ML14239A464: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 9: Line 9:
| docket = 05000361, 05000362
| docket = 05000361, 05000362
| license number = NPF-010, NPF-015
| license number = NPF-010, NPF-015
| contact person = Wengert T J
| contact person = Wengert T
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| page count = 15
| page count = 15
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Meeting Agenda Decommiss i oning San Onofre Nuclear Generating Stat i on Topic Time Introduction 1:30 SONGS Decommissioning Plan/Schedule 1:40 Decommissioning Quality Assurance Plan 2:00 NRC Feedback 2:45 Path Forward 3:15 Summary/ Actions/Conclusion 3:25 2 en 0 z C) en c (I) n 0 3 3 -* tn tn *. -* 0 :::l -* ::l (Q -c. -Q) ::l ..
{{#Wiki_filter:Decommissioning Meeting Agenda San Onofre Nuclear Generating Station Topic                                 Time Introduction                           1:30 SONGS Decommissioning Plan/Schedule   1:40 Decommissioning Quality Assurance Plan 2:00 NRC Feedback                           2:45 Path Forward                           3:15 Summary/Actions/Conclusion             3:25 2
Introduction Decommiss i o.ning San Onofre Nuclear Generating Station
 
en 0
z C) en c
(I) n 0
3 3
tn tn *.
0-*
:::l
::l (Q
  -c .
-::l Q)
 
Decommissio.n ing Introduction San Onofre Nuclear Generating Station
* SONGS is a permanently defueled station transitioning to decommissioning.
* SONGS is a permanently defueled station transitioning to decommissioning.
* Quality is an essential cornerstone of what we do at SONGS -SONGS is a 10 CFR 50 Appendix B licensee with an approved Quality Assurance Program (QAP). Going forward SONGS will remain a 1 0 CFR 50 Appendix B licensee with a simplified Decommissioning QAP (DQAP) aligned with plant status and activities.
* Quality is an essential cornerstone of what we do at SONGS
* In the face of a changing environment, the SONGS QA program will: -Continue to provide effective oversight of programs and activities that are important to safety. (SAFETY) -Efficiently manage available resources to continue to add value to the decommissioning effort. (STEWARDSHIP)  
            -       SONGS is a 10 CFR 50 Appendix B licensee with an approved Quality Assurance Program (QAP).
-Establish a clear path from essential decommissioning regulatory requirements to implementing programs and procedures to ensure complete station engagement. (ENGAGEMENT)
Going forward SONGS will remain a 10 CFR 50 Appendix B licensee with a simplified Decommissioning QAP (DQAP) aligned with plant status and activities.
Decomm i s s ion in g San Onofre N u c lea r G e n erii tin g St a t i on Decommissioning Plan 20 YEARS OR LESS
* In the face of a changing environment, the SONGS QA program will:
* Major Milestone  
            -       Continue to provide effective oversight of programs and activities that are important to safety.
*y **y** ............ y-* 1 201.-! 201.c I 201s ; 201s 201s Quarter Quarter 1 31'111 Quarter! ,,. Quartet" I Quarter 3"' Quarter ,.., Quart *** *******-?*******-**  
(SAFETY)
** ** **4----* *******--**-<>--*****  
            -       Efficiently manage available resources to continue to add value to the decommissioning effort.
*** ***** ***? *** ... r r*** ****l*** ****--r-***
(STEWARDSHIP)
2016 2017 J 2018 2019 +---....... -r-.. **-*------<,'-y I 2020 '( 2021 2022 1 202. 2025 ... " 2031 2032 +-+ >r-'* i' ' r*******''  
            -       Establish a clear path from essential decommissioning regulatory requirements to implementing programs and procedures to ensure complete station engagement. (ENGAGEMENT)
-';-** y ...............
 
2033 *******"'\
Decommission ing Decommissioning Plan San Onofre Nuclear Ge neriiting Station 20 YEARS OR LESS
I i I I PHYSICAL PLANT CHANGES AU Syste ms drained. 1 temporary power fing j j' ! f I ' I I
* Major Milestone
* i ! LIC ENSE SUBMIJTALS Permanently Emerbency Plan. Permanently Techhicol I i Spe c ifications j ! I I IMPLEMENTATION I ! : IFMP I i !
                                                                *y                   **y**   ........... . y-*
* SUBMITTAL l DECOMMISSIONING DCE i __ _ suBMmALS i SUBivjiTTAL I PSDA!R I I I I START DECONTAMINATION
r*** ****l***                        y                    y
& DISMANTLEMENT (D&D) 10 years I 1 r ' SUBMITTAL .J I I ! I I I DRY FUEL STORAGE (DFS) Eng+eering I I . DRY Fl{EL STORAGE -I I PROJEtT IMPLEMENTATION ALL FUEL IN DR Y FUEL ..  
                                                                                                                                                                                                                                                          ~. 1202. ~ 2025 ~-2... .,~; 1*2028 -, 2029 ]--~ "2031
.. L ! I DRY FUEL STORAGE I EXPANSION I 6RY FUEL STORAGE t 'tCAN IST ER FABR I CATION' _! __ _ C f0312011*1-CE'"20 Y EAI! OR lW aASE TIME I!CASONA81.!
                                                                                                                                                                                                          ****--r-***              '(
OOLSTOR.h.G E ) __ j I mod if cotion I() ISFSI only I .c Any -;-tmo i ning St o l e reQU* menls for unres ric led l and use , END OF PLA Nt 'DECOMMISSIONiNG iDry Fuel Storage: Pad ' Rema i ns) _j
                                      ~!"          ~*                                  !                                                ~s                                                                                I 1
-D) :::J ;;c CD < -* tJ) -* 0 :::J
201.-             201.c           I   201s             ;                       201s         201s J2018                                                                                                                          2032 Quarter ~ _.., Quarter ! ,,. Quartet" I                                                                 2016    2017                        2019    2020    2021          2022                                                                            2033 Quarter
. Quality Assurance' Plan ChcinQes Decommissioning for Decommissioning San Onofre Nuclear Generating Station
                                              ~'-
* Scope of DQAP optimized to fit a permanently defueled facility -Applicability changed due to Systems, Structures and Components (SSCs) reclassification
Quarter 131'111
                                                      *** *******-?*******-** ** ** **4----
I                    i
                                                                                            * *******--**-<>--***** *** ***** ***? ***
I                    I Quarter
                                                                                                                                                  ...r 3"' Quarter ,.., Quart
                                                                                                                                                                                      +---.. . . -r-..**-*- -----<,'-                   ...............                 +-+     I
                                                                                                                                                                                                                                                                                        >r- '*     i' '     r*******''       -';-**   *******"'\
PHYSICAL PLANT CHANGES AU Systems de-en~rgized, d~pressurizSd. drained.
1 temporary power fing esto~ished                                          j                   j'
                                                                  !                     f                   I
                                                                  '                     I                   I
* i LIC ENSE SUBMIJTALS Permanently Defu~led Emerbency Plan.                                                                                                                                                     I Permanently Defu~led Techhicol                                           I                   i Spec ifications               j                   !                   I                   I IMPLEMENTATION                                                                           I I                    I'                                    ~
                                                                  !                     : IFMP I                                 i                                                                                         I
                                                                  !
* SUBMITTAL l                                                                       START DECONTAMINATION &
DECOMMISSIONING suBMmALS
                                                                                      ~
i DCE SUBivjiTTAL i            J~
I~.,..,.,
__ _                  DISMANTLEMENT (D&D) 10 years I   PSDA!R                              I
                                                                                      '       SUBMITTAL                       .JI                                                                                      I 1        r I I         .                                      Port.SOk:e~              Any -;-tmoining Sto l e
                                                                                                                                                                                                                        ~
modifcotion I() ISFSI    reQU* menls for II                  !
I I                                 DRY Fl{EL STORAGE                                 -     I       I                                       only I                    unres ric led land use ,
DRY FUEL STORAGE (DFS)                                                              PROJEtT IMPLEMENTATION                                 ALL FUEL IN DRY FUEL Eng+ eering              a~ Procur~ment                                          ~~~        . .~----~~ --~** $0RAGE
                                                                                                            !             I DRY FUEL STORAGE I ~AD EXPANSION                                                                                                                                                                       END OF PLANt
                                                                                                                                                                                                                                                                                                            ' DECOMMISSIONiNG I 6RY FUEL STORAGE                             t                                                                                                                               iDry Fuel Storage:Pad
                                                                                                                          'tCAN ISTER FABR ICATION '                                                                                                                                                        '         Remains)
OOLSTOR.h.GE
                                                                                                                                                                                                  ) __                                                      j
                                                                .. L                                                              _! __ _
                                                                                                                                                                                                                                                                                                    .c
                            ~EV C f0312011 *1-CE'"20 YEAI! OR lW aASE TIME I!CASONA81.!
_j
 
