ML11356A086: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/09/2011
| issue date = 12/09/2011
| title = Request for Approval of Proposed Changes to the Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules
| title = Request for Approval of Proposed Changes to the Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules
| author name = Mims D C
| author name = Mims D
| author affiliation = APS, Arizona Public Service Co
| author affiliation = APS, Arizona Public Service Co
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:10 CFR 50, Appendix H A W A subsidiary of Pinnacle West Capital Corporation Dwight C. Mims Mail Station 7605 Palo Verde Nuclear Senior Vice President Tel. 623-393-5403 P. 0. Box 52034 Generating Station Nuclear Regulatory and Oversight Fax 623-393-6077 Phoenix, Arizona 85072-2034 102-06447-DCM/GAM December 09, 2011 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
{{#Wiki_filter:10 CFR 50, Appendix H A W                           A subsidiaryof Pinnacle West CapitalCorporation Dwight C. Mims                                               Mail Station 7605 Palo Verde Nuclear     Senior Vice President                 Tel. 623-393-5403     P. 0. Box 52034 Generating Station     Nuclear Regulatory and Oversight       Fax 623-393-6077     Phoenix, Arizona 85072-2034 102-06447-DCM/GAM December 09, 2011 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001


==Dear Sirs:==
==Dear Sirs:==


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket Nos. STN 50-528, 50-529, and 50-530 Request for Approval of Proposed Changes to the Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules Arizona Public Service Company (APS) is requesting approval of proposed changes to the PVNGS Units 1, 2, and 3 reactor pressure vessel surveillance capsule withdrawal schedules in the Updated Final Safety Analysis Report. The proposed changes are submitted pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix H, Section III.B.3, which requires that: (1) withdrawal schedules be submitted, as specified in 10 CFR 50.4, and (2) the proposed schedule must be approved by the Nuclear Regulatory Commission (NRC) prior to implementation.
Palo Verde Nuclear Generating Station (PVNGS)
The proposed changes to the reactor pressure vessel surveillance capsule withdrawal schedules are consistent with the recommendations specified in American Society for Testing and Materials (ASTM) Standard Practice E 185-82, as referenced by the requirements of 10 CFR Part 50, Appendix H. In addition, the proposed changes are consistent with Commitment No. 17 in Table A4-1 in the PVNGS license renewal application submitted in APS letter no. 102-05937, dated December 11, 2008 (ADAMS Accession No. ML083510627), and Appendix A in the related NRC Safety Evaluation Report, NUREG-1 961 (ADAMS Accession No. ML1 1095A01 1).A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
Units 1, 2, and 3 Docket Nos. STN 50-528, 50-529, and 50-530 Request for Approval of Proposed Changes to the Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules Arizona Public Service Company (APS) is requesting approval of proposed changes to the PVNGS Units 1, 2, and 3 reactor pressure vessel surveillance capsule withdrawal schedules in the Updated Final Safety Analysis Report. The proposed changes are submitted pursuant to Title 10 of the Code of FederalRegulations (10 CFR) Part 50, Appendix H, Section III.B.3, which requires that: (1) withdrawal schedules be submitted, as specified in 10 CFR 50.4, and (2) the proposed schedule must be approved by the Nuclear Regulatory Commission (NRC) prior to implementation.
The proposed changes to the reactor pressure vessel surveillance capsule withdrawal schedules are consistent with the recommendations specified in American Society for Testing and Materials (ASTM) Standard Practice E 185-82, as referenced by the requirements of 10 CFR Part 50, Appendix H. In addition, the proposed changes are consistent with Commitment No. 17 in Table A4-1 in the PVNGS license renewal application submitted in APS letter no. 102-05937, dated December 11, 2008 (ADAMS Accession No. ML083510627), and Appendix A in the related NRC Safety Evaluation Report, NUREG-1 961 (ADAMS Accession No. ML11095A011).
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
* Comanche Peak
* Comanche Peak
* Diablo Canyon
* Diablo Canyon
* Palo Verde -San Onofre -South Texas
* Palo Verde - San Onofre - South Texas
* Wolf Creek ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Request for Approval of Proposed Changes to the Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules Page 2 No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111.Sincerely, fc'e p. c, /,./,,,45 DCM/RAS/GAM/gat
* Wolf Creek
 
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Request for Approval of Proposed Changes to the Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules Page 2 No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111.
Sincerely, fc'e p. c, /,./,,,45 DCM/RAS/GAM/gat


==Enclosure:==
==Enclosure:==
Proposed Changes to the Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules cc:    E. E. Collins Jr. NRC  Region IV Regional Administrator L. K. Gibson        NRC  NRR Project Manager for PVNGS J. R. Hall          NRC  NRR Senior Project Manager M. A. Brown          NRC  Senior Resident Inspector for PVNGS
Enclosure Proposed Changes to the Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules


Proposed Changes to the Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules cc: E. E. Collins Jr.L. K. Gibson J. R. Hall M. A. Brown NRC Region IV Regional Administrator NRC NRR Project Manager for PVNGS NRC NRR Senior Project Manager NRC Senior Resident Inspector for PVNGS Enclosure Proposed Changes to the Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules
==1.0  INTRODUCTION==


==1.0 INTRODUCTION==
==2.0   REGULATORY EVALUATION==


==2.0 REGULATORY EVALUATION==
2.1  License Renewal Commitment 3,0   TECHNICAL EVALUATION 3.1  Evaluation Criteria of ASTM Standard Practice E 185-82 3.2  Changes Proposed to the Withdrawal Schedule for PVNGS Units 1, 2, and 3


===2.1 License===
==4.0  CONCLUSION==
Renewal Commitment 3,0 TECHNICAL EVALUATION


===3.1 Evaluation===
5,0  REFERENCES ATTACHMENT Updated Final Safety Analysis Report Markups


Criteria of ASTM Standard Practice E 185-82 3.2 Changes Proposed to the Withdrawal Schedule for PVNGS Units 1, 2, and 3  
Proposed Changes to the PVNGS Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules


==4.0 CONCLUSION==
==1.0     INTRODUCTION==


5,0 REFERENCES ATTACHMENT Updated Final Safety Analysis Report Markups Proposed Changes to the PVNGS Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules
Arizona Public Service Company (APS) is requesting approval of proposed changes to the Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3 reactor pressure vessel (RPV) surveillance capsule withdrawal schedules. The proposed changes are submitted pursuant to Title 10 of the Code of FederalRegulations (10 CFR) Part 50, Appendix H, Section III.B.3, which requires that: (1) withdrawal schedules be submitted, as specified in 10 CFR 50.4, and (2) the proposed schedule must be approved by the Nuclear Regulatory Commission (NRC) prior to implementation, The proposed changes to the RPV surveillance capsule withdrawal schedules are consistent with the recommendations specified in American Society for Testing and Materials (ASTM) Standard Practice E 185-82, as referenced by the requirements of 10 CFR Part 50, Appendix H. In addition, the proposed changes are consistent with Commitment No. 17 in Table A4-1 in the PVNGS license renewal application submitted in APS letter no. 102-05937, dated December 11, 2008 (ADAMS Accession No. ML083510627), as reflected in Appendix A in the related NRC Safety Evaluation Report, NUREG-1961 (ADAMS Accession No. ML11095AO11).


==1.0 INTRODUCTION==
==2.0     REGULATORY EVALUATION==


Arizona Public Service Company (APS) is requesting approval of proposed changes to the Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3 reactor pressure vessel (RPV) surveillance capsule withdrawal schedules.
Appendix H to 10 CFR Part 50 requires nuclear power plant licensees to implement reactor pressure vessel (RPV) surveillance programs to "monitor changes in the fracture toughness properties of ferritic materials in the reactor vessel beltline region... which result from the exposure of these materials to neutron irradiation and the thermal environment." Section III.B.1 of Appendix H states that the design of the surveillance program and the withdrawal schedule must meet the requirements of the edition of the American Society for Testing and Materials (ASTM) E 185, "Standard Practice for Conducting Surveillance Tests for Light-Water Cooled Nuclear Power Reactor Vessels,"
The proposed changes are submitted pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix H, Section III.B.3, which requires that: (1) withdrawal schedules be submitted, as specified in 10 CFR 50.4, and (2) the proposed schedule must be approved by the Nuclear Regulatory Commission (NRC) prior to implementation, The proposed changes to the RPV surveillance capsule withdrawal schedules are consistent with the recommendations specified in American Society for Testing and Materials (ASTM) Standard Practice E 185-82, as referenced by the requirements of 10 CFR Part 50, Appendix H. In addition, the proposed changes are consistent with Commitment No. 17 in Table A4-1 in the PVNGS license renewal application submitted in APS letter no. 102-05937, dated December 11, 2008 (ADAMS Accession No.ML083510627), as reflected in Appendix A in the related NRC Safety Evaluation Report, NUREG-1961 (ADAMS Accession No. ML11095AO11).
that is current on the issue date of the American Society of Mechanical Engineers (ASME) Code to which the RPV was purchased. The rule permits the use of later editions of ASTM E 185, but including only those editions through 1982 (i.e., ASTM E 185-82). The current PVNGS Units 1,2, and 3, RPV surveillance programs and the withdrawal schedules meet the requirements of ASTM E 185-82.
Appendix H to 10 CFR Part 50, Section III.B.3, requires prior NRC approval of all RPV surveillance capsule withdrawal schedule changes. Further, NRC Administrative Letter 97-04, "NRC Staff Approval for Changes to 10 CFR Part 50, Appendix H, Reactor Vessel Surveillance Specimen Withdrawal Schedules," dated September 30, 1997, specifies that changes to RPV surveillance capsule withdrawal schedules that do not conform to ASTM E 185 require approval by the license amendment process, whereas changes that conform to the ASTM standard require only staff verification of such conformance. The proposed changes to the PVNGS Units 1, 2, and 3 RPV surveillance capsule withdrawal schedules conform to ASTM E 185-82, and, therefore, a license amendment is not required for these proposed changes.
1


==2.0 REGULATORY EVALUATION==
Proposed Changes to the PVNGS Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules 2.1    License Renewal Commitment The PVNGS Units 1,2, and 3 license renewal application (Ref. 5.1) contained the following item in Commitment No. 17 in Table A4-1, as reflected in Appendix A of the related NRC Safety Evaluation Report, NUREG-1961, April 2011 (Ref. 5.2):
Priorto the period of extended operation:
o  The [reactorpressure vessel surveillance program]schedule will be revised to withdraw the next capsule at the equivalent clad-base metal exposure of approximately 54 effective full power years (EFPY)expected for the 60-year period of operation, and to withdraw remaining standby capsules at equivalent clad-base metal exposures not exceeding the 72 EFPY expected for a possible 80-year second period of extended operation. This withdrawalschedule is in accordance with NUREG-1801
[GenericAging Lessons Learned (GALL) Report], Section XI.M31, item 6, and with the ASTM E 185-82 criterion which states that capsules may be removed when the capsule neutron fluence is between one and two times the limiting fluence calculated for the vessel at the end of expected life.
This schedule change must be approved by the NRC, as required by 10 CFR 50 Appendix H.
This request to revise the PVNGS Units 1, 2, and 3 RPV surveillance capsule withdrawal schedules will address this commitment.


Appendix H to 10 CFR Part 50 requires nuclear power plant licensees to implement reactor pressure vessel (RPV) surveillance programs to "monitor changes in the fracture toughness properties of ferritic materials in the reactor vessel beltline region...
==3.0    TECHNICAL EVALUATION==
which result from the exposure of these materials to neutron irradiation and the thermal environment." Section III.B.1 of Appendix H states that the design of the surveillance program and the withdrawal schedule must meet the requirements of the edition of the American Society for Testing and Materials (ASTM) E 185, "Standard Practice for Conducting Surveillance Tests for Light-Water Cooled Nuclear Power Reactor Vessels," that is current on the issue date of the American Society of Mechanical Engineers (ASME) Code to which the RPV was purchased.
The rule permits the use of later editions of ASTM E 185, but including only those editions through 1982 (i.e., ASTM E 185-82). The current PVNGS Units 1,2, and 3, RPV surveillance programs and the withdrawal schedules meet the requirements of ASTM E 185-82.Appendix H to 10 CFR Part 50, Section III.B.3, requires prior NRC approval of all RPV surveillance capsule withdrawal schedule changes. Further, NRC Administrative Letter 97-04, "NRC Staff Approval for Changes to 10 CFR Part 50, Appendix H, Reactor Vessel Surveillance Specimen Withdrawal Schedules," dated September 30, 1997, specifies that changes to RPV surveillance capsule withdrawal schedules that do not conform to ASTM E 185 require approval by the license amendment process, whereas changes that conform to the ASTM standard require only staff verification of such conformance.
The proposed changes to the PVNGS Units 1, 2, and 3 RPV surveillance capsule withdrawal schedules conform to ASTM E 185-82, and, therefore, a license amendment is not required for these proposed changes.1 Proposed Changes to the PVNGS Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules 2.1 License Renewal Commitment The PVNGS Units 1,2, and 3 license renewal application (Ref. 5.1) contained the following item in Commitment No. 17 in Table A4-1, as reflected in Appendix A of the related NRC Safety Evaluation Report, NUREG-1961, April 2011 (Ref. 5.2): Prior to the period of extended operation:
o The [reactor pressure vessel surveillance program] schedule will be revised to withdraw the next capsule at the equivalent clad-base metal exposure of approximately 54 effective full power years (EFPY) expected for the 60-year period of operation, and to withdraw remaining standby capsules at equivalent clad-base metal exposures not exceeding the 72 EFPY expected for a possible 80-year second period of extended operation.
This withdrawal schedule is in accordance with NUREG-1801
[Generic Aging Lessons Learned (GALL) Report], Section XI.M31, item 6, and with the ASTM E 185-82 criterion which states that capsules may be removed when the capsule neutron fluence is between one and two times the limiting fluence calculated for the vessel at the end of expected life.This schedule change must be approved by the NRC, as required by 10 CFR 50 Appendix H.This request to revise the PVNGS Units 1, 2, and 3 RPV surveillance capsule withdrawal schedules will address this commitment.


