| issue date = 05/18/2016
| issue date = 05/18/2016
| title = Request for Dual Unit Operator Licenses
| title = Request for Dual Unit Operator Licenses
| author name = Guthrie E F
| author name = Guthrie E
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
| addressee name = Simmons P R
| addressee name = Simmons P
| addressee affiliation = Tennessee Valley Authority
| addressee affiliation = Tennessee Valley Authority
| docket = 05000390, 05000391
| docket = 05000390, 05000391
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 18, 2016 Mr. Paul R. Simmons Site Vice President, Watts Bar Nuclear Plant Tennessee Valley Authority P. O. Box 2000 MOB-2M-WBN  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 18, 2016 Mr. Paul R. Simmons Site Vice President, Watts Bar Nuclear Plant Tennessee Valley Authority P. O. Box 2000 MOB-2M-WBN Spring City, TN 37381
 
Spring City, TN 37381  


==SUBJECT:==
==SUBJECT:==
WATTS BAR NUCLEAR PLANT UNITS 1 AND 2 - REQUEST FOR DUAL UNIT OPERATOR LICENSES  
WATTS BAR NUCLEAR PLANT UNITS 1 AND 2 - REQUEST FOR DUAL UNIT OPERATOR LICENSES


==Dear Mr. Simmons:==
==Dear Mr. Simmons:==


In a letter dated April 15, 2016, the Tennessee Valley Authority (TVA) requested approval of TVA's plan for obtaining dual-unit licenses for four operators currently licensed on Unit 1 only, in accordance with 10 CFR 55.47 and NUREG 1021, Revision 10, ES-204, Section D.2. Specifically, TVA proposed that 520 hours (13 weeks at 40 hours per week) be considered sufficient operating experience to allow the issuance of dual-unit operator licenses for the four operators currently licensed on Unit 1 only.  
In a letter dated April 15, 2016, the Tennessee Valley Authority (TVA) requested approval of TVAs plan for obtaining dual-unit licenses for four operators currently licensed on Unit 1 only, in accordance with 10 CFR 55.47 and NUREG 1021, Revision 10, ES-204, Section D.2.
 
Specifically, TVA proposed that 520 hours (13 weeks at 40 hours per week) be considered sufficient operating experience to allow the issuance of dual-unit operator licenses for the four operators currently licensed on Unit 1 only.
The U.S. Nuclear Regulatory Commission (NRC) cannot make a determination on operator license applications until the applic ations are actually submitted to the NRC in accordance with 10 CFR 55.31. The NRC will approve an initial application for an operator (RO) and/or senior reactor operator (SRO) if it finds that the application satisfies the requirements of 10 CFR 55.31(a), that the applicant's medical condition and general health satisfy 10 CFR 55.33, and that the applicant has passed the requisite written examination and operating test. However, the NRC cannot evaluate any aspect of an application, including examination waiver requests, before the application is actually submitted to the NRC. Consequently, the NRC cannot provide a determination of whether the subject RO and/or SRO license applications, requesting waivers of the written examination and operating test, in accordance with 10 CFR 55.47 guidelines necessary to meet 10 CFR 55.33 (a)(2), would be approved.
The U.S. Nuclear Regulatory Commission (NRC) cannot make a determination on operator license applications until the applications are actually submitted to the NRC in accordance with 10 CFR 55.31. The NRC will approve an initial application for an operator (RO) and/or senior reactor operator (SRO) if it finds that the application satisfies the requirements of 10 CFR 55.31(a), that the applicants medical condition and general health satisfy 10 CFR 55.33, and that the applicant has passed the requisite written examination and operating test. However, the NRC cannot evaluate any aspect of an application, including examination waiver requests, before the application is actually submitted to the NRC. Consequently, the NRC cannot provide a determination of whether the subject RO and/or SRO license applications, requesting waivers of the written examination and operating test, in accordance with 10 CFR 55.47 guidelines necessary to meet 10 CFR 55.33 (a)(2), would be approved.
P. Simmons 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice, " a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).  