D)
:::J
;;c CD tJ) 0
:::J
 
Quality Assurance' Plan ChcinQes Decommissioning San Onofre for Decommissioning Nuclear Generating Station
* Scope of DQAP optimized to fit a permanently defueled facility
                            - Applicability changed due to Systems, Structures and Components (SSCs) reclassification
* Maintain compliance with 10 CFR 50 Appendix B
* Maintain compliance with 10 CFR 50 Appendix B
* Eliminate Operating Plant QA standards and guides
* Eliminate Operating Plant QA standards and guides
* Add Decommissioning Plant QA standards and guides
* Add Decommissioning Plant QA standards and guides
* Eliminate redundancies with other SONGS programs
* Eliminate redundancies with other SONGS programs
* Perform 10 CFR 50.54(a) evaluation to identify reduction in commitments DQAP Revision Development Decommissioning San Onofre Nuclear Generating Sta t i on
* Perform 10 CFR 50.54(a) evaluation to identify reduction in commitments
 
Decommissioning DQAP Revision Development San Onofre Nuclear Generating Station
* SONGS approach for the development of the DQAP was based on an evaluation of QAP changes at previously decommissioned facilities.
* SONGS approach for the development of the DQAP was based on an evaluation of QAP changes at previously decommissioned facilities.
* SONGS focused on Maine Yankee, Zion Station and Humboldt Bay Programs.
* SONGS focused on Maine Yankee, Zion Station and Humboldt Bay Programs.
These programs were selected because of their similarity to SONGS
These programs were selected because of their similarity to SONGS
* Essentially a single Nuclear Utility -limited corporate involvement and support
* Essentially a single Nuclear Utility - limited corporate involvement and support
* Concise yet specific quality requirements
* Concise yet specific quality requirements
* Well-aligned with the existing structure of SONGS QAP  
* Well-aligned with the existing structure of SONGS QAP
*---*-
                                                                            ~-.....                      *It~
*---*-**OIC
                            ~ !~~~~JJWCCOMNJIY          I                      ~                                  m ~-             --~
_____ ..__ *--*-*----
                                                                                                                                -.=:::.-::::::.
r..,*-*--****----***---:::::::::::::--
                                                                                                                                    ~              ~      ~
..... ..-...  
                            .:.=::::::~
... ,.. _.....,_....,_
                                                                =-=:=-:~
.... -.........
::..-:-...::::::-..::.::-=:.:..-:::..:.:=-...
--.. _._ .. _____ .... __ _ -....... --...........
                                *-.::;.::-.:;:.-=~"':L.-
----*-.. --------------
                            *---*-**OIC _____ . __
---------o...*  
                                                          ----------o...*
... -.. _w.., .. ,.,
_w..,.. ,.,
___ _ ___ .. _______ _ _________
                                                                                                                    ~:;~1:::~~~&#xa3;.:~
..., ___ _  
                            ~=-;-;z:~~-;:.:::_~~
.... _ ... _____ , __
r..,*-*--****----
.. *----*-..
                                                            -..-~-*-u,.,.
.. -...... .. *--*---*---
                                                            *---~              ______ __.
__ .... ______ ....  
                                                            ~...::=.~~-=::.:.:.":lt"
... -.... ____ _ .,_;t.-ar:..:..::s._,_ .. ,nl =:::.-::::::. --.. --.--.-* .. *----* ::..-:-...::::::-..::.::-=:.:..-:::..:.:=-
                                                            =..*=.::::-..=-.:.---==;:::=.:~
... -
:=:-;~-s..-:=~&sect;-::
Decommissioning San Onofre Nuclear Generating Station Regulations
E:=:;ttr-=z..:~              *----*--~-
* SONGS QA Process Standards and Guides Updated FSAR Chapter 1 [ Contains the Quality Assurance Program (QAP) Topical Quality Assurance Manual (TQAM) [ Admlnistrative Document for the Implementation of theQAP SONG Programs and Procedures Decommiss i oning San Onofre Nuclear Generating Stat i on Regulations  
                                                                                .. -**---~*-
** Streamlining the Process [ Revise CH 17 l..rSARto reference DQAP 1 Standards DQAP TQAM [ Retired Administrative Implementation Document SONG Programs SONG Nuclear Oversight Program and Procedures
:;:.~.:=:..~..:.=:!==::t:.:-::=
[ Programs and .
                                                                                                        .... ~
reql.lll"ements Decommissioning San Onofre Nuclear Gonorotlng Station Summary Of Significant QAP Changes
                                                            ~'::.*:::;::=:::.::::;:;-...:..-:-~t:           ...
                                                                        .,_;t.-ar:..:..::s._,_          ~-t .. ,nl
 
