthorized by thisrenewedoperating licensein accordance withthe rules and regulations of the Commission; F. The licensees havesatisfied the applicable provisionsof 10 CFRPart140,"Financial Protection Requirements and Indemnity Agreements," of the Commission's regulations;

  • FENOC is authorizedto act as agentfor FirstEnergyNuclearGeneration,LLC, and has exclusive and controlover the physicalconstruction,operation,and maintenanceof the facility.

responsibility AmendmentNo. RenewedOperatingLicenseDPR-66

Proposed Page G. The issuanceof thisrenewedoperating licensewillnot be inimicalto the common defenseandsecurityor to the healthandsafetyof the public; H. Afterweighingthe environmental, economic, technical andotherbenefitsof the facility againstenvironmental andothercostsandconsidering availablealternatives,the issuance of RenewedFacilityOperating LicenseNo.DPR-66is in accordance with10 CFRPart51 (formerly AppendixD of 10 CFRPart50) of the Commission's regulations andall applicable requirements havebeensatisfied; and L Thereceipt,possession, anduseof source,by-product, and specialnuclearmaterialas authorized by thisrenewedoperating licensewillbe in accordance withthe Commission's regulations in 10 CFRParts30,40,and70,including 10 CFRSections 30.33,40.32,70.23, and70.31. J. Actionshavebeenidentified andhavebeenor willbe takenwithrespectto: (1) managing the effectsof agingon thefunctionality of structuresandcomponents that havebeenidentified to requirereviewunder10 CFR5a.21(a)(1) duringthe periodof extendedoperation, and (2)time-limited aginganalyses thathavebeenidentified to requirereviewunder10 CFR 54.21(c), suchthatthereis reasonable assurance thatthe activities authorized by thisrenewedoperating licensewillcontinueto be conducted in accordance withthe currentlicensing basis,as definedin 10 CFR54.3for the facility, andthatanychangesmadeto the facility's currentlicensing basisin orderto comply with10 CFR5a.29(a)are in accordance withtheAct andthe Commission's regulations;

2. RenewedFacilityOperating LicenseNo.DPR-66is herebyissuedto FENOCandFirstEnergy NuclearGeneration, LLCto readas follows:

A. Thisrenewedlicenseappliesto the BeaverValleyPowerStation,UnitNo.1, a pressurized waternuclearreactorandassociated equipment (thefacility), ownedby FirstEnergy NuclearGeneration, LLC,andoperatedby FENOC.Thefacilityis locatedin BeaverCounty,Pennsylvania, on thesouthernshoreof the OhioRiver,andis described in the "UpdatedFinalSafetyAnalysisReport"as supplemented andamendedandthe Environmental Reportas supplemented andamended. B. Subjectto the conditions andrequirements incorporated herein,the Commission hereby licenses: (1) FENOC,pursuant to Section104bof theAct and 10 GFRPart50,"Licensing of Production and Utilization to possess,use,andoperatethefacility, Facilities," andFirstEnergy NuclearGeneration, LLCto possessthefacilityat the designated locationin BeaverCounty,Pennsylvania in accordance withthe procedures and limitationssetforthin thisrenewedlicense; (2) FENOC,pursuant to theAct and 10 CFRPart70,to receive,possess, and useat anytimespecialnuclearmaterialas reactorfuel,in accordance withthe limitations for storageand amountsrequired for reactoroperation, as described in the UpdatedFinalSafetyAnalysisReport,as supplemented andamended; AmendmentNo. BeaverValleyUnit1 RenewedOperatingLicenseDPR-66

Proposed Page (3) FENOC,pursuantto theAct and 10 CFRParts30,40 and70,to receive, possessand useat anytimeanybyproduct, sourceandspecialnuclearmaterial as sealedneutronsourcesfor reactorstartup,sealedsourcesfor reactor instrumentation andradiation monitoring equipment andas fission calibration, detectorsin amountsas required; (4) FENOC,pursuant to theAct and 10 CFRParts30,40 and70,to receive, possessand usein amountsas requiredanybyproduct, source,or special nuclearmaterialwithout to chemicalor physicalform, restriction for sample analysisor instrument calibrationor associated withradioactive apparatus or components; (5) FENOC,pursuant to theAct and 10 CFRParts30,40, and70,to possess,but notseparate, suchbyproduct andspecialnuclearmaterials as maybe produced by the operation of thefacility.

c. Thisrenewedoperating licenseshallbe deemedto containandis subjectto the conditions specifiedin thefollowing Commission regulations in 10 CFRChapter1:

Part20, Section30.34of Part30, Section40.41ofPart40, Sections50.54and50.59of Part50, andSection70.32of Part70;andis subjectto all applicable provisionsof the Act andto the rules,regulations, andordersof the Commission nowor hereafterin effect;and is subjectto the additional conditions specified or incorporated below: (1) MaximumPowerLevel FENOCis authorized to operatethefacilityat a steadystatereactorcorepower levelof 2900megawatts thermal. (2) Technical Specifications TheTechnical Specifications contained in Appendix A, as revisedthrough Amendment No. , are herebyincorporated in the license.The licenseeshall operatethe facilityin accordance withthe Technical Specifications. (3) AuxiliarvRiverWaterSvstem (Deieteeiby Amendmeni irio.6) AmendmentNo. BeaverValleyUnit 1 RenewedOperatingLicenseDPR-66

                                              -6                                             Proposed Page (10)   AdditionalConditions The AdditionalConditionscontainedin AppendixC, as revisedthrough AmendmentNo. , are herebyincorporatedintothis license. FENOC shall operatethe facilityin accordancewith the AdditionalConditions.

(11) MitiqationStrateovLicenseCondition The licensee shalldevelopandmaintainstrategies for addressing largefiresand explosions andthatincludethe followingkeyareas: (a) Firefightingresponse strategywiththe following elements:

1. Pre-defined coordinated fire response strategyandguidance
2. Assessment of mutualaidfirefightingassets
3. Designated stagingareasfor equipment andmaterials
4. Commandandcontrol
5. Trainingof responsepersonnel (b) Operations to mitigatefueldamageconsidering the following:
1. Protection and useof personnel assets
2. Communications
3. Minimizing firespread
4. Procedures for implementing fire responsestrategy integrated
5. ldentification of readily-available pre-stagedequipment
6. Trainingon integrated fireresponse strategy
7. Spentfuelpoolmitigation measures (c) Actionsto minimize releaseto includeconsideration of:
1. Watersprayscrubbing
2. Doseto onsiteresponders AmendmentNo.

BeaverValleyUnit 1 RenewedOperatingLicenseDPR-66

APPENDIXC Proposed Page ADDITIONALCONDITIONS OPERATINGLICENSENO. DPR-66 FirstEnergyNuclearOperating Companyand FirstEnergy NuclearGeneration,LLCshatlcomplywith II the followingconditionson the schedules notedbelow: Amendment AdditionalCondition lmplementation Number Date 202 The licenseeis authorized to relocatecertain The amendment Technical Specification requirements to licensee- shallbe controlled documents.lmplementation of this implemented within amendment shallincludethe relocation of these 60 daysfrom technical specification requirements to the April14,1997 appropriatedocuments,as describedin the licensee'sapplicationdated September9, 1996, and evaluatedin the staffs safetyevaluation attachedto this amendment. 2Og The licenseeis authorizedto relocatecertain The amendment TechnicalSpecificationrequirementsto licensee- shall be controlleddocuments. lmplementation of this implementedwithin amendmentshall includethe relocationof these 60 days from technical specification requirementsto the December 10.1997 appropriatedocuments,as describedin the licensee'sapplicationdated March 14, 1997,as supplemented July 29 and August13, 1997,and evaluatedin the staffs safety evaluationattached to this amendment. 210 The licenseeis authorizedto relocatecertain The amendment TechnicalSpecificationrequirementsto licensee- shall be controlleddocuments. lmplementation of this implementedwithin amendmentshall includethe relocationof these 30 days from technical specification requirementsto the January20, 1998 appropriate documents, as describedin the licensee's application datedSeptember 11,1997, andevaluated in the staffssafetyevaluation atiaeheciio thisamendment. BeaverValleyUnit 1 c-1 Amendment No. I