===3.0 TECHNICAL===
3.1    Evaluation Criteria of ASTM Standard Practice E 185-82 Table 1 of ASTM Standard Practice E 185-82 requires that either a minimum of three, four, or five surveillance capsules be removed from the vessels, as based on the limiting amount of reference temperature for nil-ductility transition shift (limiting RTNDT) that is projected to occur at the clad-vessel interface location of the RPV at the end-of-licensed plant life (EOL). For plants with projected RTNDT shifts (i.e., ARTNDT) less than 100 OF (56 0C), three capsules are required to be removed from the RPV.
For the renewed operating license operating terms, the PVNGS RPVs have limiting ARTNDT values of less than 100 OF. At 60 years (54 EFPY), the maximum shift in reference temperature for pressurized thermal shock (ARTPTS) is 57.7 OF for Unit 1, the maximum ARTPTS is 54 OF for Unit 2, and the maximum ARTPTS is 40.7 °F for Unit 3 (Ref. 5.1, License Renewal Application Tables 4.2-6, 7, and 8). In this context, ARTPTS is equivalent to ARTNDT. Therefore APS is required, as a minimum, to remove three capsules from each reactor during the current operating period.
2


EVALUATION
Proposed Changes to the PVNGS Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules Table 1 of ASTM Standard Practice E 185-82 also provides specific criteria for removal of surveillance capsules. The criteria are that the surveillance capsules be removed after a certain amount of power operation has elapsed or at various times when the RPV shell is projected to achieve certain levels of neutron fluence. The intent of the Standard Practice is to achieve a set of testing data over a range of neutron fluences for the RPV that bounds the current life of the plant. Of key importance are the removal criteria for the second to last and final capsules required for capsule withdrawal. For the second-to-last required capsule in a withdrawal schedule, the ASTM standard requires that the capsules be pulled at either 13 effective full power years (EFPYs) or at the time when the capsule is equivalent to the limiting fluence projected for the clad-based metal interface of the RPV at EOL, whichever time comes first. For the final capsule that is required for removal, ASTM E 185-82 requires that the capsule be removed at a time when the neutron fluence projected for the capsule is between the limiting fluence value projected for the RPV at the EOL and two times that value.
3.2    Changes Proposed to the Withdrawal Schedule for PVNGS Units 1, 2, and 3 The proposed changes to the PVNGS Units 1, 2, and 3 RPV surveillance capsule withdrawal schedule are shown in the attached markups of UFSAR Tables 5.3-18, 5.3-19, 5.3-19A, 5.3-13, 5.3-14, and 5.3-15.
For the final capsule that is required for removal, ASTM E 185-82 requires that the capsule be removed at a time when the neutron fluence projected for the capsule is between the limiting fluence value projected for the RPV at the EOL and two times that value. The limiting fluence values projected for the RPVs at the EOL for the final capsule required for removal from each unit, Capsule 6 (3100), are shown in Tables 3.2-1, 3.2-2, and 3.2-3 below.
3


===3.1 Evaluation===
Proposed Changes to the PVNGS Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules Table 3.2-1 PVNGS Unit I Reactor Pressure Vessel Surveillance Capsule Withdrawalma)
Capsule No.
CapsuleWihrwlIM Location Location_____        Lead Factor            EFPY(b)
Withdrawal        Fune(lm Fluence (n 3                  1370                  1.34                  4.57              3.65E18 1                    380                  1.33                  9.76              6.28E18 5                  2300                  1.35                  13.83              8.76E18 6                  3100                  1.35                  40OC)            2.56E19(O) 2                  430                  1.35                Standby 4                  1420                  1.35                Standby (a) Based on Table 7-1 in WCAP-16374-NP, "Analysis of Capsule 2300 from the Arizona Public Service Company Palo Verde Unit 1 Reactor Vessel Radiation Surveillance Program," February 2005 (Ref. 5.3).
(b) Effective full power years (EFPY) from plant startup.
(c) Equivalent to capsule accumulating a fluence equal to 54 EFPY.
(d) Calculated at reactor vessel clad-to-metal interface. (Source: Table 1-2 of WCAP-1 6835-NP [Ref.
5.6]. This value was calculated for the current maximum licensed power of 3990 MWt, whereas the 2.51 E19 value shown in Table 6-2 in WCAP-1 6374 [Ref. 5.3] and in Section 4.2.1 of the PVNGS License Renewal Application [Ref. 5.1] was calculated for the previous maximum licensed power of 3876 MWt prior to implementation of the Unit 1 power uprate license amendment.)
Table 3.2-2 PVNGS Unit 2 Reactor Pressure Vessel Surveillance Capsule Withdrawal(a)
(a) Based on Table 7-1 in WCAP-16524-NP, "Analysis of Capsule 2300 from the Arizona Public Service Company Palo Verde Unit 2 Reactor Vessel Radiation Surveillance Program," February 2006 (Ref. 5.4).
(b) Effective full power years (EFPY) from plant startup.
(c) Equivalent to capsule accumulating a fluence equal to 54 EFPY.
(d) Calculated at reactor vessel clad-to-metal interface. (Source: Table 1-3 of WCAP-16835-NP [Ref.
5.6]. This value was calculated for the current maximum licensed power of 3990 MWt, and is the same as shown in Table 6-2 in WCAP-1 6524 [Ref. 5.4] and in Section 4.2.1 of the PVNGS License Renewal Application [Ref. 5.1], reflecting the Unit 2 power uprate license amendment.)
4


Criteria of ASTM Standard Practice E 185-82 Table 1 of ASTM Standard Practice E 185-82 requires that either a minimum of three, four, or five surveillance capsules be removed from the vessels, as based on the limiting amount of reference temperature for nil-ductility transition shift (limiting RTNDT) that is projected to occur at the clad-vessel interface location of the RPV at the end-of-licensed plant life (EOL). For plants with projected RTNDT shifts (i.e., ARTNDT) less than 100 OF (56 0 C), three capsules are required to be removed from the RPV.For the renewed operating license operating terms, the PVNGS RPVs have limiting ARTNDT values of less than 100 OF. At 60 years (54 EFPY), the maximum shift in reference temperature for pressurized thermal shock (ARTPTS) is 57.7 OF for Unit 1, the maximum ARTPTS is 54 OF for Unit 2, and the maximum ARTPTS is 40.7 °F for Unit 3 (Ref. 5.1, License Renewal Application Tables 4.2-6, 7, and 8). In this context, ARTPTS is equivalent to ARTNDT. Therefore APS is required, as a minimum, to remove three capsules from each reactor during the current operating period.2 Proposed Changes to the PVNGS Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules Table 1 of ASTM Standard Practice E 185-82 also provides specific criteria for removal of surveillance capsules.
Proposed Changes to the PVNGS Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules Table 3.2-3 Pressure Vessel Surveillance PVNGS Unit 3 ReactorCapsule                                  Capsule Withdrawal(a)
The criteria are that the surveillance capsules be removed after a certain amount of power operation has elapsed or at various times when the RPV shell is projected to achieve certain levels of neutron fluence. The intent of the Standard Practice is to achieve a set of testing data over a range of neutron fluences for the RPV that bounds the current life of the plant. Of key importance are the removal criteria for the second to last and final capsules required for capsule withdrawal.
WithdrawalM2 Capsule__No.
For the second-to-last required capsule in a withdrawal schedule, the ASTM standard requires that the capsules be pulled at either 13 effective full power years (EFPYs) or at the time when the capsule is equivalent to the limiting fluence projected for the clad-based metal interface of the RPV at EOL, whichever time comes first. For the final capsule that is required for removal, ASTM E 185-82 requires that the capsule be removed at a time when the neutron fluence projected for the capsule is between the limiting fluence value projected for the RPV at the EOL and two times that value.3.2 Changes Proposed to the Withdrawal Schedule for PVNGS Units 1, 2, and 3 The proposed changes to the PVNGS Units 1, 2, and 3 RPV surveillance capsule withdrawal schedule are shown in the attached markups of UFSAR Tables 5.3-18, 5.3-19, 5.3-19A, 5.3-13, 5.3-14, and 5.3-15.For the final capsule that is required for removal, ASTM E 185-82 requires that the capsule be removed at a time when the neutron fluence projected for the capsule is between the limiting fluence value projected for the RPV at the EOL and two times that value. The limiting fluence values projected for the RPVs at the EOL for the final capsule required for removal from each unit, Capsule 6 (3100), are shown in Tables 3.2-1, 3.2-2, and 3.2-3 below.3 Proposed Changes to the PVNGS Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules Table 3.2-1 PVNGS Unit I Reactor Pressure Vessel Surveillance Capsule Withdrawalma)
Capsule No.             Location ca                LaFctrEFPY(b)
CapsuleWihrwlIM Capsule No. Location Lead Factor Withdrawal Fluence (n Location_____
Lead Factor                             Fluence (n/cm2 )
EFPY(b) Fune(lm 3 1370 1.34 4.57 3.65E18 1 380 1.33 9.76 6.28E18 5 2300 1.35 13.83 8.76E18 6 3100 1.35 40OC) 2.56E19(O) 2 430 1.35 Standby 4 1420 1.35 Standby (a) Based on Table 7-1 in WCAP-16374-NP, "Analysis of Capsule 2300 from the Arizona Public Service Company Palo Verde Unit 1 Reactor Vessel Radiation Surveillance Program," February 2005 (Ref. 5.3).(b) Effective full power years (EFPY) from plant startup.(c) Equivalent to capsule accumulating a fluence equal to 54 EFPY.(d) Calculated at reactor vessel clad-to-metal interface. (Source: Table 1-2 of WCAP-1 6835-NP [Ref.5.6]. This value was calculated for the current maximum licensed power of 3990 MWt, whereas the 2.51 E19 value shown in Table 6-2 in WCAP-1 6374 [Ref. 5.3] and in Section 4.2.1 of the PVNGS License Renewal Application
4                  1370                   1.28                 4.44                 3.48E18 5                 2300                   1.31                 13.75                 9.07E18 6                 3100                   1.31                 42(c)             2.99E19(d) 2                   430                   1.30               Standby 3                 1420                   1.28               Standby 1                   380                   1.28               Standby (a) Based on Table 7-1 in WCAP-16449-NP, "Analysis of Capsule 2300 from the Arizona Public Service Company Palo Verde Unit 3 Reactor Vessel Radiation Surveillance Program," August 2005 (Ref. 5.5).
[Ref. 5.1] was calculated for the previous maximum licensed power of 3876 MWt prior to implementation of the Unit 1 power uprate license amendment.)
(b) Effective full power years (EFPY) from plant startup.
Table 3.2-2 PVNGS Unit 2 Reactor Pressure Vessel Surveillance Capsule Withdrawal(a)(a) Based on Table 7-1 in WCAP-16524-NP, "Analysis of Capsule 2300 from the Arizona Public Service Company Palo Verde Unit 2 Reactor Vessel Radiation Surveillance Program," February 2006 (Ref. 5.4).(b) Effective full power years (EFPY) from plant startup.(c) Equivalent to capsule accumulating a fluence equal to 54 EFPY.(d) Calculated at reactor vessel clad-to-metal interface. (Source: Table 1-3 of WCAP-16835-NP
(c) Equivalent to capsule accumulating a fluence equal to 54 EFPY.
[Ref.5.6]. This value was calculated for the current maximum licensed power of 3990 MWt, and is the same as shown in Table 6-2 in WCAP-1 6524 [Ref. 5.4] and in Section 4.2.1 of the PVNGS License Renewal Application
(d) Calculated at reactor vessel clad-to-metal interface. (Source: Table 1-4 of WCAP-16835-NP [Ref.
[Ref. 5.1], reflecting the Unit 2 power uprate license amendment.)
5.6]. This value was calculated for the current maximum licensed power of 3990 MWt, whereas the 2.93E19 value shown in Table 6-2 in WCAP-16449 [Ref. 5.5] and in Section 4.2.1 of the PVNGS License Renewal Application [Ref. 5.1] was calculated for the previous maximum licensed power of 3876 MWt prior to implementation of the Unit 3 power uprate license amendment.)
4 Proposed Changes to the PVNGS Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules Table 3.2-3 PVNGS Unit 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal(a)
Capsule WithdrawalM2 Capsule No. ca Lead Factor Fluence (n/cm 2)Capsule__No.
Location LaFctrEFPY(b)
________4 1370 1.28 4.44 3.48E18 5 2300 1.31 13.75 9.07E18 6 3100 1.31 42(c) 2.99E19(d) 2 430 1.30 Standby 3 1420 1.28 Standby 1 380 1.28 Standby (a) Based on Table 7-1 in WCAP-16449-NP, "Analysis of Capsule 2300 from the Arizona Public Service Company Palo Verde Unit 3 Reactor Vessel Radiation Surveillance Program," August 2005 (Ref. 5.5).(b) Effective full power years (EFPY) from plant startup.(c) Equivalent to capsule accumulating a fluence equal to 54 EFPY.(d) Calculated at reactor vessel clad-to-metal interface. (Source: Table 1-4 of WCAP-16835-NP  
[Ref.5.6]. This value was calculated for the current maximum licensed power of 3990 MWt, whereas the 2.93E19 value shown in Table 6-2 in WCAP-16449  
[Ref. 5.5] and in Section 4.2.1 of the PVNGS License Renewal Application  
[Ref. 5.1] was calculated for the previous maximum licensed power of 3876 MWt prior to implementation of the Unit 3 power uprate license amendment.)


