ML14328A684: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ES-301 Control Room/In
{{#Wiki_filter:ES-301                             Control Room/In-Plant Systems Outline                             Form ES-301-2 Facility: __Point Beach U1/U2                                           Date of Examination: _02/23/2015__
-Plant Systems Outline Form ES-301-2   Facility: __Point Beach U1/U2 Date of Examination: _02/23/2015
Exam Level: RO               SRO-I         SRO-U                     Operating Test No.: __2015301_____
__ Exam Level: RO SRO-I       SRO-U       Operating Test No.: __2015301_____ Control Room Systems
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
@ (8 for RO); (7 for SRO
Safety System / JPM Title                                 Type Code*
-I); (2 or 3 for SRO
Function
-U, including 1 ESF)
: a.       CVCS / Manually Makeup to the VCT                                          A,P,D,S               1
System / JPM Title Type Code*
: b.       RCS / Fill and Vent the RCS                                                 N,L,S                 2
Safety Function a. CVCS / Manually Makeup to the VC T A,P,D ,S 1 b. RCS / Fill and Vent the RCS N,L,S 2 c. ECCS / Respond to a LOCA in a S/D Unit D,L,P,S 3 d. AFW / Raise S/G Water Level A,D,L,S 4S e. CNMT Cooling / Align CS Pump for Sump Recirc from RHR A,D,L,S 5 f. AC / Transfer an Instrument Bus D,S 6 g. RPS / Restore Instrument to Service D, S 7 h. CWS / Respond to CW Malfunction A,N,S 8 In-Plant Systems
: c.       ECCS / Respond to a LOCA in a S/D Unit                                     D,L,P,S               3
@ (3 for RO); (3 for SRO
: d.       AFW / Raise S/G Water Level                                                 A,D,L,S               4S
-I); (3 or 2 for SRO
: e.       CNMT Cooling / Align CS Pump for Sump Recirc from RHR                       A,D,L,S               5
-U) i. S/G / Locally Operate Atmospheric Steam Dump D,E,P,R 4P j. DC / Shift Battery Chargers D 6 k. SFP / Perform Lineups of SFP Cooling N,R 8 @ All RO and SRO
: f.       AC / Transfer an Instrument Bus                                               D,S                 6
-I control room (and in
: g.       RPS / Restore Instrument to Service                                           D,S                 7
-plant) systems must be different and serve different safety functions; all 5 SRO
: h.       CWS / Respond to CW Malfunction                                             A,N,S                 8 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
: i.       S/G / Locally Operate Atmospheric Steam Dump                               D,E,P,R               4P
* Type Codes Criteria for RO / SRO
: j.       DC / Shift Battery Chargers                                                   D                   6
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
: k.       SFP / Perform Lineups of SFP Cooling                                         N,R                 8
-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
@           All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3      -  /  -
* Type Codes                                   Criteria for RO / SRO-I / SRO-U (A)lternate path                                                               4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                             9/8/4 (E)mergency or abnormal in-plant                                               1/1/1 (EN)gineered safety feature                                                       - / - / 1 (control room system)
ES-301 Control Room/In
(L)ow-Power / Shutdown                                                         1/1/1 (N)ew or (M)odified from bank including 1(A)                                   2/2/1 (P)revious 2 exams                                                               3 /  3 /  2 (randomly selected)
-Plant Systems Outline Form ES-301-2   Facility: __Point Beach U1/U2 Date of Examination: _02/23/2015
(R)CA                                                                           1/1/1 (S)imulator
__ Exam Level: RO SRO-I       SRO-U       Operating Test No.: __2015301_____ Control Room Systems
 