Proposed A P P E N D I XC Page ADDITIONAL CONDITIONS OPERATING LICENSE NO.DPR-66 FirstEnergyNuclearOperating CompanyandFirstEnergy NuclearGeneration, LLCshallcomplywith thefollowingconditions on the schedules notedbelow. Amendment Additional Condition lmplementation Number Date 225 The licenseeis authorized to relocatecertain The amendment TechnicalSpecification requirements to licensee- shallbe controlled documents.lmplementation of this implemented within amendment shallincludethe relocation of these 60 daysfrom TechnicalSpecification requirements to the August30, 1999 appropriate documents as described in the licensee's application datedDecember 24, 1998, as supplemented June15,June17, andJuly7, 1999,andevaluated in the staffssafety evaluation attachedto thisamendment. 269 On the closingdate(s)of the transfers to FENGenCo* The amendment of theirinterests in BeaverValleyPowerStation,Unit shallbe No. 1, Pennsylvania PowerCompanyandOhioEdison implementedwithin Companyshalltransferto FENGenCo* all of each 30 daysfrom transferor's respective accumulated decommissioning December 16,2005 fundsfor BeaverValleyPowerStation,UnitNo. 1, and tenderto FENGenCo* additional amounts equalto remaining fundsexpected to be collected in 2005,as represented in the application datedJune1, 2005,but notyet collected by thetimeof closing.All of the funds shallbe deposited in a separateexternaltrustfundfor the reactorin the sameamountas received with respectto the unitto be segregated from otherassets of FENGenCo* andoutsideits administrative control, as requiredby NRCregulations, and FENGenCo* shall takeall necessary stepsto ensurethatthisexternal trustfundis maintained in accordance withthe requirements of the orderapproving the transferof the iicenseandconsisient wiihthe saietyevaiuaiion supporting the orderandin accordance withthe requirements of 10 CFRSection50.75,"Reporting and recordkeeping for decommissioning planning." " FirstEnergy NuclearGeneration Corp.(FENGenCo) hasbeenrenamedFirstEnergy Nuclear Generation.LLC. BeaverValleyUnit 1 c-2 AmendmentNo.

Proposed APPENDIXC Page ADDITIONALCONDITIONS OPERATINGLICENSENO. DPR-66 FirstEnergy NuclearOperating Companyand FirstEnergy NuclearGeneration, LLCshallcomplywith thefollowingconditions on the schedules notedbelow: Amendment Additional Condition lmplementation Number Date 269 By the dateof closingof thetransferof the ownership Theamendment shall interestsin BeaverValleyPowerStation,UnitNo. 1 be implementedwithin fromPennsylvania PowerCompanyto FENGenCo*, 30 daysfrom FENGenCo* shallobtaina parentcompanyguarantee December16.2005 fromFirstEnergy in an initialamountof at least$80 million(in2005dollars)to provideadditional decommissioning fundingassurance regarding such ownership interests.Required fundinglevelsshallbe recalculated annually and,as necessary, FENGenCo* shalleitherobtainappropriate adjustments to the parentcompanyguarantee or otheruvise provideany additional decommissioning fundingassurance necessary for FENGenCo* to meetNRCrequirements u n d e r1 0C F R5 0 .7 5. The SupportAgreements described in the applications datedMay18,2005(upto $80million), andJune1, 2005(upto $400million), shallbe effectiveconsistent withthe representations contained in the applications. FENGenCo* shalltakeno actionto causeFirstEnergy, or its successors andassigns,to void,cancel,or modify the SupportAgreements withoutthe priorwritten consentof the NRCstaff,except,however, the $80 millionSupportAgreement in connection withthe transferof the Pennsylvania PowerCompanyinterests maybe revokedor rescinded if andwhenthe $400 millionsupportagreement described in the June1, 2005,application becomeseffective.FENGenCo" shall informthe Directorof the Officeof NuclearReactor Reguiation, in writing,no iaterthanten ciaysafterany fundsare provided to FENGenCo* by FirstEnergy undereitherSupportAgreement. . FrrstEnergy NuclearGeneration Corp.(FENGenCo) hasbeenrenamed FirstEnergyNuclear Generation.LLC. BeaverValleyUnit 1 c-3 AmendmentNo.

Proposed APPENDIX C Page ADDITIONAL CONDITIONS OPERATING LICENSE NO.DPR-66 FirstEnergy NuclearOperating Companyand FirstEnergy NuclearGeneration, LLCshallcomplywith thefollowingconditionson the schedules notedbelow: Amendment Additional Condition lmplementation Number Date 278 Schedule for Newand RevisedSurveillance Requirements (SRs) Theschedule for performing SRsthatare newor revisedin The Amendment No.278shallbe as follows: amendment shall be ForSRsthatare newin thisamendment, thefirstperformance implemented is due at the endof thefirstsurveillance interval, whichbegins within150 days on the dateof implementation of thisamendment. from date of issuance ForSRsthatexistedpriorto thisamendment, whoseintervals of performance are beingreduced,the firstreduced surveillance intervalbeginsuponcompletion of thefirst surveillance performed afterimplementation of this amendment. ForSRsthatexistedpriorto thisamendment, whoseintervals of performance are beingextended, the firstextended surveillance intervalbeginsuponcompletion of the last surveillance performed priorto implementation of this amendment. ForSRsthatexistedpriorto thisamendment thathave modifiedacceptance criteria,the first performance subjectto the modifiedacceptance criteriais due at theendof thefirst surveillance intervalthatbeganon the datethe surveillance waslastperformed priorto the implementation of this amendment. 278 Relocation of CertainTechnical Specification Requirements LicenseAmendment No.278authorizes the relocation of certain The Technical Specifications to otherlicensee-controlled documents. amendment lmplementation of thisamendment shallincluderelocation of the shall be requirements to the specified documents, as described in implemented (1)Sections4D and 4Eof the NRCstaffsSafetyEvaluation, and within 150 days (2)TableLA, RemovedDetailChanges, andTableR, Relocated from date of Specifications, attachedto the NRCstaffs SafetyEvaluation, issuance whichis enclosedin thisamendment. BeaverValleyUnit1 c-4 AmendmentNo.

Proposed APPEND]XC Page ADDITIONALCONDITIONS OPERATINGLICENSENO. DPR-66 FirstEnergyNuclearOperating Companyand FirstEnergy NuclearGeneration, LLCshallcomplywith the followingconditionson the schedules notedbelow: Amendment Additional Condition lmplementation Number Date 281 InitialPerformance of NewSurveillance andAssessment Requirements Uponimplementation of Amendment No.281 adoptingTSTF-448, The Revision 3, the determination of controlroomenvelope(CRE) amendment unfiltered air inleakage as requiredby Surveillance Requirement shallbe (SR)3.7.10.4,in accordance withSpecification 5.5.14.c(i), the implemented assessment of CREhabitability as requiredby Specification within120days 5.5.14.c(ii),andthe measurement of CREpressureas requiredby fromdateof Specification 5.5.14.d,shallbe considered met. Following issuance implementation: (a) Thefirstperformance of SR 3.7.10.4, in accordance with Specification 5.5.14.c(i), shallbe withinthe specified Frequency of 6 years,plusthe 18-month allowanceof SR 3.0.2,as measured fromthedateof the mostrecent successful tracergastest,or withinthe next18 monthsif the timeperiodsincethe mostrecentsuccessful tracergas test is greaterthan6 years. (b) The first performance of the periodicassessmentof CRE habitability,Specification 5.5.14.c(ii), shallbe within 3 years,plusthe 9-monthallowance of SR 3.0.2,as measured fromthe dateof the mostrecentsuccessful tracergastest,or withinthe next9 monthsif thetime periodsincethe mostrecentsuccessful tracergastestis greaterthan3 years. (c) Thefirstperformance of the periodicmeasurement of CRE plessur-e, Specification

                                    -  - tf:  - - Ll 5.5.i4.cj,shaiibe wiihini8 i-r-ronths, plusthe 138daysallowedby SR 3.0.2,as measured                  from the dateof the mostrecentsuccessfulpressure measurement      test.

BeaverValleyUnit1 c-5 Amendment No.

