ML16341C519: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:NRC 2016-INP01 RCS Makeup With CVCS Cross
{{#Wiki_filter:OPERATIONS JPM TRAINING PROGRAM TITLE           INITIAL LICENSE TRAINING                             TIME: 20 MINUTES NUMBER           NRC 2016-INP01 AND TITLE:
-Tie Using BIT Injection Revision:
RCS Makeup With CVCS Cross-Tie Using BIT         REVISION: 0 Injection Created from RO-O-AEO-E279 Examinees Name: _____________________________________________________________
0 NRC 2016-INP01.doc Page 1 of 8  OPERATIONS JPM TRAINING PROGRAM TITLE INITIAL LICENSE TRAINING TIME: 20 MINUTES   NUMBER AND TITLE:
Evaluators Name: _____________________________________________________________
NRC 2016-INP0 1 RCS Makeup With CVCS Cross
Date Performed: _______________________________________________________________
-Tie Using BIT Injection  REVISION: 0 Created from RO-O-AEO-E 279 Examinee's Name: _____________________________________________________________
Result (Circle One):         SAT       /   UNSAT Number of Attempts: ___________________________________________________________
Evaluator's Name:
Time to Complete: _____________________________________________________________
_____________________________________________________________
Comments: ________________________________________________________________
Date Performed:
Revision: 0 NRC 2016-INP01 RCS Makeup With CVCS Cross-Tie Using BIT Injection NRC 2016-INP01.doc                                                          Page 1 of 8
_______________________________________________________________
Result (Circle One):
SAT   /   UNSAT   Number of Attempts:
___________________________________________________________
Time to Complete:
_____________________________________________________________
Comments:   ________________________________________
________________________
___________________________________________________________________________
___________________________________________________________________________


OPERATIONS JPM NRC 2016-INP01 RCS Makeup With CVCS Cross
OPERATIONS JPM REFERENCES Procedures:
-Tie Using BIT Injection Revision:
1-OHP-4025-LS-6                   RCS MAKEUP WITH CVCS CROSS-TIE Miscellaneous  
0 NRC 2016-INP01.doc Page 2 of 8  REFERENCES Procedures:
1-OHP-4025-LS-6 RCS MAKEUP WITH CVCS CROSS
-TIE  
 
Miscellaneous  


==References:==
==References:==


TRAINING AIDS/TOOLS/EQUIPMENT NRC KA APE.022.AA1.01 Ability to operate and / or monitor the following as they apply to the Loss of Reactor Coolant Pump Makeup: (CFR 41.7 / 45.5 / 45.6): CVCS letdown and charging RO/SRO Importance 3.4/3.3 TASKS APR0150612 Locally control systems for RCS make
TRAINING AIDS/TOOLS/EQUIPMENT NRC KA APE.022.AA1.01                   Ability to operate and / or monitor the following as they apply to the Loss of Reactor Coolant Pump Makeup: (CFR 41.7 /
-up, Seal Injection and Boration with CVCS cross
45.5 / 45.6): CVCS letdown and charging RO/SRO Importance                 3.4/3.3 TASKS APR0150612                       Locally control systems for RCS make-up, Seal Injection and Boration with CVCS cross-tie.
-tie.  
 
OBJECTIVES*
OBJECTIVES*
JPM-0030560406                    RCS Makeup With CVCS Cross-Tie Using BIT Injection Revision: 0 NRC 2016-INP01 RCS Makeup With CVCS Cross-Tie Using BIT Injection NRC 2016-INP01.doc                                                                Page 2 of 8


JPM-0030560406 RCS Makeup With CVCS Cross
OPERATIONS JPM HANDOUTS:
-Tie Using BIT Injection
Task Briefing Copy of 1-OHP 4025.LS-6-1, RCS Makeup with CVCS Cross-Tie using BIT Injection ATTACHMENTS:
 
None EVALUATION SETTINGS: In Plant - Unit 1, Simulation Only EVALUATION METHOD:                 PERFORM:                     SIMULATE:
OPERATIONS JPM NRC 2016-INP01 RCS Makeup With CVCS Cross
-Tie Using BIT Injection Revision:
0 NRC 2016-INP01.doc Page 3 of 8    HANDOUTS: Task Briefing Copy of 1-OHP 4025.LS-6-1, RCS Makeup with CVCS Cross
-Tie using BIT Injection ATTACHMENTS:
None   EVALUATION SETTINGS: In Plant - Unit 1, Simulation Only EVALUATION METHOD:
PERFORM:   SIMULATE:
SIMULATOR/LAB SETUP: NA EVALUATOR INSTRUCTIONS Give copy of Task Briefing to examinee.
SIMULATOR/LAB SETUP: NA EVALUATOR INSTRUCTIONS Give copy of Task Briefing to examinee.
TASK BRIEFING:
TASK BRIEFING:
Unit 1 was evacuated due to fire and damage.
Unit 1 was evacuated due to fire and damage.
The Unit Supervisor directs you to establish RCS makeup flow from Unit 2.
The Unit Supervisor directs you to establish RCS makeup flow from Unit 2.
You are to accomplish this evolution by performing 1
You are to accomplish this evolution by performing 1-OHP 4025.LS-6-1 , RCS Makeup with CVCS Cross-Tie, steps 3-7.
-OHP 4025.LS-6-1 , RCS Makeup with CVCS Cross-Tie, steps 3
A Security Event is NOT in progress 1-OHP 4025.LS-6-1 Step 2, De-energize BIT injection valve motors, has been completed.
-7. A Security Event is NOT in progress 1-OHP 4025.LS 1 Step 2, De
Notify the control room when steps 3-7 are complete.
-energize BIT injection valve motors, has been completed.
JPM OVERVIEW BIT injection is established from the opposite unit using RCS makeup with CVCS Cross-Tie.
Notify the control room when steps 3
GENERAL STANDARDS/PRECAUTIONS Cross-Tie is performed in accordance with expectations for procedure use and adherence.
-7 are complete.
Revision: 0 NRC 2016-INP01 RCS Makeup With CVCS Cross-Tie Using BIT Injection NRC 2016-INP01.doc                                                            Page 3 of 8
JPM OVERVIEW
 
BIT injection is established from the opposite unit using RCS makeup with CVCS Cross
-Tie. GENERAL STANDARDS/PRECAUTIONS
 
Cross-Tie is performed in accordance with expectations for procedure use and adherence.


OPERATIONS JPM NRC 2016-INP01 RCS Makeup With CVCS Cross
OPERATIONS JPM EXPECTED ACTIONS                                       CUES/STANDARDS (CS Indicates Critical Standard)
-Tie Using BIT Injection Revision:
0 NRC 2016-INP01.doc Page 4 of 8  EXPECTED ACTIONS CUES/STANDARDS ("
CS" Indicates Critical Standard)
General Feedback;
General Feedback;
: 1. Valve full travel should be acknowledged by stating "Resistance is felt in that direction".
: 1. Valve full travel should be acknowledged by stating Resistance is felt in that direction.
: 2. Discharge header crosstie valve position may be determined by observing the sliding pointer on the yoke of the valve. When the pointer is down at the bonnet, the valve is closed Cue: Control room acknowledges that you are performing RCS Make
: 2. Discharge header crosstie valve position may be determined by observing the sliding pointer on the yoke of the valve. When the pointer is down at the bonnet, the valve is closed Cue: Control room acknowledges that you are performing RCS Make-UP with CVCS Cross-Tie.
-UP with CVCS Cross
CUE: A security event is not in progress.
-Tie. CUE: A security event is not in progress.
Notes completion of step from task briefing CUE: From Task Brief, 1-OHP 4025.LS-6-1 Step 2, De-energize BIT injection valve motors, has been completed.
 
STANDARD: CS - Breakers moved to open position CUE: Breakers click when simulated to be moved to open SAT:             UNSAT:
Notes completion of step from task briefing CUE: From Task Brief, 1-OHP 4025.LS 1 Step 2, De
STANDARD: CS: Operator Simulates engaging Clutch and manually opening 1-ICM-250 SAT:             UNSAT:
-energize BIT injection valve motors, has been completed.
Revision: 0 NRC 2016-INP01 RCS Makeup With CVCS Cross-Tie Using BIT Injection NRC 2016-INP01.doc                                                                   Page 4 of 8
 
STANDARD: CS - Breakers moved to open position CUE: Breakers click when simulated to be moved to open SAT: UNSAT:
STANDARD: CS: Operator Simulates engaging Clutch and manually opening 1
-ICM-250 SAT: UNSAT:
OPERATIONS JPM  NRC 2016-INP01 RCS Makeup With CVCS Cross
-Tie Using BIT Injection Revision:
0 NRC 2016-INP01.doc Page 5 of 8 EXPECTED ACTIONS CUES/STANDARDS ("
CS" Indicates Critical Standard)
 
STANDARD: CS: Operator closing 1
-CS-302. CUE: (per task briefing sheet
) SAT:  UNSAT: 


OPERATIONS JPM EXPECTED ACTIONS                                        CUES/STANDARDS (CS Indicates Critical Standard)
STANDARD: CS: Operator closing 1-CS-302.
CUE: (per task briefing sheet)
SAT:              UNSAT:
STANDARD: Operator verifies all valves are CLOSED.
STANDARD: Operator verifies all valves are CLOSED.
CUE: All valves are as indicated. (Pointer is all the way in) SAT: UNSAT:  
CUE: All valves are as indicated. (Pointer is all the way in)
 
SAT:             UNSAT:
OPERATIONS JPM  NRC 2016-INP01 RCS Makeup With CVCS Cross
Revision: 0 NRC 2016-INP01 RCS Makeup With CVCS Cross-Tie Using BIT Injection NRC 2016-INP01.doc                                                               Page 5 of 8
-Tie Using BIT Injection Revision:
0 NRC 2016-INP01.doc Page 6 of 8 EXPECTED ACTIONS CUES/STANDARDS ("
CS" Indicates Critical Standard)
STANDARD: CS: Operator simulates cutting seal and opening 2-CS-536. CUE: Seal Broken; You feel movement, you feel resistance.
SAT:  UNSAT:   


OPERATIONS JPM EXPECTED ACTIONS                                        CUES/STANDARDS (CS Indicates Critical Standard)
STANDARD: CS: Operator simulates cutting seal and opening 2-CS-536.
CUE: Seal Broken; You feel movement, you feel resistance.
SAT:              UNSAT:
STANDARD: Operator simulates establishing communication with the control room.
STANDARD: Operator simulates establishing communication with the control room.
CUE: Control room communicator is online and standin g by. SAT: UNSAT:  
CUE: Control room communicator is online and standing by.
 
SAT:             UNSAT:
STANDARD: Operator verifies switches are in LOCAL CUE: If asked, 1
STANDARD: Operator verifies switches are in LOCAL CUE: If asked, 1-NLI-151 and 1-NPS-122 have been selected to LOCAL at 1-LSI-3. 1-NLI-151 is reading 20%, 1-NPS-122 is reading 2130 psig SAT:             UNSAT:
-NLI-151 and 1-NPS-122 have been selected to "LOCAL" at 1
CUE: There is another operator stationed to monitor Pressurizer level.
-LSI-3. 1-NLI-151 is reading 20%, 1-NPS-122 is reading 2130 psig SAT: UNSAT:   CUE: There is another operator stationed to monitor Pressurizer level.
Revision: 0 NRC 2016-INP01 RCS Makeup With CVCS Cross-Tie Using BIT Injection NRC 2016-INP01.doc                                                            Page 6 of 8


OPERATIONS JPM NRC 2016-INP01 RCS Makeup With CVCS Cross
OPERATIONS JPM EXPECTED ACTIONS                                         CUES/STANDARDS (CS Indicates Critical Standard)
-Tie Using BIT Injection Revision:
CUE: 1-NLI-151 is reading 20% and another operator will monitor PZR Level STANDARD: Operator checks flow on 12-QFI-201.
0 NRC 2016-INP01.doc Page 7 of 8  EXPECTED ACTIONS CUES/STANDARDS ("
CUE: Meter indication is ZERO gpm.
CS" Indicates Critical Standard)
SAT:           UNSAT:
CUE: 1-NLI-151 is reading 20% and another operator will monitor PZR Level STANDARD: Operator checks flow on 12
CUE: If Control Room is contacted, inform operator that they are to establish initial local flow between 25 and 35 gpm.
-QFI-201. CUE: Meter indication is ZERO gpm.
STANDARD: CS: Operator simulates cutting seal and slowly opens valve 1-CS-534 to establish 25-35 gpm flow.
SAT: UNSAT:   CUE: If Control Room is contacted, inform operator that they are to establish initial local flow between 25 and 35 gpm.
CUE: Seal Broken; Some resistance is noted, Valve moves; flow is rising on 12-QFI-201. Meter indication is 30 gpm to Unit 1. PZR Level is reading 20% and slowly rising.
STANDARD: CS: Operator simulates cutting seal and slowly opens valve 1
SAT:           UNSAT:
-CS-534 to establish 25
STANDARD: Operator reports to the Main Control Room that CVCS crosstie operations are in progress CUE: Control Room acknowledges CVCS Cross-Tie flow established.
-35 gpm flow.
SAT:           UNSAT:
CUE: Seal Broken; Some resistance is noted, Valve moves; flow is rising on 12
Termination Cue: The operator notifies the control room that Unit 1 BIT injection has been established.
-QFI-201. Meter indication is 30 gpm to Unit 1.
Revision: 0 NRC 2016-INP01 RCS Makeup With CVCS Cross-Tie Using BIT Injection NRC 2016-INP01.doc                                                                Page 7 of 8
PZR Level is reading 20% and slowly rising.
SAT: UNSAT:
STANDARD: Operator reports to the Main Control Room that CVCS crosstie operations are in progress CUE: Control Room acknowledges CVCS Cross
-Tie flow established.
SAT: UNSAT:   Termination Cue: The operator notifies the control room that Unit 1 BIT injection has been established.


OPERATIONS JPM   Revision:
OPERATIONS JPM TASK BRIEFING:
0 NRC 2016-INP01.doc Page 8 of 8    TASK BRIEFING:
Unit 1 (Unit 2) was evacuated due to fire and damage.
Unit 1 (Unit 2) was evacuated due to fire and damage.
The Unit Supervisor directs you to establish RCS makeup flow from Unit 2 You are to accomplish this evolution by performing 1
The Unit Supervisor directs you to establish RCS makeup flow from Unit 2 You are to accomplish this evolution by performing 1-OHP 4025.LS-6-1, RCS Makeup with CVCS Cross-Tie, steps 3-7.
-OHP 4025.LS 1 , RCS Makeup with CVCS Cross-Tie, steps 3
A Security Event is NOT in progress 1-OHP 4025.LS-6-1 Step 2, De-energize BIT injection valve motors, has been completed.
-7. A Security Event is NOT in progress 1-OHP 4025.LS 1 Step 2, De
Notify the control room when steps 3-7 are complete.
-energize BIT injection valve motors, has been completed.
Revision: 0 NRC 2016-INP01.doc                                                          Page 8 of 8


Notify the control room when steps 3
OPERATIONS JPM TRAINING PROGRAM TITLE          INITIAL LICENSE TRAINING                                TIME:  15 MINUTES NUMBER            NRC 2016-INP02 AND TITLE:
-7 are complete.
Shift Turbine Driven Auxiliary Feed Pump Suction      REVISION: 0 to ESW Created from RO-O-AEO-E250 Examinees Name: _____________________________________________________________
Evaluators Name: _____________________________________________________________
Date Performed: _______________________________________________________________
Result (Circle One):            SAT      /      UNSAT Number of Attempts: ___________________________________________________________
Time to Complete: _____________________________________________________________
Comments: ________________________________________________________________
Revision: 1 NRC 2016-INP02 Shift Turbine Driven Auxiliary Feed Pump Suction to ESW NRC 2016-INP02.doc                                                                Page 1 of 7


NRC 2016-INP02 Shift Turbine Driven Auxiliary Feed Pump Suction to ESW Revision:
OPERATIONS JPM REFERENCES Procedures:
1 NRC 2016-INP02.doc Page 1 of 7  OPERATIONS JPM   TRAINING PROGRAM TITLE  INITIAL LICENSE TRAINING TIME:  15 MINUTES  NUMBER AND TITLE:
1-OHP-4022-055-003                   LOSS OF CONDENSATE TO AUXILIARY FEEDWATER PUMPS Miscellaneous  
NRC 2016-INP0 2 Shift Turbine Driven Auxiliary Feed Pump Suction to ESW  REVISION:  0 Created from RO-O-AEO-E250 Examinee's Name: _____________________________________________________________
Evaluator's Name:
_____________________________________________________________
Date Performed:
_____________________________________________________________
__  Result (Circle One):
SAT  /  UNSAT  Number of Attempts:
___________________________________________________________
Time to Complete:
_____________________________________________________________
Comments:  __________________________________
______________________________
___________________________________________________________________________
___________________________________________________________________________
 
OPERATIONS JPM  NRC 2016-INP02 Shift Turbine Driven Auxiliary Feed Pump Suction to ESW Revision:
1 NRC 2016-INP02.doc Page 2 of 7  REFERENCES Procedures:
1-OHP-4022-055-003 LOSS OF CONDENSATE TO AUXILIARY FEEDWATER PUMPS  
 
Miscellaneous  


==References:==
==References:==


TRAINING AIDS/TOOLS/EQUIPMENT NRC KA APE.054.AA1.01 Ability to operate and / or monitor the following as they apply to the Loss of Main Feedwater: AFW controls, including the use of alternate AFW sources RO/SRO Importance 4.5/4.4 TASKS LOCAOP0150401 Perform local actions to align ESW to supply AFW pump suction during a loss of condensate to auxiliary feedwater pumps  
TRAINING AIDS/TOOLS/EQUIPMENT NRC KA APE.054.AA1.01                       Ability to operate and / or monitor the following as they apply to the Loss of Main Feedwater: AFW controls, including the use of alternate AFW sources RO/SRO Importance                   4.5/4.4 TASKS LOCAOP0150401                       Perform local actions to align ESW to supply AFW pump suction during a loss of condensate to auxiliary feedwater pumps OBJECTIVES*
JPM-0560230404                      Shift Auxiliary Feed Pump Suction to ESW (Unit 1 TDAFWP)
Revision: 1 NRC 2016-INP02 Shift Turbine Driven Auxiliary Feed Pump Suction to ESW NRC 2016-INP02.doc                                                                    Page 2 of 7


OBJECTIVES*
OPERATIONS JPM HANDOUTS:
 
Copy of procedure 1-OHP-4022-055-003, Loss of Condensate to Auxiliary Feedwater, Step 13 ATTACHMENTS:
JPM-0560230404 Shift Auxiliary Feed Pump Suction to ESW (Unit 1 TDAFWP)  .
None EVALUATION SETTINGS:
OPERATIONS JPM NRC 2016-INP02 Shift Turbine Driven Auxiliary Feed Pump Suction to ESW Revision:
In plant EVALUATION METHOD:                   PERFORM:                       SIMULATE:
1 NRC 2016-INP02.doc Page 3 of 7    HANDOUTS: Copy of procedure 1
-OHP-4022-055-003, Loss of Condensate to Auxiliary Feedwater, Step 13 ATTACHMENTS:
None   EVALUATION SETTINGS:
In plant EVALUATION METHOD:
PERFORM:   SIMULATE:
EVALUATOR INSTRUCTIONS Give copy of Task Briefing to examinee.
EVALUATOR INSTRUCTIONS Give copy of Task Briefing to examinee.
TASK BRIEFING:
TASK BRIEFING:
You are an extra operator.
You are an extra operator.
The Shift Manager directs you to locally align ESW to the Unit 1 Turbine Driven Auxiliary Feed pump to prepare for a Control Room pump start in accordance with Step 13 of 1
The Shift Manager directs you to locally align ESW to the Unit 1 Turbine Driven Auxiliary Feed pump to prepare for a Control Room pump start in accordance with Step 13 of 1-OHP-4022-055-003, Loss of Condensate to Auxiliary Feedwater pumps.
-OHP-4022-055-003 , Loss of Condensate to Auxiliary Feedwater pumps.
1-WMO-753, ESW supply to TDAFW, has no power available.
1-WMO-753, ESW supply to TDAFW, has no power available.
JPM OVERVIEW Examinee will simulate local actions to align ESW to Unit 1 TDAFWP GENERAL STANDARDS/PRECAUTIONS NA  
JPM OVERVIEW Examinee will simulate local actions to align ESW to Unit 1 TDAFWP GENERAL STANDARDS/PRECAUTIONS NA Revision: 1 NRC 2016-INP02 Shift Turbine Driven Auxiliary Feed Pump Suction to ESW NRC 2016-INP02.doc                                                              Page 3 of 7


OPERATIONS JPM NRC 2016-INP02 Shift Turbine Driven Auxiliary Feed Pump Suction to ESW Revision:
OPERATIONS JPM EXPECTED ACTIONS                                             CUES/STANDARDS (CS Indicates Critical Standard)
1 NRC 2016-INP02.doc Page 4 of 7  EXPECTED ACTIONS CUES/STANDARDS ("
CS" Indicates Critical Standard)
No actions are expected on this page; page included for evaluator reference.
No actions are expected on this page; page included for evaluator reference.
Note : Briefing Starts operator on Step 13 Revision: 1 NRC 2016-INP02 Shift Turbine Driven Auxiliary Feed Pump Suction to ESW NRC 2016-INP02.doc                                                                    Page 4 of 7


Note : Briefing Starts operator on Step 13
OPERATIONS JPM EXPECTED ACTIONS                                             CUES/STANDARDS (CS Indicates Critical Standard)
 
OPERATIONS JPM NRC 2016-INP02 Shift Turbine Driven Auxiliary Feed Pump Suction to ESW Revision:
1 NRC 2016-INP02.doc Page 5 of 7  EXPECTED ACTIONS CUES/STANDARDS ("
CS" Indicates Critical Standard)
No actions are expected on this page; page included for evaluator reference.
No actions are expected on this page; page included for evaluator reference.
Note Task is to align Turbine Driven AFW Revision: 1 NRC 2016-INP02 Shift Turbine Driven Auxiliary Feed Pump Suction to ESW NRC 2016-INP02.doc                                                                    Page 5 of 7


Note Task is to align Turbine Driven AFW
OPERATIONS JPM EXPECTED ACTIONS                                             CUES/STANDARDS (CS Indicates Critical Standard)
 
STANDARD: CS: Operator breaks seal then closes 1-ESW-110 by turning the valve in the clockwise direction.
OPERATIONS JPM NRC 2016-INP02 Shift Turbine Driven Auxiliary Feed Pump Suction to ESW Revision:
1 NRC 2016-INP02.doc Page 6 of 7  EXPECTED ACTIONS CUES/STANDARDS ("
CS" Indicates Critical Standard)
STANDARD: CS: Operator breaks seal then closes 1
-ESW-110 by turning the valve in the clockwise direction.
CUE: You feel movement; you feel resistance.
CUE: You feel movement; you feel resistance.
SAT: UNSAT:
SAT:           UNSAT:
STANDARD: CS: Operator breaks seal then opens 1
STANDARD: CS: Operator breaks seal then opens 1-ESW-115 by turning the lever 90 degrees.
-ESW-115 by turning the lever 90 degrees.
CUE: You feel movement; you feel resistance.
CUE: You feel movement; you feel resistance.
SAT: UNSAT:  
SAT:           UNSAT:
NOTE: If the operator instructs the Control Room to open 1-WMO-753, inform the operator that the breaker for 1-WMO-753 is open and direct local operation STANDARD: CS: Operator pushes de-clutch lever in the direction of the arrow then releases the de-clutch lever. Operator opens 1-WMO-753 (turns hand-wheel Counter-clockwise.)
CUE: You feel movement; you feel resistance. Position indicator moves to the INLINE position.
SAT:            UNSAT:
STANDARD: Operator reports ESW is aligned to TDAFWP suction.
CUE: Control room acknowledges that ESW is aligned to the TDAFP suction.
SAT:            UNSAT:
Termination Cue: When operator notifies CR of task completion Revision: 1 NRC 2016-INP02 Shift Turbine Driven Auxiliary Feed Pump Suction to ESW NRC 2016-INP02.doc                                                                      Page 6 of 7


NOTE: If the operator instructs the Control Room to open 1
TASK BRIEFING:
-WMO-753, inform the operator that the breaker for 1
-WMO-753 is open and direct local operation STANDARD: CS: Operator pushes de
-clutch lever in the direction of the arrow then releases the de
-clutch lever. Operator open s 1-WMO-753 (turns hand
-wheel Counter
-clockwise.
) CUE: You feel movement; you feel resistance. Position indicator moves to the INLINE position.
SAT:  UNSAT: 
 
STANDARD: Operator reports ESW is aligned to TDAFWP suction. CUE: Control room acknowledges that ESW is aligned to the TDAFP suction.
SAT:  UNSAT:  Termination Cue: When operator notifies CR of task completion
 
NRC 2016-INP02 Shift Turbine Driven Auxiliary Feed Pump Suction to ESW Revision:
1 NRC 2016-INP02.doc Page 7 of 7  TASK BRIEFING:
You are an extra operator.
You are an extra operator.
The Shift Manager directs you to locally align ESW to the Unit 1 Turbine Driven Auxiliary Feed pump to prepare for a Control Room pump start in accordance with Step 13 of 1
The Shift Manager directs you to locally align ESW to the Unit 1 Turbine Driven Auxiliary Feed pump to prepare for a Control Room pump start in accordance with Step 13 of 1-OHP-4022-055-003, Loss of Condensate to Auxiliary Feedwater pumps.
-OHP-4022-055-003 , Loss of Condensate to Auxiliary Feedwater pumps.
1-WMO-753, ESW supply to TDAFW, has no power available.
1-WMO-753, ESW supply to TDAFW, has no power available.
Revision: 1 NRC 2016-INP02 Shift Turbine Driven Auxiliary Feed Pump Suction to ESW NRC 2016-INP02.doc                                                              Page 7 of 7


NRC 2016-INP03 Perform local DG trip and isolation Revision:
OPERATIONS JPM TRAINING PROGRAM TITLE           INITIAL LICENSE TRAINING                         TIME:   20 MINUTES NUMBER           NRC 2016-INP03 AND TITLE:
0 NRC 2016-INP03.doc Page 1 of 8  OPERATIONS JPM TRAINING PROGRAM TITLE INITIAL LICENSE TRAINING TIME: 20 MINUTES   NUMBER AND TITLE:
Perform local DG trip and isolation           REVISION: 0 Created from AE-O-E277 Examinees Name: _____________________________________________________________
NRC 2016-INP03 Perform local DG trip and isolation REVISION: 0 Created from AE
Evaluators Name: _____________________________________________________________
-O-E277     Examinee's Name: _____________________________________
Date Performed: _______________________________________________________________
________________________
Result (Circle One):           SAT       /     UNSAT Number of Attempts: ___________________________________________________________
Evaluator's Name:
Time to Complete: _____________________________________________________________
_____________________________________________________________
Comments: ________________________________________________________________
Date Performed:
Revision: 0 NRC 2016-INP03 Perform local DG trip and isolation NRC 2016-INP03.doc                                                        Page 1 of 8
_______________________________________________________________
Result (Circle One):
SAT   /   UNSAT   Number of Attempts:
___________________________________________________________
Time to Complete:
_____________________________________________________________
Comments:   ________________________________________________________________
_______________________________________
____________________________________
___________________________________________________________________________