SONGS QA Process Decommissioning San Onofre Nuclear Generating Station Standards and Guides                           SONG Programs and Procedures Regulations  Updated FSAR Topical Quality Chapter 1       Assurance Manual (TQAM)
Contains the      Admlnistrative Document for the Quality Assurance
[ Program (QAP)     [ Implementation of theQAP
 
Streamlining the Process Decommissioning San Onofre Nuclear Generating Station SONG Nuclear Standards Oversight Program DQAP Regulations         Revise CH 17 l..rSARto
[ reference DQAP 1 SONG Programs TQAM         and Procedures Retired Administrative           Programs and proced~esidentify
[ Implementation        [    reql.lll"ements Document            .
 
Summary Of Significant QAP Decommissioning San Onofre Nuclear Gonorotlng Station Changes
* Eliminate Operating Plant Standards and Guides
* Eliminate Operating Plant Standards and Guides
* Include Decommissioning Plant Standards and Guides
* Include Decommissioning Plant Standards and Guides
* Streamline QAP to Eliminate Redundancy with other SONGS Programs
* Streamline QAP to Eliminate Redundancy with other SONGS Programs
* Revise UFSAR Chapter 17 -Eliminate inclusion of QAP in the UFSAR -Provide a reference to the DQAP -Eliminate the need for the administrative implementation details provided in the SONGS Topical Quality Assurance Manual (TQAM)
* Revise UFSAR Chapter 17
* Remove the Nuclear Oversight Board (NOB) Commitment from the QAP -Strengthen the use of on-site independent senior leadership reviews -Continues to provide the SONGS Chief Nuclear Officer the opportunity to utilize NOB reviews as appropriate.
                        - Eliminate inclusion of QAP in the UFSAR
c (I) z n ::;a 0 0 3 'TI 3 (I) -* (I) c. -* c-o D) ::::s n -* ::::s .............
                        - Provide a reference to the DQAP
ccC -* -gtn -n D) c: ::l tn 0 -c 0 0 0 ::::s tn ::3 ..
                        - Eliminate the need for the administrative implementation details provided in the SONGS Topical Quality Assurance Manual (TQAM)
..
* Remove the Nuclear Oversight Board (NOB) Commitment from the QAP
Path Forward Decommissioning San Onofre Nuclear Generating Station August 28, 2014 -Brief the NRC on the SONGS Decommissioning Quality Assurance Program. 4th QTR 2014-Submit New DQAP to the NRC in accordance with 10 CFR 50.54a. 1st QTR 2015 -Implement SONGS DQAP.   
                        - Strengthen the use of on-site independent senior leadership reviews
)> n ...... -* 0 ::l en c: ...........
                        - Continues to provide the SONGS Chief Nuclear Officer the opportunity to utilize NOB reviews as appropriate.
0 3 0 3 ::l n tu -c: tA -* 0 ::l en}}
 
c(I) z n ::;a 0       0 3       'TI 3       (I)
  - * (I)
  ~ c.
o-* c- D)
::::s n
::::s .~
ccC
  -gtn  -*
-nD) c:
::l tn 0 ~.
-c 0
  ~::l 0 0
::::s ::3 tn            ..
 
Path Forward Decommissioning San Onofre Nuclear Generating Station August 28, 2014 - Brief the NRC on the SONGS Decommissioning Quality Assurance Program.
4th QTR 2014- Submit New DQAP to the NRC in accordance with 10 CFR 50.54a.
1st QTR 2015 -Implement SONGS DQAP.
 