Attachment6 ProposedBeaverValleyPowerStation,UnitNo.2 OperatingLicenseChanges (Retyped- For Information Only) (ElevenPagesFollow)

UNITED STATES Proposed NUCLEAR REGULATORY COMMISSION Page WASHINGTON, D.C. 20555-0001 FIRSTENERGYNUCLEAROPERATINGCOMPANY FIRSTENERGY NUCLEARGENERATION. LLC OHIO EDISONCOMPANY THE TOLEDO EDISONCOMPANY DOCKETNO. s0-412 BEAVERVALLEYPOWERSTATION,UNIT2 LicenseNo. NPF-73

1. The NuclearRegulatoryCommission(the Commissionor the NRC) has foundthat:

A. The application to renewFacilityOperating LicenseNo' NPF-73filedby FirstEnergy NuclearOperating bompany(FENOC)" actingon its ownbehalfand as agentior FirstEnergy NuclearGeneration, LLC,OhioEdisonCompany, and TheToledoEdisoncompany(thelicensees), complies with the standards and requirements of theAtomicEnergyAct of 1954,as amended(theAct),andthe Commission's regulations setforthin 10CFRChapterl, andall required to otheragencies notifications or bodieshavebeendulymade; B. Construction of the BeaverValleyPowerStation,Unit2 (thefacility), hasbeen substantiallycompleted in conformity withConstruction Permit No. CPPR-105 and the applicatlon, as amended, the provisions of theAct,and the regulations of the Commission; C. Thefacilitywilloperatein conformity withthe application, the provisions of the Act, andthe regulations of the Commission (exceptas exempted from compliance in Section2.D.below); D. Thereis reasonable assurance:(i)thatthe activities authorized by thisrenewed operating licensecanbe conducted without endangering the health andsafetyof and (ii)thatsuchactivities the publ'rc will be conducted in compliance withthe . Commission's regulations setforthin 10 CFRChapter l (except as exempted from ccrmplianee !n -Seetion 2.D.below); .FENOC is authorizedto act as agentfor FirstEnergyNuclearGeneration,LLC,Ohio EdisonCompany, and The Toledo EdisonCompany-andhas exclusiveresponsibilityand controlover the physical construction,operation,and maintenanceof the facility. AmendmentNo. RenewedOPeratingLicenseNPF-73

Proposed Page E. FENOCis technicallyqualifiedto engagein the activitiesauthorizedby this renewedoperatinglicensein accordancewith the Commission'sregulationsset forthin 10 CFR Chapterl; F. The licenseeshave satisfiedthe applicableprovisionsof 10 CFR Part 140, "FinancialProtectionRequirementsand lndemnityAgreements,"of the Commission'sregulations; G. The issuanceof this renewedoperatinglicensewill not be inimicalto the common defense and securityor to the health and safety of the public; H. After weighingthe environmental, economic,technical,and other benefitsof the facilityagainstenvironmentaland other costs and consideringavailable alternatives, the issuanceof this RenewedOperatingLicenseNo. NPF-73is subjectto the conditionsfor protectionof the environmentset forth in the Environmental ProtectionPlan attachedas AppendixB, is in accordancewith 10 CFR Part 51 of the Commission'sregulations,and all applicablerequirements have been satisfied;

l. The receipt,possessionand use of source,byproductand specialnuclearmaterial as authorizedby this licensewill be in accordancewith the Commission's regulations in 10 CFR Parts30,40, and 70.

J Actionshave been identifiedand have been or will be taken with respectto: (1) managingthe effectsof aging on the functionalityof structuresand components that have been identifiedto requirereviewunder 10 CFR 54.21(aX1)duringthe periodof extendedoperation,and (2) time-limitedaging analysesthat have been identifiedto requirereviewunder 10 CFR 54.2Uc),such that there is reasonable assurancethat the activitiesauthorizedby this renewedoperatinglicensewill continueto be conductedin accordancewith the currentlicensingbasis,as definedin 10 CFR 54.3 for the facility,and that any changesmade to the facility's currentlicensingbasisin order to complywith 10 CFR 54.29(a)are in accordance with the Act and the Commission'sregulations;

2. RenewedFacilityOperatingLicenseNPF-73is herebyissuedto FENOC,FirstEnergy NuclearGeneration,LLC, Ohio EdisonCompany,and The ToledoEdisonCompany(the licensees)to read as follows:

A. This renewedlicenseappliesto the BeaverValleyPowerStation,Unit 2, a pressurizedwater reactorand associatedequipment(the facility),owned by Fit"stEnergy,NuclearGeneration,LLC (owner"). leasedto Ohio FdisonComoany (lessee),and The ToledoEdisonCompany(lessee)and operatedby FENOC (collectivelythe licensees).The facilityis locatedon the licensees'site on the southernshoreof the Ohio Riverin BeaverCounty,Pennsylvania, approximately 22 milesnorthwestof Pittsburghand 5 mileseast of East Liverpool,Ohio, and is describedin FENOC'sUpdatedFinalSafetyAnalysisReport,as supplemented and amended,and in its Environmental Report,as supplementedand amended; B. Subjectto the conditionsand requirementsincorporatedherein,the Commission herebylicenses: (1) Pursuant to Section103of theAct and 10 CFRPart50, FENOCto possess,use,andoperatethefacilityat the designated locationin Beaver County,Pennsylvania, in accordance withthe procedures and limitations setforthin thislicense: AmendmentNo. BeaverValleyUnit 2 RenewedOperatingLicenseNPF-73

Proposed Page (2) Pursuant to theAct and 10CFRPart50, FirstEnergy NuclearGeneration, LLC,OhioEdisonCompany, andTheToledoEdisonCompanyto possessthe facilityat the designated locationin BeaverCounty, Pennsylvania, in accordance withthe procedures and limitations setforth in the license; (3) Pursuant to theAct and 10 CFRPart70, FENOC,to receive,possess, anduseat anytimespecialnuclearmaterialas reactorfuel,in accordance withthe limitations for storageandamountsrequiredfor reactoroperation, as described in the UpdatedFinalSafetyAnalysis Report,as supplemented andamended; (4) Pursuant to theAct and 10CFRParts30,40, and70, FENOCto receive, possess,anduseat anytimeanybyproduct, source,andspecialnuclear materialsuchas sealedneutronsourcesfor reactorstartup,sealed sourcesfor reactorinstrumentation andradiationmonitoring equipment calibration, andas fissiondetectors in amountsas required; (5) Pursuant to theAct and 10 CFRParts30,40, and70, FENOCto receive, possess,and usein amountsas requiredanybyproduct, source,or specialnuclearmaterialwithout restriction to chemicalor physical form, for sampleanalysisor instrument calibration or otheractivityassociated withradioactive apparatus or components; (6) Pursuant to theAct and 10CFRParts30,40, and70, FENOCto possess,but notseparate, suchbyproduct andspecialnuclearmaterials as maybe producedby the operation of the facilityauthorized herein. (7) (a) OhioEdisonCompanyandTheToledoEdisonCompanyare authorized to transferanyportionof theirrespective leased interestsin BVPSUnit2 anda proportionate shareof theirleased interestsin the BVPScommonfacilities to certainpotential investors identified in theirsubmittals of July 14,16,22 and31, andSeptember 14,17and18,1987,andat thesametimeto leasebackfromsuchpurchasers suchinteresttransferred in the BVPSUnit2 facility.Thetermof the leaseis for approximately 29-112 yearssubjectto a rightof renewal.Suchsaleand l^^^^l^a^l, +-^^^^^ri^^ ,t^i^^l +^ +t^^ -^^-^^^^l^+;^*^ ^^l lsc>s-c'st\  !.!.:! !><!Lt!U! !> 4! g Dr-lL'j=rrr rl.,! t! lg ! gPl sDsl ll-lLlul l+ c! !u conditions setforthin the aforementioned submittals.Specifically, a lessorand anyoneelsewhomayacquirean interestunder thesetransactions areprohibited fromexercising directlyor indirectly anycontroloverthe licenseof BVPSUnit2. For purposes of thiscondition thelimitations in 10 CFR50.81,as now in effectandas maybe subsequently amended,arefully applicable to the lessorandanysuccessor in interestto that lessoras longas the licensefor BVPSUnit2 remainsin effect; thesefinancial transactions shallhaveno effecton the licensefor the BVPSUnit2 facilitythroughout thetermof the license. Amendment No. BeaverValleyUnit2 RenewedOperating LicenseNPF-73