OPERATIONS JPM NRC 2016-INP03 Perform local DG trip and isolation Revision:
OPERATIONS JPM REFERENCES Procedures:
0 NRC 2016-INP03.doc Page 2 of 8  REFERENCES Procedures:
2-OHP-4025-LTI-3                         LOCAL DIESEL GENERATOR TRIP AND ISOLATION, Rev. 2, 3/3/2006 Miscellaneous  
2-OHP-4025-LTI-3 LOCAL DIESEL GENERATOR TRIP AND ISOLATION, Rev. 2, 3/3/2006
 
Miscellaneous  


==References:==
==References:==


TRAINING AIDS/TOOLS/EQUIPMENT NRC KA APE.068.AA1.31 Ability to operate and / or monitor the following as they apply to the Control Room Evacuation: (CFR 41.7 / 45.5 / 45.6) : ED/G RO/SRO Importance 3.9/4.0 TASKS APR0030601 Perform local diesel generator trip and isolation during an Emergency Remote Shutdown  
TRAINING AIDS/TOOLS/EQUIPMENT NRC KA APE.068.AA1.31                           Ability to operate and / or monitor the following as they apply to the Control Room Evacuation: (CFR 41.7 / 45.5 / 45.6) :
ED/G RO/SRO Importance                         3.9/4.0 TASKS APR0030601                               Perform local diesel generator trip and isolation during an Emergency Remote Shutdown OBJECTIVES*
JPM-0320250604                            Perform local DG trip and isolation
*Unless otherwise stated, conditions and standards for objectives are from memory, either orally or in writing, and without error respectively.
Revision: 0 NRC 2016-INP03 Perform local DG trip and isolation NRC 2016-INP03.doc                                                                                Page 2 of 8


OBJECTIVES*
OPERATIONS JPM HANDOUTS:
Task Briefing Copy of 02-OHP-4025-LTI-3, Local Diesel Generator Trip and Isolation Picture of the inside of a 4KV Breaker Control Power (Top) Cubicle Picture of Breaker Mechanical Trip Pushbutton and Flag ATTACHMENTS:
Picture of the inside of a 4KV Breaker Control Power (Top) Cubicle Picture of Breaker Mechanical Trip Pushbutton and Flag EVALUATION SETTINGS:
In plant EVALUATION METHOD:                    PERFORM:                      SIMULATE:
SIMULATOR/LAB SETUP NA EVALUATOR INSTRUCTIONS Give copy of the following to examinee:
Task Briefing Copy of 02-OHP-4025-LTI-3, Local Diesel Generator Trip and Isolation TASK BRIEFING:
Following a fire event on Unit 2, the 2AB Diesel Generator started but failed to load.
The US directs you to locally trip and isolate the 2AB Diesel Generator in accordance with 02-OHP-4025-LTI-3-1, DG2AB Local Trip and Isolation.
Fire areas do not interfere with the implementation of this task.
JPM OVERVIEW Perform a local trip and isolation on Unit 2 AB Diesel Generator per 02-OHP-4025-LTI-3, observing applicable precautions and limitations and procedural steps.
GENERAL STANDARDS/PRECAUTIONS None Revision: 0 NRC 2016-INP03 Perform local DG trip and isolation NRC 2016-INP03.doc                                                                Page 3 of 8


JPM-0320250604 Perform local DG trip and isolation  
OPERATIONS JPM EXPECTED ACTIONS                                      CUES/STANDARDS (CS Indicates Critical Standard)
  *Unless otherwise stated, conditions and standards for objectives are "from memory, either orally or in writing," and "without error" respectively.
STANDARD: CS: Operator (simulates) depressing local EMERGENCY TRIP CUE: 2AB EDG has stopped running SAT:          UNSAT:
COMMENT:
NOTE: Operator leaves the 2AB DG room and proceeds to the 4KV Switchgear Room (609 TB) and simulates donning full flash equipment.
Revision: 0 NRC 2016-INP03 Perform local DG trip and isolation NRC 2016-INP03.doc                                                          Page 4 of 8


OPERATIONS JPM NRC 2016-INP03 Perform local DG trip and isolation Revision:
OPERATIONS JPM EXPECTED ACTIONS                                      CUES/STANDARDS (CS Indicates Critical Standard)
0 NRC 2016-INP03.doc Page 3 of 8   HANDOUTS:  Task Briefing Copy of 02
EVALUATOR NOTE: Use attached picture (Inside of a 4KV Breaker Control Power (Top) Cubicle) to evaluate operators ability to locate control power fuses. Fuses are located in the lower right part of the picture CUE: GREEN light ON before removing fuse(s)
-OHP-4025-LTI-3, Local Diesel Generator Trip and Isolation Picture of the inside of a 4KV Breaker Control Power (Top) Cubicle Picture of Breaker Mechanical Trip Pushbutton and Flag
STANDARD: CS: Operator locates T21A11 breaker and (simulates) removes control power fuses CUE: GREEN lights OFF on front of breaker panel SAT:          UNSAT:
STANDARD: Operator verifies breaker T21A11 tripped CUE: Provide attached picture of Breaker Mechanical Trip Pushbutton and Flag (green OPEN flag is showing).
SAT:          UNSAT:
CUE: GREEN light ON before removing fuse(s)
STANDARD: CS: Operator locates T21B4 breaker and (simulates) removes control power fuses CUE: GREEN lights OFF on front of breaker panel SAT:          UNSAT:
STANDARD: Operator verifies breaker T21B4 tripped CUE: Provide attached picture of Breaker Mechanical Trip Pushbutton and Flag (green OPEN flag is showing).
SAT:          UNSAT:
STANDARD: Operator reports completion of LTI-3 SAT:          UNSAT:
Termination Cue: When operator reports completion of 2-OHP-4025-LTI-3-1 Revision: 0 NRC 2016-INP03 Perform local DG trip and isolation NRC 2016-INP03.doc                                                             Page 5 of 8


ATTACHMENTS:
OPERATIONS JPM Revision: 0 NRC 2016-INP03 Perform local DG trip and isolation NRC 2016-INP03.doc                                      Page 6 of 8


Picture of the inside of a 4KV Breaker Control Power (Top) Cubicle Picture of Breaker Mechanical Trip Pushbutton and Flag
Revision: 0 NRC 2016-INP03 Perform local DG trip and isolation NRC 2016-INP03.doc                                      Page 7 of 8