==4.0 CONCLUSION==
==4.0       CONCLUSION==


The proposed changes to the PVNGS RPV surveillance capsule withdrawal schedules will continue to meet the RPV surveillance capsule withdrawal schedule criteria in ASTM E 185-82 for the renewed licensed periods of PVNGS Units 1, 2, and 3.
The proposed changes to the PVNGS RPV surveillance capsule withdrawal schedules will continue to meet the RPV surveillance capsule withdrawal schedule criteria in ASTM E 185-82 for the renewed licensed periods of PVNGS Units 1, 2, and 3.


==5.0 REFERENCES==
==5.0       REFERENCES==
 
5.1      Letter no. 102-05937, from APS to the NRC, "License Renewal Application,"
December 11, 2008 (ADAMS Accession No. ML083510627) 5.2      NUREG-1961 "Safety Evaluation Report Related to the License Renewal of Palo Verde Nuclear Generating Station, Units 1,2 and 3." (ADAMS Accession No. ML11095A011) 5.3      Letter no. 102-05242 from APS to the NRC, "Palo Verde Nuclear Generating Station Unit 1 Reactor Vessel Material Surveillance Capsule at 230','' April 5, 2005 (transmittal of WCAP-16374-NP, "Analysis of Capsule 230' from Arizona Public Service Company Palo Verde Unit 1 Reactor Vessel Radiation Surveillance Program," February 2005) (ADAMS Accession No. not publicly available).
5
 
Proposed Changes to the PVNGS Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules 5.4 Letter no. 102-05457 from APS to the NRC, "Palo Verde Nuclear Generating Station Unit 2 Reactor Vessel Material Surveillance Capsule at 2300,' April 4, 2006 (transmittal of WCAP-16524-NP, "Analysis of Capsule 230' from Arizona Public Service Company Palo Verde Unit 2 Reactor Vessel Radiation Surveillance Program," February 2006) (ADAMS Accession No. ML061040586).
5.5 Letter no. 102-05348 from APS to the NRC, "Palo Verde Nuclear Generating Station Unit 3 Analysis of Reactor Vessel Material Surveillance Capsule at 2300,"
September 26, 2005 (transmittal of WCAP-16449-NP, "Analysis of Capsule 2300 from Arizona Public Service Company Palo Verde Unit 3 Reactor Vessel Radiation Surveillance Program," August 2005) (ADAMS Accession No. ML053390139).
5.6 Westinghouse Report WCAP-16835-NP, "Palo Verde Nuclear Generating Station Units 1, 2, and 3; Basis for RCS Pressure and Temperature Limits Report," June 2008 (ADAMS Accession No. ML090641016). This report was submitted with letter no. 102-05960 from APS to the NRC, "Request for Technical Specification Amendment and Exemption from 10 CFR 50, Appendix G, to Relocate the Reactor Coolant System Pressure and Temperature Limits and the Low Temperature Overpressure Protection Enable Temperatures," February 19, 2009 (ADAMS Accession No. ML090641014).
6
 
ATTACHMENT Updated Final Safety Analysis Report Markups Page No.
5.3-27 (no changes - for information only) 5.3-28 (no changes - for information only) 5.3-29 (no changes - for information only) 5.3-30 5.3-31 (no changes - for information only) 5.3-32 (no changes - for information only) 5.3-33 5.3-34 (no changes - for information only) 5.3-35 (no changes - for information only) 5.3-36 (no changes - for information only) 5.3-37 5.3-46 5.3-47
 
No changes to this page -
for information only Table 5.3-13 C-                        PVNGS UNIT  1 SURVEILLANCE PROGRAM          (Sheet 1 of 4)
(D r')
Capsule                                                                                          Specimens Assembly                Withdrawal No. and    Azimuthal    Schedule      Lead              Surveillance Type    Location      EFPY")      Factor            Material Origins          No.      Type    Orientation 1              380        8-10    1.0<LF<I.5    Base metal                      15    C,            Trans.
PC,                                              lower shell plate                9    PC,          Trans.
M-4311-I1*'                      9    PCv          Long.
3    Tension      Trans.
9    Cv            Long.
Weld metalb                      3    Tension      Trans.        1-3 M-4311-2/M-4311-3('1            15    C,            Trans.
weld wires                                                        tl)
(-n                                                  B-4 heat/lot 90071                9    PC,          Trans.
Flux Linde 0091/1054 HAZ metal                        12    C,            Trans.
Lower shell plate M-4311-1 SRM HSST plate 01d)              9    C&#xfd;            Long.
0
: a. See table 5.3-1 for chemistry of plate code No.      M-4311-1  (lower shell plates).
C')
: b. See table 5.3-2 for chemistry of weld code No.      101-142 A-C    (lower shell long seams).                Wl (D  c. Surveillance weld metal between plates m-4311-2 and M-4311-3          (long seams).
: d. See ORNL-4315,  dated February 1968 for chemistry of SRM      (HSST-01 Ppate).
H"  e. See table 5.3-1 for chemistry of plate code No.      M-6701-2  (intermediate shell plate).
0
: f. Effective full power years.
o-
 
No changes to this page -
for information only Table 5.3-13 C-                    PVNGS UNIT 1 SURVEILLANCE PROGRAM              (Sheet 2 of 4)
(D C)  Capsule                                                                                  Specimens Assembly          Withdrawal No. and  Azimuthal  Schedule      Lead                    Surveillance Type  Location    EFPY"'    Factor                Material Origins        No. Type    Orientation 2          430      Standby  1.0<LF<I.5      Base metal                      15  C,          Trans.
CT                                            Inter. shell plate              10  1/2t CT      Trans.        z M-6701-2 e(                      3  Tension      Trans.
U)
Weld metal(b)                    3  Tension      Trans.
M-4311-2/M-4311-3(o              15  C,          Trans.
Weld wires B-4 heat lot 90071              10  1/2t CT      Trans.        H Flux Linde 0091/1054 I-zj Cn                                                HAZ metal                        12  C,          Trans.        U)
Lower shell plate M-4311-1("
co SRM HSST plate 01d                9  C,          Long.
3        1370      4-5      1.0<LF<l.5      Base metal                      15  C,          Trans.
PC,                                          Inter shell plate                9  PC,          Trans.
M-6701-2"'e                      9  PC,          Long. C) 3  Tension      Trans.
9  C,          Long. 0 Weld metalb                      3  Tension      Trans.
M-4311-2/M-4311-3(&#xfd;)            15  C,          Trans.
Weld wire                                                    W)
U/)
B-4 heat/lot 90071                9  PC,          Trans. no Flux Linde 0091/1054                                        t-i (D
HAZ metal                        12  C,          Trans.
Lower shell plate M-4311-1 0
SRM HSST plate 01d                9  C,          Long.
I-.
 
No changes to this page -
for information only Table 5.3-13 PVNGS UNIT 1 SURVEILLANCE PROGRAM              (Sheet 3 of 4)
Capsule                                                                                  Specimens Assembly          Withdrawal No. and  Azimuthal  Schedule      Lead                  Surveillance Type  Location    EFPY'f    Factor            Material Origins          No. Type    Orientation 4        1420      Standby  1.0<LF<1.5    Base metal                        15  C0            Trans.
CT                                        Lower shell plate                10  1/2t CT      Trans.
M-4311-1"a'                        3  Tension      Trans.      G')
C/)
Weld metallbI                      3  Tension      Trans.
0 M-4311-2/M-4311-3(    )          15  C0            Trans.
Weld wires B-4 heat lot 90071                10  1/2t CT      Trans.      C:
Flux Linde 0091/1054              3  Tension      Trans.
HAZ metal                        12  C0            Trans.
Lower shell plate M-4311-1"'
SRM HSST plate 01dl                9  C,            Long.
5        2300      12-15    1.0<LF<I.5    Base metal                        15  C0            Trans.
PC,                                        Inter shell plate                9  PC,          Trans.
M-6701-2")                        9  PC,          Long.
3  Tension      Trans.
9  C0            Long. 0 Weld metallb                      3  Tension      Trans.
0 M-4311-2/M-4311-3(    )          15  C0            Trans.
Weld wire B-4 heat/lot 90071                9  PC0          Trans. t7' Flux Linde 0091/1054 HAZ metal                        12  C0            Trans.
Lower shell plate M-4311-1")      12  C0            Trans.
SRM HSST plate    01(d)            9  C0            Long.
 
Table 5.3-13 PVNGS UNIT 1 SURVEILLANCE      PROGRAM    (Sheet 4 of 4)
Capsule                                                                                Specimens Assembly            Withdrawal No. and  Azimuthal    Schedule    Lead                Surveillance Type  Location      EFPY")    Factor            Material Origins        No. Type    Orientation 6        3100        I        1.0<LF<I.5  Base metal                    15  C,            Trans.
CD    PC,                      4                  Lower shell plate                9 PCv          Trans.
M-4311-1'a                      9 PC,          Long.
F044                                                    3 Tension      Trans.      C')
WI-                                                                              9 C,            Long.
Weld metal bI                    3 Tension      Trans.
M-4311-2/M-4311-3(')          15  C&#xfd;            Trans.
Weld wires B-4 heat/lot 90071              9 PC&#xfd;          Trans.
Flux Linde 0091/1054                                          C/)
(C)                                              HAZ metal                      12  C,            Trans.
Lower shell plate M-4311-1")
SRM HSST plate 01d)              9 C,            Long.
0 1l (D
H-00'
 
No changes to this page -
r-I                                            for information only CD                                                    Table 5.3-14 N)                        PVNGS UNIT 2 SURVEILLANCE PROGRAM (Sheet 1 of 3)
C)
Capsule Assembly                    Withdrawal                                                                Specimens No. and      Azimuthal        Schedule        Lead                  Surveillance Type      Location          EFPY")      Factor              Material Origins        No.      Type  Orientation 1              380          Standby    1.0<LF<I.5      Base metal                    15    C,            Trans CT                                                      Lower shell plate            10    1/2t CT      Trans F-773-1.                        3    Tension      Trans Weld metalc'c                15    C,            Trans F-773-2/F-773-3(&#xfd;)            10    1/2t CT      Trans        F-3 Weld wires                      3    Tension      Trans B-4 heat/lot 3P7317 Flux Linde 124/0662                                            Cl)
Cn                                                            HAZ metal                    12    C,            Trans Lower shell plate Cd Id                                                            F_ 773-IbI SRM HSST plate 01"e'          9      C,            Long.
2            430            Standby    1.0<LF<l.5      Base metal                    15    Cv            Trans CT                                                      Lower shell plate            10    1/2t CT      Trans F- 7 7 3-I'b)                  3    Tension      Trans Weld metal"c)                15    Cv            Trans F-773-2/F-773-3(d)            10    1/2t CT      Trans Weld wire                      3    Tension      Trans B-4 heat/lot 3P7317 Flux Linde 124/0662                                        0 HAZ metal                    12    C,            Trans Lower shell plate (D                                                            F-773-11b)
Cl)
SRM HSST plate 01              9    C,            Trans  t7-1 01(e) 0
: a. Effective      full  power years.
: b. See tables      5.3-3 for chemistry      of plates.
: c. See tables      5.3-4  for chemistry    of weld      code No. 101-142 A-C  (lower shell      long seams).
: d. Surveillance        weld metal  formed between designated plates
: e. See ORNL-4315 dated February 1968 for chemistry of SRM                      (HHST-01 plate).
 
No changes to this page    -
for information only C-4 (D                                        Table 5.3-14 PVNGS UNIT 2 SURVEILLANCE PROGRAM              (Sheet 2 of 3)
Capsule                                                                              Specimens Assembly            Withdrawal No. and  Azimuthal  Schedule      Lead            Surveillance Type  Location    EFPY'*'    Factor          Material Origins      No. Type  Orientation 3        1370        4-6    1.0<LF<I.5    Base metal                15  Cv            Trans PC&#xfd;                                        Lower shell plate            9  PC&#xfd;          Trans N)                                              F-773-1IbI                  9  PC,          Long.
3  Tension      Trans      0 9  CQ            Long.
Weld metal'c'              15  C,            Trans F-773-2/F-773-3(&#xfd;)          9  PC,          Trans Weld wires                  3  Tension      Trans B-4 heat/lot 3P7317                                      cl)
Flux Linde 124/0662 HAZ metal                  12  C,            Trans Lower shell plate F-773-I'0 '
SRM HSST plate 01'*        9    C,            Long.
4        142'      Standby  1.0<LF<I.5    Base metal                15  C,            Trans CT                                          Lower shell plate          10  1/2T CT      Trans F-773-1Ib                    3  Tension      Trans Weld metal"c)              15  C,            Trans F-773-2/F-773-3'd)
Weld wire                  10  1/2t CT      Trans  0 B-4 heat/lot 3P7317 Flux Linde 124/0662          3  Tension      Trans HAZ metal                  12  C,            Trans  Cf)
(D Lower shell plate 0                                                F-773- _IbI 02                                              SRM HSST plate 01"'          9  C            Long.
O
 
C-4 Table 5.3-14 (D                  PVNGS UNIT 2 SURVEILLANCE PROGRAM              (Sheet 3 of 3)
N)
Capsule                                                                            Specimens Assembly            Withdrawal No. and  Azimuthal  Schedule      Lead            Surveillance Type  Location    EFPY W      Factor        Material Origins      No. Type  Orientation 5        2300      12-15    1.0<LF<I.5  Base metal                15  C0            Trans PC,                                        Lower shell plate          9  PC,          Trans 0
F-773-1' '                  9  PC0          Long.      z 3  Tension      Trans Cl) 9  C,            Long.
Weld metal"'l              15  C0            Trans      '-0 0
F-773-2/F-773-3' '          9  PC,          Trans Weld wires                  3  Tension      Trans
                                                                                                          '-3 B-4 heat/lot 3P7317 Flux Linde 124/0662                                      4::,
CA                                                                                                        ITj HAZ material              12  Cv            Trans Cl)
Lower shell plate F-773-1I'b SRM HSST plate 01          9    C,            Long.
6        310'                1.0<LF<I.5  Base metal                15  C0            Trans PC,                                        Lower shell plate          9  PC,          Trans F-773-1I~b                  9  PC,          Long.
3  Tension      Trans 9  C0            Long.  '-3 Weld metal"'*              15  C,            Trans  0 0
F-773-2/F-773-3' '              Tension      Trans Weld wire                  9  PC0          Trans B-4 heat/lot 3P7317 Flux Linde 124/0662 (D                                              HAZ metal                  12  C0            Trans Lower shell plate F-773-1 0                                              SRM HSST plate 01"'          9  C0            Long.
 
for changes to only No information this page -
Table 5.3-15 CA                      PVNGS UNIT 3 SURVEILLANCE PROGRAM            (Sheet 1 of 4)
(D N)  Capsule                                                                                      Specimens I-,
Assembly              Withdrawal No. and    Azimuthal  Schedule      Lead                Surveillance Type    Location    EFPYle,      Factor            Material Origins          No. Type    Orientation 1            380      Standby    1.0<LF<I.5  Base metal                        15  Cv            Trans.
CT                                            Lower shell plate                10  1/2t CT      Trans.
F-6411-2  a)                      3  Tension      Trans.      0 U)
Weld metal1b,                    15  C,            Trans.
F-6411-1 to 3(C)                  10  1/2t CT      Trans.
Weld wires                        3  Tension      Trans.
B-4 heat lot 4P7869                                              H Flux Linde 124/0281
                                                                                                                    '-Il HAZ metal                        12  Cv            Trans.      Cl)
Lower shell plate F-6411-2"'
SRM HSST plate 01l                9  Cv            Long.
2          430      Standby    1.0<LF<I.5  Base metal                        15  Cv            Trans.
CT                                            Lower shell plate                10  1/2t CT      Trans.
F-6411-2"a                        3  Tension      Trans.
0
: a. See table 5.3-5 for chemistry of plates.
: b. See table 5.3-6 for chemistry of weld code No.      101-142 A-C (lower shell long seams).                CO W)
C. Surveillance  weld metal formed between designated plates.
(D
: d. See ORNL-4315 dated February 1968 for chemistry of SRM (HSST-01 plate).
O  e. Effective full power years.
:o3


===5.1 Letter===
No changes to this page -
no. 102-05937, from APS to the NRC, "License Renewal Application," December 11, 2008 (ADAMS Accession No. ML083510627) 5.2 NUREG-1961 "Safety Evaluation Report Related to the License Renewal of Palo Verde Nuclear Generating Station, Units 1,2 and 3." (ADAMS Accession No.ML11095A011)
for information only Table 5.3-15 PVNGS UNIT 3 SURVEILLANCE          PROGRAM  (Sheet 2 of 4)
(D C)  Capsule                                                                                  Specimens Assembly            Withdrawal No. and  Azimuthal  Schedule      Lead                Surveillance Type  Location    EFPY"'    Factor              Material Origins      No. Type    Orientation 2                                            Weld metal bI                  15  C,            Trans.
CT                                          F-6411-1 to 3"C'              10  1/2t CT      Trans.
(Cont.)                                    Weld wires                      3  Tension      Trans.        C)
B-4 heat lot 4P7869                                            U)
I-Flux Linde 124/0281                                            '-0 Trans.        U HAZ metal                4    12  C, al Lower shell plate F-6411-2                                    H U
SRM HSST plate 01 l            9  Cv            Long.
                                                                                                                '-Il CI)
C-n  3        1420      Standby  1.0<LF<I.5     Base metal                    15  Cv            Trans.
PC,                                          Lower shell plate              9  PC,          Trans.
F-6411-2"'                      9  PC,          Long.
3  Tension      Trans.
9  C,            Long.
Weld metalc                    15  C,           Trans.
F-6411-1 to 3(C'                9  PC,           Trans.
Weld wire                      3 Tension      Trans.
0 B-4 heat/lot 4P7869 Flux Linde 124/0281 HAZ metal                      12  C,            Trans. Cn Lower shell plate F-6411-2c tzl (D
SRM HSST plate 01'              9  Cv            Long.
H-0 0H


===5.3 Letter===
No changes to this page -
no. 102-05242 from APS to the NRC, "Palo Verde Nuclear Generating Station Unit 1 Reactor Vessel Material Surveillance Capsule at 230','' April 5, 2005 (transmittal of WCAP-16374-NP, "Analysis of Capsule 230' from Arizona Public Service Company Palo Verde Unit 1 Reactor Vessel Radiation Surveillance Program," February 2005) (ADAMS Accession No. not publicly available).
for information only Table 5.3-15 PVNGS UNIT 3 SURVEILLANCE PROGRAM            (Sheet 3 of 4)
5 Proposed Changes to the PVNGS Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules 5.4 Letter no. 102-05457 from APS to the NRC, "Palo Verde Nuclear Generating Station Unit 2 Reactor Vessel Material Surveillance Capsule at 2300,' April 4, 2006 (transmittal of WCAP-16524-NP, "Analysis of Capsule 230' from Arizona Public Service Company Palo Verde Unit 2 Reactor Vessel Radiation Surveillance Program," February 2006) (ADAMS Accession No. ML061040586).
Capsule                                                                                Specimens Assembly          Withdrawal No. and  Azimuthal  Schedule      Lead                Surveillance Type  Location    EFPY(e)    Factor            Material Origins        No. Type    Orientation 4        1370        4-6    1.0<LF<l.5   Base metal                      15  C0            Trans.
CT                                        Lower shell plate F-6411-2"'e  10  1/2t CT      Trans.
3  Tension      Trans.        Cl)
Weld metal(b)                   15  C,            Trans.
F-6411-1 to 3(0)
Weld wire                      10  1/2t CT      Trans.        Lii B-4 heat lot 4P7869 tJ2 Flux Linde 124/0281              3 Tension      Trans.
HAZ metal                      12  C0            Trans.
Lower shell plate F-6411-2a SRM HSST plate 01(d)            9  C,           Long.
5        2300       12-15    1.0<LF<1.5    Base metal                      15  C0            Trans.
PC,                                         Lower shell plate                9  PC,           Trans.
F-6411-2"'                       9  PC,           Long.
3  Tension      Trans. F-3 9  C0            Long.
Cf)
Weld metal 0 bI                15  C0            Trans.
F-6411-1 to 3C)                 9  PC,          Trans.
Weld wire                        3  Tension      Trans.
Cl)
B-4 heat/lot 4P7869                                        NI Flux Linde 124/0281 HAZ material                    12  C0            Trans.
Lower shell plate F-6411-2' SRM HSST plate 01(dl            9  C0            Long.


===5.5 Letter===
C-4 Table 5.3-15 PVNGS UNIT 3 SURVEILLANCE      PROGRAM    (Sheet 4 of 4)
no. 102-05348 from APS to the NRC, "Palo Verde Nuclear Generating Station Unit 3 Analysis of Reactor Vessel Material Surveillance Capsule at 2300," September 26, 2005 (transmittal of WCAP-16449-NP, "Analysis of Capsule 2300 from Arizona Public Service Company Palo Verde Unit 3 Reactor Vessel Radiation Surveillance Program," August 2005) (ADAMS Accession No.ML053390139).
F-.
I-,
Capsule                                                                              Specimens Assembly          Withdrawal No. and  Azimuthal  Schedule      Lead              Surveillance Type  Location    EFPY"'    Factor          Material Origins        No. Type    Orientation 6        3100      1_P-2_4  1.0<LF<I.5  Base metal                      15  C,            Trans.
PC,                                     Lower shell plate                9  PC,           Trans.
F-6411-2"'                      9  PC,          Long.
3  Tension      Trans.
9  C,           Long.
C" Weld metalb                    15  C,            Trans.
F-6411-1 to 3(C)                9  Tension      Trans.
Weld wire                        3 PC,          Trans.
B-4 heat/lot 4P7869 I-Cl Flux Linde 124/0281 HAZ metal                      12  C,           Trans.
Lower shell plate F-6411-2"'
Cn                                            SRM HSST plate 01(dl            9  C&#xfd;            Long.
0 o-                                                                                                      t7-'


===5.6 Westinghouse===
PVNGS UPDATED    FSAR REACTOR VESSEL Table 5.3-18 PVNGS UNIT 1 CAPSULE ASSEMBLY REMOVAL SCHEDULE Azimuthal        Removal              Base Metal Capsule      Locations          Time          Material  Included 1          380          8-10 EFPY        Lower shell PCv 2          430          Standby          Intermediate  shell CT 3        1370          4-5 EFPY        Intermediate  shell PCv 4        1420          Standby          Lower shell CT 5        2300          12-15 EFPY      Intermediate shell PCv 6        3100          I-    4 EFPY    Lower shell PCv Note:  Schedule may be      odified to coincide with those refueling o      ages or scheduled shutdowns most closely approximat      g the withdrawal schedule.
140-44                  Table 5.3-19 PVNGS UNIT 2 CAPSULE ASSEMBLY REMOVAL SCHEDULE Azimuthal        Removal              Base Metal Capsule      Locations          Time            Material Included 1        380          Standby          Lower shell CT 2        430          Standby          Lower shell CT 3        1370              4-6 EFPY    Lower shell PCv 4        1420          Standby          Lower shell CT 5        2300          12-15 EFPY      Lower shell PCv 6        3100          1-94 EFPY        Lower shell PCv Note:  Schedule may be odified to coincide with those refueling ou ages or scheduled shutdowns most closely approximatig the withdrawal schedule.
139 -43
* June 2011                            5.3-46                  Revision 16


Report WCAP-16835-NP, "Palo Verde Nuclear Generating Station Units 1, 2, and 3; Basis for RCS Pressure and Temperature Limits Report," June 2008 (ADAMS Accession No. ML090641016).
PVNGS UPDATED FSAR REACTOR VESSEL Table 5.3-19A PVNGS UNIT 3 CAPSULE ASSEMBLY REMOVAL SCHEDULE Azimuthal       Removal               Base Metal Capsule     Locations           Time           Material Included 1         380           Standby           Lower shell CT 2         430           Standby           Lower shell CT 3         1420           Standby           Lower shell PCv 4         1370           4-6 EFPY         Lower shell CT 5         2300           12-15 EFPY       Lower shell PCv 6         3100             -     EFPY     Lower shell PCv Note:     Schedule may be modified to         *ncide with those refueling outages or scheduled         utdowns most closely approximating the withdrawal sched
This report was submitted with letter no. 102-05960 from APS to the NRC, "Request for Technical Specification Amendment and Exemption from 10 CFR 50, Appendix G, to Relocate the Reactor Coolant System Pressure and Temperature Limits and the Low Temperature Overpressure Protection Enable Temperatures," February 19, 2009 (ADAMS Accession No. ML090641014).
                                                                "".42_-46I 5.3.1.6.7       Irradiation Effects Prediction Basis The design curve used to predict the radiation induced increase in transition temperature is         shown in figure 5.3-5. Predicted changes in     the transition temperature are used to select the surveillance materials       (paragraph 5.3.1.6.1)     and to formulate the initial     heatup and cooldown limit curves for plant operation.     Once actual post-irradiation surveillance data become available,       these data will be used to adjust plant operating limit curves.
6 ATTACHMENT Updated Final Safety Analysis Report Markups Page No.5.3-27 (no changes -for information only)5.3-28 (no changes -for information only)5.3-29 (no changes -for information only)5.3-30 5.3-31 (no changes -for information only)5.3-32 (no changes -for information only)5.3-33 5.3-34 (no changes -for information only)5.3-35 (no changes -for information only)5.3-36 (no changes -for information only)5.3-37 5.3-46 5.3-47 No changes to this page -for information only Table 5.3-13 1 SURVEILLANCE PROGRAM (Sheet 1 of 4)C-(D r')(-n PVNGS UNIT Capsule Specimens Assembly Withdrawal No. and Azimuthal Schedule Lead Surveillance Type Location EFPY") Factor Material Origins No. Type Orientation 1 380 8-10 1.0<LF<I.5 Base metal 15 C, Trans.PC, lower shell plate 9 PC, Trans.
Figure 5.3-5 was conservatively drawn using the data given in table 5.3-20 including SA533B,           Class 1, plate and weld zone material typical of that used in           the fabrication of the Palo Verde reactor vessel beltline materials.           The curve is applicable for materials with copper contents of 0.10 w/o or June 2011                             5.3-47                   Revision 16}}
9 PCv Long.3 Tension Trans.9 Cv Long.Weld metalb 3 Tension Trans.M-4311-2/M-4311-3('
1  15 C, Trans.weld wires B-4 heat/lot 90071 9 PC, Trans.Flux Linde 0091/1054 HAZ metal 12 C, Trans.Lower shell plate M-4311-1 SRM HSST plate 01d) 9 C&#xfd; Long.1-3 tl)0 C')Wl a.b.c.(D d.H" e.0 f.o-See table 5.3-1 for chemistry of plate code No. M-4311-1 (lower shell plates).See table 5.3-2 for chemistry of weld code No. 101-142 A-C (lower shell long seams).Surveillance weld metal between plates m-4311-2 and M-4311-3 (long seams).See ORNL-4315, dated February 1968 for chemistry of SRM (HSST-01 Ppate).See table 5.3-1 for chemistry of plate code No. M-6701-2 (intermediate shell plate).Effective full power years.
No changes to this page -for information only Table 5.3-13 C-(D C)PVNGS UNIT 1 SURVEILLANCE PROGRAM (Sheet 2 of 4)Cn co Capsule Specimens Assembly Withdrawal No. and Azimuthal Schedule Lead Surveillance Type Location EFPY"' Factor Material Origins No. Type Orientation 2 430 Standby 1.0<LF<I.5 Base metal 15 C, Trans.CT Inter. shell plate 10 1/2t CT Trans.M-6701-2 e( 3 Tension Trans.Weld metal(b) 3 Tension Trans.M-4311-2/M-4311-3(o 15 C, Trans.Weld wires B-4 heat lot 90071 10 1/2t CT Trans.Flux Linde 0091/1054 HAZ metal 12 C, Trans.Lower shell plate M-4311-1(" SRM HSST plate 01d 9 C, Long.3 1370 4-5 1.0<LF<l.5 Base metal 15 C, Trans.PC, Inter shell plate 9 PC, Trans.M-6701-2"'e 9 PC, Long.3 Tension Trans.9 C, Long.Weld metalb 3 Tension Trans.M-4311-2/M-4311-3(&#xfd;)
15 C, Trans.Weld wire B-4 heat/lot 90071 9 PC, Trans.Flux Linde 0091/1054 HAZ metal 12 C, Trans.Lower shell plate M-4311-1 SRM HSST plate 01d 9 C, Long.z U)H I-zj U)C)0 W)U/)no t-i (D 0 I-.
No changes to this page -for information only Table 5.3-13 PVNGS UNIT 1 SURVEILLANCE PROGRAM (Sheet 3 of 4)Capsule Specimens Assembly Withdrawal No. and Azimuthal Schedule Lead Surveillance Type Location EFPY'f Factor Material Origins No. Type Orientation 4 1420 Standby 1.0<LF<1.5 Base metal 15 C 0  Trans.CT Lower shell plate 10 1/2t CT Trans.M-4311-1"a' 3 Tension Trans.Weld metallbI 3 Tension Trans.M-4311-2/M-4311-3(0) 15 C 0  Trans.Weld wires B-4 heat lot 90071 10 1/2t CT Trans.Flux Linde 0091/1054 3 Tension Trans.HAZ metal 12 C 0  Trans.Lower shell plate M-4311-1"'
SRM HSST plate 01dl 9 C, Long.5 2300 12-15 1.0<LF<I.5 Base metal 15 C 0  Trans.PC, Inter shell plate 9 PC, Trans.M-6701-2")
9 PC, Long.3 Tension Trans.9 C 0  Long.Weld metallb 3 Tension Trans.M-4311-2/M-4311-3(0) 15 C 0  Trans.Weld wire B-4 heat/lot 90071 9 PC 0  Trans.Flux Linde 0091/1054 HAZ metal 12 C 0  Trans.Lower shell plate M-4311-1")
12 C 0  Trans.SRM HSST plate 01(d) 9 C 0 Long.G')C/)C: 0 t7' Table 5.3-13 CD WI-(C)PVNGS UNIT 1 SURVEILLANCE PROGRAM (Sheet 4 of 4)Capsule Specimens Assembly Withdrawal No. and Azimuthal Schedule Lead Surveillance Type Location EFPY") Factor Material Origins No. Type Orientation 6 3100 I 1.0<LF<I.5 Base metal 15 C, Trans.PC, 4 Lower shell plate 9 PCv Trans.M-4311-1'a 9 PC, Long.F044 3 Tension Trans.9 C, Long.Weld metal bI 3 Tension Trans.M-4311-2/M-4311-3(')
15 C&#xfd; Trans.Weld wires B-4 heat/lot 90071 9 PC&#xfd; Trans.Flux Linde 0091/1054 HAZ metal 12 C, Trans.Lower shell plate M-4311-1")
SRM HSST plate 01d) 9 C, Long.C')C/)0 1l (D H-0 0' No changes to this page -for information only r-I CD N)C)Table 5.3-14 SURVEILLANCE PROGRAM PVNGS UNIT 2 (Sheet 1 of 3)Cn Cd Id Capsule Assembly Withdrawal Specimens No. and Azimuthal Schedule Lead Surveillance Type Location EFPY") Factor Material Origins No. Type Orientation 1 380 Standby 1.0<LF<I.5 Base metal 15 C, Trans CT Lower shell plate 10 1/2t CT Trans F-773-1. 3 Tension Trans Weld metalc'c 15 C, Trans F-773-2/F-773-3(&#xfd;)
10 1/2t CT Trans Weld wires 3 Tension Trans B-4 heat/lot 3P7317 Flux Linde 124/0662 HAZ metal 12 C, Trans Lower shell plate F_ 773-IbI SRM HSST plate 01"e' 9 C, Long.2 430 Standby 1.0<LF<l.5 Base metal 15 Cv Trans CT Lower shell plate 10 1/2t CT Trans F-7 7 3-I'b) 3 Tension Trans Weld metal"c) 15 Cv Trans F-773-2/F-773-3(d) 10 1/2t CT Trans Weld wire 3 Tension Trans B-4 heat/lot 3P7317 Flux Linde 124/0662 HAZ metal 12 C, Trans Lower shell plate F-773-11b)
SRM HSST plate 01 9 C, Trans 01(e)F-3 Cl)0 Cl)t7-1 (D 0 a.b.c.d.e.Effective full power years.See tables 5.3-3 for chemistry of plates.See tables 5.3-4 for chemistry of weld code No. 101-142 A-C (lower shell long seams).Surveillance weld metal formed between designated plates See ORNL-4315 dated February 1968 for chemistry of SRM (HHST-01 plate).
C-4 (D N)No changes to this page -for information only Table 5.3-14 PVNGS UNIT 2 SURVEILLANCE PROGRAM (Sheet 2 of 3)Capsule Specimens Assembly Withdrawal No. and Azimuthal Schedule Lead Surveillance Type Location EFPY'*' Factor Material Origins No. Type Orientation 3 1370 4-6 1.0<LF<I.5 Base metal 15 Cv Trans PC&#xfd; Lower shell plate 9 PC&#xfd; Trans F-773-1IbI 9 PC, Long.3 Tension Trans 9 CQ Long.Weld metal'c' 15 C, Trans F-773-2/F-773-3(&#xfd;)
9 PC, Trans Weld wires 3 Tension Trans B-4 heat/lot 3P7317 Flux Linde 124/0662 HAZ metal 12 C, Trans Lower shell plate F-773-I'0'SRM HSST plate 01'* 9 C, Long.4 142' Standby 1.0<LF<I.5 Base metal 15 C, Trans CT Lower shell plate 10 1/2T CT Trans F-773-1Ib 3 Tension Trans Weld metal"c) 15 C, Trans F-773-2/F-773-3'd)
Weld wire 10 1/2t CT Trans B-4 heat/lot 3P7317 Flux Linde 124/0662 3 Tension Trans HAZ metal 12 C, Trans Lower shell plate F-773- _IbI SRM HSST plate 01"' 9 C Long.0 cl)0 Cf)(D 02 0 O C-4 (D N)Table 5.3-14 PVNGS UNIT 2 SURVEILLANCE PROGRAM (Sheet 3 of 3)CA Capsule Specimens Assembly Withdrawal No. and Azimuthal Schedule Lead Surveillance Type Location EFPY W Factor Material Origins No. Type Orientation 5 2300 12-15 1.0<LF<I.5 Base metal 15 C 0  Trans PC, Lower shell plate 9 PC, Trans F-773-1'0' 9 PC 0  Long.3 Tension Trans 9 C, Long.Weld metal"'l 15 C 0  Trans F-773-2/F-773-3' 0' 9 PC, Trans Weld wires 3 Tension Trans B-4 heat/lot 3P7317 Flux Linde 124/0662 HAZ material 12 Cv Trans Lower shell plate F-773-1I'b SRM HSST plate 01 9 C, Long.6 310' 1.0<LF<I.5 Base metal 15 C 0  Trans PC, Lower shell plate 9 PC, Trans F-773-1I~b 9 PC, Long.3 Tension Trans 9 C 0  Long.Weld 15 C, Trans F-773-2/F-773-3' 0' Tension Trans Weld wire 9 PC 0  Trans B-4 heat/lot 3P7317 Flux Linde 124/0662 HAZ metal 12 C 0  Trans Lower shell plate F-773-1 SRM HSST plate 01"' 9 C 0 Long.z Cl)'-0'-3 4::, ITj Cl)'-3 0 (D 0 No changes to this page -for information only Table 5.3-15 PVNGS UNIT 3 SURVEILLANCE PROGRAM CA (D N)I-, (Sheet 1 of 4)Capsule Specimens Assembly Withdrawal No. and Azimuthal Schedule Lead Surveillance Type Location EFPYle, Factor Material Origins No. Type Orientation 1 380 Standby 1.0<LF<I.5 Base metal 15 Cv Trans.CT Lower shell plate 10 1/2t CT Trans.F-6411-2 a) 3 Tension Trans.Weld metal1b, 15 C, Trans.F-6411-1 to 3(C) 10 1/2t CT Trans.Weld wires 3 Tension Trans.B-4 heat lot 4P7869 Flux Linde 124/0281 HAZ metal 12 Cv Trans.Lower shell plate F-6411-2"'
SRM HSST plate 01l 9 Cv Long.2 430 Standby 1.0<LF<I.5 Base metal 15 Cv Trans.CT Lower shell plate 10 1/2t CT Trans.F-6411-2"a 3 Tension Trans.0 U)H'-Il Cl)a.b.C.(D d.O e.:o3 See table 5.3-5 for chemistry of plates.See table 5.3-6 for chemistry of weld code No. 101-142 A-C (lower shell long seams).Surveillance weld metal formed between designated plates.See ORNL-4315 dated February 1968 for chemistry of SRM (HSST-01 plate).Effective full power years.0 CO W)
No changes to this page -for information only Table 5.3-15 PVNGS UNIT 3 SURVEILLANCE PROGRAM (Sheet 2 of 4)(D C)I-C-n (D H-0 0H Capsule Specimens Assembly Withdrawal No. and Azimuthal Schedule Lead Surveillance Type Location EFPY"' Factor Material Origins No. Type Orientation 2 Weld metal bI 15 C, Trans.CT F-6411-1 to 3"C' 10 1/2t CT Trans.(Cont.) Weld wires 3 Tension Trans.B-4 heat lot 4P7869 Flux Linde 124/0281 HAZ metal 12 C, Trans.Lower shell plate F-6411-2 4 al SRM HSST plate 01 l 9 Cv Long.3 1420 Standby 1.0<LF<I.5 Base metal 15 Cv Trans.PC, Lower shell plate 9 PC, Trans.F-6411-2"'
9 PC, Long.3 Tension Trans.9 C, Long.Weld metalc 15 C, Trans.F-6411-1 to 3(C' 9 PC, Trans.Weld wire 3 Tension Trans.B-4 heat/lot 4P7869 Flux Linde 124/0281 HAZ metal 12 C, Trans.Lower shell plate F-6411-2c SRM HSST plate 01' 9 Cv Long.C)U)'-0 U H U'-Il CI)0 Cn tzl No changes to this page -for information only Table 5.3-15 PVNGS UNIT 3 SURVEILLANCE PROGRAM (Sheet 3 of 4)Capsule Specimens Assembly Withdrawal No. and Azimuthal Schedule Lead Surveillance Type Location EFPY(e) Factor Material Origins No. Type Orientation 4 1370 4-6 1.0<LF<l.5 Base metal 15 C 0  Trans.CT Lower shell plate F-6411-2"'e 10 1/2t CT Trans.3 Tension Trans.Weld metal(b) 15 C, Trans.F-6411-1 to 3(0)Weld wire 10 1/2t CT Trans.B-4 heat lot 4P7869 Flux Linde 124/0281 3 Tension Trans.HAZ metal 12 C 0  Trans.Lower shell plate F-6411-2a SRM HSST plate 01(d) 9 C, Long.5 2300 12-15 1.0<LF<1.5 Base metal 15 C 0  Trans.PC, Lower shell plate 9 PC, Trans.F-6411-2"'
9 PC, Long.3 Tension Trans.9 C 0  Long.Weld metal 0 bI 15 C 0  Trans.F-6411-1 to 3C) 9 PC, Trans.Weld wire 3 Tension Trans.B-4 heat/lot 4P7869 Flux Linde 124/0281 HAZ material 12 C 0  Trans.Lower shell plate F-6411-2'SRM HSST plate 01(dl 9 C 0 Long.Cl)Lii tJ2 F-3 Cf)Cl)NI C-4 F-.I-, Table 5.3-15 PVNGS UNIT 3 SURVEILLANCE PROGRAM (Sheet 4 of 4)Capsule Specimens Assembly Withdrawal No. and Azimuthal Schedule Lead Surveillance Type Location EFPY"' Factor Material Origins No. Type Orientation 6 3100 1_P-2_4 1.0<LF<I.5 Base metal 15 C, Trans.PC, Lower shell plate 9 PC, Trans.F-6411-2"'
9 PC, Long.3 Tension Trans.9 C, Long.Weld metalb 15 C, Trans.F-6411-1 to 3(C) 9 Tension Trans.Weld wire 3 PC, Trans.B-4 heat/lot 4P7869 Flux Linde 124/0281 HAZ metal 12 C, Trans.Lower shell plate F-6411-2"'
SRM HSST plate 01(dl 9 C&#xfd; Long.Cn o-C" I-Cl 0 t7-'
PVNGS UPDATED FSAR REACTOR VESSEL Table 5.3-18 PVNGS UNIT 1 CAPSULE ASSEMBLY REMOVAL SCHEDULE Azimuthal Removal Base Metal Capsule Locations Time Material Included 1 380 8-10 EFPY Lower shell PCv 2 430 Standby Intermediate shell CT 3 1370 4-5 EFPY Intermediate shell PCv 4 1420 Standby Lower shell CT 5 2300 12-15 EFPY Intermediate shell PCv 6 3100 I- 4 EFPY Lower shell PCv Note: Schedule may be odified to coincide with those refueling o ages or scheduled shutdowns most closely approximat g the withdrawal schedule.140-44 Table 5.3-19 PVNGS UNIT 2 CAPSULE ASSEMBLY REMOVAL SCHEDULE Azimuthal Removal Base Metal Capsule Locations Time Material Included 1 380 Standby Lower shell CT 2 430 Standby Lower shell CT 3 1370 4-6 EFPY Lower shell PCv 4 1420 Standby Lower shell CT 5 2300 12-15 EFPY Lower shell PCv 6 3100 1-94 EFPY Lower shell PCv Note: Schedule may be odified to coincide with those refueling ou ages or scheduled shutdowns most closely approximatig the withdrawal schedule.139 -43 June 2011 5.3-46 Revision 16 PVNGS UPDATED FSAR REACTOR VESSEL Table 5.3-19A PVNGS UNIT 3 CAPSULE ASSEMBLY REMOVAL SCHEDULE Azimuthal Removal Base Metal Capsule Locations Time Material Included 1 380 Standby Lower shell CT 2 430 Standby Lower shell CT 3 1420 Standby Lower shell PCv 4 1370 4-6 EFPY Lower shell CT 5 2300 12-15 EFPY Lower shell PCv 6 3100 -EFPY Lower shell PCv Note: Schedule may be modified to *ncide with those refueling outages or scheduled utdowns most closely approximating the withdrawal sched"".42_-46I 5.3.1.6.7 Irradiation Effects Prediction Basis The design curve used to predict the radiation induced increase in transition temperature is shown in figure 5.3-5. Predicted changes in the transition temperature are used to select the surveillance materials (paragraph 5.3.1.6.1) and to formulate the initial heatup and cooldown limit curves for plant operation.
Once actual post-irradiation surveillance data become available, these data will be used to adjust plant operating limit curves.Figure 5.3-5 was conservatively drawn using the data given in table 5.3-20 including SA533B, Class 1, plate and weld zone material typical of that used in the fabrication of the Palo Verde reactor vessel beltline materials.
The curve is applicable for materials with copper contents of 0.10 w/o or June 2011 5.3-47 Revision 16}}

Latest revision as of 20:24, 6 February 2020

Request for Approval of Proposed Changes to the Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules
ML11356A086
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/09/2011
From: Mims D
APS, Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-06447-DCM/GAM
Download: ML11356A086 (23)


Text

10 CFR 50, Appendix H A W A subsidiaryof Pinnacle West CapitalCorporation Dwight C. Mims Mail Station 7605 Palo Verde Nuclear Senior Vice President Tel. 623-393-5403 P. 0. Box 52034 Generating Station Nuclear Regulatory and Oversight Fax 623-393-6077 Phoenix, Arizona 85072-2034 102-06447-DCM/GAM December 09, 2011 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528, 50-529, and 50-530 Request for Approval of Proposed Changes to the Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules Arizona Public Service Company (APS) is requesting approval of proposed changes to the PVNGS Units 1, 2, and 3 reactor pressure vessel surveillance capsule withdrawal schedules in the Updated Final Safety Analysis Report. The proposed changes are submitted pursuant to Title 10 of the Code of FederalRegulations (10 CFR) Part 50, Appendix H,Section III.B.3, which requires that: (1) withdrawal schedules be submitted, as specified in 10 CFR 50.4, and (2) the proposed schedule must be approved by the Nuclear Regulatory Commission (NRC) prior to implementation.

The proposed changes to the reactor pressure vessel surveillance capsule withdrawal schedules are consistent with the recommendations specified in American Society for Testing and Materials (ASTM) Standard Practice E 185-82, as referenced by the requirements of 10 CFR Part 50, Appendix H. In addition, the proposed changes are consistent with Commitment No. 17 in Table A4-1 in the PVNGS license renewal application submitted in APS letter no. 102-05937, dated December 11, 2008 (ADAMS Accession No. ML083510627), and Appendix A in the related NRC Safety Evaluation Report, NUREG-1 961 (ADAMS Accession No. ML11095A011).

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde - San Onofre - South Texas
  • Wolf Creek

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Request for Approval of Proposed Changes to the Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules Page 2 No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111.

Sincerely, fc'e p. c, /,./,,,45 DCM/RAS/GAM/gat

Enclosure:

Proposed Changes to the Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules cc: E. E. Collins Jr. NRC Region IV Regional Administrator L. K. Gibson NRC NRR Project Manager for PVNGS J. R. Hall NRC NRR Senior Project Manager M. A. Brown NRC Senior Resident Inspector for PVNGS

Enclosure Proposed Changes to the Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules

1.0 INTRODUCTION

2.0 REGULATORY EVALUATION

2.1 License Renewal Commitment 3,0 TECHNICAL EVALUATION 3.1 Evaluation Criteria of ASTM Standard Practice E 185-82 3.2 Changes Proposed to the Withdrawal Schedule for PVNGS Units 1, 2, and 3

4.0 CONCLUSION

5,0 REFERENCES ATTACHMENT Updated Final Safety Analysis Report Markups

Proposed Changes to the PVNGS Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules

1.0 INTRODUCTION

Arizona Public Service Company (APS) is requesting approval of proposed changes to the Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3 reactor pressure vessel (RPV) surveillance capsule withdrawal schedules. The proposed changes are submitted pursuant to Title 10 of the Code of FederalRegulations (10 CFR) Part 50, Appendix H,Section III.B.3, which requires that: (1) withdrawal schedules be submitted, as specified in 10 CFR 50.4, and (2) the proposed schedule must be approved by the Nuclear Regulatory Commission (NRC) prior to implementation, The proposed changes to the RPV surveillance capsule withdrawal schedules are consistent with the recommendations specified in American Society for Testing and Materials (ASTM) Standard Practice E 185-82, as referenced by the requirements of 10 CFR Part 50, Appendix H. In addition, the proposed changes are consistent with Commitment No. 17 in Table A4-1 in the PVNGS license renewal application submitted in APS letter no. 102-05937, dated December 11, 2008 (ADAMS Accession No. ML083510627), as reflected in Appendix A in the related NRC Safety Evaluation Report, NUREG-1961 (ADAMS Accession No. ML11095AO11).

2.0 REGULATORY EVALUATION

Appendix H to 10 CFR Part 50 requires nuclear power plant licensees to implement reactor pressure vessel (RPV) surveillance programs to "monitor changes in the fracture toughness properties of ferritic materials in the reactor vessel beltline region... which result from the exposure of these materials to neutron irradiation and the thermal environment."Section III.B.1 of Appendix H states that the design of the surveillance program and the withdrawal schedule must meet the requirements of the edition of the American Society for Testing and Materials (ASTM) E 185, "Standard Practice for Conducting Surveillance Tests for Light-Water Cooled Nuclear Power Reactor Vessels,"

that is current on the issue date of the American Society of Mechanical Engineers (ASME) Code to which the RPV was purchased. The rule permits the use of later editions of ASTM E 185, but including only those editions through 1982 (i.e., ASTM E 185-82). The current PVNGS Units 1,2, and 3, RPV surveillance programs and the withdrawal schedules meet the requirements of ASTM E 185-82.

Appendix H to 10 CFR Part 50, Section III.B.3, requires prior NRC approval of all RPV surveillance capsule withdrawal schedule changes. Further, NRC Administrative Letter 97-04, "NRC Staff Approval for Changes to 10 CFR Part 50, Appendix H, Reactor Vessel Surveillance Specimen Withdrawal Schedules," dated September 30, 1997, specifies that changes to RPV surveillance capsule withdrawal schedules that do not conform to ASTM E 185 require approval by the license amendment process, whereas changes that conform to the ASTM standard require only staff verification of such conformance. The proposed changes to the PVNGS Units 1, 2, and 3 RPV surveillance capsule withdrawal schedules conform to ASTM E 185-82, and, therefore, a license amendment is not required for these proposed changes.

1

Proposed Changes to the PVNGS Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules 2.1 License Renewal Commitment The PVNGS Units 1,2, and 3 license renewal application (Ref. 5.1) contained the following item in Commitment No. 17 in Table A4-1, as reflected in Appendix A of the related NRC Safety Evaluation Report, NUREG-1961, April 2011 (Ref. 5.2):

Priorto the period of extended operation:

o The [reactorpressure vessel surveillance program]schedule will be revised to withdraw the next capsule at the equivalent clad-base metal exposure of approximately 54 effective full power years (EFPY)expected for the 60-year period of operation, and to withdraw remaining standby capsules at equivalent clad-base metal exposures not exceeding the 72 EFPY expected for a possible 80-year second period of extended operation. This withdrawalschedule is in accordance with NUREG-1801

[GenericAging Lessons Learned (GALL) Report],Section XI.M31, item 6, and with the ASTM E 185-82 criterion which states that capsules may be removed when the capsule neutron fluence is between one and two times the limiting fluence calculated for the vessel at the end of expected life.

This schedule change must be approved by the NRC, as required by 10 CFR 50 Appendix H.

This request to revise the PVNGS Units 1, 2, and 3 RPV surveillance capsule withdrawal schedules will address this commitment.

3.0 TECHNICAL EVALUATION

3.1 Evaluation Criteria of ASTM Standard Practice E 185-82 Table 1 of ASTM Standard Practice E 185-82 requires that either a minimum of three, four, or five surveillance capsules be removed from the vessels, as based on the limiting amount of reference temperature for nil-ductility transition shift (limiting RTNDT) that is projected to occur at the clad-vessel interface location of the RPV at the end-of-licensed plant life (EOL). For plants with projected RTNDT shifts (i.e., ARTNDT) less than 100 OF (56 0C), three capsules are required to be removed from the RPV.

For the renewed operating license operating terms, the PVNGS RPVs have limiting ARTNDT values of less than 100 OF. At 60 years (54 EFPY), the maximum shift in reference temperature for pressurized thermal shock (ARTPTS) is 57.7 OF for Unit 1, the maximum ARTPTS is 54 OF for Unit 2, and the maximum ARTPTS is 40.7 °F for Unit 3 (Ref. 5.1, License Renewal Application Tables 4.2-6, 7, and 8). In this context, ARTPTS is equivalent to ARTNDT. Therefore APS is required, as a minimum, to remove three capsules from each reactor during the current operating period.