Proposed Page (b) Further,the licensees are alsorequiredto notifythe NRCin writingpriorto anychangein. (i) the termor conditions of anyleaseagreements executedas part of these transactions; (ii)the BVPSOperating Agreement, (iii)the existingpropertyinsurance coverage for BVPSUnit2, and (iv)anyactionby a lessoror othersthatmayhaveadverse effecton the safeoperationof the facility. C. Thisrenewedoperating licenseshallbe deemedto containandis subject to the conditions specified in thefollowingCommission regulations set forthin 10 CFRChapter1 andis subjectto all applicable provisions of the Act andto the rules,regulations, andordersof the Commission nowor hereafter in effect;andis subjectto the additional conditions specified or incorporated below: (1) MaximumPowerLevel FENOCis authorized to operatethe facilityat a steadystatereactor corepowerlevelof 2900megawatts thermal. (2) Technical Specifications TheTechnical Specifications contained in Appendix A, as revised throughAmendment No. , andthe Environmental Protection Plan contained in AppendixB, bothof whichare attachedheretoare herebyincorporated in the license.FENOCshalloperatethe facilityin accordance withtheTechnical Specifications andthe Environmental Protection Plan. Amendment No. BeaverValleyUnit2 RenewedOperating LicenseNPF-73

Proposed Page (8) DetailedControlRoomDesiqnReview(DCRDR) Deleted (9) SafetvParameter DisplavSvstem(SPDS) Deleted (10) FireProtection Modifications (Section9.5.1of SERSupplement 6) Deleted (1 1 ) A d d i ti o n a l C onditions TheAdditional Conditions contained in AppendixD, as revisedthrough I Amendment No. , are herebyincorporated intothislicense.FENOC I shalloperatethe facilityin accordance withtheAdditional Conditions. (12) SteamGenerator Surveillance lntervalExtension Deleted (13) Mitioation StrateqvLicenseCondition The licenseeshalldevelopandmaintainstrategies for addressing large firesandexplosions andthatincludethefollowingkeyareas: (a) Firefightingresponse strategywiththefollowing elements:

1. Pre-defined coordinated fireresponse strategyandguidance
2. Assessment of mutualaidfirefightingassets
3. Designated stagingareasfor equipment and materials
4. Commandandcontrol
5. Trainingof responsepersonnel (b) Operations to mitigatefueldamageconsidering the following:
1. Protection and useof personnel assets
2. Communications
3. Minimizing firespread
4. Procedures for implementing integratedfireresponsestrategy
5. ldentification of readily-availablepre-staged equipment
6. Trainingon integratedfire responsestrategy
7. Spentfuelpoolmitigation measures (c) Actionsto minimize releaseto includeconsideration of:
1. Watersprayscrubbing
2. Doseto onsiteresponders Amendment No. I BeaverValleyUnit2 Renewed Operating LicenseNPF-73 I

Proposed 1.0 Obiectives of the Environmental Protection Plan Page The Environmental ProtectionPlan (EPP)is to providefor protectionof nonradiological environmentalvaluesduringoperationof the BeaverValleyPowerStation,Unit 2 (facility).The principalobjectivesof the EPP are as follows: (1) Verifythatthe facilityis operatedin an environmentally acceptable manner,as established by the FinalEnvironmental Statement - Operating LicenseStage(FES-OL) andotherNRCenvironmental impactassessments. (2) Coordinate NRCrequirements andmaintainconsistency withotherFederal,State,and localrequirements for environmental protection. (3) KeepNRCinformedof the environmental effectsof facilityconstructionandoperation and of actionstakento controlthoseeffects. Environmental concernsidentified in the FES-OL(September 1985,NUREG-1094) whichrelate to waterqualitymattersare regulated by wayof the licensee's* NPDESpermit. 2.0 EnvironmentalProtectionlssues ln the FES-OL(NUREG-1094, September 1985),the staffconsidered the environmental impactsassociated withthe operation of the BeaverValleyPowerStation,Unit2. No aquatic/water quality,terrestrial,or noiseissueswereidentified. 3.0 Consistencv Requirements 3.1 PlantDesiqnandOperation The licenseemaymakechangesin stationdesignor operation or performtestsor experiments affectingthe environment providedsuchactivities do notinvolvean unreviewed environmental questionanddo notinvolvea changein the EPP.. Changesin stationdesignor operation or performance of testsor experiments whichdo notaffecttheenvironment are notsubjectto the requirements of thisEPP. Activities governedby Section3.3are not subjectto the requirements of thisSection. Beforeengagingin additional construction or operational activities whichmaysignificantly affect the environment, the licenseeshallprepareand recordan environmental evaluation of such activity.Activities are excluded fromthisrequirement if all measurable nonradiological environmental effectsareconfinedto the on-siteareaspreviously disturbedduringsite preparation andplanteonstrucjion. Whenthe evaluation indieates thatsuehactivityinvolvesan unreviewed environmental question, the licenseeshallprovidea writtenevaluation of such activityandobtainpriorNRCapproval.Suchactivityandchangeto the EPPmaybe implemented onlyin accordance withan appropriate licenseamendment as setforthin Section5.3of thisEPP.

  • "Licensee" refersto FirstEnergy NuclearOperating Company, operatorof thefacility,and actingas agentfor FirstEnergy NuclearGeneration, LLC,OhioEdisonCompany, andThe ToledoEdisonCompany, ownersor lesseesof thefacility.

BeaverValleyUnit 2 B-1 AmendmentNo.

Proposed APPENDIXD Page ADDITIONALCONDITIONS OPERATINGLICENSENO. NPF-73 FirstEnergy NuclearOperating Company, FirstEnergy NuclearGeneration, LLC,OhioEdison Company, andTheToledoEdisonCompanyshallcomplywiththe followingconditions on the schedulesnotedbelow: Amendment Additional Condition lmplementation Number Date 83 The licenseeis authorized to relocatecertain Theamendment Technical Specification requirements to licensee- shallbe implemented controlled documents.lmplementation of this within60 days amendment shallincludethe relocation of these fromApril14,1997 technical specification requirements to the appropriate documents, as described in the licensee's application datedSeptember 9, 1996, andevaluated in the staffssafetyevaluation attached to thisamendment. 87 The licenseeis authorized to relocatecertain The amendment Technical Specification requirements to licensee- shall be implemented controlled documents.lmplementation of this within60 days from amendment shallincludethe relocation of these December10, 1997 technical specification requirements to the appropriate documents, as described in the licensee's application datedMarch14,1997,as supplemented July29 andAugust13,1997,and evaluatedin the staff'ssafetyevaluationattached to thisamendment. 88 The licenseeis authorized to relocatecertain Theamendment TechnicalSpecification requirements to licensee- shallbe implemented controlled documents.lmplementation of this within30 daysfrom amendment shallincludethe relocation of these January 20, 1998 technical specification requirements to the appropriate documents, as described in the licensee's application datedSeptember11,1997, and evaii;aieci in ihe siaffs safeiiievaiuaiion attached to thisamendment. 98 The licenseecommitsto performvisualacceptance The amendment examinations of sleevewelds;postweldheattreatment shallbe implemented of sleevewelds;andthe NRC- within60 days from recommended inspections of repaired tubesas March26, 1999 described in the licensee's application dated March10,1997,as supplemented July28, 1997, S e p te mb e1r7 ,1997, Apr il30,1998,and January29, 1999,andevaluated in the staffs safetyevaluation attachedto thisamendment. BeaverValleyUnit 2 D-1 AmendmentNo.