P. Simmons                                    2 In accordance with 10 CFR 2.390 of the NRCs Rules of Practice,  a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this letter or planned inspections please contact me at (404) 997- 4662, (Internet E-mail:
Thank you for your cooperation in this matter. If you have any questions regarding this letter or planned inspections please contact me at (404) 997- 4662, (Internet E-mail:
Eugene.Guthrie@nrc.gov).       Sincerely,  
Eugene.Guthrie@nrc.gov).
      /RA/ Eugene F. Guthrie, Chief       Operations Branch 2 Division of Reactor Safety  
Sincerely,
 
                                                /RA/
Docket No(s).: 50-390, 50-391 License No(s).: NPF-90, NPF-96  
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket No(s).: 50-390, 50-391 License No(s).: NPF-90, NPF-96 cc: See page 3
 
cc: See page 3
 
_________________________  SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE BLC2 EFG      NAME CABALLERO GUTHRIE      DATE 5/18/2016 5/18/2016 5/    /2016 5/    /2016 5/    /2016 5/    /2016 5/    /2016 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO P. Simmons 3 Mr. Gordon P. Arent Senior Manager, Licensing  WBN Unit Two  Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 
 
Mr. O. J. Zeringue, General Manager  Engineering and Construction WBN Unit Two Watts Bar Nuclear Plant Tennessee Valley Authority  P.O. Box 2000  Spring City, Tennessee 37381 
 
Mr. R. A. Hruby, General Manager Technical Services  WBN Unit Two  Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City Tennessee 37381 
 
Ms. Donna Guinn, Manager  Licensing and Industry Affairs 
 
WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000  Spring City, Tennessee 37381 
 
Mr. Joseph P. Grimes 
 
Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority  1101 Market Place 3R Lookout Place Chattanooga, Tennessee 37402-2801 
 
County Executive 375 Church Street Suite 215 Dayton, Tennessee 37321 
 
Mr. Dave Gronek  Plant Manager, WBN Nuclear Plant  Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 
 
Mr. R. R. Baron, Senior Manager  Nuclear Construction Quality Assurance  WBN Unit Two  Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 
 
Mr. Joseph Shea, Vice President  Nuclear Licensing Tennessee Valley Authority 
 
1101 Market Street 
 
3R Lookout Place Chattanooga, TN 37402-2801 
 
Mr. E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority 400 West Summit Hill Drive 6A West Tower Knoxville, Tennessee 37402 
 
Mr. Lawrence E. Nanney, Director Tennessee Department of Environmental Health & Conservation Division of Radiological Health 3rd Floor, L&C Annex 
 
401 Church Street 
 
Nashville, TN 37243-1532 Mr. T. P. Cleary Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000  Spring City, Tennessee 37381 
 
County Mayor P.O. Box 156 Decatur, Tennessee 37322 Ms. Ann P. Harris Public 341 Swing Loop 
 