@ (8 for RO); (7 for SRO
ES-301                             Control Room/In-Plant Systems Outline                             Form ES-301-2 Facility: __Point Beach U1/U2                                           Date of Examination: _02/23/2015__
-I); (2 or 3 for SRO
Exam Level: RO               SRO-I         SRO-U                       Operating Test No.: __2015301_____
-U, including 1 ESF)
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code*
System / JPM Title                                 Type Code*             Safety Function
Safety Function a. CVCS / Manually Makeup to the VC T A,P,D ,S 1 b. RCS / Fill and Vent the RCS N,L,S 2 c. n/a   d. AFW / Raise S/G Water Level A,D,L,S 4S e. CNMT Cooling / Align CS Pump for Sump Recirc from RHR A,D,L,S 5 f. AC / Transfer an Instrument Bus D,S 6 g. RPS / Restore Instrument to Service D, S 7 h. CWS / Respond to CW Malfunction A,N,S 8 In-Plant Systems
: a.       CVCS / Manually Makeup to the VCT                                          A,P,D,S               1
@ (3 for RO); (3 for SRO
: b.       RCS / Fill and Vent the RCS                                                 N,L,S                 2
-I); (3 or 2 for SRO
: c.       n/a
-U) i. S/G / Locally Operate Atmospheric Steam Dump D,E,P,R 4P j. DC / Shift Battery Chargers D 6 k. SFP / Perform Lineups of SFP Cooling N,R 8 @ All RO and SRO
: d.       AFW / Raise S/G Water Level                                                 A,D,L,S               4S
-I control room (and in
: e.       CNMT Cooling / Align CS Pump for Sump Recirc from RHR                       A,D,L,S               5
-plant) systems must be different and serve different safety functions; all 5 SRO
: f.       AC / Transfer an Instrument Bus                                               D,S                 6
-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
: g.       RPS / Restore Instrument to Service                                           D,S                 7
* Type Codes Criteria for RO / SRO
: h.       CWS / Respond to CW Malfunction                                             A,N,S                 8 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
: i.       S/G / Locally Operate Atmospheric Steam Dump                               D,E,P,R               4P
-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
: j.       DC / Shift Battery Chargers                                                   D                   6
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3      -  /  -}}
: k.       SFP / Perform Lineups of SFP Cooling                                         N,R                 8
@           All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes                                   Criteria for RO / SRO-I / SRO-U (A)lternate path                                                               4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                             9/8/4 (E)mergency or abnormal in-plant                                               1/1/1 (EN)gineered safety feature                                                       - / - / 1 (control room system)
(L)ow-Power / Shutdown                                                         1/1/1 (N)ew or (M)odified from bank including 1(A)                                   2/2/1 (P)revious 2 exams                                                               3 /  3 /  2 (randomly selected)
(R)CA                                                                           1/1/1 (S)imulator}}

Latest revision as of 17:27, 5 February 2020

2015 Point Beach Nuclear Power Plant Initial License Examination Form ES-301-2
ML14328A684
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/06/2015
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML14328A659 List:
References
Download: ML14328A684 (2)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: __Point Beach U1/U2 Date of Examination: _02/23/2015__

Exam Level: RO SRO-I SRO-U Operating Test No.: __2015301_____

Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

Safety System / JPM Title Type Code*

Function

a. CVCS / Manually Makeup to the VCT A,P,D,S 1
b. RCS / Fill and Vent the RCS N,L,S 2
c. ECCS / Respond to a LOCA in a S/D Unit D,L,P,S 3
d. AFW / Raise S/G Water Level A,D,L,S 4S
e. CNMT Cooling / Align CS Pump for Sump Recirc from RHR A,D,L,S 5
f. AC / Transfer an Instrument Bus D,S 6
g. RPS / Restore Instrument to Service D,S 7
h. CWS / Respond to CW Malfunction A,N,S 8 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. S/G / Locally Operate Atmospheric Steam Dump D,E,P,R 4P
j. DC / Shift Battery Chargers D 6
k. SFP / Perform Lineups of SFP Cooling N,R 8

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature - / - / 1 (control room system)

(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: __Point Beach U1/U2 Date of Examination: _02/23/2015__

Exam Level: RO SRO-I SRO-U Operating Test No.: __2015301_____

Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function

a. CVCS / Manually Makeup to the VCT A,P,D,S 1
b. RCS / Fill and Vent the RCS N,L,S 2
c. n/a
d. AFW / Raise S/G Water Level A,D,L,S 4S
e. CNMT Cooling / Align CS Pump for Sump Recirc from RHR A,D,L,S 5
f. AC / Transfer an Instrument Bus D,S 6
g. RPS / Restore Instrument to Service D,S 7
h. CWS / Respond to CW Malfunction A,N,S 8 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. S/G / Locally Operate Atmospheric Steam Dump D,E,P,R 4P
j. DC / Shift Battery Chargers D 6
k. SFP / Perform Lineups of SFP Cooling N,R 8

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature - / - / 1 (control room system)

(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator