July 1, 2015 In the Matter of DTE ELECTRIC COMPANY (Fermi Nuclear Power Plant, Unit 2)
Docket No. 50-341-LR
Dear Administrative Judges:
Pursuant to 10 C.F.R. §§ 2.336 and 2.1203 and as modified by the Atomic Safety and Licensing Boards (Board) Initial Scheduling Order (ISO) dated February 27, 2015, the U.S. Nuclear Regulatory Commission (NRC) staff (Staff) is providing notification that no documents were identified as requiring disclosure in this update.
Pursuant to 10 C.F.R. § 2.336(c), attached is the Affidavit of Elaine Keegan, certifying that all potentially relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as to documents identified as of June 26, 2015 (Attachment 1).
Administrative Judge Ronald M. Spritzer, Chair Atomic Safety and Licensing Board Panel Mail Stop: T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-001 Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop: T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel Mail Stop: T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
The Staff notes that the dates for the publication of the Draft Supplemental Environmental Impact Statement (DSEIS) and the Final Supplemental Environmental Impact Statement (FSEIS) have changed. The Staff anticipates publishing the DSEIS in October 2015 and the FSEIS in June 2016. The Safety Evaluation Report (SER) with open items and the final SER are anticipated to be published in September 2015 and February 2016, respectively.
Respectfully submitted,
/signed (electronically) by/
Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-1392 Brian.harris@nrc.gov
Enclosures:
- Affidavit of Elaine Keegan
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
DTE ELECTRIC COMPANY
)
Docket No. 50-341-LR
)
(Fermi Nuclear Power Plant, Unit 2)
)
AFFIDAVIT OF ELAINE KEEGAN CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)
I, Elaine Keegan, do hereby state as follows:
- 1.
I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation (NRR). I serve as a project manager for the Fermi Nuclear Power Plant, Unit 2, license renewal application (LRA). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.
- 2.
I hereby certify that all potentially relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336(b) and (c) in the above-captioned proceeding have been disclosed in the attached Hearing File Index and that the disclosures are accurate and complete for documents identified as of June 26, 2015.
- 3.
I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information, and belief.
/Executed in Accord with 10 C.F.R. § 2.304(d)/
Elaine Keegan Senior Project Manager Division of License Renewal, NRR U.S. Nuclear Regulatory Commission Washington, DC 20555 Telephone: 301-415-8517 E-mail: Elaine.Keegan@nrc.gov Executed in Rockville, Maryland this 1st day of July, 2015
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
DTE ELECTRIC COMPANY
)
Docket No. 50-341-LR
)
(Fermi Nuclear Power Plant, Unit 2)
)
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of: Letter from Brian G. Harris to the Board, dated July 1, 2015 and Attachment 1 - Affidavit of Elaine Keegan, have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above-captioned proceeding, this 1st day of July, 2015.
/Signed (electronically) by/
Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-1392 brian.harris@nrc.gov