EVALUATION SETTINGS:
TASK BRIEFING:
In plant  EVALUATION METHOD:
PERFORM:  SIMULATE:
SIMULATOR/LAB SETUP NA  EVALUATOR INSTRUCTIONS Give copy of the following to examinee:
Task Briefing Copy of 02
-OHP-4025-LTI-3, Local Diesel Generator Trip and Isolation TASK BRIEFING:
Following a fire event on Unit 2, the 2AB Diesel Generator started but failed to load.
Following a fire event on Unit 2, the 2AB Diesel Generator started but failed to load.
The US directs you to locally trip and isolate the 2AB Diesel Generator in accordance with 02-OHP-4025-LTI-3-1, DG2AB Local Trip and Isolation.
The US directs you to locally trip and isolate the 2AB Diesel Generator in accordance with 02-OHP-4025-LTI-3-1, DG2AB Local Trip and Isolation.
Fire areas do not interfere with the implementation of this task.
Fire areas do not interfere with the implementation of this task.
JPM OVERVIEW Perform a local trip and isolation on Unit 2 AB Diesel Generator per 02
Revision: 0 NRC 2016-INP03 Perform local DG trip and isolation NRC 2016-INP03.doc                                                               Page 8 of 8}}
-OHP-4025-LTI-3, observing applicable precautions and limitations and procedural steps.
GENERAL STANDARDS/PRECAUTIONS None OPERATIONS JPM NRC 2016-INP03 Perform local DG trip and isolation Revision:
0 NRC 2016-INP03.doc Page 4 of 8  EXPECTED ACTIONS CUES/STANDARDS ("
CS" Indicates Critical Standard)
STANDARD: CS: Operator (simulates) depressing local EMERGENCY TRIP CUE: 2AB EDG has stopped running SAT:  UNSAT:  COMMENT:
NOTE: Operator leaves the 2AB DG room and proceeds to the 4KV Switchgear Room (609' TB) and simulates donning full flash equipment.
 
OPERATIONS JPM NRC 2016-INP03 Perform local DG trip and isolation Revision:
0 NRC 2016-INP03.doc Page 5 of 8 EXPECTED ACTIONS CUES/STANDARDS ("
CS" Indicates Critical Standard)
EVALUATOR NOTE:  Use attached picture (Inside of a 4KV Breaker Control Power (Top) Cubicle) to evaluate operator's ability to locate control power fuses. Fuses are located in the lower right part of the pictu re CUE:  GREEN light ON before removing fuse(s)
STANDARD: CS: Operator locates T21A11 breaker and (simulates) removes control power fuses CUE: GREEN lights OFF on front of breaker panel SAT:  UNSAT:  STANDARD: Operator verifies breaker T21A11 tripped CUE: Provide attached picture of Breaker Mechanical Trip Pushbutton and Flag (green OPEN flag is showing).
SAT:  UNSAT:    CUE:  GREEN light ON before removing fuse(s)
STANDARD: CS: Operator locates T21B4 breaker and (simulates) removes control power fuses CUE: GREEN lights OFF on front of breaker panel SAT:  UNSAT:    STANDARD: Operator verifies breaker T21B4 tripped CUE: Provide attached picture of Breaker Mechanical Trip Pushbutton and Flag (green OPEN flag is showing).
SAT:  UNSAT:    STANDARD: Operator reports completion of LTI
-3 SAT:  UNSAT:  Termination Cue: When operator reports completion of 2
-OHP-4025-LTI-3-1 OPERATIONS JPM NRC 2016-INP03 Perform local DG trip and isolation Revision:
0 NRC 2016-INP03.doc Page 6 of 8 NRC 2016-INP03 Perform local DG trip and isolation Revision:
0 NRC 2016-INP03.doc Page 7 of 8 NRC 2016-INP03 Perform local DG trip and isolation Revision:
0 NRC 2016-INP03.doc Page 8 of 8  TASK BRIEFING:
Following a fire event on Unit 2, the 2AB Diesel Generator started but failed to load.
The US directs you to locally trip and isolate the 2AB Diesel Generator in accordance with 02-OHP-4025-LTI-3-1, DG2AB Local Trip and Isolation.
Fire areas do not interfere with the implementation of this task.}}

Latest revision as of 22:41, 4 February 2020

DC Cook 2016 Administered Operating Test Inplant JPMs
ML16341C519
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/02/2016
From:
NRC/RGN-III
To:
Indiana Michigan Power Co, American Electric Power
Shared Package
ML152274A376 List:
References
Download: ML16341C519 (23)


Text

OPERATIONS JPM TRAINING PROGRAM TITLE INITIAL LICENSE TRAINING TIME: 20 MINUTES NUMBER NRC 2016-INP01 AND TITLE:

RCS Makeup With CVCS Cross-Tie Using BIT REVISION: 0 Injection Created from RO-O-AEO-E279 Examinees Name: _____________________________________________________________

Evaluators Name: _____________________________________________________________

Date Performed: _______________________________________________________________

Result (Circle One): SAT / UNSAT Number of Attempts: ___________________________________________________________

Time to Complete: _____________________________________________________________

Comments: ________________________________________________________________

Revision: 0 NRC 2016-INP01 RCS Makeup With CVCS Cross-Tie Using BIT Injection NRC 2016-INP01.doc Page 1 of 8

OPERATIONS JPM REFERENCES Procedures:

1-OHP-4025-LS-6 RCS MAKEUP WITH CVCS CROSS-TIE Miscellaneous

References:

TRAINING AIDS/TOOLS/EQUIPMENT NRC KA APE.022.AA1.01 Ability to operate and / or monitor the following as they apply to the Loss of Reactor Coolant Pump Makeup: (CFR 41.7 /

45.5 / 45.6): CVCS letdown and charging RO/SRO Importance 3.4/3.3 TASKS APR0150612 Locally control systems for RCS make-up, Seal Injection and Boration with CVCS cross-tie.

OBJECTIVES*

JPM-0030560406 RCS Makeup With CVCS Cross-Tie Using BIT Injection Revision: 0 NRC 2016-INP01 RCS Makeup With CVCS Cross-Tie Using BIT Injection NRC 2016-INP01.doc Page 2 of 8

OPERATIONS JPM HANDOUTS:

Task Briefing Copy of 1-OHP 4025.LS-6-1, RCS Makeup with CVCS Cross-Tie using BIT Injection ATTACHMENTS:

None EVALUATION SETTINGS: In Plant - Unit 1, Simulation Only EVALUATION METHOD: PERFORM: SIMULATE:

SIMULATOR/LAB SETUP: NA EVALUATOR INSTRUCTIONS Give copy of Task Briefing to examinee.

TASK BRIEFING:

Unit 1 was evacuated due to fire and damage.

The Unit Supervisor directs you to establish RCS makeup flow from Unit 2.

You are to accomplish this evolution by performing 1-OHP 4025.LS-6-1 , RCS Makeup with CVCS Cross-Tie, steps 3-7.

A Security Event is NOT in progress 1-OHP 4025.LS-6-1 Step 2, De-energize BIT injection valve motors, has been completed.

Notify the control room when steps 3-7 are complete.

JPM OVERVIEW BIT injection is established from the opposite unit using RCS makeup with CVCS Cross-Tie.

GENERAL STANDARDS/PRECAUTIONS Cross-Tie is performed in accordance with expectations for procedure use and adherence.

Revision: 0 NRC 2016-INP01 RCS Makeup With CVCS Cross-Tie Using BIT Injection NRC 2016-INP01.doc Page 3 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

General Feedback;

1. Valve full travel should be acknowledged by stating Resistance is felt in that direction.
2. Discharge header crosstie valve position may be determined by observing the sliding pointer on the yoke of the valve. When the pointer is down at the bonnet, the valve is closed Cue: Control room acknowledges that you are performing RCS Make-UP with CVCS Cross-Tie.

CUE: A security event is not in progress.

Notes completion of step from task briefing CUE: From Task Brief, 1-OHP 4025.LS-6-1 Step 2, De-energize BIT injection valve motors, has been completed.

STANDARD: CS - Breakers moved to open position CUE: Breakers click when simulated to be moved to open SAT: UNSAT:

STANDARD: CS: Operator Simulates engaging Clutch and manually opening 1-ICM-250 SAT: UNSAT:

Revision: 0 NRC 2016-INP01 RCS Makeup With CVCS Cross-Tie Using BIT Injection NRC 2016-INP01.doc Page 4 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: CS: Operator closing 1-CS-302.

CUE: (per task briefing sheet)

SAT: UNSAT:

STANDARD: Operator verifies all valves are CLOSED.

CUE: All valves are as indicated. (Pointer is all the way in)

SAT: UNSAT:

Revision: 0 NRC 2016-INP01 RCS Makeup With CVCS Cross-Tie Using BIT Injection NRC 2016-INP01.doc Page 5 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: CS: Operator simulates cutting seal and opening 2-CS-536.

CUE: Seal Broken; You feel movement, you feel resistance.

SAT: UNSAT:

STANDARD: Operator simulates establishing communication with the control room.

CUE: Control room communicator is online and standing by.

SAT: UNSAT:

STANDARD: Operator verifies switches are in LOCAL CUE: If asked, 1-NLI-151 and 1-NPS-122 have been selected to LOCAL at 1-LSI-3. 1-NLI-151 is reading 20%, 1-NPS-122 is reading 2130 psig SAT: UNSAT:

CUE: There is another operator stationed to monitor Pressurizer level.

Revision: 0 NRC 2016-INP01 RCS Makeup With CVCS Cross-Tie Using BIT Injection NRC 2016-INP01.doc Page 6 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

CUE: 1-NLI-151 is reading 20% and another operator will monitor PZR Level STANDARD: Operator checks flow on 12-QFI-201.

CUE: Meter indication is ZERO gpm.

SAT: UNSAT:

CUE: If Control Room is contacted, inform operator that they are to establish initial local flow between 25 and 35 gpm.

STANDARD: CS: Operator simulates cutting seal and slowly opens valve 1-CS-534 to establish 25-35 gpm flow.

CUE: Seal Broken; Some resistance is noted, Valve moves; flow is rising on 12-QFI-201. Meter indication is 30 gpm to Unit 1. PZR Level is reading 20% and slowly rising.

SAT: UNSAT:

STANDARD: Operator reports to the Main Control Room that CVCS crosstie operations are in progress CUE: Control Room acknowledges CVCS Cross-Tie flow established.

SAT: UNSAT:

Termination Cue: The operator notifies the control room that Unit 1 BIT injection has been established.

Revision: 0 NRC 2016-INP01 RCS Makeup With CVCS Cross-Tie Using BIT Injection NRC 2016-INP01.doc Page 7 of 8

OPERATIONS JPM TASK BRIEFING:

Unit 1 (Unit 2) was evacuated due to fire and damage.

The Unit Supervisor directs you to establish RCS makeup flow from Unit 2 You are to accomplish this evolution by performing 1-OHP 4025.LS-6-1, RCS Makeup with CVCS Cross-Tie, steps 3-7.

A Security Event is NOT in progress 1-OHP 4025.LS-6-1 Step 2, De-energize BIT injection valve motors, has been completed.

Notify the control room when steps 3-7 are complete.

Revision: 0 NRC 2016-INP01.doc Page 8 of 8

OPERATIONS JPM TRAINING PROGRAM TITLE INITIAL LICENSE TRAINING TIME: 15 MINUTES NUMBER NRC 2016-INP02 AND TITLE:

Shift Turbine Driven Auxiliary Feed Pump Suction REVISION: 0 to ESW Created from RO-O-AEO-E250 Examinees Name: _____________________________________________________________

Evaluators Name: _____________________________________________________________

Date Performed: _______________________________________________________________

Result (Circle One): SAT / UNSAT Number of Attempts: ___________________________________________________________

Time to Complete: _____________________________________________________________

Comments: ________________________________________________________________

Revision: 1 NRC 2016-INP02 Shift Turbine Driven Auxiliary Feed Pump Suction to ESW NRC 2016-INP02.doc Page 1 of 7

OPERATIONS JPM REFERENCES Procedures:

1-OHP-4022-055-003 LOSS OF CONDENSATE TO AUXILIARY FEEDWATER PUMPS Miscellaneous

References:

TRAINING AIDS/TOOLS/EQUIPMENT NRC KA APE.054.AA1.01 Ability to operate and / or monitor the following as they apply to the Loss of Main Feedwater: AFW controls, including the use of alternate AFW sources RO/SRO Importance 4.5/4.4 TASKS LOCAOP0150401 Perform local actions to align ESW to supply AFW pump suction during a loss of condensate to auxiliary feedwater pumps OBJECTIVES*

JPM-0560230404 Shift Auxiliary Feed Pump Suction to ESW (Unit 1 TDAFWP)

Revision: 1 NRC 2016-INP02 Shift Turbine Driven Auxiliary Feed Pump Suction to ESW NRC 2016-INP02.doc Page 2 of 7

OPERATIONS JPM HANDOUTS:

Copy of procedure 1-OHP-4022-055-003, Loss of Condensate to Auxiliary Feedwater, Step 13 ATTACHMENTS:

None EVALUATION SETTINGS:

In plant EVALUATION METHOD: PERFORM: SIMULATE:

EVALUATOR INSTRUCTIONS Give copy of Task Briefing to examinee.

TASK BRIEFING:

You are an extra operator.

The Shift Manager directs you to locally align ESW to the Unit 1 Turbine Driven Auxiliary Feed pump to prepare for a Control Room pump start in accordance with Step 13 of 1-OHP-4022-055-003, Loss of Condensate to Auxiliary Feedwater pumps.

1-WMO-753, ESW supply to TDAFW, has no power available.

JPM OVERVIEW Examinee will simulate local actions to align ESW to Unit 1 TDAFWP GENERAL STANDARDS/PRECAUTIONS NA Revision: 1 NRC 2016-INP02 Shift Turbine Driven Auxiliary Feed Pump Suction to ESW NRC 2016-INP02.doc Page 3 of 7

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

No actions are expected on this page; page included for evaluator reference.

Note : Briefing Starts operator on Step 13 Revision: 1 NRC 2016-INP02 Shift Turbine Driven Auxiliary Feed Pump Suction to ESW NRC 2016-INP02.doc Page 4 of 7

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

No actions are expected on this page; page included for evaluator reference.

Note Task is to align Turbine Driven AFW Revision: 1 NRC 2016-INP02 Shift Turbine Driven Auxiliary Feed Pump Suction to ESW NRC 2016-INP02.doc Page 5 of 7

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: CS: Operator breaks seal then closes 1-ESW-110 by turning the valve in the clockwise direction.

CUE: You feel movement; you feel resistance.

SAT: UNSAT:

STANDARD: CS: Operator breaks seal then opens 1-ESW-115 by turning the lever 90 degrees.