2

Proposed Changes to the PVNGS Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules Table 1 of ASTM Standard Practice E 185-82 also provides specific criteria for removal of surveillance capsules. The criteria are that the surveillance capsules be removed after a certain amount of power operation has elapsed or at various times when the RPV shell is projected to achieve certain levels of neutron fluence. The intent of the Standard Practice is to achieve a set of testing data over a range of neutron fluences for the RPV that bounds the current life of the plant. Of key importance are the removal criteria for the second to last and final capsules required for capsule withdrawal. For the second-to-last required capsule in a withdrawal schedule, the ASTM standard requires that the capsules be pulled at either 13 effective full power years (EFPYs) or at the time when the capsule is equivalent to the limiting fluence projected for the clad-based metal interface of the RPV at EOL, whichever time comes first. For the final capsule that is required for removal, ASTM E 185-82 requires that the capsule be removed at a time when the neutron fluence projected for the capsule is between the limiting fluence value projected for the RPV at the EOL and two times that value.

3.2 Changes Proposed to the Withdrawal Schedule for PVNGS Units 1, 2, and 3 The proposed changes to the PVNGS Units 1, 2, and 3 RPV surveillance capsule withdrawal schedule are shown in the attached markups of UFSAR Tables 5.3-18, 5.3-19, 5.3-19A, 5.3-13, 5.3-14, and 5.3-15.

For the final capsule that is required for removal, ASTM E 185-82 requires that the capsule be removed at a time when the neutron fluence projected for the capsule is between the limiting fluence value projected for the RPV at the EOL and two times that value. The limiting fluence values projected for the RPVs at the EOL for the final capsule required for removal from each unit, Capsule 6 (3100), are shown in Tables 3.2-1, 3.2-2, and 3.2-3 below.

3

Proposed Changes to the PVNGS Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules Table 3.2-1 PVNGS Unit I Reactor Pressure Vessel Surveillance Capsule Withdrawalma)

Capsule No.

CapsuleWihrwlIM Location Location_____ Lead Factor EFPY(b)

Withdrawal Fune(lm Fluence (n 3 1370 1.34 4.57 3.65E18 1 380 1.33 9.76 6.28E18 5 2300 1.35 13.83 8.76E18 6 3100 1.35 40OC) 2.56E19(O) 2 430 1.35 Standby 4 1420 1.35 Standby (a) Based on Table 7-1 in WCAP-16374-NP, "Analysis of Capsule 2300 from the Arizona Public Service Company Palo Verde Unit 1 Reactor Vessel Radiation Surveillance Program," February 2005 (Ref. 5.3).

(b) Effective full power years (EFPY) from plant startup.

(c) Equivalent to capsule accumulating a fluence equal to 54 EFPY.

(d) Calculated at reactor vessel clad-to-metal interface. (Source: Table 1-2 of WCAP-1 6835-NP [Ref.

5.6]. This value was calculated for the current maximum licensed power of 3990 MWt, whereas the 2.51 E19 value shown in Table 6-2 in WCAP-1 6374 [Ref. 5.3] and in Section 4.2.1 of the PVNGS License Renewal Application [Ref. 5.1] was calculated for the previous maximum licensed power of 3876 MWt prior to implementation of the Unit 1 power uprate license amendment.)

Table 3.2-2 PVNGS Unit 2 Reactor Pressure Vessel Surveillance Capsule Withdrawal(a)

(a) Based on Table 7-1 in WCAP-16524-NP, "Analysis of Capsule 2300 from the Arizona Public Service Company Palo Verde Unit 2 Reactor Vessel Radiation Surveillance Program," February 2006 (Ref. 5.4).

(b) Effective full power years (EFPY) from plant startup.

(c) Equivalent to capsule accumulating a fluence equal to 54 EFPY.

(d) Calculated at reactor vessel clad-to-metal interface. (Source: Table 1-3 of WCAP-16835-NP [Ref.

5.6]. This value was calculated for the current maximum licensed power of 3990 MWt, and is the same as shown in Table 6-2 in WCAP-1 6524 [Ref. 5.4] and in Section 4.2.1 of the PVNGS License Renewal Application [Ref. 5.1], reflecting the Unit 2 power uprate license amendment.)

4

Proposed Changes to the PVNGS Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules Table 3.2-3 Pressure Vessel Surveillance PVNGS Unit 3 ReactorCapsule Capsule Withdrawal(a)

WithdrawalM2 Capsule__No.

Capsule No. Location ca LaFctrEFPY(b)

Lead Factor Fluence (n/cm2 )

4 1370 1.28 4.44 3.48E18 5 2300 1.31 13.75 9.07E18 6 3100 1.31 42(c) 2.99E19(d) 2 430 1.30 Standby 3 1420 1.28 Standby 1 380 1.28 Standby (a) Based on Table 7-1 in WCAP-16449-NP, "Analysis of Capsule 2300 from the Arizona Public Service Company Palo Verde Unit 3 Reactor Vessel Radiation Surveillance Program," August 2005 (Ref. 5.5).

(b) Effective full power years (EFPY) from plant startup.

(c) Equivalent to capsule accumulating a fluence equal to 54 EFPY.

(d) Calculated at reactor vessel clad-to-metal interface. (Source: Table 1-4 of WCAP-16835-NP [Ref.

5.6]. This value was calculated for the current maximum licensed power of 3990 MWt, whereas the 2.93E19 value shown in Table 6-2 in WCAP-16449 [Ref. 5.5] and in Section 4.2.1 of the PVNGS License Renewal Application [Ref. 5.1] was calculated for the previous maximum licensed power of 3876 MWt prior to implementation of the Unit 3 power uprate license amendment.)

4.0 CONCLUSION

The proposed changes to the PVNGS RPV surveillance capsule withdrawal schedules will continue to meet the RPV surveillance capsule withdrawal schedule criteria in ASTM E 185-82 for the renewed licensed periods of PVNGS Units 1, 2, and 3.

5.0 REFERENCES

5.1 Letter no. 102-05937, from APS to the NRC, "License Renewal Application,"

December 11, 2008 (ADAMS Accession No. ML083510627) 5.2 NUREG-1961 "Safety Evaluation Report Related to the License Renewal of Palo Verde Nuclear Generating Station, Units 1,2 and 3." (ADAMS Accession No. ML11095A011) 5.3 Letter no. 102-05242 from APS to the NRC, "Palo Verde Nuclear Generating Station Unit 1 Reactor Vessel Material Surveillance Capsule at 230', April 5, 2005 (transmittal of WCAP-16374-NP, "Analysis of Capsule 230' from Arizona Public Service Company Palo Verde Unit 1 Reactor Vessel Radiation Surveillance Program," February 2005) (ADAMS Accession No. not publicly available).

5

Proposed Changes to the PVNGS Units 1, 2, and 3 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules 5.4 Letter no. 102-05457 from APS to the NRC, "Palo Verde Nuclear Generating Station Unit 2 Reactor Vessel Material Surveillance Capsule at 2300,' April 4, 2006 (transmittal of WCAP-16524-NP, "Analysis of Capsule 230' from Arizona Public Service Company Palo Verde Unit 2 Reactor Vessel Radiation Surveillance Program," February 2006) (ADAMS Accession No. ML061040586).

5.5 Letter no. 102-05348 from APS to the NRC, "Palo Verde Nuclear Generating Station Unit 3 Analysis of Reactor Vessel Material Surveillance Capsule at 2300,"

September 26, 2005 (transmittal of WCAP-16449-NP, "Analysis of Capsule 2300 from Arizona Public Service Company Palo Verde Unit 3 Reactor Vessel Radiation Surveillance Program," August 2005) (ADAMS Accession No. ML053390139).

5.6 Westinghouse Report WCAP-16835-NP, "Palo Verde Nuclear Generating Station Units 1, 2, and 3; Basis for RCS Pressure and Temperature Limits Report," June 2008 (ADAMS Accession No. ML090641016). This report was submitted with letter no. 102-05960 from APS to the NRC, "Request for Technical Specification Amendment and Exemption from 10 CFR 50, Appendix G, to Relocate the Reactor Coolant System Pressure and Temperature Limits and the Low Temperature Overpressure Protection Enable Temperatures," February 19, 2009 (ADAMS Accession No. ML090641014).

6

ATTACHMENT Updated Final Safety Analysis Report Markups Page No.

5.3-27 (no changes - for information only) 5.3-28 (no changes - for information only) 5.3-29 (no changes - for information only) 5.3-30 5.3-31 (no changes - for information only) 5.3-32 (no changes - for information only) 5.3-33 5.3-34 (no changes - for information only) 5.3-35 (no changes - for information only) 5.3-36 (no changes - for information only) 5.3-37 5.3-46 5.3-47

No changes to this page -

for information only Table 5.3-13 C- PVNGS UNIT 1 SURVEILLANCE PROGRAM (Sheet 1 of 4)

(D r')

Capsule Specimens Assembly Withdrawal No. and Azimuthal Schedule Lead Surveillance Type Location EFPY") Factor Material Origins No. Type Orientation 1 380 8-10 1.0<LF<I.5 Base metal 15 C, Trans.

PC, lower shell plate 9 PC, Trans.

M-4311-I1*' 9 PCv Long.

3 Tension Trans.

9 Cv Long.

Weld metalb 3 Tension Trans. 1-3 M-4311-2/M-4311-3('1 15 C, Trans.

weld wires tl)

(-n B-4 heat/lot 90071 9 PC, Trans.

Flux Linde 0091/1054 HAZ metal 12 C, Trans.

Lower shell plate M-4311-1 SRM HSST plate 01d) 9 Cý Long.

0

a. See table 5.3-1 for chemistry of plate code No. M-4311-1 (lower shell plates).

C')

b. See table 5.3-2 for chemistry of weld code No. 101-142 A-C (lower shell long seams). Wl (D c. Surveillance weld metal between plates m-4311-2 and M-4311-3 (long seams).
d. See ORNL-4315, dated February 1968 for chemistry of SRM (HSST-01 Ppate).

H" e. See table 5.3-1 for chemistry of plate code No. M-6701-2 (intermediate shell plate).

0

f. Effective full power years.

o-

No changes to this page -

for information only Table 5.3-13 C- PVNGS UNIT 1 SURVEILLANCE PROGRAM (Sheet 2 of 4)

(D C) Capsule Specimens Assembly Withdrawal No. and Azimuthal Schedule Lead Surveillance Type Location EFPY"' Factor Material Origins No. Type Orientation 2 430 Standby 1.0<LF<I.5 Base metal 15 C, Trans.

CT Inter. shell plate 10 1/2t CT Trans. z M-6701-2 e( 3 Tension Trans.

U)

Weld metal(b) 3 Tension Trans.

M-4311-2/M-4311-3(o 15 C, Trans.

Weld wires B-4 heat lot 90071 10 1/2t CT Trans. H Flux Linde 0091/1054 I-zj Cn HAZ metal 12 C, Trans. U)

Lower shell plate M-4311-1("

co SRM HSST plate 01d 9 C, Long.

3 1370 4-5 1.0<LF<l.5 Base metal 15 C, Trans.

PC, Inter shell plate 9 PC, Trans.

M-6701-2"'e 9 PC, Long. C) 3 Tension Trans.

9 C, Long. 0 Weld metalb 3 Tension Trans.

M-4311-2/M-4311-3(ý) 15 C, Trans.

Weld wire W)

U/)

B-4 heat/lot 90071 9 PC, Trans. no Flux Linde 0091/1054 t-i (D

HAZ metal 12 C, Trans.

Lower shell plate M-4311-1 0

SRM HSST plate 01d 9 C, Long.

I-.

No changes to this page -

for information only Table 5.3-13 PVNGS UNIT 1 SURVEILLANCE PROGRAM (Sheet 3 of 4)

Capsule Specimens Assembly Withdrawal No. and Azimuthal Schedule Lead Surveillance Type Location EFPY'f Factor Material Origins No. Type Orientation 4 1420 Standby 1.0<LF<1.5 Base metal 15 C0 Trans.

CT Lower shell plate 10 1/2t CT Trans.

M-4311-1"a' 3 Tension Trans. G')

C/)

Weld metallbI 3 Tension Trans.

0 M-4311-2/M-4311-3( ) 15 C0 Trans.

Weld wires B-4 heat lot 90071 10 1/2t CT Trans. C:

Flux Linde 0091/1054 3 Tension Trans.

HAZ metal 12 C0 Trans.

Lower shell plate M-4311-1"'

SRM HSST plate 01dl 9 C, Long.

5 2300 12-15 1.0<LF<I.5 Base metal 15 C0 Trans.

PC, Inter shell plate 9 PC, Trans.

M-6701-2") 9 PC, Long.

3 Tension Trans.

9 C0 Long. 0 Weld metallb 3 Tension Trans.

0 M-4311-2/M-4311-3( ) 15 C0 Trans.

Weld wire B-4 heat/lot 90071 9 PC0 Trans. t7' Flux Linde 0091/1054 HAZ metal 12 C0 Trans.

Lower shell plate M-4311-1") 12 C0 Trans.

SRM HSST plate 01(d) 9 C0 Long.

Table 5.3-13 PVNGS UNIT 1 SURVEILLANCE PROGRAM (Sheet 4 of 4)

Capsule Specimens Assembly Withdrawal No. and Azimuthal Schedule Lead Surveillance Type Location EFPY") Factor Material Origins No. Type Orientation 6 3100 I 1.0<LF<I.5 Base metal 15 C, Trans.

