|
|
Line 35: |
Line 35: |
| OR A.3 --------------NOTE------------- | | OR A.3 --------------NOTE------------- |
| Not applicable in MODES 4 and 5. | | Not applicable in MODES 4 and 5. |
| -----------------------------------
| |
| Initiate action to increase Immediately all RCS cold leg temperatures to 500°F. | | Initiate action to increase Immediately all RCS cold leg temperatures to 500°F. |
| Wolf Creek - Unit 1 3.1-21 Amendment No. | | Wolf Creek - Unit 1 3.1-21 Amendment No. |
Line 51: |
Line 50: |
| CONDITION REQUIRED ACTION COMPLETION TIME V. One channel inoperable. ---------------------NOTE------------------- | | CONDITION REQUIRED ACTION COMPLETION TIME V. One channel inoperable. ---------------------NOTE------------------- |
| The inoperable channel may be bypassed for up to 12 hours for surveillance testing of other channels. | | The inoperable channel may be bypassed for up to 12 hours for surveillance testing of other channels. |
| ------------------------------------------------
| |
| V.1 Place channel in trip. 72 hours OR V.2.1 Be in MODE 2 with 78 hours keff < 1.0. | | V.1 Place channel in trip. 72 hours OR V.2.1 Be in MODE 2 with 78 hours keff < 1.0. |
| AND V.2.2.1 Initiate action to fully insert 78 hours all rods. | | AND V.2.2.1 Initiate action to fully insert 78 hours all rods. |
Line 62: |
Line 60: |
| CONDITION REQUIRED ACTION COMPLETION TIME W. One channel inoperable. ---------------------NOTE------------------- | | CONDITION REQUIRED ACTION COMPLETION TIME W. One channel inoperable. ---------------------NOTE------------------- |
| The inoperable channel may be bypassed for up to 12 hours for surveillance testing of other channels. | | The inoperable channel may be bypassed for up to 12 hours for surveillance testing of other channels. |
| ------------------------------------------------
| |
| W.1 Place channel in trip. 72 hours X. Required Action and X.1.1 Initiate action to fully insert Immediately associated Completion all rods. | | W.1 Place channel in trip. 72 hours X. Required Action and X.1.1 Initiate action to fully insert Immediately associated Completion all rods. |
| Time of Condition W not met. AND OR X.1.2 Initiate action to place the Immediately Rod Control System in a Two or more channels condition incapable of rod inoperable. withdrawal. | | Time of Condition W not met. AND OR X.1.2 Initiate action to place the Immediately Rod Control System in a Two or more channels condition incapable of rod inoperable. withdrawal. |
Line 69: |
Line 66: |
| ----------------------------------------------------------NOTE--------------------------------------------------------------- | | ----------------------------------------------------------NOTE--------------------------------------------------------------- |
| Refer to Table 3.3.1-1 to determine which SRs apply for each RTS Function. | | Refer to Table 3.3.1-1 to determine which SRs apply for each RTS Function. |
| ---------------------------------------------------------------------------------------------------------------------------------
| |
| SURVEILLANCE FREQUENCY SR 3.3.1.1 Perform CHANNEL CHECK. 12 hours (continued) | | SURVEILLANCE FREQUENCY SR 3.3.1.1 Perform CHANNEL CHECK. 12 hours (continued) |
| Wolf Creek - Unit 1 3.3-11 Amendment No. 123, | | Wolf Creek - Unit 1 3.3-11 Amendment No. 123, |
Line 119: |
Line 115: |
| : a. THERMAL POWER ramp > 5% RTP per minute; or | | : a. THERMAL POWER ramp > 5% RTP per minute; or |
| : b. THERMAL POWER step > 10% RTP. | | : b. THERMAL POWER step > 10% RTP. |
| ---------------------------------------------------------------------------------------------------
| |
| ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. --------------NOTE------------- A.1 Restore RCS DNB 2 hours Not applicable to RCS total parameter(s) to within flow rate. limit. | | ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. --------------NOTE------------- A.1 Restore RCS DNB 2 hours Not applicable to RCS total parameter(s) to within flow rate. limit. |
| ------------------------------------
| |
| One or more RCS DNB parameters not within limits. | | One or more RCS DNB parameters not within limits. |
| (continued) | | (continued) |
Line 131: |
Line 125: |
| SR 3.4.1.4 ----------------------------NOTE----------------------------------- | | SR 3.4.1.4 ----------------------------NOTE----------------------------------- |
| Not required to be performed until 7 days after 95% RTP. | | Not required to be performed until 7 days after 95% RTP. |
| -----------------------------------------------------------------------
| |
| Verify by precision heat balance that RCS total flow 18 months rate is 361,200 gpm and greater than or equal to the limit specified in the COLR. | | Verify by precision heat balance that RCS total flow 18 months rate is 361,200 gpm and greater than or equal to the limit specified in the COLR. |
| Wolf Creek - Unit 1 3.4-4 Amendment No. 123, 144, | | Wolf Creek - Unit 1 3.4-4 Amendment No. 123, 144, |
|
---|
Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24068A1992024-03-0707 March 2024 Changes to Technical Specification Bases - Revisions 93 and 94 ML24018A2482024-01-18018 January 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 238 ML23331A4972023-11-27027 November 2023 Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23171B1312023-06-20020 June 2023 Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ET 23-0003, License Amendment Request (LAR) for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications2023-03-0101 March 2023 License Amendment Request (LAR) for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ML23045A1952023-02-14014 February 2023 Transmittal of the National Pollution Discharge Elimination System Permit Renewal Application for Wolf Creek Generating Station I-NE07-PO02 ET 23-0002, Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2023-02-0707 February 2023 Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML22353A5552022-12-15015 December 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements ET 22-0006, Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2022-12-0101 December 2022 Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ET 22-0010, License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements2022-08-0202 August 2022 License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ET 22-0001, Removal of the Table of Contents from the Technical Specifications2022-01-12012 January 2022 Removal of the Table of Contents from the Technical Specifications ET 21-0004, License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2021-09-29029 September 2021 License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 21-0005, Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-1912021-08-12012 August 2021 Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-191 WO 21-0015, License Amendment Request (LAR) for Revision to the Emergency Plan2021-05-25025 May 2021 License Amendment Request (LAR) for Revision to the Emergency Plan WM 21-0005, Supplement to License Amendment Request for Change to Owner Licensee Names2021-05-24024 May 2021 Supplement to License Amendment Request for Change to Owner Licensee Names ML21070A0582021-03-11011 March 2021 Changes to Technical Specification Bases - Revisions 82, 83, 84, and 85 WO 20-0050, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange2020-11-10010 November 2020 License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange WM 20-0006, (WCGS) - License Amendment Request for Change to Owner Licensee Names2020-11-0404 November 2020 (WCGS) - License Amendment Request for Change to Owner Licensee Names ET 20-0007, License Amendment Request for Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers2020-06-0808 June 2020 License Amendment Request for Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers ET 20-0004, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2020-04-27027 April 2020 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) WO 20-0029, License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2020-04-20020 April 2020 License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies WO 19-0033, License Amendment Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System2019-08-29029 August 2019 License Amendment Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System WO 19-0031, Supplement 1 to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 42019-08-0808 August 2019 Supplement 1 to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 ML19052A5462019-04-0101 April 2019 Issuance of Amendment No. 220 Revision to the Emergency Plan ET 19-0002, License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-03-18018 March 2019 License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ET 19-0003, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Remove Use of a Blind Flange2019-02-25025 February 2019 License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Remove Use of a Blind Flange ET 19-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 42019-01-23023 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 WO 18-0044, Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-11-15015 November 2018 Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term WO 18-0034, Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-08-0909 August 2018 Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term WO 18-0016, License Amendment Request for Revision to the Emergency Plan2018-05-0909 May 2018 License Amendment Request for Revision to the Emergency Plan ML18135A1462018-05-0909 May 2018 Attachments I to V: Evaluation of Proposed Changes, Emergency Plan Change Summary, ERO Position Matrix, Summary of Shift Staffing and Letter of Consultation and Concurrence from Off-Site Response Organizations Ack of Opportunity ET 18-0007, Supplement to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System.2018-02-15015 February 2018 Supplement to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System. ML17363A1422017-12-19019 December 2017 License Amendment Request (LAR) for Revision to the Emergency Plan (Attachments and Enclosures) WM 17-0021, Updated Request for Consent to Indirect Transfer of Control2017-09-0505 September 2017 Updated Request for Consent to Indirect Transfer of Control WO 17-0026, Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses2017-03-22022 March 2017 Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses ET 