CUE: You feel movement; you feel resistance.

SAT: UNSAT:

NOTE: If the operator instructs the Control Room to open 1-WMO-753, inform the operator that the breaker for 1-WMO-753 is open and direct local operation STANDARD: CS: Operator pushes de-clutch lever in the direction of the arrow then releases the de-clutch lever. Operator opens 1-WMO-753 (turns hand-wheel Counter-clockwise.)

CUE: You feel movement; you feel resistance. Position indicator moves to the INLINE position.

SAT: UNSAT:

STANDARD: Operator reports ESW is aligned to TDAFWP suction.

CUE: Control room acknowledges that ESW is aligned to the TDAFP suction.

SAT: UNSAT:

Termination Cue: When operator notifies CR of task completion Revision: 1 NRC 2016-INP02 Shift Turbine Driven Auxiliary Feed Pump Suction to ESW NRC 2016-INP02.doc Page 6 of 7

TASK BRIEFING:

You are an extra operator.

The Shift Manager directs you to locally align ESW to the Unit 1 Turbine Driven Auxiliary Feed pump to prepare for a Control Room pump start in accordance with Step 13 of 1-OHP-4022-055-003, Loss of Condensate to Auxiliary Feedwater pumps.

1-WMO-753, ESW supply to TDAFW, has no power available.

Revision: 1 NRC 2016-INP02 Shift Turbine Driven Auxiliary Feed Pump Suction to ESW NRC 2016-INP02.doc Page 7 of 7

OPERATIONS JPM TRAINING PROGRAM TITLE INITIAL LICENSE TRAINING TIME: 20 MINUTES NUMBER NRC 2016-INP03 AND TITLE:

Perform local DG trip and isolation REVISION: 0 Created from AE-O-E277 Examinees Name: _____________________________________________________________

Evaluators Name: _____________________________________________________________

Date Performed: _______________________________________________________________

Result (Circle One): SAT / UNSAT Number of Attempts: ___________________________________________________________

Time to Complete: _____________________________________________________________

Comments: ________________________________________________________________

Revision: 0 NRC 2016-INP03 Perform local DG trip and isolation NRC 2016-INP03.doc Page 1 of 8

OPERATIONS JPM REFERENCES Procedures:

2-OHP-4025-LTI-3 LOCAL DIESEL GENERATOR TRIP AND ISOLATION, Rev. 2, 3/3/2006 Miscellaneous

References:

TRAINING AIDS/TOOLS/EQUIPMENT NRC KA APE.068.AA1.31 Ability to operate and / or monitor the following as they apply to the Control Room Evacuation: (CFR 41.7 / 45.5 / 45.6) :

ED/G RO/SRO Importance 3.9/4.0 TASKS APR0030601 Perform local diesel generator trip and isolation during an Emergency Remote Shutdown OBJECTIVES*

JPM-0320250604 Perform local DG trip and isolation

  • Unless otherwise stated, conditions and standards for objectives are from memory, either orally or in writing, and without error respectively.

Revision: 0 NRC 2016-INP03 Perform local DG trip and isolation NRC 2016-INP03.doc Page 2 of 8

OPERATIONS JPM HANDOUTS:

Task Briefing Copy of 02-OHP-4025-LTI-3, Local Diesel Generator Trip and Isolation Picture of the inside of a 4KV Breaker Control Power (Top) Cubicle Picture of Breaker Mechanical Trip Pushbutton and Flag ATTACHMENTS:

Picture of the inside of a 4KV Breaker Control Power (Top) Cubicle Picture of Breaker Mechanical Trip Pushbutton and Flag EVALUATION SETTINGS:

In plant EVALUATION METHOD: PERFORM: SIMULATE:

SIMULATOR/LAB SETUP NA EVALUATOR INSTRUCTIONS Give copy of the following to examinee:

Task Briefing Copy of 02-OHP-4025-LTI-3, Local Diesel Generator Trip and Isolation TASK BRIEFING:

Following a fire event on Unit 2, the 2AB Diesel Generator started but failed to load.

The US directs you to locally trip and isolate the 2AB Diesel Generator in accordance with 02-OHP-4025-LTI-3-1, DG2AB Local Trip and Isolation.

Fire areas do not interfere with the implementation of this task.

JPM OVERVIEW Perform a local trip and isolation on Unit 2 AB Diesel Generator per 02-OHP-4025-LTI-3, observing applicable precautions and limitations and procedural steps.

GENERAL STANDARDS/PRECAUTIONS None Revision: 0 NRC 2016-INP03 Perform local DG trip and isolation NRC 2016-INP03.doc Page 3 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: CS: Operator (simulates) depressing local EMERGENCY TRIP CUE: 2AB EDG has stopped running SAT: UNSAT:

COMMENT:

NOTE: Operator leaves the 2AB DG room and proceeds to the 4KV Switchgear Room (609 TB) and simulates donning full flash equipment.

Revision: 0 NRC 2016-INP03 Perform local DG trip and isolation NRC 2016-INP03.doc Page 4 of 8

OPERATIONS JPM EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

EVALUATOR NOTE: Use attached picture (Inside of a 4KV Breaker Control Power (Top) Cubicle) to evaluate operators ability to locate control power fuses. Fuses are located in the lower right part of the picture CUE: GREEN light ON before removing fuse(s)

STANDARD: CS: Operator locates T21A11 breaker and (simulates) removes control power fuses CUE: GREEN lights OFF on front of breaker panel SAT: UNSAT:

STANDARD: Operator verifies breaker T21A11 tripped CUE: Provide attached picture of Breaker Mechanical Trip Pushbutton and Flag (green OPEN flag is showing).

SAT: UNSAT:

CUE: GREEN light ON before removing fuse(s)

STANDARD: CS: Operator locates T21B4 breaker and (simulates) removes control power fuses CUE: GREEN lights OFF on front of breaker panel SAT: UNSAT:

STANDARD: Operator verifies breaker T21B4 tripped CUE: Provide attached picture of Breaker Mechanical Trip Pushbutton and Flag (green OPEN flag is showing).

SAT: UNSAT:

STANDARD: Operator reports completion of LTI-3 SAT: UNSAT:

Termination Cue: When operator reports completion of 2-OHP-4025-LTI-3-1 Revision: 0 NRC 2016-INP03 Perform local DG trip and isolation NRC 2016-INP03.doc Page 5 of 8

OPERATIONS JPM Revision: 0 NRC 2016-INP03 Perform local DG trip and isolation NRC 2016-INP03.doc Page 6 of 8

Revision: 0 NRC 2016-INP03 Perform local DG trip and isolation NRC 2016-INP03.doc Page 7 of 8

TASK BRIEFING:

Following a fire event on Unit 2, the 2AB Diesel Generator started but failed to load.

The US directs you to locally trip and isolate the 2AB Diesel Generator in accordance with 02-OHP-4025-LTI-3-1, DG2AB Local Trip and Isolation.

Fire areas do not interfere with the implementation of this task.

Revision: 0 NRC 2016-INP03 Perform local DG trip and isolation NRC 2016-INP03.doc Page 8 of 8