CD PC, 4 Lower shell plate 9 PCv Trans.

M-4311-1'a 9 PC, Long.

F044 3 Tension Trans. C')

WI- 9 C, Long.

Weld metal bI 3 Tension Trans.

M-4311-2/M-4311-3(') 15 Cý Trans.

Weld wires B-4 heat/lot 90071 9 PCý Trans.

Flux Linde 0091/1054 C/)

(C) HAZ metal 12 C, Trans.

Lower shell plate M-4311-1")

SRM HSST plate 01d) 9 C, Long.

0 1l (D

H-00'

No changes to this page -

r-I for information only CD Table 5.3-14 N) PVNGS UNIT 2 SURVEILLANCE PROGRAM (Sheet 1 of 3)

C)

Capsule Assembly Withdrawal Specimens No. and Azimuthal Schedule Lead Surveillance Type Location EFPY") Factor Material Origins No. Type Orientation 1 380 Standby 1.0<LF<I.5 Base metal 15 C, Trans CT Lower shell plate 10 1/2t CT Trans F-773-1. 3 Tension Trans Weld metalc'c 15 C, Trans F-773-2/F-773-3(ý) 10 1/2t CT Trans F-3 Weld wires 3 Tension Trans B-4 heat/lot 3P7317 Flux Linde 124/0662 Cl)

Cn HAZ metal 12 C, Trans Lower shell plate Cd Id F_ 773-IbI SRM HSST plate 01"e' 9 C, Long.

2 430 Standby 1.0<LF<l.5 Base metal 15 Cv Trans CT Lower shell plate 10 1/2t CT Trans F- 7 7 3-I'b) 3 Tension Trans Weld metal"c) 15 Cv Trans F-773-2/F-773-3(d) 10 1/2t CT Trans Weld wire 3 Tension Trans B-4 heat/lot 3P7317 Flux Linde 124/0662 0 HAZ metal 12 C, Trans Lower shell plate (D F-773-11b)

Cl)

SRM HSST plate 01 9 C, Trans t7-1 01(e) 0

a. Effective full power years.
b. See tables 5.3-3 for chemistry of plates.
c. See tables 5.3-4 for chemistry of weld code No. 101-142 A-C (lower shell long seams).
d. Surveillance weld metal formed between designated plates
e. See ORNL-4315 dated February 1968 for chemistry of SRM (HHST-01 plate).

No changes to this page -

for information only C-4 (D Table 5.3-14 PVNGS UNIT 2 SURVEILLANCE PROGRAM (Sheet 2 of 3)

Capsule Specimens Assembly Withdrawal No. and Azimuthal Schedule Lead Surveillance Type Location EFPY'*' Factor Material Origins No. Type Orientation 3 1370 4-6 1.0<LF<I.5 Base metal 15 Cv Trans PCý Lower shell plate 9 PCý Trans N) F-773-1IbI 9 PC, Long.

3 Tension Trans 0 9 CQ Long.

Weld metal'c' 15 C, Trans F-773-2/F-773-3(ý) 9 PC, Trans Weld wires 3 Tension Trans B-4 heat/lot 3P7317 cl)

Flux Linde 124/0662 HAZ metal 12 C, Trans Lower shell plate F-773-I'0 '

SRM HSST plate 01'* 9 C, Long.

4 142' Standby 1.0<LF<I.5 Base metal 15 C, Trans CT Lower shell plate 10 1/2T CT Trans F-773-1Ib 3 Tension Trans Weld metal"c) 15 C, Trans F-773-2/F-773-3'd)

Weld wire 10 1/2t CT Trans 0 B-4 heat/lot 3P7317 Flux Linde 124/0662 3 Tension Trans HAZ metal 12 C, Trans Cf)

(D Lower shell plate 0 F-773- _IbI 02 SRM HSST plate 01"' 9 C Long.

O

C-4 Table 5.3-14 (D PVNGS UNIT 2 SURVEILLANCE PROGRAM (Sheet 3 of 3)

N)

Capsule Specimens Assembly Withdrawal No. and Azimuthal Schedule Lead Surveillance Type Location EFPY W Factor Material Origins No. Type Orientation 5 2300 12-15 1.0<LF<I.5 Base metal 15 C0 Trans PC, Lower shell plate 9 PC, Trans 0

F-773-1' ' 9 PC0 Long. z 3 Tension Trans Cl) 9 C, Long.

Weld metal"'l 15 C0 Trans '-0 0

F-773-2/F-773-3' ' 9 PC, Trans Weld wires 3 Tension Trans

'-3 B-4 heat/lot 3P7317 Flux Linde 124/0662 4::,

CA ITj HAZ material 12 Cv Trans Cl)

Lower shell plate F-773-1I'b SRM HSST plate 01 9 C, Long.

6 310' 1.0<LF<I.5 Base metal 15 C0 Trans PC, Lower shell plate 9 PC, Trans F-773-1I~b 9 PC, Long.

3 Tension Trans 9 C0 Long. '-3 Weld metal"'* 15 C, Trans 0 0

F-773-2/F-773-3' ' Tension Trans Weld wire 9 PC0 Trans B-4 heat/lot 3P7317 Flux Linde 124/0662 (D HAZ metal 12 C0 Trans Lower shell plate F-773-1 0 SRM HSST plate 01"' 9 C0 Long.

for changes to only No information this page -

Table 5.3-15 CA PVNGS UNIT 3 SURVEILLANCE PROGRAM (Sheet 1 of 4)

(D N) Capsule Specimens I-,

Assembly Withdrawal No. and Azimuthal Schedule Lead Surveillance Type Location EFPYle, Factor Material Origins No. Type Orientation 1 380 Standby 1.0<LF<I.5 Base metal 15 Cv Trans.

CT Lower shell plate 10 1/2t CT Trans.

F-6411-2 a) 3 Tension Trans. 0 U)

Weld metal1b, 15 C, Trans.

F-6411-1 to 3(C) 10 1/2t CT Trans.

Weld wires 3 Tension Trans.

B-4 heat lot 4P7869 H Flux Linde 124/0281

'-Il HAZ metal 12 Cv Trans. Cl)

Lower shell plate F-6411-2"'

SRM HSST plate 01l 9 Cv Long.

2 430 Standby 1.0<LF<I.5 Base metal 15 Cv Trans.

CT Lower shell plate 10 1/2t CT Trans.

F-6411-2"a 3 Tension Trans.

0

a. See table 5.3-5 for chemistry of plates.
b. See table 5.3-6 for chemistry of weld code No. 101-142 A-C (lower shell long seams). CO W)

C. Surveillance weld metal formed between designated plates.

(D

d. See ORNL-4315 dated February 1968 for chemistry of SRM (HSST-01 plate).

O e. Effective full power years.

o3

No changes to this page -

for information only Table 5.3-15 PVNGS UNIT 3 SURVEILLANCE PROGRAM (Sheet 2 of 4)

(D C) Capsule Specimens Assembly Withdrawal No. and Azimuthal Schedule Lead Surveillance Type Location EFPY"' Factor Material Origins No. Type Orientation 2 Weld metal bI 15 C, Trans.

CT F-6411-1 to 3"C' 10 1/2t CT Trans.

(Cont.) Weld wires 3 Tension Trans. C)

B-4 heat lot 4P7869 U)

I-Flux Linde 124/0281 '-0 Trans. U HAZ metal 4 12 C, al Lower shell plate F-6411-2 H U

SRM HSST plate 01 l 9 Cv Long.

'-Il CI)

C-n 3 1420 Standby 1.0<LF<I.5 Base metal 15 Cv Trans.

PC, Lower shell plate 9 PC, Trans.

F-6411-2"' 9 PC, Long.

3 Tension Trans.

9 C, Long.

Weld metalc 15 C, Trans.

F-6411-1 to 3(C' 9 PC, Trans.

Weld wire 3 Tension Trans.

0 B-4 heat/lot 4P7869 Flux Linde 124/0281 HAZ metal 12 C, Trans. Cn Lower shell plate F-6411-2c tzl (D

SRM HSST plate 01' 9 Cv Long.

H-0 0H

No changes to this page -

for information only Table 5.3-15 PVNGS UNIT 3 SURVEILLANCE PROGRAM (Sheet 3 of 4)

Capsule Specimens Assembly Withdrawal No. and Azimuthal Schedule Lead Surveillance Type Location EFPY(e) Factor Material Origins No. Type Orientation 4 1370 4-6 1.0<LF<l.5 Base metal 15 C0 Trans.

CT Lower shell plate F-6411-2"'e 10 1/2t CT Trans.

3 Tension Trans. Cl)

Weld metal(b) 15 C, Trans.

F-6411-1 to 3(0)

Weld wire 10 1/2t CT Trans. Lii B-4 heat lot 4P7869 tJ2 Flux Linde 124/0281 3 Tension Trans.

HAZ metal 12 C0 Trans.

Lower shell plate F-6411-2a SRM HSST plate 01(d) 9 C, Long.

5 2300 12-15 1.0<LF<1.5 Base metal 15 C0 Trans.

PC, Lower shell plate 9 PC, Trans.

F-6411-2"' 9 PC, Long.

3 Tension Trans. F-3 9 C0 Long.

Cf)

Weld metal 0 bI 15 C0 Trans.

F-6411-1 to 3C) 9 PC, Trans.

Weld wire 3 Tension Trans.

Cl)

B-4 heat/lot 4P7869 NI Flux Linde 124/0281 HAZ material 12 C0 Trans.

Lower shell plate F-6411-2' SRM HSST plate 01(dl 9 C0 Long.

C-4 Table 5.3-15 PVNGS UNIT 3 SURVEILLANCE PROGRAM (Sheet 4 of 4)

F-.

I-,

Capsule Specimens Assembly Withdrawal No. and Azimuthal Schedule Lead Surveillance Type Location EFPY"' Factor Material Origins No. Type Orientation 6 3100 1_P-2_4 1.0<LF<I.5 Base metal 15 C, Trans.

PC, Lower shell plate 9 PC, Trans.

F-6411-2"' 9 PC, Long.

3 Tension Trans.

9 C, Long.

C" Weld metalb 15 C, Trans.

F-6411-1 to 3(C) 9 Tension Trans.

Weld wire 3 PC, Trans.

B-4 heat/lot 4P7869 I-Cl Flux Linde 124/0281 HAZ metal 12 C, Trans.

Lower shell plate F-6411-2"'

Cn SRM HSST plate 01(dl 9 Cý Long.

0 o- t7-'

PVNGS UPDATED FSAR REACTOR VESSEL Table 5.3-18 PVNGS UNIT 1 CAPSULE ASSEMBLY REMOVAL SCHEDULE Azimuthal Removal Base Metal Capsule Locations Time Material Included 1 380 8-10 EFPY Lower shell PCv 2 430 Standby Intermediate shell CT 3 1370 4-5 EFPY Intermediate shell PCv 4 1420 Standby Lower shell CT 5 2300 12-15 EFPY Intermediate shell PCv 6 3100 I- 4 EFPY Lower shell PCv Note: Schedule may be odified to coincide with those refueling o ages or scheduled shutdowns most closely approximat g the withdrawal schedule.

140-44 Table 5.3-19 PVNGS UNIT 2 CAPSULE ASSEMBLY REMOVAL SCHEDULE Azimuthal Removal Base Metal Capsule Locations Time Material Included 1 380 Standby Lower shell CT 2 430 Standby Lower shell CT 3 1370 4-6 EFPY Lower shell PCv 4 1420 Standby Lower shell CT 5 2300 12-15 EFPY Lower shell PCv 6 3100 1-94 EFPY Lower shell PCv Note: Schedule may be odified to coincide with those refueling ou ages or scheduled shutdowns most closely approximatig the withdrawal schedule.

139 -43

  • June 2011 5.3-46 Revision 16

PVNGS UPDATED FSAR REACTOR VESSEL Table 5.3-19A PVNGS UNIT 3 CAPSULE ASSEMBLY REMOVAL SCHEDULE Azimuthal Removal Base Metal Capsule Locations Time Material Included 1 380 Standby Lower shell CT 2 430 Standby Lower shell CT 3 1420 Standby Lower shell PCv 4 1370 4-6 EFPY Lower shell CT 5 2300 12-15 EFPY Lower shell PCv 6 3100 - EFPY Lower shell PCv Note: Schedule may be modified to *ncide with those refueling outages or scheduled utdowns most closely approximating the withdrawal sched

"".42_-46I 5.3.1.6.7 Irradiation Effects Prediction Basis The design curve used to predict the radiation induced increase in transition temperature is shown in figure 5.3-5. Predicted changes in the transition temperature are used to select the surveillance materials (paragraph 5.3.1.6.1) and to formulate the initial heatup and cooldown limit curves for plant operation. Once actual post-irradiation surveillance data become available, these data will be used to adjust plant operating limit curves.

Figure 5.3-5 was conservatively drawn using the data given in table 5.3-20 including SA533B, Class 1, plate and weld zone material typical of that used in the fabrication of the Palo Verde reactor vessel beltline materials. The curve is applicable for materials with copper contents of 0.10 w/o or June 2011 5.3-47 Revision 16