17-0001, License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses, Enclosure 10 - CAW-16-45002017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses, Enclosure 10 - CAW-16-4500 ML17054C2232017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Proposed COLR Changes ML17054C2302017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - A-3788, Technical Report, Appendix a, Fission Product Removal Effectiveness of Chemical Additives in PWR Containment Sprays ML17054C2332017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - CAW-92-287 ML17054C2202017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Proposed Technical Specification Changes ML17054C2322017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - OG-92-25, Steam Generator Tube Uncovery Issue ML17054C2212017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Revised Technical Specification Pages ML17054C2292017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Responses to NRC RAIs on August 2013 Methodology Transition LAR Submittal ML17054C2222017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Proposed Technical Specification Bases Changes ML17054C2262017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - WCAP-18083-NP, Rev 0, Westinghouse Revised Thermal Design Procedure Uncertainty Calculations. ML17054C2352017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - WOG-93-066 2024-09-17
[Table view] Category:Technical Specification
MONTHYEARML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24068A1992024-03-0707 March 2024 Changes to Technical Specification Bases - Revisions 93 and 94 ML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23068A1232023-03-0909 March 2023 Changes to Technical Specification Bases – Revisions 91 and 92 ET 23-0002, Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2023-02-0707 February 2023 Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML22353A5552022-12-15015 December 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements ET 22-0006, Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2022-12-0101 December 2022 Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ET 22-0012, Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-07-12012 July 2022 Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ML22067A0302022-03-0808 March 2022 Changes to Technical Specification Bases - Revisions 86, 87, 88, 89, and 90 ML21070A0582021-03-11011 March 2021 Changes to Technical Specification Bases - Revisions 82, 83, 84, and 85 WO 20-0050, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange2020-11-10010 November 2020 License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange ET 20-0004, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2020-04-27027 April 2020 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) WO 20-0029, License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2020-04-20020 April 2020 License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML20070L9822020-03-0202 March 2020 Changes to Technical Specification Bases - Revisions 80 and 81 ET 19-0002, License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-03-18018 March 2019 License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ML19078A1302019-03-11011 March 2019 Changes to Technical Specification Bases - Revisions 78 and 79 WO 19-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 42019-03-11011 March 2019 Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 WO 18-0044, Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-11-15015 November 2018 Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ML18075A0242018-03-0808 March 2018 Changes to Technical Specification Bases - Revisions 76 and 77 WO 18-0004, Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ...2018-01-15015 January 2018 Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ... ML17073A0932017-03-0909 March 2017 Changes to Technical Specification Bases - Revisions 74 and 75 ML17054C2212017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Revised Technical Specification Pages ML17054C2222017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Proposed Technical Specification Bases Changes ML17054C2202017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Proposed Technical Specification Changes ML16076A3572016-03-10010 March 2016 Changes to Technical Specification Bases - Revisions 67 Through 73 WO 15-0051, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10 and 3.8.1.142015-09-23023 September 2015 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10 and 3.8.1.14 ML15077A0662015-03-11011 March 2015 Changes to Technical Specification Bases, Revisions 61 Through 66 WO 14-0092, Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2014-12-15015 December 2014 Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report ET 13-0028, Application to Revise Technical Specifications to Replace a Methodology to TS 5.6.5, Core Operating Limits Report.2013-09-23023 September 2013 Application to Revise Technical Specifications to Replace a Methodology to TS 5.6.5, Core Operating Limits Report. ET 13-0023, License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis2013-08-13013 August 2013 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis ML13079A0602013-03-0808 March 