  )>
n 0-*
::l fA ~
en
........... c:
0           3 0
::l         3 n
-c:
tA tu
            ~
0
::l en}}

Latest revision as of 19:05, 5 February 2020

August 28, 2014, Public Meeting Slides Concerning San Onofre Nuclear Generating Station (SONGS) Decommisioning Quality Assurance Program
ML14239A464
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 08/28/2014
From:
Southern California Edison Co
To:
Plant Licensing Branch IV
Wengert T
References
Download: ML14239A464 (15)


Text

Decommissioning Meeting Agenda San Onofre Nuclear Generating Station Topic Time Introduction 1:30 SONGS Decommissioning Plan/Schedule 1:40 Decommissioning Quality Assurance Plan 2:00 NRC Feedback 2:45 Path Forward 3:15 Summary/Actions/Conclusion 3:25 2

en 0

z C) en c

(I) n 0

3 3

tn tn *.

0-*

l
l (Q

-c .

-::l Q)

Decommissio.n ing Introduction San Onofre Nuclear Generating Station

  • SONGS is a permanently defueled station transitioning to decommissioning.
  • Quality is an essential cornerstone of what we do at SONGS

- SONGS is a 10 CFR 50 Appendix B licensee with an approved Quality Assurance Program (QAP).

Going forward SONGS will remain a 10 CFR 50 Appendix B licensee with a simplified Decommissioning QAP (DQAP) aligned with plant status and activities.

  • In the face of a changing environment, the SONGS QA program will:

- Continue to provide effective oversight of programs and activities that are important to safety.

(SAFETY)

- Efficiently manage available resources to continue to add value to the decommissioning effort.

(STEWARDSHIP)

- Establish a clear path from essential decommissioning regulatory requirements to implementing programs and procedures to ensure complete station engagement. (ENGAGEMENT)

Decommission ing Decommissioning Plan San Onofre Nuclear Ge neriiting Station 20 YEARS OR LESS

  • Major Milestone
  • y **y** ........... . y-*

r*** ****l*** y y

~. 1202. ~ 2025 ~-2... .,~; 1*2028 -, 2029 ]--~ "2031

        • --r-*** '(

~!" ~*  ! ~s I 1

201.- 201.c I 201s  ; 201s 201s J2018 2032 Quarter ~ _.., Quarter ! ,,. Quartet" I 2016 2017 2019 2020 2021 2022 2033 Quarter

~'-

Quarter 131'111

      • *******-?*******-** ** ** **4----

I i

  • *******--**-<>--***** *** ***** ***? ***

I I Quarter

...r 3"' Quarter ,.., Quart

+---.. . . -r-..**-*- -----<,'- ............... +-+ I

>r- '* i' ' r******* -';-** *******"'\

PHYSICAL PLANT CHANGES AU Systems de-en~rgized, d~pressurizSd. drained.

1 temporary power fing esto~ished j j'

! f I

' I I

  • i LIC ENSE SUBMIJTALS Permanently Defu~led Emerbency Plan. I Permanently Defu~led Techhicol I i Spec ifications j  ! I I IMPLEMENTATION I I I' ~

!  : IFMP I i I

!

  • SUBMITTAL l START DECONTAMINATION &

DECOMMISSIONING suBMmALS

~

i DCE SUBivjiTTAL i J~

I~.,..,.,

__ _ DISMANTLEMENT (D&D) 10 years I PSDA!R I

' SUBMITTAL .JI I 1 r I I . Port.SOk:e~ Any -;-tmoining Sto l e

~

modifcotion I() ISFSI reQU* menls for II  !

I I DRY Fl{EL STORAGE - I I only I unres ric led land use ,

DRY FUEL STORAGE (DFS) PROJEtT IMPLEMENTATION ALL FUEL IN DRY FUEL Eng+ eering a~ Procur~ment ~~~ . .~----~~ --~** $0RAGE

! I DRY FUEL STORAGE I ~AD EXPANSION END OF PLANt

' DECOMMISSIONiNG I 6RY FUEL STORAGE t iDry Fuel Storage:Pad

'tCAN ISTER FABR ICATION ' ' Remains)

OOLSTOR.h.GE

) __ j

.. L _! __ _

.c

~EV C f0312011 *1-CE'"20 YEAI! OR lW aASE TIME I!CASONA81.!