Rockwood, TN 37854 Tennessee Valley Authority ATTN:  Ms. Betsy Eiford-Lee
 
Training Manager Watts Bar Nuclear Plant P. O. Box 2000 Spring City, TN  37381


UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257 May 18, 2016 Mr. Paul R. Simmons Site Vice President, Watts Bar Nuclear Plant Tennessee Valley Authority P. O. Box 2000 MOB-2M-WBN
_________________________                SUNSI REVIEW COMPLETE    FORM 665 ATTACHED OFFICE            RII:DRS        RII:DRS SIGNATURE        BLC2          EFG NAME              CABALLERO      GUTHRIE DATE                  5/18/2016      5/18/2016    5/ /2016      5/ /2016      5/ /2016      5/ /2016      5/  /2016 E-MAIL COPY?        YES    NO    YES      NO  YES    NO    YES    NO    YES    NO    YES    NO    YES    NO P. Simmons                          3 Mr. Gordon P. Arent                  Mr. R. R. Baron, Senior Manager Senior Manager, Licensing            Nuclear Construction Quality Assurance WBN Unit Two                          WBN Unit Two Watts Bar Nuclear Plant              Watts Bar Nuclear Plant Tennessee Valley Authority            Tennessee Valley Authority P.O. Box 2000                        P.O. Box 2000 Spring City, Tennessee 37381          Spring City, Tennessee 37381 Mr. O. J. Zeringue, General Manager  Mr. Joseph Shea, Vice President Engineering and Construction          Nuclear Licensing WBN Unit Two                          Tennessee Valley Authority Watts Bar Nuclear Plant              1101 Market Street Tennessee Valley Authority            3R Lookout Place P.O. Box 2000                        Chattanooga, TN 37402-2801 Spring City, Tennessee 37381 Mr. E. J. Vigluicci Mr. R. A. Hruby, General Manager      Assistant General Counsel Technical Services                    Tennessee Valley Authority WBN Unit Two                          400 West Summit Hill Drive Watts Bar Nuclear Plant              6A West Tower Tennessee Valley Authority            Knoxville, Tennessee 37402 P.O. Box 2000 Spring City Tennessee 37381          Mr. Lawrence E. Nanney, Director Tennessee Department of Environmental Ms. Donna Guinn, Manager              Health & Conservation Licensing and Industry Affairs        Division of Radiological Health WBN Nuclear Plant                    3rd Floor, L&C Annex Tennessee Valley Authority            401 Church Street P.O. Box 2000                        Nashville, TN 37243-1532 Spring City, Tennessee 37381 Mr. T. P. Cleary Mr. Joseph P. Grimes                  Site Vice President Chief Nuclear Officer                Watts Bar Nuclear Plant and Executive Vice President          Tennessee Valley Authority Tennessee Valley Authority           P.O. Box 2000 1101 Market Place                    Spring City, Tennessee 37381 3R Lookout Place Chattanooga, Tennessee 37402-2801    County Mayor P.O. Box 156 County Executive                      Decatur, Tennessee 37322 375 Church Street Suite 215                            Ms. Ann P. Harris Dayton, Tennessee 37321              Public 341 Swing Loop Mr. Dave Gronek                      Rockwood, TN 37854 Plant Manager, WBN Nuclear Plant Tennessee Valley Authority            Tennessee Valley Authority P.O. Box 2000                        ATTN: Ms. Betsy Eiford-Lee Spring City, Tennessee 37381                  Training Manager Watts Bar Nuclear Plant P. O. Box 2000 Spring City, TN 37381


Spring City, TN 37381  
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 18, 2016 Mr. Paul R. Simmons Site Vice President, Watts Bar Nuclear Plant Tennessee Valley Authority P. O. Box 2000 MOB-2M-WBN Spring City, TN 37381


==SUBJECT:==
==SUBJECT:==
WATTS BAR NUCLEAR PLANT UNITS 1 AND 2 - REQUEST FOR DUAL UNIT OPERATOR LICENSES  
WATTS BAR NUCLEAR PLANT UNITS 1 AND 2 - REQUEST FOR DUAL UNIT OPERATOR LICENSES


==Dear Mr. Simmons:==
==Dear Mr. Simmons:==


In a letter dated April 15, 2016, the Tennessee Valley Authority (TVA) requested approval of TVA's plan for obtaining dual-unit licenses for four operators currently licensed on Unit 1 only, in accordance with 10 CFR 55.47 and NUREG 1021, Revision 10, ES-204, Section D.2. Specifically, TVA proposed that 520 hours (13 weeks at 40 hours per week) be considered sufficient operating experience to allow the issuance of dual-unit operator licenses for the four operators currently licensed on Unit 1 only.  
In a letter dated April 15, 2016, the Tennessee Valley Authority (TVA) requested approval of TVAs plan for obtaining dual-unit licenses for four operators currently licensed on Unit 1 only, in accordance with 10 CFR 55.47 and NUREG 1021, Revision 10, ES-204, Section D.2.
 
Specifically, TVA proposed that 520 hours (13 weeks at 40 hours per week) be considered sufficient operating experience to allow the issuance of dual-unit operator licenses for the four operators currently licensed on Unit 1 only.
The U.S. Nuclear Regulatory Commission (NRC) cannot make a determination on operator license applications until the applic ations are actually submitted to the NRC in accordance with 10 CFR 55.31. The NRC will approve an initial application for an operator (RO) and/or senior reactor operator (SRO) if it finds that the application satisfies the requirements of 10 CFR 55.31(a), that the applicant's medical condition and general health satisfy 10 CFR 55.33, and that the applicant has passed the requisite written examination and operating test. However, the NRC cannot evaluate any aspect of an application, including examination waiver requests, before the application is actually submitted to the NRC. Consequently, the NRC cannot provide a determination of whether the subject RO and/or SRO license applications, requesting waivers of the written examination and operating test, in accordance with 10 CFR 55.47 guidelines necessary to meet 10 CFR 55.33 (a)(2), would be approved.
The U.S. Nuclear Regulatory Commission (NRC) cannot make a determination on operator license applications until the applications are actually submitted to the NRC in accordance with 10 CFR 55.31. The NRC will approve an initial application for an operator (RO) and/or senior reactor operator (SRO) if it finds that the application satisfies the requirements of 10 CFR 55.31(a), that the applicants medical condition and general health satisfy 10 CFR 55.33, and that the applicant has passed the requisite written examination and operating test. However, the NRC cannot evaluate any aspect of an application, including examination waiver requests, before the application is actually submitted to the NRC. Consequently, the NRC cannot provide a determination of whether the subject RO and/or SRO license applications, requesting waivers of the written examination and operating test, in accordance with 10 CFR 55.47 guidelines necessary to meet 10 CFR 55.33 (a)(2), would be approved.
P. Simmons 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice, " a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).  


P. Simmons                                    2 In accordance with 10 CFR 2.390 of the NRCs Rules of Practice,  a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this letter or planned inspections please contact me at (404) 997- 4662, (Internet E-mail:
Thank you for your cooperation in this matter. If you have any questions regarding this letter or planned inspections please contact me at (404) 997- 4662, (Internet E-mail:
Eugene.Guthrie@nrc.gov).       Sincerely,  
Eugene.Guthrie@nrc.gov).
      /RA/ Eugene F. Guthrie, Chief       Operations Branch 2 Division of Reactor Safety  
Sincerely,
 
                                                /RA/
Docket No(s).: 50-390, 50-391 License No(s).: NPF-90, NPF-96  
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket No(s).: 50-390, 50-391 License No(s).: NPF-90, NPF-96 cc: See page 3
 
cc: See page 3
 
_________________________  SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE BLC2 EFG      NAME CABALLERO GUTHRIE      DATE 5/18/2016 5/18/2016 5/    /2016 5/    /2016 5/    /2016 5/    /2016 5/    /2016 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO P. Simmons 3 Mr. Gordon P. Arent Senior Manager, Licensing  WBN Unit Two  Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 
 
Mr. O. J. Zeringue, General Manager  Engineering and Construction WBN Unit Two Watts Bar Nuclear Plant Tennessee Valley Authority  P.O. Box 2000  Spring City, Tennessee 37381 
 
Mr. R. A. Hruby, General Manager Technical Services  WBN Unit Two  Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City Tennessee 37381 
 
Ms. Donna Guinn, Manager  Licensing and Industry Affairs 
 
WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000  Spring City, Tennessee 37381 
 
Mr. Joseph P. Grimes 
 
Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority  1101 Market Place 3R Lookout Place Chattanooga, Tennessee 37402-2801 
 
County Executive 375 Church Street Suite 215 Dayton, Tennessee 37321 
 
Mr. Dave Gronek  Plant Manager, WBN Nuclear Plant  Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 
 
Mr. R. R. Baron, Senior Manager  Nuclear Construction Quality Assurance  WBN Unit Two  Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 
 
Mr. Joseph Shea, Vice President  Nuclear Licensing Tennessee Valley Authority 
 
1101 Market Street 
 
3R Lookout Place Chattanooga, TN 37402-2801 
 
Mr. E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority 400 West Summit Hill Drive 6A West Tower Knoxville, Tennessee 37402 
 
Mr. Lawrence E. Nanney, Director Tennessee Department of Environmental Health & Conservation Division of Radiological Health 3rd Floor, L&C Annex 
 
401 Church Street 
 
Nashville, TN 37243-1532 Mr. T. P. Cleary Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000  Spring City, Tennessee 37381 
 
County Mayor P.O. Box 156 Decatur, Tennessee 37322 Ms. Ann P. Harris Public 341 Swing Loop 
 
Rockwood, TN 37854 Tennessee Valley Authority ATTN:  Ms. Betsy Eiford-Lee


Training Manager Watts Bar Nuclear Plant P. O. Box 2000 Spring City, TN 37381}}
_________________________                SUNSI REVIEW COMPLETE    FORM 665 ATTACHED OFFICE            RII:DRS        RII:DRS SIGNATURE        BLC2          EFG NAME              CABALLERO      GUTHRIE DATE                  5/18/2016      5/18/2016    5/ /2016      5/ /2016      5/ /2016      5/ /2016      5/  /2016 E-MAIL COPY?        YES    NO    YES      NO  YES    NO    YES    NO    YES    NO    YES    NO    YES    NO P. Simmons                          3 Mr. Gordon P. Arent                  Mr. R. R. Baron, Senior Manager Senior Manager, Licensing            Nuclear Construction Quality Assurance WBN Unit Two                          WBN Unit Two Watts Bar Nuclear Plant              Watts Bar Nuclear Plant Tennessee Valley Authority            Tennessee Valley Authority P.O. Box 2000                        P.O. Box 2000 Spring City, Tennessee 37381          Spring City, Tennessee 37381 Mr. O. J. Zeringue, General Manager  Mr. Joseph Shea, Vice President Engineering and Construction          Nuclear Licensing WBN Unit Two                          Tennessee Valley Authority Watts Bar Nuclear Plant              1101 Market Street Tennessee Valley Authority            3R Lookout Place P.O. Box 2000                        Chattanooga, TN 37402-2801 Spring City, Tennessee 37381 Mr. E. J. Vigluicci Mr. R. A. Hruby, General Manager      Assistant General Counsel Technical Services                    Tennessee Valley Authority WBN Unit Two                          400 West Summit Hill Drive Watts Bar Nuclear Plant              6A West Tower Tennessee Valley Authority            Knoxville, Tennessee 37402 P.O. Box 2000 Spring City Tennessee 37381          Mr. Lawrence E. Nanney, Director Tennessee Department of Environmental Ms. Donna Guinn, Manager              Health & Conservation Licensing and Industry Affairs        Division of Radiological Health WBN Nuclear Plant                    3rd Floor, L&C Annex Tennessee Valley Authority            401 Church Street P.O. Box 2000                        Nashville, TN 37243-1532 Spring City, Tennessee 37381 Mr. T. P. Cleary Mr. Joseph P. Grimes                  Site Vice President Chief Nuclear Officer                Watts Bar Nuclear Plant and Executive Vice President          Tennessee Valley Authority Tennessee Valley Authority            P.O. Box 2000 1101 Market Place                    Spring City, Tennessee 37381 3R Lookout Place Chattanooga, Tennessee 37402-2801    County Mayor P.O. Box 156 County Executive                      Decatur, Tennessee 37322 375 Church Street Suite 215                            Ms. Ann P. Harris Dayton, Tennessee 37321              Public 341 Swing Loop Mr. Dave Gronek                      Rockwood, TN 37854 Plant Manager, WBN Nuclear Plant Tennessee Valley Authority            Tennessee Valley Authority P.O. Box 2000                        ATTN: Ms. Betsy Eiford-Lee Spring City, Tennessee 37381                  Training Manager Watts Bar Nuclear Plant P. O. Box 2000 Spring City, TN 37381}}

Latest revision as of 03:16, 5 February 2020

Request for Dual Unit Operator Licenses
ML16144A630
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 05/18/2016
From: Eugene Guthrie
Division of Reactor Safety II
To: Simmons P
Tennessee Valley Authority
References
Download: ML16144A630 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 18, 2016 Mr. Paul R. Simmons Site Vice President, Watts Bar Nuclear Plant Tennessee Valley Authority P. O. Box 2000 MOB-2M-WBN Spring City, TN 37381

SUBJECT:

WATTS BAR NUCLEAR PLANT UNITS 1 AND 2 - REQUEST FOR DUAL UNIT OPERATOR LICENSES

Dear Mr. Simmons:

In a letter dated April 15, 2016, the Tennessee Valley Authority (TVA) requested approval of TVAs plan for obtaining dual-unit licenses for four operators currently licensed on Unit 1 only, in accordance with 10 CFR 55.47 and NUREG 1021, Revision 10, ES-204, Section D.2.

Specifically, TVA proposed that 520 hours0.00602 days <br />0.144 hours <br />8.597884e-4 weeks <br />1.9786e-4 months <br /> (13 weeks at 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> per week) be considered sufficient operating experience to allow the issuance of dual-unit operator licenses for the four operators currently licensed on Unit 1 only.

The U.S. Nuclear Regulatory Commission (NRC) cannot make a determination on operator license applications until the applications are actually submitted to the NRC in accordance with 10 CFR 55.31. The NRC will approve an initial application for an operator (RO) and/or senior reactor operator (SRO) if it finds that the application satisfies the requirements of 10 CFR 55.31(a), that the applicants medical condition and general health satisfy 10 CFR 55.33, and that the applicant has passed the requisite written examination and operating test. However, the NRC cannot evaluate any aspect of an application, including examination waiver requests, before the application is actually submitted to the NRC. Consequently, the NRC cannot provide a determination of whether the subject RO and/or SRO license applications, requesting waivers of the written examination and operating test, in accordance with 10 CFR 55.47 guidelines necessary to meet 10 CFR 55.33 (a)(2), would be approved.

P. Simmons 2 In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this letter or planned inspections please contact me at (404) 997- 4662, (Internet E-mail:

Eugene.Guthrie@nrc.gov).

Sincerely,

/RA/

Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket No(s).: 50-390, 50-391 License No(s).: NPF-90, NPF-96 cc: See page 3

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE BLC2 EFG NAME CABALLERO GUTHRIE DATE 5/18/2016 5/18/2016 5/ /2016 5/ /2016 5/ /2016 5/ /2016 5/ /2016 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO P. Simmons 3 Mr. Gordon P. Arent Mr. R. R. Baron, Senior Manager Senior Manager, Licensing Nuclear Construction Quality Assurance WBN Unit Two WBN Unit Two Watts Bar Nuclear Plant Watts Bar Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 P.O. Box 2000 Spring City, Tennessee 37381 Spring City, Tennessee 37381 Mr. O. J. Zeringue, General Manager Mr. Joseph Shea, Vice President Engineering and Construction Nuclear Licensing WBN Unit Two Tennessee Valley Authority Watts Bar Nuclear Plant 1101 Market Street Tennessee Valley Authority 3R Lookout Place P.O. Box 2000 Chattanooga, TN 37402-2801 Spring City, Tennessee 37381 Mr. E. J. Vigluicci Mr. R. A. Hruby, General Manager Assistant General Counsel Technical Services Tennessee Valley Authority WBN Unit Two 400 West Summit Hill Drive Watts Bar Nuclear Plant 6A West Tower Tennessee Valley Authority Knoxville, Tennessee 37402 P.O. Box 2000 Spring City Tennessee 37381 Mr. Lawrence E. Nanney, Director Tennessee Department of Environmental Ms. Donna Guinn, Manager Health & Conservation Licensing and Industry Affairs Division of Radiological Health WBN Nuclear Plant 3rd Floor, L&C Annex Tennessee Valley Authority 401 Church Street P.O. Box 2000 Nashville, TN 37243-1532 Spring City, Tennessee 37381 Mr. T. P. Cleary Mr. Joseph P. Grimes Site Vice President Chief Nuclear Officer Watts Bar Nuclear Plant and Executive Vice President Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 1101 Market Place Spring City, Tennessee 37381 3R Lookout Place Chattanooga, Tennessee 37402-2801 County Mayor P.O. Box 156 County Executive Decatur, Tennessee 37322 375 Church Street Suite 215 Ms. Ann P. Harris Dayton, Tennessee 37321 Public 341 Swing Loop Mr. Dave Gronek Rockwood, TN 37854 Plant Manager, WBN Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 ATTN: Ms. Betsy Eiford-Lee Spring City, Tennessee 37381 Training Manager Watts Bar Nuclear Plant P. O. Box 2000 Spring City, TN 37381

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 18, 2016 Mr. Paul R. Simmons Site Vice President, Watts Bar Nuclear Plant Tennessee Valley Authority P. O. Box 2000 MOB-2M-WBN Spring City, TN 37381

SUBJECT:

WATTS BAR NUCLEAR PLANT UNITS 1 AND 2 - REQUEST FOR DUAL UNIT OPERATOR LICENSES

Dear Mr. Simmons:

In a letter dated April 15, 2016, the Tennessee Valley Authority (TVA) requested approval of TVAs plan for obtaining dual-unit licenses for four operators currently licensed on Unit 1 only, in accordance with 10 CFR 55.47 and NUREG 1021, Revision 10, ES-204, Section D.2.