2013 Changes to Technical Specification Bases - Revisions 55 and 56 ML12080A2162012-03-12012 March 2012 Changes to Technical Specification Bases - Revisions 50 Through 54 WO 11-0086, Application to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating2011-11-30030 November 2011 Application to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating ML1107500362011-03-10010 March 2011 Changes to Technical Specification Bases - Revisions 45 Through 49 ML1007801282010-03-11011 March 2010 Changes to Technical Specification Bases - Revisions 41 Through 44 ML1006401412010-03-0404 March 2010 Supplemental Information for Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps ET 10-0011, Supplemental Information for Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps2010-03-0404 March 2010 Supplemental Information for Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps ML1006400442010-03-0303 March 2010 Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps ET 09-0025, Revision to Technical Specification (TS) 5.5.9, Steam Generator (SG) Program, and TS 5.6.10, Steam Generator Tube Inspection Report2009-09-15015 September 2009 Revision to Technical Specification (TS) 5.5.9, Steam Generator (SG) Program, and TS 5.6.10, Steam Generator Tube Inspection Report WO 09-0022, Request for Approval of Changes to the Technical Specification 3.8.1, AC Sources - Operating, Bases2009-09-0303 September 2009 Request for Approval of Changes to the Technical Specification 3.8.1, AC Sources - Operating, Bases ML0907506242009-03-11011 March 2009 Submittal of Changes to Technical Specification Bases - Revisions 36 Through 40 WO 08-0019, Application to Revise Technical Specification 3.5.2, ECCS-Operating, in Accordance with TSTF-325-A2008-08-18018 August 2008 Application to Revise Technical Specification 3.5.2, ECCS-Operating, in Accordance with TSTF-325-A ET 08-0041, Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation.2008-08-14014 August 2008 Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation. ML0811201492008-04-29029 April 2008 Corrected Technical Specification Pages, Amendment No. 177 Revision to Technical Specification 3.7.3, Main Feedwater Isolation Valves, to Add Main Feedwater Regulating Valves and MFRV Bypass Valves ML0807805602008-03-0707 March 2008 Changes to Technical Specification Bases - Revisions 32 Through 35 ML0804501852008-02-28028 February 2008 Withdrawal of License Amendment Request on Steam Generator Tube Inspections WO 08-0001, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2008-01-15015 January 2008 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0707402282007-03-0909 March 2007 Changes to Technical Specification Bases - Revisions 24 Through 31 ML0631905352006-11-15015 November 2006 Tech Spec Pages for Issuance of License Amendment 172 Regarding Revision to Technical Specification 5.5.8 on the Inservice Testing Program 2024-08-14
[Table view] Category:Bases Change
MONTHYEARML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24068A1992024-03-0707 March 2024 Changes to Technical Specification Bases - Revisions 93 and 94 ML23068A1232023-03-0909 March 2023 Changes to Technical Specification Bases – Revisions 91 and 92 ET 22-0006, Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2022-12-0101 December 2022 Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ET 22-0012, Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-07-12012 July 2022 Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ML22067A0302022-03-0808 March 2022 Changes to Technical Specification Bases - Revisions 86, 87, 88, 89, and 90 ML21070A0582021-03-11011 March 2021 Changes to Technical Specification Bases - Revisions 82, 83, 84, and 85 WO 20-0050, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange2020-11-10010 November 2020 License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange ET 20-0004, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2020-04-27027 April 2020 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) WO 20-0029, License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2020-04-20020 April 2020 License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML20070L9822020-03-0202 March 2020 Changes to Technical Specification Bases - Revisions 80 and 81 ET 19-0002, License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-03-18018 March 2019 License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ML19078A1302019-03-11011 March 2019 Changes to Technical Specification Bases - Revisions 78 and 79 WO 19-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 42019-03-11011 March 2019 Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 WO 18-0044, Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-11-15015 November 2018 Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ML18075A0242018-03-0808 March 2018 Changes to Technical Specification Bases - Revisions 76 and 77 ML17073A0932017-03-0909 March 2017 Changes to Technical Specification Bases - Revisions 74 and 75 ML17054C2212017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Revised Technical Specification Pages ML17054C2222017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Proposed Technical Specification Bases Changes