July 31, 2015 Administrative Judge Administrative Judge Ronald M. Spritzer, Chair Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3 F23 Mail Stop: T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-001 Washington, DC 20555-0001 Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel Mail Stop: T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of DTE ELECTRIC COMPANY (Fermi Nuclear Power Plant, Unit 2)
Docket No. 50-341-LR
Dear Administrative Judges:
Pursuant to 10 C.F.R. §§ 2.336 and 2.1203 and as modified by the Atomic Safety and Licensing Boards (Board) Initial Scheduling Order (ISO) dated February 27, 2015, the U.S. Nuclear Regulatory Commission (NRC) staff (Staff) is providing notification that a supplement to hearing file has been created for this proceeding. The hearing file includes the Staffs documents subject to disclosure under 10 C.F.R. §§ 2.336 and 2.1203 and the ISO. On or about August 6, 2015, materials in the hearing file may be accessed through the Agencywide Documents Access and Management System (ADAMS) or through the Electronic Hearing Docket (EHD), which may be accessed at http://adams.nrc.gov/ehd/. An index containing the ADAMS accession number, document date, and document title or description of each item in the hearing file is appended hereto as Attachment 1.
Pursuant to 10 C.F.R. § 2.336(c), attached is the Affidavit of Elaine Keegan, certifying that all potentially relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as to documents identified as of July 27, 2015 (Attachment 2).
The Staff notes that it has made a good faith effort to identify and characterize all documents meeting the criteria of 10 C.F.R. § 2.336(b) and 10 C.F.R. § 2.1203 in this proceeding, while excluding those documents for which there is a claim of privilege or protected status, based on the information and documentation reasonably available to it. In identifying these documents, the Staff does not concede their relevance to the issues to be decided in this proceeding.
The Staff anticipates publishing the Draft Supplemental Environmental Impact Statement in October 2015 and the Final Supplemental Environmental Impact Statement in June 2016. The Safety Evaluation Report (SER) with open items and the final SER are anticipated to be published in September 2015 and February 2016, respectively.
Respectfully submitted,
/signed (electronically) by/
Catherine E. Kanatas Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-2321 catherine.kanatas@nrc.gov
Enclosures:
Attachment 1: Hearing File Index Attachment 2: Affidavit of Elaine Keegan Attachment 1 -- Fermi Nuclear Power Plant, Unit 2 License Renewal Hearing File Index Supplemental Disclosure #3 - July 31, 2015 ADAMS Document ID # Accession Document Title/Description Date Number 00223 ML15181A380 06/30/2015 2015/06/30 Fermi 2 LRA - Schedule change letter ML15198A184 07/17/2015 2015/07/17 Fermi 2 LRA - [External_Sender] Re: Questions asked at Fermi 2 meeting - June 18, 00224 2015 00225 ML15198A493 07/17/2015 2015/07/17 Fermi 2 LRA - Questions asked at Fermi 2 meeting June 18, 2015
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
DTE ELECTRIC COMPANY ) Docket No. 50-341-LR
)
(Fermi Nuclear Power Plant, Unit 2) )
AFFIDAVIT OF ELAINE KEEGAN CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)
I, Elaine Keegan, do hereby state as follows:
- 1. I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation (NRR). I serve as a project manager for the Fermi Nuclear Power Plant, Unit 2, license renewal application (LRA). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.
- 2. I hereby certify that all potentially relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336(b) and (c) in the above-captioned proceeding have been disclosed in the attached Hearing File Index and that the disclosures are accurate and complete for documents identified as of July 27, 2015.
- 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information, and belief.
/Executed in Accord with 10 C.F.R. § 2.304(d)/
Elaine Keegan Senior Project Manager Division of License Renewal, NRR U.S. Nuclear Regulatory Commission Washington, DC 20555 Telephone: 301-415-8517 E-mail: Elaine.Keegan@nrc.gov Executed in Rockville, Maryland this 27th day of July, 2015
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
DTE ELECTRIC COMPANY ) Docket No. 50-341-LR
)
(Fermi Nuclear Power Plant, Unit 2) )
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of: Letter from Catherine E.
Kanatas to the Board, dated July 31, 2015; Attachment 1 - Hearing File Index; and Attachment 2 - Affidavit of Elaine Keegan, have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above-captioned proceeding, this 31st day of July, 2015.
/Signed (electronically) by/
Catherine E. Kanatas Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-2321 catherine.kanatas@nrc.gov