| issue date = 09/01/2015
| issue date = 09/01/2015
| title = NRC Staff Hearing File September 2015 Update
| title = NRC Staff Hearing File September 2015 Update
| author name = Kanatas C E
| author name = Kanatas C
| author affiliation = NRC/OGC
| author affiliation = NRC/OGC
| addressee name = Arnold G S, Spritzer R M, Trikouros N G
| addressee name = Arnold G, Spritzer R, Trikouros N
| addressee affiliation = NRC/ASLBP
| addressee affiliation = NRC/ASLBP
| docket = 05000341
| docket = 05000341
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATESNUCLEAR REGULATORY COMMISSIONWASHINGTON, DC 20555 - 0001 September 1, 2015   In the Matter of DTE ELECTRIC COMPANY (Fermi Nuclear Power Plant, Unit 2)
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555 - 0001 September 1, 2015 Administrative Judge                                Administrative Judge Ronald M. Spritzer, Chair                           Nicholas G. Trikouros Atomic Safety and Licensing Board Panel            Atomic Safety and Licensing Board Panel Mail Stop: T-3 F23                                  Mail Stop: T-3 F23 U.S. Nuclear Regulatory Commission                 U.S. Nuclear Regulatory Commission Washington, DC 20555-001                           Washington, DC 20555-0001 Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel Mail Stop: T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of DTE ELECTRIC COMPANY (Fermi Nuclear Power Plant, Unit 2)
Docket No. 50
Docket No. 50-341-LR
-341-LR  Dear Administrative Judges
:  Pursuant to 10 C.F.R.
§§ 2.336 and 2.1203 and as modified by the Atomic Safety and Licensing Board's ("Board") Initial Scheduling Order ("ISO") dated February 27, 2015, the U.S. Nuclear Regulatory Commission ("NRC") staff ("Staff") is providing notification that a supplement to the hearing file has be en created for this proceeding. The hearing file includes the Staff's documents subject to disclosure under 10 C.F.R.
§§ 2.336 and 2.1203 and the ISO
. On or about September 4, 2015, materials in the hearing file may be accessed through the Agencywide Documents Access and Management System ("ADAMS")
or through the Electronic Hearing Docket ("EHD")
, which may be accessed at http://adams.nrc.gov/ehd/
. An index containing the ADAMS accession number, document date, and document title or description of each item in the hearing file is appended hereto as Attachment 1
. Pursuant to 10 C.F.R. § 2.336(c), attached is the Affidavit of Elaine Keegan, certifying that all potentially relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as to documents identified as of August 27, 2015 (Attachment 2)
. The Staff notes that it has made a good faith effort to identify and characterize all documents meeting the criteria of 10 C.F.R.
§ 2.336(b) and 10 C.F.R.
§ 2.1203 in this proceeding, while excluding those documents for which there is a claim of privilege or protected status, based on the information and documentation reasonably available to it.
In identifying these documents, the Staff does not concede their relevance to the issues to be decided in this proceeding.
Administrative Judge Ronald M. Spritzer, Chair Atomic Safety and Licensing Board Panel Mail Stop:
T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555
-001  Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop:
T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555
-0001 Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel Mail Stop:
T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555
-0001 The Staff anticipates publishing the Draft Supplemental Environmental Impact Statement in October 2015 and the Final Supplemental Environmental Impact Statement in June 2016. The Safety Evaluation Report ("SER") with open items is anticipated to be published in January 2016. The schedule for the publication of the final SER is to be determined at this time.
1 Respectfully submitted,
        /signed (electronically) by/
Catherine E. Kanatas Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O
-15 D21        Washington, DC 20555
-0001        Telephone: (301) 415
-2321        E-mail: catherine.kanatas@nrc.gov        Date of Signature: September 1, 2015


==Enclosures:==
==Dear Administrative Judges:==
 
Pursuant to 10 C.F.R. §§ 2.336 and 2.1203 and as modified by the Atomic Safety and Licensing Boards (Board) Initial Scheduling Order (ISO) dated February 27, 2015, the U.S. Nuclear Regulatory Commission (NRC) staff (Staff) is providing notification that a supplement to the hearing file has been created for this proceeding. The hearing file includes the Staffs documents subject to disclosure under 10 C.F.R. §§ 2.336 and 2.1203 and the ISO. On or about September 4, 2015, materials in the hearing file may be accessed through the Agencywide Documents Access and Management System (ADAMS) or through the Electronic Hearing Docket (EHD), which may be accessed at http://adams.nrc.gov/ehd/. An index containing the ADAMS accession number, document date, and document title or description of each item in the hearing file is appended hereto as Attachment 1.
Pursuant to 10 C.F.R. § 2.336(c), attached is the Affidavit of Elaine Keegan, certifying that all potentially relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as to documents identified as of August 27, 2015 (Attachment 2).
The Staff notes that it has made a good faith effort to identify and characterize all documents meeting the criteria of 10 C.F.R. § 2.336(b) and 10 C.F.R. § 2.1203 in this proceeding, while excluding those documents for which there is a claim of privilege or protected status, based on the information and documentation reasonably available to it. In identifying these documents, the Staff does not concede their relevance to the issues to be decided in this proceeding.


Attachment 1: Hearing File Index Attachment 2: Affidavit of Elaine Keegan
The Staff anticipates publishing the Draft Supplemental Environmental Impact Statement in October 2015 and the Final Supplemental Environmental Impact Statement in June 2016. The Safety Evaluation Report (SER) with open items is anticipated to be published in January 2016. The schedule for the publication of the final SER is to be determined at this time.1 Respectfully submitted,
                                                        /signed (electronically) by/
Catherine E. Kanatas Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 Telephone: (301) 415-2321 E-mail: catherine.kanatas@nrc.gov Date of Signature: September 1, 2015


1 See Letter to Mr. Vito Kaminskas, DTE Electric Co.
==Enclosures:==
, from Christopher G. Miller, NRC, "Schedule Revision for the Safety Review of the Fermi 2 License Renewal Application (TAC No. MF4222) (Aug. 28, 2015) (ADAMS Accession No. ML15238B790).
Attachment 1: Hearing File Index Attachment 2: Affidavit of Elaine Keegan 1 See Letter to Mr. Vito Kaminskas, DTE Electric Co., from Christopher G. Miller, NRC, Schedule Revision for the Safety Review of the Fermi 2 License Renewal Application (TAC No. MF4222) (Aug. 28, 2015) (ADAMS Accession No. ML15238B790).
Attachment 1  
Attachment 1 -- Fermi Nuclear Power Plant, Unit 2 License Renewal Hearing File Index Supplemental Disclosure #4 - September 1, 2015 ADAMS Document ID #  Accession                                                     Document Title/Description Date Number ML15243A208       08/03/2015 [External_Sender] Incorrect email address for Michael J. Keegan / Spent Fuel Pool Concerns 00226 at Fermi 2 - Redacted Version
-- Fermi Nuclear Power Plant, Unit 2 License Renewal Hearing File Index Supplemental Disclosure #4
- September 1, 2015     ID #  ADAMS Accession Number Document Date Document Title/Description 00226 ML15243A208 08/03/2015 [External_Sender] Incorrect email address for Michael J. Keegan / Spent Fuel Pool Concerns at Fermi 2
- Redacted Version


UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                     )
        )              ) DTE ELECTRIC COMPANY
                                                    )
        ) Docket No. 50
DTE ELECTRIC COMPANY                                 )     Docket No. 50-341-LR
-341-LR           )   (Fermi Nuclear Power Plant, Unit 2)
                                                    )
      )
(Fermi Nuclear Power Plant, Unit 2)                 )
AFFIDAVIT OF ELAINE KEEGAN CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)
AFFIDAVIT OF ELAINE KEEGAN CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)
I, Elaine Keegan
I, Elaine Keegan, do hereby state as follows:
, do hereby state as follows:
: 1.     I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation (NRR). I serve as a project manager for the Fermi Nuclear Power Plant, Unit 2, license renewal application (LRA). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.
: 1. I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation
: 2.     I hereby certify that all potentially relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336(b) and (c) in the above-captioned proceeding have been disclosed in the attached Hearing File Index and that the disclosures are accurate and complete for documents identified as of August 27, 2015.
("NRR"). I serve as a project manager for the Fermi Nuclear Power Plant, Unit 2
: 3.     I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information, and belief.
, license renewal application ("LRA"). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.
                                                /Executed in Accord with 10 C.F.R. § 2.304(d)/
: 2. I hereby certify that all potentially relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336(b) and (c) in the above-captioned proceeding have been disclosed in the attached Hearing File Index and that the disclosures are accurate and complete for documents identified as of August 27, 2015. 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information
Elaine Keegan Senior Project Manager Division of License Renewal, NRR U.S. Nuclear Regulatory Commission Washington, DC 20555 Telephone: 301-415-8517 E-mail: Elaine.Keegan@nrc.gov Executed in Rockville, Maryland this 27th day of August, 2015
, and belief.       /Executed in Accord with 10 C.F.R. § 2.304(d)
 
/      Elaine Keegan Senior Project Manager Division of License Renewal, NRR U.S. Nuclear Regulatory Commission Washington, DC 20555 Telephone: 301
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                               )
-415-8517 E-mail: Elaine.Keegan@nrc.gov Executed in Rockville, Maryland this 27th day of August, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
                                                )
        )              ) DTE ELECTRIC COMPANY
DTE ELECTRIC COMPANY                           )     Docket No. 50-341-LR
        ) Docket No. 50
                                                )
-341-LR           )   (Fermi Nuclear Power Plant, Unit 2)
(Fermi Nuclear Power Plant, Unit 2)            )
      )  CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of: Letter from Catherine E.
: Letter from Catherine E. Kanatas to the Board, dated September 1, 2015; Attachment 1  
Kanatas to the Board, dated September 1, 2015; Attachment 1 - Hearing File Index; and - Affidavit of Elaine Keegan, have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above-captioned proceeding, this 1st day of September, 2015.
- Hearing File Index; and Attachment 2
                                                    /Signed (electronically) by/
- Affidavit of Elaine Keegan
Catherine E. Kanatas Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 Telephone: (301) 415-2321 E-mail: catherine.kanatas@nrc.gov Date of Signature: September 1, 2015}}
, have been served upon the Electronic Information Exchange, the NRC's E
-Filing System, in the above
-captioned proceeding, this 1st day of September, 2015. /Signed (electronically) by/
Catherine E. Kanatas Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O
-15 D21       Washington, DC 20555
-0001       Telephone: (301) 415
-2321         E-mail: catherine.kanatas@nrc.gov           Date of Signature: September 1, 2015}}

Latest revision as of 09:19, 5 February 2020

NRC Staff Hearing File September 2015 Update
ML15244B412
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/01/2015
From: Catherine Kanatas
NRC/OGC
To: Gary Arnold, Ronald Spritzer, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-341-LR, ASLBP 14-933-01-LR-BD01, RAS 28244
Download: ML15244B412 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555 - 0001 September 1, 2015 Administrative Judge Administrative Judge Ronald M. Spritzer, Chair Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3 F23 Mail Stop: T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-001 Washington, DC 20555-0001 Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel Mail Stop: T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of DTE ELECTRIC COMPANY (Fermi Nuclear Power Plant, Unit 2)

Docket No. 50-341-LR

Dear Administrative Judges:

Pursuant to 10 C.F.R. §§ 2.336 and 2.1203 and as modified by the Atomic Safety and Licensing Boards (Board) Initial Scheduling Order (ISO) dated February 27, 2015, the U.S. Nuclear Regulatory Commission (NRC) staff (Staff) is providing notification that a supplement to the hearing file has been created for this proceeding. The hearing file includes the Staffs documents subject to disclosure under 10 C.F.R. §§ 2.336 and 2.1203 and the ISO. On or about September 4, 2015, materials in the hearing file may be accessed through the Agencywide Documents Access and Management System (ADAMS) or through the Electronic Hearing Docket (EHD), which may be accessed at http://adams.nrc.gov/ehd/. An index containing the ADAMS accession number, document date, and document title or description of each item in the hearing file is appended hereto as Attachment 1.