Specifically, TVA proposed that 520 hours0.00602 days <br />0.144 hours <br />8.597884e-4 weeks <br />1.9786e-4 months <br /> (13 weeks at 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> per week) be considered sufficient operating experience to allow the issuance of dual-unit operator licenses for the four operators currently licensed on Unit 1 only.

The U.S. Nuclear Regulatory Commission (NRC) cannot make a determination on operator license applications until the applications are actually submitted to the NRC in accordance with 10 CFR 55.31. The NRC will approve an initial application for an operator (RO) and/or senior reactor operator (SRO) if it finds that the application satisfies the requirements of 10 CFR 55.31(a), that the applicants medical condition and general health satisfy 10 CFR 55.33, and that the applicant has passed the requisite written examination and operating test. However, the NRC cannot evaluate any aspect of an application, including examination waiver requests, before the application is actually submitted to the NRC. Consequently, the NRC cannot provide a determination of whether the subject RO and/or SRO license applications, requesting waivers of the written examination and operating test, in accordance with 10 CFR 55.47 guidelines necessary to meet 10 CFR 55.33 (a)(2), would be approved.

P. Simmons 2 In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this letter or planned inspections please contact me at (404) 997- 4662, (Internet E-mail:

Eugene.Guthrie@nrc.gov).

Sincerely,

/RA/

Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket No(s).: 50-390, 50-391 License No(s).: NPF-90, NPF-96 cc: See page 3

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE BLC2 EFG NAME CABALLERO GUTHRIE DATE 5/18/2016 5/18/2016 5/ /2016 5/ /2016 5/ /2016 5/ /2016 5/ /2016 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO P. Simmons 3 Mr. Gordon P. Arent Mr. R. R. Baron, Senior Manager Senior Manager, Licensing Nuclear Construction Quality Assurance WBN Unit Two WBN Unit Two Watts Bar Nuclear Plant Watts Bar Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 P.O. Box 2000 Spring City, Tennessee 37381 Spring City, Tennessee 37381 Mr. O. J. Zeringue, General Manager Mr. Joseph Shea, Vice President Engineering and Construction Nuclear Licensing WBN Unit Two Tennessee Valley Authority Watts Bar Nuclear Plant 1101 Market Street Tennessee Valley Authority 3R Lookout Place P.O. Box 2000 Chattanooga, TN 37402-2801 Spring City, Tennessee 37381 Mr. E. J. Vigluicci Mr. R. A. Hruby, General Manager Assistant General Counsel Technical Services Tennessee Valley Authority WBN Unit Two 400 West Summit Hill Drive Watts Bar Nuclear Plant 6A West Tower Tennessee Valley Authority Knoxville, Tennessee 37402 P.O. Box 2000 Spring City Tennessee 37381 Mr. Lawrence E. Nanney, Director Tennessee Department of Environmental Ms. Donna Guinn, Manager Health & Conservation Licensing and Industry Affairs Division of Radiological Health WBN Nuclear Plant 3rd Floor, L&C Annex Tennessee Valley Authority 401 Church Street P.O. Box 2000 Nashville, TN 37243-1532 Spring City, Tennessee 37381 Mr. T. P. Cleary Mr. Joseph P. Grimes Site Vice President Chief Nuclear Officer Watts Bar Nuclear Plant and Executive Vice President Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 1101 Market Place Spring City, Tennessee 37381 3R Lookout Place Chattanooga, Tennessee 37402-2801 County Mayor P.O. Box 156 County Executive Decatur, Tennessee 37322 375 Church Street Suite 215 Ms. Ann P. Harris Dayton, Tennessee 37321 Public 341 Swing Loop Mr. Dave Gronek Rockwood, TN 37854 Plant Manager, WBN Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 ATTN: Ms. Betsy Eiford-Lee Spring City, Tennessee 37381 Training Manager Watts Bar Nuclear Plant P. O. Box 2000 Spring City, TN 37381