ML17054C2202017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Proposed Technical Specification Changes WO 15-0051, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10 and 3.8.1.142015-09-23023 September 2015 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10 and 3.8.1.14 ML15077A0662015-03-11011 March 2015 Changes to Technical Specification Bases, Revisions 61 Through 66 WO 14-0092, Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2014-12-15015 December 2014 Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report ET 13-0028, Application to Revise Technical Specifications to Replace a Methodology to TS 5.6.5, Core Operating Limits Report.2013-09-23023 September 2013 Application to Revise Technical Specifications to Replace a Methodology to TS 5.6.5, Core Operating Limits Report. ET 13-0023, License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis2013-08-13013 August 2013 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis ML13079A0602013-03-0808 March 2013 Changes to Technical Specification Bases - Revisions 55 and 56 ML12080A2162012-03-12012 March 2012 Changes to Technical Specification Bases - Revisions 50 Through 54 ML1107500362011-03-10010 March 2011 Changes to Technical Specification Bases - Revisions 45 Through 49 ML1007801282010-03-11011 March 2010 Changes to Technical Specification Bases - Revisions 41 Through 44 ET 10-0011, Supplemental Information for Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps2010-03-0404 March 2010 Supplemental Information for Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps ML1006401412010-03-0404 March 2010 Supplemental Information for Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps ML1006400442010-03-0303 March 2010 Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps WO 09-0022, Request for Approval of Changes to the Technical Specification 3.8.1, AC Sources - Operating, Bases2009-09-0303 September 2009 Request for Approval of Changes to the Technical Specification 3.8.1, AC Sources - Operating, Bases ML0907506242009-03-11011 March 2009 Submittal of Changes to Technical Specification Bases - Revisions 36 Through 40 ET 08-0041, Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation.2008-08-14014 August 2008 Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation. ML0807805602008-03-0707 March 2008 Changes to Technical Specification Bases - Revisions 32 Through 35 ML0707402282007-03-0909 March 2007 Changes to Technical Specification Bases - Revisions 24 Through 31 WM 06-0033, Revision to Technical Specification (TS) 3.7.2, Main Steam Isolation Valves (Msivs), and TS 3.7.3, Main Feedwater Isolation Valves (Mfivs).2006-08-25025 August 2006 Revision to Technical Specification (TS) 3.7.2, Main Steam Isolation Valves (Msivs), and TS 3.7.3, Main Feedwater Isolation Valves (Mfivs). ML0607602412006-03-0808 March 2006 Changes to Technical Specification Bases - Revisions 20 Through 23 ML0531401852005-11-0303 November 2005 Application for Technical Specification Improvement Re Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process ET 05-0007, Request for Approval of Changes to the Reactor Coolant System Leakage Detection Instrumentation Methodology2005-08-26026 August 2005 Request for Approval of Changes to the Reactor Coolant System Leakage Detection Instrumentation Methodology ML0507704152005-03-10010 March 2005 Changes to Technical Specification Bases - Revisions 17 Through 19 WO 04-0013, Supporting Information for the Revision to Technical Specifications 3.8.1, AC Sources - Operating, and 3.8.4, DC Sources - Operating.2004-04-13013 April 2004 Supporting Information for the Revision to Technical Specifications 3.8.1, AC Sources - Operating, and 3.8.4, DC Sources - Operating. ML0407807542004-03-11011 March 2004 Changes to Technical Specifications Bases - Revisions 14-16 WO 03-0059, Application for Amendment for Revision to Technical Specification 3.3.1, Reactor Trip System Instrumentation, and Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation (Common Stars License Amendment.)2003-12-15015 December 2003 Application for Amendment for Revision to Technical Specification 3.3.1, Reactor Trip System Instrumentation, and Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation (Common Stars License Amendment.) ML0307801372003-03-10010 March 2003 Docket 50-482: Wolf Creek Generating Station Changes to TS Bases - Revisions 9 Through 13 ET 02-0033, Revision to Technical Specification 3.1.6, Physics Tests Exceptions - Mode 2.2002-10-0101 October 2002 Revision to Technical Specification 3.1.6, Physics Tests Exceptions - Mode 2. ET 02-0015, Changes to Technical Specification Bases - Revisions 6 Through 82002-03-0101 March 2002 Changes to Technical Specification Bases - Revisions 6 Through 8 2024-08-14
[Table view] |
Text
SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs In MODES 1 and 2, the combination of THERMAL POWER, Reactor Coolant System (RCS) highest loop average temperature, and pressurizer pressure shall not exceed the limits specified in the COLR; and the following SLs shall not be exceeded:
2.1.1.1 The departure from nucleate boiling ratio (DNBR) shall be maintained 1.17 for the WRB-2 DNB correlation, and 1.13 for the ABB-NV DNB correlation, and 1.18 for the WLOP DNB.