_j

D)

J
c CD tJ) 0
J

Quality Assurance' Plan ChcinQes Decommissioning San Onofre for Decommissioning Nuclear Generating Station

  • Scope of DQAP optimized to fit a permanently defueled facility

- Applicability changed due to Systems, Structures and Components (SSCs) reclassification

  • Eliminate Operating Plant QA standards and guides
  • Add Decommissioning Plant QA standards and guides
  • Eliminate redundancies with other SONGS programs

Decommissioning DQAP Revision Development San Onofre Nuclear Generating Station

  • SONGS approach for the development of the DQAP was based on an evaluation of QAP changes at previously decommissioned facilities.
  • SONGS focused on Maine Yankee, Zion Station and Humboldt Bay Programs.

These programs were selected because of their similarity to SONGS

  • Essentially a single Nuclear Utility - limited corporate involvement and support
  • Concise yet specific quality requirements
  • Well-aligned with the existing structure of SONGS QAP

~-..... *It~

~ !~~~~JJWCCOMNJIY I ~ m ~- --~

-.=:::.-::::::.

~ ~ ~

.:.=::::::~

=-=:=-:~

..-:-...::::::-..::.::-=:.:..-:::..:.:=-...
  • -.::;.::-.:;:.-=~"':L.-
  • ---*-**OIC _____ . __

o...*

_w..,.. ,.,

~:;~1:::~~~£.:~

~=-;-;z:~~-;:.:::_~~

r..,*-*--****----

-..-~-*-u,.,.

  • ---~ ______ __.

~...::=.~~-=::.:.:.":lt"

=..*=.::::-..=-.:.---==;:::=.:~

=:-;~-s..-:=~§-::

E:=:;ttr-=z..:~ *----*--~-

.. -**---~*-

.~.
=:..~..:.=:!==::t:.:-::=

.... ~

~'::.*:::;::=:::.::::;:;-...:..-:-~t: ...

.,_;t.-ar:..:..::s._,_ ~-t .. ,nl

SONGS QA Process Decommissioning San Onofre Nuclear Generating Station Standards and Guides SONG Programs and Procedures Regulations Updated FSAR Topical Quality Chapter 1 Assurance Manual (TQAM)

Contains the Admlnistrative Document for the Quality Assurance

[ Program (QAP) [ Implementation of theQAP

Streamlining the Process Decommissioning San Onofre Nuclear Generating Station SONG Nuclear Standards Oversight Program DQAP Regulations Revise CH 17 l..rSARto

[ reference DQAP 1 SONG Programs TQAM and Procedures Retired Administrative Programs and proced~esidentify

[ Implementation [ reql.lll"ements Document .

Summary Of Significant QAP Decommissioning San Onofre Nuclear Gonorotlng Station Changes

  • Eliminate Operating Plant Standards and Guides
  • Include Decommissioning Plant Standards and Guides
  • Streamline QAP to Eliminate Redundancy with other SONGS Programs

- Eliminate inclusion of QAP in the UFSAR

- Provide a reference to the DQAP

- Eliminate the need for the administrative implementation details provided in the SONGS Topical Quality Assurance Manual (TQAM)

  • Remove the Nuclear Oversight Board (NOB) Commitment from the QAP

- Strengthen the use of on-site independent senior leadership reviews

- Continues to provide the SONGS Chief Nuclear Officer the opportunity to utilize NOB reviews as appropriate.

c(I) z n ::;a 0 0 3 'TI 3 (I)

- * (I)

~ c.

o-* c- D)

s n
s .~

ccC

-gtn -*

-nD) c:

l tn 0 ~.

-c 0

~::l 0 0

s ::3 tn ..

Path Forward Decommissioning San Onofre Nuclear Generating Station August 28, 2014 - Brief the NRC on the SONGS Decommissioning Quality Assurance Program.

4th QTR 2014- Submit New DQAP to the NRC in accordance with 10 CFR 50.54a.

1st QTR 2015 -Implement SONGS DQAP.

)>

n 0-*

l fA ~

en

........... c:

0 3 0

l 3 n

-c:

tA tu

~

0

l en