APPENDIXD Proposed Page ADDITIONALCONDITIONS OPERAT]NGLICENSENO. NPF-73 FirstEnergy NuclearOperating Company, FirstEnergy NuclearGeneration, LLC,OhioEdison Company, andTheToledoEdisonCompanyshallcomplywiththefollowingconditions on the schedulesnotedbelow: Amendment Additional Condition lmplementation Number Date 102 The licenseeis authorized to relocatecertain The amendment Technical Specification requirements to licensee- shallbe implemented controlled documents.lmplementation of this within60 days amendment shallincludethe relocation of these fromAugust30, TechnicalSpecification requirements to the 1999 appropriate documents as described in the licensee's application datedDecember 24, 1998,as supplemented June15,June17, andJuly7, 1999, andevaluated in the staff'sevaluation attachedto thisamendment. 151 On the closingdate(s)of the transfers to FENGenCo" The amendment of theirinterests in BeaverValleyPowerStation,Unit shallbe No.2, Pennsylvania PowerCompany, The Cleveland implementedwithin Electric llluminating Company, OhioEdisonCompany, 30 days from andTheToledoEdisonCompanyshalltransferto December16. 2005 FENGenCo" all of eachtransferor's respective accumulated decommissioning fundsfor BeaverValley PowerStation,UnitNo.2, exceptfor fundsassociated withthe leasedportionsof BeaverValleyPower Station,UnitNo.2, andtenderto FENGenCo* additional amountsequaltoremaining fundsexpected to be collected in 2005,as represented in the application datedJune1, 2005,but notyet collected by the timeof closing.All of the fundsshallbe deposited in a separateexternaltrustfundfor the reactorin the sameamountas received withrespectto the unitto be segregated fromotherassetsof FENGenCo* and

                  ^, ,.^3i^ :3^ ^..'*:^:^+-^3i.,^    ^^^9-^i              ,i-^,.! L., t :D.^

uul)tu5 ii9 ctLilliltltJUCtUvti uvtil.tLil,4D !<t'.iuilglr vy rrr\v regulations, and FENGenCo*shalltakeall necessary stepsto ensurethat this externaltrust fund is maintainedin accordancewith the requirementsof the order approvingthe transferof the licenseand consistentwith the safetyevaluationsupportingthe order and in accordancewith the requirementsof 10 CFR Section50.75,"Reportingand recordkeeping for decommissioning planning."

  • FirstEnergy NuclearGeneration Corp.(FENGenCo) hasbeenrenamedFirstEnergy Nuclear Generation.

LLC. BeaverValleyUnit2 D-2 AmendmentNo.

Proposed APPENDIX D Page ADDITIONALCONDITIONS OPERATINGLICENSENO. NPF-73 FirstEnergy NuclearOperating Company, FirstEnergy NuclearGeneration, LLC,OhioEdison Company, andTheToledoEdisonCompanyshallcomplywiththefollowing on the conditions schedulesnotedbelow: Amendment Additional Condition lmplementation Number Date 151 By the dateof closingof thetransferof the ownership Theamendment interestsin BeaverValleyPowerStation,UnitNo.2 shallbe implemented fromPennsylvania PowerCompanyto FENGenCo", within30 daysfrom FENGenCo* shallobtaina parentcompanyguarantee Decem be16,2005 r fromFirstEnergy in an initialamountof at least$80 million(in2005dollars)to provideadditional decommissioning fundingassurance regarding such ownership interests.Required fundinglevelsshallbe recalculated annually and,as necessary, FENGenCo" shalleitherobtainappropriate adjustments to the parent companyguarantee or otheruvise provideanyadditional decommissioning fundingassurance necessary for FENGenCo* to meetNRCrequirements under10 CFR 50.75. The SupportAgreements described in the applications datedMay18,2005(upto $80million), andJune1, 2005(upto $400million), shallbe effectiveconsistent withthe representations contained in the applications. FENGenCo* shalltakeno actionto causeFirstEnergy, or its successors andassigns,to void,cancel,or modify the SupportAgreements withoutthe priorwritten consentof the NRCstaff,except,however, the $80 millionSupportAgreement in connection withthe transferof the Pennsylvania PowerCompanyinterests maybe revokedor rescinded if andwhenthe $400 millionsupportagreement described in the June1, 2005,application becomeseffective.FENGenCo* shall infoi'mihe Dii'ecioi'ofihe Officeof tiiucieai'Reacior Regulation, in writing,no laterthanten daysafterany fundsare provided to FENGenCo" by FirstEnergy under eitherSupportAgreement.

  • FirstEnergy NuclearGeneration Corp.(FENGenCo) hasbeenrenamedFirstEnergy Nuclear Generation,LLC.

BeaverValleyUnit 2 D-3 AmendmentNo.

APPENDIX D Proposed Page ADDITIONALCONDITIONS OPERAT]NGLICENSENO. NPF-73 FirstEnergyNuclearOperatingCompany,FirstEnergyNuclearGeneration,LLC, Ohio Edison I Company,and The ToledoEdisonCompanyshallcomplywith the followingconditionson the I schedulesnotedbelow: Amendment Additional Condition lmplementation Number Date 161 Schedule for NewandRevisedSurveillance Requirements (SRs) Theschedule for performing SRsthatare newor revisedin The AmendmentNo. 161 shall be as follows: amendment shallbe ForSRsthatare newin thisamendment, thefirstperformance implemented is dueat the endof thefirstsurveillance interval,whichbegins within150days on the dateof implementation of thisamendment. from date of issuance ForSRsthatexistedpriorto thisamendment, whoseintervals of performance are beingreduced,the firstreduced surveillanceintervalbeginsuponcompletion of thefirst surveillanceperformed afterimplementation of this amendment. ForSRsthatexistedpriorto thisamendment, whoseintervals of performance are beingextended, thefirstextended surveillanceintervalbeginsuponcompletion of the last surveillanceperformed priorto implementation of this amendment. ForSRsthatexistedpriorto thisamendment thathave modifiedacceptance criteria,the firstperformance subjectto the modifiedacceptance criteriais due at the endof the first surveillanceintervalthatbeganon the datethe surveillance was lastperformed priorto the implementation of this amendment. 141 Relocation of eedalnTechnleal Specifieation Requirernents LicenseAmendmentNo. 161 authorizesthe relocationof certain The TechnicalSpecifications to other licensee-controlled documents. amendment lmplementation of this amendmentshall includerelocationof the shall be requirementsto the specifieddocuments,as describedin implemented (1) Sections4D and 4E of the NRC staffs SafetyEvaluation,and within 150 days (2) Table LA, RemovedDetailChanges,and Table R, Relocated from date of Specifications,attachedto the NRC staffs SafetyEvaluation, issuance which is enclosedin this amendment. BeaverValleyUnit2 D-4 AmendmentNo.

Proposed APPENDIXD Page ADDITIONALCONDITIONS OPERATINGLICENSENO. NPF-73 FirstEnergy NuclearOperating Company, FirstEnergy NuclearGeneration, LLC,OhioEdison Company, andThe ToledoEdisonCompanyshallcomplywiththe followingconditions on the schedules notedbelow: Amendment Additional Condition lmplementation Number Date 163 lnitialPerformance of NewSurveillance andAssessment Requirements Uponimplementation of Amendment No. 163adoptingTSTF-448, The Revision 3, the determination of controlroomenvelope(CRE) amendment unfiltered air inleakage as requiredby Surveillance Requirement shallbe (SR)3.7.10.4, in accordance withSpecification 5.5.14.c(i), the implemented assessment of CREhabitability as requiredby Specification within 120 days 5.5.1a.c(ii), andthemeasurement of CREpressure as required by from date of Specification 5.5.14.d, shallbe considered met. Following issuance implementation: (a) Thefirstperformance of SR 3.7.10.4, in accordance with Specification 5.5.14.c(i),shallbe withinthe specified Frequency of 6 years,plusthe 18-month allowance of SR 3.0.2,as measured fromthedateof the mostrecent successful tracergastest,or withinthe next18 monthsif the time period sincethe mostrecentsuccessfultracer gas testis greaterthan6 years. (b) Thefirstperformance of the periodicassessment of CRE habitability, Specification 5.5.14.c(ii), shallbe within 3 years,plusthe 9-monthallowance of SR 3.0.2,as measured fromthe dateof the mostrecentsuccessful tracergas test,or withinthe next9 monthsif the time periodsincethe mostrecentsuccessfultracergas test is greaterthan3 years. (c) The iii-sipei-fcrmance of ihe pei'iociic measiii'ement of CRE pressure, Specification 5.5.14.d, shallbe within18months, plusthe 138daysallowedby SR 3.0.2,as measured from the dateof the mostrecentsuccessfulpressure measurement test. BeaverValleyUnit2 D-5 Amendment No.