2.1.1.2 The peak centerline temperature shall be maintained 5080 °F, decreasing by 58 °F per 10,000 MWD/MTU of burnup.
2.1.2 RCS Pressure SL In MODES 1, 2, 3, 4, and 5, the RCS pressure shall be maintained 2735 psig.
2.2 SL Violations 2.2.1 If SL 2.1.1 is violated, restore compliance and be in MODE 3 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
2.2.2 If SL 2.1.2 is violated:
2.2.2.1 In MODE 1 or 2, restore compliance and be in MODE 3 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
2.2.2.2 In MODE 3, 4, or 5, restore compliance within 5 minutes.
Wolf Creek - Unit 1 2.0-1 Amendment No. 123, 144,
RCS Boron Limitations < 500°F 3.1.9 3.1 REACTIVITY CONTROL SYSTEMS 3.1.9 RCS Boron Limitations < 500°F LCO 3.1.9 The boron concentration of the Reactor Coolant System (RCS) shall be greater than the all rods out (ARO) critical boron concentration.
APPLICABILITY: MODE 2 with keff < 1.0 with any RCS cold leg temperature < 500°F and with Rod Control System capable of rod withdrawal, MODE 3 with any RCS cold leg temperature < 500°F and with Rod Control System capable of rod withdrawal, MODES 4 and 5 with Rod Control System capable of rod withdrawal.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. RCS boron concentration A.1 Initiate boration to restore Immediately not within limit. RCS boron concentration to within limit.
OR A.2 Initiate action to place the Immediately Rod Control System in a condition incapable of rod withdrawal.
OR A.3 --------------NOTE-------------
Not applicable in MODES 4 and 5.
Initiate action to increase Immediately all RCS cold leg temperatures to 500°F.
Wolf Creek - Unit 1 3.1-21 Amendment No.
RCS Boron Limitations < 500°F 3.1.9 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.9.1 Verify RCS boron concentration is greater than the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ARO critical boron concentration.
Wolf Creek - Unit 1 3.1-22 Amendment No.
RTS Instrumentation 3.3.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME T. One or more required T.1 Verify interlock is in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> channel(s) or train required state for existing inoperable. unit conditions.
OR T.2 Be in MODE 2. 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> U. One trip mechanism U.1 Restore inoperable trip 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> inoperable for one RTB. mechanism to OPERABLE status.
OR U.2 Be in MODE 3. 54 hours6.25e-4 days <br />0.015 hours <br />8.928571e-5 weeks <br />2.0547e-5 months <br /> (continued)
Wolf Creek - Unit 1 3.3-9 Amendment No. 123,
RTS Instrumentation 3.3.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME V. One channel inoperable. ---------------------NOTE-------------------
The inoperable channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing of other channels.
V.1 Place channel in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OR V.2.1 Be in MODE 2 with 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> keff < 1.0.
AND V.2.2.1 Initiate action to fully insert 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> all rods.
AND V.2.2.2 Initiate action to place the 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> Rod Control System in a condition incapable of rod withdrawal.
OR V.2.3 Initiate action to borate the 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> RCS to greater than all rods out (ARO) critical boron concentration.
(continued)
Wolf Creek - Unit 1 3.3-10 Amendment No.
RTS Instrumentation 3.3.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME W. One channel inoperable. ---------------------NOTE-------------------
The inoperable channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing of other channels.
W.1 Place channel in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> X. Required Action and X.1.1 Initiate action to fully insert Immediately associated Completion all rods.
Time of Condition W not met. AND OR X.1.2 Initiate action to place the Immediately Rod Control System in a Two or more channels condition incapable of rod inoperable. withdrawal.
OR X.2 Initiate action to borate the Immediately RCS to greater than all rods out (ARO) critical boron concentration.
SURVEILLANCE REQUIREMENTS
NOTE---------------------------------------------------------------
Refer to Table 3.3.1-1 to determine which SRs apply for each RTS Function.