Pursuant to 10 C.F.R. § 2.336(c), attached is the Affidavit of Elaine Keegan, certifying that all potentially relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as to documents identified as of August 27, 2015 (Attachment 2).

The Staff notes that it has made a good faith effort to identify and characterize all documents meeting the criteria of 10 C.F.R. § 2.336(b) and 10 C.F.R. § 2.1203 in this proceeding, while excluding those documents for which there is a claim of privilege or protected status, based on the information and documentation reasonably available to it. In identifying these documents, the Staff does not concede their relevance to the issues to be decided in this proceeding.

The Staff anticipates publishing the Draft Supplemental Environmental Impact Statement in October 2015 and the Final Supplemental Environmental Impact Statement in June 2016. The Safety Evaluation Report (SER) with open items is anticipated to be published in January 2016. The schedule for the publication of the final SER is to be determined at this time.1 Respectfully submitted,

/signed (electronically) by/

Catherine E. Kanatas Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 Telephone: (301) 415-2321 E-mail: catherine.kanatas@nrc.gov Date of Signature: September 1, 2015

Enclosures:

Attachment 1: Hearing File Index Attachment 2: Affidavit of Elaine Keegan 1 See Letter to Mr. Vito Kaminskas, DTE Electric Co., from Christopher G. Miller, NRC, Schedule Revision for the Safety Review of the Fermi 2 License Renewal Application (TAC No. MF4222) (Aug. 28, 2015) (ADAMS Accession No. ML15238B790).

Attachment 1 -- Fermi Nuclear Power Plant, Unit 2 License Renewal Hearing File Index Supplemental Disclosure #4 - September 1, 2015 ADAMS Document ID # Accession Document Title/Description Date Number ML15243A208 08/03/2015 [External_Sender] Incorrect email address for Michael J. Keegan / Spent Fuel Pool Concerns 00226 at Fermi 2 - Redacted Version

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

DTE ELECTRIC COMPANY ) Docket No. 50-341-LR

)

(Fermi Nuclear Power Plant, Unit 2) )

AFFIDAVIT OF ELAINE KEEGAN CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Elaine Keegan, do hereby state as follows:

1. I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation (NRR). I serve as a project manager for the Fermi Nuclear Power Plant, Unit 2, license renewal application (LRA). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.
2. I hereby certify that all potentially relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336(b) and (c) in the above-captioned proceeding have been disclosed in the attached Hearing File Index and that the disclosures are accurate and complete for documents identified as of August 27, 2015.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information, and belief.

/Executed in Accord with 10 C.F.R. § 2.304(d)/

Elaine Keegan Senior Project Manager Division of License Renewal, NRR U.S. Nuclear Regulatory Commission Washington, DC 20555 Telephone: 301-415-8517 E-mail: Elaine.Keegan@nrc.gov Executed in Rockville, Maryland this 27th day of August, 2015

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

DTE ELECTRIC COMPANY ) Docket No. 50-341-LR

)

(Fermi Nuclear Power Plant, Unit 2) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of: Letter from Catherine E.

Kanatas to the Board, dated September 1, 2015; Attachment 1 - Hearing File Index; and - Affidavit of Elaine Keegan, have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above-captioned proceeding, this 1st day of September, 2015.

/Signed (electronically) by/

Catherine E. Kanatas Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 Telephone: (301) 415-2321 E-mail: catherine.kanatas@nrc.gov Date of Signature: September 1, 2015