Attachment 7 NuclearPowerStation,UnitNo. 1 ProposedDavis-Besse OperatingLicenseChanges (Re{yped- For Information Only) (SevenPagesFollow)

Proposed Page UNITEDSTATES NUCLEAR REGULATORY COMMISSION wASHtNGTON, D.C.20555-0001 FIRSTENERGY NUCLEAR OPERATING COMPANY AND FIRSTENERGY NUCLEAR GENERATION, LLC D O C K E TN O . 5 0 - 3 4 6 DAVIS-BESSE NUCLEAR POWER STATION I'NIT NO. 1 FACILITY OPERATING LICENSE License No. NPF-3 The Nuclear Regulatory Commission (the Commission) having found that: A. The application for license filed by FirstEnergy NucLear Operating Company (FENOC)1, acting on its own behalf and as agent for FirstEnergy Nuclear Generation, LLC (Iicensees) complies with the standards and reguirements of the Atomic Energy Act of L954, as amended (the AcU), and the Commission's rules and regulations set forth in 10 CFR Chapt,er I and all reguired notifications to other agencies or bodies have been duly made; B. Construction of the Davis-Besse NucLear power Station, Unit No. 1 (tshe facility) has been substantially completed in conformity with Construction Permit No. CppR-80 and the application, as amended, the provisions of the Act and the rul_es and regulations of the Commission;

c. The facility will operat,e in conformity with the applicaEion, as amended, the provisions of t.he Act, and the rules and regulations of the Commission; FENOC j-s aut,horized t.o act as agent for FirstEnergy Nuclear GeneraLion, LLC, and has exclusive responsibility and control over the physical construction, operaiion, anci maintenance of the facility.

L-1 Amendment No.

Proposed Page

1. D. There is reasonable assurance: (i) that the activities authorized by this operating license can be eonduct.ed without endangering the health and safety of the public, and (ii) Ehat such activities wil-l be conducted in compliance with the rules and regulat,ions of the Commission; E. The FirstEnergy Nuclear Operat,ing company is technically qualified and the Ii-censees are financially qualified to engage in the activities authorized by this operating license in accordance with the rules and regulaLions of t.he Commission; The licensees have satisfied the applicable provisions of 10 CFR Part l-40, rrFinancial Protect.i-on Reguirements and Indemnity Agree-menLs," of Lhe Commission's regulations; The issuance of this operating l-icense will" not be inimical the common defense and securitv or to the health and safetv of the public,.

H. After weighing the environmental, economic, technical, and oLher benefi-ts of the facility against environmental and other costs and considering available alternaLives, Ehe issuance of Facility Operating License No. NPF-3 subject to the condj-tions for protection of the environment seL fort,h herein is in accordance with 10 CFR Part 51- (formerly Appendix D to 10 CFR Part 50), of the Commission's regulations and all applicable reguirements have been satisfied; and I. The receipt., possession, and use of source, blproduct and special nuclear materiaL as authorized by thi-s license w j - 1 1 -b e i n a c c o r d - ance wit.h the Commission's regulations in l-0 CFR Part 30, 40, and 70, including 10 CFR Sect.ions 30.33, 40.32,70-23, and 70.31. Facilit.y Operat,ing License No. NPF-3 is hereby issued Lo FirstEnergy Nuclear Operating Company (FENOC), and First.Energy Nuclear Generation, LLC t.o read as follows: A. This l-icense applies to the Davis-Besse Nuc'lear Power Station, Uni-t No. 1, - pr"""rrrized water nuclear reactor and associated equi-pment (the facility), owned by FirstEnergy Nuclear Generation, IJLC. The facility is located on the south-western shore of Lake Erie in Ottawa CounLy, Ohio, approximately 21 miles east of Toledo, Ohio, and is described in the "Fina1 Safety Analysis Report" as supplemented and amended (Amendments 14 through 44) and the Environmental ReporL as supplemented and amended (Supplements 1 through 2). L-2 Amendment No.

Proposed Page

                                              -5 2 .8. Subject. to the conditions                  and requirements       incorporated      herein, the Commission herebv licenses:

(1) FENOC, pursuant to Section 103 of t,he Act and 10 CFR Part. 50, 'rLicensing of Product,ion and Utilization Facilities,tt to possess, use, and operate the facility; (2) FirstEnergy Nuclear Generation, LLC, to possess the facility at the designated locat,ion in Ottawa County, Ohio in accordance with the procedures and limitations set forth i-n this l-icense; (3) FENOC, pursuant to the Act. and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as suppJ-emented and amended; (4) FENOC, pursuant to the Act and 10 CFR parts 30, 40, and 70 to receive, possess and use at any time any byproduct, source and special nucl-ear mat,erial as sealed neuLron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring eguipment ca]ibration, and as fission detectors in amounts as r avm li Ygr l r avAg ,. (5) FENOC,pursuanL to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any blproduct, source or special- nuclear material_ wit,hout restrict.ion Lo chemical or physical form, for sample analysis or instrument. cal-ibration or associated with radioactive apparatus or components; and (5) FENOC, pursuant t.o the Act and l-o CFR part,s 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operat,ion of the facil_ity. L-3 Amendment No.

Proposed Page 2.C. This licenseshall be deemedto contain and is subjectto the conditionsspecifiedin the following Commissionregulationsin 10 CFR ChapterI: Part 20, Section30.34 of Part 30, Section40.4I of Part 40, Sections50.54 and 50.59 of Part 50, and Section70.32 of Part 70; and is subjectto all applicableprovisionsof the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subjectto the additionalconditionsspecifiedor incorporatedbelow: (l) Maximum PowerLevel FENOC is authorized to operatethe facility at steadystate reactor core power levels not in excessof 2817 megawatts(thermal). Prior to attainingthe power level, Toledo Edison Companyshall comply with the conditionsidentified in Paragraph(3) (o) below and complete the preoperationaltests, startup tests and other items identified in Attachment 2 to this license in the sequence specified.Attachment2 is an integral part of this license. (2) Technical Specifications The TechnicalSpecificationscontainedin Appendix A, as revisedthroughAmendmentNo. , are herebyincorporated in the license. FENOC shall operatethe facility in accordancewith the TechnicalSpecifications. (3) Additional Conditions The mattersspecifiedin the following conditionsshall be completedto the satisfactionof the Commissionwithin the statedtime periodsfollowing the issuanceof the licenseor within the operationalrestrictionsindicated.The removal of theseconditionsshall be madeby an amendmentto the licensesupportedby a favorableevaluationby the Commission: (a\ FF.Nf}C chell nnf nnprefc fhe rcanfnr in nneraf inrral ModesI and?with lessthanthreereactorcoolant pumps m operatlon. (b) Deletedper Amendment6 (c) Deletedper Amendment5 L-4 AmendmentNo.

Proposed Page 2.C(4) fire Protection FENOCshaf] implement and maintain in effect al} provisions of the approved Fire Protection Program as described in t,he Updated Safety Analysis Report and as approved in the SERs dated JuIy 26, L979, and May 30, !99:.-, subject Lo the following provision: FENOC may make changes to the approved Fire Protection Program without prior approval of the Commission only if those changes would noE adversely affect the ability to achieve and maintain safe strutdown in Lhe event of a fire - (s) Del-eted per Amendment No. 279. (6) Antit.rust Conditions FENOC and FirstEnergy Nuclear Generation, LLC shall comply wiLh the antitrust conditions delineated in Condition 2.8 of this license as if named therein. FENOCshall not market or broker power or energy from the Davis-Besse Nucl-ear Power Station, Unit No. 1. FirstEnergy Nuclear Generation, LLC is responsible and accountabfe for the actions o f F E N O Ct o t h e e x t e n E t h a t s a i d a c t i o n s affect the marketing or brokering of power or energy from Ehe Davis-Besse Nuclear Power Station, Unit No. 1, and in any way, conLravene the antiLrust license conditions contained in the license. L-6 Amendment No.

Proposed Page

                                                -l         G.       In accordance with the requirement              imposed by the October 8, L9'76, order of the United States Court of Appeals for the Dist,rict       of Columbia CircuiL        in Natural Resources Defense Council v. Nuclear Regulatory                 Commission, No. 74-L385 and 74-1586, that Lhe Nucl-ear Regulatory               Commission "shalL make any licenses         granted between July 21, 19'76 and such time when the mandate is issued subject               to the outcome of such proceedings      herein,"      Ehis license     shall be subject to the outcome of such proceedings.

H. This license is effective as of the date of issuance and shal-l-expire at midnight, April 22, 20L7.

3. Based on the Commission's Order dated December 15, 2005 and conforming Amendment No. 270 dated December 15, 2OO5 regarding the direct. transfer of the license from the Cleveland Electric Il-luminating Company (CLeveland Electric) and Lhe Toledo Edison Company (Toledo ndison) to FirstEnergy NucLear Generation Corp.

(FENGenCo)*, FirstEnergy Nuclear Operating Company and FENGenCo* shall comply with the following conditions noted bel_ow: A. On t.he closing date of the transfers to FENGenCo* of their interesLs in Davis-Besse, Cleveland Electric and Toledo Edison shal-l- transfer to FENGenCo* all of each transferor, s respective accumulated decommj-ssioning funds for Davis-Besse and tender to FENGenCo* additional amounEs equal to remaining funds expected to be collected in 2005, as represented in t,he application dated June 1, 2005, but not yet collected by the time of closing. AlI of the funds shatl be deposited in a separate external trust fund for the reactor in the same amount as received with respecE to the unj_t to be segregated from other assets of FENGenCo* and out,side its administrative controL, as reqluired by NRC regulaEions, and FENGenCo* shall take all necessary sleps to ensure that this external_ trust fund is maintained in accordance with t,he requirements of the order approving the transfer of the license and consistent with the safety evaluation supporting the order and in accordance with the reguirements of 10 CFR SecLion 50.75, "Reporting and recordkeeping for decommissioning planning.,'

  • FirstEnergy Nuclear Generation Corp. (FENGenCo)* has been renamedFirstEnergy Nuclear Generation,LLC.

L-T4 Amendment No.

Proposed Page

                                              - 14A-The Support Agreement described           in the application      dated June 1, 2005 (up to $400 million),             shall be effectj-ve consistent with the representations         contained     in t.he application. FENGenCo*

shall take no action to cause FirstEnergy, or its successors and assigns, to void, cancel, or modify t.he Support Agreement without the prior written consenL of the NRC staff. FENGenCo* shalf inform the Director of the Office of Nuclear ReacEor Regulation, in writing, no lat.er than ten days after any funds are provided to FENGenCo* by FirstEnergy under either Support Agreement. FOR THE NUCLEAR REGULATORYCOMMISSION Original- Signed by R. C. DeYourxg (for) Roger S. Boyd, Di-rector Division of Project Management Office of Nuclear Reactor Regulation Attachments:

1. Appendices A & B - Technical Specifications
2. Preoperational- Tests, Startup Tests and OLher Items Which Must Be Completed Prior to Proceeding Lo Succeeding Operational Modes Date of Issuance: (APR 22 1977)
  • FirstEnergyNuclearGenerationCorp.(FENGenCo)*hasbeenrenamedFirstEnergyNuclear Generation.

LLC. L- 14A Amendment No.

Attachment8 ProposedPerryNuclearPowerPlant,UnitNo. 1 OperatingLicenseChanges (Re-typed- For Information Only) (SevenPagesFollow)

Proposed Page UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHTNGTON, D.C. 29555-0001 FIRSTENERGY NUCLEAROPERATINGCOMPANY FIRSTENERGY NUCLEARGENERATION. LLC OHIOEDISONCOMPANY DOCKETNO.50440 PERRYNUCLEARPOWER.PLANT.UNIT NO. 1 FACILITYOPERATINGLICENSE LicenseNo.NPF-58

1. TheNuclearRegulatory Commission (theCommission) hasfoundthat:

A. Theapplication for licensefiledby FirstEnergy NuclearOperating Company(FENOC)I actingon itsownbehalfandas agentfor FiriienergyNuilearGJneration, LLCandOhio EdisonCompany, (licensees) complies withthestandards andrequirements of the I AtomicEnergyActof 1954,as amended(theAct),andtheCommission's set regulations forthin 10CFRChapterl, andall required notifications or bodieshave to otheragencies beendulymade; B. Constructionof the PerryNuclearPowerPlant,UnitNo.1 (thefacility), hasbeen substantially completed in conformitywithConstruction PermitNo.CPPR-148 andthe application, as amended, theprovisions of theAct,andtheregulations of the Commission: tFEtrtOC is authorizedto act as agentfor FirstEnergyNuclearGeneration,LLC and Ohio EdisonCompany,and has exclusiveresponsibility and controloverthe physicalconstruction, operation,and maintenanceof the facility. AmendmentNo.

Proposed Page C. The facilitywilloperatein conformitywith the application, as amended,the provisionsof the Act, and the regulationsof the Commission(exceptas exemptedfrom complianeein Section2.D below); D. There is reasonableassurance:(l) that the activitiesauthorizedby this operatinglicense can be conductedwithoutendangeringthe healthand safetyof the public,and (ii) that such activitieswill be conductedin compliancewith the Commission'sregulationsset forth in 10 CFR Chapterl (exceptas exemptedfrom compliancein Section2.D below); E. The FirstEnergyNuclearOperatingCompanyis technicallyqualifiedto engagein the activitiesauthorizedby this licensein accordancewith the Commission'sregulationsset forth in 10 CFR Chapterl; F. The licenseeshavesatisfiedthe applicableprovisionsof 10 CFR Part 140, "Financial ProtectionRequirements and lndemnityAgreements," of the Commission'sregulations; G. The issuanceof this licensewill not be inimicalto the commondefenseand securityor to the healthand safety of the public; H. Afterweighingthe environmental, economic,technical,and other benefitsof the facility againstenvironmental and othercostsand consideringavailablealternatives, the issuanceof this FacilityOperatingLicenseNo. NPF-58,subjectto the conditionsfor protectionof the environmentset forth in the EnvironmentalProtectionPlan attachedas AppendixB, is in accordancewith 10 CFR Part 51 of the Commission'sregulationsand allapplicablerequirementshave been satisfied;and

l. The receipt,possession,and use of source,byproduct,and specialnuclearmaterialas authorizedby this licensewillbe in accordancewith the Commission'sregulationsin 10 CFR Parts30, 40, and 70.
2. Basedon the foregoingfindingsregardingthis facility,the Partial-lnitial Decisionsissued December2, 1983,and September3, 1985,by the AtomicSafetyand LicensingBoardin regardto this facility(affirmedby ALAB-841,datedJuly 25, 1986)and pursuantto approvalby the NuclearRegulatoryCommissionat a meetingon November7, 1986,FacilityOperating LicenseNo. NPF-58,which supersedesthe licensefor fuel loadingand low powertesting, LicenseNo. NPF-45,issuedon March18, 1986,is herebyissuedto FirstEnergyNuclear OperatingCompany,FirstEnergyNuclearGeneration,LLC,and Ohio EdisonCompany,(the licensees)to read as follows:

A. The iicenseappiiesto ihe Pei-i-yi.iucieai'Power Plani, Unit l.!o. '1,a boiiingwaier nuciear reactorand associatedequipment(the facility),ownedby FirstEnergyNuclear Generation,LLC (owner)and leasedto Ohio EdisonCompany(lessee)(collectively the licensees). AmendmentNo.

Proposed Page The facilityis locatedon the shore of Lake Erie in Lake County,Ohio, approximately 35 milesnortheastof Cleveland,Ohio,and is describedin the licensees'FinalSafetyAnalysisReport,as supplemented and amended,and in the licensees'Environmental Report,as supplemented and amended. B. Subjectto the conditionsand requirementsincorporated herein,the Commissionherebylicenses: (1) FENOC,pursuantto Section103 of the Act and 10 CFR Part 50, to possess,use, and operatethe facilityat the designatedlocationin Lake County,Ohio,in accordancewith the proceduresand limitationsset forth in this license; (2) FirstEnergyNuclearGeneration,LLC and Ohio EdisonCompany,to possessthe facilityat the designatedlocationin LakeCounty,Ohio,in accordancewith the proceduresand limitationsset forth in this license: (3) FENOC,pursuant to theActand10CFRPart70,to receive,possess, anduseat anytimespecial nuclearmaterial as reactorfuel,in accordance for storageandamountsrequired withthe limitations for reactoroperation, as described in theFinalSafetyAnalysisReport,as supplemented andamended; (4) FENOC,pursuant to theAct and10CFRParts30,40,and70,to receive, possess, anduseat any timeanybyproduct, source,andspecialnuclearmaterial suchas sealedneutronsourcesfor reactor startup, sealedsourcesfor reactorinstrumentation andradiation monitoring equipment and calibration, fissiondetectors in amountsas required; (5) FENOC,pursuant to theActand10CFRParts30,40,and70,to receive, possess, andusein amountsas required anybyproduct, source,or specialnuclearmaterialwithout restriction as to chemicalor physicalform,for sampleanalysisor instrument calibrationor associated withradioactive apparatus or components; and (6) FENOC,pursuantto the Act and 10 CFR Parts30, 40, and 70, to possess,but not separate,such byproductand specialnuclearmaterialsas may be producedby the operationof the facility. (7)(a)Ohio EdisonCompanyis authorizedto transferany portionof its 30.0%ownershipshareof PNPP Unit 1 and a proportionateshare of its interestin the PNPP common facilitiesto certainequity investors identifiedin its submissionof January23, 1987, as supplementedon March3, 1987,and at the same time to lease back from such purchaserssuch interestsold in the PNPP Unit 1 facility.The term of the lease is for approximately29% years subjectto a right of AmendmentNo.

Proposed Page renewal.Suchsaleand leaseback transactions are subjectto the representations andconditions set forthin the abovementioned application of January23, 1987 , as supplemented on March 3, 1987, as well as the of letter the Directorof the Officeof NuclearReactorRegulation datedMarch16, 1987, consenting to suchtransactions. Specifically, a lessorandanyoneelsewhomay acquirean interestunderthesetransactions are prohibited fromexercising directlyor indirectly anycontroloverthelicenses of PNPPUnit1. Forpurposes of thiscondition the limitations of 10CFR50.81,as nowin effectandas maybe subsequently amended, arefullyapplicable to the lessorandanysuccessor in interestto thatlessoras longas the license for PNPP Unit 1 remains in effect; thesefinancialtransactions shallhaveno effecton the licensefor the Perry Nuclearfacilitythroughout thetermof the license. (b) Further, the licensees arealsorequired to notifythe NRCin writingpriorto any changein: (i)thetermsor conditions of anyleaseagreements executed as part of thesetransactions; (ii)the PNPPOperating Agreement; (iii)theexisting property insurance coverage for PNPPUnit1; and(iv)anyactionby a lessoror othersthat mayhavean adverseeffecton the safeoperationof thefacility. C. Thislicenseshallbe deemedto containandis subjectto theconditions specified in theCommission's regulations setforthin 10CFRChapterI andis subjectto all applicable provisions of theActandto therules,regulations, andordersof the Commission nowor hereafter in effect;andis subjectto theadditional conditions specifiedor incorporated below: (1) MaximumPowerLevel FENOCis authorized to operatethe facilityat reactorcorepowerlevelsnot in excessof 3758megawatts thermal('100o/o power)in accordance withthe conditions specified herein. (2) TechnicalSpecifications TheTechnical Specifications contained in Appendix A andthe Environmental Protection Plancontained in Appendix B, as revisedthroughAmendment No. areherebyincorporated intothelicense.FENOCshalloperatethefacilityin accordance withtheTechnical Specifications andthe Environmental Protection Plan (3) AntitrustConditions 6 f ;.-iE^^r^., i.i, '-i^ar /laaaralian l ! i- -:irr,l l1!ir. F,-lic,rn i/].-rn-,n=ni/ o- l rrJLLrrElv)f l!uvlgqt vgrrvrqfrvrr, LLv srrv vlllv Lvrevrl Amendment No.

Proposed Page H. Thislicenseis effective as of thedateof issuance andshallexpireat midnight on March18, 2026.

3. Basedon theCommission's OrderdatedNovember 15.2005andtheCommission's revisedOrder datedDecember 16,2005andconforming Amendment No.137datedDecember 16,2005regarding thedirecttransferof thelicensefromPennsylvania PowerCompany, OhioEdisonCompany, OES Nuclear, Inc.,TheCleveland Electric llluminating Company, andtheToledoEdisonCompany, to FirstEnergy NuclearGeneration Corp.(FENGenCo)*, FirstEnergy NuclearOperating Company and FirstEnergy NuclearGeneration Corp.*shallcomplywiththefollowing conditions notedbelow:

On theclosingdate(s)of thetransfers to FENGenCo* of theirinterests in Perry,Pennsylvania PowerCompany, TheCleveland Electricllluminating Company, OhioEdisonCompany, OES Nuclear, lnc.,andToledoEdisonCompany shalltransfer to FENGenCo* all of eachtransferor's respective accumulated decommissioning fundsfor Perry,exceptfor fundsassociated withthe leasedportions of Perry,andtenderto FENGenCo* additional amountsequalto remaining funds expected to be collected in 2005,as represented in theapplication datedJune1,2005, butnotyet collectedby thetimeof closing.All of thefundsshallbe depositedin a separateexternaltrust fundfor the reactorin the sameamountas receivedwithrespectto the unitto be segregated from otherassetsof FENGenCo* andoutsideitsadministrative control,as requiredby NRC regulations, and FENGenCo" shalltakealtnecessarystepsto ensurethat thisexternaltrustfund is maintained in accordance withtherequirements of theorderapproving thetransferof the licenseandconsistent withthesafetyevaluation supporting theorderand in accordance withthe requirements of 10CFRSection50.75,"Reporting andrecordkeeping for decommissioning planning." B . By the dateof closingof the transferof theownershipinterestsin PerryfromPennsylvania Power Company to FENGenCo*, FENGenCo* shallobtaina parentcompany guarantee from FirstEnergy in an initialamountof at least$80million(in2005dollars) to provideadditional decommissioning fundingassurance regarding suchownership interests. Required fundinglevels shallbe recalculated annually and,as necessary, FENGenCo* shalleitherobtainappropriate adjustments to the parentcompany guarantee or otherwise provideanyadditional decommissioning fundingassurance necessary for FENGenCo* to meetNRCrequirements under10CFR50.75.

  • FirstEnergyNuclearGeneration Corp.(FENGenCo)" hasbeenrenamedFirstEnergy Nuclear Generation, LLC.

AmendmentNo.

Proposed Page

c. The SupportAgreementsdescribedin the applications datedMay 18, 2005 (up to $80 million),

and June 1,2005 (up to $400 million),shallbe effectiveconsistentwith the representations containedin the applications.FENGenCo*shalltakeno actionto cause FirstEnergy, or its successorsand assigns,to void,cancel,or modifythe SupportAgreementswithoutthe prior written consentof the NRC staff, except,however,the $80 millionSupportAgreementin connectionwith the transferof the Penn Power interestsmay be revokedor rescindedif and when the $400 millionsupportagreementdescribedin the June 1,2005,applicationbecomes effective.FENGenCo"shallinformthe Directorof the Officeof NuclearReactorRegulation,in writing,no laterthan ten days afterany fundsare providedto FENGenCo*by FirstEnergyunder eitherSupportAgreement. FOR THE NUCLEARREGULATORY COMMISSION ORIGINALSIGNEDBY: HaroldR. Denton,Director Officeof NuclearReactorRegulation Attachments/Appendices

1. Attachments1 - 2
2. AppendixA - TechnicalSpecifications (NUREG-1204\
3. AppendixB - Environmental Protection Plan
4. AppendixC - AntitrustConditions Dateof lssuance:November13. 19Bo
  • FirstEnergyNuclearGeneration Corp.(FENGenCo)* hasbeenrenamedFirstEnergy Nuclear Generation, LLC.

AmendmentNo.

Proposed Page APPENDIXC PERRYNUCLEARPOWERPLANT.UNITNO. 1 NPF-58 ANTITRUSTCONDITIONS FOR FIRSTENERGY NUCLEARGENERATION. LLC OHIO EDISONCOMPANY A. The licenseesare subjectto the followingantitrustconditions: Definitions Applicantsshall meanthe two companieslistedabove. Entityshall mean any electricgenerationand/or distributionsystem or municipalityor cooperativewith a statutoryright or privilegeto engage in either of these functions. Wheelinqshallmeantransportation of electricityby a utilityover its linesfor anotherutility,includingthe receiptfrom and deliveryto anothersystemof like amountsbut not necessarilythe same energy.Federal PowerCommission,The 1970 NationalPowerSurvev,Part 1, P. 1-24-8. Licensinq Conditions (1) Applicants shallnotcondition thesaleor exchange of wholesale poweror coordination services uponthe conditionthatanyotherentity: (a) enterintoanyagreement or understanding the useof or alienation restricting of such energyor servicesto anycustomers or territories; (b) enterintoanyagreement or understanding requiringthe receiving entityto,giveup anyother powersuppiyaitei-natives or io denyitseifanymai'keiopporii:niiies; (c) withdrawany ,petitionto interveneor foregoparticipation in any proceeding beforethe NuclearRegulatory Commission or refrainfrominstigating or prosecutinganyantitrust actionin anyotherforum. AmendmentNo.}}