SURVEILLANCE FREQUENCY SR 3.3.1.1 Perform CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)
Wolf Creek - Unit 1 3.3-11 Amendment No. 123,
RTS Instrumentation 3.3.1 Table 3.3.1-1 (page 1 of 6)
Reactor Trip System Instrumentation APPLICABLE MODES OR OTHER SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS CHANNELS CONDITIONS REQUIREMENTS VALUE (a)
- 1. Manual Reactor Trip 1,2 2 B SR 3.3.1.14 NA 3(b), 4(b), 5(b) 2 C SR 3.3.1.14 NA
- 2. Power Range Neutron Flux
- a. High 1,2 4 D SR 3.3.1.1 112.3% RTP SR 3.3.1.2 SR 3.3.1.7 SR 3.3.1.11 SR 3.3.1.16
- b. Low 1(c), 2(f) 4 V SR 3.3.1.1 28.3% RTP SR 3.3.1.8 SR 3.3.1.11 SR 3.3.1.16 4 W, X SR 3.3.1.1 2(h), 3(i) 28.3% RTP SR 3.3.1.8 SR 3.3.1.11 SR 3.3.1.16
- 3. Power Range Neutron Flux Rate
- a. High Positive Rate 1,2 4 E SR 3.3.1.7 6.3% RTP SR 3.3.1.11 with time SR 3.3.1.16 constant 2 sec
- b. High Negative 1,2 4 E SR 3.3.1.7 6.3% RTP with Rate SR 3.3.1.11 time constant SR 3.3.1.16 2 sec
- 4. Intermediate Range 1(c), 2(d) 2 F,G SR 3.3.1.1 35.3% RTP Neutron Flux SR 3.3.1.8 SR 3.3.1.11 (continued)
(a) The Allowable Value defines the Limiting Safety System Setting. See the Bases for the Trip Setpoints.
(b) With Rod Control System capable of rod withdrawal or one or more rods not fully inserted.
(c) Below the P-10 (Power Range Neutron Flux) interlock.
(d) Above the P-6 (Intermediate Range Neutron Flux) interlock.
(e) Below the P-6 (Intermediate Range Neutron Flux) interlock.
(f) With Keff 1.0.
(h) With Keff < 1.0, and all RCS cold leg temperatures 500°F, and RCS boron concentration the all rods out (ARO) critical boron concentration, and Rod Control System capable of rod withdrawal or one or more rods not fully inserted.
(i) With all RCS cold leg temperatures 500°F, and RCS boron concentration the ARO critical boron concentration, and Rod Control System capable of rod withdrawal or one or more rods not fully inserted.
Wolf Creek - Unit 1 3.3-17 Amendment No. 123, 131, 132, 165,
RTS Instrumentation 3.3.1 Table 3.3.1-1 (page 2 of 6)
Reactor Trip System Instrumentation APPLICABLE MODES OR OTHER SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS CHANNELS CONDITIONS REQUIREMENTS VALUE (a)
- 5. Source Range Neutron 2(e) 2 I,J SR 3.3.1.1 1.6 E5 cps Flux SR 3.3.1.8 SR 3.3.1.11 3(b), 4(b), 5(b) 2 J,K SR 3.3.1.1 1.6 E5 cps SR 3.3.1.7 SR 3.3.1.11
- 6. Overtemperature T 1,2 4 E SR 3.3.1.1 Refer to Note 1 SR 3.3.1.3 (Page 3.3-19)
SR 3.3.1.6 SR 3.3.1.7 SR 3.3.1.10 SR 3.3.1.16
- 7. Overpower T 1,2 4 E SR 3.3.1.1 Refer to SR 3.3.1.7 Note 2 SR 3.3.1.10 (Page SR 3.3.1.16 3.3-20)
- 8. Pressurizer Pressure
- a. Low 1(g) 4 M SR 3.3.1.1 1930 psig SR 3.3.1.7 SR 3.3.1.10 SR 3.3.1.16
- b. High 1,2 4 E SR 3.3.1.1 2395 psig SR 3.3.1.7 SR 3.3.1.10 SR 3.3.1.16
- 9. Pressurizer Water 1(g) 3 M SR 3.3.1.1 93.9% of Level - High SR 3.3.1.7 instrument span SR 3.3.1.10
- 10. Reactor Coolant Flow - 1(g) 3 per loop M SR 3.3.1.1 88.9% of Low SR 3.3.1.7 normalized flow SR 3.3.1.10 SR 3.3.1.16 (continued)
(a) The Allowable Value defines the Limiting Safety System Setting. See the Bases for the Trip Setpoints.
(b) With Rod Control System capable of rod withdrawal or one or more rods not fully inserted.
(e) Below the P-6 (Intermediate Range Neutron Flux) interlock.
(g) Above the P-7 (Low Power Reactor Trips Block) interlock.
Wolf Creek - Unit 1 3.3-18 Amendment No. 123, 140,
RCS Pressure, Temperature and Flow DNB Limits 3.4.1 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.1 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits LCO 3.4.1 RCS DNB parameters for pressurizer pressure, RCS average temperature, and RCS total flow rate shall be within the limits specified below:
- a. Pressurizer pressure is greater than or equal to the limit specified in the COLR;
- b. RCS average temperature is less than or equal to the limit specified in the COLR; and
- c. RCS total flow rate 361,200 gpm and greater than or equal to the limit specified in the COLR.
APPLICABILITY: MODE 1.
NOTE-----------------------------------------------
Pressurizer pressure limit does not apply during :
- a. THERMAL POWER ramp > 5% RTP per minute; or
- b. THERMAL POWER step > 10% RTP.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. --------------NOTE------------- A.1 Restore RCS DNB 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Not applicable to RCS total parameter(s) to within flow rate. limit.
One or more RCS DNB parameters not within limits.
(continued)
Wolf Creek - Unit 1 3.4-1 Amendment No. 123, 144,
RCS Pressure, Temperature and Flow DNB Limits 3.4.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.4.1.2 Verify RCS average temperature is less than or equal 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to the limit specified in the COLR.
SR 3.4.1.3 Verify RCS total flow rate is 361,200 gpm and 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> greater than or equal to the limit specified in the COLR.
SR 3.4.1.4 ----------------------------NOTE-----------------------------------
Not required to be performed until 7 days after 95% RTP.
Verify by precision heat balance that RCS total flow 18 months rate is 361,200 gpm and greater than or equal to the limit specified in the COLR.
Wolf Creek - Unit 1 3.4-4 Amendment No. 123, 144,
MSSVs 3.7.1 Table 3.7.1-1 (page 1 of 1)
OPERABLE Main Steam Safety Valves versus Maximum Allowable Power NUMBER OF OPERABLE MSSVs PER MAXIMUM ALLOWABLE POWER STEAM GENERATOR (% RTP) 4 70 3 51 2 31 Wolf Creek - Unit 1 3.7-3 Amendment No. 123,
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR)
- a. Core operating limits shall be established prior to each reload cycle, or prior to any remaining portion of a reload cycle, and shall be documented in the COLR for the following:
- 1. Specification 3.1.3: Moderator Temperature Coefficient (MTC),
- 2. Specification 3.1.5: Shutdown Bank Insertion Limits,
- 3. Specification 3.1.6: Control Bank Insertion Limits,
- 4. Specification 3.2.3: Axial Flux Difference,
- 5. Specification 3.2.1: Heat Flux Hot Channel Factor, FQ(Z),
- 6. Specification 3.2.2: Nuclear Enthalpy Rise Hot Channel Factor (FNH),
- 7. Specification 3.9.1: Boron Concentration,
- 8. SHUTDOWN MARGIN for Specification 3.1.1 and 3.1.4, 3.1.5, 3.1.6, and 3.1.8,
- 9. Specification 3.3.1: Overtemperature T and Overpower T Trip Setpoints,
- 10. Specification 3.4.1: Reactor Coolant System pressure, temperature, and flow DNB limits, and
- 11. Specification 2.1.1: Reactor Core Safety Limits.
- b. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
- 1. WCAP-11397-P-A, Revised Thermal Design Procedure.
- 2. WCAP-10216-P-A, Relaxation of Constant Axial Offset Control -
FQ Surveillance Technical Specification.
- 3. WCAP-9272-P-A, Westinghouse Reload Safety Evaluation Methodology.
(continued)
Wolf Creek - Unit 1 5.0-25 Amendment No. 123, 142, 144, 158, 159, 164, 179,
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)
- 4. WCAP-16009-P-A, Realistic Large Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM).
- 5. WCAP-16045-P-A, Qualification of the Two-Dimensional Transport Code PARAGON.
- 6. WCAP-16045-P-A, Addendum 1-A, Qualification of the NEXUS Nuclear Data Methodology.
- 7. WCAP 10965-P-A, ANC: A Westinghouse Advanced Nodal Computer Code.
- 8. WCAP-12610-P-A, VANTAGE+ Fuel Assembly Reference Core Report.
- 9. WCAP-8745-P-A, Design Bases for the Thermal Power T and Thermal Overtemperature T Trip Functions.
- c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
- d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.
(continued)
Wolf Creek - Unit 1 5.0-26 Amendment No. 123, 142, 144, 158, 164, 179, 209, 213,